| issue date = 08/28/2017
| issue date = 08/28/2017
| title = Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005)
| title = Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005)
| author name = Kozal J W
| author name = Kozal J
| author affiliation = NRC/RGN-IV/DRP
| author affiliation = NRC/RGN-IV/DRP
| addressee name = Dent J
| addressee name = Dent J
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:August 28. 2017 Mr. John Dent, Jr. Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321
{{#Wiki_filter:==SUBJECT:==
UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)


SUBJECT: UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)
==Dear Mr. Dent:==
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.


==Dear Mr. Dent:==
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact me at 817-200-1144 with any questions you have regarding this letter.
 
Please contact me at 817-200-1144 with any questions you have regarding this letter.


Sincerely,/RA/ Jason Kozal, Chief Division of Reactor Projects Docket No. 50-298 License No. DPR-46
Sincerely,
/RA/
Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION


===Enclosure:===
==REGION IV==
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Docket No. 50-298 License No. DPR-46 Enclosure:
Inspection Plan for Cooper Nuclear Station  
Inspection Plan for Cooper Nuclear Station  


SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE /RA/ DATE 8/28/17 Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCooperInspection / Activity Plan07/01/2017-06/30/2019Page 1 of 208/25/2017 08:18:35ISFSI-LOADING INSPECTION11 IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants60855.107/24/201707/28/2017BRQ-BRQ INSPECTION31 IPLicensed Operator Requalification Program7111111B10/02/201710/06/2017EB1-21N-CNS DESIGN BASIS PROGRAMS INSPECTION31 IPDesign Bases Assurance Inspection (Programs)7111121N08/14/201709/01/2017RS 5678-RS TEAM41 IPRadiation Monitoring Instrumentation71124.0510/02/201710/06/20171 IPRadioactive Gaseous and Liquid Effluent Treatment71124.0610/02/201710/06/20171 IPRadiological Environmental Monitoring Program71124.0710/02/201710/06/20171 IPRadioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation71124.0810/02/201710/06/2017RS 24-RAD SAFETY21 IPOccupational ALARA Planning and Controls71124.0202/12/201802/16/20181 IPOccupational Dose Assessment71124.0402/12/201802/16/2018EXAM-INITIAL EXAM31 INITIAL EXAM COOPER (12/18)X0262408/27/201808/31/20181 INITIAL EXAM COOPER (12/18)X0262409/24/201809/28/2018EB1-21M-COOPER DESIGN BASES ASSURANCE TEAMS61 IPDesign Bases Assurance Inspection (Teams)7111121M04/02/201804/20/2018EP-1-EP EXERCISE INSPECTION41 IPExercise Evaluation711140107/30/201808/03/20181 IPEmergency Action Level and Emergency Plan Changes711140407/30/201808/03/20181 IPDrill/Exercise Performance71151-EP0107/30/201808/03/20181 IPERO Readiness71151-EP0207/30/201808/03/20181 IPAlert & Notification System Reliability71151-EP0307/30/201808/03/2018EB1-07T-CNS HEAT SINK PERFORMANCE21 IPHeat Sink Performance7111107T08/20/201808/24/20187111108-INSERVICE INSPECTION RF3011 IPInservice Inspection Activities - BWR7111108G10/08/201810/19/2018RS 12PI-RAD SAFETY21 IPRadiological Hazard Assessment and Exposure Controls71124.0110/15/201810/19/20181 IPOccupational ALARA Planning and Controls71124.0210/15/201810/19/20181 IPOccupational Exposure Control Effectiveness71151-OR0110/15/201810/19/2018This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE  
/RA/
DATE 8/28/17  
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/25/2017 08:18:35 ISFSI
- LOADING INSPECTION
 
1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/24/2017 07/28/2017 BRQ
- BRQ INSPECTION
 
1 IP Licensed Operator Requalification Program 7111111B 10/02/2017 10/06/2017 EB1-21N
- CNS DESIGN BASIS PROGRAMS INSPECTION
 
1 IP Design Bases Assurance Inspection (Programs)
7111121N 08/14/2017 09/01/2017 RS 5678
- RS TEAM
 
1 IP Radiation Monitoring Instrumentation 71124.05 10/02/2017 10/06/2017
 
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 10/02/2017 10/06/2017
 
IP Radiological Environmental Monitoring Program 71124.07 10/02/2017 10/06/2017
 
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/02/2017 10/06/2017 RS 24
- RAD SAFETY
 
1 IP Occupational ALARA Planning and Controls 71124.02 02/12/2018 02/16/2018
 
IP Occupational Dose Assessment 71124.04 02/12/2018 02/16/2018 EXAM
- INITIAL EXAM
 
1 INITIAL EXAM COOPER (12/18)
X02624 08/27/2018 08/31/2018
 
INITIAL EXAM COOPER (12/18)
X02624 09/24/2018 09/28/2018 EB1-21M
- COOPER DESIGN BASES ASSURANCE TEAMS
 
1 IP Design Bases Assurance Inspection (Teams)
7111121M 04/02/2018 04/20/2018 EP-1
- EP EXERCISE INSPECTION
 
1 IP Exercise Evaluation 7111401 07/30/2018 08/03/2018
 
IP Emergency Action Level and Emergency Plan Changes 7111404 07/30/2018 08/03/2018
 
IP Drill/Exercise Performance 71151-EP01 07/30/2018 08/03/2018
 
IP ERO Readiness 71151-EP02 07/30/2018 08/03/2018
 
IP Alert & Notification System Reliability 71151-EP03 07/30/2018 08/03/2018 EB1-07T
- CNS HEAT SINK PERFORMANCE
 
1 IP Heat Sink Performance 7111107T 08/20/2018 08/24/2018 7111108
- INSERVICE INSPECTION RF30
 
1 IP Inservice Inspection Activities - BWR 7111108G 10/08/2018 10/19/2018 RS 12PI
- RAD SAFETY
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018
 
IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018
 
IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities.
 
This report shows only on-site and announced inspection procedures.
 
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/25/2017 08:18:35 RS 12PI
- RAD SAFETY
 
1 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 EB2-05XT
- TRIENNIAL FIRE PROTECTION INSPECTION
 
1 IP Fire Protection - NFPA 805 (Triennial)
7111105X 04/15/2019 04/19/2019
 
IP Fire Protection - NFPA 805 (Triennial)
7111105X 04/29/2019 05/03/2019 EP-1
- EP PROGRAM INSPECTION
 
1 IP Alert and Notification System Testing 7111402 05/06/2019 05/10/2019
 
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/06/2019 05/10/2019
 
IP Emergency Action Level and Emergency Plan Changes 7111404 05/06/2019 05/10/2019
 
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/06/2019 05/10/2019
 
IP Drill/Exercise Performance 71151-EP01 05/06/2019 05/10/2019
 
IP ERO Readiness 71151-EP02 05/06/2019 05/10/2019
 
IP Alert & Notification System Reliability 71151-EP03 05/06/2019 05/10/2019 RS 13 PI
- RP INSPECTION
 
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/20/2019 05/24/2019
 
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/20/2019 05/24/2019
 
IP Occupational Exposure Control Effectiveness 71151-OR01 05/20/2019 05/24/2019
 
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/20/2019 05/24/2019 PI&R
- BIENNIAL PI&R INSPECTION
 
1 IP Problem Identification and Resolution 71152B 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.


Report 22UnitNumberPlanned DatesStart EndInspection ActivityTitleNo. of Staffon SiteCooperInspection / Activity Plan07/01/2017-06/30/2019Page 2 of 208/25/2017 08:18:35RS 12PI-RAD SAFETY21 IPOccupational Exposure Control Effectiveness71151-OR0110/15/201810/19/2018EB2-05XT-TRIENNIAL FIRE PROTECTION INSPECTION41 IPFire Protection - NFPA 805 (Triennial)7111105X04/15/201904/19/20191 IPFire Protection - NFPA 805 (Triennial)7111105X04/29/201905/03/2019EP-1-EP PROGRAM INSPECTION11 IPAlert and Notification System Testing711140205/06/201905/10/20191 IPEmergency Preparedness Organization Staffing and Augmentation System711140305/06/201905/10/20191 IPEmergency Action Level and Emergency Plan Changes711140405/06/201905/10/20191 IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140505/06/201905/10/20191 IPDrill/Exercise Performance71151-EP0105/06/201905/10/20191 IPERO Readiness71151-EP0205/06/201905/10/20191 IPAlert & Notification System Reliability71151-EP0305/06/201905/10/2019RS 13 PI-RP INSPECTION31 IPRadiological Hazard Assessment and Exposure Controls71124.0105/20/201905/24/20191 IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/20/201905/24/20191 IPOccupational Exposure Control Effectiveness71151-OR0105/20/201905/24/20191 IPRETS/ODCM Radiological Effluent Occurrences71151-PR0105/20/201905/24/2019PI&R-BIENNIAL PI&R INSPECTION41 IPProblem Identification and Resolution71152B06/24/201906/28/2019This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 12:31, 8 January 2025

Updated Inspection Plan for Cooper Nuclear Station (Report 05000298/2017005)
ML17242A212
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/28/2017
From: Jason Kozal
NRC/RGN-IV/DRP
To: Dent J
Nebraska Public Power District (NPPD)
JASON KOZAL
References
IR 2017005
Download: ML17242A212 (5)


Text

SUBJECT:

UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)

Dear Mr. Dent:

The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 817-200-1144 with any questions you have regarding this letter.

Sincerely,

/RA/

Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Docket No. 50-298 License No. DPR-46 Enclosure:

Inspection Plan for Cooper Nuclear Station

SUNSI Review:

ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE

/RA/

DATE 8/28/17

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/25/2017 08:18:35 ISFSI

- LOADING INSPECTION

1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/24/2017 07/28/2017 BRQ

- BRQ INSPECTION

1 IP Licensed Operator Requalification Program 7111111B 10/02/2017 10/06/2017 EB1-21N

- CNS DESIGN BASIS PROGRAMS INSPECTION

1 IP Design Bases Assurance Inspection (Programs)

7111121N 08/14/2017 09/01/2017 RS 5678

- RS TEAM

1 IP Radiation Monitoring Instrumentation 71124.05 10/02/2017 10/06/2017

IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 10/02/2017 10/06/2017

IP Radiological Environmental Monitoring Program 71124.07 10/02/2017 10/06/2017

IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/02/2017 10/06/2017 RS 24

- RAD SAFETY

1 IP Occupational ALARA Planning and Controls 71124.02 02/12/2018 02/16/2018

IP Occupational Dose Assessment 71124.04 02/12/2018 02/16/2018 EXAM

- INITIAL EXAM

1 INITIAL EXAM COOPER (12/18)

X02624 08/27/2018 08/31/2018

INITIAL EXAM COOPER (12/18)

X02624 09/24/2018 09/28/2018 EB1-21M

- COOPER DESIGN BASES ASSURANCE TEAMS

1 IP Design Bases Assurance Inspection (Teams)

7111121M 04/02/2018 04/20/2018 EP-1

- EP EXERCISE INSPECTION

1 IP Exercise Evaluation 7111401 07/30/2018 08/03/2018

IP Emergency Action Level and Emergency Plan Changes 7111404 07/30/2018 08/03/2018

IP Drill/Exercise Performance 71151-EP01 07/30/2018 08/03/2018

IP ERO Readiness 71151-EP02 07/30/2018 08/03/2018

IP Alert & Notification System Reliability 71151-EP03 07/30/2018 08/03/2018 EB1-07T

- CNS HEAT SINK PERFORMANCE

1 IP Heat Sink Performance 7111107T 08/20/2018 08/24/2018 7111108

- INSERVICE INSPECTION RF30

1 IP Inservice Inspection Activities - BWR 7111108G 10/08/2018 10/19/2018 RS 12PI

- RAD SAFETY

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018

IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018

IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/25/2017 08:18:35 RS 12PI

- RAD SAFETY

1 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 EB2-05XT

- TRIENNIAL FIRE PROTECTION INSPECTION

1 IP Fire Protection - NFPA 805 (Triennial)

7111105X 04/15/2019 04/19/2019

IP Fire Protection - NFPA 805 (Triennial)

7111105X 04/29/2019 05/03/2019 EP-1

- EP PROGRAM INSPECTION

1 IP Alert and Notification System Testing 7111402 05/06/2019 05/10/2019

IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/06/2019 05/10/2019

IP Emergency Action Level and Emergency Plan Changes 7111404 05/06/2019 05/10/2019

IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/06/2019 05/10/2019

IP Drill/Exercise Performance 71151-EP01 05/06/2019 05/10/2019

IP ERO Readiness 71151-EP02 05/06/2019 05/10/2019

IP Alert & Notification System Reliability 71151-EP03 05/06/2019 05/10/2019 RS 13 PI

- RP INSPECTION

1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/20/2019 05/24/2019

IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/20/2019 05/24/2019

IP Occupational Exposure Control Effectiveness 71151-OR01 05/20/2019 05/24/2019

IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/20/2019 05/24/2019 PI&R

- BIENNIAL PI&R INSPECTION

1 IP Problem Identification and Resolution 71152B 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.