IR 05000298/2017005: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 22: | Line 22: | ||
==Dear Mr. Dent:== | ==Dear Mr. Dent:== | ||
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. | The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence. | ||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the | |||
Please contact me at 817-200-1144 with any questions you have regarding this letter. | Please contact me at 817-200-1144 with any questions you have regarding this letter. | ||
Sincerely, | Sincerely, | ||
/RA/ Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Docket No. | /RA/ | ||
Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION | |||
==REGION IV== | |||
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Docket No. 50-298 License No. DPR-46 Enclosure: | |||
Inspection Plan for Cooper Nuclear Station | |||
SUNSI Review: | |||
ADAMS: | |||
Non-Publicly Available Non-Sensitive Keyword: | |||
By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE | |||
/RA/ | |||
DATE 8/28/17 | |||
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/25/2017 08:18:35 ISFSI | |||
- LOADING INSPECTION | |||
1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/24/2017 07/28/2017 BRQ | |||
- BRQ INSPECTION | |||
1 IP Licensed Operator Requalification Program 7111111B 10/02/2017 10/06/2017 EB1-21N | |||
- CNS DESIGN BASIS PROGRAMS INSPECTION | |||
1 IP Design Bases Assurance Inspection (Programs) | |||
7111121N 08/14/2017 09/01/2017 RS 5678 | |||
- RS TEAM | |||
1 IP Radiation Monitoring Instrumentation 71124.05 10/02/2017 10/06/2017 | |||
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 10/02/2017 10/06/2017 | |||
IP Radiological Environmental Monitoring Program 71124.07 10/02/2017 10/06/2017 | |||
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/02/2017 10/06/2017 RS 24 | |||
- RAD SAFETY | |||
1 IP Occupational ALARA Planning and Controls 71124.02 02/12/2018 02/16/2018 | |||
IP Occupational Dose Assessment 71124.04 02/12/2018 02/16/2018 EXAM | |||
- INITIAL EXAM | |||
1 INITIAL EXAM COOPER (12/18) | |||
X02624 08/27/2018 08/31/2018 | |||
INITIAL EXAM COOPER (12/18) | |||
X02624 09/24/2018 09/28/2018 EB1-21M | |||
- COOPER DESIGN BASES ASSURANCE TEAMS | |||
1 IP Design Bases Assurance Inspection (Teams) | |||
7111121M 04/02/2018 04/20/2018 EP-1 | |||
- EP EXERCISE INSPECTION | |||
1 IP Exercise Evaluation 7111401 07/30/2018 08/03/2018 | |||
IP Emergency Action Level and Emergency Plan Changes 7111404 07/30/2018 08/03/2018 | |||
IP Drill/Exercise Performance 71151-EP01 07/30/2018 08/03/2018 | |||
IP ERO Readiness 71151-EP02 07/30/2018 08/03/2018 | |||
IP Alert & Notification System Reliability 71151-EP03 07/30/2018 08/03/2018 EB1-07T | |||
- CNS HEAT SINK PERFORMANCE | |||
1 IP Heat Sink Performance 7111107T 08/20/2018 08/24/2018 7111108 | |||
- INSERVICE INSPECTION RF30 | |||
1 IP Inservice Inspection Activities - BWR 7111108G 10/08/2018 10/19/2018 RS 12PI | |||
- RAD SAFETY | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018 | |||
IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018 | |||
IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/25/2017 08:18:35 RS 12PI | |||
- RAD SAFETY | |||
1 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 EB2-05XT | |||
- TRIENNIAL FIRE PROTECTION INSPECTION | |||
1 IP Fire Protection - NFPA 805 (Triennial) | |||
7111105X 04/15/2019 04/19/2019 | |||
IP Fire Protection - NFPA 805 (Triennial) | |||
7111105X 04/29/2019 05/03/2019 EP-1 | |||
- EP PROGRAM INSPECTION | |||
1 IP Alert and Notification System Testing 7111402 05/06/2019 05/10/2019 | |||
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/06/2019 05/10/2019 | |||
IP Emergency Action Level and Emergency Plan Changes 7111404 05/06/2019 05/10/2019 | |||
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/06/2019 05/10/2019 | |||
IP Drill/Exercise Performance 71151-EP01 05/06/2019 05/10/2019 | |||
IP ERO Readiness 71151-EP02 05/06/2019 05/10/2019 | |||
IP Alert & Notification System Reliability 71151-EP03 05/06/2019 05/10/2019 RS 13 PI | |||
- RP INSPECTION | |||
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/20/2019 05/24/2019 | |||
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/20/2019 05/24/2019 | |||
IP Occupational Exposure Control Effectiveness 71151-OR01 05/20/2019 05/24/2019 | |||
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/20/2019 05/24/2019 PI&R | |||
- BIENNIAL PI&R INSPECTION | |||
1 IP Problem Identification and Resolution 71152B 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities. | |||
This report shows only on-site and announced inspection procedures. | |||
}} | }} | ||
Latest revision as of 12:31, 8 January 2025
| ML17242A212 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 08/28/2017 |
| From: | Jason Kozal NRC/RGN-IV/DRP |
| To: | Dent J Nebraska Public Power District (NPPD) |
| JASON KOZAL | |
| References | |
| IR 2017005 | |
| Download: ML17242A212 (5) | |
Text
SUBJECT:
UPDATED INSPECTION PLAN FOR COOPER NUCLEAR STATION (REPORT 05000298/2017005)
Dear Mr. Dent:
The enclosed inspection plan lists the inspections scheduled through June 30, 2019, for Cooper Nuclear Station. The U.S. Nuclear Regulatory Commission (NRC) provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include the plan for security-related inspections, which will be sent via separate, non-publicly available correspondence.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 817-200-1144 with any questions you have regarding this letter.
Sincerely,
/RA/
Jason Kozal, Chief Division of Reactor Projects UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 Docket No. 50-298 License No. DPR-46 Enclosure:
Inspection Plan for Cooper Nuclear Station
SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: CHY Yes No Publicly Available Sensitive NRC-002 OFFICE BC:DRP/C NAME JKozal SIGNATURE
/RA/
DATE 8/28/17
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 1 of 2 08/25/2017 08:18:35 ISFSI
- LOADING INSPECTION
1 IP Operation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.1 07/24/2017 07/28/2017 BRQ
- BRQ INSPECTION
1 IP Licensed Operator Requalification Program 7111111B 10/02/2017 10/06/2017 EB1-21N
- CNS DESIGN BASIS PROGRAMS INSPECTION
1 IP Design Bases Assurance Inspection (Programs)
7111121N 08/14/2017 09/01/2017 RS 5678
- RS TEAM
1 IP Radiation Monitoring Instrumentation 71124.05 10/02/2017 10/06/2017
IP Radioactive Gaseous and Liquid Effluent Treatment 71124.06 10/02/2017 10/06/2017
IP Radiological Environmental Monitoring Program 71124.07 10/02/2017 10/06/2017
IP Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and Transportation 71124.08 10/02/2017 10/06/2017 RS 24
- RAD SAFETY
1 IP Occupational ALARA Planning and Controls 71124.02 02/12/2018 02/16/2018
IP Occupational Dose Assessment 71124.04 02/12/2018 02/16/2018 EXAM
- INITIAL EXAM
1 INITIAL EXAM COOPER (12/18)
X02624 08/27/2018 08/31/2018
INITIAL EXAM COOPER (12/18)
X02624 09/24/2018 09/28/2018 EB1-21M
- COOPER DESIGN BASES ASSURANCE TEAMS
1 IP Design Bases Assurance Inspection (Teams)
7111121M 04/02/2018 04/20/2018 EP-1
- EP EXERCISE INSPECTION
1 IP Exercise Evaluation 7111401 07/30/2018 08/03/2018
IP Emergency Action Level and Emergency Plan Changes 7111404 07/30/2018 08/03/2018
IP Drill/Exercise Performance 71151-EP01 07/30/2018 08/03/2018
IP ERO Readiness 71151-EP02 07/30/2018 08/03/2018
IP Alert & Notification System Reliability 71151-EP03 07/30/2018 08/03/2018 EB1-07T
- CNS HEAT SINK PERFORMANCE
1 IP Heat Sink Performance 7111107T 08/20/2018 08/24/2018 7111108
- INSERVICE INSPECTION RF30
1 IP Inservice Inspection Activities - BWR 7111108G 10/08/2018 10/19/2018 RS 12PI
- RAD SAFETY
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 10/15/2018 10/19/2018
IP Occupational ALARA Planning and Controls 71124.02 10/15/2018 10/19/2018
IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.
Report 22 Unit Number Planned Dates Start End Inspection Activity Title No. of Staff on Site Cooper Inspection / Activity Plan 07/01/2017 - 06/30/2019 Page 2 of 2 08/25/2017 08:18:35 RS 12PI
- RAD SAFETY
1 IP Occupational Exposure Control Effectiveness 71151-OR01 10/15/2018 10/19/2018 EB2-05XT
- TRIENNIAL FIRE PROTECTION INSPECTION
1 IP Fire Protection - NFPA 805 (Triennial)
7111105X 04/15/2019 04/19/2019
IP Fire Protection - NFPA 805 (Triennial)
7111105X 04/29/2019 05/03/2019 EP-1
- EP PROGRAM INSPECTION
1 IP Alert and Notification System Testing 7111402 05/06/2019 05/10/2019
IP Emergency Preparedness Organization Staffing and Augmentation System 7111403 05/06/2019 05/10/2019
IP Emergency Action Level and Emergency Plan Changes 7111404 05/06/2019 05/10/2019
IP Correction of Emergency Preparedness Weaknesses and Deficiencies 7111405 05/06/2019 05/10/2019
IP Drill/Exercise Performance 71151-EP01 05/06/2019 05/10/2019
IP ERO Readiness 71151-EP02 05/06/2019 05/10/2019
IP Alert & Notification System Reliability 71151-EP03 05/06/2019 05/10/2019 RS 13 PI
- RP INSPECTION
1 IP Radiological Hazard Assessment and Exposure Controls 71124.01 05/20/2019 05/24/2019
IP In-Plant Airborne Radioactivity Control and Mitigation 71124.03 05/20/2019 05/24/2019
IP Occupational Exposure Control Effectiveness 71151-OR01 05/20/2019 05/24/2019
IP RETS/ODCM Radiological Effluent Occurrences 71151-PR01 05/20/2019 05/24/2019 PI&R
- BIENNIAL PI&R INSPECTION
1 IP Problem Identification and Resolution 71152B 06/24/2019 06/28/2019 This report does not include INPO and OUTAGE activities.