ML17249A898: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(6 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/08/1980
| issue date = 05/08/1980
| title = Monthly Operating Rept for Apr 1980
| title = Monthly Operating Rept for Apr 1980
| author name = MCNAMARA A E
| author name = Mcnamara A
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:~~8005X3Q97VI-gOPERATliVGSTATUSOPERATlNGDATAREPORTDOCKETNO.50244DATEMa81980COMPLETEDBYAndrewE.McNamarTELFPIIONE1-315-524-4446Ext.293,atGinnaI.IlnitName:GiiVNASTATIONUN2ReportingPcr;od.~Aril1980,5.I.icenscdThermalPower(hfWt):f.NamcplatcRating(GrossMWc):'i.1)csignI'.IcctricalRating(NctMWe):6.hfaximumDcpcndableCapacity(GrosshfWe):.hfaximumDependableCapacity(NethfWc):90NotesAnnualRefuelingandMaintenanceShutdowncontinued.8.lfChangesOccurinCapacityRatings(ItemsNumber3Through7)SinceLastReport,GiveReasons:').PowerLeveltoWhichRestricted,IfAny(NctMWc):It).ReasonsForRestrictions,IfAny:ThishfonthYr.-to-DateCumulativeII.IloursInReportingPeriod12.NumberofHoursReactorWasCriticalIIReactorRescrvcShutdownHoursI'i.IloursGeneratorOn-LineIS.IInitRc>>ervcShutdownHoursI6.GrossThermalEnergyGenera(cd(hfWH)I'.GrossElectricalEnergyGenerated(MWkl)III.iVetFlcctricalEnergyGenerated(hfWH)I9UnitbcfvlccFactor71900po29032114.752114.5031186561021026970,81172.83/9141569794.521,621.57*68071.138.5Yr913944582970699728,132,35974.46%2i).IinitAvailabilityFactor2l.UnitCapacityIactor(UsinghfDCNet)22.UnitCapacityFactor(Using,DERNct)2.$.UnitForcedOutageRate2f.ShutdownsScheduledOverNext6hfonths(Type,000%0/0%72.83%71.15%71.15%0%DateandDurationofEach):74.47%67.85%67.85%9.63%2>.IfShutDownAtEndOfReport.Period,EstimatedDateofStartup:May17,198026.UnitsInTestStatus(PrtortoCommercialOperation):ForecastINITIALCRITICALITYINITIALELECTRICITYCOhfhfERCIALOPERATIONAchieved"<CumulativeTotalCommencingJanuary1,19754918iRKV,IjTii)  
{{#Wiki_filter:~
'~r 0AVERAGEDAILYUNITPOWERUNIT-2-Aril1980DOCKETNQ.-50244UNITO'IpinnaStatioMay8,1980COMPLETEDBYAndrewE.McNamaraTELEPHONE1-315524-444-6Ext.293,atGinnaREFUELINGANDMAINTENANCESHUTD(NNCONTINUEDDAYAVERAGEDAILYPOWERLEVEL(MWe-Net)DAY,AVERAGEDAlLYPOWERLEVEL'MWe-Net)101213141516171819202122232425262128293031INSTRUCTIONSOnthisformat,listtheaveragedailyunitpowerlevelinMWe-Netforeachdayinthereportingmonth,Computetothenearestwholemegawatt.4987(RKV1/789 V
~
UNITSHUTDOWNANDPOWERREDUCTIONSDO(:KI:.TNO.llNll'NAhlENlGinnaStationDATI'.ME9(:OhlPLETI'.DIIYtt'~~ndrewE.McNamaha1I'.LI'.P)lONE1-315-2-6Ext.293,atGinnaNo.Date040~00X.'-P4C00001~0Cu00EAC0nLicenseeEventReportIIEm0IA(JC0II1C000EolJCause&CorrectiveActiontoPreventRecurrenceAnnualRefuelingandMaintenanceShutdowncontinued.IF:ForcedStScheduled49991Ravo1/791Reason:A-EtluipmcntFailure(Explain)ll-hlaintenanccor1'cstC-RefuelingD-RegulatoryRestrictionE-OperatorTraining8:LiccnscExaminationF-AdministrativeG-OperationalError(Explain)II-Other(Explain)hlethod:I-hfanual2-hlanualScram.3-AutomaticScram.4-Other(Explain)ExhibitG-InstructionsforPreparationofDataEntryShcctsforLiccnsccEventReport(LER)File(NUREG-0161)Exhibit1-SameSource c5aa 4-NARRATIVESUMMARYOFOPERATINGEXPERIENCEDOCKETNO.0-2UNITGinnaStatonDATECOMPLETEDBYAndrewE.McNamarMONTHAril1980TELEPHONEI."315-524-4446Ext.293,atGinnaAnnualRefuelingandMaintenanceShutdowncontinued.49123(1/7$)  
80 05X 3 Q97V I -
~.r-~  
g OPERATliVG STATUS OPERATlNG DATA REPORT DOCKET NO.
}}
50 244 DATE Ma 8
1980 COMPLETED BY Andrew E. McNamar TELFPIIONE 1-315-524-4446 Ext. 293, at Ginna I. Ilnit Name:
GiiVNA STATION UN 2
Reporting Pcr;od. ~Aril 1980
,5. I.icenscd Thermal Power (hfWt):
: f. Namcplatc Rating (Gross MWc):
'i. 1)csign I'.Icctrical Rating (Nct MWe):
: 6. hfaximum Dcpcndable Capacity (Gross hfWe):
. hfaximum Dependable Capacity (Net hfWc):
90 Notes Annual Refueling and Maintenance Shutdown continued.
: 8. lfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
'). Power Level to Which Restricted, If Any (Nct MWc):
It). Reasons For Restrictions, If Any:
This hfonth Yr.-to-Date Cumulative I I. Ilours In Reporting Period
: 12. Number of Hours Reactor Was Critical I I Reactor Rescrvc Shutdown Hours I 'i. Ilours Generator On-Line IS. IInit Rc>>ervc Shutdown Hours I 6. Gross Thermal Energy Genera(cd (hfWH)
I'. Gross Electrical Energy Generated (MWkl)
III. iVet Flcctrical Energy Generated (hfWH)
I 9 Unit bcfvlcc Factor 719 0
0 po 2 903 2 114.75 2 114.50 3 118 656 1 021 026 970,811 72.83/
91 415 69 794.52 1,621.57
* 68 071.13 8.5 Yr 91 394 458 29 706 997 28,132,359 74.46%
2i). Iinit Availability Factor 2l. Unit Capacity I actor (Using hfDC Net)
: 22. Unit Capacity Factor (Using,DER Nct) 2.$. Unit Forced Outage Rate 2 f. Shutdowns Scheduled Over Next 6 hfonths (Type, 00 0%
0/
0%
72.83%
71.15%
71.15%
0%
Date and Duration of Each):
74.47%
67.85%
67.85%
: 9. 63%
2>. If Shut Down At End Of Report. Period, Estimated Date of Startup:
May 17, 1980
: 26. Units In Test Status (Prtor to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPERATION Achieved
"< Cumulative Total Commencing January 1, 1975 49 18
: iRKV, IjTii)
 
~ r
 
0 AVERAGE DAILYUNIT POWER UNIT A ril 1980 DOCKET NQ. -50 244 UNIT O'I pinna Statio May 8, 1980 COMPLETED BY Andrew E.
McNamara TELEPHONE 1-315 524-444-6 Ext. 293, at Ginna REFUELING AND MAINTENANCE SHUTD(NN CONTINUED DAY AVERAGE DAILYPOWER LEVEL (MWe-N et)
DAY,AVERAGE DAlLYPOWER LEVEL'M We-Net) 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 21 28 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, Compute to the nearest whole megawatt.
49 87 (RKV 1/789
 
V
 
UNIT SHUTDOWN AND POWER REDUCTIONS DO(:KI:.T NO.
llNll'NAhlE Nl Ginna Station DATI'.M E9
(:OhlPLETI'.D IIY tt'~~
ndrew E. McNamaha 1 I'.LI'.P)lONE 1-315-2 -
6 Ext. 293, at Ginna No.
Date 0
4 0
~
0 0 X.'-
P4 C0 00 01 ~0 C u 0
0EA C
0n Licensee Event Report II Em 0
IA (J C0 II1 C00 0 Eo lJ Cause & Corrective Action to Prevent Recurrence Annual Refueling and Maintenance Shutdown continued.
I F:
Forced St Scheduled 49 99 1Ravo 1/791 Reason:
A-Etluipmcnt Failure (Explain) ll-hlaintenancc or 1'cst C-Refueling D-Regulatory Restriction E-Operator Training 8: Liccnsc Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) hlethod:
I -hfanual 2-hlanual Scram.
3-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnscc Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
 
c 5
aa
 
4-NARRATIVE
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.
0-2 UNIT Ginna Stat on DATE COMPLETED BY Andrew E. McNamar MONTH A ril 1980 TELEPHONE I."315-524-4446 Ext. 293, at Ginna Annual Refueling and Maintenance Shutdown continued.
49 123 (1/7$ )
 
~.r-~}}

Latest revision as of 11:59, 8 January 2025

Monthly Operating Rept for Apr 1980
ML17249A898
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/08/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17249A897 List:
References
NUDOCS 8005130379
Download: ML17249A898 (8)


Text

~

~

80 05X 3 Q97V I -

g OPERATliVG STATUS OPERATlNG DATA REPORT DOCKET NO.

50 244 DATE Ma 8

1980 COMPLETED BY Andrew E. McNamar TELFPIIONE 1-315-524-4446 Ext. 293, at Ginna I. Ilnit Name:

GiiVNA STATION UN 2

Reporting Pcr;od. ~Aril 1980

,5. I.icenscd Thermal Power (hfWt):

f. Namcplatc Rating (Gross MWc):

'i. 1)csign I'.Icctrical Rating (Nct MWe):

6. hfaximum Dcpcndable Capacity (Gross hfWe):

. hfaximum Dependable Capacity (Net hfWc):

90 Notes Annual Refueling and Maintenance Shutdown continued.

8. lfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

'). Power Level to Which Restricted, If Any (Nct MWc):

It). Reasons For Restrictions, If Any:

This hfonth Yr.-to-Date Cumulative I I. Ilours In Reporting Period

12. Number of Hours Reactor Was Critical I I Reactor Rescrvc Shutdown Hours I 'i. Ilours Generator On-Line IS. IInit Rc>>ervc Shutdown Hours I 6. Gross Thermal Energy Genera(cd (hfWH)

I'. Gross Electrical Energy Generated (MWkl)

III. iVet Flcctrical Energy Generated (hfWH)

I 9 Unit bcfvlcc Factor 719 0

0 po 2 903 2 114.75 2 114.50 3 118 656 1 021 026 970,811 72.83/

91 415 69 794.52 1,621.57

  • 68 071.13 8.5 Yr 91 394 458 29 706 997 28,132,359 74.46%

2i). Iinit Availability Factor 2l. Unit Capacity I actor (Using hfDC Net)

22. Unit Capacity Factor (Using,DER Nct) 2.$. Unit Forced Outage Rate 2 f. Shutdowns Scheduled Over Next 6 hfonths (Type, 00 0%

0/

0%

72.83%

71.15%

71.15%

0%

Date and Duration of Each):

74.47%

67.85%

67.85%

9. 63%

2>. If Shut Down At End Of Report. Period, Estimated Date of Startup:

May 17, 1980

26. Units In Test Status (Prtor to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPERATION Achieved

"< Cumulative Total Commencing January 1, 1975 49 18

iRKV, IjTii)

~ r

0 AVERAGE DAILYUNIT POWER UNIT A ril 1980 DOCKET NQ. -50 244 UNIT O'I pinna Statio May 8, 1980 COMPLETED BY Andrew E.

McNamara TELEPHONE 1-315 524-444-6 Ext. 293, at Ginna REFUELING AND MAINTENANCE SHUTD(NN CONTINUED DAY AVERAGE DAILYPOWER LEVEL (MWe-N et)

DAY,AVERAGE DAlLYPOWER LEVEL'M We-Net) 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 21 28 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, Compute to the nearest whole megawatt.

49 87 (RKV 1/789

V

UNIT SHUTDOWN AND POWER REDUCTIONS DO(:KI:.T NO.

llNll'NAhlE Nl Ginna Station DATI'.M E9

(:OhlPLETI'.D IIY tt'~~

ndrew E. McNamaha 1 I'.LI'.P)lONE 1-315-2 -

6 Ext. 293, at Ginna No.

Date 0

4 0

~

0 0 X.'-

P4 C0 00 01 ~0 C u 0

0EA C

0n Licensee Event Report II Em 0

IA (J C0 II1 C00 0 Eo lJ Cause & Corrective Action to Prevent Recurrence Annual Refueling and Maintenance Shutdown continued.

I F:

Forced St Scheduled 49 99 1Ravo 1/791 Reason:

A-Etluipmcnt Failure (Explain) ll-hlaintenancc or 1'cst C-Refueling D-Regulatory Restriction E-Operator Training 8: Liccnsc Examination F-Administrative G-Operational Error (Explain)

II-Other (Explain) hlethod:

I -hfanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Shccts for Liccnscc Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

c 5

aa

4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

0-2 UNIT Ginna Stat on DATE COMPLETED BY Andrew E. McNamar MONTH A ril 1980 TELEPHONE I."315-524-4446 Ext. 293, at Ginna Annual Refueling and Maintenance Shutdown continued.

49 123 (1/7$ )

~.r-~