| (5 intermediate revisions by the same user not shown) | |||
| Line 14: | Line 14: | ||
| document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | | document type = TECHNICAL SPECIFICATIONS, TECHNICAL SPECIFICATIONS & TEST REPORTS | ||
| page count = 1 | | page count = 1 | ||
| project = | |||
| stage = Request | |||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:6. | {{#Wiki_filter:6.2 ORGANIZATION 6.2.1 Onsite and Offsite Organization An onsite and an offsite organization shall be established for unit operation and, corporate management. | ||
The onsite and offsite organization shall include the positions for activities affecting the safety of the nuclear power plant. | |||
: a. Lines of authority, responsibility and communication shall be established and defined from the highest management levels through intermediate levels to and including all Plant management positions. | |||
b. | Those relationships shall be documented and | ||
: updated, as appropriate, in the form of organization charts. | |||
These organization charts will be documented in the UFSAR and updated in accordance with 10CFR50.71. | |||
b. | |||
The Senior Vice President, Production and Engineering, shall have corporate responsibility for overall Plant nuclear | |||
: safety, and shally take any measures needed to assure acceptable performance of the staff in operating, maintaining, and providing technical support in the Plant so that continued nuclear safety is assured. | |||
: c. The Ginna Station Superintendent shall have responsibility for overall unit operation and shall have control over those resources necessary for safe operation and maintenance of the Plant. | |||
8805'i 90158 880505 PDR ADOCK 05000244 J | |||
~P PDR 6.2-1 Proposed}} | |||
Latest revision as of 11:37, 8 January 2025
| ML17251B085 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 05/05/1988 |
| From: | ROCHESTER GAS & ELECTRIC CORP. |
| To: | |
| Shared Package | |
| ML17251B078 | List: |
| References | |
| NUDOCS 8805190158 | |
| Download: ML17251B085 (1) | |
Text
6.2 ORGANIZATION 6.2.1 Onsite and Offsite Organization An onsite and an offsite organization shall be established for unit operation and, corporate management.
The onsite and offsite organization shall include the positions for activities affecting the safety of the nuclear power plant.
- a. Lines of authority, responsibility and communication shall be established and defined from the highest management levels through intermediate levels to and including all Plant management positions.
Those relationships shall be documented and
- updated, as appropriate, in the form of organization charts.
These organization charts will be documented in the UFSAR and updated in accordance with 10CFR50.71.
b.
The Senior Vice President, Production and Engineering, shall have corporate responsibility for overall Plant nuclear
- safety, and shally take any measures needed to assure acceptable performance of the staff in operating, maintaining, and providing technical support in the Plant so that continued nuclear safety is assured.
- c. The Ginna Station Superintendent shall have responsibility for overall unit operation and shall have control over those resources necessary for safe operation and maintenance of the Plant.
8805'i 90158 880505 PDR ADOCK 05000244 J
~P PDR 6.2-1 Proposed