IR 05000263/2017405: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (5 intermediate revisions by the same user not shown) | |||
| Line 5: | Line 5: | ||
| author name = Riemer K | | author name = Riemer K | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Gardner P | | addressee name = Gardner P | ||
| addressee affiliation = Northern States Power Company, Minnesota | | addressee affiliation = Northern States Power Company, Minnesota | ||
| docket = 05000263 | | docket = 05000263 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:September 14, 2017 | ||
SUBJECT: MONTICELLO NUCLEAR GENERATING PLANT | ==SUBJECT:== | ||
- NRC SECURITY BASELINE INSPECTION REPORT | MONTICELLO NUCLEAR GENERATING PLANT - NRC SECURITY BASELINE INSPECTION REPORT 05000263/2017405 | ||
==Dear Mr. Gardner:== | ==Dear Mr. Gardner:== | ||
On August 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Monticello Nuclear Plant and the | On August 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Monticello Nuclear Plant and the inspectors discussed the results of this inspection with Mr. Dieckmann and other members of your staff. The results of this inspection are documented in the enclosed report. | ||
The NRC inspectors did not identify any finding or violation of more than minor significance. | |||
Should you have any questions concerning this inspection, we will be please to discuss this with you. | This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding. | ||
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information -Withhold from public disclosure under 10 CFR 2.390 Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be please to discuss this with you. | |||
Should you have any questions concerning this inspection, we will be please to discuss this with you. | Should you have any questions concerning this inspection, we will be please to discuss this with you. | ||
Sincerely,/RA/ | Sincerely, | ||
/RA/ | |||
Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety | |||
Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure: | |||
Inspection Report | Inspection Report 05000263/2017405 cc w/o encl: Distribution via LISTSERV | ||
Distribution via LISTSERV | |||
}} | }} | ||
Latest revision as of 10:55, 8 January 2025
| ML17257A325 | |
| Person / Time | |
|---|---|
| Site: | Monticello |
| Issue date: | 09/14/2017 |
| From: | Kenneth Riemer Plant Support Branch II |
| To: | Gardner P Northern States Power Company, Minnesota |
| References | |
| IR 2017405 | |
| Download: ML17257A325 (3) | |
Text
September 14, 2017
SUBJECT:
MONTICELLO NUCLEAR GENERATING PLANT - NRC SECURITY BASELINE INSPECTION REPORT 05000263/2017405
Dear Mr. Gardner:
On August 4, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Monticello Nuclear Plant and the inspectors discussed the results of this inspection with Mr. Dieckmann and other members of your staff. The results of this inspection are documented in the enclosed report.
The NRC inspectors did not identify any finding or violation of more than minor significance.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding.
However, the enclosed report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information -Withhold from public disclosure under 10 CFR 2.390 Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii). Should you have any questions concerning this inspection, we will be please to discuss this with you.
Should you have any questions concerning this inspection, we will be please to discuss this with you.
Sincerely,
/RA/
Kenneth Riemer, Acting Chief Plant Support Branch Division of Reactor Safety
Docket No. 50-263 License No. DPR-22 Nonpublic Enclosure:
Inspection Report 05000263/2017405 cc w/o encl: Distribution via LISTSERV