| issue date = 03/17/1981
| issue date = 03/17/1981
| title = Responds to IE Bulletin 81-01, Surveillance of Mechanical Snubbers. No Inc Mechanical Snubbers Installed.One Pacific Scientific Co Mechanical Snubber,Model PSA-3,installed on Steam Generator B Blowdown Line
| title = Responds to IE Bulletin 81-01, Surveillance of Mechanical Snubbers. No Inc Mechanical Snubbers Installed.One Pacific Scientific Co Mechanical Snubber,Model PSA-3,installed on Steam Generator B Blowdown Line
| author name = MAIER J E
| author name = Maier J
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| author affiliation = ROCHESTER GAS & ELECTRIC CORP.
| addressee name = GRIER B H
| addressee name = Grier B
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| addressee affiliation = NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
| docket = 05000244
| docket = 05000244
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:g$'.Sld'vl'i/,l I"j,litl.i~~lI'/I ROCHESTER GAS AND ELECTRIC CORPORATION
{{#Wiki_filter:g$'.Sld'vl'i/,lI"j,litl.i~~lI'/I ROCHESTER GAS AND ELECTRIC CORPORATION
)~~O i'0 (~W o 89 EAST AVENUE, ROCHESTER, N.Y.14649 JOHN E.viA IER VICE PRESIDENT TCI,CPHDVC ARCA CddC TIC 546-2700 March 17, 1981 4EI(pg~"ie~~~98]m 3 O)AIIIi~P Mr.Boyce H.Grier, Director U.S.Nuclear Regulatory Commission Cffice of Inspection and Enforcement Region I 631 Park Avenue King of P  
) ~
~ O i'
0
( ~W o
89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.
viA IER VICE PRESIDENT TCI,CPHDVC ARCA CddC TIC 546-2700 March 17, 1981 4EI(pg
~
"ie~~ ~98]m 3
O)AIIIi~P Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Cffice of Inspection and Enforcement Region I 631 Park Avenue King of P


==Subject:==
==Subject:==
russia, Pennsylvania 19406'v cn IE Bulletin 81-01,"Surveillance of Mechanical Snubbers"~R.E.Ginna Nuclear Power Plant, Unit'll Docket No.50-244  
: russia, Pennsylvania 19406
'v cn IE Bulletin 81-01, "Surveillance of Mechanical Snubbers"
~ R. E. Ginna Nuclear Power Plant, Unit'll Docket No. 50-244


==Dear Mr.Grier:==
==Dear Mr. Grier:==
In response to Inspection and Enforcement Bulletin 81-01 dated January 27, 1981, concerning failures of mechanical snubbers, the follow-ing information is provided.Ginna Station has no INC mechanical snubbers.Action items 1 and 2, therefore, do not pertain to Ginna Station.There is one Pacific Scientific Company mechanical snubber installed on a safety-related system at Ginna Station.It.is a model PSA-3 and is installed on the B steam generator blow-down line.It is located inside containment and is not normally accessible during reactor operation.
In response to Inspection and Enforcement Bulletin 81-01 dated January 27, 1981, concerning failures of mechanical snubbers, the follow-ing information is provided.
A'dditional Pacific Scientific snubbers are presently in storage and are planned to be installed on safety-related systems.Each of the Pacific Scientific snubbers was subjected to a final functional test prior to shipment to verify that drag forces were within the specified range.The installed snubber has been in service only since last November.Freedom of movement is required of each snuboer to enable ins tallation.
Ginna Station has no INC mechanical snubbers.
As described in the subject bulletin, the installed PSA-3 snubber will be visually examined and manually tested during'he spring 1981 refuel-ing outage.The mechanical snubbers in storage will be examined as pre-scribed prior to installation.
Action items 1 and 2, therefore, do not pertain to Ginna Station.
The results of the inspection of the installed mechanical snubbers will be submitted within 60 days after completion.
There is one Pacific Scientific Company mechanical snubber installed on a safety-related system at Ginna Station.
810424088 I  
It.is a model PSA-3 and is installed on the B steam generator blow-down line. It is located inside containment and is not normally accessible during reactor operation.
~a"-l J"",/.ip i V'lg pg~N/J ROCHESTER CAS AHO ELECTRIC C..P.oATE March 17, 1981 Mr.Boyce H.Grier, Director SHEET phIO.2 To assist in evaluating the value/impact of each Bulletin on licensees, manpower expended in conduct of the review and preparation of this report is approximately six manhours.Manpower expended for any needed corrective actions will be provided in the report on the results of the inspections.
A'dditional Pacific Scientific snubbers are presently in storage and are planned to be installed on safety-related systems.
Very truly yours, o n E.Maier Subscribed and sworn to me on this 17th day of March 1981.GARY L'EISS IIOTARY PUBLIC, State of II.Y.Monroe Co.rpy Commission Expires ipsrch 30, 19;p"/cc: Mr.Victor Stello, Jr., Director U.S.Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D.C.20555 J'1 l 0}}
Each of the Pacific Scientific snubbers was subjected to a final functional test prior to shipment to verify that drag forces were within the specified range.
The installed snubber has been in service only since last November.
Freedom of movement is required of each snuboer to enable ins tallation.
As described in the subject bulletin, the installed PSA-3 snubber willbe visually examined and manually tested during'he spring 1981 refuel-ing outage.
The mechanical snubbers in storage willbe examined as pre-scribed prior to installation.
The results of the inspection of the installed mechanical snubbers willbe submitted within 60 days after completion.
810424088 I
 
~a
"- l J"",
/
. ip i
V
'lg pg
~ N/
J
 
ROCHESTER CAS AHO ELECTRIC C..P.
oATE March 17, 1981 Mr. Boyce H. Grier, Director SHEET phIO.
2 To assist in evaluating the value/impact of each Bulletin on licensees, manpower expended in conduct of the review and preparation of this report is approximately six manhours.
Manpower expended for any needed corrective actions willbe provided in the report on the results of the inspections.
Very truly yours, o n E. Maier Subscribed and sworn to me on this 17th day of March 1981.
GARY L'EISS IIOTARY PUBLIC, State of II. Y. Monroe Co.
rpy Commission Expires ipsrch 30, 19;p"/
cc: Mr. Victor Stello, Jr., Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D. C.
20555
 
J' 1
l 0}}

Latest revision as of 10:45, 8 January 2025

Responds to IE Bulletin 81-01, Surveillance of Mechanical Snubbers. No Inc Mechanical Snubbers Installed.One Pacific Scientific Co Mechanical Snubber,Model PSA-3,installed on Steam Generator B Blowdown Line
ML17258A975
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/17/1981
From: Maier J
ROCHESTER GAS & ELECTRIC CORP.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
IEB-81-01, IEB-81-1, NUDOCS 8104240321
Download: ML17258A975 (4)


Text

g$'.Sld'vl'i/,lI"j,litl.i~~lI'/I ROCHESTER GAS AND ELECTRIC CORPORATION

) ~

~ O i'

0

( ~W o

89 EAST AVENUE, ROCHESTER, N.Y. 14649 JOHN E.

viA IER VICE PRESIDENT TCI,CPHDVC ARCA CddC TIC 546-2700 March 17, 1981 4EI(pg

~

"ie~~ ~98]m 3

O)AIIIi~P Mr. Boyce H. Grier, Director U. S. Nuclear Regulatory Commission Cffice of Inspection and Enforcement Region I 631 Park Avenue King of P

Subject:

russia, Pennsylvania 19406

'v cn IE Bulletin 81-01, "Surveillance of Mechanical Snubbers"

~ R. E. Ginna Nuclear Power Plant, Unit'll Docket No. 50-244

Dear Mr. Grier:

In response to Inspection and Enforcement Bulletin 81-01 dated January 27, 1981, concerning failures of mechanical snubbers, the follow-ing information is provided.

Ginna Station has no INC mechanical snubbers.

Action items 1 and 2, therefore, do not pertain to Ginna Station.

There is one Pacific Scientific Company mechanical snubber installed on a safety-related system at Ginna Station.

It.is a model PSA-3 and is installed on the B steam generator blow-down line. It is located inside containment and is not normally accessible during reactor operation.

A'dditional Pacific Scientific snubbers are presently in storage and are planned to be installed on safety-related systems.

Each of the Pacific Scientific snubbers was subjected to a final functional test prior to shipment to verify that drag forces were within the specified range.

The installed snubber has been in service only since last November.

Freedom of movement is required of each snuboer to enable ins tallation.

As described in the subject bulletin, the installed PSA-3 snubber willbe visually examined and manually tested during'he spring 1981 refuel-ing outage.

The mechanical snubbers in storage willbe examined as pre-scribed prior to installation.

The results of the inspection of the installed mechanical snubbers willbe submitted within 60 days after completion.

810424088 I

~a

"- l J"",

/

. ip i

V

'lg pg

~ N/

J

ROCHESTER CAS AHO ELECTRIC C..P.

oATE March 17, 1981 Mr. Boyce H. Grier, Director SHEET phIO.

2 To assist in evaluating the value/impact of each Bulletin on licensees, manpower expended in conduct of the review and preparation of this report is approximately six manhours.

Manpower expended for any needed corrective actions willbe provided in the report on the results of the inspections.

Very truly yours, o n E. Maier Subscribed and sworn to me on this 17th day of March 1981.

GARY L'EISS IIOTARY PUBLIC, State of II. Y. Monroe Co.

rpy Commission Expires ipsrch 30, 19;p"/

cc: Mr. Victor Stello, Jr., Director U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement Washington, D. C.

20555

J' 1