IR 05000285/2016006: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (7 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17261B187 | | number = ML17261B187 | ||
| issue date = 09/18/2017 | | issue date = 09/18/2017 | ||
| title = | | title = NRC Inspection Report 05000285/2016006 | ||
| author name = Miller G | | author name = Miller G | ||
| author affiliation = NRC/RGN-IV/DRP/RPB-D | | author affiliation = NRC/RGN-IV/DRP/RPB-D | ||
| addressee name = Fisher M | | addressee name = Fisher M | ||
| addressee affiliation = Omaha Public Power District | | addressee affiliation = Omaha Public Power District | ||
| docket = 05000285 | | docket = 05000285 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:September 18, 2017 | ||
==SUBJECT:== | |||
FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2016006 | |||
SUBJECT: FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2016006 | |||
==Dear Ms. Fisher:== | ==Dear Ms. Fisher:== | ||
The purpose of this letter is to inform you of the U.S. Nuclear Regulatory | The purpose of this letter is to inform you of the U.S. Nuclear Regulatory Commissions (NRC) action to close Inspection Report 05000285/2016006. This report was the annual assessment report for 2016, however, the NRC terminated the Reactor Oversight Process for Fort Calhoun on December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A449). The hours charged to this report were for the preparation of materials to close out the Reactor Oversight Process and transition to decommissioning oversight, including issuance of the Updated Inspection Plan (ADAMS Accession No. ML16347A308), and Commencement of Decommissiong Inspection Program Under Inspection Manual Chapter 2561 (ADAMS Accession No. ML17006A431). A separate report will not be issued. | ||
This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading | This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding. | ||
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, | |||
Please contact me at 817-200-1173, with any questions you may have regarding this letter. | Please contact me at 817-200-1173, with any questions you may have regarding this letter. | ||
Sincerely,/RA/ Geoffrey B. Miller, Chief Projects Branch D Division of Reactor Projects Docket No. 50 | Sincerely, | ||
-285 License No. DPR-40 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011 | /RA/ | ||
-4511 | Geoffrey B. Miller, Chief Projects Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40 UNITED STATES NUCLEAR REGULATORY COMMISSION | ||
==REGION IV== | |||
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 | |||
SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JDixon/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:PBD C:PBD NAME JDixon GMiller SIGNATURE | SUNSI Review: | ||
ADAMS: | |||
Non-Publicly Available Non-Sensitive Keyword: | |||
By: JDixon/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:PBD C:PBD NAME JDixon GMiller SIGNATURE | |||
/RA/ | |||
/RA/ | |||
DATE 9/12/2017 9/18/2017 | |||
}} | }} | ||
Latest revision as of 10:31, 8 January 2025
| ML17261B187 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 09/18/2017 |
| From: | Geoffrey Miller NRC/RGN-IV/DRP/RPB-D |
| To: | Fisher M Omaha Public Power District |
| Geoffrey MIller | |
| References | |
| IR 2016006 | |
| Download: ML17261B187 (2) | |
Text
September 18, 2017
SUBJECT:
FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2016006
Dear Ms. Fisher:
The purpose of this letter is to inform you of the U.S. Nuclear Regulatory Commissions (NRC) action to close Inspection Report 05000285/2016006. This report was the annual assessment report for 2016, however, the NRC terminated the Reactor Oversight Process for Fort Calhoun on December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A449). The hours charged to this report were for the preparation of materials to close out the Reactor Oversight Process and transition to decommissioning oversight, including issuance of the Updated Inspection Plan (ADAMS Accession No. ML16347A308), and Commencement of Decommissiong Inspection Program Under Inspection Manual Chapter 2561 (ADAMS Accession No. ML17006A431). A separate report will not be issued.
This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding.
Please contact me at 817-200-1173, with any questions you may have regarding this letter.
Sincerely,
/RA/
Geoffrey B. Miller, Chief Projects Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40 UNITED STATES NUCLEAR REGULATORY COMMISSION
REGION IV
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511
SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: JDixon/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:PBD C:PBD NAME JDixon GMiller SIGNATURE
/RA/
/RA/
DATE 9/12/2017 9/18/2017