IR 05000285/2016006: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(8 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML17261B187
| number = ML17261B187
| issue date = 09/18/2017
| issue date = 09/18/2017
| title = Fort Calhoun Station - NRC Inspection Report 05000285/2016006
| title = NRC Inspection Report 05000285/2016006
| author name = Miller G B
| author name = Miller G
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| author affiliation = NRC/RGN-IV/DRP/RPB-D
| addressee name = Fisher M J
| addressee name = Fisher M
| addressee affiliation = Omaha Public Power District
| addressee affiliation = Omaha Public Power District
| docket = 05000285
| docket = 05000285
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:September 18, 2017
[[Issue date::September 18, 2017]]


Ms. Mary Senior Director - FCS Decommissioning Omaha Public Power District Fort Calhoun Station Mail Stop FC-2-4 9610 Power Lane Blair, NE 68008
==SUBJECT:==
FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2016006


SUBJECT: FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2016006
==Dear Ms. Fisher:==
The purpose of this letter is to inform you of the U.S. Nuclear Regulatory Commissions (NRC) action to close Inspection Report 05000285/2016006. This report was the annual assessment report for 2016, however, the NRC terminated the Reactor Oversight Process for Fort Calhoun on December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A449). The hours charged to this report were for the preparation of materials to close out the Reactor Oversight Process and transition to decommissioning oversight, including issuance of the Updated Inspection Plan (ADAMS Accession No. ML16347A308), and Commencement of Decommissiong Inspection Program Under Inspection Manual Chapter 2561 (ADAMS Accession No. ML17006A431). A separate report will not be issued.


==Dear Ms. Fisher:==
This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding.
The purpose of this letter is to inform you of the U.S. Nuclear Regulatory Commission's (NRC) action to close Inspection Report 05000285/2016006. This report was the annual assessment report for 2016, however, the NRC terminated the Reactor Oversight Process for Fort Calhoun on December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A449). The hours charged to this report were for the preparation of materials to close out the Reactor Oversight Process and transition to decommissioning oversight, including issuance of the Updated Inspection Plan (ADAMS Accession No. ML16347A308), and Commencement of Decommissiong Inspection Program Under Inspection Manual Chapter 2561 (ADAMS Accession No. ML17006A431). A separate report will not be issued. This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public inspections, exemptions, requests for withholding." Please contact me at 817-200-1173, with any questions you may have regarding this letter.
 
Please contact me at 817-200-1173, with any questions you may have regarding this letter.
 
Sincerely,
/RA/
Geoffrey B. Miller, Chief Projects Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40 UNITED STATES NUCLEAR REGULATORY COMMISSION
 
==REGION IV==
1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511


Sincerely,/RA/ Geoffrey B. Miller, Chief Projects Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40 SUNSI Review: ADAMS: Non-Publicly Available Non-Sensitive Keyword: By: JDixon/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:PBD C:PBD NAME JDixon GMiller SIGNATURE /RA/ /RA/ DATE 9/12/2017 9/18/2017
SUNSI Review:
ADAMS:
Non-Publicly Available Non-Sensitive Keyword:
By: JDixon/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:PBD C:PBD NAME JDixon GMiller SIGNATURE  
/RA/  
/RA/
DATE 9/12/2017 9/18/2017
}}
}}

Latest revision as of 10:31, 8 January 2025

NRC Inspection Report 05000285/2016006
ML17261B187
Person / Time
Site: Fort Calhoun Omaha Public Power District icon.png
Issue date: 09/18/2017
From: Geoffrey Miller
NRC/RGN-IV/DRP/RPB-D
To: Fisher M
Omaha Public Power District
Geoffrey MIller
References
IR 2016006
Download: ML17261B187 (2)


Text

September 18, 2017

SUBJECT:

FORT CALHOUN STATION - NRC INSPECTION REPORT 05000285/2016006

Dear Ms. Fisher:

The purpose of this letter is to inform you of the U.S. Nuclear Regulatory Commissions (NRC) action to close Inspection Report 05000285/2016006. This report was the annual assessment report for 2016, however, the NRC terminated the Reactor Oversight Process for Fort Calhoun on December 28, 2016 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML16363A449). The hours charged to this report were for the preparation of materials to close out the Reactor Oversight Process and transition to decommissioning oversight, including issuance of the Updated Inspection Plan (ADAMS Accession No. ML16347A308), and Commencement of Decommissiong Inspection Program Under Inspection Manual Chapter 2561 (ADAMS Accession No. ML17006A431). A separate report will not be issued.

This letter and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public inspections, exemptions, requests for withholding.

Please contact me at 817-200-1173, with any questions you may have regarding this letter.

Sincerely,

/RA/

Geoffrey B. Miller, Chief Projects Branch D Division of Reactor Projects Docket No. 50-285 License No. DPR-40 UNITED STATES NUCLEAR REGULATORY COMMISSION

REGION IV

1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511

SUNSI Review:

ADAMS:

Non-Publicly Available Non-Sensitive Keyword:

By: JDixon/dll Yes No Publicly Available Sensitive NRC-002 OFFICE SPE:PBD C:PBD NAME JDixon GMiller SIGNATURE

/RA/

/RA/

DATE 9/12/2017 9/18/2017