IR 05000454/2017009: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (21 intermediate revisions by the same user not shown) | |||
| Line 1: | Line 1: | ||
{{Adams | {{Adams | ||
| number = | | number = ML17300B053 | ||
| issue date = | | issue date = 10/26/2017 | ||
| title = | | title = Follow-Up to Disputed Violation of NRC Inspection Report 05000454/2017009; 05000455/2017009 (DRS-D.Szwarc) | ||
| author name = | | author name = Daley R | ||
| author affiliation = NRC/RGN-III/ | | author affiliation = NRC/RGN-III/DRS/EB3 | ||
| addressee name = Hanson B | | addressee name = Hanson B | ||
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | | addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear | ||
| docket = 05000454, 05000455 | | docket = 05000454, 05000455 | ||
| Line 12: | Line 12: | ||
| case reference number = EA-17-138 | | case reference number = EA-17-138 | ||
| document report number = IR 2017009 | | document report number = IR 2017009 | ||
| document type = Letter | | document type = Letter | ||
| page count = | | page count = 2 | ||
}} | }} | ||
| Line 19: | Line 19: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:October 26, 2017 | ||
==SUBJECT:== | |||
BYRON STATION FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000454/2017009; 05000455/2017009 | |||
SUBJECT: | ==Dear Mr. Hanson:== | ||
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report 05000454/2017009; 05000455/2017009. | |||
Specifically, on August 28, 2017, the NRC acknowledged your letter sent to the NRC, dated July 31, 2017, that contested a Non-Cited Violation documented in our inspection report issued on June 29, 2017. The contested Non-Cited Violation is Failure to Perform 10 CFR 50.59 Evaluation for Updated Final Safety Analysis Report Change. | |||
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of a licensees points of contention, as described in Section 2.2.7 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation. We will inform you as soon as we complete our evaluation. | |||
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. | |||
Sincerely, | |||
/RA/ | |||
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERV | |||
Letter to Bryan from Robert C. Daley dated October 26, 2017 SUBJECT: BYRON STATION FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000454/2017009; 05000455/2017009 DISTRIBUTION: | |||
Theresa Clark RidsNrrDorlLpl3 RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth OBrien Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII | |||
ADAMS Accession Number ML17300B053 OFFICE RIII | |||
RIII | |||
RIII | |||
RIII | |||
NAME DSzwarc:cl RDaley RSkokowski | |||
DATE 10/825/17 10/26/17 10/25/17 | |||
OFFICIAL RECORD COPY | |||
}} | }} | ||
Latest revision as of 03:12, 8 January 2025
| ML17300B053 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 10/26/2017 |
| From: | Robert Daley Engineering Branch 3 |
| To: | Bryan Hanson Exelon Generation Co, Exelon Nuclear |
| References | |
| EA-17-138 IR 2017009 | |
| Preceding documents: |
|
| Download: ML17300B053 (2) | |
Text
October 26, 2017
SUBJECT:
BYRON STATION FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000454/2017009; 05000455/2017009
Dear Mr. Hanson:
This is a follow-up letter to the U.S. Nuclear Regulatory Commission (NRC) acknowledgement of disputed violation of NRC Inspection Report 05000454/2017009; 05000455/2017009.
Specifically, on August 28, 2017, the NRC acknowledged your letter sent to the NRC, dated July 31, 2017, that contested a Non-Cited Violation documented in our inspection report issued on June 29, 2017. The contested Non-Cited Violation is Failure to Perform 10 CFR 50.59 Evaluation for Updated Final Safety Analysis Report Change.
The NRC seeks to provide a thorough response to disputed violations within 90 days of receipt of a licensees points of contention, as described in Section 2.2.7 of the NRC Enforcement Manual, Part I. However, the NRC review of this disputed violation is expected to take longer than 90 days because of ongoing activities related to the subject of this disputed violation. We will inform you as soon as we complete our evaluation.
This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Sincerely,
/RA/
Robert C. Daley, Chief Engineering Branch 3 Division of Reactor Safety Docket Nos. 50-454; 50-455 License Nos. NPF-37; NPF-66 cc: Distribution via LISTSERV
Letter to Bryan from Robert C. Daley dated October 26, 2017 SUBJECT: BYRON STATION FOLLOW-UP TO DISPUTED VIOLATION OF NRC INSPECTION REPORT 05000454/2017009; 05000455/2017009 DISTRIBUTION:
Theresa Clark RidsNrrDorlLpl3 RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Kenneth OBrien Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII
ADAMS Accession Number ML17300B053 OFFICE RIII
RIII
RIII
RIII
NAME DSzwarc:cl RDaley RSkokowski
DATE 10/825/17 10/26/17 10/25/17
OFFICIAL RECORD COPY