IR 05000327/2017403: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (9 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML17325B106 | | number = ML17325B106 | ||
| issue date = 11/14/2017 | | issue date = 11/14/2017 | ||
| title = | | title = Units No. 1 and 2 - U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000327/2017403 and 05000328/2017403 - OUO Information Removed | ||
| author name = Shaeffer S | | author name = Shaeffer S | ||
| author affiliation = NRC/RGN-II/DRS | | author affiliation = NRC/RGN-II/DRS | ||
| addressee name = Shea J | | addressee name = Shea J | ||
| addressee affiliation = Tennessee Valley Authority | | addressee affiliation = Tennessee Valley Authority | ||
| docket = 05000327, 05000328 | | docket = 05000327, 05000328 | ||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter | {{#Wiki_filter:November 14, 2017 | ||
==SUBJECT:== | |||
SEQUOYAH NUCLEAR PLANT, UNITS NO. 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000327/2017403 AND 05000328/2017403 | |||
SUBJECT: SEQUOYAH NUCLEAR PLANT, UNITS NO. 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000327/2017403 AND 05000328/2017403 | |||
==Dear Mr. Shea:== | ==Dear Mr. Shea:== | ||
On October 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the | On October 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results, which were discussed on October 17, 2017, with Mr. Brian Brigman and other members of your staff. | ||
The inspection examined activities conducted under your license as they relate to security and compliance with the | The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | ||
Based on the results of this inspection, no findings of significance were identified. The inspectors also documented one licensee-identified violation, which was determined to be of very low safety significance, in this inspection report. | Based on the results of this inspection, no findings of significance were identified. The inspectors also documented one licensee-identified violation, which was determined to be of very low safety significance, in this inspection report. | ||
In accordance with 10 CFR 2.390 of the | In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. | ||
Sincerely, | |||
/RA/ | |||
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety | |||
Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79 | |||
Nonpublic Enclosure: | |||
NRC Inspection Report No. 05000327/2017403, and 05000328/2017403 w/ | NRC Inspection Report No. 05000327/2017403, and 05000328/2017403 w/ Attachment: Supplementary Information (OUO) | ||
(Official Use Only - Security Related Information) | |||
cc: (See page 3) cc: | |||
Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801 | |||
Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000 | Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000 | ||
| Line 46: | Line 50: | ||
D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000 | D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000 | ||
Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000 Fred. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000 | Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000 | ||
Fred. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801 | |||
Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000 | |||
___ ________________ | |||
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII: | |||
RII: | |||
RII: | |||
RII: | |||
SIGNATURE WRM1 ETC1 SMS ADM2 SMS | |||
NAME MONK COFFMAN SHAEFFER MASTERS SHAEFFER | |||
DATE 11/ 9 /2017 10/27/2017 11/ 9/2017 11/ 9 /2017 11/14 /2017 | |||
/ /2017 | |||
/ /2017 E-MAIL COPY? | |||
YES NO YES NO YES NO YES NO YES NO YES NO YES NO | |||
}} | }} | ||
Latest revision as of 15:36, 7 January 2025
| ML17325B106 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 11/14/2017 |
| From: | Scott Shaeffer Division of Reactor Safety II |
| To: | James Shea Tennessee Valley Authority |
| References | |
| IR 2017403 | |
| Download: ML17325B106 (4) | |
Text
November 14, 2017
SUBJECT:
SEQUOYAH NUCLEAR PLANT, UNITS NO. 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000327/2017403 AND 05000328/2017403
Dear Mr. Shea:
On October 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results, which were discussed on October 17, 2017, with Mr. Brian Brigman and other members of your staff.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
Based on the results of this inspection, no findings of significance were identified. The inspectors also documented one licensee-identified violation, which was determined to be of very low safety significance, in this inspection report.
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety
Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79
Nonpublic Enclosure:
NRC Inspection Report No. 05000327/2017403, and 05000328/2017403 w/ Attachment: Supplementary Information (OUO)
(Official Use Only - Security Related Information)
cc: (See page 3) cc:
Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801
Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000
D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000
Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000
Fred. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801
Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000
___ ________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:
RII:
RII:
RII:
SIGNATURE WRM1 ETC1 SMS ADM2 SMS
NAME MONK COFFMAN SHAEFFER MASTERS SHAEFFER
DATE 11/ 9 /2017 10/27/2017 11/ 9/2017 11/ 9 /2017 11/14 /2017
/ /2017
/ /2017 E-MAIL COPY?