IR 05000327/2017403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(5 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 11/14/2017
| issue date = 11/14/2017
| title = Units No. 1 and 2 - U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000327/2017403 and 05000328/2017403 - OUO Information Removed
| title = Units No. 1 and 2 - U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000327/2017403 and 05000328/2017403 - OUO Information Removed
| author name = Shaeffer S M
| author name = Shaeffer S
| author affiliation = NRC/RGN-II/DRS
| author affiliation = NRC/RGN-II/DRS
| addressee name = Shea J W
| addressee name = Shea J
| addressee affiliation = Tennessee Valley Authority
| addressee affiliation = Tennessee Valley Authority
| docket = 05000327, 05000328
| docket = 05000327, 05000328
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 November 14, 2017 Mr. Joseph Vice President, Nuclear Regulatory Affairs and Support Services Tennessee Valley Authority
{{#Wiki_filter:November 14, 2017


1101 Market Street, LP 3D-C Chattanooga, TN 37402-2801
==SUBJECT:==
 
SEQUOYAH NUCLEAR PLANT, UNITS NO. 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000327/2017403 AND 05000328/2017403
SUBJECT: SEQUOYAH NUCLEAR PLANT, UNITS NO. 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000327/2017403 AND 05000328/2017403


==Dear Mr. Shea:==
==Dear Mr. Shea:==
On October 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRC's Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results, which were discussed on October 17, 2017, with Mr. Brian Brigman and other members of your staff.
On October 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results, which were discussed on October 17, 2017, with Mr. Brian Brigman and other members of your staff.


The inspection examined activities conducted under your license as they relate to security and compliance with the Commission's rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.


Based on the results of this inspection, no findings of significance were identified. The inspectors also documented one licensee-identified violation, which was determined to be of very low safety significance, in this inspection report.
Based on the results of this inspection, no findings of significance were identified. The inspectors also documented one licensee-identified violation, which was determined to be of very low safety significance, in this inspection report.


In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter will be  
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.


available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390," in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.
Sincerely,
/RA/  


Sincerely,
/RA/
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  
Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety  


Line 42: Line 40:


Nonpublic Enclosure:
Nonpublic Enclosure:
NRC Inspection Report No. 05000327/2017403, and 05000328/2017403 w/ Attachment: Supplementary Information (OUO) (Official Use Only - Security Related Information)
NRC Inspection Report No. 05000327/2017403, and 05000328/2017403 w/ Attachment: Supplementary Information (OUO)  
cc: (See page 3) cc: Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C
(Official Use Only - Security Related Information)  


Chattanooga, TN 37402-2801  
cc: (See page 3) cc:
Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801  


Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000  
Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000  
Line 51: Line 50:
D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000  
D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000  


Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000 Fred. E. Marcussen Director, Nuclear Security Tennessee Valley Authority  
Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000  
 
Fred. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801


1101 Market Street, LP 1A Chattanooga, TN 37402-2801
Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000


Brian E. Brigman
___ ________________
SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:
RII:
RII:
RII:
SIGNATURE WRM1 ETC1 SMS ADM2 SMS


Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box
NAME MONK COFFMAN SHAEFFER MASTERS SHAEFFER


___ ________________ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII: RII: RII: RII: SIGNATURE WRM1 ETC1 SMS ADM2 SMS NAME MONK COFFMAN SHAEFFER MASTERS SHAEFFER DATE 11/ 9 /2017 10/27/2017 11/ 9/2017 11/ 9 /2017 11/14 /2017 / /2017 / /2017 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO
DATE 11/ 9 /2017 10/27/2017 11/ 9/2017 11/ 9 /2017 11/14 /2017  
/ /2017  
/ /2017 E-MAIL COPY?
YES NO YES NO YES NO YES NO YES NO YES NO YES NO
}}
}}

Latest revision as of 15:36, 7 January 2025

Units No. 1 and 2 - U.S. Nuclear Regulatory Commission Security Target Set Inspection Report 05000327/2017403 and 05000328/2017403 - OUO Information Removed
ML17325B106
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 11/14/2017
From: Scott Shaeffer
Division of Reactor Safety II
To: James Shea
Tennessee Valley Authority
References
IR 2017403
Download: ML17325B106 (4)


Text

November 14, 2017

SUBJECT:

SEQUOYAH NUCLEAR PLANT, UNITS NO. 1 AND 2 - U.S. NUCLEAR REGULATORY COMMISSION SECURITY TARGET SET INSPECTION REPORT 05000327/2017403 AND 05000328/2017403

Dear Mr. Shea:

On October 17, 2017, the U.S. Nuclear Regulatory Commission (NRC) completed a security baseline inspection at your Sequoyah Nuclear Plant, Units 1 and 2. The inspection covered one or more of the key attributes of the security cornerstone of the NRCs Reactor Oversight Process. The enclosed inspection report (IR) documents the inspection results, which were discussed on October 17, 2017, with Mr. Brian Brigman and other members of your staff.

The inspection examined activities conducted under your license as they relate to security and compliance with the Commissions rules and regulations, and with the conditions of your license. The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.

Based on the results of this inspection, no findings of significance were identified. The inspectors also documented one licensee-identified violation, which was determined to be of very low safety significance, in this inspection report.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of the NRCs Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1), and its disclosure to unauthorized individuals could present a security vulnerability. Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room, or from the PARS component of NRC's ADAMS. If you choose to provide a response and security-related information is necessary to provide an acceptable response, please mark your entire response Security-Related Information - Withhold from Public Disclosure under 10 CFR 2.390, in accordance with 10 CFR 2.390(d)(1), and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response.

Sincerely,

/RA/

Scott M. Shaeffer, Chief Engineering Branch 2 Division of Reactor Safety

Docket No.: 50-327, 50-328 License No.: DPR-77, DPR-79

Nonpublic Enclosure:

NRC Inspection Report No. 05000327/2017403, and 05000328/2017403 w/ Attachment: Supplementary Information (OUO)

(Official Use Only - Security Related Information)

cc: (See page 3) cc:

Erin K. Henderson Senior Management, Fleet Regulatory Operations Tennessee Valley Authority 1101 Market Street, LP 5A-C Chattanooga, TN 37402-2801

Matthew Rasmussen Plant Manager, Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, POB 2A-SQN Soddy Daisy, TN 37384-2000

D. G. Dimopoulos Director, Plant Support Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000

Michael W. McBrearty Manager, Site Licensing Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, OPS 4A-SQN Soddy Daisy, TN 37384-2000

Fred. E. Marcussen Director, Nuclear Security Tennessee Valley Authority 1101 Market Street, LP 1A Chattanooga, TN 37402-2801

Brian E. Brigman Senior Manager, Site Security Sequoyah Nuclear Plant Tennessee Valley Authority P.O. Box 2000, MPB 1A-SQN Soddy Daisy, TN 37384-2000

___ ________________

SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRS RII:DRS RII:DRS RII:

RII:

RII:

RII:

SIGNATURE WRM1 ETC1 SMS ADM2 SMS

NAME MONK COFFMAN SHAEFFER MASTERS SHAEFFER

DATE 11/ 9 /2017 10/27/2017 11/ 9/2017 11/ 9 /2017 11/14 /2017

/ /2017

/ /2017 E-MAIL COPY?

YES NO YES NO YES NO YES NO YES NO YES NO YES NO