ML17352A377: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[L-94-008, Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4]]
| number = ML17352A377
| issue date = 12/31/1993
| title = Monthly Operating Repts for Dec 1993 for Turkey Point Units 3 & 4.W/940113 Ltr
| author name = Knorr J, Plunkett T
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =
| addressee affiliation = NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
| docket = 05000250, 05000251
| license number =
| contact person =
| document report number = L-94-008, L-94-8, NUDOCS 9401240146
| document type = MONTHLY OPERATING ANALYSIS REPORT, TEXT-SAFETY REPORT
| page count = 20
}}
 
=Text=
{{#Wiki_filter:Y E~
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
: CQSU4N4                            DOCKET FACIL:50-250 Turkey Point Plant, Unit 3, Florida Power and Light                  C 05000250 50-251 Turkey Point Plant, Unit 4, Florida Power and Light                C 05000251 AUTH. NAME            AUTHOR AFFILIATION Florida      Power 6 Light Co.
  ,
KNORR,J.E.
PLUNKETT,T.F.        Florida      Power 6 Light Co.
RECIP.NAME            RECIPIENT AFFILIATION
 
==SUBJECT:==
Monthly o    e      'ng repts    for Dec 1993 for Turkey Point Units 3 & 4.        113    tr.                                                        D DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR                  ENCL      SIZE:
TITLE: Monthly Operating Report (per Tech Specs)
NOTES:
RECIPIENT              COPIES            RECIPIENT          COPIES ID  CODE/NAME            LTTR ENCL      ID  CODE/NAME      LTTR ENCL          D PD2-2 PD                    1    1      RAGHAVAN,L            1    1 INTERNAL: AEOD/DOA                      1    1      AEOD/DSP/TPAB          1    1            D N    DORS  0                1    1      NRR/DRIL/RPEB          1    1 EG  WIXR        01        1    1      RGN2                  1    1 EXTERNAL    EGGG BRYCE i J ~ H          1    1      NRC PDR                1    1 NSIC                        1    1 D
D NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED: LTTR                11  ENCL    11
 
                                              .. Box 029100,  Miami, FL, 33102-9100 Jp,N      l3    19M L-94-008 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn:    Document Control Desk Washington, D. C.                20555 Gentlemen:
RE:  Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Monthl        0  eratin      Re ort In accordance with the requirements of Turkey Point Units 3 and 4 Technical Specification 6.9 '.5, and the guidance of NUREG-0020, attached are the December 1993 Operating Status and Summary of Operating Experience Reports for Turkey Point Units 3 and 4.
Very Truly Yours, T. F. Plunkett Vice President Turkey Point Nuclear TFP/JEK/jk attachments cc: Stewart D. Ebneter, Regional Administrator, Region II, USNRC T. P. Johnson, Senior Resident Inspector, USNRC, Turkey Point Plant s~.j. OO 8 pg PDR R      'DR 9401240146 931231 ADOCK 05000250 an PPL Group company
                              '.
ZEND
                                                                                  //(
 
F gO
~ $ +>
~p'a ! e I
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-250 UNIT          llKRH POINT 3 DATE COMPLETED BY TELEPHONE MONTH DECEMBER  1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93  701 12/02/93  700 12/03/93  699 12/04/93  695 12/05/93  690 12/06/93  692 12/07/93  697 12/08/93  696 12/09/93  693 12/10/93  692 12/11/93  690 12/12/93  703 12/13/93  700 12/14/93  698 12/15/93  697 12/16/93  706 12/17/93  700 12/18/93  704 12/19/93  698 12/20/93  693 12/21/93  692 12/22/93  695 12/23/93  693 12/24/93  694 12/25/93  698 12/26/93  703 3.2/27/93  705 12/28/93  702 12/29/93  694 12/30/93  693 12/31/93  693
 
J UNIT      SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.                50-250 UNlT NAME:
DATE:                      anuar COMPLETED BY:            .      . norr TELEPHONE REPORT MONTH DECEMBER 1993 No    Date Type'uration (Hours)
Reasons  Method Shutting of  Licensee Event Spstep    Comgnept              Cause  4 Corrective Action to Down    Reportt                                      Prevent Recurrence Reactors NA      N/A  NIA  0.0          N/A      N/A        N/A          N/A        NIA                    N/A F  Forced              Reason                        Method                        Exhibit G - Instructions        Exhibit 1    same Source s  scheduled            A  Equipment Failure          1  Manual                    for Preparation of Data B  Maintenance or Test        2  Manual Scram              Entrv Sheets Licensee C  Refueling                  3  Automatic Scram          Event Report (LER)  File D  Regulatory restriction    4  Continued                (NUREG-0161)
E  Operator Traininc 6        5  Load Reduction License Examination      9  Other  (Explain)
F  Administrative G  Operational Error (Explain)
 
H    other (Explain)
 
aM I',
V II 1
c'            c' a  I<
if,'yt'f
    ,p
        '
N '.
              ~
e<
1
          '<1 L j  C P
 
OPERATING DATA REPORT DOCKET NO            50  250 DATE                    1/ 7/94 COMPLETED BY      J. E. KNORR TELEPHONE        305/246/6757 OPERAT I NG STATUS
: 1. UNIT NAME: TURKEY POINT            UNIT 3 REf>OH f ING PERIOD: DECEMBER 1993 L I CLffSED Tt IERMAL POWER (MWT ):                  2200
: 4. NAMf:PLATL ttaIING (GROSS MWE):                        760
: b. DLSl(AN ELECTRI(.AL RATING (NET MWL):                  693 6 MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):                699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):                  666 8    It" CffANGES OCCUR IN CAPACITY RATINGS ( ITEMS NUMBER 3 THROUGH 7)
SINCE AST REPORT GIVE REASONS:
t            ~
9    POWt.R LEVEL TO WHICH RESTRICTED. IF ANY (NET MWE)
'IO    HLASONS FOR HFSTRICfIONS ~ IF ANY>>
MONTHLY    - YTD-    CUMULATIVE 1 1. 1(, HS Itt REPORf PERIOD:
      ~                                                    744      8760          184737.6
: 12. NUMBER OF ttOURS REACTOR WAS CRITICAL                    744.0    8501.0        121260. 3
: 13. fct-af lOR RFSERVE SHUTDOWN HOURS                          0.0        0.0          844.4
: 14. tfOt)HS GENERATOR ON-LING                                744.0    8422.6        1 19533. 4 15, uutl fEEsLRvh SrfufDowN H0URs                              0.0        0.0          121.8 16    GfCO  5  IftERMA'tEERGY GENERAfEO    (MWH)        1637596  1823291'I    248139838 ff. Gffo' El ECTRICAL FNCRGY GENERATED (MWH)            543065    5939690      79581816
'tl. NF,I LLFCTRICAI. ENERGY GENERATED (MWH)              518542    5657345      75269505 IU. UNII EENVICE FACTOR                                  100. 0      96. 1          64.7
: 20. UNIT AVAILAUIIITY FACTOR                              100. 0      96. 1          64.8
: 21. caPAcll Y        I aclOR (UsING Muc NET)                104. 6      97. 0          62.2 2>>". CAPAC11Y FAC1'OH (USING DER NET)                        100. 6      93.2            58.8
: 23. utEIT I-ORCEO Outa(.E RATE                                0.0        1.8            11.8
: 24. SffulDOWNS SCHBt)tfLFD OVER NEXT 6 MONTHS
          ,CYCLE 14 REFUELING OU1AGE SCtfEt)ul.ED 4/94 25  =    I f SttUI'OWN AT    END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP f
 
V I
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO. 50-250 UNIT:          ur e  own DATE            anuar COMPLETED BY          orr TELEPHONE:
REPORT MONTH  DECEMBER  1993 Unit 3 began the month of December at  100% power and retained that status through the end of the month.
 
I E
 
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-251 UNIT        TURTKP POINT 4 DATE          ANUA COMPLETED BY    E. N  R TELEPHONE MONTH DECEMBER  1993 AVERAGE DAILY POWER LEVEL (MWe-Net) 12/01/93  699 12/02/93  699 12/03/93  697 12/04/93  695 12/05/93  690 12/06/93  691 12/07/93  695 12/08/93  695 12/09/93  694 12/10/93  694 12/11/92  693 12/12/93  701 12/13/93  704 12/14/93  701 12/15/93  698 12/16/93  701 12/17/93  704 12/18/93  703 12/19/93  698 12/20/93  694 12/21/93  691 12/22/93  694 12/23/93  693 12/24/93  695 12/25/93  698 12/26/93  704 12/27/93  704 12/28/93  701 12/29/93  695 12/30/93  690 12/31/93  693
 
IV 4
'E F
 
UNIT    SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.              50-251 UNIT NAME:
DATE:
COMPLETED BY:
TELEPHONE:
REPORT MONTH DECEMBER 1993 No. Date  Type~ Duration (Hours)
Reason*  Method  of Shutting Licensee Event        Sgs t e(m  Componept Code Cause 4  Corrective Action to Down      Reports                                          Prevent Recurrence Reactors ,
N/A        N/A N/A    0.0          N/A      N/A        N/A            N/A          N/A                              N/A F  Forced                  Reason                        Method                            Exhibit G -  Instructions      Exhibit 1 - same source s  scheduled              A  Equipment  Failure        1  Manual                        foz Preparation of Data B  Maintenance or Test        2  -  Manual Sczam                EntrV Sheets Licensee C  Refueling                                                    Event Report (LER) File D  Regulatory restriction 3
4  - Automatic Continued Scram (NUREG-0161)
E  Operator Training &        5      Load Reduction License Examination      9  Other (Explain)
F - Administrative G  Operational Error (Explain)
H  Other (Explain)
 
1 "l
          ~  ~ I II << ~
          -  ~    I' 1
 
~ C ~  ~,
 
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.
UNIT:          ur e    oxn DATE:
TELEPHONE'0-251 anua COMPLETED BY:          orr REPORT MONTH  DECEMBER 1993 Unit 4 began the montn  of December at 100~- power and  retained that status through the  end of the month.
 
J
    .0  1~
i g
 
OPERATING DATA REPORT DOCKET NO            50  -  251 DATE                  1/ 7/94 COMPLETED BY    J. E. KNORR TELEPHONE      305/246/6757 OPERaflNG STA'rUS
: 1. UNI 1'AME: TURKEY POINT      UNIT 4 2, REf'ORTING PERIOD: DECEMBER 1993
: 3. LICENSED THERMAL POWER (MWT):                    2200 NAMEPLATE RATING (GROSS MwE):                    760
: 5. DESIGN ELECTRICAL RATING (NET MWF.):            693
: 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWE):        699
: 7. MAXIMUM DEPENDABLE CAPACITY (NET MWE):          666
: 8. IF  CHANGES OCCUR IN CAPACITY RAl'INGS (ITEMS NUMBER 3 THROUGH 7)
StNCE LAST REPORT. GIVE REASONS:
: 9. POwER LEVFL TO wHICH RESTRICTED. IF aNY (NET MWE)
: 10. REASONS FOR RESTRICTIONS, IF ANY:
o MONTHLY    -YTD- CUMULATIVE
: 11. HOURS IN REPORT PERIOD:                            744      8760        178469.0
'e
: 2. NUMBER OF HOURS REACTOR WAS CRIT'AL              744.0    7441. 7      117280.3
: 13. REAC1'OR RESERVE SHUTDOWN HOURS                    0.0        0.0          166.6
: 14. HOURS GFNERATOR ON-LINE                          744.0    7279.7      113325.0
: 15. UN11 RESERVE SHUTDOWN HOURS                        0.0        0.0          577.3 16    GROSS iHERMat. ENERGY GENERa'rFD (MwH)        1637791    15485620      239059955 17    GROSS I:LL'CTRICAL ENERGY GENERATED (MWH)      542820    4995000      76353970
: 18. tetr El.ECTRICAL ENERGY GENERATEO (MWH)        518449    4746291      72235232
: 19. UNll SERVICE FaCTOR                                100. 0      83.1            63.5
: 20. UNIT AVAILABlt,lTYFACTOR                            100. 0      83.1            63.8
: 21. capacil'Y Factok (osING MDG NET)                    104. 6      81.4            61. 8
: 22. caknCI1Y FAclDR (UsING DER NET)                    100. 6      78.2            58.4
: 23. UNtl FORCED OitraGE RaTE                              0.0        2.0            11.4
: 24. SHUIDOWNS SCHt".RULED OVER NEXT 6    MONTHS NONE
: 25. 1F SHUT DOWN AT END OF REPORT  PERIOD, ESTIMATED DATE OF STARTUP:
 
(~
I}}

Latest revision as of 09:01, 7 January 2025