ML18010A858: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18010A858
| number = ML18010A858
| issue date = 10/22/1992
| issue date = 10/22/1992
| title = Forwards Summary of ECCS Outage Times Covering 5-yr Period Commencing W/Issuance of Low Power OL on 861024 & Ending on 911023 to Address NUREG-0737,Item II.K.3.17, Rept on Outages of ECCS Sys.
| title = Forwards Summary of ECCS Outage Times Covering 5-yr Period Commencing W/Issuance of Low Power OL on 861024 & Ending on 911023 to Address NUREG-0737,Item II.K.3.17, Rept on Outages of ECCS Sys
| author name = Mccarthy D
| author name = Mccarthy D
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:,~cczr.za.hr~a Orsra.~am                       rOW   ozivro~, a.~now SvSIZrvr REGULBTZ       ZNFORMBTZON DZSTRZBUTZON       ZSTEM (RZDS)
{{#Wiki_filter:,~cczr.za.hr~a Orsra.~am rOW ozivro~, a.~now SvSIZrvr REGULBTZ ZNFORMBTZON DZSTRZBUTZON ZSTEM (RZDS)
ACCES~IOP /BR:9210280283           DOC.DATE:     92/10/22   NOTARIZED: NO         DOCKET FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina                   05000400 AUTH. NAME           AUTHOR AFFILIATION MCCARTHY,D.C.       Carolina Power       a Light Co.
ACCES~IOP /BR:9210280283 DOC.DATE: 92/10/22 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION MCCARTHY,D.C.
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document           Control Desk)
Carolina Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000400


==SUBJECT:==
==SUBJECT:==
Forwards summary of         ECCS   outage times covering 5-yr period commencing w/issuance of low power OL on 861024 & ending on 911023 to address NUREG-0737,Item II.K.3.17, "Rept on Outages of ECCS Sys."
Forwards summary of ECCS outage times covering 5-yr period commencing w/issuance of low power OL on 861024
D DISTRIBUTION CODE: A003D         COPIES RECEIVED:LTR       I ENCL   ( SIZE:   t TITLE: OR/Licensing Submittal: Suppl             1 to NUREG-0737(Generic Ltr 82-33)
& ending on 911023 to address NUREG-0737,Item II.K.3.17, "Rept on Outages of ECCS Sys."
NOTES:Application     for permit renewal filed.                                   05000400   i RECIPIENT             COPIES              RECIPIENT        COPIES ID CODE/NAME           LTTR ENCL          ID  CODE/NAME      LTTR ENCL PD2-1 LA                   1      1      PD2-1 PD              1    1 LE,N                       2      2 INTERNAL: NRR/DLPQ/LHFB11             1     1       OC/LFMB               1    0 PE                01        1      1      RES/DSIR/EIB         1   1 EXTERNAL: NRC PDR                      1     1       NSIC                  1   1 NOTE TO ALL "RIDS" RECIPIENTS:
D DISTRIBUTION CODE:
A003D COPIES RECEIVED:LTR I
ENCL
(
SIZE:
t TITLE: OR/Licensing Submittal:
Suppl 1 to NUREG-0737(Generic Ltr 82-33)
NOTES:Application for permit renewal filed.
05000400 i RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: NRR/DLPQ/LHFB11 PE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PD2-1 PD OC/LFMB RES/DSIR/EIB NSIC COPIES LTTR ENCL 1
1 1
0 1
1 1
1 NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION S
ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
LISTS FOR DOCUMENTS YOU DON'T NEED!
S TOTAL NUMBER OF COPIES REQUIRED:
TOTAL NUMBER OF COPIES REQUIRED: LTTR               10   ENCL   9
LTTR 10 ENCL 9


I Ii p
I
                                                      @ME Carolina Power   8 Light Company OCT   32   1992 SERIAL: NLS 288 United States Nuclear Regulatory Commission ATTENTION: Document Control Desk Washington,   DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 NUREG-0737, Item     II.K.3.17;       REPORT ON OUTAGES OF ECCS SYSTEMS Gentlemen:
 
NUREG-0737,   "Post TMI-Requirements," Item II.K.3.17 "Report on Outages of Emergency   Core-Cooling     Systems Licensee Report and Proposed Technical Specification Changes" dated October 31, 1980, requires licensees and applicants to submit an Emergency Core Cooling System (ECCS) outage history for a five year period.
Ii p
The attached data represents a summary of the Shearon Harris Nuclear Power Plant (SHNPP) ECCS outage times (component and system). The data covers the five year period commencing with the issuance of the low power operating license on October 24, 1986 and ending October 23, 1991. It includes required maintenance and surveillance testing and was obtained from Equipment Inoperable Records and the Surveillance Test Scheduling System (STSS). The data obtained from STSS for duration is estimated based on average performance time.
@ME Carolina Power 8 Light Company OCT 32 1992 SERIAL:
Attachment   1 provides the:           a) Outage dates and durations (in hours) b) Cause of each outage c) ECC System or components involved d) Corrective actions, as applicable Attachment   2 is a glossary of terms and abbreviations used in Attachment                       l.
NLS 288 United States Nuclear Regulatory Commission ATTENTION:
Safety system availability is tracked and reported monthly to the Institute of Nuclear Power Operations (INPO) in accordance with the guidance provided by INPO. Improvements have been accomplished in recent years by scheduling testing and maintenance outages concurrently. Carolina Power & Light Company (CP&L) is committed to ensure the highest safety system availability and performance possible, given the necessary preventive maintenance, corrective maintenance, and required surveillance test:s.
Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 NUREG-0737, Item II.K.3.17; REPORT ON OUTAGES OF ECCS SYSTEMS Gentlemen:
Carolina Power & Light Company has reviewed the availability of ECCS systems and components and concludes that no Technical Specification changes are warranted.
NUREG-0737, "Post TMI-Requirements,"
Item II.K.3.17 "Report on Outages of Emergency Core-Cooling Systems Licensee Report and Proposed Technical Specification Changes" dated October 31, 1980, requires licensees and applicants to submit an Emergency Core Cooling System (ECCS) outage history for a five year period.
The attached data represents a summary of the Shearon Harris Nuclear Power Plant (SHNPP)
ECCS outage times (component and system).
The data covers the five year period commencing with the issuance of the low power operating license on October 24, 1986 and ending October 23, 1991. It includes required maintenance and surveillance testing and was obtained from Equipment Inoperable Records and the Surveillance Test Scheduling System (STSS).
The data obtained from STSS for duration is estimated based on average performance time.
Attachment 1 provides the:
a) Outage dates and durations (in hours) b) Cause of each outage c)
ECC System or components involved d) Corrective actions, as applicable Attachment 2 is a glossary of terms and abbreviations used in Attachment l.
Safety system availability is tracked and reported monthly to the Institute of Nuclear Power Operations (INPO) in accordance with the guidance provided by INPO.
Improvements have been accomplished in recent years by scheduling testing and maintenance outages concurrently.
Carolina Power
& Light Company (CP&L) is committed to ensure the highest safety system availability and performance possible, given the necessary preventive maintenance, corrective maintenance, and required surveillance test:s.
Carolina Power
& Light Company has reviewed the availability of ECCS systems and components and concludes that no Technical Specification changes are warranted.
28062g
28062g
                                  '-ayettevilte Street ~ P. O. 8ox 1551 o Raleigh, N. C. 27602
'7210280283 921022 PDR ADOCK 05000400 P
'7210280283 921022 PDR      ADOCK 05000400 P                      PDR
PDR
'-ayettevilte Street
~ P. O. 8ox 1551 o Raleigh, N. C. 27602


4
4
Line 45: Line 80:


Document Control Desi~
Document Control Desi~
'~ ~VLS-92-288 / Page 2 This report fulfills CPGL's commitment as documented   in the SHNPP Final Safety Analysis Report for NUREG-0737, Item II.K.3.17.
'~ ~VLS-92-288 / Page 2
Questions regarding this matter may be referred to Mr. R. W. Prunty at (919) 546-7318.
This report fulfills CPGL's commitment as documented in the SHNPP Final Safety Analysis Report for NUREG-0737, Item II.K.3.17.
Yours very truly, D. C. McCarthy Manager Nuclear Licensing Section SDC/sdc cc: Mr. S. D. Ebneter Mr. N. B. Le Mr. J. E. Tedrow
Questions regarding this matter may be referred to Mr. R.
W. Prunty at (919) 546-7318.
Yours very truly, D.
C. McCarthy Manager Nuclear Licensing Section SDC/sdc cc:
Mr. S.
D. Ebneter Mr. N. B. Le Mr. J.
E. Tedrow
 
~
~
I


~ ~ I Page 1                                                                   ATTACHMENT 1 DATE   DURATION                                     CAUSE                         SYSTEH/COHPONENT         CORRECTIVE ACTION 10/24/86       'I ~ 50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL               EDG    B EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/24/86      1.50     OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY                   EDG    8  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/27/86      1.50     OST-1823 1A-SA EDG OPERABILITY 18 MONTH                       EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/27/86      1.50     OST-1823 1A-SA EDG OPERABILITY 18 MONTH                         EDG    A  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/27/86      1.50     OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY                     EDG    A  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/07/86      1 ~ 50 OST-1085   1A-SA EDG OPERABILITY SEHIANHUALLY                     EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/07/86      1.50 OST-1013     1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 1.50     OST.1824 1B-SB EDG OPERABILITY 18 HONTH                         EDG    B  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/11/86
Page 1
'I1/11/86      1.50   OST-1824 1B-SB EDG OPERABILITY 18 HONTH                         EDG    B  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 1.50   OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY                     EDG    8  EDG          'PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/11/86 11/13/86        1.50   OST-1823 1A-SA EDG OPERABILITY 18 HONTH                         EDG    A  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/13/86        1.50   OST-1823 1A-SA EDG OPERABILITY 18 MONTH                         EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/18/86      0.97     A CSIP INOP FOR MAINTENAHCE                                     ECCS  A CSIP          COMPLETE MAINTENANCE AND TEST 11/19/86      1.50   OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG    8 EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/01/86      1.50   OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY                     EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/10/86      1.50   OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A  EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/21/86      1 ~ 50 OST-1073 18-SB EDG OPERABILITY HONTHLY INTERVAL                 EDG    B EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/25/86      0.50 OST-'1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                   ECCS  8 RHR            COMPLETE SCHEDULED TEST 12/25/86      0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                 ~ ECCS  A RHR            COMPLETE SCHEDULED TEST 01/04/87      0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL                   ECCS  A  RHR            COHPLETE SCHEDULED TEST 01/04/87      0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                   ECCS  8  RHR            COHPLETE SCHEDULED TEST 01/08/87      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                     EDG    A  EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 01/20/87      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                     EDG    8  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 01/21/87      5.92 PLACED IN MAIN'IENANCE TO SUPPORT S/U TESTING                       EDG    A  EDG          COHPLETE S/U TESTING 01/22/87      8.58 AH-10A UNIT WAS INOPERABLE                                         ECCS    C  CSIP/AH-10A  COHPLETE CORRECTIVE MAINTENANCE 01/23/87      0.92 8 CHILLER FAILED TO START                                           ECCS  8 CSIP/ESCWC    REFERENCE LER 87-006 FOR CORRECTIVE ACTION 01/25/87      5.25 RWST USED FOR EPT-039T, LEVEL BELOW T ~ S. LIMIT                     ECCS  RWST            RESTORE LEVEL ABOVE TS LIMIT 02/09/87        1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                     EDG  A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 02/10/87        5.33 8 CHILLER INOP DUE TO LOW LUBE OIL WITH A CHILLER INOP             ECCS  8  CSIP/ESCWC    REFERENCE LER 87-007 FOR CORRECTIVE ACTION 02/20/87        8.75   INOPERABLE TO INSPECT GE TYPE HFA RELAYS                         EDG   A  EDG           COHPLETE INSPECTION AND TEST 02/21/87        1.50   OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY                      EDG   8 EDG           PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 02/21/87        1.50    OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    B  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/09/87        1.50    OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/22/87        1.50    OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    8  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/23/87        1   '0  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 03/29/87      0.50    OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                ECCS  A  RHR          COMPLETE SCHEDULED TEST 03/29/87       0.50    OST-1008 RHR PUHP OPERABILITY QUAR'IERLY INTERVAL                ECCS  B  RNR            COHPLETE SCHEDULED TEST 04/06/87        1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A  EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 10/24/86 10/24/86 10/27/86 10/27/86 10/27/86 11/07/86 11/07/86 11/11/86
'I1/11/86 11/11/86 11/13/86 11/13/86 11/18/86 11/19/86 12/01/86 12/10/86 12/21/86 12/25/86 12/25/86 01/04/87 01/04/87 01/08/87 01/20/87 01/21/87 01/22/87 01/23/87 01/25/87 02/09/87 02/10/87 02/20/87 02/21/87 02/21/87 03/09/87 03/22/87 03/23/87 03/29/87 03/29/87 04/06/87
'I ~ 50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY 1 ~ 50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST.1824 1B-SB EDG OPERABILITY 18 HONTH 1.50 OST-1824 1B-SB EDG OPERABILITY 18 HONTH 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY 1.50 OST-1823 1A-SA EDG OPERABILITY 18 HONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 0.97 A CSIP INOP FOR MAINTENAHCE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1 ~ 50 OST-1073 18-SB EDG OPERABILITY HONTHLY INTERVAL 0.50 OST-'1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 5.92 PLACED IN MAIN'IENANCE TO SUPPORT S/U TESTING 8.58 AH-10A UNIT WAS INOPERABLE 0.92 8 CHILLER FAILED TO START 5.25 RWST USED FOR EPT-039T, LEVEL BELOW T ~ S. LIMIT 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 5.33 8 CHILLER INOP DUE TO LOW LUBE OIL WITH A CHILLER INOP 8.75 INOPERABLE TO INSPECT GE TYPE HFA RELAYS 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1'0 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUAR'IERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG ECCS EDG EDG EDG EDG ECCS
~ ECCS ECCS ECCS EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG EDG EDG EDG EDG EDG ECCS ECCS EDG B EDG 8
EDG A EDG A EDG A EDG A EDG A EDG B EDG B EDG 8
EDG A EDG A EDG A CSIP 8
EDG A EDG A EDG B EDG 8
RHR A RHR A RHR 8 RHR A EDG 8
EDG A EDG C CSIP/AH-10A 8 CSIP/ESCWC RWST A EDG 8 CSIP/ESCWC A EDG 8
EDG B EDG A EDG 8
EDG A EDG A RHR B RNR A EDG PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST
'PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE MAINTENANCE AND TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE S/U TESTING COHPLETE CORRECTIVE MAINTENANCE REFERENCE LER 87-006 FOR CORRECTIVE ACTION RESTORE LEVEL ABOVE TS LIMIT PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST REFERENCE LER 87-007 FOR CORRECTIVE ACTION COHPLETE INSPECTION AND TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST


g ~
g ~
Page 2                                                                  ATTACHMENT 1 DATE  DURATION                                  CAUSE                              SYSTEM/COMPONENT    CORRECTIVE ACTION 04/20/87      'I.25 C CSIP INOP DUE TO HISPOSITIONED ALT. MINI FLOW VALVES              ECCS    C  CSIP      REFERENCE LER 87-023 FOR CORRECTIVE ACTION 04/23/87      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                      EDG    B EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/87      8.23 FAILURE OST-1085 DUE TO TIHE ARB FOR FREQ TO REACH REQUIRED    BAND EDG    A EDG        COMPLETE RETEST 05/07/87      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                      EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 1.50 OST 1085 1A-SA EDG OPERABILITY SEMIANNUALLY                          EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/87 05/18/87      4.83 CHANGE OIL IN PUHP                                                  ECCS    A CSIP      COMPLETE MAINTENANCE ACTIVITY 6 50 CHANGE LUBE OIL~ INSPECT ~ TIGHTEN FITTINGS    OIL LINES            ECCS    C  CSIP      COMPLETE MAINTENANCE ACTIVITY 05/19/87                                                        ON 05/20/87      1 ~ 07 VALVED OOS TO ALLOW TESl'ING OF CSIP 8                            ECCS    8 CSIP      COMPLETE TEST 0.08                                                                      EDG    A EDG        COMPLETE INSTALLATION OF BARRING DEVICE 05/22/87              BARRING DEVICE INSTALLED 1.50    OST-1073 18-SB EDG OPERABILITY MOHTHLY IHTERVAL                  EDG    B EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/22/87 9.09                                                                      EDG    8 EOG        REFERENCE LER 87-033 FOR CORRECTIVE ACTION 06/07/87              MISSED AIR ROLL 06/07/87        1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/12/87      0.50    OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                  ECCS    A RHR        COMPLETE SCHEDULED TEST 0.50    OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL                  ECCS    8 RKR        COMPLETE SCHEDULED TEST 06/12/87 06/21/87        1.50  OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL                  EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/23/87        1 ~ 50 OST-1073 1B-SB EDG OPERABILITY MON'INLY INTERVAL                  EDG    8  EDG      PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/02/87        0.95  INADVERTANTLY DRAINED RWST LEVEL BELOW  T.S. LIMIT                ECCS    RWST        COMPLETE FILL OF R'WST BACK INTO T.S. LIMIT 07/08/87        1  50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    B EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
                  ~
07/08/87      1.50  OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL                  EDG    A EDG 07/?3/87      1.50  OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    8 EOG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 1.50  OST-1086 1B-SB EDG OPERABILITY SEHIAHNUALLY                      EDG    8 EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/23/87 08/06/87      0.50  OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                  ECCS  B RHR        COMPLETE SCHEDULED TEST 08/06/87      F 50 PERFORMANCE OF EPT-072 AND MPT-10032                                ECCS  8 RHR/1RH-63 COMPLETE PERIODIC TESTS 08/06/87      0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL                    ECCS  A RHR        COMPLETE SCHEDULED TEST 08/08/87      6.42 BKR 106 WOULD HOT CLOSE FROM CONTROL PANEL                          EDG    A EDG        COMPLETE REPAIR OF BKR 106 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                    EDG    B EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/09/87 08/09/87        1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                    EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/23/87        F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                    EDG    8 EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/08/87        1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                    EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/10/87        0.32 INOPERABLE TO PERFORM OST-1008                                      ECCS    8 RHR PUMP'  COHPLETE SURVEILLANCE TEST OST-1008 09/11/87        0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY IHTERVAL                    ECCS      RHR      COMPLETE SCHEDULED TEST 09/11/87        0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL                    ECCS    8  RHR      COMPLETE SCHEDULED TEST 09/20/87      21.70 A DG TRIPPED ON HIGH VIBRATION DURING OST-1823                      EDG    A  EDG      RECALIBRATE A DG VIBRATION SWITCH 09/22/87        1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH                            EDG    A  EDG      PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/22/87        1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH                            EDG    A  EDG      PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/23/87        1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                    EDG    8  EDG      PERFORH 3 AIR ROLLS - 1 PRE-TESj'  2 POST-TEST 10/09/87      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                    EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/09/87      1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY                        EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST


~ t Page 3                                                                  ATTACHMENT   1 DATE DURATION                                     CAUSE                                 SYSTEH/COMPONENT         CORRECTIVE ACTION 10/15/87     0.33    LOSS OF ALL RKR DURIKG VALVE TESTING                                  ECCS    A RHR-          REFEREKCE LER 87-060 FOR CORRECTIVE ACTION 10/16/87     1.50    OST-1824 18-SB EDG OPERABILITY 18 HOHTH                                EDG    8  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/22/87     1.50    OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                        EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST 10/31/87       1.50    OST-1073 18-SB EDG OPERABILIT'Y MONTHLY INTERVAL                      EDG    8 EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST 11/08/87     2.75    IKOP 1 EXHST FAN TO PROVIDE VENT FOR FUEL OIL TRNS PMP                EDG    B EDG            RECALIBRATE FLOW SWITCH AKD RESTORED EXKST FAH 11/09/87       1.50    OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                        EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/10/87     11.67    1CS-746 FAILED CLOSED DUE TO LIMIT SMITCH FAILURE                      ECCS    A CSIP/1CS-746  COMPLETE HAIHTENANCE ON SWITCH 20.50                                                                            ECCS    8 CSIP          RAN CHILLER MANUALLY STROKED VALVE 11/16/87               WC-28 CHILLER INOP 0.20    KCR-87-'132 ON CSIP MIKIFLOW WIRING 1CS-196                            ECCS    8 CSIP          COMPLETE MODIFICATION 11/16/87 51.50    ES'W TRAIN 8 INOP FAILED PART OF OST-1215                              EDG    B EDG            COMPLETE CORRECTIVE MAINTENANCE 11/17/87 1.50    OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                        EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/18/87 11/24/87       1.50   OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                       EDG    8 EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 19.00    1CC-167 WILL NOT STROKE FULLY OPEH FROM MCB                            ECCS    8 RKR            COMPLETE CORRECTIVE MAINTENANCE 11/24/87 12/02/87    24.50     1SW-270 MOV TRIPPED ON START OF A ESW PUMP                            EDG     A EDG            COMPLETE CORRECTIVE MAINTENANCE 12/10/87      1  ~ 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                       EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/16/87      0.50   OST 1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL                       ECCS    A RKR            COMPLETE SCHEDULED TEST 12/16/87      0.50   OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL                       ECCS    8 RHR            COMPLETE SCKEDULED TEST 12/22/87      1.50   OST-1073 1B-SB EDG OPERABILITY MOHTKLY INTERVAL                       EDG    B EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST EE 2 POST-TEST 12/23/87      8.25    INSPECT BEARIHGS ON AH-5-SB                                           ECCS  B RHR/AH-5B      COMPLETE INSPECTIONS 12/28/87      2.50   SUMP COVER REMOVED TO PUMP DOWN SUMP                                    ECCS  8 RKR            COMPLETE PUMP DOWN 01/04/88      1.87    PUHP SUMP COVER REMOVED                                                ECCS  8 RKR            REINSTALL SUMP COVER 01/10/88      1.50   OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                         EDG    A EDG            PERFORM 3 AIR ROLLS -  1 PRE-TEST 8 2 POST-TEST 01/11/88      1.50   PUMP DOWH 8 CONTAINHEHT RECIRC SUMP                                    ECCS  8 RHR            COMPLETE PUHP DOWN 01/13/88      8.20    CHANGE OIL IN MOTOR BEARINGS                                          ECCS    8 CSIP          COMPLETE MAINTEHANCE 01/14/88    18.50    REMOVE PLUG FROM FLANGE AND STOP LEAK ON HEAT EXCHANGER                ECCS  A RKR HX          COMPLETE CORRECTIVE MAINTENANCE 01/14/88      0.50     OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL                      ECCS    8  RHR          COMPLETE SCHEDULED TEST 01/14/88      0.50     OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL                       ECCS    A RKR          COMPLETE SCHEDULED TEST 01/15/88      3.75    CLEAN STRAINER 8 FILTER ON PUMP B SPEED INCREASER                      ECCS    A  CSIP          COMPLETE CORRECTIVE MAINTENAHCE 01/18/88      1.50   PUMP DOWN THE RECIRCULATION SUMP
Page 2
* ECCS    8  RKR PUMP      COMPLETE PUMP DOWN 01/20/88      1.50   OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY                            EDG    8  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 01/20/88      1.50   OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL                        EDG     8  EDG           PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/22/88      1.08    REMOVAL OF INDICATOR TO INSPECT STEM NUT PER MPT-M0082                ECCS   A  CSIP/1CS-746  COMPLETE INSPECTION PER MPT-0082 COMPLETE PUMP DOWN 02/01/88      3.75 1.50 PUMP DOWH THE RECIRCULATION SUMP OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL ECCS EDG B RKR A EDG           PERFORM 3 AIR ROLLS
ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 04/20/87 04/23/87 05/07/87 05/07/87 05/07/87 05/18/87 05/19/87 05/20/87 05/22/87 05/22/87 06/07/87 06/07/87 06/12/87 06/12/87 06/21/87 06/23/87 07/02/87 07/08/87 07/08/87 07/?3/87 07/23/87 08/06/87 08/06/87 08/06/87 08/08/87 08/09/87 08/09/87 08/23/87 09/08/87 09/10/87 09/11/87 09/11/87 09/20/87 09/22/87 09/22/87 09/23/87 10/09/87 10/09/87
                                                                                                                                            -'  PRE-TEST 8 2 POST-TEST 02/06/88 02/08/88    21.47    PLACED UNDER SF CLEARANCE AS A RESULT OF ESW PUMP BEING INOP          EDG     8 EDG/ES'W       REFERENCE LER 88-006 FOR CORRECTIVE ACTION 02/15/88        1.43    PUHP DOWH THE RECIRCULATION SUHP                                      ECCS    8 RKR            COMPLETE PUMP DOWN 02/15/88      0.92    CHANGE DIFFERENTIAL RELAY                                            EDG    A EDG            COMPLETE CORRECTIVE MAINTENAHCE 02/17/88    38.42      ESW PUMP FAILED TO START DURING INADVERTENT ACTUATION 0 F SEQUENCER  EDG    8 EDG/ESW        REFERENCE LER 88-008 FOR CORRECTIVE ACTION
'I.25 C CSIP INOP DUE TO HISPOSITIONED ALT. MINI FLOW VALVES 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 8.23 FAILURE OST-1085 DUE TO TIHE ARB FOR FREQ TO REACH REQUIRED BAND 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST 1085 1A-SA EDG OPERABILITY SEMIANNUALLY 4.83 CHANGE OIL IN PUHP 6 50 CHANGE LUBE OIL~ INSPECT ~ TIGHTEN FITTINGS ON OIL LINES 1 ~ 07 VALVED OOS TO ALLOW TESl'ING OF CSIP 8 0.08 BARRING DEVICE INSTALLED 1.50 OST-1073 18-SB EDG OPERABILITY MOHTHLY IHTERVAL 9.09 MISSED AIR ROLL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 1 ~ 50 OST-1073 1B-SB EDG OPERABILITY MON'INLY INTERVAL 0.95 INADVERTANTLYDRAINED RWST LEVEL BELOW T.S. LIMIT 1 ~ 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIAHNUALLY 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL F 50 PERFORMANCE OF EPT-072 AND MPT-10032 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 6.42 BKR 106 WOULD HOT CLOSE FROM CONTROL PANEL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.32 INOPERABLE TO PERFORM OST-1008 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY IHTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 21.70 A DG TRIPPED ON HIGH VIBRATION DURING OST-1823 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY ECCS EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG C CSIP B EDG A EDG A EDG A EDG A CSIP C CSIP 8 CSIP A EDG B EDG 8
EOG A EDG A RHR 8 RKR A EDG 8
EDG RWST B EDG A EDG 8
EOG 8
EDG B RHR 8 RHR/1RH-63 A RHR A EDG B EDG A EDG 8
EDG A EDG 8
RHR PUMP' RHR 8
RHR A EDG A EDG A EDG 8
EDG A EDG A EDG REFERENCE LER 87-023 FOR CORRECTIVE ACTION PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE RETEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE MAINTENANCE ACTIVITY COMPLETE MAINTENANCE ACTIVITY COMPLETE TEST COMPLETE INSTALLATION OF BARRING DEVICE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST REFERENCE LER 87-033 FOR CORRECTIVE ACTION PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE FILL OF R'WST BACK INTO T.S. LIMIT PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE PERIODIC TESTS COMPLETE SCHEDULED TEST COMPLETE REPAIR OF BKR 106 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COHPLETE SURVEILLANCE TEST OST-1008 COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST RECALIBRATE A DG VIBRATION SWITCH PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TESj' 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST
 
~ t
 
Page 3 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 10/15/87 10/16/87 10/22/87 10/31/87 11/08/87 11/09/87 11/10/87 11/16/87 11/16/87 11/17/87 11/18/87 11/24/87 11/24/87 12/02/87 12/10/87 12/16/87 12/16/87 12/22/87 12/23/87 12/28/87 01/04/88 01/10/88 01/11/88 01/13/88 01/14/88 01/14/88 01/14/88 01/15/88 01/18/88 01/20/88 01/20/88 01/22/88 02/01/88 02/06/88 02/08/88 02/15/88 02/15/88 02/17/88 INOP F SEQUENCER 0.33 LOSS OF ALL RKR DURIKG VALVE TESTING 1.50 OST-1824 18-SB EDG OPERABILITY 18 HOHTH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILIT'Y MONTHLY INTERVAL 2.75 IKOP 1
EXHST FAN TO PROVIDE VENT FOR FUEL OIL TRNS PMP 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 11.67 1CS-746 FAILED CLOSED DUE TO LIMIT SMITCH FAILURE 20.50 WC-28 CHILLER INOP 0.20 KCR-87-'132 ON CSIP MIKIFLOW WIRING 1CS-196 51.50 ES'W TRAIN 8 INOP FAILED PART OF OST-1215 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 19.00 1CC-167 WILL NOT STROKE FULLY OPEH FROM MCB 24.50 1SW-270 MOV TRIPPED ON START OF A ESW PUMP 1 ~50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST 1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTKLY INTERVAL 8.25 INSPECT BEARIHGS ON AH-5-SB 2.50 SUMP COVER REMOVED TO PUMP DOWN SUMP 1.87 PUHP SUMP COVER REMOVED 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 PUMP DOWH 8 CONTAINHEHT RECIRC SUMP 8.20 CHANGE OIL IN MOTOR BEARINGS 18.50 REMOVE PLUG FROM FLANGE AND STOP LEAK ON HEAT EXCHANGER 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL 3.75 CLEAN STRAINER 8 FILTER ON PUMP B SPEED INCREASER 1.50 PUMP DOWN THE RECIRCULATION SUMP 1.50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL 1.08 REMOVAL OF INDICATOR TO INSPECT STEM NUT PER MPT-M0082 3.75 PUMP DOWH THE RECIRCULATION SUMP 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 21.47 PLACED UNDER SF CLEARANCE AS A RESULT OF ESW PUMP BEING 1.43 PUHP DOWH THE RECIRCULATION SUHP 0.92 CHANGE DIFFERENTIAL RELAY 38.42 ESW PUMP FAILED TO START DURING INADVERTENT ACTUATION 0 ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG ECCS EDG EDG ECCS ECCS EDG ECCS ECCS ECCS EDG ECCS ECCS ECCS ECCS ECCS ECCS
* ECCS EDG EDG ECCS ECCS EDG EDG ECCS EDG EDG A RHR-8 EDG A EDG 8
EDG B EDG A EDG A CSIP/1CS-746 8 CSIP 8 CSIP B EDG A EDG 8
EDG 8
RKR A EDG A EDG A RKR 8
RHR B EDG B RHR/AH-5B 8
RKR 8 RKR A EDG 8
RHR 8 CSIP A RKR HX 8
RHR A RKR A CSIP 8 RKR PUMP 8
EDG 8
EDG A CSIP/1CS-746 B RKR A EDG 8 EDG/ES'W 8 RKR A EDG 8 EDG/ESW REFEREKCE LER 87-060 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST F 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST F 2 POST-TEST RECALIBRATE FLOW SWITCH AKD RESTORED EXKST FAH PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE HAIHTENANCE ON SWITCH RAN CHILLER MANUALLY STROKED VALVE COMPLETE MODIFICATION COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCKEDULED TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST EE 2 POST-TEST COMPLETE INSPECTIONS COMPLETE PUMP DOWN REINSTALL SUMP COVER PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE PUHP DOWN COMPLETE MAINTEHANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENAHCE COMPLETE PUMP DOWN PERFORM 3 AIR ROLLS -
1 PRE-TEST B 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE INSPECTION PER MPT-0082 COMPLETE PUMP DOWN PERFORM 3 AIR ROLLS -'
PRE-TEST 8 2 POST-TEST REFERENCE LER 88-006 FOR CORRECTIVE ACTION COMPLETE PUMP DOWN COMPLETE CORRECTIVE MAINTENAHCE REFERENCE LER 88-008 FOR CORRECTIVE ACTION


Page 4                                                               ATTACHHENI' DURATIOH                                 CAUSE                       SYSTEH/COHPONENT       CORRECTIVE ACTION DATE 02/'l7/88   38.42 CALIBRATION OF AGASTAT RELAY P1A2/1183                       EDG    B EDG          COHPLETE CALIBRATION 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL               EDG    B EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST            }}  2 POST-TEST 02/19/88 02/20/88      8.42 EQ INSPECTION OF MOVES 1CS-292, 278, 169, 171                 ECCS    8 CSIP        COHPLETE INSPECTIONS 8.08 EQ INSP. OF HOV'S 1CS-168, 170, 291                           ECCS    A CSIP        COHPLETE INSPECTIONS 02/21/88 02/26/88      4.33 INSPECTION OF HEAT SHRINK ON l}IRING, CLEARANCE REQ'D         ECCS    8 CSIP/1CS-291 PERFORM Qc INSPECTION 03/04/88      0.58 ADJUST PACKING                                               ECCS    A CSIP/1CS-168 COHPLETE CORRECTIVE HAINTENANCE 2.40 PUHP DOWN THE RECIRCULATION SUMP                             ECCS    B RHR          COHPLETE PUHP DOWN 03/07/88 14.67 MST'S AND HAINTENANCE                                         EDG    A EDG          COHPLETE TEST AND MAINTENANCE 03/07/88 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL               EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST            B 2 POST-TEST 03/08/88 1.00 RHR INOP.FOR HAINTENANCE ON AH-SA                             ECCS    A RHR          COHPLETE MAINTENANCE 03/09/88 12.20 PUHP DOWN THE RECIRCULATION SUMP                             ECCS    8 RHR          COMPLETE PUHP DOWN 03/14/88 7.37 18-SB ESW UNDER CLEARANCE FOR EPT-101T                       EOG    B EDG/ESW      COMPLETE PERIODIC TEST 03/14/88 15.33 CHANGE OIL IN PUHP HOTOR                                     ECCS    A RHR          COHPLETE HAINTENANCE 03/15/88 3.38 'IA-SA ESW INOP. FOR EPT-101T                                 ECCS    A EDG          COHPLETE SCHEDULED TEST 03/16/88 15.87 CHANGE OIL                                                   ECCS    B RHR PUHP    COHPLETE MAINTENANCE 03/17/88 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL             ECCS    A RHR          COMPLETE SCHEDULED TEST 03/18/88 03/18/88      0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL             ECCS    B RHR          COHPLETE SCHEDULED TEST 03/21/88    19.00 PERFORM PHS ON LOCAL HETERS, RELAYS AND 6.9 BKR.             EDG    B EDG          COMPLETE MAINTENANCE 2.00 PUHP DOWN THE RECIRCULATION SUMP                             ECCS    8 RHR          COMPLETE PUHP DOWN 03/21/88 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL             EDG    B EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST            }I 2 POST-TEST 03/22/88 9.70 A ESW HEADER REPAIR LEAK ON WELD AT 1SW 69                   EDG    A EDG          COMPLETE CORRECTIVE HAINTENANCE 03/25/88 03/28/88      5.08 PUHP DOWN THE RECIRCULATIOH SUHP                             ECCS  8 RHR'        COHPLETE PUHP DOWN 0.58 PERFORM HST-l0098 ON P-925                                   ECCS      ACCUH      COHPLETE SURVEILLANCE TEST 03/29/88 0.43 PERFORH HST-10098 ON P-927                                   ECCS  B ACCUH        COHPLETE SURVEILLANCE TEST 03/29/88 04/04/88      3.25 PUMP DOWN THE RECIRCULATION SUHP                             ECCS  B RHR PUMP      COHPLETE PUMP DOWN 7.92 WORK ON 1A-SA SEQUENCER To ADJUST AGASTAT SETPOINTS PCR-2867 EOG    A EDG          COHPLETE HOD IF I CAT ION 04/06/88 04/07/88      1.33 WORK ON 18-SB SEQUENCER TO ADJUST AGASTAT SETPOINTS           EDG    B EDG          COMPLETE EPT-033 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY                   EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST            8  2 POST-TEST 04/09/88 04/09/88      1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL               EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST            I}  2 POST-TEST 04/11/88      0.63 ACCUM C PRESSURE LOOP CAL (P-0931) HST-I0101                 ECCS    C ACCUH        HST-I0101 COMPLETE 04/11/88      3.17 PUHP DOWN THE RECIRCULATION SUHP                             ECCS    B RHR          COHPLETE PUHP DOWN 04/14/88      6.82 PIC-l032 INSPECT 4 ADJUST FLOW INDICATING SWITCH             ECCS    B RHR          PIC-1032 COMPLETE 04/15/88      5.88 CALIBRATION OF FS-602A                                       ECCS    A RHR          COHPLETE CALIBRATION 04/22/88    14.55 STOP FUEL OIL LEAK                                           EDG    B EDG          COMPLETE CORRECTIVE HAINTENANCE 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL             EDG    B EDG          PERFORM 3 AIR ROLLS - 1                    5 2 POST-TEST 04/22/88                                                                                                                          PRE-TESI'OHPLETE 04/25/88      2.00 PUHP DOWN THE RECIRCULATION SUHP                             ECCS    B RHR                  PUHP DOWN 04/29/88      0.77 PERFORH LEVEL SECTIONS (7.2-7.10) OF MST-10110               ECCS    C ACCUH        COMPLETE SURVEILLANCE TEST 05/02/88      3.25 PUHP DOWN THE RECIRCULATION SUHP                             ECCS   8 RHR         COHPLETE PUHP DOWN
Page 4
ATTACHHENI' DATE DURATIOH CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 02/'l7/88 02/19/88 02/20/88 02/21/88 02/26/88 03/04/88 03/07/88 03/07/88 03/08/88 03/09/88 03/14/88 03/14/88 03/15/88 03/16/88 03/17/88 03/18/88 03/18/88 03/21/88 03/21/88 03/22/88 03/25/88 03/28/88 03/29/88 03/29/88 04/04/88 04/06/88 04/07/88 04/09/88 04/09/88 04/11/88 04/11/88 04/14/88 04/15/88 04/22/88 04/22/88 04/25/88 04/29/88 05/02/88 38.42 CALIBRATION OF AGASTAT RELAY P1A2/1183 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 8.42 EQ INSPECTION OF MOVES 1CS-292,
: 278, 169, 171 8.08 EQ INSP.
OF HOV'S 1CS-168,
: 170, 291 4.33 INSPECTION OF HEAT SHRINK ON l}IRING, CLEARANCE REQ'D 0.58 ADJUST PACKING 2.40 PUHP DOWN THE RECIRCULATION SUMP 14.67 MST'S AND HAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 1.00 RHR INOP.FOR HAINTENANCE ON AH-SA 12.20 PUHP DOWN THE RECIRCULATION SUMP 7.37 18-SB ESW UNDER CLEARANCE FOR EPT-101T 15.33 CHANGE OIL IN PUHP HOTOR 3.38 'IA-SA ESW INOP.
FOR EPT-101T 15.87 CHANGE OIL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 19.00 PERFORM PHS ON LOCAL HETERS, RELAYS AND 6.9 BKR.
2.00 PUHP DOWN THE RECIRCULATION SUMP 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 9.70 A ESW HEADER REPAIR LEAK ON WELD AT 1SW 69 5.08 PUHP DOWN THE RECIRCULATIOH SUHP 0.58 PERFORM HST-l0098 ON P-925 0.43 PERFORH HST-10098 ON P-927 3.25 PUMP DOWN THE RECIRCULATION SUHP 7.92 WORK ON 1A-SA SEQUENCER To ADJUST AGASTAT SETPOINTS PCR-2867 1.33 WORK ON 18-SB SEQUENCER TO ADJUST AGASTAT SETPOINTS 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 0.63 ACCUM C PRESSURE LOOP CAL (P-0931) HST-I0101 3.17 PUHP DOWN THE RECIRCULATION SUHP 6.82 PIC-l032 INSPECT 4 ADJUST FLOW INDICATING SWITCH 5.88 CALIBRATION OF FS-602A 14.55 STOP FUEL OIL LEAK 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 2.00 PUHP DOWN THE RECIRCULATION SUHP 0.77 PERFORH LEVEL SECTIONS (7.2-7.10)
OF MST-10110 3.25 PUHP DOWN THE RECIRCULATION SUHP EDG EDG ECCS ECCS ECCS ECCS ECCS EDG EDG ECCS ECCS EOG ECCS ECCS ECCS ECCS ECCS EDG ECCS EDG EDG ECCS ECCS ECCS ECCS EOG EDG EDG EDG ECCS ECCS ECCS ECCS EDG EDG ECCS ECCS ECCS B EDG B EDG 8 CSIP A CSIP 8 CSIP/1CS-291 A CSIP/1CS-168 B RHR A EDG A EDG A RHR 8
RHR B EDG/ESW A RHR A EDG B RHR PUHP A RHR B RHR B EDG 8
RHR B EDG A EDG 8 RHR' ACCUH B ACCUH B RHR PUMP A EDG B EDG A EDG A EDG C ACCUH B RHR B RHR A RHR B EDG B EDG B RHR C ACCUH 8
RHR COHPLETE CALIBRATION PERFORH 3 AIR ROLLS -
1 PRE-TEST COHPLETE INSPECTIONS COHPLETE INSPECTIONS PERFORM Qc INSPECTION COHPLETE CORRECTIVE HAINTENANCE COHPLETE PUHP DOWN COHPLETE TEST AND MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST COHPLETE MAINTENANCE COMPLETE PUHP DOWN COMPLETE PERIODIC TEST COHPLETE HAINTENANCE COHPLETE SCHEDULED TEST COHPLETE MAINTENANCE COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COMPLETE MAINTENANCE COMPLETE PUHP DOWN PERFORH 3 AIR ROLLS -
1 PRE-TEST COMPLETE CORRECTIVE HAINTENANCE COHPLETE PUHP DOWN COHPLETE SURVEILLANCE TEST COHPLETE SURVEILLANCE TEST COHPLETE PUMP DOWN COHPLETE HODIFICATION COMPLETE EPT-033 PERFORH 3 AIR ROLLS -
1 PRE-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST HST-I0101 COMPLETE COHPLETE PUHP DOWN PIC-1032 COMPLETE COHPLETE CALIBRATION COMPLETE CORRECTIVE HAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TESI'OHPLETE PUHP DOWN COMPLETE SURVEILLANCE TEST COHPLETE PUHP DOWN
}} 2 POST-TEST B 2 POST-TEST
}I 2 POST-TEST 8 2 POST-TEST I} 2 POST-TEST 5 2 POST-TEST


  ~ ~
~
~
P
P


Page 5                                                                 ATTACHMENT 1 DURATION                                   CAUSE                             SYSTEH/COMPONENT         CORRECTIVE ACTION DATE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                    EDG    'A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/88 2.08 PUMP DOWN THE RECIRCULATION SUHP                                    ECCS    8 RHR          COMPLETE PUMP DOWN 05/09/88 0.17 1SW-1329 & 1SW-1326 FAILED TO OPEN                                  EDG      A EDG/A ESW    REFERENCE LER 88-012 FOR'CORRECTIVE ACTION 05/13/88 6.67  ESW PUMP FAILED TO START DUE TO DEFECTIVE RELAY IH THE SEQUENCER  EDG      8 EDG/ESW      REFERENCE LER 88-029 FOR CORRECTIVE ACTION 05/15/88 6.17                                                                    ECCS    8  RHR          COHPLETE PUMP DOWN 05/16/88             PUMP DOWN THE RECIRCULATION SUHP 4.08  ROTATE CONTROL POWER TOGGLE SWITCH TO PROPER POSITION            ECCS    A RHR PMP      ROTATION COHLETE 05/19/88 1.87                                                                    ECCS    B RHR          COMPLETE PUMP DOWN 05/23/88             PUHP DOWN THE RECIRCULATION SUMP 21.83  REPAIR JACKET WATER COOLER LEAKS REPAIR BEARING OIL              EDG      B EDG          COMPLETE CORRECTIVE MAINTEHANCE 05/23/88 0.83 PERFORH EPT-033                                                    EDG      8 EDG/B SEQ    COHPLETE EPT-033 05/23/88 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL                    EDG      8  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 05/24/88 05/30/88       2.33 PUMP DOWN THE RECIRCULATION SUMP                                    ECCS    8  RHR          COMPLETE PUMP DOWN 8.00 LUBRICATE PUMP                                                      ECCS    8 CSIP          COHPLETE MAINTENANCE 05/31/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                    EDG      8  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST &t 2 POST-TEST 06/03/88 12.68 PHP FAILED TO START ON LOOP SEQUENCER WHEN BUS 1ASA WAS DE-EHERGIZEDEDG      A EDG/ES'W PHP  REFERENCE LER 88-013 FOR CORRECTIVE ACTION 06/03/88 1.42 PUMP DOWN THE RECIRCULATION SUHP                                  ECCS    8 RHR          COHPLETE PUMP DOWN 06/06/88 17.15 PERFORM MAINTENANCE PRIOR TO SCHEDULED OST-1013 PERFORHANCE        EDG      A EDG          COMPLETE SURVEILLANCE TEST 06/08/88 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL                    EDG      A EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 06/09/88 18.75 PERFORMANCE OF EPT-072 AND MPT-10032                                ECCS    B RHR/1RH-69    COMPLETE PERIODIC TESTS 06/13/88 18.75 PERFORM PH-EOO'l2 ON PUMP BREAKER                                  ECCS     B RHR PUHP      COMPLETE PERIODIC MAINTENANCE 06/13/88 2.50 PUMP DOWN OF CONT SPRAY/RNR RECIR SUMP 8                          ECCS    B RHR            SATISFACTORY COHPLETION OF OST-1803 & 1081 06/13/88 20;75 PERFORHANCE OF EPT-072 AHD HPT-l0032                                ECCS    8 RHR/1S1-311    COMPLETE PERIODIC TESTS 06/13/88 06/13/88    20.75 PERFORH EPT-072 AND MPT-10032                                        ECCS    8 RHR/1SI -327  COMPLETE PERIODIC TESTS 06/13/88    18.75 PERFORH EPT-072 AND HPT-10032                                        ECCS    B  RHR/1SI-323  COHPLETE PERIODIC TESTS 20.75 PERFORHANCE OF EPT-072 AND MPT-I0032                                ECCS    B RHR/1RH-63    COHPLETE PERIODIC TESTS 06/13/88 20.75 PROVIDE ISOLATION FOR TESTING OF 181-311                            ECCS    B RHR/1SI-301  COMPLETE APPLICABLE PORTIONS OF OST-1008 06/13/88 18.92 PERFORH EPT-072 (EQ INSP) 4 MPT-I0032                                ECCS    A RHR/1RH-31    COHPLETE PERIODIC TESTS 06/14/88 17.58 EPT-072 (EQ INSPECTION) OF LIHITORQUES                              ECCS    A RHR/1RH-25    COMPLETE PERIODIC TESTS 06/14/88 17.08 PERFORH EPT-072 (EQ INSP) a HPT-10032                              ECCS    A RHR/1SI-310  COHPLETE PERIODIC TESTS 06/14/88 06/14/88      19.37 PERFORH EPT-072 (EQ INSP) & HPT-l0032                              ECCS    A RHR/1SI-326  COHPLETE  PERIODIC TESTS 06/14/88      9.25 PERFORH EPT-072 & MPT-10037                                        ECCS    A CSIP/1SI-322  COMPLETE  PERIODIC TESTS ECCS    A              COMPLETE  SCHEDULED TEST 06/15/88      0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL                                RHR ECCS    B RHR          COHPLETE  SCHEDULED TEST 06/15/88        0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY IHTERVAL 34.48 PERFORM EPT-072, MPT-I0032 FOUND BAD GREASE IN OPERATOR            ECCS    8 CSIP/1CS-752  COMPLETE  CORRECTIVE HAINTENANCE 06/16/88 06/16/88      31.32 PERFORM EPT-072 II MPT-I0032                                        ECCS    B  CSIP/1SI-2  COHPLETE  PERIODIC TESTS 39.90 PERFORH MPT-E0008                                                  ECCS    8 CSIP          COHPLETE  PERIODIC TESTS 06/16/88 40.15 PERFORM EPT-072 AND HPT-I0032                                       ECCS    8 CSIP/1CS-196  COHPLETE  PERIODIC TESTS 06/16/88 06/20/88      3.83 1CS-753 B CSIP ALT HINIFLOW ISOLATION                             ECCS    B CSIP          COMPLETE  EPT-072 3.45 PERFORM PIC-I009 ON 1CH-616 AH-98-SB TCV                           ECCS    8 CSIP          COMPLETE  CALIBRATIONS 06/20/88
Page 5
ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 05/07/88 05/09/88 05/13/88 05/15/88 05/16/88 05/19/88 05/23/88 05/23/88 05/23/88 05/24/88 05/30/88 05/31/88 06/03/88 06/03/88 06/06/88 06/08/88 06/09/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/14/88 06/14/88 06/14/88 06/14/88 06/14/88 06/15/88 06/15/88 06/16/88 06/16/88 06/16/88 06/16/88 06/20/88 06/20/88 EDG ECCS EDG EDG ECCS ECCS ECCS EDG EDG EDG ECCS ECCS EDG ECCS EDG EDG ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 2.08 PUMP DOWN THE RECIRCULATION SUHP 0.17 1SW-1329
& 1SW-1326 FAILED TO OPEN 6.67 ESW PUMP FAILED TO START DUE TO DEFECTIVE RELAY IH THE SEQUENCER 6.17 PUMP DOWN THE RECIRCULATION SUHP 4.08 ROTATE CONTROL POWER TOGGLE SWITCH TO PROPER POSITION 1.87 PUHP DOWN THE RECIRCULATION SUMP 21.83 REPAIR JACKET WATER COOLER LEAKS REPAIR BEARING OIL 0.83 PERFORH EPT-033 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 2.33 PUMP DOWN THE RECIRCULATION SUMP 8.00 LUBRICATE PUMP 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 12.68 PHP FAILED TO START ON LOOP SEQUENCER WHEN BUS 1ASA WAS DE-EHERGIZEDEDG 1.42 PUMP DOWN THE RECIRCULATION SUHP 17.15 PERFORM MAINTENANCE PRIOR TO SCHEDULED OST-1013 PERFORHANCE 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 18.75 PERFORMANCE OF EPT-072 AND MPT-10032 18.75 PERFORM PH-EOO'l2 ON PUMP BREAKER 2.50 PUMP DOWN OF CONT SPRAY/RNR RECIR SUMP 8 20;75 PERFORHANCE OF EPT-072 AHD HPT-l0032 20.75 PERFORH EPT-072 AND MPT-10032 18.75 PERFORH EPT-072 AND HPT-10032 20.75 PERFORHANCE OF EPT-072 AND MPT-I0032 20.75 PROVIDE ISOLATION FOR TESTING OF 181-311 18.92 PERFORH EPT-072 (EQ INSP) 4 MPT-I0032 17.58 EPT-072 (EQ INSPECTION) OF LIHITORQUES 17.08 PERFORH EPT-072 (EQ INSP) a HPT-10032 19.37 PERFORH EPT-072 (EQ INSP)
& HPT-l0032 9.25 PERFORH EPT-072
& MPT-10037 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY IHTERVAL 34.48 PERFORM EPT-072, MPT-I0032 FOUND BAD GREASE IN OPERATOR 31.32 PERFORM EPT-072 II MPT-I0032 39.90 PERFORH MPT-E0008 40.15 PERFORM EPT-072 AND HPT-I0032 3.83 1CS-753 B CSIP ALT HINIFLOW ISOLATION 3.45 PERFORM PIC-I009 ON 1CH-616 AH-98-SB TCV
'A EDG 8
RHR A EDG/A ESW 8 EDG/ESW 8
RHR A RHR PMP B RHR B EDG 8 EDG/B SEQ 8
EDG 8
RHR 8 CSIP 8
EDG A EDG/ES'W PHP 8
RHR A EDG A EDG B RHR/1RH-69 B RHR PUHP B RHR 8 RHR/1S1-311 8 RHR/1SI -327 B RHR/1SI-323 B RHR/1RH-63 B RHR/1SI-301 A RHR/1RH-31 A RHR/1RH-25 A RHR/1SI-310 A RHR/1SI-326 A CSIP/1SI-322 A RHR B RHR 8 CSIP/1CS-752 B CSIP/1SI-2 8 CSIP 8 CSIP/1CS-196 B CSIP 8 CSIP PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE PUMP DOWN REFERENCE LER 88-012 FOR'CORRECTIVE ACTION REFERENCE LER 88-029 FOR CORRECTIVE ACTION COHPLETE PUMP DOWN ROTATION COHLETE COMPLETE PUMP DOWN COMPLETE CORRECTIVE MAINTEHANCE COHPLETE EPT-033 PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE PUMP DOWN COHPLETE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
&t 2 POST-TEST REFERENCE LER 88-013 FOR CORRECTIVE ACTION COHPLETE PUMP DOWN COMPLETE SURVEILLANCE TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST B 2 POST-TEST COMPLETE PERIODIC TESTS COMPLETE PERIODIC MAINTENANCE SATISFACTORY COHPLETION OF OST-1803
& 1081 COMPLETE PERIODIC TESTS COMPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COMPLETE APPLICABLE PORTIONS OF OST-1008 COHPLETE PERIODIC TESTS COMPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COMPLETE PERIODIC TESTS COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COMPLETE CORRECTIVE HAINTENANCE COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COMPLETE EPT-072 COMPLETE CALIBRATIONS
 
Page 6
ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 06/20/88 06/22/88 06/22/88 06/22/88 06/22/88 06/24/88 06/24/88 06/27/88 06/29/88 06/30/88 06/30/88 07/04/88 07/05/88 07/06/88 07/06/88 07/08/88 07/08/88 07/08/88 07/08/88 07/09/88 07/11/88 07/18/88 07/21/88 07/22/88 07/22/88 07/23/88 07/26/88 07/26/88 07/27/88 07/27/88 07/27/88 07/27/88 08/06/88 08/06/88 08/08/88 08/08/88 08/08/88 08/15/88 3.17 PUHP DOWN THE RECIRCULATION SUHP 13.62 PERFORH MPT-I0032 & EPT-072 11.82 PERFORH EPT-072 AND MPT-10032 13.92 PERFORM MPT-E0008 11.75 PERFORH EPT-072 AND MPT-10032 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL F 50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY 2.25 PUMP DOWN THE RECIRCULATION SUHP 1.40 SCREENS ON A ESW BAY 8 FAIL TO MOVE WHILE PUMP IS RUNNING 8.33 REPAIR LEAK ON A CCW NEAT EXCHANGER 2.07 PERFORH PIC-1009 ON 1CH-199 0.75 PERFORH PIC-1009 ON 1CH 251 2.50 PUHP THE SUMP DOWN DUE TO LEAKAGE PAST 1CT-102 SEAT 0.45 TESTING OF OVERSPEED OF EDG & BARRING 18.67 A ESW TRAIN IS INOP DUE TO TRAVELING SCREEH SHEAR PIN BROKEN 6.23 ADJUST OR REPLACE FAN BELTS 5.38 PERFORM EPT-033 4.97 CALIBRATE RELAY 2-32A/1116 5.88 PERFORH PIC l0666 ON TE.6903 A-SA HVAC 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.42 PUMP OUT THE SUHP 2.92 PUHP DOWN THE RECIRC SUHP 8 2.55 REPACK VALVES 1RH-20,
: 1RH26, 1S1-324, 1SI-325 0.78 PERFORM EPT-033 0.88 1CC-167 FAILED TO OPEN
& CLOSE PROPERLY 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 6.50 PUMP WTR THAT HAS LEAKED FROH RWST ISO VLVS INTO CT 8 SUHP 0.56 ESW PUMP DECLARED INOP DUE TO FAILED TRAVELING SCREEHS F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 3.42 REPLACE JUMPER WIRE WITH A QUALIFIED WIRE 5.72 TIGHTEN & REPLACE BELTS ON AH-5A IN 190'AB 3.42 REPLACE JUHPER WITH QUALIFIED WIRE 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1824 1B-SB EDG OPERABILITY 18 HONTH 7.15 PERFORH HODIFICATIOH PCR-875 AND 924 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL ECCS ECCS ECCS ECCS ECCS EDG EDG ECCS EDG ECCS ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG ECCS EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG 8
RNR A CSIP/1SI-1 A CSIP/1CS.745 A CSIP A CSIP/1CS-746 8
EDG 8
EDG 8
RHR
& 2 POST-TEST
& 2 POST-TESI' EDG/TRAV SCREEN A RMR PHP A RHR/AH-SA A RHR/1CH-251 8
RHR 8 EDG A EDG A EDG/AH-86A A EDG/A SEQ A EDG/A SEQ 8
EDG A EDG B RHR 8
RHR A RNR 8
EDG 8
RHR 8
EDG 8
RHR A EDG/ESW 8
EDG 8 CSIP/181-2 A RHR 8 CSIP/1SI-2 A EDG A EDG 8
EDG A EDG 8
EDG A EDG EDG
& 2 POST-TEST
& 2 POST-TEST IVE ACTION
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST COMPLETE PUHP DOWN
. COHPLETE PERIODIC TESTS COMPLETE EPT-072 AND MPT-'I0032 COHPLETE MPT-E008 COHPLETE EPT-072 AND MPT-10032 PERFORH 3 AIR ROLLS -
1 PRE-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST COMPLETE PUMP DOWN COHPLETE CORRECTIVE HAIHTENANCE REPAIR LEAK COMPLETE CALIBRATION COHPLETE PIC-I009 COHPLETE PUMP DOWN
~
COMPLETE TEST AND BARRING OF "B" COHPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COHPLETE PERIODIC TEST COMPLETE MAINTENANCE COHPLETE CALIBRATION PROCEDURE PERFORM 3 AIR ROLLS -
1 PRE-TEST COHPLETE PUHP DOWN COMPLETE PUMP DOWN COMPLETE MAIHTENAHCE COMPLETE EPT-033 COHPLETE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST COHPLETE HAINTENANCE REFERENCE LER 88-017 FOR CORRECT PERFORH 3 AIR ROLLS -
1 PRE-TEST COMPLETE HAIHTENANCE COMPLETE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST COHPLETE HODIFICATIONS PERFORH 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
 
0
 
Page 7
ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 08/22/88 08/25/88 08/29/88 09/05/88 09/16/88 09/16/88 09/20/88 09/27/88 10/09/88 10/09/88 10/10/88 10/13/88 10/21/88 10/22/88 11/06/88 11/08/88 11/10/88 11/11/88 11/18/88 11/19/88 11/21/88 11/22/88 11/23/88 11/25/88 11/29/88 12/02/88 12/02/88 12/07/88 12/14/88 12/14/88 12/22/88 12/22/88 12/22/88 12/29/88 01/03/89 01/03/89 01/05/89 01/06/89 15.20 LEAKING OIL AND LEAK OH SEAL WATER EQUALIZING LINE 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.08 EST-317.PERFORM SEQUENCER TEST 0.08 EST-317 PERFORM SEQUENCER TEST 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY F 50 OST-1013 1A-SA EDG OPERABILITY HONTHLY IHTERVAL 4.42 INSTALLATION OF INSULATION ON EXHAUST STACK 2.75 FAN E-86 D-SB IS INOPERABLE 9.50 PROBLEHS WITH SPEED CONTROL DURING OST-1073 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 31.32 CALIBRATE DIFFERENTIAL PRESSURE INDICATOR 8.23 CALIBRATE PRESSURE DIFFERENTIAL INDICATOR FOR AH-9B 32.33'REPAIR SEAT LEAKS ON CASING DRAIN VALVES 1CS-175 8
1CS 5.33 FANS E-85 1ASA B 1BSA WILL NOT RUN, DIESEL INOPERABLE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 12.12 COMPLETE PCR-1446 F
PERFORH MOO-204 ACCEPTANCE TEST AN 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 21.27 DISASSEHBLE F
INSP SEATING SURFACES ALT MINIFLOW VLV 33.92 PUMP UNDER CLEARANCE TO REPAIR WELD ON SEAL LINE 3.67 CALIBRATE FS-69078 (E-85 ASB 4 BSB) 25.50 INCOMPLETE ECCS TIME RESPONSE TESTING 21.42 CSIP DECLEARED INOP DUE TO MISSED SURVEILLANCE TESTS 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 8.12 REMOVAL AND INSPECTION OF FUEL CONTROL BEARING BRACKET 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY 1.08 LOSS OF BUS DURING PERFORH OF UNDER VOLTAGE TEST 5.92 TEST AH-9A COOLING COlL FOR LEAKAGE 5.90 OIL CHANGE 23 F 08 REPAIR OIL LEAKS MPT-M0001 ON STARTING AIR DRYERS 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL
-176 0 EPT-33 ECCS EDG EDG EDG ECCS ECCS EDG EDG EDG EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS ECCS EDG ECCS ECCS EDG ECCS ECCS EDG EDG EDG EDG ECCS ECCS EDG EDG 8 CSIP B EDG B EDG A EDG 8 RHR B RHR 8 EDG A EDG A EDG A EDG A EDG B EDG B EDG B EDG A EDG A CSIP/AH-9A B CSIP A CSIP A EDG 8 EDG 8
EDG B EDG A CSIP 8 CSIP B EDG C CSIP C CSIP A EDG 8 RHR A RHR 8 EDG B EDG B EDG A EDG BUS A CSIP/AH-9A A CSIP A EDG A EDG COMPLETE CORRECTIVE HAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST II 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST K 2 POST-TEST COMPLETE EST-317 COMPLETE EST-3'17 PERFORH 3 AIR ROLLS -
1 PRE-TEST 8I 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS - I PRE-TEST 4 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST B 2 POST-TEST COMPLETE MAIHTENANCE REPAIR FAN ADJUST SPEED CONTROLLER PERFORM 3 AIR ROLLS -
1 PRE-TEST Bt 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST B 2 POST-TEST COMPLETE CALIBRATION COMPLETE CALIBRATION COMPLETE MAINTENANCE COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE TEST AND MAIHTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST B 2 POST-TEST COMPLETE MAINTENANCE COMPLETE MAINTENANCE COMPLETE CALIBRATION REFERENCE LER 88-035 FOR CORRECTIVE ACTIOH REFERENCE LER 88-033 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS --
1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST B 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST RESTORE OFFSITE POWER TO 1ASA BUS CHECK FAN FOR LEAKAGE COMPLETE MAINTENANCE COMPLETE TEST AND MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST
 
\\ J


Page 6                                                                ATTACHMENT 1 DATE   DURATION                                   CAUSE                         SYSTEH/COMPONENT             CORRECTIVE ACTION 06/20/88      3.17  PUHP DOWN THE RECIRCULATION SUHP                              ECCS    8 RNR                COMPLETE PUHP DOWN 06/22/88      13.62 PERFORH MPT-I0032 & EPT-072                                    ECCS    A  CSIP/1SI-1      . COHPLETE PERIODIC TESTS 11.82 PERFORH EPT-072 AND MPT-10032                                  ECCS    A  CSIP/1CS.745      COMPLETE EPT-072 AND MPT-'I0032 06/22/88 13.92 PERFORM MPT-E0008                                              ECCS    A  CSIP              COHPLETE MPT-E008 06/22/88 11.75 PERFORH EPT-072 AND MPT-10032                                  ECCS    A  CSIP/1CS-746      COHPLETE EPT-072 AND MPT-10032 06/22/88 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                EDG    8  EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/24/88 18-SB                                              EDG    8  EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TESI' 06/24/88      F 50 OST-1086          EDG OPERABILITY SEHIANNUALLY 2.25 PUMP DOWN THE RECIRCULATION SUHP                                ECCS    8  RHR                COMPLETE PUMP DOWN 06/27/88 06/29/88      1.40 SCREENS ON A ESW BAY 8 FAIL TO MOVE WHILE PUMP IS RUNNING      EDG        EDG/TRAV SCREEN COHPLETE CORRECTIVE HAIHTENANCE 06/30/88      8.33 REPAIR LEAK ON A CCW NEAT EXCHANGER                            ECCS    A  RMR PHP            REPAIR LEAK 2.07 PERFORH PIC-1009 ON 1CH-199                                    ECCS    A  RHR/AH-SA          COMPLETE CALIBRATION 06/30/88 0.75 PERFORH PIC-1009 ON 1CH 251                                    ECCS    A  RHR/1CH-251        COHPLETE PIC-I009 07/04/88 07/05/88      2.50 PUHP THE SUMP DOWN DUE TO LEAKAGE PAST 1CT-102 SEAT            ECCS    8  RHR                COHPLETE PUMP DOWN 0.45 TESTING OF OVERSPEED OF EDG & BARRING                          EDG    8  EDG            ~  COMPLETE TEST AND BARRING OF "B" EDG 07/06/88 18.67 A ESW TRAIN IS INOP DUE TO TRAVELING SCREEH SHEAR PIN BROKEN    EDG    A EDG                COHPLETE CORRECTIVE MAINTENANCE 07/06/88 6.23 ADJUST OR REPLACE FAN BELTS                                    EDG    A EDG/AH-86A          COMPLETE CORRECTIVE MAINTENANCE 07/08/88 07/08/88      5.38 PERFORM EPT-033                                                EDG    A EDG/A SEQ          COHPLETE PERIODIC TEST 4.97 CALIBRATE RELAY 2-32A/1116                                      EDG     A EDG/A SEQ          COMPLETE MAINTENANCE 07/08/88 5.88 PERFORH PIC l0666 ON TE.6903 A-SA HVAC                          EDG    8  EDG                COHPLETE CALIBRATION PROCEDURE 07/08/88 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL               EDG    A EDG                PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/09/88 1.42 PUMP OUT THE SUHP                                              ECCS    B RHR                 COHPLETE PUHP DOWN 07/11/88 2.92 PUHP DOWN THE RECIRC SUHP 8                                      ECCS    8 RHR                COMPLETE PUMP DOWN 07/18/88 07/21/88      2.55 REPACK VALVES 1RH-20, 1RH26, 1S1-324, 1SI-325                  ECCS  A RNR                COMPLETE MAIHTENAHCE 0.78 PERFORM EPT-033                                                EDG     8 EDG                COMPLETE EPT-033 07/22/88 0.88 1CC-167 FAILED TO OPEN & CLOSE PROPERLY                        ECCS    8 RHR                COHPLETE MAINTENANCE 07/22/88 07/23/88      1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG    8 EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 6.50 PUMP WTR THAT HAS LEAKED FROH RWST ISO VLVS INTO CT 8 SUHP      ECCS    8 RHR                COHPLETE HAINTENANCE 07/26/88 0.56 ESW PUMP DECLARED INOP DUE TO FAILED TRAVELING SCREEHS          EDG     A EDG/ESW            REFERENCE LER 88-017 FOR CORRECT IVE ACTION 07/26/88 07/27/88      F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG     8 EDG                 PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/27/88      3.42 REPLACE JUMPER WIRE WITH A QUALIFIED WIRE                      ECCS    8 CSIP/181-2          COMPLETE HAIHTENANCE 07/27/88      5.72 TIGHTEN & REPLACE BELTS ON AH-5A IN 190'AB                      ECCS    A RHR                 COMPLETE MAINTENANCE 07/27/88      3.42 REPLACE JUHPER WITH QUALIFIED WIRE                              ECCS    8 CSIP/1SI-2          COHPLETE CORRECTIVE MAINTENANCE 08/06/88      1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH                        EDG     A EDG                 PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/06/88      1.50  OST-1823 1A-SA EDG OPERABILITY 18 MONTH                      EDG    A EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/08/88      1.50  OST-1824 1B-SB EDG OPERABILITY 18 HONTH                      EDG    8 EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/08/88      7.15  PERFORH HODIFICATIOH PCR-875 AND 924                          EDG    A EDG                COHPLETE HODIFICATIONS 08/08/88      1.50  OST-1824 1B-SB EDG OPERABILITY 18 MONTH                      EDG    8 EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/15/88      1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL              EDG    A EDG                PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
Page 8
ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 01/06/89 01/07/89 01/09/89 01/12/89 01/23/89 01/23/89 01/24/89 01/25/89 01/25/89 01/26/89 01/26/89 02/10/89 02/10/89 02/21/89 02/21/89 03/02/89 03/04/89 03/OC/89 03/09/89 03/09/89 03/09/89 03/09/89 03/22/89 03/23/89 03/23/89 04/06/89 04/06/89 04/10/89 04/10/89 04/12/89 04/12/89 04/12/89 04/13/89 04/13/89 04/13/89 04/20/89 04/26/89 04/26/89 CHANGE GREASE CR-845 VALVES 7.17 REPAIR MECH SEAL JACKET-MATER KEEP I!ARM PNIP 2.45 REPAIR MECH SEAL JACKET IIATER KEEP
'WARM PUMP 4.77 PERFORM MPT-10084 OIL CHANGE 12.18 REPAIR OIL LEAKS AND CHANGE OIL 6.50 CHANGE OIL 11 F 07 CLEAN F.O.
STRAINERS, REMORK LEAKING INTAKE ELBOII 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 14.75 DISASSEMBLE VALVE, INSPECT, LAP SEAT 5.60 MEGGAR AND BRIDGE MOTOR 6.00 PERFORM MPT-MOO&4 (MOTOR LUBE) 20.67 REPLACE BONNET GASKET 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 41.10 CALIBRATE RELAY, PIC-E037, REPLACE VARMETER PER P
0.88 VERIFY REMOVAL OF TEMP.
MOO. PCR-768 F 50 OST-1073
'IB-SB EDG OPERABILITY MONTHLY INTERVAL 3.42 A TRAIN E-85 FANS MILL MOT CONTINUE RUNNING 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0 ~ 50 oST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 2C.65 VALVE 1CS-214 FAILED To STROKE SHUT 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALL'Y 15.83 REPAIR LEAKS ON PUHPS, FITTINGS AMD JACKET SAMPLE 14.07 INSTALL PCR-845 0.25 TROUBLESHOOT PROBLEH 'NITH Fl-605A AND REPAIR 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 4.42 REMOVE TERMINAL COVER AMD CHECK PER PCR-3425 F 00 REMOVE TERMINAL COVER AND CHECK PER PCR-3425 12.53 MPT-10032 LIMITORQUE INSPECTION 12.53 MPT-10032 LIMITORQUE INSPECTION 11.05 MPT-10032 LIMITORQUE INSPECTION 0.30 INSPECT 1DFO-164 'NSP ~
SEQUENCER, HST-10493 11.05 MpT-10032 LIHIToRQUE IMspECTloN 0'8 REPAIR BARRING DEVICE 0.35 REPLACE BARRING DEVICE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 4.42 CLEAN GEAR DRIVE OIL STRAINER 4.47 CLEAN GEAR DRIVE OIL STRAINER EDG EDG ECCS ECCS ECCS EDG EDG ECCS EDG ECCS ECCS EDG EDG ECCS EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS EDG ECCS ECCS ECCS ECCS ECCS EDG ECCS EDG EDG EDG EDG ECCS ECCS 8 EDG 8
EDG A CSIP 8 CSIP B RKR 8 EDG B EDG B CSIP/1CS-754 8 EDG/DFO XFER A RHR PHP A CSIP/1CS-745 A EDG A EDG 8 RHR/1CC-167 8
EDG A EDG A RHR 8
RHR A CSIP A EDG A EDG A EDG B EDG/ESII A RHR 8
EDG A CSIP/1$ 1-4 8 CSIP/1RH-63 C CSIP/1CS-'169 B CSIP C CSIP/1CS-168 A EDG A CSIP/1CS-170 A EDG A EDG A EDG 8
EDG A CSIP 8 CSIP COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAIN'IENANCE COMPLETE MAINTENANCE COMPLETE MAINTENANCE COMPLETE OIL CNAHGE COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTEHANCE PMP COMPLETE TESTS COMPLETE MAINTENANCE REPLACE GASKET PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE CALIBRATION AND MODIFICATION COMPLETE REMOVAL PERFORM 3 AIR-ROLLS -
1 PRE-TEST 8 2 POST-TEST COHPLETE CORRECTIVE MAINTENANCE COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE MODIFICATION COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE MODIFICATION COMPLETE MODIFICATION COMPLETE MAINTENANCE TEST AND INSPECTION COMPLETE MAINTENANCE TESI'MD INSPECTION COMPLETE MAINTEHANCE TEST AHD INSPECTION COMPLETE CORRECTIVE MAINTENANCE AND TEST COMPLETE MAINTENANCE TEST AND INSPECTION REPAIR BARRING DEVICE REPLACE AFTER ATTEMPTED REPAIR PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE MAINTENANCE COMPLETE MAINTENANCE


0 Page 7                                                                  ATTACHMENT 1 DATE   DURATION                                   CAUSE                         SYSTEH/COMPONENT     CORRECTIVE ACTION 08/22/88      15.20  LEAKING OIL AND LEAK OH SEAL WATER EQUALIZING LINE              ECCS    8 CSIP        COMPLETE CORRECTIVE HAINTENANCE 08/25/88      1.50   OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG    B EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/29/88      1.50   OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG    B EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST II 2 POST-TEST 09/05/88      1.50   OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                EDG    A EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST K 2 POST-TEST 09/16/88      0.08  EST-317.PERFORM SEQUENCER TEST                                  ECCS    8 RHR        COMPLETE EST-317 09/16/88      0.08  EST-317 PERFORM SEQUENCER TEST                                  ECCS    B RHR        COMPLETE EST-3'17 09/20/88      1.50   OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                EDG    8 EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8I 2 POST-TEST 09/27/88      1.50   OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/09/88      1.50  OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY                    EDG    A EDG        PERFORH 3 AIR ROLLS - I PRE-TEST 4 2 POST-TEST 10/09/88      F 50 OST-1013 1A-SA EDG OPERABILITY HONTHLY IHTERVAL                  EDG    A EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 10/10/88      4.42 INSTALLATION OF INSULATION ON EXHAUST STACK                      EDG    A EDG        COMPLETE MAIHTENANCE 10/13/88      2.75 FAN E-86 D-SB IS INOPERABLE                                      EDG    B EDG        REPAIR FAN 10/21/88      9.50 PROBLEHS WITH SPEED CONTROL DURING OST-1073                      EDG    B EDG        ADJUST SPEED CONTROLLER 10/22/88      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG     B EDG         PERFORM 3 AIR ROLLS - 1 PRE-TEST Bt 2 POST-TEST 11/06/88      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG     A EDG         PERFORH 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 11/08/88    31.32 CALIBRATE DIFFERENTIAL PRESSURE INDICATOR                        ECCS    A CSIP/AH-9A  COMPLETE CALIBRATION 11/10/88      8.23 CALIBRATE PRESSURE DIFFERENTIAL INDICATOR FOR AH-9B              ECCS    B CSIP       COMPLETE CALIBRATION 11/11/88    32.33'REPAIR SEAT LEAKS ON CASING DRAIN VALVES 1CS-175 8 1CS -176      ECCS    A CSIP      COMPLETE MAINTENANCE 11/18/88      5.33 FANS E-85 1ASA B 1BSA WILL NOT RUN, DIESEL INOPERABLE            EDG     A EDG       COMPLETE MAINTENANCE 11/19/88      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG     8 EDG       PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/21/88    12.12 COMPLETE PCR-1446 F PERFORH MOO-204 ACCEPTANCE TEST AN0 EPT-33    EDG    8  EDG        COMPLETE TEST AND MAIHTENANCE 11/22/88      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    B EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 11/23/88    21.27    DISASSEHBLE  F INSP SEATING SURFACES ALT MINIFLOW VLV          ECCS    A CSIP        COMPLETE MAINTENANCE 11/25/88    33.92    PUMP UNDER CLEARANCE TO REPAIR WELD ON SEAL  LINE              ECCS  8 CSIP        COMPLETE MAINTENANCE 11/29/88      3.67  CALIBRATE FS-69078 (E-85 ASB 4 BSB)                            EDG    B EDG        COMPLETE CALIBRATION 12/02/88    25.50    INCOMPLETE ECCS TIME RESPONSE TESTING                          ECCS    C CSIP        REFERENCE LER 88-035 FOR CORRECTIVE ACTIOH 12/02/88    21.42    CSIP DECLEARED INOP DUE TO MISSED SURVEILLANCE TESTS            ECCS    C CSIP        REFERENCE LER 88-033 FOR CORRECTIVE ACTION 12/07/88      1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                EDG    A EDG          PERFORM 3 AIR ROLLS -- 1 PRE-TEST 8 2 POST-TEST 12/14/88      0.50  OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL                ECCS    8 RHR        COMPLETE SCHEDULED TEST 12/14/88      0.50  OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL                ECCS    A RHR        COMPLETE SCHEDULED TEST 12/22/88      8.12  REMOVAL AND INSPECTION OF FUEL CONTROL BEARING BRACKET          EDG    8 EDG        COMPLETE CORRECTIVE MAINTENANCE 12/22/88      1.50  OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                EDG    B EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST 12/22/88      1.50  OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY                    EDG    B EDG        PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/29/88      1.08  LOSS OF BUS DURING PERFORH OF UNDER VOLTAGE TEST                EDG    A EDG BUS    RESTORE OFFSITE POWER TO 1ASA BUS 01/03/89      5.92  TEST AH-9A COOLING COlL FOR LEAKAGE                            ECCS    A CSIP/AH-9A  CHECK FAN FOR LEAKAGE 01/03/89      5.90  OIL  CHANGE                                                    ECCS    A CSIP        COMPLETE MAINTENANCE 01/05/89    23 F 08 REPAIR OIL LEAKS MPT-M0001 ON STARTING AIR DRYERS              EDG    A EDG        COMPLETE TEST AND MAINTENANCE 01/06/89      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG        PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
Page 9 ATTACHHENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 04/27/89 05/08/89 05/09/89 05/16/89 05/16/89 05/17/89 05/17/89 05/17/89 05/19/89 05/26/89 05/27/89 05/31/89 06/02/89 06/02/89 06/04/89 06/04/89 06/05/89 06/07/89 06/07/89 06/07/89 06/16/89 06/16/89 06/16/89 06/17/89 06/17/89 06/18/89 06/20/89 06/22/89 07/05/89 07/05/89 07/05/89 07/05/89 07/06/89 07/07/89 07/11/89 07/17/89 07/17/89 07/24/89 3.92 REPLACE PLUGS IN OIL COOLER HEAT EXCHANGER 16.50 INSPECTION FOR LEAKS AND PERFORM EST-211 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL 4.72 FUEL OIL TRANSFER PUHP FAILED OST-1073 13.33 REPLACE TORQUE SWTCH 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 2.12 BREAKER REPLACEMENT PCR-4007 6.65 REPLACE TORQUE SWITCH 6.83 E-86A FAN TRIPPED B
BKR WILL NOT RESET 4.72 REPLACE TORQUE SWITCH 5.92 REHOVED FROH SERVICE TO PLACE 8 CSIP IN SERVICE 1.42 TAKEN OOS TO TEST B-CSIP 3.00 BKR RACKED OUT TO ALLOW 8 CSIP PMP TEST 1.32 AIR START SOLENOID TROUBLESHOOTING 27.62 FAN BKR TRIPS ON THERHALS 23.28 DISASSEHBLE AND INSPECT IDFO-205 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL 2'0 MPT-I0068 WHICH INOPS AH-85 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50,0ST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 7.48 CHANGE OIL 14.08 DG INOP WITH ESW INOP 8 DUE TO MST-10490 14.03 REPACK VALVE 1-S'WB 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 3.25 CALIBRATE FLOW SWITCH 6905B 13.18 ADJUST % CYLINDER 3.03 INSPECT VALVE SPRINGS 1.38 REPAIR 1EA-14, 1EA29 8 SOLENOID VALVE 15.58 CHANGE OIL IH PUMP 12.72 UNDER CLEARANCE FOR COIL LEAK CHECK 10.48 CHANGE OIL IN PUHP 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 2.13 REMOVE SUMP COVER TO FIX LEVEL INDICATOR 5.67 MAINTENANCE ON 1SW-E006 12.50 REPLACE EXHAUST GASKET, PLANNED PM 1.50 OST-1073 1B-SB EDG OPERABILITY HOHTHLY INTERVAL 7.57 PERFORM MAINTENANCE OH 1SW-270 ECCS EDG EDG EDG ECCS EDG EDG ECCS EDG ECCS ECCS ECCS ECCS EDG EDG
, EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG EDG EDG EDG 8 CSIP A EDG A EDG B EDG/1DFO.E003 A RHR/1CC-147 8
EDG B EDG B RHR/1CC-167 A EDG 8 RHR/1CC-167 C CSIP C CSIP C CSIP 8
EDG A EDG/1DG-E017 A EDG/1DG-E017 A EDG 8 EDG/1DG E015 A RHR B RHR 8
RHR 8 EDG/ESW B EDG/1SW-8 8
EDG B EDG B EDG/AH-85 B EDG A EDG/1DG-E002 A EDG A CSIP A CSIP/AH-9A A RHR A EDG 8
RHR 8
EDG 8 EDG 8 EDG 8 EDG/1SW-E005 ND TEST 8 2 POST-TEST 8 2 POST-TEST
& 2 POST-TEST 8 2 POST-TEST 8 2 POST-TEST Bt 2 POST-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE A PERFORM 3 AIR ROLLS -
1 PRE-TEST COHPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS 1 PRE-TEST COMPLETE MODIFICATION COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE COMPLETE TRANSFER COMPLETE TEST RETURN TO SERVICE COHPLETE TEST RETURH TO. SERVICE COMPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE HAINTEHANCE COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST COHPLETE PERIODIC TEST COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST INSPECT FOR PROPER OIL LEVEL COMPLETE SURVEILLANCE TEST COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST COMPLETE CALIBRATION COHPLETE CORRECTIVE MAINTENANCE COMPLETE INSPECI'ION COMPLETE CORRECTIVE MAINTENANCE COMPLETE MAINTENANCE COHPLETE MAINTEHANCE COMPLETE OIL CHANGE PERFORM 3 AIR ROLLS -
1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE COHPLETE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE


\ J Page 8                                                                  ATTACHMENT 1 DATE DURATION                                       CAUSE                           SYSTEH/COMPONENT           CORRECTIVE ACTION 01/06/89     7.17    REPAIR MECH SEAL JACKET-MATER KEEP I!ARM PNIP                      EDG    8 EDG              COMPLETE CORRECTIVE MAINTENANCE 01/07/89     2.45    REPAIR MECH SEAL JACKET IIATER KEEP 'WARM PUMP                    EDG    8 EDG              COMPLETE CORRECTIVE MAIN'IENANCE 01/09/89     4.77    PERFORM  MPT-10084 OIL  CHANGE                                    ECCS    A CSIP            COMPLETE MAINTENANCE 01/12/89     12.18 REPAIR OIL      LEAKS AND CHANGE  OIL                                ECCS    8 CSIP            COMPLETE MAINTENANCE 6.50            OIL                                                        ECCS    B RKR              COMPLETE OIL CNAHGE 01/23/89             CHANGE 11 F 07 CLEAN F.O. STRAINERS, REMORK LEAKING INTAKE ELBOII,  CHANGE GREASE EDG    8 EDG              COMPLETE MAINTENANCE 01/23/89 01/24/89       1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL                      EDG    B EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/25/89     14.75 DISASSEMBLE VALVE, INSPECT, LAP SEAT                                  ECCS    B CSIP/1CS-754    COMPLETE CORRECTIVE MAINTEHANCE 01/25/89     5.60 MEGGAR AND BRIDGE MOTOR                                              EDG    8 EDG/DFO XFER PMP COMPLETE TESTS 6.00 PERFORM MPT-MOO&4 (MOTOR LUBE)                                        ECCS    A RHR PHP          COMPLETE MAINTENANCE 01/26/89 01/26/89     20.67 REPLACE BONNET GASKET                                                ECCS    A CSIP/1CS-745    REPLACE GASKET 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                     EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/10/89 02/10/89    41.10 CALIBRATE RELAY, PIC-E037, REPLACE VARMETER PER P CR-845              EDG    A EDG              COMPLETE CALIBRATION AND MODIFICATION 02/21/89      0.88 VERIFY REMOVAL OF TEMP. MOO. PCR-768                                ECCS    8 RHR/1CC-167      COMPLETE REMOVAL
Page
                                'IB-SB     OPERABILITY MONTHLY INTERVAL                 EDG    8 EDG              PERFORM 3 AIR-ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/21/89      F 50 OST-1073          EDG 03/02/89      3.42 A TRAIN E-85    FANS  MILL MOT CONTINUE RUNNING                    EDG    A EDG              COHPLETE CORRECTIVE MAINTENANCE 03/04/89      0.50 OST-1008 RHR     PUMP OPERABILITY QUARTERLY INTERVAL                 ECCS    A RHR              COMPLETE SCHEDULED TEST 03/OC/89      0 ~ 50 oST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL                   ECCS    8 RHR              COMPLETE SCHEDULED TEST 03/09/89    2C.65 VALVE 1CS-214 FAILED To STROKE SHUT                                  ECCS    A CSIP            COMPLETE CORRECTIVE MAINTENANCE 03/09/89      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                     EDG    A EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/09/89      1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALL'Y                        EDG     A EDG             PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/09/89    15.83 REPAIR LEAKS ON PUHPS, FITTINGS AMD JACKET SAMPLE VALVES              EDG     A EDG              COMPLETE CORRECTIVE MAINTENANCE 03/22/89    14.07 INSTALL PCR-845                                                      EDG     B EDG/ESII        COMPLETE MODIFICATION 03/23/89      0.25 TROUBLESHOOT PROBLEH 'NITH Fl-605A AND REPAIR                        ECCS  A RHR              COMPLETE CORRECTIVE MAINTENANCE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                       EDG     8 EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/23/89 04/06/89      4.42 REMOVE TERMINAL COVER AMD CHECK PER PCR-3425                          ECCS  A CSIP/1$ 1-4      COMPLETE MODIFICATION 04/06/89      F 00 REMOVE TERMINAL COVER AND CHECK      PER PCR-3425                    ECCS    8 CSIP/1RH-63      COMPLETE MODIFICATION 04/10/89    12.53 MPT-10032 LIMITORQUE INSPECTION                                       ECCS    C CSIP/1CS-'169    COMPLETE MAINTENANCE TEST AND INSPECTION 04/10/89     12.53 MPT-10032 LIMITORQUE INSPECTION                                      ECCS    B CSIP            COMPLETE MAINTENANCE TESI'MD INSPECTION 04/12/89    11.05 MPT-10032 LIMITORQUE INSPECTION                                      ECCS    C CSIP/1CS-168    COMPLETE MAINTEHANCE TEST AHD INSPECTION 04/12/89      0.30    INSPECT 1DFO-164  'NSP  ~ SEQUENCER, HST-10493                    EDG    A EDG              COMPLETE CORRECTIVE MAINTENANCE AND TEST 04/12/89    11.05 MpT-10032 LIHIToRQUE IMspECTloN                                      ECCS    A CSIP/1CS-170    COMPLETE MAINTENANCE TEST AND INSPECTION 04/13/89      0 '8  REPAIR BARRING DEVICE                                              EDG    A EDG A EDG REPAIR BARRING DEVICE REPLACE AFTER ATTEMPTED REPAIR 04/13/89      0.35 REPLACE BARRING DEVICE                                              EDG 04/13/89      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                      EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/20/89      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                      EDG    8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/26/89      4.42 CLEAN GEAR DRIVE OIL STRAINER                                        ECCS    A CSIP            COMPLETE MAINTENANCE 04/26/89      4.47 CLEAN GEAR DRIVE OIL STRAINER                                        ECCS    8 CSIP            COMPLETE MAINTENANCE
'IO ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 07/26/89 07/26/89 07/26/89 07/31/89 07/31/89 07/31/89 07/31/89 08/14/89 08/14/89 08/15/89 08/21/89 08/22/89 08/22/89 08/22/89 08/28/89 08/29/89 09/06/89 09/07/89 09/07/89 09/11/89 09/11/89 o9/11/e9 09/25/89 09/25/89 09/25/89 09/26/89 09/26/89 09/27/89 09/27/89 10/09/89 10/09/89 10/09/89 10/16/89 10/16/89 10/23/89 11/07/89 11/08/e9 11/22/89 9.52 LIMITORQUE INSPECTION 9.27 LIMITORQUE INSPECTION 8.58 LIMITORQUE INSPECTION 6.80 DISASSENBLE AND CLEAN VALVE REGULATOR F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 7.00 INSTALL PCR-4'662 AND PERFORM EPT-33 5.72 PERFORN LP-T-6589A 7.67 TRAHSPOSE lIIRES To AGREE ll/ DESIGN IAM PCR-4663 7.00 INSPECT COUPLING GUARD 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 5.67 RHR VALVES NOT BEING TESTED AS REQUIRED 11'8 REPLACE FILTERS ON BOTH FANS 14.50 PERFORM CM-ME0018, CLEAN CORROSION FROM PMP COUPL 14.50 MAINTENANCE INSPECTION AND LUBRICATIOH 6.92 MAINTENAHCE ON EDG 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL 8.75 PERFORM MPT-10032 LIMITORQUE INSPECTION 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 12.18 MAINTEHAHCE OH DG RELAYS 1.50 OST-1073 18 SB EDG OPERABILITY MONTHLY INTERVAL 3.80 SERVICE HATER LEAK ON SPEED CHANGER COOLER 7.12 PERFORN MST-E0059 AND NST-E0061 1.00 CALIBRATE FLOI SlIITCHES FS-6905B-SB 1.50 PERFORN LP-T-6502A 4.83 INSPECT PUMP CLEARANCES 2.67 CHANGE FILTER AIR HANDLER AH-86 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 5.00 IHSPECT & REPLACE A]R FILTERS 4.50 FUEL OIL XFER PUMP STRAINER LEAK 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL F 50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1013 1A-SA EDG OPERABILITY NONTHLY INTERVAL 1.92 2 HANGERS REMOVED FOR ISI INSPECTION 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL ING & SHAFT ECCS ECCS ECCS EDG EDG EDG EDG EDG ECCS EDG ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG ECCS EDG EDG ECCS EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG ECCS EDG EDG 8 CSIP/1CS-196 C CSIP/1CS-752 8 CSIP/181-2 A EDG/1S'W-20 A EDG A EDG/A SEQ A EDG/AH-86A B EDG/B SEQ 8 CSIP B EDG RHR A EDG/AH-85 A EDG/ESll PUMP A EDG/AUX RES S
A EDG A EDG B CSIP/1SI-323 B RHR A RHR 8
EDG 8
EDG 8 CSIP A EDG 8 EDG/AH.85 A RHR/AH-SA A EDG/EslI SCRH A EDG A EDG A EDG 8 EDG/AH-85 8 EDG/XFER PMP 8 EDG A EDG A EDG A EDG A RHR 8 EDG 8
EDG COMPLETE INSPECTION COMPLETE INSPECTION COMPLETE INSPECTION COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST COMPLETE MODIFICATION AND TEST COMPLETE LOOP CALIBRATION COMPLETE MODIFICATION AND TEST COMPLETE INSPECTION PERFORN 3 AIR ROLLS -
1 PRE-TEST REFERENCE LER 89-014 FOR CORRECTI COMPLETE MAINTENANCE COMPLETE MAINTEHANCE CRN VERIFY PROPER SCREEH OPERATIOH COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST COMPLETE INSPECTIONS AND TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE SURVEILLANCE TEST COMPLETE CALIBRATION COMPLETE LOOP CALIBRATIOH
'MASHCOMPLETE IHSPECTIONS COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAIHTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST REINSTALL HANGERS PERFORH 3 AIR ROLLS -
1 PRE-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST
&, 2 POST-TEST VE ACTION
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST 8 2 POST-TEST
& 2 POST-TEST 8 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST
& 2 POST-TEST


Page 9                                                                ATTACHHENT 1 DATE  DURATION                                  CAUSE                            SYSTEM/COMPONENT        CORRECTIVE ACTION 04/27/89      3.92 REPLACE PLUGS IN OIL COOLER HEAT EXCHANGER                        ECCS    8 CSIP          COMPLETE CORRECTIVE MAINTENANCE 05/08/89      16.50 INSPECTION FOR LEAKS AND PERFORM EST-211                          EDG    A EDG            COMPLETE CORRECTIVE MAINTENANCE AND TEST 05/09/89        1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL                  EDG    A EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/16/89      4.72 FUEL OIL TRANSFER PUHP FAILED OST-1073                            EDG    B EDG/1DFO.E003 COHPLETE CORRECTIVE MAINTENANCE 05/16/89      13.33 REPLACE TORQUE SWTCH                                              ECCS    A RHR/1CC-147  COHPLETE CORRECTIVE MAINTENANCE 8 EDG          PERFORH 3 AIR ROLLS    1 PRE-TEST 8 2 POST-TEST 05/17/89        1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG 05/17/89      2.12 BREAKER REPLACEMENT PCR-4007                                      EDG    B EDG          COMPLETE MODIFICATION 05/17/89      6.65 REPLACE TORQUE SWITCH                                            ECCS    B RHR/1CC-167  COMPLETE CORRECTIVE MAINTENANCE 05/19/89        6.83 E-86A FAN TRIPPED B BKR WILL NOT RESET                          EDG    A EDG          COMPLETE CORRECTIVE MAINTENANCE 05/26/89        4.72 REPLACE TORQUE SWITCH                                            ECCS    8 RHR/1CC-167  COHPLETE CORRECTIVE MAINTENANCE 05/27/89        5.92 REHOVED FROH SERVICE TO PLACE 8 CSIP IN SERVICE                  ECCS    C CSIP          COMPLETE TRANSFER 05/31/89        1.42 TAKEN OOS TO TEST B-CSIP                                        ECCS    C CSIP          COMPLETE TEST RETURN TO SERVICE 06/02/89        3.00 BKR RACKED OUT TO ALLOW 8 CSIP PMP TEST                          ECCS    C CSIP          COHPLETE TEST RETURH TO. SERVICE 06/02/89        1.32 AIR START SOLENOID TROUBLESHOOTING                              EDG    8 EDG          COMPLETE CORRECTIVE MAINTENANCE 06/04/89      27.62 FAN BKR TRIPS ON THERHALS                                        EDG    A EDG/1DG-E017  COHPLETE CORRECTIVE HAINTEHANCE 06/04/89      23.28 DISASSEHBLE AND INSPECT IDFO-205                                  EDG    A EDG/1DG-E017  COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
\\
                                                                                    ,
06/05/89        1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL                  EDG    A EDG 06/07/89        2 '0  MPT-I0068 WHICH INOPS AH-85                                    EDG    8 EDG/1DG E015 A RHR COHPLETE PERIODIC TEST COMPLETE SCHEDULED TEST 06/07/89        0.50 OST-1008 RHR PUMP OPERABILITY  QUARTERLY INTERVAL                ECCS 06/07/89        0.50,0ST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL                ECCS    B RHR          COHPLETE SCHEDULED TEST 06/16/89      7.48 CHANGE OIL                                                        ECCS  8 RHR            INSPECT FOR PROPER OIL LEVEL 06/16/89    14.08 DG INOP WITH ESW INOP 8 DUE TO MST-10490                          EDG    8 EDG/ESW        COMPLETE SURVEILLANCE TEST 06/16/89      14.03 REPACK VALVE 1-S'WB                                              EDG    B EDG/1SW-8    COMPLETE MAINTENANCE 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY                      EDG    8 EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/17/89 06/17/89      1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    B EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/18/89      3.25 CALIBRATE FLOW SWITCH 6905B                                      EDG    B EDG/AH-85    COMPLETE CALIBRATION 06/20/89      13.18 ADJUST % CYLINDER                                                EDG    B EDG          COHPLETE CORRECTIVE MAINTENANCE 06/22/89      3.03 INSPECT VALVE SPRINGS                                            EDG    A EDG/1DG-E002  COMPLETE INSPECI'ION 07/05/89        1.38 REPAIR 1EA-14, 1EA29 8 SOLENOID VALVE                            EDG    A EDG          COMPLETE CORRECTIVE MAINTENANCE 07/05/89      15.58 CHANGE OIL IH PUMP                                                ECCS    A CSIP          COMPLETE MAINTENANCE 07/05/89      12.72 UNDER CLEARANCE FOR COIL LEAK CHECK                              ECCS    A CSIP/AH-9A    COHPLETE MAINTEHANCE 07/05/89      10.48 CHANGE OIL IN PUHP                                                ECCS    A RHR          COMPLETE OIL CHANGE 07/06/89        1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST Bt 2 POST-TEST 07/07/89        2.13 REMOVE SUMP COVER TO FIX LEVEL INDICATOR                        ECCS    8 RHR          COMPLETE CORRECTIVE MAINTENANCE 07/11/89        5.67 MAINTENANCE ON 1SW-E006                                          EDG    8 EDG          COHPLETE MAINTENANCE 07/17/89      12.50 REPLACE EXHAUST GASKET, PLANNED PM                                EDG    8 EDG          COHPLETE CORRECTIVE MAINTENANCE 07/17/89        1.50 OST-1073 1B-SB EDG OPERABILITY HOHTHLY INTERVAL                  EDG    8 EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/24/89      7.57 PERFORM MAINTENANCE OH 1SW-270                                  EDG    8 EDG/1SW-E005  COMPLETE CORRECTIVE MAINTENANCE


Page 'IO                                                                ATTACHMENT 1 DATE   DURATION                                     CAUSE                       SYSTEH/COMPONENT            CORRECTIVE ACTION 07/26/89       9.52 LIMITORQUE INSPECTION                                            ECCS    8 CSIP/1CS-196      COMPLETE INSPECTION 07/26/89       9.27 LIMITORQUE INSPECTION                                            ECCS    C  CSIP/1CS-752    COMPLETE INSPECTION 07/26/89       8.58 LIMITORQUE INSPECTION                                            ECCS    8 CSIP/181-2        COMPLETE INSPECTION 07/31/89       6.80 DISASSENBLE AND CLEAN    VALVE REGULATOR                        EDG    A EDG/1S'W-20       COMPLETE CORRECTIVE MAINTENANCE 07/31/89      F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/31/89      7.00 INSTALL PCR-4'662 AND PERFORM EPT-33                            EDG     A EDG/A SEQ        COMPLETE MODIFICATION AND TEST 07/31/89      5.72 PERFORN LP-T-6589A                                              EDG     A EDG/AH-86A        COMPLETE LOOP CALIBRATION 08/14/89      7.67 TRAHSPOSE lIIRES To AGREE  ll/ DESIGN IAM PCR-4663              EDG     B EDG/B SEQ        COMPLETE MODIFICATION AND TEST 08/14/89      7.00 INSPECT COUPLING GUARD                                          ECCS    8 CSIP              COMPLETE INSPECTION 08/15/89      1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG    B EDG              PERFORN 3 AIR ROLLS - 1 PRE-TEST &, 2 POST-TEST 08/21/89      5.67 RHR VALVES NOT BEING TESTED AS REQUIRED                          ECCS    RHR                REFERENCE LER 89-014 FOR CORRECTI VE ACTION 08/22/89      11  '8 REPLACE FILTERS ON BOTH FANS                                  EDG    A EDG/AH-85 A EDG/ESll PUMP COMPLETE MAINTENANCE COMPLETE MAINTEHANCE 08/22/89      14.50 PERFORM CM-ME0018, CLEAN CORROSION FROM PMP COUPL ING & SHAFT    EDG 08/22/89      14.50 MAINTENANCE INSPECTION AND LUBRICATIOH                          EDG    A EDG/AUX RES S CRN VERIFY PROPER SCREEH OPERATIOH 08/28/89      6.92 MAINTENAHCE ON EDG                                              EDG    A EDG              COMPLETE MAINTENANCE 08/29/89      1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL                  EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/06/89      8.75  PERFORM  MPT-10032 LIMITORQUE INSPECTION                      ECCS    B CSIP/1SI-323      COMPLETE INSPECTIONS AND TEST 09/07/89      0.50   OST-1008  RHR PUMP OPERABILITY QUARTERLY INTERVAL             ECCS    B RHR              COMPLETE SCHEDULED TEST 09/07/89      0.50   OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL             ECCS    A RHR              COMPLETE SCHEDULED TEST 09/11/89    12.18  MAINTEHAHCE OH DG RELAYS                                        EDG    8 EDG                COMPLETE MAINTENANCE 09/11/89      1.50 OST-1073 18 SB EDG OPERABILITY MONTHLY INTERVAL               EDG    8 EDG                PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST o9/11/e9      3.80  SERVICE HATER LEAK ON SPEED CHANGER COOLER                      ECCS   8 CSIP               COMPLETE CORRECTIVE MAINTENANCE 09/25/89      7.12  PERFORN MST-E0059 AND NST-E0061                                EDG   A EDG               COMPLETE SURVEILLANCE TEST 09/25/89      1.00  CALIBRATE FLOI SlIITCHES FS-6905B-SB                            EDG   8 EDG/AH.85          COMPLETE CALIBRATION 09/25/89      1.50  PERFORN  LP-T-6502A                                            ECCS  A RHR/AH-SA          COMPLETE LOOP CALIBRATIOH 09/26/89      4.83  INSPECT PUMP CLEARANCES                                        EDG   A EDG/EslI SCRH 'MASHCOMPLETE IHSPECTIONS 09/26/89      2.67  CHANGE FILTER AIR HANDLER AH-86                                EDG   A EDG               COMPLETE CORRECTIVE MAINTENANCE 09/27/89      1.50  OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY                    EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/27/89       1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/09/89      5.00  IHSPECT & REPLACE A]R FILTERS                                  EDG    8 EDG/AH-85        COMPLETE CORRECTIVE MAINTENANCE 10/09/89      4.50  FUEL OIL XFER PUMP STRAINER LEAK                              EDG    8 EDG/XFER PMP      COMPLETE CORRECTIVE MAIHTENANCE 10/09/89      1.50  OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL                EDG    8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/16/89      F 50  OST-1823 1A-SA EDG OPERABILITY 18 MONTH                        EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/16/89      1.50  OST-1823 1A-SA EDG OPERABILITY 18 MONTH                        EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/23/89      1.50  OST-1013 1A-SA EDG OPERABILITY NONTHLY INTERVAL                EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/07/89      1.92  2 HANGERS REMOVED FOR ISI INSPECTION                          ECCS    A RHR              REINSTALL HANGERS 11/08/e9      1.50  OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                EDG    8 EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/22/89      1.50  OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                EDG    8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
Page 11 ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPOHENT CORRECTIVE ACTION 11/23/89 11/23/89 11/27/89 12/04/89 12/10/89 12/12/89 12/12/89 12/14/89 12/15/89 12/15/89 12/17/89 12/22/89 12/22/89 12/28/89 12/31/89 01/01/90 01/01/90 01/03/90 01/15/90 01/16/90 01/23/90 01/29/90 01/29/90 01/29/90 01/29/90 01/29/90 01/29/90 02/12/90 02/13/90 02/13/90 02/20/90 02/20/90 02/20/90 02/22/90 02/26/90 02/26/90 02/28/90 03/01/90 0.50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.28 LOSS OF ALL RHR DURING VALVE TESTING 1 ~ 50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 2.77 PERFORM MAIHTEHANCE ON iSI-3 32.08 JACKET HATER KEEPMARM PMP LEAK 3.30 REPLACE TORQUE SNITCH 1.50 OST-'I013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 1B-SB EDG OPERABILITY SEMIANNUALLY 1.50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL
'1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 46.00 FREQUENCY DID NOT STABILIZE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY IN'IERVAL 0.58 IHD. LIGHTS FOR 8 DG FUEL OIL XFER PMP S
DAY TNK IHLT NOT OPER ~
12.20 HAINTENAHCE ON RELAY 43T-DG1SB/1085 14.87 REPAIR 1DJO-10 AND 1PH.45 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 0.67 ADJUST PACKIHG 13.32 SET LIMIT SNITCHES 21.82 LUBRICATE DRIVE COUPLING 21.82 REPLACE EXHAUST GASKET 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 13.07 CHANGE FILTER 8.53 REBUILD AIR REGULATOR 36.78 PREPLANNED MAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL 13.03 TORQUE BLADE PITCH LOCKNUT OH EXHAUST FAH 12.80 IHSPECT MOTOR HIHDING 13.07 8 CHILLER FAILED TO DEVELOP REQUIRED FLOW 3.03 A ESM OOS FOR CALIBRATION OF PT-9101A1 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 19.20 VARIOUS MAINTENANCE JOBS 6.40 PERFORM PM-I0020 OH 1SI-341 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS ECCS EDG EDG ECCS EDG EDG ECCS EDG ECCS EDG EDG EDG EDG EDG EDG EDG EDG EOG EDG ECCS ECCS EDG EDG EDG EDG ECCS EDG EDG ECCS EDG EDG ECCS EDG EDG EDG ECCS ECCS B RHR A RHR A EDG A EDG RHR B EDG 8
EDG B CSIP/1SI-3 B EDG A CSIP/181-4 A EDG 8
EDG 8
EDG A EDG B EDG 8
EDG 8
EDG 8
EDG A EDG A EDG 8 CSIP/1SI-2 B CSIP/1 s I-311 B EDG/1DLO-E006 B EDG 8
EDG 8 EDG/1B23-SB-3A B RHR/1RH-66 A EDG A EDG A RHR A EDG/EBBA A EDG/ESH PUMP CSIP/ESCIIC A EDG B EDG 8
EDG B RHR/1SI-341 B RHR POST-TEST POST-TEST CTION POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST CT ION POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS -
1 PRE-TEST t 2 REFERENCE LER 89-022 FOR CORRECTIVE A PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 REPLACE TORQUE SNITCH COMPLETE CORRECTIVE MAINTENANCE REPLACE TORQUE SMITCH PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE.TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 COMPLETE RETEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 REPLACE RELAY IN THE CONTROL PANEL COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTEHANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 COMPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTEHANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 REPLACE FILTER COMPLETE CORRECTIVE MAINTENANCE COMPLETE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE INSPECTIOHS REFERENCE LER 90-003 FOR CORRECTIVE A COMPLETE CALIBRATION PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 COMPLETE HAINTENANCE COHPLETE MAIHTENAHCE COMPLETE SCHEDULED TEST


\
Page 12 ATTACHHENT 1 DATE DURATION CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 03/06/90 03/06/90 03/12/90 03/13/90 03/13/90 03/19/90 03/22/90 03/23/90 03/26/90 03/27/90 03/28/90 03/29/90 03/29/90 04/11/90 04/11/90 04/24/90 05/01/90 05/03/90 05/07/90 05/07/90 05/17/90 05/20/90 05/21/90 06/04/90 06/04/90 06/04/90 06/06/90 06/13/90 06/14/90 06/19/90 06/19/90 06/20/90 06/22/90 06/26/90 07/02/90 07/02/90 07/16/90 07/16/90 12.42 PERFORH PM-E0012 OH BREAKER 20.18 REPLACE MOTOR PINION KEY 20.42 PREPLANNED HAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY 0.18 1SW-271 FAILED IN OPEN POSITION 0.18 PREPLANNED MAINTENANCE 0.70 ADJUST PACKING 20.92 CHANGE VARIOUS AIR AND FUEL OIL FILTERS 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 11.33 SAMPLE AND CHANGE OIL ARE REQiD IAW MPT-M0084 0'5 8 ESW SCREENWASH PUMP TRIPPED ON OVER LOAD 3.75 ESW PHP 6.9KV MTR RACKED OUT FOR LP-P-91018 ON PMP DISCH 25.95 PUMP TRIPS FREQUENTLY ON THERMALS.
Page 11                                                                ATTACHMENT 1 CAUSE                           SYSTEM/COMPOHENT          CORRECTIVE ACTION DATE  DURATION OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL           ECCS    B RHR              COMPLETE SCHEDULED TEST 11/23/89      0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL                  ECCS    A RHR              COMPLETE SCHEDULED TEST 11/23/89      0.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                   EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 11/27/89      1.50                                                                                                                                  t 1.50   OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                   EDG    A EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST    2 POST-TEST 12/04/89 ECCS    RHR                REFERENCE LER 89-022 FOR CORRECTIVE ACTI ON 12/10/89      0.28  LOSS OF ALL RHR DURING VALVE TESTING EDG    B EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/12/89      1 ~ 50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/12/89      1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH                            EDG 2.77 PERFORM MAIHTEHANCE ON iSI-3                                        ECCS    B CSIP/1SI-3      REPLACE TORQUE SNITCH 12/14/89                                                                                                          COMPLETE CORRECTIVE MAINTENANCE 32.08 JACKET HATER KEEPMARM PMP LEAK                                      EDG    B EDG 12/15/89 12/15/89      3.30 REPLACE TORQUE SNITCH                                              ECCS    A CSIP/181-4      REPLACE TORQUE SMITCH A EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/17/89      1.50 OST-'I013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG EDG    8 EDG              PERFORM 3 AIR ROLLS - 1 PRE.TEST 8 2 POST-TEST 12/22/89      1.50 OST-1086 1B-SB EDG OPERABILITY SEMIANNUALLY 8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/22/89      1.50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                   EDG
1.50 OST-1013 1A SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 6.70 CHANGE OIL 0.50 OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL 8.83 PERFORH PREPLANNED EDG HAINTENANCE 1.50 OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL 0.20 PERFORM EPT-153 8.30 SCREEH NOT ROTATING 1.50 OST-1073 1B SB EDG OPERABILITY MONTHLY INTERVAL 7.83 PERFORH LOOP CALIBRATRION LP-9101A 16.23 MAINTENAHCE 1.50 OST-1013 1A-SA EOG OPERABILITY MONTHLY INTERVAL 6.52 ADJUST/REPLACE BELTS OH AH-9A 12.75 PREPLANNED MAIHTEHANCE REPLACE MOTOR OIL 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY IHTERVAL 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY 6.50 B CHILLER INOP DUE TO A MISPOSITIONED VALVE 7.37 FAH TRIPPED UPON STARTIHG 1.85 INSTALL TEST EQUIP TO VERIFY DIESEL START TIMES 14.33 PERFORH OIL LEAK REPAIRS AND MPT-0001 1.50 OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL.
              '1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG     A EDG             PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 12/28/89 FREQUENCY DID NOT STABILIZE                                      EDG     B EDG              COMPLETE RETEST 12/31/89    46.00 OST-1073 1B-SB EDG OPERABILITY MONTHLY IN'IERVAL                  EDG     8 EDG             PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/01/90      1.50 IHD. LIGHTS FOR 8 DG FUEL OIL XFER PMP S DAY TNK IHLT  NOT OPER  EDG     8 EDG             REPLACE RELAY IN THE CONTROL PANEL 01/01/90      0.58                                                                  ~
'1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY IHTERVAL 13.40 PREPLANNED HAINTENANCE ECCS ECCS EDG EDG EDG EDG EDG ECCS EDG EDG ECCS EDG PRESS INST EDG EDG EDG EDG ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG EDG EDG A RHR A RHR/1RH-25 A EDG A EDG A EDG 8 EDG/1SW-271 A EOG 8 CSIP/1SI-2 8
HAINTENAHCE ON RELAY 43T-DG1SB/1085                              EDG     8 EDG              COMPLETE CORRECTIVE MAINTENANCE 01/03/90    12.20 REPAIR 1DJO-10 AND 1PH.45                                        EOG    A EDG             COMPLETE CORRECTIVE MAINTEHANCE 01/15/90    14.87 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL                    EDG   A EDG             PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/16/90      1.50 01/23/90      0.67  ADJUST PACKIHG                                                    ECCS  8 CSIP/1SI-2       COMPLETE CORRECTIVE MAINTENANCE 01/29/90    13.32  SET LIMIT SNITCHES                                                ECCS  B  CSIP/1 s I -311 COHPLETE CORRECTIVE MAINTEHANCE EDG    B  EDG/1DLO-E006    COMPLETE CORRECTIVE MAINTENANCE 01/29/90    21.82  LUBRICATE DRIVE COUPLING EDG    B EDG              COMPLETE CORRECTIVE MAINTENANCE 01/29/90    21.82  REPLACE EXHAUST GASKET OST-1073 1B-SB      OPERABILITY MONTHLY INTERVAL                  EDG    8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/29/90      1.50                EDG EDG    8 EDG/1B23-SB-3A  REPLACE FILTER 01/29/90    13.07  CHANGE FILTER ECCS    B RHR/1RH-66      COMPLETE CORRECTIVE MAINTENANCE 01/29/90      8.53 REBUILD AIR REGULATOR EDG    A EDG              COMPLETE MAINTENANCE 02/12/90    36.78  PREPLANNED MAINTENANCE 1.50 OST-1013 1A-SA  EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/13/90 0.50  OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL            ECCS    A RHR              COMPLETE SCHEDULED TEST 02/13/90 13.03  TORQUE BLADE PITCH LOCKNUT OH EXHAUST FAH                        EDG    A EDG/EBBA        COMPLETE CORRECTIVE MAINTENANCE 02/20/90 IHSPECT MOTOR HIHDING                                            EDG    A EDG/ESH PUMP    COMPLETE INSPECTIOHS 02/20/90    12.80 13.07  8 CHILLER FAILED TO DEVELOP REQUIRED FLOW                        ECCS    CSIP/ESCIIC        REFERENCE LER 90-003 FOR CORRECTIVE ACT ION 02/20/90 A EDG              COMPLETE CALIBRATION 02/22/90      3.03  A ESM OOS FOR CALIBRATION OF PT-9101A1                            EDG 1.50  OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    B EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/26/90 EDG    8 EDG              COMPLETE HAINTENANCE 02/26/90    19.20  VARIOUS MAINTENANCE JOBS 02/28/90      6.40  PERFORM PM-I0020  OH 1SI-341                                      ECCS    B RHR/1SI-341      COHPLETE MAIHTENAHCE 0.50  OST-1092 1B-SB  RHR PUMP OPERABILITY QUARTERLY INTERVAL          ECCS    B RHR              COMPLETE SCHEDULED TEST 03/01/90
EDG 8
EDG 8 CSIP 8 EDG/1SC-BAY6 8 EDG/ESW 8 EDG/1SC-BAY6 A EDG 8 EDG A RHR A RHR A EDG/1DG-E002 A EDG C CSIP A EDG 8 EDG A EDG/1SW-E005 A EDG/1DG-E002 A EDG A CSIP/AH-9A 8 RHR 8
RHR 8
EDG B EDG 8 CSIP/ESCWC B EOG/1DG-E019 A EDG/1DG-E002 A EDG/1DG.E002 A EDG 8
EDG A EDG COMPLETE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE CORRECTIVE HAINTENANCE COMPLETE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE HAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST CHECK XORHAL OIL LEVELS COHPLETE CORRECTIVE MAINTENANCE COMPLETE CALIBRATION COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE MAINTENANCE COMPLETE SCHEDULED TEST COHPLETE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE TEST VERIFY SCREEH ROTATION WITH ESW PUMP RUNNING PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE LP-9101A COMPLETE MAINTEHANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST RESTORE AH-9A VERIFY OIL LEVEL COMPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST REFERENCE LER 90-017 FOR CORRECTIVE ACTION COMPLETE CORRECTIVE MAINTENANCE COHPLETE TEST COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE MAINTENANCE


Page 12                                                                ATTACHHENT 1 DURATION                                   CAUSE                               SYSTEH/COHPONENT        CORRECTIVE ACTION DATE 12.42 PERFORH PM-E0012 OH BREAKER                                            ECCS    A RHR          COMPLETE MAINTENANCE 03/06/90 20.18 REPLACE MOTOR PINION KEY                                              ECCS    A RHR/1RH-25    COMPLETE CORRECTIVE MAINTENANCE 03/06/90 20.42 PREPLANNED HAINTENANCE                                                EDG    A EDG          COMPLETE MAINTENANCE 03/12/90 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL                      EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2  POST-TEST 03/13/90 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY                          EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2  POST-TEST 03/13/90 0.18 1SW-271 FAILED IN OPEN POSITION                                        EDG    8 EDG/1SW-271  COMPLETE CORRECTIVE HAINTENANCE 03/19/90 0.18 PREPLANNED MAINTENANCE                                                EDG    A EOG          COMPLETE MAINTENANCE 03/22/90 03/23/90     0.70 ADJUST PACKING                                                        ECCS    8 CSIP/1SI-2    COMPLETE CORRECTIVE MAINTENANCE 8 EDG          COMPLETE CORRECTIVE HAINTENANCE 03/26/90     20.92 CHANGE VARIOUS AIR AND FUEL OIL FILTERS                                EDG EDG    8 EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2  POST-TEST 03/27/90       1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 11.33 SAMPLE AND CHANGE OIL ARE REQiD IAW MPT-M0084                          ECCS    8 CSIP          CHECK XORHAL OIL LEVELS 03/28/90 03/29/90       0 '5  8 ESW SCREENWASH PUMP TRIPPED ON OVER LOAD                          EDG    8 EDG/1SC-BAY6 8 EDG/ESW COHPLETE CORRECTIVE MAINTENANCE COMPLETE CALIBRATION 03/29/90       3.75   ESW PHP 6.9KV MTR RACKED OUT FOR LP-P-91018 ON PMP DISCH PRESS INST EDG 25.95    PUMP TRIPS FREQUENTLY ON THERMALS .                                EDG     8 EDG/1SC-BAY6  COMPLETE CORRECTIVE MAINTENANCE 04/11/90 OST-1013 1A SA EDG OPERABILITY MONTHLY INTERVAL                     EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2  POST-TEST 04/11/90      1.50 1.50  OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                     EDG     8  EDG         PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2  POST-TEST 04/24/90 6.70  CHANGE OIL                                                         ECCS    A RHR          COMPLETE MAINTENANCE 05/01/90 0.50  OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL             ECCS    A RHR          COMPLETE SCHEDULED TEST 05/03/90 8.83                                                                      EDG     A EDG/1DG-E002  COHPLETE MAINTENANCE 05/07/90              PERFORH PREPLANNED EDG HAINTENANCE OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL                     EDG   A EDG           PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2  POST-TEST 05/07/90      1.50 0.20  PERFORM EPT-153                                                      ECCS   C  CSIP         COMPLETE TEST 05/17/90                                                                                                                                                RUNNING 05/20/90      8.30  SCREEH NOT ROTATING                                                  EDG   A EDG           VERIFY SCREEH ROTATION WITH ESW PUMP OST-1073 1B SB EDG OPERABILITY MONTHLY INTERVAL                      EDG     8 EDG         PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 05/21/90      1.50 7.83  PERFORH LOOP CALIBRATRION LP-9101A                                  EDG    A EDG/1SW-E005  COMPLETE LP-9101A 06/04/90 16.23 MAINTENAHCE                                                            EDG    A EDG/1DG-E002  COMPLETE MAINTEHANCE 06/04/90 1.50 OST-1013 1A-SA      OPERABILITY MONTHLY INTERVAL                    EDG    A EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/04/90                            EOG 6.52  ADJUST/REPLACE BELTS OH AH-9A                                        ECCS    A CSIP/AH-9A    RESTORE AH-9A 06/06/90 06/13/90    12.75 PREPLANNED MAIHTEHANCE REPLACE MOTOR OIL                              ECCS    8 RHR          VERIFY OIL LEVEL 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL                ECCS    8 RHR          COMPLETE SCHEDULED TEST 06/14/90 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY IHTERVAL                      EDG    8 EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/19/90 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY                          EDG    B EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 06/19/90 6.50 B CHILLER INOP DUE TO A MISPOSITIONED VALVE                          ECCS    8 CSIP/ESCWC    REFERENCE LER 90-017 FOR CORRECTIVE ACTION 06/20/90 7.37 FAH TRIPPED UPON STARTIHG                                            EDG    B EOG/1DG-E019  COMPLETE CORRECTIVE MAINTENANCE 06/22/90 1.85 INSTALL TEST EQUIP TO VERIFY DIESEL START TIMES                      EDG    A EDG/1DG-E002  COHPLETE TEST 06/26/90 14.33 PERFORH OIL LEAK REPAIRS AND MPT-0001                                  EDG    A EDG/1DG.E002  COMPLETE CORRECTIVE MAINTENANCE 07/02/90 1.50 OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL.                      EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/02/90
Page 13 ATTACNHENT 'I DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 07/26/90 07/31/90 08/02/90 08/02/90 08/08/90 08/10/90 08/10/90 08/13/90 08/14/90 08/20/90 08/21/90 08/27/90 08/28/90 08/30/90 09/04/90 09/05/90 09/10/90 09/12/90 09/14/90 09/24/90 09/25/90 10/07/90 10/11/90 10/12/90 10/22/90
                '1.50 OST-1073 18-SB      OPERABILITY MONTHLY IHTERVAL                      EDG    8 EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 07/16/90                            EDG 13.40                                                                        EDG    A EDG          COHPLETE MAINTENANCE 07/16/90              PREPLANNED HAINTENANCE
-'IO/24/90 10/25/90 11/03/90 11/04/90 11/07/90 11/07/90 11/12/90 11/19/90 12/03/90 12/03/90 12/06/90 12/11/90 12/12/90 7.67 1.50 0.90 0.58 0.83 0.67 0.50 1.50 7.60 0.17 3.02 35.37 1.50 0.37 19.28 6.72 1.50 0.25 0.50 1.50 1.50 3.92 9.80 1.50 1.50 3.50 0.50 28.75 1.50 2.33 51.28 1.33 1.50 1 ~ 50 1.50 5.08 3.85 0.50 OIL CHANGE AND SAHPLE OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL BREAKER MOO PCR-3510 FR01 IMPLEHENT BREAKER FIELD MODIFICATION PUMP BONN THE A TRAIN SUHP INSIDE CONTAINHENT PCR-3510 480V BKR HODIFICATIOH OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL OST-1073 1B-SB EDG OPERABILIT'Y MONTHLY INTERVAL OIL CHANGE AND ROUTINE PREVENTATIVE HAINTENAHCE REPLACE SPARE BREAKER MITH MODIFIED ORIGINAL PER PCR-3510 REMOVE ORIGINAL BKR AND INSTALL MODIFIED BKR PER PCR-35'IO REPLACE CAHSHAFT COVER GASKET AND CRANKCASE RELIEF VALVES OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL IHSTALL PCR-3510 TRANSHITTER FAILED HST-10078 PERFORM EPT-150 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL VALVE FAILED TO STROKE SHUT DURING OST-1215 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY PERFORH MPT-H0011 VALVE COVER GASKET REPLACEMENT TROUBLESNOOTIHG PROBLEH IIITH COHTROL AIR LEAK OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL CHANGE OIL OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL REPAIR LEAK ON EQUALIZIHG LINE OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL PERFORH LOOP CALIBRATIOH OH T-6522A DECHROHATING SKID ATTACHED ACROSS A CCM PUMP LINKAGE ON VALVE ACTUATOR IS BROKEN OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL CHANGE LUBE OIL PERFORH HPT-H0084 AND PM-M0074 OIL CHANGE OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS EDG ECCS ECCS ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG EDG ECCS ECCS EDG EDG EDG ECCS EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS ECCS A CSIP A EDG A RHR/1A2-SA-5A A RHR A RHR A RHR A RHR B EDG B CSIP A RHR B RHR A EDG A EDG B RHR A RHR/FT-605A 8 EDG/1QI-E006 B EDG A EDG/1SN-276 8
RHR A EDG A EDG 8 EDG 8
EDG 8
EDG A EDG A RHR A RHR B CSIP 8 EDG A CSIP/AH-9A A CSIP A CSIP/1SM-1055 A EDG B EDG 8
EDG A EDG B RHR B RHR COHPLETE MAINTENANCE AND VERIFY OIL LEVEL PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST RUN A RHR PUHP CHECK BREAKER OPERATION RACK IN ORIGINAL UNHODIFIED BREAKER COHPLETE PUHP DOMN COHPLETE MODIFICATION COHPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE HAINTENANCE CYCLE BKR OBSERVE NORHAL PHP OPERATION CYCLE BKR OBSERVE NORHAL PMP OPERATION COHPLETE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE HDOIFICATION REPLACE TRANSHITTER RESTORE EQI PER EPT-150 PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST CLOSE 1Sll-276 COHPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE MAINTENANCE COHPLETE CORRECTIVE HAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE HAINTENANCE COMPLETE SCHEDULED TEST COHPLETE CORRECTIVE MAIN'IENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE LOOP CALIBRATION COMPLETE EPT-097 COHPLETE CORRECTIVE MAINTEHANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
&I 2 POST-TEST COHPLETE MAINTENANCE COHPLETE HAINTENANCE COMPLETE SCHEDULED TEST


Page 13                                                                  ATTACNHENT 'I DATE   DURATION                                     CAUSE                           SYSTEH/COMPONENT         CORRECTIVE ACTION 07/26/90       7.67  OIL  CHANGE AND SAHPLE                                          ECCS    A  CSIP          COHPLETE MAINTENANCE AND VERIFY OIL LEVEL 07/31/90       1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 0.90   BREAKER MOO PCR-3510 FR01                                        ECCS    A  RHR/1A2-SA-5A RUN A RHR PUHP CHECK BREAKER OPERATION 08/02/90 08/02/90      0.58    IMPLEHENT BREAKER FIELD MODIFICATION                            ECCS    A  RHR          RACK IN ORIGINAL UNHODIFIED BREAKER 08/08/90      0.83  PUMP BONN THE A TRAIN SUHP INSIDE CONTAINHENT                    ECCS    A  RHR          COHPLETE PUHP DOMN 08/10/90      0.67   PCR-3510 480V BKR HODIFICATIOH                                    ECCS    A  RHR          COHPLETE MODIFICATION 08/10/90      0.50   OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL           ECCS    A RHR          COHPLETE SCHEDULED TEST EDG    B EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/13/90      1.50 OST-1073 1B-SB EDG OPERABILIT'Y MONTHLY INTERVAL 7.60  OIL  CHANGE AND ROUTINE PREVENTATIVE HAINTENAHCE                ECCS    B CSIP           COHPLETE HAINTENANCE 08/14/90 0.17    REPLACE SPARE BREAKER MITH MODIFIED ORIGINAL PER PCR-3510        ECCS    A RHR            CYCLE BKR OBSERVE NORHAL PHP OPERATION 08/20/90 08/21/90      3.02    REMOVE ORIGINAL BKR AND INSTALL MODIFIED BKR PER PCR-35'IO      ECCS    B RHR            CYCLE BKR OBSERVE NORHAL PMP OPERATION 35.37    REPLACE CAHSHAFT COVER GASKET AND CRANKCASE RELIEF VALVES        EDG     A EDG            COHPLETE MAINTENANCE 08/27/90 1.50    OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/28/90 0.37    IHSTALL PCR-3510                                                ECCS    B RHR           COHPLETE HDOIFICATION 08/30/90 09/04/90      19.28    TRANSHITTER FAILED HST-10078                                    ECCS    A RHR/FT-605A    REPLACE TRANSHITTER 6.72            EPT-150                                                EDG     8 EDG/1QI-E006  RESTORE EQI PER EPT-150 09/05/90              PERFORM 1.50    OST-1073 1B-SB   EDG OPERABILITY MONTHLY INTERVAL               EDG     B EDG           PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/10/90 0.25    VALVE FAILED TO STROKE SHUT DURING OST-1215                      EDG     A EDG/1SN-276    CLOSE 1Sll-276 09/12/90 09/14/90      0.50    OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL          ECCS    8 RHR           COHPLETE SCHEDULED TEST 1.50    OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL                  EDG     A EDG           PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/24/90 1.50                                                                    EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/25/90              OST-1085 1A-SA  EDG OPERABILITY SEHIANNUALLY 3.92                                                                    EDG    8 EDG            COHPLETE MAINTENANCE 10/07/90              PERFORH MPT-H0011 VALVE COVER GASKET REPLACEMENT 9.80    TROUBLESNOOTIHG PROBLEH IIITH COHTROL AIR LEAK                    EDG    8  EDG          COHPLETE CORRECTIVE HAINTENANCE 10/11/90 1.50  OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL                  EDG    8 EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/12/90 10/22/90      1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A  EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST
Page 14 ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 12/17/90 12/18/90 12/27/90 12/31/90 12/31/90 01/02/91 01/08/91 01/12/91 01/14/91 01/22/91 01/22/91 01/22/91 01/22/91 01/24/91 01/28/91 01/28/91 02/11/91 02/11/91 02/11/91 02/12/91 02/12/91 02/14/91 02/25/91 02/26/91 02/27/91 03/02/91 03/06/91 03/11/91 03/11/91 03/13/91 03/13/91 03/14/91 03/14/91 03/14/91 03/20/91 03/25/91 03/29/91 03/31/91 37.68 1.50 37.92 1.50 4.17 10.15 4.35 0.47 1.50 8.67 4.52 30.33 30.33 9.72 1.50 8.08 1.02 14.38 1.50 1.18 57.28 0.50 1.50 1 ~ 57 42.58 0.50 7.37 1.50 1.50 5.50 0.95 0.13 1.50 8.72 3.00 1.86 1.50 1.50 INSPECT CYLINDER HEADS 8 REPLACE LEAK GASKET OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL TROUBLESHOOT MHY VALVE HILL NOT OPEN OST-1073 18-SB EDG OPERABILI'TY MONTHLY INTERVAL AN-9A U/C TO REPLACE BELTS THIS INOPS A CSIP REPLACE PRESSURE SNITCH FOR 86 LO RELAY PERFORM LP-T-6502B LOOP CALIBRATIOH RETEST AUX RESERVOIR SCREENS ON Ml SPEED AFTER COIL REPLACEMENT OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL PERFORM EPT-300 ON CS-210(
-'IO/24/90      3.50    CHANGE OIL                                                      ECCS  A  RHR          COHPLETE HAINTENANCE 10/25/90      0.50    OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL          ECCS  A  RHR          COMPLETE SCHEDULED TEST 11/03/90    28.75    REPAIR LEAK ON EQUALIZIHG LINE                                  ECCS    B  CSIP          COHPLETE CORRECTIVE MAIN'IENANCE 1.50    OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    8  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/04/90 11/07/90      2.33    PERFORH LOOP CALIBRATIOH OH T-6522A                              ECCS  A CSIP/AH-9A      COHPLETE LOOP CALIBRATION 51.28                                                                      ECCS    A CSIP          COMPLETE EPT-097 11/07/90              DECHROHATING SKID ATTACHED ACROSS A CCM PUMP 11/12/90      1.33    LINKAGE ON VALVE ACTUATOR IS BROKEN                              ECCS    A CSIP/1SM-1055  COHPLETE CORRECTIVE MAINTEHANCE 1.50    OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 11/19/90 12/03/90      1 ~ 50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY                      EDG    B EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 12/03/90      1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                    EDG    8 EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST &I 2 POST-TEST 12/06/90      5.08 CHANGE LUBE OIL                                                    EDG    A EDG            COHPLETE MAINTENANCE 12/11/90      3.85 PERFORH HPT-H0084 AND PM-M0074 OIL CHANGE                          ECCS    B RHR            COHPLETE HAINTENANCE 12/12/90      0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY    INTERVAL          ECCS    B RHR            COMPLETE SCHEDULED TEST
C CSIP MINIFLN ISOLATION PERFORH LOOP CALIBRATIOH LP-T-65228 PCR-5435 AND LIHITORQUE INSPECTION PCR-5435 AND LIMITORQUE INSPECTION ADJUST SEAL TAKE LO SAMPLES CHG OIL 8 GREASE IN COUPLING OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL PLANNED MAINTENANCE PERFORM LP-T-6589A LOOP CALIBRATIOH INSTALL HEN SHUTTLE VALVE OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL REPLACE BREAKER OH 1CS-946 INSTALL VOTES OH VARIOUS RHR VALVES PCR-5435 OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL PERFORM LOOP CALIBRATIOH ON TEMPERATURE LOOP B LOOP OUTAGE VARIOUS JOBS IN MODE 5-6 OST-1092 1B-SB RHR PUMP OPERABILI'TY QUARTERLY INTERVAL REPLACE QUICK VENT SHUTTLE VALVE OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL BOTH CSIPS IHOP DUE TO 8 SEQUENCER RELAYS FAILIHG VOTES TESTING ON 1CS-182 8 CHILLER INOP DUE FAILED PERFORMANCE TESTS OST-1823 1A.SA EDG OPERABILITY 18 MONTH VOTES TESTING 8 TORQUE SNITCH SETTING VALVE TNERHALS OUT DURIHG OPERATION BOTH TRAINS OF ESll MERE REMOVED FROM SERVICE OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL EDG EDG ECCS EDG ECCS EDG ECCS EDG EDG ECCS ECCS ECCS ECCS ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG ECCS ECCS EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG ECCS EDG EDG A EDG A EDG A CSIP/1SI-1 B EDG A CSIP/AH-9A 8 EDG B RHR/AH-58 8 EDG A EDG 8 CSIP B CSIP/AH-9B 8 RHR/1RH-69 8 CSIP/1SI-2 A CSIP 8 EDG 8
EDG A EDG/1EV-A86A A EDG A EDG A CS IP/1CS-946 A RMR A RHR 8
EDG A EDG/EBBA 8 RHR B RHR 8 EDG A EDG A EDG 8 CSIP/B SEQ A CSIP/1CS-182 B CSIP/ESCIIC A EDG A CSIP/1CS-182 A EDG/1'-270 RHR/ESM/CCll A EDG 8 EDG COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST F 2 POST-TEST COMPLETE CORRECTIVE MAINTEHANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST. TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE LP-T-65028 COMPLETE MAINTENANCE AND TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE PERIODIC TEST COMPLETE LOOP CALIBRATION COMPLETE MODIFICATION AND INSPECTION COMPLETE MODIFICATION AHD INSPECTION VERIFY PROPER OIL LEVEL 8 NO OIL LEAKS PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE MAIHTEHANCE COMPLETE LOOP CALIBRATION COMPLETE VALVE REPLACEMEHT PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST VERIFY VALVE STROKES COMPLETE TEST AND MAIHTEHANCE COMPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE LOOP CALIBRATION COMPLETE MAINTENANCE COMPLETE SCHEDULED TEST COMPLETE VALVE REPLACEMENT PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -
'I PRE-TEST 8 2 POST-TEST REFERENCE LER 91-005 FOR CORRECTIVE ACTIOH COMPLETE TESTING REFERENCE LER 91-004 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE TESTING COMPLETE CORRECTIVE MAINTENANCE REFERENCE LER 91-007 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS'-
1 PRE-TEST 8 2 POST-TEST


Page 14                                                                  ATTACHMENT 1 DATE  DURATION                                    CAUSE                          SYSTEM/COMPONENT        CORRECTIVE ACTION 12/17/90    37.68 INSPECT CYLINDER HEADS 8 REPLACE LEAK GASKET                        EDG    A EDG            COMPLETE MAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL                    EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST 12/18/90 12/27/90    37.92 TROUBLESHOOT MHY VALVE HILL NOT OPEN                                ECCS    A  CSIP/1SI-1    COMPLETE CORRECTIVE MAINTEHANCE 1.50 OST-1073 18-SB EDG OPERABILI'TY MONTHLY INTERVAL                  EDG    B EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST. TEST 12/31/90 12/31/90      4.17 AN-9A U/C TO REPLACE BELTS THIS INOPS A CSIP                        ECCS    A CSIP/AH-9A    COMPLETE CORRECTIVE MAINTENANCE 01/02/91    10.15    REPLACE PRESSURE  SNITCH FOR 86 LO RELAY                        EDG    8 EDG            COMPLETE CORRECTIVE MAINTENANCE 4.35    PERFORM LP-T-6502B LOOP CALIBRATIOH                              ECCS    B  RHR/AH-58    COMPLETE LP-T-65028 01/08/91 0.47  RETEST AUX RESERVOIR SCREENS ON Ml SPEED AFTER COIL REPLACEMENT  EDG    8  EDG          COMPLETE MAINTENANCE AND TEST 01/12/91 1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/14/91 8.67  PERFORM EPT-300 ON CS-210( C CSIP MINIFLN ISOLATION              ECCS    8 CSIP          COMPLETE PERIODIC TEST 01/22/91 4.52  PERFORH LOOP CALIBRATIOH LP-T-65228                              ECCS    B  CSIP/AH-9B    COMPLETE LOOP CALIBRATION 01/22/91 01/22/91    30.33    PCR-5435 AND LIHITORQUE INSPECTION                              ECCS    8  RHR/1RH-69    COMPLETE MODIFICATION AND INSPECTION 01/22/91    30.33    PCR-5435 AND LIMITORQUE INSPECTION                              ECCS    8  CSIP/1SI-2    COMPLETE MODIFICATION AHD INSPECTION 01/24/91      9.72  ADJUST SEAL TAKE LO SAMPLES CHG  OIL 8 GREASE IN COUPLING      ECCS    A  CSIP          VERIFY PROPER OIL LEVEL 8 NO OIL LEAKS 1.50  OST-1073  18-SB EDG OPERABILITY MONTHLY INTERVAL                EDG    8  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 01/28/91 01/28/91      8.08  PLANNED MAINTENANCE                                              EDG    8  EDG          COMPLETE MAIHTEHANCE 02/11/91      1.02  PERFORM LP-T-6589A LOOP CALIBRATIOH                              EDG    A EDG/1EV-A86A  COMPLETE LOOP CALIBRATION 02/11/91    14.38    INSTALL HEN SHUTTLE VALVE                                        EDG    A EDG            COMPLETE VALVE REPLACEMEHT 1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/11/91 02/12/91      1.18  REPLACE BREAKER OH 1CS-946                                      ECCS    A  CS IP/1CS-946 VERIFY VALVE STROKES 02/12/91    57.28    INSTALL VOTES OH VARIOUS RHR VALVES PCR-5435                    ECCS    A  RMR          COMPLETE TEST AND MAIHTEHANCE 02/14/91      0.50  OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL          ECCS    A  RHR          COMPLETE SCHEDULED TEST 02/25/91      1.50  OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                  EDG    8  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 02/26/91      1 ~ 57 PERFORM LOOP CALIBRATIOH ON TEMPERATURE LOOP                      EDG    A EDG/EBBA        COMPLETE LOOP CALIBRATION 02/27/91    42.58    B LOOP OUTAGE VARIOUS JOBS IN MODE 5-6                          ECCS  8 RHR            COMPLETE MAINTENANCE 03/02/91      0.50  OST-1092 1B-SB RHR PUMP OPERABILI'TY QUARTERLY INTERVAL          ECCS  B RHR            COMPLETE SCHEDULED TEST 03/06/91      7.37    REPLACE QUICK VENT SHUTTLE VALVE                                EDG    8 EDG            COMPLETE VALVE REPLACEMENT A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/11/91      1.50  OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY                      EDG 03/11/91      1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG            PERFORM 3 AIR ROLLS - 'I PRE-TEST 8 2 POST-TEST 03/13/91      5.50    BOTH CSIPS IHOP DUE TO 8 SEQUENCER RELAYS FAILIHG                ECCS    8 CSIP/B SEQ    REFERENCE LER 91-005 FOR CORRECTIVE ACTIOH 03/13/91      0.95  VOTES TESTING ON 1CS-182                                        ECCS    A CSIP/1CS-182  COMPLETE TESTING 03/14/91      0.13  8 CHILLER INOP DUE FAILED PERFORMANCE TESTS                      ECCS    B  CSIP/ESCIIC  REFERENCE LER 91-004 FOR CORRECTIVE ACTION 03/14/91      1.50  OST-1823 1A.SA EDG OPERABILITY 18 MONTH                          EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/14/91      8.72  VOTES TESTING 8 TORQUE SNITCH SETTING                            ECCS    A CSIP/1CS-182  COMPLETE TESTING 03/20/91      3.00  VALVE TNERHALS OUT DURIHG OPERATION                              EDG    A EDG/1'-270    COMPLETE CORRECTIVE MAINTENANCE 03/25/91      1.86  BOTH TRAINS OF ESll MERE REMOVED FROM SERVICE                    ECCS    RHR/ESM/CCll    REFERENCE LER 91-007 FOR CORRECTIVE ACTION 03/29/91      1.50  OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                  EDG    A EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 03/31/91      1.50  OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL                  EDG    8 EDG            PERFORM 3 AIR ROLLS'- 1 PRE-TEST 8 2 POST-TEST
0


0 Page 15                                                                 ATTACHMENT 1 DATE   DURATION                                     CAUSE                         SYSTEH/COMPONENT           CORRECTIVE ACTION 1.50 OST-1013 1A-SA   EDG OPERABILITY MONTHLY INTERVAL                 EDG    A EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/16/91
Page 15 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 04/16/91 04/16/91 04/18/91 04/18/91 04/24/91 04/24/91 04/25/91 05/01/9'I 05/04/91 05/04/91 05/07/91 05/07/91 05/08/91 05/08/91 05/08/91 05/12/91 05/23/91 05/24/91 05/29/91 06/02/91 06/05/91
                    '0 OST.1823 1A-SA EDG OPERABILITY 18 MONTH                         EDG    A  EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/16/91      1 1.50   OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A  EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/18/91 1.50   OST-1823 1A-SA EDG OPERABILITY 18 MOHI'H                         EDG    A  EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/18/91 0.50   OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL           ECCS    8  RHR            COMPLETE SCHEDULED TEST 04/24/91 0.50   OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY IHTERVAL           ECCS    A  RKR            COMPLETE SCHEDULED TEST 04/24/91 1.50   OST 1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                 EDG    8  EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 04/25/91 05/01/9'I      1.50   OST-1824 1B-SB EDG OPERABILITY 18 MONTH                         EDG    B EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 1.50   OST-1073 1B-SB EDG OPERABILITY MOHTHLY IHTERVAL                 EDG    8 EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/04/91 1.50   OST-1824 1B-SB EDG OPERABILITY 18 MONTH                         EDG    8 EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/04/91 1.50   OST-1824 18-SB EDG OPERABILITY 18 MONTH                         EDG    B EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/91 OST-1824 18-SB EDG OPERABILITY 18 MONTH                         EDG    8 EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 05/07/91                                                      '.50 0.38   DISCHARGE VALVE SHUT FOR STROKING SI VALVES                     ECCS    A CSIP            COMPLETE TESTING 05/08/91 0.08   DISCHARGE VALVE SHUT TO STROKE 1SI-107                           ECCS    A CSIP            COMPLETE TESTING 05/08/91 05/08/91      0.88   DISCHARGE VALVE SHUT TO STROKE 'IS1-107                         ECCS    A CSIP            COMPLETE TESTING 144.00                                                                   ECCS    RUST              REFERENCE LER 91-011 FOR CORRECTIVE ACT ION 05/12/91              RUST BOROH HIGHER THAN ALLOMED 5.53   REPLACE GENERATOR BEARING TEMPERATURE SNITCH                     EDG    A EDG              COMPLETE CORRECI'IVE MAINTENANCE 05/23/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A EDG              PERFORM 3 AIR ROLLS - 1 PRE-TEST 8, 2 POST-TEST 05/24/91 5.62                                                                   ECCS    8 CSIP            COMPLETE CORRECTIVE MAIHTEHAHCE 05/29/91            OIL COOLER SERVICE MATER LEAK 06/02/91      1.42 SHEAR PIN BROKEN OH AUX TRAV SCREEN                             EDG    8  EDG            REPAIR, VERIFY PROPER OPERATION
- 06/05/91 06/05/91 06/12/91 06/12/91 06/17/91 06/19/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/21/91 07/01/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1'0 OST.1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MOHI'H 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY IHTERVAL 1.50 OST 1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY IHTERVAL 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1824 18-SB EDG OPERABILITY 18 MONTH
                    '0 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                   EDG    8  EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/05/91      1 12.92 REPAIR/REPLACE 1DFO-213 VALVE                                       EDG    8  EDG            REPLACE LEAKING VALVE
'.50 OST-1824 18-SB EDG OPERABILITY 18 MONTH 0.38 DISCHARGE VALVE SHUT FOR STROKING SI VALVES 0.08 DISCHARGE VALVE SHUT TO STROKE 1SI-107 0.88 DISCHARGE VALVE SHUT TO STROKE 'IS1-107 144.00 RUST BOROH HIGHER THAN ALLOMED 5.53 REPLACE GENERATOR BEARING TEMPERATURE SNITCH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 5.62 OIL COOLER SERVICE MATER LEAK 1.42 SHEAR PIN BROKEN OH AUX TRAV SCREEN 1'0 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 12.92 REPAIR/REPLACE 1DFO-213 VALVE 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY 0.25 PACKING ADJUSTMENT RESULTS IN LOSS OF ECCS 0'0 CCll FLSI TO A RHR PUMP llAS LOST 0.50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 3.17 BELT INSPECTIOH 9.25 TIGHTEN BELTS 25.67 REPLACE STRAINER 22.42 STRAIGHTEN UPPER STEH ON VALVE 1CC-142 1.63 COMPLETE LP-T-6502A LOOP CALIBRATIOH 9.25 CHANGE OIL IH PUHP 27.82 INSP ~
-  06/05/91 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY                       EDG    8  EDG              PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 06/05/91 0.25 PACKING ADJUSTMENT RESULTS IN LOSS OF ECCS                         ECCS  8 CSIP/A RHR/CQI    REFERENCE LER 91-014 FOR CORRECTIVE ACT ION 06/12/91 06/12/91      0 '0 CCll FLSI TO A RHR PUMP llAS LOST                                 ECCS ECCS A RHR B RHR RESTORE CCLI FLml COMPLETE SCHEDULED TEST 06/17/91      0.50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 06/19/91      3.17 BELT INSPECTIOH                                                   ECCS  8 CSIP/AH-98        INSTALL NEM BELTS 9.25                                                                   ECCS  A CSIP/AH-9A        COMPLETE BELT ADJUSTMEHTS 06/20/91            TIGHTEN BELTS 25.67                                                                     EDG    A EDG/1SII-E041    COMPLETE CORRECTIVE MAINTENANCE 06/20/91              REPLACE STRAINER 22.42   STRAIGHTEN UPPER STEH ON VALVE 1CC-142                           ECCS    A RHR/1CC-147      COMPLETE CORRECTIVE MAIHTEHAHCE 06/20/91 06/20/91        1.63 COMPLETE LP-T-6502A LOOP CALIBRATIOH                            ECCS    A RKR/AH-SA        COMPLETE LOOP CALIBRATIOH 9.25 CHANGE OIL IH PUHP                                               ECCS    A CSIP            COMPLETE MAINTENANCE 06/20/91 06/20/91    27.82   INSP ~ ST AIR CAM, REPAIR OIL LEAK ON HUMPHREY VALVE             EDG    A  EDG            COMPLETE INSPECTIONS AND MAINTENAHCE 06/20/91        2.97 PERFORH CALIBRATION PIC-l 032                                    ECCS    A  RHR/RH-602ASll  COMPLETE CALIBRATION 25.67                                                                   EDG    A  EDG/1SH-E005    REPLACE MOTOR BEARINGS 06/20/91            IHSPECT/REPLACE UPPER MOTOR BEARING 06/20/91    27.82   INSPECT SUCTION STRAINER                                       .EDG     A EDG/1DFO-E002   COHPLETE INSPECTIONS EDG     A  EDG             PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST-06/21/91       1.50 OST-1013 1A-SA  EDG OPERABILITY MONTHLY INTERVAL 07/01/91      1.50 OST-1073 18-SB  EDG OPERABILITY MONTHLY INTERVAL                EDG    8 EDG            PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST
ST AIR CAM, REPAIR OIL LEAK ON HUMPHREY VALVE 2.97 PERFORH CALIBRATION PIC-l032 25.67 IHSPECT/REPLACE UPPER MOTOR BEARING 27.82 INSPECT SUCTION STRAINER 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG EDG EDG EDG ECCS ECCS EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG ECCS ECCS ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG ECCS EDG
.EDG EDG EDG A EDG A EDG A EDG A EDG 8
RHR A RKR 8
EDG B EDG 8
EDG 8
EDG B EDG 8
EDG A CSIP A CSIP A CSIP RUST A EDG A EDG 8 CSIP 8
EDG 8
EDG 8
EDG 8
EDG 8 CSIP/A RHR/CQI A RHR B RHR 8 CSIP/AH-98 A CSIP/AH-9A A EDG/1SII-E041 A RHR/1CC-147 A RKR/AH-SA A CSIP A EDG A RHR/RH-602ASll A EDG/1SH-E005 A EDG/1DFO-E002 A EDG 8
EDG POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST CT ION POST-TEST POST-TEST POST-TEST CT ION POST-TEST-POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 COMPLETE TESTING COMPLETE TESTING COMPLETE TESTING REFERENCE LER 91-011 FOR CORRECTIVE A COMPLETE CORRECI'IVE MAINTENANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8, 2 COMPLETE CORRECTIVE MAIHTEHAHCE REPAIR, VERIFY PROPER OPERATION PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 REPLACE LEAKING VALVE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 REFERENCE LER 91-014 FOR CORRECTIVE A RESTORE CCLI FLml COMPLETE SCHEDULED TEST INSTALL NEM BELTS COMPLETE BELT ADJUSTMEHTS COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAIHTEHAHCE COMPLETE LOOP CALIBRATIOH COMPLETE MAINTENANCE COMPLETE INSPECTIONS AND MAINTENAHCE COMPLETE CALIBRATION REPLACE MOTOR BEARINGS COHPLETE INSPECTIONS PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2


k fJ
k fJ


Page 16                                                               ATTACHMENT 1 DATE 'DURATIOH                                   CAUSE                           SYSTEH/COHPONENT-       CORRECTIVE ACTION 07/03/91     10.30 INSPECT/PUMP   AND CHANGE OIL                                     ECCS  8  CSIP          COMPLETE  OIL CHANGE 3.13 REPLACE DIRTY LUBE OIL FILTER                                     EDG    8  EDG          COHPLElE CORRECTIVE MAINTEHANCE 07/06/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL                   EDG    A  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/16/91 07/16/91      3.68 REPAIR MELD LEAK ON EQUALIZING LINE                              ECCS  8  CSIP          LEAK CHECK EQUALIZING LINE 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL           ECCS  A RHR            COHPLETE SCHEDULED TEST 07/17/91 07/26/91      2.67 SMAPPIHG TO 1B-SB CSIP                                           ECCS  C  CSIP          COHPLETE SMAP 10.22 1RH-31 lIILL HOT AUTO OPEN ON LOM FLOM                           ECCS  A RHR            COMPLETE CORRECTIVE MAINlENANCE AND CALIBRATION 07/28/91
Page 16 ATTACHMENT 1 DATE
                '0   OST-1073 18-SB EDG OPERABILITT HONTHLY INTERVAL                 EDG    8  EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 07/29/91      1 RHR PINP OPERABILITT QUARTERLY INTERVAL          ECCS  8 RHR            COHPLETE SCHEDULED TEST 07/30/91      0.50 OST-1092 18-SB 0 F 50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL         ECCS  B RHR            COHPLETE SCHEDULED TEST 07/30/91 0.73 INSTALL TEST EQUIPHENT FOR EPT-184                               ECCS  8 CSIP/1CS-755  COMPLETE TESTING REMOVE TEST EQUIPMENT 08/01/91 1.62   CALIBRATE FS-69058-SB                                           EDG    A EDG/AH-85      COHPLETE CALIBRATIONS 08/07/91 08/11/91    22.18   DISASSEMBLE, BEHCH TEST & REPLACE RELIEF VALVE                 'CCS    8 RHR/1CC-165    COHPLETE TEST 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL                 EDG  A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 08/13/91 1.23 INSTALL TEST EQUIPMENT FOR EPT-183                               ECCS  A CSIP/1CS-744  COHPLETE TESTING REHOVE TEST EQUIPMENT 08/16/91 15.00   RUNNING 2 PUMPS CAUSES 1CC-145 To LIFT                           ECCS  A RHR/1CC-145    COMPLETE CORRECTIVE MAINlENANCE 08/16/91 5.78   PERFORMANCE OF LP-T-6904B                                       EDG    8 EDG          COHPLETE CALIBRATIONS 08/29/91 1.50 OST-1073 18-SB EDG OPERABILITY HOHTHLT IHTERVAL                 EDG    8 EDG          PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 08/30/91 10.68   PRESS. QIITCH MOULD NOT RESET DURIHG OST-1215                   EDG    B EDG/8752BSB  COHPLETE CORRECTIVE MAINTENANCE 08/31/91 5.18 MOULD NOT DEVELOP REQ'D FLOM IAM OST-1215                       EDG    8 EDG/1SC-BAY6  COHPLETE CORRECTIVE MAINTENANCE 08/31/91 4.43 PERFORM LOOP CALIBRATIONS ON LP-T-6904A                         EDG    A EDG          COMPLETE LOOP CALIBRATIOHS 09/04/91 0.58 FAILED EPT-033                                                   EDG    A EDG/A SEQ    COMPLETE PERIODIC TEST 09/09/91 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY                     EDG    A EDG          PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/09/91 EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 09/09/91      F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL           ECCS  8  RHR          COHPLETE SCHEDULED TEST 09/16/91 09/20/9'I    1.50 LOOP CALIBRATIONS                                                EDG    A EDG            COHPLETE LOOP CALIBRATIONS 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL                   EDG    8 EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 09/24/91 EDG    8 EDG/1DG-E019  COMPLETE CORRECTIVE HAIHlENANCE 10/02/91      2.57 MORK ON DG-045B 1 MOTOR OPERATED DAMPER
'DURATIOH CAUSE SYSTEH/COHPONENT-CORRECTIVE ACTION 07/03/91 07/06/91 07/16/91 07/16/91 07/17/91 07/26/91 07/28/91 07/29/91 07/30/91 07/30/91 08/01/91 08/07/91 08/11/91 08/13/91 08/16/91 08/16/91 08/29/91 08/30/91 08/31/91 08/31/91 09/04/91 09/09/91 09/09/91 09/09/91 09/16/91 09/20/9'I 09/24/91 10/02/91 10/07/91 10/08/91 10/17/91 10/21/91 10/22/91 10/23/91 10.30 INSPECT/PUMP AND CHANGE OIL 3.13 REPLACE DIRTY LUBE OIL FILTER 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 3.68 REPAIR MELD LEAK ON EQUALIZING LINE 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL 2.67 SMAPPIHG TO 1B-SB CSIP 10.22 1RH-31 lIILL HOT AUTO OPEN ON LOM FLOM 1'0 OST-1073 18-SB EDG OPERABILITT HONTHLY INTERVAL 0.50 OST-1092 18-SB RHR PINP OPERABILITT QUARTERLY INTERVAL 0 F 50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.73 INSTALL TEST EQUIPHENT FOR EPT-184 1.62 CALIBRATE FS-69058-SB 22.18 DISASSEMBLE, BEHCH TEST & REPLACE RELIEF VALVE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL 1.23 INSTALL TEST EQUIPMENT FOR EPT-183 15.00 RUNNING 2 PUMPS CAUSES 1CC-145 To LIFT 5.78 PERFORMANCE OF LP-T-6904B 1.50 OST-1073 18-SB EDG OPERABILITY HOHTHLT IHTERVAL 10.68 PRESS.
                '0 OST-1013   1A-SA EDG OPERABILITY MONTHLY INTERVAL                 EDG    A EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST 10/07/91      1 0.50 OST-1008 1A-SA RHR PUMP OPERABILITT QUARTERLY INTERVAL           ECCS  A RHR            COHPLETE SCHEDULED TEST 10/08/91 10/17/91      0.90 PACKING ADJUSTMENT                                               ECCS  A  CSIP/1CS-182  COHPLETE CORRECTIVE MAINTENANCE 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL                   EDG  8 EDG            PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST 10/21/91 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL             ECCS  8  RHR          COMPLETE SCHEDULED TEST 10/22/91 59.00 INOPERABLE To CLEAN EQI SCREEN IIASH PUHP                         EDG   A EDG/ESM       COMPLETE CORRECTIVE MAINlENANCE 10/23/91
QIITCH MOULD NOT RESET DURIHG OST-1215 5.18 MOULD NOT DEVELOP REQ'D FLOM IAM OST-1215 4.43 PERFORM LOOP CALIBRATIONS ON LP-T-6904A 0.58 FAILED EPT-033 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 LOOP CALIBRATIONS 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 2.57 MORK ON DG-045B 1
MOTOR OPERATED DAMPER 1'0 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 1A-SA RHR PUMP OPERABILITT QUARTERLY INTERVAL 0.90 PACKING ADJUSTMENT 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 59.00 INOPERABLE To CLEAN EQI SCREEN IIASH PUHP ECCS EDG EDG ECCS ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG
'CCS EDG ECCS ECCS EDG EDG EDG EDG EDG EDG EDG EDG ECCS EDG EDG EDG EDG ECCS ECCS EDG ECCS EDG 8 CSIP 8
EDG A EDG 8 CSIP A RHR C CSIP A RHR 8 EDG 8
RHR B RHR 8 CSIP/1CS-755 A EDG/AH-85 8 RHR/1CC-165 A EDG A CSIP/1CS-744 A RHR/1CC-145 8 EDG 8
EDG B EDG/8752BSB 8 EDG/1SC-BAY6 A EDG A EDG/A SEQ A EDG A EDG 8
RHR A EDG 8
EDG 8 EDG/1DG-E019 A EDG A RHR A CSIP/1CS-182 8 EDG 8
RHR A EDG/ESM COMPLETE OIL CHANGE COHPLElE CORRECTIVE MAINTEHANCE PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST LEAK CHECK EQUALIZING LINE COHPLETE SCHEDULED TEST COHPLETE SMAP COMPLETE CORRECTIVE MAINlENANCE AND CALIBRATION PERFORM 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COHPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COMPLETE TESTING REMOVE TEST EQUIPMENT COHPLETE CALIBRATIONS COHPLETE TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COHPLETE TESTING REHOVE TEST EQUIPMENT COMPLETE CORRECTIVE MAINlENANCE COHPLETE CALIBRATIONS PERFORM 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE COMPLETE LOOP CALIBRATIOHS COMPLETE PERIODIC TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COHPLETE SCHEDULED TEST COHPLETE LOOP CALIBRATIONS PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COMPLETE CORRECTIVE HAIHlENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST
& 2 POST-TEST COHPLETE SCHEDULED TEST COHPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -
1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINlENANCE


ATTACHMENT 2 GLOSSARY OF TERMS/ABBREVIATIONS USED ON ATTACHMENT ACCUM Accumulator for low head injection AH    Air handler ALT  Alternate BKR  Circuit breaker CCW  Component cooling water CM    Corrective maintenance CSIP  Charging .safety injection pump for high h ead safety injection EDG  Emergency diesel generator ESCWC Essential service chilled water chiller ESW  Emergency service water EPT  Engineering periodic test EQ    Equipment qualification (environmental)
ATTACHMENT 2 ACCUM AH ALT BKR CCW CM CSIP EDG ESCWC ESW EPT EQ FO FR FREQ FS HFA HVAC IND INOP INSP ISI LER LO LVL MOD MOV MST OOS OST PCR PMP RECIR RHR RWST SAT SEQ TS VLCO XFER Accumulator for low head injection Air handler Alternate Circuit breaker Component cooling water Corrective maintenance Charging.safety injection pump for high h Emergency diesel generator Essential service chilled water chiller Emergency service water Engineering periodic test Equipment qualification (environmental)
FO    Fuel oil FR    Field revision FREQ  Frequency FS    Flow switch HFA  A type of "General Electric" relay HVAC  Heating ventilation air conditionxng IND  Indicator INOP  Inoperable INSP  Inspection ISI  Inservice inspection LER  Licensee event report LO    Lock out LVL  Level MOD  Modification MOV  Motor operated valve MST  Maintenance surveillance test OOS  Out of service OST  Operations surveillance test PCR  Plant change request.
Fuel oil Field revision Frequency Flow switch A type of "General Electric" relay Heating ventilation air conditionxng Indicator Inoperable Inspection Inservice inspection Licensee event report Lock out Level Modification Motor operated valve Maintenance surveillance test Out of service Operations surveillance test Plant change request.
PMP  Pump RECIR Reczrculating RHR  Residual heat removal system for low head safety injection RWST  Reactor water storage tank SAT  Satisfactory SEQ  Sequencer TS    Technical specification VLCO  Voluntary lzmited condition of operation XFER  Transfer
Pump Reczrculating Residual heat removal system for low head Reactor water storage tank Satisfactory Sequencer Technical specification Voluntary lzmited condition of operation Transfer ead safety injection safety injection GLOSSARY OF TERMS/ABBREVIATIONS USED ON ATTACHMENT


4+ L K v 4.
L 4+
K v 4.
4}}
4}}

Latest revision as of 06:40, 7 January 2025

Forwards Summary of ECCS Outage Times Covering 5-yr Period Commencing W/Issuance of Low Power OL on 861024 & Ending on 911023 to Address NUREG-0737,Item II.K.3.17, Rept on Outages of ECCS Sys
ML18010A858
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 10/22/1992
From: Mccarthy D
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.K.3.17, TASK-TM NLS-92-288, NUDOCS 9210280283
Download: ML18010A858 (40)


Text

,~cczr.za.hr~a Orsra.~am rOW ozivro~, a.~now SvSIZrvr REGULBTZ ZNFORMBTZON DZSTRZBUTZON ZSTEM (RZDS)

ACCES~IOP /BR:9210280283 DOC.DATE: 92/10/22 NOTARIZED: NO FACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION MCCARTHY,D.C.

Carolina Power a Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000400

SUBJECT:

Forwards summary of ECCS outage times covering 5-yr period commencing w/issuance of low power OL on 861024

& ending on 911023 to address NUREG-0737,Item II.K.3.17, "Rept on Outages of ECCS Sys."

D DISTRIBUTION CODE:

A003D COPIES RECEIVED:LTR I

ENCL

(

SIZE:

t TITLE: OR/Licensing Submittal:

Suppl 1 to NUREG-0737(Generic Ltr 82-33)

NOTES:Application for permit renewal filed.

05000400 i RECIPIENT ID CODE/NAME PD2-1 LA LE,N INTERNAL: NRR/DLPQ/LHFB11 PE 01 EXTERNAL: NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD2-1 PD OC/LFMB RES/DSIR/EIB NSIC COPIES LTTR ENCL 1

1 1

0 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

S TOTAL NUMBER OF COPIES REQUIRED:

LTTR 10 ENCL 9

I

Ii p

@ME Carolina Power 8 Light Company OCT 32 1992 SERIAL:

NLS 288 United States Nuclear Regulatory Commission ATTENTION:

Document Control Desk Washington, DC 20555 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400/LICENSE NO. NPF-63 NUREG-0737, Item II.K.3.17; REPORT ON OUTAGES OF ECCS SYSTEMS Gentlemen:

NUREG-0737, "Post TMI-Requirements,"

Item II.K.3.17 "Report on Outages of Emergency Core-Cooling Systems Licensee Report and Proposed Technical Specification Changes" dated October 31, 1980, requires licensees and applicants to submit an Emergency Core Cooling System (ECCS) outage history for a five year period.

The attached data represents a summary of the Shearon Harris Nuclear Power Plant (SHNPP)

ECCS outage times (component and system).

The data covers the five year period commencing with the issuance of the low power operating license on October 24, 1986 and ending October 23, 1991. It includes required maintenance and surveillance testing and was obtained from Equipment Inoperable Records and the Surveillance Test Scheduling System (STSS).

The data obtained from STSS for duration is estimated based on average performance time.

Attachment 1 provides the:

a) Outage dates and durations (in hours) b) Cause of each outage c)

ECC System or components involved d) Corrective actions, as applicable Attachment 2 is a glossary of terms and abbreviations used in Attachment l.

Safety system availability is tracked and reported monthly to the Institute of Nuclear Power Operations (INPO) in accordance with the guidance provided by INPO.

Improvements have been accomplished in recent years by scheduling testing and maintenance outages concurrently.

Carolina Power

& Light Company (CP&L) is committed to ensure the highest safety system availability and performance possible, given the necessary preventive maintenance, corrective maintenance, and required surveillance test:s.

Carolina Power

& Light Company has reviewed the availability of ECCS systems and components and concludes that no Technical Specification changes are warranted.

28062g

'7210280283 921022 PDR ADOCK 05000400 P

PDR

'-ayettevilte Street

~ P. O. 8ox 1551 o Raleigh, N. C. 27602

4

$ W

Document Control Desi~

'~ ~VLS-92-288 / Page 2

This report fulfills CPGL's commitment as documented in the SHNPP Final Safety Analysis Report for NUREG-0737, Item II.K.3.17.

Questions regarding this matter may be referred to Mr. R.

W. Prunty at (919) 546-7318.

Yours very truly, D.

C. McCarthy Manager Nuclear Licensing Section SDC/sdc cc:

Mr. S.

D. Ebneter Mr. N. B. Le Mr. J.

E. Tedrow

~

~

I

Page 1

ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 10/24/86 10/24/86 10/27/86 10/27/86 10/27/86 11/07/86 11/07/86 11/11/86

'I1/11/86 11/11/86 11/13/86 11/13/86 11/18/86 11/19/86 12/01/86 12/10/86 12/21/86 12/25/86 12/25/86 01/04/87 01/04/87 01/08/87 01/20/87 01/21/87 01/22/87 01/23/87 01/25/87 02/09/87 02/10/87 02/20/87 02/21/87 02/21/87 03/09/87 03/22/87 03/23/87 03/29/87 03/29/87 04/06/87

'I ~ 50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY 1 ~ 50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST.1824 1B-SB EDG OPERABILITY 18 HONTH 1.50 OST-1824 1B-SB EDG OPERABILITY 18 HONTH 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY 1.50 OST-1823 1A-SA EDG OPERABILITY 18 HONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 0.97 A CSIP INOP FOR MAINTENAHCE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1 ~ 50 OST-1073 18-SB EDG OPERABILITY HONTHLY INTERVAL 0.50 OST-'1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 5.92 PLACED IN MAIN'IENANCE TO SUPPORT S/U TESTING 8.58 AH-10A UNIT WAS INOPERABLE 0.92 8 CHILLER FAILED TO START 5.25 RWST USED FOR EPT-039T, LEVEL BELOW T ~ S. LIMIT 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 5.33 8 CHILLER INOP DUE TO LOW LUBE OIL WITH A CHILLER INOP 8.75 INOPERABLE TO INSPECT GE TYPE HFA RELAYS 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1'0 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUAR'IERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG ECCS EDG EDG EDG EDG ECCS

~ ECCS ECCS ECCS EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG EDG EDG EDG EDG EDG ECCS ECCS EDG B EDG 8

EDG A EDG A EDG A EDG A EDG A EDG B EDG B EDG 8

EDG A EDG A EDG A CSIP 8

EDG A EDG A EDG B EDG 8

RHR A RHR A RHR 8 RHR A EDG 8

EDG A EDG C CSIP/AH-10A 8 CSIP/ESCWC RWST A EDG 8 CSIP/ESCWC A EDG 8

EDG B EDG A EDG 8

EDG A EDG A RHR B RNR A EDG PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST

'PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST COMPLETE MAINTENANCE AND TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST COHPLETE S/U TESTING COHPLETE CORRECTIVE MAINTENANCE REFERENCE LER 87-006 FOR CORRECTIVE ACTION RESTORE LEVEL ABOVE TS LIMIT PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST REFERENCE LER 87-007 FOR CORRECTIVE ACTION COHPLETE INSPECTION AND TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST

& 2 POST-TEST

g ~

Page 2

ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 04/20/87 04/23/87 05/07/87 05/07/87 05/07/87 05/18/87 05/19/87 05/20/87 05/22/87 05/22/87 06/07/87 06/07/87 06/12/87 06/12/87 06/21/87 06/23/87 07/02/87 07/08/87 07/08/87 07/?3/87 07/23/87 08/06/87 08/06/87 08/06/87 08/08/87 08/09/87 08/09/87 08/23/87 09/08/87 09/10/87 09/11/87 09/11/87 09/20/87 09/22/87 09/22/87 09/23/87 10/09/87 10/09/87

'I.25 C CSIP INOP DUE TO HISPOSITIONED ALT. MINI FLOW VALVES 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 8.23 FAILURE OST-1085 DUE TO TIHE ARB FOR FREQ TO REACH REQUIRED BAND 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST 1085 1A-SA EDG OPERABILITY SEMIANNUALLY 4.83 CHANGE OIL IN PUHP 6 50 CHANGE LUBE OIL~ INSPECT ~ TIGHTEN FITTINGS ON OIL LINES 1 ~ 07 VALVED OOS TO ALLOW TESl'ING OF CSIP 8 0.08 BARRING DEVICE INSTALLED 1.50 OST-1073 18-SB EDG OPERABILITY MOHTHLY IHTERVAL 9.09 MISSED AIR ROLL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 1 ~ 50 OST-1073 1B-SB EDG OPERABILITY MON'INLY INTERVAL 0.95 INADVERTANTLYDRAINED RWST LEVEL BELOW T.S. LIMIT 1 ~ 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIAHNUALLY 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL F 50 PERFORMANCE OF EPT-072 AND MPT-10032 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 6.42 BKR 106 WOULD HOT CLOSE FROM CONTROL PANEL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.32 INOPERABLE TO PERFORM OST-1008 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY IHTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 21.70 A DG TRIPPED ON HIGH VIBRATION DURING OST-1823 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY ECCS EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG C CSIP B EDG A EDG A EDG A EDG A CSIP C CSIP 8 CSIP A EDG B EDG 8

EOG A EDG A RHR 8 RKR A EDG 8

EDG RWST B EDG A EDG 8

EOG 8

EDG B RHR 8 RHR/1RH-63 A RHR A EDG B EDG A EDG 8

EDG A EDG 8

RHR PUMP' RHR 8

RHR A EDG A EDG A EDG 8

EDG A EDG A EDG REFERENCE LER 87-023 FOR CORRECTIVE ACTION PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE RETEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE MAINTENANCE ACTIVITY COMPLETE MAINTENANCE ACTIVITY COMPLETE TEST COMPLETE INSTALLATION OF BARRING DEVICE PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST REFERENCE LER 87-033 FOR CORRECTIVE ACTION PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE FILL OF R'WST BACK INTO T.S. LIMIT PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE PERIODIC TESTS COMPLETE SCHEDULED TEST COMPLETE REPAIR OF BKR 106 PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COHPLETE SURVEILLANCE TEST OST-1008 COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST RECALIBRATE A DG VIBRATION SWITCH PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TESj' 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST

~ t

Page 3 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 10/15/87 10/16/87 10/22/87 10/31/87 11/08/87 11/09/87 11/10/87 11/16/87 11/16/87 11/17/87 11/18/87 11/24/87 11/24/87 12/02/87 12/10/87 12/16/87 12/16/87 12/22/87 12/23/87 12/28/87 01/04/88 01/10/88 01/11/88 01/13/88 01/14/88 01/14/88 01/14/88 01/15/88 01/18/88 01/20/88 01/20/88 01/22/88 02/01/88 02/06/88 02/08/88 02/15/88 02/15/88 02/17/88 INOP F SEQUENCER 0.33 LOSS OF ALL RKR DURIKG VALVE TESTING 1.50 OST-1824 18-SB EDG OPERABILITY 18 HOHTH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILIT'Y MONTHLY INTERVAL 2.75 IKOP 1

EXHST FAN TO PROVIDE VENT FOR FUEL OIL TRNS PMP 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 11.67 1CS-746 FAILED CLOSED DUE TO LIMIT SMITCH FAILURE 20.50 WC-28 CHILLER INOP 0.20 KCR-87-'132 ON CSIP MIKIFLOW WIRING 1CS-196 51.50 ES'W TRAIN 8 INOP FAILED PART OF OST-1215 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 19.00 1CC-167 WILL NOT STROKE FULLY OPEH FROM MCB 24.50 1SW-270 MOV TRIPPED ON START OF A ESW PUMP 1 ~50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST 1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTKLY INTERVAL 8.25 INSPECT BEARIHGS ON AH-5-SB 2.50 SUMP COVER REMOVED TO PUMP DOWN SUMP 1.87 PUHP SUMP COVER REMOVED 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 PUMP DOWH 8 CONTAINHEHT RECIRC SUMP 8.20 CHANGE OIL IN MOTOR BEARINGS 18.50 REMOVE PLUG FROM FLANGE AND STOP LEAK ON HEAT EXCHANGER 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL 3.75 CLEAN STRAINER 8 FILTER ON PUMP B SPEED INCREASER 1.50 PUMP DOWN THE RECIRCULATION SUMP 1.50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL 1.08 REMOVAL OF INDICATOR TO INSPECT STEM NUT PER MPT-M0082 3.75 PUMP DOWH THE RECIRCULATION SUMP 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 21.47 PLACED UNDER SF CLEARANCE AS A RESULT OF ESW PUMP BEING 1.43 PUHP DOWH THE RECIRCULATION SUHP 0.92 CHANGE DIFFERENTIAL RELAY 38.42 ESW PUMP FAILED TO START DURING INADVERTENT ACTUATION 0 ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG ECCS EDG EDG ECCS ECCS EDG ECCS ECCS ECCS EDG ECCS ECCS ECCS ECCS ECCS ECCS

EDG B EDG A EDG A CSIP/1CS-746 8 CSIP 8 CSIP B EDG A EDG 8

EDG 8

RKR A EDG A EDG A RKR 8

RHR B EDG B RHR/AH-5B 8

RKR 8 RKR A EDG 8

RHR 8 CSIP A RKR HX 8

RHR A RKR A CSIP 8 RKR PUMP 8

EDG 8

EDG A CSIP/1CS-746 B RKR A EDG 8 EDG/ES'W 8 RKR A EDG 8 EDG/ESW REFEREKCE LER 87-060 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST F 2 POST-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST F 2 POST-TEST RECALIBRATE FLOW SWITCH AKD RESTORED EXKST FAH PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE HAIHTENANCE ON SWITCH RAN CHILLER MANUALLY STROKED VALVE COMPLETE MODIFICATION COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCKEDULED TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST EE 2 POST-TEST COMPLETE INSPECTIONS COMPLETE PUMP DOWN REINSTALL SUMP COVER PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE PUHP DOWN COMPLETE MAINTEHANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENAHCE COMPLETE PUMP DOWN PERFORM 3 AIR ROLLS -

1 PRE-TEST B 2 POST-TEST PERFORM 3 AIR ROLLS -

1 PRE-TEST 8 2 POST-TEST COMPLETE INSPECTION PER MPT-0082 COMPLETE PUMP DOWN PERFORM 3 AIR ROLLS -'

PRE-TEST 8 2 POST-TEST REFERENCE LER 88-006 FOR CORRECTIVE ACTION COMPLETE PUMP DOWN COMPLETE CORRECTIVE MAINTENAHCE REFERENCE LER 88-008 FOR CORRECTIVE ACTION

Page 4

ATTACHHENI' DATE DURATIOH CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 02/'l7/88 02/19/88 02/20/88 02/21/88 02/26/88 03/04/88 03/07/88 03/07/88 03/08/88 03/09/88 03/14/88 03/14/88 03/15/88 03/16/88 03/17/88 03/18/88 03/18/88 03/21/88 03/21/88 03/22/88 03/25/88 03/28/88 03/29/88 03/29/88 04/04/88 04/06/88 04/07/88 04/09/88 04/09/88 04/11/88 04/11/88 04/14/88 04/15/88 04/22/88 04/22/88 04/25/88 04/29/88 05/02/88 38.42 CALIBRATION OF AGASTAT RELAY P1A2/1183 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 8.42 EQ INSPECTION OF MOVES 1CS-292,

278, 169, 171 8.08 EQ INSP.

OF HOV'S 1CS-168,

170, 291 4.33 INSPECTION OF HEAT SHRINK ON l}IRING, CLEARANCE REQ'D 0.58 ADJUST PACKING 2.40 PUHP DOWN THE RECIRCULATION SUMP 14.67 MST'S AND HAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 1.00 RHR INOP.FOR HAINTENANCE ON AH-SA 12.20 PUHP DOWN THE RECIRCULATION SUMP 7.37 18-SB ESW UNDER CLEARANCE FOR EPT-101T 15.33 CHANGE OIL IN PUHP HOTOR 3.38 'IA-SA ESW INOP.

FOR EPT-101T 15.87 CHANGE OIL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 19.00 PERFORM PHS ON LOCAL HETERS, RELAYS AND 6.9 BKR.

2.00 PUHP DOWN THE RECIRCULATION SUMP 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 9.70 A ESW HEADER REPAIR LEAK ON WELD AT 1SW 69 5.08 PUHP DOWN THE RECIRCULATIOH SUHP 0.58 PERFORM HST-l0098 ON P-925 0.43 PERFORH HST-10098 ON P-927 3.25 PUMP DOWN THE RECIRCULATION SUHP 7.92 WORK ON 1A-SA SEQUENCER To ADJUST AGASTAT SETPOINTS PCR-2867 1.33 WORK ON 18-SB SEQUENCER TO ADJUST AGASTAT SETPOINTS 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANHUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 0.63 ACCUM C PRESSURE LOOP CAL (P-0931) HST-I0101 3.17 PUHP DOWN THE RECIRCULATION SUHP 6.82 PIC-l032 INSPECT 4 ADJUST FLOW INDICATING SWITCH 5.88 CALIBRATION OF FS-602A 14.55 STOP FUEL OIL LEAK 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 2.00 PUHP DOWN THE RECIRCULATION SUHP 0.77 PERFORH LEVEL SECTIONS (7.2-7.10)

OF MST-10110 3.25 PUHP DOWN THE RECIRCULATION SUHP EDG EDG ECCS ECCS ECCS ECCS ECCS EDG EDG ECCS ECCS EOG ECCS ECCS ECCS ECCS ECCS EDG ECCS EDG EDG ECCS ECCS ECCS ECCS EOG EDG EDG EDG ECCS ECCS ECCS ECCS EDG EDG ECCS ECCS ECCS B EDG B EDG 8 CSIP A CSIP 8 CSIP/1CS-291 A CSIP/1CS-168 B RHR A EDG A EDG A RHR 8

RHR B EDG/ESW A RHR A EDG B RHR PUHP A RHR B RHR B EDG 8

RHR B EDG A EDG 8 RHR' ACCUH B ACCUH B RHR PUMP A EDG B EDG A EDG A EDG C ACCUH B RHR B RHR A RHR B EDG B EDG B RHR C ACCUH 8

RHR COHPLETE CALIBRATION PERFORH 3 AIR ROLLS -

1 PRE-TEST COHPLETE INSPECTIONS COHPLETE INSPECTIONS PERFORM Qc INSPECTION COHPLETE CORRECTIVE HAINTENANCE COHPLETE PUHP DOWN COHPLETE TEST AND MAINTENANCE PERFORH 3 AIR ROLLS -

1 PRE-TEST COHPLETE MAINTENANCE COMPLETE PUHP DOWN COMPLETE PERIODIC TEST COHPLETE HAINTENANCE COHPLETE SCHEDULED TEST COHPLETE MAINTENANCE COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COMPLETE MAINTENANCE COMPLETE PUHP DOWN PERFORH 3 AIR ROLLS -

1 PRE-TEST COMPLETE CORRECTIVE HAINTENANCE COHPLETE PUHP DOWN COHPLETE SURVEILLANCE TEST COHPLETE SURVEILLANCE TEST COHPLETE PUMP DOWN COHPLETE HODIFICATION COMPLETE EPT-033 PERFORH 3 AIR ROLLS -

1 PRE-TEST PERFORH 3 AIR ROLLS -

1 PRE-TEST HST-I0101 COMPLETE COHPLETE PUHP DOWN PIC-1032 COMPLETE COHPLETE CALIBRATION COMPLETE CORRECTIVE HAINTENANCE PERFORM 3 AIR ROLLS -

1 PRE-TESI'OHPLETE PUHP DOWN COMPLETE SURVEILLANCE TEST COHPLETE PUHP DOWN 2 POST-TEST B 2 POST-TEST }I 2 POST-TEST 8 2 POST-TEST I} 2 POST-TEST 5 2 POST-TEST

~ ~ P

Page 5 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 05/07/88 05/09/88 05/13/88 05/15/88 05/16/88 05/19/88 05/23/88 05/23/88 05/23/88 05/24/88 05/30/88 05/31/88 06/03/88 06/03/88 06/06/88 06/08/88 06/09/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/13/88 06/14/88 06/14/88 06/14/88 06/14/88 06/14/88 06/15/88 06/15/88 06/16/88 06/16/88 06/16/88 06/16/88 06/20/88 06/20/88 EDG ECCS EDG EDG ECCS ECCS ECCS EDG EDG EDG ECCS ECCS EDG ECCS EDG EDG ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS ECCS 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 2.08 PUMP DOWN THE RECIRCULATION SUHP 0.17 1SW-1329 & 1SW-1326 FAILED TO OPEN 6.67 ESW PUMP FAILED TO START DUE TO DEFECTIVE RELAY IH THE SEQUENCER 6.17 PUMP DOWN THE RECIRCULATION SUHP 4.08 ROTATE CONTROL POWER TOGGLE SWITCH TO PROPER POSITION 1.87 PUHP DOWN THE RECIRCULATION SUMP 21.83 REPAIR JACKET WATER COOLER LEAKS REPAIR BEARING OIL 0.83 PERFORH EPT-033 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 2.33 PUMP DOWN THE RECIRCULATION SUMP 8.00 LUBRICATE PUMP 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 12.68 PHP FAILED TO START ON LOOP SEQUENCER WHEN BUS 1ASA WAS DE-EHERGIZEDEDG 1.42 PUMP DOWN THE RECIRCULATION SUHP 17.15 PERFORM MAINTENANCE PRIOR TO SCHEDULED OST-1013 PERFORHANCE 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 18.75 PERFORMANCE OF EPT-072 AND MPT-10032 18.75 PERFORM PH-EOO'l2 ON PUMP BREAKER 2.50 PUMP DOWN OF CONT SPRAY/RNR RECIR SUMP 8 20;75 PERFORHANCE OF EPT-072 AHD HPT-l0032 20.75 PERFORH EPT-072 AND MPT-10032 18.75 PERFORH EPT-072 AND HPT-10032 20.75 PERFORHANCE OF EPT-072 AND MPT-I0032 20.75 PROVIDE ISOLATION FOR TESTING OF 181-311 18.92 PERFORH EPT-072 (EQ INSP) 4 MPT-I0032 17.58 EPT-072 (EQ INSPECTION) OF LIHITORQUES 17.08 PERFORH EPT-072 (EQ INSP) a HPT-10032 19.37 PERFORH EPT-072 (EQ INSP) & HPT-l0032 9.25 PERFORH EPT-072 & MPT-10037 0.50 OST-1008 RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY IHTERVAL 34.48 PERFORM EPT-072, MPT-I0032 FOUND BAD GREASE IN OPERATOR 31.32 PERFORM EPT-072 II MPT-I0032 39.90 PERFORH MPT-E0008 40.15 PERFORM EPT-072 AND HPT-I0032 3.83 1CS-753 B CSIP ALT HINIFLOW ISOLATION 3.45 PERFORM PIC-I009 ON 1CH-616 AH-98-SB TCV 'A EDG 8 RHR A EDG/A ESW 8 EDG/ESW 8 RHR A RHR PMP B RHR B EDG 8 EDG/B SEQ 8 EDG 8 RHR 8 CSIP 8 EDG A EDG/ES'W PHP 8 RHR A EDG A EDG B RHR/1RH-69 B RHR PUHP B RHR 8 RHR/1S1-311 8 RHR/1SI -327 B RHR/1SI-323 B RHR/1RH-63 B RHR/1SI-301 A RHR/1RH-31 A RHR/1RH-25 A RHR/1SI-310 A RHR/1SI-326 A CSIP/1SI-322 A RHR B RHR 8 CSIP/1CS-752 B CSIP/1SI-2 8 CSIP 8 CSIP/1CS-196 B CSIP 8 CSIP PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE PUMP DOWN REFERENCE LER 88-012 FOR'CORRECTIVE ACTION REFERENCE LER 88-029 FOR CORRECTIVE ACTION COHPLETE PUMP DOWN ROTATION COHLETE COMPLETE PUMP DOWN COMPLETE CORRECTIVE MAINTEHANCE COHPLETE EPT-033 PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COMPLETE PUMP DOWN COHPLETE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST &t 2 POST-TEST REFERENCE LER 88-013 FOR CORRECTIVE ACTION COHPLETE PUMP DOWN COMPLETE SURVEILLANCE TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST COMPLETE PERIODIC TESTS COMPLETE PERIODIC MAINTENANCE SATISFACTORY COHPLETION OF OST-1803 & 1081 COMPLETE PERIODIC TESTS COMPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COMPLETE APPLICABLE PORTIONS OF OST-1008 COHPLETE PERIODIC TESTS COMPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COMPLETE PERIODIC TESTS COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COMPLETE CORRECTIVE HAINTENANCE COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COHPLETE PERIODIC TESTS COMPLETE EPT-072 COMPLETE CALIBRATIONS

Page 6 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 06/20/88 06/22/88 06/22/88 06/22/88 06/22/88 06/24/88 06/24/88 06/27/88 06/29/88 06/30/88 06/30/88 07/04/88 07/05/88 07/06/88 07/06/88 07/08/88 07/08/88 07/08/88 07/08/88 07/09/88 07/11/88 07/18/88 07/21/88 07/22/88 07/22/88 07/23/88 07/26/88 07/26/88 07/27/88 07/27/88 07/27/88 07/27/88 08/06/88 08/06/88 08/08/88 08/08/88 08/08/88 08/15/88 3.17 PUHP DOWN THE RECIRCULATION SUHP 13.62 PERFORH MPT-I0032 & EPT-072 11.82 PERFORH EPT-072 AND MPT-10032 13.92 PERFORM MPT-E0008 11.75 PERFORH EPT-072 AND MPT-10032 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL F 50 OST-1086 18-SB EDG OPERABILITY SEHIANNUALLY 2.25 PUMP DOWN THE RECIRCULATION SUHP 1.40 SCREENS ON A ESW BAY 8 FAIL TO MOVE WHILE PUMP IS RUNNING 8.33 REPAIR LEAK ON A CCW NEAT EXCHANGER 2.07 PERFORH PIC-1009 ON 1CH-199 0.75 PERFORH PIC-1009 ON 1CH 251 2.50 PUHP THE SUMP DOWN DUE TO LEAKAGE PAST 1CT-102 SEAT 0.45 TESTING OF OVERSPEED OF EDG & BARRING 18.67 A ESW TRAIN IS INOP DUE TO TRAVELING SCREEH SHEAR PIN BROKEN 6.23 ADJUST OR REPLACE FAN BELTS 5.38 PERFORM EPT-033 4.97 CALIBRATE RELAY 2-32A/1116 5.88 PERFORH PIC l0666 ON TE.6903 A-SA HVAC 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.42 PUMP OUT THE SUHP 2.92 PUHP DOWN THE RECIRC SUHP 8 2.55 REPACK VALVES 1RH-20,

1RH26, 1S1-324, 1SI-325 0.78 PERFORM EPT-033 0.88 1CC-167 FAILED TO OPEN

& CLOSE PROPERLY 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 6.50 PUMP WTR THAT HAS LEAKED FROH RWST ISO VLVS INTO CT 8 SUHP 0.56 ESW PUMP DECLARED INOP DUE TO FAILED TRAVELING SCREEHS F 50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 3.42 REPLACE JUMPER WIRE WITH A QUALIFIED WIRE 5.72 TIGHTEN & REPLACE BELTS ON AH-5A IN 190'AB 3.42 REPLACE JUHPER WITH QUALIFIED WIRE 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1824 1B-SB EDG OPERABILITY 18 HONTH 7.15 PERFORH HODIFICATIOH PCR-875 AND 924 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL ECCS ECCS ECCS ECCS ECCS EDG EDG ECCS EDG ECCS ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG ECCS EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG 8 RNR A CSIP/1SI-1 A CSIP/1CS.745 A CSIP A CSIP/1CS-746 8 EDG 8 EDG 8 RHR & 2 POST-TEST & 2 POST-TESI' EDG/TRAV SCREEN A RMR PHP A RHR/AH-SA A RHR/1CH-251 8 RHR 8 EDG A EDG A EDG/AH-86A A EDG/A SEQ A EDG/A SEQ 8 EDG A EDG B RHR 8 RHR A RNR 8 EDG 8 RHR 8 EDG 8 RHR A EDG/ESW 8 EDG 8 CSIP/181-2 A RHR 8 CSIP/1SI-2 A EDG A EDG 8 EDG A EDG 8 EDG A EDG EDG & 2 POST-TEST & 2 POST-TEST IVE ACTION & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST COMPLETE PUHP DOWN . COHPLETE PERIODIC TESTS COMPLETE EPT-072 AND MPT-'I0032 COHPLETE MPT-E008 COHPLETE EPT-072 AND MPT-10032 PERFORH 3 AIR ROLLS - 1 PRE-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST COMPLETE PUMP DOWN COHPLETE CORRECTIVE HAIHTENANCE REPAIR LEAK COMPLETE CALIBRATION COHPLETE PIC-I009 COHPLETE PUMP DOWN ~ COMPLETE TEST AND BARRING OF "B" COHPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COHPLETE PERIODIC TEST COMPLETE MAINTENANCE COHPLETE CALIBRATION PROCEDURE PERFORM 3 AIR ROLLS - 1 PRE-TEST COHPLETE PUHP DOWN COMPLETE PUMP DOWN COMPLETE MAIHTENAHCE COMPLETE EPT-033 COHPLETE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST COHPLETE HAINTENANCE REFERENCE LER 88-017 FOR CORRECT PERFORH 3 AIR ROLLS - 1 PRE-TEST COMPLETE HAIHTENANCE COMPLETE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST COHPLETE HODIFICATIONS PERFORH 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST

0

Page 7 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 08/22/88 08/25/88 08/29/88 09/05/88 09/16/88 09/16/88 09/20/88 09/27/88 10/09/88 10/09/88 10/10/88 10/13/88 10/21/88 10/22/88 11/06/88 11/08/88 11/10/88 11/11/88 11/18/88 11/19/88 11/21/88 11/22/88 11/23/88 11/25/88 11/29/88 12/02/88 12/02/88 12/07/88 12/14/88 12/14/88 12/22/88 12/22/88 12/22/88 12/29/88 01/03/89 01/03/89 01/05/89 01/06/89 15.20 LEAKING OIL AND LEAK OH SEAL WATER EQUALIZING LINE 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.08 EST-317.PERFORM SEQUENCER TEST 0.08 EST-317 PERFORM SEQUENCER TEST 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY F 50 OST-1013 1A-SA EDG OPERABILITY HONTHLY IHTERVAL 4.42 INSTALLATION OF INSULATION ON EXHAUST STACK 2.75 FAN E-86 D-SB IS INOPERABLE 9.50 PROBLEHS WITH SPEED CONTROL DURING OST-1073 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 31.32 CALIBRATE DIFFERENTIAL PRESSURE INDICATOR 8.23 CALIBRATE PRESSURE DIFFERENTIAL INDICATOR FOR AH-9B 32.33'REPAIR SEAT LEAKS ON CASING DRAIN VALVES 1CS-175 8 1CS 5.33 FANS E-85 1ASA B 1BSA WILL NOT RUN, DIESEL INOPERABLE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 12.12 COMPLETE PCR-1446 F PERFORH MOO-204 ACCEPTANCE TEST AN 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 21.27 DISASSEHBLE F INSP SEATING SURFACES ALT MINIFLOW VLV 33.92 PUMP UNDER CLEARANCE TO REPAIR WELD ON SEAL LINE 3.67 CALIBRATE FS-69078 (E-85 ASB 4 BSB) 25.50 INCOMPLETE ECCS TIME RESPONSE TESTING 21.42 CSIP DECLEARED INOP DUE TO MISSED SURVEILLANCE TESTS 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RNR PUMP OPERABILITY QUARTERLY INTERVAL 8.12 REMOVAL AND INSPECTION OF FUEL CONTROL BEARING BRACKET 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY 1.08 LOSS OF BUS DURING PERFORH OF UNDER VOLTAGE TEST 5.92 TEST AH-9A COOLING COlL FOR LEAKAGE 5.90 OIL CHANGE 23 F 08 REPAIR OIL LEAKS MPT-M0001 ON STARTING AIR DRYERS 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL -176 0 EPT-33 ECCS EDG EDG EDG ECCS ECCS EDG EDG EDG EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS ECCS EDG ECCS ECCS EDG ECCS ECCS EDG EDG EDG EDG ECCS ECCS EDG EDG 8 CSIP B EDG B EDG A EDG 8 RHR B RHR 8 EDG A EDG A EDG A EDG A EDG B EDG B EDG B EDG A EDG A CSIP/AH-9A B CSIP A CSIP A EDG 8 EDG 8 EDG B EDG A CSIP 8 CSIP B EDG C CSIP C CSIP A EDG 8 RHR A RHR 8 EDG B EDG B EDG A EDG BUS A CSIP/AH-9A A CSIP A EDG A EDG COMPLETE CORRECTIVE HAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST II 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST K 2 POST-TEST COMPLETE EST-317 COMPLETE EST-3'17 PERFORH 3 AIR ROLLS - 1 PRE-TEST 8I 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORH 3 AIR ROLLS - I PRE-TEST 4 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST COMPLETE MAIHTENANCE REPAIR FAN ADJUST SPEED CONTROLLER PERFORM 3 AIR ROLLS - 1 PRE-TEST Bt 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST COMPLETE CALIBRATION COMPLETE CALIBRATION COMPLETE MAINTENANCE COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE TEST AND MAIHTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST COMPLETE MAINTENANCE COMPLETE MAINTENANCE COMPLETE CALIBRATION REFERENCE LER 88-035 FOR CORRECTIVE ACTIOH REFERENCE LER 88-033 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS -- 1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST B 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST RESTORE OFFSITE POWER TO 1ASA BUS CHECK FAN FOR LEAKAGE COMPLETE MAINTENANCE COMPLETE TEST AND MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST

\\ J

Page 8 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 01/06/89 01/07/89 01/09/89 01/12/89 01/23/89 01/23/89 01/24/89 01/25/89 01/25/89 01/26/89 01/26/89 02/10/89 02/10/89 02/21/89 02/21/89 03/02/89 03/04/89 03/OC/89 03/09/89 03/09/89 03/09/89 03/09/89 03/22/89 03/23/89 03/23/89 04/06/89 04/06/89 04/10/89 04/10/89 04/12/89 04/12/89 04/12/89 04/13/89 04/13/89 04/13/89 04/20/89 04/26/89 04/26/89 CHANGE GREASE CR-845 VALVES 7.17 REPAIR MECH SEAL JACKET-MATER KEEP I!ARM PNIP 2.45 REPAIR MECH SEAL JACKET IIATER KEEP 'WARM PUMP 4.77 PERFORM MPT-10084 OIL CHANGE 12.18 REPAIR OIL LEAKS AND CHANGE OIL 6.50 CHANGE OIL 11 F 07 CLEAN F.O. STRAINERS, REMORK LEAKING INTAKE ELBOII 1.50 OST-1073 1B-SB EDG OPERABILITY HONTHLY INTERVAL 14.75 DISASSEMBLE VALVE, INSPECT, LAP SEAT 5.60 MEGGAR AND BRIDGE MOTOR 6.00 PERFORM MPT-MOO&4 (MOTOR LUBE) 20.67 REPLACE BONNET GASKET 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 41.10 CALIBRATE RELAY, PIC-E037, REPLACE VARMETER PER P 0.88 VERIFY REMOVAL OF TEMP. MOO. PCR-768 F 50 OST-1073 'IB-SB EDG OPERABILITY MONTHLY INTERVAL 3.42 A TRAIN E-85 FANS MILL MOT CONTINUE RUNNING 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0 ~ 50 oST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 2C.65 VALVE 1CS-214 FAILED To STROKE SHUT 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALL'Y 15.83 REPAIR LEAKS ON PUHPS, FITTINGS AMD JACKET SAMPLE 14.07 INSTALL PCR-845 0.25 TROUBLESHOOT PROBLEH 'NITH Fl-605A AND REPAIR 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 4.42 REMOVE TERMINAL COVER AMD CHECK PER PCR-3425 F 00 REMOVE TERMINAL COVER AND CHECK PER PCR-3425 12.53 MPT-10032 LIMITORQUE INSPECTION 12.53 MPT-10032 LIMITORQUE INSPECTION 11.05 MPT-10032 LIMITORQUE INSPECTION 0.30 INSPECT 1DFO-164 'NSP ~ SEQUENCER, HST-10493 11.05 MpT-10032 LIHIToRQUE IMspECTloN 0'8 REPAIR BARRING DEVICE 0.35 REPLACE BARRING DEVICE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 4.42 CLEAN GEAR DRIVE OIL STRAINER 4.47 CLEAN GEAR DRIVE OIL STRAINER EDG EDG ECCS ECCS ECCS EDG EDG ECCS EDG ECCS ECCS EDG EDG ECCS EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS EDG ECCS ECCS ECCS ECCS ECCS EDG ECCS EDG EDG EDG EDG ECCS ECCS 8 EDG 8 EDG A CSIP 8 CSIP B RKR 8 EDG B EDG B CSIP/1CS-754 8 EDG/DFO XFER A RHR PHP A CSIP/1CS-745 A EDG A EDG 8 RHR/1CC-167 8 EDG A EDG A RHR 8 RHR A CSIP A EDG A EDG A EDG B EDG/ESII A RHR 8 EDG A CSIP/1$ 1-4 8 CSIP/1RH-63 C CSIP/1CS-'169 B CSIP C CSIP/1CS-168 A EDG A CSIP/1CS-170 A EDG A EDG A EDG 8 EDG A CSIP 8 CSIP COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAIN'IENANCE COMPLETE MAINTENANCE COMPLETE MAINTENANCE COMPLETE OIL CNAHGE COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTEHANCE PMP COMPLETE TESTS COMPLETE MAINTENANCE REPLACE GASKET PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE CALIBRATION AND MODIFICATION COMPLETE REMOVAL PERFORM 3 AIR-ROLLS - 1 PRE-TEST 8 2 POST-TEST COHPLETE CORRECTIVE MAINTENANCE COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE MODIFICATION COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE MODIFICATION COMPLETE MODIFICATION COMPLETE MAINTENANCE TEST AND INSPECTION COMPLETE MAINTENANCE TESI'MD INSPECTION COMPLETE MAINTEHANCE TEST AHD INSPECTION COMPLETE CORRECTIVE MAINTENANCE AND TEST COMPLETE MAINTENANCE TEST AND INSPECTION REPAIR BARRING DEVICE REPLACE AFTER ATTEMPTED REPAIR PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE MAINTENANCE COMPLETE MAINTENANCE

Page 9 ATTACHHENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 04/27/89 05/08/89 05/09/89 05/16/89 05/16/89 05/17/89 05/17/89 05/17/89 05/19/89 05/26/89 05/27/89 05/31/89 06/02/89 06/02/89 06/04/89 06/04/89 06/05/89 06/07/89 06/07/89 06/07/89 06/16/89 06/16/89 06/16/89 06/17/89 06/17/89 06/18/89 06/20/89 06/22/89 07/05/89 07/05/89 07/05/89 07/05/89 07/06/89 07/07/89 07/11/89 07/17/89 07/17/89 07/24/89 3.92 REPLACE PLUGS IN OIL COOLER HEAT EXCHANGER 16.50 INSPECTION FOR LEAKS AND PERFORM EST-211 1.50 OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL 4.72 FUEL OIL TRANSFER PUHP FAILED OST-1073 13.33 REPLACE TORQUE SWTCH 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 2.12 BREAKER REPLACEMENT PCR-4007 6.65 REPLACE TORQUE SWITCH 6.83 E-86A FAN TRIPPED B BKR WILL NOT RESET 4.72 REPLACE TORQUE SWITCH 5.92 REHOVED FROH SERVICE TO PLACE 8 CSIP IN SERVICE 1.42 TAKEN OOS TO TEST B-CSIP 3.00 BKR RACKED OUT TO ALLOW 8 CSIP PMP TEST 1.32 AIR START SOLENOID TROUBLESHOOTING 27.62 FAN BKR TRIPS ON THERHALS 23.28 DISASSEHBLE AND INSPECT IDFO-205 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL 2'0 MPT-I0068 WHICH INOPS AH-85 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50,0ST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 7.48 CHANGE OIL 14.08 DG INOP WITH ESW INOP 8 DUE TO MST-10490 14.03 REPACK VALVE 1-S'WB 1.50 OST-1086 1B-SB EDG OPERABILITY SEHIANHUALLY 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 3.25 CALIBRATE FLOW SWITCH 6905B 13.18 ADJUST % CYLINDER 3.03 INSPECT VALVE SPRINGS 1.38 REPAIR 1EA-14, 1EA29 8 SOLENOID VALVE 15.58 CHANGE OIL IH PUMP 12.72 UNDER CLEARANCE FOR COIL LEAK CHECK 10.48 CHANGE OIL IN PUHP 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 2.13 REMOVE SUMP COVER TO FIX LEVEL INDICATOR 5.67 MAINTENANCE ON 1SW-E006 12.50 REPLACE EXHAUST GASKET, PLANNED PM 1.50 OST-1073 1B-SB EDG OPERABILITY HOHTHLY INTERVAL 7.57 PERFORM MAINTENANCE OH 1SW-270 ECCS EDG EDG EDG ECCS EDG EDG ECCS EDG ECCS ECCS ECCS ECCS EDG EDG , EDG EDG EDG ECCS ECCS ECCS EDG EDG EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG EDG EDG EDG 8 CSIP A EDG A EDG B EDG/1DFO.E003 A RHR/1CC-147 8 EDG B EDG B RHR/1CC-167 A EDG 8 RHR/1CC-167 C CSIP C CSIP C CSIP 8 EDG A EDG/1DG-E017 A EDG/1DG-E017 A EDG 8 EDG/1DG E015 A RHR B RHR 8 RHR 8 EDG/ESW B EDG/1SW-8 8 EDG B EDG B EDG/AH-85 B EDG A EDG/1DG-E002 A EDG A CSIP A CSIP/AH-9A A RHR A EDG 8 RHR 8 EDG 8 EDG 8 EDG 8 EDG/1SW-E005 ND TEST 8 2 POST-TEST 8 2 POST-TEST & 2 POST-TEST 8 2 POST-TEST 8 2 POST-TEST Bt 2 POST-TEST 8 2 POST-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE A PERFORM 3 AIR ROLLS - 1 PRE-TEST COHPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS 1 PRE-TEST COMPLETE MODIFICATION COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE COMPLETE TRANSFER COMPLETE TEST RETURN TO SERVICE COHPLETE TEST RETURH TO. SERVICE COMPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE HAINTEHANCE COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST COHPLETE PERIODIC TEST COMPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST INSPECT FOR PROPER OIL LEVEL COMPLETE SURVEILLANCE TEST COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST COMPLETE CALIBRATION COHPLETE CORRECTIVE MAINTENANCE COMPLETE INSPECI'ION COMPLETE CORRECTIVE MAINTENANCE COMPLETE MAINTENANCE COHPLETE MAINTEHANCE COMPLETE OIL CHANGE PERFORM 3 AIR ROLLS - 1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE COHPLETE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE

Page 'IO ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 07/26/89 07/26/89 07/26/89 07/31/89 07/31/89 07/31/89 07/31/89 08/14/89 08/14/89 08/15/89 08/21/89 08/22/89 08/22/89 08/22/89 08/28/89 08/29/89 09/06/89 09/07/89 09/07/89 09/11/89 09/11/89 o9/11/e9 09/25/89 09/25/89 09/25/89 09/26/89 09/26/89 09/27/89 09/27/89 10/09/89 10/09/89 10/09/89 10/16/89 10/16/89 10/23/89 11/07/89 11/08/e9 11/22/89 9.52 LIMITORQUE INSPECTION 9.27 LIMITORQUE INSPECTION 8.58 LIMITORQUE INSPECTION 6.80 DISASSENBLE AND CLEAN VALVE REGULATOR F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 7.00 INSTALL PCR-4'662 AND PERFORM EPT-33 5.72 PERFORN LP-T-6589A 7.67 TRAHSPOSE lIIRES To AGREE ll/ DESIGN IAM PCR-4663 7.00 INSPECT COUPLING GUARD 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 5.67 RHR VALVES NOT BEING TESTED AS REQUIRED 11'8 REPLACE FILTERS ON BOTH FANS 14.50 PERFORM CM-ME0018, CLEAN CORROSION FROM PMP COUPL 14.50 MAINTENANCE INSPECTION AND LUBRICATIOH 6.92 MAINTENAHCE ON EDG 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL 8.75 PERFORM MPT-10032 LIMITORQUE INSPECTION 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RHR PUMP OPERABILITY QUARTERLY INTERVAL 12.18 MAINTEHAHCE OH DG RELAYS 1.50 OST-1073 18 SB EDG OPERABILITY MONTHLY INTERVAL 3.80 SERVICE HATER LEAK ON SPEED CHANGER COOLER 7.12 PERFORN MST-E0059 AND NST-E0061 1.00 CALIBRATE FLOI SlIITCHES FS-6905B-SB 1.50 PERFORN LP-T-6502A 4.83 INSPECT PUMP CLEARANCES 2.67 CHANGE FILTER AIR HANDLER AH-86 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 5.00 IHSPECT & REPLACE A]R FILTERS 4.50 FUEL OIL XFER PUMP STRAINER LEAK 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL F 50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1013 1A-SA EDG OPERABILITY NONTHLY INTERVAL 1.92 2 HANGERS REMOVED FOR ISI INSPECTION 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL ING & SHAFT ECCS ECCS ECCS EDG EDG EDG EDG EDG ECCS EDG ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG ECCS EDG EDG ECCS EDG EDG EDG EDG EDG EDG EDG EDG EDG EDG ECCS EDG EDG 8 CSIP/1CS-196 C CSIP/1CS-752 8 CSIP/181-2 A EDG/1S'W-20 A EDG A EDG/A SEQ A EDG/AH-86A B EDG/B SEQ 8 CSIP B EDG RHR A EDG/AH-85 A EDG/ESll PUMP A EDG/AUX RES S A EDG A EDG B CSIP/1SI-323 B RHR A RHR 8 EDG 8 EDG 8 CSIP A EDG 8 EDG/AH.85 A RHR/AH-SA A EDG/EslI SCRH A EDG A EDG A EDG 8 EDG/AH-85 8 EDG/XFER PMP 8 EDG A EDG A EDG A EDG A RHR 8 EDG 8 EDG COMPLETE INSPECTION COMPLETE INSPECTION COMPLETE INSPECTION COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST COMPLETE MODIFICATION AND TEST COMPLETE LOOP CALIBRATION COMPLETE MODIFICATION AND TEST COMPLETE INSPECTION PERFORN 3 AIR ROLLS - 1 PRE-TEST REFERENCE LER 89-014 FOR CORRECTI COMPLETE MAINTENANCE COMPLETE MAINTEHANCE CRN VERIFY PROPER SCREEH OPERATIOH COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST COMPLETE INSPECTIONS AND TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST COMPLETE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE SURVEILLANCE TEST COMPLETE CALIBRATION COMPLETE LOOP CALIBRATIOH 'MASHCOMPLETE IHSPECTIONS COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAIHTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST REINSTALL HANGERS PERFORH 3 AIR ROLLS - 1 PRE-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST &, 2 POST-TEST VE ACTION & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST 8 2 POST-TEST & 2 POST-TEST 8 2 POST-TEST & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST & 2 POST-TEST

\\

Page 11 ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPOHENT CORRECTIVE ACTION 11/23/89 11/23/89 11/27/89 12/04/89 12/10/89 12/12/89 12/12/89 12/14/89 12/15/89 12/15/89 12/17/89 12/22/89 12/22/89 12/28/89 12/31/89 01/01/90 01/01/90 01/03/90 01/15/90 01/16/90 01/23/90 01/29/90 01/29/90 01/29/90 01/29/90 01/29/90 01/29/90 02/12/90 02/13/90 02/13/90 02/20/90 02/20/90 02/20/90 02/22/90 02/26/90 02/26/90 02/28/90 03/01/90 0.50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 RKR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.28 LOSS OF ALL RHR DURING VALVE TESTING 1 ~ 50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 2.77 PERFORM MAIHTEHANCE ON iSI-3 32.08 JACKET HATER KEEPMARM PMP LEAK 3.30 REPLACE TORQUE SNITCH 1.50 OST-'I013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1086 1B-SB EDG OPERABILITY SEMIANNUALLY 1.50 OST-'1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL '1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 46.00 FREQUENCY DID NOT STABILIZE 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY IN'IERVAL 0.58 IHD. LIGHTS FOR 8 DG FUEL OIL XFER PMP S DAY TNK IHLT NOT OPER ~ 12.20 HAINTENAHCE ON RELAY 43T-DG1SB/1085 14.87 REPAIR 1DJO-10 AND 1PH.45 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 0.67 ADJUST PACKIHG 13.32 SET LIMIT SNITCHES 21.82 LUBRICATE DRIVE COUPLING 21.82 REPLACE EXHAUST GASKET 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 13.07 CHANGE FILTER 8.53 REBUILD AIR REGULATOR 36.78 PREPLANNED MAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL 13.03 TORQUE BLADE PITCH LOCKNUT OH EXHAUST FAH 12.80 IHSPECT MOTOR HIHDING 13.07 8 CHILLER FAILED TO DEVELOP REQUIRED FLOW 3.03 A ESM OOS FOR CALIBRATION OF PT-9101A1 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 19.20 VARIOUS MAINTENANCE JOBS 6.40 PERFORM PM-I0020 OH 1SI-341 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS ECCS EDG EDG ECCS EDG EDG ECCS EDG ECCS EDG EDG EDG EDG EDG EDG EDG EDG EOG EDG ECCS ECCS EDG EDG EDG EDG ECCS EDG EDG ECCS EDG EDG ECCS EDG EDG EDG ECCS ECCS B RHR A RHR A EDG A EDG RHR B EDG 8 EDG B CSIP/1SI-3 B EDG A CSIP/181-4 A EDG 8 EDG 8 EDG A EDG B EDG 8 EDG 8 EDG 8 EDG A EDG A EDG 8 CSIP/1SI-2 B CSIP/1 s I-311 B EDG/1DLO-E006 B EDG 8 EDG 8 EDG/1B23-SB-3A B RHR/1RH-66 A EDG A EDG A RHR A EDG/EBBA A EDG/ESH PUMP CSIP/ESCIIC A EDG B EDG 8 EDG B RHR/1SI-341 B RHR POST-TEST POST-TEST CTION POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST CT ION POST-TEST COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS - 1 PRE-TEST t 2 REFERENCE LER 89-022 FOR CORRECTIVE A PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 REPLACE TORQUE SNITCH COMPLETE CORRECTIVE MAINTENANCE REPLACE TORQUE SMITCH PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE.TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 COMPLETE RETEST PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 REPLACE RELAY IN THE CONTROL PANEL COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTEHANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 COMPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTEHANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 REPLACE FILTER COMPLETE CORRECTIVE MAINTENANCE COMPLETE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE INSPECTIOHS REFERENCE LER 90-003 FOR CORRECTIVE A COMPLETE CALIBRATION PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 COMPLETE HAINTENANCE COHPLETE MAIHTENAHCE COMPLETE SCHEDULED TEST

Page 12 ATTACHHENT 1 DATE DURATION CAUSE SYSTEH/COHPONENT CORRECTIVE ACTION 03/06/90 03/06/90 03/12/90 03/13/90 03/13/90 03/19/90 03/22/90 03/23/90 03/26/90 03/27/90 03/28/90 03/29/90 03/29/90 04/11/90 04/11/90 04/24/90 05/01/90 05/03/90 05/07/90 05/07/90 05/17/90 05/20/90 05/21/90 06/04/90 06/04/90 06/04/90 06/06/90 06/13/90 06/14/90 06/19/90 06/19/90 06/20/90 06/22/90 06/26/90 07/02/90 07/02/90 07/16/90 07/16/90 12.42 PERFORH PM-E0012 OH BREAKER 20.18 REPLACE MOTOR PINION KEY 20.42 PREPLANNED HAINTENANCE 1.50 OST-1013 1A-SA EDG OPERABILITY HONTHLY INTERVAL 1.50 OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY 0.18 1SW-271 FAILED IN OPEN POSITION 0.18 PREPLANNED MAINTENANCE 0.70 ADJUST PACKING 20.92 CHANGE VARIOUS AIR AND FUEL OIL FILTERS 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 11.33 SAMPLE AND CHANGE OIL ARE REQiD IAW MPT-M0084 0'5 8 ESW SCREENWASH PUMP TRIPPED ON OVER LOAD 3.75 ESW PHP 6.9KV MTR RACKED OUT FOR LP-P-91018 ON PMP DISCH 25.95 PUMP TRIPS FREQUENTLY ON THERMALS. 1.50 OST-1013 1A SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 6.70 CHANGE OIL 0.50 OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL 8.83 PERFORH PREPLANNED EDG HAINTENANCE 1.50 OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL 0.20 PERFORM EPT-153 8.30 SCREEH NOT ROTATING 1.50 OST-1073 1B SB EDG OPERABILITY MONTHLY INTERVAL 7.83 PERFORH LOOP CALIBRATRION LP-9101A 16.23 MAINTENAHCE 1.50 OST-1013 1A-SA EOG OPERABILITY MONTHLY INTERVAL 6.52 ADJUST/REPLACE BELTS OH AH-9A 12.75 PREPLANNED MAIHTEHANCE REPLACE MOTOR OIL 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY IHTERVAL 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY 6.50 B CHILLER INOP DUE TO A MISPOSITIONED VALVE 7.37 FAH TRIPPED UPON STARTIHG 1.85 INSTALL TEST EQUIP TO VERIFY DIESEL START TIMES 14.33 PERFORH OIL LEAK REPAIRS AND MPT-0001 1.50 OST-1013 1A.SA EDG OPERABILITY MONTHLY INTERVAL. '1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY IHTERVAL 13.40 PREPLANNED HAINTENANCE ECCS ECCS EDG EDG EDG EDG EDG ECCS EDG EDG ECCS EDG PRESS INST EDG EDG EDG EDG ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG EDG EDG A RHR A RHR/1RH-25 A EDG A EDG A EDG 8 EDG/1SW-271 A EOG 8 CSIP/1SI-2 8 EDG 8 EDG 8 CSIP 8 EDG/1SC-BAY6 8 EDG/ESW 8 EDG/1SC-BAY6 A EDG 8 EDG A RHR A RHR A EDG/1DG-E002 A EDG C CSIP A EDG 8 EDG A EDG/1SW-E005 A EDG/1DG-E002 A EDG A CSIP/AH-9A 8 RHR 8 RHR 8 EDG B EDG 8 CSIP/ESCWC B EOG/1DG-E019 A EDG/1DG-E002 A EDG/1DG.E002 A EDG 8 EDG A EDG COMPLETE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COMPLETE CORRECTIVE HAINTENANCE COMPLETE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE HAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST CHECK XORHAL OIL LEVELS COHPLETE CORRECTIVE MAINTENANCE COMPLETE CALIBRATION COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COMPLETE MAINTENANCE COMPLETE SCHEDULED TEST COHPLETE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COMPLETE TEST VERIFY SCREEH ROTATION WITH ESW PUMP RUNNING PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COMPLETE LP-9101A COMPLETE MAINTEHANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST RESTORE AH-9A VERIFY OIL LEVEL COMPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST REFERENCE LER 90-017 FOR CORRECTIVE ACTION COMPLETE CORRECTIVE MAINTENANCE COHPLETE TEST COMPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE MAINTENANCE

Page 13 ATTACNHENT 'I DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 07/26/90 07/31/90 08/02/90 08/02/90 08/08/90 08/10/90 08/10/90 08/13/90 08/14/90 08/20/90 08/21/90 08/27/90 08/28/90 08/30/90 09/04/90 09/05/90 09/10/90 09/12/90 09/14/90 09/24/90 09/25/90 10/07/90 10/11/90 10/12/90 10/22/90 -'IO/24/90 10/25/90 11/03/90 11/04/90 11/07/90 11/07/90 11/12/90 11/19/90 12/03/90 12/03/90 12/06/90 12/11/90 12/12/90 7.67 1.50 0.90 0.58 0.83 0.67 0.50 1.50 7.60 0.17 3.02 35.37 1.50 0.37 19.28 6.72 1.50 0.25 0.50 1.50 1.50 3.92 9.80 1.50 1.50 3.50 0.50 28.75 1.50 2.33 51.28 1.33 1.50 1 ~ 50 1.50 5.08 3.85 0.50 OIL CHANGE AND SAHPLE OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL BREAKER MOO PCR-3510 FR01 IMPLEHENT BREAKER FIELD MODIFICATION PUMP BONN THE A TRAIN SUHP INSIDE CONTAINHENT PCR-3510 480V BKR HODIFICATIOH OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL OST-1073 1B-SB EDG OPERABILIT'Y MONTHLY INTERVAL OIL CHANGE AND ROUTINE PREVENTATIVE HAINTENAHCE REPLACE SPARE BREAKER MITH MODIFIED ORIGINAL PER PCR-3510 REMOVE ORIGINAL BKR AND INSTALL MODIFIED BKR PER PCR-35'IO REPLACE CAHSHAFT COVER GASKET AND CRANKCASE RELIEF VALVES OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL IHSTALL PCR-3510 TRANSHITTER FAILED HST-10078 PERFORM EPT-150 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL VALVE FAILED TO STROKE SHUT DURING OST-1215 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL OST-1013 1A-SA EDG OPERABILITY MOHTHLY INTERVAL OST-1085 1A-SA EDG OPERABILITY SEHIANNUALLY PERFORH MPT-H0011 VALVE COVER GASKET REPLACEMENT TROUBLESNOOTIHG PROBLEH IIITH COHTROL AIR LEAK OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL CHANGE OIL OST-1008 1A-SA RHR PUHP OPERABILITY QUARTERLY INTERVAL REPAIR LEAK ON EQUALIZIHG LINE OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL PERFORH LOOP CALIBRATIOH OH T-6522A DECHROHATING SKID ATTACHED ACROSS A CCM PUMP LINKAGE ON VALVE ACTUATOR IS BROKEN OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL OST-1086 1B-SB EDG OPERABILITY SEHIANNUALLY OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL CHANGE LUBE OIL PERFORH HPT-H0084 AND PM-M0074 OIL CHANGE OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL ECCS EDG ECCS ECCS ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG EDG ECCS ECCS EDG EDG EDG ECCS EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG EDG EDG EDG ECCS ECCS A CSIP A EDG A RHR/1A2-SA-5A A RHR A RHR A RHR A RHR B EDG B CSIP A RHR B RHR A EDG A EDG B RHR A RHR/FT-605A 8 EDG/1QI-E006 B EDG A EDG/1SN-276 8 RHR A EDG A EDG 8 EDG 8 EDG 8 EDG A EDG A RHR A RHR B CSIP 8 EDG A CSIP/AH-9A A CSIP A CSIP/1SM-1055 A EDG B EDG 8 EDG A EDG B RHR B RHR COHPLETE MAINTENANCE AND VERIFY OIL LEVEL PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST RUN A RHR PUHP CHECK BREAKER OPERATION RACK IN ORIGINAL UNHODIFIED BREAKER COHPLETE PUHP DOMN COHPLETE MODIFICATION COHPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE HAINTENANCE CYCLE BKR OBSERVE NORHAL PHP OPERATION CYCLE BKR OBSERVE NORHAL PMP OPERATION COHPLETE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE HDOIFICATION REPLACE TRANSHITTER RESTORE EQI PER EPT-150 PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST CLOSE 1Sll-276 COHPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE MAINTENANCE COHPLETE CORRECTIVE HAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE HAINTENANCE COMPLETE SCHEDULED TEST COHPLETE CORRECTIVE MAIN'IENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE LOOP CALIBRATION COMPLETE EPT-097 COHPLETE CORRECTIVE MAINTEHANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST &I 2 POST-TEST COHPLETE MAINTENANCE COHPLETE HAINTENANCE COMPLETE SCHEDULED TEST

Page 14 ATTACHMENT 1 DATE DURATION CAUSE SYSTEM/COMPONENT CORRECTIVE ACTION 12/17/90 12/18/90 12/27/90 12/31/90 12/31/90 01/02/91 01/08/91 01/12/91 01/14/91 01/22/91 01/22/91 01/22/91 01/22/91 01/24/91 01/28/91 01/28/91 02/11/91 02/11/91 02/11/91 02/12/91 02/12/91 02/14/91 02/25/91 02/26/91 02/27/91 03/02/91 03/06/91 03/11/91 03/11/91 03/13/91 03/13/91 03/14/91 03/14/91 03/14/91 03/20/91 03/25/91 03/29/91 03/31/91 37.68 1.50 37.92 1.50 4.17 10.15 4.35 0.47 1.50 8.67 4.52 30.33 30.33 9.72 1.50 8.08 1.02 14.38 1.50 1.18 57.28 0.50 1.50 1 ~ 57 42.58 0.50 7.37 1.50 1.50 5.50 0.95 0.13 1.50 8.72 3.00 1.86 1.50 1.50 INSPECT CYLINDER HEADS 8 REPLACE LEAK GASKET OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL TROUBLESHOOT MHY VALVE HILL NOT OPEN OST-1073 18-SB EDG OPERABILI'TY MONTHLY INTERVAL AN-9A U/C TO REPLACE BELTS THIS INOPS A CSIP REPLACE PRESSURE SNITCH FOR 86 LO RELAY PERFORM LP-T-6502B LOOP CALIBRATIOH RETEST AUX RESERVOIR SCREENS ON Ml SPEED AFTER COIL REPLACEMENT OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL PERFORM EPT-300 ON CS-210( C CSIP MINIFLN ISOLATION PERFORH LOOP CALIBRATIOH LP-T-65228 PCR-5435 AND LIHITORQUE INSPECTION PCR-5435 AND LIMITORQUE INSPECTION ADJUST SEAL TAKE LO SAMPLES CHG OIL 8 GREASE IN COUPLING OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL PLANNED MAINTENANCE PERFORM LP-T-6589A LOOP CALIBRATIOH INSTALL HEN SHUTTLE VALVE OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL REPLACE BREAKER OH 1CS-946 INSTALL VOTES OH VARIOUS RHR VALVES PCR-5435 OST-1008 1A-SA RNR PUMP OPERABILITY QUARTERLY INTERVAL OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL PERFORM LOOP CALIBRATIOH ON TEMPERATURE LOOP B LOOP OUTAGE VARIOUS JOBS IN MODE 5-6 OST-1092 1B-SB RHR PUMP OPERABILI'TY QUARTERLY INTERVAL REPLACE QUICK VENT SHUTTLE VALVE OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL BOTH CSIPS IHOP DUE TO 8 SEQUENCER RELAYS FAILIHG VOTES TESTING ON 1CS-182 8 CHILLER INOP DUE FAILED PERFORMANCE TESTS OST-1823 1A.SA EDG OPERABILITY 18 MONTH VOTES TESTING 8 TORQUE SNITCH SETTING VALVE TNERHALS OUT DURIHG OPERATION BOTH TRAINS OF ESll MERE REMOVED FROM SERVICE OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL OST-1073 1B-SB EDG OPERABILITY MOHTHLY INTERVAL EDG EDG ECCS EDG ECCS EDG ECCS EDG EDG ECCS ECCS ECCS ECCS ECCS EDG EDG EDG EDG EDG ECCS ECCS ECCS EDG EDG ECCS ECCS EDG EDG EDG ECCS ECCS ECCS EDG ECCS EDG ECCS EDG EDG A EDG A EDG A CSIP/1SI-1 B EDG A CSIP/AH-9A 8 EDG B RHR/AH-58 8 EDG A EDG 8 CSIP B CSIP/AH-9B 8 RHR/1RH-69 8 CSIP/1SI-2 A CSIP 8 EDG 8 EDG A EDG/1EV-A86A A EDG A EDG A CS IP/1CS-946 A RMR A RHR 8 EDG A EDG/EBBA 8 RHR B RHR 8 EDG A EDG A EDG 8 CSIP/B SEQ A CSIP/1CS-182 B CSIP/ESCIIC A EDG A CSIP/1CS-182 A EDG/1'-270 RHR/ESM/CCll A EDG 8 EDG COMPLETE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST F 2 POST-TEST COMPLETE CORRECTIVE MAINTEHANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST. TEST COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAINTENANCE COMPLETE LP-T-65028 COMPLETE MAINTENANCE AND TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE PERIODIC TEST COMPLETE LOOP CALIBRATION COMPLETE MODIFICATION AND INSPECTION COMPLETE MODIFICATION AHD INSPECTION VERIFY PROPER OIL LEVEL 8 NO OIL LEAKS PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE MAIHTEHANCE COMPLETE LOOP CALIBRATION COMPLETE VALVE REPLACEMEHT PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST VERIFY VALVE STROKES COMPLETE TEST AND MAIHTEHANCE COMPLETE SCHEDULED TEST PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE LOOP CALIBRATION COMPLETE MAINTENANCE COMPLETE SCHEDULED TEST COMPLETE VALVE REPLACEMENT PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS - 'I PRE-TEST 8 2 POST-TEST REFERENCE LER 91-005 FOR CORRECTIVE ACTIOH COMPLETE TESTING REFERENCE LER 91-004 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE TESTING COMPLETE CORRECTIVE MAINTENANCE REFERENCE LER 91-007 FOR CORRECTIVE ACTION PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST PERFORM 3 AIR ROLLS'- 1 PRE-TEST 8 2 POST-TEST

0

Page 15 ATTACHMENT 1 DATE DURATION CAUSE SYSTEH/COMPONENT CORRECTIVE ACTION 04/16/91 04/16/91 04/18/91 04/18/91 04/24/91 04/24/91 04/25/91 05/01/9'I 05/04/91 05/04/91 05/07/91 05/07/91 05/08/91 05/08/91 05/08/91 05/12/91 05/23/91 05/24/91 05/29/91 06/02/91 06/05/91 - 06/05/91 06/05/91 06/12/91 06/12/91 06/17/91 06/19/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/20/91 06/21/91 07/01/91 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1'0 OST.1823 1A-SA EDG OPERABILITY 18 MONTH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1823 1A-SA EDG OPERABILITY 18 MOHI'H 0.50 OST-1092 1B-SB RHR PUHP OPERABILITY QUARTERLY INTERVAL 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY IHTERVAL 1.50 OST 1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1073 1B-SB EDG OPERABILITY MOHTHLY IHTERVAL 1.50 OST-1824 1B-SB EDG OPERABILITY 18 MONTH 1.50 OST-1824 18-SB EDG OPERABILITY 18 MONTH '.50 OST-1824 18-SB EDG OPERABILITY 18 MONTH 0.38 DISCHARGE VALVE SHUT FOR STROKING SI VALVES 0.08 DISCHARGE VALVE SHUT TO STROKE 1SI-107 0.88 DISCHARGE VALVE SHUT TO STROKE 'IS1-107 144.00 RUST BOROH HIGHER THAN ALLOMED 5.53 REPLACE GENERATOR BEARING TEMPERATURE SNITCH 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 5.62 OIL COOLER SERVICE MATER LEAK 1.42 SHEAR PIN BROKEN OH AUX TRAV SCREEN 1'0 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 12.92 REPAIR/REPLACE 1DFO-213 VALVE 1.50 OST-1086 18-SB EDG OPERABILITY SEMIANNUALLY 0.25 PACKING ADJUSTMENT RESULTS IN LOSS OF ECCS 0'0 CCll FLSI TO A RHR PUMP llAS LOST 0.50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 3.17 BELT INSPECTIOH 9.25 TIGHTEN BELTS 25.67 REPLACE STRAINER 22.42 STRAIGHTEN UPPER STEH ON VALVE 1CC-142 1.63 COMPLETE LP-T-6502A LOOP CALIBRATIOH 9.25 CHANGE OIL IH PUHP 27.82 INSP ~ ST AIR CAM, REPAIR OIL LEAK ON HUMPHREY VALVE 2.97 PERFORH CALIBRATION PIC-l032 25.67 IHSPECT/REPLACE UPPER MOTOR BEARING 27.82 INSPECT SUCTION STRAINER 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL EDG EDG EDG EDG ECCS ECCS EDG EDG EDG EDG EDG EDG ECCS ECCS ECCS ECCS EDG EDG ECCS EDG EDG EDG EDG ECCS ECCS ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG ECCS EDG .EDG EDG EDG A EDG A EDG A EDG A EDG 8 RHR A RKR 8 EDG B EDG 8 EDG 8 EDG B EDG 8 EDG A CSIP A CSIP A CSIP RUST A EDG A EDG 8 CSIP 8 EDG 8 EDG 8 EDG 8 EDG 8 CSIP/A RHR/CQI A RHR B RHR 8 CSIP/AH-98 A CSIP/AH-9A A EDG/1SII-E041 A RHR/1CC-147 A RKR/AH-SA A CSIP A EDG A RHR/RH-602ASll A EDG/1SH-E005 A EDG/1DFO-E002 A EDG 8 EDG POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST POST-TEST CT ION POST-TEST POST-TEST POST-TEST CT ION POST-TEST-POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 COMPLETE SCHEDULED TEST COMPLETE SCHEDULED TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 COMPLETE TESTING COMPLETE TESTING COMPLETE TESTING REFERENCE LER 91-011 FOR CORRECTIVE A COMPLETE CORRECI'IVE MAINTENANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8, 2 COMPLETE CORRECTIVE MAIHTEHAHCE REPAIR, VERIFY PROPER OPERATION PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 REPLACE LEAKING VALVE PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 REFERENCE LER 91-014 FOR CORRECTIVE A RESTORE CCLI FLml COMPLETE SCHEDULED TEST INSTALL NEM BELTS COMPLETE BELT ADJUSTMEHTS COMPLETE CORRECTIVE MAINTENANCE COMPLETE CORRECTIVE MAIHTEHAHCE COMPLETE LOOP CALIBRATIOH COMPLETE MAINTENANCE COMPLETE INSPECTIONS AND MAINTENAHCE COMPLETE CALIBRATION REPLACE MOTOR BEARINGS COHPLETE INSPECTIONS PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2

k fJ

Page 16 ATTACHMENT 1 DATE 'DURATIOH CAUSE SYSTEH/COHPONENT-CORRECTIVE ACTION 07/03/91 07/06/91 07/16/91 07/16/91 07/17/91 07/26/91 07/28/91 07/29/91 07/30/91 07/30/91 08/01/91 08/07/91 08/11/91 08/13/91 08/16/91 08/16/91 08/29/91 08/30/91 08/31/91 08/31/91 09/04/91 09/09/91 09/09/91 09/09/91 09/16/91 09/20/9'I 09/24/91 10/02/91 10/07/91 10/08/91 10/17/91 10/21/91 10/22/91 10/23/91 10.30 INSPECT/PUMP AND CHANGE OIL 3.13 REPLACE DIRTY LUBE OIL FILTER 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 3.68 REPAIR MELD LEAK ON EQUALIZING LINE 0.50 OST-1008 1A-SA RHR PUMP OPERABILITY QUARTERLY INTERVAL 2.67 SMAPPIHG TO 1B-SB CSIP 10.22 1RH-31 lIILL HOT AUTO OPEN ON LOM FLOM 1'0 OST-1073 18-SB EDG OPERABILITT HONTHLY INTERVAL 0.50 OST-1092 18-SB RHR PINP OPERABILITT QUARTERLY INTERVAL 0 F 50 OST-1092 18-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 0.73 INSTALL TEST EQUIPHENT FOR EPT-184 1.62 CALIBRATE FS-69058-SB 22.18 DISASSEMBLE, BEHCH TEST & REPLACE RELIEF VALVE 1.50 OST-1013 1A-SA EDG OPERABILITY MONTHLY IHTERVAL 1.23 INSTALL TEST EQUIPMENT FOR EPT-183 15.00 RUNNING 2 PUMPS CAUSES 1CC-145 To LIFT 5.78 PERFORMANCE OF LP-T-6904B 1.50 OST-1073 18-SB EDG OPERABILITY HOHTHLT IHTERVAL 10.68 PRESS. QIITCH MOULD NOT RESET DURIHG OST-1215 5.18 MOULD NOT DEVELOP REQ'D FLOM IAM OST-1215 4.43 PERFORM LOOP CALIBRATIONS ON LP-T-6904A 0.58 FAILED EPT-033 1.50 OST-1085 1A-SA EDG OPERABILITY SEMIANNUALLY F 50 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 1.50 LOOP CALIBRATIONS 1.50 OST-1073 1B-SB EDG OPERABILITY MONTHLY INTERVAL 2.57 MORK ON DG-045B 1 MOTOR OPERATED DAMPER 1'0 OST-1013 1A-SA EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1008 1A-SA RHR PUMP OPERABILITT QUARTERLY INTERVAL 0.90 PACKING ADJUSTMENT 1.50 OST-1073 18-SB EDG OPERABILITY MONTHLY INTERVAL 0.50 OST-1092 1B-SB RHR PUMP OPERABILITY QUARTERLY INTERVAL 59.00 INOPERABLE To CLEAN EQI SCREEN IIASH PUHP ECCS EDG EDG ECCS ECCS ECCS ECCS EDG ECCS ECCS ECCS EDG 'CCS EDG ECCS ECCS EDG EDG EDG EDG EDG EDG EDG EDG ECCS EDG EDG EDG EDG ECCS ECCS EDG ECCS EDG 8 CSIP 8 EDG A EDG 8 CSIP A RHR C CSIP A RHR 8 EDG 8 RHR B RHR 8 CSIP/1CS-755 A EDG/AH-85 8 RHR/1CC-165 A EDG A CSIP/1CS-744 A RHR/1CC-145 8 EDG 8 EDG B EDG/8752BSB 8 EDG/1SC-BAY6 A EDG A EDG/A SEQ A EDG A EDG 8 RHR A EDG 8 EDG 8 EDG/1DG-E019 A EDG A RHR A CSIP/1CS-182 8 EDG 8 RHR A EDG/ESM COMPLETE OIL CHANGE COHPLElE CORRECTIVE MAINTEHANCE PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST LEAK CHECK EQUALIZING LINE COHPLETE SCHEDULED TEST COHPLETE SMAP COMPLETE CORRECTIVE MAINlENANCE AND CALIBRATION PERFORM 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COHPLETE SCHEDULED TEST COHPLETE SCHEDULED TEST COMPLETE TESTING REMOVE TEST EQUIPMENT COHPLETE CALIBRATIONS COHPLETE TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COHPLETE TESTING REHOVE TEST EQUIPMENT COMPLETE CORRECTIVE MAINlENANCE COHPLETE CALIBRATIONS PERFORM 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE CORRECTIVE MAINTENANCE COHPLETE CORRECTIVE MAINTENANCE COMPLETE LOOP CALIBRATIOHS COMPLETE PERIODIC TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COHPLETE SCHEDULED TEST COHPLETE LOOP CALIBRATIONS PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COMPLETE CORRECTIVE HAIHlENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST & 2 POST-TEST COHPLETE SCHEDULED TEST COHPLETE CORRECTIVE MAINTENANCE PERFORH 3 AIR ROLLS - 1 PRE-TEST 8 2 POST-TEST COMPLETE SCHEDULED TEST COMPLETE CORRECTIVE MAINlENANCE

ATTACHMENT 2 ACCUM AH ALT BKR CCW CM CSIP EDG ESCWC ESW EPT EQ FO FR FREQ FS HFA HVAC IND INOP INSP ISI LER LO LVL MOD MOV MST OOS OST PCR PMP RECIR RHR RWST SAT SEQ TS VLCO XFER Accumulator for low head injection Air handler Alternate Circuit breaker Component cooling water Corrective maintenance Charging.safety injection pump for high h Emergency diesel generator Essential service chilled water chiller Emergency service water Engineering periodic test Equipment qualification (environmental) Fuel oil Field revision Frequency Flow switch A type of "General Electric" relay Heating ventilation air conditionxng Indicator Inoperable Inspection Inservice inspection Licensee event report Lock out Level Modification Motor operated valve Maintenance surveillance test Out of service Operations surveillance test Plant change request. Pump Reczrculating Residual heat removal system for low head Reactor water storage tank Satisfactory Sequencer Technical specification Voluntary lzmited condition of operation Transfer ead safety injection safety injection GLOSSARY OF TERMS/ABBREVIATIONS USED ON ATTACHMENT

L 4+ K v 4. 4}}