ML18010B066: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (3 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML18010B066 | | number = ML18010B066 | ||
| issue date = 03/26/1993 | | issue date = 03/26/1993 | ||
| title = Responds to NRC | | title = Responds to NRC Re Violations Noted in Insp Rept 50-400/93-03.Corrective Actions:Mgt & Organizational Changes Will Provide Further Enhancement to EP Program by Shifting Responsibility for Conducting Drills & Exercises | ||
| author name = Vaughn G | | author name = Vaughn G | ||
| author affiliation = CAROLINA POWER & LIGHT CO. | | author affiliation = CAROLINA POWER & LIGHT CO. | ||
| Line 12: | Line 12: | ||
| case reference number = CON-NRC-807 | | case reference number = CON-NRC-807 | ||
| document report number = HO-930070, NUDOCS 9303290224 | | document report number = HO-930070, NUDOCS 9303290224 | ||
| title reference date = 02-25-1993 | |||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE | ||
| page count = 11 | | page count = 11 | ||
}} | }} | ||
=Text= | =Text= | ||
{{#Wiki_filter:ACCELERATED | {{#Wiki_filter:ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) | ||
DOCUMENT | ACCESSION'BR:9303290224 DOC.DATE: 93/03/26 NOTARIZED: NO ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION AUGHNiG.E. | ||
Carolina Power | |||
INFORMATION | & Light Co. | ||
DISTRIBUTION | RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | ||
SYSTEM (RIDS)ACCESSION'BR:9303290224 | DOCKET N | ||
DOC.DATE: 93/03/26 NOTARIZED: | 05000400 | ||
NO ACIL:50-400 | |||
Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION | ==SUBJECT:== | ||
AUGHNiG.E. | Responds to NRC 930225 ltr re violations noted in insp rept 50-400/93-03.'Corrective actions:mgt | ||
Carolina Power&Light Co.RECIP.NAME | & organizational changes will provide further enhancement to EP program by shifting responsibility for conducting drills | ||
RECIPIENT AFFILIATION | & exercises. | ||
Document Control Branch (Document Control Desk)DOCKET N 05000400 SUBJECT: Responds to NRC 930225 ltr re violations | DISTRIBUTION CODE: | ||
noted in insp rept 50-400/93-03.'Corrective | IE01D COPIES RECEIVED:LTR ENCL SIZE: | ||
actions:mgt | TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed. | ||
&organizational | 05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFBPT NRR/DRSS/PEPB NRR/PMAS/ILPB2 REG FIL 02 RGN2 | ||
changes will provide further enhancement | 'FILE 01 EXTERNAL: EG&G/BRYCE,J.H. | ||
to EP program by shifting responsibility | NSIC COPIES LTTR ENCL 1 | ||
for conducting | 1 2 | ||
2 1 | |||
DISTRIBUTION | 1 1 | ||
CODE: IE01D COPIES RECEIVED:LTR | 1 1 | ||
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice | 1 1 | ||
of Violation Response NOTES:Application | 1 1 | ||
for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/TPAB | 1 1 | ||
DEDRO NRR/DRCH/HHFBPT | 1 1 | ||
NRR/DRSS/PEPB | 1 1 | ||
NRR/PMAS/ILPB2 | 1 1 | ||
REG FIL 02 RGN2'FILE 01 EXTERNAL: EG&G/BRYCE,J.H. | 1 1 | ||
NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/TTC NRR/DORS/OEAB | 1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1 | ||
NRR/DRIL/RPEB | 1 1 | ||
NRR/PMAS/ILPB1 | 1 1 | ||
NUDOCS-ABSTRACT | 1 1 | ||
OGC/HDS1 RES MORISSEAU,D | 1 1 | ||
NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS: | 1 1 | ||
PLEASE HELP US fO REDUCE WASTE!CONTACT TIIE DOCUMEN'f CONTROL D)>V, ROOM Pl-37 (EXT.504-2065)TO | 1 1 | ||
1 1 | |||
t Carolina Power&Light Company P.O.Box 165~New Hill, NC 27562 G.E.VAUGHN Vice President Harris Nuclear Plant MAR 2 6 199'etter Number: HO-930070 Document Control Desk United States Nuclear Regulatory | 1 1 | ||
Commission | 1 1 | ||
Washington, DC 20555 NRC-807 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400 LICENSE NO.NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen: | 1 NOTE TO ALL"RIDS" RECIPIENTS: | ||
In refere nce to your letter of February 25, 1993, referring to NRC Inspection | PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMEN'f CONTROL D)>V, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISmIDU'fION LISTS FOR DOCUMENTS YOU DON'T NEED! | ||
Report RII: 50-400/93-03, the attached is Carolina Power and Light Company's reply to the notice of violation identified | TOTAL NUMBER OF COPIES REQUIRED: | ||
in Enclosure 1.Thank you for your consideration | LTTR 23 ENCL 23 | ||
in this matter.Very truly yours, Vice President Harris Nuclear Plant MGW:kls Attachment | |||
cc: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRC-NRR)Mr.J.E.Tedrow (NRC-SHNPP) | t Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vice President Harris Nuclear Plant MAR 2 6 | ||
9303290224 | 199'etter Number: | ||
93032b PDR ADQCK 05000400 8 PDR MEM/HO-930070/1/Osl (t(t | HO-930070 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-807 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen: | ||
In refere nce to your letter of February 25, 1993, referring to NRC Inspection Report RII: | |||
Attachment | 50-400/93-03, the attached is Carolina Power and Light Company's reply to the notice of violation identified in Enclosure 1. | ||
to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION | Thank you for your consideration in this matter. | ||
REPORT NO.50-400/93-03 | Very truly yours, Vice President Harris Nuclear Plant MGW:kls Attachment cc: | ||
VIOLATION 400 93-03-01 Re orted Violation: | Mr. S. | ||
10 CFR 50.54(q)states that a licensee authorized | D. Ebneter (NRC-RII) | ||
to possess and operate a nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b)and the requirements | Mr. N. B. Le (NRC-NRR) | ||
of appendix E to 10 CFR Part 50.10 CFR 50.47(b)(8) | Mr. J. | ||
requires that adequate emergency facilities | E. Tedrow (NRC-SHNPP) 9303290224 93032b PDR ADQCK 05000400 8 | ||
and equipment to support the emergency response are provided and maintained. | PDR MEM/HO-930070/1/Osl (t( | ||
t | |||
10 CFR 50.47(b)(8), states that adequate emergency facilities, communication, and equipment to support emergency response are provided and maintained. | |||
Section 3.5.3.b of the Shearon Harris Emergency Plan identifies | Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-01 Re orted Violation: | ||
10 CFR 50.54(q) states that a licensee authorized to possess and operate a | |||
System (ERFIS)consoles, capable of displaying | nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of appendix E to 10 CFR Part 50. | ||
plant data, SPDS, and RMS, as Emergency Operations | 10 CFR 50.47(b)(8) requires that adequate emergency facilities and equipment to support the emergency response are provided and maintained. | ||
Facility equipment to be maintained. | Section 3..1 of the Shearon Harris Emergency | ||
PEP-402,"Maintaining | : Plan, which implements 10 CFR 50.47(b)(8), states that adequate emergency facilities, communication, and equipment to support emergency response are provided and maintained. | ||
Readiness of Emergency Facilities, identifies | Section 3.5.3.b of the Shearon Harris Emergency Plan identifies Emergency | ||
Portable Radios and Base Stations as emergency equipment. | |||
Contrary to the above, two examples of inadequately | ===Response=== | ||
maintained | Facility Information System (ERFIS) | ||
equipment were identified: | : consoles, capable of displaying plant data, | ||
1.=When tested by the inspector, two of the six hand-held mobile radios maintained | : SPDS, and | ||
in the Operational | : RMS, as Emergency Operations Facility equipment to be maintained. | ||
Support Center (OSC)kits failed to transmit.2.When an operational | PEP-402, "Maintaining Readiness of Emergency Facilities, identifies Portable Radios and Base Stations as emergency equipment. | ||
demonstration | Contrary to the above, two examples of inadequately maintained equipment were identified: | ||
was requested by the inspector, Emergency Operations | 1. | ||
Facility (EOF)ERFIS terminals 1, 2, and 3 did not operate.This is a Severity Level IV violation (Supplement | = | ||
VIII).Denial or Admission: | When tested by the inspector, two of the six hand-held mobile radios maintained in the Operational Support Center (OSC) kits failed to transmit. | ||
The violation is denied.(Example 1)OSC emergency response personnel are taught to check equipment such as radios to ensure proper operation prior to leaving the OSC on a mission.It is true that on the date of the NRC inspectors | 2. | ||
visit and upon examination | When an operational demonstration was requested by the inspector, Emergency Operations Facility (EOF) | ||
of one of the three'SC emergency supply kits, two of the six hand-held-.radios failed to transmit due to deficient batteries. | ERFIS terminals 1, | ||
However, there were spare batteries available in the kit for use in the radios.This was demonstrated | 2, and 3 did not operate. | ||
at the time of the inspection. | This is a Severity Level IV violation (Supplement VIII). | ||
MEM/HO-930070/2/OS1 | Denial or Admission: | ||
The violation is denied. | |||
Attachment | (Example 1) | ||
to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION | OSC emergency response personnel are taught to check equipment such as radios to ensure proper operation prior to leaving the OSC on a mission. | ||
REPORT NO.50-400/93-03 | It is true that on the date of the NRC inspectors visit and upon examination of one of the three'SC emergency supply kits, two of the six hand-held -.radios failed to transmit due to deficient batteries. | ||
Since radio operability | : However, there were spare batteries available in the kit for use in the radios. | ||
checks are normal practice and spare batteries were available, CP&L contends that the radios were available for use at the time of inspection. | This was demonstrated at the time of the inspection. | ||
The condition noted by the inspector is not considered | MEM/HO-930070/2/OS1 | ||
a violation of the Emergency Plan or implementing | |||
procedure (PEP-402). | Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 Since radio operability checks are normal practice and spare batteries were available, CP&L contends that the radios were available for use at the time of inspection. | ||
The condition noted by the inspector is not considered a violation of the Emergency Plan or implementing procedure (PEP-402). | |||
The cause of the two batteries not to function properly was due to memory lock on the batteries. | The cause of the two batteries not to function properly was due to memory lock on the batteries. | ||
In order to alleviate the memory lock problem a battery manager is being purchased and batteries for the OSC radios will be rotated through the battery manager.(Example 2)It is true that when an operational | In order to alleviate the memory lock problem a battery manager is being purchased and batteries for the OSC radios will be rotated through the battery manager. | ||
demonstration | (Example 2) | ||
was requested by the inspector on January 26, 1993, the EOF ERFIS terminals 1, 2, and 3 did not operate.First, it should be made clear that alternate means of transmitting | It is true that when an operational demonstration was requested by the inspector on January 26, 1993, the EOF ERFIS terminals 1, 2, and 3 did not operate. | ||
plant operating data to the Technical Support Center (TSC)and EOF is available. | : First, it should be made clear that alternate means of transmitting plant operating data to the Technical Support Center (TSC) and EOF is available. | ||
Secondly, the problem that ultimately | : Secondly, the problem that ultimately would cause the non-operational state noted by the inspector had been recognized on January 21, | ||
would cause the non-operational | : 1993, and a work ticket was written to correct the switcher problem. | ||
state noted by the inspector had been recognized | On January 25, | ||
on January 21, 1993, and a work ticket was written to correct the switcher problem.On January 25, 1993, an upgrade to enhance the reliability | : 1993, an upgrade to enhance the reliability of our ERFIS system was initiated. | ||
of our ERFIS system was initiated. | The EOF equipment was operating properly on January 22 1993, and January 25, | ||
The EOF equipment was operating properly on January 22 1993, and January 25, 1993, when checked by a member of the Harris Emergency Preparedness (EP)staff.On the morning of January 26, 1993, as part of the ERFIS upgrade, the switchers were activated and since the switcher for the EOF ERFIS equipment was not functioning | : 1993, when checked by a member of the Harris Emergency Preparedness (EP) staff. | ||
properly, the EOF ERFIS equipment went off line.This was discovered | On the morning of January 26, | ||
at about 4 p.m.on January 26, 1993, when the demonstration | : 1993, as part of the ERFIS upgrade, the switchers were activated and since the switcher for the EOF ERFIS equipment was not functioning properly, the EOF ERFIS equipment went off line. | ||
was requested by the inspector in the EOF.The Specialist | This was discovered at about 4 p.m. | ||
contacted by phone to place the EOF ERFIS equipment on line was not aware of the switcher problem.From his look at the equipment he felt the EOF equipment should be on line.The next morning the technician | on January 26, | ||
that normally works with the EOF equipment became aware of the problem, he changed switchers and had the EOF equipment back on line within 30 minutes on January 27, 1993.The ERFIS computer is a very complex computer system with numerous remote devices subject to various perturbations | : 1993, when the demonstration was requested by the inspector in the EOF. | ||
which can trip various components | The Specialist contacted by phone to place the EOF ERFIS equipment on line was not aware of the switcher problem. | ||
off line.However, we have the ability to return these components | From his look at the equipment he felt the EOF equipment should be on line. | ||
very rapidly to an operational | The next morning the technician that normally works with the EOF equipment became aware of the problem, he changed switchers and had the EOF equipment back on line within 30 minutes on January 27, 1993. | ||
status by getting the proper qualified technician | The ERFIS computer is a very complex computer system with numerous remote devices subject to various perturbations which can trip various components off line. | ||
in the Computer Control Room to accomplish | : However, we have the ability to return these components very rapidly to an operational status by getting the proper qualified technician in the Computer Control Room to accomplish the proper line up. | ||
the proper line up.The technicians | The technicians are trained as part of the Emergency | ||
are trained as part of the Emergency Response Organization | |||
and during emergencies | ===Response=== | ||
or exercises are called in to perform any required adjustments | Organization and during emergencies or exercises are called in to perform any required adjustments in order to keep ERFIS functional. | ||
in order to keep ERFIS functional. | CP&L does not consider this to be a violation in that the problem had been self-identified and the ability to rapidly place the equipment back on line by a qualified technician is available and was demonstrated. | ||
CP&L does not consider this to be a violation in that the problem had been self-identified | The ERFIS upgrade is an ongoing major proj ect to improve the operation and reliability of the ERFIS system. | ||
and the ability to rapidly place the equipment back on line by a qualified technician | This fact has been noted as one of the strengths in the EP Program in the past. | ||
is available and was demonstrated. | : Further, the upgrade of the ERFIS will greatly enhance the system's entire capability. | ||
The ERFIS upgrade is an ongoing major proj ect to improve the operation and reliability | The particular switcher problems have been repaired and an upgrade with new model, more reliable switchers had been identified as part of the ERFIS upgrade. | ||
of the ERFIS system.This fact has been noted as one of the strengths in the EP Program in the past.Further, the upgrade of the ERFIS will greatly enhance the system's entire capability. | The replacement of these switchers is to be accomplished in 1993. | ||
The particular | MEM/HO-930070/3/OS1 | ||
switcher problems have been repaired and an upgrade with new model, more reliable switchers had been identified | |||
as part of the ERFIS upgrade.The replacement | Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-03 Re orted Violation: | ||
of these switchers is to be accomplished | 10 CFR 50.54(q) states that a licensee authorized to possess and operate a | ||
in 1993.MEM/HO-930070/3/OS1 | nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50. | ||
Attachment | 10 CFR 50, Appendix E.IV.D.2 states that signs or other measures shall also be used to disseminate to any transient population within the plume exposure pathway Emergency Planning Zone (EPZ) appropriate information that would be helpful if an accident occurs. | ||
to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION | Section 5.2.5 of the Shearon Harris Emergency Plan states that adhesive decals are located at public telephone booths in the 10-mile EPZ to inform transients that they are in an emergency warning zone and what immediate actions to take should they hear the sirens. | ||
REPORT NO.50-400/93-03 | Contrary to the | ||
VIOLATION 400 93-03-03 Re orted Violation: | : above, four out of eight telephone booths surveyed by the inspector did not display the adhesive decals. | ||
10 CFR 50.54(q)states that a licensee authorized | This is a Severity Level V violation (Supplement VIII). | ||
to possess and operate a nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b)and the requirements | Denial or Admission: | ||
of Appendix E to 10 CFR Part 50.10 CFR 50, Appendix E.IV.D.2 states that signs or other measures shall also be used to disseminate | While the above statement is true, CPGL requests that the NRC withdraw the violation as allowed by 10CFR2 Appendix C VII B [1]. | ||
to any transient population | The basis for this request is (a) this condition was not one which could be expected to have been prevented by the licensee's corrective action for a previous violation, (b) corrective action was initiated prior to the end of the inspection to survey public phone booths within the 10-mile EPZ and ensure the decals were in place and (c) this was not a willfulviolation. | ||
within the plume exposure pathway Emergency Planning Zone (EPZ)appropriate | The public phone booth decals serve only as an enhancement to other more effective and logical means of notifying the transient population as to the meaning of sirens and what actions to take. | ||
information | More realistic warning to transients would naturally come from their asking someone within the 10 mile EPZ what the sirens indicate. | ||
that would be helpful if an accident occurs.Section 5.2.5 of the Shearon Harris Emergency Plan states that adhesive decals are located at public telephone booths in the 10-mile EPZ to inform transients | The residents and businesses within the 10 mile EPZ are furnished with an Annual Emergency Preparedness Calendar with all the information concerning | ||
that they are in an emergency warning zone and what immediate actions to take should they hear the sirens.Contrary to the above, four out of eight telephone booths surveyed by the inspector did not display the adhesive decals.This is a Severity Level V violation (Supplement | : sirens, possible evacuations and turning to Emergency Broadcast Frequencies on Radio or TV. | ||
VIII).Denial or Admission: | The other most logical means of providing the information to transients is the Emergency Broadcast System which would carry information concerning the emergency or drill. | ||
While the above statement is true, CPGL requests that the NRC withdraw the violation as allowed by 10CFR2 Appendix C VII B[1].The basis for this request is (a)this condition was not one which could be expected to have been prevented by the licensee's | In addition to fixed sirens sounding in the event of a real emergency," | ||
corrective | the vehicle routes inside the 10 mile EPZ willhave emergency vehicles with flashing lights, sirens and broadcast capabilities doing route alerting which would alert the permanent and transient populations. | ||
action for a previous violation, (b)corrective | Efforts were underway prior to the inspection to enhance the entire program of notification of transients. | ||
action was initiated prior to the end of the inspection | While CP&L has had a contract in force with the areas major telephone company to ensure that the decal information is placed in MEM/HO-930070/4/OS1 | ||
to survey public phone booths within the 10-mile EPZ and ensure the decals were in place and (c)this was not a | |||
The public phone booth decals serve only as an enhancement | ,~ | ||
to other more effective and logical means of notifying the transient population | |||
as to the meaning of sirens and what actions to take.More realistic warning to transients | I Attachment to NRC-807 g' | ||
would naturally come from their asking someone within the 10 mile EPZ what the sirens indicate.The residents and businesses | REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 all of their public telephones within the 10 mile | ||
within the 10 mile EPZ are furnished with an Annual Emergency Preparedness | : EPZ, we recognize the difficulty in ensuring decal placement and preventing removal of the decals by members of the public. | ||
Calendar with all the information | CP&L is currently evaluating the basis for this commitment. | ||
concerning | Because of the marginal value of decals and the availability of more effective means to notify the transient population during an emergency, CP&L intends to pursue a change to | ||
sirens, possible evacuations | 'the Emergency Plan removing the commitment to have the adhesive decals located in public telephone booths throughout the 10 mile EPZ. | ||
and turning to Emergency Broadcast Frequencies | In conclusion, the Shearon Harris Nuclear Plant has an effective EP Program. | ||
on Radio or TV.The other most logical means of providing the information | This is evidenced by the successful annual graded exercises conducted without NRC identified deficiencies or weaknesses for the past several years. | ||
to transients | Recently announced management and organizational changes willprovide further enhancement to the EP Program by shifting responsibility for conducting drills and exercises, including scenario development, from the EP Organization to the Harris Training Section. | ||
is the Emergency Broadcast System which would carry information | This move will allow the EP Organization to improve their focus on administration responsibilities and program compliance. | ||
concerning | MEM/HO-930070/5/OS1 | ||
the emergency or drill.In addition to fixed sirens sounding in the event of a real emergency," the vehicle routes inside the 10 mile EPZ | |||
doing route alerting which would alert the permanent and transient populations. | I(}} | ||
Efforts were underway prior to the inspection | |||
to enhance the entire program of notification | |||
of transients. | |||
While CP&L has had a contract in force with the areas major telephone company to ensure that the decal information | |||
is placed in MEM/HO-930070/4/OS1 | |||
,~ | |||
I Attachment | |||
to NRC-807 g'REPLY TO A NOTICE OF VIOLATION NRC INSPECTION | |||
REPORT NO.50-400/93-03 | |||
all of their public telephones | |||
within the 10 mile EPZ, we recognize the difficulty | |||
in ensuring decal placement and preventing | |||
removal of the decals by members of the public.CP&L is currently evaluating | |||
the basis for this commitment. | |||
Because of the marginal value of decals and the availability | |||
of more effective means to notify the transient population | |||
during an emergency, CP&L intends to pursue a change to'the Emergency Plan removing the commitment | |||
to have the adhesive decals located in public telephone booths throughout | |||
the 10 mile EPZ.In conclusion, the Shearon Harris Nuclear Plant has an effective EP Program.This is evidenced by the successful | |||
annual graded exercises conducted without NRC identified | |||
deficiencies | |||
or weaknesses | |||
for the past several years.Recently announced management | |||
and organizational | |||
changes | |||
to the EP Program by shifting responsibility | |||
for conducting | |||
drills and exercises, including scenario development, from the EP Organization | |||
to the Harris Training Section.This move will allow the EP Organization | |||
to improve their focus on administration | |||
responsibilities | |||
and program compliance. | |||
MEM/HO-930070/5/OS1 | |||
I( | |||
}} | |||
Latest revision as of 06:37, 7 January 2025
| ML18010B066 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 03/26/1993 |
| From: | Vaughn G CAROLINA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-807 HO-930070, NUDOCS 9303290224 | |
| Download: ML18010B066 (11) | |
Text
ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION'BR:9303290224 DOC.DATE: 93/03/26 NOTARIZED: NO ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION AUGHNiG.E.
Carolina Power
& Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET N
05000400
SUBJECT:
Responds to NRC 930225 ltr re violations noted in insp rept 50-400/93-03.'Corrective actions:mgt
& organizational changes will provide further enhancement to EP program by shifting responsibility for conducting drills
& exercises.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR ENCL SIZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFBPT NRR/DRSS/PEPB NRR/PMAS/ILPB2 REG FIL 02 RGN2
'FILE 01 EXTERNAL: EG&G/BRYCE,J.H.
NSIC COPIES LTTR ENCL 1
1 2
2 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMEN'f CONTROL D)>V, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISmIDU'fION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 23 ENCL 23
t Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vice President Harris Nuclear Plant MAR 2 6
199'etter Number:
HO-930070 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-807 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:
In refere nce to your letter of February 25, 1993, referring to NRC Inspection Report RII:
50-400/93-03, the attached is Carolina Power and Light Company's reply to the notice of violation identified in Enclosure 1.
Thank you for your consideration in this matter.
Very truly yours, Vice President Harris Nuclear Plant MGW:kls Attachment cc:
Mr. S.
D. Ebneter (NRC-RII)
Mr. N. B. Le (NRC-NRR)
Mr. J.
E. Tedrow (NRC-SHNPP) 9303290224 93032b PDR ADQCK 05000400 8
PDR MEM/HO-930070/1/Osl (t(
t
Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-01 Re orted Violation:
10 CFR 50.54(q) states that a licensee authorized to possess and operate a
nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of appendix E to 10 CFR Part 50.
10 CFR 50.47(b)(8) requires that adequate emergency facilities and equipment to support the emergency response are provided and maintained.
Section 3..1 of the Shearon Harris Emergency
- Plan, which implements 10 CFR 50.47(b)(8), states that adequate emergency facilities, communication, and equipment to support emergency response are provided and maintained.
Section 3.5.3.b of the Shearon Harris Emergency Plan identifies Emergency
Response
Facility Information System (ERFIS)
- consoles, capable of displaying plant data,
- SPDS, and
- RMS, as Emergency Operations Facility equipment to be maintained.
PEP-402, "Maintaining Readiness of Emergency Facilities, identifies Portable Radios and Base Stations as emergency equipment.
Contrary to the above, two examples of inadequately maintained equipment were identified:
1.
=
When tested by the inspector, two of the six hand-held mobile radios maintained in the Operational Support Center (OSC) kits failed to transmit.
2.
When an operational demonstration was requested by the inspector, Emergency Operations Facility (EOF)
ERFIS terminals 1,
2, and 3 did not operate.
This is a Severity Level IV violation (Supplement VIII).
Denial or Admission:
The violation is denied.
(Example 1)
OSC emergency response personnel are taught to check equipment such as radios to ensure proper operation prior to leaving the OSC on a mission.
It is true that on the date of the NRC inspectors visit and upon examination of one of the three'SC emergency supply kits, two of the six hand-held -.radios failed to transmit due to deficient batteries.
- However, there were spare batteries available in the kit for use in the radios.
This was demonstrated at the time of the inspection.
MEM/HO-930070/2/OS1
Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 Since radio operability checks are normal practice and spare batteries were available, CP&L contends that the radios were available for use at the time of inspection.
The condition noted by the inspector is not considered a violation of the Emergency Plan or implementing procedure (PEP-402).
The cause of the two batteries not to function properly was due to memory lock on the batteries.
In order to alleviate the memory lock problem a battery manager is being purchased and batteries for the OSC radios will be rotated through the battery manager.
(Example 2)
It is true that when an operational demonstration was requested by the inspector on January 26, 1993, the EOF ERFIS terminals 1, 2, and 3 did not operate.
- First, it should be made clear that alternate means of transmitting plant operating data to the Technical Support Center (TSC) and EOF is available.
- Secondly, the problem that ultimately would cause the non-operational state noted by the inspector had been recognized on January 21,
- 1993, and a work ticket was written to correct the switcher problem.
On January 25,
- 1993, an upgrade to enhance the reliability of our ERFIS system was initiated.
The EOF equipment was operating properly on January 22 1993, and January 25,
- 1993, when checked by a member of the Harris Emergency Preparedness (EP) staff.
On the morning of January 26,
- 1993, as part of the ERFIS upgrade, the switchers were activated and since the switcher for the EOF ERFIS equipment was not functioning properly, the EOF ERFIS equipment went off line.
This was discovered at about 4 p.m.
on January 26,
- 1993, when the demonstration was requested by the inspector in the EOF.
The Specialist contacted by phone to place the EOF ERFIS equipment on line was not aware of the switcher problem.
From his look at the equipment he felt the EOF equipment should be on line.
The next morning the technician that normally works with the EOF equipment became aware of the problem, he changed switchers and had the EOF equipment back on line within 30 minutes on January 27, 1993.
The ERFIS computer is a very complex computer system with numerous remote devices subject to various perturbations which can trip various components off line.
- However, we have the ability to return these components very rapidly to an operational status by getting the proper qualified technician in the Computer Control Room to accomplish the proper line up.
The technicians are trained as part of the Emergency
Response
Organization and during emergencies or exercises are called in to perform any required adjustments in order to keep ERFIS functional.
CP&L does not consider this to be a violation in that the problem had been self-identified and the ability to rapidly place the equipment back on line by a qualified technician is available and was demonstrated.
The ERFIS upgrade is an ongoing major proj ect to improve the operation and reliability of the ERFIS system.
This fact has been noted as one of the strengths in the EP Program in the past.
- Further, the upgrade of the ERFIS will greatly enhance the system's entire capability.
The particular switcher problems have been repaired and an upgrade with new model, more reliable switchers had been identified as part of the ERFIS upgrade.
The replacement of these switchers is to be accomplished in 1993.
MEM/HO-930070/3/OS1
Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-03 Re orted Violation:
10 CFR 50.54(q) states that a licensee authorized to possess and operate a
nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
10 CFR 50, Appendix E.IV.D.2 states that signs or other measures shall also be used to disseminate to any transient population within the plume exposure pathway Emergency Planning Zone (EPZ) appropriate information that would be helpful if an accident occurs.
Section 5.2.5 of the Shearon Harris Emergency Plan states that adhesive decals are located at public telephone booths in the 10-mile EPZ to inform transients that they are in an emergency warning zone and what immediate actions to take should they hear the sirens.
Contrary to the
- above, four out of eight telephone booths surveyed by the inspector did not display the adhesive decals.
This is a Severity Level V violation (Supplement VIII).
Denial or Admission:
While the above statement is true, CPGL requests that the NRC withdraw the violation as allowed by 10CFR2 Appendix C VII B [1].
The basis for this request is (a) this condition was not one which could be expected to have been prevented by the licensee's corrective action for a previous violation, (b) corrective action was initiated prior to the end of the inspection to survey public phone booths within the 10-mile EPZ and ensure the decals were in place and (c) this was not a willfulviolation.
The public phone booth decals serve only as an enhancement to other more effective and logical means of notifying the transient population as to the meaning of sirens and what actions to take.
More realistic warning to transients would naturally come from their asking someone within the 10 mile EPZ what the sirens indicate.
The residents and businesses within the 10 mile EPZ are furnished with an Annual Emergency Preparedness Calendar with all the information concerning
- sirens, possible evacuations and turning to Emergency Broadcast Frequencies on Radio or TV.
The other most logical means of providing the information to transients is the Emergency Broadcast System which would carry information concerning the emergency or drill.
In addition to fixed sirens sounding in the event of a real emergency,"
the vehicle routes inside the 10 mile EPZ willhave emergency vehicles with flashing lights, sirens and broadcast capabilities doing route alerting which would alert the permanent and transient populations.
Efforts were underway prior to the inspection to enhance the entire program of notification of transients.
While CP&L has had a contract in force with the areas major telephone company to ensure that the decal information is placed in MEM/HO-930070/4/OS1
,~
I Attachment to NRC-807 g'
REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 all of their public telephones within the 10 mile
- EPZ, we recognize the difficulty in ensuring decal placement and preventing removal of the decals by members of the public.
CP&L is currently evaluating the basis for this commitment.
Because of the marginal value of decals and the availability of more effective means to notify the transient population during an emergency, CP&L intends to pursue a change to
'the Emergency Plan removing the commitment to have the adhesive decals located in public telephone booths throughout the 10 mile EPZ.
In conclusion, the Shearon Harris Nuclear Plant has an effective EP Program.
This is evidenced by the successful annual graded exercises conducted without NRC identified deficiencies or weaknesses for the past several years.
Recently announced management and organizational changes willprovide further enhancement to the EP Program by shifting responsibility for conducting drills and exercises, including scenario development, from the EP Organization to the Harris Training Section.
This move will allow the EP Organization to improve their focus on administration responsibilities and program compliance.
MEM/HO-930070/5/OS1
I(