ML18010B066: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18010B066
| number = ML18010B066
| issue date = 03/26/1993
| issue date = 03/26/1993
| title = Responds to NRC 930225 Ltr Re Violations Noted in Insp Rept 50-400/93-03.Corrective Actions:Mgt & Organizational Changes Will Provide Further Enhancement to EP Program by Shifting Responsibility for Conducting Drills & Exercises
| title = Responds to NRC Re Violations Noted in Insp Rept 50-400/93-03.Corrective Actions:Mgt & Organizational Changes Will Provide Further Enhancement to EP Program by Shifting Responsibility for Conducting Drills & Exercises
| author name = Vaughn G
| author name = Vaughn G
| author affiliation = CAROLINA POWER & LIGHT CO.
| author affiliation = CAROLINA POWER & LIGHT CO.
Line 12: Line 12:
| case reference number = CON-NRC-807
| case reference number = CON-NRC-807
| document report number = HO-930070, NUDOCS 9303290224
| document report number = HO-930070, NUDOCS 9303290224
| title reference date = 02-25-1993
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE
| page count = 11
| page count = 11
}}
}}
See also: [[see also::IR 05000400/1993003]]


=Text=
=Text=
{{#Wiki_filter:ACCELERATED
{{#Wiki_filter:ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
DOCUMENT DISTRIBUTION
ACCESSION'BR:9303290224 DOC.DATE: 93/03/26 NOTARIZED: NO ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION AUGHNiG.E.
SYSTEM REGULATORY
Carolina Power
INFORMATION
& Light Co.
DISTRIBUTION
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SYSTEM (RIDS)ACCESSION'BR:9303290224
DOCKET N
DOC.DATE: 93/03/26 NOTARIZED:
05000400
NO ACIL:50-400
 
Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION
==SUBJECT:==
AUGHNiG.E.
Responds to NRC 930225 ltr re violations noted in insp rept 50-400/93-03.'Corrective actions:mgt
Carolina Power&Light Co.RECIP.NAME
& organizational changes will provide further enhancement to EP program by shifting responsibility for conducting drills
RECIPIENT AFFILIATION
& exercises.
Document Control Branch (Document Control Desk)DOCKET N 05000400 SUBJECT: Responds to NRC 930225 ltr re violations
DISTRIBUTION CODE:
noted in insp rept 50-400/93-03.'Corrective
IE01D COPIES RECEIVED:LTR ENCL SIZE:
actions:mgt
TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.
&organizational
05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFBPT NRR/DRSS/PEPB NRR/PMAS/ILPB2 REG FIL 02 RGN2
changes will provide further enhancement
'FILE 01 EXTERNAL: EG&G/BRYCE,J.H.
to EP program by shifting responsibility
NSIC COPIES LTTR ENCL 1
for conducting
1 2
drills&exercises.
2 1
DISTRIBUTION
1 1
CODE: IE01D COPIES RECEIVED:LTR
1 1
ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice
1 1
of Violation Response NOTES:Application
1 1
for permit renewal filed.05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/TPAB
1 1
DEDRO NRR/DRCH/HHFBPT
1 1
NRR/DRSS/PEPB
1 1
NRR/PMAS/ILPB2
1 1
REG FIL 02 RGN2'FILE 01 EXTERNAL: EG&G/BRYCE,J.H.
1 1
NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/TTC NRR/DORS/OEAB
1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1
NRR/DRIL/RPEB
1 1
NRR/PMAS/ILPB1
1 1
NUDOCS-ABSTRACT
1 1
OGC/HDS1 RES MORISSEAU,D
1 1
NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
1 1
PLEASE HELP US fO REDUCE WASTE!CONTACT TIIE DOCUMEN'f CONTROL D)>V, ROOM Pl-37 (EXT.504-2065)TO ELIMINATE YOUR NAME FROM DISmIDU'f ION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 23 ENCL 23  
1 1
'
1 1
t Carolina Power&Light Company P.O.Box 165~New Hill, NC 27562 G.E.VAUGHN Vice President Harris Nuclear Plant MAR 2 6 199'etter Number: HO-930070 Document Control Desk United States Nuclear Regulatory
1 1
Commission
1 1
Washington, DC 20555 NRC-807 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO.50-400 LICENSE NO.NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:
1 NOTE TO ALL"RIDS" RECIPIENTS:
In refere nce to your letter of February 25, 1993, referring to NRC Inspection
PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMEN'f CONTROL D)>V, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISmIDU'fION LISTS FOR DOCUMENTS YOU DON'T NEED!
Report RII: 50-400/93-03, the attached is Carolina Power and Light Company's reply to the notice of violation identified
TOTAL NUMBER OF COPIES REQUIRED:
in Enclosure 1.Thank you for your consideration
LTTR 23 ENCL 23
in this matter.Very truly yours, Vice President Harris Nuclear Plant MGW:kls Attachment
 
cc: Mr.S.D.Ebneter (NRC-RII)Mr.N.B.Le (NRC-NRR)Mr.J.E.Tedrow (NRC-SHNPP)
t Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vice President Harris Nuclear Plant MAR 2 6
9303290224
199'etter Number:
93032b PDR ADQCK 05000400 8 PDR MEM/HO-930070/1/Osl (t(t  
HO-930070 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-807 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:
In refere nce to your letter of February 25, 1993, referring to NRC Inspection Report RII:
Attachment
50-400/93-03, the attached is Carolina Power and Light Company's reply to the notice of violation identified in Enclosure 1.
to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION
Thank you for your consideration in this matter.
REPORT NO.50-400/93-03
Very truly yours, Vice President Harris Nuclear Plant MGW:kls Attachment cc:
VIOLATION 400 93-03-01 Re orted Violation:
Mr. S.
10 CFR 50.54(q)states that a licensee authorized
D. Ebneter (NRC-RII)
to possess and operate a nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b)and the requirements
Mr. N. B. Le (NRC-NRR)
of appendix E to 10 CFR Part 50.10 CFR 50.47(b)(8)
Mr. J.
requires that adequate emergency facilities
E. Tedrow (NRC-SHNPP) 9303290224 93032b PDR ADQCK 05000400 8
and equipment to support the emergency response are provided and maintained.
PDR MEM/HO-930070/1/Osl (t(
Section3..1 ofthe Shearon Harris Emergency Plan, which implements
t
10 CFR 50.47(b)(8), states that adequate emergency facilities, communication, and equipment to support emergency response are provided and maintained.
 
Section 3.5.3.b of the Shearon Harris Emergency Plan identifies
Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-01 Re orted Violation:
Emergency Response Facility Information
10 CFR 50.54(q) states that a licensee authorized to possess and operate a
System (ERFIS)consoles, capable of displaying
nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of appendix E to 10 CFR Part 50.
plant data, SPDS, and RMS, as Emergency Operations
10 CFR 50.47(b)(8) requires that adequate emergency facilities and equipment to support the emergency response are provided and maintained.
Facility equipment to be maintained.
Section 3..1 of the Shearon Harris Emergency
PEP-402,"Maintaining
: Plan, which implements 10 CFR 50.47(b)(8), states that adequate emergency facilities, communication, and equipment to support emergency response are provided and maintained.
Readiness of Emergency Facilities, identifies
Section 3.5.3.b of the Shearon Harris Emergency Plan identifies Emergency
Portable Radios and Base Stations as emergency equipment.
 
Contrary to the above, two examples of inadequately
===Response===
maintained
Facility Information System (ERFIS)
equipment were identified:
: consoles, capable of displaying plant data,
1.=When tested by the inspector, two of the six hand-held mobile radios maintained
: SPDS, and
in the Operational
: RMS, as Emergency Operations Facility equipment to be maintained.
Support Center (OSC)kits failed to transmit.2.When an operational
PEP-402, "Maintaining Readiness of Emergency Facilities, identifies Portable Radios and Base Stations as emergency equipment.
demonstration
Contrary to the above, two examples of inadequately maintained equipment were identified:
was requested by the inspector, Emergency Operations
1.
Facility (EOF)ERFIS terminals 1, 2, and 3 did not operate.This is a Severity Level IV violation (Supplement
=
VIII).Denial or Admission:
When tested by the inspector, two of the six hand-held mobile radios maintained in the Operational Support Center (OSC) kits failed to transmit.
The violation is denied.(Example 1)OSC emergency response personnel are taught to check equipment such as radios to ensure proper operation prior to leaving the OSC on a mission.It is true that on the date of the NRC inspectors
2.
visit and upon examination
When an operational demonstration was requested by the inspector, Emergency Operations Facility (EOF)
of one of the three'SC emergency supply kits, two of the six hand-held-.radios failed to transmit due to deficient batteries.
ERFIS terminals 1,
However, there were spare batteries available in the kit for use in the radios.This was demonstrated
2, and 3 did not operate.
at the time of the inspection.
This is a Severity Level IV violation (Supplement VIII).
MEM/HO-930070/2/OS1  
Denial or Admission:
The violation is denied.
Attachment
(Example 1)
to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION
OSC emergency response personnel are taught to check equipment such as radios to ensure proper operation prior to leaving the OSC on a mission.
REPORT NO.50-400/93-03
It is true that on the date of the NRC inspectors visit and upon examination of one of the three'SC emergency supply kits, two of the six hand-held -.radios failed to transmit due to deficient batteries.
Since radio operability
: However, there were spare batteries available in the kit for use in the radios.
checks are normal practice and spare batteries were available, CP&L contends that the radios were available for use at the time of inspection.
This was demonstrated at the time of the inspection.
The condition noted by the inspector is not considered
MEM/HO-930070/2/OS1
a violation of the Emergency Plan or implementing
 
procedure (PEP-402).
Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 Since radio operability checks are normal practice and spare batteries were available, CP&L contends that the radios were available for use at the time of inspection.
The condition noted by the inspector is not considered a violation of the Emergency Plan or implementing procedure (PEP-402).
The cause of the two batteries not to function properly was due to memory lock on the batteries.
The cause of the two batteries not to function properly was due to memory lock on the batteries.
In order to alleviate the memory lock problem a battery manager is being purchased and batteries for the OSC radios will be rotated through the battery manager.(Example 2)It is true that when an operational
In order to alleviate the memory lock problem a battery manager is being purchased and batteries for the OSC radios will be rotated through the battery manager.
demonstration
(Example 2)
was requested by the inspector on January 26, 1993, the EOF ERFIS terminals 1, 2, and 3 did not operate.First, it should be made clear that alternate means of transmitting
It is true that when an operational demonstration was requested by the inspector on January 26, 1993, the EOF ERFIS terminals 1, 2, and 3 did not operate.
plant operating data to the Technical Support Center (TSC)and EOF is available.
: First, it should be made clear that alternate means of transmitting plant operating data to the Technical Support Center (TSC) and EOF is available.
Secondly, the problem that ultimately
: Secondly, the problem that ultimately would cause the non-operational state noted by the inspector had been recognized on January 21,
would cause the non-operational
: 1993, and a work ticket was written to correct the switcher problem.
state noted by the inspector had been recognized
On January 25,
on January 21, 1993, and a work ticket was written to correct the switcher problem.On January 25, 1993, an upgrade to enhance the reliability
: 1993, an upgrade to enhance the reliability of our ERFIS system was initiated.
of our ERFIS system was initiated.
The EOF equipment was operating properly on January 22 1993, and January 25,
The EOF equipment was operating properly on January 22 1993, and January 25, 1993, when checked by a member of the Harris Emergency Preparedness (EP)staff.On the morning of January 26, 1993, as part of the ERFIS upgrade, the switchers were activated and since the switcher for the EOF ERFIS equipment was not functioning
: 1993, when checked by a member of the Harris Emergency Preparedness (EP) staff.
properly, the EOF ERFIS equipment went off line.This was discovered
On the morning of January 26,
at about 4 p.m.on January 26, 1993, when the demonstration
: 1993, as part of the ERFIS upgrade, the switchers were activated and since the switcher for the EOF ERFIS equipment was not functioning properly, the EOF ERFIS equipment went off line.
was requested by the inspector in the EOF.The Specialist
This was discovered at about 4 p.m.
contacted by phone to place the EOF ERFIS equipment on line was not aware of the switcher problem.From his look at the equipment he felt the EOF equipment should be on line.The next morning the technician
on January 26,
that normally works with the EOF equipment became aware of the problem, he changed switchers and had the EOF equipment back on line within 30 minutes on January 27, 1993.The ERFIS computer is a very complex computer system with numerous remote devices subject to various perturbations
: 1993, when the demonstration was requested by the inspector in the EOF.
which can trip various components
The Specialist contacted by phone to place the EOF ERFIS equipment on line was not aware of the switcher problem.
off line.However, we have the ability to return these components
From his look at the equipment he felt the EOF equipment should be on line.
very rapidly to an operational
The next morning the technician that normally works with the EOF equipment became aware of the problem, he changed switchers and had the EOF equipment back on line within 30 minutes on January 27, 1993.
status by getting the proper qualified technician
The ERFIS computer is a very complex computer system with numerous remote devices subject to various perturbations which can trip various components off line.
in the Computer Control Room to accomplish
: However, we have the ability to return these components very rapidly to an operational status by getting the proper qualified technician in the Computer Control Room to accomplish the proper line up.
the proper line up.The technicians
The technicians are trained as part of the Emergency
are trained as part of the Emergency Response Organization
 
and during emergencies
===Response===
or exercises are called in to perform any required adjustments
Organization and during emergencies or exercises are called in to perform any required adjustments in order to keep ERFIS functional.
in order to keep ERFIS functional.
CP&L does not consider this to be a violation in that the problem had been self-identified and the ability to rapidly place the equipment back on line by a qualified technician is available and was demonstrated.
CP&L does not consider this to be a violation in that the problem had been self-identified
The ERFIS upgrade is an ongoing major proj ect to improve the operation and reliability of the ERFIS system.
and the ability to rapidly place the equipment back on line by a qualified technician
This fact has been noted as one of the strengths in the EP Program in the past.
is available and was demonstrated.
: Further, the upgrade of the ERFIS will greatly enhance the system's entire capability.
The ERFIS upgrade is an ongoing major proj ect to improve the operation and reliability
The particular switcher problems have been repaired and an upgrade with new model, more reliable switchers had been identified as part of the ERFIS upgrade.
of the ERFIS system.This fact has been noted as one of the strengths in the EP Program in the past.Further, the upgrade of the ERFIS will greatly enhance the system's entire capability.
The replacement of these switchers is to be accomplished in 1993.
The particular
MEM/HO-930070/3/OS1
switcher problems have been repaired and an upgrade with new model, more reliable switchers had been identified
 
as part of the ERFIS upgrade.The replacement
Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-03 Re orted Violation:
of these switchers is to be accomplished
10 CFR 50.54(q) states that a licensee authorized to possess and operate a
in 1993.MEM/HO-930070/3/OS1  
nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.
Attachment
10 CFR 50, Appendix E.IV.D.2 states that signs or other measures shall also be used to disseminate to any transient population within the plume exposure pathway Emergency Planning Zone (EPZ) appropriate information that would be helpful if an accident occurs.
to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION
Section 5.2.5 of the Shearon Harris Emergency Plan states that adhesive decals are located at public telephone booths in the 10-mile EPZ to inform transients that they are in an emergency warning zone and what immediate actions to take should they hear the sirens.
REPORT NO.50-400/93-03
Contrary to the
VIOLATION 400 93-03-03 Re orted Violation:
: above, four out of eight telephone booths surveyed by the inspector did not display the adhesive decals.
10 CFR 50.54(q)states that a licensee authorized
This is a Severity Level V violation (Supplement VIII).
to possess and operate a nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b)and the requirements
Denial or Admission:
of Appendix E to 10 CFR Part 50.10 CFR 50, Appendix E.IV.D.2 states that signs or other measures shall also be used to disseminate
While the above statement is true, CPGL requests that the NRC withdraw the violation as allowed by 10CFR2 Appendix C VII B [1].
to any transient population
The basis for this request is (a) this condition was not one which could be expected to have been prevented by the licensee's corrective action for a previous violation, (b) corrective action was initiated prior to the end of the inspection to survey public phone booths within the 10-mile EPZ and ensure the decals were in place and (c) this was not a willfulviolation.
within the plume exposure pathway Emergency Planning Zone (EPZ)appropriate
The public phone booth decals serve only as an enhancement to other more effective and logical means of notifying the transient population as to the meaning of sirens and what actions to take.
information
More realistic warning to transients would naturally come from their asking someone within the 10 mile EPZ what the sirens indicate.
that would be helpful if an accident occurs.Section 5.2.5 of the Shearon Harris Emergency Plan states that adhesive decals are located at public telephone booths in the 10-mile EPZ to inform transients
The residents and businesses within the 10 mile EPZ are furnished with an Annual Emergency Preparedness Calendar with all the information concerning
that they are in an emergency warning zone and what immediate actions to take should they hear the sirens.Contrary to the above, four out of eight telephone booths surveyed by the inspector did not display the adhesive decals.This is a Severity Level V violation (Supplement
: sirens, possible evacuations and turning to Emergency Broadcast Frequencies on Radio or TV.
VIII).Denial or Admission:
The other most logical means of providing the information to transients is the Emergency Broadcast System which would carry information concerning the emergency or drill.
While the above statement is true, CPGL requests that the NRC withdraw the violation as allowed by 10CFR2 Appendix C VII B[1].The basis for this request is (a)this condition was not one which could be expected to have been prevented by the licensee's
In addition to fixed sirens sounding in the event of a real emergency,"
corrective
the vehicle routes inside the 10 mile EPZ willhave emergency vehicles with flashing lights, sirens and broadcast capabilities doing route alerting which would alert the permanent and transient populations.
action for a previous violation, (b)corrective
Efforts were underway prior to the inspection to enhance the entire program of notification of transients.
action was initiated prior to the end of the inspection
While CP&L has had a contract in force with the areas major telephone company to ensure that the decal information is placed in MEM/HO-930070/4/OS1
to survey public phone booths within the 10-mile EPZ and ensure the decals were in place and (c)this was not a willful violation.
 
The public phone booth decals serve only as an enhancement
,~
to other more effective and logical means of notifying the transient population
 
as to the meaning of sirens and what actions to take.More realistic warning to transients
I Attachment to NRC-807 g'
would naturally come from their asking someone within the 10 mile EPZ what the sirens indicate.The residents and businesses
REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 all of their public telephones within the 10 mile
within the 10 mile EPZ are furnished with an Annual Emergency Preparedness
: EPZ, we recognize the difficulty in ensuring decal placement and preventing removal of the decals by members of the public.
Calendar with all the information
CP&L is currently evaluating the basis for this commitment.
concerning
Because of the marginal value of decals and the availability of more effective means to notify the transient population during an emergency, CP&L intends to pursue a change to
sirens, possible evacuations
'the Emergency Plan removing the commitment to have the adhesive decals located in public telephone booths throughout the 10 mile EPZ.
and turning to Emergency Broadcast Frequencies
In conclusion, the Shearon Harris Nuclear Plant has an effective EP Program.
on Radio or TV.The other most logical means of providing the information
This is evidenced by the successful annual graded exercises conducted without NRC identified deficiencies or weaknesses for the past several years.
to transients
Recently announced management and organizational changes willprovide further enhancement to the EP Program by shifting responsibility for conducting drills and exercises, including scenario development, from the EP Organization to the Harris Training Section.
is the Emergency Broadcast System which would carry information
This move will allow the EP Organization to improve their focus on administration responsibilities and program compliance.
concerning
MEM/HO-930070/5/OS1
the emergency or drill.In addition to fixed sirens sounding in the event of a real emergency," the vehicle routes inside the 10 mile EPZ will have emergency vehicles with flashing lights, sirens and broadcast capabilities
 
doing route alerting which would alert the permanent and transient populations.
I(}}
Efforts were underway prior to the inspection
to enhance the entire program of notification
of transients.
While CP&L has had a contract in force with the areas major telephone company to ensure that the decal information
is placed in MEM/HO-930070/4/OS1  
,~  
I Attachment
to NRC-807 g'REPLY TO A NOTICE OF VIOLATION NRC INSPECTION
REPORT NO.50-400/93-03
all of their public telephones
within the 10 mile EPZ, we recognize the difficulty
in ensuring decal placement and preventing
removal of the decals by members of the public.CP&L is currently evaluating
the basis for this commitment.
Because of the marginal value of decals and the availability
of more effective means to notify the transient population
during an emergency, CP&L intends to pursue a change to'the Emergency Plan removing the commitment
to have the adhesive decals located in public telephone booths throughout
the 10 mile EPZ.In conclusion, the Shearon Harris Nuclear Plant has an effective EP Program.This is evidenced by the successful
annual graded exercises conducted without NRC identified
deficiencies
or weaknesses
for the past several years.Recently announced management
and organizational
changes will provide further enhancement
to the EP Program by shifting responsibility
for conducting
drills and exercises, including scenario development, from the EP Organization
to the Harris Training Section.This move will allow the EP Organization
to improve their focus on administration
responsibilities
and program compliance.
MEM/HO-930070/5/OS1  
I(
}}

Latest revision as of 06:37, 7 January 2025

Responds to NRC Re Violations Noted in Insp Rept 50-400/93-03.Corrective Actions:Mgt & Organizational Changes Will Provide Further Enhancement to EP Program by Shifting Responsibility for Conducting Drills & Exercises
ML18010B066
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 03/26/1993
From: Vaughn G
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-807 HO-930070, NUDOCS 9303290224
Download: ML18010B066 (11)


Text

ACCELERATED DOCUMENT DISTRIBUTIONSYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION'BR:9303290224 DOC.DATE: 93/03/26 NOTARIZED: NO ACIL:50-400 Shearon Harris Nuclear Power Plant, Unit 1, Carolina AUTH.NAME AUTHOR AFFILIATION AUGHNiG.E.

Carolina Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET N

05000400

SUBJECT:

Responds to NRC 930225 ltr re violations noted in insp rept 50-400/93-03.'Corrective actions:mgt

& organizational changes will provide further enhancement to EP program by shifting responsibility for conducting drills

& exercises.

DISTRIBUTION CODE:

IE01D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES:Application for permit renewal filed.

05000400 RECIPIENT ID CODE/NAME PD2-1 PD INTERNAL: ACRS AEOD/DSP/TPAB DEDRO NRR/DRCH/HHFBPT NRR/DRSS/PEPB NRR/PMAS/ILPB2 REG FIL 02 RGN2

'FILE 01 EXTERNAL: EG&G/BRYCE,J.H.

NSIC COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME LE,N AEOD/DEIB AEOD/TTC NRR/DORS/OEAB NRR/DRIL/RPEB NRR/PMAS/ILPB1 NUDOCS-ABSTRACT OGC/HDS1 RES MORISSEAU,D NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US fO REDUCE WASTE! CONTACT TIIE DOCUMEN'f CONTROL D)>V, ROOM Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISmIDU'fION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 23 ENCL 23

t Carolina Power & Light Company P.O. Box 165 ~ New Hill,NC 27562 G.E. VAUGHN Vice President Harris Nuclear Plant MAR 2 6

199'etter Number:

HO-930070 Document Control Desk United States Nuclear Regulatory Commission Washington, DC 20555 NRC-807 SHEARON HARRIS NUCLEAR POWER PLANT DOCKET NO. 50-400 LICENSE NO. NPF-63 REPLY TO A NOTICE OF VIOLATION Gentlemen:

In refere nce to your letter of February 25, 1993, referring to NRC Inspection Report RII:

50-400/93-03, the attached is Carolina Power and Light Company's reply to the notice of violation identified in Enclosure 1.

Thank you for your consideration in this matter.

Very truly yours, Vice President Harris Nuclear Plant MGW:kls Attachment cc:

Mr. S.

D. Ebneter (NRC-RII)

Mr. N. B. Le (NRC-NRR)

Mr. J.

E. Tedrow (NRC-SHNPP) 9303290224 93032b PDR ADQCK 05000400 8

PDR MEM/HO-930070/1/Osl (t(

t

Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-01 Re orted Violation:

10 CFR 50.54(q) states that a licensee authorized to possess and operate a

nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of appendix E to 10 CFR Part 50.

10 CFR 50.47(b)(8) requires that adequate emergency facilities and equipment to support the emergency response are provided and maintained.

Section 3..1 of the Shearon Harris Emergency

Plan, which implements 10 CFR 50.47(b)(8), states that adequate emergency facilities, communication, and equipment to support emergency response are provided and maintained.

Section 3.5.3.b of the Shearon Harris Emergency Plan identifies Emergency

Response

Facility Information System (ERFIS)

consoles, capable of displaying plant data,
SPDS, and
RMS, as Emergency Operations Facility equipment to be maintained.

PEP-402, "Maintaining Readiness of Emergency Facilities, identifies Portable Radios and Base Stations as emergency equipment.

Contrary to the above, two examples of inadequately maintained equipment were identified:

1.

=

When tested by the inspector, two of the six hand-held mobile radios maintained in the Operational Support Center (OSC) kits failed to transmit.

2.

When an operational demonstration was requested by the inspector, Emergency Operations Facility (EOF)

ERFIS terminals 1,

2, and 3 did not operate.

This is a Severity Level IV violation (Supplement VIII).

Denial or Admission:

The violation is denied.

(Example 1)

OSC emergency response personnel are taught to check equipment such as radios to ensure proper operation prior to leaving the OSC on a mission.

It is true that on the date of the NRC inspectors visit and upon examination of one of the three'SC emergency supply kits, two of the six hand-held -.radios failed to transmit due to deficient batteries.

However, there were spare batteries available in the kit for use in the radios.

This was demonstrated at the time of the inspection.

MEM/HO-930070/2/OS1

Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 Since radio operability checks are normal practice and spare batteries were available, CP&L contends that the radios were available for use at the time of inspection.

The condition noted by the inspector is not considered a violation of the Emergency Plan or implementing procedure (PEP-402).

The cause of the two batteries not to function properly was due to memory lock on the batteries.

In order to alleviate the memory lock problem a battery manager is being purchased and batteries for the OSC radios will be rotated through the battery manager.

(Example 2)

It is true that when an operational demonstration was requested by the inspector on January 26, 1993, the EOF ERFIS terminals 1, 2, and 3 did not operate.

First, it should be made clear that alternate means of transmitting plant operating data to the Technical Support Center (TSC) and EOF is available.
Secondly, the problem that ultimately would cause the non-operational state noted by the inspector had been recognized on January 21,
1993, and a work ticket was written to correct the switcher problem.

On January 25,

1993, an upgrade to enhance the reliability of our ERFIS system was initiated.

The EOF equipment was operating properly on January 22 1993, and January 25,

1993, when checked by a member of the Harris Emergency Preparedness (EP) staff.

On the morning of January 26,

1993, as part of the ERFIS upgrade, the switchers were activated and since the switcher for the EOF ERFIS equipment was not functioning properly, the EOF ERFIS equipment went off line.

This was discovered at about 4 p.m.

on January 26,

1993, when the demonstration was requested by the inspector in the EOF.

The Specialist contacted by phone to place the EOF ERFIS equipment on line was not aware of the switcher problem.

From his look at the equipment he felt the EOF equipment should be on line.

The next morning the technician that normally works with the EOF equipment became aware of the problem, he changed switchers and had the EOF equipment back on line within 30 minutes on January 27, 1993.

The ERFIS computer is a very complex computer system with numerous remote devices subject to various perturbations which can trip various components off line.

However, we have the ability to return these components very rapidly to an operational status by getting the proper qualified technician in the Computer Control Room to accomplish the proper line up.

The technicians are trained as part of the Emergency

Response

Organization and during emergencies or exercises are called in to perform any required adjustments in order to keep ERFIS functional.

CP&L does not consider this to be a violation in that the problem had been self-identified and the ability to rapidly place the equipment back on line by a qualified technician is available and was demonstrated.

The ERFIS upgrade is an ongoing major proj ect to improve the operation and reliability of the ERFIS system.

This fact has been noted as one of the strengths in the EP Program in the past.

Further, the upgrade of the ERFIS will greatly enhance the system's entire capability.

The particular switcher problems have been repaired and an upgrade with new model, more reliable switchers had been identified as part of the ERFIS upgrade.

The replacement of these switchers is to be accomplished in 1993.

MEM/HO-930070/3/OS1

Attachment to NRC-807 REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 VIOLATION 400 93-03-03 Re orted Violation:

10 CFR 50.54(q) states that a licensee authorized to possess and operate a

nuclear power reactor shall follow and maintain in effect an emergency plan which meets the standards in 10 CFR 50.47(b) and the requirements of Appendix E to 10 CFR Part 50.

10 CFR 50, Appendix E.IV.D.2 states that signs or other measures shall also be used to disseminate to any transient population within the plume exposure pathway Emergency Planning Zone (EPZ) appropriate information that would be helpful if an accident occurs.

Section 5.2.5 of the Shearon Harris Emergency Plan states that adhesive decals are located at public telephone booths in the 10-mile EPZ to inform transients that they are in an emergency warning zone and what immediate actions to take should they hear the sirens.

Contrary to the

above, four out of eight telephone booths surveyed by the inspector did not display the adhesive decals.

This is a Severity Level V violation (Supplement VIII).

Denial or Admission:

While the above statement is true, CPGL requests that the NRC withdraw the violation as allowed by 10CFR2 Appendix C VII B [1].

The basis for this request is (a) this condition was not one which could be expected to have been prevented by the licensee's corrective action for a previous violation, (b) corrective action was initiated prior to the end of the inspection to survey public phone booths within the 10-mile EPZ and ensure the decals were in place and (c) this was not a willfulviolation.

The public phone booth decals serve only as an enhancement to other more effective and logical means of notifying the transient population as to the meaning of sirens and what actions to take.

More realistic warning to transients would naturally come from their asking someone within the 10 mile EPZ what the sirens indicate.

The residents and businesses within the 10 mile EPZ are furnished with an Annual Emergency Preparedness Calendar with all the information concerning

sirens, possible evacuations and turning to Emergency Broadcast Frequencies on Radio or TV.

The other most logical means of providing the information to transients is the Emergency Broadcast System which would carry information concerning the emergency or drill.

In addition to fixed sirens sounding in the event of a real emergency,"

the vehicle routes inside the 10 mile EPZ willhave emergency vehicles with flashing lights, sirens and broadcast capabilities doing route alerting which would alert the permanent and transient populations.

Efforts were underway prior to the inspection to enhance the entire program of notification of transients.

While CP&L has had a contract in force with the areas major telephone company to ensure that the decal information is placed in MEM/HO-930070/4/OS1

,~

I Attachment to NRC-807 g'

REPLY TO A NOTICE OF VIOLATION NRC INSPECTION REPORT NO. 50-400/93-03 all of their public telephones within the 10 mile

EPZ, we recognize the difficulty in ensuring decal placement and preventing removal of the decals by members of the public.

CP&L is currently evaluating the basis for this commitment.

Because of the marginal value of decals and the availability of more effective means to notify the transient population during an emergency, CP&L intends to pursue a change to

'the Emergency Plan removing the commitment to have the adhesive decals located in public telephone booths throughout the 10 mile EPZ.

In conclusion, the Shearon Harris Nuclear Plant has an effective EP Program.

This is evidenced by the successful annual graded exercises conducted without NRC identified deficiencies or weaknesses for the past several years.

Recently announced management and organizational changes willprovide further enhancement to the EP Program by shifting responsibility for conducting drills and exercises, including scenario development, from the EP Organization to the Harris Training Section.

This move will allow the EP Organization to improve their focus on administration responsibilities and program compliance.

MEM/HO-930070/5/OS1

I(