ML18016A433: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 1: Line 1:
{{Adams
#REDIRECT [[IR 05000272/2018403]]
| number = ML18016A433
| issue date = 01/16/2018
| title = Information Request for the Cyber-Security Inspection, Notification to Perform Inspection 05000272/2018403 and 05000311/2018403
| author name = Dentel G
| author affiliation = NRC/RGN-I/DRS/EB2
| addressee name = Sena P
| addressee affiliation = PSEG Nuclear, LLC
| docket = 05000272, 05000311
| license number = DPR-070, DPR-075
| contact person =
| document report number = IR 2018403
| document type = Letter
| page count = 8
}}
See also: [[see also::IR 05000272/2018403]]
 
=Text=
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I 2100 RENAISSANCE BLVD., SUITE 100
KING OF PRUSSIA, PA  19406
-2713    January 16, 2018
  Mr. Peter P. Sena, III
President and Chief Nuclear Officer
PSEG Nuclear LLC
- N09 P.O. Box 236
Hancocks Bridge, NJ 08038
  SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND 2
- INFORMATION REQUEST FOR THE "CYBER-SECURITY" INSPECTION , NOTIFICATION TO PERFORM INSPECTION 05000 272/2018 40 3 AND 0 5000311/201 8403  Dear Mr. Sena:  On June 4, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin
a team inspection in accordance with Inspection Procedure (IP)
71130.10 P , "Cyber-Security ," issued May 15, 2017 , at your Salem Nuclear Generating Stations, Units 1 and 2
(Salem).  Th e inspection will be performed to evaluate and verify your ability to meet full implementation
requirements of the
NRC's Cyber
-Security Rule, Title
10 of the Code of Federal Regulations
(CFR), Part
73, Section 54, "Protection of Digital Computer and Communication Systems and Networks."
  The onsite portion of the inspection will take place during the weeks of
June 4-8, 2018, and  June 18-22, 2018.  Experience has shown that team inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection.  These documents have b
een divided into four groups.  The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., "sample set"
) to be inspected by the cyber
security inspection
procedure.  This information should be made available via compact disc and delivered to the regional office no later than March 12, 2018.  The inspection team will review this information and, by April 9 , 2018, will request the specific items that should be provided for review
.  The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs), defensive architecture, and the areas of your plant's Cyber
Security Program
selected for the cyber
security inspection.  This information will be requested for review in the regional office prior to the inspection by
May 7, 2018.  The third group of
requested documents consists of those items that the
inspection team will review, or need access to, during the inspection.  Please have this information available by the first day of the onsite inspection, June 4, 2018.
P. Sena 2  The four th group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection.  It is requested that this information be provided to the
lead inspector as the information is generated during the inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.
  The lead inspector for this inspection is Mr. David Werkheiser.  We understand that our regulatory contact for this inspection
is Mr. Thomas Cachaza of your organization, at Salem.  If there are any questions about the inspection or the material requested, please contact the lead inspector at
610-337-5316 or via e-mail at David.Werkheiser@nrc.gov
.  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995
(44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, control number 3150
-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget control number.
  This letter and its enclosure will be available
for public inspection and copying at
http://www.nrc.gov/reading
-rm/adams.html
and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exe
mptions, Requests for Withholding."
  Sincerely,        /RA/    Glenn T. Dentel , Chief  Engineering Branch
2 Division of Reactor Safety
  Docket No s.  50-272 and 50-311 License No
s.  DPR-70 and DPR
-75  Enclosure: Salem Nuclear Generating Stations, Units 1 and 2
Cyber-Security    Inspection Document Request
  cc w/encl:
  Distribution via ListServ
 
P. Sena 3  SUBJECT: SALEM NUCLEAR GENERATING STATION, UNIT NOS. 1 AND
- INFORMATION REQUEST FOR THE "CYBER SECURITY" INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000244/
2018403 DATED JANUARY 16, 2018  DISTRIBUTION: (via email)
DLew, ORA  DCollins, ORA
  DPelton, DRP
MGray, DRP
    JYerokun, DRS
  BWelling, DRS
  FBower, DRP
RBarkley, DRP
MDraxton, DRP
PFinney, DRP, SRI 
AZiedonis, DRP, RI
COtt, DRP, AA
JBowen, RI, OEDO 
RidsNrrPMSalem Resource
RidsNrrDorlLpl1 Resource
ROPreports Resource    DOCUMENT NAME:
G:\DRS\Engineering Branch 2
\Werkheiser
\2-Cyber\2018-Salem 2018403
\Salem-CyberFI_120d RFI Letter.docx
ADAMS ACCESSION NUMBER:
  ML18016A433  SUNSI Review
  Non-Sensitive  Sensitive  Publicly Available
  Non-Publicly Available
  OFFICE RI/DRS RI/DRS    NAME DWerkheiser
GDentel    DATE 1/16/18 1/16/18    OFFICIAL RECORD CO
PY     
SALEM NUCLEAR GENERATING STATIONS, UNITS
1 AND 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  1  Enclosure  Inspection Report
: 05000272/2018403 and 05000311/2018403
  Inspection Dates
: June 4 - 8, 2018, and June 18 - 22, 2018  Inspection Procedure
: IP 71130.10 P , "Cyber-Security ," Issue Date May 15, 2017
  Reference: Guidance Document for Development of the Request for Information (RFI) and Notification Letter for Full
-Implementation of the Cyber Security Inspection , Issue Date May 25, 2017
  NRC Inspector s: David Werkheiser, Lead Eugene DiPaolo
610-337-5316 610-337-6959 David.Werkheiser@nrc.gov
Eugene.DiPaolo@nrc.gov  NRC Contractors
: Fredrick Priester
Cynthia DeBisschop
301-230-4590 301-287-3710 Fredrick.Priester@nrc.gov Cynthia.DeBisschop
                                                            @nrc.gov  NRC Observers: Michael Brown
301-287-3679 Michael.Brown@nrc.gov  I. Information Requested for In
-Office Preparation
The initial request for information (i.e., first RFI) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber Security Program (CSP) elements to develop a site
-specific inspection plan. 
The first RFI is used to identify the list of critical systems and critical digital assets
(CSs/CDAs) plus operational and management (O&M) security control portions of the CSP to be chosen as the "sample set" required to be inspected
by the cyber security IP.  The first RFI
's requested information is specified below in Table RFI #1.  The Table RFI #1 information is requested to be provided
to the regional office
by March 12 , 2018, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks
.  The inspection team
will examin e the returned documentation from the first RFI
and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow
-up request to develop the second RFI.  The inspection team will submit
the specific systems and equipment
list to your staff by April 9, 2018, which will identify the specific systems and equipment that
will be utilized to evaluate the CSs/CDAs, defensive architecture, and the areas of the licensee's CSP selected for the cyber
security inspection.  We request that the additional information provided from the second RFI be made available to the regional office by May 7, 2018
.   
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  2  The information requested for the first RFI is identified in Table
RFI #1.  All requested information shall follow the Table RFI #
1 and the guidance document referenced above.      The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by March 12, 2018.  Please provide four copies of each CD submitted (i.e., one for each inspector/cont
ractor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a
CD.  The se CDs should be indexed and hyper
-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
  Table RFI #1 Reference Section 3, Paragraph Number/Title:
Items 1 List All Identified Critical Systems and Critical Digital Assets
All 2 List CDA Facility and Site Ethernet
- Transmission Control Protocol/Internet Protocol (TCP/IP)
Based Local Area Networks (LANs) and
Identify Those LAN's
That Have N on-CDAs O n Them All 3 List CDA Facility and
Site N on-Ethernet TCP/IP
Based LANs
Including Those Industrial
Networks and
Identify LANs
That Have N on-CDAs O n Them All 4 Network Topology Diagrams (Be Sure To Include all Network Intrusion Detection Systems (NIDS) and Security Information and Event Management (SIEMs) for Emergency Preparedness (EP) networks and Security Level 3 and 4 Networks)
All 8 List All Network Security Boundary Devices for EP Networks and All Network Security Boundary Devices for Levels 3 and 4
All 9 List CDA Wireless Industrial
Networks All 11 NIDS Documentation for Critical Systems That Have CDAs Associated with Them 11.a.1) 11.a.2) 12 SIEM Documentation for Critical systems That Have CDAs Associated with Them 12.a.1) 12.a.2) 14 List EP and Security Onsite and Offsite Digital Communication
Systems All 25 Cyber Security Assessment and Cyber
Security Incident Response Teams All  In addition to the above information
please provide the following:
  (1) Electronic copy of your current Cyber Security Plan.
  (2) Electronic copy of summary of changes (if any), including any 10 CFR 50.54p analysis to support those changes, made to the originally approved Cyber Security Plan.
  (3) Electronic copy of a matrix that summarizes what controls are in place to satisfy the controls required by Policies and Procedures.
(4) Electronic copy of the Updated Final Safety Analysis Report and technical specifications.
 
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  3 (5) Name(s) and phone numbers for the regulatory and technical contact
s.  (6) Current management and engineering organizational chart
s.  Based on th is information
, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and will submit a list of specific systems and equipment
to your staff by April 9, 2018
, for the second RFI
(i.e., Table RFI #2).  II. Additional Information Requested to be Available Prior to Inspection.
  As stated above, in Section I. of this enclosure , th e inspection team
will examin e the returned documentation requested from Table RFI #1 and will submit the list of specific systems and equipment
to your staff by April 9, 2018
, for the second RFI (i.e., RFI #2).  The second RFI will request additional information required to evaluate the CSs
/CDAs, defensive architecture, and the areas of your station's
CSP selected for the cyber
-security inspection.  The additional information requested for the specific systems and equipment is identified in Table
RFI #2.  All requested information shall follow the Table RFI #2 and the guidance document referenced above.
  The Table RFI #2 information shall be provided on CD to the lead inspector by
May 7, 2018.  Please provide four copies of each CD submitted (i.e., one for each inspector/contractor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a CD.  These CDs should be indexed and hyper
-linked to facilitate
ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
  Table RFI #2 Section 3, Paragraph Number/Title:
Items 5 Plant Computer System Block Diagram (If Plant Computer System Is Selected for Inspection)
All 6 Plant Security System Block Diagram (If Security Computer System Is Selected for Inspection)
All 7 Systems That Are Distributed Block Diagrams (For Systems Selected For Inspection)
All 10 Host-Based Intrusion Detection System Documentation (For
CDAs for Systems Selected for Inspection)
10.a.1) 10.a.2) 13 List all Maintenance and Test Equipment Used On CDAs for Systems Selected for Inspection All 15 Configuration Management
All 16 Supply Chain Management
16.a. 16.b.1) 16.b.5) 16.b.6) 17 Portable Media and Mobile Device Control
All 18 Software Management
All 20 Vendor Access and Monitoring
All 
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  4 Table RFI #2 Section 3, Paragraph Number/Title:
Items 21 Work Control
All 22 Device Access and Key Control
All 23 Password/Authenticator Policy
All 24 User Account/Credential Policy
All 26 Corrective Actions Since Last NRC Inspection
All  In addition to the above information please provide the following:
  (1) The documented CSP assessment and analysis for each CDA in each of the selected system
s.  III. Information Requested to be Available on First Day of Inspection
  For the specific systems and equipment identi fied in this enclosure's Section I I., provide the following RFI (i.e., Table 1 ST Week Onsite
) on a CD by June 4, 2018 , the first day of the inspection
.  All request
ed information shall follow the Table 1 ST Week Onsite and the guidance document
referenced above.
  Please provide four copies of each CD submitted (i.e., one for each inspector/contractor).  The preferred file format for all lists is a searchable Excel spreadsheet file on a CD.  The se CDs should be indexed and hyper
-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.
  Table 1 ST Week Onsite
Section 3, Paragraph Number/Title:
Items 10 Host-Based Intrusion Detection System Documentation
for CDAs for systems selected for inspection
10.a.3) thru 10.a.12) 11 NIDS Documentation
for Critical Systems That Have CDAs Associated with T
hem 11.a.3) thru 11.a.15) 12 SIEM Documentation
for Critical Systems That Have CDAs Associated with T
hem 12.a.3) thru 12.a.14) 16 Supply Chain Management
16.b.2) 16.b.3) 16.b.4) 19 Cyber Security Event Notifications
All  In addition to the above information
please provide the following:
 
SALEM NUCLEAR GENERATING STATIONS, UNITS 1 AN
D 2 CYBER-SECURITY INSPECTION DOCUMENT REQUEST
  5 (1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access
to them:  a. Original Final Safety Analysis Report Volumes;
  b. Original Safety Evaluation Report and Supplements;
  c. Final Safety Analysis Report Question and Answers;
  d. Quality Assurance (QA) Plan;
  e. Latest Individual Plant Examination for External Events / Probabilistic Risk Assessment Report; and
  f. Vendor Manuals.
  (2)  Assessment
and Corrective Actions:
  a. The most recent Cyber Security QA audit and/or self
-assessment; and
  b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate
d as a result of the most recent Cyber Security QA audit and/or self
-assessment.
  I V. Information Requested
To Be Provided Throughout the Inspection
  (1) Copies of any corrective action documents generated as a result of the inspection team's questions or queries during th
e inspection.
  (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provide
d daily during the inspection to each inspection team member).
  If you have any questions regarding the information requested, please contact the inspection team leader.
}}

Latest revision as of 06:00, 7 January 2025