ML18041A073: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML18041A073
| number = ML18041A073
| issue date = 07/27/1999
| issue date = 07/27/1999
| title = Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2.
| title = Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2
| author name = Brombach T, Mcclain E, Perkins G
| author name = Brombach T, Mcclain E, Perkins G
| author affiliation = NIAGARA MOHAWK POWER CORP.
| author affiliation = NIAGARA MOHAWK POWER CORP.
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:NIAGARA MOHAWK POWER CORPORATION SECOND TKN YEAR INTERVAL INSKRVICE INSPECTION PROGRAM PLAN FOR NINE MILKPOINT NUCLEA.R POWER STATION - UNIT 2 CONTROLLED DOCUMENT NO.
{{#Wiki_filter:}}
NMP2-IS I-006 Revision I Effective JULY 31, 1999 Prepared by:
E. L. Clain, ASME Section  XIPrograms Reviewed by:
l                                  g z71)q T. W. Br    bach,  SME Section XIPrograms Approved by:
G. R. Perkins, Supervisor; ASME Section X Programs Approved by:
7-P7- 0 W. R. Yaeger    Manag, Engineering  Services 9908050'106 990730 PDR  ADQCK 050004i0 8              PDR
 
1f 7!"
tk )
  ~  +<    e r
A+    .L~J    .,g J>
ll N
I A
al l egglp r'Ld(' 'f    14 a
c'.'>'A
                .                r
                                          '0
 
TABLE OF CONTENTS NMP2-ISI-006 Rev.1
 
==1.0        INTRODUCTION==
 
1.1        NONMANDATORYAPPENDIX F ...
1.1.1      ARTICLE F-2000: INSPECTION PLAN CONTENTS l.l.l.l    SUBARTICLE F-2100; BACKGROUND AND INTRODUCTION 1.1.1.1.1  CONSTRUCTION CODES USED..
1.1.1.1.2  DATES OF INSPECTION PERIODS AND INTERVALS.....
1.1.1.1.3  SECTION XI EDITION AND ADDENDA 1.1.1.1.4  CODE CLASSIFICATIONOF COMPONENTS AND SYSTEM BOUNDARIES 1.1.1.1.4.1 SPECIHC RULES FOR CLASSIFICATION 1.1.1.1.4.2 LIST OF SYSTEMS AND IDENTIFICATIONOF ACRONYMS....
1.1.1.1.4.3 PIPING AND INSTRUMENTATIONDIAGRAMS (P&IDs) SHOWING CLASSIHCATIONBOUNDARIES .....
1.1.1.1.5 
 
==SUMMARY==
TABLES .............
1.1.1.1.6  NAMES. SIGNATURES, AND COMPANY AFFILIATIONSOF PREPARERS AND APPROVERS          ..
1.1.1.2    SUBARTICLE F-2200:
 
==SUMMARY==
OF CHANGES IN UPDATED INSPECTION PLANS 1.1.1.2.1  LISTING OF NEW OR REVISED PROCEDURES...,
1  1  1 2 " CHANGES IN EXEMPTIONS, SAMPLES. EXAMNATlONS.OR TESTS 1.1.1,2.3  SUCCESSIVE, INSPECTIONS REQUIRED BY IWB-2420. IWC-2420, IWE-2420, OR IWF-2420 1.1.1.2A    CHANGES IN SUBSTITUTE EXAMINATIONSOR TESTS OF F-3000.
1.1.1.3    SUBARTICLE F-2300, APPLICABLEDOCUMENTS 11,1.4    SUBARTICLE F-2400, CODE SUBSECTIONS 1.1.1.4.1  SUBSECTION IWAGENERAL REQUIREMENTS 1.1.1.4.2  SUBSECTION IWB REQUIREMENTS FOR CLASS      1 COMPONENTS OF LIGHT WATER COOLED POWER PLANTS I.l.lA.3    SUBSECTION IWC REQUIREMENTS FOR CLASS 2 COMPONENTS OF LIGHT WATER COOLED POWER PLANTS 1.1.1.4.4  SUBSECTION IWD REQUIREMENTS FOR CLASS 3 COMPONENTS OF LIGHT WATER COOLED POWER PLANTS 1.1.1.4.5  SUBSECTION IWE REQUIREMENTS FOR CLASS MC AND METALLIC        ~~      OF CLASS CC COMPONENTS OF LIGHT WATER COOLED POWER    PLANTS....
1.1.1.4.6  SUBSECTION IWF REQUIREMENTS FOR CLASS l.2. 3, and MC COMPONENT SUPPORTS      OF LIGHT WATER COOLED POWER PLANTS 1.1.1.4.7  SUBSECTION IWP INSERVICE TESTING OF PUMPS IN NUCLEAR POWER PLANTS 1.1.1  A.8 SUBSECTION IWVINSERVICE TESTING OF VALVES lN NUCI.EAR POWER PLANTS 1.1.1.5    SUBARTICLE F-2500. DETAILEDCONTENTS 1.1.1.5.1  DRAWINGS SHOWING COMPONENTS TO BE EXAMINED.
1.1.1.5.2  SPECIFIC EXEMPTIONS APPLIED TO EACH S YSTEM.
'  1.1.1.5.3 1.1.1.5.4 1.1.1.5.5 LINE LISTS FOR EACH SYSTEM.
TABLES THAT PROVIDE DETAILS OF EXAMINATIONS LIST OF CALIBRATIONBLOCKS NMP2-ISI406 Rev.1                                  i ofiv
 
1.1.1.5,6    LIST OF EQUATION AND TEST PROCEDURES 1.1.2        ARTICLE F-3000; SUBSTITUTE EXAMINATIONSOR TESTS 1,1.3        APPENDIX F SUPPLEMENTS 1.1.3.1      SUPPLEMENT  1
                                - CONTENTS OF IWB. IWC. IWD. IWE. AND IWL TABLES.
1.1.3,1.1    IDENTIFICATIONOF SYSTEMS IN SYSTEM-BY-SYSTEM ORDER.
1.1.3.1.2    CODE CLASSIFICATION 1.1.3.1.3    EXAMINATIONCATEGORY AND ITEM NUMBER.
1.1.3. L4    INDIVIDUALCOMPONENTS AND WELDS SELECTED FOR EXAMINATIONSOR TESTS...,,,    ..
1.1.3.
 
==1.5    REFERENCES==
TO DRAWINGS LOCATING WELDS AND COMPONENTS ...
1.1.3.1,6    TEST OR EXAMINATIONMETHODS .,
1.1,3.1.7    CAI.IBRATIONBLOCKS ..
1.1.3.
 
==1.8    REFERENCES==
TO PROCEDURES USED..
1.1.3.1.9    EXAMINATIONOR TEST SCHEDULES        .
1.1.3.1.10  REFERENCES TO SECTION XI REQUIREMENTS THAT ARE NOT BEING SATISFIED, AND IDENTIFICATIONOF SUBSTITUTE EXAMINATIONSOR TESTS .................
2.0            ASME BOILER AND PRESSURE VESSEL CODE REQUIREMENTS 2.1            SECTION XI OF THE ASME BOILER AND PRESSURE VESSEL CODE 2.1.1          ASME CODE CLASS    1 PIPE WELDS ..
ASME CODE CLASS 2 PIPE WELDS 2.1.3          ASME CODE CLASS 3 INTEGRAL ATTACHMENTSAND PRESSURE RETAINING BOUNDARY.......
2,1.4          DEFERRED INCLUSION OF SUBSECTIONS IWE AND IWL      ..
2.1.5          EXCLUSION OF SUBSECTION IWF.
2.1.6          ASME SECTION XI CODE CASES 3.0            AUGMENTED EXAMINATIONS                                            t.
3.1            COMMITMENTS MADE TO THE REGULATORS IN THE FSAR AND AS UPDATED IN THE USAR.......
3.1.1          BREAK EXCLUSION REGIONS 3.1.2        ~ NUREG4313 Rcv. 2 3.1.3          NUREG4619.
3.2            REGULATORY GUIDES 3.2.1          REGULATORYGUIDE 126.
3.2.2          REGULATORYGUIDE 1.147.
3.2.3'.3 REGULATORY GUIDE 1.150.
RECOMMI..NDATIONSOF THE NSSS SUPPLIER 3,4            COMMITMENTSMADE TO NRC PURSUANT TO BWR VESSEL & INTERNALS PROJECT 3.5            INSTITUTE FOR NUCLEAR POWER OPERATIONS RECOMMENDATIONS...
3.6            USNRC OFFICE OF INSPECTION AND ENFORCEMENT BULLETINS 3.7            USNRC INFORMATIONNOTICES 4.0            INSERVICE INSPECTION BOUNDARIES 4.1            PIPING & INSTRUMENTATIONDRAWINGS (P&IDs) ..
NMP24SI406 Rev.1                                          ii ofiv
 
EXEMPTIONS, CLASS    1  VOLUMETRICAND SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS CLASS 2 VOLUMETRICOR SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS 4'>21      STANDBY GAS TREATMENT SYSTEM (GTS) 4.2.3      CLASS 3 EXEMPTIONS 4.2.4      APPLICABILITYOF CLASS 2 PRESSURE/TEMPERATURE EXEMPTIONS (Table 4.2-4) Class 2 System Portions Exempt Due to Operating Temperature and Pressure.
5.0        BASES OF SAMPLE SELECTION AND FREQUENCIES OF EXAMINATION 5.1        FREQUENCY OF EXAMINATIONS, FREQUENCY CODES 5.3        INTERVALDISTRIBUTION, 5.4        MULTIPLECOMPONENT CONCEPT 5.5        CLASS    1 EXAMINATIONBASES 5.5.1      EXAMINATIONCATEGORY B-A. PRESSURE RETAINING WELDS IN REACTOR VESSEL 5.5.2      EXAMINATIONCATEGORY B-B - PRESSURE-RETAINING WELDS IN VESSELS OTHER THAN REACTOR VESSELS 5.5,3      EXAMINATIONCATEGORY B-D, FULL PENETRATION WELDS OF NOZZLES IN VESSELS - INSPECTION PROGRAM B............
5.5.4      CATEGORY B-E, PRESSURE RETAININGPARTIAL PENETRATION WELDS IN VESSELS 5.5.5      CATEGORY B-F, PRESSURE RETAININGDISSIMILARMETALWELDS IN VESSEL NOZZLES .......
5.5.6      CATEGORY B&-1, PRESSURE RETAININGBOLTING, GREATER THAN 2 in. IN DIAMETER.
5.5.7      CATEGORY B&-2, PRESSURE RETAININGBOLTING, 2 in. AND LESS IN DIAMETER 5.5.8      CATEGORY B-H, INTEGRALATTACHMENTSFOR VESSELS..
5.5.9      CATEGORY B-J, PRESSURE        RETAISG WELDS IN PIPING.
5.5.10      CATEGORY B-K-1, INTEGRALATTACHMENTFOR PIPING, PUMPS AND VALVES 5.5,1 1    CATEGORY B-L-1. PRESSURE RETAINING WELDS IN PUMP CASINGS 5,5.12      CATEGORY B-L-2. PUMP CASINGS 5,5.13      CATEGORY B-M-I, PRESSURE RE1 AINING WELDS Ihl VALVl BODIIrS 5.5,14      CATEGORY B-M-2, VALVEBODIES 5.5.15      CATEGORY B-N-I, INTERIOR OF REACTOR VESSEL, 5.5.16      CATEGORY B-N-2. INTEGRALLYWELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTSTO REACTOR VESSELS 5.5.17      CATEGORY B-N-3, REMOVABLECORE SUPPORT STRUCTURES 5.5.18      CATEGORY BW, PRESSURE RETAINING WELDS IN CONTROL ROD DRIVE HOUSINGS 5.5.19      CATEGORY B-P, ALLPRESSURE RETAININGCOMPONENTS 5.6        CLASS 2 EXAMINATIONBASIS .
5.6.1      CATEGORY C-A, PRESSURE RETAINING WELDS IN PRESSURE VESSELS 5.6.2      CATEGORY C-B, PRESSURE RETAININGNOZZLE WELDS IN VESSELS ..
5.6.3      CATEGORY C<, INTEGRALATTACHMENTSFOR VESSELS. PIPING, AND VALVES..
5.6.4      CATEGORY C-D, PRESSURE RETAININGBOLTING GREATER THAN 2 in.
5.6.5      CATEGORY C-F-I, PRESSURE RETAININGWELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOYPIPING ..
NMP2-ISI406 Rev.t                                              iii of iv
 
CATEGORY C-F-2. PRESSURE RETAINING WELDS IN CARBON OR LOW ALLOYSTEEL PIPING CATEGORY C.G. PRESSURE-RETAiNING WELDS IN PUMPS AND VALVES 5.6.8          CATEGORY C-H. ALL PRESSURE RETAINING COMPONENTS 5.6.9          CLASS 2 AUGMENTED INSPECTION REQUIREMENTS 5,7            CLASS 3 EXAMINATIONBASES .....
5.7.1          CATEGORY D-A, SYSTEMS IN SUPPORT OF REACTOR SHUTDOWN FUNCTION 5.7.2          CATEGORY D-B. SYSTEMS IN SUPPORT OF EMERGENCY CORE COOLING, CONTAINlvG=.NTHEAT REMOVAL, ATMOSPHERE CLEANUP. AND REACTOR RESIDUAL HEAT REMOVAL 5.7.3          CATEGORY DK. SYSTEMS IN SUPPORT OF RESIDUAL HEAT REMOVALFROM SPENT FUEL STORAGE POOL....
6.0            EXAMINATIONPROGRAM PLAN TABLE FIELDS DESCRIPTION .
7.0            EXCEPTIONS TO ASME CODE REQUIREMENTS
: 7. I          REQUESTING RELIEF UNDER IOCFR50.55a.
7.l. I        DETERMINATIONOF IMPRACTICALITY, 7.1.2          NOTIHCATIONOF REGULATORS 7,2          CYCLIC REVIEW.
8.0            NONDESTRUCTIVE EXAMINATIONPROCEDURES LIST ...
ULTRASONIC CALIBRATIONSTANDARDS LIST 10.0          ASME Xl REPAIR/REPLACEMENT PROGRAM APPENDICES A      Class  I, Category 1W, Pipe Weld Count Summary.
B. Class 2, Categoty C-F-1 and C-F-2 Pipe Weld Count Summary.
C      Class 1, 2 &, 3, Multiple Vessel, Pump & Valve Tables.
D      Class 1, 2  & 3, IWF Component Su p ports (Code Case N-t91-1) ..
E.  ~ Class  1, 2 & 3, Integral Attachments (Code Case N-509) ........
F. ISI Rellel'equests  ..
G      Class  I & 2 NDE Requirements.,
H      IWF Class 1,2 & 3 Component Support..
L      IWF- Class 1,2 & 3 Snubbers.....
J.      Change History..
NMP2-ISI406 Rev.1                                                iv of iv
 
0
 
==1.0  INTRODUCTION==
 
Pursuant to 10 CFR 50.55a(g)(2), Niagara Mohawk Power Corporation (NMPC), the holder of the operating license (NPF-69) for Nine Mile Point - Unit 2 (NMP2), a General Electric BWR-5 boiling (light) water~ooled nuclear power facility whose construction peimit was issued on or after January 1, 1971, but before July 1, 1974 (i.e., June 24, 1974) is committed to inservice inspection and examination of pressure retaining nuclear safety related components (including supports) in accordance with the American Society of Mechanical Engineers'ASME) Boiler Pressure    k Vessel Code's Section XI, 1989 Edition with no Addenda. In that collection of publications, (herein referred to'as "the Code" ) NMPC is defined as the Owner of NMP2.
Revision 1 to this ISI Program Plan constitutes a major re-write of all sections and appendices. In addition, the Component Support Program Plan (Document Number NMP2-IWF-007) has been deleted and its contents have been incorporated into this document. This action provides better continuity and control of the examinations that are required to be performed during this Second Ten Year and subsequent Intervals.
V The Second Ten Year Interval Inservice Inspection Program Plan for pressure-retaining components and their supports for the Nine Mile Point Nuclear Station Unit 2 (NMP2) details the technical basis and provides the overall description of the activities planned to fulfillthe ISI requirements defined in the Code. The ISI Examination Program Plan, included herein, identifies the Class 1, 2 and 3 components (i.e., piping, pumps, valves, vessels, and their associated integral attachments)and their supports required to be examined in accordance with Subsections IWB, IWC, IWD and IWF of the Code. Pressure testing is addressed in a separate document (the NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.) Items selected for examination are identified in the respective programs and on separate work lists. These work lists are issued by the NMP2 ISI Program Manager to the NMPC Quality Inspection Group in order to facilitate outage planning and conduct of examinations.
1.1  NONMANDATORYAPPENDIX F Appendix F to the 1989 Edition of Section XI of the ASME Boiler and Pressure Vessel Code provides guidance for preparation of inspection plans to provide adequate information for submittal to reviewing agencies. As such, NMP2 has elected to incorporate its 'attributes below as a checklist to assure compliance with the 1989 Edition of Section XI of the ASME Boiler and Pressure Vessel Code.
1.1.1    ARTICLE F-2000; INSPECTION PLAN CONTENTS This is the title of the article. It is subdivided into four (4) subarticles: F-2100 through F-2400 inclusive. Each is addressed below.
1.1.1.1 SUBARTICLE F-2100; BACKGROUND AND INTRODUCTION This is the title of the subarticle. Each  of its numerous    topics is addressed below.
1.1.1,1.1    CONSTRUCTION CODES USED The N-3 Data Report for the unit identifies 54 N-5 certified piping systems. Fifty (50) of those systems were constructed to the 1974 Edition of Division 1 of Section III of the ASME Boiler and Pressure Vessel Code the remaining four (Manufacturer's Serial Nos. RPV-8, RCI-NMP-01, RCI-NMP-02, RCI-NMP-03) were constructed to the 1977 Edition with Summer of 1978 Addenda of that same Code.
NMP2 recognizes that the application of ASME XI begins when the requirements of the various Construction Codes have been satisfied. Satisfaction of those Codes is evidenced by the Code certification (Data Reports) referenced above.
NMP2-IS1406 Rev.i                                      Seeiion 1                                          Page 1 of 16
 
1.1.1.1.2                DATES OF THE FIRST and SECOND TEN YEAR INTERVALSand INSPECTION PERIODS INTERVAL                  'PERIOD                FROM                                      TO A ril5,1988                            Au ust4,1991 Au ust 5, 1991                        December 4, 1994 First                                  December 5, 1994                          A ril4,1998 A iii 5, 1998                          A ril4,2001 A ril5,2001                            A ril4,2005 Second                                      April 5, 2005                          April 4, 2008 1.1.1.1.3                SECTION XI EDITION AND ADDENDA This plan is written to the 1989 Edition with no Addenda of Section XI of the American Society          of Mechanical Engineers'oiler & Pressure Vessel Code, Division 1.
1.1.1.1.4                CODE CLASSIFICATIONOF COMPONENTS AND SYSTEM BOUNDARIES NMP2 was constructed and certified to Section IIIof the ASME KkPV Code. As such, systems have been classified as either Clas's 1, 2, or 3 in accordance with the Code's criteria for the same.
These classifications and system boundaries are also used to evaluate Code applicability for repair/replacement (includes modifications) activities, regardless of whether or not the item is included in this program plan for inspection.
            '.1.1.1.4.1 SPECIFIC RULES FOR CLASSIFICATION General Design Criterion 1 of 10CFR50, Appendix A, requires that nuclear power plant systems and components important to safety be designed, fabricated, erected, and tested to quality standards commensurate with the importance of the safety function to be performed. These pressure retaining components of fluid systems are part of the reactor coolant pressure boundary (RCPB), and other fluid systems important to safety, where reliance is placed on these systems to:
(1) prevent or mitigate the consequences of accidents and malfunctions originating within the RCPB, (2) permit shutdown of the reactor and maintain it in a safe shutdown condition, and; (3) retain radioactive material.
At NMP2, Quality Group A components          have been classified as ASME HI, Division 1, Class 1 in accordance with 10CFR50.2(v). Quality Group B components have been classified as ASME III, Division 1, Class 2. Quality Group C components have been classified as ASME III, Division 1, Class 3. (Both in accordance with Regulatory Guide 1.26 guidelines.) There are two notable exceptions:
(1) The main steam lines &om the outermost containment isolation valves to the turbine stop valves were neither classified nor constructed to ASME III, Division 1, Class 2 criteria. Rather, they were constructed to the ANSI B31.1 Code, with augmented quality requirements. They have been classified as ASME XI Class 2 in this program, and are inspected accordingly..
(2) The Reactor Water Cleanup System piping in the reactor building, beyond the outermost isolation valve, although classified as "not important to safety," was nevertheless classified as ASME III, Division 1, Class 3, and NMP2.IS1406 Rev. i                                    Section i                                          Page 2 of 16
 
constructed accordingly. It retains that classification (most notably for repair & replacement activities) in this program.
Quality Group D components are not categorically addressed in this plan. However, singular quality Group D items have been included to satisfy related quality inspection concerns.
USNRC has found (in NUREG-1047, the safety evaluation report related to the operation of NMP2) that these specific rules for classification are in conformance with the ASME Code and industry standards, the Commission's regulations, and the guidance found in RG 1.26. These classifications of ASME III Class 1, 2, or 3 have been associated with items classified as a "component" in the plant's Masfer Equipment List (MEL) thus allowing for the rapid acquisition of Code classification by plant personnel.
1.1.1.1.4.2    LIST OF SYSTEMS AND IDENTIFICATIONOF ACRONYMS I~
This information is contained in Section 6 of this Second Ten- Year Interval Inservice Inspection Program Plan.
1.1.1.1.4.3    PIPING AND INSTRUMENTATIONDIAGRAMS (PEcIDs) SHOWING CLASSIFICATION BOUNDARIES Are described in Section 4 of this Second Ten-Year Interval Inservice Inspection Program Plan.
1.1.1.1.5     
 
==SUMMARY==
TABLES Summaiy tables for each system showing Code classification, Code examination category and item number, types of components, examinations or tests to be performed, and number of components for each item number are contained in the approproiate Appendices of this Program Plan.
1.1.1.1.6      NAMES, SIGNATURES, AND COMPANY AFFILIATIONS OF PREPARE RS                                          AND APPROVERS OF THE INSPECTION PLAN This information is included on the cover page of this Second Ten- Year Interval Inservice Inspection Program Plan.
The reader is referred to that cover page for NMPC personnel names and signatures. Arkwright Mutual Insurance Company (NMPC's Authorized Inservice Inspection Agency) document their review and concurrence via separate correspondence with NMPC.
1.1.1.2 SUBARTICLE F-2200;
 
==SUMMARY==
OF CHANGES                            IN UPDATED INSPECTION PLANS This is the title of the subarticle. Each  of its numerous    topics is addressed below.
1.1.1.2.1    LISTING OF NEW OR REVISED PROCEDURES I
Section 8  of this plan lists the Nondestructive Testing      procedures used to implement this program.
1.1.1.22      CHANGES IN EXEMPTIONS, SAMPLES, EXAMINATIONS,OR TESTS There have been no changes between the First and Second Interval Programs other than to reflect any changes as a direct result of updating this Second Ten Year Interval Program to the 1989 Edition of ASME Section XI.
1.1.1.2.3    SUCCESSIVE INSPECHONS REQUIRED BY IWB-2420, IWC-2420, IWE-2420, OR IWF-'2420 Successive inspections required by IWB-2420 from the first interval was limited to 2Rpvwo32, a 10 inch, stainless steel High Pressure Core Spray nozzle safe end-to-safe end extension weld. This weld is examined pursuant to two sets of examination criteria, as it receives augmented volumetric examinations on an increased frequency resultant NMP2-ISI406 Rcv. i                                      Seciion i                                        Page 3 of 16
 
to NMP2's commitment to the guidance provided by NRC in NUREG-0313 and Generic Letter 88-01. The associated ASME XI criteria states that "ifflaw indications are evaluated in accordance with IWB-3122.4 and the component qualifies as acceptable for continued service, the areas containing such flaw indications shall be reexamined during the next three inspection periods listed in the schedules of the inspection programs of IWB-2410." This weldment was accepted by evaluation.
The examinations conducted during the first interval under the guidance provided by Subsections IWC, IWD and IWF resulted in no acceptances by evaluation and therefore no successive inspection carryovers are required.
As stated in paragraph 2.1.4 of this document,    a program plan for Subsection IWE/IWL(Class MC/CC) of ASME Section  XI is under development.
1.1.1.2.4      CIIANGES IN SUBSTITUTE EXAMINATIONSOR TESTS OF F-3000 Appendix F of this program Plan provides technical details of any substitute examinations that NMP2 is intending to perform. These requests are documented in the form of Relief Requests. Refer to the Inservice Testing Program Plan, and the Pressure Testing Program Plan for changes fiom the testing required/performed in the second interval for rhose specific items..
1.1.1,3 SUBARTICLE F-2300, APPLICABLE DOCUMENTS This subarticle recommends that inspection plans include a reference list of applicable documents. Therefore, NMP2 reports that the following documents, in whole or in part, are applicable to this Second Interval Program Plan:
NOTE: Augmented examination reference documents are listed in Section 3.0.
(a) Part 50  of Title  10 of the  Code of Federal Regulations, entitled, Domestic Licensing of Production and Urilizarion Faci lines (b)  The American Society of Mechanical Engineers Boiler & Pressure Vessel Code; Sections II, III, V, IX, and XI, 1989 Edition (no Addenda); Section XI, 1992 Edition, 1992 Summer Addenda for IWE/IWL Repairs and Replacements.
(c) ASME XI Code Cases:
N-416-1        Alternative Pressure Test Requirement for Welded Repairs or Installation ofReplacement Items by Welding, Class 1, 2, and 3 N-460          Alternative Examination Coverage for Class 1 and Class 2 Welds N-461          Alternative Rules for Piping Calibration Block Thickness N-496          Helical-Coil Threaded Inserts N-491-1        Alternarive Rules for Examination ofClass l.2.3 and MC Component Supports ofLight Water Cooled Power Plants, Section Xf, Division 1.
N-498-1        Alternative Rules for 10-Year Hydrostaric Pressure Testing for Class 1 and 2 Systems N-504          Alternative Rules for Repair ofClass 1, 2, and 3 Austenitic Stainless Steel Piping N-504-1        Alternative Rules for Repair of Class 1, 2, and 3 Austeniric Stainless Steel Piping N-509          Alternarive Rules for the Selection and Examinanon of Class 1, 2, and 3 Integrally Welded Attachments. Section XE, Division 1 N-524          Alternate Examinanon Requirements for Longitudinal Welds in Class 1 dc 2 Piping NMP2-ISI406 Rcv. i                                  Section i                                          Page 4 of i6
 
(d) Regulatory Guides:
1.26          Quality Group Classification and Standards for Water-, Steam-, and Radioactive-Waste-Containing Components ofNuclear Power Plants (Revision 3 February 1978) 1.65          Materials and Inspecrions For Reactor Vessel Closure Studs (October 1973) 1.84          Design and Fabricarion Code Case Acceptability, ASME IllDivision I (Revision 29 July 1993) 1.85          Materials Code Case Acceptability ASME Section lllDivision l 1.147        Inservice Inspection Code Case Acceptability ASME Section XlDivision l (Revision 12 May 1999 1.150        Ultrasonic Testing    of Reactor Vessel Welds  During Preservice and Inservice Examinations (Revision  1 February,  1983)
(e) NUREGs 0313          Technical Report on Material Selection and Processing Guidelines for BWR Coolant Pressure Boundary Piping, Final Repon (Revision 2, January 1988) 0619          BWRFeedwater Nozzle and CRD Return Line Nozzle Cracking (November, 1980) 0800          "Standard Review Plan for the Review ofSafety Analysis Report for Nuclear Power Plants" 1047          Safety Evaluation Report related to the operation ofNine Mile Point Nuclear Station, Unit No.
2, Docket No. 50-410 (Februaiy 1985)
(f) Generic Letters 88-01, &.Supp. 1    Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping 1.1.1,4 SUBARTICLE F-2400, CODE SUBSECTIONS This subarticle recommends that inspection plans address the following Subsections      of the Code:
1.1.1.4.1    SUBSECTION IWAGENERAL REQUIREMENTS This subsection is divided into eight (8) Articles, each of which is further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan will only number these items to the level of Subsections. Below that level, items are grouped, and Code designators are used. As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan willlist only those for which NMPC feels that some achtowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site.
IWA-1000 SCOPE AND RESPONSIBILITY This is the title of the article. Pertinent comments on subarticles follow.
IWA-1100 SCOPE - Inservice testing is outside the scope of this plan. The reader is referenced to the separate 1ST Program Plan document, NMP2-IST-005.
IWA-1400 OWNERS RESPONSIBILITIES - NMPC specifically acknowledges its responsibilities as listed in this subarticle, and will take all authorized actions necessary to meet them throughout the Second Ten Year Interval.
IWA-2000 EXAMINATIONAND INSPECI'ION This is the title of the article. Pertinent comments on subarticles follow.
IWA-2130 ACCESS FOR INSPECTOR - NMPC shall arranged for the Authorized Nuclear Inservice Inspector (ANII)to have access to all parts of the plant as necessary to make the required inspections.
IWA-2211 Visual Examination VT NMP2 has substituted remote VT-.1 visual examination for direct examination in the firstinterval and anticipates doing the same in the second interval.
NMP2-ISI406 Rev. I                                    Section I                                            Page 5 of 16
 
IWA-2212 Visual Examination VT VT-2 examinations are performed under the guidance of the NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.
IWA-2212 Visual Examination VT NMP2 may perform visual examinations remotely              as allowed  by minor subparagraph (c) when applicable.
IWA-2311 NDE Methods listed in SNT-TC-1A - Training, qualification, and certification of ultrasonic examination personnel complies with the requirements specified in mandatory Appendix VII.
IWA-2313 Certification and Recertification - Nondestructive examination personnel at NMP2 are qualified by examination and so certified, in accordance with SNT-TC-lA, per ASME Section Xl. Level I and Level II personnel are recertified by qualification examinations every 3 years. Level III personnel are recertified by qualification examinations once every 5 years.
IWA-2321 Visual Acuity - The visual examinations required by this paragraph are conducted annually by personnel qualified to conduct them.
IWA-2322 Level IIIPersonnel - The technical qualifications of Level IIINDE personnel are determined using written examinations. These examinations cover the Basic, Method, and Specific areas of knowledge as defined in SNT-TC-IA.
IWA-2323 Level I and Level IIPersonnel - The technical qualifications of Level I and Level IINDE personnel are determined using written General and Specific Examinations and a Practical hands-on examination. The Practical Examination is administered by a level III.
IWA-2420 INSPECTION PLANS AND SCHEDULES - Code requirements (by category and item number for each component) that are not being satisfied by examinations, and the justiflcation for substitute examinations are found in the associated request for relief.
IWA-2430 INSPECTION INTERVALS - NMP2 did not utilize the extension allowed by IWA-2400(c) in the first interval.
IWA-2432 Inspection Program B - NMPC implemented Inspection Program B at NMP2 in the first iri terval, and continues to use it in the second interval.
IWA-3000 STANDARDS FOR EXAMINATIONEVALUATION This is the title of the article. Pertinent comments on subarticles follow.
IWA-3200 SIGNIFICANT DIGITS FOR LIMITINGVALUES - (a) All observed or calculated values of dimensions or component thickness and of flaws detected by nondestructive examinations used for comparison with the evaluation standards of IWX-3000 are expressed to the nearest 0.1 inches for values 1 inch and greater, and to the nearest 0.05 inches for values less than I inch. Rounding-off of values is performed in accordance with the Rounding-off Method of ASTM Recommended Practice E 29. (b) Interpolation of percentage values for acceptance standards, as required for intermediate flaw aspect ratios in the tables of allowable flaw standards, are rounded to the nearest 0.1%. (c) Interpolation of decimal or &actional dimensions specified in the tables of allowable flaw standards are rounded to the nearest 0.1 inches or '/t6 of an inch, respectively.
NMP2-ISI.006 Rev.i                                    Section I                                            Page 6 of 16
 
IWA-4000 REPAIR PROCEDURES Relevant information is contained in Section 10    of this Second  Ten- Year Interval Inservice Inspection Program Plan.
IWA-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
NMP2-PT-008.
IWA-6000 RECORDS AND REPORTS This is the title of the article. Pertinent comments on subarticles follow IWA-6310 MAINTENANCEOF RECORDS - At a minimum, NMP2 retains the records and reports identified in IWA-6330 (construction records) and IWA-6340 (lnservice Inspection records.) The records and reports are filed and maintained in a manner that allows access as required. NMPC provides suitable protection &om deterioration and damage in accordance with the NMPC Quality Assurance program for the service lifetime of the plant. The QA program allows for the use of microfilming.
IWA-7000 REPLACEMENT Relevant information is contained in Section 10    of this Second  Ten- Year Interval Inservice Inspection Program Plan.
IWA-9000 GLOSSARY The following definitions apply to this Program Plan:
component - an item in a nuclear power plant such as a vessel, pump, valve, or piping system" constant load type support - spring type support that produces a relatively constant supporting force throughout a specified deflection.
component standard support - a support consisting        of one or more  generally mass-produced units usually referred to as catalog items.
component support - a metal support designed to transmit loads &om a component to the loadwanying building or foundation structure. Component supports include piping supports and encompass those structural elements relied upon to either support the weight or provide structural stability to components.
core support structures - those structures or parts of structures that are designed to provide direct support or restraint of the core (fuel and blanket assemblies) within the reactor pressure vessel.
defect - a flaw (imperfection or unintentional discontinuity)  of such size, shape, orientation, location or properties as to be rejectable.
discontinuity - an interruption in the normal physical structure of material or a product.
engineering evaluation - an evaluation of indications that exceed allowable acceptance standards to determine          ifthe margins required by the Design Specifications and Construction Code are maintained.
NMP2-ISI406 Rcv. 1                                    Scaion i                                              Paac 7 of 16
 
evaluation - the process of determining the significance of examination or test results, including the comparison of examination or test  results with applicable acceptance criteria or previous results.
flaw - an imperfection or unintentional discontinuity that    is detectable by nondestructive examination.
hanger- a item that carries the weight of components or piping &om above with the supporting members being mainly in tension.
indication - the response or evidence &om the application of a nondestructive examination.
inservice inspecnon - methods and actions for assuring the structural and pressure - retaining integrity of safety related nuclear power plant components in accordance with the rules of ASME Section XI.
inservi ce examination - the process of visual, surface or volumetric examination performed in accordance with the rules of ASME Section XI, Division I inspection - verification of the performance    of examinations    and tests by an ANII item - a material, part, appurtenance, piping subassembly, component or component support.
relevant condition - a condition observed during a visual examination that requires supplemental examination, corrective measure, repair, replacement, or analytic'al evaluation.
support - (I) an item used to position components, resist gravity, resist dynamic loading, or maintain equilibrium of components; (2) an item that carries the weight of a component or piping &om below with the supporting members being mainly in compression.
support part-  a part of subassembly of a component support or piping support.
terminal ends - the extremities of piping'runs that connect to structures, components, or pipe anchors, each of which acts as a rigid restraint or provides at least 2 degrees of restraint to piping thermal expansion.
test - a procedure to obtain information through measurement or observation to determine the operational readiness of a component or system while under controlled conditions.
variable spring type support-a spring type support providing a variable supporting force throughout a specified deflection.
vibration control and sway brace - a spring type support providing a variable restraining force along its axis.
1.1.1.4.2    SUBSECHON IWB REQUIREMENTS FOR CLASS 1 COMPONENTS OF LIGHTWATER COOLED POWER PLANTS This subsection is divided into six (6) Articles, each of which is further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan willonly number these items to the level of Subsections. Below that level, items are grouped, and Code designators are used. NMPC finds the Code to be well written and clear in its direction.
As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan will list only those for which NMPC feels that some acknowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site. Components with alternative examination, as in Code Cases, the rules of that document shall apply.
NMP2.ISI406 Rcv. i                                      section i                                            Page 8 of l6
 
IWB-1220 COMPONENTS EXEMPT FROM EXAMINATION- NMPC has utilized all three (3) of the exemptions identified in this subsubarticle, and wishes to draw special attention to paragraph (c), "reactor vessel head connections and associated piping, NPS 2 and smaller, made inaccessible by control rod drive penetrations." Examination item 2RpvklF, the weld of the reactor vessel shell to the N-15 nozzle for the bottom head drain is exempt per IWB-1220(c), and no relief lrom Code requirements is necessary for the Second Interval Program Plan.
IWB-2200 PRESERVICE EXAMINATION- NMPC performs appropriate preservice examinations per the requirements of subarticle IWB-2200 whenever a component is replaced, added, or altered during the service lifetime of NMP2. The results of those examinations are documented on a NIS-2 Form.
IWB-2412 Inspection Program B - The interpretation of Table IWB-2412-1 correlates the first, second, and third periods of the second interval with the 13, 17, and 20 calendar years of plant service. NMPC's second interval will comply with this schedule to the extent practical. The current refueling outage schedule, upon which this Program Plan is based, includes 6 refuel outages or 2 per period. Some variations to the length of Inspection Periods may be required based on actual versus scheduled outage dates.
IWB-2420 SUCCESSIVE INSPECTIONS -The sequence of component examinations established during the first ins pection interval is, to the extent practical, being repeated during this second inspection interval. NMPC has changed the sequence of several piping weld examinations in order to reduce support work duplication and radiation exposure (ALARA).Most of these changes were made to examine RPV welds and adjacent piping welds during the same refueling outage to reduce the need for duplication of the required support work (i.e. Scaffolding, insulation removal, etc.) in different outages. NMPC will continue to reschedule examinatioins where possible to optimize the ISI Program implementation with the primary goal of reducing duplicate support requirements and thereby reducing radiation exposure.
Any additional scheduling changes that are made will be documented in the controlled ISI Program Plan. First interval flaws accepted by analytical evaluation have resulted in reexaminations (or the future scheduling thereof) at three successive inspection periods, one of which overlaps into this'second interval.(Reference paragraph 1.1.1.2.3)
IWB-2430 ADDITIONALEXAMINATIONS- (a) Examinations of Class 1 items performed during an outage, in accordance with Table IWB-2500-1, that reveal indications exceeding the acceptance standards of Table IWB-3410-1, are extended to include additional examinations during that outage. NMPC will further define the scope of additional examinations to those welds, items, parts etc. that are of similar materials, design, size and service conditions. Those additional examinations include (a) the remaining welds, areas, or parts contained in the Table IWB-2500-1 inspection item listing and scheduled for inspection. (b) Ifany of those additional examinations reveal indications exceeding the acceptance standards of Table IWB-3410-1, the examinations are further extended to include all the welds, areas, or parts of similar design, size, and function. (c) The performance of these additional examinations in the current period shall have no impact upon the original schedule of examinations in the period immediately following.
IWB-3132 - Acceptance by Volumetric or Surface Examination -. Second interval NIS-1 Forms and Summary Reports will contain "Acceptance by Volumetric and/or Surface Examination" verbiage.
IWB-3132.4- Acceptance by Analytical Evaluation - For items whose volumetric or surface examination reveals flaws that exceed the acceptance standards listed in Table IWB-3410-1, and that have been analyzed as acceptable to return to service without benefit of either: flaw removal, repair, or replacement, NMPC will: (1) submit the analytical evaluation to NRC for review (and approval), and (2) schedule the item for examination during the next three periods.
IWB-3134 - Review by Authorities-Class 1 examinations performed during an outage, in accordance with Table IWB-2500-1, that reveal indications exceeding the acceptance standards of Table IWB-3410-1, and that require flaw removal by mechanical methods, or the component to be repaired (welded upon) to the extent necessaiy to meet the acceptance standards of IWB-3000, shall possess an ASME XI repair plan.
NMP2.lsl406 Rcv.i                                      Section I                                          Page 9 of l6
 
IWB-3142.1 - Acceptance by Visual Examination - Second interval NIS-1, or Form, and Summary Reports will contain "Acceptance by Visual Examination" verbiage.
IWB-3142.2 - Acceptance by Supplemental Examination - Visual examinations that reveal unacceptable relevant conditions may be supplemented by surface or volumetric examinations. These items may be considered acceptable for continued service ifthe results of the supplemental examinations meet the applicable acceptance criteria.
IWB-3142,3 - Acceptance by Corrective Measures or Repairs - Second interval NIS-1 Form and Summary Reports will contain "Acceptance by Corrective Measures or Repairs" verbiage (i.e., the acceptance may be by "Corrective Measures," or the acceptance may be by "Repairs," or a combination of the two.)
ARTICLE IWB-4000 REPAIR PROCEDURES The reader is referred to Section 10 of this Second Ten- Year Interval Inserv ice Inspection Program Plan for generic repair procedures commentary.
ARTICLE IWB-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
NMP2-PT-008.
ARTICLE IWB-7000 REPLACEMENTS The reader is referred to Section 10 of this  Second Ten- Year Interval Inservice Inspection Program Plan  for generic repair procedures commentary 1.1.1.4.3    SUBSECTION IWC REQUIREMENTS FOR CLASS 2 COMPONENTS OF LIGHTWATER COOLED POWER PLANTS This subsection is divided into six (6) Articles, some of which are further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan willonly number these items to the level of Subsections. Below that level, items are grouped, and Code designators are used. NMPC finds the Code to be well written and clear in its direction.
As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan will list only those for which NMPC feels that some acknowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site. Components with alternative examination, as in Code Cases, the rules o(that document shall apply.
IWC-1220 COMPONENTS EXEMPT FROM EXAMINATION- NMPC had been using the exemptions allowed by Code Case NAOS-2 during the first interval. With only minor editorial alterations, those exemptions have been into the 1989 Edition of ASME XI, and have had no impact upon the non-exempt population for the          'ncorporated second interval.
IWC-2200 PRESERVICE EXAMINATION- NMPC performs appropriate preservice examinations per the requirements of subarticle IWB-2200 whenever a component is replaced, added, or altered during the service lifetime of NMP2. The results of those examinations are documented on an NIS-2 Form.
IWC-2412 Inspection Program B - Table IWC-2412-1 correlates the first, second, and third periods of the second interval with the 13, 17, and 20 calendar years of plant service. NMPC's second interval willcomply with this schedule to the extent practical. The current refueling outage schedule, upon which this Program Plan is based, NMP2-ISI406 Rev. i                                  Section i                                          Page 10 of 16
 
C7 includes 6 refuel outages or 2 per period. Some variations to the length    of Inspection Periods may be required based on actual versus scheduled outage dates.
IWC-2420 SUCCESSIVE INSPECTIONS - The sequence of component examinations established during the first inspection interval. is, to the extent practical, being repeated during this second inspection interval. NMPC has changed the sequence of several piping weld examinations in order to reduce support work duplication and radiation exposure (ALARA).These changes were made to examine adjacent piping welds during the same refueling outage to reduce the need for duplication of the required support work (i.e. scaffolding, insulation removal, etc.) in different outages. NMPC willcontinue to reschedule examinatioins where possible to optimize the ISI Program implementation with the primary goal of reducing duplicate support requirements and thereby reducing radiation exposure. Any additional scheduling changes that are made willbe documented in the controlled ISI Program Plan.
IWC-2430 ADDITIONALEXAMINATIONS- (a) Examinations of Class 2 items, performed in accordance with Table IWC-2500-1, that detect indications exceeding the allowable standards of Table IWC-3410-1, are extended to include an additional number of examinations within the same examination category, approximately equal to the number of examinations initially performed. NMPC will further limit the scope of additional examinations to those welds, items, parts etc. that are of similar materials, design, size and service conditions. (5) Ifany of those additional examinations detect further indications exceeding the allowable standards of Table IWC-3410-1, the remaining number of similar items within the same examination category willbe examined.
IWC-3000 ACCEPTANCE STANDARDS The requirements  of IWC - 3000    shall be implemented as detailed below.
IWC-3132.1 - Acceptance by Supplemental Examination - Visual'examinations that reveal unacceptable relevant conditions may be supplemented by surface or volumetric examinations. These items may be considered acceptable for continued service ifthe results of the supplemental examinations meet the applicable acceptance criteria.
IWC-3132,2 - Acceptance by Corrective Measures or Repairs - Second interval NIS-1 Form, and Summary Reports will contain "Acceptance by Corrective Measures or Repairs" verbiage (i.e., the acceptance may be by "Corrective Measures," or the acceptance may be by "Repairs," or a combination of the two.)
IWC-3200 SUPPLEMENTAL EXAMINATIONS- For the second interval, visual examinations that reveal relevant conditions will be supplemented by either surface examinations, volumetric examinations or alternative examinations in order to determine the need for correcrive measures, repairs, evaluation, or replacement.
IWC-4000 REPAIR PROCEDURES, The reader is referted to Section 10 of this Second Ten-Year Interval Inservice Inspection Program Plan for generic repair/replacement procedures commentary.
A'RTICLE IWC-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
NMP2-PT-008.
ARTICLE IWC-7000 REPLACEMENTS The reader is referred to Section 10 of this Second Ten- Year Interval Inserv ice Inspection Program Plan for generic repair/replacement procedures commentary.
NMP2.1SI406 Rev.1                                      Section 1                                            Page 11 of 16
 
1.1.1.4A      SUBSECTION IWD REQUIREMENTS FOR CLASS 3 COMPONENTS OF LIGHTWATER COOLED POWER PLANTS The IWD Articles of the Code require a VT-3 examination of integral attachments to the pressure boundary. This portion includes the weld to the pressure boundary. The Second Interval ISI Program Plan identifies and controls the Class 3 integral attachments, in their entirety, that are subject to VT-3 examination. Pursuant to ASME Code Case N-509, NMPC has elected to perform the required visual examinations on 10/o of the integral attachments. These VT-3 examinations shall be coordinated with the corresponding support 'examinations.
IWD-3000 ACCEPTANCE STANDARDS This article continues to authorize NMPC to use the rules of IWB-3000. Since Article IWB-.3000 has been updated, IWD-3000 is electively updated also. However, as indicated above, these updates are limited to their effect on repairzreplacemenf activities.
IWD-4000 REPAIR PROCEDURES This article no longer contains a set of rules specifically tailored to Class 3 components and their supports. Instead, it now references the generic rules of IWA4000. NMP2        addresses this in Section 10 of ttiis Second Ten- Year Interval Component Support Program Plan.
ARTICLE IWD-5000 SYSTEM PRESSURE TESTS VT-2 examinations are addressed in a separate document; the NMP2 Pressure Testing Program Plan, Document No.
NMP2-PT-008.
I ARTICLE IWD-7000 REPLACEMENTS j
The reader is referred to Section 10 of this Second Ten- Year Interval Inservice Inspection Program Plan for generic repair/replacement procedures commentary.
1.1.1.4.5      SUBSECTIONS IWE/IWLREQUIREMENTS FOR CLASS MC AND METALLICLINERS OF CLASS CC COMPONENTS OF LIGHT WATER.COOLED POWER PLANTS AND CLASS CC REQUIREMENTS FOR CONCRETE COMPONENTS OF LIGHT WATER COOLED POWER PLANTS The Inspection Program Plans for IWE (Class MC) and IWL (Class CC) Components are under development. These programs will be completed and implemented prior to September, 2001.
Repair and replacement activities within the scope of Subsections IWE and                  IWL of the  Code conducted after September 9, 1996, are conducted in accordance with these subsections.
1.1.1.4.6      SUBSECHON IWFREQUIREMENTS FOR CLASS 1, 2,3, and MC COMPONENT SUPPORTS OF LIGHTWATER COOLED POWER PLANTS This subsection is divided into six (6) Articles, some of which are further subdivided by Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. This plan will only number these items to the level of Subsection. Below that level, items are grouped, and Code designators are used. As a result, NMPC feels that no comment is required on the majority of Subarticles, Subsubarticles, Paragraphs, and Subparagraphs. Rather than list each, and state "no comment," this plan will list only those for which NMPC feels that some acknowledgment, explanation, or disclaimer is required due to the unique nature of its application to the NMP2 site.
NMP2.ISI406 Rev. i                                    Section t                                              Page r2of16
 
IWF-1000 SCOPE AND RESPONSIBILITY This is the title of the article. Pertinent comments on subarticles follow.
IWF-1220 SNUBBER INSPECI ION REQUIREMENTS This subsubarticle requires the inservice inspection requirements for snubbers to be in accordance with Article IWF-5000.
That article requires visual examination VT-3 and performance testing          both pursuant to the first Addenda to ASME/ANSI OM-1987, Part 4 (published in 1988.) However, NMP2 has proposed an alternative to these requirements.
The reader is referred to the paragraph on Article IWF-5000 below and Relief Req. 4 RR-IWF-4.
IWF-1300 SUPPORT EXAMINATIONBOUNDARIES
'MP2 notes      no changes to the examination boundaries utilized during the first interval as a result of this update to the 1989 Edition of ASME XI.
IWF-2000 EXAMINATIONAND INSPECTION This is the title of the article. Pertinent comments on subaiticles follow.
IWF-2410 INSPECI'ION PROGRAM This subsubarticle continues to allow for inservice examinations to be performed during normal system operation as well as at plant outages. NMP2 has performed many inservice inspections of component supports during normal system operation in the first interval, and plans to continue that practice during the second ten year interval.
IWF-2420 SUCCESSIVE INSPECI'ION INTERVALS NMP2 has, to the extent practical, scheduled the component support examinations of the second interval to repeat the sequence of component support examinations established in the first interval. This criterion has been factored into our reduced scope of examinations as a result of implementing ASME Code Case N491-1.
IWF-2430 ADDITIONALEXAMINATIONS NMP2 willcomply with the requirements for additional examinations when corrective measures are required          as the result of examinations performed, per the requirements of Code Case N-491-1.
IWF-2510 SUPPORTS SELECTED FOR EXAMINATION 1.) For multiple components other than piping, within a system of similar design, function and service, the supports      of only one of the multiple components are required to be examined 2.) Exam Category F-A, Table IWF-2500-1 shall be utilized in it's entirety for categorizing and selecting supports for examination based on Code Case N-491-1 selection criteria.
TABLE IWF-2500-1              EXAMINATIONCATEGORIES NMP2 will categorize supports in the Appendix H exam tables in accordance with Code Case NA91-I and Table IWF-2500-1, Note l.
IWF-3000 STANDARDS FOR EXAMINATIONEVALUATIONS This is the title of the article. Pertinent comments on subarticles follow.
NMP2-ISI406 Rev. 1                                    Section I                                            Page 13 of16
 
IWF-3122 Acceptance NMP2 has noted the change to the authorized acceptance methodology for supports found unacceptable        for continued service to include (non repair/replacement) adj usrmenr to the authorized remediation methods, and to introduce the term correcrion to capture all three methods. These concepts have been incorporated into the applicable NDE examination procedures.
IWF-3410 ACCEPTANCE STANDARDS                    COMPONENT SUPPORT STRUCTURAL INTEGRITY NMP2 has noted the deletion of references to "snubbers" and "fluid loss" &om, as well as the addition of "misalignment of supports" to this subsubarticle, and has amended our visual examination VT-3 attributes accordingly.
IWF-4000 REPAIR PROCEDURES NMP2 has altered its first inrerval methodology and to process Second Interval ASME XI Component Support Repair Plans in accordance with this Article, Section 10 of this document has been updated accordingly.
IWF-5000 INSERVICE INSPECTION REQUIREMENTS FOR SNUBBERS As previously indicated, all snubber testing and visual examination requirements shall be performed per the NMP2 Technical Specification requirements of Section 3/4.7.5.
IWF-7000 REPLACEMENTS This article is fundamentally unchanged from the iteration contained in the Code of record for the first interval.
1.1.1.4.7      SUBSECTION IWP INSERVICE TESTING OF PUMPS IN NUCLEAR POWER PLANTS The Inservice Testing Program Plan for pumps is found in NMPC's Controlled Document No. NMP2-IST-005.
1.1.1.4,8      SUBSECTION IWVINSERVICE TESTING OF VALVES IN NUCLEAR POWER PLANTS The Inservice Testing Program Plan for valves is found in NMPC's Controlled Document No. NMP2-IST-005.
1.1.1.5 SUBARTICLE F-2500, DETAILEDCONTENTS This subarticle addresses six (6) items:
1.1.1.5.1      DRAWINGS SHOWING COMPONENTS TO BE EXAMINED 1
The components to be examined are depicted and labeled with their associated examination identifiers on two sets of drawings that are controlled in accordance with the procedures governing NMPC's Controlled Document System (CDS).
They represent the as-built condition of the plant and are updated as NIS-2 Forms are signed, which document repairs or replacements (includes modifications) to the physical plant.
A full set of these drawings was delivered to the NRC with the Second Ten Year Interval Program Plan submittal of July 31, 1998.
1.1.1.5.2
    ~ ~ ~      SPECIFIC EXEMPTIONS APPLIED TO EACH SYSTEM NMP2 has reported this information in Section 4 of this Second Ten- Year Interval Inservice Inspection Program Plan.
NMP2-ISI406 Rev. i                                  Section i                                          Page 14 or 16
 
1.1.1.5.3      LINE LISTS FOR EACH SYSTEM This nonmandatory recommendation did not exist in the Code of record for the first interval. As a result, NMPC did not provide line lists for each system in the First Ten-Year Inservice Inspection Program Plan. Therefore, NMPC has decided to again exclude such line lists in this, The Second Ten- Year Inservice Inspection Program Plan. However; Appendix G contains the following relevant information, line number, system identifier, Code Classification, pipe size, and material description.
1.1.1.5.4      TABLES THAT PROVIDE DETAILS OF EXAMINATIONS This information is contained in Appendices G & H of this Second Ten- Year Interval Inservice Inspection Program Plan.
1.1.1.5.5      LIST OF CALIBRATIONBLOCKS This information is contained in Section 9    of the Second Ten- Year Interval Inservice Inspection Program Plan.
1.1.1.5,6      LIST OF EXAMINATIONAND TEST PROCEDURES NDE Procedures applicable to this Second Ten- Year Interval Inservice Inspection Program Plan are contained in Section 8  of this document.
1.1.2      ARTICLE F-3000; SUBSTITUTE EXAMINATIONSOR TESTS Section 7  of the Second Ten- Year Interval Inservice Inspection Program Plan addresses substitute examinations in the form of Relief Requests.
1.1.3      APPENDIX F- SUPPLEMENTS There are four supplements listed in this Appendix. Supplement l        & 2 are  applicable to this program plan.
1.1.3.1 SUPPLEMENT          1 -CONTENTS OF IWB, IWC, IWD, IWE, AND IWLTABLES, SUPPLEMENT 2 -CONTENTS OF IWF TABLES The following attributes are applicable to IWB, IWC, IWD and IWF Tables only. As previously stated the IWE/IWL Program Plans are currently under development and will be addressed in a separate document.
1,1.3.1.1      IDENTIFICATIONOF SYSTEMS IN SYSTEM-BY-SYSTEM ORDER The referenced system-by-system format is contained in Appendices G & H of this Second Ten-Year Interval Inservice Inspection Program Plan.
1.1.3:1.2      CODE CLASSIFICATION NMP2 has previously reported this information in the cLAss field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
1.1.3.1.3      EXAMINATIONCATEGORY AND ITEM NUMBER NMP2 has previously reported this information in the cATGRY and ITEM &#xb9; fields of Appendices G & H of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year NMP2-ISI406 Rev. I                                    Section I                                          Page 15 of 16
 
IJ lnservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description    of the associated field in the tables of the Appendix.
1.1.3.1.4      INDIVIDUALCOMPONENTS AND WELDS SELECTED FOR EXAMINATIONSOR TESTS NMP2 has previously reported this information in the    ExAMINATIQNIDENTIFIER field of Appendices    G & H of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G and new Appendix H of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
1.1.3.
 
==1.5      REFERENCES==
TO DRAWINGS LOCATINGWELDS AND COMPONENTS NMP2 has previously reported this information in the coMPoNENT DRAwlNG field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
1.1.3.1,6      TEST OR EXAMINATIONMETHODS NMP2 has previously reported this information in the Ex1, Ex2, Ex3 field of Appendix G of the First Ten- Year Inservice Inspection Program Plan and continues to do so in'the analogous Appendix G of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
1.1.3.1.7      CALIBRATIONBLOCKS NMP2 has previously reported this information in the        UT cAUBRATIN BLK field  of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.                                                        h 1,1.3.
 
==1.8      REFERENCES==
TO PROCEDURES USED NMP2 has previously reported this information in the NDE RocEDuRE field of Appendix G of the First Ten- Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten-Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
1.1,3.1.9    EXAMINATIONOR TEST SCHEDULES NMP2 has previously reported this information in the PERIDD1,2,3 field of Appendix G of the First Ten- Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
1.1.3.1.10    REFERENCES TO SECTION XI REQUIREMENTS THAT ARE NOT BEING SATISFIED, AND IDENTIFICATIONOF SUBSTITUTE EXAMINATIONSOR TESTS ll NMP2 has previously reported this information in the REL REQ &#xb9; field of Appendix G of the First Ten-Year Inservice Inspection Program Plan and continues to do so in the analogous Appendix G of this Second Ten- Year Inservice Inspection Program Plan. The reader is referred to that Appendix, as well as Section 6, for a description of the associated field in the tables of the Appendix.
NMP2.ISI406 Rev. l                                    Section l                                            Page l6of 16
 
2.0 ASME BOILER AND PRESSURE VESSEL CODE REQUIREMENTS The 1989 Edition (with no addenda) of the ASME Boiler and Pressure Vessel Code, Section XI was utilized to determine the examination requirements for this Second Ten Year Interval Inservice Inspection Program Plan.
However, the requirements of the Code have been modified as noted below by incorporating the following ASME Section XI Code Cases:
N-416-1      Alternative Pressure Test Requirement for 8'elded Repairs or Installation ofReplacement Items by 8'elding, Class I, 2, and 3 N-460        Alternarive Examinarion Coverage for Class I and Class 2 8'elds N-461        Alternative Rules for Piping Calibranon Block Thickness N-491-1      Alternative Rules for Examinarion ofClass l,2,3 and MC Component Supports ofLight 8'ater Cooled Power Plants, Section XT, Division I, N-496        Helical-Coil Threaded Inserts N-498-1      Alternative Rules for IO-Year Hydrostatic Pressure Testing for Class I and 2 Systems N-504        Alternative Rules for Repair ofClass I, 2, and 3 Austenitic Stainless Steel Piping N-504-1      Alternan've Rules for Repair of Class l, 2, and 3 Austenitic Stainless Steel Piping N-509        Alternarive Rules for the Selecnon and Examination of Class l. 2, and 3 Integrally fVelded Attachments. Section Xl, Division l N-524        Alternate Examination Requirements for Longitudinal Welds in Class 1 & 2 Piping This second interval is determined by the number of calendar years following the date of initial commercial operation. Unless altered, as described below, it shall run &om April 5, 1998 through April 4, 2008. The following historical information has been considered in the development of this Program Plan:
~ Issuance of Construction Permit                                  June 24, 1974
~ Issuance of Low Power Operating License (NPF-54)
                                                            - = October 31, 1986
~ Issuance of Full Power Operating License (NPF-69)            = July 2, 1987
~ Commercial Operation Date                                        April 4, 1988
~ First Ten- Year Interval Begins                                  April 5, 1988
~ First Ten- Year Interval Ends                                    April 4, 1998 Inspection Progra'm B has been used as described by Section XI, subsubarticles IWB-2400. This interval, being the second 10-year inspection interval, may be decreased or extended by as much as one year to coincide with a plant outage. It may also be extended to compensate for an extended outage (i.e., > 6 months.) The inspection interval during which the outage occurred may be extended for a length of time equivalent to the outage, and the original pattern ofintervals extended accordingly for successive intervals. NMPC may elect, for certain components, to meet supplemental requirements, as set forth in the editions and addenda of the Code, which become effective subsequent to the 1989 Edition with no Addenda. Where utilized, they are referenced in this document and the use of proposed alternatives are documented on Relief Requests per Section 7 of this Program Plan.
2.1  SECTION XI OF THE ASME BOILER AND PRESSURE VESSEL CODE The 1983 Edition with Summer of 1983 Addenda of Section XI of the ASME B&PV Code was used to develop the First 10-Year Interval ISI Program Plan. The 1989 Edition of ASME Section XI is utilized for the development of this Second Ten Year Interval ISI Program Plan.
2.1.1 AS ME CODE CLASS          1 PIPE WELDS Code Class    1 pip'e welds requiring examination during the second interval include:
NMP2-ISI406 Rev.1                                        Section 2                                      Page1of3
 
          ~ terminal ends in pipe or branch runs connected to vessels;
          ~  weldments whose stress levels exceed.
either:
a) a primary, plus secondary stress intensity range of 2.4S or, b) a cumulative usage factor Uof 0.4;
          ~ dissimilar metal welds between combinations of:
a) carbon or low alloy steels to low alloy steels b) carbon or low alloy steels to high nickel alloys c) high alloy steels to high nickel alloys
          ~ commitments to NUREG-0313 (GL88-01) for non-resistant austenitic materials;
          ~ commitments to the NUREG-0800 Branch Technical Position MEB 3-1 for the break exclusion region;
          ~ additional welds as required to meet the 25% Code requirement for non-exempt welds per interval.
A comparison of the 1989 Edition of ASME XI to the originally utilized      1983 Edition with Summer 1983 Addenda required no alteration to the original weld selection from the First Interval.
2,1.2    ASME CODE CLASS 2 PIPE WELDS
          ~ the Code required minimum of 28 austenitic stainless steel welds;
          ~ 7.5% of all carbon and low alloy steel welds not exempted by subsubarticle IWC-1220;
          ~ commitments to the NUREG-0800 Branch Technical Position MEB 3-1 for the break exclusion region.
A comparison of the 1989 Edition of ASME XI to the originally utilized      1983 Edition with Summer 1983 Addenda required no alteration to the original weld selection &om the First Interval.
2.1.3
  ~ ~    ASME CODE CLASS 3 INTEGRALATTACHMENTSAND PRESSURE RETAINING BOUNDARY These requirements for pressure testing are addressed in a separate program plan document, the NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.
Subsection IWD of the Code requires a VT-3 examination of integral attachments to the pressure boundary. This portion includes the weld to the pressure boundary. This plan identifies and controls the Class 3 integral attachments, that are subject to VT-3 examination.
ASME Section XI Code Case N-509 (Alternative Rules for the Selection and Examination of Class 1, 2 and 3 Integrally Welded Attachments of Light Water Cooled Power Plants, Section XI, Division 1) has been implemented per the additional requirements documented in RG1. 147 Rev. 12 for determining the scope of examinations to be performed on Class 3 Integral Attachments that are contained in this Program Plan.
2.1A    DEFERRED INCLUSION OF SUBSECTIONS IWE AND IWL The Inspection Program Plans for IWE (Class MC) and IWL (Class CC) Components are under development. These programs will be completed and implemented prior to September, 2001.
Repair and replacement activities within the scope of Subsections IWE and IWL of the Code conducted after September 9, 1996, are conducted in accordance with these subsections.
NMP2-ISI406 Rev.1                                        Section 2                                          Page 2 of 3
 
2.1.5    SUBSECTION IWF Component supports, per IWF-1100, are considered to be "...those metal supports designed to transmit loads &om the component and piping to the load-carrying building or structure. 'This shall include the attachment portion of intervening element(s) to pressure-retaining components." NMP2 utilizes this definition to identify component supports.
ASME Section XI Code Case N-491-1 (Alternative Rules for Examination of Class 1, 2,3 and MC Component Supports of Light Water Cooled Power Plants, Section XI, Division 1) has been implemented to determine the scope of examinations to be  performed on Class    1, 2 and 3 supports.
2.1.5.1  INSPECTION PURSUANT TO THE CODE OF RECORD Visual (VT-3) examinations of all supports selected for examination (per Code Case N-491-1) shall be conducted in accordance with the requirements of the 1989 Edition of ASME Section XI.
Testing of all snubbers shall be performed per the requirements of NMP2 Technical Specifications 3/4.7.5.
Visual (VT-3) examination of the attachment portions of the snubbers shall not be performed as part of this programs requirements as it represents essentially a duplication of the Tech Spec visual examinations. The Tech Spec visual examinations are also completed on a more &equent basis than the Section XI required visual exam. Reference Relief Request &#xb9; RR-IWF-4.
Qualified VT-3 examiners shall be utilized to perform the VT-3 examinations and the results will be reported in conjuntion with the Tech Spec testing activities. The ISI Program Plan willcontinue to track all ASME Class 1, 2 and 3 snubbers in Appendix I and refer to the Tech Spec exam requirements.
2.1.6    ASME SECTION XI CODE CASES The use of Code Cases as alternatives to those rules contained in the Code of record for this second Ten-Year Plan is permitted ifthey have been endorsed for use by the regulators, either per Regulatory Guide 1.147, or in a separate and unique correspondence with NMPC. ASME XI Code Cases applicable to this plan are listed in paragraph 2.0 above. Code Cases N-416-1 and N-498-1,have been specifically approved for use by NMPC via NRC letters dated October 18, 1994 and January 13, 1995, respectively.
NMP2-ISI406 Rev.1                                        Section 2                                        Page 3 of 3
 
3.0 AUGMENTED EXAMINATIONS For purposes of this Program Plan, augm ented examinations are defined as those scheduled examinations which are outside the scope of the core mspections provided for in the 1989 Edition with no Addenda of Section XI of the ASME Boiler & Pressure Vessel Code, as altered by NMPC invoked, regulator approved Code Cases as well as NMPC requested, regulator approved, relief from the requirements of that Code, all as invoked and sanctioned by 10 CFR 50.55a. These augmented examinations are the result of:
~ Commitments made to the regulators in the FSAR and as updated in the UFSAR
~ Commitments made to regulatory guidance documents (Reg. Guides)
~ Commitments made to the regulators in responses to NRC Generic Letters
~ NSSS supplier recommendations (RICSILs and SILs);
~ Commitments made to NRC via BWR Vessel & Internals Project
~ Voluntary actions in response to INPO recommendations
~ Commitments made to USNRC Inspection d'c Enforcement Bulletins
~ Voluntary actions taken pursuant to knowledge gained from NRC Information Notices.
3.1 COMMITMENTSMADETO THE REGULATORS IN THE FSAR AND AS UPDATED IN THE USAR 3.1.1 BREAK EXCLUSION REGIONS Pipe rupture has been addressed in the design for NMP2 by postulating ruptures and their effects. Empirical evidence suggests that ruptures generally occur at high stress and fatigue locations, such as at the terminal ends of a piping system at its connection to the nozzles'of a component. As such, the postulation of pipe rupture events at such locations is intended to comply with the requirements of General Design Criteria 4 of Appendix A to 10 CFR 50 for the design of nuclear power plant structures and components.
USNRC Branch Technical Position MEB 3-1 (BTP MEB 3-1) of the Standard Review Plan Section 3.6.2 of NUREG-0800, has been utilized by NMP2 as noted in USAR Section 3.6, entitled, Protection Against Dynamic Effects Associated II'ith The Postulated Rupture ofPiping.
In addition to requiring the postulation of pipe ruptures, BTP MEB 3-1 also allows for the non-postulation of ruptures in those portions of piping from the containment wall to and including the inboard or outboard isolation valves, provided they meet several requirements, one of which is that a 100% volumetric inservice examination of all (circumferential and longitudinal) pipe welds within the break exclusion region be conducted during each inspection interval.
NMP2 has utilized (and expanded the boundaries of) that allowance, as reflected in the USAR (Revisions 7 & 9) paragraph 3.6A.2.1.5, entitled Postulated Pipe Break Locations, wherein it is currently stated, "Breaks are not postulated in the portions of highwnergy piping between the containment isolation valves, outside and inside containment. Breaks are not postulated in the portions of high-energy piping between the isolation valve and the first restraint or groups of restraints designed to protect these portions of piping.
Containment isolation valve pipe whip restraints are capable of resisting bending and torsional moments produced by a postulated piping failure outboard of the first restraint or group of restraints beyond the containment isolation valves.
Restraints are designed to withstand the loadings resulting from a postulated piping failure, so that neither the isolation valve operability nor the leak-tight integrity of the associated containment penetration will be impaired. These portions of piping are designed to meet the requirements of ASME Section III, Subarticle NE-1120, and the following additional design requirements, which are in conformance with Revision 1 (July 1981) of SRP 3.6.2 and BTP MEB 3-1, the documents applicable at the time the analysis was performed: ...
NMP2-ISI406 Rev.1                                          Section 3                                        Pege1of13
 
I For these portions of high-energy fluid system piping, preservice and subsequent in-service examinations are performed in accordance with the requirements specified in ASME Section XL During each inspection interval, as defined in IWA-2400, an ISI is performed on all non-exempt ASME Code Section XI cir-cumferential and longitudinal welds within the break exclusion region for high-energy fluid system piping.
These inspections consist of augmented volumetric examinations (nominal pipe size greater than or equal to 4 inches) and augmented surface examinations (nominal pipe size less'than 4 inches) such that 100 percent of the previously defined welds are inspected at each interval. The break exclusion zone consists of those portions of high-energy fluid system piping between the moment limiting restraint(s) outside the outboard containment isolation valve and the moment limiting restraint(s) beyond the inboard containment isolation valve. The choice of the restraint(s) that define the limits of the break exclusion zone is based upon those restraints which are necessary to ensure the operability of the primary containment isolation valves."
These break exclusion regions are found in four (4) systems:
~    Main Steam                                                      (MSS)
~    Reactor Core Isolation Cooling (steam supply)                    (ICS)
~    Feedwater                                                        (FWS)
~    Reactor Water Clean-up                                          (WCS)
NMPC has elected to perform both volumetric and surface examinations so that the circumferential and welds found in the break exclusion regions may be included in the 25% sample to satisfy Category B-J requirements.
The USAR commitment for examining break exclusion region welds results in the examination of four (4) Class 3 (2wcs4946AI022; 2wcs49-14'; 2wcs49-14RN07; 2wcs49-14Av009) and two (2) Class 4 (2Fws47-13AI002 aild 2RNSA7-19~002) welds.
3.1.2 NUREG-0313 Rev. 2 (as required by Generic Letter 88-01 & GL88-01 Supp 1, "Intergranular Stress Corrosion Cracking in BWR Austenitic Stainless Steel Piping.")
Generic Letter 88-01 applies to all BWR piping made of austenitic stainless steel that is four (4) inches or larger in nominal diameter and contains reactor coolant at a temperature above 200'ahrenheit during power operation, regardless of Code classification. It also applies to reactor vessel attachments and appurtenances such as jet instrumentation penetration assemblies and head spray and vent components. The Generic Letter divides these welds into seven (7) categories, lettered A through G, of which only four (4) are currently applicable to NMP2: A, D, E, and F. A summary of these categories, as well as their current applicability to NMP2 may be found in Section 6 of this plan under the IGSCC Field Description. Examinations performed under the scope of GL88-01 (and this Program Plan) are in compliance with the applicable Edition and Addenda of the ASME Code, Section XI, as specified in paragraph (g), Inservice Inspection Requirements of 10 CFR 50.55a, Codes and Standards, as stipulated in Generic Letter 88-01. As noted in Amendment No. 8 to NMP2 Technical Specifications, issued June 14, 1989, paragraph 4.0.5f., Niagara Mohawk is committed to, and has incorporated, the examinations defined in Generic Letter 88-01 into this document:
Materials NUREG-0313, Revision 2, as implemented by Generic Letter 88-01, is the current version of this NUREG, and is addressed in the NMP2 USAR Section 5.2.3.4.1. This NUREG addresses intergranular stress corrosion cracking of stainless steel piping material at BWR's. The following excerpts &om this USAR section are evidence of NMP2 com-pliance.
~  Since these materials have all been demonstrated to be highly resistant to oxygen-assisted stress corrosion in the as-installed condition, the reactor coolant pressure boundaiy is in complete compliance with NUREG-0313, Rev. 2.
~  In addition to the RCPB, the balance-of plant ASMEIIIClass I, 2, and 3 piping and components 4-inch nominal pipe diameter and larger comply wi th NUREG-0313, Revision 2, except as noted below:
NMP2-ISI-006 Rev.1                                          Section 3                                      Page 2 of 13
 
pd
(. Where the normal operating temperature is 200 7 or less. the line has not necessarily been revised to comply with NUREG-03l3, Rev. 2. Test data and analysis ofactualin-service failures demonstrate that there is an insignificant risk ofIGSCC in systems which normally operate at temperatures of 200 'F or less in normal BWR environments.
: 2. Where the normal operaring temperature exceeds 200 'Ffor an extremely short period oftime Pess than 1% ofthe total design life ofthe plant), the line has not necessarily been revised to comply with NUREG-0313, Revision 2. In these cases, the total length oftime in which these lines are exposed to temperatures greater than 200 'is insignificant with respect to the service conditions that cover IGSCC ...
Examination Method NMPC considers the intersecting longitudinal seam welds of those circumferential welds which are not resistant, to be themselves resistant, and excludes them from the augmented examination. For example, ifa non-selected, Code Examination Category B-J circumferential weld is being ultrasonically examined, solely pursuant to Generic Letter 88-01, then, not only will that circumferential weld not receive the Code required surface examination, but both the surface and volumetric examinations normally performed on the appropriate length of the associated intersecting longitudinal seam weld would likewise not be performed. Furthermore, NMPC understands Generic Letter 88-01 to require augmented volumetric examinations only. Generic Letter 88-01 categoiy A through G weldments not coincidentally selected per Code requirements receive volumetric (UT) examination only        no surface examination is performed.
The NDE procedures used for all stainless steel components at NMP2 include special techniques and trained personnel for detection of IGSCC.
Schedule Augmented piping examinations required by Generic Letter 88-01 are identified in the examination tables              of Appendix G by IGSCC categoiy.
~  ~Core o    A - Wetds of resistant material, ICrSCC Category A, are examined according to an extent and t'requency in excess of that specified in applicable provisions of Section XI of the ASME Boiler and Pressure Vessel Code. This also exceeds the requirement reflected in Table 1, Summary ofInspection Schedules for BWR Piping Weldments, of the Generic Letter. That table identifies the extent and schedule of Category A welds to be (the same) "25%
(sample) every 10 years." There are currently 113 Category A weldments at NMP2.
It should be noted that the Category A portion of the NMP2 commitment to NRC is contained in a letter dated November 20, 1990 (NMP2L-1263.) That letter contains a list of welds categorized as A pursuant to the Generic Letter. Further, 24 of those Category A welds were arbitrarily annotated to reflect the 25% sample required by Table 1 referenced above. However, the arbitrary nature of that annotation failed to address the overlap created by the implementation of the mandatory selection criteria described by      categorization in accordance  with Category  B-J of that Code. As a result, although NMP2 examined more than the minimum number of Category              A welds in the first interval, they were not precisely the ones annotated in NMP2L-1263. Some of the originally selected welds were exchanged for other Category A welds, and others were not. Since the total of ASME XI mandatory examinations was always equal to or greater than the 25% of population required by the NMP2 commitment to the Generic Letter, the total number of first interval examinations of Category A welds exceeded the minimum 25% of population required. The Second Ten Year Program Plan took into consideration those welds examined in the First Interval and of those chose 34 (30%) for examination in the Second Interval. This exceeds the required minimum of GL-88-01.
~    ~Cate o    D There are curre-ntly 47 Category D weldments at NMP2. All of these welds are specifically identified in the Apendix G examination Tables with the &equency of examination clearly specified.
18 welds are. located  in the WCS System, all are examined every even numbered refueling outage. (RFO-6,8,10) 1  weld is in the RCS System and is examined every odd numbered refuelinf outage (RFO- 7,9,11)
NMP2-IS I406 Rev.1                                        Section 3                                          Page3of13
 
29 welds are associated with the reactor vessel nozzle to safe ends and safe end extension welds. These examinations are performed approximately one half each refueling outage during the Second Interval such that all are examined every two refueling outages.
~    ~Care o    g  T-his GL88 01 Category was not utilized in the    First Ten-Year Program Plan prior to February 12, 1996. At that time, the High Pressure Core Spray nozzle          safe-end  to safe-end extension weld (2RPA(c32) was upgr'aded &om a GL88-01 Category F weldment pursuant to NRC approval contained in a letter of that date(2RP v-KG32 that was re-categorized to Category E and approved by the NRC on Feb. 12,1998.) Weld 2RPv-Kc32 was examined during RFO-6 with no detectable growth indicated from the previous examination.
~    Cate o F- Cycle-6(May5,1998- July5,1998)
Examinations conducted on GL-88-01 Cat. D weld 2RPvm2o revealed unacceptable indications in excess of ASME Section XI acceptance criteria. DER 2-98-1713 was generated to document this deficiency. Fracture Mechanics Analysis was performed (File 8 NMPC-12Q-401) and approval for operation for one fuel cycle was granted by an NRC SER dated 6/25/98. Expanded sample requirements of GL-88-01 were implemented and the three remaining Feedwater Nozzle to Safe-end welds (not scheduled for examination in RFO-6) were examined by ultrasonic techniques, all with acceptable results. Weld 2RPY-K820 has been re-classified as Category F and is scheduled for examination every refueling outage.
Sample Expansion Cate o ASam leEx ansion Category A lends itself directly to sample expansion at NMP2. Ifone or more cracked welds are found by a sample inspection during a given Refueling Outage, an additional sample of Category A welds will be examined. Per the guidance contained in Generic Letter 88-01 the sample expansion shall be sized approximately equal to the original scope for that outage. The sample expansion will be determined based on size, system, location and operating environment most similar to the cracked weld. Ifany additional cracked welds are found in the expanded sample, all Category A weldments shall then be examined prior to a return to service of the unit.
Cate orv D Sam le Ex ansion GL 88-01 requested Category D welds to be 100% inspected every two refueling cycles, thus negating the need for sample expansion. However as written, GL 88-01 would have required sampleexpansion had~Cate o D wehh been examined on a sampling basis during each inspection with cracking identified during examination. With adequate justification, GL 88-01, Supplement 1 now provides for the sample expansion of Category D welds to be limited to the piping system where cracking is found. NMP2 has opted to examine approximately 50% of Category D (RPV Nozzle to safe-end and safe-end to safe-end extension welds) welds each cycle, and will use this sample expansion criteria should cracking be found.
All 18 welds in the WCS      System and 1 weld in the RCS System are examined every other outage, therefore, based on the above definition there willbe no sainple expansion required for Category D welds in the WCS or RCS Systems in the event that cracking is found.
Cate o      E&FSam leEx          ansion Not applicable to NMP2 at this time as each of these categories are currently populated with one weld apiece. Sample expansion is therefore not required.
Reporting Requirements Ifany cracks    are identified that do not meet the criteria for continued operation without evaluation given in ASME XI,  USNRC    approval of flaw evaluations and/or repairs in accordance with IWB-3640 and IWA-4130 is required before resumption of operation.
NMP2-ISI406 Rev.1                                            Section 3                                          Page 4of13
 
USNRC approval was sought and acquired for the aforementioned 2RPv4c$ 2 weld indication's acceptance-by-evaluation, prior to resumption of operation.
Despite the fact that the indications found in 2RPvwB04 alld 2RPv+B10 durlllg the RFOA inspection were not IGSCC, NMP2 sought and acquired the approval of NRC prior to the resumption of operation.
USNRC approval was sought and acquired for the Category D weld 2RPV-KB20 as identified above.
3.1.3 NUREG-0619 This NUREG is covered in the FSAR as Licensing Issue 36. The subject is cracking of the feedwater nozzles and con-trol rod drive return lines at BWR's. However, neither of these are problems at NMP2 since:
~    The feedwater nozzles have been redesigned by GE and a topical report issued covering this redesign has been accepted by NRC.
~    The potential CRD return line problem has been solved at NMP2 by removing the CRD return line, thus elimi-nating temperature transients that caused cracking in other BWR facilities.
3.2 REGULATORY GUIDES Regulatory Guides are issued by NRC to describe and make available to the public those methods of implementing specific parts of the Commission's regulations which are acceptable to the Regulatory StaK They are meant to provide guidance or delineate techniques used by the staK They are not substitutes for regulations, and compliance with them is not required by NRC. However, NMP2 understands that those implementation methods which differ substantially from the associated Regulatory Guide are subject to scrutiny by the Commission prior to acceptance by them. In such cases, those methods/solutions (di6'erent from those set out in the guides) are understood to be accept-able to the Commission ifthey provide a basis for the findings requisite to the continuance of NMP2's license by the Commission. NMP2 will always comply with the pre-approved methodology described in those Regulatory Guides which are applicable to this Program, or provide the appropriate basis for findings requisite to the continuance of our license.
Three Regulatory Guides have been determined to be applicable to NMP2 for purposes          of this ISI Program  Plan:
3.2.1  REGULATORY GUIDE 1.26 This Regulatory Guide is titled, Quality Group Classificanons for Nuclear Piping and Components. Although the existing design ASME Class boundaries were used in development of this Program Plan, Regulatory Guide 1.26 was used as a reference document throughout the course of ISI Program Plan development. For example, although designed to Class 4 requirements, the Main Steam piping outboard of the containment isolation valves, up to but not including the stop valves, has been upgraded to Class 2 for ISI purposes. This upgrade is resultant to a commitment made by NMPC in the Final Safety Analysis Report.
3.2.2 REGULATORY GUIDE 1.147 This Regulatory Guide is titled, ASMZ Code Case Applicability. It lists the ASME Section XI Code Cases which are accepted by NRC. Code cases listed in this Regulatory Guide, and which are applicable to NMP2, are tabulated in Section 2 of this plan.
3.2.3 REGULATORY GUIDE 1.150 This Regulatory Guide is titled, UT ofRP V Welds During 1SI. It is addressed in NQAO-NDE Procedure NDEP 1.08
- Implementarion ofRegulatory Guide I. I50 for RPV Examinations.
L NMP2-ISI~ Rev.1                                        Section 3                                            Pege5of13
 
t NOTE: The requirements of this Reg. Guide have been modified based upon the utilization of General Electrics PDI enhanced inspection techniques for all Reactor Pressure Vessel Examinations.
3.3 RECOMMENDATIONS OF THE NSSS SUPPLIER General Electric Nuclear Energy (GENE) implemented the Service Information Letter (SIL) program as a service to owners of GE BWRs in July of 1973. The purpose of the program is to promote plant performance improvements and to alert owners to conditions which can degrade plant performance. SILs usually convey specific recommenda-tions regarding GE BWR plant equipment or procedures. They also furnish information about unique operating conditions and experiences at GE BWRs. Because SILs only communicate GENEs recommendations, it is inappropriate for GENE to identify schedules for implementing those recommendations. Where no associated mandate from USNRC exists, implementation and scheduling are at the discretion of NMPC.
On April 1, 1986, GENE added Rapid Information Communication Services Information Letters (RICSILs) to the SIL program. The purpose of RICSILs is to communicate technical information concerning develo in situations which GENE believes may interest owners.
The following referenced documents are currently being implemented for this Second Ten Year Inservice Inspection Program Plan.
RICSIL-065 Jet Pum Beam Crackin This RICSIL is dated December 3, 1993 and was received by NMP2 shortly aAer entry into the fourth fuel cycle. In it, GENE provided an update to SIL-330 Supplement 2 which revealed that, "Ultrasonic testing (UT) procedures currently (i.e., 1993) in use do not address cracking in beam end locations, (and that) it is not possible currently to determine by in-vessel examinations whether installed beams are crack &ee and suitable for continued service." As a result, NMP2 implemented EDC 2M10802A at RFOQ to replace all 20 jet pump hold-down beam assemblies.
(This action also addressed concerns raised in USNRC Information Notice No. 93-101.) The inspection requirements of EDC 2M10802A supersede those of DER 2-93-2702 and SIL-330 Supp.2. They are:
~  IVVIinspection of the as-left configuration of the beams and the keeper welds
~  baseline (PSI) UT
~  ISI UT examinations of the beam center sections aAer 10 years of hot reactor service (since these new beams have been installed, which precludes these specific bulleted examinations during the span of this first interval Plan)
~  visual inspection at RFO-5 and RFO-6 of the sole jet pump beam retainer (&#xb9;16) that was bent instead of removed (as allowed by Option 2) and at each ISI (IVVI)of the jet pump beams thereafter.
SIL-330 Su . 2 GEBFR/6 Jet Pum InletMixer Eection This SIL is dated October 27, 1993, and was received by NMP2 during its third refueling outage. General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of this SIL is to alert owners of GE BWRs with jet pumps, that a BWR/6 has recently been added to the list of two (2) BWR/3s that have experienced the loss of a jet pump inlet mixer due to IGSCC fomented beam failures. NMPC has evaluated this concern in Deviation/Event Report
&#xb9; 2-93-2702 which reveals that:
~  crack initiation is not anticipated, on average, before October, 1996 (8.5 calendar years aAer commercial operation,)
~  jet pumps are monitored daily for operability per Technical Specification 3.4.1.2,
~  jet pump failure is more of a reliability/operability issue than a safety-related issue,
~  root cause, and final assessment are yet to be determined/rendered,
~  UT examinations are to be performed each RFO commencing with RFO-4.
SIL-409 Rev. I -Incore D Tube Cracks General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of a first revision to this Services Informarion Letter is ".to provide new information and recommendations on the cracks found in Intermediate Range Monitor (IRM) and Source Range Monitor (SRM) dry tubes." NMPC has evaluated this concern in Deviation/Event NMP2-ISI~ Rev.1                                            Section 3                                        Pege6of13 f
 
        &#xb9; Report C-93-0105, which reveals that GENE's original notification to the industry appeared in Revision 0 of SIL-409, which had been issued 6-19-84. The DER disposition is all-inclusive, as Rev. 1 of the SIL supersedes the original issue, and NMP2 had already taken action on Rev. 0.
All twelve SRM/IRM's were examined during RFO-6 in May'of 1998, during the IVVIexaminations. Allwere acceptable with the exception of dry tubes designated as 16-21 and 32-37 that were rejected and documented on DER 2-98-1584. These two are required to be inspected in RFO-7and are so scheduled in Appendix G.
SIL-420-Ins ecrion o JetPum Sensin Lines This SIL is dated March 28, 1985, and was received by NMP2 three (3) years prior to commercial operation. It was addressed three (3) years later, on the first day of the First Ten- Year Interval, April 5, 1988, by Internal Memorandum NMP-17671.
The SIL relates the results of visual inspections conducted in 1982 and 1984 at two (2} separate BWR/4s, where it was noted that the low pressure sensing line was fractured in the vertical section and separated from its middle support bracket at the attaching weld. GENE recommended a visual inspection suQicient to determine "that the weld between the support brackets and the vertical run on the sensing line is intact."
NMPC implemented no special exaininations to address this concern. Rather, credit was taken for the mandatory ASME XI Category B-N-1 VT-3 examinations anticipated to be performed " at the first refueling outage and subsequent refueling outages at approximately three year intervals" per coritractor (Nuclear Engineering Services) procedure number NES 83A2681. It specifically referenced the subject lines in its Section 1.2 as Item 21, "Jet Pump Sensing Lines." However, that procedure was not used to perform the B-N-1 VT-3s performed during the jirst interval. Instead, B-N-1 examinations were performed by GENE personnel to GENE procedures, the latest being at RFOA, to GE-VT-203, as documented on pages 9, and 11 through 15, inclusive, of examination report no. 2-2.01-95-0239.
SIL-455 Rev. I Su . I - ISI o Addirional Allo l82 0'eldments This SIL recommends additional ISI examination of safe end-to-nozzle weldments made with alloy 182, The purpose of these examinations is to assure that alloy 182 butter cracking has not occurred and extended into the low alloy nozzle material. These examinations can be performed during inservice inspection. The recommendations of SIL-455 Rev. I, Supp. 1 are being implemented as part of a Niagara Mohawk internal commitment and are not considered an NRC requirement.
SILP55 A//o 182 Ex anded Area Examinations RPV NOZZLES                                                        WELD ID&#xb9; N1A, B                                        (2)        RPV-KB01, 02 N2A,B,G,D,E,F,G,H,J,K                        (10)        RPV-KB03, 04, 05, 06, 07, 08, 09, 10, 11, 12 N4A, B, C, D, E, F                            (6)        RPV-KB17, 18, 19, 20, 21, 22 N5                                            (1)        RPV-KB23 N6A, B, C                                      (3)        RPV-KB24, 25, 26 N9A, B                                        (2)        RPV-KB29, 30 (1)        RPV-KB32 SIL-462 Su . 3 - Radial Crackin in Creviced Inconel 600 Access Hole Cover Weldments This supplement is dated June 8, 1992. NMPC has evaluated this concern in Deviation/Event Report &#xb9; 2-92-2684, which reveals that this supplement does not discuss any adverse conditions found that are associated with a creviced 316L configuration, nor does it give any revised guidelines for the 316L material over those previously addressed in supplement 1. The commitment found in internal correspondence NMP-72187 requires a visual inspection (IVVI)
NMP2-ISI406 Rev.1                                            Section 3                                          Page7of13
 
will be performed on both cover plates once per 10-year inspection interval. The third period contained RFOA and RFO-5. An IVVIwas performed during RFO-4. That examination detected no cracking.
SIL-474 Steam D er Drain Channel Crackin This SIL is dated October 26, 1988, and was received by NMP2 during the mid-cycle outage (which had been conducted prior to RFO-I.) General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of this SIL is to inform BWR owners of the significance of cracks which had been discovered at several BWR-4, 5, and 6 plants. Those cracks were in the welds that attached the drain channels to the steam dtyer shrt. Although the steam dryer is not a safety related component, and drain channel crachng is not a safety concern, GENE recommends further inspection and repair in the event such cracks are discovered at NMP2. No inspection was performed at the mid-cycle outage.
NMP2 examined all four steam dryer drain channels via remote, underwater, visual examination (RUVE) in October of 1990, during RFO-1. Drain channels I, 2 and 3 displayed no relevant indications and, although the weld that attaches drain channel &#xb9;4 to the steam dryer skirt likewise displayed no relevant indications, the base metal of
. the skirt, from the toe of the weld outward, did. This heat affected zone at the left side vertical weld was found to contain 27 crack-like indications, ranging from.125" to 1.1" in length. The condition was found to be acceptable for continued use via NCR&#xb9; 2-90-0054, which also required an additional remote, underwater, visual examination at RF0-2.
NMP2 re-examined drain channel &#xb9;4 via RUVE in April of 1992, during RFO-2. The indications in the base metal were found to have grown, now ranging in size Irom 0.25" to 1.5 inches. GENE characterized this 36% crack growth as "small," with, "no fundamental change in the observed indications." The condition continued to be accept-able for use via DER 2-92-1381, which also required yet another RUVE at RFO-3              the largest indication to be mea-sured for growth, with a remote visual on the inside    of  the skirt  (to determine  if the  indications continue behind the drain channel) in the event crack growth was detected, i.e: greater than 36%.
NMP2 reexamined drain channel &#xb9;4 via RUVE in October of 1993, during RFO-3. The longest indication was verified to be 1.6" in length. Consistent with the initial evaluation of growth, this 6% increase was considered incon-sequential. Therefore, no inspection was performed on the inside of the skirt. The condition continued to be acceptable for use via Revision &#xb9;3 to DER 2-92-1381, which required yet another RUVE                this one at RFO-6, and intended to be coincidental with the first IVVIof the second interval, as mandated by          ASME    XI Code Category B-N-1.
NMP2 re-examined drain channel &#xb9;4 via RUVE in May of 1995, during RFO-4. The longest indication was verified to be 1.8" in length. This represents growth of 0.2" in a span of one cycle (approximately 1.5 years) for a calculated growth rate of 0. 13 "/year, or '6 the allowable growth rate of 0.4"/year.
Acceptance Criteria.
Ifinspection results indicate crack growth to be limited to 0.4"/year, then further inspections shall be performed at every fourth RFO (so as to coincide with the IVVIexaminations.)                                                              t Ifinspection  results indicate crack growth to exceed  0.4 "/year,  or additional cracks  are discovered, they shall be reported (to the design engineering department) via the governing procedure.
SIL-551 -Jet Pum Riser Brace Crackin This SIL is dated February 26, 1993, and was received by NMP2 on March 15, 1993, during its third operating cycle.
This SIL is safety related because jet pump integrity is required to maintain water level in the core following a design basis accident. It is important to note that although the title implies a concern regarding cracking of the brace, the text of the SIL relates a concern regarding'cracking on the weld that attaches the brace leaf to reactor vessel pads.
This SIL is addressed by NMP2 on April 1, 1993 via DER 2-93-0824, which concluded that the jet pump riser welds at NMP2 were (coincidental with ASME XI mandates) already being examined to the extent (VT-1 as opposed to VT-3) and frequency (every refueling outage, as opposed to every other refueling outage) recommended by this SIL. This conclusion is incorrect. The ASME XI criteria actually stipulates; that the less stringent VT-3 type visual examination be performed at a similar &equency (i.e., 100% every other refueling outage) on the braces, and that the more stringent (i.e., the appropriate visual examination) VT- I type visual examination be performed at a lesser frequency (i.e., 100% every 10 years) on the welds connecting the braces to the pads on the interior of the vessel wall.
Specifically, NMP2 does not perform a VT-1 type visual examination of the jet pump riser brace welds at a frequency of 50% every refueling outage, as recommended by this SIL. Rather, NMP2 routinely performs a VT-1 examination NMP2-ISI406 Rev.1                                          Section 3                                              Page Bof13
 
of acce  sible jet pump riser bracket welds once evety ten years in accordance with ASME XI Examination Category B-N-2, Item No. B13.20, entitled "Interior Attachments Within Beltline Region," (JETNUMPs-233) and a VT-3 examination of accessible areas of the vessel interior (read jet pump brackets, i.e., braces) every even-numbered refueling outage in accordance with ASME XI Examination Category B-N-1, Item No. B13.10, entitled "Vessel Interior" (JET+UMr -291.) NMP2 will continue this alternate examination type and &equency until the disposition to DER 2-93-0824 is superseded.
SIL-554 -To Guide Crackin The top guide in a GE BRW maintains alignment and spacing at the top of fuel assemblies. (i.e., the top guide is part of the core support structure.) NMP2 routinely examines the top guide pursuant to ASME XI Examination Category B-N-2, Item No. B13.40, entitled "Core Support Structure." The top guide examination is specifically identified as coRENTRUGT-1 in Appendix G of this document. It is limited to those areas "made accessible for examination by removal of components during normal refueling outages.
SIL-571 - Instrument Nozzle Sa e Fnd Crack This SIL is dated September 15, 1993, and was received by NMP2 during its third refueling outage. General Electric Nuclear Energy's (GENE) stated purpose for the promulgation of this SIL is to locate any cracking in water-level-instrument-nozzle safe ends, so that they may be repaired on a timely basis. Although there is no safety concern associated with a failure of these safe ends, and a leak in one is unlikely to damage any drywell equipment, not performing the recommended actions only increases the length of time that a crack may go undetected, and commensurately, the chance that a leaking crack may be discovered at an inopportune time at which to perform mandatory repairs. NMPC has evaluated this concern in Deviation/Event Report &#xb9; 2-93-2388 which reveals that:
~    NMP2 possesses eleven (11) such nozzles:
(1) Nozzle N11 1.953" dia., 0.251" thick, SA-336 Class F8 austenitic stainless steel, (4) Nozzles N12 2.406" dia., 0.485" thick, SA-508 Class 1 carbon steel, (2) Nozzles N13 - 2.406" dia., 0.485" thick, SA-508 Class 1 carbon steel, and, (4) Nozzles N14 2.406" dia., 0.360" thick, SA-508 Class I carbon steel.
~    Only one (1) nozzle (N11) utilizes a stainless steel safe end.
~    That nozzle contains a weld which is included in this Plan: 2N vc834-a Category B-F nozzle-to-safe-end,
                                        &#xb9; dissimilar metal weld, (ref. Dwg. ISI-COM-035.)
~    Only that weld was scheduled for examination (via the liquid penetrant method in the third Period of each Interval)-the entire length of the safe end was not.
Accordingly, this Program Plan was revised at RFO-3 to include the ultrasonic examination of the entire length of the stainless steel nozzle safe end base material at nozzle N11 that is accessible by that method, dependent upon the feasibility of acquiring a suitable calibration block. Accessibility was to be assured via field walk-down prior to acquisition of a standard.
During RFO-4, a GENE UT technician performed a walk-down of the N11 nozzle to determine access con-figuration and potential examination requirements, finding that:
~    the nozzle safe end area is accessible for UT examination
~    a calibration standard (block) should (now) be fabricated to develop a meaningful examination technique
~    curved transducer wedges may be required due to the small diameter of the safe end (with confirmation upon acquisition of the above mentioned calibration standard.)
As a result of that walk-down (and the fact that the examinations need not commence prior to 15 years of plant opera-tion) the disposition to DER 2-93-2388 was revised to tentatively schedule an initial UT in or about the year 2001, during RFO-8. Thereafter, examinations will be planned based on the results of previous examinations.
Ifa linear indication is located, then ultrasonic examination should be used to determine crack depth, with the results reported to the Design Engineering department, in writing, via the appropriate vehicle.
NMP2-ISI406 Rev.1                                          Section 3                                        Page 9 of 13
 
SIL-574- Jet pum Ad ustin Screw Tack Weld Failures This SIL is dated October 5, 1993, and was received by NMP2 during its third refueling outage. General Electric Nu-clear Energy's (GENE) stated purpose for the promulgation of this SIL is to alert owners of GE BWRs with jet pumps, that cracking has occurred in the tack welds that lock the adjusting screws that are threaded into jet pump re-strainer brackets at four (4) (other, not NMP2) GE BWRs. There are: 20 jet pumps in the NMP2 vessel; two (2) set screws per jet pump (orie on the shroud side, and one on the vessel side); and two (2) tack welds per set screw, for a total of 80 tack welds. The vessel side screws (and therefore, their tack welds) are far more accessible to an underwater camera than the shroud side screws. NMPC has evaluated this concern in Deviation/Event Report ii 2 2295 which reveals that:
~    Plants with observed cracking, and the subsequent loss of screw positioning, had operated for approximately six years or more (seven or more calendar years). A historical review of the events following weld cracking (i.e.,
failure of additional welds; back-out of screws; wearing of the pad/wedge areas) indicates a significant duration that may involve several operating cycles. As of RFO-3 (Autumn, 1993) NMP2 had completed 4.14 years of operation, through three (3) operating cycles-significantly less than plants which have experienced weld cracking. At RFO-4, NMP2 will have operated for a maximum of 5.64 years, through four (4) operating cycles.
~    Of the four plants referenced, only Tokai 2 has the same jet pump design as NMP2. However, Tokai 2 also pos-sesses a higher vibration level. GENE believes that the cause of tack weld failure is high cycle fatigue &om jet pump vibration.
~  NMP2 tack welds typically exceed the minimum size required by as much as 108%. GENE has reported that substantial tack welds greatly reduce the chances of finding fatigue cracks.
~  NMP2 adjusting screws typically evince no gaps at the point of contact with the inlet-mixer "belly band," allowing the adjusting screws to transmit vibratory loads Irom the inlet-mixer to the restraint bracket directly through the screw threads, thus negating transmission to the welds.
~  RFO-1 and RFO-2 IVVls addressed a large sample of adjusting screw tack welds; all of which exhibited no cracking.
3.4 COMMITMENTS MADE TO NRC PURSUANT TO BWR VESSEL &, INTERNALS PROJECT The following information addressing BWRVIP Implementation addresses only those examinations'completed during RFO-06 and those currently scheduled for RFO-07 (Spring 2000). Development of the complete BWRVIP implementation for the entire second Ten Year Interval is under development. Upon completion that information will be added to the Program and implemented as specified.
BWRVIP-01 BFR Core Shroud Ins ection and Flaw Fvaluation Guideline Guidelines which are used for inspection of BWR Core Shrouds and for the evaluation of any Qaws. Flaws being cracks due to Intergranular Stress Corrosion Cracking (IGSCC) observed in the vicinity of the Core Shroud welds.
This document standardizes methodology which is accepted by regulators for performing Core Shroud inspections and for evaluating the results of any observed cracking.
During RFO-6 inspection of 4 of the 8 horizontal Reactor Pressure Vessel Core Shroud welds (H3, H4, H6 and H8) had been scheduled to be performed in order to determine ifevidence of cracking existed. These inspections were conducted in accordance with the BWR Vessel and Internals Project Shroud Inspections Guidelines (BWRVIP-01).
DER 2-98-1557 was generated on 5/27/98 to document this deficiency. An Engineering Analysis to support core re-load was completed on 6/8/98. Approval for operation for one fuel cycle was granted by an NRC SER dated 6/25/98.
BWRVIP-07 Guidelines or Reins ection o BH% Core Shrouds Provides a generic inspection criteria for the reinspection of BWR core shrouds.          This document provides inspection criteria for both unrepaired and repaired core shrouds.
NMP2-ISI406 Rev.1                                        Section 3                                            Page10 of 13
 
BWRVIP Core S ra Internals Ins ecnon and Flaw Evaluation Guidelines Guidelines to provide information on weld location in core spray piping, spargers and brackets a "baseline" approach for the first inspection and an approach for subsequent reinspections.
. BWRVIP BFR Core Plate Ins ection and Flaw Evaluarion Guidelines Guidelines intended to present he appropriate inspection and evaluation of the core plate. The scope addresses all welds and bolted locations of the core plate stiffener beams, stabilizer beams, aligner pins, hold down bolts and wed ges.
BWRVIP BWR To Guide Ins ecrion and Flaw Evaluation Guidelines Guidelines for inspection  of BWR top  guides and presents an approach for evaluating flaws found during an inspection.
BWRVIP BWR Standb I.i uid Control S stem/Core Plate dP Inse ction and Flaw Evaluation Guidelines Guidelines to define the inspection requirements for BWR Standby Liquid Control (SLC) system piping &om the vessel nozzle safe-end inward.
BWRVIP BWR Shroud Su            ort Ins ection and Flow Guidelines Guideline for the inspection  of the BWR Shroud support      structure and for the evaluation of any flaws found.
BWRVIP BFR Jet Pum Assembl Ins ection and Flaw Evaluation Guidelines NMP2 committed to the guidance contained in this document via disposition to NMP2 DER 2-97-0090. BWRVP-41 was submitted for approval to the regulators in October of 1997. NMP2 has not received a concluding Safety Evaluation Report as of August -1998. As a result, the guidance, and therefore, the commitment, remains tentative.
The following Jet Pump Riser welds were examined during RFO-06 with the remainder planned as noted.
A.) Riser Elbow -to- Thermal Sleeve Weld (RS-1):Performed enhanced VT-1 examination during RFO-06 of 100% of the accessible weld heat affected zone (HAZ) on one half (5) of the jet pumps (all with acceptable results).
B.) Riser Elbow -to- Riser Pipe Weld (RS-2): Performed enhanced VT-1 examination during RFO-06 of 100
          % of the accessible weld heat affected zone (HAZ) on one half (5) of the jet pumps (all with acceptable results).
C.) Riser Pipe -to- Transition Piece Weld (RS-3): Performed enhanced VT-1 examination during RFO-06 of 100
            % of the accessible weld heat affected zone (HAZ) on one half (5) of the jet pumps (all with acceptable results). (The cast side of the weld is not required to be inspected.)
NMP2-ISI406 Rev.1                                          Section 3                                          Page 11 ot13
 
BWRVIP - 41 Table 3.2-1 defines an inspection Cycle as six (6) years which is based on fuel cycles, ie. For a plant on a 24 month fuel cycle, the inspection cycle is 3 fuel cycles.
Future examinations for the remaining RS-1 & RS-2 welds are required to be completed within the next two inspection cycles (12 years), by RFO-12. ThereaAer, reinspection will be 25 % every 6 year inspection cycle.
The remaining RS-3 welds are required to be inspected within one inspection cycle (6years), by RFO-09. Thereafter, reinspection will be 50% every 6 year inspection cycle.
Scope Expansion:
Ifone or more flaws are found during either the baseline      or re-inspection of a specific location, all of the remaining locations of the same type on all other jet pumps should be inspected during the same refueling outage unless the law can be correlated to a specific event. The purpose of this scope expansion recommendation is to assure that, for those degraded locations, inspections are completed so that any generic degredation can be identified. In addition, the e6ect that degredation of one location has on other locations should be considered when determining ifscope expansion is warranted. Flaw evaluation criteria is p'rovided in GE Report, GE-NE-01927, Rev. 0 (NMPC ii MISC017115028)
BWRVIP LPCI Cou lin Ins ection and Flaw Evaluation Guidelines These guideline provide design information on the types    of LPCI coupling arid identify potential failure locations as welds, bolts, and other appurtenances.
BWRVIP Vessel ID Attachment Weld Ins ection and Evaluation                de  Guidelines Guidelines for vessel attachments which were determined to be safety-related (the core spray piping bracket and jet pump riser brace attachments).
BWRVIP Instrument Penetration Ins ection and Flaw Evaluation Guidelines Guidelines for the recommended approach    of Instrument    Penetrations which will assure the integrity of all safety functions.
3.5 INSTITUTE FOR NUCLEAR POWER OPERATIONS RECOMMENDATIONS No recommendations applicable to pressure retaining components have been implemented at NMP2.
3.6 USNRC OFFICE OF INSPECTION AND ENFORCEMENT BULLETINS NMPC routinely receives, reviews, and dispositions the information contained in USNRC, OQice of Inspection &
Enforcement bulletins in accordance with internal NMP C procedure no. NIP-ECA-01. Dispositions are documented in Deviation/Event Reports (DER). DER dispositions requiring periodic inspections to be incorporated into this plan are identified below under the heading of the originating Inspection & Enforcement bulletin.
3.7 USNRC      INFORMATIONNOTICES USNRC routinely issues Information Notices to alert addresses of industiy events; NRC expects that recipients will review the information for applicability to their facility and consider actions as appropriate to detect or avoid similar problems. However, suggestions contained in information notices are not NRC requirements; therefore, no specific action or written response is required by NRC. Nevertheless, NMPC routinely receives, reviews, and dispositions the information contained in Information Notices in accordance with internal NMPC procedure no. NIP-ECA-01.
NMP2-ISI406 Rev.1                                          Section 3                                            Page 12 of 13
 
Dispositions are documented in Deviation/Event Reports (DER). DER dispositions that require periodic inspections to be incorporated into this plan are identified below under the heading of the originating Information Notices.
~    Information Notice 97-02 Cracks Found In Jet Pump Assembly Elbows at Boiling 8'arer Reactors NRC Information Notice 97-02 was issued February 6, 1997 to alert NMP2 that cracking had been detected in a jet pump riser assembly of a foreign BWR, at a location not previously known to have cracks. It was received by NMP2 in the ninth year of its First 10-Year ISI Plan, during its sixth fuel cycle. NMPC performed a preliminary assessment as documented in Quality Assurance Department memorandum no. QA97086, wherein it is stated that Information Notice 97-02 is applicable to NMP2 and is to be dispositioned in DER 2-97-0090.
That same DER addresses GE SIL-605, a document that preceded and, in part, fomented this Information Notice.
The reader is referred to that entry above.
~    Information Notice 97-29 Containment Inspection Rule NMPC addressed this Information Notice in DER 2-97-2724, and references that document here (to facilitate auditability of this plan), despite the fact that its disposition does not require periodic inspections to be incorporated into this plan.
The Inspection Program Plans for IWE (Class MC) and IWL (Class CC) Components are under development. These programs will be completed and implemented prior to September, 2001.
Repair and replacement activities within the scope of Subsections IWE and IWL of the code conducted after September 9,,1996, are conducted in accordance with these subsections.
NMP2-ISI406 Rev.1                                        Section 3                                      Page 13 or 13
 
4.0 INSERVICE INSPECTION BOUNDARIES For the sake of clarity, it is important to note that:
~  The boundaries addressed below apply to inservice inspection only-this, as opposed to repair and replacement boundaries, which address all the components within these Class 1, 2 and 3 boundaries.
4.1 PIPING 8c      INSTRUMENTATIONDRAWINGS (PEcIDs)
The NMPC piping and instrumentation drawings covering all ASME Class 1, 2 and 3 systems were used to determine which piping lines and components were subject to the examinations required by Section XI of the ASME B&PV Code. The results of that analysis and application were submitted to the regulators in the First Ten-Year Inservice Inspection Program Plan, and were found to be in accordance with the Code of record as indicated in the approval letter and SER issued by the Commission.. All first interval inservice inspections were carried out in accordance with the 1983 Edition with Summer of 1983 Addenda to. Section XI of the Code. Plant configuration has been maintained throughout the interval via updates, in compliance with Criterion 6 of Appendix B to Part 50 of Title 10 of the Code of Federal Regulations, (i.e., the P&IDs have been updated to continue to reflect the as-built condition of the physical plant.) This ISI program document, by inclusion of those controlled P&IDs at their latest revision levels, together with posted, unincorporated change paper, updates the boundaries from those originally specified. As previously reported in the First Ten-Year Inservice Inspection Program Plan, the inservice inspection component classifications used continue to be determined by the class designations provided on the P&ID's.
A notable exception to the    use of the classifications indicated    on the P &ID's is the main steam piping from the outermost containment isolation valves up to the turbine stop valves, and branch lines 2-'/2 inches and larger (up to and including the first valve capable of automatic closure.) These lines are designed to ANSI B31.1 requirements and classified seismic Category I, Quality Group D. However; this piping is inspected to Section XI requirements for Class 2 piping. The examination classification upgrade of these runs of main steam piping is consistent with the USAR and Regulatory Guide 1.26.
I TABLE 4.1-1 P &ID'S IN SCOPE FOR ISI PROGRAM PLAN DOCUMENT NMP2-ISI-006 SYSTEM P  Sc ID NUMBER                                                  NAME                                    CODE 2-A. B C,D E                                                  S    bols Main Steam                                  MSS 1-A,B,C,D,E F,G H,J K                            Main Steam Safe      Valves, Vents, and Drains              SVV 6-B                                                  Feed water 13AB CDE                                  Reactor Buildin Closed Loo Coolin Water                      CCP 25-A                                                Auxili    Steam                              ASS 25-F                                        Turbine Gland Seal and Exhaust 28-A, B, C                                        Reactor Vessel Instrument                          ISC 29-A B C                                            Reactor Recirculation                          RCS 30-B, C                                        Control Rod Drive H draulics                        RDS 31-    BCDEFG                                            Residual Heat Removal NMP2-ISI406 Rev.l                                      Section 4                                    Page i of 4
 
Low Pressure Core                  rav                          CSL 32-A                                                                                        S 33-A, B                                                    Hj h Pressure. Core              S ra                          CSH 35-AB CD                                                    Reactor Core Isolation Coolin                                        ICS 36-A                                                        Standb    Li uid Control                                      SLS 37-A, B                                                      Reactor Water Cleanup                                          WCS 4.2 EXEMPTIONS Class    1 and 2 exemptions applied in this ISI Program are given below.
4.2.1 CLASS 1          VOLUMETRICAND SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS As stated in subsubarticle IWB-1220, "The following components (or parts of components) are exempted from the volumetric and surface examination requirements of IWB-2500:
(a) Components'hat are connected to the reactor coolant system and part of the reactor coolant pressure boundmy,'nd that are of such a size and shape so that upon postulated rupture the resulting flow of coolant from the reactor coolant system under normal plant operating conditions is within the capacity of makeup systems which are operable from on-site emergency power; (b) (1) piping ofNPS-1 and smaller; ...
(2) components and their connections in piping'f NPS 1 and smaller; (c) reactor vessel head connections and associated piping, NPS 2 and smaller, made inaccessible by control rod drive        penetrations."'.2.2 CLASS 2 VOLUMETRICOR SURFACE EXAMINATIONREQUIREMENT EXEMPTIONS As stated in subsubarticle IWC-1220, "The following components (or parts                                              of components)  are exempted from the volumetric and surface examination requirements of IWC-2500.
Components Within RHR, ECC, and CHR Systems (or Portions of                                        Systems)'a)
Vessels, piping, pumps, valves, and other components NPS 4 and smaller in all systems ...
(b) ... (not applicable to NMP2)
(c) Component connections NPS 4 and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size in all systems ...
(d) ... (not applicable to NMP2)
(e) ... (not applicable to NMP2)
(f) Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions.
  'efer to 10 CFR 50, Section    50.55a, (c)(2), revised March 15. 1984.
The exemptions from examination in IWC-1220 may bc applied to those components permined to be Class 2 in lieu of Class 1 by thc regulatory authority having jurisdiction at the plant site.
Reactor coolant pressure boundary is defined in 10 CFR 50, Section 50.2(v); revised January 1, 1975.
  'n  piping is defined as having one inlet and one outlet pipe, each of which shall be NPS 1 or smaller.
NMP2 has used this allowance to exempt the RPV bonom head drain shell-to.nozzle exainination item number sttrv ttF.
RHR, ECC, and CHR systems are the Residual Heat Removal, Emergency Core Cooling, and Containment Heat Removal Systems, rcspectivcly.
NMP2.ISI406 Rcv. 1                                                    Section 4                                                  Page 2 of 4
 
Components Within Systems (or Portions of Systems) Other Than RHR, ECC, and CHR Systems (a) Vessels, piping, pumps, valves, and other components NPS 4 and smaller.
(b) Component connections NPS 4 and smaller (including nozzles, socket fittings, and other connections) in vessels, piping, pumps, valves, and other components of any size.
(c) Vessels, piping, pumps, valves, other components and component connections of any size in systems or portions of systems that operate (when the system function is required) at a pressure equal to or less than 275 psig and at a temperature equal to or less than 200'F.
(d) Piping and other components of any size beyond the last shutoff valve in open ended portions of systems that do not contain water during normal plant operating conditions."
4.2.2.1 STANDBY GAS        TREATMENT SYSTEM (GTS)
As stated in the NMP2 FSAR Table 3.2-1, this piping, although designed to Class 2 requirements, is actually intended to fulfillthe function of duct work. Therefore, the safety class portions of this system are Class 2 exempt.
4.2.3 CLASS 3 EXEMPTIONS As stated in major subparagraph IWD-1220.1, "Integral attachments of supports and restraints to components (and therefore the supports associated with those components) that are NPS 4 (4" nominal pipe size) and smaller within the system boundaries of Examination Categories D-A, D-B, and D-C of Table IWD-2500-1 shall be exempt from the visual examination VT-3."
As stated in major subparagraph IWD-1220.2, "Integral attachments of supports and restraints to components (and therefore the supports associated with those components) exceeding NPS 4 may be exempted from the visual examination VT-3 of Table IWD-2500-1 provided:
(a) the components are located in systems (or portions of systems) whose function is not required in support of residual heat removal, containment heat removal, and emergency core cooling; and (b) the components operate at a pressure of 275 psig or less and at a temperature of 200'F or less.
As authorized by NRC in their response to first ten-year request for relief RR-IWD-1, piping and other components of any size beyond the last shut off valve in openhanded portions of systems that do not contain water during normal operation may be exempted from the visual examination VT-3 of Table IWD-2500-1.
4,2.4  APPLICABILITYOF CLASS 2 PRESSURE/TEMPERATURE EXEMPTIONS Most of the IWB and IWC exemptions are quite clear and not subject to interpretation, as they are based on the physical size of components. However, IWC (Class 2) provides exemptions for which the criteria are based on system functions and operating temperatures and pressures. These temperature and pressure exemptions were discussed in the previous section. Table 4.2-4,provides a listing of lines and system portions where these exemptions are used on Class 2 systems.
It is important to note that where the primary flow path provides the intended system function, as identified in the exemptions, any branching flow path which does not provide a system function, as identified in the exemptions, is included as part of the primary system to the nearest isolation valve.
;4MP2.ISl406 Rev. i                                Section 4                                  Page 3 of 4
 
TABLE 4,2A
                                        'LASS 2 SYSTEM PORTIONS EXEMPT DUE TO OPERATING TEMPERATURE AND PRESSURE SYSTEM                              PRESS      / TEMP*                                                                  REFERENCE**.
ICS pump suction from 35A              150/                                            su ression        1 170'4.7 Reactor Core Iso-          35B                    /                                  Ru ture disc to    atmo  here lation Cooling ICS                35D                    /
160'ESCRIPTION 104'6.3 ICS um suction          i in PDP 274 Rev. 6 100'.8/
Purge inlets to suppression chamber and veil 110'/
Containment Purge                                                              Purge outlet from suppression chamber and        PDP 22-23 CPS                  61A                                                                        veil                      Rev. 3 135'.3 63C                  /                                    Containment Drain Header Reactor Building                                          150'.3 Equipment 8c Floor                                                                      Dlywell to Reactor Building                PDP 26-3 Drains FR                63E                  /                                            Drain Header                      Rev. 4 150'35 DBA Hydrogen                                                                                                                  PDP 27-13 Recombiner        CS        62B                  /                                  Outlet of water        ra coolers          Rev. 5
+  Allpressures are in pounds per square inch absolute (psia); temperatures        are in degrees Fahrenheit
+ + The ASM E  IIIN-5 Data Reports are predicated, in part, on Pipe Stress Data Packages (PDPs).
NMP2-ISI406 Rev.l                                                          Section 4                                      Page4of4
 
5.0 BASES OF SAMPLE SELECTION AND FREQUENCIES OF EXAMINATION This Section identifies and applies the requirements of the 1989 Edition, Section XI of the ASME Boiler and Pressure Vessel Code (as well as requirements of Code Cases) that were used in identifying the representative samples (by Code Category and Item No.) and frequencies of examination for Class 1 & 2 welds, component surfaces, bolting and integral attachments, Class 1, 2 & 3 supports and integral attachments that require examination during the Second Ten Year Interval. NMPC is committed to maintaining the identity and sequence of examinations established during the first inspection interval to the extent practical during this second interval.
In essence, selection requires that the piping systems and components have been designated    as safety related and, for ASME XI Class      1 s stems:
: 1)  the pipe size will be greater than 1 NPS and,
: 2)  if2 NPS or smaller, the piping, will not be rendered inaccessible due to its association with reactor vessel head connections and,
: 3) not have been documented as being of such a size and shape that, upon postulation of a rupture (during normal plant operating conditions) resulting in the flow of coolant fiom the reactor coolant system, that said flow is within the capacity of make-up systems that are operable &om on-site emergency power, for ASME XI Class 2        stems:
: 1) the pipe size will be greater than 4 NPS and,
: 2) the piping will not be part of an open-ended portion of the system beyond the last shut-off valve, and,
: 3) the system (or portions of it) willhave been designed to:
directly provide for residual heat removal (RHR) (regardless of operating pressure or temperature) or, directly provide for emergency core cooling (ECC) (regardless of operating pressure or temperature) or, directly provide for containment heat removal (CHR) (regardless of operating pressure or temperature) or, operate at a pressure greater than 275 psig (even ifnot designed for one of the above three purposes) or, operate at a temperature greater than 200' (even ifnot designed for one of the above three purposes),
for ASME XI Class    3    stems:
: 1) the pipe size willbe greater than 4 NPS, and,
: 2) the system (or portions of it) will have been designed to:
be ~in su ort of reactor residual heat removal.(RHR) (regardless of operating pressure or temperature) or, be ~in su ort of containment heat removal (CHR) (regardless of operating pressure or temperature) or, be ~in su ort of emergency core cooling (ECC) (regardless of operating pressure or temperature) or, operate at a pressure greater than 275 psig (even ifnot designed for one of the above three purposes) or, operate at a temperature greater than 200' (even ifnot designed for one of the above three purposes) and,
: 3) the design of supports for the system (or portions of it) will use integral attachments to the pressure boundaiy, 5.1 FREQUENCY OF EXAMINATIONS Frequencies of examination are routinely referenced within the itemization of Code Categories addressed below. In order to more easily follow those references, a brief discussion of the Code's semblance of order regarding the repetitive nature of examination of sampled items is in order.
First 10- Year Interval - NMP2 submitted its First Ten Year Interval Program Plan to NRC on July 30,          1987.
The First Ten Year Interval Program Plan was developed to the 1983 Edition, Summer 1983 Addenda              of ASME Section XI. The First Interval covered the period from April 5, 1988 to April 4, 1998.
Second 10- Year Interval - The second 10-year interval commences immediately following the closure of the first 10-year interval covering the time periods of April 5, 1998 to April 4, 2008 and developed to the 1989 Edition of ASME Section XI.
NMP2-ISI406 Rev.1                                              Section 5                                  Page 1 of16
 
Inspection Periods -The interpretation of Table IWB-2412-1 correlates the first, second, and third periods of the second interval with the 13, 17, and 20 calendar years of plant service. NMPC's second interval willcomply with this schedule to the extent practical. The current refueling outage schedule, upon which this Program Plan is based, includes 6 refuel outages, or 2 per period. Some variations to the length of Inspection Periods may be required based on actual versus scheduled outage dates.
The current scheduled periods    of the second interval are:
PERIOD                START                            END April 5, 1998                    April 4, 2001 April 5, 2001                    April 4, 2005 April 5, 2005                    April 4, 2008 Each period may be increased or decreased by as much as one year to allow the examination to correspond to plant outages, although the net increase over the 10-year interval cannot exceed one year.
ASME Section XI Subarticle IWA-2400 allows for additional flexibilityin the case where a plant is out of service
~
continuously for six months or more; in this situation, the interval during which the outage occurred may be extended for a length of time equivalent to the outage duration and the original pattern of intervals extended accordingly for successive intervals.
Fuel Cycles - Defined as that period of time from the end of one refueling outage to the start of the next refueling outage. This is approximately 24 months for Unit 2.
Frequencies of examination are based on these concepts      of intervals, periods,  and fuel cycles, and the commentary below makes extensive use of them.
5.2 FREQUENCY CODES As noted above, this plan specifies that certain items be examined, in full or in part, during a specific period, fuel cycle, or combination 'thereof. These are designated 1P, 2P, 3P, with or without suffixes of < or , as expanded upon in Section 6 of this plan. Other examinations can be performed anytime during the interval, provided they are performed by the end of the interval. These types of examinations are designated Eoi for "End of Interval."
When an examination must be performed each refueling outage, the inspection &equency reflects ERQ.
When an examination must be performed each period, the inspection &equency may reflect              123.
When an examination must be performed every other refueling outage, the inspection &equency is shown as either ENRO'(Even Numbered Refuel Outage) or ONRO (Odd Numbered Refuel Outage.)
Dis indicates  that the examination &equency is contingent upon routine disassembly. It is to be performed in the event the item is disassembled for reasons other than performance of the ISI examination. (e.g., the fasteners in control rod drive housings.)
DisG indicates  that the examination frequency is contingent upon the routine disassembly of the representative component of a group of components of similar design, size, function, and service within a system, in accordance with the multiple component concept described below. The Code's examination requirements for all of the examination items on all of the components within an entire group of components are satisfied ifthe examination items of only one component within a multiple component group are examined to the extent practical. Practicality dictates that NMP2-ISI406 Rev.1                                              Section 5                                      Page2of16
 
these examinations need only take place when and      ifthe component    is coincidentally disassembled for maintenance, repair or volumetric examination. The disassembly      of more than  one  component within a multiple component group during the interval, will not be cause for additional ISI examinations    to be performed within that group; examination is only required to be performed on one of the components.
Where the Code does not allow deferral until the end of the interval, the examinations must be distributed among the three periods in accordance with the schedule presented in the following paragraph.
5.3 INTERVALDISTRIBUTION Class 1, 2 and 3 examinations within an examination category shall be performed among the three periods of the interval, in the percentages noted (unless specifically indicated otherwise) in Tables IWX-2412-1 of Section XI:
DISTRIBUTION OF EXAMINATIONS PERIOD                                              RANGE OF EXAMINATIONS 1st      16% minimum, and not to exceed 34% of all re ulred examinations 50% minimum, and not to exceed 67% of all required examinations. This includes the examinations 2fld        erformeddurin the1st eriod 3rd      100% of all required examinations (total for all three periods)
Most of the IWB, IWC, IWD and IWF examinations are scheduled by this method. This is indicated in the ISI Program Plan as interval distribution (io).
Interval distribution typically applies to a quantity of welds/items where the cumulative percent of the total number of welds/items examined by the end of each period must be in accordance with the ranges given in the preceding table.
However, interval distribution can also apply to a single-vessel weld where a percentage of the total weld length is examined each period. The cumulative percent of total weld length examined by the end of each period must be in accordance with the ranges given in the table above .
Period scheduling, per the Inspection Plan, is for guidance only-substitutions may be made          as required as long as all scheduled examinations are completed by the end of the interval.
Examination substitutions for any Section XI scheduled weld/item may be made as long as the ISI Program Manager concurs with the requested substitution. Rescheduling of Augmented (GL 88%1) Category 'D', 'E'nd 'F'elds is not allowed untess prior NRC Approval Is obtained. A Licensing Document Change Request does not have to be written to cover selection changes; a revised selection change willsimply appear in the next regularly scheduled status update to the Program Plan Inspection Tables. Status updates were performed on a fuel cycle basis during the first interval, and may continue on that &equency in the second interval, or drop to a periodic frequency.
5.4  MULTIPLECOMPONENT CONCEPT For Class I, 2 and 3 components (pumps, valves, and vessels only) of similar design, size, function, and service within a system, the Code allows for the grouping of those components, such that the examinations required to be performed on those components may be satisfied by the examination of only one of the components within a group (or divided among the components in a group, such that the total number of examinations performed is equivalent to the number that would be performed ifonly one of the components was required to be completely examined.) Those items qualify-ing as multiple components are identified in Appendix C.
NMP2-ISI406 Rev.1                                              Section 5                                        Page 3 of 16
 
5.5      CLASS    1 EXAMINATIONBASES 5.5.1    EXAMINATIONCATEGORY B-A, PRESSURE RETAININGWELDS IN REACTOR VESSEL Item B1.11 Circumferential Shell Welds Extent of Examination - all welds, to at least the extent achieved in the first interval.
Frequency of Examination - end of interval (Eol), but repeat first interval to the extent practical.
NoTE: NMPC is considering a Request for Relief from performing examinations of RPV Circumferential welds based on USNRC - GENERIC LETTER 98-05.
Item B1.12 Longitudinal Shell Welds Extent of Examination - all welds, to at least the extent achieved in the first interval.
Frequency of Examination - end of interval (Eoi), but repeat first interval to the extent practical.
Item Bl.21- Circumferential Head Welds Extent of Examination - accessible lengths of all welds, to at least the extent achieved in the first interval.
Frequency of Examination - end of interval (Eoi), but repeat first interval to the extent practical.
Item B1.22 - Meridional Head Welds Extent of Examination - accessible lengths of all welds, to at least the extent achieved in the first interval.
Frequency of Examination - end of interval (Eoi), but repeat first interval to the extent practical.
Item B1.30- Shell-to-Flange Weld Extent of Examination - entire weld, to at least the extent achieved in the first interval.
Frequency of Examination - firstperiod (1P) and third period (3P) with a minimum of 50% of the total weld length completed in the firstperiod with the remainder to be performed in the third period, so that entire weld length has been examined by the end of the interval. (Ifpartial examinations are conducted &om the flange face, the remaining volumetric examinations required to be performed from the vessel wall may be deferred to the end of the interval.
The flange face is defined as the contact area between the shell flange and head flange.)
Item B1.40 - Head-to-Flange Weld Extent of Examination - entire weld, to at least the extent achieved in the firstinterval Frequency of Examination - interval distribution (io), repeating first interval to the extent practical. (If partial examinations are conducted &om the flange face, the remaining volumetric examinations required to be performed from the vessel wall may be deferred to the end of the interval. The flange face is defined as the contact area between the shell flange and head flange.)
Item B1.50- Repair Welds - Not applicable to the NMP2 Reactor Vessel.
H 5.5.2'XAMINATIONCATEGORY B-B - PRESSURE-RETAINING WELDS                                      IN VESSELS OTHER THAN REACTOR VESSELS The only non-exempt Class    1 vessel is the reactor pressure vessel, at Nine Mile Point Unit 2.
5.5.3    EXAMINATIONCATEGORY B-D, FULL PENETRATION WELDS OF NOZZLES IN VESSELS
        - INSPECTION PROGRAM B Item B3.90- Nozzle-to-Vessel Welds Extent of Examination - all welds, to at least the extent achieved in the first interval.
Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
NMP2-ISI4I6 Rev.1                                            Section 5                                      Pege4of16
 
Item B3.100 Nozzle Inside Radius Section Extent of Examination - all radii, to at least the extent achieved in the first interval.
Frequency of Examination: interval distribution (io), repeating first interval to the extent  practical.
Items B3.110 through B3.160 - not applicable at NMP2.
5.5,4 CATEGORY B-E, PRESSURE RETAININGPARTIALPENETRATION WELDS IN VESSELS Item B4.11 - Vessel Nozzles -    See  NMP2 Inservice Inspection Pressure Testing Program Plan Document No.
NMP2-PT-008.
Item B4.12 - Control Rod Drive Nozzles - See NMP2 Inservice Inspection Pressure Testing Program Plan Docu-ment No. NMP2-PT-008.
Item B4.13 - Instrumentation Nozzles - See NMP2 Inservice Inspection Pressure Testing Program Plan Document No. NMP2-PT-008.
Item B4.20- Pressurizer Heater Penetration Welds - not applicable at NMP2 5.5,5 CATEGORY B-F, PRESSURE RETAININGDISSIMILARMETALWELDS Item B5.10- Reactor Vessel; NPS 4 or Larger Extent of Examination - all welds, to at least the extent achieved in the first interval.
Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
Item B5.20- Reactor Vessel; Less Than NPS 4 Extent of Examination - all welds, to at least the extent achieved in the first interval.
Frequency of Examination: interval distribution (io), repeating first interval to the extent practical.
Item B5.30- Reactor Vessel Nozzle-to-Safe End Socket Welds - not applicable at NMP2 Item B5.40 - Pressurizer Nozzle-to-Safe End Butt Welds NPS 4 or Larger - not applicable at NMP2 Item B5.50 - Pressurizer Nozzle-to-Safe End Butt Welds Less Than NPS 4 - not applicable at NMP2 Item B5.60 - Pressurizer Nozzle-to-Safe End Socket Welds - not applicable at NMP2 Item B5.70- Steam Generator Nozzle-to-Safe End Butt Welds NPS 4 or Larger - not applicable at NMP2 Item B5.80- Steam Generator Nozzle-to-Safe End Butt Welds Less Than NPS                  4- not applicable at NMP2 Item B5.90- Steam Generator Nozzle-to-Safe End Socket Welds - not applicable at NMP2 Item B5.100 - Heat Exchanger Nozzle-to-Safe End Butt Welds NPS 4 or Larger - not applicable at NMP2 Item B5.110- Heat Exchanger Nozzle-to-Safe End Butt Welds Less Than NPS 4-not applicable at NMP2 Item B5.120- Heat Exchanger Nozzle-to-Safe End Socket Welds - not applicable at NMP2 NMP2-ISI406 Rev.1                                              Section 5                                      Page 5of16
 
Item B5.130- Dissimilar Metal Butt Welds in Piping NPS 4 or Larger Extent of Examination - all welds, to the extent achieved in the first interval. (Total of 5 welds, listed in Appendix A.)
Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
Item B5.140- Dissimilar Metal Butt Welds in Piping Less Than NPS 4 Extent of Examination - all welds, to the extent achieved in the first interval. (Total of 2 welds, listed in Appendix A.)
Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
Item B5.150 Dissimilar Metal Socket Welds in Piping- not applicable at NMP2 5.5.6 CATEGORY B-G-1, PRESSURE RETAININGBOLTING, GREATER THAN 2 in. IN DIAMETER Item B6.10- Reactor Vessel Closure Head Nuts NMPC proposes to perform a VT-1 visual examination of the reactor vessel closure head nuts in lieu of the surface examination required by the 1989 Edition of Section XI of the ASME B&PV Code. Refer to Appendix F for the proposed Relief Request to utilize an alternate method to the Code of record.
Extent of Examination - all nuts (via VT-1)
Frequency of Examination: interval distribution (ID), repeating  the first interval to the extent practical Item B6,20- Reactor Vessel Closure Studs, in place NMP2 did no examinations to Item 6.20 in the first interval, and does not anticipate examining the closure studs in place during the second interval, However, as a contingency, NMPC provides the following:
Extent of Examination - all studs (volumetric only.)
Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
Item B6.30- Reactor Vessel Closure Studs, when removed Extent of Examination - all studs, surface and volumetric examination to the extent achieved in the first interval.
Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
Item B6.40- Reactor Vessel Threads in Flange Extent of Examination - all threads, to the extent achieved in the first interval.
Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
Item B6.50- Reactor Vessel Closure Washers, Bushings Extent of Examination - all washers and the singular bushing, to the extent achieved in the first interval.
Frequency of Examination: interval distribution (ID), repeating first interval to the extent practical.
Item B6,60- Pressurizer Bolts and Studs - not applicable at NMP2 Item B6.70- Pressurizer Flange Surface, when connection disassembled - not applicable at NMP2 Item B6.SO- Pressurizer Nuts, Bushings, and Washers - not applicable at NMP2 Item B6,90- Steam Generator Bolts and Studs - not applicable at NMP2 Item B6.100- Steam Generator Flange Surface, when connection disassembled - not applicable at NMP2 NMP2-ISI406 Rev.1                                            Section 5                                        Page 6of16
 
'Item B6.110 - Steam Generator Nuts, Bushings, and Washers - not applicable at NMP2 Item B6.120- Heat Exchangers Bolts and Studs - not applicable at NMP2 Item B6.130- Heat Exchangers Flange Surface, when connection disassembled - not applicable at NMP2 Item B6.140- Heat Exchangers Nuts, Bushings, and Washers - not applicable at NMP2 Item B6.150- Piping Bolts and Studs - not applicable at NMP2 Item B6.160- Piping Flange Surface, when connection disassembled - not applicable at NMP2 Item B6.170- Piping Nuts, Bushings, and Washers - not applicable at NMP2 Item B6.180- Pump Bolts and Studs Extent of Examination - bolts and/or studs of each pump selected for examination under B-L-2. A tabulation of pumps considered to qualify for the multiple component approach may be found in Appendix D to this document.
Frequency of Examination - interval distribution (Io)
Item B6.190- Pump Flange Surface, when connection disassembled Extent  of Examination - Should    the flanged connection of any pump in the representative group of pumps to be examined under Code Category B-L-2 be disassembled for maintenance, repair, or volumetric examination, the bushings and threads in flange stud holes and the 1" annular surface of flange surrounding the stud or bolt shall be examined. A tabulation of pumps considered to qualify for the multiple component approach may be found in Appendix C to this document.
Frequency of Examination - disassembly (Dis)
B6.200- Pump Nuts, Bushings, and Washers Extent of Examination - the 16 nuts on 2RCS*P1 (one of two pumps in the Recirculation System        pump design does not utilize bushings or washers at the pressure retaining connection);  examination item  PPB103A on the pump selected for examination under B-L-2 in accordance with the tabulation of pumps          considered  to qualify for the multiple component approach (which may be found in Appendix C to this document.)
Frequency of Examination -interval distribution (Io)
Item B6.210- Valve Bolts and Studs Extent of Exaniination - One valve (2MSS*AOV7B) Multiple Component Group No. 14 valves (all of which were originally designed to utilize 2" bonnet-to-body fasteners) was modified in the first interval to use 2'/4" diameter bonnet-to-body connection step studs.
Frequency of Examination interval distribution (Io)
Item B6.220- Valve Flange Surface, when connection disassembled Extent of Examination - One valve (2MSS*AOV7B)Multiple Component Group No. 14 valves (all of which were originally designed to utilize 2" bonnet-to-body fasteners) was modified in the first interval to use 2'/4" diameter bonnet-to-body connection step studs.
Frequency of Examination when disassembled Item B6.230- Valve Nuts, Bushings, and Washers Extent of Examination - One valve (2MSS*AOV7B) Multiple Component Group No. 14 valves (all of which were originally designed to utilize 2" bonnet-to-body fasteners) was modified in the first interval to use 2'/4" diameter bonnet-to-body connection step studs.
Frequency of Examination when disassembled NMP2-ISI406 Rev.1                                            Section 5                                      Page7ot16
 
5.5.7 CATEGORY B-G-2, PRESSURE RETAINING BOLTING, 2 in. AND LESS                            IN DIAMETER Item B7.10- Reactor Vessel Bolts, Studs, and Nuts Extent of Examination - limited to the 12 studs and 24 nuts found at the N-18 (spare) nozzle blind flange on the top of the reactor pressure vessel; examination item 2RPv+8164.
Frequency of Examination - interval distribution (ID)
Item B7.20- Pressurizer Bolts, Studs, and Nuts - not applicable at NMP2.
Item B7.30- Steam Generator Bolts, Studs, and Nuts - not applicable at NMP2.
Item B7.40- Heat Exchanger Bolts, Studs, and Nuts - not applicable at NMP2.
Item B7.50- Piping Bolts, Studs, and Nuts Extent  of Examination - all bolts, studs,  and nuts, on piping containing welds requiring examination under Category B-J.
Frequency  of Examination - interval distribution (ID)
Item B7.60- Pump Bolts, Studs, and Nuts - not applicable at NMP2 Item B7.70- Valve Bolts, Studs, and Nuts Extent  of Examination - all bolts,  studs, and nuts on the valves selected for examination in the several groups of valves requiring  examination  under  B-M-2. (Category B-M-2 pemtits the application of the multiple component concept for valves. A tabulation of valves considered to qualify for the multiple component approach may be found in Appendix B to this document.)
Frequency of Examination - inrerval distribution (ID)
Item B7.80- CRD Housing Bolts, Studs, and Nuts Extent of Examination - cap screws on CRD housings made accessible by coincidental disassembly Frequency of Examination - only examined when disassembled (Dis) 5.5,8 CATEGORY B-H, INTEGRAL'TTACHMENTSFOR VESSELS This category is now listed as B-K per Code Case N-509 Item B8.10- Integrally Welded Attachments to Reactor Vessel This item is now listed as B10.10 per Code Case N-509 Item B8,20- Integrally Welded Attachments to Pressurizer - not applicable at NMP2 Item B8.30- Integrally Welded Attachments to Steam Generators - not applicable at NMP2 Item B8.40 - Integrally Welded Attachments to Heat Exchangers - not applicable at NMP2 5.5.9 CATEGORY B-J, PRESSURE RETAINING WELDS IN PIPING Item B9.11- Circumferential Welds NPS 4 or Larger Extent of Examination - all dissimilar metal pipe welds, high stress welds, and terminal ends, plus an additional number of piping welds, so that 25% of all non-exempt circumferential welds are examined.
Frequency of Examination - interval distribution (ID)
NMP2-ISI406 Rev.1                                              Section 5                                  Page 6of16
 
Item B9.12- Longitudinal Welds NPS 4 or Larger Extent of Examination - all longitudinal pipe welds intersecting any      of the  selected circumferential welds.
Frequency of Examination - interval distribution (ID)
Code Case N-524 shall be utilized Item B9.21 - Circumferential Welds Less Than NPS 4 Extent of Examination - all dissimilar metal pipe welds, high stress welds, and terminal ends plus an additional number of piping welds, so that 25% of all non-exempt circumferential welds are examined Frequency of Examination - interval distribution (Io)
Item B9,22- Longitudinal Welds Less Than NPS            4- not applicable      at NMP2 (There are no longitudinal pipe welds intersecting any  of the  selected B9.21 circumferential welds.)
Item B9.31- Branch Pipe Connection Welds NPS 4 or Larger Extent of Examination - 25% of all non-exempt branch pipe connection welds Frequency of Examination - interval distribution (io)
Item B9.32- Branch Pipe Connection Welds Less Than NPS 4 Extent  of Examination - 25% of all non-exempt branch pipe connection          welds Frequency of Examination - interval distribution (Io)
Item B9.40- Socket Welds Extent of Examination - 25% of all non-exempt socket welds Frequency of Examination - interval distribution (Io)
See  Appendix Afor a complete listing, by system,    of1velds    in scope  ofExamination      Category BV 5.5.10 CATEGORY B-K-1, INTEGRAL ATTACHMENTFOR PIPING, PUMPS AND VALVES This category is now listed as B-K per Code Case N-509 Item B10.10- Integrally Welded Attachments to Reactor Vessel Extent of Examination 100% of the reactor vessel support skirt weld, and stablilizer bracket welds.
Frequency of Examination interval distribution (ID)
Item B10.20 - Integrally Welded Attachments to Piping Extent of Examination - Allintegrally welded attachments with a design thickness of /s inch and greater welded to piping required to be examined under Examination Category B-J. The multiple component concept is not applicable to this examination category. (It should be noted that integral attachments to piping include attachments at contain-ment penetrations. However, the Class 1 nonexempt piping containment penetrations at NMP2 are of a forged design as shown in Figure  IWB-2500-14. The surface examinations required by B-K-1 need only be performed on welds that are within a region that is "t" inches &om the pressure-retaining component, where "t" is the wall thickness of the pressure-retaining component (the piping in this case). At NMP2, none of the Class l non-exempt piping containment penetrations have welds that are within this region.)                                              I Frequency of Examination - interval distribution (Io)
Item B10.30- Integrally Welded Attachments to Pumps - not applicable at NMP2 Item B10.40 Integrally Welded Attachments to Valves - not applicable at NMP2 NMP2-ISI406 Rev.1                                              Section 5                                          Pagegot16
 
5.5.11 CATEGORY B-L-1, PRESSURE              RETAININGWELDS IN PUMP CASINGS Item B12.10- Pump Casing Welds - not applicable at NMP2 5.5.12 CATEGORY B-L-2, PUMP CASINGS Item B12,20- Pump Casing Extent of Examination - multiple component concept is applicable; i.e., only the interior surface of one recirculation pump requires examination. Examination shall be performed only ifa pump is disassembled for repair or mainte-nance.
Frequency  of Examination  - end of interval (Eoi) 5.5.13 CATEGORY B-M-1, PRESSURE RETAININGWELDS IN VALVEBODIES Item B12,30 - Valve Body Welds in Valves Less Than NPS 4 - not applicable at NMP2 Item B12.40- Valve Body Welds in Valves NPS 4 or Larger - not applicable at NMP2 4
5.5.14 CATEGORY B-M-2, VALVEBODIES Item B12,50- Valve Body, Exceeding NPS 4 Extent of Examination - multiple component concept is applicable, and examinations      are limited to one valve within a group  of valves that  are of the same constructional design (globe, gate, check), manufacturing method, and that if perform similar functions within the system. Examination shall be performed valves are disassembled for mainte-nance, repair or volumetric examination. A tabulation of valves considered to qualify for the multiple component ap-proach may be found in Appendix B to this document.
Frequency of Examination - end of interval (Eol) 5.5.15  CATEGORY B-N-1, INTERIOR OF REACTOR VESSEL Item B13.10 - Vessel Interior Extent of Examination - the spaces above and below the reactor core that are made accessible for examination by removal of items during normal refueling outages-most specifically, the core spray header and its brackets; the core spray spargers and their brackets; the fuel cells; the feedwater sparger and its brackets; the jet pumps and their brackets and supports; the moisture separator; the steam dryer; and interior wall of the vessel shell.
Frequency of Examination - once per period, at even numbered refueling outages (ENRO) 5.5.16  CATEGORY B-N-2, INTEGRALLYWELDED CORE SUPPORT STRUCTURES AND INTERIOR ATTACHMENTSTO REACTOR VESSELS B13.20- Interior Attachments Within Beltline Region of Boiling Water Reactors Extent of Examination - attachment welds made accessible by removal of items during a refueling outage          most specifically, those associated with: jet pump brackets and supports; and surveillance specimen pad(s) and brackets Frequency of Examination - once per interval, in the first period, at an even numbered refueling outage (1PN)
B13.30- Interior Attachments Beyond Beltline Region of Boiling Water Reactors Extent of Examination - attachment welds made accessible by removal of items during a refueling outage          most specifically, those associated  with: core spray sparger brackets;  feedwater sparger brackets; shroud  support stubs; steam dryer support brackets; steam dryer guide rod brackets; steam dryer hold down brackets; and surveillance specimen pad(s) and brackets; Frequency of Examination - once per interval, in the first period, at an even numbered refueling outage (1P<)
F NMP2-ISI406 Rev.1                                            Section S                                    Page 10 oI 16
 
B13.40- Core Support Structure of Boiling Water Reactors Extent of Examination - all surfaces of the core support structure made accessible by removal of components during a refueling outage  most specifically, those associated with: the top guide; the core shroud; the shroud support stubs; and the core plate Frequency of Examination - once per interval, in the first period, at an even numbered refueling outage (1P<)
B1350- Interior Attachments Within Beltline Region of Pressurized Water Reactors - not applicable              at NMP2.
B13.60- Interior Attachments Beyond Beltline Region of Pressurized Water Reactors - not applicable at NMP2.
5.5.17 CATEGORY B-N-3, REMOVABLECORE SUPPORT STRUCTURES B13.70- Core Support Structure of Pressurized Water Reactors - not applicable at NMP2 5.5.18 CATEGORY B-O, PRESSURE RETAININGWELDS IN CONTROL ROD DRIVE HOUSINGS Item B14.10- Welds in CRD Housing Extent of Examination - in accordance with the subsfi rute examinarion proposed by NMPC in request for relief no.
RR-IWB-I, and as sanctioned by the regulators in the granting of that relief in the first interval plan; 5.5.19    CATEGORY B-P, ALLPRESSURE RETAINING COMPONENTS See  NMP2-ISI Pressure Testing Program Plan Document &#xb9;NMP2-PT-008.
5.6 CLASS 2    EXAMINATIONBASIS 5.6.1 CATEGORY C-A, PRESSURE                RETAININGWELDS IN PRESSURE VESSELS Note on Frequency of Examination - There are only two examinations required in this category for the whole of the interval. As such, it is impossible to comply with the percentages over three periods. Therefore, both examina-tions will be conducted at the same time, in the second period.
Item C1.10- Shell Circumferential Welds Extent of Examination - at least 78% of the length of Hw101A, on heat exchanger 2RHs'E1A (in the Residual Heat Removal System), the only weld at a gross structural discontinuity. Refer to Appendix C for a tabulation of the Class 2 vessels that are in the scope of this examination category, and are considered to qualify for the multi pie component approach.
Frequency  of Examination - interval distribution (2P)  (See note above)
Item C1.20- Head Circumferential Welds Extent of Examination - at least 95% of the length of HW1ooA, on heat exchanger 2RHs E1A (in the Residual Heat Removal System), the only vessel in this examination category that requires examination, as the multiple component concept is applicable. Refer to Appendix C for a tabulation of the vessels that are in the scope of this examination category and, are considered to qualify for the multiple component approach.
Frequency of Examination - interval distribution (2P) (See note above)
Item C1.30- Tubesheet-to-Shell Welds - not applicable at NMP2 5.6.2 CATEGORY C-B, PRESSURE RETAININGNOZZLE WELDS IN VESSELS Item C2.11 - Nozzle-to-Shell (or Head) Weld in Vessels c          'w in. Nominal Thickness - not applicable at NMP2 NMP2-ISI406 Rev.1                                              Section 5                                      Page 11 of 16
 
0 Item C2.21 - Nozzle-to-Shell (or Head) Weld (Without Reinforcing Plate) in Vessels > v in. Nominal Thickness Extent of Examination - at least 96% of Hw10aA, the N3 nozzle weld, and 80% of Hw102A, Ole N4 nozzle weld (in accordance with the substitute examination proposed by NMPC in request for relief no. RR-IWC-5, on Residual Heat Removal System heat exchanger 2RHS'E1A. Refer to Appendix C for a tabulation of the vessels that are in the scope of this examination category, and are considered to qualify for the multiple component approach.
Frequency of Examination - interval distribution (ID)
Item C2.22 - Nozzle Inside Radius Section Extent  of Examination - 100%  each of Hw1o4A, the N3 nozzle, and Hw10sA, the N4 nozzle on Residual Heat Removal System heat exchanger  2RHS'E1A. Refer to Appendix C for a tabulation of the vessels that are, in the scope of this examination category, and are considered to qualify for the multiple component approach.
Frequency of Examination - interval distribution (Io)
C2.31 - Reinforcing Plate Welds to Nozzle and Vessel - not applicable at NMP2 C2.32- Nozzle-to-Shell (or Head) Weld (With Reinforcing Plate) in Vessels > v in. Nominal Thickness When Inside of Vessel Is Accessible - not applicable at NMP2 C2.33 - Nozzle-to-Shell (or Head) Weld (Without Reinforcing Plate) in Vessels > v in. Nominal Thickness When Inside of Vessel Is Accessible - not applicable to NMP2 5.6.3 CATEGORY C-C, INTEGRAL ATTACHMENTS FOR VESSELS, PIPING, AND VALVES Per Code Case N-509 Item C3.10- Integrally Welded Attachments to Pressure Vessels-Extent of Examination at least 90% of the required area subject to examination Frequency of Examination interval distribution (Io)
Item C3.20- Integrally Welded Attachments to Piping Extent of Examination - at least 90% of the required areas of the welded attachments to the piping subject to examina-tion.
Frequency  of Examination - interval distribution (ID)
Item C3.30 - Integrally Welded Attachments to Pumps Extent of Examination - at least 90% of the required areas of the welded attachments subject to examination.
Frequency of Examination - interval distribution (ID)
Item C3.40- Integrally Welded Attachments to Valves - not applicable at NMP2 5.6.4 CATEGORY C-D, PRESSURE RETAININGBOLTING GREATER THAN 2 in. IN DIAMETER Item C4.10 - Bolts and Studs in Pressure Vessels - not applicable at NMP2 Item C4.20- Bolts and Studs in Piping - not applicable at NMP2 Item C4.30- Bolts and Studs in Pumps Extent of Examination - studs in low pressure core spray pump number 2CSL'P1 (the only pump at NMP2 examined under Category C-G that utilizes pressure retaining fasteners greater than 2" in diameter, i.e., the head-to-barrel connection studs.)
Frequency of Examination - interval distribution (ID)
Item C4.40- Bolts and Studs in Valves - not applicable at NMP2 NMP2-ISI406 Rev.1                                            Section 5                                      Pege12o116
 
5.6.5 CATEGORY C-F-1, PRESSURE RETAININGWELDS IN AUSTENITIC STAINLESS STEEL OR HIGH ALLOYPIPING Pursuant to the Code of record, the welds selectedfor examination shall include 7.5%, but not less than 28 welds, ofall austenitic stainless steel ofhigh allow welds not exempted by BVC-1220. (Some welds not exempted by IH C-I 220 are not required to be nondestrucnvely examined per Examination Category C-F-I. These welds, however, shall be included in the total weld count to which the 7.5% sampling rate is applied) The examinations shall be distributed as follows:
a) rhe examinations shall be distributed among the sysrems prorated, to the degree practicable, on the number if ofnonexempt austenitic stainless steel or high allo~ welds in each system (i.e., a system contains 30% of the nonexempt welds, then 30% ofthe nondestrucnve examinations required by Examination Category C-F-I should be performed on that system):
b),within a system, the examinations shall be distributed among terminal ends and structural disconrinuities (Structural disconnnui rie include pipe weldjoints ro vessel nozzles, valve bodies, pump casings, pipe fittings (such as elbows, tees, reducers, flanges, etc conforming to ANSI BI6.9), and pipe branch connecrions and disconrinui fitrings.j prorated, to the degree practicable, on the number of nonexempt terminal ends and stnictural tie in that system; and c)    wirhin each system, examinarions shall be disrributed between line sizes prorated to the degree pracn'cable.
That said, there are 88 welds at NMP2 that have been categorized as Category C-F-1 weldments; 49 are circumferen-tial and 39 are associated longitudinal seam welds. NMP2 examines 33 of those 88 weldments. Seventeen (17) of the 33 examined are circumferential welds, while 16 are longitudinal welds that intersect those 17 circumferential welds.
Table 2 in Appendix B to this document identifies which 17 circumferential welds and which 16 longitudinal welds.
It does so by first listing all 49 circumferential welds at NMP2 that have been categorized as Examination Category C-F-1 welds (for the purpose of calculating a representative sample) and then listing (in those cases where longitudi-nal welds intersect circumferential welds) the associated longitudinal weld numbers. Based on a population of 49 cir-cumferential welds, the Code mandates a minimum representative sample of 28 circumferential welds (plus their as-sociated intersecting longitudinal seam welds.) However, 12 of the 49 circumferential welds are included only for sample sizing, and are not themselves required to be nondestructively examined. This decreases the set of those that do require nondestructive examination from 49 circumferential welds down to 37 circumferential welds (&om which the 28 were to have been selected.) However, more than half (20) of those 37 circumferential welds were found to be in locations that were not readily accessible for the performance of nondestructive examinations. They (along with their 20 associated intersecting, longitudinal welds) are located in the suppression pool, under water. Therefore, pursuant to 10 CFR 50.55A(g)(5), NMPC has again determined that conformance with the examination requirements of the Code is not practical for those 20 circumferential welds (and their associated intersecting longitudinal welds.)
Those 20 circumferential welds have been identified in NMP2 relief request number RR-IWC-2, Revision 1. NRC granted that relief in the first interval, and NMPC anticipates a repetition of the granting of that relief in this second interval, as there has been no fundamental change in the factors affecting the impracticality of performing these examinations.
Item C5.11 - Circumferential Welds in Piping w'/6 in. Nominal Wall Thickness and > NPS 4 Extent of.Examination - at least 90% of the surface and volume of 16 of the 17 accessible welds noted above, and at least 50% of the surface and volume of the examination identified as 2RHscs-22~o1a (whose accessibility is limited due to a permanent interference) in accordance with the resubmittal of request for relief no. RR-IWC-5.
Frequency of Examination - interval distribution (Io)
Item C5.12- Longitudinal Welds in Piping a /s in. Nominal Wall Thickness and >NPS 4 (Per Code Case N-524)
Extent of Examination - at least 90% of the surface and volume of a length (equal to a minimum of 2.5 times the thickness of the piping) of the 16 intersecting welds noted above.
Frequency of Ex~ation - interval distribution (Io)
NMP2-ISI406 Rev.1                                            Section 5                                        Page 13 of 16
 
Item C5.21- Circumferential Welds in Piping > /s in. Nominal Wall Thickness and a NPS 2 and s NPS                4- this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
Item C5.22- Longitudinal Welds in Piping>'/5 in, Nominal Wall Thickness and                  a NPS 2 and 5 NPS  4- this item is only applicable to pressurized  water  reactors,  and  is therefore not applicable at NMP2.
Item C5.30- Socket Welds - not applicable at NMP2 Item C5.41- Circumferential Welds in Pipe Branch Connections of Branch Piping a NPS 2- not applicable at NMP2 Item C5.42- Longitudinal Welds in Pipe Branch Connections of Branch Piping z NPS 2 - not applicable at NMP2 5.6.6 CATEGORY C-F-2, PRESSURE RETAINING WELDS                              IN CARBON OR LOW ALLOY STEEL PIPING The welds selected for this examination category include 7.5% of all carbon and low allow steel welds not exempted by IWC-1220. (Some welds not exempted by IWC-1220 are not required to be nondestructively examined per Examination Category C-F-2. However, these welds have been included in the total weld count to which the 7.5%
sampling rate is applied.) The examinations have been distributed:
a) among the Class 2 systems prorated, to the degree practicable, on the number of nonexempt carbon and low allow steel welds in each system; b) within a system, among terminal ends and structural discontinuities prorated, to the degree practicable, on the number of nonexempt terminal ends and structural discontinuities in that system; and c)  within each system, between line sizes prorated to the degree practicable; as indicated in Tables 3, 4, and 5 of Appendix B to this program document Item C5.51 - Circumferential Welds in Piping          w  /s in. Nominal Wall Thickness and > NPS 4 Extent of Examination - at least 90% of the surface and volume of the 98 welds examined in the first interval Frequency of Examination - interval distribution (Io)
U Item C5.52 - Longitudinal Welds in Piping z /s in. Nominal Wall Thickness and > NPS 4 (Per Code Case N-524)
Extent of Examination - at least 90% of the surface and volume of a length (equal to a minimum of 2.5 times the thickness of the piping) of the singular intersecting weld (2csH P1pw216) examined in the first interval Frequency of Examination - interval distribution (Io)
Item C5.61 - Circumferential Welds in Piping >'/5 in. Nominal Wall Thickness and              2 NPS 2 and 5 NPS 4  - this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
Item C5,62 - Longitudinal Welds in Piping >'/5 in. Nominal Wall Thickness and a NPS 2 and s NPS 4 - this item is only applicable to pressurized water reactors, and is therefore not applicable at NMP2.
t Item C5.70- Socket Welds Extent of Examination - at least 90% of the socket weld (2RHs Mov2A,vwMov2A-A)examined in the first interval Frequency of Examination - interval distribution (Io)
Item C5.81 - Circumferential Welds in Pipe Branch Connections of Branch Piping                  a NPS 2 Extent of Examination at least  90%  of the three  (3)  branch  connection  welds (2csH'P1+w201; 2RHs'P1c,Pw103c; alld 2RHsws-24~sw026) examined in the first interval Frequency of Examination - interval distribution (Io)
NMP2-ISI406,Rev.1                                                Section 5                                  Page 14 ot16
 
Item C5.82- Longitudinal Welds in Pipe Branch Connections of Branch Piping a NPS 2 - not applicable at NMP2 5.6.7 CATEGORY C-G, PRESSURE-RETAINING WELDS IN PUMPS AND VALVES Item C6.10 Pump Casing Welds Extent  of Examination - at least 90% of the surface  areas of the pressure retaining welds in the casings of pumps that are themselves in piping runs that are examined under Examination Categories C-F-1 and C-F-2, that are not made inaccessible by the nature of their installation in concrete pits. (Request for Relief no. RR-IWC-1 is applicable to 21 of these selected welds.) The multiple component concept is applicable for pumps of similar design, function, size, and service within a system. Refer to Appendix D for a tabulation of the pumps that are in the scope of this examina-tion category and, are considered to qualify for the multiple component approach.
Frequency of Examination - interval distribution (io)
Item C6.20- Valve Body Welds Extent of Examination - at least 60% (per Request for Relief no. RR-IWC-5) of the surface areas of the pressure retaining welds in the bodies of valves that are in runs of pipe required to be examined by either Examination Category C-F-1 or Examination Category C-F-2. The multiple component concept is applicable for pumps of similar design, function, size, and service within a system. Its invocation has resulted in the selection of 25 of the 32 C6.20 weldments. Refer to Appendix D for a tabulation of the valves that are in the scope of this examination category and, are considered to qualify for the multiple component approach. Refer to Appendix F for a listing of the 20 weldments for which 90% or better examination coverage could not be achieved.
Frequency of Examination - interval distribution (io) 5.6.8 CATEGORY C-H, ALLPRESSURE RETAINING COMPONENTS See  NMP2-ISI Pressure Testing Program Plan Document &#xb9;NMP2-PT-008.
5.6.9 CLASS 2 AUGMENTED INSPECTION REQUIREMENTS Extent of Examination - all welds on Class 2 portions of systems on highwnergy piping systems within the break exclusion region at the containment penetrations (of which there are only three; all in the Reactor Core Isolation Cooling (steam supply) System: 2icsw7<9~009, 2lcs4749cw016, and 21cs4749<w016.) The rationale for the inclusion of these examinations appears in paragraph 3.1.1 of Section 3 of this program plan document, It should be noted that the Class 2 break exclusion welds are also classified and examined as Category C-F-2 welds.
Frequency of Examination - interval distribution (io) 5.7 CLASS 3      EXAMINATIONBASES NMP2 addresses all Class 3 pressure retaining components in:
NMP2 Pressure Testing Program Plan, Document No. NMP2-PT-008.
A 10% sample of Class      3 supports are selected per Code Case      N491-I and  listed in the IWF Section of Appendix H.
Class 3 integral attachments associated with the IWF supports scheduled for examination during the second ten year interval are also examined to meet IWD criteria. Integral attachments shall be selected for examination per the requirements of Code Case N-509 and in conjunction with those Class 3 supports selected for examination.
NMP2.ISI406 Rev.1                                              Section 5                                      Pege15ot16
 
5.8 ADDITIONALEXAMINATIONS When the results of examinations require Code Repair or Replacement (for their acceptance) the component supports immedtately adjacent to those reqtunng corrective action willbe examined. Also, the examinations will be extended to include additional supports equal in number and similar in type, design, and function to those initially examined during the inspection [Reference Code Case N-491-1.] When these additional examinations require corrective measures, the remaining component supports within the system of the same type, design, and function will be examined.
NMP2-ISI-006 Rev.1                                        Section 5                                      Page 16 of 16
 
0 6.0 EXAMINATIONPROGRAM PLAN TABLE FIELDS DESCRIPTION The Examination Program Plan Tables are included as Appendix G. A description of each Program Plan Table field is given below. The reader should be so advised that not all of these codes appear m the current Appendix G. Rather, they are indicative of the several codes used over both interval's plans.
This column contains codes which represent the known restraints to access for inspection are:
HzoLEvEL      Standard suppression pool water level covers support INSULATN      NMPC Level    Ill VT examiner    has authorized the removal  of insulation to facilitate              the 1" interval examination Level IIIVT examiner has authorized/required the use
                                              'MPC of a ladder to facilitate the examination 1"'nterval NMPC Level III VT examiner has authorized the building of scaII'aiding to facilitate the 1" interval examination TIP ROOM      Personnel radiation exposure concern associated with passage through transverse incore probe room ASSOC NONEX          An asterisk in this column indicates the presence of associated non-exempt ASME Code INT ATT              Class 1, 2, or 3 integral attachments. Their quantity may follow in parentheses.      Identifiers'ay follow the quantity-if space permits.
SLOG                This column contains codes which serve to identify the building in which the support will be found. Building abbreviations are defined as follows:
Auxiliary Bay North Auxiliary Bay South Control Building Standby Diesel Generator Building Main Steam Tunnel Primary Containment Secondary Containment SP    Suppression Pool Screenwell Building Service Water Tunnel Turbine Building ELEV                This column contains the approximate centerline elevation at the point of support.
ISO LOCATOR          This column contains the inservice inspection isometric piping drawing/location number which is used to identify and locate a pipe support.
NMP2-ISI-006 Rev.1                                            Section 6                              Page  1            of 7
 
LINE NUMBER        Identifies the piping line designation, as defined in the ASME III certified Specificanon for Piping Engineering and Design, (for) ASME III Code Class I, 2, and 3, and ANSI B3I. I  numbered NMP2-P301A.
RELREO&#xb9;            This field provides a reference to Section XI requirements that are not being satisfied, and identification, of substitute examinations, if any, via the uniquely numbered, 10 CFR 50.55a(g)(5)(iii) approved request for relief from the regulators. Summaries and statuses of the approved requests can be found in Appendix F to this Program Plan.
SUPPORT            The alpha-numeric identifier for the support to be examined. Manufacturers'onstruction EXAMINATION        identifiers, where applicable, have been utilized to provide traceability to construction records NO CATGRY                ASME XI Code Table IWX-2500-1 Examination Category CLASS                ASME XI Inservice Inspection Code Classification, COMPONENT            References the planar drawn, ISI program item drawing (weld/mechanical connection map)
DRAWING which serves to locate the associated EXAM /Don an item, once the item has been located in the plant by other means.
Provides brief description  of item to be  examined, i.e.pipe/elbow weld, pipe/lug, valve OF ITEM TO BE EX-AMINED                bolting, etc.
Identifies the type  of nondestructive examination to be performed through        the use of the EX1. EX2. EX3        following codes:
455              Special SIL-455 Alloy l82 expanded area examination IVV              Special SILs/RICSILs in-vessel visual examinations NA              Er field is logically not applicable.
PT              Special SIL-419 liquid penetrant examination RUV              Special SIL-474 remote underwater visual examination SUR              Code surface examination (e.g.- magnetic particle or liquid penetrant)
UT              Special SIL-330 jet pump ultrasonic examination VOL              Code volumetric examination (e.g.- ultrasonic or radiographic)
VT1              Code visual examination to determine condition      of surface VT3              Code visual examination to determine structural integrity EXAMINATION          The alpha-numeric identifier for the weld, bolt, or component surface to be examined. This IDENTIFIER identifier will usually be unique to the particular weld or part of a component. Manufac-turers'onstruction identifiers, where applicable, are utilized to provide traceability to con-struction records.
NMP2-ISI406 Rev.1                                            Section 6                                Page2of7
 
This column contains abbreviated notations indicating the requirement for frequency of FREQY          examination as noted below.
123    Examinations are to be performed during all three periods (i.e., 1, 2, and 3.)
1P    Examinations are to be performed during    1st periods.
2P    Examinations are to be performed during 2nd periods.
3P    Examinations are to be performed during 3rd periods.
DisG  Examination belongs to a group of examinations on a single component, all of which are intended to be performed at the same time. DlsG indicates that this is a grouped component and is selected to represent the group.
Dis    Examination &equency is contingent upon disassembly. It is to be performed in the event the item is disassembled for reasons other than performance of the ISI examination.
ENRO  Examination performed at even numbered refueling outages EOI    This examination must be performed during the interval, but may be deferred to the end of the interval.
EDR    Examinations are to be performed every other refueling outage ERO    Examination performed each refueling outage EERO  Examination performed only ifrequired pursuant to an evaluation conducted at the end of the previous refueling outage (evaluate every refuel outage per DER 2-93-2295)
ID    Selected for examination, and may be performed any time during the interval, given consideration on its impact on percentage requirements (i.e., on an interval distribution.)
na    Freq field is logically not applicable.
NS    The item was not selected for examination.
ONRO  Examination performed at odd numbered'refueling outages RFO4  Examination performed at refueling outage number 4 (only.)
RR    A USNRC relief request (pending or granted) renders frequency moot.
IGSCC            Ifa weldment falls within the scope of Generic Letter 88-01, then it must be categorized pursuant to GL88-Ol's "Table 1." The applicability of that table (as modified by GL88-01 Supplement 1) to NMP2 is summarized immediately following.
NMP2-IS I406 Rev.1                                    Section 6                              Page3of7
 
I,I
                          .':GL'88;,01:::TABL'E,,'l-'s -'APPLICABIL'ITY'TONMP2 EXTENT&                        DESCRIPTION                                    NMP2 SCHEDULE                      OF WELDMENT                                COMMENTS 25'/ every 10 years                Resistant Materials                There are currently 113 Category A A      at least 12'/ In 6 rs.                                                weidments at NMP2 50% every 10 years                Non-resistant Materials;            There are currently Stress Improvement (Sl)            no Category 8 weldments viithln 2 ears of o eration        at NMP2 All within the next 2 refueling    Non-resistant Materials;            There are currently cycles, then all every 10 years    Stress Improvement (SI)            no Category C weldments at least 50% in 6 s.              after 2 earsofo eration            at NMP2 All every 2 refueling cycles      Non<esistant Materials;            There are currently 47 D                                        No Stress Im rovement              Cat. D weldments at NMP2 50% next refueling outage,        Cracked;                            There is currently one (1) Category E then all every 2 refueling          Reinforced by weld                weldment at NMP2, as NRC granted ap-outages                            overlay, or                        proval to upgrade weld KC32 from Cat.
mitl atedb Sl                      F b letter dated Februa      12, 1996 All every refueling outage        Cracked;                            There are currently One Category F weld-Inad uate or no re air            ments at NMP2 2RPV-KB20 AII next refueling outage          Non-Resistant;                      There are currently no Category G weld-Not Inspected (by UT)              ments at NMP2 ITS ISOMETRIC            References the isometrically drawn, ISI program piping drawing (mapping of welds and mechanical connections) that serves to locate the associated EYAMIDon a run of pipe in the plant.
ITEM ff                  ASME XI Code Table IWX-2500-1 Examination Category Item No.
LINE NO.                  Identifies the piping line designation, as defined in the ASME III certified Specification for Piping 'Engineering and Design, (for) ASME Ill Code Class I. 2, and 3. and ANSI B3I. I    numbered NMP2-P30 IA.
Identifies the procedure used to perform the required NDE examination NOTES                    Specific information relating to the examination item, such as examination item form/material, or special requirements PERIOD1,      g3    This column contains abbreviations indicating both schodule and perfor.
mance of examinations. Slngi~haracter notations may be combined to produce a com-pound statement:          examination scheduled for this period 6    associates    examination    with fuel cycle    number      6 7    associates    examination    with fuel cycle    number    7 a    associates    examination    with fuel cycle    number    8 g    associates    examination    with fuel cycle    number    9 10    associates    examination    with fuel cycle    number    10 associates    examination    with fuel cycle    number    11 NMP2-ISI406 Rev.t                                                        Section 6                                      Page4of7
 
  ~
 
At (&#xb9;)            These letters indicate that the scheduled examinations were attempted (but not completed) in the period. A variable (number) may follow these letters. If so, then that number identifies the fuel cycle in which the attempt occurred.
CN              These letters indicate that examinations were NIS-I certified in the period, but not required (e.g., rendered superfluous via subsequent de-selection.)
0 (&#xb9;)            This (capital) letter indicates that all examinations were done for the period. A variable (number) may follow this letter. Ifso, then that number identifies the fuel cycle in which the completion (examinations) occurred. (A lower case "d" indicates that a portion (but not all) of the listed examinations were done that period.)
ES  (&#xb9;)          These letters indicate that erpanded sample examinations were performed (e.g., pursuant to IWX-2430 - ADDITIONALEXAMINATIONS.) A variable (number) may follow these letters. Ifso, then that number identifies the fuel cycle in which those examinations occutTed.
Ev (&#xb9;)            These letters indicate that the examinations required by the referenced Code Category were performed and were accepted by NMPC Design Engineering Department's evaluation pursuant to IWB-3122.4 Acceptance by Evaluation. A variable (number) may follow these letters. Ifso, then that number identifies the fuel cycle in which those examinations occurred.
(A lower case "e" indicates that a portion (but not all) of the listed examinations were performed.)
Ex (&#xb9;)            These letters indicate that the examinations required by the referenced Code Category were performed and were accepted by meeting the examination acceptance criteria provided to the NMPC Quality Inspection Department personnel pursuant to IWB-3122.1 Acceptance by Examination. A variable (number) may follow these letters. If so, then that number "e" indi-identifies the refueling cycle in which those examinations occurred. (A lower case cates that a portion (but not all) of the listed examinations were performed.)
This letter indicates that a special mid-cycle examination was performed and accepted.
Ps (&#xb9;)            These letters indicate that Code preservice examinations required by the referenced Code Category were performed and were accepted by meeting the various acceptance, repair, and reexamination criteria provided to the NMPC Quality Inspection Department personnel pur-suant to IWB-3110 PRESERVICE EXAMINATIONS. A variable (number) may follow these letters. Ifso, then that number identifies the refueling cycle in which those examinations oc-
                                              'll culTed.
Rr (&#xb9;)            These letters indicate that the examinations required by the referenced Code Category were performed, failed to meet acceptance criteria, could not be accepted by evaluation, but rather, required repair, and were subsequently reexamined and found to be acceptable pursuant to IWB-3122.2 Acceptance by Repair. A variable (number) may follow these letters. Ifso, then that number identifies the refueling cycle in which those examinations occurred.
Rt (&#xb9;)            These letters indicate that the examinations required by the referenced Code Category were performed, failed to meet acceptance criteria, could not be accepted by evaluation, but rather, required replacement, and were subsequently reexamined and found to be acceptable pursuant to IWB-3122.3 Acceptance by Rcplacemiet. A variable (number) may follow these letters. If so, then that number identifies the refueling cycle in which those examinations occuITed.
NMP2-ISI-006 Rev. 1                                              Section 6                              Page5o(7
 
Sc (&#xb9;)        These letters indicate that examinations are scheduled. A variable (number) may follow these letters. Ifso, then that number identifies the refueling cycle in which those examinations are scheduled. (A lower case "s" indicates that a portion (but not all) of the listed examinations are to be performed.)
W            This letter indicates that the Code required examination has been waived by the regulatory and enforcement authority having jurisdiction at the plant site (i.e., the United States Nuclear Regulatory Commission.)
This typographic symbol indicates a status which was under review at the time the table was promulgated.
REL REQ  &#xb9;            This field provides a reference to Section XI requirements that are not being satisfied, and identification of substitute examinations, if any, via the uniquely numbered, 10 CFR 50.55a(g)(5)(iii) approved request for relief from the regulators. Summaries and statuses of the approved requests can be found in Appendix F to this Program Plan.
REMARKS              Although there is no special format to this column, it does fulfilla specific requirement. In general terms, that requirement is to assure continuity and auditability of the Program Plan by identifying changes and the motivation/rationale behind them. Specifically, this column satisfies the NMPC procedural requirements of NIP-LPP-01, 93.2.1, insofar as:
                            ~  it provides "a brief description that summarizes the change,"
                            ~  it identifies the page (of the Table) upon which it appears as "a retyped version which clearly indicates the change."
ECT                    ASME XI relies on the concept of representative sampling. Therefore, although the Code and this Plan require entire populations of categories of weldments and base materials be listed herein, in most cases, only subsets of those populations require examination. This column provides the rationale for those selections. (Some weldments may be chosen pursuant to more than one criteria and, as a result, more than one code may, at times, appear.)
10%perl        Modified (RR-IWB-1) B14.10 10% sample selected weldment 7.5%Min          C-F-I, C5.11 minimum 7.5% sample selected weldment AL          Associated Longitudinal weld      of a selected circumferential weld ANC          Anchor (welded to, or adjacent to)
AU          Augmented examination as defined in Section 3          of this Program AW          Additional Weld BER            Break Exclusion Region weldment DER  Dlspo        Deviation Event Report disposition selection mandate OM            Dissimilar Metals weldment Exempt          Nonselected item due to meeting ASME XI exemption criteria Grp Rep          Multi-component group representative HS            High Stress weldment Mandate          Mandatory ASME XI Code examination NMP2-ISI406 Rev.1                                              Section 6                                Pege6of7
 
NA                Not Applicable none                Selection criteria not provided by ASME XI Code (currently limited to Category C-F-2)
NR                Not Required NS                Selectable, but not selected (due to the selection              of other    items within its group)
SD                Structural Discontinuity TE                Category C-F-2, C5.51 or C5.81 terminal end sub-sample selection group member TEV                Terminal End to Vessel UponDis                Selection incumbent upon routine disassembly for maintenance, repair, or volumetric exam SYSTEM                        This is a three letter code which is associated with a piping system or the master nuclear component, i.e.the reactor pressure vessel. (It appears only once per page, at the top, in the heading.) A piping system is an assembly of piping, piping supports, components, and, if applicable, component supports of one or more Code Classes, with a defined function as described in the Design Specification for the piping system. The master nuclear component is the reactor pressure vessel, in its "as-received" configuration at NMP2.'here are 13 such codes      listed below, replete with system name.
Ass          Auxiliary Steam High Pressure Core Spray Low Pressure Core Spray Reactor Building Equipment Drains Feedwater Reactor Core Isolation Cooling Main Steam Reactor Coolant (Recirculation)
Control Rod Drive Hydraulic System Residual Heat Removal Reactor Pressure Vessel sLs          Standby Liquid Control Reactor Water Cleanup UT CALIBRATN                  Identifies the calibration standard that, under most conditions, will be best suited for the BLK required examination. If, for some technically justified reason, the use of a different calibration block becomes necessary, the QI supervisor will be responsible for notifying the ISI Program Manager in writing, and obtaining his concurrence.
  'n  addition to being ASME III Form N.IA certified by CBI Nuclear Company (CBI). and beanng senal number T52, the vessel also appears on a Form N-5 ccnification resultant to the CBI shop installation of I85 CRD housings, 55 incorc housings, 370 CRD hydraulic linc piping subassemblies, one drain line piping subassembly, one diifcrential prcssure & liquid control line piping subassembly, and one jet pump penetration seal appurtenance.
NMP2-ISI406 Rev.t                                                                Section 6                                      Page  7of7
 
7.0 EXCEPTIONS TO ASME CODE REQUIREMENTS 7.1  REQUESTING RELIEF UNDER 10 CFR 50.55a Relief from ASME Code requirements may be requested based on either of the two following criteria. The format presented in Paragraph 7.1.2 below shall be utilized for both requests for relief with the proper reference to the the applicable 10CFR50.55a section included in the request.
(1)      Section 50.55a(g)(5)(iii) of Title 10 of the Code of Federal Regulations states, "Ifthe licensee has determined that conformance with certain code requirements is impractical for its facility, the licensee shall notify the Commission and submit, as specified in f50.4, information to support the determinations."
(2)    Section 50.55a(3) of Title 10 of the Code of Federal Regulations states, "Proposed alternatives to the requirements of paragraphs (c), (d), (e), (f), (g), and (h) of this section or portions thereof may be used when authorized by the Director of the Office of Nuclear Reactor Regulation. The applicant shall demonstrate that:
(i) The proposed alternatives would provide an acceptable, level of quality and safety, or (ii) Compliance with the specified requirements of this section would result in hardship or unusual diKculty without a compensating increase in the level of quality and safety.
7.1.1 DETERMINATIONOF IMPRACTICALITY if Conformance with a code requirement shall be considered to be impractical a successful, meaningful implementa-tion of the requirement could only be achieved by altering or otherwise reworking the existing design, geometry or materials ofconstruction of an item within the facility. This alteration or reworking shall be termed a burden on NMPC in documents and communications with the Commission, subsequent and resultant to, NMPC's conclusion that a code requirement is not credible at NMP2.
7.1.2 NOTIFICATION,OF REGULATORS In those cases where NMPC submits information to the Commission to support              a determination that conformance with certain Code requirements is impractical for NMP2:
~ prepare an analysis in the form provided below; Identifier          Relief Request Number Component            the assigned plant identifier associated ASME component System Title        the applicable plant designated system title Function            a brief description of system function during:
(a) normal plant operations (b) shutdown (c) refueling conditions Code Class          ASME Section XI Class, Examination Category, and Item Number NMP2-ISI406 Rev.1                                      Section 7                                          Page 1 of 2
 
Examination                  a description    of the examination required by 10CFR50.55a(g)                      is to include a reference to the Requirements                salient portions of the document from which the examination                          is required', including:
(a) interval for which relief is requested (b) ifthe examination is required by ASME XI, the table or section                            of the  Code delineating same (c) &equency of examination (d) specific type of examination Burden                                                                if describe the burden on NMPC the Code requirements were imposed (e.g., a system would have to be redesigned or an item would have to be replaced), include:
(a) the rationale upon which the examination is deemed impractical, such as:
(1) geometric constraints; (2) metallurgical constraints; (3) inaccessibility; (4) ALARAconcerns (not to be the sole reason)
(a) radiation levels at the test area; (b) total estimated man-REM exposure involved in the examination; (c) flushing or shielding capabilities that might reduce radiation level; (d) considerations involving remote inspection; (b) past  history/lessons      learned from previous intervals Recommended                  &om the discussion above, a synopsis of any substitute examination, including its &equency, Substitute                  and ifpossible, a specific schedule for implementation.
Technical                    provide support information, including:
Justification                (a) description of, and justification for, any changes expected in the overall level of plant and Data to                      quality and safety resultant to implementation of the recommended substitute in lieu of Supportthe                        the ASME XI requirement; Determination                (b) identification and discussion of similar components (in redundant systems or in the same system) to be examined or tested as substitutes; (c) percentage of the required examinations that have been or willbe completed on each com-ponent for which substitute examinations are planned; (d) discussion      of the consequences of failure of the component for which substitute examina-tions are planned.
~  submit this information to the Commission as specified in g 50.4 Written Communications,                                      of Title 10 of the Code of Federal Regulations, through the Nuclear Licensing Department.
7.2  CYCLIC REVIEW The list of relief requests that is contained in this program as Appendix F shall be reviewed for continued applicability as well as potential withdrawal on a cyclic basis. The cycles shall correspond with the generation of the ASME XI required Summary Report, that is to say, on a refueling outage basis if Code Case N-532 is not utilized, or on a if periodic basis Code Case N-532 is utilized. The review will consider such factors as system safety classification changes and evolving nondestructive examination techniques. The results of each cycle's review willappear as updates to the status contained in Appendix F.
    'his  may bc a part ofthe core requirements contained inthe ASME Boiler & Pressure Vessel Code, Section
                                                                                                          ~        Xl, or may be an augmented inspection
                                                                                                                      ~
as al-lowed by 10CFR50.55a(gX6Xii).
    'is  requirement is derived &om the disposition to NMPC Deviation/Event Report tt t-934308, dated 2-9 93, wherein it was reported that the Nhl Pl Second
                                                                                                  ~              ~
Tcn Year Program Plan was ddicient in thc area of relief request submittal/review. In part, the disposition to that DER requires this program plan to bc revised to incorporate a requirement for a periodic review ofrelief requests.
NMP2-ISI406 Rev.t                                                    Section 7                                                            Page2o(2
 
8.0 NONDESTRUCTIVE EXAMINATIONPROCEDURES VT 2.01      ASME Section XI Visual Examination Procedure PT 3.00      Liquid Penetrant Examination Procedure MT 4.00    Magnetic Particle Examination Procedure RT 5.00    Radiographic Examination UT 6.01      Ultrasonic Linearity Verification UT 6.04      Ultrasonic Examination of Bolts, Studs, Nuts and Cylindrical Components UT 6.05      Ultrasonic Thickness Measurement UT 6.06      Manual Planar Flaw Sizing Procedure UT 6.07      Ultrasonic Examination  of Nozzle Inner Radii UT 6.09      Ultrasonic Examination Procedure for RPV Flange Weld and Stud Hole Threads in the RPV Flange UT 6.10      System Performance Checks and Implementation        of Regulatory Guide 1.150 for RPV Examinations UT 6.13      Ultrasonic Examination  of Bi-Metallic Piping Welds UT 6.20      Ultrasonic Examination  of Reactor CRD Housings UT6.21      Ultrasonic Examination Procedure For Vessel Welds 2" Thick or Less And Associated Nozzle Inner Radius Areas UT 6.23    Ultrasonic Examination  of Ferritic Pipe    Welds UT 6.24    Ultrasonic Examination  of Austenitic Pipe    Welds UT 6.25    Straight Beam, Ultrasonic Examination    of Bolts and Studs See controlled copy of NDE Procedures for latest    approved revision.
NOTE: NON-DESTRUCTIVE EXAMINATION(NDE) PROCEDURES REFERENCED FOR USE IN THE APPENDIX G k H TABLES MAY BE SUPERCEDED WITH UPDATED OR NEW PROCEDURES TO COMPLY WITH CURRENT ASME CODE REQUIREMENTS WITHOUT REQUIRING CHANGES TO THE TABLES TO REFLECT THE ACTUALPROCEDURES USED.
The following are three examples of identified procedure changes required to implement the requirements of the 1989 Editiori of ASME Section Xl.
Current procedure:                                  New procedure:
NDEP-UT-6.02                                    NDEP-UT-6.23 NDEP-UT-6.03                                    NDEP-UT-6.24 NDEP-UT-6.11                                    NDEP-UT-6.25 NMP2-ISI406 Rev.1                              Section 8                                          Page1 of1
 
9.0 ULTRASONIC CALIBRATIONSTANDARDS At NMP2, basic calibration blocks      are made from material            of the same nominal diameter                                                  and nominal wall thickness or pipe schedule as the item to be examined. The calibration blocks for similar metal welds are fabricated from one of the materials specified for the piping being joined by the weld. Calibration blocks for dissimilar metal welds are fabricated from the material specified for the side of the weld Irom which the examination is conducted. In those cases where material of the same specification is not available, material of similar chemical analysis, tensile properties and metallurgical structure have been and will continue to be used. In those cases where the material to be examined has been clad, the block has been and will continue to be clad by the same welding procedure as the production part (except in those instances where the automatic method is impractical-there, deposition of the clad is by the manual method.) The finish on the surfaces of these blocks is representative of the surface finishes of the items being examined in this interval. The inside and outside diameters of these blocks contain circumferential and longitudinal notches, the sides of which are perpendicular to the surface of the block Each notch is at least one (I) inch in length.
The basic calibration blocks, as listed below, are retained by the Owner, NMPC. Throughout the first interval, they were supplemented by two borrowed blocks, one Irom General Electric Nuclear Power (Serial No. N2NZ001) and the other from Carolina Power & Light's Brunswick-2 facility (Serial No. 83-8.) NMP2 anticipates that additional supplemental blocks may be used in the second interval based on its implementation of the Performance Demonstra-tion Initiative (PDI) or its use of newly developed techniques.
NMPC ID                  IN USE            MATERIAL                                                                    COMMENTS This is a welded mock-up of quenched and tempered vacuum-treated carbon steel (P-1) forging material to forged or rolled austenitic alloy steel (P-8) material for use by the vendor of automated examinations on reactor pressure vessel nozzles. It may be supple-SA-508 Class 1a                          mented by General Electric Nuclear Energy's (welded to) SA-182                      calibration block, Serial No. N2NZ001 or CP8L's                                                              ~
GE795E254G3                      Yes        Grade F 316L                            Brunswick-2 block Serial No. 83-B.
Block is carbon steel plate for pressure vessels intended for intermediate and higher temperature service, made from SA-516 Grade 70 material, certified to meet SA-515 Grade 70, and intended to SR-155                                  be representative of the Main Steam System header, KC70                                    made from A155 KC70 Class 1.1 plate, rolled and NMP-2-48-3.50-CS                Yes        Class 1                                  welded.
This is a wrought carbon steel piping fitting; starting" SAQ20                                    material was SA-350 Grade LF2 (Charpy V-notch NMP-2-30-2.90-CS                Yes        Grade WPL6                              tou hness tested. Used for Feedwater S em tees.
                                                                                    .': This'Is'caibon steel foigIng requIring notch>>toughness~
                                                                                      ',testiiigIfor"'piping:comp'an'enta!'.Althoiigh. fabricated",,)
                                            '4 "''"                                ':;:,,durin'g,.tI)e."pr'eseryic'e inspection 'pha's'e."a'rid'intended:,":
                                                                                    "foi'tise'In",the i,',':, ,': - .'",'-';
performance:of,.iiiariual'examinabons'at.,'>>NMP2,",this,block'Is'.not.'prese'ntiy:
                                              -'SA-350,,'                                                                                                                                      used;for'InseivIce':>
  .NMP-'2-'28-'2.60~'>>:-''9.:;::i":            Gra'de L'F2'i:::':.':,':", '...": ".examin'ations.'.";":-."~-':"-"i=":": ':",'>>~-";..':
                                                                                                                                                            '""                              :I:  7:::::: .'..,"':.: ''"5.:':::::""I This is seamless carbon steel pipe used for main NMP-2-28-1.34-CS                Yes        SA-106 Grade B                          steam line examinations This is quenched and tempered vacuum-treated alloy SA-508                                  steel forging material for pressure vessels; used for NMP-2-27-1.57-CS                Yes        Class 2                                  main steam nozzle to safe end weld examinations Seamless carbon steel pipe for main steam line NMP-2-26-1.26-CS                Yes        SA-106 Grade B                          examinations NMP2-ISI-006 Rev.1                                                Section 9                                                                                                                      Page10f8
 
NMPC ID  IN USE      MATERIAL                                COMMENTS Quenched and tempered vacuum-treated alloy steel SA-508                  forging for pressure vessels is used for recirculation NMP-2-25-1.84-NOZ Yes    Class 2                suction nozzle to safe end weld examinations This is a quenched and tempered vacuum-treated alloy steel forging intended for pressure vessels; at SA-508                  NMP2 it is used for feedwater system penetration weld NMP-2-24-2.469-CS Yes    Class 2                examinations NMP-2-24-2.06-CS  Yes    SA-106 Grade B          Seamless carbon steel pipe in feedwater system This is an electric fusion welded austenitic chromium-SA-358                  nickel alloy steel pipe, double welded with filler metal Grade 316              in all passes, then completely radiographed. It is used NMP-2-24-1.317-SS Yes    Class 1                for recirculation    tern i in examinations at NMP2.
This is a wrought austenitic stainless steel (18-8, Mo) pipe fitting, made from A-1 82, Grade F 316 material, SAA03                  and used for recirculation system piping weld ex-NMP-2-24-1.234-SS Yes    WP 316                  aminations Seamless carbon steel pipe used for feedwater NMP-2-24-1.219-CS Yes    SA-106 Grade B          s tern i in weld examinations Electric fusion welded austenitic chromium-nickel alloy SA-358                  steel pipe, double welded with filler metal in aF passes, Grade 316              then completely radiographed; used for recirculation NMP-2-24-1.002-SS Yes    Class 1                s tern i in weld examinations SA-312                  Austenitic stainless steel pipe used for residual heat Yes    Grade TP 304            removals tern i in weldexaminations Seamless carbon steel pipe used for residual heat NMP-2-24-.500-CS  Yes    SA-106 Grade B          removals tern i in weldexaminations Seamless carbon steel pipe used for low pressure NMP-2-24-.375-CS  Yes    SA-106 Grade B          cores ra s tern i in weld examinations This is an electric fusion'welded austenitic chromium-,
nickel alloy steel:pipe; double welded with filler metal "
in.. all- passes,    but not'adiographed.,'Although fabricated during the presenrice inspection phase SA'-358                              for use- fn the performance of.manuaf    and'ntended Grade 316L-              e'xamfnations at NMP2, this block is not presently u-NMP-2-20-1.03-SS      No. Class 2                sed for inservice examinations.
Seamless carbon steel pipe used for residual heat NMP-2-20-1.031-CS Yes    SA-106 Grade B          removals tern i in weldexaminations Electric fusion welded austenitic chromium-nickel alloy SA-358                  steel pipe; double welded with fiFer metal in ail passes, Grade 316L              but not radiographed; used for residual heat removal NMP-2-20-.84-SS  Yes    Class 2                  s tern i in weld examinations Seamless carbon steel pipe used for residual heat NMP-2-20-.812-CS  Yes    SA-106 Grade B          removal s tern i in weld examinations Seamless carbon steel pipe used for residual heat NMP-2-20-.594-CS  Yes    SA-106 Grade B          removal s tern f in weld examinations Seamless carbon steel pipe used for residual heat Yes    SA-106 Grade B          removals tern i in weld examinations NMP2-ISI406 Rev.1                        Section 9                                          Page  2of8
 
,I NMPC ID                IN USE                  MATERIAL                                          COMMENTS Seamless Carbon Steel Pipe used for high and low NMP-2-20-.375-CS              Yes        SA-106 Grade B                        pressure core spray systems piping weld examinations Austenitic stainless steel pipe used for high and low NMP-2-20-.375-SS              Yes        SA-312 Grade TP 304                      ressurecores ra s tems i 'n weldexaminations Seamless carbon steel pipe used for feedwater and NMP-2-18-.938-CS              Yes        SA-106 Grade B                        mainsteams tems i in weldexaminations Seamless carbon steel pipe used for residual heat NMP-2-18-.500-CS              Yes        SA-106 Grade B                        removals tern i in weld examinations Seamless carbon steel pipe used for high and low pressure core spray and residual heat removal NMP-2-18-.375-CS              Yes        SA-106 Grade B                        s tems i in weldexaminations Austenitic stainless steel pipe used for high pressure NMP-2-1 8-.375-SS            Yes        SA-312 Grade TP 304                    cores ra s tern i in weldexaminations Seamless carbon steel pipe used for high and low pressure core spray and main steam system piping NMP-2-1 6-1.031-CS            Yes        SA-106 Grade B                        weld examinations Electric fusion welded austenitic chromium-nickel aloy SA-358                                steel pipe, double welded with filler metal in all passes, Grade 316                              then completely radiographed; used for recirculation NMP-2-16-.822-SS              Yes        Class 1                                s tern i in weld examinations Seamless carbon steel pipe used for low pressure core spray and residual heat removal systems piping NMP-2-16-.500-CS              Yes        SA-106 Grade B                        weld examinations
                                                                  ':Austenitic                  stainless. steel-pipe;---,although fabricated "during the preseivice Inspection'phase and intended
:  . for use iri the performance of manual examinations at:
                                        'A-'312''o.'rade
:,:, NMP2,    this.block'is,not piesently used. fo''.:inservice NMP-2-16-.375-SS                                        TP.'304                                    .                                                                                      -.'.examinatioris Seamless carbon steel pipe used for low pressure NMP-2-16-.375-CS              Yes        SA-106 Grade B                        cores ra s tern          i in weld examinations Seamless carbon steel pipe used for high pressure NMP-2-14-.375-CS              Yes        SA-106 Grade B                        cores ra s tern          i  in weldexaminations "RECIRC:.1NLET'.'SAF E END~ENSION"''GAL'.
BLOCK. MODIFICATION"..-:.This is: forged, or rolled::
austenitic alloy steel fo'r;high'-temperature.service.::AI-:.:;
tho'ugtI:fab'ric'ated,"duiiiig th''res'ervice:
in the perfo'rinance.of. j Iri's'pection':,>>'phase,''and,inteiide'd':for:;us'e',
                        'A-',182 NMP-'2-12-'1'.004S'.':- :',":
                          "';::            .Grade F'316L manu'al';:examinations",at'MP2,',:this'';.'bio'ck:is''.:not"',
resen ''s'e'd'for'iri'se'i'vice examination's..
                                                                                  ,Thh Is:an''.electric'fusIori 'w'ekied au'st'enilic chromium-".
nickel alloy. steel pipe;, double welded with. filler metal
                                                                                ,in "all'.passes "but 'not,radiographed, 'Although fabricated. during the presenrice inspection phase and
                                          ".SA-358..                              intended for use in the performance of manual
                                          .'Grade 316                              examinations at NMP2; this'lock is not presently.,u-.-
'NMP-'2-'12-.844-SS"              No ~    Class 2                            -
sed for inservice examinations; Seamless carbon steel pipe used for high pressure core spray, control rod drive and residual heat removal NMP-2-1 2-.844-CS            Yes        SA-106 Grade B                        s tern i in weld examinations NMP2-ISI406 Rev.1                                                Section 9                                                      Page 3 of 8
 
NMPC ID        IN USE          MATERIAL                                    COMMENTS Seamless carbon steel pipe used for high and low pressure core spray, feedwater, and residual heat NMP-2-12-.688-CS        Yes        SA-106 Grade B              removal system piping weld examinations SA-376                      Seamless austenitic steel pipe used for residual heat NMP-2-12-.688-SS        Yes        Grade TP 304                removals tern i in weld examinations Electric fusion welded austenitic chromium-nickel alloy SA-358                      steel pipe, double welded with filler metal in all passes, Grade 316                  then completely radiographed; used for recirculation NMP-2-12-.657-SS        Yes        Class 1                    s tern i in weld examinations Austenitic stainless steel pipe; although fabricated dur-ing the preservice inspection phase and intended for
                                                            'use in the performance of manual examinations at
                                  'A-312                    'NMP2, this;block is not presently used for inservice NMP-2-'12-.375-SS  -
No    Grade TP 304              -
examinations.
Seamless Carbon Steel Pipe; used for low pressure core spray, reactor core isolation cooling, and residual NMP-2-12-.375-CS        Yes        SA-106 Grade B              heatremovals tems i in weldexaminations Quenched and tempered vacuum-treated alloy steel forging for pressure vessels used for reactor pressure vessel nozzle safe end to safe end extension weld ex-aminations associated with the high and low pressure NMP-2-11.625-1.125-CS  Yes        SA-508 Class 2              core s ra and residual heat removal s stems Carbon steel forging requiring notch toughness SA-350                      testing for piping components; used for feedwater NMP-2-10-1.00-CS        Yes        Grade LF2                  s tern i in weld examinations Seamless carbon steel pipe used for high pressure core spray and reactor core isolation system piping NMP-2-10-.719-CS        Yes        SA-106 Grade B              weld examinations Seamless carbon steel pipe used for high and low pressure core spray and reactor core isolation system NMP-2-10-.594-CS        Yes        SA-106 Grade B                i in weld examinations Seamless carbon steel pipe; although fabricated dur-ing the presenrice inspection phase and intended for use,in the perforrftance of manual examinations at.
NMP2, this block.h not presently used for inservice NMP-'.2-10-.365-CS.        No: . SA-'106 Grade B              examinations.
Quenched and tempered vacuum-treated alloy steel forging for pressure vessels used for nozzle to flange NMP-2-9.3-1.77-CS      Yes        SA-508 Class 2              welds on to head of reactor ressure vessel Seamless or welded steel pipe for low-temperature service used for reactor water cleanup system piping NMP-2-8-.906-CS        Yes        SA-333 Grade 6              weld examinations Seamless carbon steel pipe used for reactor water NMP-2-8-.718-CS        Yes        SA-106 Grade B              cleanu s tern i in weld examinations Seamless carbon steel pipe used for control rod drive and residual heat removal systems piping weld NMP-2-8-.594-CS        Yes        SA-106 Grade B              examinations Seamless carbon steel pipe used for residual heat removal and reactor water cleanup systems piping NMP-2-8-.500-CS        Yes        SA-106 Grade B              weld examinations NMP2-ISI406 Rev.t                                  Section 9                                              Page 4 of 8
 
NMPC ID        IN USE            MATERIAL                                      COMMENTS Austenitic stainless steel pipe; although fabricated dur ."    =
                                                            .  -'ing the preseryice inspection phase and intended for,.
                                                                'se      in the performance, of m'anual examinations, at I              '.SA-'312.                    'MP2, this block is not presently used for insenrice
'-                                            304,                exa'min ations.
NMP-2-8-.322S            . No    Grade TP Seamless carbon steel pipe; although fabricated dur<<            -:
Ing the presenrice inspection:phase and intended for.-.
                                                              ,:: use, in the performance of,.m'anual examinations, at"
:  'NMP2;,thh:block ls not presently'used for inseivice:
examin'ations. '.
-  NMP-2-8-'.322'-CS:        No- 'SA'-106GradeB Quenched and tempered vacuum-treated alloy steel forging for pressure vessels; used for spare nozzle to NMP-2-6.3-1.24-CS    Yes          SA-508 Class 2                flan e weld on to head of reactor ressure vessel Seamless carbon steel pipe used for auxiliary steam and reactor core isolation systems piping weld ex-NMP-2-6-.562-CS      Yes          SA-106 Grade B                aminations Seamless carbon steel pipe used for reactor core isolation, main steam, and residual heat removal NMP-2-6-.432-CS      Yes          SA-106 Grade B                s tems i in weld examinations Seamless carbon ste'el pipe; although fabricated'dui-'
                                                                  .ing the preseryIce'inspection phase and jritendef for::
use iii the performari'ce:'of, manual'examinations'at.':
                                      = 1.                      -NMP2;, this'lock is not'presently us'ed for Ins'eivIce'. I NMP-2-6-.280-CS'          No 'A'-'.106,Grade B                  exa min'ation s'.
::Austenitic stainless steel pipe; although fabricated dur=
                                                                  -:ing:the presenrice inspection phase and intended foi
:.use in:.th'; performance,:of 'manual'ex'aminations at;
                                  "'SA-312                      :
NMP2, this:block: ls not presently used. for insenrice            =
NMP-2-5;8-.365-SS          No    Grade TP.'304.                examinations; "
Alloy steel forging for pressure and high-temperature SA-336                        parts used for jet pump instrumentation nozzle welds NMP-2-5.25-.69-NOZ  Yes          Class F304                    on reactor ressure vessel Quenched and tempered vacuum-treated alloy steel SA-508                        forging for pressure vessels; used for control rod drive NMP-2-5-.78-CS      Yes          Class 2                        h draulic s tern return line nozzle to safe end weld Seamless carbon steel pipe used for main steam and reactor water cleanup systems piping weld ex-NMP-2<-.337-CS        Yes        SA-106 Grade B                  aminations SA-312                        Austenitic stainless steel pipe used for reactor water NMP-2-4-.337-SS      Yes        Grade TP 316L                  cleanu s tern i in weld examinations Forged or rolled austenitic alloy steel for high-A-182                          temperature      service used for reactor water NMP-2-4-.337-SS182    Yes        Grade F 316                    recirculation s tern i in weld examinations
                      'o:
Seamless,.'carbon      althou'gh; fabricated during - the,.':
preservice'ins pectioii phase and intended for us'e.in.';
                                                                    ..the:.performari'ce.of manual examinations at NMP2;.
this block: is .not'resently.'sed', for., inservice:
t NMP-2-4-.250-CS                . SA-106:Grade B                  examinatioris.
NMP2-ISI406 Rev.1                                  Section 9                                                  Page 5of8
 
t          NMPC ID NMP-2W.250-SS-IN USE No MATERIAL SA-182 Grade F 316 COMMENTS Forged or roiled austenitic aHoy steel for high-temperature setvice; although fabricated during the preservice inspection phase and intended for use in the performance of manual examinations at NMP2, this 'block is not presently used for inservice ex-aminations.
RCS PUMP STUD CAL. BLOCK - Chromium-nickel-SA-540                molybdenum alloy steel bolting matedal used for Grade B23            reactor water recirculation system pump fastener ex-NMP-2-3.25-23.5-STUD Yes    Class 5              aminations CORE SPRAY LOW PRESSURE PUMP STUD-SA-193                Chromium-molybdenum alloy steel bolting material NMP-2-2.25-1 0-STUD  Yes    Grade B7              usedforlow ressurecores ra um fasteners RPV NOZZLE INNER RADIUS - Quenched and tempered vacuum-treated alloy steel forging for pressure vessels; only used for N2 (Reactor Recirculation) and N3 (Main Steam) manual nozzle SA-508                examinations, othetwise, automated examinations use NMP-2-IR-9-CS        Yes    Class 2                NMP2-126-1-RP V RPV NOZZLE INNER RADIUS - Quenched and tempered vacuum-treated alloy steel forging for pressure vessels; only used for manual nozzle ex-aminations on the reactor pressure vessel, otherwise, SA-508                the preferred, automated examinations use NMP2-NMP-2-IR-7.5-CS      Yes    Class 2                124-1-RPV or NMP2-127-1-RPV RPV NOZZLE INNER RADIUS - Quenched and Tempered Vacuum-Treated Alloy Steel Forging for Pressure Vessels; used on reactor pressure vessel top head nozzles N7 and N18 for manual examinations conducted from the nozzle barrel.
(Automated methodology has not been utilized for top head nozzle examinations, and NMPC does not SA-508                anticipate its use on top head nozzles in the second NMP-2-IR-4-CS        Yes    Class 2              interval.
RHS HEAT EXCHANGER - Carbon steel plate for pressure vessels of moderate or Lower temperature setvice for high and low pressure core spray, and SA-516                residual heat removal systems vessel weld and piping NMP-2-RHS-.75-CS    Yes    Grade 70              weld examinations RHS NOZZLE INNER RADIUS - Carbon steel forging used for residual heat removal vessel (heat ex-NMP-2-RHS-IR-3.75-CS Yes    SA-105                chan er nozzle inner radius section examinations RPV FLANGE - Manganese-molybdenum-nickel alloy steel plate, (Heat No. 860269) quenched, tempered SA-533                and used for reactor pressure vessel Itange-side shell-Type B                to-flange weld examination as well as the base metal Class 1                examinations of the threads in the stud holes of the NMP-2-FLG-RPV        Yes                          flan e RPV CLOSURE HEAD STUD - Chromium-nickel-SA-540                  molybdenum alloy steel bolting material (Heat No.
Grade B23              6072871) used for the 76 reactor pressure vessel stud Yes    Class 3                base material examinations NMP2-ISI406 Rev.1                        Section 9                                          Page 6 ot 8
 
NMPC ID      IN USE          MATERIAL
                                                                    'OMMENTS          ,',',;RPV! CLOSURE HEAD THREADJNUT;-':Chromium-;:,.
                                                                                      ';nlc)kel'r'n)oly)bdehum'a)llo)y,steel bomng materiai '(Heat;",I I:;  No'.'2D388) although fabricated during,,the preservice fo'use in:the perfor-',
                              'SA440':-'.;""",::,'
Giade'B23';.:.;;"'.,;;::;, :<:
                                                              ',:                    ': man'ce.of, manyal'examInations, volumetiic examine-.),
                                                                                      'ion n'of iequiie'd;,and this'block is not presently.'used
                                                                                                                                                                    ':inspectio)n"phase"and)intended
':.'NMP-'2-RPV-NUT-'1."
                                                      ".: ':"': -'    ',"Class':3'::)
                                                                                      'or:inservlce'examinations.              "  '
TOP HEAD RADIAL PLATE - A 5.25" manganese-molybdenum-nickel alloy steel plate, quenched and SA-533                                                    tempered (but not dad) and used for reactor pressure Type B                                                    vessel top head-to4lange weld and all top head NMP-2-128-1-RPV      Yes      Class 1                                                    meridional welds 'oinin the radial Iates.
TOP HEAD DOLLAR - A 3.18" thick manganese-molybdenum-nickel alloy steel plate, quenched and tempered (but not clad) and used for the reactor pressure vessel top head circumferential weld examinations, nozzle-to-vessel weld examinations, SA-533                                                    and nozzle inside radius section base metal examina-Type B                                                    tions when'he examination is conducted from the top NMP-2-127-1-RPV      Yes      Class 1                                                    head late.
NO. 4 SHELL RING - A 7.9" thick manganese-molybdenum-nickel alloy steel plate, (Ht No. C3066-2) quenched, tempered, clad, and used for the reactor SA-533                                                    pressure vessel shell ring &#xb9;4 examinations, and as a Type B                                                    substitute for block NMP2-123-1-RPV as noted NMP-2-126-1-RPV      Yes      Class 1                                                    below.
                                                                                        "::NO,:  1((2:and'3)"',SHEL'L!"RING(s) -".A"nominal'6- /4"-",",
                                                                                        .',thIckman)gariestHnolybdenummckel'alhy'teel                phte,'::,'.;:.
(He'at No.'::.C3192-2):quenched;,temp'er'e'd and clad in'
::s)up'po)it'of,the".Ie)actor press)ure.vessel    'shell rings'&#xb9;1,:
                                                                                      "&#xb9;2, an!'d &#xb9;3''examination's.        This block was'.used for. the
                                                                                          'presetvce examinations.)However, it was.not used for:
                                                                                        'everal. of the inservice examinations in the flrst inter.-
                                                                                        ;:vel,:as;basic'calibration.,block:.NMP2-124-"1-RPV is' "made of the same material; and Is'the same n'ominai,.
                                                                            .,thickness,'As, such,'it meets tlie requirements foundin".
ASME;:V,';:A'ttide"'4, paragraph,:TM1';::-",:1;3;4,: Baslc'-
:Callb'ratio'n'Block) Coiifi'jpir'ation".and'isbn''a'cceptable':,
substitute. for it;:)Us'e'"of.this subsbtutIon:.saves NMP2"'
:;.S'A'-:533;,
                                            "'TypeB                                  'n the admlnIstiatiy'e'"costs".ass'ociated:"with'cairyin'g.:;
                                                                                                                                                  'ust on'e-NMP-2-125-1-RPV:    Yes::  , Classi1.                                                  .two.blocks'he'calibre'tion area'instea)d'of BOTIOM HEAD RADIALPLATE - A6.68" thick man-ganese-molybdenum-nickel alloy steel plate, (Heat No.
C3073-2) quenched, tempered, clad, and used for SA-533                                                      pressure vessel bottom head radial plate ex-Type B                                                      aminations, and, as a substitute for block NMP2-125-NMP-2-124-1-RPV      Yes      Class 1                                                    1-RPV as noted immediate above.
NMP2-ISI406 Rev.t                                            Section 9                                                                    Page 7 of 8
 
14 NMPC ID      IN USE            MATERIAL                                                    COMMENTS BOTTOM HEAD DOLL'AR,ASSEMBLY -. A nominal
                                                                          .," 6-sl16", m'anganesmolybdenum-nickel alloy steel
                                                                      ', plate', (Heat No. B6603-1):quenched; tempered and--'.
cIadin support of examinabon of two'(2) internal welds ',
                                                                      ..':: ofthe Bottom Head DollarPlate Assembly. (2RPVNG:
                                                                              =
and'-2RPVNR.)'This block was used for the're-service'examinabons. However; it was hot used for the
                                                                            .: inservice examinations in the firstinterval, as th'ey are the- only two examinations it services, and basic calibration block NMP2-126<<1-RPV is made of the same material, and isthe same nominal thickness. As
                                                                              'such; it meets the requirements',found in ASME V,
                                                                            . Article'4-paragraph:TA41.'1.3;4 Basic Calibration.,
Block ConQguratton and is an acceptable sub stitutB:.
                                                                            -: for it;":Use'of this substitution saves NMP2 on the ad-::
5
                            "::::; -SA-'533  -:~.                            'ministrative 'cosh;associated with"carryirig two blocks
::.'o  :: Type'8': -'.",                                                      Instead'of just one;          'o"the'c'alib'rabo'n,:a'res NMP.-'2-1 23-:,1-RPV,                              'Class',1, NMP2-ISI406 Rev.1                                              Section 9                                                  Page 8 or 8
 
10.0 ASME XI REPAIR/REPLACEMENT PROGRAM The Code defined and mandated repair and replacement (includes modification) of items subject to examination and/or test pursuant to this Program Plan, shall be completed in accordance with the Code of record and NMP2's Repair/Replacement Program as identified herein.
The NMP2 Program is a set of documents that defines the managerial and administrative controls for the completion of repairs or the replacement of items. NMP2's Repair/Replacement Program consists of the latest versions, or supersedings, of the following NMPC documents (as well as the interface procedures referenced therein) as controlled by NMPC in accordance with Criterion VI of Appendix B to 10 CFR                                50.'OL NUCLEAR DIVISIONPOLICY NDD-ASU              AUDITS AND SURVEILLANCES NDD-CON              CONFIGURATION MANAGEMENT NDD-DES              DESIGN CONTROL NDD-DOC              DOCUMENT CONTROL NDD-ECA              EVALUATIONAND CORRECTIVE ACTION NDD-IIT              INSERVICE INSPECTION AND TESTING NDD-INS              INSPECTIONS NDD-INV              INVENTORY, IDENTIFICATION,AND PHYSICAL CONTROL OF MATERIALS, PARTS AND SUPPLIES NDD-MAI              MAINTENANCE NDD-MTE              MEASURING AND TESTING EQUIPMENT NDD-PRO              PROCEDURES AND ORDERS NDD-RMG              RECORDS MANAGEMENT NDD-SAT              SURVEILLANCEAND TES TING NDD-SEV              SAFETY EVALUATIONS NDD-SPC              SPECIAL PROCESSES CONTROL NDD-SRE              SAFETY REVIEWS NDD-TQS              TRAINING QUALIFICATIONAND SIMULATORS These procedures, in whole or in part, provide for:
(a) identification of the applicable Edition and Addenda of Section XI to be used for the repairlreplacement activity; (b) a description of the items to be repaired or replaced and the Codes and Code Cases to which they were con-structed; (c) a description of the work to be performed; (d) the Code Edition, Addenda, and Code Cases applicable to materials, design, manufacture, and installation; (e) any special requirements pertaining to materials, welding, heat treatment, and nondestructive examination requirements; g) the test and acceptance criteria to be used to verify the acceptability of the repairlreplacement; (g) for replacements, the documentation required by IWA-7500:
      ~    all procedures for installation of items to be used for replacement shall be in accordance with IWA-4100;
      ~    maintenance of the following reports and records, to the extent required by the Construction Code and Article IWA-7000, as applicable to the description of the work to be performed:
(I) Certified Design Specification (2) Certified Design Report
  'his  listing need only bc updated with each sucoessive mrerval's submission to the regulators. It is a dated compilation intended to quantitatively depict NMPCs Code compliance at the beginning of an Interval. It is not the control mechanism, The reader is referred to thc NMPC (on line, computerized) Controlled Document System. currently resident on the VAN Cluster, P Building, Nine Mile Point Site. Lycoming, NY.
NMP2-ISI406 Rev.1                                                    Section 10                                                          Page  1  of 4
 
r (3) Design Report (4) Over pressure Protection Report (5) Manufacturer's Data Report (6) Material Certification (7) Evaluation Report required by IWA-7220 (8) completed Owner's Report for Repairs and Replacements, Form NIS-2
      ~    preservice inspection (prior'to return of the system to service) in accordance with IWB, C, D, E, or F-2200 for the item to be used for replacement, as applicable, including the joints that connect the item to the system; (h) the application of the ASME Code Symbol Stamp (which is neither required nor prohibited, and is generally not applied at NMP2.)
NMP2 utilizes the services of an Authorized Inservice Inspection Agency'for all repairs or replacements by notifying the ANIIprior to starting either of these activities and by keeping the ANII informed of the progress of the work so that necessary inspections may be performed. These notifications are documented in the form of signatures, hold points, and initials in work plans unique to each Code repair or replacement.
NMP2's Repair/Replacement Program anticipates the generation of individual repairireplacement plans for each vessel, pump, valve, or piping system (including their supports) that include the essential requirements for completion
,of the repair or replacement. Among those essential requirements is the invocation of alternate rules to the ASME Boiler and Pressure Vessel Code Sections III and XI, as promulgated in the ASME's Code Cases, as sanctioned for use by the regulatory and enforcement authority having jurisdiction at the plant site that is, USNRC.
Special IWE/IWL interpretation pursuant to IN 97-29 Despite the facts that:
(I) licensees do not have to submit to the NRC staff for approval of the containment inservice inspection program developed to satisfy the requirements of Subsection IWE and Subsection IWL, (2) the program elements and the required documentation may be maintained on site for audit, and, (3) the inclusion of those elements in this document is deferred, all repair and replacement activities within the scope of Subsections IWE and IWL of the code conducted after September 9, 1996, are conducted in accordance with these subsections.
Use  of Code  Cases The ASME Boiler and Pressure Vessel Committee publishes a document entitled Code Cases. Generally, the individual Code Cases that make up this document explain the intent of Code rules or provide for alternative requirements under special circumstances. Most Code Cases are eventually superseded by revision of the Code and then are annulled by action of the ASME. In such instances, the intent of the annulled Code Case becomes part of the revised Code, and therefore continued use of the Code Case intent is sanctioned under the rules of the Code. In other instances, the Code Case is annulled because it is no longer acceptable or there is no further requirement for it. A Code Case that was approved for a particular situation and not for a generic application willonly be used for the approved situation because annulment of such a Code Case could result in situations that would not meet Code requirements.
The following table lists the Code Cases invoked by NMP2's Repair/Replacement Program. It includes references to: the individual plan identifiers (as controlled and revised) which first invoked the alternate rule at NMP2, documented evidence of USNRC staff acceptance for that use, and a brief synopsis of the rule. In those instances where a Case has not yet been utilized, but its use is anticipated, it has been included in the list.
NMP2-ISI-006 Rev.1                                    Section 10                                            Page 2 of 4
 
":::::"':."".-''": ..:"'-.''ALTERNATE REPAIR/REPLsACEMENT RULES:VIA':CODE.CASE CODE              INVOKING R/R                                                                                                  USNRC STAFF CASE                  PLAN S                                                SYNOPSIS                                          ACCEPTANCE System hydrostatic test required by IWA4400 for R/R of Class 2 piping that cannot be isolated by existing valves or that requires securing safety or relief valves for isolation may              Reg. Guide N-416          RHS- /EDC2M10494A                be deferred until the next regularly scheduled system                        1.147, Rev.9 RHS- /EDC2M10495A                h drostatic test.                                                              A rll 1992 May substitute a system leakage test for the system hydrostatic test normally required by IWA-4000 for repair/replacement of items by welding, provided; (a) NDE is performed IAWASME III 1992 Edition, and; (b) prior to, or immediately upon return to service, VT-2 is performed in conjunction with a system leakage test, using ASME XI, 1992 Edition's IWA-5000, at nominal                      Per10 CFR SWPQ/EDC2M10693A SWP-3/ED C2M10694                      operating pressure and temperature, and;                                50.55a(a)(3)(ii)
SWP4/E0C2M10695A                  (c) use of this Code Case is documented on Form NIS-2                        via letter SWP-3/ED C2M10696                      (or NIS-2A per N-532, if that alternative is approved by                of 10-18-94, SWP-3/ED C2M10697A                      NRC.)
SWP-3/E 0 C2M10698A              If the previous N-416 was used to defer a Class 2 LBMarsh, SWP-3/EDC2M10757                hydrostatic test, the deferred test may be eliminated when                    USNRC to N-416-1                                            a    b and c abovearemet.                                                    BRS Ivia, NMPC May use helicalwoil threaded inserts in pressure retaining items provided; (a) installation performed in accordance with IWX-7000; (b) they meet loadings in the Construction Code (for materials not listed in the Construction Code, primary stress shall not exceed /3 of the minimum specified yield strength or '/i of the minimum specified tensile strength of the applicable material, whichever is lower);
(c) they are purchased in accordance with the Owner's Quality Assurance Program with the supplier being evaluated for compliance with NCA-3800 or 10CFR50, Appendix B; (d) they are supplied with a CMTR that provides trace-ability to the item, material specification, grade or class, mechanical properties, and heat treated condition; (e) they shall be installed in accordance with the manufac-turer's instructions;                                                  Reg. Guide 2MSS'P SV1 20-              (f) use of this Code Case is documented in the ap-                            1.147, Rev.10 N-496                137/2M 10660                      propriate Owner's Report (NIS-2 or NIS-2A.)                            (July 1993)
Usc of Code Case NAI6-1 is authorized: provided additional surface examinations arc performed on the root pass layer ofbutt and socket welds on thc pressure retaining boundary of Class 3 components when the surface examination method is used in accordance with ASM E Section 111, and until such time as the Code Case is publislied in a future revision of Regulatory Guide 1.147. At that time, ifNMPC continues to implement the Code Case, NMPC will be bound by any limitations Issued In the Regulatory Guide, as well as continuing to be required to follow all provisions in the Code Case.
NMP2-ISI406 Rev.1                                                        Section 10                                                        Page3of4
 
". ",: ', ~ . '. ",".':":- '''ALTERNATE,REPAIR/REPLACEMENT RULES VIA CODE, CASE:,
CODE              INVOKING R/R                                          SYNOPSIS                                        USNRC STAFF CASE                  PLAN S                                                                                            ACCEPTANCE May establish the acceptability of a defect in austenitic stainless steel piping in accordance with IWB-3640 by deposition of weld reinforcement (weld overlay) on the outside surface of pipe, provided; (a) the repair is performed in accordance with a Repair Program satisfying the requirements of IWAA130; (b) reinforcing weld metal is low carbon (0.035% max.) SS applied 360'round the circumference of the pipe, and in accordance with a qualified welding procedure specification identified in the Repair Program; (c) prior to welding, surface to be repaired is LP examined with indications greater than /16 inch being prepared for weld reinforcement by either:
(1) excavating to the extent necessary to create a cavity that can be repaired using qualified welding procedures, or (2) applying one or more layers of weld overlay without excavation, provided these layers are in addition to the design reinforcement thickness; (d) post preparation LPS reveal no indications greater than f16 of an inch; (e) weld reinforcement consists of a minimum of two weld layers having as-deposited delta ferrite content of at least 7.5 FN (with exceptions);
(I) weld design assures access for PSI and ISI; (g) an evaluation of the rammcations of the repair is con-ducted; (h) the specified Code pressure test is performed; (I) preservice examination is performed per IWB-2200; (j) ISI will include the entire volume PSI'd in (I) above; (k) post repair support design tolerances are verified via VT-3; (I) all other applicable requirements of IWXA000 are met; (m) use of this Code Case is documented on an NIS-2 (or Reg. Guide NIS-2A per N-532, if that alternative is approved by                  1.147, Rev.11 N-504              None at ublication            NRC                                                                    October 1994 The technical merits of this Code Case are essentially the same as those for N-504, the differences being.                            NRC approval via administrative insofar as they correct typographic errors                  acceptance of N-504-1            (None at publication)    (inaccurate references) in the original.                                  this plan Also, repairlreplacement plans are subject to review by USNRC at any time, upon request. The certified results of those plans (NIS-2 Data Reports) are compiled and submitted'o USNRC (replete with references to Evaluation Reports verifying acceptability) within 90 calendar days of the completion of each refueling outage. As such, this Repair/Replacement Program is subject to review by USNRC,
    'nly those NIS 2 Data Reports which eettify Code work on ASME Class  I and 2 components are inel uded with the IWA4230 Summary Report Submittal.
NMP2-ISI406 Rev.1                                                  Section 10                                                      Page4of4
 
APPENDIX A CLASS 1 CATEGORY B-J PIPE WELD COUNT
 
==SUMMARY==
 
Table A-1:      &#xb9;nexempt        Class  l Circumferential Pipe          IYeld Count Summary This table shows the total number of nonexempt circumferential pipe welds in each Class 1 system, as well as the subset totals of those welds selected for volumetric and/or surface examinations pursuant to Category B-J criteria or Augmented examination criteria.
Table A-2: Nonexempt Class              l Pipe    8'eld Count For each isometric within a system, this table identifies the number of welds for each                        of the Section  XI Category B-J item numbers.
Table A-3: Class          l Pipe  8'elds Selected    for Examination This table lists Examination Category B-J welds which have been selected for examination. In each case, the reason for selecting a particular weld has been provided. In cases where longitudinal welds intersect circumferential welds, the longitudinal weld number has also been provided. In those instances, the examination willinclude at least a pipe-diameter length, but not more than 12n of each longitudinal weld intersecting the circumferential welds required to be examined by this Examination Category B-J. Should a circumferential weld be examined solely pursuant to NUREG-0313 Rev. 2, (USNRC Generic Letter 88-01) the associated longitudinal welds does not require ex-amination.'
Refcrencc Section 3 0, Augmented Examinations, subsection 3 7, Augmented Requirements Applicable To Tire hfMP2 Program Plan, NUREG 03 i 3 Rev.
2, paragraph entitled, "Examuunion Method," for amplification of NMP2 stance.
NMP2-ISI406 Revn                                                    Appendix A                                                  Page1 of18
 
TABLE A-1 NONEXEMPT CLASS 1 CIRCUMFERENTIAL PIPE WELD COUNT
 
==SUMMARY==
 
(Cat. B-J Items B9.11, B9.21, B9.31, B9.32, & B9.40)
System                  System        Nonexempt        ASME XI      Augmented Name                Abbreviation    Weld Count      Selection    Selection Hi h-Pressure Core S ra                    CSH                21 Low-Pressure Core S ra                      CSL                19 D    ell E ui ment Drains                    DER Feedwater                                                      99            25            10 Reactor Core Isolation Coolin                ICS              67            16 Reactor Vessel Instrumentation              ISC Main Steam                                  MSS              248            62            31        Break Exduska R Reactor Recirculation                        RCS              106            27 Control Rod Drive                            RDS Residual Heat Removal                        RHS              164            41 Reactor Pressure Vessel                      RPV Standb    Li uid Control                    SLS              50            13 Reactor Water Cleanup                      WCS              157            39            32    (14 GL8801. 18 Break Exoi Region)
TOTALWELD COUNTS                          946            237            73 NMP2-ISI~ Rev. 1                                        Appendix A                                              Page2of18
 
TABLE A-2 NONEXEMPT            ISI    CLASS      1 PIPE WELD COUNT System        :..:    -'':. Dwg. Mo;'.: ':,                                          Code: Item No.
B9.11            B9.12      B9.21        B9 22'.':: B9.'31    B9 32      B9AO 25-09                                  0                        0          0      0          0 CSH 25-10                    18            0          0            0          0                  0 SUBTOTALS                20              0          0            0          0                  0 SEL'ECTED  ~                5"'9 0          '0:          0                  0          0 26-05                                  0            0          0          0      0          0 Cst SUBTOTALS                  19            0            0          0          0      0          0 SELECTED m      '-                                      0          0          0,      0          .0 07-A                      0            0                        0          0      0          0 DER SUBTOTALS                    0            0                        0          0      0          0 I:,  'ELECTED'~                                      0                    :::":0';        0      0          '0
  'FWS:,.::,:                      47-1 3                  19            0            0          0                    0          0 47-14                                  0            0                                0          0 47-15                    14            0            0          0          0        0          0 47-16                    20            0            0          0                    0        '0 47-17                                  0            0          0                    0          0 47-18                    18            0            0          0          0        0          0 SUBTOTALS                  93            0            0          0                    0          0
                              'SELECTED    ~  .
33                          0          0                    0          0 57-07                    49            0            0          0          0        0          0
    !CS 57-09                    17            0            0          0          0                  0 SUBTOTALS                  66            0            0          0          0                  0 SELECTED    ~                15            0':
E
: 0.      '.
322-B                      0          0                        0          0        0          0 ISC SUBTOTALS                    0          0                        0          0        0          0
:;;SELECTED    II'. ".;'",':,'. 0          0                        0    '.    '0                  0 01-1 3                    19            0          0          0 MSS NMP2-ISI406 Rev.1                                                  Appendix A                                      Page 3 of 18
 
TABLE A-2 NONEXEMPT ISI CLASS                    1 PIPE WELD COUNT System                  Dwg.:No.                                                              Code Item No.
B9.10        B9.'12. B9.21    B9.:22,: '.B9.31      B9;32        B9AO:-:,-"
01-14                                              0          0        0
                                                  '1-'15 20          0          0        0
                            ,  01-"I6                                  19          0          0        0 01-20                                              0          0        0          0            0          0 01.-',21                                15          0                    0          0                        0
                  .                                                      0        0        31          0          0            0 47.-..'A;':..
                                'f064                    ~ '-:                      0        16        '0          0            0          0
                    .';:107.'-:A'
                    ,                                                    0        0        12          0          0            0 110-A                                    0        0        18          0          0            0
                          .SUBTOTALS'1 110-B                  .
0        0        18          0          0            0 98          0        97          0        19                      25 SELECTED~                                    58;        0                    0        18'''
64-00-1                                                          0        0                                  0 RCS.
64-00-2                                                          0        0                                  0 64-00-3                                  25        22          0        0                        0          0 64-00-4                                            10          0        0                        0          0 64-00-5                                                        0        0                                  0 64-00%                                  25                    0          0                      0          0 SUB TOTALS                                  92        81          0          0        14            0          0
                " '-::  ',SELECTED                        ~  '-',:: '::26      :36          0                    1",;..':::::: 0          0 ISI-COM-004                                    0        0                    0        0            0          0 RDS.
ISI-COM-005                                    0        0                    0        0            0          0 SUBTOTALS                                    0        0                    0        0            0          0 SELECTED'cr                                    0        0                              0            0 ISI-COM-033                                              0          0          0        0            0          0 RPV SUBTOTALS                                              0          0          0        0            0          0 SEL'ECTED                        ~                                  0                  ''0 NMP24SI406 Rev.1                                                            Appendix A                                        Page 4 of 18
 
0 TABLE A-2 NONEXEMPT ISI CLASS            1 PIPE WELD COUNT System''    "':,",:'.  '!;-':    Dwg..No;:                                      Code':Item'o.
                                                  ; B9.'11    B9."12: -:B9.21      B9 22    B9.3$  B9.32:  - .. B9.40 RHS.                              66-19                        0          0        0        0        0            0 66-21                        0                    0        0        0            0 66-26                        0          0        0        0        0            0 66-31                        0          0        0        0        0            0 66-32                        0          0        0        0        0            0 6647              16        0          0        0        0      0            0 66-50              25        0          0        0        0      0            0 66-51              20        0          0        0        0      0            0 66-52              19        0          0        0        0      0            0 66-53              14                    0        0        0                    0 66-54              16                    0        0        0                    0 66-55              18                    0        0        0      0            0 177-A                0        0          12        0        0      0 SUBTOTALS            140                    12        0        0 SELECTED:~,            39'                              0 75-A                0        0          14        0        0      0            0 88-A                0        0          30        0        0      0            0 88-B                0        0                    0        0      0            0 SUBTOTALS              0        0          50        0        0      0            0 I
                .;    i,',';
                                'SELECTED'Iz'9-05 0        '13                        ,0          ~
0 .t 44                              0                0            0
- NfcS                                                              0          0 09-06              21          0        17        0 09-14              41          0          0        0        0      0            0 12-A                0        0                    0        0      0 94-A                0        0                    0                0            0 100-A                0        0                    0        0      0            0 217-A                0        0                    0        0      0 NMP2-ISI406 Rev.1                                            Appendix A                                Page 5 of 18
 
TABLE A-2 NONEXEMPT ISI CLASS      1 PIPE WELD COUNT System          'Dwg. No.                              Code Item No.
B9.'l0  B9.12      B9.2$    B9.22    B9.31 89.32    B9AO SUBTOTALS                0        42        0 SELECTED'06                0                  0            0        0 NMP2-ISI406 Rev.1                    Appendix A                            Page6oI18
 
0 TABLE A-3 CLASS                1    PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
                  '.V't, g.': .
P:".:"'..
Weld.""::::,,:-';::,':"" "...                  ,.:;,::;;:"'-:-.': Code'.:.;:;:. '.,".,::Reason        :::::::::::--:::Associated:-:::  .:
          'umber                ',:.'::.:.;...::.-,,:::.:,. ',:::::.: ":,::-:'Item'No."':":,': -''":: Selected ".            Longwelds                ,',:::,:..::
2RPV-KB31-A                                                          89.21                      DM                        none 2CSH-25-09-FW009                                                          89.11                      TEV                      none 2CSH-25-10-FW001                                                          89.11                      TEV                      none 2CSH-25-1 0-FW006                                                        89.11                      HS                        none 2CSH-25-10-FW007                                                          89.11                      HS                        none 2CSH-25-10-FW008                                                          89.11                      TEV                      none 2CSL-26-05-FW005                                                          89.11                      TEV                      none 2CSL-26-05-FW006                                                          89.11                      TEV                      none 2CSL-26-05-FW009                                                          89.11                      HS                      none 2CSL-26-05-FW010                                                          89.11                      HS                      none 2CSL-26-05-FW012                                                          89.11                      TEV                      none 2DER-07A-FW001                                                          89.21                      HS                      none 2FWS-47-1 3-FW003                                                          89.11                    BER                      none 2FWS-47-1 3-FW006                                                          89.11                  AW/ber                      none 2FWS-47-1 3-FW007                                                          89.11                  AW/ber                      none 2FWS-47-1 3-FW008                                                          89.11                  TEV/ber                    none 2FWS-47-13-FW009                                                          89.11                  AW/ber                      none 2FWSQ7-13-FW010                                                            89.11                  AW/ber                      none 2FWSQ7-1 3-FW012                                                          89.11                      HS                      none 2FWS-47-13-FW014                                                          89.11                    BER                      none 2FWS-47-1 3-FW017                                                          89.11                    BER                      none 2FWS-47-13-SW003                                                          89.11                    BER                      none 2FWS-47-1 3-SW011                                                          89.11                    BER                      none NMP2-ISI406 Rev.t                                                                      Appendix A                                        Page 7 of 18
 
TABLE A-3 CLASS        1  PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld::::::,.: '.        ;;;,;.,;;-;:,',,:;::;:,,'.:;: Code:,::..';-,'-  .=:  Reason".; .... ":::::..:,:".:::: Associate'd.,.':",.::;:,,.:.:.:;:::.:;.::;:.:,i Number'.':      ..:      '':.:";::.:,'It'e"m'',No.':.'.. ".,...          .'.=. Selecte'd-..        .'... L'ongwelds':,':."                                "",'one 2FWSQ7-1 3-VW001                                              89.11                    AW/ber 2FWSQ7-1 3-VW002                                              89.11                    AW/ber                                  none 2FWSQ7-13-VW003                                              89.31                    AW/ber                                  none 2FWS47-13-VWZ4A-SWA                                              89.11                    TEV/ber                                none 2FWS-47-1 4-FW005                                            89.11                      TEV                                  none 2FWS47-1 5-FW003                                              89.11                      TEV                                  none 2FWS47-15-FW007                                              89.11                      TEV                                  none 2FWSQ7-16-FW003                                              89.11                      BER                                    none 2FWS-47-16-FW006                                              89.11                    AW/ber                                  none 2FWSQ7-16-FW007                                              89.11                    AW/ber                                  none 2FWSQ7-16-FW008                                              89.11                    TEV/ber                                  none 2FWSQ7-1 6-FW009                                              89.11                    TEV/ber                                  none 2FWS-47-1 6-FW010                                            89.11                    AW/ber                                  none 2F WS-47-1 6-FW012                                            89.11                      HS                                    none 2FWS47-1 6-FW014                                              89.11                      BER                                    none 2FWSQ7-1 6-SW003                                              89.11                    BER                                    none 2FWS-47-1 6-SW010                                              89.11                    BER                                    none 2FWS47-16-SW011                                                89.11                    BER                                    none 2FWS-47-16-VW001                                              89.11                    AW/ber                                  none 2FWSQ7-16-VW002                                                89.11                    AW/ber                                  none 2F WS-47-'16-VW003                                            89.31                    AW/ber                                  none 2FWSQ7-1 7-FW004                                              89.11                    TEV                                    none 2FWS-47-18-FW003                                              89.11                    TEV                                    none 2FWS-47-18-FW007                                              89.11                    TEV                                    none 2ICS-57-07-FW005                                              89.11                    TEV                                    none 2ICS-57-07-FW012                                              89.11                      HS                                    none NMP2-ISI406 Rev.t                                                          Appendix A                                                        Page 8 of 18
 
TABLE A-3 CLASS              1      PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
            ;.Weld""...',:",.',:                  .".,:-'.:::: ':,''Code.'.-.'.,""...', .':".:.".: Reason":.::::::,,:,:,.:";::      ';::::,:.:::.':.:;: ':: A's'sociated  :
            'Nvmb'er'.:..:. '''.:::.'":.:'.::::..'..! ',':::,'Item.':No". '.".:.-'." ;,;:        '-';Selected.':::::.:',:::::::,',:: .:::::::.::,:::::;::::,    Longwelds.:
2ICS-57-07-FW021                                                  89.11                            TEV                                                        none 2ICS-57-07-FW024                                                  89.11                            HS                                                        none 2ICS-57-07-FW026                                                  89.11                            HS                                                        none 2ICS-57-07-FW027                                                  89.11                            HS                                                        none 2ICS-57-07-SW003                                                  89.11                            AW                                                        none 2ICS-57-09-FW001                                                  89.11                            HS                                                        none 2ICS-57-09-FW002                                                  89.11                            HS                                                        none 2ICS-57-09-FW005                                                  89.11                          AW/ber                                                      none 2ICS-57-09-FW006                                                  89.11                          AW/ber                                                      none 2ICS-57-09-FW007                                                  89.11                          TEV/ber                                                      none 2ICS-57-09-FW008                                                  89.11                          TEV/ber                                                      none 2ICS-57-09-FW027                                                  89.32                          HS/ber                                                      none 2ICS-57-09-SW009                                                  89.11                              HS                                                      none 2RPV-K827                                                    89.11                            TEV                                                        none 2ISC-3228-SW001                                                  89.21                            TEV                                                        none 2ISC-3228-SW005                                                  89.21                              HS                                                      none 2MSS-01-1 3-FW002                                                  89.11                              HS                                                      none 2MSS-01-1 3-FW005                                                  89.11                          HS/her                                                      none 2MSS-01-1 3-FW008                                                  89.11                          TEV/ber                                                      none 2MSS-01-1 3-FW009                                                  89.11                          TEV/ber                                                      none 2MSS-01-1 3-FW021                                                  89.11                            BER                                                      none 2MSS-01-1 3-FW022                                                  89.11                            BER                                                      none 2MSS-01-1 3-FW025                                                  89.11                            BER                                                      none 2MSS-01-13-FW026                                                  89.11                            BER                                                      none 2MSS I 3-SW004                                                89.31                              HS                                                      none NMP2-ISI406 Rev.1                                                              Appendix A                                                                                Pagegof18
 
TABLE A-3 CLASS      1  PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
                                                                            '':::.::;-',",''::Re'asoii'.:..';:=:.:-.':,: ',.".",::,"-.::: Associated',::::;,-::".:,
                                    .'; .","',~lt'em" No".:..:',::.-;!.::;; ::::;:.",;:/'::Selected'":-::::::-:";:;:::;:.",,":.:."; L''oi'g'welds':','.'::.:.,I: .-
2MSS-01-1 3-SW005                          89.31                                          HS                                            none 2MSS-01-13-SW006                          89.31                                          HS                                            none 2MSS-01-13-SW007                          89.31                                          HS                                            none 2MSS-01-13-SW008                          89.11                                          HS                                            none 2MSS-01-1 3-SW010                          89.11                                          BER                                            none 2MSS-01-1 3-SW013                          89.11                                          BER                                            none 2MSS-01-1 3-SW015                          89.11                                          BER                                            none 2MSS-01-1 3-SW020                          89.11                                          BER                                            none 2MSS-01-1 4-FW001                          89.11                                          AW                                              none 2MSS-01-14-FW004                          89.11                                      HS/ber                                              none 2MSS-01-14-FW009                          89.11                                    TEV/ber                                              none 2MSS-01-14-FW014                          89.11                                          HS                                            no'ne 2MSS-01-14-FW021                          89.11                                          BER                                            none 2MSS-01-14-FW022                          89.11                                          BER                                            none 2MSS-01-14-FW025                          89.11                                    TEV/ber                                              none 2MSS-01-14-FW026                          89.11                                          BER                                            none 2MSS-01-14-FW027                          89.11                                          BER                                            none 2MSS-01-14-SW007                          89.31                                          HS                                            none 2MSS-01-14-SW008                          89.31                                          HS                                            none 2MSS-01-1 4-SW009                          89.31                                          HS                                            none 2MSS-01-1 4-SW010                          89.31                                          HS                                            none 2MSS-01-14-SW011                          89.31                                          HS                                            none 2MSS-01-14-SW015                          89.11                                          BER                                            none 2MSS-01-14-SW019                          89.11                                          BER                                            none 2MSS-01-14-SW022                          89.11                                          BER                                            none 2MSS-01-1 5-FW005                          89.11                                      HS/ber                                            none 2MSS-01-1 5-FW009                          89.11                                    TEV/ber                                              none NMP2-ISI406 Rev.t                                      Appendix A                                                                                  Page 10 of 18
 
TABLE A-3 CLASS                  1      PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
                                                                                          >'-",':",",, Reason'":"':-:.::-:,.;. '';,':.;'.-.',::;;:; Associat'e'd,:::,-::;::,:i.:-:::;:-'::'",
,.:::::::::: -;.;,".:..'::: Number':.": ".-'::':.',.':.;"""..'".',.".',.                  '"",';",::;Selected'.::::."            ':;-;;:::,:::,'::;:;::.;":L''oiigwelds,:-';.".::-;:"..-":
2MSS-01-15-FW021                                        B9.11                              BER                                                none 2MSS-01-15-FW022                                        B9.11                              BER                                                none 2MSS-01-15-FW025                                        B9.11                            TEV/ber                                              none 2MSS-01-1 5-FW026                                        B9.11                            AW/her                                                none 2MSS-01-1 5-FW027                                        B9.11                              BER                                                none 2MSS-01-15-SW003                                        B9.11                              HS                                                none 2MSS-01-1 5-SW006                                        B9.31                              HS                                                none 2MSS-01-1 5-SW007                                        B9.31                              HS                                                none 2MSS-01-1 5-SW008                                        B9.31                              HS                                                none 2MSS-01-1 5-SW009                                        B9.31                              HS                                                none 2MSS-01-15-SW010                                        B9.31                              HS                                                none 2MSS-01-1 5-SW013                                        B9.32                              BER                                                none 2MSS-01-15-SW014                                        B9.11                              BER                                                none 2MSS-01-15-SW018                                        B9.11                              BER                                                none 2MSS-01-1 5-SW020                                        B9.11                              BER                                                none 2MSS-01-1 6-FW003                                        B9.11                              HS                                                none 2MSS-01-1 6-FW005                                        B9.11                            HS/ber                                                none 2MSS-01-1 6-FW008                                        B9.11                            TEV/ber                                                none 2MSS-01-1 6-FW009                                        B9.11                            TEV/ber                                                none 2MSS-01-16-FW021                                        B9.11                              BER                                                  none 2MSS-01-16-FW022                                        B9.11                              BER                                                  none 2MSS-01-16-FW025                                        B9.11                              BER                                                  none
                                                                                                                                                                            'one 2MSS-01-16-FW026                                        B9.11                              BER 2MSS-01-1 6-SW004                                        B9.31                              HS                                                  none 2MSS-01-16-SW005                                        B9.31                              HS                                                  none 2MSS-01-16-SW006                                        B9.31                              HS                                                  none 2MSS-01-'1 6-SW007                                      B9.31                              HS                                                  none NMP2-ISI406 Rev.t                                                            Appendix A                                                                              Page      11 of 18
 
TABLE A-3 CLASS      1  PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld                          Code                    Reason                    Associated Number                        Item No.                  Selected                    Longwelds 2MSS-01-16-SW008                        89.11                        HS                      none 2MSS-01-16-SW010                        89.11                      BER                      none 2MSS-01-16-SW013                        89.11                      BER                      none 2MSS-01-16-SW015                        89.11                      BER                      none 2MSS-01-1 6-SW020                      89.11                      BER                      none 2MSS-01-20-FW001                        89.11                      TEV                      none 2MSS-01-21-FW002                        89.11                        HS                      none 2MSS-01-21-FW006                        89.11                      TEV                      none 2MSS-047A-FW001A                        89.40                        HS                      none 2MSS-047A-FW023A                        89.40                        HS                      none 2MSS-047A-FW038                        89.40                        HS                      none 2MSS-047A-FW043                        89.40                        HS                      none 2MSS-1 06A-FW001A                        89.11                      HS                        none 2MSS-106A-FW002                        89.21                        HS                        none 2MSS-106A-FW004A                        89.21                        HS                        none 2MSS-106A-FW014                        89.21                        HS                        none 2MSS-106A-FW018A                        89.21                        HS                        none 2MSS-107A-FW001A                        89.21                        HS                        none 2MSS-107A-FW002A                        89.21                        HS                        none 2MSS-107A-FW006                        89.21                        HS                        none 2MSS-1 07A-FW007                        89.40                      HS                        none 2MSS-1 07A-FW011                        89.21                      HS                        none 2MSS-110A-FW001A                        89.40                      HS                        none 2MSS-110A-FW006A                        89.21                      HS                        none 2RPV-KB13                          89.11                      TEV                        none 2RPV-KB14                          89.11                      TEV                        none 2RPV-KB15                          89.11                      TEV                        none NMP2-ISI406 Rev.t                                    Appendix A                                        Page 12 of 18
 
TABLE A-3 CLASS      1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld                          Code                    Reason                    Associated Number                        Item No.                  Selected                    Long welds 2RPV-KB16                          89.11                      TEV                        none 2RPV-KB28                          89.11                      TEV                        none 2RCS-64-00-FWA01                        89.11                    TEV/au                      LW01 2RCS-64-00-FWA03                        89.11                      HS/au                  LW06A, LW068 2RCSW4-00-FWA05                        89.11                      HS/au                  LW08A, LW088 2RCS<4-00-FWA06                        89.11                      HS/au                      LW10 2RCS-64-00-FWA07                        89.11                    AW/au                      LW1 0 2RCSW4-00-FWA1 0                        89.11                      HS/au                  LW14A, LW148 2RCS-64-00-FWA1 7                      89.11                    TEV/au                      LW32 2RCS-64-00-FWA1 8                      89.11                    TEV/au                      LW29 2RCS-64-00-FWA1 9                      89.11                    TEV/au                      LW18 2RCS-64-00-FWA20                        89.11                    TEV/au                      LW26 2RCS4-00-FWA21                          89.11                    TEV/au                      LW23 2RCSW4-00-FWB01                        89.11                    TEV/au                      LW33 2RCS<4-00-FW803                        89.11                      HS/au                  LW37A, LW378 2RCS-64-00-FWB06                        89.11                      HS/au                      LW41 2RCS-64-00-FW810                        89.11                      HS/au                  LW45A, LW458 2RCS-64-00-FWB17                        89.11                    TEV/au                      LW62 2RCS-64-00-FWB18                        89.11                    TEV/au                      LW59 2RCS-64-00-FW819                        89.11                    TEV/au                      LW49 2RCS-64-00-FWB20                        89.11                    TEV/au                      LW56 2RCS-64-00-FWB21                        89.11                    TEV/au                      LW53 2RCS-64-00-SW04                        89.11                    HS/au              LW11 LW12A LW128 2RCS-64-00-SW07                        89.31                    HS/au                      none 2RCS-64-00-SW35                        89.11                    HS/au              LW07, LW08A, LW088 2RCS-64'-00-SW40                        89.11                    HS/au              LW01 LW02A LW028 NMP2-ISI406 Rev.1                                    Appendix A                                          Page 13 of 16
 
TABLE A-3 CLASS                  1  PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
;:: ':.:-'"::::::".::::.:.".:,'..-::Weld:",.:':.-'";:::..,,:-;::9':-:::
:::-:: -''::::C'ode'"-::        -'::::i :;:",::"".:-'::::R'eason':=.I':::;-',.'; ::":::::;.,'.::,:Associated::..;,'.:;-':;:::.-.-:
Numbei'.:::":'-:;-:,'::;::"'->'::::::""..":-'::: :,":;.,::::;.: Ite'm'iNo'.":::,,";,:::,    :-:4;-'-',:.:'Select'ed.':"          ." :.':-';::,'-:::.,'L'o'ngw'elds      -",.-.",::: '.:'';.
                '.";;
2RCS-64-00-SW59                                                              B9.11                                      HS/au                                    LW50 2RCS-64-00-SW67                                                              B9.11                                      MS/au                    LW38, LW39A, LW39B 2RCS-64-00-SW70                                                              B9.11                                      HS/au                    LW33, LW34A, LW34B 2RPV-KB31-A                                                              B9.21                                        DM                                      none
                                              '/
2RHS-66-1 9-FW005                                                              B9.11                                        TEV                                    none 2RHS-66-19-FW011                                                              B9.11                                        TEV                                    none 2RHS46-21-FW002                                                                B9.11                                        TEV                                    none 2RHS-66-26-FW012                                                              B9.11                                        TEV                                    none 2RHSW6-31-FW013                                                                B9.11                                        TEV                                    none 2RHS46-32-FW007                                                                B9.11                                        TEV                                    none 2RHS-66-50-FW001                                                              B9.11                                        TEV                                    none 2RHSW6-50-FW005                                                                B9.11                                        HS                                    none 2RHS-66-50-FW006                                                              B9.11                                        HS                                    none 2RHS-66-50-FW008                                                              B9.11                                        TEV                                    none 2RHS-66-50-SW013                                                              B9.11                                        HS                                    none 2RHS-66-51-FW001                                                              B9.11                                        TEV                                    none 2RHS-66-51-FW005                                                              B9.11                                        HS                                    none 2RHS-66-51-FW008                                                              B9.11                                        TEV                                    none 2RHS46-51-FW010                                                                B9.11                                        HS                                    none 2RHS46-51-FW016                                                                B9.11                                        HS                                    none 2RHSW6-52-FW001                                                                B9.11                                        TEV                                    none 2RHS-66-52-FW004                                                              B9.11                                        HS                                    none 2RHSZ6-52-FW005                                                                B9.11                                        HS                                    none 2RHS-66-52-FW007                                                              B9.11                                        TEV                                    none 2RHS-66-52-SW010                                                              B9.11                                        AW                                    none NMP24SI406 Rev.t                                                                                    Appendix A                                                                          Page 14 of 16
 
TABLE A-3 CLASS    1  PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld                          Code                    Reason--                  Associated Number                        Item No.                  Selected                    Long welds 2RHSW6-52-SW013                        B9.11                        HS                        none 2RHSW6-53-FW001                        B9.11                      TEV                        none 2RHS-66-53-FW003                      B9.11                        HS                        none 2RHS-66-53-FW004                      B9.11                        HS                        none 2RHS46-53-FW007                        B9.11                    HS/au                      LW002 2RHS-66-53-SW010                      B9.11                    DM/au                      LW002 2RHSZ6-54-FW001                        B9.11                      TEV                        none 2RHSW6-54-FW003                        B9.11                        HS                        none 2RHS-66-54-FW004                      B9.11                        HS                        none 2RHSW6-54-FW006                        B9.11                    HS/au                      LW001 2RHSW6-54-SW007                        B9.32                      AW                        none 2RHS-66-54-SW012                      B9.11                    DM/au                      LW001 2RHS-66-55-FW001                      B9.11                    AW/au                      LW001 2RHS46-55-FW002                        B9.11                        HS                        none 2RHS-66-55-FW004                      B9.11                        HS                        none 2RHS-66-55-FW005                      B9.11                      AW                        none 2RHS-66-55-FW008                      B9.11                      TEV                        none 2RHS-66-55-FW012                      B9.11                        HS                        none 2RHS-66-55-SW001                      B9.11                    DM/au                      LW001 2RHS-177A-FW016                      B9.40                        HS                        none 2SLS-75A-FW001                      B9.21                      TEV                        none 2SLS-75A-FW014                      B9.21                      AW                        none 2SLS-75A-FW023A                      B9.21                        AW                        none 2SLS-88A-FW006                      B9.21                        AW                        none 2SLS-88A-FW013A                      B9.21                        HS                        none 2SLS-88A-FW014                        B9.21                      AW                        none NMP2-ISI406 Rev.t                                  Appendix A                                          Page 15 of 18
 
TABLE A-3 CLASS      1 PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes Weld                          Code                    Reason                    Associated Number                        Item No.                  Selected                    Longwelds 2SLS-88A-F W016                      B9.21                        HS                      none 2SLS-88A-FW024                        B9.21                      AW                        none 2SLS-88A-FW039A                        B9.21                      DM                        none 2SLS-88A-FW042A                        B9.21                        HS                      none 2SLS-88A-FW049                        B9.21                      AW                        none 2SLS-88B-FW001                        B9.21                      TEV                      none 2SLS-88B-FW005A                        B9.21                      AW                        none 2WCS-09-05-FW001                        B9.11                        HS                      none 2WCS-09-05-FW014                        B9.11                      HS/au                      none 2WCS-09-05-FW01 5                      B9.11                      HS/au                      none 2WCS-09-05-SW014                        B9.11                        HS                      none 2WCS-09-05-SW020                        B9.11                    DM/au                      none 2WCS-09-05-SW021                        B9.11                      AU                      none 2WCS-09-05-SW022                        B9.11                      AU                      none 2WCS-09-05-SW023                        B9.11                      AU                      none 2WCS-09-05-SW024                        B9.11                      AU                      none 2WCS-09-05-SW025                        B9.11                      AU                      none 2WCS-09-05-SW026                        B9.11                      AU                      none 2WCS-09-05-SW027                        B9.11                      AU                      none 2WCS-09-05-SW028                        B9.11                    DM/au                      none 2WCS-09-05-SW029                        B9.11                      AU                        none 2WCS-09-05-SW030                        B9.11                      AU                        none 2WCS-09-05-SW031                        B9.11                      AU                        none 2WCS-09-05-SW032                        B9.11                      AU                        none 2WCS-09-05-SW033                        B9.11                      AU                        none 2WCS-09-05-SW034                        B9.11                      AU                        none NMP2-ISI406 Rev.t                                    Appendix A                                        Page 16 of 18
 
TABLE A-3 CLASS                  1  PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes
:::;.."."'.i.-'"'.Reason'.-,:;..;;:".;."':,',::: ';.'-..."-:.'.":- -:.Ass'ociated'.::.;:,;':,:::. '-'
        ..".;Nu'mb'er i.:;:;:::,::::".':." '::,,::"-"':":Item":No':.:,',:,:"'.",",,:,:-:.'. .':::::~Select'e'd.-'::::-':::                          ',."::Lon'gwelds',:: ",'"
89.11                                            AU                                                      none                      '''WCS-09-05-SW035 2WCS-09-06-F W003                                        89.11                                            HS                                                      none 2WCS-09-06-FW004                                          89.11                                        AW/ber                                                    none 2WCS-09-06-FW005                                          89.11                                        AW/ber                                                    none 2WCS-09-06-FW006                                          89.11                                      TEV/ber                                                      none 2WCS-09-06-FW007                                          89.11                                      TEV/ber                                                      none 2WCS-09-06-FW008                                          89.11                                        AW/ber                                                    none 2WCS-09-06-FW029                                          89.11                                            HS                                                      none 2WCS-09-14-FW009                                          89.11                                        AW/ber                                                    none 2WCS-09-14-FW011                                          89.11                                        AW/ber                                                    none 2WCS-09-1 4-FW012                                        89.11                                        AW/ber                                                    none 2WCS-09-1 4-FW013                                        89.11                                          BER                                                      none 2WCS-09-14-FW014                                          89.11                                          BER                                                      none 2WCS-09-14-FW015                                          89.11                                        AW/ber                                                    none 2WCS-09-14-FW016                                          89.11                                        AW/ber                                                    none 2WCS-09-14-FW017                                          89.11                                        AW/ber                                                    none 2WCS-09-1 4-FW021                                        89.11                                        AW/ber                                                    none 2WCS-09-14-FW024                                          89.11                                        AW/ber                                                    none 2WCS-09-14-FW029                                          89.11                                        AW/ber                                                    none 2WCS-09-1 4-FW032                                        89.11                                        AW/ber                                                    none 2WCS-09-14-FW037                                          89.11                                          BER                                                      none 2WCS-09-14-FW038                                          89.11                                          BER                                                      none
    'WCS-09-1 4-FW039                                          89.11                                            BER                                                    none 2WCS-09-1 4-FW040                                        89.11                                            BER                                                    none 2WCS-09-1 4-FW041                                        89.11                                            BER                                                    none 2WCS-09-14-FW042                                          89.11                                        AW/her                                                      none 2WCS-09-'14-FW043                                        89.11                                        AW/ber                                                      none NMP2-ISI406 Rev.1                                                        Appendix A                                                                                          Page 17 of 18
 
y E TABLE A-3 CLASS                  1    PIPE WELDS SELECTED FOR EXAMINATION Refer to Section 6 of this document for definition of Reason Selection Codes I"':".:-::",.':.'::': 'Associat'e'd;.;"::;:::"::::;".:, i~
;.;:::-'::,::.:.-"Nomb'er",;:::.: ',,"..:'-': ':::.""-.::-,"-                                      :.."-I-:".:".':;::.:::,,::,'-;,:.L"oHgwelds',"'":.;:,:.",
2WCS-09-14-FW044                                  89.11                  BER                                          none 2WCS-09-14-SW017                                  89.11                  BER                                          none 2WCS-09-14-SW018                                  89.11                AW/ber                                        none 2WCS-09-14-SW022                                  89.11                  BER                                          none 2WCS-09-1 4-SW023                                  89.11                AW/ber                                        none 2WCS-09-1 4-SW025                                  89.11                  BER                                          none 2WCS-09-14-SW026                                  89.11                AW/ber                                        none 2WCS-09-14-SW027                                  89.11                  BER                                          none 2WCS-09-14-SW028                                  89.11                AW/ber                                        none 2WCS-09-14-SW029                                  89.11                  BER                                          none 2WCS-09-14-SW030                                  89.11                AW/ber                                        none 2WCS-09-14-SW031                                  89.11                  BER                                          none 2WCS-09-1 4-SW032                                  89.11                AW/ber                                        none 2WCS-09-14-SW033                                  89.11                  BER                                          none 2WCS-09-14-SW034                                  89.11                AW/ber                                        none 2WCS-09-1 4-SW035                                  89.11                  BER                                          none 2WCS-09-14-SW036                                  89.11                  BER                                          none 2WCS-09-14-SW038                                  89.11                  BER                                          none 2WCS-09-1 4-SW039                                  89.11                AW/ber                                        none 2WCS-09-1 4-SW040                                  89.11                AW/ber                                        none 2WCS-09-1 4-SW041                                  89.11                AW/ber                                        none 2WCS-09-14-SW043                                  89.11                AW/ber                                        none 2WCS-012A-FW005                                    89.21                  AW                                          none 2WCS-094A-FW004                                    89.21                  HS                                          none 2WCS-1 00A-FW004                                  89.21                  HS                                        (none)
NMP2-ISI406 Rev.1                                                  Appendix A                                                          Page 18 of 18
 
APPENDIX B CLASS 2 CATEGORIES C-F-1 & C-F-2 PIPE WELD COUNT
 
==SUMMARY==
 
Table B-I: Class 2 Nonexempt Circumferential Pipe 8'eld Count Summary This table reports the total number of circumferential welds only (it excludes longitudinal welds) in each of the two ASME Code Examination Categories; C-F-1. and C-F-2, for the seven (7) systems found to contain such welds. Additionally, it provides sums, default percentages of those sums, and NMP2's final decision on the total number of (driving circumferential) welds chosen for the representative sample examination.
Table B-2: Class 2 Nonexempt Cat. C-F-I 8'elds Selected      for Examination There are 88 welds at NMP2 that have been categorized as Category C-F-1 weldments; 49 are cir-cumferential and 39 are associated longitudinal seam welds. NMP2 examines 33 of those 88 weldments.
Seventeen (17) of the 33 examined are circumferential welds, while 16 are longitudinal welds that intersect those 17 circumferential welds. Table 2 identifies which 17 circumferential welds and which 16 longitudinal welds. It does so by first listing all 49 circumferential welds at NMP2 that have been categorized as Examination'Category C-F-1 welds (for the purpose of calculating a representative sample) and then listing (in those cases where longitudinal welds intersect circumferential welds) the associated longitudinal weld numbers. Based on a population of 49 circumferential welds, the Code Case mandates a minimum representative sample of 28 circumferential welds (plus their associated intersecting longitudinal seam welds.) However, 12 of the 49 circumferential welds are included only for sample sizing, and are not themselves required to be nondestructively examined. This decreases the set of those that do require nondestructive examination from 49 circumferential welds down to 37 circumferential welds (from which the 28 were to have been selected.) However, more than half (20) of those 37 circumferential welds were found to be in locations that were not readily accessible for the performance of nondestructive examinations. They (along with their 20 associated intersecting, longitudinal welds) are located in the suppression pool, under water. Therefore, pursuant to 10CFR50.55a(g)(5), NMPC has determined that conformance with the examination requirements of the Code is not practical for those 20 circumferential welds (and their associated intersecting longitudinal welds.) Those 20 circumferential welds have been identified in this table, as well as in NMP2 relief request number RR-IWC-2, Revision
: 1. Pursuant to 10CFR50.55a(g)(6)(i), the Commission granted that request for relief on November 1, 1990. Since there are only 37 circumferential, Category C-F-1 welds at NMP2 that possess nondestruc-tive examination criteria, it was practical to prepare only one Category C-F-1 table.
t Table B-3: Class 2 Nonexempt Category C-F-2 Circumferential Weld Count NMP2-ISI406 Rev.1                                Appendix B                                  Page 1 of 14
 
This Table provides the number of Category C-F-2 welds for each nominal pipe size on piping isometrics and component drawings on an overall system basis.
Table B-4: Distribution of Class 2 Nonexempt Category C-F-2 Circumferential fields For all of the nonexempt line sizes in each system, this table shows:
~  the  total number of terminal end welds;
~  the  number of terminal end welds selected for examination;
~  the  total number of structural discontinuity welds;
~  the  number of structural discontinuity welds selected for examination.
Table B-5: Class 2 Nonexempt Category C-F-2 fields Selected                        for Eramination This table provides a listing of the selected welds and their nominal pipe sizes.                            It also  distinguishes between terminal end welds and structural discontinuity welds.
TABLE B-1 CLASS 2 NONEXEMPT CIRCUMFERENTIAL PIPE WELD COUNT
 
==SUMMARY==
 
System                                  System                    Cat. C+4                        Cat. C-F-2 Name                              Abbreviation            Circ Weld Count                  Circ Wefd Count Auxilia Steam                                              ASS Hi h-Pressure Core S ra                                    CSH                                                            157 Low-Pressure Core S ra                                      CSL Reactor Core Isolation Coolin                                ICS                                                          203 Main Steam                                                  MSS                                                            92 Control Rod Drive                                          RDS                                                            76 Residual Heat Removal                                      RHS                          30                              796 TOTAL NONEXEMPT CIRCUMFERENTIALWELDS                                                      49                            1,439 aa'.5%
of total nonexem t circumferential weids er Cate        o                                                          108 NUMBER OF WELDS SELECTED.:-:''                                                          28                                108 Footnotes 2 of Table IWC-2500-1 Examination Categories C-F-1 and C-F-2 require that the welds selected for examination include 7.5%, but not be less than 28, of the nonexempt welds of each category.
NMP2-ISI-006 Rev.t                                          Appendix B                                                Page 2 of 14
 
0 TABLE B-2 CLASS 2 NONEXEMPT CAT. C-F-1 WELDS SELECTED FOR EXAMINATION (RG) ~  Relief Granted (Weld had actually been selected for examination per Code Case, but found to be impractical to per-form. NMP2 requested relief from the Code Case requirement to select; that request was granted by the regulators);
INot Req'd) ~ Included for 'h calculation only, not required to be examined per Code Case Weld                                                      Sefectedl                  Associated Number                      . NPS        Item No.            Reason                    Longwelds 2CSH-25-05-FW002                    20"          C5.11              YES                      LW002-1 2CSH-25-05-FW010                    1 8II        C5.11              YES                      LW002-2 2CSH-25-05-FW012                    20"          C5.11        NO Inacc    RG              LWC & LWD 2CSH-25-05-FW013                    20"          C5.11        NO Inacc    RG                    LWA 2CSH-25-05-FW014                    20"          C5.11        NO Inacc    RG              LWC 8 LWD 2CSH-25-05-FW015                    2PII          C5.11        NO Inacc    RG                LWA8 LWB 2CSL-26-01-FW026                    20"          C5.11        NO Inacc    RG            LW02, LW03, LW04 2CSL-26-01-FW027                    20"          C5.11        NO Inacc    RG                    LW01 2CSL-26-01-FW028                    20"          C5.11        NO Inacc    RG            LW03, LW04, LW05 2CSL-26-01-FW029                    20"          C5.11              YES                    LW05 8 LW06 2CSL-26-01-FW030                    20"          C5.11              YES                          LW06 II 2CSL-26-01-FW035                    20            C5.11        NO Inacc    RG              LW01 8 LW02 2ICS'MOV136-VWMOV136A                      6 II none          NO notre 'd                      none 2ICS-57-01-FW011                      6 II none          NO notre 'd                      none 2ICS-57-04-FW010                      6 II none          NO notre 'd                      none 2ICS-57-04-FW018                      6ll          none          NO notre 'd                      none 2ICS-57-04-FW019                      6 II        none          NO notre 'd                      none 2ICS-57-04-FW020                      6lt          none          NO notre 'd                      none 2ICS-57-04-SW031                      6 II none          NO notre 'd                      none 2RHS'MOV1C,VWMOV1C-A                      24"          C5.11              YES                        LW08 2RHS V309,VWV309-A                      8"            na          NO notre 'd                      none 2RHS-66-13-FW002                      24"          C5.11              YES                    LW05 & LW06 2RHS-66-13-FW020                      24"          C5.11              YES                        LW09 2RHS46-1 3-FW021                      24"          C5.11              YES                        LW07 2RHSW6-13-FW023                      24"          C5.11        NO Inacc    RG          LW02, LW03, LW04 2RHSW6-1 3-FW024                      24"          C5.11        NO (Inacc) (RG)                  LW01 NMP2-ISI406 Rev.t                                          Appendix B                                          Page 3 of 14
 
TABLE B-2 CLASS 2 NONEXEMPT CAT. C-F-1 WELDS SELECTED FOR EXAMINATION
      """'CI'"Relief Granted (Weld had actually been selected for examination per Code Case, but found to be impractical to per-(RG) ~
form. NMP2 requested relief from the Code Case requirement to select; that request was granted by the regulators);
(Not Req'd) ~ Included for % calculation only, not required to be examined per Code Case Weld                                                      Selectedl                  Associated Number                      :NPS-        Item--No."          Reason                    L'ongwelds 2RHS-66-13-FW025                    24"          C5.11        NO Inacc    RG            LW03, LW04, LW05 2RHS46-1 3-FW029                    24"          C5.11        NO Inacc    RG              LW01 & LW02 2RHS-66-1 3-FW030                  24"          C5.11              YES                    LW06 & LW07 2RHS-66-13-FW032                    24"          C5.11              YES                          LW09 2RHS-66-22-FW009                    24"          C5.11              YES                          LW06 2RHS-66-22-FW012                    24"          C5.11              YES                    LW07 & LW08 2RHS-66-22-FW019                    24"          C5.11              YES                          LW07 2RHS-66-22-FW021                    24"          C5.11        NO Inacc    RG            LW02, LW03, LW04 2RHS-66-22-FW022                    24"          C5.11        NO Inacc    RG                    LW01 2RHS-66-22-FW023                    24"          C5.11        NO Inacc    RG            LW03, LW04, LW05 2RHSW6-22-FW027                    24"            C5.11              YES                    LW05 & LW06 2RHSW6-22-FW029                      24"          C5.11        NO Inacc    RG              LW01 & LW02 2RHS-66-23-FW002                    24"          C5.11              YES                    LW05 & LW06 2RHSW6-23-FW017                      24"          C5.11              YES                          LW07 2RHS-66-23-FW018                    24"          C5.11        NO Inacc      RG                    LW01 2RHS-66-23-FW019                    24"          C5.11        NO Inacc      RG            LW02 LW03, LW04 2RHS-66-23-FW020                    24lt          C5.11        NO Inacc      RG            LW03 LW04 LW05 2RHS-66-23-FW022                    24"          C5.11        NO Inacc      RG              LW01 & LW02 2RHS-66-23-FW024                    24"          C5.11              YES                    LW06 & LW07 2RHS-66-57-FW002                    10"            na          NO notre 'd                      LW01 2RHS-66-57-FW019                    10"            na          NO notre 'd                      LW01 2RHS-66-58-FW013                      8lt            na          NO notre 'd                      LW01-1 2RHS-66-58-SW014                      8N            na          NO (not req'd)                  LW01-2 NMP2-ISI406 Rev.1                                        Appendix 8                                          Page 4 of 14
 
0 TABLE B-3 CLASS 2 NONEXEMPT        CATEGORY      C-F-2 CIRCUMFERENTIALWELD COUNT Sys          Drawing                    Pi 12" peDa 14"        18"'
meter 2011  2411 '8ll    '8ll 61f                        16",.
                                                                                ~
10M ISI-20-01          0  0              0    0    0          0    0 ASS ASS TOTALS 4                4  0  0        0-    0    0    0            0    0 ASS SELECTED              1      0  0              0    0    0    0 IS  I-25-01        0  0              0    18    0            0    0 ISI-25-03          0  0              0    19    0            0    0 ISI-25-04          0  0              12  13    0            0    0 ISI-25-05          0  0                0    0    3    14      1    0 ISI-25-08          0  0                0  20    0            0    0 ISI-25-09          0  0                0  10    0            0    0 IS  I-25-1 3      0  4                0    0    0            0    0 ISI-25-1 7        0  0                0    0    0            0    0 IS  I-25-1 8      0    0      16      0    0    0            0    0 ISI-COM-027                                                      2    0
                              'P1      0    0              0    2    0 ISI-COM-030                                                      0    0 CSH              2CSH'STRT1        0    0              0    0    0 CSH  TOTALS'5                  0    4    . 37    12  82    3 CSH SELECTED 12                    0    1              2    5                0    0 I-26-01      0    0              0    0    0  13      0    0 CSL            IS ISI-26-02        0    0              0    0    0    18    2    0 ISI-26-03        0    0      15      0  26    0            0    0 ISI-26-04          0  0              0  16    0            0    0 ISI-26-06          0  0              0    0    0            0    0 ISI-COM-001                                                            0 CSLiPV 114      0  2              0    0    0            0 IS  I-COM-019 (2CSL'HCV118)
                            'HCV119      0  0                0    0    0            0    0 ISI-COM-020                                                        0    0 SL'MOV11      0  0                0    0    0 ISI-COM-027 f2CSL'P1)      0  0                0    2    0            2    0 NMP2-ISI-006 Rev.)                            Appendix B                                Page 5 of 14
 
I. t TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys        Drawing      .'.
                                              ;: .'...''P.-.i        p e ....
                                                                              '-'D. a-:m:.::e        t  e  r 611            10"                14". 1 6lt            20tt    24I I  2 8rl 48ft,'SI-COM-030 L'STRT1        0    0          0          0    0        0  0            2      0      0                      0 ISI-COM-057                                                                              0      0                      0 L'V121        0    0          0          0    0        0  0            1 CSLTOTALS        111 .,      0  .0          2  '-
21      0      47  0          37        4                              0
                                "        -'0:        '0                                                          0
    ... CSL SEL'ECTED.. 8            0                          2      0          0            3      0 ISI-57-01        12    0          0          0      0      0  0            0      0      0                        0 ISI-57-02        16    0          0          0      0      0  0            0      0      0                        0 ISI-57-03        17    0          0          0      0      0  0            0      0      0                        0 ISI-57-04        35    0          0          0      0      0  0            0      0      0                        0 ISI-57-05        27    0          0          0      0      0  0            0      0      0                        0 IS I-57-06        30    0          0          0      0      0  0            0      0      0                        0 ISI-57-07              0            0        0      0      0  0            0      0      0                        0 ISI-57-08          0    7          6        32      0      0  0            0      0      0                        0 IS I-57-09        0    0          16        0      0      0  0            0      0      0                        0 ISI-COM-013              0            0        0      0      0  0            0      0      0 ICS                P1 ICS TOTALS", 203            142  7:
22::,:.'::32      0'      0  0.::::;:-',;:::0 0                        0'..
ICS'SELECTED: 15                    0            5        2      0      0  0                    0      0                        0 ISI-01-03          0    0            0        0      0      8  0            0      0      0 ISI-01-04          0    0            0        0      0      0  0            0      0    20                        0 ISI-01-05          0    0            0        0      0      0  0              0      0      12 ISI-01-06          0    0            0        0      0      8  0              0      0      0                        0 ISI-01-07              0            0        0      0      0  24              0      0      0                        0 IS I-01-13        0    0          0        0      0        0  0            0      0                              0 ISI-01-14        0    0          0          0    0        0  0            0      0                              0 ISI-01-15          0    0          0          0    0        0  0            0      0                              0 ISI-01-1 6        0    0          0          0      0      0  0            0      0                              0 ISI-01-17              0          0          0      0      0  0            0      0      0                        0 INSS        ISI-01-1 9              0          0          0      0      0  0            0      0      0                        0 NMP2-ISI406 Rev.1                                        Appendix B                                            Page 6 ol 14
 
TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys        ;.::,-: Drawing,                                          P.i> p e                      -.D            a:;i  m:: 'e'f.'t:.. e,.r 7"
6ll ''8l      ~
1 Qll':      .l2".'4tt                ';l6!'>      1 8lt    2QI I >>
24"';.
28,">.;::;-;::::-48"    ':
                                                            '>"1 MSS TOTAL>S.'2,'                    3  '>t 0;                                  -16: I                                  ;36
                                        '                        I:::::0::';I ".'"':0 I'
r"":                                  p:>>                '4:.:::::::":;::::;",.0 MSS,SELiECTED:.> &                                  r Q
                                                                                                    > tff                                      0 IS  I-65-00-1      0          38              0            2            0            0          0        0          0        0                  0 RDS              ISI-65-00-2        0          34              0            2            0            0          0        0          0      0                  0 RDS TOTAL>S              6 ".'            .:72:;          "'              '4'..',:..'0              0        ":rp "      0          0,''.0                      0
    'DS'SELECTED                                  i'fi5              0        '                0          ".".0""" ''QI
                                                                                                                      ;
t>p    itp                  0 ISI-66-05        0          20              0            0            0            0          0        0          0      0                  0 RHS ISI-66-06        7          26              0            3            0            0          0                    0      0                  0 ISI-66-09        0          26              0            0            0            0          0        0          0      0                  0 ISI-66-10        3          27              0    -
2            0            0          0                    0      0                  0 ISI-66-13        0          0              0            0            0            0          2                  21      0                  0 ISI-66-14        1          0              0            0            0            0          36                    0      0                  0 IS  I-66-15      0          0              0            0            0            0        16                    0      0                  0 ISI-66-1 6      0          0              0            0            0          13          15        0          0      0                  0 IS 1-66-1 7      4          0              0            2            0            0        14        0          0      0                    0 ISI-66-18        0          0                0            2            0            16          0        0          0      0                    0 ISIW6-19        0          0                0          25            0            0          0        0          0      0                    0 IS  I-66-20      0          0                0            0            0            0        18        0          0      0                    0 ISI-66-21        0            0              0            0            0            0        21        10          0      0                    0 ISI-66-22        0            0              0            0            0            0          2        0        20      0                    0 ISI<6-23        0            0              0            0            0            0          4                  23        0                  0 IS  I-66-24      1          0              0            0            0            0        31                    0        0                  0 ISI-66-25        1          0              0            0            0            0        27        0          0      0                  0 IS I-66-26      0            0              0          21            0            0          0        Q  r 0      0                  0 ISI-66-27        0          1              0            0            0            0        21        0          0      0                  0 ISI-66-28        0          0              0            0            0            0          9        0          0      0                  0 ISI-66-29        0          0              0            0            0            4        33                    0      0                  0 ISI-66-30        0          0              0            1            0            0          17        0          0      0                  0 NMP2-ISI406 Rev.1                                                        Appendix B                                                                  Page7of14
 
TABLE B-3 CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELD COUNT Sys          Drawing                          P i p e              D          a    m e      t  e    r
                                    , 61 ~
8" 1 Qss  1 2ll  $ 4ll    1 6lt                -2pis    24ss    28H        48 II ISI-66-31                  0      8      0      26          0        0        0 ISI-66-32                    0      15      0                    0        0        0 ISI-66-34      23          0      0      0                    0        0        0 ISI-66<2        32      16  0      0      0                    0        0        0 ISI-66-47      16          0      0      0                    0        0        0 ISI-66-57                  26        0      0                    0        0        0 ISI-66-58              18  0      0      0                    0        0        0 ISI<6-60                13  0      0      0                    0        0        0 ISI-COM-001 0      0      6                    0        0        0 ISI-COM-019 r2RHS'MOV2A.8 2RHS'MOVSA 8                  0        0      0                    8        0        0 ISI-COM-020 HS'MOV1C                0        0      0                    0        0        1 IS  I-COM-026 RHS'P1A 8                  0        0      0                    6        0        6 ISI-COM-030 RHS'STRT1A 8                0        0      0                    0        0        6 ISI-COM-045 HS'PV21A38                0        0      0                    0        0        0 ISI-COM-057 r2RH~re.
V377 V378                  0        0      0                    0        0        3 RHS TOTALS          96    '9        153 26      79      6                280        24      80 RHS SELECTED 58                            pe      7      0                  23        3        6 No 10" welds had a T 2 'Is"', therefore, none were selected NMP2-t St@06 Rev.1                                  Appendix 8                                                  Page 8 of 14
 
TABLE BQ DISTRIBUTION OF CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELDS Sy'tem',';.    ":,'~:liNPS ',:,':;::.':;..-:,':.::::,: -:;,,:::;.';,;:::-,::,:, To(tal'PopulatIon.:';.':,::,:..":,".-.:,::-'=.'.;::;::..:",'=":,"."...;::::.:::."-:.!1;::
                                    ~(::::-::: --'-':-::.:..:':. -TE Tiimlnal and s~trununt nicoiittrifi:,."r-'.-'.: ':                                      "-:            I!( '::    .':: SeIected:      ."-:: ":-
                                                        '-;-. TE      ':,':-::"..:::.':SD"'::;    ::  Othe(f';:                >cO;376          .':                            ':: '..'>>'TE- ':-'.    ::SD:
ASS                  6ll                                  0                                            0                          0                                                  0 10"                                                                                  0                                                                              0 12"                                    0                    32                      5                          0                                                  0 14"                                    0                    12                      0                          0                                                  0 16"                                                          47                    30                          0 1 8tl                                  0                                            0                          0                                                  0              0 20"                                    0                    16                      0                          0                                                  0 24"                                                                                                              0                                                  0
                                                                                                                                                      ,.'i(j(lf"~.'8',
10"                                    0                                            0                          0                      g! AS'jl'
                                                                                                                                                        >i!;t((i'":.    '(''AI 0
12"                                                          18                                                  0              .Kijs(:.i'&#xc3;"'
16"                                                          44                                                  p                                                  0              3 20"                                                          28                                                  0                                                  0 CSL                24ll                                                                                  0                          0                                                  0              0 6ll                                                        52                                                81 8(l                                  0                                            0                                                                              0              0
                                            " " .V
                                        .'' (. ('(Iq
                                    'i j":    .'":
10"                                    p                    16                      0                                                                              0 ICS              12"                                                          30                                                0                                                    0
                                                      'hree                of these 16 structural discontinu',wektments are ln the'Break Exclusion Bounda 6(l                                  0                    13                      0                          0                                                  0 16"                                    p                    12                                                0              ".::"<'".. ":::,                      0 1
8ll,;:(;...:,( (l                    p                    24                      0                        p              i    '..::!:,!: ~1                    p 28"          ".':'::.:::;''            0                    324                                                0              ':'.'---:,':,:l'"-:                  0 MSS                48"                                    0                                                                        0                                                    0              0
                                                        ;".;;;;,Four(4)'of:the'se structu'ral d'scontfnuityyekfments are('bi thle, Br(e(ak Exctusfon Boundary.';.
NMP2.ISI406 Rev.t                                                                    Appendix B                                                                                                      Page 9 of 14
 
TABLE BQ DISTRIBUTION OF CLASS 2 NONEXEMPT CATEGORY C-F-2 CIRCUMFERENTIALWELDS System        'NPS";;,                      ":Total End  so structural Dbcontlnu Population'E&arrnlnal                        ::.':, ':Selected SD  ':t                    Other'      <O.576:..::        TE:"        SD 8tl              0          71                                          0                0 RDS              12"                                                                        0                0 6n                            0                            0          82                            0 8tl                          82                            21          48 10"                0            0                            0          26                0 1
2ll                          68                                          0 1
4ll              0                                          0          0                0            0 16"                              47                            10          0 18"                            236                            38          0                            21 20"                              18                                        0                0 RHS            24"                              76                                        0                0 TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION Selection Key: TE ~ Terminal End; SD ~ Structural Oiscontinuity; BER ~ Break Exclusion Region; % ~ T.6'/ criteria WEL'D:."
NUMBER:                  ', NPS-'TEM'NO.
                                                          'CODE                        ..  'REASON .-.
SEL'ECTED ASSOCIATED LONGWEL'D(S)      .
2ASS-02-01-SW001                    6ll                    C5.51                        SD                  none 2CSH-25-03-SW004                    16"                    C5.51                        SD                  none 2CSH-25-04-FW003                    16"                    C5.51                        SD                  none 2CSH-25-04-SW004                    16"                      C5.51                        SD                  none 2CSH-25-04-SW005                    14"                      C5.51                        SD                  none 2CSH-25-04-FW006                    1 4II                    C5.51                      SD                (none)
NMP2-ISI~ Rev.t                                      Appendix B                                                      Page 10 of 14
 
TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION SelectionKey: TE= TerminalEnd; SD~StructuraIOiscontinuity; BER= Break ExclusionRegion; '/i~7.5/ criteria WEL'D                                CODE            REASON,                ASSOCIATED NUMBER-                  NPS-        ITEM NO.        SELECTED.              LONGWELD(S) 2CSH-25-05-SW008                20n          C5.51              SD                      none 2CSH-25-08-FW014                1 6ll        C5.51              TE                      none 2CSH-25-09-FW006                1 2tl        C5.51              SD                      none 2CSH-25-13-FW003                  pic        C5.51                                      none 1                                SD 2CSH-25-1 3-SW003              12"          C5.51              SD                      none 2CSH-25-18-SW007                1 2ll        C5.51              SD                      none 2CSH*P1,PW201                16"          C5.51              TE                2CSH'P1,PW215 2CSL-26-01-FW033                20'<          C5.51              SD                      none 2CSL-26-01-SW007                20H          C5.51              SD                      none 2CSL-26-02-FW003                              C5.51              SD                      none 20'6" 2CSL-26-03-FW014                              C5.51              SD                      none 2CSL-26-03-SW019                1 6tl        C5.51              SD                      none 2CSL-26-04-FW002                1 6ll        C5.51              SD                      none 2CSL-26-05-FW002                1 2lt        C5.51              SD                      none 2CSL-26-05-SW004                1 2II        C5.51              SD                      none 2ICS-57-'05-FW003                6'          C5.81              SD                      none 2ICS-57-05-FW012                              C5.51              SD                      none
                                            'H 2ICS-57-05-SW001                              C5.51              SD                      none 2ICS-57-05-SW019                6  '        C5.51              TE                      none II 2ICS-57-06-FW007                              C5.51              SD                      none 2ICS-57-06-FW009                              C5.51              TE                      none 6'I 2ICS-57-06-SW016                    ~
C5.51              SD                      none 2ICS-57-07-FW001                6  '        C5.51              SD                      none 2ICS-57-08-FW021                              C5.51              SD                      none 2'2" 2ICS-57-08-SW048                              C5.51              SD                      none NMP24SI406 Rev.t                                Appendix B                                        Page11 of14
 
TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION Selection Key: TE -" Terminal End; SD ~ Structural Discontinuity; BER ~ Break Exclusion Region;  '/ ~ 7.5/. criteria Y          r!i
            ",WELD'..:                                                "CODE -',                  "::;ASSOCIATED
                        '":::;":-'UMBER.':                                      'REASON"'ELECTED NPS      .:.  '.'  'ITEM NO."                    ; LONGWELD(S) 2ICS-57-09-FW009                            10"                  C5.51        SD/ber                none 2ICS-57-09-FW012                            1 0n                C5.51          SD                  none 21CS-57-09-FW020                            10"                  C5.51          SD                  none 2ICS-57-09-SW015                            10"                  C5.51        SD/ber                none 2ICS-57-09-SW016                            10"                  C5.51        SD/ber                none 2MSS-01-03-FW002                            16"                  C5.51          SD                  none 2MSS-01-07-FW002                            18"                  C5.51          SD                  none 2MSS-01-07-SW013                            18"                  C5.51          SD                  none tl                                                  none 2MSS-01-13-FW020                            28                  C5.51        SD/ber 2MSS-01-14-FW020                            2 81I                C5.51        SD/ber                none 2MSS-01-1 5-FW020                            28"                  C5.51        SD/ber                none 2MSS-01-16-FW020                            28"                  C5.51        SD/ber                none II 2MSS-01-1 9-FW005                              6                  C5.51          SD                  none II 2RDS-65-00-FW003                              8                  C5.51          SD                  none 2RDS-65-00-FW009                              8H                C5.51          SD                  none 2RDS-65-00-FW015                              8lt                C5.51          SD                  none II 2RDS-65-00-SW040                              8                  C5.51          SD                  none 2RDS-65-00-SW044                              8lt                C5.51          SD                  none 2RDS-65-00-SW060                            12"                  C5.51          SD                  none 2RHS-66-05-FW007                              8ll                C5.51          SD                  none II 2RHSW6-05-SW004                                8                  C5.51          SD                  none II 2RHS46-05-SW007                                8                  C5.51          SD                  none It 2RHS-66-06-FW011                              8                  C5.51          SD                  none 2RHS-66-06-FW014                              8ll                C5.51          SD                (none)
NMP2-ISI~ Rev.t                                                  Appendix B                                  Page 12 of 14
 
TABLE 8-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION SelectionKey: TE~ TerrnfnaiEnd; SD"-StructuraiDiscontinuity; BER= Break ExciusionRegion; '/t~7.St/icriteria
              ..:INtEL'D                          ':.:.:,'.'CODE:.      REASON, :'.'
ASSOCIATED.:
          ,'" 'NUMBER':                  NPS.:..::: ':
ITEM-'NO;      '":::SELECTED"        ; ':: LONGWELD(S):::."
                                                                                          'D 2RHSW6-06-SW013                  8ll            C5.51                                        flofle 2RHS-66-09-FW002                  8ll            C5.51                SD                      none 2RHS<6-09-FW008                  8ll            C5.51                TE                      none tl 2RHS-66-09-FW019                  8              C5.51                SD                      none 2RHS46-10-SW001                                  C5.51                SD                      none tt 2RHSW6-10-SW019                    8              C5.51                SD                      none 2RHS-66-13-FW004                24"            C5.51                SD                      none 2RHSW6-13-FW012                  24tl            C5.51                SD                      none 2RHS-66-1 3-SW027                20"            C5.51                SD                      none 2RHSW6-14-FW004                  18"            C5.51                SD                      none 2RHS46-14-FW020                  18"            C5.51                SD                      none 2RHS-66-14-SW012                  1 8lt          C5.51                SD                      flofle 2RHSW6-14-SW013                  1 8ll          C5.51                SD                      none 2RHS<6-1 6-FW002                  18"            C5.51                TE                      none 2RHS46-16-FW006                  16"            C5.51                SD                      none 2RHS-66-1 7-FW004                12"            C5.51                SD                      none 2RHSW6-1 8-FW025                  16"            C5.51                SD                      none 2RHS-66-1 8-FW027                12"            C5.51                SD                      none 2RHSW6-19-FW002                  12"            C5.51                SD                      none 2RHS<6-1 9-SW026                  12"            C5.51                SD                      none 2RHS-66-20-FW001                  18"            C5.51                SD                      none 2RHSW6-21-FW007                  20"            C5.51                SD                      none 2RHS<6-21-SW009                  18"            C5.51                SD                      none 2RHS46-21-SW016                  18"            C5.51                SD                      none 2RHS46-22-FW014                  24"              C5.51                SD                      none 2RHS46-22-SW017                  24"            C5.51                SD                      none 2RHS-66-23-FW007                24"              C5.51                SD                      none NMP2-ISI406 Rev.t                                  Appendix B                                            Page 13 of 14
 
TABLE B-5 CLASS 2 NONEXEMPT CATEGORY C-F-2 WELDS SELECTED FOR EXAMINATION Selection Key: TE ~ Terminal End; SD ~ Structural Discontinuity; BER ~ Break Exclusion Region;
                                                                                                        ~h ~ 7.5/ criteria WEL'D                                            'ODE      REASON              ...,  ASSOCIATED
                      'UMBER NPS      ITEM NO.", SELECTED    ":            LONGWELD(S)
                              'RHS-66-23-SW018      24"        C5.51        SD                            none 2RHS-66-24-FW022                                1 8ll    C5.51        SD                            none 2RHS-66-24-FWSW026                                6H        C5.81        TE                            none II                                              none 2RHS-66-24-SW003                              20          C5.51        SD 2RHS-66-24-SW005                                18"        C5.51      SD                            none 2RHS-66-25-FW006                                1 8ll      C5.51      SD                            none 2RHS-66-25-FW007                                18"        C5.51        SD                          none 2RHS-66-26-FW010                              12"        C5.51        SD                            none 2RHS-66-27-FWSW015                              18"        C5.51        SD                            none 2RHS-66-27-SW002                              18"        C5.51        SD                            none 2RHS-66-27-SW005                              18"        C5.51        SD                            none 2RHS-66-27-SW016                              18"        C5.51        SD                            none 2RHS-66-28-FW001                              18"        C5.51        SD                            none 2RHS-66-29-FW002                              1 8tl      C5.51        SD                            none 2RHS-66-29-FW010                              1 6II      C5.51        SD                            none 2RHS-66-29-FW023                              1 8II      C5.51        SD                            none 2RHS-66-30-FW006                                18"        C5.51        SD                            none 2RHS-66-31-FW008                                16"        C5.51        TE                            none 2RHS46-31-FW011                                1 2II      C5.51        SD                            none 2RHS-66-31-SW004                                16"        C5.51        SD                            none 2RHSW6-31-SW006                                16"        C5.51        SD                            none 2RHS-66-32-SW005                                12"        C5.51        TE                            none 2RHS P1C,PW102C                                18"        C5.51        SD                            none 2RHS Pl C,PW103C                                18"        C5.81        TE                            none 2RHS'MOV2A,VWMOV2A-A                                18"        C5.70        SD                            none 2RHS'PV21A,VWPV21A-B                                  8tt      C5.51        SD                            none NMP24SI-006 Rev.t                                              Appendix B                                      Page 14 of 14
 
APPENDIX C CLASS 1,2 &3 MULTIPLEVESSEL, PUMP AND VALVETABLES This Appendix shows the equivalency of the Class 1 pumps and valves subject to examination under ASME Section XI, Examination Categories; B-L-2, Pump Casings; and B-M-2, Valve Bodies.
Class 1 Pumps The two reactor water recirculation pumps 2Rcs'P1A and 2Rcs'P1 B are the only Class 1 pumps at NMP2. Section XI, Table IWB-2500, Examination Category B-L-2 permits the examination of only "...one pump in each group of pumps performing similar functions in the system..." The NMP2 recirculation pumps are equivalent.
The only other IWB-2500 examination category that applies to the NMP2 recirculation pumps is Examination Category B-G-1, Pressure-Retaining Bolting Greater Than 2 in. in Diameter. The Code allows for B-G-1 examinations to be limited to the pump selected for examination under Category B-L-2. Therefore, at NMP2, only the bolting of 2Rcs'P1A is scheduled for B-G-1 examination.
Class 1 Valves Examination Category B-M-2 allows the examination of only one valve within each group of valves of; the same design, the same 4" NPS requires a visual manufacturing method, and similar function. As a result, only one valve, per group of valves, exceeding examination (VT-3) of internal surfaces under Category B-M-2, and this one valve need only be examined ifit is disassembled for maintenance, repair, or volumetric examination; and even then, only to the extent deemed practical by the Owner, and never more than once in any interval.
Bolting examinations for the other two IWB-2500 examination categories that apply to Class I valves at NMP2 (B-G-l, Pressure-Retaining Bolting Greater than 2-Inch Diameter pfalve 2Mss'Aov7B 2-~/s" x 2" diameter step stud only] and B-G-2, Pressure-Retaining Bolting 2-Inch Diameter and Less) are limited to those valves selected for examination under Examination Category B-M-2.
Valves determined to meet this multi-component equivalency criteria are listed in Table  B-I following.
NMP2-ISI406 Rev.1                                      Appendix C                                              Page 1 of 14
 
0 TABLE C-1 ISI CLASS  1 MULTIPLE VALVE EQUIVALENCYTABLE Group              Valve  Se-    ISI          Valve                ISI-COM  B-G-1. B-G-2      B-M-2 No.-            Number  lect  lso-.      Design                Drawing 'ID No,    ID:No.      ID No.
1Va01        2CSH'MOV107  Yes  25-09        Gate'12"                  012    na    VB100 7/8"    VBY102 1Va02        2CSH'AOV108  Yes  25-10    Swin Check 12"                003    na      VB500      VBY100 1Va03        2CSH'HCV120  Yes  25-10        Gate 12"                  008      na  VB501  1 1/8"  VBY101 1Va04        2CSL'MOV104  Yes  26-05        Gate 12"                  009      na    VB101 7/8"    VBY105 1Va05          2CSL'AOV101  Yes 26-05    Swin Check 12"                003      na      VB502      VBY103 1Va06          2CSL'HCV117  Yes 26-05        Gate 12                  008      na  VB503  1  1/8" VBY104 2FWS'MOV21A  No  47-13        Gate 24"                  007      na  VB504  1  1/8" VBY110 1Va07        2FWS'MOV21B  No  47-16        Gate 24"                  007      na  VB505  1  1/8" VBY111 2FWS'AOV23A  Yes 47-13    Swin Check 24"                002      na  VB506 .625"    VBY106 2FWS AOV23B  No  47-16    Swin Check                    002      na  VB507 .625    VBY107 24'7-13 2FWS V12A  No            Swin Check 24"                003    na  VB508 .625"    VBY112 1Va08          2FWS'V12B  No  47-16    Swing Check 24                003    na  VB509 .625    VBY113 NMP2-ISI406 Rev.1                                  Appendix    c                                    Page 2 of 14
 
TABLE C-1 ISI CLASS  1 MULTIPLE VALVE EQUIVALENCYTABLE Group    .      . Valve      Se-    ISI,          Valve                'SI-COM  B-G-1      B-G-2        :.
No..            Number    .:lect-  Iso          Design              ';..Driwing ID No. ID No.        '.'.ID'No;.-
B.-M-2':.::.,
2FWS'HCV54A    Yes  47-13        An le  24'11                        na    VB-510  1  1/8"    VBY108 1Va09        2FWS HCV54B      No  47-'16      An le 24"                  011    na    VB-511  1  1/8"    VBY109 2ICS'MOV1 21    Yes  57-09        Gate 10"                  008    na    VB-512 '/i"        VBY116 1Va10          2ICS'MOV128    No  57-09        Gate 10"                  008    na    VB-513    ~/i"    VBY118 2ICS'AOV156    Yes  57-07    Swin Check6"                  003    na    VB514 .5"          VBY114 1Va11          2ICS AOV157    No  57-07    Swin Check 6"                  003    na    VB515 .5"          VBY115 1Va12          2ICS'MOV126    Yes  57-07          Gate 6"                  015    na    VB-102 5/8"        VBY117 PB107  & VB123 1Va13          2MSS"PSV120    Yes  01-13    Safe -Relief 26"              054    na  1.625    8 1"          VB130 PB110  & VB124 2MSS'PSV1 21    No  01-13    Safe  -Relief 26"            054    na    1.625    8 1"          VB131 PB113  & VB125 2MSS'PSV1 22    No  01-13    Safe  -Relief 26"            054    na    1.625    8 1"        VB132 PB116  & VB126 2MSS'PSV123      No  01-13    Safe -Relief 26                054    na    1.625    8    1        VB133 PB119  8 VB127 2MSS'PSV124      No  01-14    Safe  -Relief                  054    na    1.625    8            VB134 26'afe                      PB122  & VB128 2MSS'PSV125      No  01-14          -Relief 26"              054    na    1.625    8    1        VB135 PB125  8  VB129 2MSS'PSV1 26    No  01-14    Safety-Relief 26"              054    na  1.625    & 1"          VB136 NMP2-ISI406 Rev.1                                      Appendix    c                                              Page 3 of 14
 
TABLE C-1 ISI CLASS  1 MULTIPLEVALVE EQUIVALENCYTABLE Group  .: -,':,-Valv.e
              -..''Numb'er:
                          .;.    . ISI
                                  .'so.
Valve Design
                                                                    -', ISI-COM:-:.;:::.-:-,:.:
                                                                      -'Drawing-:--:-:,
                                                                                          -::=.':,.;::--
                                                                                                              .8-G-1 ID No.
                                                                                                                        - ',B-,G-2.
                                                                                                                      '. -ID No;
                                                                                                                                        .:::;" 8-M-2-'D No..:,
No.                                                                                                      .
PB128 & VB130 2MSS'PSV1 27    No  01-14      Safe -Relief 26"              054                                  na    1.625      & 1"        VB137 PB131 & VB131 2MSS'PSV128    No  01-14      Safe -Relief 26"              054                                  na    1.625      & 1        VB138 PB134 & VB132 2MSS'PSV129    No  01-15    Safe -Relief 26"              055                                  na    1.625      & 1"        VB139 PB137 8 VB133 2MSS'PSV1 30  No    01-15    Safe -Relief 26"              055                                  na    1.625      & 1"        VB140 PB140 & VB134 2MSS'PSV1 31  No    01-15    Safe -Relief 26"              055                                  na    1.625      & 1"        VB141 PB143 & VB135 2MSS'PSV1 32  No    01-15    Safe -Relief 26"              055                                  na    1.625 &                VB142 PB146 & VB136 2MSS'PSV1 33  No    01-15    Safe -Relief 26"              055                                  na    1.625      & 1"        VB143 PB149 & VB137 2MSS'PSV134    No    01-16    Safe  -Relief 26"            055                                  na    1.625      & 1        VB144 PB152 & VB138 2MSS PSV135    No    01-16    Safe -Relief 26"              055                                  na    1.625      & 1"        VB145 PB155 & VB139 2MSS'PSV1 36  No    01-16    Safe -Relief 26"              055                                na    1.625      & 1"        VB146 PB158 & VB140 2MSS'PSV1 37  No    01-16    Safe -Relief 26"              055                                na    1.625      & 1"        VB147 2MSS'AOV6A    No    01-1 3  Y-Pattern Globe 26"            058                                na        VB546 2"            VBY178 1Va14 2MSS'AOV6B    No    01-14  Y-Pattern Globe 26"            058                                  na      VB547 2"            VBY179 2MSS'AOV6C    No    01-15  Y-Pattern Globe 26"            058                                  na      VB548 2            VBY180 2MSS'AOV6D    No    01-16  Y-Pattern Globe 26"            058                                  na      VB549 2            VBY181 2MSS'AOV7A    Yes  01-13  Y-Pattern Globe 26"            058                                  na      VB550 2"            VBY182 VB551B & VB551C 2MSS'AOV7B    No    01-14  Y-Pattern Globe 26"            058                                2/i            na            VBY183 NMP2-ISI406 Rev.1                                      Appendix  c                                                                              Page 4 of 14
 
0 TABLE C-1 IS) CLASS  1  MULTIPLEVALVE EQUIVALENCYTABLE Group            -; Valve    -=
Se-    ISI          Valve            ISI-:COM  B-G-1        B-G-2                        B-M-2 No.          '=. Number  ..::lect.: Iso          Design            Drawiiig ,ID No..    . ID No.                    . IDNo.
2MSS'AOV7C        No    01-15  Y-Pattern Globe 26          058      na      VB552 2                        VBY184 2MSS AOV7D        No    01-16  Y-Pattern Globe 26"        058      na      VB553 2"                        VBY185 2MSS*MOV111        No  01-21        Globe 6"              009      na      VB103 1"                        VBY127 1Va15        2MSS'MOV112      Yes  01-20        Globe 6"              009      na      VB104                          VBY128 1Va16        2MSS'MOV207      Yes  01-21        Globe 6"              018      na      VB-524    7/8'BY129 2RCS'MOV1 OA      Yes  64-00-1        Gate 24              016      na      VB113 1~/i"                      VBY150 1Va17        2RCS'MOV10B        No  64-00-4        Gate 24"              016      na      VB114 1'/i                      VBY151 2RCS'MOV1 8A      Yes  64-00-2        Gate 24"              016    na      VB115                          VBY152 1e/4'B116 64-00-5        Gate 24"              016    na                1%"                  VBY153 1Va18        2RCS'MOV1 8B      No VB105, VB107 1  5/8" 8 1 3/8" VB109, VB111 2RCS'HYV1 7A      Yes 64-00-2        Gate 24"              044      na    1%" 8    1                      VBY148 VB108 5/8'B106, 1 5/8" 8 1 3/8" VB110, VB112 2RCS'HYV1 7B          64-00-5        Gate 24"              044      na    1%" & 1 5/8"                    VBY149 1Va19                            No Appendix c                                                          Page 5 of 14 NMP2-ISI406 Rev.1
 
TABLE C-1 ISI CLASS  1  MULTIPLE VALVE EQUIVALENCYTABLE Group            Valve      Se-    ISI          Yalve              ISI-COM  -:B-G-1  . 8-G-2        . B-M-2 No.--          Number    .: lect  Iso        Design            , Drawing . ID No.      ID No;        ID No.
2RHS'HCV54A      Yes  66-53        Gate'12"              008        na    VB525  1  1/8"  VBY163 1Va20        2RHS"HCV54B      No  66-54        Gate 12"              008        na    VB526  1  1/8"  VBY164 2RHS AOV39A    Yes  66-53    Swin Check12              003        na    VB527 .625"      VBY157 1Va21        2RHS'AOV39B      No  66-54    Swin Check12              003        na    VB528 .625        VBY158 2RHS'MOV40A      Yes 66-19        Globe 12                018        na      VB529 7/8"      VBY171 1Va22        2RHS'MOV40B      No  66-32        Globe 12"              018        na      VB530 7/8"      VBY172 2RHS'MOV112      Yes 66-55        Gate 20"              007        na      VB531 7/8"      VBY166 1Va23        2RHS'MOV113      No  66-21        Gate 20"              007        na      VB532 7/8"      VBY167 2RHS'HCV53A      Yes 66-50        Gate 12"              008        na    VB533  1 1/8"    VBY160 Gate 12"                008        na    VB534    1/8"    VBY161 1Va24        2RHS'HCV53B      No  66-51                                                          1 66-52        Gate 12"              008        na    VB535      1/8"  VBY162 1Va25        2RHS'HCV53C      Yes                                                                1 2RHS AOV16A    Yes  66-50    Swin Check12"              003        na    VB536 .625"      VBY154 1Va26        2RHS'AOV16B      No  66-51    Swin Check12"              003        na    VB537 .625"      VBY155 Appendix c                                            Page 6 of 14 NMP2-ISI406 Rev.1
 
I" TABLE C-1 ISI CLASS  1 MULTIPLEVALVE EQUIVALENCYTABLE
  -Group            Valve=-    -.=':-. --;,':--.:Se'-'-.:.:-:.--::  ISI.        Valve .          ISI-COM.':: '.:.;,-:- B'-'G-1                  ..::-:::: .::.          ':                              ,
                                                                                                                                                                                                              - B-.M-'2'-.'.:.
-- -'No.          Number-.-.'-..=:- -:-'--lect-:-::-:::=';.'Iso;.            . Design                        -:::.'.:.-.:::.:,.--ID  No.'..:..:.::::.::    .-.:', -::.::. ID No.
B-'G-2'rawing-'..'::.
                                                                                                                                                                                                        ';      ID.No..-":-',.'..;
1Va27        2RHS AOV16C                      Yes              66-52      Swin Check 12"          003                            na                                VB538 .625"                            VBY156 2RHS'MOV24A                      Yes              66-1 9        Gate 12"              008                          na                                      VB539 1"                          VBY168 1Va28      2RHS'MOV24B                      No              66-31          Gate 12"              008                          na                                      VB540 1"                          VBY169 1Va29      2RHS'MOV24C                      Yes              66-26          Gate 12"              008                                                                  VB541 1"                          VBY170 1Va30          2RHS'V143                      Yes              66-47      Swin Check 6"            003                            na                                  VB542 5/8                            VBY173 1Va31      2RHS'MOV104                      Yes              66-47        Globe 6"              018                            na                                  VB543 7/8"                          VBY165 Gate 12"              017                            na                                VB544                        1/8"    VBY159 1Va32        2RHS'HCV131                      Yes              66-55,                                                                                                                          1 09-06        Globe 8"              009                            na                                VB118                      1 3/8"    VBY174 2WCS'MOV1 02                      Yes Globe 8"              009                            na                                VB122                        3/8"    VBY176 1Va33      2WCS'MOV112                        No                09-06                                                                                                                            1 IVa34      2WCS'MOV103                        Yes              09-06        Globe 8"              009                            na                                  VB119                    1  3/8      VBY175 Appendix c                                                                                                                Page 7 of 14 NMP24SI406 Rev.1
 
TABLE C-1 ISI CLASS  1 MULTIPLEVALVE EQUIVALENCYTABLE Group  .-          Valve        ISI          Valve            ISI-COM:    B-G-1  . B-G    -.'-::.'. 8-M-2
, No..:          -
Number .      lso        "Design          . DraIfvIng . ID No.    -ID No;  .          .ID No.
2WCS'MOV200    Yes 09-14      Globe 8"              018        na  VB545  1 1/8"        VBY-177 1Va35 Appendix c                                                  Page 8 of 14 NMP2-ISI406 Rev.1
 
APPENDIX C CLASS 2, MULTIPLEVESSEL EQUIVALENCY This Appendix shows the equivalency of the Class 2 vessels subject to examination under ASME Section XI, Examination categories C-A, Pressure Retaining Welds in Vessels; C-B, Pressure Retaining Nozzle Welds in Vessels; C-C, Integral Attachments for Vessels, Piping, Pumps, and Valves; and, C-D, Pressure Retaining Bolting Greater than 2 in. In Diameter.
Residual Heat Removal System (RHS) heat exchangers 2RHs'E1A and 2RHs'EIB are the only Class 2 nonexempt pressure vessels at NMP2. Section XI allows for the examination of only one vessel "...in the case of multiple vessels of similar design, size, and service..." for each of the examination categories which apply to Class 2 vessels. The RHS heat exchangers are considered to be equivalent and meet the multi-component equivalency criteria. 2RHS'E1A has been selected for the subject Class 2 examinations. The RHS heat exchangers possess no hardware which can be categorized under Examination Categories C-C and C-D.
Residual Heat Removal System heat exchanger examination requirements are summarized in Table C-I below.
TABLE C-2
 
==SUMMARY==
OF CLASS 2 VESSEL EXAMINATIONS Group          Vessel                            ISI-COM                  C-A                        C-B No.          ID No.          Selected          Drawing                ID Nos.                    ID Nos.
HW100A                HW102A HW103A 2RHS E1A            Yes                091              HW101A                HW104A HW105A HW1 008              HW1028 HW1038 2Ve01        2RHS E18              No                092              HW1018                HW1048 HW1058 NMP2-ISI406 Rev.o                                        Appendix C                                        Page 9 of 14
 
APPENDIX C CLASS 2, MULTIPLEPUMP AND VALVEBREAKDOWN This Appendix identifies the Class 2 pumps and valves subject to Code Categories C-C, C-D, C-G via application of the multi-component concept.
Class 2 Pumps There are six nonexempt Class 2 pumps:
2csH'PI - This pump is unique in its function and populates a group of one (I).
2csL'P1 - This pump is unique in its function and populates a group of one (I).
2Ics'PI - This pump is unique in its function and populates a group of one (1).
2RHS'PI A - This pump meets the equivalency requirements of the multi-component concept.
2RHS'P18 - This pump meets the equivalency requirements of the multi-component concept.
2RHS'P1c - This pump is unique in its function and populates a group of one (1).
Since 2csH'P1, 2GSL'P1, 2lcs'P1, arid 2RHs'P1 c are unique in their function, the multi-component concept can not be applied to them. Each of these pumps is required to be examined under C-C, C-D, and C-G Table D-1 shows the identification numbers              of the welds      and bolting requiring examination on the Class 2 pumps.
TABLE C-3 CLASS 2 PUMPS REQUIRING INSERVICE INSPECTION Group            Pump                  Se-    ISI-COM          Cat. C-C              Cat. C-D                                  Cat. C-G No.              No.                lect  Drawln              ID Nos.              ID Nos.                                  ID Nos.
PW203 PW206 PW207 PW208 PW209 PW210 PW212 PW217 2Pu01          2CSH*P1                  Yes      027                                        na                                PW218 PW219 PW306 PW310 PW311 2P.,u02,      2CSL P1                  Yes      027                PW319              PPB100                        PW312 PW314 PW315 PW316 PW400 PW401
.,2Pu03          2ICS*P1                  Yes      013      PW402 PW403                      na                                      na 2RHS*P1                                                                                                        PW110A PW111A PW112A A                  Yes      026              PW121A                                        PW113A PW115A PW116A PW118A
:;:2RHS'P
                                                                              '::.'.-'W108A
                                                                                    'l:;;:.;"':::,;lI.;.i7',"~",'r'>>'~e,'PeW108B',PW110B PW111B;PW112Bi~
              ":"-"~8~"'"P    5~""'Pu04 Si".':i:- PW121B        ::-! ';;:;".'na    s<N::: PW113B PW115B':PW116B PW118B              ".
2RHS*P1                                                                                            PW108C PW110C PW111C PW112C 2Pu05                C                Yes      026              PW121C                    na                  PW113C PW115C PW116C PW118C Class 2 Valves Section XI, Table IWC-2500-1, Examination Categories applicable'o Class 2 valves, are: C-C, Integral Attachments for Vessels, Piping, Pumps, and Valves; C-D, Pressure Retaining Bolting Greater Than 2 in. In Diameter; and C-G, Pressure Retaining Welds in Pumps and Valves. Research into the design of nonexempt Class 2 valves at NMP2
  'ther than pressure  tests, Category C-H.
NMP2-ISI406 Rev. I                                                      Appendix C                                                          Page10or14
 
during the formulation of the preservice inspection plan revealed that: within the (nonexempt) boundaries of the piping systems examined under Categories C-F- I or C-F-2, there exist only 12 valves that possess pressure retaining body welds requiring their inclusion into, and examination pursuant to the rules of, Categoty C-G None of those valves utilize integral attachments of the type described in Examination Category C-C. Further, none of those valves utilize bolting greater than 2 inches in diameter. Therefore, all (non-VT-2) Code examinations conducted on Class 2 valves at NMP2 are pur'suant to the requirements of Examination Category C-G.
Examination Category C-G permits the examination of only one valve in a group of valves of similar design, function, and service. Table D-2 of this Appendix shows the nonexempt Class 2 valves for which Category C-G requires examination and the multi-component equivalency of these valves. In Table D-2, equivalent valves are identified by the same group number. It should be noted that valve-to-pipe welds are not considered in Category C-G or this Ap-pendix. Valve-to-pipe weld examinations are covered in the applicable pipe weld category (C-F- I or C-F-2.) One valve from each multi-component group has been selected for examination during the interval.
TABLE C-4 ISI CLASS 2      MULTIPLE      VALVE EQUIVALENCYTABLE Group                Valve              Se-    Associated            Design            ISI-COM                                              C-G No.                ID No.              lect      Pi in Iso            T e              Drawin                                            ID Nos.
(3) VWMOV112-C, D 2Va01          2CSL'MOV112              Yes          26-01          Butte rfl              020                                            & LW (3) VWV121-C, D &
2Va02              2CSL V121            Yes          26-01          Butterfl              057                                              LW (3) VWHCV118-C, D &
2Va03          2CSL HCV118              Yes          26-02          Butterfl              019                                              LW (3) VWHCV119-C, D &
2Va04          2CSL HCV119              Yes          26-02          Butterfl                019                                            LW 2RHS MOV8A              Yes          66-14          Butterfl                019                2 VWMOV8A-C & D 2Va05          2RHS'MOV88.              No          66-29          Butterfi                019                2 -VWMOV8B-G'&D (3) VWMOV1C-C, D &
2Va06          2RHS MOV1 C              Yes          66-22          Butterfi                020                                              LW (3) VWV376-C, D &
2RHS V376            Yes          66-13          Butterfl                057                                              LW
                                                                                                                                                                    '\
iI:tv"2                    ;, . (3)';VWV377-;;C",:. D.,"&'i:;:.,
2Va07;"::,',:;..'~2RHS,V377;."::              ",: '. "66-.23      ;  .Butte'rfl:;:",      ! .:057.:.:.::.'' .',:
                                                                                                                        "'''',;:.''LW::.':.'Va08 (3) VVW378-C, D &
2RHS'V378              Yes          66-22          Butterfl                057                                              LW 2RHS MOV2A                Yes          66-1 3                                  019                2 VWMOV2A-C& D 2Va09 4" '.
                    ;2RHS;MOV2B        :,''. 'o          "::::::.66-23'utterfl
                                                                          . Butterfly;.'.    ,"',O'I9      ";    :;",.:,'(2);VWMOV2B-'G"&'
NMP2-ISI406 Rev. 1                                            Appendix C                                                                            Page 11 of 14
 
APPENDIX C IWF-2510 MULTIPLE COMPONENT IMPLEMENTATION Table C-5 Class      I Multiple Component  Equivalency for IFF Support Examination Selection This tabulation of Class l pumps and vessels, within systems at NMP2, groups those components by similar design, function, and service, for the purpose of choosing a singular component to act as a representative for its group. The table then identifies the supports (requiring examination by this plan) of that one represehtative component.
The two reactor water recirculation pumps 2Rcs'P1A aild 2Rcs P1B are Ole only Class 1 pumps at NMP2. The reactor vessel is the only Class I, vessel at NMP2. Supports of Class l valves are not specific to those valves.
Valve support design is incorporated into the support of the piping system into which the valves are installed.
TABLE C-5
 
==SUMMARY==
OF CLASS            1 MULTI-COMPONENTSUPPORT EXAMINATIONS Vendor Group      Componerrt                                                  Support                                                        Fabrication                                  Isometric No.            ID No.        Selected                                        ID                                                          Drawing                                      Locator 2RCS-PSSH009A1                                                                    BZ-70L                                64-00-1-12 2RCS-PS SH010A1                                                                    BZ-70L                                64-00-1-11 2RCS-PSSH011A1                                                                    BZ-70L                                64-00-1-09 2RCS-PSSH012A1                                                                    BZ-70L                                64-00-1-1 0 2RCS-PS SP042A1                                                                    BZ-70T                                64-00-1-07 2RCS-PSSP044A1                                                                    'BZ-70V                                64-00-1-06 2RCS-PSSP046A1                                                                    BZ-70X                                64-00-1-08 2RCS-PSSP061A1                                                                    BZ-70X                                64-00-1-13 2RCS-PSSP062A1                                                                    BZ-70X                                64-00-1-15 2RCS-PSSP063A1                                                                    BZ-70X                                64-00-1-1 4 I
2RCS-PS ST059A1                                                                    BZ-70X                                64-00-1-1 9 2RCS'P1A            Yes                                2RCS-RA2                                                              767E722                                  64-00-1-20
                                              .,",.';;:,,'2RCS-"PSSHQ13A'1,'.                                                ';"':      '.::'--::BZ-'70L': ", ..";.;;. .;".".::'": 64 'Olh'4; 15';;:I:;::;.:I::::':
                                              ',";;:::..:2RCS-PSSH01'4A1..'.;.:: :;:,                                                  :'::<<BZ-,TOL':.'.;.;.:.;:.            ;,:.:;-';,;64-00'1,:-.',1'4":;::<<''.::
:.'";:";.:;;;:;2RCS-PSSH015A1,                      ""::                ":";:,";,"BZ-,70L'-':;;.';,;,'.;.;,'                "      - 6'4-'00-',1;,12 ';:,:':,::;:::":
                                              ''        ';:2RCSWSSH016A1                    ',:;;:;                                          BZ-'70L'".-'.",,::,:;,;      '.  ~"".S4=00;1"-,13,:.':.;::;~
:."i'I:."2RCS;PSSP041A1                      'jt'I'! l:                                                                      ',;:.,: 64'-',00-'.1';"11 .: ..."i
                                              <<,':;.';:::,!  2RCS-',PSSP043A1:.':,,:.'i'"                              ":            ':";,";."'BZ>>'";70Ull'",'."."',:.:3', .';;,:-;':;<:64-';00;1',09; ".'..:.'.
                                                                                                        'i:,-,I;2RCS-'PSSP045A1;::.!'
                                                                                                                                                                                .;."",''64<0'-;1-,',10'~'."-;
                                                            .2RCS-;PSSP064A'1 ':-,',
                                                                                                            ';"
                                                                                                                          ,::          .'=  "'BZ-',70AJ;",:          '-:.  '.- -..;-.64-';00-,1-"18
                                              ':;:,'.::";2RCS;-'PSSP065A1;::,:."'                                                              BZ-'70AK;",:.''';".";. :,.'"'j'''';6'440-'1"-16:. I'".'"':
                                              "'," 2RCS-'PSSP066A1                            .,,'.
                                                                                                                        '. -,.                BZ-'.70AH:,'.,:l!:::;;.:'."";    ,";.,S4;00-'1;-'17!                                        '",
                                                          -'.2RCS-'PSST060A1,.",                      '. ;:-:,::.:; ": BZ-;70AE,""..'';.                                    ",:*
64;,00'-'1=.19:::,''."':-:'.,:'.:=:.-,"64-",00-;,1'0',;:;
1Pu01    -! .'2RCS;P1B;":;.,                  '':.:"::;  ':::.:,'::;::,.;",,:;2RCS-'RB2:                            :,:-        i:;~767E722',;
NMP2-ISI406 Rev. 1                                                            Appendix  c                                                                                                                    Page12of14
 
0' t Table C-6 Class 2 Multiple Component Equivalency for ISF Support Examinanon Selection This tabulation of Class 2 pumps and vessels, within systems at NMP2, groups those components by similar design, function, and service, for the purpose of choosing a singular component to act as a representative for its group. The table then identifies the supports (requiring examination by this plan) of that one representative component.
There are six nonexempt Class 2 pumps:
2csH P1 - This pump is unique in its function and populates a group of one (I).
2csL'P1 - This pump is unique in its function and populates a group of one (1).
2lcs'P1 - This pump is unique in its function and populates a group of one (1).
2RHs'P1A - This pump meets the equivalency requirements of the multiple component concept.
2RHs'P1B - This pump meets the equivalency requirements of the multiple component concept.
2RHS'P1 c - This pump is unique in its function and populates a group of one (1).
Since 2csH'P1, 2csL P1, 2lcs P1, and 2RHs P1c are unique in their function, the multiple component concept cannot be applied to them. Each of these pumps is required to be examined under C-C, C-D, and C-G Residual Heat Removal System (RHS) heat exchangers 2RHS'E1A and 2RHs E1B are the only Class 2 nonexempt pressure vessels at NMP2. Section XI allows for the examination of only one vessel
                                                                                            "... in the case of multiple
                                                  " for each of the examination categories that apply to Class 2 vessels.
vessels of similar design, size, and service...
The RHS heat exchangers are considered equivalent and thus, meet the multiple component equivalency criteria.
2RHS'E1A has been selected for the subject Class 2 examinations in the ISI Program Plan. Therefore, the support mechanism of that component only, need be examined under this IWF Program Plan.
TABLE CW
 
==SUMMARY==
OF CLASS 2 MULTI-COMPONENTSUPPORT EXAMINATIONS Vendor Group      Component                                  Support                Fabrication            Isometric No.          ID No.        Selected                  ID                    Drawing                Locator 2Pu01        2CSH*P1              Yes          2CSH*P1-SUPPORT                  2C-5270              25-series 2pu02        2CSL'P1              Yes          2CSL'P1-SUPPORT                  2C-5576              26-series 2Pu03        2ICS*P1            Yes          2ICS*P1-SUPPORT                FD230516              57-series 2RHS*P1A              Yes        2RHS'P1A-SUPPORT                21A1913AD                66-series 2Pu04      2RHS*P1B              No      . 2RHS P1B-SUPPORT                21A1913AD'6-seiies 2Pu05      2RHS*P1C              Yes        2RHS'P1C-SUPPORT                21A1913AD                66-series 2RHS E1A              Yes        2RHS E1A-SUPPORT                  762E909              66-series 2Ve01      2RHS*E1B              No -      2RHS" E1B-SUPPORT                  762E909              66-series NMP2-ISI406 Rev. 1                                        Appendix C                                        Page 13 of 14
 
Table C-7 Class 3 Multiple Component Fquivalency for ISF Support Framination Selection This tabulation of Class 3 pumps and vessels, within systems at NMP2, groups those components by similar design, function, and service, for the purpose of choosing a singular component to act as a representative for its group. The table then identifies the supports (requiring examination by this plan) of that one representative component.
TABLE C-7
 
==SUMMARY==
OF CLASS 3                                            MULTI-COMPONENT                                                                      SUPPORT EXAMINATIONS Group        Component                                                                                                      Support                                                    Fabrication                                          Isometric No.            ID No.                                                                                                        ID No.                                                      Drawing                                              Locator 2SFC*P1A-2SFC*P1A                                      Yes                                                            SUPPORT                                                      N239506&#xb9;1                                            07-series t,
                                                                                                                                                                      'll-:"'endor              ,I                                  ',  1
                                                                                                                                                                                                                                    " '~ Vi"
                                                                                ;  ",:;.;;.:,:;-,,2SFC'.P1B-';:::;,',:.':
3Pu01        2SFC'P1                        ;::."'.,'!No;,,'::::i B .".'SWP...",P..1'A'elected                                                                  "SUPPORT.::::-'-;:.:-:,:::i':.:::                '.
                                                                                                                                                                                    .':,~':!N239506&#xb9;5'::::::t;: ';;:;-07;"series I".""
                                                                                                                                                                                                                                                                    ';-"'"-"":'.21-'20:
                                                      ~"'",'i':!No'~'ll""''iiijx"":                        -'-,:.;SUPPORT:::".'.:.                i!:":..;
2SWP'P1B-2SWP*P1B                                      Yes                                                            SUPPORT                                                      N239505&#xb9;1
:.'2SWP..'..P I                    '..;:" No:::.::-":
                                                                                ',!I'",-'2RHS;P.:1C-.,
                                                                                  ~!I":::;:::,:..SUPPORT,',-                                        '.                ''.          -" " ',N239505&#xb9;.1-            "'1-17l9''      .""::::::      21
                                                                                                                                                                                                                                                        \'l
                                                                                "';:-',                                    2SWP.,'.P1D-",::                                                                                        4';
C:,'SWP'.P1D."-.:,
No'''"'lt                                                                          '''
                                                                                                                                                      '::,,'SUP,P.ORT':
                                                                                                                                                                                  '-':- 'N239505&#xb9;1                      ".':.::.":  I.''::::: .:  .::,21'-17
                                                                                                                                                                                                                                                                'I
              -:2SWP.::P'IE"..                  :";    '::",.No':..:':.'.;          '.              '':                    2SWP    ..P...,.1E-.
                                                                                                                              'SUP.P.ORT:..                                                  N239505&#xb9;1 I"a    'i' 21-21 2SWP P1F-No                                                            SUPPORT                                                      N2 3950 5&#xb9;.1                                            21-''18 3Pu02        2SWP P1F 2SFC E1A-2SFC'E1A                                        Yes                                                          SUPPORT                                                      5084312161                                            07-series
                                                                                  ',"-'':. 2SFC-.,E1 B-                                                                                                                          ".'L$                                                  '-.',
3Ve01    ;.  '2SFC',E1B~,                    ',",';.'-:",::. No"','""-"      ;:,'.:-'.:;::; SUP.PORT.                                                                                        t.,':~5084312;l61i:.'':.':":              ':.';",:::-~07-'series:
NMP2-IS!406 Rev. 1                                                                                                              Appendix    c                                                                                                            Page 14 or 14
 
APPENDIX D CLASS 1, 2    Ec 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.10 Class 1 Piping Support Cate orization And Distribution Class 1                SupportType                    25% of Support Type Systems            Within Each System                  Within Each System F1.10A    F1.10B      F1.10C        F1.10A  F1.10B      F1.10C C
CSH                          0                                0 CSL                          0                                0              p4~$
DER              0          0                        0        0 18                                    '';-'.30',:: ''94~<
                                                                                  '-',,:,?7'"
ICS              13                                                                      '".;,8,''SS 41        21          20                                                              '"'22'-''
RCS              0          0          10            0        0 19                    16 SLS WCS              20                    14 e+7+w, Ve"i >i iw 25 % Selection per type and function in each System A designator is F1.10A (Supports-one directional)
B designator is F1.10B (Supports-multidirectional)
C designator is F1.10C (Supports that allow thermal movement, ie. Springs)
NMP2-ISI406 Rev. I                          Appendix D                            Page    1  Of 8
 
APPENDIX D CLASS 1, 2 43 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.10 Class 1 Piping Supports Exam Distribution 8 System Period One              Period Two      Period Three          ,.
TotaIs,','A/8/C S stem          RF0-6    RFO-7        RFO-8      RFO-9  RFO-10 RF0-11                                "    '
CSH              0        IA            1C          0    IA          0                .2/0/1,.
CSL              IC          0            0          0    1A          0            -    1/0/1:."
DER              0          0            0          0      0        IC,                0/0/1        ',,
FWS            IB, IC      IA          IA,IC        1B    3C          0      '-"2/2/5;;
ICS            1A        lc          IB,IC        1A    IA,1B      1A                4/2/2 1A,2B MSS            IA,2C        3A            3A      2B,2C            3A,2B      '11/6/5 lc                                            'CS IC          0            2C          0      0        0              ,  OI0/3:.i'"
2A,lB IC      IA,IC        IA,IC      1A,IB      0 IC SLS              0      IA,IB            IA        IC    IB          0 WCS              0 IA,IB 2A,2C                IB    IC        2A      .-.;..'5/2/4            '."
IC A/8/C          2/1/6      8/2/3      '.
8/I/8:      2/5/3  4/4/5      8/3/2,      32/16/27r
.EXAMS PER OUTAGE,
%.Compiete              '29% "                                      100%
25 % Selection per type and function in each System A/B/C A designator  is F I. I OA (Supports-one directional)
B designator is F1.10B (Supports-multidirectional)
C designator is F1.10C (Supports that allow thermal movement, ie. Springs)
NMP2-ISI406 Rev. i                          Appendix D                          page 2      Of 8
 
11 APPENDIX D CLASS 1, 2 8'c 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.20 Class 2 Piping Supports Cate orization And Distribution Class 2                SupportType                      15  % of Support Type Systems            Within Each System                    Within Each System F1.20A      F1.20B    F1.20C        F1.20A    F1.20B  F1.20C '~"i"YOtaI~'"
ASS                0          0                        0        0 CSH              38          30        10                                      78 CSL              22          13                                                42,      7 ICS              17          58        12                                            14"::,
MSS              12                    19 RDS              0          36          0              0                0    '36      .6 RHS              178          88        79            27        14      12 TOTAL          .. 267  .',.'32          DS            42",',  38',          627-'01,.
15 % Selection per type and function in "each System A/B/C A designator is F1.20A (Supports-one directional)
B designator is F1.20B (Supports-multidirectional)
C designator is F1.20C (Supports that allow thermal movement, ie. Springs)
NMP2-ISI406 Rcv. I                            Appendix D                            Page 3  of 8
 
APPENDIX D CLASS 1,2 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.20 Class 2 Piping Supports Exam Distribution B S stem Period One            Period Two                  Period Three                      '. Totals RFO-6        RF0-7      RF0-8        RFO-9          RF0-10          RFO-11                             
                                                                                                                        'A/B/C, S  stem ASS                0        1C          0            0              0                0                  0/0/1 ;
CHS              18      18,1C      lA,18        2A,18          2A,18            1A,1C",6/5/2';
CSL              1A        1A      18,1C          1A          1A;18                0                --4/2/1 ICS              0          0      2A,18        28,1C          lA,28          48,1C              '/9/2, MSS              1C        1C      1A,18          1A          18,1C                0            ~
2/2/3,.;-i:
RDS          1B              28          0            28              0              18                  0/6/0 1A,18        SA,38      6A,28        SA,28          SA,28 27/14/12 2C        2C        2C            2C            1C                3C 2/3/3        6/6/5".:10/6/3          9/7/3.:,      '9/7/2:      . 6/9/5'2/38/21 Exams Per                                                                  ":-:1;8':. ."..;,, 20" '-',","-, ""<<"101 Outa e.,                                    "''
oio Com lete              25ol  ''  "        '62%''    '"'    '"    "  "'00 15 % Selection  per type and function in each System A/B/C A designator is F1.20A (Supports-one directional)
B designator is F1.20B (Supports-multidirectional)
C designator is F1.20C (Supports that allow thermal movement, ie. Springs)
NMP2-ISI406 Rev. I                          Appendix D                                                      pege4 Of 8
 
APPENDIX D CLASS 1,          2  8'c  3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.30 Class.3 Piping Supports Cate orization And Distribution Class 3                    SupportType                                        10% of Support Type Systems            Within Each System                                        Within Each System F1.30A              F1.30B          F1.30C              F1.30A      F1.30B  F1.30C 3              0 EGA              25                                      0 SFC              71                  84                                                          "$  64;,    "'.18'"o.
                                                                                                      ,gag eg',,
SWP              208                255                34                  21      26        4 SWQ                                  32 SWR                                  12                0                                    0  .":-16'x RHS                                    0                0                            0        0 WCS 8  (e(j.g
;  TOTAL";;.' ';j, ",333,';,*.ji:",,ij,'388';  .:-"=';.:,"-::47,;; ';"'                            '-768::    :,-;87;",
10 % Selection          per type and function in each System A/B/C A designator      is F1.30A (Supports-one directional)
B designator is F1.30B (Supports-multidirectional)
C designator is F1.30C (Supports that allow thermal movement, ie. Springs)
NMP2-ISI406 Rcv. I                                            Appendix D                                  page 5      of 8
 
APPENDIX D CLASS 1, 2      43 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.30 Class 3 Piping Supports Exam Distribution 8 S stem Period One              Period Two              Period Three              ",,  TotaIs' S  stem        RFO-6      RF0-7          RF0-8        RFO-9      RF0-10      RFO-11                A/SIC EGA            3A,1B          0            0              0          0 2A,3B                                                                          '."',8/Q/I'.'-,
SFC                          1A            1A          lA,2B      2A,1B        1A,3B lc 4A,4B      4A,7B 1A, 2C      lA,3B        3A,8B lc        lc          8A,4B,21"/26/4.
SWQ                1B          0            0          2B, lc    1A,1B          2A;,,3'/4/I              .
SWR                0                      2B              0          0            0 0          0            0              0        1A            0          '',-  I'/0/0 -':-;;
WCS                0          0            0          1B,  lc      0            0          ';" -0/i/1 3/3/0'.,:;" 4/10/0
                                                                    '8/9/1.      'iX/7iO::':::: '7/431/7';.
                                                                                                                  "'/B/C 5/9/3 Exams Per Outa    e 14'                                                              .I8;:              87.
% Corri  tete.            22%                    '.. 58%                    100%
10 % Selection    per type and function in each System A/B/C A designator  is F1.30A {Supports-one directional)
B designator is F1.30B (Supports-multidirectional)
C designator is    Fl.30C (Supports that allow thermal movement,          ie. Springs)
NMP2-ISI.006 Rev. I                              Appendix D                                          page 6 of 8
 
APPENDIX D CLASS 1, 2 Ec 3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.40 Supports Other Than Piping (Class 1, 2, 3 and MC)
Cate orization And Distribution Class                                                    % of Support Type SupportType                    100 1,243              Within Each System                  Within Each System Systems F1.40A      F1.40B      F1.40C      F1.20A    F1.40B        F1.40C      '-'Total.;
CSH              0                      0            0                        0:.".'."1-;.
CSL              0                      0            0                        0 ICS              0                      0            0                        0 RCS
* 0                                  0 RHS
* 0                      0            0                        0                  2 RPV              0                      0            0                        0 SFC*              0                      0            0                        0 SWP*              0                      0            0                        0 a~%I.'1~g(;~,'~,
TOTAL"',
100% of the Supports
* Supports      of only one of the multiple components are required to        be examined A/B/C A designator  is F1.40A (Supports-one directional)
B designator is F1.40B (Supports-multidirectional)
C designator is F1.40C (Supports that allow thermal movement, ie. Springs)
NMP2-ISI406 Rcv. 1                          Appendix D                                      page 7 of 8
 
0
*t
 
APPENDIX D CLASS 1, 2    Ec  3 IWF COMPONENT SUPPORTS (CODE CASE N-491)
F1.40 Supports Other Than Piping (Class 1, 2, 3 and MC)
Exam Distribution B                      S stem Period One              Period Two            Period Three      ,",.
S  stem        RFO-6      RFO-7        RFO-8            RF0-9    RFO-10      RFO-11                          Totals';."'"WB/C,;,'SL CHS              18        0              0              0        0          0    ",                  ';-'0/jl0','.
0        0              0              18        0          0    '.'-0/IIO'.'CS 0        0            18              0        0          0                                        0/1/0          .
RCS*                0        4C              0              0      2A          0                                        2/0/4 0        0              0              0      28          0                                          0/2/0, RPV              28          0            38              0      28          0                  ;>''0/7/0"4-'FC 18        0              0              0      18          0        '::;:.0/2/0'.
0        0              0              18        0          0          ;,':0/il0"'".4~
A/B/C::.::::0/4/0          0/0/4      ': 0/4/0.:,-:0/2IO          2/5'/0  ':
0/0/0:                              2/IS/4 ExaIIls                                                                                                                                        'I' I'er                                                          ,2 Outa e Com  lete.          38% @*i            :-" '.'"66.6%::.
                                                                  '.  :  -;:"100%                                              h 100% of the Supports
    " Supports of only one of the multiple components are required to be examined
                                          ** Best % possible A/B/C A designator  is F 1.40A (Supports-one directional)
B designator is F1.40B (Supports-multidirectional)
C designator is F1.40C (Supports that allow thermal movement, ie. Springs)
NhkP2-ISI406 Rev. I                              Appendix D                                                                      Pege8 of 8
 
APPENDIX E Class 1,2  &3 Integral Attachments (Code Case N-509)
CL-1                          CL-2                    CL-3 B10.10        B10.20 C3.10    C3.20        C3.20  C3.30      D1.20 Pipe        Piping            Piping SYS            Vessel      Piping Vessel                        Pump IWF          Pen.
Total        10%
CSH              N/A              N/A        13                N/A  N/A          N/A
'CSL              N/A              N/A        14                      N/A          N/A EGA              N/A        N/A    N/A        N/A          N/A    N/A  16 FWS              N/A        16    N/A        N/A          N/A    N/A  N/A          N/A ICS              N/A              N/A        13          N/A          N/A          N/A MSS              N/A        42    N/A        18          N/A    N/A  N/A          N/A RCS              N/A              N/A        N/A          N/A    N/A  N/A          N/A RDS              N/A        N/A    N/A        16          N/A    N/A  N/A          N/A N/A                          130 SFC              N/A        N/A    N/A        N/A-        N/A    N/A SWP              N/A        N/A  N/A        N/A          N/A  N/A  156            16 SW                N/A        N/A  N/A        N/A          N/A  N/A  27 N/A        N/A  N/A        N/A          N/A  N/A RPV                          N/A  N/A        N/A          N/A  N/A  N/A          N/A WCS              N/A              N/A        N/A          N/A  N/A  N/A          N/A Total                                        204 C3.20 Total                                                  209              215            25 76 I.A.
        'Re 100%        10%  100%*              10%        10%
Exams                                                    21 Re .
Multiple Vessel selected NMP2.ISI-006 Rcv. I                        Appendix E                          page 1 of l
 
IP 0
 
APPENDIX F SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Eleven of the following Relief Requests are based upon the examination results obtained during the First Ten Year ISI Interval. Each of these relief request reliects those items/welds for which code requirements were not met during the first interval and which are also scheduled for examination during the Second Ten Year Interval. Relief Request RR-IWB-14 has been added and is applicable to the Second Ten Year Interval only.
(1) RR-IWB-1 (2) RR-IWB-2 (3) RR-IWB-3 (4) RR-IWB-6 (5) RR-IWB-7 (6) RR-IWB-1 3 (7) RR.IWB-14 (8) RR.IWC-1 (9) RR-IWC-2 (10) RR-IWC-3 (11) RR-IWC-5 (Parts    1 - 3)
(12) RR-IWFK NMP2-ISI406 Rev.1                                      Appendix F                                      Page 1 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-lWB-1 Component: Five (5) pressure retaining (Categ. B-0) welds in control rod housings: 2RPv-cRDH001 A through 2RPv-cRDH040A and 2RPv-cRDH0018 through 2RPv-cRDH0408 are the total population of peripheral welds, of which, 10% require examination.
System
 
==Title:==
Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Qass: ASME Section XI Class        1 Examination Requirements: Volumetric or surface examination of 100% of 10% of the peripheral CRD housing welds per Examination Category B-O, pressure Retaining fields in Control Rod Housings. There are 40 peripheral CRD housings. Each housing has two welds. Therefore, eight welds are required to be examined. Assuming a Code (Case) minimum coverage allowable of 90%, eight (8) full examinations equals a minimum requirement of 720 total percentage points.
Burden: Limited accessibility for all peripheral CRD housing welds due to inherent obstructioris caused by surrounding cables, tubing, and foundations which are not practical to remove or replace.
Recommended Substitute: Partial examinations of: 10% of the welds plus six (6) additional welds, such that the aggregate total is greater than or equal to eight full examinations (720 total percentage points.)
Technical Justification and Data to Support the Determination: Portions of 6 additional welds were examined to the extent possible, such that, fourteen (14) welds were actually examined. Examination coverages ranged from 27% to 100%. The total of examined percentage points summed to 953, thus exceeding the 720 required. Although the use of an inspection mirror achieved 100% coverage on three of the welds (thus reducing the original population for which relief is sought &om 8 to 5) this request is still required. It has been modified accordingly and submitted with this Second Interval Program.
Ori inalSeo e                                                            Additional welds 2RP V-CRD H007A      27%  Coverage  achieved                  2RPV-CRDH001A      43%  Coverage  achieved 2RPV-CRDH0036A        54%  Coverage  achieved                  2RPV-CRDH0018      80%  Coverage  achieved 2R P V-C R D H0037A  43%  Coverage  achieved                  2RPV-CRDH004A      43%  Coverage  achieved 2RPV-CRDH0038A        84%  Coverage  achieved                  2RPV-CRDH0048      75%  Coverage  achieved 2RPV-CRDH00388        76%  Coverage  achieved                  2RPV-CRDHOOSA      64%  Coverage  achieved 2RPV-CRDH0058      64%  Coverage  achieved NMP2-ISI406 Rey.1                                    Appendix F                                        Page 2 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IwB-2 Component: Thirty -three (33) reactor pressure vessel nozzle-to-shell welds.
System
 
==Title:==
Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Class: ASME Section      XI Class  1 Examination Requirements: 100% volumetric per Examination Categoiy B-D, Full Peneh ation fields ofNozzles in Vessels (90% per invoked Code Case N-460)
Burden: The automated examination of these RPV nozzle-to-shell welds is limited to'arying extents due to nozzle-to-shell blend, vessel scanner tracks, other nozzles, limited access from nozzle side of welds and mechanical limitations.
Recommended Substitute: Perform volumetric examinations to the maximum extent practical, utilizing the latest UT techniques and equipment.
Technical JustiTication and Data to Support the Determination: The following welds were examined to the maximum extent possible with the principal deterrent to achieving Code Compliance being the design configuration of the weld joints.
2RPv-KA01 examined    with 58% coverage    achieved 2RPY.KA02 examined    with 58% coverage    achieved 2RPv-KA03 examined    with 65% coverage    achieved 2RPv-KA04 examined    with 65% coverage    achieved 2RPV-KA05 examined    with 65% coverage    achieved 2RPv-KAos examined    with 65% coverage    achieved 2RPv-KA07 examined    with 65% coverage    achieved 2RPv-KAos examined    with 65% coverage    achieved 2RPv-KAos examined    with 65% coverage    achieved 2RPV-KA10 examined    with 65% coverage    achieved 2RPv-KA11 examined    with 65% coverage    achieved 2RPv-KA12 examined    with 65% coverage    achieved 2RPv-KA13 examined    with 63% coverage    achieved 2RPY.KA14 examined    with 63% coverage    achieved 2RPv-KA15 examined    with 65% coverage    achieved 2RPv-KA16 examined    with 65% coverage    achieved 2RPv-KA17 examined    with 56% coverage    achieved 2RPv-KA1s examined    with 56% coverage    achieved 2RPv-KA19 examined    with 58% coverage    achieved 2RPV-KA20 examined    with 63% coverage    achieved NMP2-ISI~ Rev.1                                Appendix F                                Page 3 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS RR-IWS-2 Contlnuatlon:
2RPv-KA21 examined  with 58% coverage achieved 2RPv-KA22 examined  with 63% coverage achieved 2RPY.KA23 examined  with 56% coverage achieved 2RPv-KA24 examined  with 61% coverage achieved 2RPv-KA25 examined  with 69% coverage  achieved 2RPv-KA26 examined  with 65% coverage achieved 2RPv-KA27 examined  with 63% coverage achieved 2RPv-KA2s  examined with 63% coverage achieved 2RPv-KA29  examined with 64% coverage achieved 2RPv-KA30  examined with 64% coverage achieved 2RPv-KA31  examined  with 64% coverage achieved 2RPv-KA32  examined with 67% coverage achieved 2RPv-KA33  examined  with 63% coverage achieved NMP2-ISI406 Rev.1                          Appendix F  Page 4 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IwB 3 Component: RPV Flange to Shell Weld System
 
==Title:==
Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Class: ASME XI Class      1 Examination Requirements: 100% volumetric examination per Examination Category B-A, Item No. B1.30, Pressure Retaining Welds in Reactor Vessel.
Burden: The configuration of the subject weld joint does not allow access &om both sides of the weld due to the ID taper from the flange forging to the thinner upper shell course.
Recommended Substitute: Perform volumetric examinations from the shell side to the maximum extent possible and supplement this with examinations &om the flange face as recommended in ASME Section 5 ~icle 4, Para.
T-441.3.2.2.
Technical Justification and Data to Support the Determination: Examination of the subject weld was performed to the maximum extent possible &om both the RPV shell course and from the flange face as recommended. Because of unparallel surfaces above the weld it is impossible to achieve further coverage without redesign of the flange.
Weld: 2RP V-AE - From the shell side - CRV= 52%
2RPV-AE - From the flange face - CRY= 100%
NMP2-ISI406 Rev.1                                  Appendix F                                      Page 5 of 17
 
0 SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWBW Component: One (1) pressure retaining weld, zRcs-64-oo-sw35, partially inaccessible for a complete surface exam due to interference by a pipe rupture restraint.
System
 
==Title:==
Reactor water recirculation Function: Circulation of reactor coolant within the vessel during power operation to control reactivity and assure thermal mixing Code Class: ASME XI Class        1 Examination Requirements: 100% volumetric and surface (90% per invoked Code Case N-460) per Examination Category B-J, Pressure Retaining Welds in Piping, Item No. B9.11, Circumferential 8'elds NPS 4 or Larger.
Burden: Access for the surface exam is limited by a pipe rupture restraint.
Recommended Substitute: Surface examination is performed to the maximum extent possible. Without redesign of the affected rupture restraint additional coverage is not possible.
Technical Justification and Data to Support the Determination: The weld for which relief is requested has been examined to the maximum extent possible by the surface exam technique. The entire Code Required Volume has been examined volumetrically by UT and was acceptable thus ensuring the integrity of the more critical inner third of the weld volume &om where flaws detrimental to the weld integrity would be expected to originate.
NMP2 anticipates no changes in the overall level of plant quality and safety based on performing the subject exam to the maximum extent possible.
(1): 2Rcs-64-00-sw35      100% of the UT exam was completed, 66%    of the required surface exam was completed.
NMP2-ISI~ Rev.1                                      Appendix F                                      Page6of17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWS-7 Component: Four (4) reactor vessel bottom head longitudinal welds:
2RPv-DB        (meridional bottom head radial plate-to-bottom head radial plate) 2Rt v-Dc      (meridional bottom head radial plate-to-bottom head radial plate) 2RPv-DG        (circumferential bottom head dollar plate-to-bottom head dollar plate) 2RPv-DR        (circumferential bottom head dollar plate-to-bottom head dollar plate)
System
 
==Title:==
Reactor Pressure Vessel Function: Exact reactor coolant pressure boundary and provide core support Code Class: ASME Section        XI Class  1 Examination Requirements: 100% volumetric examination of the reactor vessel bottom head welds per Examination Category B-A, Pressure Retaining 8'elds in Reactor Vessel, Items No. B1.21, Circumferennal Head 8'elds, and B1.22, Meridional Head Welds.
Burden: Accessibility for the manual volumetric examinations on the bottom head welds is limited do to inter-ference with the CRD penetrations and the vessel support skirt. Only approximately 12" to 24" on each end of welds 2RPv-DG & 2RPv-DR can be examined due to interference with        the CRD  penetration housings.
Approximately one foot cannot be examined on each of the other bottom head welds due to interference with the RPV support skirt.
Recommended Substitute: Perform volumetric examinations to the maximum extent possible based on design limitations.
Technical Justification and Data to Support the Determination: The subject examinations have been completed to the maximum extent possible, additional coverage is not possible without redesign of the vessel.
2RPv DB      was  examined  with 82% coverage  achieved 2RPY.Dc      was  examined  with 82% coverage  achieved 2RPv-DG      was  examined    with 19% coverage  achieved 2RPv-DR      was  examined    with 21% coverage  achieved NMP2-ISI-006 Rev.1                                  Appendix F                                        Page 7 of 17
 
0 SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-lWB-13 ComPonent:        2Mss'REv1 (2RPY-TF001 thru 2RPv-TFo76)
System
 
==Title:==
Reactor Pressure Vessel Function: These threads, located in the reactor pressure vessel top flange, provide for pressure retention and closure of the RPV Head to the Reactor Pressure Vessel.
Code Class: ASME Section XI Class 1, Examination Category B-G-1, Pressure Retaining Bolnng Greater
'rhan 2 in. In Diameter, Code Item B6.40, Threads in Reactor Vessel Flange Examination Requirements: Requires a volumetric examination of essentially 100% of the volume described by Figure IWB-2500-12 of 1989 Edition of ASME Section XI. This examination is required to be performed once per inspection interval.
Burden: The groove that the o-ring seal is placed in limits the accessibility of the transducers used to ultrasoni-cally interrogate this base material. As a result, 100% volumetric interrogation is deemed impractical.
Recommended Substitute: These examinations document interrogated volumes greater than 90%, but less than 100%, in all cases. There are no additional techniques that could be utilized to increase the volume examined for each of the ligament areas.
Technical Justification and Data to Support the Determination: NMP2 has considered the consequences of a failure of this system and finds that, due to the conservatism of design inherent to the reactor pressure vessel, catastrophic failure of this component is considered highly unlikely (as reflected in the FSAR choice of the design basis accident.) Therefore, further analysis of the consequences of failure of the reactor pressure vessel flange threads is not required. Examination of the flange ligament areas >vill be performed to the maximum extent possible for each of the 76 ligament areas, ie., CRV = 90.2 %.
Lastly, NMP2 anticipates no changes in the overall level    of plant quality and safety based on performing the subject examinations to the maximum extent possible.
NMP2-ISI406 Rev.1                                    Appendix F                                        Page 8 of 17
 
SECOND TEN-YEAR INTERNAL ISI RELIEF REQVESTS Identifier: RR-lWB-14 Component: Reactor Pressure Vessel Closure Head Nuts (2RPV-N001 through 2RPV-N076)
System
 
==Title:==
Reactor Pressure Vessel Code Class: ASME Section XI Code Class        1 Examination Requirements: 100% surface examination of the Reactor Pressure Vessel Closure Head Nuts per Examination Category B-G-I,Pressure Retaining Bolting, Greater Than 21nchIn Diamefer, ItemNo. B6.10.
C Burden: Relief is requested from performing a 100% surface (magnetic particle) examination of the Reactor Pressure Vessel Closure Head Nuts as required by ASME Section XI.
Recommended Substitute:. NMPC proposes to perform a visual, VT-1 examination of the Reactor Pressure Vessel Closure Head Nuts to the criteria of ASME Section XI, 1989 Edition with 1989 Addenda in conjunction with the acceptance criteria as stated in Subsection IWB-3000.
Technical Justification and Data to Support the Determination: The 1989 Edition of Section XI does not provide acceptance criteria for the mandated surface examination of Table IWB-2500-1. Table IWB-2500-1 was subsequently changed in the 1989 Addenda requiring a VT-1 examination of the closure nuts, additionally providing acceptance criteria for VT-1 examination of bolting greater than 2 inches. This change to the Code by the Section XI Subcommittee recognized that a VT-I examination could supplant the surface examination requirement without diminishing the level of quality and safety.
It is NMPC's intention to use  the requirements of the 1989 Edition with the 1989 Addenda  of the Code for the proposed examination as an alternative permitted by paragraph (a)(3)(i) of 10CFR50.55a.
 
==Reference:==
ASME Section XI, 1989 Edition with Addenda through 1989, Table IWB-2500-1.
NMP2-ISI406 Rev.1                                  Appendix F                                      Page 9 of 17
 
V SECOND TEN-YEAR INTERVAL ISI RELIEF REQVESTS Identifier: RR-IWC-1 Component: Thirty-four (38) weldments, on six (6) separate pumps; twelve (12) integral attachment (Cat. C-C) welds, and 26 pressure retaining (Cat. C-G) welds:
2CSH'P1,PW207, 208, 209, 212, 217, 218, and        219 2csI P1)Pw311) 312) 315) 316) Gnd 319 2RHS P1A)PW1 1 1A) 1 12A) 1 13A) 1 16A) 1 18A)    GIld 121 A 2RHs'P1B)Pw111B) 112B) 113B) 116B) 118B)          Gild 121B 2RHS P1C)PW111C) 112C) 113C) 116C) 118C)          GIld 121C 2ICS  '1,  PW400, 401, 402, and 403 System Titles (4): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal, Reactor Core Isolation Cooling Functions:    I) The High Pressure    Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch in diameter) which does not result in rapid reactor depressurization. 2)
The Low Pressure Core Spray System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing. 4) Used to reestablish reactor pressure vessel water level when the vessel is isolated and feedwater is not available.
Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface examination of integrally welded attachment on Class 2 pumps per Examination Category C-C, Integral Attachments for Vessels, Piping, Pumps and Valves, Item C3.30 Integrally 8'elded Attachments to Pumps, and 100% surface examination of Class 2 pump casing welds per Category C-G, Pressure Retaining fields in Pumps and Valves, Item C6.10, Pump Casing 8'elds.
Burden: The pumps are installed in a concrete pit, thereby making the exterior of the casing welds and entire integral attachment welds inaccessible for surface examination. Examination of the casing welds would require either disassembly or removal &om the pit. Examination of the integral attachment welds would require lifting the pump from the pit. The hardships associated with pump disassembly of lifting from the pit would far exceed any beneficial safety improvements that might be achieved by such an examination. For the integral attachments on pump Ics'P1, approximately 17% of each of the four welds is inaccessible. The pump design utilizes U shaped attachments that limit access to the entire weld surface.
Recommended Substitute: Perform surface examination on welds of pumps that become accessible when dis-assembled for routine maintenance. Perform surface exams on integral attachments to the maximum extent possible when accessible.
Technical Justification and Data to Support the Determination: Since these pumps are subject to testing per IWP of the ASME Code, loss of integrity of the pump casing welds would be detected during quarterly pressure, differential, and flow rate testing. Failure of integral attachments welds would be detected by quarterly vibration measurements. Furthermore, pump casing integrity is verified during system leakage testing.
NMP2-ISI406 Rev.1                                      Appendix F                                      Page 10 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWC-2 Component: Twenty (20) pressure retaining welds in austenitic stainless steel piping:
2CSH-25-05-FW01+ 013, 014 and      015 2CSL-26-01-FW026, 027, 028 and    035 2RHS 66 13 FW023t 024) 025 and      029 2RHS-66-22-FW021, 022, 023 and      029 2RHS 66 23 FW018t 019) 020 and      022 System Titles (3): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal Functions: 1) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch in diameter) which does not result in rapid reactor depressurization. 2)
The Low Pressure Core Spray System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
Code Class: ASME Section      XI Class 2 Examination Requirements: Surface and volumetric examination on a minimum of 28 welds (out of a nonexempt population of 37 welds) per Examination Category C-F-1, Pressure Retaining 8'elds in Austenitic Stainless Steel or High AlloyPiping, Item No. C5.11, Circumferential 8'elds in Piping z ~lain. Nominal Pall Thickness for Piping > NPS 4 Burden: Twenty (20) of the 37 welds are inaccessible for both surface and volumetric examination (by design,        as they are submerged in the suppression pool.) Greater access would require these systems to be redesigned.
Recommended Substitute: Perform the full compliment of examinations on the 17 accessible welds Technical Justification and Data to Support the Determination: The subject welds are on pump suction piping, which is under water, postulated cracks in these welds are not detrimental to the safety function of their associated systems. There has been no change in the NMP2 design through the first interval. As such, the granted relief was used on all 20 weldments and is submitted for use with this Second Interval plan.
NMP2-ISI406 Rev.1                                  Appendix F                                        Page11 of17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-IWC Component: Thirteen (13) integral attachment welds on piping submerged in the suppression pool:
2csH 25-O~w301 (previously called FW301; it is actually a shopweld in penetration assembly z-12, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2csL-26-01-sw301 (previously called Fw315, it is actually a shopweld in penetration assembly z-15, and is inac-cessible behind a leak channel under approximately five feet of water in the suppression pool) 2RHs-66-13-Fw316 Under water in the suppression pool.
2RH&46-13-Fw317 Under water in the suppression pool.
RHs-66-1~w301          (previously called Fw314; it is actually a shopweld in penetration assembly z-5A, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2RHs-66-22-Fw-310 Under water in the suppression pool.
2RH&66-22-Fw-311 Under water in the suppression pool.
2RHae6-22-sw-301 (previously called FW312; it is actually a shopweld in penetration assembly z-sc, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2RHs-66-23-Fw-313 Under water in the suppression pool.
2RHs-66-23-Fw-314 Under water in the suppression pool.
2RHs 23-sw-301 (previously called Fw315; it is actually a shopweld in penetration assembly z-5B, and is inaccessible behind a leak channel under approximately five feet of water in the suppression pool) 2csL- 26-01-Fw313 Under water in the suppression pooh 2csL- 26-01-Fw314 Under water in the suppression pool.
System Titles (3): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal Functions:    I) The High Pressure  Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch in diameter) which does not result in rapid reactor depressurization 2)
The Low Pressure Core Spray System provides coolant inventoiy and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat
,Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface examination of the areas depicted in Code Figure No. IWC-2500-5 per Examination Category C-C, Integral Attachments for Vessels. Piping, Pumps and Valves, Item C3.20, Integrally Welded Attachments to Piping.
Burden: These welds are inaccessible for surface examination because they are located under water in the suppression pool. Greater access would require the redesign of the NMP2 containment and suppression systems.
Recommended Substitute: None Technical Justification and Data to Support the Determination: Compliance with the specific requirements of ASME Section XI would result in hardship or unusual diQiculties without a compensating increase in the level of quality or safety.
NMP2-ISI406 Rev.1                                    Appendix F                                        Page 12 of 17
 
lt SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-lWCW Component: Twenty-six (26) welds in six Code Categories, subdivided into 3 parts for clarity:
(1) Category C-A examinations (part 1)
(1) Category C-B examinations (part'1)
(3) Category C-C examinations (part 2)
(1) Category C-F-1 examinations (part 2)
(20) Category C-G examinations (part 3)
System Titles (3): High Pressure Core Spray; Low Pressure Core Spray; Residual Heat Removal Function: 1) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than 1 inch) which does not result in rapid reactor depressurization. 2) The Low Pressure Core Spray System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 3) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
Code Class: ASME Section XI, Class 2 Examination Requirements: Various;        See Parts 1 through 3 following.
Burden: Accessibility is limited due to permanent interferences.
Recommended Substitute: Perform volumetric and/or surface examinations to maximum extent possible for each.
Technical Justification and Data to Support the Determination: See Parts        1 through 3 below for item-by-item status.
NMP2-ISI406 Rev.1                                    Appendix F                                        Page 13 of 17
 
1
  'J
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQUESTS Identifier: RR-tWCW (Part I of 3)
Component: Two (2) examinations in two categories RHEAS'E1A,HW101A (C-A)
RHEAS'E1A,HW102A (C-B) t System
 
==Title:==
Residual Heat Removal Function: Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (I) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
Code Class: ASME Section      XI Class  2 Examination Requirements: 100% volumetric examination of the volume depicted in Code Figure IWC-2500-I per Examination Category C-A, Pressure Retaining Welds in Pressure Vessels, Item No. C1.10, Shell Circumferential fields, and, both 100% volumetric and surface examinations of the volumes and areas depicted in IWC-2500-4(a) or (b) per Examination Category C-B, Pressure Retaining Nozzle Helds in Vessels, Item No.
C2.21, Nozzle to shell (or head) 8'elds in Nozzles 8'i thout Reinforcing Plates in Vessels Y~ in. Nominal Thickness.
Burden: Accessibility is limited due to permanent interferences.
Recommended Substitute: Perform volumetric and/or surface examination to maximum extent possible for each.
Technical Justification and Data to Support the Determination: A significant portion of the required code coverage has been achieved, as noted below, for each of the two welds for which relief is requested. This coverage assures an acceptable level of inservice structural integrity. To increase the % of coverage, major redesign and modification would be required without a compensating increase in the level of quality or safety.
RHEAs'E1A,Hw1 01A 78% UT coverage achieved RHEAs'E1A,Hw102A 100% MT Ec 80% UT coverage achieved NMP2-IS  14m6 Rev.1                                  Appendix F                                        Page 14 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQVESTS Identifier: RR-lWCN (Part 2 of 3)
Component: 2csH-amFIN300 (C-C) and RHEA&46-22-Fw019 (C-F-1).
System Titles (2): High Pressure Core Spray and Residual Heat Removal Functions (2): 1) The High Pressure Core Spray System maintains reactor vessel coolant inventory (water level) in the event of a small break (less than I inch) which does not result in rapid reactor depressurization. 2) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface examination of the integrally welded attachments on piping as depicted in Code Figure No. IWC-2500-5 per Examination Category C-C, Integral Attachments for Vessels, Piping, Pumps, and Valves, Item No. C3.20, Integrally 0'elded Attachments to Piping, and 100% surface and volumetric examination of a weld neck flange to pipe weld, as depicted in Code Figure No. IWC-2500-7, per Examination Category C-F-I, Pressure Retaining fields in Austenitic Stainless Steel or High AlloyPiping, Item No. C5.11, Circumferential 0'elds in Piping 2~lnin. Nominal Hall Thickness for Piping > NPS 4.
Burden: Accessibility is limited due to permanent interferences.
        ~
Recommended Substitute: Perform volumetric and/or surface examinations to maximum extent.
                            ~
Technical Justification and Data to Support the Determination: A significant portion of the required code coverage has been achieved, as noted below, for three of the four welds for which relief is requested. This coverage assures an acceptable level of inservice structural integrity. To increase the % of coverage, major redesign and modification would be required without a compensating increase in the level of quality or safety.
2csH-25-09-Fw300; 55% MT coverage achieved RHEA6-66-22.Fw019; 50% UT 4 100% PT coverage achieved NMP2-IS I406 Rev.1                                  Appendix F                                          Page 15 of 17
 
SECOND TEN-YEAR INTERVAL ISI RELIEF REQVESTS Identifier: RR-lWCN (Part    3 of 3)
Component: Twenty (20) surface examinations on eight (8) valves: 2cst. Hcv118; 2cst.'Hcv119; 2CSL MOV112; RHEASiMOV1C; RHEASiMOV2A;RHEAS'MOVBA; RHEAS'V376; RHEAS'V378 System Titles (2): Low Pressure Core Spray (LPCS); Residual Heat Removal Functions (2): 1) The LPCS System provides coolant inventory and spray cooling during large breaks in which the core is calculated to uncover. Also, following a small break with initiation of the Automatic Depressurization System, it provides coolant inventory makeup. 2) Using three (3) independent loops of piping, the Residual Heat Removal System provides five (5) distinct functions: (1) low pressure coolant injection, (2) shutdown cooling, (3) containment spray/suppression chamber spray, (4) suppression pool cooling, and (5) steam condensing.
Code Class: ASME Section XI Class 2 Examination Requirements: 100% surface (inside or outside) examination of valve body welds per Examination Category C-G,Pressure Retaining Welds in Pumps and Valves, Item C6.20, Valve Body 8'elds,            as depicted in Fig. No. IWC-2500-8 for the representative in each group of valves of similar design.
Burden: Accessibility is limited due to permanent interferences.
Recommended Substitute: Perform surface examinations to maximum extent possible for each.
Technical Justification and Data to Support the Determination: A significant portion of the required code coverage has been achieved, as noted below, for the twenty welds for which relief is requested. This coverage assures an acceptable level of inservice structural integrity. To increase the % of coverage, major redesign and modification would be required without a compensating increase in the level of quality or safety.
2csL'Hcv118,vwHcv118-c; 86% MT coverage                        RHEAs'v376, vwv376-Lw; 82% coverage 2csL'Hcv118,vwHcv118-D; 86% MT coverage                        RHEAs'v378, vwv378-Lw; 81% coverage 2csL'Hcv118,vwHcv118-Lw; 76% PT coverage                  RHEAs'MovBA,vwMovBA-D;80% PT coverage
'CSL    HCV1 19yWVHCV1 19 Ct 60% PT coverage 2csL'Hcv119,wvHcv119-D; 80% PT coverage 2csL'Hcv119,wvHcv119-Lw; 82% MT coverage 2csL Mov112,vwMov112-c; 80% MT coverage 2csL'Mov1 1+vwMov112-D; 60% PT coverage 2csL'Mov1 1+vwMov112-Lw; 87% MT coverage 2csL'v121,vwv121 w; 80% MT coverage 2csL'v121,YBw1214w; 87% MT coverage RHEAs'Mov1c,vwMov1c-c; 70% PT coverage RHEAs'Mov1c,vwMov1c-D; 84% PT coverage RHEAs'Mov1c,vwMov1c-Lw; 81% PT coverage RHEAs'Mov2A,vwMov2A-c; 60% PT coverage RHEAs'Mov2A,vwMov2A-D; 80% PT coverage RHEAs'MovBA,vwMovBA-c;60% PT coverage NMP2-ISI406 Rev.1                                  Appendix F                                        Page16of17
 
SECOND TEN-YEAR INTERNAL ISI RELIEF REQUESTS Identifier: RR-IWFK Component: Inservice Inspection Requirements for Snubbers listed in Article IWF-5000 of the ASME B&PV Code, Section XI, 1989 Edition, Division 1 System Titles:  All ASME Code    Class 1, 2 &3  systems.
Functions: Sampling criteria requirements per ASME Section XI, IWF-5000.
Code Class: ASME Section XI Class 1, 2      & 3.
Examination Requirements: IWF-5000 invokes the snubber examination requirements of the first Addenda to ASME/ANSI OM-1987, Part 4 (published 1988).
Burden: Relief is requested from Article IWF-5000 "Inservice Inspection Requirements for Snubbers". The article provides rules and requirements for the inservice examination of snubbers in accordance with the first addenda to ASME/ANSI OM-1987, Part 4 (published 1988) titled "Operation and Maintenance ofNuclear Power Plants". Part 4 of the OMa-1988    requirements (specifically, the examinations to be conducted at 18-month intervals and the subsequent examination schedule adjustment) does not fit into Nine Mile Unit 2's 24 month refueling cycles.
Recommended Substitute: All inservice inspection of snubbers shall be performed per the requirements        of section 3/4.7.5 of the Nine Mile Point Unit 2 Technical Specification (TS).
Technical Justification and Data to Support the Determination: In addition to the ASME Section XI requirements of IWF-5000, an augmented inservice inspection program for snubbers is required by TS 3/4.7.5.
The above-mentioned TS was amended (Amendment No. 29 dated May 6, 1991) to incorporate the recommendations on snubber visual inspection frequencies, as contained in Generic Letter 90-09, titled "Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions". The augmented snubber program provides the necessary assurance for snubber operability and visual examination requirements to fulfillthe ASME Section XI Code requirements without duplicating the inspections. This sampling program is practical and provides an acceptable level of quality and safety, as permitted by paragraph (a)(3)(i) of 10CFR So.ssa.
 
==Reference:==
(1)    First Ten- Year Interval Relief Request No. RR-IWF-4 (2)    Generic Letter 90-09 "Alternative Requirements for Snubber Visual Inspection Intervals and Corrective Actions" (3)    SER dated 10/24/90 NMP2-ISI406 Rev.1                                    Appendix F                                      Page 17 of 17
 
NIAGARA MONANK POHER CORPORATION -        H      ILE POINT NUCLEAR STATION - UNIT 2 NMP2-ISI-006( REV. 1( CN 000                                    SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                            APPENDIX    G - ASS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED  )
DESCRIPTIOH OF ITEM TO BE EXAMINED)CATGRY (IGSCC) EX1/NDE PROCEDURE [PERIOD          1                        REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR COMPONENT DllG    &#xb9;  I ITEM &#xb9; IFREOYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK  &#xb9; I LINE  NO  AND NOTES'S  APPLICABLE ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i SHL/PIPE                          /C-F-2  /  na    / VOL/UT6.02 2ASS-20-01-FH001        i QISO 20-01          or DUG&#xb9; na  in /C5.51  /none    /  SUR/PT3.00/MT4.00    /          I NMP2-6-.562-CS    I LINE&#xb9; 2ASS-006-125-4 HTS: 1,2      ISO      I    2    I na /na                I          I I PIPE/*MOV148                      /C-F-2  (  na    )
VOL/UT6.02                      I 2ASS-20-01-Fll002        i Ql SO 20-01        or DMG&#xb9; na  in JC5.51  (none    f  SUR/PT3.00/MT4.00    J HMP2-6-.562-CS    (
LINE&#xb9; 2ASS-006-125-4 NTS: 2(4      JSD      (    2  ( na /na I PIPE/ELB                          JC-F-2    f  na    ) VOL/UT6.02                      I 2ASS-20-01-SHGDI        I 9 ISO 20-01        or DUG&#xb9; na  in JC5.51    [ ID    ]  SUR/PT3.00/MT4.00 ]Sc8 NMP2-6-.562-CS    f LINE&#xb9; 2ASS-006.125-4 Nl'S: 2,3    JSD      f    2  f  na /na                          I I ELB/PIPE                          JC-F-2    f  na    / VOL/UT6.02                      I 2ASS-20-01-SI502        i Ql SO 20-01        or DNG&#xb9; na  in [C5.51    ]none    (  SUR/PT3 F 00/MT4.00  J NMP2-6-.562-CS    f LINE&#xb9; 2ASS-006-125-4 HTS: 3,2      JSD      /    2  f na /na EHD OF SYSTEM ASS
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1,    CH~
System: ASS General Notes
: 3. 6 Sch. 120 Elbow, A234 WP8
: 1. 16" X 6'ch. 80 Sweepolet, A105                                4. 6 Valve, SA-105
: 2. 6 Sch.120Pipe,A106Gr. B
 
NIAGARA NOHAMK POWER CORPORATION            -        NILE POINT NUCLEAR STATION    - UNIT 2                      1 of 25 HHP2-ISI-006, REV. 1, CH.OOO                                          SECOND TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPEHDIX G -  CSH SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED      DESCRIPTION OF ITEH TO BE EXAHINEDJCATGRY          IGSCC( EX1/NDE PROCEDURE [PERIOD          1                                  REMARKS
(                                                    )
EXAHIHATION IDENTIFIER  )  ITS ISO LOCATOR,  COHPOHENT DMG  &#xb9;,  [ITEN  &#xb9;  JFREOYJ        EX2/HDE PROCEDURE ]PERIOD 2    f USE CAL BLK &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I i <<AOV108 BLTG
                                                                  /8-G-2 / na          /    VT1/VT2.01              Sc7 2CSH<<AOVIOB,VBNOO      I QISO 25-10          or DMG&#xb9; 003 in (87.70 )ID              f  na /na              I
                        )  LINE&#xb9; 2CSH-012-15-1 NTS: (none) JGrp Rep) 1                  J na  /na              I
                            *AOV108  INI'UR                      JB.H-2    ]  na      J VT3/VT2.01                      J>> Examine  shen dissassemble for maintenance 2CSH<<AOV108,VBY100      I  QISO  25-10          or DMG&#xb9; 003    in JB12.50 [DlsG        f  na /na                /<<
                        )
LINE&#xb9; 2CSH-012-15-1 NTS: 5            (Grp Repf      'I J
na  /na              /<<
I
                            *HCV120 IHT SUR                        IB-H-2    I  na      I  VT3/VT2.01            /<<        (>> Examine when dissasseahie  for maintenance 2CSH*HCV120,VBY101      I  QISO  25-10          or DMG&#xb9; 008    in JB12.50 )DisG        (
na /na                )<<
(  LINE&#xb9; 2CSH.012-46-1 NTS: 6            /Grp Rep/      1    f  na /na                i>>
I
                            *NOV107 BLTG                          IB-G-2 I na          I  VT1/VT2.01            I 2CSH>>NOV107, VB100      I  QISO  25-09          or DWG&#xb9; 012 in )B7.70 [ID              )  na /na                  Sc9
[  LINE&#xb9; 2CSH-012-4-1      HTS: (none)    [Grp Rep) 1          )  na /na                I I
                            *NOV107 INT SUR                        /B-H-2 / na            /  VT3/VT2.01            I        [<<Examine when dissassemble    for maintenance 2CSH>>HOV107, VBY102      I  QISO 25-09          or DWG&#xb9; 012 in )B12.50 (DisG            )
na  /na              /<<
f  LINE&#xb9; 2CSH-012-4-1      NTS: 11        (Grp Rep) 1            f  na  /na              /<<
I
                            *Pl  PIPE/MNF                          /C-F-2    /  na      /  VOL/RT5.00                      [Deseiected 2CSH>>P1,PM200            J QISO  25-08          or DMG&#xb9; 027. in /C5.51      /none      /  SUR/PT3.00/NT4.00    /
                        /  LINE&#xb9; 2CSH-016-na-2 NTS: 58,39        /SD        /    2      /  na /na I
                            <<P1 HD/PIPE                            (C-F-2    J na      )  SUR/PT3.00/NT4.00    f  Sc7 2CSH*P1, PM201              QISO  25-08          or DWG&#xb9; 027 in (C5.81      )ID            na  /
                          )
I LINE&#xb9; 2CSH 016 na 2 HT      '7  58    ITE        I    2
[
I na /na I
I I
                            *P1  HD  COVER/HD SNL                  JC-G      f  na      f SUR/PT3.00/HT4.00    f  Sc7 2CSH<<P1,PM203            I QISO  25-08          or D'WG&#xb9; 027 in [C6.10 ]ID              [ na  /na f  LINE&#xb9; 2CSH-na-na-2      NTS: 57,59    /Handate/ 2            / na  /na              I I
                            *P1 MNF/PIPE                          IC-F-2    I  na      I VOL/RT5.00/UT6.02    I 2CSH*P1,PM204            i QISO 25-05            or  DMG&#xb9; 027  in IC5-51    lnone        I SUR/P'T3.00/HT4 F 00 I NHP2-RHS-.75-CS    f  LINE&#xb9; 2CSH-024-na-2    NTS: 38,50    JSD      /    2      / na  /na
 
NIAGARA HOHAMK POWER CORPORATION          -      NILE POINT HUCLEAR STATION - UNIT 2                          2 of 25 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                    APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED  (
DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/HDE PROCEDURE            (PERIOD  1                                  REHARKS EXAHINATIOH IDENTIFIER    (
ITS ISO LOCATOR,  COHPONENT DWG    &#xb9;, (ITEN &#xb9;    (FREOY( EX2/NDE PROCEDURE (PERIOD 2        (
USE CAL BLK  &#xb9; I  LINE HO. AND NOTES, AS APPLICABLE (SELECT      (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I
                              *P1 PIPE/HO                            (C-F-2    (
na  (
SUR/PT3.00/HT4.00  (
2CSN~PI,PM205            (
aiso 2s-os          or  DMG&#xb9; 027  in  (C5.81    (none  (  na  /
na                  (
LIHE&#xb9; 2CSH-024-na-2    NTS: 50,57    (TE      (
2    (
na  /na            I I
                              *P1 HD/FLG                            (C-G      (
na    (
SUR/PT3.00/HT4.00  (
Sc7 2CSH*P1,PM206            I QISO 25-08            or  OMG&#xb9;  027 in  (C6.10 (ID        (
na /na na                  (
LINE&#xb9; 2CSH-na.na-2      NTS: 57,60    (Handate(    2    (
na /na              I IMC-1      I
                              *P1 UPR BARREL FLG/SHL                (C-G      (
na    (
SUR/PT3.00/HT4.00  (*        (* Examine  When dissassembie for maintenance 2CSH*PI,PW207              I QISO 25-            or  DMG&#xb9; 027  in  (C6.10 (IO        (
na /na              I*
(  LINE&#xb9; 2CSH-na-na-2      HTS: 61,62    (Handate( 2        (
na /na              I IMC-1      (
                              *P1 UPR BARREL/LMR BARREL              (C-G      (
na      SUR/PT3.00/HT4.00  (*        (>> Examine When dissassemble  for maintenance 2CSH*P1,PW208              (
QISO 25-            or  DWG&#xb9;  027  in (C6.10 (ID            na /na              (*
(  LINE&#xb9; 2CSH-na-na-2      NTS: 62        (Handate( 2          na /na              (*
IMC-1      I
                              *P1  LWR BARREL SHL/HD                (C-G      (
na      SUR/PT3.00/HT4.00  (*          (* Examine Ken dissassemble  for maintenance 2CSN*P1,PW209                QISO  25-            or O'MG&#xb9; 027 in (C6.10 (ID              na /na              (*
(  LINE&#xb9; 2CSH-na-na-2      HTS: 62,63    (Handate(    2      na /na
(
                              *P1 LM                                (C-G      (
na    (
SUR/PT3.00/HT4.00      Sc7 2CSH~P1,PM210              (  QISO  25-08          or DMG&#xb9; 027. in (C6.10 (ID            (
na  /na              I
(
LINE&#xb9; 2CSH-na-na-2      NTS: 57        (Handate(      2    ( na /na              I IWC-1        (
                              ~Pl HID BARREL SHL/LMR BARREL SHL (C-G            ( na SUR/PT3.00/HT4.00    (*        (~ Examine When dissassemble  for maintenance 2CSN*P1,PM212              (
also  25-            or  DWG&#xb9;  027  in (C6.10    (IO        na /na              I
(
LINE&#xb9; 2CSH-na-na-2    NTS:  62      (Handate(      2      na /na
(
                              <<P1 LM                                  (C-F-2    (
na    ( VOL/RT5.00                      (Deselected 2CSH*PI,PW215              ( QISO 25-08          or OMG&#xb9; 027    in  (C5.52    (none    (
SUR/PT3.00/HT4.00
(
LIHE&#xb9; 2CSH-016-na.2    HTS: 58        (AL      (
2    ( na  /na
(
                              *P1 LM                                (C-F-2    (
na    (
VOL/RT5.00/UT6.02    (
2CSH*P1,PM216              (  QISO 25-            or DWG&#xb9; 027    in (C5.52    (none    (
SUR/PT3.00/HT4.00    (
HHP2-RHS-.75-CS      (  LINE&#xb9; 2CSH-024-na-2    NTS: 50        (AL      (
2    (
na  /na
 
NIAGARA MOHAMK POMER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2                          3 of 25 NMP2-ISI.006( REV. 1, CH.000                                                  SECOND TEN YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date:    07/29/1999                                                                          APPENDIX G - CSH SYSTEH (sorted by Examination Identifier)
ND  IHTVL REL REQ  I    DESCRIPTION      F ITEM TO BE EXAMINEDICATGRY lIGSCCI EX1/NDE PROCEDURE              IPERIOD  1  I                                REMARKS EXAMINATION IDENTIFIER j ITS ISO LOCATOR, COMPONENT DMG                &#xb9;,  LITEM  &#xb9; ifREQYi EX2/NDE PROCEDURE      iPERIOD 2 USE CAL BLK  &#xb9; [    LINE  NO. AND NOTES,  AS  APPLICABLE    [SELECT  iCLASSi EX3/NDE PROCEDURE      iPERIOD 3  (
IMC- I    I
                                <<P1 L'M UPR BARREL SHL                    IC-G      I  na    I  SUR/PT3.00/MT4.00 I>>          i>> Examine when dissassemble    for maintenance 2CSH<<P1,PM217              I    QISO 25-                or  DMG&#xb9;  027  in iC6.10      iID      i na  /na            J>>
LINE&#xb9; 2CSH-na-na-2        HTS: 62        iMandatei      2    i na  /na            I*
INC-1      I
                                *P1  L'M  MID BARREL SHL                  IC    G    I  na    I  SUR/PT  'MT        i>>        [>> Examine when dissassembie    for maintenance 2CSH*P1, PM218            i    QISO 25-                or DMG&#xb9; 027    in iC6.10 iID          i na /na              i>>
i  LINE&#xb9; 2CSH-na-na-2        HTS: 62        iMandatei      2    i na /na              i>>
IMC-1      I
                                *Pl  LM LMR BARREL SHL                    IC-G      I  na    I  SUR/PT3.00/MT4.00 I>>          i>> Examine when dissassemble    for maintenance 2CS H*P1, PM219            J QISO 25-                or  DMG&#xb9;  027  in iC6.10      iID      i na  /na            i>>
na                    /  LINE&#xb9; 2CSH-na-na-2        NTS: 62        iMandatei      2    )
na  /na            i>>
i LM IC-F-2    i na    /
VOL/U'T6.02 2CSH*STRT1,S'IRT-L'M001    I  QISO 25-05              or  DMG&#xb9; 030  in iC5.52      lnone    i  SUR/PT3.00/MT4.00  /
NHP2-20-.375.CS      I  LINE&#xb9; 2CSH.020-2-2        NTS: 36        INS            2    i na  /na i MNF/PIPE                                    IC-F-2    j na    i VOL/UT6.02 2CSH*STRT1,STRTMELD003Ai QISO 25-05                    or  DMG&#xb9; 030  in  iC5.51    inone    i SUR/PT3.00/MT4.00 i NMP2-20-.375-CS      I  LINE&#xb9; 2CSH.020-2-2        NTS:  35,36    ISD            2    i na  /na            I I  EXT RING/TEE                                IC-F-2    i na    / VOL/UT6.02 2CSH<<STRTI,STRTMEL0003Bi QISO 25-05                    or  DMG&#xb9; 030. in  iC5.51    inone i SUR/PT3.00/MT4.00      i NMP2-20-.375-CS        I  LINE&#xb9; 2CSH-020-2-2        HTS:  34,36      I SD          2    i na  /na            I I  PIPE  /  PIPE                            iC-F-2              i VOL/                            iAdded  NEM  record/Exam Identerfier 2CSH-25-01-f M002            i QISO 25-01              or  DMG&#xb9;        in iC5.51              i SUR/                            I LINE&#xb9; 2CSH.016.43-2        NTS:            I          I  2    I                                I I ELBOM    /  PIPE                            IC-F-2              / VOL/                            iAdded  NEM  record/Exam ldenterfier 2CSH-25-01-FM003            i QISO 25-01              or  DMG&#xb9;        in  iC5.51    I        I SUR/                            I LINE&#xb9; 2CSH.016-43-2      HTS:            I          I  2    I                                I i ELBOM    /  PIPE                            IC-F-2              i VOL/                            iAdded  NEM  record/Exam Identerfier 2CSH-25-01-FM003            I  QISO 25.01            or  DMG&#xb9;        in  JC5.51    I        I SUR/                            I I  LINE&#xb9; 2CSH.016.43-2      NTS              I          I  2    I                                I
 
NIAGARA KONAMK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2                  4 of 25 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION        (ISI)    IHTERVAL PLAN Change  date:  07/29/1999                                                                      APPENDIX G - CSH SYSTEH (sorted by Examination Identifier)
HD IH'IVL REL REQ I DESCRIPTIOH OF      ITEN To BE EXAHIHEDICATGRY llGSCCI EX1/NDE PROCEDURE IPERIOD            1  I                              REHARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHl'MG            &#xb9;,  )ITEN    &#xb9; iFREOYJ EX2/NDE PROCEDURE    iPERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AHD NOTES, AS APPLICABLE DESELECT            iCLASSJ EX3/NDE PROCEDURE iPERIOD 3 PIPE  / PIPE                            IC-F-2                vou                          iAdded  NEM record/Exam Identerfier 2CSH-25-01-FM004 I
i QISO 25-O1              or  DMG&#xb9;      in  iC5 ~ 51  I' I        i i SUR/                          I I  LINE&#xb9; 2CSH-016-43-2      HTS:          I                                                    I i ELBOW      / PIPE                          IC-F-2    I        )  vou                          iAdded  NEM record/Exam Identerfier 2CSH-25-01-FM006          i QISO 25-OT              or  DMG&#xb9;      in  )C5.51    I          SUR/                          I i  LINE&#xb9; 2CSH-16-43-2        HTS:          I            2                                      I i PIPE    /  ELBOW                        IC-F-2    I        i VOL/                          iAdded  NEM record/Exam Identerfier 2CSH-25-01-FMSM003        i Qisa 25-O1              or DWG&#xb9;      in iC5.51      I        I  SUR/                          I i  LINE&#xb9;    2CSH.016-43-2    HTS:          I            2                                      I I  PIPE  /  ELBOW                        IC.F-2    I        (  VOL/              I          iAdded NEll record/Exam  Identerfier 2CSH-25-01-SW001          i QISO 25-01              or  DMG&#xb9;      in  JC5.51    I        I SUR/                I I  LINE&#xb9; 2CSH-016-43-2      NTS:          I          I  2                          I I ELBOW    /  PIPE                        IC-F-2    I        J VOL/                          (Added  NEM record/Exam Identerfier 2CSH-25-01-SM002          (  QISO 25-01            or  DWG&#xb9;      in  JC5.51    I        I  SUR/                          I I  LINE&#xb9; 2CSH-016.43-2      NTS            I            2                                      I i PIPE    / ELBOW                          IC-F-2    I        )  vou                          iAdded  NEM record/Exam Identerfier 2CSH-25-01-SM004          I QISO 25-01              or  DMG&#xb9;    . in  iC5.51    I        I SUR/                          I I  LINE&#xb9; 2CSH-016-43-2      HTS:          I              2                                    I I ELBOW    /  PIPE                        IC-F-2    I        i  vou                          iAdded  HEM record/Exam Identerfier 2CSH-25-01-SM005          i QISO 25-O1              or  DMG&#xb9;      in iC5.51    I        I  SUR/                          I i LINE&#xb9; 2CSH-016-43-2        HTS:          I          I  2                                    I I  PIPE  / ELBOM                          IC-F-2    I        i  vou                          iAdded  HEM record/Exam Identerfier 2CSH-25-01-SM006          i QISO 25.01              or DMG&#xb9;        in )C5.51    I        I SUR/                          I L I HE&#xb9;  2CSH-016-43-2    NTS:          I          I  2                                    I I ELBOW    /  PIPE                          IC-F-2    I        [ VOL/                          iAdded  HEM record/Exam Identerfier 2CSH.25-01-SM007            I QISO 25-01            or  DMG&#xb9;      in iC5.51      I        I SUR/                          I I LINE&#xb9; 2CSH-016-43-2      NTS:            I          I  2                                      I
 
NIAGARA NOHAMK POWER CORPORATIOH    -      NILE POINT NUCLEAR STATION - UNIT 2                  5 of 25 NHP2-ISI-006t REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION    (ISI)    INTERVAL PLAN Change date:    07/29/1999 .                                                              APPENDIX G - CSH SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED    )
DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE        )PERIOD  1  )                              REMARKS EXAHINATION IDENI'IFIER  )
ITS ISO LOCATOR,    COHPONENT DMG    &#xb9;, )ITEN &#xb9;  )FREOY) EX2/NDE PROCEDURE  )PERIOD 2  )
USE CAL BLK  &#xb9; I  LINE ko. AND NOTES, AS  APPLICABLE )SELECT )CLASS) EX3/NDE PROCEDURE    )PERIOD 3 I
                          )  PIPE /  ELBOW                          IC-F-2          )  vou                          )Added  HEM record/Exam Identerfier 2CSH-25-01-S'I$ 08        )
QISO 25-01            or  DMG&#xb9;      in )C5.51          I SUR/
                                                                                                                    'I
                          )  LINE&#xb9; 2CSH-016-43-2      HTS:          I          2                                    I PIPE /  ELBOW                          IC-F-2          )  vou                          )Added  NEM record/Exam Identerfier 2CSH-25-01-Sl$ 09        I  QISO 25-01            or  DMG&#xb9;      in )C5 ~ 51        ) suR/                          I LINE&#xb9; 2CSH-016-43-2      NTS:          I          2                                    I I  PIPE /  PIPE                          IC-F-2          )
vou                          )Added  NEM record/Exam Identerfier 2CSH-25-01-SM010          I  QISO 25-01            or  DWG&#xb9;      in )C5 ~ 51        )
suR/                          I I  LINE&#xb9; 2CSH-016-43-2      NTS:          I          2                                    I PIPE /  PIPE                          IC-F-2          )
VOL/                          )Added NEll record/Exam  Identerfier 2CSH-25-01-SM011            QISO 25-01            or  DMS&#xb9;      in )C5.51            SUR/
LINE&#xb9; 2CSH.016-43-2      NTS:          I          2 I  PIPE /  PIPE                          IC-F-2          )
VOL/                          )Added HEll record/Exam Identerfier 2CSH-25-01-9513          )
QISO 25-01            or  DMG&#xb9;      in )C5.51          )
suR/
I  LINE&#xb9; 2CSH-016.43-2      NTS:          I          2
                          )
PIPE /    PIPE                          IC-F-2          ) VOL/                          )Added HEll record/Exam Identerfier 2CSH-25.01-SW014          I QISO 25-01            or  DMG&#xb9;    . in )C5.51          ) SUR/
                          )
LINE&#xb9; 2CSH.016-43-2      NTS:                      2    )
ELBOW  / PIPE                          IC-F-2          ) VOL/                          )Added HEll record/Exam Identerfier 2CSH-25-03-Fl$ 02          )
QISO 25-03            or  DMG&#xb9;      in )C5.51          I SUR/                          I I LINE&#xb9; 2CSH.016-43-2      NTS:          I          2                                    I
                          )
ELBOM  /  PIPE                        IC-F-2          ) vou                            )Added  NEM record/Exam Identerfier 2CSH-25-03-FW003          )
QISO 25-03            or  DMG&#xb9;      in )C5.51          )
suR/                          I I LINE&#xb9; 2CSH-016-43-2      NTS:          I          2                                    I
                          ) PIPE  /  PIPE                          IC-F-2          ) VOL/              I          )Added NEll record/Exam Identerfier 2CSH-25.03-FI$ 04          ) QISO 25-03            or  DMG&#xb9;      in )C5.51          ) suR/              I          I I LINE&#xb9; 2CSH-016-43-2      NTS:          I          2    )    I              I          I
 
NIAGARA MOHAMK POMER CORPORATION -              MILE POINT NUCLEAR STATION - UNIT 2                    6 of 25 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX G - CSH SYSTEM (sorted by Examination Identifier) 2HO INTVL REL RED i OESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY            irGSCCi EX1/HDE    PROCEDURE iPERIOO  1  (                                REHARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG        &#xb9;,  LITEM    &#xb9; JFREQYi EX2/NDE PROCEDURE    iPERIOO 2 USE CAL BLK  &#xb9; i  LINE HO. AND NOTES,  AS  APPLICABLE  DESELECT  /CLASSY EX3/NDE PROCEDURE    iPERIOO 3 i PIPE  / ELBOM                            IC-F-2            i VOL/                            iAdded HEll record/Exam  Identerfier 2CSH-25-03-FM009        )  QISO 25-03            or OMG&#xb9;      in iC5.51                  SUR/
i LINE&#xb9;    2CSH.016-43-2    HTS:          I          I  2    I I  PIPE /  PIPE                            IC-F-2              I  VOL/                          iAdded  NE'M record/Exam Identerfier 2CSH-25-03-FM010        i QISO 25-03              or  DMG&#xb9;      in  iC5 ~ 51            i SUR/                          I I  LINE&#xb9; 2CSH.016-43-2      NTS:          I            2    i    /                          I I  PIPE / PIPE                            IC-F-2              i VOL/                          iAdded  HEM  record/Exam Identerfier 2CSH-25-03-FM013        i QISO 25-03            or  DMG&#xb9;      in  )C5.51              I  SUR/                          I I  LINE&#xb9; 2CSH.016-43-2      HTS:          I            2    I                                I i PIPE  /  PIPE                            IC-F-2              i VOL/                I          iAdded  NEM  record/Exam Identerfier 2CSH-25-03-Fl$ 14        I  QISO 25-03            or  DMG&#xb9;      in iC5.51              I  SUR/              I          I
                        )
LINE&#xb9; 2CSH-016.43.2      NTS:          I            2                          I          I i ELBOM  /  PIPE                          IC-F.2              (  VOL/                          iAdded  HEM  record/Exam Identerfier 2CSH-25-03-FM015        I  QISO 25.03            or DMG&#xb9;        in iC5.51                SUR/                          I LINE&#xb9; 2CSH-016.43-2 NTS:                I              2                                      I I  PIPE /  PIPE                          iC-F-2              i VOL/                            iAdded  HEM  record/Exam Identerfier 2CSH-25-03-Fl$ 21        i QISO 25-03            or  OMG&#xb9;    . in iC5.51              I SUR/                            I I  LIHE&#xb9; 2CSH-016.43-2      NTS:            I            2                                      I I PIPE /  PIPE                            IC-F-2              i VOL/                          iAdded  HEM  record/Exam Identerfier 2CSH.25-03-Fl$ 22        i QISO 25-03            or  DMG&#xb9;      in iC5.51              I SUR/                          I I LINE&#xb9; 2CSH-016-43-2      NTS:            I            2                                      i I PIPE /  PIPE                            IC-F-2              / VOL/                          iAdded NEll record/Exam  Identerfier 2CSH-25-03-FM023          I QISO 25.03            or DMG&#xb9;        in iC5.51              I SUR/                          I I LIHE&#xb9; 2CSH-016-43-2 HTS:                I            2                                      I I PIPE /  PIPE                            IC-F-2              i VOL/                          iAdded  HEM  record/Exam Identerfier 2CSH-25-03-FM028          I QISO 25 03            or  DMG&#xb9;      in iC5.51              I SUR/                          I I  LINE&#xb9; 2CSH.016-43-2    HTS:            I            2                                      I
 
0 NIAGARA HOHAMK POMER CORPORATION -              ILE POINT NUCLEAR STATION - UHIT 2                                            7 of 25 NHP2-IS1-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION      (ISI)    INTERVAL PLAN Change  date:  07/29/1999                                                                  APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY            IIGSCCI EX1/HDE PROCEDURE IPERIOO    1  I                                REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPONEHT DMG          &#xb9;i  I ITEN  &#xb9; IFREQYI EX2/NDE PROCEDURE IPERIOO 2    I USE CAL BLK  &#xb9; I  LINE No. AND NOTES'S    APPLICABLE  ISELECT    ICLASSI EX3/NDE PROCEDURE IPERIOO 3    I I  PIPE /  ELBOM                        IC-F-2            i VOL/                          iAdded  NEM record/Exam  Identerfier 2CSH-25-03-SM001          I QISO 25-03            or  DMG&#xb9;      in iC5.51            I SUR/                          I I  LINE&#xb9; 2CSH-016-43-2    NTS:          I            2                                    I i PIPE  /  ELBOM                        IC-F-2            i VOL/                          iAdded  HEM record/Exam  Identerfier 2CSH-25-03-SMD02          I QISO 25-03          or DMG&#xb9;      in  JC5.51            I SUR/                          I i LINE&#xb9; 2CSH.016.43-2 NTS:                I            2                                    I i PIPE  /  ELBOM                        IC-F-2            i  VOL/UT6.24            H7    iAdded  NEM record/Exam  Identerfier. Hidcycie Exam PT/UT during Cycle 7.
2CSH-25-03-SM004          I  QISO 25-03          or  DMG&#xb9;      in iC5.51              I  SUR/PT3.00 NHP2-16-.375-SS      I  LINE&#xb9; 2CSH.016.43-2    NTS:          I PIPE /  PIPE                          IC-F-2            i VOL/                I        iAdded  NEM record/Exam  Identerfier 2CSH-25-03-SM005          I QISO  25-03          or DMG&#xb9;      in  iC5 ~ 51              SUR/              I        I I  LINE&#xb9; 2CSH-016-43-2 NTS:              I            2                          I        I I  PIPE /  PIPE                          ic-F-2            i VOL/                          iAdded  NEM record/Exam  Identerfier 2CSH-25-03-SM006          I  QISO 25 03          or  DMG&#xb9;      in iC5.51              I SUR/                          I I  LINE&#xb9; 2CSH-016-43-2    HTS:            I                                                I I  PIPE / PIPE                            IC-F-2            i VOL/                          iAdded  NEM  record/Exam Identerfier 2CSH-25-03-SM007          (
QISO 25-O3          or  O'MG&#xb9;    ,in  JC5.51            I SUR/                          I I  LINE&#xb9; 2CSH-016.43-2    NTS:                          2                                    I I  PIPE / PIPE                            IC-F-2            i VOL/                          iAdded  NEM  record/Exam Identerfier 2CSH-25-03-SMDOB          i QISO 25-O3          or  DMG&#xb9;      in iC5.51            I SUR/
I LINE&#xb9; 2CSH-016.43-2    HTS:            I            2 I ELBOM  / PIPE                          IC-F-2            i VOL/                          iAdded HEll record/Exam  Identerfier 2CSH-25-04-FM001            i QISO 25-04          or  DMG&#xb9;      in /C5.51              I SUR/                          I LINE&#xb9; 2CSH-016-43-2    Nj'S:          I            2                                    I I
ELBOM  / PIPE                          IC-F-2            I VOL/UT6.24            H7      iAdded HEll record/Exam  Identerfier. Hidcycie Exam PT/UT during Cycle 7.
2CSH-25.04-FM003            QISO 25-04          or  DUG&#xb9;      in  JC5.51            i SUR/PT3.00 NHP2-16-.375-SS        LINE&#xb9; 2CSH-016-43-2    NTS:            I
 
NIAGARA HOHAMK POMER CORPORATION -              HILE POINT NUCLEAR STATION - UNIT 2                    8of 25 NHP2-ISI-006( REV. 1I CH.OOO                                              SECOND TEN YEAR IHSERVICE INSPECTION      (ISI)    INTERVAL PLAN Change date:  07/29/1999                                                                      APPEHDIX G - CSH SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY [IGSCC[ EXl/NDE PROCEDURE ]PERIOD 1                                                      REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  JITEH  &#xb9; )FREGY( EX2/NDE PROCEDURE ]PERIOD 2 USE CAL  BLK &#xb9; I  LINE NO    AND NOTES ~  AS  APPLICABLE    ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  PIPE / HOV101                            /C-F-2            /  VOL/                          (Added HEll record/Exam  Identerfier 2CSH-25-04-FM004        i QISO 25-04              or DMG&#xb9;        in  /C5.51    I      I SUR/
LINE&#xb9;  2CSH-014-1-2      HTS:            I        I  2    I HOV101/P I PE                            IC-F-2    )
na    ]  VOL/UT6.02 2CSH-25 FM005        i QISO  25-04            or DMG&#xb9; na in (C5.51        Inone    I SUR/PT3.00/HT4.00  I NHP2-14-.375-CS    I  LIHE&#xb9; 2CSH-014-1-2        HTS: 14,15      ISD          2    f  na /na            I I  ELB/PIPE                                  IC-F-2    I  na    I  VOL/UT6.02        lEX6 2CSH-25.04-FM006          i QISO  25-04            or O'MG&#xb9; na in JC5.51        IID      I  SUR/PT3.00/HT4.00 I NHP2-14-.375-CS    I  LINE&#xb9; 2CSH-014-1-2        NTS: 15,16      ISD          2    /  na/na              I I  PIPE/~V59                                IC-F-2    J na    J VOL/UT6.02 2CSH-25-04-FM007          i  QISO  25-04            or  OMG&#xb9;  na  in  JC5.5'l    ]none  f  SUR/PT3.00/HT4.00  )
NHP2-14-.375-CS    I  LINE&#xb9;  2CSH-014-1.2      NTS:  15I17    ISD          2    /  na /na            I I
                            *V59/PIPE                                  IC-F-2    I na    I  VOL/UT6.02        I 2CSH-25-04-FM008          I  QISO 25-04            or  DMG&#xb9; na    in  (C5.51    )none  )
SUR/PT3.00/HT4.00  [
NNP2-14-.375-CS    I  LIHE&#xb9;  2CSH 014  1 2      NTS'5i17        ISD          2    [ na/na              I I  PIPE/TEE                                  IC-F-2    [ na    [ VOL/UT6.02 2CSH-25-04-FM009          i QISO 25-04            or  DMG&#xb9; na . in  JC5.51    Inone    I SUR/PT3.00/HT4.00  I NHP2-14-.375-CS      I LINE&#xb9; 2CSH-014-1-2        NTS: 15,18      ISO          2    [ na /na            I i PIPE  /  PIPE                              IC-F-2            ) VOL/                          )Added  NEM  record/Exam Identerfier 2CSH-25-04-FM011          I QISO  25-04            or  OMG&#xb9;      in  (C5.51    I        I SUR/                          I LINN 2CSH.016-43-2        NTS:            I        I  2    I                              I i PIPE  /  ELBOM                            IC-F-2            i VOL/                          ]Added  NEM  record/Exam Identerfier 2CSH-25-04-FM012            QISO 25-04            or  OMG&#xb9;        in (C5.51              / SUR/                          I I LINE&#xb9; 2CSH-016-43-2      HTS:            I        I  21                                    I I ELBOM  / PIPE                            IC-F-2            i VOL/                          (Added NEll record/Exam  Identerf ier 2CSH-25-04-FM013          I QISO  25-04            or DMG&#xb9;        in [C5.51              / SUR/                          I i  LINE&#xb9;  2CSH-016-43-2    NTS:            I        I  2    I                                I
 
NIAGARA HOHAWK POWER CORPORATION -            NILE POINT NUCLEAR STATION - UHIT 2                                          9 of 25 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                  APPEHDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED    i DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1                                              REHARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG          &#xb9;,  i ITEN &#xb9; iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3
I  PIPE /  PIPE                            IC-F-2            i VOL/                          iAdded NEll record/Exam Identerf ier 2CSH-25-04-FW016          i QISO  25-04            or DMG&#xb9;      in /C5.51                SUR/
I  LINE&#xb9; 2CSH.016-43-2 HTS:                I        I  2    I I  PIPE / PIPE                            IC-F-2            J VOL/                        iAdded  NEW record/Exam Identerfier 2CSH-25-04-FM029          I  QISO 25-04            or DUG&#xb9;      in  JC5.51              SUR/                        I
(
LINE&#xb9; 2CSH-016-43-2 NTS:                I        I  2    I                              I I  PIPE /  PIPE                            IC-F-2            i VOL/                          iAdded  NEW record/Exam Identerfier 2CSH-25-04-FM030          i QISO  25-04            or DWG&#xb9;      in iC5.51    I      I  SUR/                        I I  LINE&#xb9; 2CSH-016.43-2 NTS:                I        I  2    I                              I REDUCER  / PIPE                        IC-F-2            J VOL/UT6.23                  iAdded  NEW record/Exam Identerfier. Hidcycie Exam HT/O'I during Cycle 7.
2CSH.25.04-FMSW005            QISO 25-04            or  DWG&#xb9;      in iC5.51    I      I SUR/HT4.00/PT3.00            I NHP2-14-.375-CS        LINE&#xb9; 2CSH-014-1-2      NTS:          I        I  2    I                              I i PIPE  /  ELBOM                          IC-F-2            i VOL/                          iAdded HEll record/Exam Identerfier 2CSH-25-04-SW002          i QISO  25-04            or DMG&#xb9;      in iC5.5'I    I      I  SUR/                        I I  LINE&#xb9; 2CSH-016.43-2 NTS:                I        12      I                              I i PIPE  /  ELBOW                          IC-F-2            )  VOL/                        iAdded  HEW record/Exam Identerfier 2CSH-25-04-SW003          i QISO 25-04            or  DWG&#xb9;    ,  in iC5.51    I      I SUR/                          I I  LINE&#xb9; 2CSH.016.43-2      NTS:          I        I  2    I                              I I ELBOW  /  REDUCER                      IC-F-2            i VOL/UT6.24            H7    iAdded HEll record/Exam Identerfier. Hidcycie Exam PT/UT  during Cycle 7.
2CSH-25-04-SW004          i  QISO 25-04            or DUG&#xb9;        in (C5.51    I      I SUR/PIC 00          I        I NHP2 ~ 375-SS    I  LINE&#xb9;  2CSH-O'I6-43-2    NTS:          I        I  2    I                    I        I I  PIPE/ELB                                IC-F-2  i na    i VOL/UT6.02 2CSH-25-04-SW007          i QISO 25-04            or D'WG&#xb9; na in iC5.51      inone i SUR/PT3.00/HT4.00 i NHP2-14-.375-CS        LINE&#xb9;  2CSH-014-1-2      NTS 15,16      LSD      I  2    I na/na              I I  ELB/PIPE                                IC-F-2  ) na    i VOL/UT6.02 2CSH-25-04-SW008            I QISO 25-04            or DWG&#xb9; na in [C5.51        [none i SUR/PT3.00/HT4.00    i NHP2.14-.375-CS        LINE&#xb9; 2CSH-014-1-2      NTS: 15,16      LSD        2    i na /na
 
NIAGARA HOHAMK POWER CORPORATION -                NILE POINT NUCLEAR STATION - UNIT 2                  10 of 25 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEH YEAR INSERVICE INSPECTIOH      (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTION OF ITEN To BE EXAHINEDiCATGRY              iIGSCCi EX1/NDE    PROCEDURE iPERIOO  1                                REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, CDHPONEHT DMG            &#xb9;,  i ITEH &#xb9; iFREOYi EX2/NDE PROCEDURE    iPERIOO 2 USE CAL BLK &#xb9; I LINE Ho    AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/KDE PROCEDURE              IPERIOO 3 I I  PIPE/ELB                                    IC-F-2  I  na  I  VOL/UT6.02        I 2CSH-25-04-SW009        I  QISO 25-04            or  DMG&#xb9; na      in iC5.51    inone i SUR/PT3.00/HT4.00 i KHP2-14-.375-CS    I  LINE&#xb9; csH-014-1-2        NTs:  1    16    Iso          2  i na  /na I  PIPE/ELB                                    IC-F-2  i na    i VOL/UT6.02 2CSH-25-04-S'M011      I  QISO 25-04            or  DMG&#xb9; na      in  JC5.51  /none i SUR/PT3.00/MT4.00    i NHP2-14-.375-CS    I  LINE&#xb9; 2CSH-014-1.2      HTS:,15( 16        ISD          2    i na  /na I  ELB/PIPE                                    IC-F-2    i na    i VOL/UT6.02 2CSH-25-04-SM012        I oilSO 25 04            or  D'MG&#xb9;  na    in  iC5.51    )none  J SUR/PT3.00/HT4.00  i NHP2-14-.375-CS  I  LINE&#xb9; 2CSH-014.1-2      NTS: 15,16        Iso          2    / na/na              I I  PIPE  /  PIPE                              IC-F-2            i VOL/                          iAdded  NEM record/Exam Identerfier 2CSH-25-04-SM013        i QISO 25-04            or  DWG&#xb9;          in iC5.51    I      I SUR/                          I I  LINE&#xb9; 2CSH-016.43-2      NTS:              I        I  2    I                                I PIPE  / PIPE                                IC-F-2            i VOL/                          )Added  NEM record/Exam Identerfier 2CSH-25-04-SW014        i QISO  25.04          or DWG&#xb9;          in  iC5.51            i SUR/                          I LINE&#xb9; 2CSH.016-43-2 NTS                    I        I  2    I                                I PENET 212/RED                              iC-F-1    J na    ( VOL/UT6.03          I 2CSH-25-05-FM002        I QISO 25-05            or  DMG&#xb9; na . in iC5.11    iID    / SUR/PT3.00          JSc8 NHP2-20-.375-SS    i LINE&#xb9; 2CSH.020-13-2      HTS:  23,26      )7.5XHIn)    2    i na  /              I i *HOVI18/r IPE                              IC-F-2    i na    i VOL/UT6.O2 2CSH-25-05-FW003        i QISO 25.05            or  DMG&#xb9; na      in iC5.51    inone  i SUR/PT3.00/HT4.00  [
NHP2-18-.375-CS      LIHE&#xb9; 2CSH-018  45-2    NTS:  27,28      iSO          2    i na  /na I PIPE/ELB                                    IC-F-2    i na    i VOL/UT6.02 2CSH.25-05-FW004        I QISO  25.05          or DMG&#xb9; na in iC5.51            inone i SUR/PT3.00/H'I4.00    i NHP2-20-.375-CS    I LINE&#xb9; 2CSH.020.2-2      NTS 30,31          ISD          2    / na  /na I ELB/sv16                                    IC-F-2    ) na    ) VOL/UT6.02 2CSH-25-05-FW005        i QISO  25-05          or  DMG&#xb9;    na    in iC5.51    inone i SUR/PT3.00/HT4.00 NHP2-20-.375-CS    I LINE&#xb9; 2CSH-020-2-2    NTS:  30(32        ISO        2    ) na /na
 
NIAGARA HOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        11 of 25 NHP2-ISI-006, REV. 1I CH-000                                              SECOND TEN YEAR        INSERVICE IHSPECTION    (ISI) INTERVAL PLAN Change date:    07/29/1999                                                                        APPEHDIX G - CSH SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1                                              REHARKS EXAHINATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG            &#xb9;,  iITEH  &#xb9; iFREQYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK    &#xb9; I  LINE  NO  AND  NOTEsi  AS  APPLICABLE    ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  *V16/PIPE                                IC-F-2    I  na    I  VOL/UT6.02          I 2CSH-25 FWOI16        (  QISO 25-05            or  DWG&#xb9; na    in iC5.51    inone i SUR/PT3.00/HT4.00        J NHP2-20-.375-CS      I  LINE&#xb9; 2CSH-020-2-2      HTS: 29,32      ISD          2    i na  /na            I i  PIPE/*STRT-1                            IC-F-2    i  na    i  VOL/UT6.02 2CSH-25-05-Fl$ 07          i QISO 25-O5              or  DMG&#xb9; na    in iC5.51    inone    J SUR/PT3.00/NT4.00  i NHP2-20-.375-CS      i LINE&#xb9; 2CSH-020-2-2        NTS: 29(34      iso          2    )  na  /na            I I  STRT-1/RED                              IC-F-2    i na      i VOL/UT6.O2 2CSH-25-05-FM008          I  QISO  25-05          or DMG&#xb9;  na    in iC5.51    inone    i  SUR/PT3.00/HT4.00  i NHP2-20-.375-CS      I  LINE&#xb9; 2CSH-020-2-2      NTS: 34,37      ISD          2    i  na/na              I i PIPE/*HOV118 IC-F-2    i na      i VOL/UT6.02 2CSH.25-05-Fl$ 09          I  QISO 25-05            or  DMG&#xb9; na    in iC5.51    Inone I SUR/PT3.00/HT4 F 00 I HHP2-18-.375-CS      i  LINE&#xb9; 2CSH-018-44.2      NTS: 27,28      iso          2 i na/na                    I I RED/PIPE
                                                                        )C-F-1    i  na    J VOL/UT6.13          I 2CSH.25-05-FW010          i QISO 25-05              or  O'MG&#xb9; na    in iC5.11    iio      i SUR/PT3.00            JSc8 NHP2-18-.375-SS      i  LINE&#xb9; 2CSH-018-44-2      HTS:  26,27    i7.5XNini 2        i na  /                I IWC-2r1      I  PIPE/ELB                                IC-F-1    i na      i VOL/UT6.03          ] Inacc 2CSH-25-05-FM012            I  QISO 25-05            or  DMG&#xb9;  na. in iC5.11      )RR        i SUR/PT3.00          I NHP2-20-.375-SS      i  LINE&#xb9; 2CSH-020-13-2      NTS: 21,22      iNS            2    dna/                  I IMC-2r1      I WNF/PIPE iC-F-I    i na      i VOL/UT6.03          ilnacc 2CSH-25-05-FM013            I  QISO  25-05          or DMG&#xb9; na in iC5.11          IRR      I SUR/PT              I NHP2-20-.375-SS      I  LIHE&#xb9; 2CSH-020-13-2 NTS: 19,20            INS      i  2    ina/                  I I'MC-2r'I    I ELB/PEHET    212                          IC-F-1    [ na      i VOL/UT6.03          iinacc 2CSH-25-05-FM014            i QISO 25-05            or  DMG&#xb9; na    in  [C5.11    IRR      I SUR/PT3 00          I NHP2-20-.375-SS      i  LINE&#xb9; 2CSH-020-13-2      NTS: 22,23      iNS          2    dna/                  I IWC-2r1      I  PIPE/PIPE                                IC-F-1    I na      I VOL/UT6.03            i inacc 2CSH-25-05-Fl$ 15          i  QISO  25-05          or  DMG&#xb9;  na    in  iC5.11    IRR      I SUR/PT3.00            I NHP2-20-.375-SS        I LINE&#xb9;  2CSH  020 13 2    NTS'0    21    IHS          2    dna/                    I
 
NIAGARA MOHAWK POMER CORPORATIOH          -      NILE POINT NUCLEAR STATION - UNIT 2        12 of 25 NHP2-ISI-006, REV. 1( CH-000                                            SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                    APPEHDIX G - CSH SYSTEN (sorted by Examination Identifier)
HD INTVL REL RED      DESCRIPTION OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE            IPERIOO  1  I                    REMARKS I
EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, COMPONENT          DMG &#xb9;, iITEH &#xb9;  iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK  &#xb9; i LIHE NO. AND NOTES, AS APPLICABLE [SELECT iCLASSi EX3/NDE PROCEDURE iPERIOO 3 i Lu assoc M/FW002 IC-F-I    )  na  i  VOL/UT6.03        I 2CSH-25-05-LM002-1        i QISO    25-05          or DMG&#xb9; na    in )C5.12    iID      J SUR/PT3.00        isc8 HHP2-20-.375-SS    I  LINE&#xb9; 2CSH-020.13-2 NTS: 26            IAL            2  dna/                  I
                          )  Lu assoc v/FW010                      IC-F-1    i na      i  VOL/UT6.03        I 2CSH-25-05-LM002-2        i QISO 25-05            or  DMG&#xb9; na  in iC5.12    iiD      i SUR/PT3.00          isc8 NHP2-18-.375-SS      I  LINE&#xb9;  2CSH 020-13-2    HTS: 26        )AL            2    )na/                  I
[  Lu                                    IC-F-1    i  na    i'OL/UT6.03          iInacc 2CSH.25-05-LWA            I  QISO 25-05          or  DMG&#xb9; na  in iC5.12    IRR      I  SUR/PT3.00        I NHP2-20-.375-SS      I  LINE&#xb9; 2CSH-020-13-2    NTS: 20        INS            2                          I i Lu                                      IC-F-1    i na      )  VOL/UT6.03        [Inacc 2CSH-25-05-LMB            i QISO 25-05            or  DMG&#xb9; na  in iC5.12    ERR      i SUR/PT3.00          I HHP2-20-.375-SS      I  LINE&#xb9; 2CSH-020-13-2    N'IS'1        INS      (    2    dna/                  I I LW  IR                                IC-F-1    i  na    i VOL/UT6.03          iInacc 2CSH.25.05-LMC            i QISO 2S-DS            or  D'MG&#xb9; na  in iC5.12    IRR      I SUR/PT3.00          I NHP2-20-.375-SS        LINE&#xb9; 2CSH-020-13-2    NTS: 22        FANS 2    dna/                  I I  LM OR                                  IC-F-1    i na    i  VOL/UT6.03          iinacc 2CSH-25-05-LMD              i QISO 25-05          or  DMG&#xb9; na . in )C5.12    IRR      I  SUR/PT3.00          I NHP2-20-.375-SS      I LINE&#xb9; 2CSH-020-13-2    NTS: 22        INS            2    (na/                  I i Lu assoc v/FW002 L  f414              JC-F-1    i na      i VOL/UT6.03          I 2CSH-25.05-LME              I QISO 25-05          or  DMG&#xb9; na    in iC5.12    I ID      I SUR/PT3.00          isc8 NHP2-20-.375-SS      I LINE&#xb9; 2CSH-020-13-2    HTS: 23        IAL            2    )na/                  I I PIPE/RED IC-F-2    J na    i VOL/UT6.02 2CSH-25-05-SM007            I QISO 25-05          or DWG&#xb9; na in iC5.51        inone    i SUR/PT3.00/NT4.00  i NHP2-18-.375.CS      I LINE&#xb9;  2CSH-018.45-2    NTS: 27,29      ISD            2    J na /na              I I RED/PIPE                                IC-F-2    I  na    I VOL/UT6.02          I 2CSH.25.05.SM008          I QISO 25-05          or DMG&#xb9; na in iC5.51        iID      i SUR/PT3.00/NT4.00  JSc8 NHP2-20-.375.CS        LINE&#xb9;  2CSH-020-2.2    HTS 29 30      LSD            2    [ na /na              I
 
NIAGARA HOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        13 of 25 NHP2-ISI-006, REV. 1, CH-OOO                                          SECOHD TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G - CSH SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                  IPERIOD  1  I                    REHARKS EXAHINATIOH IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  ]ITEN  &#xb9; JFREOY( EX2/NDE PROCEDURE        [PERIOD 2 USE CAL BLK  &#xb9; f  LINE NO. AND NOTES, AS APPLICABLE ]SELECT )CLASS) EX3/NDE                PROCEDURE )PERIOD 3 I  ELB/PIPE                              IC-F-2    J na    (
VOL/UT6.02 2CSH-25-05-SW009        (
QISO 25-05          or  DMG&#xb9; na    in  (C5.51    ]none    f SUR/PT3.00/HT4.00  )
NHP2-20-.375-CS    I  LINE&#xb9; 2CSH-020-2-2    NTS: 30,31      ISO            2    J na /na I  PIPE/ELB                              IC-F-2    (
na    ]    VOL/UT6.02 2CSH-25-05-SM010        i QISO 25-05            or  DMG&#xb9; na    in  (C5.51    [none    J SUR/PT3.00/HT4.00  J NHP2-20-.375-CS    I  LINE&#xb9; 2CSH-020-2.2    NTS: 30,31      I SD          2    J na  /na            I I  PIPE/ELB                              IC-F-2    [  na    [    VOL/UT6.02 2CSH-25-05-SM014        I  QISO 25-05          or  DMG&#xb9; na    in  [C5.51    Inone    I    SUR/PT3.00/HT4.00  I NHP2-20-.375-CS    I  LINE&#xb9; 2CSH-020-2-2    NTS: 29,30      I              2    f    na /na              I I  ELB/PIPE                              IC-F-2              )    VOL/UT6.02 2CSH-25-05-SW015          I  QISO 25-05          or  DWG&#xb9; na    in (C5.51    ]none    f  SUR/PT3.00/MT4.00  f NHP2-20-.375-CS        LINE&#xb9; 2CSH-020-2-2    NTS:  29,30    LSD            2    /  na /na I  PIPE/ELB                              IC-F-2    (
na    [  VOL/UT6.02 2CSH-25-05-SM016          i QISO 25-05          or  DMG&#xb9; na    in IC5.51    ]none    f  SUR/PT3.00/NT4.00    f NHP2-20-.375-CS        LINE&#xb9; 2CSH-020-2-2    NTS:  29,30    /SD            2    ]
                                                                                            'na /na i
ELB/PIPE                              IC-F-2    f  na    J VOL/UT6.02 2CSH-25.05-SM017            QISO 25-05          or  DMG&#xb9; na  in  [C5.51    (none    J SUR/PT3.00/HT4.00    [
NHP2-20..375-CS      LINE&#xb9; 2CSH.020-2-2    N'IS: 29,30      ISD          2      [  na/na                I I  PIPE/TEE                                IC-F-2    f na      J VOL/UT6.02 2CSH-25-05-SM019          I  QISO 25-05          or  DMG&#xb9; na    in  )C5.51    ]none    J SUR/PT3.00/HT4.00    J NHP2-20-.375-CS    i LINE&#xb9; 2CSH-020.2-2      NTS:  29,33      LSD            2    J na /na              I I TEE/PIPE                                IC-F-2    [ na      [  VOL/UT6.02 2CSH-25-05-SM020          I QISO 25-05          or  DWG&#xb9; na    in  JC5.51    [none    [  SUR/PT3.00/HT4.00    [
NHP2-20-.375-CS    I LINE&#xb9; 2CSH-020-2-2    NTS:  29,33      ISD            2    f  na /na RED/WNF                                IC-F-2    [ na      [  VOL/UT6.02 2CSH-25-05-SM026            QISO 25-05          or  DMG&#xb9; na    in  JC5.51    )none    [  SUR/PT3.00/HT4.00    ]
NHP2-20-.375-CS        LINE&#xb9; 2CSH-024-2-2    NTS:  37,38      )SD            2    (  na/na
 
NIAGARA HONAMK POMER CORPORATION          -  . NILE POINT NUCLEAR STATION - UNIT 2        14 of 25 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G  - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED  (
DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC[ EX1/HDE PROCEDURE              (PERIOD    1                    REHARKS EXAHIHATIOH IDENl'IFIER i ITS ISO LOCATOR, COHPOHEHT DMG        &#xb9;,  LITEM  &#xb9; )FREQY) EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK  &#xb9; I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3      I IMC 3          INTEG ATT PENET Z12 SHOPMELD          (C-C      ),na    )
SUR/(inaccessibie)  (
Inacc 2CSH-25-05-SM301        /  QISO 25-05          or  OMG&#xb9; na  in /C3.20    [RR      J na  /na              I
                        /  LINE&#xb9; 2CSH-020-13-2    HTS: (none)    /HS            2  /  na/na                I I INTEG ATT PEHET    Z12  SHOPMELO        IC-C      I  na    I  SUR/PT3.00          I 2CSH-25-05.SM302        I  QISO 25-05          or  DMG&#xb9; na  in /C3.20    ]ID          na /na              /Sc8 f  LINE&#xb9; 2CSH-020-13-2    NTS: (none)    [Handate)      2      na /na              I I  PIPE/ELB                              IC-F-2    [  na    (
VOL/UT6.02          I 2CSH-25-08-FM003        i QISO    25.08          or  DMG&#xb9; na  in  JC5.51    (none    )
SUR/PT3.00/HT4.00    f NHP2-16-1.031-CS  I  LINE&#xb9; 2CSH-016.3-2      NTS: 40,41    ISD            2    /  na /na I  ELB/PIPE                              IC-F-2    /  na    )
VOL/UT6.02 2CSH-25-08.FM004        (
QISO  25-08          or DMG&#xb9; na in JC5.51        /none    /  SUR/PT3.00/HT4.00    /
NHP2-16-1.031.CS  I  LINE&#xb9; 2CSH-016-3-2      HTS: 40,41    I TE          2    /  na/na                I I  ELB/PIPE                              IC-F-2    [  na    (
VOL/UT6.02 2CSH.25-08-FM005          i QISO  25-08          or DMG&#xb9; na in JC5.51        ]none    J SUR/PT3.00/HT4.00    (
NHP2-16-1.031-CS    I  LINE&#xb9; 2CSH-016-3-2      HTS 40 41      I              2    /  na  /na I  ~FE105/PIPE                            IC-F-2    I  na    I  VOL/UT6.02          I 2CSH-25 FM006        I  QISO 25-08          or DUG&#xb9; na  .in  JC5.51    /none    /  SUR/PT3.00/HT4.00    )
NKP2-16-1.031-CS    I  LINE&#xb9;  2CSH-016-3-2    HTS'0          ISO            2    /  na /na              I I
PIPE/AFE-105                            IC-F-2    I  na    I  VOL/UT6.02          I 2CSH-25-08.FM007          I QISO  25-08          or  DMG&#xb9; na    in /C5.51    Inone    I SUR/PT3.00/HT4.00    I NHP2-16-1.031-CS    I  LIHE&#xb9; CSH 016 3        NTS  "          ISD      I  2    I na/na                I I PIPE/PIPE                              IC-F-2    [  na    [ VOL/UT6.02 2CSH-25-08-FM008          I QISO  25-08          or DMG&#xb9; na    in  JC5.51    ]none    J SUR/PT3.00/HT4.00    J NHP2-16-1.031-CS    / LINE&#xb9; 2CSH-016-3-2      NTS: 40        ]none        2    / na /na I MNF/PIPE                                IC-F-2    [  na    ) VOL/UT6.02            ]    ScT 2CSH-25-08-FM014          [ QISO  25-08          or DMG&#xb9; na in [C5.51        I ID      I SUR/PT3.00/HT4.00    I NHP2-16-1.031-CS    I  LINE&#xb9; 2CSH-016-3-2    HTS: 39,40      ITE            2    ] na  /na
 
NIAGARA HONAWK POWER CORPORATION        -      ILE POINT NUCLEAR STATION - UNIT 2        15 of 25 NHP2-ISI-006I REV. I( CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI) INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED    J DESCRIPTION OF ITEN TO BE EXAMINED)CATGRY [ IGSCC) EX1/NDE PROCEDURE          (PERIOD  1                        REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATORi COHPONENT DMG i IITEH            &#xb9; IFREQYI EX2/HDE PROCEDURE IPERIOD 2 I USE  CAL  BLK &#xb9;  i  LINE NO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I
                          /  ELB/MHF                              IC-F-2    f  na    f  VOL/UT6.02 2CSH-25-08-FM015          (
QISO 25-08          or DMG&#xb9; na    in [C5.51    ]none    /  SUR/PT3.00/HT4.00  f NHP2-16-1.031-CS    I  LINE&#xb9;  2CSH-016-3-2    NTS: 39,41    LSD          2    / na /na              I I  WNF/PIPE                              IC-F-2            i  VOL/UT6.02 2CSH-25-08-FM016          I  QISO 25-08          or DMG&#xb9; na in [C5 ~ 51    [none    I  SUR/PT3.00/HT4.00  I NHP2-16-1.031-CS    i LINE&#xb9; 2CSH-016-3-2      NTS: 39,40    LSD          2    /  na  /na            I
                          ]  PIPE/*V9                              IC-F-2    f  na    /  VOL/UT6.02 2CSH-25-08-FW018          I  QISO 25.08          or DMG&#xb9; na in )C5.51      /none    f  SUR/PT3.00/HT4.00  f NHP2-16-1.031-CS        LINE&#xb9; 2CSH-016-3.2      NTS: 40,42    LSD          2    J na  /na            I
[  *V9/ELB                              IC-F-2    ]  na    [  VOL/UT6.02 2CSH.25-08-FW019          i QISO 25-08            or  DMG&#xb9; na  in /C5.51    )none    [  SUR/PT3.00/HT4.00  )
NHP2-16.1.031-CS    I  LINE&#xb9; 2CSH-016-3.2      NTS: 41,42    ISD      (  2    f  na  /na            I I  IHTEG ATT                            )C-C      [  na    (
SUR/PT3.00/HT4.00      Sc7 2CSH-25-08.FW301          [  QISO  25-08-7        or DWG&#xb9; na in JC3.20 (ID            /  na  /na            I f  LINE&#xb9; 2CSN-016-3-2      NTS: 40,43    JHandatef    2    [ na /na              I I  PIPE/ELB                              IC-F-2    /  na    / VOL/UT6.02 2CSH-25-08-SM006          i QISO  25-08          or DWG&#xb9; na .in /C5.51      )none    / SUR/PT3.00/HT4.00  /
NHP2-16-1.031-CS    i LINE&#xb9; 2CSH-016-3-2      HTS: 40,41    LSD      I  2    I                    I I ELB/PIPE                              IC-F-2    )
na    ( VDL/UT6.02 2CSH-25 SW010          I QISO  25-08          or DMG&#xb9; na in )C5.51        [none    J SUR/PT3.00/HT4.00  [
NHP2-16-1.031-CS      i LIHE&#xb9; 2CSH.016.3-2      HTS: 40,41    LSD          2    f na /na              I I ELB/PIPE                              IC-F-2    )
na    )
VOL/UT6.02 2CSH-25.08-SM012            i QISO  25-08          or DWG&#xb9; na in /C5.51        )none    f SUR/PT3.00/HT4.00  )
NHP2-16-1.031-CS      (
LINE&#xb9; 2CSH-016-3-2      NTS: 40,41    [SD          2    / na  /na
(
PIPE/PIPE                              IC-F-2    [ na    [ VOL/UT6.02 2CSH-25-08-SW016            ) QISO  25-08          or DMG&#xb9; na    in  [C5.51    Inone    I SUR/PT3.00/HT4.00 NHP2-16-1.031-CS      I LINE&#xb9; 2CSH-016-3-2      NTS: 40        Inone        2    I na  /na              I
 
NIAGARA HOHAWK POWER CORPORATION -                  HILE POINT NUCLEAR STATION - UNIT 2        16 of 25 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                      IPERIOO  1  I REMARKS EXANINATION IDENTIFIER    f ITS ISO LOCATOR, COHPONEHT DWG    &#xb9;,  ( ITEN  &#xb9;  [FREOY) EX2/HDE PROCEDURE        (PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES  AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE                IPERIOD 3 I I  PIPE/ELB                              IC-F-2      ]  na    [  VOL/UT6.02 2CSH-25-08-SW017          )
QISO  25-08        or DMG&#xb9; na in JC5.51          [none    f  SUR/PT3.00/HID 00  )
NHP2-16.1.031.CS    I  LINE&#xb9; 2CSH-016-3-2    NTS: 40,41      ISD            2    f  na  /na I  PIPE/ELB                              IC-F-2      [  na    [  VOL/UT6.02 2CSH-25-08-SW018          )
QISO  25-08        or DMG&#xb9; na    in  /C5.51      ]none    J SUR/PT3.00/HT4.00  )
NHP2-16-1.031-CS    I  LINE&#xb9;  2CSH-016-3-2  NTS: 40,41      ITE            2    /  na  /na I  PIPE/TEE                              IC-F-2      )  na    )
VOL/UT6.02 2CSH-25-08-SW019          I  QISO  25-08        or DMG&#xb9;  na  in  /C5.51      [none    J SUR/PT3.00/HT4.00    J NHP2-16-1.031.CS    I  LINE&#xb9; 2CSH-016-3-2    NTS: 40,44      ISD            2    /  na /na TEE/PIPE                              IC-F-2      [  na    J VOL/UT6.02 2CSH.25-08-SW020              QISO  25-08        or DWG&#xb9; na      in [C5.51      lno"    I  SUR/PT3.00/HT4 00    I NHP2-16.1. 031- CS      LINE&#xb9; 2CSH-016-3-2    NTS: 40,44      i SD          2    f  na /na I  PIPE/ELB                                IC-F-2    )
na    )  VOL/UT6.02 2CSH.25-08.SW021          I  QISO  25.08        or DMG&#xb9; na      in  [C5.51    )none    )  SUR/PT3.00/HT4 F 00  J NHP2-16-'1.031-CS    I  LINE&#xb9; 2CSH-016-3-2    NTS: 40,41      ISD            2    f  na  /na I  ELB/PIPE                                IC-F-2      I na    I  VOL/UT6.02          I 2CSH-25-09. FM001          / QISO 25-09          or  DMG&#xb9; na  .in  /C5.51      ]none    J SUR/PT3.00/HT4.00    /
NHP2-16-1.031.CS    I  LINE&#xb9; 2CSH-016-3-2    NTS:  41,40      ISD        I  2    I  na  /na              I I  TEE/PIPE                                IC-F-2      [ na.    [  VOL/UT6.02 2CSH-25-09 FW002          i QISO 25-09          or  DMG&#xb9; na    in [C5.51      Inone    I  SUR/PT3.00/HT4.00    I NHP2-16.1.031-CS    I  LINE&#xb9; 2CSH-016-3-2    HTS: 40,44      ISD            2    /  na  /na I  PIPE/PIPE                              IC-F-2      I na    I  VOL/UT6.02            I 2CSH-25-09-FW003          (
QISO 25-09          or  DMG&#xb9; na    in )C5.51      ]none    (
SUR/PT3.00/HT4.00    J HHP2-16-1.031-CS      (
LINE&#xb9; 2CSH-016-3-2    N'IS: 40        ]none          2    f na/na I PIPE/ELB                                IC-F-2    (
na      ( VOL/UT6.02 2CSH-25-09 FW004          i QISO 25-09          or  DWG&#xb9;  na  in  [C5.51    /none    / SUR/PT3.00/HT4.00    /
NHP2-16-1.031.CS        LINE&#xb9; 2CSH-016-3-2    NTS:  41,40      i SD          2    / na /na
 
NIAGARA HOHAWK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        17 of 25 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX  G - CSH SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEOICATGRY IIGSCCI EX1/HDE PROCEDURE                    IPERIOD  1                        REHARKS EXAHINATION IDEHI'IFIER I ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  IITEH  &#xb9; IFREOYI EX2/NDE PROCEDURE        IPERIOD 2  I USE CAL BLK    &#xb9; I LINE NO. AND    NOTES'S    APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE            IPERIOD 3  I I  PIPE/ELB                              IC-F-2    I  na    I  VOL/UT6.02 2CSH-25-09-FM006          I  QISO 25-09          or  DMG&#xb9; na    in IC5.51    IID      I  SUR/PT3.00/HT4.00  I  Sc9 NHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-42-2    HTS:  1,50      ISD      I  2    I  na /na I
PIPE/*HOVIO                            IC-F-2    I  na    I  VOL/UT6.02 2CSH-25-09-FM007          I  QISO 25-09          or  DWG&#xb9;  na  in  IC5.51    Inone    I  SUR/PT3 F 00/HT4.00  I HHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-42-2    HTS: 1,51      ISD          2    I  na /na              I I  *HOV107/PIPE                          IB-J      I  na    I  VOL/UT6.02          I 2CSH-25-09.F'W008          I  QISO 25-09          or  DMG&#xb9; na    in  IB9.11    Inone    I  SUR/PT3.00/HT4.00    I NHP2.12-.844.CS      I  LINE&#xb9; 2CSH-012-4-1    NTS: 1,11      INS          1    I  na  /na              I PIPE/PENET 214                        IB-J      I  na    I  VOL/UT6.02          I  Sc7 2CSH-25-09-FM009          I  QISO 25-09          or DMG&#xb9; na    in IB9.11    IID      I  SUR/PT3.00/HT4.00    I NHP2-12-.844-CS      I  LINE&#xb9;  2CSH.012-4-1    NTS: 1(7        ITEV          1    Ina/
I  PIPE/PIPE                              IC-F-2    I  na    I  VOL/UT6.02 2CSH-25-09-FW013            I  QISO 25-09          or  DWG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/HT4.00    I NHP2-16-1  '31-CS    I  LINE&#xb9;  2CSH 016-3.2    NTS: 40        Inone        2    I  na /na              I I'MC-5      I  INTEG ATT OUTSIDE EDGES  1"  PLATE    IC-C      I  na        SUR/PT3.00/HT4.00    I 2CSH-25-&#xb9;FW300              I QISO  25-&#xb9;6        or  DMG&#xb9;  na. in  IC3.20 IID            na  /na                  Sc8 I  LINE&#xb9; 2CSH-016-3-2    NTS: 40,45      IHandateI 2          na /na              I I INTEG ATT                                IC-C      I na      I SUR/PT3.00/HT4.00    I 2CSH-25-09-FM306            I QISO  25-09-8      or DMG&#xb9; na in IC3.20 IID                I na /na                I I  LINE&#xb9; 2CSN-016-3-2    HTS: 40,47      IHandateI 2        I na /na                I I PIPE/WNF IC-F-2    I na      I VOL/UT6.02 2CSH-25-09-FMSM005          I  QISO 25-09          or  DMG&#xb9; na    in IC5.51    Inone    I SUR/PT3.00/HT4.00    I NHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-42-2    HTS:  1,49      ISD          2    I na /na                I I ELB/PIPE                                IC-F-2    I na      I VOL/UT6.02 2CSH-25-09.SM002            I QISO 25-09          or  DWG&#xb9; na    in IC5.51    Inone    I SUR/PT3.00/HT4.00    I NHP2. 16-1. 031- CS    I LINE&#xb9; 2CSH.016-3-2    NTS:  41,40      ISD          2    I na /na                I
 
NIAGARA MOHAWK POWER CORPORATION            -      NILE POINI'UCLEAR Sl'ATION - UNIT 2        18 of 25 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                      APPEHDIX  G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED        DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE                [PERIOD  1                        REHARKS
(
EXAHINATIOH IDENTIFIER I ITS IS LOCATOR'OMPONENT DWG              &#xb9;i  IITEH    IFREQYI EX2/NDE PROCEDURE IPERIOD 2          I USE CAL BLK  &#xb9; I LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3    I I PIPE/RED IC-F-2    I  na  I    VOL/UT6.02 2CSH-25-09-SW003        [    QISO  25-09          or DWG&#xb9; na in /C5.51        ]none  f    SUR/PT3.00/HT4.00    f NHP2-16-1.031-CS  I    LINE&#xb9; 2CSH-016-3-2      NTS: 40,48      ITE          2  I    na /na              I I    RED/PIPE                                IC-F-2    (  na    (
VOL/UT6.02 2CSH-25-09-SW004        i QISO    25.09          or DWG&#xb9; na in JC5.51        Inon    I  SUR/Pl'3'00/HT4 00  I NHP2-12-.844-CS    I  LINE&#xb9; 2CSH-012-42-2 HTS: 48,1            ISD          2    / na  /na              I
                          / WHF/PIPE IC-F-2    (
na    )
VOL/UT6.02 2CSH-25-09-SW008          ] QISO    25-09          or DMG&#xb9; na    in  JC5.51    (none    f  SUR/PT3.00/HT4.00    J NHP2.12-.844-CS    I  LINE&#xb9; 2CSH.012.42-2 NTS: 1,49            ISD          2    f  na /na              I I  PIPE/ELB                                IC-F-2    ]  na    J VOL/UT6.02 2CSH-25-09-SM009          I  QISO  25-09          or DWG&#xb9; na    in  [C5 ~ 51  [none    )
SUR/PT3.00/HT4.00    J NHP2-12-.844-CS    I  LINE&#xb9; 2CSH.012-42-2 NTS: 1      '0 ISD          2    /  na /na I  ELB/PIPE                                IC-F-2    [  na    J VOL/UT6.02 2CSH-25-09.SW010          I  QISO  25.09          or  DWG&#xb9;  na  in  (C5.51    [none    [  SUR/PT3.00/HT4.00    )
NHP2-12-.844-CS    i  LINE&#xb9;  2CSH-012-42-2    NTS:  1,50      LSD          2    /  na /na I  ELB/PIPE                                IC-F-2    ] na    [  VOL/UT6.02 2CSH-25.09.S'W011        ]  QISO 25-09            or DWG&#xb9; na . in  ]C5.51    Inone    I  SUR/PT3.00/HT4 00    I NHP2-12-.844-CS        LINE&#xb9;  2CSH-012-42-2    NTS: 1,50        LSD          2    /  na  /na
(
PIPE/PIPE                                IC-F-2            [  VOL/UT6.02 2CSH-25-09-SW016          i QISO 25-09            or DWG&#xb9; na    in  (C5.51    )none    )
SUR/PT3.00/Hl'4.00    (
NHP2-16-1.031-CS    )
LINE&#xb9;  2CSH-016-3-2    NTS: 40          (none    I  2    I  na/na                I I  PIPE/TEE                                  IC-F-2    [ na    )
VDL/UT6.02 2CSH-25-09-SWOIT          I QISO  25-09          or DWG&#xb9; na    in  JC5.51    [none    (
SUR/PT3.00/HT4.00    )
NHP2-16.1.031-CS    I  LINE&#xb9; 2CSH.016-3-2      NTS: 40,44      ISD          2    /  na /na I  PIPE/PIPE                                IC-F-2    )
na    )
VOL/UT6.02 2CSH-25-09-SW018          I  QISO  25-09          or DWG&#xb9; na    in  JC5.51    ]none    /  SUR/PT3.00/MT4.00    (
NHP2-16-1.031-CS      J LIHE&#xb9; 2CSH-016-3-2      NTS: 40          ]none        2    f na  /na
 
NIAGARA MOHAWK POWER CORPORATION          -      MILE POINT NUCLEAR STATION  - UNIT 2        19 of 25 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEH YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEM TO BE EXAMIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOO  1                          REMARKS EXAMINATION IDENTIFIER  f ITS ISO LOCATOR, COMPONENT DWG      &#xb9;,  [ITEM  &#xb9; JFREOY[ EX2/NDE PROCEDURE      [PERIOD 2 USE CAL BLK  &#xb9; [  LINE NO. AND NOTES, AS APPLICABLE ]SELECT (CLASS] EX3/NDE PROCEDURE (PERIOD 3 I PENET  214/PIPE                        IB-J    J na    J VOL/UT6.02        J Sc7 2CSH-25-10-FW001        i QISO 25-10          or  DWG&#xb9; na    in )89.11    IID'        SUR/PT3.00/MT4.00  I NMP2-12-.844-CS    I  LINE&#xb9; 2CSH.012-15-1    NTS:  1,7      ITEV          1    (na/
I  PIPE/ELB                              iB-J    I  na    I VOL/UT6.02 2CSH-25-10-FW002        i QISO 25-10          or  DWG&#xb9; na    in /89.1'l  ]none      f SUR/PT3.00/Ml'4.00  f HMP2-12-.844-CS    i  LINE&#xb9; 2CSH-012-15-1    HTS: 1,4        iNS      I    1    I na/na              I I  PIPE/ELB                              )B-J    I  na    I VOL/UT6.02 2CSH-25-10-FW003        I  QISO 25-10          or  DWG&#xb9; na    in /B9.11    [none      ] SUR/PT3.00/HT4.00  f NHP2-12-.844-CS    I  LINE&#xb9; 2CSH-012-15-1    NTS: 1,4        INS          1    / na  /na            I I  PIPE/*AOV108                          IB-J    (
na    )
VOL/UT6.02 2CSH-25-10-FW004        I  QISO 25-10          or  DWG&#xb9; na    in )89.11    [none      ] SUR/PT3.00/MT4.00  ]
NHP2-12-.844.CS    I  LINE&#xb9; 2CSH-012-15-1    NTS:  1,5      iNS                ] na  /na            I
                        /  *AOV108/PIPE                          IB-J      [  na    [ VOL/UT6.02                    (Deselected 2CSH-25-10-FW005        i QISO 25-10          or  DWG&#xb9; na    in /B9.11    [none    (
SUR/PT3.00/HT4.00  [
HMP2  12-.844-CS    i LINE&#xb9; 2CSH-012-15-1    NTS: 1,5        iNS          1    /na/                  I=
I PIPE/*HCV120                          IB-J      (
na    )
VOL/UT6.02          (
Sc7 2CSH-25-10-FW006          I QISO 25-10          or  DWG&#xb9; na  ,in  )89.11    IID      I SUR/PT3.00/HT4.00  I NMP2-12-.844-CS    I LIHE&#xb9; 2CSH.012-15-1    NTS:  1,6      IHS            1    (na/
I *HCV120/PIPE                          IB-J      ]  na    (
VOL/UT6.02          (  Sc7 2CSH-25-10-FW007          i QISO 25-10          or  O'WG&#xb9;  na  in IB9.11    IID      I SUR/PT3.00/MT4.00  I HMP2-12-.688-CS    (
LINE&#xb9; 2CSH-012-46-1    NTS:  2,6      IHS            1    /na/
I PIPE/SEEX  Q N16 Az240 HI PRESS CS    /B-J      I  na    I VOL/UT6.02          I  Sc7 2CSH-25-10-FW008          I QISO 25-10          or  DWG&#xb9; na    in ]B9.11    IID-E    I SUR/PT3.00/MT4.00  I NMP2-10-.594-CS    i LINE&#xb9; 2CSH-010-27-1    NTS:  3,9      ]TEV          1    ina/
I ELB/PIPE                              IB-J      I na    I VOL/UT6.02 2CSH-25-10-FW010          i QISO 25-10          or  DWG&#xb9;  na  in /89.11    (none    ( SUR/PT3.00/MT4.00  f NMP2-12-.844-CS    I LINE&#xb9; 2CSH-012-15-1    NTS: 1,4        ]NS            1    / na /na
 
NIAGARA HOHAMK POMER CORPORATION            -          HILE POINT NUCLEAR STATION - UHIT 2        20 of 25 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEH YEAR INSERVICE INSPECTION              (ISI)    INTERVAL PLAN Change  date:    07/29/1999                                                                    APPENDIX      G  - CSH SYSTEH (sorted by Examination            Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI                  EX1/NDE PROCEDURE        IPERIOD  1 I                    REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  ]ITEN  &#xb9;  (FREQYJ EX2/NDE PROCEDURE            [PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT        iCLASSJ EX3/NDE PROCEDURE            )PERIOD 3 I  MOL/PIPE                              IB-J      I  na    I  SUR/PT3.00/HT4.00        I 2CSH.25-10-FM013          I  QISO 25-10          or  DMG&#xb9; na  in (89.32    /none    f  na  /na
(  LINE&#xb9; 2CSH-012-46-1    NTS: 2,12      iNS                /  na /na                  I I  INTEG ATT                              JB-K      J na    f  SUR/PT3.00/HT4.00        f 2CSH-25-10-FM300          f  QISO 25-'IO-12      or  DMG&#xb9; na  in [810.20 [ID        (  na /na                    I J
LINE&#xb9; 2CSH-012-46-1    NTS: 2,10      (Handate)    1    J na /na                  I I
INTEG ATT                              (8-K      [ na      ]  SUR/PT3.00/HT4.00 2CSH-25-10-FM301            f  QISO 25-10-12        or DMG&#xb9; na in )810.20 ]ID            )
na  /na                  I f  LINE&#xb9; 2CSH-012-46-1 NTS: 2,10          /Handatef 1        / na  /na                  I I  ELB/PIPE                              IB-J      I  na    I  VOL/UT6.02                I 2CSH-25-10-SM001            i QISO  25-10          or DMG&#xb9; na    in /89.11    ]none    f  SUR/PT3.00/HT4.00        f NHP2-12-.844-CS      (  LINE&#xb9; 2CSH-012-15-1 NTS: 1,4          /NS I  ELB/PIPE                              IB-J      I  na    I  VOL/UT6.02                I 2CSH-25-10-SM002            I  QISO  25-10          or DMG&#xb9; na    in /89.11    ]none    / SUR/PT3  F 00/HT4.00      (
NHP2-12-.844    CS      LINE&#xb9; 2CSH-012-15-1 NTS: I(4          /NS      /    1    [  na  /na I  PIPE/ELB                              IB-J      (  na    (
VOL/UT6.02 2CSH-25-10-SM003            i QISO 25-10            or  DMG&#xb9; na . in /89.11              I  SUR/PT      /HT4 F 00
                                                                                                          'none I
NHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-15-1    NTS: 1,4      INS                                              I I  PIPE/ELB                              IB-J      / na    /  VOL/UT6.02 2CSH-25 SM006          i QISO  25-10          or DMG&#xb9; na    in /89.11    /none    )
SUR/PT3.00/Hl'4.00        /
NHP2-12-.844-CS      i  LINE&#xb9; 2CSH-012-15-1 NTS: 1,4          /NS            1
                                                                                          /  na  /na I  PIPE/ELB                              IB-J      f na    /  VOL/UT6.02                            I 2CSH.25-10-SM008            I QISO 25-10          or DMG&#xb9; na    in /89.11    [none    J SUR/PT3.00/HT4.00        /          I NHP2-12-.688-CS        I LINE&#xb9;  2CSH-012-46-1    NTS: 2,8      JNS            1    J na/na                    I          I I ELB/PIPE                              IB-J      / na    /  VOL/UT6.02 2CSH-25-10-SM009            i QISO 25-10          or DMG&#xb9; na    in /89.11    (none    )  SUR/PT3.00/HT4.00        (
NHP2  12-.688-CS        LINE&#xb9;  2CSH-012-46-1    NTS: 2,8        /NS                [ na /na
 
NIAGARA HOHAMK POMER CORPORATION            -        ILE POINT  NUCLEAR STATION  - UNIT 2        21 of 25 NHP2-ISI-006( REV. 'I, CH-000                                              SECOND TEN YEAR INSERVICE IHSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G  - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ f DESCRIPTIOH OF ITEH TO BE EXAHIHED(CATGRY [IGSCC) EX1/NDE PROCEDURE                      (PERIOD  1                          REHARKS EXAHINATIOH IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DMG            &#xb9;,  [ITEN  &#xb9; JFREOY) EX2/NDE PROCEDURE        ]PERIOD 2 USE CAL BLK    &#xb9; I  LINE  NO  AND NOTES  AS APPLICABLE ISELECT ]CLASS] EX3/NDE PROCEDURE                ]PERIOD 3  )
I PIPE/RED                                  IB-J      [  na    f  VOL/UT6.02 2CSH-25-10.9810          /  QISO 25-10          or DMG&#xb9; na      in  /89.11    /none    /  SUR/PT3.00/HT4.00    /
NHP2-12-.688-CS    i  LINE&#xb9; 2CSH.012-46-1 NTS: 2,8            iNS            1    /  na /na I RED/PIPE                                  IB-J      [  na    (
VOL/UT6.02 2CSH-25-10-Sl$  11      i QISO 25-10            or  DMG&#xb9; na    in [89.'ll [none        J SUR/PT3.00/HT4.00    J NHP2-10. ~ 594-CS  ]  LINE&#xb9; 2CSH.010-27-1    HTS:  8,3        [NS            1    /  na /na I  ELB/PIPE                                IB-J      /  na    /  VOL/UT6.02                      I' 2CSH-25-10-9012          I QISO    25-10        or DMG&#xb9; na      in )89.11      )none    (
SUR/PT3.00/HI'4.00  (
NHP2-12-.844-CS    (
LINE&#xb9; 2CSH-012-15-1 NTS: 1 4            INS                /  na /na                          I I  TEE/PIPE                                IC-F-2    J na    f  VOL/UT6.02 2CSH-25-13-FM002          )
QISO 25-13          or  DMG&#xb9; na    in  JC5.51    ]none    [  SUR/PT3.00/HT4.00    f NHP2.12-.844-CS    i LINE&#xb9; 2CSH.012-20-2      NTS: 44,1        [SD-          2    [  na /na              I i PIPE/~HOV110 IC-F-2    )  na    [  VOL/UT6.02 2CSH-25-13.FM003          i QISO 25-13            or  DIIG&#xb9; na    in  [C5.51    ilD      i  SUR/PT3.00/HT4.00    igc8 NHP2-10-.719-CS      I  LINE&#xb9;  2CSH 010 19 2    N'IS'3    54    ISD            2    /  na /na              I I  *HOV110/PIPE                            (C-F-2    I  na    I  VOL/UT6.02          I 2CSH-25-13-FM004          i QISO 25-13            or  DMG&#xb9; na  .in  [C5.51    [none    f  SUR/PT3.00/HT4.00    [
NHP2-10-.719-CS      i LINE&#xb9; 2CSH.010-19-2      HTS: 53,54      LSD            2    /  na /na                I I  PIPE/*HOV112                            IC-F-2    J na.    [  VOL/UT6.02 2CSH-25-13-FM005          i QISO 25-13            or  DMG&#xb9; na      in (C5.51    )none    f  SUR/PT3.00/HT4.00    J NHP2-10-.719-CS        LINE&#xb9; 2CSH-010-19-2    NTS:  53'4        I SD      I  2    I  na/                  I I  PIPE/PIPE                                IC-F-2    [ na    )
VOL/UT6.02 2CSH-25 Fl$ 16        I  QISO 25-13          or  DMG&#xb9; na      in  )C5.51    Inone    )
SUR/PT3.00/HT4.00    (
NHP2-12-.844-CS      [  LINE&#xb9; 2CSH-012-20-2    NTS:  1          )none      I  2    I  na /na                I I  INTEG ATT                                JC-C      [ na    (  SUR/PT3.00/HT4.00    J 2CSH-25-13-FM306            / QISO 25-13-7        or  DMG&#xb9; na      in  JC3.20    )ID      f na /na f LINE&#xb9; 2CSH-010-19-2    NTS:  53,45      [Mandate/ 2          f na /na                I
 
NIAGARA MOHAMK POMER CORPORATION            -          ILE POINT  NUCLEAR STATION  - UNIT 2        22 of 25 KNP2-ISI-006( REV. '1, CH-000                                        SECOND TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAH Change date: 07/29/1999                                                                      APPEKDIX G -  CSH SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAMIHEDICATGRY l IGSCCI EX1/KDE PROCEDURE                    IPERIOO  1  I                        RENARKS EXAMIHATION IDENTIFIER    ITS ISO LOCATOR, COMPONENT DIIG    &#xb9;,  LITEM  &#xb9;  tFREOYi EX2/HDE PROCEDURE          iPERIOO 2 i USE CAL BLK &#xb9; i  LINE  NO. AND NOTES,  AS  APPLICABLE    ISELECT    ICLASSI      EX3/NDE  PROCEDURE IPERIOO 3 I I  INTEG ATT                              iC-C      i na    I SUR/PT3    00/MT4 F 00  I 2CSH-25-13-FM30W        i  QISO 25-'13-7        or DMG&#xb9; na    in iC3.20      )IO      i na    /na na                i  LINE&#xb9;  2CSH-010-19-2    NTS: 53,45      /Mandated'          J na  /na                I
(  PIPE/ELB                                ic-F-2    i na    ]  VOL/UT6.02 2CSH-25-13-SM001        i QISO 25-13            or  DUG&#xb9; na    in iC5.51      inone    i SUR/PT3.00/MTC.OO        i NNP2-12-.844.CS  I  LINE&#xb9; 2CSH-012-20-2    HTS: 1,50      ISD            2    i na    /na                I I  ELB/PIPE                                IC-F-2    t  na    i  VOL/UT6.02 2CSH.25-13.SN002        i QISO 25-13            or  DIJG&#xb9; na  in iC5.51      inone    i  SUR/PT3.00/MT4.00      L HNP2-12..844-CS  I  LINE&#xb9; 2CSH-012-20.2    NTS: 1,50      ISO            2    )  na /na                I i  PIPE/ELB                                IC-F-2    i na    i  VOL/UT6.02 2CSH-25-13.SM003        I  QISO 25-13          or  DUG&#xb9; na    in iC5.51      LID      i  SUR/PT3.00/MT4.00 igc8, NNP2-12-.844-CS  I  LINE&#xb9; 2CSH-012-20-2    NTS: 1,50      ISD            2    i na    /na I  REO/PIPE                                IC-F-2    i  na    )  VOL/UT6.02 2CSH-25-13-SN006        I  QISO 25-13          or  D'IIG&#xb9; na  in iC5.51    inone    (
SUR/PT3.00/MT4.00 i NNP2-10-.719-CS  I  LINE&#xb9; 2CSH-010.19-2    NTS: 52,53      ISD            2    i  na/na                  I I  ELB/PIPE                                IC-F-2    i na      i  VOL/UT6.02 2CSH-25-13-SU017        i QISO 25-13            or  DUG&#xb9; na . in iC5.51    inone    i SUR/PT3.00/MT4.00 i KNP2-12-.844-CS  I  LINE&#xb9; 2CSH-012-20.2    NTS: 1,50      I              2    J na /na I PIPE/RED IC-F-2      I na    i VOL/UT6.02              I 2CSH-25-13-SN018        I QISO 25-13          or  DIIG&#xb9; na    in iC5.51      inone    i SUR/PT3.00/MT4.00      t NNP2-12-.844-CS    i LINE&#xb9; 2CSH-012-20-2    NTS: 1,52      LSD            2    i na /na                  I I TEE/PIPE                                IC-F-2    t na    i  VOL/UT6.02 2CSH-25-17-FN001        t QISO  25-17          or  DUG&#xb9; na    in iC5.51      inone i SUR/PT3.00/MT4.00          i HNP2-12-.84C-CS    I LINE&#xb9; CSH 012  5 2    NTS    48i1      I            2    /  na /na I PIPE/PIPE                                IC-F-2    i na    i VOL/UT6.02 2CSH-25-17-FM002        I QISO  25-17          or DlJG&#xb9; na    in iC5.51      inone    i SUR/PT3.00/MTC.OO      i KNP2-12-.844-CS    I LIKE&#xb9; 2CSH 012-5-2      HTS: 1          Inone        2      i na  /na
 
NIAGARA HOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        23 of 25 NHP2-ISI-006, REV. 1( CH-000                                            SECOND TEN YEAR        INSERVICE INSPECTION  (ISI) INTERVAL PLAN Change date:    07/29/1999                                                                    APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTIOH OF ITEH To BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE                  IPERIOO  1                        REHARKS EXAHINATION IDENTIFIER    I ITS ISO LOCATOR, COHPONENT D'MG  &#xb9;,  IITEH    &#xb9; IFREOYI EX2/NDE PROCEDURE      IPERIOO 2 USE CAL BLK    &#xb9; I  LINE  No'ND NOTES'S    APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  PIPE/ELB                              IC-F-2    I  na    I VOL'/UT6.02 2CSH-25-17-FMOI53          I  QISO  25-17        or  DMG&#xb9;  na  in  IC5 ~ 51  Inone    I  SUR/PT3.00/HT4.00  I NHP2-12-.844-CS      I LINE&#xb9; 2CSH 012 5 2    NT '    50    I              2    I  na  /na I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02 2CSH.25-17.SM001          I  QISO  25-17        or DMG&#xb9; na in IC5.51          Inone    I  SUR/PT3.00/HT4.00  I NHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-5-2    NTS: 1,50      ISD            2    I  na  /na            I I  PIPE/ELB                              IC-F-2    I  na    I  VOL/uT6.02 2CSH-25-17.SM002            I  QISO 25-17        or  DMG&#xb9; na    in IC5.51      Inone    I  SUR/PT3.00/HT4.00  I NMP2  12-.844-CS        LINE&#xb9; 2CSH-012-5-2    NTS: 1,50      ISD            2    I  na  /na            I I  PIPE/PIPE                            IC-F-2    I  na    I voL/ul'6.02 2CSH-25-17-SM003            I  QISO 2S-17        or DMG&#xb9; na    in  ICS.S1    Inone    I  SUR/PT3.00/HT4.00  I NMP2-12-.844.CS      I  LINE&#xb9; 2CSH.012.5-2    NTS: 'I        Inone          2    I  na  /na I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02 2CSH-25-18-FM001            I  QISO 25-18        or  DMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/HT4.00  I NHP2.12-.844-CS      I  LINE&#xb9; 2CSH.012-5-2    NTS: 50(1      Iso            2    I  na  /na            I I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02          I 2CSH-25-18-FM002            I  QISO 25-18        or  DMG&#xb9; na . in  IC5.51    Inone    I  SUR/PT3.00/HT4.00  I NHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-5-2    NTS: 50,1        ISD          2    I na/na              I I  PIPE/PIPE                              IC-F-2    I na    I VOL/uT6.O2 2CSH-25-18-FM003            I QISO 25-18          or  DMG&#xb9; na    in IC5.51      Inone    I SUR/PT3.00/Hl'4.00  I NHP2-12-.84C-CS      I  LINE&#xb9; 2CSH.012-5-2    NTS:  1          Inone      I  2    I na/na              I I PIPE/PIPE                              IC-F-2    I na    I VOL/UT6.02 2CSH-25-18-FM004            I QISO 25-18        or  DMG&#xb9; na    in  IC5.51    Inone    I SUR/PT3.00/HT4.00 NHP2-12-.84C-CS        I LINE&#xb9; 2CSH-012.5.2    NTS:  1          Inone          2    I na  /na            I I ELB/PIPE                              IC-F-2    I na    I voL/UT6.o2 2CSH-25-18-FM005            I QISO 25-18        or  DMG&#xb9; na    in  IC5.51    Inone    I SUR/PT3.00/HT4.00  I HHP2-12-.844-CS        I LINE&#xb9; 2CSH-012-5-2    NTS: 50,1        ISD            2    I na  /na
 
NIAGARA NOHAMK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        24 of 25 NHP2-ISI-006, REV. 1( CH-000                                            SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX G - CSH SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ i DESCRIPTION OF ITEN TO BE EXAHIHEOiCATGRY i IGSCCi EX1/HDE PROCEDURE                iPERIOD    1                    REMARKS EXANINATION IDENI'IFIER  J ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  ]ITEN  &#xb9; JFREQYJ EX2/HDE PROCEDURE      ]PERIOD 2      J USE CAL BLK  &#xb9; I  LINE  NO  AHD NOTES'S    APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE          IPERIOO 3      I I  PIPE/ELB                                IC-F-2            /  VOL/UT6.O2 2CSH-25-18-FM006        [  QISO  25-18          or DMG&#xb9; na    in  /C5.51    /none  /  SUR/PT3.00/HT4.00  /
NHP2-12-.844-CS    i  LINE&#xb9;  2CSH-012-5-2    NTS: 50,1      /SO          2  /  na /na I  PIPE/ELB                                IC-F-2    /  na    )
VOL/UT6.O2 2CSH-25-18-FM007          [  QISO  25-18          or  DWG&#xb9; na    in  [C5.51    /none    /  SUR/PT3.00/NT4.00  /
NHP2-12-.844-CS    I  LIHE&#xb9; 2CSH 012  5 2    HTS'0    1      ISD          2    /  na  /na            I I PIPE/~NOV111 IC-F-2    I  na    I  VOL/UT6 02          I 2CSH-25-18-FM008          I  QISO  25-18          or  DMG&#xb9; na    in  )C5.51    )none    (
SUR/PT3.00/HT4.00 NHP2-12-.844-CS    I  LINE  2CSH 012 5 ?    HTS'i55        ISD      ~
2    J na /na              I I  INTEG ATT                              IC-C      I  na    I  SUR/PT3.00/HT4.00  I 2CSH-25-18-FW300          [  QISO 25-18-8        or DWG&#xb9; na in /C3.20 /ID              /  na  /na            (  Sc10
                          /  LINE&#xb9;  2CSH-012-5-2    NTS: 1,45      JHandate)    2    /  na /na              I I  INTEG ATT                              [C-C      ]  na    f  SUR/PT3.00/HT4.00  I 2CSH-25-18-FW301          /  QISO 25-18-8        or DWG&#xb9; na in JC3.20 ]ID              /  na  /na            i Sci0 f LINE&#xb9; 2CSH-012-5-2      NTS: 1,45      JHandate)    2    f  na /na              I I ELB/PIPE                                IC-F-2    J na    J VOL/UT6.O2 2CSH-25-18-FMSM010        i QISO 25-18          or  DMG&#xb9;  na. in    [C5.51  ]none    f  SUR/PT3.00/NT4.00  J HHP2-12-.844-CS      I LINE&#xb9;  2CSH 012 5 2    H'IS'    1      ISD          2    f na /na              I I PIPE/ELB                                IC-F-2    I na    I VOL/UT6.02          I 2CSH-25-18-SM001          I QI    2518          or  DMG&#xb9; na    in /C5.51    )none    f SUR/PT3.00/HT4.00  /
HHP2-12-.844-CS      I LINE&#xb9; 2CSH-012-5-2      HTS: 50(1        ISD          2    f na /na              I I PIPE/ELB                                IC-F-2    / na    / VOL/UT6.O2 2CSH-25-18-S'M003          i QISO 25-18          or  DMG&#xb9; na    in /C5.51    /none    / SUR/PT3.00/NT4.00    /
NHP2-12-.844-CS      I LINE 2CSH 01      2    HTS              )SD          2    / na  /na              I I PIPE/ELB                                IC-F-2    I na    I VOL/UT6.02 2CSH-25-18-SM004          [ QISO 25-18          or  DMG&#xb9; na    in  /C5.51    )none    (
SUR/PT3.00/HT4.00    (
NHP2-12-.844-CS      I  LINE&#xb9; 2CSH-012-5-2    NTS: 50,1        ISD          2    / na /na
 
NIAGARA HOHAMK PONER CORPORATIOH        -      NILE POINT  NUCLEAR STATION  - UNIT 2        25 of 25 NHP2-ISI-006( REV. 1I CH-OOO                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                APPENDIX G - CSH SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED      DESCRIPTION OF ITEN TO BE EXANINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD          1                          REHARKS
(
EXAHINATION IDENTIFIER    I  ITS ISO LOCATOR'OHPOHENT DllG    &#xb9;i I ITEN  &#xb9; IFREQYI EX2/NDE PROCEDURE      IPERIOO 2  I USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE        IPERIOO 3 I I  ELB/PIPE                            /C-F-2    /  na    /  VOL/UT6.02                    I 2CSH-25-18-SM005          /  QISO  25-18        or DWG&#xb9; na in /C5.51      /none    /  SUR/PT3.00/HT4.00  /          I NHP2-12-.844-CS    /  LINE&#xb9; 2CSH-012-5-2    HTS: 50,1    /SD      )  2    )  na /na                        I I  ELB/PIPE                            /C-F-2    /  na    / VOL/UT6.02                    I 2CSH-25-18-SM007          i  Ql SO 25-18        or DllG&#xb9;  na in (C5.51    (
ID      (
SUR/PT3.00/HT4.00  (Sc8 NHP2-12-.844-CS    f  LIHE&#xb9; 2CSH-012-5-2    HTS: 50,1    /SD      f  2    ) na /na              I          I I  PIPE/ELB                            IC-F-2  I  na    I VOL/UT6.02          I          I 2CSH-25-18-SN008          [ QI SO 25-18        or  DllG&#xb9; na in  )C5.51  /none    f SUR/PT3.00/HT4.00  J          I NHP2-12-.844-CS      [ LIHE&#xb9; 2CSH.012-5-2    NTS: 50,1    JSD      f  2    f na  /na            I          I I ELB/PIPE                            [C-F-2  /  na    / VOL/UT6.02                    I 2CSH-25-18.SW009          I QISO  25-18        or DNG&#xb9; na in /C5.51      /none    J SUR/Pl'3.00/HT4.00  /
NHP2-12-.844-CS      I LINE&#xb9; 2CSH-012-5-2    NTS: 50,1    ISD      I    2    I na /na              I          I END OF SYSTEH CSH
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System: CSH General Notes
: 1. 12" SCH  100 PIPE, SA-1 06B                                      33. 20" X14" STD REDTEE,SA-234WPB 12  SCH  80 PIPE MATERIAL,SA-108B                                34. 20" STD TEE, SA-234 WPB
: 3. 10" SCH  80 PIPE MATERIAL,SA-106B                                35. 20 15% WNF, SA-105
: 4. 12  SCH  100 PIPE FITTINGS, SA-234 WPB                          36. 20" EXT RING, SA-516 GR 70
: 5. 'AOV108- BODY, SA-216 WCB                                        37. 24 X 20" STD ECC REDUCER, SA-234 WPB
: 6. 'HCV120- BODY, SA-105                                            38. 24" 19% WN FLANGE, SA-105
: 7. PENETRATION Z-14, SA408 CL 1                                    39. 16" 90% WNF, SA-105
: 8. 12" SCH 80 PIPE FITTINGS, SA-234 WPB                            40. 16 SCH 100 PIPE, SA-106 GRB
: 9. N-16 NOZ SEE, SA-508 CL2                                        41. 16 SCH 100 ELBOW, SA-234 WPB
: 10. PLATE MATERIAL,SA416 GR 70                                      42. 16" CHECKVALVE,SA-216WCB
: 11. MOV107- BODY, SA-216 WCB                                        43. 1-1/2" PLATE, SA416 GR65
: 12. 12" X2 SCH 160 WELDOLET, SA-105                                  44. 16" X 17 SCH 100 RED TEE, SA-234 WPB
: 13. 20,1 DIAMETER STUDS AND NUTS                                    45. 1" PlATE, SA415 GR 65
: 14. 14" GATE VALVE,SA-216 WCB                                        46. 12 SCH160PIPE
: 15. 14" STD PIPE, SA-106 GRB                                        47. 12" SCH 120 PIPE
: 16. 14" STD ELBOW. SA-234 WPB                                        48. 16 X12 SCH100CONC RED,SA-234WPB
: 17. 14" CHECK VALVE,SA-105                                          49. 12 90& WNF, SA-105
: 18. 20" X 14" STD REDUCING TEE, SA-234 WPB                          50. 12 SCH 100 ELBOW, SA-234 WPB
: 19. 20  15'N      FLANGE, SA-182 F304                                51. 17 GATE VALVE,SA-216 WCB 20" SCH 100 PIPE, SA412TP 304W                                  52. 17 X 10" SCH 100 CONC RED, SA-234 WPB
: 21. 20" STD PIPE, SAD12 WP 304 W                                    53. 10" SCH 100 PIPE, SA-106 GRB 20" STD ELBOW,    SA~    WP 304 W                                54. 10 GLOBE VALVE,SA-216 WCB 20 STD PIPE (PENETRATION) SA412TP 304 W                          55. 12" GLOBE VALVE,SA-216 WCB
: 24. 3/4 PLATE, SA-240 TP 304                                        56. 24" X 3/4" WALLPIPE, SA416 GR 70 3/4" PLATE, SA437 CL 2                                          57. HEAD SHELL 1-1/2" PLATE, SA416 GR 70 20" X 18" STD CONC REDUCER, SA 403 WP 304 W                      58. 16" X 1-1/2" WALLPIPE, SA416 GR 70
: 27. 18 STD PIPE SA-106 GRB                                          59. HEAD COVER, SA-105
: 28. 18" GATE VALVE,SA-216 WCB                                        60. HEAD FLANGE, SA-105 20 X 18" CONC RED, SA-234WPB                                    61. BARREL FLANGE, SA-105 20" STD PIPE, SA-106 GRB                                        62. BARREL SHELL 1/2" PLATE, SA416 GR70
: 31. 20" STD ELBOW, SA-234 WPB                                        63. DISHED HEAD 4-7/16" MIN PLT, SA416 GR 70
: 32. 20 STD CHECK VALVE,SA-105                                        64. SUPPORT RING 1-1/Z PLT, SAN16 GR 70
 
NIAGARA HOHAWK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2                        1 of 20 HHP2-ISI-006( REV. 1, CH-000                                            SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO ) DESCRIPTION OF ITEN TO BE EXAHIHED]CATGRY J IGSCC) EX1/NDE PROCEDURE                    [PERIOD  1                                REMARKS EXAHIHATION IDENI'IFIER ( ITS ISO LOCATOR, COHPONEHT DllG        &#xb9;,  ]ITEN  &#xb9; [FREQYJ EX2/NDE PROCEDURE        [PERIOD 2 USE CAL BLK &#xb9;  I  LINE  NO  AHD NOTES'S      APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3                I I
                            <<AOV101 BLTG                            IB  G 2  I  na    I  VT1/VT2.01              Sc7 2CSL*AOV101, VB502      t QISO 26-05              or  DWG&#xb9;  003  in (87.70    ]ID      ]  na  /na            I
                        /  LINE&#xb9; 2CSL-012-4-1      HTS:  (none)    /Grp Rep/      1    /  na /na              I I
                            *AOV101 INT SUR                          ]8-H-2    f  na    ]  VT3/VT2.01          /<<          [<< Examine shen dissassemble for maintenance 2CSL<<AOV101, VBY103      ]  QISO 26-05            or  DMG&#xb9; 003  in (812.50 (DisG        [  na  /na
                        /  LINE&#xb9; 2CSL-012-4-1      NTS: 5          (Grp Rept      1    f  na /na I  RED/*FV114                              /C-F-2    /  na    /  na  /na 2CSL*FV114, VWFV114-A    I  QISO 26-03            or  DWG&#xb9; 001  in [C5.51    (none      )
na /na f  LINE&#xb9; 2CSL-010-8-2      NTS: 42,43      (SD      J 2    J na  /na I
                            *Fv'I14/RED                              /C-F-2    /  na        na  /na 2CSL<<FV114,VWFV114-8    .i  QISO 26-03            or  DWG&#xb9; 001    in JC5.51    [none      f  na  /na na                I  LIHE&#xb9; 2CSL-010-8-2      NTS:  42,43    ISD      I    2    I  na /na
                            *HCV117 INT SUR                          IB.H-2    I  na    I  VT3/VT2.01          IEX6 2CSL*HCV117, VBY104      [  QISO 26-05            or  DWG&#xb9;  008  in [812.50  (OisG      [  na /na              I J
LINE&#xb9; 2CSL-012-4-1      NTS: 4          JGrp Rep)      1    (  na /na              I
(
                            *HCV118 BODY(pipe)/SOF                  Ic-F-2    I  na    I  SUR/PT3.00/NT4.00    I 2CSL HCVIIB,VWHCVI18 8    (
QISO 26-02            or DWG&#xb9; 019. in )none        (none    (
na  /                I na                  J LINE&#xb9;  2CSL-020-32-2    NTS: 19        [na        J 2    J na /na              I IMC-5      / *HCV118 BODY/BEARING NECK                fc-G      /  na        SUR/PT3.00/HT4 F 00 IEX6 2CSL<<HCV118,VWKCV118.C ( QISO 26-02                or DWG&#xb9;  019  in JC6.20    )ID          na /na              I na                /  LIHE&#xb9; 2CSL-020-32-2      NTS: 18,20      /Grp Rep( 2            na  /na              I IMC-5      J
                            <<HCV118 BODY/BEARIHG HECK                /C-G      f  na      f SUR/PT3.00/NT4.00 JEX6 2CSL*HCV118,VWHCV118.D i QISO 26-02                or  D'WG&#xb9; 019  in )C6.20    )ID        (
na /na na                  f  LINE&#xb9; 2CSL-020-32-2    NTS: 18,20      JGrp Rep)    2      f na /na              I IWC-5      J
                            <<HCV118 BODY LW                          Jc-G      ]  na        SUR/PT3.00/HT4.00    IEX6 2CSL'HCV118,VWHCV118-LW( QISO 26-02              or  DWG&#xb9;  019  in ]C6.20    (
ID        na /na              I na                  [  LINE&#xb9; 2CSL-020-32-2    NTS: 18          [Grp Rep[      2      na  /na              I
 
HIAGARA HOHAMK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2                          2 of 20 NNP2-ISI-006, REV. 1, CH-000                                          SECOND TEN 'YEAR IHSERVICE INSPECTION          (ISI)  INI'ERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX  G - CSL SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ      DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY )IGSCC) EX1/HOE PROCEDURE              (PERIOD    1                                REHARKS
                        )
EXANINATIOH IDENTIFIER  I  ITS ISO LOCATOR,  CONPOHEHT DMG    &#xb9;,  I ITEN &#xb9;  IFREQYI EX2/HDE PROCEDURE IPERIOO 2          I USE CAL BLK &#xb9;  I  LINE  NO'ND  HOTEL AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
(
                            'HCV119 BODY(pipe)/SOF                ]C-F-2    [  na    ]  SUR/PT3.00/HT4.00  [
2CSI.*HCV119,VWHCV119-A  [  QISO 26-02          or  DMG&#xb9; 019  in [none      (none    J na  /
na                f  LINE&#xb9; 2CSL-020-34-2    HTS: 18,27    )na      f  2    I  na  /na            I IWC      I *HCV119 BODY/BEARING NECK                JC-G      )
na    f  SUR/PT3.00/HT4.00  f 2CSL<<HCVI19(VWHCV119-C  (
QISO 26.02          or DWG&#xb9;  019 in  JC6.20    (ID      f  na /na              I AS                f  LIHE&#xb9; 2CSL-020-34-2    HTS: 18,20    /Grp Repf    2    f na  /na                    Sc11 IWC-5    (
                            *HCV1'19 BODY/BEARING HECK            JC-G      /  na    f  SUR/PT3 ~ 00/HT4.00  f 2CSL*HCV119,VWHCVI19.D  f  QISO 26-02          or  DMG&#xb9; 019  in /C6.20    /ID      f  na /na              I f  LINE&#xb9; 2CSL-020-34-2    NTS: 18,20    /Grp Rep/    2    /  na /na                    Sc11 IMC-5    i <<HCV119 LW                              JC.G      J na    )
SUR/PT3.00/HT4.00    J 2CSL<<HCV119,VWHCV119 LWL QISO      26-02          or DMS&#xb9; 019 in (C6.20 JIO            (
na /na              I na                /    LINE&#xb9; 2CSL-020-34-2 NTS: 18          JGrp Rep) 2        f  na /na              I    Sc11 I *NOV104 BLTG
                                                                    )B-G-2    J na    J VT1/VT2.01          I 2CSL<<HOV104, VB101        J QISO 26-05          or  DWG&#xb9;  009  in (87.70    ]ID      (  na  /na              I f  LINE&#xb9; 2CSL-012-17-1    NTS: 8          JGrp Rep)    1    f  na /na              iSc10
                              <<NOV104 INT SUR                        /B.N-2  /  na    f  VT3/VT2.01          /<<          )<< Examine  Ken dissassemble for maintenance 2CSL<<NOVI 04, VBY105      f  QISO 26-05          or  DWG&#xb9;  009.in /812.50 (DisG        f  na /na
                          )  LINE&#xb9; 2CSL-012-17-1    NTS: 4          ]Grp Rep[    1    (
na /na
                          )
                              <<NOV112 BODY(pipe)/SOF                fC-F-2    [ na    (  SUR/PT3.00/HT4.00    f 2CSL<<HOVI12,VWNOV112-B i      QISO 26.01          or DUG&#xb9; 020 in [none        [none    f na  /
f  LINE&#xb9; 2CSL-020-1-2    NTS: 18,19      )na      )  2      f na /na              I IMC-5      f <<HOV112 BODY/BEARING HECK                )C-G      ] na      J SUR/PT3.00/NT4.00    J 2CSL<<HOV112,VWNOVI12-C ] QISO 26.01              or DWG&#xb9;  020  in [C6.20    [ID      [ na /na                  Sc9 AS                  J LINE&#xb9; 2CSL-020-1-2    NTS: 18,20      JGrp Rep)    2      f na /na              I IWC-5      I  *HOV112 BODY/BEARIHG HECK              IC  G    I na      I SUR/PT3  00/NT      I 2CSL*HOV112, VWNOV112. D  I  QISO 26.01          or DMG&#xb9; 020 in JC6.20 [ID              ] na  /na              ]  Sc9
                          /  LINE&#xb9; 2CSL-020-1-2    NTS: 18,20      /Grp Rep/ 2        / na  /na              j
 
NIAGARA HOHAMK POMER CORPORATION -                HILE POINT NUCLEAR STATION - UNIT 2                        E 3of 20 NHP2-ISI-006I REV. 1, CN.OOO                                        SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX  G -  CSL SYSTEH (sorted by Examination Identifier) 2NO INTVL REL RED  )
DESCRIPTION OF ITEM TO BE EXAHINEDJCATGRY (IGSCC) EX1/NDE PROCEDURE                (PERIOD  1                              REHARKS EXAHINATION IDENTIFIER  J ITS ISO LOCATOR, COHPONENT DMG &#xb9;, [ITEH        &#xb9;  [FREOY( EX2/NDE    PROCEDURE    (PERIOD 2 USE CAL BLK &#xb9;  f LINE NO. AND NOTES, AS APPLICABLE ]SELECT ]CLASS( EX3/NDE            PROCEDURE    ]PERIOD 3 [
luc 5    I <<HOV112 BODY LM                      Ic-G        I na    I SUR/PT3.00/HT4 F 00  I 2CSL<<HOvi12,vuHOv112-LM) Qlso 26-01            or  DMG&#xb9; 020  in IC6.20      IID      I na  /na              I    Sc9 na                  I LINE&#xb9; 2CSL-020-1-2    NTS: 18        IGrp Repl      2    I na /na                I I
                          *P1 BLTG                              Jc-D          na      VOL/UT6.04
                                                                            /        f                      I 2CSL*P1, PPB100          I QISO 26-            or  DMG&#xb9;  027  in JC4 ~ 30    /10      f    /                      Sc9 NHP2-2.25-10.STUD  / LINE&#xb9; 2CSL-020-na-2    NTS:  (none)  /Handate/      2    [    /                I
(
                          *Pl  PIPE/MNF                        Ic-F-2      I na    I VOL/RT5.00/UT6.02    I 2CSL*P1,PM300            I QISO  26.03        or DMG&#xb9; 027 in (C5.51        [none    )
SUR/PT3.00/Hl'4.00    )
NHP2-16..375-CS    J LINE&#xb9; 2CSL-016-na-2 NTS: 47,33        JSD        [  2    J na  /na              I I
                          *P1 ND/PIPE                          Jc-F-2      f na    ( SUR/PT3.00/HT4.00    (
2CSL*P1,PM301          i QISO 26-03          or  DUG&#xb9; 027  in )C5.81      (none    ( na  /                I na                f  LINE&#xb9; 2CSL-016-na-2    NTS: 46,47    /TE        f  2    t na  /na              I I
                          *Pl  HD COVER/SNL                    Ic  G      I  na    I SUR/PT3.00/HT4.00    I 2CSL<<P1,PM306          i QISONA              or  DMG&#xb9;  027  in [C6.10    ]ID      (
na  /na                    Sc9
(  LINN 2CSL-020-1-2      NTS: 46,48    JHandate[      2  f  na /na              I
(
                          <<Pl MNF/PIPE                          Ic-F-2    I  na    I VOL/RT5 F 00/UT6.02  I 2CSL*P1,PM308          /  QISO 26-02          or  DMG&#xb9; 027. in /C5.51      /none    /  SUR/PT3.00/Hl'4.00  /
NHP2-RNS-.75-CS    /  LINE&#xb9; 2CSL-024-na-2    NTS: 32 45    /SD        /    2  /  na  /na I  *P1 PIPE/ND                          Ic-F-2    I  na    I  SUR/PT3.00/HT4.00    I 2csL*P1,Pu309          I QISO 26-02          or  DMG&#xb9;  027 in  (C5.81    (none    J na  /                I
(  LINE&#xb9; 2CSL-024-na-2    NTS: 45,46    JTE        f    2  f  na  /na              I I
                          <<P1 HD/FLG                            fc-G      [  na    ]  SUR/PT3.00/HT4.00    J 2CSL*P1, PM310          [ cilISONA            or  DUG&#xb9; 027  in  JC6.10    ]ID      ( na /na                (
Sc9 J
LINE&#xb9; 2CSL-020-1-2    NTS: 46,50    JHandate)      2    [ na /na                I IMC-1  I
                          *P1 UPR BARREL SHL/FLG                fc  G      (  na    f  SUR/P'T3.00/H'T4.00  (<<          (<< Examine  Ken dissassemble for maintenance 2CSL*P1, PM31'I        I  QISO 26-            or  DMG&#xb9; 027  in /C6.10      ]ID      f  na /na              /<<
f  LINE&#xb9; 2CSL-020-1-2    NTS: 50,51    JHandatef      2    ]  na /na
 
NIAGARA HOHAMK POMER CORPORATION -            HILE POINT NUCLEAR STATION - UNIT 2                        E 4 of 20 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                              APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REO ) DESCRIPTION OF ITEM TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE              iPERIOD  1                                REHARKS EXAHINATION IDENTIFIER ] ITS ISO LOCATOR, COHPONEN'I D'MG      &#xb9;, ]ITEN  &#xb9;  JFREQYJ EX2/NDE PROCEDURE    /PERIOD 2 i USE CAL BLK  &#xb9; J LINE NO. AND NOTES, AS APPLICABLE    DESELECT  iCLASSi EX3/NDE PROCEDURE /PERIOD 3 IMC-1      I
                            <<P1 LMR BARREL SHL/ND                [C-G      (  na    SUR/PT3.00/HT4.00                J>> Examine when dissassemble for maintenance 2CSL<<P1, Pl612            / QISO 26-            or DMG&#xb9; 027    in /C6.10    /ID      na  /na              />>          I i LINE&#xb9; 2CSL-016-3-2    NTS: 51,52    (Handate(    2    na /na              J>>          I
                            <<P1 HD LM                                          na                /HT4 00
[                                      IC  G    I      I SUR/PT3              I 2CS L*P1, PM314            / QISONA              or  DMG&#xb9;  027 in /C6.10    /ID    / na  /na                  Sc9
[ LINE&#xb9; 2CSL-020.1-2    Hl'S: 46      (Handate(    2  (
na /na              I IMC-1      I
                            *P1 UPR BARREL SNL LM                /C-G      /  na    SUR/PT3.00/HT4.00                (>> Examine when dissassemble for maintenance 2CSL*P1, PM315            I QISO 26-            or DMG&#xb9; 027    in /C6.10    /ID      na /na              /<<          I
                          / LINE&#xb9; 2CSL-020-1-2    NTS: 5'I      /Handate/    2    na /na                          I IMC-1        <<P1 UPR BARREL SHL/LMR SHL            /C-G      f  na    SUR/PT3.00/HI'4.00 />>            )>> Examine when dissassemble for maintenance 2CSL*P1, PM316              QISO 26-            or  DMG&#xb9; 027  in (C6.10    (ID      na /na              />>          I LINE&#xb9; 2CSL-020.na-2    NTS: 51        JHandate(    2    na /na              />>          I
                            *P1 LM                                (C-F-2      na    VOL/UI'6.02
                                                                            /      f 2CSL*P1, PM317            I QISO 26-            or  DMG&#xb9;  027 in /C5.52    /none  J SUR/PT3.00/HT4.00  /
NHP2-RHS-.75-CS      / LINE&#xb9; 2CSL-020.1-2    NTS: 45        /AL      J 2  / na /na              I IMC-1        *P1 BARREL SHL PIN/HD                fC-C      J na    SUR/PT3.00/HT4.00  />>          J>> Examine when dissassemb(e for maintenance 2CSL<<P1,PM319              / QISO 26-            or  DMG&#xb9; 027. in /C3.30    /ID      na /na              />>          I
                          / LIHE&#xb9; 2CSL-020-na-2    NTS: 52,53    /Handate/    2    na  /na            /<<          I i MNF/EXT RING                          (C-F-2    /  na  [ VOL/UT6.02 2CSL<<STRT1,STRTMELD004Ai QISO 26-02              or  DMG&#xb9; 030  in [C5.51    ]none  f SUR/PT3.00/HT4.00 NHP2-20-.375-CS      I LINE&#xb9; 2CSL-020 1-2    NTS: 21,30    ISD      I 2    I na /na I EXT RING/TEE                          IC-F-2    I  na  I VOL/UT6.02 2CSL<<STRTI,STRTMELD004Bi QISO 26-02              or  O'MG&#xb9;  030 in (C5.51    )none  ) SUR/PT3.00/HT4.00 NHP2-18-.375-CS      f LINE&#xb9; 2CSL-020-1-2    NTS:  28,29    JSD      f  2  / na  /na
(
                            *V121 BODY(pipe)/SOF                  JC-F-2    /  na    SUR/PT3.00/HT4.00  /
2CSL<<V121, VMV121-B        i QISO 26.01          or  DMG&#xb9; 057  in (none    ]none  ( na  /              I
( LINE&#xb9; 2CSI.-020-1-2    NTS: 18,19    dna      f  2    na /na              I
 
NIAGARA MOHAWK POWER CORPORATION          -      MILE POINT NUCLEAR STATION    - UNIT 2                                  5 of 20 NMP2-ISI-006, REV. 1, CH-000                                            SECOND TEH YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                  APPENDIX G - CSL SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED    (
DESCRIPTIOH OF ITEM TO BE EXAMINEDJCATGRY (IGSCC[ EX1/NDE PROCEDURE [PERIOD              1                              REMARKS EXAMINATION IDENTIFIER    J ITS ISO LOCATOR,  COMPONENT D'WG  &#xb9;, ]ITEM &#xb9;  JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK    &#xb9; / LIHE HO. AHD NOTES, AS APPLICABLE ]SELECT )CLASS] EX3/HDE PROCEDURE              [PERIOD 3 I WC-5      f
                              *V121 BODY/BEARING NECK                JC-G    ]  na  f  SUR/PT3.00/MT4.00  ]
2CSL*V121, VWV121-C        i QISO    26.01        or  DWG&#xb9;  057  in  JC6.20  )ID    ]  na /na J
LINE&#xb9; 2CSL-020-1-2    NTS: 18,20      IGrp Repl    2  I  na /na                  Sc11
[ *V121 BODY/BEARING NECK                  [C-G    J na    (
SUR/PT3.00/Ml'4.00 (
2CSL*V121, VllV121-D      I QISO 26-01          or DWG&#xb9; 057    in  (C6.20  ]ID      J na  /na na                  [  LINE&#xb9; 2CSL-020-1-2    NTS: 18,20      JGrp Rep)    2    J na /na                  Sc11 IllC-5      f
                              *V121 BODY  L'W                        JC-G    ]  na    f  SUR/PT3.00/MT4.00  J
[NOTE NAME CHANGE:  Called VBW121-LW in 1st Interval Plan 2CSL*V121, VWV121. LW      i QISO 26.01            or  DWG&#xb9;  057  in  JC6.20  [ID      /  na /na            I          I J
LINE&#xb9; 2CSL-020-1-2    NTS: 18        ]Grp Repf    2    /  na /na            I    Sc11  I
                          ]
PIPE/*MOV112                          /C-F-2  /  na    /  VOL/UT6.02 2CSL-26-01-FW004            [  QISO 26-01          or  DWG&#xb9;  na  in  )C5.51  )none    )
SUR/PT3.00/MT4.00  (
NMP2-20-.375-CS      /  LINE&#xb9; 2CSL-020-1-2    HTS: 18,22      /SD      /  2    /  na /na I  PIPE/ELB                              [C-F-2  )  na    J VOL/Ul'6.02 2CSL-26.01-FW008            i QISO 26-01          or  DWG&#xb9;  na  in  )C5.51  (none    ]  SUR/PT3.00/MT4.00  )
HMP2-20-.375-CS      )
LINE&#xb9; 2CSL-020-1-2    NTS: 22,23      )SD      (  2    ]  na  /na            I
(
WHF/PIPE                              JC-F-2    f na    f VOL/UT6.02 2CSL-26-01-FW009            I  QISO 26-01          or  DWG&#xb9;  na  in  JC5.51    ]none  [  SUR/PT3.00/MT4.00  (
HMP2-20-.375-CS          LINE&#xb9; 2CSL-020-1-2    HTS:  21,22    JSD      f  2    [  na /na I ELB/PIPE                              JC-F-2    J na    f  VOL/UT6.02 2CSL-26-01-Fl$ 15            i QISO 26.01          or  DWG&#xb9; na    in  ]C5.51    ]none  )
SUR/PT3.00/MT4.00  (
NMP2-20-.375-CS        / LINE&#xb9; 2CSL-020-1-2    NTS: 22,23      /SD      /  2    /  na  /na I PIPE/PIPE                              IC-F-2    I na    I  VOL/UT6.02          I 2CSL-26-01-FW016            I QISO 26-01          or  DWG&#xb9;  na    in (C5.51    [none  )
SUR/PT3.00/MT4.00  )
NMP2-20-.375-CS        f LIHE&#xb9; 2CSL-020-'1-2    NTS: 22        ]none    f  2    f  na  /na I PIPE/ELB                              IC-F-2    I na    I  VOL/UT6.02 2CSL-26-01-FW022            I QISO 26.01          or  DWG&#xb9; na    in JC5.51    [none    [ SUR/PT3.00/MT4.00 HMP2-20-.375-CS        J LINE&#xb9; 2CSL-020-'l-2    HTS:  22,23    ]SD      J 2    [ na  /na
 
NIAGARA NOHAMK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        6of 20 HHP2-ISI-006, REV. 1, CH-000                                            SECOHD TEH YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                    APPENDIX  G - CSL SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE                    IPERIOO  1  I                    REMARKS EXANIHATIOH IDENTIFIER    J ITS ISO LOCATOR, COHPOHEHT DMG      &#xb9;,  ]ITEN  &#xb9; JFREQYJ EX2/HDE PROCEDURE      ]PERIOD 2    )
USE CAL BLK  &#xb9; f  LIHE HO. AND NOTES, AS APPLICABLE ]SELECT )CLASS] EX3/HDE PROCEDURE              ]PERIOD 3 IMC-2r1    I  PIPE/ELB                                IC-F-1    /  na    /  VOL/UT6.03          [ Inacc 2CSL-26 01-FW026          I  QISO 26-01          or  DWG&#xb9; na    in (C5.11    ERR      /  SUR/PT3.00          I NHP2-20-.375-SS    I  LINE&#xb9; 2CSL-020-2-2    HTS'4    15    INS          2    /na/                  I IWC-2r1    I  WNF/PIPE                                IC-F-1    (
na    )
VOL/UT6.03          ]Inacc 2CSL-26.01-FM027          I QISO 26 01            or  DWG&#xb9; na    in (C5.11    IRR      I SUR/PT3.00          I NMP2-20-.375-SS    I  LIHE&#xb9; 2CSL-020-2-2    HTS: 11,12      INS      ~
2    ina/                  I IWC-2rl    I  ELB/PENET Z15                          IC-F-1    ]  na    [  VOL/UT6.03          finacc 2CSL-26.01-FI$ 28        i  QISO 26-01          or DWG&#xb9; na in )C5.11          ERR      )
SUR/PT3.00          I HHP2-20..375-SS      I  LINE&#xb9; 2CSL-020-2-2    NTS: 15(14      INS          2    /na/                    I I  215/PIPE                                (C-F-I    J na    J VOL/UT6.03          I 2CSL-26-01-FW029          I  QI    26 01        or  DWG&#xb9; na    in  JC5.11    ]ID      f  SUR/PT3.00          I HNP2.20-.375-SS      f  LINE&#xb9; 2CSL-020-64-2    NTS: 12,14      (7.5XNin) 2        f  na  /                iSc10 PIPE/~VI21                              IC F-1    [ na    )
VOL/UT6.13          I 2CSL-26-01-FW030          I  Ql    26 01        or DWG&#xb9; na in (C5.11 (ID              (
SUR/PT3.00          I HNP2-20..375-SS      f  LINE&#xb9; 2CSL-020-64-2 HTS: 12,18          )7.5XHIn) 2        J na  /                )Solo I  PIPE/PIPE                              IC-F-2    J na    J VOL/UT6.02 2CSL-26.01-FW032            i QISO 26-01          or  DWG&#xb9; na  . in [C5.51    ]none    f  SUR/PT3 F 00/HT4.00 ]
HNP2-20-.375-CS      )
LINE&#xb9; 2CSL-020-1-2      HTS: 22        )none    [    2  ~
na /na
[ WNF/PIPE                                IC-F-2    f na    ]  VOL/UT6.02 2CSL-26-01-FW033            i QISO 26-01          or  DMG&#xb9; na    in (C5.51    ]ID      f SUR/PT3.00/HT4.00    JSc8 NHP2-20-.375-CS      I LINE&#xb9; 2CSL-020-1-2      NTS: 21(22      I SD          2    / na /na I'WC-2r1    I PIPE/PIPE                                IC-F-1    I na    I VOL/UT6.03          (Inacc 2CSL-26-01-FW035            i QISO 26-01          or  DMG&#xb9; na    in  [C5.11    IRR      I SUR/PT3.00          I HHP2-20-.375-SS      i LINE&#xb9; 2CSL-020.2-2      HTS: 12,14      iHS          2    /na/                  I I PIPE/PIPE                                IC-F-2    )
na    (
VOL/UT6.02 2CSL-26.01-FM036          i QISO 26-01          or DWG&#xb9; na      in  )C5.51    ]none    J SUR/PT3.00/NT4.00    )
NNP2-20-.375-CS      J LINE&#xb9; 2CSL-020-1-2      HTS: 22          )none        2    / na /na              I
 
                      /
NIAGARA NOHAMK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        7 of 20 NNP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR INSERVICE INSPECTION              (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                      APPENDIX  G - CSL SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED        DESCRIPTIOH OF ITEN TO BE EXAMINED)CATGRY )IGSCC) EX1/NDE PROCEDURE )PERIOD                    1                    RENARKS
                          )
EXANIHATIOH IDENIIFIER    I  ITS ISO LOCATOR'ONPONEHT DMG        &#xb9;i  )ITEN    &#xb9; IFREQYI EX2/NDE PROCEDURE        )PERIOD 2 I USE CAL BLK  &#xb9; )  LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/HDE                PROCEDURE  )PERIOD 3 )
IWC-3      I INTEG ATT                              )C-C      )
na    )
SUR/(inaccessible))lnacc 2CSL-26.01-FM313          )
QISO  26-01-12        or DWG&#xb9; na in )C3.20        IRR          na /na              I
                          )
LINE&#xb9; 2CSL-020-2-2      NTS: 12,13      )HS            2    )
na /na              I IMC-3      I  IHTEG ATT                              )C-C      )
na        SUR/(inaccessible)) Inacc 2CSL-26.01-FM314          I  QISO  26-01-12      or DMG&#xb9; na in IC3.20        IRR      )  na /na              I
                          )  LINE&#xb9; 2CSL-020-2-2      NTS: 12,13    )HS            2    )  na /na              I
                          )
LM                                      Ic-F-1    )  na    )
VOL/UT6.03          )Inacc 2CSL-26-01-LW01          )
QISO 26-01            or  DMG&#xb9; na  in )C5.12      )RR      I  SUR/PT3.00          I HNP2-20..375-SS      I  LINE&#xb9; 2CSL-020-2-2      NTS: 12        INS            2    )  na/                  I
                          )
LW                                      Ic-F-1    )
na    )
VOL/UT6.03          )  Inacc 2CSL-26-01-LM02            )
QISO 26-01            or  DWG&#xb9; na    in )C5.12    )RR      I  SUR/PT3.00          I HNP2-20-.375-SS        LINE&#xb9; 2CSL-020-2-2      HTS: 14        )NS            2    )
na/                  I L'M IR                                    -  -1      na        VOL/UT6.03          )lnacc I                                          IC F      )        )
2CSL-26-01-LM03            I QI      26 01          or  DWG&#xb9; na    in )C5 ~ 12  IRR      I  SUR/PT3.00          I HNP2-20-.375-SS      )
LINE&#xb9; 2CSL-020-2-2      N'IS: 15      )HS            2    )
na/                  I
                          )
LM OR                                  Ic-F-1      )
na    )  VOL/UT6.03          )lnacc 2CSL-26-01-LW04            )
QISO 26-01            or  DMG&#xb9; na    in )C5.12      IRR      I  SUR/PT3.00          I HNP2-20-.375-SS      I  LINE&#xb9;    CSL 020 2 2    NTS'          INS        I  2    )
na /na              I
                          )
LM  assoc w/fr@28  B, FM029            )C-F-1      )
na      I VOL/UT6.03          )            I 2CSL-26-01-LM05            )
QISO 26-01            or  DMG&#xb9; na    in  )C5.12    )ID      I SUR/PT3.00          I            I NNP2-20-.375-SS      I LINE&#xb9; 2CSL-020.2-2      NTS: 14        IAL            2    )
na /na                )
Sc10
                            )
LM  assoc w/FW029  8, FW030              )C-F-1    )
na      I VOL/UT6.03            I 2CSL-26-01-LW06            I QI    2601          or  DMG&#xb9; na    in )C5.12      )ID      I SUR/PT3.00            I NNP2-20-.375-SS      I LINE&#xb9; 2CSL-020-64-2      NTS: 12        IAL            2    )
na /na                )
Sc10 I ELB/PIPE                                Ic-F-2    )
na      ) VOL/UT6.02 2CSL-26-01-SM006            ) QISO 26-01            or  DMG&#xb9; na    in  )C5.51    )none    ) SUR/PT3 F 00/NT4.00  )
NNP2-20-.375-CS      I  LINE&#xb9; 2CSL-020-1-2      NTS: 22,23      ISD            2    ) na /na
 
NIAGARA HONAMK POMER CORPORATION        -        NILE POINT    NUCLEAR STATION  - UNIT 2        8 of 20 NHP2-ISI-006, REV. 1( CH.OOO                                            SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                  APPENDIX  G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO    J DESCRIPTION OF ITEN TO BE EXAHINED[CATGRY JIGSCC] EX1/NDE PROCEDURE              ]PERIOD    1  J REHARKS EXAHIHATION IDENl'IFIER  f  ITS ISO LOCATOR, COHPONEHT    DMG    &#xb9;, ]ITEN  &#xb9;  (FREQYJ    EX2/HDE PROCEDURE  ]PERIOD 2 USE CAL BLK  &#xb9; I  LINE  NO  AND  NOTES'S    APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE          IPERIOD 3    I
[  PIPE/ELB                                IC-F-2    ] na    J VOL/UT6.02 2CSL-26-01-SM007          i QISO 26-01            or  DMG&#xb9; na    in [C5.51    iID    i SUR/PT3.00/HT4.00    igc8 NHP2-20..375-CS      i LINE&#xb9; 2CSL-020-1-2        NTS: 22,23      iSO          2    / na /na              I I  ELB/PIPE                                IC-F-2    / na    / VOL/UT6.02 2CSL-26-01-SM011          i QISO 26-01            or  DMG&#xb9; na    in (C5.51    [none    (
SUR/PT3.00/HT4.00  (
NHP2-20-.375-CS    I  LINE&#xb9; 2CSL-020-1-2      HTS: 22,23      ISD      I  2    I na /na              I I  PIPE/ELB                                IC-F-2    I na    I VOL/UT6.02 2CSL-26.01-SM013          i QISO 26-01            or  OMG&#xb9; na    in )C5.51    ]none    f SUR/PT3.00/HT4.00  (
NHP2-20..375-CS        LINE&#xb9; 2CSL-020-1-2      NTS: 22,23      [SD      I  2    I                    I IMC-3      I  INTEG ATT PENET 215 SKOPIIELD          IC-C      )
na    [ SUR/(inaccessible)[lnacc 2CSL-26-01-SM301          i QISO    26-01          or  DMG&#xb9; na    in [C3.20    IRR      I na /na              I i LIHE&#xb9;  2CSL-020-2-2    NTS: 14,16      iNS          2    f na/na                I I  INTEG ATT PENET Z15 SHOPMELO            IC-C      I na    I SUR/PT3.00/HT4.00    I 2CSL-26.01-SM302          i  QISO  26.01          or DMG&#xb9;  NA    in (C3.20 ]ID        f na /na f  LINE&#xb9; 2CSL-020.2-2      NTS: 14,17      JHandatef    2    J na /na              i Sc10 I  ELB/PIPE                                )C-F-2    [ na    ] VOL/UT6.02 2CSL-26-02-FM001          (
QISO 26-02          or  DMG&#xb9; na  ~ in [C5.51    [none    ) SUR/PT3.00/HT4.00    (
NHP2-20-.375-SS      I  LINE&#xb9; 2CSL    20 1 2    HTS'3    2      ITE          2    f na /na I  ELB/PIPE                                IC-F-2    ] na    (
VOL/UT6.02 2CSL-26-02-FII002          I QISO 26-02          or  DMG&#xb9; na    in (C5.51    ]none    J SUR/PT3.00/H'I4.00  J NHP2 ~ 375-CS    I LINE&#xb9;  2CSL 020.1-2    HTS: 23,24      ISO          2    ) na /na I PIPE/TEE                                IC-F-2    ] na    [ VOL/UT6.02 2CSL-26.02-FM003            I QISO  26-02          or DMG&#xb9; na in [C5.51        IID      I SUR/PT3.00/HT4.00    ISc8 NHP2 ~ 375-CS    I LINE&#xb9; 2CSL-020-1-2      HTS: 24,26      ISO          2    [ na /na I ELB/PIPE                                IC-F-2    J na    [ VOL/UT6.02 2CSL-26-02.FM008            I QISO  26.02          or OMG&#xb9; na in JC5.51        (none    ( SUR/PT3.00/HT4 F 00  J NHP2-20..375-CS      I LIHE&#xb9; 2CSL-020-1-2      NTS: 23,24      ISD          2    f na /na
 
HIAGARA HONAWK POMER CORPORATION            -      NILE POINT NUCLEAR STATIOH - UNIT 2        9 of 20 HHP2-ISI-006( REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPEHDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND  IN'IVL REL RED ( DESCRIPTIOH OF      ITEN TO BE EXANINED(CATGRY ( IGSCC( EX1/NDE PROCEDURE (PERIOD            1                        REMARKS EXAHIHATION IDENT'IFIER  (  ITS ISO LOCATOR,    COHPONEHT DWG    &#xb9;,  (ITEM  &#xb9; (FREOY( EX2/NDE PROCEDURE (PERIOD 2        (
USE CAL BLK  &#xb9; I  LINE  NO  AND NOTES  AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE            (PERIOD 3  I I  ELB/ELB                                  IC-F-2  (
n      (
VOL/UT6.02 2CSL-26.02-FW009        (
QISO  26-02          or DWG&#xb9; na      in (C5.51    (none    (  SUR/PT3.00/NT4.00  (
NHP2-20-.375-CS    I  LINE&#xb9; 2CSL-020-1-2      NTS: 23          ISD          2    (  na /na I
                            *STRT 1/RED                              IC-F-2    (
na    (
VOL/UT6.02 2CSL-26-02-FW011        I  QISO  26-02          or  DWG&#xb9;  na    in  (C5.51    (none    (
SUR/PT3.00/MT4.00  (
HHP2-20-.375-CS    (
LINE&#xb9;    2CSL-020-1-2    HTS:  28,30      (SD          2    (
na /na
(
PIPE/*STRT-1                              IC-F-2    ( na    (
VOL/UT6.02 2CSL-26.02-FM012        I QISO    26-02          or DMG&#xb9; na in (C5.51          (none    (
SUR/PT3.00/NT4.00  (
NHP2-20-.375-CS    (  LINE&#xb9; 2CSL-020-1-2      NTS: 24,28      (SD      (  2    (
na  /na
(
WNF/PIPE                                  IC-F-2    I na    I  VOL/UT6.02          I 2CSL-26-02-FM013        (  QISO  26.02          or DWG&#xb9; na in (C5.5'I        (none    (  SUR/PT3.00/HT4.00  (
NHP2-20-.375.CS    (  LINE&#xb9; 2CSL.020-32-2 NTS: 24,2'I          (SD          2    (  na  /na I  RED/PIPE                                  IC-F-2    (
na    (
VOL/UT6.02                    I 2CSL-26-02-FW018          (  QISO  26.02          or DWG&#xb9; na in (C5.51          (none    (
SUR/PT3.00/HT4.00  (          I NHP2-24-.375-CS    (
LINE&#xb9; 2CSL-024-1.2      HTS: 30,31      ISD          2    (
na  /na            (          I P I PE/WNF                                IC-F-2    ( na    (  VOL/UT6.02                    I 2CSL-26.02-FM019          I  QISO 26-02            or  DWG&#xb9; na  ~  in (C5.51    (none    (  SUR/PT3.00/HT4.00  (          I HHP2-24-.375.CS    I  LINE&#xb9; 2CSL-024-1-2      HTS:  31,32      ISD          2    (  na  /na                        I
(  ELB/PIPE                                  IC-F-2    ( na    (  VOL/UT6.02 2CSL-26-02-FW020          I  QISO 26-02            or  DWG&#xb9;  na    in (C5.51    (none    (
SUR/PT3.00/Nl'4.00  (
NHP2.20-.375-CS        LINE&#xb9; 2CSL-020-1-2      HTS:  23,24      (SD          2    (
na  /na I  PIPE/ELB                                  IC-F-2    I na      I VOL/UT6.02          I 2CSL-26.02.SW009          (  QISO 26-02            or  DWG&#xb9;  na    in (C5.51    (none    (
SUR/PT3.00/HT4.00  (
NHP2-20-.375-CS    I  LINE&#xb9; 2CSL-020.1-2      NTS:  23,24      ISD          2    ( na  /na I  PIPE/ELB                                  IC-F-2  ( na      (
VOL/UT6.02 2CSL-26-02-SW010          I QISO    26.02        or DWG&#xb9; na in (C5.51          (none    (
SUR/PT3.00/NT4.00  (
NHP2-20-.375-CS      I LINE&#xb9; 2CSL-020-1-2      HTS: 23,24        ISD          2    ( na  /na
 
NIAGARA NOHAWK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        10 of 20 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN change date: 07/29/1999                                                                      APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOD  1  I                    REHARKS EXAHIHATION IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT DWG        &#xb9;,  ]ITEN  &#xb9; JFREOYJ EX2/HDE PROCEDURE      ]PERIOD 2 USE CAL BLK  I  LINE  NO  AND HOTESi AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE              IPERIOO 3  I I  TEE/PIPE                                IC-F-2    ]  na  )
VOL/UT6.02 2CSL-26-02-SI$  11    ] QISO    26-02        or DWG&#xb9; na in )C5.51          )none  ]    SUR/PT3.00/HT4.00  )
HHP2 ~ 375-CS (
LINE&#xb9; 2CSL-020-1-2    NTS: 24,26      )SD          2    J na /na            I I  PIPE/TEE                                IC-F-2    f  na    [
VOL/UT6.02 2CSL-26-02-SW012        i QISO 26-02            or  DMG&#xb9; na    in  /C5.51    ]none    f  SUR/PT3.00/MT4.00  /
NNP2.20-.375.CS  I  LINE&#xb9; 2CSL-020-32-2    NTS:  24I26      ISD          2,  /  na /na            I I  ELB/PIPE                                IC-F-2    [  na    ]  VOL/UT6.02 2CSL-26-02-SW013        )  QISO  26-02        or DWG&#xb9; na in /C5.51          [none    f  SUR/PT3.00/NT4.00  f HNP2-20-.375.CS    /  LINE&#xb9; 2CSL-020-32-2 HTS: 23,24          /SD          2    /  na  /na            I I  PIPE/ELB                                IC-F-2    )  na    [  VOL/UT6.02 2CSL-26.02-SW014        i QISO 26-02          or  DWG&#xb9; na    in [C5.51    [none    [  SUR/PT3.00/HT4.00  (
NHP2-20-.375-CS    I  LINE&#xb9; 2CSL-020-32-2    HTS:  23,24      ISD          2    )  na /na              I I  ELB/PIPE                                IC-F-2    ]  na    [  VOL/UT6.02 2CSL-26-02-SW015        ]  QISO  26-02        or  DWG&#xb9;  na    in ]C5.51    Inone    I  SUR/PT3.00/HT4 00  I HNP2-20-.375-CS    i  LINE&#xb9;  2CSL-020-1-2    HTS:  23,24      LSD          2    /  na /na              I I  PIPE/ELB                                IC-F-2    I na    I  "  L/UT6 02        I 2CSL-26.02-Sl$ 16      i QISO 26-02          or  DMG&#xb9; na  ~  in )C5.51    ]none    f  SUR/PT3.00/Hl'4.00  /
HNP2-20-.375-CS      LINE&#xb9; 2CSL-020 1-2      NTS: 23,24      (SD          2    f  na  /na            I
                        ]  PIPE/ELB                                IC.F-2    [ na    J VOL/UT6.02 2CSL-26-02-SW017        I QISO 26-02          or  DWG&#xb9;  na    in  JC5.51    (none    f  SUR/PT3.00/HT4.00  J HHP2-20-.375-CS    I LINE&#xb9; 2CSL-020-1-2      HTS:  23,24      ITE          2      [ na  /na            I
                          )
PIPE/*V4                                IC-F-2    [ na      [ VOL/UT6.02 2CSL-26-03-FM003        ( QISO 26-03          or DWG&#xb9; na      in  [C5.51    (none    I SUR/PT3.00/HT4.00  I NHP2-16-.500-CS    (
LINE&#xb9; 2CSL-016-3-2      NTS: 34,35      )SD          2    f na /na              I I *V4/PIPE                                IC-F-2    (
na      ( VOL/UT6.02 2CSL-26-03-FW004        ] QISO 26-03          or DWG&#xb9; na      in  [C5.51    )none    ) SUR/PT3.00/HT4.00  (
NHP2-16-.500-CS    I  LINE&#xb9; 2CSL-016-3-2    NTS: 34,35      ISD          2    ] na /na
 
NIAGARA NOHAWK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        11 of 20 NNP2-ISI-006, REV. 1, CN.OOO                                        SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                  APPEHDIX  G - CSL SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXANINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE              iPERIOD  1                        RENARKS EXANINATION IDENTIFIER i ITS ISO LOCATOR, CONPONEHT DWG      &#xb9;,  (
ITEN  &#xb9; iFREOYi EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK  &#xb9; I  LINE  No. AND NOTES'S    APPLICABLE    ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3        I I  ELB/PIPE                              IC-F-2    i na    i  VOL/ur6.O2 2CSL-26-03-Fl$ 05      I  QISO 26.03          or  DWG&#xb9;  na  in iC5.51    inone  i  SUR/PT3.00/NT4.00  i NNP2-16-.500.CS  i LINE&#xb9; 2csL-016-3-2      Nrs: 34,36      iso          2  i na  /na i ELB/PIPE                                IC-F-2    i na    t  VOL/UT6.02 2CSL-26-03-FW006        I  QISO 26.03          or  DMG&#xb9; na    in iC5.51    inone i SUR/PT3.00/NT4.00 i NNI2-16-.500-CS  I  LINE&#xb9; 2CSL-016-3-2    NTS:  34,36    ISO          2  i na  /na I  PIPE/ELB                              IC-F-2    J na    i  VOL/ur6.O2 2CSL-26-03-FM007        I  Qlso 26.03          or DMG&#xb9; na in iC5.51        )none    J SUR/PT3.00/NT4.00  i HNP2-16-.500-CS  i  LINE&#xb9; 2CSL-016-3-2    NTS: 34,36      iSD          2    i na  /na              I I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02          I 2CSL-26.03-Fl$ 08      / QISO  26-03        or DMG&#xb9; na in /C5.51        inone    i  SUR/PT3.00/NT4.00  i NNP2-16-.500-CS  t  LINE&#xb9; 2CSL-016-3-2    NTS: 34,36      LSD          2    i na /na I  TEE/PIPE                                IC-F-2  i na    J VOL/UT6.02 2CSL-26.03-FW009        I  QISO 26-03          or  DWG&#xb9; na    in iC5.51    inone    /  SUR/PT3.00/NT4.00  i NNP2-16-.500.CS  I  LINE&#xb9; 2CSL-016-3-2    NTS:  34,39      ISO          2    i na  /na I  TEE/PIPE                                IC-F-2  i na    i  vol./ur6.02 2CSL-26 Fl$ 10      I QISO  26.03        or DWG&#xb9; na      in iC5.51    )none i SUR/PT3.00/NT4.00 i NNP2-12-.375-CS    I LINE&#xb9; CSL 012 8 2      HT  '9i40        ISD          2 i na /na                  I I ELB/PIPE                                IC-F-2  i na    i VOL/ur6.O2 2CSL-26-03-Fl$ 11        i QISO  26.03        or DWG&#xb9; na in iC5.51          [none i SUR/PT3 F 00/NT4.00 i HNP2-12-.375-CS      LINE&#xb9; 2CSL-012-8-2    HTS: 40,41      LSD          2    i na  /na              I I PIPE/RED IC-F-2    i na    i VOL/ur6.02 2CSL-26-03-Fl$ 12        I QISO 26-03          or  DWG&#xb9; na    in  iC5.51    Inone  I  SUR/PT3.00/NT4.00  I NNP2-12-.375-CS    I LINE&#xb9; 2CSL-012-8-2    NTS:  40i42      ISO          2    i na  /na              I I PIPE/~FEI                              IC-F-2    I na    I VOL/UT6 02          I 2CSL-26-03-Fl$ 13        I QISO 26.03        or  DWG&#xb9;  na    in  (C5.51    inone    i SUR/PT3.00/NT4.00  i NNP2-16 .500-Cs    i LIHE&#xb9;  2CSL-016-3-2    NTS:  34,37      iso          2    i na /na
 
NIAGARA MOHAWK POWER (X)RPORATION        -      MILE POINT NUCLEAR STATION - UHIT 2        12 of 20 NMP2-ISI-0061 REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                  APPENDIX  G -  CSL SYSTEM (sorted by Exenination Identifier) 2ND INTVL REL RED ) DESCRIPTIOH OF ITEM To BE EXAMINED)CATGRY )IGSCC) EX1/HDE PROCEDURE                  )PERIOD  1                        REMARKS EXAMINATION IDENTIFIER  )
ITS ISO LOCATOR, COMPONENT DWG      &#xb9;,  )ITEM  &#xb9; )FREOY) EX2/NDE PROCEDURE      )PERIOD 2  )
USE CAL BLK  &#xb9; )
LINE Ho. AND No'IES, AS APPLICABLE )SELECT )CLASS) EX3/HDE PROCEDURE )PERIOD 3 I  PIPE/*FE107                              IC-F-2  )
na  )
VOL/UT6.02          )  Sc7 2CSL-26.03-FW014        )
QISO  26-03          "or  DWG&#xb9;  na  in  )C5.51  IID    I  SUR/PT3.00/MT4.00    I NMP2-16-1.031-Cs  )  LINE&#xb9; 2CSL-016-3-2      NTS: 34,37      )SD          2  )  na/na
                        )  PIPE/PIPE                                IC-F-2  )  na  )
VOL/UT6.02 2CSL-26-03-FW017        )
QISO 26-O3            or  DWG&#xb9;  na  in  )C5.51  )none  )
SUR/PT3.00/MT4.00    )
NMP2-12-.375-CS    I  LINE&#xb9;  2CSL 012 8 2      HTS'0          )none        2  )
na /na              )
I  PIPE/ELB                                IC-F-2  )
na  )
VOL/UT6.02 2CSL-26.03-FW018        )
QISO 26-03            or  DWG&#xb9;  na  in  )C5.51  )none  )  SUR/PT3 F 00/MT4.00  )
NMP2-12-.375-CS    )  LINE&#xb9; 2CSL-012-8-2      NTS: 40,41      )SD          2  )  na/na I ELB/PIPE                                IC-F-2  )  na  )  VOL/UT6.02 2CSL-26-03-FW019          I also 26-03            or  DWG&#xb9;  na  in  )C5.51    )none  )
SUR/PT3.00/MT4.00    )
HMP2-12-.375-CS    I LIHE&#xb9; 2CSL-012-8-2      HTS: 40,41      ISD          2    )
na  /na              I
                          )
PIPE/ELB                                IC-F-2    )
na    )
VOL/UT6.02 2CSL-26-03-FW020          )
Qrso 26-o3            or DWG&#xb9; na    in )C5.51    )none  )
SUR/PT3.00/MT4.00    )
HMP2-12-.375-CS    ) LINE&#xb9; 2CSL-012-8.2      HTS 40,41      )SD          2    )
na /na                I
                          )
PIPE/ELB                                IC-F-2    )
na    ) VOL/UT6.02 2CSL-26-03-FW023          )
QISO 26-03            or  DWG&#xb9; na  .in  )C5.51    )none  ) SUR/PT3.00/MT4.00    )
NMP2-16-.500-CS    )
LINE&#xb9; 2CSL-016-3-2      HTS:  34,36    )SD      )
2    )
na /na
                          ) WNF/PIPE                                IC-F-2    ) na    I VOL/UT6.02            I 2CSL-26-03-FW025          )
also 26-03            or  DWG&#xb9; na    in  )C5.51    )none  )
SUR/PT3 F 00/Ml'4.00  )
NMP2-16-.500-CS    I LINE&#xb9; 2CSL-016-3-2      NTS: 33  '4    ISD          2    )
na  /na
                          ) INTEG ATT                                IC-C      I na    I SUR/PT3.00/MT4.00    I 2CSL-26-03-FW300          )
arSO 26-03-13        or  DWG&#xb9;  na    in )C3.20    )ID    ) na  /na              )
Sc9
                          )
LINE&#xb9; 2CSL-016-3-2      HTS:  34,38    )Mandate)    2    )
na /na                I I PIPE/ELB                                IC-F.2    )
na    )
VOL/UT6.02 2CSL-26.03-S'W008        I also 26-03            or  DWG&#xb9;  na    in )C5.51    )none  )
SUR/PT3.00/MT4.00    )
NMP2-16-.500  CS    I LINE&#xb9; 2CSL-016-3-2      NTS:  34,36    )SD          2    ) na /na
 
NIAGARA NOHAWK POWER CORPORATION        -        MILE POINT NUCLEAR STATION - UNIT 2        13 of 20 HNP2-ISI-006( REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:    07/29/1999                                                                APPENDIX  G -  CSL SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED    )
DESCRIPTION OF ITEN TO BE EXANIHED)CATGRY ) IGSCC) EX1/HDE PROCEDURE )PERIOD            1                        REHARKS EXANIHATION IDENTIFIER    I  ITS ISO LOCATOR ~ CONPOHEHT DMG  &#xb9;i )ITEN  &#xb9; IFREQYI EX2/NDE PROCEDURE )PERIOD 2 I USE CAL BLK  &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE )SELECT )CLASS) EX3/NDE PROCEDURE )PERIOD 3 )
ELB/PIPE                            IC-F-2    )  na  )
VOL/UT6.02 2CSL-26-03-SM009          I  QISO 26-03          or  OMG&#xb9; na  in )C5.51    )none  )
SUR/PT3 F 00/HT4 F 00 )
HNP2-16-.500.CS    I  LINE&#xb9; 2CSL-016-3-2    HTS: 34,36    ISD          -2  )
na /na                I I  PIPE/ELB                            )C-F-2    )
na    )
VOL/UT6.02 2CSL-26-03-SM010          I  QISO  26-03        or DMG&#xb9; na in )C5.51      )none    )
SUR/PT3.00/NT4.00      )
NNP2-16-.500-CS    )
LINE&#xb9; 2CSL-016-3-2    NTS: 34,36    )SD          2    )
na /na I  PIPE/ELB                            IC-F-2    )  na    )
VOL/UT6.02 2CSL-26-03-SM011          I  QISO  26-03        or DMG&#xb9; na in )C5.51      )none    )
SUR/PT3.00/NT4.00      )
HNP2-16..500.CS      )  LINE&#xb9; 2CSL-016.3-2    HTS: 34,36    )SO          2    )
na /na                I I  ELB/PIPE                            IC-F-2    )
na    )
VOL/UT6.02 2CSL-26.03-SW014          )
QISO  26-03        or DMG&#xb9; na in )C5.51      )none    ) SUR/PT3.00/HT4.00      )
HHP2-16-.500-CS      )  LINE&#xb9; 2CSL-016-3.2    NTS 34,36    )SD          2    )
na /na                I
                          )  PIPE/ELB                            )C-F-2    )
na    )
VOL/UT6.02 2CSL-26.03-SM015          )  QISO 26-03          or  DMG&#xb9; na  in )C5.51    )none    )
SUR/PT3.00/NT4.00      )
HNP2 F 500-CS      LINE&#xb9; 2CSL-016-3-2    NTS: 34,36    )SD          2    )
na /na I  ELB/PIPE                            )C-F-2    )
na    )
VOL/UT6.02 2CSL-26-03-SM016          I Q      26 03        or  DMG&#xb9; na . in )C5.5'I  )none    ) SUR/PT3.00/NT4.00      )
NNP2-16-.500-CS        LINE&#xb9; 2CSL-016-3-2    NTS: 34,36    )SD          2    ) na /na I  PIPE/ELB                            IC-F-2    )  na    )
VOL/UT6.02 2CSL-26-03.SW018          )  QISO  26.03        or DMG&#xb9; na in )C5.51      )none    I SUR/PT3.00/MT4.00      I HNP2-16-.500.CS      I  LINE&#xb9; 2CSL-016-3-2    NTS: 34 36    I o          2    ) na /na I  ELB/PIPE                            IC-F-2      na    )
VOL/UT6.02            )
Sc7 2CSL-26-03-SM019          )
QISO  26-03        or DMG&#xb9; na in )C5.51        IID    I SUR/PT3.00/NT4.00      I NNP2-16-.500.CS        LIHE&#xb9; 2CSL-016-3-2    NTS: 34,36    )SD          2    ) na /na I PIPE/ELB                            IC-F-2    )
na    )
VOL/UT6.02 2CSL-26-03-SM020            I QISO 26-03          or  DMG&#xb9; na  in )C5.51    )none  I SUR/PT3 F 00/NT4.00    I NNP2-16-.500.CS      I LINE&#xb9; 2CSL-016-3-2    NTS: 34,36    ISD          2    )
na /na
 
NIAGARA. NOHAMK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        14 of 20 HNP2-ISI-006, REV. 1, CH-000                                            SECOND TEH YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX G - CSL SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTIOH OF ITEI4 TO BE EXANIHED(CATGRY )IGSCC) EX1/HDE PROCEDURE                  (PERIOD  1                        REHARKS EXANIHATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG          &#xb9;,  IITEH  &#xb9; IFREQYI EX2/NDE PROCEDURE        IPERIOO 2  I USE CAL BLK  &#xb9; I    LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3                I I    ELB/PIPE                              IC-F-2    [  na  [    VOL/UT6.02 2CSL-26-03-SM021          i QISO    26-03        or DMG&#xb9; na in /C5 ~ 51      )none    f    SUR/PT3.00/MT4.00  f NNP2-16-.500-CS    i    LINE&#xb9; 2CSL-016-3-2    HTS'4i36 ISD                  2  )
na /na I    PIPE/TEE                              IC-F-2    J na    J VOL/UT6.02 2CSL-26-03-SW022          I  QISO  26-03        or DMG&#xb9; na in ]C5.51        ]none    f  SUR/PT3.00/HT4.00  f NNP2-16-.500-CS      I  LINE&#xb9; 2CSL-016-3-2    HTS: 34,39    ISD            2    )  na  /na            I i PIPE/ELB                                IC-F-2    [  na    ]  VOL/UT6.02 2CSL-26.03-SM023          [  QISO 26-03          or  DMG&#xb9; na    in ]C5.51    )none    )
SUR/PT3.00/H'l4.00  )
NHP2-16-.500-CS      i  LINE&#xb9; 2CSL-016-3-2    NTS: 34,36    LSD            2    J na  /na I  ELB/PIPE                              IC-F-2    f  na    [  VOL/UT6.02 2CSL-26-03-SW024          I  QISO 26-03          or  DMG&#xb9; na    in [C5.51    ]none    f  SUR/PT3.00/HT4.00  /
HNP2-16-.500-CS      I  LIHE&#xb9; 2CSL-016-3-2    NTS: 34,36    ISD            2    /  na /na              I PIPE/MNF                              IC-F-2    [  na    )  VOL/UT6.02 2CSL-26-03-SM025          I  QISO  26.03        or DMG&#xb9; na in )C5.51        ]none    f SUR/PT3.00/HT4.00  f NHP2-16-.500-CS      I  LINE&#xb9; 2CSL-016-3-2    HTS: 33,34    ISO            2    /  na /na              I I  PIPE/ELB                              IC-F-2    f  na    f  VOL/UT6.02 2CSL-26-03-SW029            I  QISO  26-03        or  DMG&#xb9; na -  in  (C5.51    /none    f  SUR/PT3.00/NT4.00  f NHP2-12-.375-CS      (  LINE&#xb9;  2CSL-012-B-2    HTS: 40,41      )SO          2    /  na/na I  PIPE/ELB                              IC-F-2    I  na    I  VOL/UT6.02 2CSL-26-03-SM031            (
QISO  26-03        or DWG&#xb9; na in JC5.51          [none    f  SUR/PT3.00/HT4.00    [
HHP2-12-.375-CS      i LINE&#xb9; 2CSL-012.8.2      HTS: 40,41      LSD            2    / na  /na I  ELB/PIPE                              IC-F-2    [ na      [ VOL/UT6.02 2CSL-26-03-SW032            [  QISO 26-03          or  DMG&#xb9; na    in ]C5.5'l    [none    J SUR/PT3.00/HT4.00    J HHP2-12-.375-CS      I  LINE&#xb9; 2CSL-012-8-2    NTS: 40,41      ITE            2    ) na /na I  PIPE/ELB                              IC-F-2    I na      [ VOL/UT6.02          I 2CSL-26-03-SM033          I QISO  26.03        or DWG&#xb9; na in ]C5.51          ]none    J SUR/PT3.00/NT4.00    J HHP2-12-.375-CS      i LINE&#xb9; 2CSL-012-8-2    NTS: 40,41      ATE            2    / na /na
 
NIAGARA NOHAMK POMER CORPORATION -                NILE POINT NUCLEAR STATIOH - UNIT 2        15 of 20 NHP2-ISI-006,  REV. 1) CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                    APPEHDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN TO BE EXANINEDJCATGRY )IGSCC( EX1/HDE PROCEDURE                  (PERIOD  1                        RENARKS EXAHIHATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHENT DMG          &#xb9;,  ]ITEN  &#xb9; )FREOYJ EX2/HDE PROCEDURE      ]PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I  ELB/PIPE                              IC-F-2    [  na  )    VOL/UT6.02 2CSL-26-03-SM034          f  QISO 26-03          or  DMG&#xb9; na    in  [C5.51    [none  ]    SUR/PT3.00/HT4.00  (
NNP2-12-.375-CS    I  LINE&#xb9; 2CSL;012-8-2    NTS: 40,41      ISD          2    J na  /na            I I  PIPE/ELB                              IC-F-2    [  na    [  VOL/UT6.02 2CSL-26-03-SM038          i QISO 26-03          or  DMG&#xb9; na    in  )C5.51    [none    J SUR/PT3.00/NT4.00  )
HNP2-12-.375-CS        LIHE&#xb9; 2CSL-012-8-2    NTS: 40,41      LSD          2    /  na  /na I  ELB/PIPE                              IC-F-2    [  na    ]  VOL/UT6.02 2CSL-26.03-SM039          I QISO 26-03          or  DMG&#xb9; na    in  [C5.51    ]none    I  SUR/PT3.00/NT4.00  I NHP2-12-.375-CS        LIHE&#xb9; 2CSL-012-8-2    NTS: 40,41      (SD          2    J na /na              I I  ELB/PIPE                              IC-F-2    (  na    (
VOL/UT6.02 2CSL-26-03-SM040          I  QISO 26-03          or  DMG&#xb9; na    in  (C5.51    (none    (
SUR/PT3.00/NT4.00  (
HHP2-12-.375-CS      I  LINE&#xb9; 2CSL-012-8-2    NTS: 40,41      LSD          2    /  na /na              I I  ELB/PIPE                              IC-F-2    [  na    ]  VOL/UT6.02 2CSL-26-04-FM001          i  QISO  26-04        or  DMG&#xb9; na    in  [C5.51    [none    ]  SUR/PT3.00/MT4.00  (
NHP2-16-.500-CS      (
LINE&#xb9;  2CSL-016-3-2    HTS: 34,36      )SD          2    /  na  /na I  ELB/PIPE                              IC-F-2    ]  na    f  VOL/UI'6.02 2CSL-26-04-FM002          [  QISO .26-04        or  DMG&#xb9; na  ~  in )C5.51    )ID      i  SUR/PT3.00/HT4.00 i    Sc9 NHP2-16-.500.CS      [  LIHE&#xb9; 2CSL-016-3-2    NTS: 34,36      (SD          2    f  na  /na            I
(
PIPE/PIPE                              IC.F-2    [ na    f  VOL/UT6.02                    I 2CSL-26-04-FM003            ] QISO 26-04          or DMG&#xb9; na      in [C5.51    [none    f  SUR/PT3.00/HT4.00  J          I-NHP2-16-.500-CS      [ LINE&#xb9; 2CSL-016-3-2    NTS: 34        ]none        2    /  na /na                        I I PIPE/ELB                                IC-F-2    [ na      [ VOL/UT6.02 2CSL-26-04-FM004              QISO  26.04        or DMG&#xb9; na in [C5.51          )none    f SUR/PT3.00/NT4.00  J HHP2-16-.500-CS      I LINE&#xb9; 2CSL-016-3-2    NTS: 34,36      ISD          2    / na /na PIPE/PIPE                              IC-F-2    I na      i VOL/UT6 02          I 2CSL-26.04-FM005              QISO  26.04        or DMG&#xb9; na      in  (C5.51    (none    )
SUR/PT3.00/NT4.00  )
HHP2-16-.500.CS        LINE&#xb9; 2CSL-016-3-2    NTS: 34          [none        2    / na /na
 
NIAGARA HOHAMK POWER CORPORATION -                NILE POINT HUCLEAR STATION - UNIT 2        16 of 20 NNP2-ISI-006, REV. 1( CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION        (ISI) INTERVAL PLAN Change date:    07/29/1999                                                                    APPENDIX G -  CSL SYSTEN (sorted by Examination Identifier)
HD INTVL REL RED        DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE              IPERIOD  1                        RENARKS I
EXAHINATIOH IDEHI'IFIER    J ITS  ISO LOCATOR, COHPONENT DWG    &#xb9;, iITEN &#xb9;  )FREOYi EX2/HDE PROCEDURE      iPERIOD 2 USE CAL BLK    &#xb9; I    LINE Ho    AHD NOTES'S  APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE          IPERIOD 3 I I    ELB/PIPE                                iC-F-2    i na    i voL/UT6.02 2CSL-26.04-FW006          i QISO 26-04              or  DMG&#xb9; na    in iC5.51    inane  /  SUR/PT3.00/NT4.00  i NHP2 F 500-CS    I    LIHE&#xb9; 2CSL-016-3-2      HTS: 34,36      ISD          2    i na  /na I    ELB/PIPE                                IC-F-2    i na    i VOL/UT6.O2 2CSL-26.04-FM007          i QISO 26.04              or  DMG&#xb9; na    in iC5.51    inone i SUR/PT3.00/NT4.00      i HMP2-16-.500-CS      i LINE&#xb9; 2CSL-016-3-2        HTS: 34,36      LSD          2    i na  /na P I PE/WHF                              IC-F-2    i na    i  VOL/UT6.02 2CSL-26.04-SM001            i QISO 26-04            or  DMG&#xb9; na    in iC5.51    inone    i  SUR/PT3.00/HT4.00  i NHP2-16-.500.CS      i  LINE&#xb9; 2CSL-016-3-2      HTS: 33,34      LSD          2    i na  /na              I I  PIPE/ELB                                IC-F-2    [  na i voL/uT6.02 2CSL-26.04-SW003            i QISO      26.04        or DWG&#xb9; na in iC5.51        (none i SUR/PT3.00/HT4.00 i HHP2-16-.500-CS      I  LINE&#xb9; 2CSL-016-3-2      NTS: 34,36      ISD          2    J na /na I  PIPE/ELB                                IC-F-2    i na    (
voL/UT6.O2 2CSL-26-04-SW004            i QISO    26.04        or DWG&#xb9; na in iC5.51        (none i SUR/PT3.00/NT4.00      i HHP2-16-.500-CS        i LINE&#xb9; 2CSL-016-3-2      NTS: 34,36      LSD          2 i na /na I  PIPE/ELB                                IC-F-2    i na    i VOL/UT6.02 2CSL-26.04-SW005            i QISO 26-04            or  DWG&#xb9; na  ~  in iC5.51    )none  )  SUR/PT3.00/NT4.00  i HHP2-16-.500.CS        I  LINE&#xb9; 2CSL-016-3-2      HTS: 34,36      ISD          2    i na  /na I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2CSL-26-04-SW006            i QISO    26-04        or DWG&#xb9; na in iC5.51          inone    J SuR/PT3.00/HT4.00  i HHP2 F 500.CS      i  LIHE&#xb9; 2CSL-016-3-2      NTS: 34,36      LSD          2    J na /na              I I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2CSL-26-04-SW007            i QISO    26.04        or DMG&#xb9; na in iC5.51          inone    i SUR/PT3.00/Hl'4.00  i HHP2-16-.500-CS        I  LINE&#xb9; 2CSL-016-3-2      NTS'4 36 ISD                  2    i na  /na I PIPE/ELB                                IC-F-2    i na    i VOL/UT6.02 2CSL-26-04-SM008            i QISO 26-04          or  DWG&#xb9; na    in iC5.51    inone i SUR/PT3.00/NT4.00 HHP2-16-.500-CS            LINE&#xb9; 2CSL-016-3-2    HTS: 34,36      LSD      i  2                            I
 
NIAGARA MOHAWK POWER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2        17 of 20 HMP2-ISI-006, REV. I( CH.ODO                                        SECOND TEH YEAR IHSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX  G - CSL SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEM TO BE EXAMIHEDiCATGRY iIGSCC) EX1/HDE PROCEDURE                  iPERIOD  1                        REMARKS EXAMINATION IDENTIFIER L ITS ISO LOCATOR, COMPONENT DWG        &#xb9;,  )ITEM    &#xb9; iFREOY( EX2/HDE PROCEDURE      iPERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  PIPE/ELB                              IC-F-2    (
na    i  VOL/u'l6.02 2CSL-26-04-SWD09        i QISO 26-04            or  DMG&#xb9; na  in  iC5 ~ 51  inone    J SUR/PT3.00/MT4.00 i NHP2-16-.500-CS    J LINE&#xb9; 2CSL-016-3-2    NTS: 34,36    LSD            2    J na  /na I  PIPE/ELB                              IC-F-2    i na    J voL/uT6.02 2CSL-26-04-SW010        i QISO 26-04            or  DWG&#xb9; na  in  iC5.51    inone    i SUR/PT3.00/MT4.00 i NMP2-16-.500-CS    i  LIHE&#xb9; 2CSL-016-3.2    HTS: 34,36    LSD            2    i na /na I  ELB/PIPE                              IC-F-2    i na      i vol./uT6.02 2CSL-26-05-FW001        i QISO 26-05            or  DMG&#xb9; na  in  )C5.51    inone    i SUR/P'I3.00/MT4.00  i NMP2-16-.500-CS    i LINE&#xb9; 2CSL-016-3-2      NTS: 34,36    LSD            2    i na /na I  PIPE/<<MOV104                          IC-F-2    J na    i VOL/uT6.02 2CSL-26-05-FW002          I  QISO 26-05          or  DWG&#xb9; na  in  iC5.51    [ID      i SUR/PT3.00/MT4.00 i    $ c9 NHP2.12-.375-CS    i  LIHE&#xb9; 2CSL-012-42-2    HTS: (none)    LSD            2    i na  /na              I I <<MOV104/PIPE                          iB-J      i na      i vOL/UT6.02 2CSL-26-05-FW004          I QISO 26.05          or  DWG&#xb9; na  in i89.11      [none    i SUR/PT3.00/MT4.00    i NMP2-12-.688-CS    i LINE&#xb9; 2CSL-012-17-1    NTS: 1,7      )HS                  i na  /na I  PIPE/PENET 216                        IB J      i na      i VOL/UT6.02 2CSL-26-05-FW005          i QISO 26-05          or  DWG&#xb9; na  in i89.11      IID      I SURIPT3.00/MT4.00    I NMP2-12-.688. CS    I  LINE&#xb9; 2CSL-012.17-1    NTS: 1,6      ITEV          1    i na  I                i    Sc11 I  PENET  216/PIPE                      IB-J      i na      i voL/uT6.02          i  sc7 2CSL-26-05-FW006          i QISO 26.05          or DWG&#xb9; na    in /89.11      iID      i SUR/PT3.00/MT4.00 NMP2-12-.688-CS    i LINE&#xb9; 2CSL-012-4-1    HTS: 1,6      iTEV          1    dna/
i ELB/PIPE                              IB-J        I na    I VOL/UT6.02          I 2CSL-26-05-FM007          I QISO 26.05          or  DWG&#xb9; na    in i89.11      inone i SUR/PT3.00/MT4.00 i NMP2-12-.688.CS      I LINE&#xb9; 2CSL-012.4-1    HTS: 1,2      IHS                  / na /na I PIPE/*AOV101                          IB-J        i na    i VOL/UT6.02 2CSL-26-05-FW008          I QISO  26-05        or  DMG&#xb9; na    in i89.11      Inone    I SUR/PT3 F 00/MT4.00  I NMP2-12-.688-CS        LINE&#xb9; 2CSL-012-4-1    NTS: 1,5      iHS            1    [ na  /na
 
NIAGARA HOHAMK POMER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2        18 of 20 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTIOH        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                    APPENDIX G - CSL SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED        DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD              1                        REHARKS
(
EXAHINATION IDENI'IFIER  I  ITS ISO LOCATOR,  COHPONEHT DMG  &#xb9;i  I ITEN  &#xb9; IFREOYI EX2/NDE PROCEDURE ]PERIOD 2        J USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT        iCLASSi EX3/NDE PROCEDURE iPERIOO 3        )
I  *AOV101/PIPE                          IB-J      [  na    [  VOL/UT6.02          [  Sc7 2CSL-26-05-FM009          i QISO 26-05            or DMG&#xb9; na    in /89.11    IID      I  SUR/PT3.00/HT4.00  I NHP2-12-.688-CS    i LINE&#xb9;    2CSL-012-4-1    NTS: 1,5        IHS          1    /na/                    I I  PIPE/*HCV117                          IB-J      I  na    I  VOL/UT6 02          I  Sc7 2CSL-26-05-FM010          i QISO    26-05          or DMG&#xb9; na    in /89.11    IID      I  SUR/PT3.00/HT4.00  I NHP2-12-.688-CS      [  LINE&#xb9; 2CSL-012-4-1      NTS: 1,4      IHS            1    /na/                  I
(
                              *HCV117/PIPE                          IB-J      [  na    [  VOL/UT6.02 2CSL-26-05-FM011          i QISO  26.05          or DMG&#xb9; na    in IB9.11    [none    f  SUR/PT3.00/HT4.00  /
NHP2-12-.688-CS      I  LINE&#xb9; 2CSL-012-4-1      NTS: 1,4      INS            1
                                                                                        /  na/na                I I  PIPE/SEEK  Q N5 A7120 LOM PRES CS    IB-J      [  na    [  Vol./UT6.02          [  Sc7 2CSL-26.05-FM012          i QISO 26-05            or  DMG&#xb9; na  in (89.11    IID      I  SUR/PT3.00/HT4.00    I NHP2-10-.594-CS      i  LINE&#xb9; 2CSL-010-13-1    NTS: 10,9      iTEV      j    1    lna/                    I I INTEG ATT                              IB-K      I  na    I  SUR/PT3.00/HT4.00    I 2CSL-26-05-FIQOO          (
QISO  26-05-8        or DMG&#xb9; na    in (810.20 ]ID          f  na /na i  LINE&#xb9;  2CSL-012-4-1    NTS: 1,3      JNS      f    1    f  na /na              I I  INTEG ATT                              IB-K      I  na    I  SUR/PT3.00/HT4.00    I 2CSL-26-05-FI601          f  QISO  26-05-8        or DMG&#xb9; na  .in /810.20 /ID          [ na /na I  LINE&#xb9; 2CSL-012-4-1      NTS: 1,3      INS      I    1    I na /na                I I  INTEG ATT                              IB K      I  na    I  SUR/PT3.00/HT4 F 00  J 2CSL-26-05-FI602          (
QISO  26-05-8        or  DMG&#xb9; na    in /810.20    )IO      / na  /na              I I  LINE&#xb9; 2CSL 012 4  1    HT '  3        /NS      /  1
                                                                                        / na  /na              I I  INTEG ATT                              JB-K      J na    J SUR/PT3.00/HT4.00    f 2CSL-26-05-FI603            (
QISO  26-05-8        or DMG&#xb9; na    in ]810.20 ]ID        J na /na I LINE&#xb9; 2CSL-012.4-1      NTS: 1,3        [NS      f 1
                                                                                        ]  na/na                I I PIPE/PIPE                              IB-J      [ na    /  VOL/UT6.02 2CSL-26-05-FMSM023          I QISO 26-05          or DMG&#xb9; na    in  /B9.11    /none    /  SUR/PT3.00/HT4.00    /
NHP2-12-.688-CS      I LINE&#xb9; 2CSL-012.4-1      NTS: 1          iNS          1    [ na /na
 
NIAGARA HOHAWK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2        19 of 20 NHP2-ISI-006, REV. 1, CH.OOO                                      SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  IN'IERVAL PLAN Change date: 07/29/1999                                                                APPEHDIX  G - CSL SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED  J DESCRIPTIOH OF ITEM TO BE EXAHINED[CATGRY (IGSCC( EX1/HDE PROCEDURE          (PERIOD  1                        RENARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG      &#xb9;, iITEN  &#xb9; iFREQYJ EX2/NDE PROCEDURE iPERIOD 2 USE CAL BLK &#xb9; I  LIHE  NO. AHD HOlES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOD 3        I I  PIPE/ELB                              IC-F-2  I na    I  VOL/UT6 02          I 2CSL-26-05-SM001        I  QISO 26-05          or  DMG&#xb9; na  in JC5.51  )none  [  SUR/PT3.00/NT4.00  J NHP2-16-.500-CS    I  LINE&#xb9; 2CSL-016-3-2      NTS: 34,36    ISD        2    f  na /na              I I  ELB/RED                              IC-F-2  [ na    [  VOL/UT6.02 2CSL-26-05-SW003        I  QISO 26-05          or  DWG&#xb9; na  in [C5.51  [none  /  SUR/PT3 F 00/MT4.00 /
HHP2-16-.500.CS    I  LINE&#xb9; 2CSL-016-3-2      HTS: 36      ISD        2    /  na /na I RED/PIPE                              IC-F-2  f na    f  VOL/UT6.02
                                          -    or            in (C5.51 2CSL-26-05-SW004        / QISO 26-05                OWG&#xb9; na              IID    I  SUR/PT3.00/NT4.00  I  Sc9 HNP2-12-.375.CS  f  LINE&#xb9; 2CSL-012-42-2    NTS: (none)  /SO        2    J na  /na
                        ]  PIPE/ELB                              JB-J    (
na    )
VOI./UT6.02 2CSL-26.05-SW011        I  QISO 26.05          or OWG&#xb9; na    in (89.11  ]none  J SUR/PT3.00/NT4.00  [
HHP2-12..688.CS      LINE&#xb9; 2CSL-012-4-1      NTS: 1,2      iHS          1 J
na  /na            I I  ELB/PIPE                              IB-J    (
na    J VOL/UT6.02 2CSL-26-05-SW012        I  QISO  26.05          or DWG&#xb9; na    in (89.11  )none  f  SUR/PT3.00/NT4.00  f NHP2-12-.688.CS  i  LINE&#xb9; 2CSL-012-4-1    'NTS: 1,2      iHS          1    [ na  /na I PIPE/ELB                              IB-J    f na    [ VOL/UT6.02 2CSL-26.05-SW013        i QISO  26-05          or DMG&#xb9; na  . in )89.11  /none    f SUR/PT3.00/NT4.00  f NHP2-12-.688.CS    i LINE&#xb9; 2CSL-012-4-1      HTS: 1,2      iHS          1    / na  /na            I I PIPE/ELB                              IB J    ) na    [ VOL/UT6.02 2CSL-26-05-SM014        i QISO  26.05          or DMG&#xb9; na    in [89.11  (none    f SUR/PT3.00/NT4.00  f NHP2-12-.688-CS    I LINE&#xb9; 2CSL-012.4-1      NTS: 1,2      INS          1    f na  /na I ELB/PIPE                              IB-J    I na    I VOL/UT6.02          I 2CSL-26.05-SW015        I QISO  26.05          or  DMG&#xb9; na  in (89.11  ]none    J SUR/PT3.00/HT4.00  J HNP2-12-.688-CS    I LINE&#xb9; 2CSL 012 4  1    NTS'  '      INS          1    / na /na I PIPE/ELB                              IB- J    I na    [ VOL/UT6  02        I 2CSL-26-05-SW016        i QISO  26-05          or DWG&#xb9; na    in (89.11  ]none    J SUR/PT3.00/NT4.00  J HNP2-12..688-CS    i LINE&#xb9; 2CSL-012-4-1      NTS: 1,2      iHS          1    f na /na
 
NIAGARA HOHAWK POWER CORPORATION          -      NILE POINT NUCLEAR STATION  - UNIT 2        20 of 20 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                  APPENDIX  G - CSL SYSTEH (sorted by Examination Identifier)
ND IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE iPERIOO 1                I                        REHARKS EXANINATION IDENTIFIER [ ITS ISO LOCATOR, CONPONENT DWG        &#xb9;,  )ITEN  &#xb9; JFREOV) EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I  ELB/PIPE                                IB-J      [  na  [  VOL/UT6.02 2CSL-26-05-SM017        )
QISO  26.05          or DMG&#xb9; na    in (89.11    [none  J SUR/PT3.00/NT4.00  J NNP2-12-.688.CS    )  LINE&#xb9; 2CSL-012-4-1      NTS: 'I 2      INS          1  /  na  /na I  PIPE/RED                                IB-J      ]  na  )
VOL/UT6.02 2CSL-26.05-SM019        i QISO 26-05            or  DWG&#xb9; na    in )89.11    ]none  )  SUR/PT3.00/HT4.00  J HNP2-12-.688.CS    i  LINE&#xb9; 2CSL-012-4-1      NTS: 1,2        iNS              ~
na  /na I RED/PIPE                                IB-J      [  na    [ VOL/UT6.02 2CSL-26-05-SW020        i QISO 26-05            or  DWG&#xb9; na    in  JB9.1'I  )none    J SUR/PT3 F 00/NT4.00  J NMP2-10-.594.CS    I LIHE&#xb9; 2CSL.010.13-1    NTS: 10,2      IHS          1    J na/na                I I RED/PIPE                                IC-F-2    f  na    f VOL/UT6.02 2CSL-26-06.FW005          i QISO  26-06          or DMG&#xb9; na in [C5 ~ 51      ]none    [ SUR/PT3.00/MT4.00    J NHP2-12-.375-CS    i LINE&#xb9; 2CSL-012-9-2      NTS: 40,42      LSD          2    J na /na
(
PIPE/*V9                                IC-F-2    [  na    [ VOL/UT6.02 2CSL-26-06-FW006          I QISO 26-06          or D'WG&#xb9; na    in  )C5.51    [none    f SUR/PT3.00/NT4.00    f HNP2-12-.375-CS    [ LINE&#xb9;  2CSI.-012-9-2    HTS: 40,44      (SD          2    / na /na I PIPE/ELB                                IC-F-2    [  na    )
VOL/UT6.02 2CSL-26.06-SM005          i QISO  26-06          or DMG&#xb9; na in )C5.51
                                                              ~              ]none    ) SUR/PT3.00/HT4.00    J HNP2-12-.375-CS    i LINE&#xb9; 2CSL-012-9-2      HTS: 40,41      LSD          2    / na  /na i ELB/PIPE                                IC-F-2    f  na    f VOL/UT6.02 2CSL-26.06-SW006          i QISO  26.06          or DMG&#xb9; na      in ]C5.51    ]none  [ SUR/PT3.00/NT4.00    [
NHP2-12-.375-CS    I LIHE&#xb9; 2CSL-012-9-2      NTS: 40,41      ISD      I  2    I na  /na              I EHD OF SYSTEH CSL
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System: CSL General Notes
: 1. 12" SCH PIPE MATERIAL,SA-106B                                                      28. 20" STD TEE, SA-234 WPB
: 2. 12" SCH 80 PIPE FITTINGS, SA-234 WPB                                                29. 20" EXTENSION RING, SAC16GR70
: 3. PLATE MATERIAL,SA416 GR 70                                                          30. 24" X20 STD ECC REDUCER, SA-234WPB
: 4.  'HCV117 VALVEBODY, SA-105                                                          31. 24" STD PIPE, SA-106 GR B
: 5.  'AOV101 VALVEBODY, SA-216 WCB                                                      32. 24 150&#xb9; WNF, SA-105
: 6. Z-16 PENETRATION MATERIAL,SA408 CL1                                                33. 16" 300&#xb9; WN FLANGE, SA-105
: 7.  'MOV104 VALVEBODY, SA450 LF 2                                                      34. 16" XS PIPE, SA-106 GR B
: 8. BOLTING MATERIAL,SA-193 GR B7: SA-194 GR 2H                                        35. 16" CHECK VALVE, SA-105
: 9. SAFE END EXT. MATERIAL,SA408 CL1                                                    36. 16 XS ELBOW, SA-234 WPB
: 10. 10" PIPE MAT'L. - SA 106B SCH 80                                                    37. 16" SCH. 100 PIPE, SA-106 GR B 20" 150&#xb9; WNF, SA-182 F304                                                          38. 3/4" PLATE, SA415 GR 65
: 12. 20" SCH 100 PIPE, SA412 TP 304 W                                                    39. 16" XS X 12" STD RED. TEE, SA-234 WPB
: 13. 1-1/2 PLATE, SA-240 TP 304                                                          40. 12" STD PIPE, SA-106 GR B
: 14. 20" STD PIPE, SA412TP304W                                                          41. 12" STD ELBOW, SA-234 WPB
: 15. 20" STD ELBOW, SAM3 WP 304 W                                                        42. 12" X 10" STD. CONC. REDUCER, SA-234 WPB
: 16. 3/4" PLATE SA-240                                                                  43. 10" CONTROL VALVE, SA-217 GR C5
: 17. 3/4" PLATE SA-537 CL2                                                              44.'2" CHECK VALVE, SA-105
: 18. 20" BUTTERFLY VALVE(BODY) SA-516 GR 70/SA-515 BR 70                                45. 24" 3/4" WALLPIPE SA416 GR 70
: 19. 20" 150&#xb9; SOF, SA-105                                                                46. HEAD SHELL 1-1/4" PLATE, SA416 GR 70
: 20. 20" BUTTERFLY VALVE(BEARING NEClq SA-105                                            47. 16" SCH,40PIPE, SA-106GR B
: 21. 20 150&#xb9; WNF, SA-105                                                                48. HEAD COVER, SA-105
: 22. 20" STD PIPE, SA-106 GR B                                                          49. HEAD FLANGE, SA-105
: 23. 20" STD ELBOW, SA-234 WPB                                                          50. BARREL FLANGE, SA-105
: 24. 14" SCH 120 PIPE, SA-106 GR B                                                      51. BARREL SHELL, 1/2" PLATE, SA416 GR 70 18" SCH 120 PIPE, SA-106 GR B                                                      52. DISHED HEAD, SAW16 GR 70
: 26. 20 STD STR TEE, SA-234 WPB                                                          53. BARREL SHELL PIN, SA-105
: 27. 20 300&#xb9; SOF, SA-105
 
NIAGARA MOHAHK PSIER CORPORATION    -      MILE POINT NUCLEAR STATION    - UNIT 2        E 1of1 NMP2-ISI-006, REV. 1, CH-000                                    SECOND TEH YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                            APPENDIX G - DER SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED  ( DESCRIPTIOH OF ITEM TO BE EXAMINED(CATGRY (IGSCC( EX1/HDE PROCEDURE      (PERIOD  1                          REMARKS EXAMINATION IDENTIFIER  (
ITS ISO LOCATOR,  COMPONENT DWG  &#xb9;, (ITEM  &#xb9; (FREOY( EX2/HDE PROCEDURE    (PERIOD 2  (
USE CAL BLK  &#xb9; I LINE  NO AND NOTES'S    APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I I PIPE/<<MOV128                        (B-J    (
na    (  SUR/PT3.00/MT4.00 (
20ER-07A-FW001          I QISO 07-A          or  DIIG&#xb9; na in (B9.21  (ID    (
na /na                        I na                  (
LINE&#xb9; 2DER-002-7-1    HTS:  1,2    (HS      (
1
(
na  /na                  Scil  (
(
                          <<MOV128/P IPE                      (B-J    (
na    (
SUR/PT3.00/MT'0  (          I 20ER-07A-FN002          ( QISO 07-A          or DllG&#xb9; na  in (89.21  (none  (
na /na            I          I
(
LINE&#xb9; 2DER-002-7-1    HTS: 1,2    (HS      (
1
(
na /na            I          I I P IPE/<<MOV129                      IB-J    I na    I  SUR/PT3.00/MT4.00 I          I 2DER-07A-FH003          (
QISO 07-A          or  DMG&#xb9; na  in (B9.21  (none  (
na  /na            (          I
(
LINE&#xb9; 2DER-002-7-1    NTS:  1,2    (NS      (
1  (
na /na            I          I EHD OF SYSTEM DER
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System: DER General Notes
: 1. Z SCH 80 SMLS PIPE, SA-106B                                2. 2'LOBE VALVE, SA-105
 
NIAGARA NOHAMK POMER CORPORATION          NILE POINT NUCLEAR STATION - UNIT 2                        1 of 19 NHP2-ISI-006, REV. 1( CH.OOO                                      SECOND TEH YEAR IHSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                            APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEOICATGRY      IIGSCCI EX1/HDE  PROCEDURE (PERIOD  1                                REHARKS EXAHIHATION IDENTIFIER    ITS ISO LOCATOR, COHPOHEH'T DMG &#xb9;, (ITEN    &#xb9; (FREOY( EX2/HDE  PROCEDURE (PERIOD 2 USE CAL BLK &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE      PROCEDURE (PERIOD 3  (
I
                        <<AOV23A BLTG                          IB-G-2 I na    I VT1/VT2.01        I 2FMS<<AOV23A,V8506      I QISO  47-13          or DMG&#xb9; 002 in (87.70 (ID        ( na /na            I na                (
LINE&#xb9; 2FMS-024-50-1 HTS: (none) (Grp Rep( 1          (
na /na            (Sc10
(
                        *AOV23A  IHI'UR                      (8-H-2 ( na    (
VT3/VT2.01        J<<          (*  Examine shen dissassemble for maintenance 2FMS<<AOV23A,VBY106    ( QISO  47-13          or DMG&#xb9; 002 in (812.50 (DisG    (    /
(
LINE&#xb9; 2FMS-024-50-1 HTS: 7            (Grp Rep( 1    (    /              I*
I <<AOV238 BLTG                          (8-G-2  ( na  (
VT1/VT2.01 2FMS<<AOV23B,V8507      ( QISO 47-16            or  DMG&#xb9; 002  in (87.70  (none  (
na /na
(  LINE&#xb9; 2FMS-024-51-1    NTS: (none)  (HS      (  1  (-na /na
(
                          *AOV238 IHT SUR                      (8-H-2 ( na    (
VT3/VT2.01 2FMS<<AOV23B,VBY107    (
QISO 47-16            or  DMG&#xb9;  002 in (812.50 (none  (    /
I  LINE&#xb9; 2FMS 024  1  1    NTS'8        IHS      I  1  I    /
I *NCV54A IHT SUR                        (8-H-2  (
na  (
VT3/VT2.01        (<<          (* Examine  Mhen dissassemble for maintenance 2FMS*KCV54A,VBY108    I QISO  47-13          or DMG&#xb9; 011  in (812.50  (DisG  (    /              I*
(
LINE&#xb9; 2FMS-024-31-1 N'TS: '12        (Grp Rep(  1  (    /              (*
I
                          <<HCV548 INT SUR                      (8-H-2 ( na    ( VT3/VT2.01 2FMS*HCV548, VBY109    (
QISO 47-16          or DMG&#xb9; 011 in (812.50 (none    (    /
na                (
LINE&#xb9; 2FMS-024-32-1 NTS: 14          (HS      (
1
(    /
I
                          >>NOV2IA INT SUR                      (8-H-2  (
na  (
VT3/VT2.01        I          (>> Examine Mhen dissassemble  for maintenance 2FMS<<NOV21A,VBY110    I QISO 47-13            or  DMG&#xb9; 007  in (812.50 (DisG  (    /              (*
(  LIHE&#xb9; 2FMS-024-50-'I    HTS: 2        (Grp Rep(  1  (    /              (*
(
                          <<NOV218 INT SUR                      (8-N-2 ( na    (
VT3/VT2.01 2FMS*MOV21B,VBY111    I  QISO 47-16          or DMG&#xb9; 007 in (812.50 (none    (    /
I  LINE&#xb9; 2FMS-024-51-1 NTS 2            IHS      I  1  I    /
I <<V12A BLTG                            IB-G-2  I na  I VT1/VT2.01 2FMS<<V12A,VB508        I QISO  47-13          or DMG&#xb9; 003 in (87.70    (none  ( na /na
(  LINE&#xb9; 2FMS-024-31-1 NTS: (none) (HS            (  1  ( na /na
 
NIAGARA NOHAMK POMER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        2of 19 HHP2-ISI-006, REV. 1, CN-OOO                                          SECOND TEH YEAR INSERVICE INSPECTION              (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G -  FMS SYSTEII (sorted by Examination Identifier) 2ND IHTVL REL RED [ DESCRIPI'ION OF ITEM TO BE EXAHINED[CATGRY ]IGSCC[ EX1/HDE PROCEDURE                    ]PERIOD    1                    RENARKS EXAHINATION IDENTIFIER J ITS ISO LOCATOR, COHPOHEHT DMG        &#xb9;,  ]ITEN  &#xb9; JFREOY( EX2/NDE PROCEDURE          (PERIOD 2    J USE CAL BLK  &#xb9; I  LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3                    I I
                            *V12A IH'I  SUR                        (8-H-2    f    na    /  VT3/VT2.01 2FMS*V12A,VBY112        i QISO    47-13          or DMG&#xb9; 003 in )812.50 ]none          )      /
I  LINE&#xb9; 2FMS-024-31-1 HTS: 7            INS      I    1    I I
                            *V128 BLTG                            IB-G-2    I    na    I  T1/VT2 01 2FMS~V128,VB509          I QISO    47-16          or DMG&#xb9; 003  in )87.70    /none / na        /na
(
LINE&#xb9; 2FMS-024-32-1 HTS: (none)        (HS                  /n    /n I  *V128 IHT    SUR                      IB-M-2    i na        i  VT3/VT2.01 2FMS*V12B,VBY113        / QISO    47-16          or DWG&#xb9; 003  in /812.50    /none      )    /
I  LINE&#xb9; 2FWS-024-32-1 HTS: 28            INS      I      I    I
                        /  PIPE/*MOV2IA (AUGHENTED VOL ONLY) /na            f    na    [  VOL/UT6.02          I 2FMS-47-13-FW002                  4713          or DWG&#xb9; na in )na              ID          * /n/a I QI                                                J          )                      I NMP2-24-2.06;CS    I  LINE&#xb9; 2FWS-024-27-4 HTS: 1,2          IBER      I    4    I                      i Sc10
                            *HOV21A/PIPE                          IB-J      I  na    I  VOL/UT6.02          iEX6 2F'MS-47-13-FM003        I  QISO 47-13          or  DWG&#xb9; na    in /89.11    [ID        [  SUR/PT3.00/MT4.00 ]
NHP2-24-2.06-CS    i  LINE&#xb9; 2FMS-024-50-1    NTS:  1,2      IBER                                          I
                          )
PIPE/*AOV23A                            JB-J      ]  na      f VOL/UT6.02 2FMS-47-13-FM006          I  QISO 47-13          or  DWG&#xb9; na . in )89.11    )ID        (
SUR/PT3.00/HT4.00    [
HHP2-24-2.06-CS    /  LINE&#xb9; 2FWS-024-50-1    HTS:  1,7      /AM/ber  f 1    / na /                / Sc10
                          )
                            *AOV23A/PIPE                            )8-J      f  na      f VOL/UT6.02                          I 2F MS.47 F'M007      I  QI    4713          or  DMG&#xb9; na    in [89.11    ]ID        f SUR/PT3.00/HT4.00    f              I NHP2-24-2.06-CS    I  LINE&#xb9; 2FMS-024-50-1    NI'S: 1(7      (AM/ber  J 1
f na /                )Sc10      ~  I I PIPE/PEHET 24A                          JB-J      [  na      (
VOL/UT6.02          (EX6 2FMS-47-13-FM008          I QISO  47-13        or DWG&#xb9; na    in  JB9.11    ]ID        f SUR/PT3.00/HT4.00    f NHP2-24-2.06-CS      )
LINE&#xb9; 2FMS-024-50-1 HTS: 1,8          /TEV/berf 1          f na  /                I f  PEHET  Z4A/*V12A                      IB-J      I  na      I VOL/UT6.02          I 2FMS-47-13-FM009          I QISO 47-13          or  DWG&#xb9; na    in (89.11    )ID        [ SUR/PT3.00/HT4 F 00 f NHP2-24-2.469-CS    )  LINE&#xb9; 2FMS-024-31-1    HTS:  7,9      fAW/ber    f    1 f na  /                JSc10
 
NIAGARA MOHAWK POWER CORPORATION -                      NILE POINT NUCLEAR STATION - UNIT 2        3of 19 NHP2-ISI-006, REV. 1( CH-000                                                  SECOND TEN YEAR IHSERVICE IHSPECTION                (ISI)  INTERVAL PLAN APPENDIX  - FMS SYSTEH Change date:    07/29/1999                                                                                        G (sorted by Examination Identifier) 2ND IHTVL REL RED          DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY (IGSCC) EX1/HDE PROCEDURE                      (PERIOD      1                    REHARKS
(
EXAHINATION IDENTIFIER    I    ITS ISO LOCATOR'OMPONENT DWG        &#xb9;i  IITEH  &#xb9; IFREOYl EX2/HDE PROCEDURE            IPERIOD 2 I USE CAL BLK    &#xb9; I    LIHE  HO. AHD NOTES,  AS  APPLICABLE    ISELECT  ICLASSI          EX3/HDE PROCEDURE IPERIOD 3 I
                                *V12A/PIPE                                JB-J      f    na    J VOL/UT6.02
                          ]
2FWS-47-13. F MOTO        I    QISO 47-13            or DWG&#xb9; na    in )89.11      /ID        [
SUR/PT3.00/HT4.00  f NHP2-24-2.06-CS      I    LINE&#xb9;  2FWS-024-31-1    HTS: 1,7        /AW/ber    /      1    /    na  /              /Scio I
PIPE/*HCV54A                              IB-J      f    na    f    VOL/UT6.02 2FWS-47 Fl$ 11          i QISO      47-13          or DWG&#xb9; na    in )89.11      ]none      f    SUR/PT3.00/HT4.00  /
NNP2-24-2.06.CS      i LINE&#xb9; 2FWS-024-31-1          NTS: 1,12      JHS              1    /    na/na              I I
                                *NCV54A/PIPE                              IB-J      J na      (
VOL/UT6.02 2FWS-47-13 Fl$ 12          I    QISO 47-13            or  DWG&#xb9; na    in (89.11      ]ID          f SUR/PT3.00/HT4.00  /
HHP2-24-1.219-CS      I    LINE&#xb9; 2FWS.024-61-1      NTS: 12,13      IHS              1    )na/                    J Sc10 I    ELB/PIPE                                  IB- J    )
na      (
VOL/UT6.02 2FWS-47 Fl$ 14          (
QISO  47-13          or DWG&#xb9; na in [89.11          I  ID      I  SUR/PT3.00/MT4.00  I NNP2.24-2.06.CS        I  LIHE&#xb9; 2FMS-024-31-1 HTS: 1,10              I DER            1    (na/                    i Sc10
                                *FTG18/P I PE                              IB-J      f  na      )
VOL/UT6.02          [EX6 2FWS-47-13-FW017            I  QISO  47-13          or DWG&#xb9; na    in (89. 11      ]  ID        ]
SUR/PT3.00/HT4.00    [
NNP2.24-2.06.CS          LINE&#xb9; 2FWS-024-50-1 HTS: 1,5              IBER                    [  na/                  I I    INTEG ATT                                JB-K      f  na      [  SUR/PT3.00/HT4.00    )
2FWS-47-13-FM308            / QISO    47-13-07 .      or D'WG&#xb9;    . in /810.20 ]ID              /      /
NA                    I    LINE&#xb9; 2FWS.024-31-1 NTS: 1,11            INS        I      1    I      /                I INTEG ATT                                IB K        I  na      I  SUR/PT3.00/MT'0      I 2FWS.47-13-FW309            )
QISO  47-13-07        or DWG&#xb9;        in (810.20 /ID              /      /
NA                    I  LINE&#xb9; 2FMS-024-31-1 HTS: II11              JNS        /    1    /      /                I IN'IEG ATT                                [8-K      f na        [  SUR/PT3.00/HT4.00  f 2FWS-47-13. F W310          J QISO  47-13-07        or DMG&#xb9;        in /810.20 /ID              /    /
HA                    I  LINE&#xb9; 2FWS-024-31-1 NTS: 1,11              IHS        I    1      I    /                I IHTEG ATT                                IB-K      I  na      I  SUR/PT3.00/HT4.00    I            /0-I 2FWS.47-13-FW3'l1            J QISO  47-13-07        or DWG&#xb9;        in /810.20 /ID                                                    I NA                      I  LINE&#xb9; 2FWS.024-31-1 NTS: 1,11              /NS        /    1      /      /                I            I
 
NIAGARA HOHAWK POWER CORPORATIOH -                  NILE POIHT NUCLEAR'STATION - UNIT 2        4of 19 NHP2-ISI-006I REV. II CH-OOO                                            SECOND TEN YEAR IHSERVICE INSPECTION              (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                      APPENDIX G -  FWS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEM TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    IPERIOO    1  I                  REHARKS EXAHIHATION IDENTIFIER    [ ITS ISO LOCATOR, CONPOHEHT DMG    &#xb9;,  )ITEN  &#xb9; (FREOY( EX2/HDE PROCEDURE          (PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                    I I  PIPE/ELB                              IB-J      f  na    f    VOL/UT6.02 2FMS-47-13-SW003          I  QISO 47-13          or  DWG&#xb9; na    in [89.11    )ID      (    SUR/PT3.00/NT4.00  i NNP2-24-2.06-CS    i LINE&#xb9; 2FMS-024-31-1      NTS: 1,10      ABER          1    /na/                    [Sc10
[  PIPE/ELB                              IB-J      i  na    J VOL/UT6.02 2FWS-47-13-SM006          I  QISO  47-13        or  DWG&#xb9;  na  in  [89.11    /none    [  SUR/PT3.00/NT4.00    f NNP2-24-1.219-CS    I  LIHE&#xb9; 2FMS-024-61-1 NTS: 13,14        INS                /  na  /na I  ELB/PIPE                              IB-J      [  na    [  VOL/uT6.O2 2FWS-47-13-SM007          i QISO    47-13        or DMG&#xb9; na    in [89.11    ]none    )  SUR/PT3.00/NT4.00    J NHP2-24-1.219-CS        LINE&#xb9; 2FWS-024.61-1 HTS: 14,15        (NS                                          I I PIPE/SWL                                /8-J                [  voL/uT6.O2 2FWS-47-13-SM008          i QISO    47-13        or DWG&#xb9; na in )89.31        ]none    f  SUR/PT3.00/NT4.00    [
HHP2-24-1.219-CS        LINE&#xb9; 2FMS.024-61-1 NTS: 15,16        iNS          1    /  na /na              I I PIPE/RED                                IB-J      (
na    )  VOL/uT6.O2 2F WS-47-13-SM009        I QISO    47 13        or DWG&#xb9; na in (89.11        [none    ]  SuR/PT3.00/NT4 F 00  )
NHP2-24-1. 219- CS  I  LINE&#xb9; 2FMS-024-61-1 NTS: 15(17        IHS                /  na /na              I I  PIPE/0FTG18                            IB-J      I  na      I  VOL/UT6.02          I 2FMS-47-13-SM011          I QISO 47 13          or  DWG&#xb9;  na. in )89.11      IID      I  SUR/PT3.00/HT4.00    I HNP2-24-2.06-CS      I  LINE&#xb9; 2FMS-024-50-1    NTS:  1,3      IBER          1    dna/                    iSc10 I  PIPE/PIPE                              IB-J      [ na      (
VOL/uT6.O2 2FWS-47-13-SW012          i QISO 47-13          or  DWG&#xb9; na    in [89.11    (none    J SUR/PT3.00/NT4.00    J HNP2-24-2.06-CS      i  LINE&#xb9; 2FMS-024-31-1    NTS:  1        iNS            1    /  na /na              I FLUED KD/TEE ( FTG18)                  ]8-J      (
na      f  VOL/UT6.02 2FMS.47-13-VMOOI          )
QISO 47-13          or  DWG&#xb9;  048  in (89.11    )ID        J SUR/PT3.00/NT4.00    J NHP2-30-2.90-CS      f  LINE&#xb9; 2FMS-024-50-1    NTS:  3,4        JAM/ber  /  1      f na  /                JSc10 I  TEE/RED(*FTG18)                        /8-J      f na      f VOL/UT6.02 2FMS-47-13-VM002          I QISO 47-13          or  DMG&#xb9; 048    in [89.11    (ID        (
SUR/PT3.00/NT4.00    [
NHP2-30-2.90-CS      / LINE&#xb9; 2FMS-024-50-1    NTS:  4,5        /AW/ber  /  1      / na  /                I Sc10
 
NIAGARA NOHAMK POMER CORPORATION              -      MILE POIN'I NUCLEAR STATION - UNIT 2        5of 19 NHP2-ISI-006( REV. 1, CH-000                                          SECOHD TEN YEAR IHSERVICE INSPECTION              (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX  G - FMS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED      DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE (PERIOD                  1                      REHARKS
(
EXAHIHATIOH IDEHTIFIER f ITS ISO LOCATOR, COMPONENT DMG        &#xb9;,  )ITEN  &#xb9; )FREOV) EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK  &#xb9; f LINE NO. AND NOTES, AS APPLICABLE [SELECT (CLASS( EX3/HDE PROCEDURE              ]PERIOD 3 I
TEE/THERNAL SLEEVE(*FTG1B)            IB-J      I na      I    VOL/UT6.02          I 2FMS-47-13-VM003        f  QISO 47-13          or DMG&#xb9; 048 in (89.31 /ID            f    SUR/PT3.00/NT4.00  /
HNP2-10-1.00-CS    /  LINE&#xb9; 2FMS.024-50-1 NTS: 4,6          /AM/ber / 1        /    na  /              /Sc10 f  FLUED HD FORGING/PIPE Z4A            )B-J      ]  na    f  VOL/UT6.02          I 2FMS-47-13-VMZ4A-SMA    I Q      4713          or  DMG&#xb9; na  in )89.11    )
ID      )
SUR/PT3.00/HT4.00  I HNP2-24-2.469.CS  f  LINE&#xb9; 2FMS-024-31-1    NTS: 8,9      JTEV/ber(      1 J
na  /              )
Sc10 I  RED/PIPE                              IB-J      [  na    )
VOL/UT6.02 2FMS-47-14-FM001        I  QISO  47-14        or DMG&#xb9; na in (89.11        ]none      f  SUR/PT3.00/MT4.00    f HNP2-18-.938.CS    J LINE&#xb9; 2FMS-018-36-1 NTS: 19,2        iHS            1 f  na/na                I I  PIPE/ELB                              IB-J      [  na    J VOL/UT6.02 2FMS-47-14-FM002          i QISO 47-14          or  DMG&#xb9; na    in (B9.11    ]none      I  SUR/PT3.00/NT4.00    I HHP2-18-.938-CS    I  LINE&#xb9; 2FMS-018-36-1    HTS: 20,22    INS            1    / na    /na              I I  ELB/PIPE                              /8-J      J na    [  VOL/UT6.02 2FMS-47 FM004        I  QISO 47-14          or  DMG&#xb9; na    in [89.11    (none      [  SUR/PT3.00/NT4.00    J HNP2-12-.688  CS    i  LINE&#xb9; 2FMS-012-53-1    HTS: 24,25    (HS            1    /  na  /na I  PIPE/SE  Q N4A Az030 FEEDMATER        IB-J      [  na    ]  VOL/UT6.02          ]    Sc7 2FMS-47-14-FM005          /  QISO 47-14          or  DMG&#xb9; na. in /89.11      [ID 0    ]  SUR/PT3.00/NT4.00    ]
NNP2-12-.688-CS    I  LINE&#xb9; 2FMS-012-53-1    NTS: 24,26    I TEV      I    1    lna/                    I I  PIPE/PIPE                              IB-J      (
na      )
VOL/UT6.02 2FMS-47-14-FM013          I QISO 47-14          or  DUG&#xb9; na    in )89.'l1    ]none      f  SUR/PT3.00/NT4.00    J HNP2-12-.688-CS      I LINE&#xb9; 2FMS-012-53-1    NTS: 24        IHS            1    [  na  /na              I IHTEG ATT                            IB-K      I  na      I  SUR/PT3.00/NT4.00    I 2FMS-47-14-FM300          / QISO 47-14-13      or DMG&#xb9; na in /810.20 /ID              f  na  /na na                  I LINE&#xb9; 2FMS-012-53-1 NTS: 24,26        INS      I    1    I  na /na              I I  IHTEG ATT                            JB-K      [  na      / SUR/PT3  F 00/NT4.00  J 2FMS-47-14-FM301          f QISO  47-14-13      or DMG&#xb9; na in /810.20 /ID                [ na  /na
[ LIHE&#xb9; 2FMS-012-53-1 NTS: 24,26        [HS      I    1      I na  /na              I
 
NIAGARA HONAMK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        6 of 19 NNP2-ISI-006( REV. TI CN-000                                          SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G -  FMS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED      DESCRIPTION OF ITEN TO BE EXANINED(CATGRY JIGSCC) EX1/HDE PROCEDURE              )PERIOD  1                        RENARKS
                        )
EXAHINATIOH IDENTIFIER  J ITS ISO LOCATOR,  COMPONENT DWG    &#xb9;,  )ITEH  &#xb9;  (FREOYJ      EX2/HDE PROCEDURE ]PERIOD 2    J USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE        DESELECT  iCLASSJ EX3/HDE PROCEDURE        iPERIOO 3 i I    INTEG ATT                              IB-K      I na      I  SUR/PT3.00/NT4.00  I 2FMS-47 FM302      /    QISO 47-14-13        or DMG&#xb9; na in (810.20 /ID            /  na  /na
                        /    LIHE&#xb9; 2FWS-012-53-1 NTS: 24,26        /HS      /  1    /  na /na              I I    IHTEG ATT                              (8-K      (
na    )
SUR/PT3.00/Hl'4.00  )
2FWS-47-14-FM303        /    QISO 47-14-13        or  DWG&#xb9; na  in  [810.20  )ID      ] na  /na              I f    LINE&#xb9; 2FMS-012-53-1 NTS: 24,26        /HS      /  1    f na  /na              I I IHTEG ATT                                JB-K      I  na    I  SUR/PT3.00/NT4.00    I 2FWS-47-14-FW304        f  QISO 47-14-13        or DUG&#xb9; na in (8'l0.20 )ID            f  na /na              I I  LINE&#xb9;  2FWS-012-53-1    HTS: 24,26    IHS      I  1    I  na /na              I I  IHTEG ATT                              IB-K      I  na    I  SUR/PT3.00/NT4.00    I 2FMS-47 F W305      )
QISO 47-14-13        or DMG&#xb9; na in JB10.20 ]ID            )  na  /na              I f  LINE&#xb9; 2FMS-012-53-1 HTS: 24,26        FANS      f  1    /  na /na              I I  INTEG ATT                              (8-K      f na      )
SUR/PT3.00/NT4 F 00  (
2FMS-47 FM306        )  QISO  47-14-13      or DMG&#xb9; na in ]810.20 (ID            J na  /na              I
(
LINE&#xb9; 2FMS-012-53-1 NTS: 24,26        /HS      f  1    [  na /na              I IHTEG ATT                              )8-K      [ na      (  SUR/PT3.00/HT4.00    f 2FWS-47-14-FM307          f QISO 47-14-13      or DMG&#xb9; na . in IB10.20 IID          I  na  /na              I
                          /  LIHE&#xb9; 2FWS-012-53-1 NTS: 24,26        (HS      )
1      f na /na              I
                          / PIPE/SWL IB-J      [ na      [ VOL/UT6.02 2FWS-47-14-SM001          i QISO 47-14            or  DMG&#xb9; na    in [89.31    [none    J SUR/PT3.00/NT4.00    J HHP2-18-.938-CS        LINE&#xb9; 2FWS-018-36-1    HTS: 20,21      )HS          1    f na /na I  ELB/PIPE                                IB-J      [ na      J VOL/UT6.02 2FMS-47-14-SM002          [ QISO 47-14            or  DMG&#xb9; na    in )89.11    (none    J SUR/PT3.00/NT4.00    J NNP2-18-.938.CS    I  LINE&#xb9; 2FMS-018-36-1    HTS: 20 '2      INS                / na /na I  PIPE/RED                                IB-J      I na      I VOL/UT6.02            I 2FMS-47-14-SW003          i QISO  47-14          or DMG&#xb9; na in )89.11        ]none    ) SUR/PT3.00/HT4.00    (
NNP2-18-.938-CS      [  LINE&#xb9; 2FWS-018-36-1 NTS: 20,23        (NS          1    [ na  /na
 
r NIAGARA MOHAWK POWER CORPORATION                  -        ILE POINT NUCLEAR STATION - UNIT 2        7 of 19 HNP2-ISI-006, REV. 1, CH.OOO                                                    SECOND TEN YEAR INSERVICE INSPECTION                (ISI)  INTERVAL PLAN APPENDIX    -  FWS SYSTEH Change date:    07/29/1999                                                                                          G (sorted by Examination Identifier)
(PERIOD                          RENARKS 2HD INTVL REL RED I DESCRIPTIOH OF ITEN To BE EXANINEDICATGRY I IGSCCI EX1/HDE PROCEDURE                                        1 EXAHIHATIOH IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DMG                &#xb9;,  (ITEN  &#xb9; (FREQY( EX2/HDE PROCEDURE              (PERIOD 2  (
USE CAL BLK  &#xb9; I    LINE Ho. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE                        PROCEDURE    (PERIOD 3  (
RED/PIPE                                    IB-J      (
na      (
VOL/UT6.02 I
2FMS-47-14-SM004          (
QISO  47-14          or  DMG&#xb9; na      in  (B9.11    (none        (
SUR/PT3.00/NIL 00    (
HHP2-12-.688.CS      I    LINE&#xb9; 2FWS 012 53  1    NTS'3 '4            IHS              1    (
na /na I    PIPE/ELB                                    IB-J      I    na    I    VOL/UT6.02          I 2FMS-47-14-SM005          (
QISO 47-14            or  DMG&#xb9; na        in (89.11    (none        (
SUR/PT3.00/NT4.00    (
HNP2-12-.688-CS      (    LINE&#xb9; 2FWS-012-53-1      HTS: 24,25          (HS                                              I PIPE/ELB                                    IB J      (
na    (
voL/uT6.O2 I
2FMS-47-14-SM007          (
QISO  47-14          or DMG&#xb9; na in (89.11              (none      (
SUR/PT3.00/NI'F 00  (
HNP2-12-.688  CS    (
LINE&#xb9; 2FWS-012-53-1 NTS: 24,25              (NS              1    (
na  /na
(  ELB/PIIE                                      IB-J      (
na      (
VOL/uT6.O2 2FMS-47-14-SM008            I  QISO 47-14            or  DWG&#xb9; na        in (B9.11      (none        (
SUR/PT3.00/NT4.00    (
NHP2-12-.688-CS      (
LINE&#xb9; 2FWS-012-53-1      NTS: 24,25          (NS                    (  na  /na I SWL/PIPE (8-J      (
na      (  VOL/uT6.02 2F WS-47 FM001          I  QISO  47-15          or DMG&#xb9; na in (B9.11              (none        (
SUR/P'13.00/HT4.00    (
HNP2-12-.688-CS          LINE&#xb9; 2FWS-012-52-1 NTS: 18(24                INS              1      (
na /na
(
ELB/PIPE                                      IB-J      (
na      (
VOL/UT6.02 I
2FWS-47-15-FM002            I  QISO  47-15          or  DMG&#xb9;    na  .in    (89.11    (none        (
SUR/PT3.00/NT4 F 00  (
NHP2-12-.688-CS          LINE&#xb9;  2FWS-012-52-1    HTS:    24  25      IHS              1    (
na /na I
PIPE/SE  Q N4B Az090 FEEDWATER              (B.J      I  na      I VOL/UT6.02            I
(
2FWS-47-15-FM003                QISO  47-15          or  DMG&#xb9;    na    in  (89.11    I ID-0      I  SUR/PT3.00/NT4.00    (
Sc9
(
NNP2-12-.688.CS        (
LINE&#xb9;  2FWS-012-52-1    NI'S:  24,27        (TEV            1    (na/
I  SWL/PIPE                                      IB-J      (
na      (
VOL/UT6.02 2FMS-47-15-FW004            (
QISO 47-15            or  DWG&#xb9; na        in (89.'ll    (none        (
SUR/PT3.00/HT4.00    (
NNP2-12-.688.CS          LIHE&#xb9; 2FMS-012-34-1      HTS: 18,24          (HS                    (
na /na
(
ELB/PIPE                                      IB-J      (
na      (  VOL/UT6.02 I
2FWS-47-15-FW005            I  QISO 47-15            or  DMG&#xb9; na        in (89.11      (none        (
SUR/PT3.00/Hl'4.00    (
NNP2-12-.688-CS          LINE&#xb9; 2FWS-012-34-1      Hl'S: 24,25          (NS              1      (
na /na
 
NIAGARA NOHAMK POWER CORPORATION -                  IIILE POINT  NUCLEAR STATION  - UNIT 2        8 of 19 NNP2-ISI-006) REV. 1I CH-OOO                                            SECOHD TEH TEAR INSERVICE INSPECTION            (ISI)    INTERVAL PLAN Change date:  07/29/1999                                                                        APPENDIX G - FMS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REO ] DESCRIPTIOH OF ITEN TO BE EXANIHED)CATGRY [IGSCC( EX1/NDE PROCEDURE (PERIOD 1                                                  RENARKS EXANINATION IDENTIFIER f ITS ISO LOCATOR, COHPOHEHT OMG          &#xb9;,  ]ITEN  &#xb9;  )FREQYJ EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK  &#xb9; I    LINE  NO. AHD NOTES'S    APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOO 3            I I    ELB/PIPE                                IB-J      )
na    [  VOL/UT6.02 2FMS-47 FM006        I    QISO 47-15            or  D'MG&#xb9; na  in (89.11    ]none      f  SUR/PT3.00/NT4.00    f HNP2-12-.688-CS    I    LINE&#xb9;  2FMS  012 34 1    NTS'4i25      IHS                  (  na  /na              I I    PIPE/SE  Q N4C A2150 FEEDMATER        IB-J      (
na    )
VOL/UT6.02 2FMS-47 F W007        I  QISO  47-15          or DMG&#xb9;  na  in  JB9.11    IID 0      I  SUR/PT3.00/MT4.00    I HKP2-12-.688-CS    I  LINE&#xb9; 2FMS-012-34-1 HTS:.24,27          ITEV          1    dna/                    I    Sc11 I  PIPE/ELB                                IB-J      )
na    )
VOL/UT6.02 2FMS-47-15-FM008          I  QISO 47-15            or  DMG&#xb9; na  in  JB9.11    )none      )  SUR/PT3.00/NT4.00    J NHP2-12-.688-CS    I  LINE&#xb9; 2FMS-012-34-1      NTS: 24(25    IHS                  [  na  /na              I IHTEG ATT                              IB-K      I na      I  SUR/PT3.00/NT4.00 2FMS-47 FM300        /  QISO  47-15-13        or DMG&#xb9; HA    in /B10.20 [IO          /  na  /na na                  /  LINE&#xb9; 2FMS-012-34-1 NTS: 24,13          [NS      /    1    /  na  /na INTEG ATT                              ]B-K      ] na      [  SUR/PT3.00/NT4.00    ]
2FMS-47 FM301        f  QISO  47-15-13        or DWG&#xb9; NA in JB10.20 JIO              J na  /na              I na                  J LINE&#xb9; 2FMS-012-34-1 NTS 24(13            JHS      f    1
                                                                                            )
na /na                I I  IHTEG ATT                                IB K      I  na      I  SUR/PT3.00/NT4.00    I 2FMS-47-15-FM310          f  QISO  47-15-10        or DMG&#xb9; na . in (B10.20 /ID            f  na  /na              I na                  )  LINE&#xb9; 2FMS-012-34-1 NTS: 24,28          fNS      (
1    f  na /na                I I  IHTEG ATT                              IB K      I  na      I  SUR/PT3.00/NT4 F 00 2FMS-47 FM311          [ QISO 47-15-10        or DMG&#xb9; na in (B10.20 ]ID              f  na  /na
(
LINE&#xb9; 2FMS.012-34-1 NTS: 24,28          fHS      /    1    f  na  /na I  INTEG ATT                              [B-K      f na      [  SUR/PT3.00/MT4.00    f 2FMS-47-15-FM314          f QISO 47-15-12        or OMG&#xb9; na in /B10.20 ]ID              /  na /na                          I f  LINE&#xb9; 2FMS-012-34-1 NTS: 24,13          /Nandate)      1      f na /na                      Sc8 i I IHTEG ATT                                IB  K      I na      I SUR/PT  00/NT4.00    I          I 2FMS-47-15-FM3'l5          f QISO  47-15-12        or DWG&#xb9; na in JB10.20 ]ID                J na  /na              I          I f  LINE&#xb9; 2FMS-012-34-1 NTS: 24,13          [Nandatef 1          ] na /na                      Sc8 i
 
NIAGARA HONAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        9 of 19 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEH YEAR IHSERVICE INSPECTION        (ISI) INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX G - FMS SYSTEN (sorted by Examination Identifier) 2ND  IN'IVL REL RED      DESCRIPTIOH OF ITEN TO BE EXAHIHED)CATGRY )IGSCC) EX1/HDE PROCEDURE              )PERICO  1                        REHARKS
(
EXAMINATION IDENT'IFIER  J ITS ISO LOCATOR, COHPONEHT    DMG  &#xb9;, [ITEN &#xb9;  JFREQV[ EX2/HDE PROCEDURE        [PERIOD 2 USE CAL BLK  &#xb9; I    LINE NO  AND  NOTES'S    APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE ]PERIOD 3 /
I    INTEG ATT                              JB-K .  ]  na    J SUR/PT3.00/NT4.00  [
2FMS-47-15-FM3X2              QISO 47-15-15        or  DMG&#xb9; na    in (810.20 )ID            na  /na f
I    LINE" 2FMS 012 34  1    HT '4    13    IHS      I  1 f
I  na /na            I I    INTEG ATT                              (B-K      f  na    f  SUR/PT3.00/NT4.00  f 2FMS.47-15-FM3X3          f    QISO 47-15-15        or DMG&#xb9; na in (810.20 ]ID              )  na /na            I
[  LINE&#xb9; 2FMS-012-34-1 NTS: 24,13          JNS      f  1    /  na  /na            I I  IHTEG ATT                              /8-K      ] na      f  SUR/PT3.00/HT4.00  f 2FMS-47-15-FM3X4          f  QISO 47-15-14        or DMG&#xb9; na in /810.20 /ID              f  na /na              I J
LINE&#xb9; 2FMS.012-34-1 NTS: 24,13          /NS      f  1    f  na /na              I I  IHTEG ATT                              JB-K      J na    f  SUR/PT3.00/NT4.00 2FMS-47-15-FM3X5          J QISO 47-15-14        or DMG&#xb9; na in JB10.20 [ID              ]  na  /na f  LINE&#xb9; 2FMS-012-34-1 HTS: 24,13          /HS      )  1    f  na /na I INTEG ATT                                IB-K      I na      I  SUR/PT3.00/NT4.00  I 2FMS-47-15-FM3X6          / QISO  47-15-11        or DMG&#xb9; na in (810.20 ]ID              f  na  /na            I f  LINE&#xb9; 2FMS-012-34-1 HTS: 24,13          /HS      )    1    f  na /na I INTEG ATT                                [B-K      f na    f  SUR/PT3.00/NT4.00  ]
2FMS-47 FM3X7          f  QISO 47-15-11        or DMG&#xb9; na . in JB10.20 ]ID            f  na /na I  LINE&#xb9; 2FMS-012-34-1 NTS: 24,13          IHS        I  1    I  na /na              I I INTEG ATT                                /B-K      J na      f SUR/PT3.00/HT4.00 2FMS-47  FM3XB          f  QISO  47-15-10      or DMG&#xb9; na in /B10.20 /ID              f na /na f  LINE&#xb9; 2FMS-012-34-1 HTS: 24,28          /HS        I  1    f na /na I INTEG ATT                                JB-K      f na      / SUR/PT3.00/NT4.00  f 2FMS-47-15-FM3X9            f QISO  47-15-10      or DMG&#xb9; na in )810.20 (10              / na  /na J
LINE&#xb9; 2FMS-012-34-1 NTS: 24,28          ]HS      /  1    / na /na              I I PIPE/ELB                                IB-J      / na      / VOL/UT6.02 2FMS-47-15-SM001            I QISO 47-15          or  DMG&#xb9; na    in (89.11    /none    J SUR/PT3.00/NT4.00    /
HKP2-12-.688.CS        I  LINE&#xb9; 2FMS-012-52-1    HTS'4    25      INS          1    / na /na
 
NIAGARA NOHAWK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        10 of 19 HNP2-ISI-006, REV. 1( CH-000                                          SECOHD TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G - FMS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOD  1  I                    REMARKS EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPOHENT DMG        &#xb9;,  [ITEN  &#xb9; [FREQYJ EX2/NDE PROCEDURE        )PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  PIPE/ELB                              IB-J    i na      i  VOL/UT6.02 2FMS-47-15-SWOON        I  QISO 47-15          or  DMG&#xb9; na  in  (B9.11  /none    /  SUR/PT3.00/HT4.00  )
HNP2-12-.688-CS    I  LINE&#xb9; 2FWS-012-52-1    NTS: 24,25    iHS I  ELB/PIPE                              IB-J      J na    J VOL/UT6.02 2FMS-47-15-SM004        I  QISO 47-15          or  DMG&#xb9; na  in )89.11    [none    J SUR/PT3.00/HT4.00  J NHP2-12-.688.CS    i  LINE&#xb9; 2FMS-012-52-1    HTS: 24,25    iHS          1    J na /na            I I  PIPE/ELB                              IB-J      f  na    f  VOL/UT6.02 2FWS.47-15-SM005        i QISO 47-15            or  DMG&#xb9; na  in  [B9.11    ]none    f  SUR/PT3.00/HT4.00  (
NHP2-12-.688.CS      LINE&#xb9; 2FMS-012-34-1    HTS: 24,25    [HS                f  na  /na            I I  PIPE/ELB                              IB-J      J na    J VOL/UT6.02 2F WS-47-15. SW008      I  QISO 47-15          or  DMG&#xb9; na  in (89.11    Inone    I  SUR/PT3.00/HT4.00  i NHP2-12-.688  CS  I  LINE&#xb9; 2FWS-012-34-1    HTS: 24,25    INS          1    /  na  /na            I I  ELB/PIPE                              IB-J      f  na    f  VOI./UT6.02 2FMS-47-15-SW009        I  QISO 47-15          or  DMG&#xb9; na    in )89.11    ]none    f  SUR/PT3.00/HT4.00  f NNP2-12-.688.CS    I  LINE&#xb9; 2FMS-012-34-1    NTS: 24,25    IHS          1    /  na /na              I
                        )
PIPE/*NOV218 (AUGNENTED VOL ONLY) Ina            )
na    [  VOL/UT6.02          I or DMG&#xb9; na  .in                          * /n/a                Sc9 2FMS-47 FM002        i QISO 47-16                              [na      )ID      (
NNP2-24-2.06-CS    I LINE&#xb9; 2FWS-024-28-4    NTS: 1,2      IBER      I  4    I                      I
                          / *KOV21B/PIPE                          IB-J      I na      I VOL/UT6.02          I 2FWS-47 FM003        I QISO 47-16          or DWG&#xb9; na    in (B9.11    ilD      i SUR/PT3.00/HT4.00  (  Sc9 NHP2-24-2.06-CS      LINE&#xb9;  2FMS.024-51-1    HTS: 1,2      ABER      I  1      lna/                  I PIPE/*AOV23B                          ]B-J      [ na      ] VOL/UT6.02 2FMS-47 FM006        [ QISO  47-16          or DMG&#xb9; na    in [89.'l1    (ID      f SUR/PT3.00/HT4.00  f  Sc9 NHP2-24-2.06.CS    / LINE&#xb9; 2FWS-024-51-1 HTS: 1,28          [AW/ber  /  1    / na  /
I
                            *AOV23B/PIPE                            /8-J      / na      / VOL/UT6.02 2FMS-47 FM007        / QISO  47-16          or DWG&#xb9; na in /89.11 /ID              / SUR/PT3.00/HT4.00  (
Sc9 HHP2-24-2.06.CS    / LINE&#xb9; 2FWS-024-51-1 N'IS: 1,28          /AM/ber / 1        / na  /
 
NIAGARA HOHAMK POWER CORPORATION            -      HILE POINT NUCLEAR STATION - UNIT 2                                          11 of 19 NHP2-ISI-006( REV. 1, CH-000                                            SECOND TEH YEAR        IHSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPEHDIX  G - FMS SYSTEH (sorted by Examination Identifier)
ND IHTVL REL RED      DESCRIPTIOH OF ITEM TO BE EXAHIHEDlCATGRY IIGSCCI EX1/NDE PROCEDURE              )PERIOD  1  I                              REHARKS I
EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, COHPOHENT DMG          &#xb9;,  (ITEN  &#xb9; [FREOYJ EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK  &#xb9; i LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                    I i PIPE/PENET Z4B                          /8-J      f  na    /  VOL/UT6.02 2FMS-47-16-FM008          (
aiso 47-16          or  DMG&#xb9; na    in /89.11    /IO      /  SUR/PT3.00/HT4.00  /    Sc9 NHP2-24-2.06-CS    )
LINE&#xb9; 2FMS-024-51-1    HTS: 1,8        /TEV/ber/ 1        /  na  /
I  PENET  Z4B/*V12B                      IB-J      I  na    I  VOL/UT6.02          I 2FMS-47-16-FW009          [  arso 47-16          or  DMG&#xb9; na    in  JB9.11    ]ID      (
SUR/PT3.00/MT4.00 Jsc8 NHP2-24-2.469-CS    f  LINE&#xb9; 2FMS-024-32-1    NTS: 28,8      [TEV/berf 1        /  na  /              I t  *V12B/PIPE                            [B-J      J na    [  VOL/UT6.02 2Fl5-47 FM010        / QISO 47-16            or  DMG&#xb9; na    in (89.11    ]ID      /  SUR/PT3.00/MI'4.00 Jsc8 NHP2-24-2.06-CS    f  LINE&#xb9; 2FWS-024-32-1    NTS: 1,28      /AW/ber  f  1    /  na  /
                          /  PIPE/*HCV54B                          IB-J      I  na    I  VOL/UT6.02          I 2FMS-47-16-FW011          i QISO    47-16        or DMG&#xb9; na in (89.11        ]none    J SUR/PT3.00/HT4.00    [
NHP2.24-2.06-CS        LINE&#xb9; 2FI5-024-32-1 NTS 3 14          IHS            1    /  na  /na I
                              *HCV54B/PIPE                          IB-J      [  na    )
VOL/UT6.O2 2FMS-47-16-FW012          I  QISO  47-16        or DMG&#xb9; na in (B9.11        IID      I  SUR/PT3.00/HT4.00    Isc8 NHP2-24-1. 219. CS  I  LINE&#xb9; 2FMS-024.60-1 NTS: 3,14          IHS            1    [na/                    I I  RED/PIPE                              IB-J      I na    I  VOL/UT6.02          I 2FI5-47-16-FM013          I  QISO  47-16        or  DWG&#xb9; na  . in (89.11    Inone    I SUR/PT3  F 00/HT4.00  I HHP2-24-1.219-CS    I  LINE&#xb9; 2FMS-024-60-1 NTS'7 19          IHS            1    /  na  /na              I I  ELB/PIPE                              IB-J      I na    I  VOL/UT6.02          I 2Fl5-47-16. FM014        f  arSO 47-16        , or  DMG&#xb9; na    in ]89.11    /ID      f SUR/PT3.00/HT4.00    [Sc8 HHP2-24-2.06-CS      i LIHE&#xb9; 2FMS-024-32-1    NTS: 3, 12      ABER          1    /na/
I  INTEG ATT                            (8-K                  SUR/PT3.00/MT4.00    I            )Re-entered into program associated with 2FMS-PSSH233A1/BZ-17KU 2FMS-47 FM300          J QISO 47-'l6-07      or DMG&#xb9; HA in /810.20 /Ns                      /              I NA                  I  LINE&#xb9; 2Fl5-024-32-1 HTS: 3,13          [na      /  1            /              I I  INTEG ATT                              /8-K      / na        SUR/PT3.00/HT4.00    I            [Re-entered into program associated with 2FMS-PSSH233A1/BZ-17KU 2FIIS-47-16. FW301          J QISO  47-16-07      or DWG&#xb9; NA      in JB'l0.20 /Ns                /              I NA                    ] LINE&#xb9; 2FMS-024-32-1 NTS: 3,'13          Jna      /  1            /              I
 
HIAGARA HONAMK POMER CORPORATIOH          -        NILE POINT NUCLEAR STATION - UNIT 2                                          12 of 19 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEH YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                        APPENDIX    G  - FMS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                        )PERIOD  1  I                            REHARKS EXAHINATIOH IDENTIFIER    ) ITS ISO LOCATOR, COHPONENT DMG    &#xb9;,  ) ITEN &#xb9; )FREQY) EX2/NDE PROCEDURE          )PERIOD 2    )
USE CAL BLK    &#xb9; I    LINE No. AND NOTES, AS APPLICABLE )SELECT      )CLASS) EX3/NDE PROCEDURE          )PERIOD 3    I I IHTEG ATT                                  IB K      I  na    I SUR/PT        /HT      I            )Re-entered into program associated with 2FMS.PSSH233AI/BZ-17KU 2FMS-47-16.FM302          )
QISO 47-16-07        or DMG&#xb9; NA in )810.20      )NS      )    /
NA                  )
LINE&#xb9;  2FMS-024-32-1    NTS: 3,13      )na      )  1    )    /                  I I    IHTEG ATT                              )8-K      )
na    )
SUR/PT3.00/HT4 F 00                )Re-entered into program associated with 2FMS-PSSH233A1/BZ-17KU 2FMS-47-16-FM303          )
QISO  47-16-07        or DMG&#xb9; NA    in )810.20    )NS      )    /
NA                  )
LINE&#xb9; 2FMS-024-32-1 NTS: 3,13          )na      )
1    )    /
I    PIPE/SML                                IB-J      )
na    )
VOL/UT6.02 2FMS.47 FMS'MOOB        )
QISO  47-16            or DMG&#xb9; na in )89.31      )none    I SUR/PT3  00/HT4    0  I NHP2-24.1.219. CS      LINE&#xb9; 2FMS 024-60-1 NTS: 17,18          )NS            1
                                                                                            )
na /na I  PIPE/ELB                                IB-J    )
na    )
VOL/UT6.02 2f MS-47-16-SM003          I  QISO 47-16            or  DMG&#xb9; na  in )89.11    )ID      )
SUR/PT3.00/HT4.00      )Sc8 NHP2-24-2.06-CS      I  LINE&#xb9; 2FMS-024-32-1      NTS: 3,12      IBER          1    )na/                      I
                            )  PIPE/ELB                                IB-J    )
na    )
VOuuT6.O2 2FMS-47-16-SM006            I  QISO  47-16            or DMG&#xb9; na    in )89.11    )none    )
SUR/PT3.00/HT4 F 00    )
NHP2-24-1.219-CS      )
LINE&#xb9; 2FMS-024-60.1 N'IS: 3(4            )NS                                          I I  ELB/PIPE                                IB-J      I na    I  VOL/UT6.02            I ZFMS-47-16-SM007            )  QISO  47-16            or DMG&#xb9; na . in )89.11      )none    )
SUR/PT3.00/HT4.00      )
NHP2-24-1 ~ 219. CS      LINE&#xb9; 2FMS-024-60-1 NTS: 16,15          )NS          1    )
na /na                I I  PIPE/RED                                IB-J      )
na      )
VOL/UT6.02 2FMS-47-16.SM009            I  QISO  47-16            or DMG&#xb9; na in )89.11        )none    )
SUR/PT3.00/HT4.00      )
NHP2-24-1.219-CS      I  LINE&#xb9; 2FMS-024-60.1 NTS: 17,19          INS          1
                                                                                            )
na /na
                            )
PIPE/*FTGIA                              IB-J      )
na      )
VOL/UT6.02 2FMS.47-16-SM010            I  QISO  47-16            or  DMG&#xb9; na  in )89.11    )IO      )
SUR/PT3.00/MT4.00      )
Sc9 NHP2-24-2.06-CS        )
LINE&#xb9; 2FMS 024  51  1    NTS'    3      IBER                )
na/
I
                                <<FTG1A/PIPE                              IB-J      )
na      ) vouUT6.o2 2FMS-47-16-SM011            )
QISO  47-16            or DMG&#xb9; na    in )89.11    )ID      )
SUR/PT3 F 00/HT4.00    )    Sc9 NHP2-24-2.06-CS        I  LINE&#xb9; 2FMS-024-51-1 NTS: 1,5            IBER          1    )na/
 
NIAGARA MOHAMK POMER CORPORATIOH            -      MILE POINT NUCLEAR STATION      - UNIT 2        13 of 19 NMP2-1SI-006, REV. 1,    CN-OOO                                        SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                      APPENDIX  G - FMS SYSTEH (sorted by Examination        Identifier) 2ND INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAMINED(CATGRY (IGSCC(                    EX1/NDE PROCEDURE  (PERIOD 'I                            REHARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR ~ COMPONENT DMG          &#xb9;i  IITEH  &#xb9; IFREQYI EX2/NDE PROCEDURE        (PERIOD 2    (
USE CAL BLK  &#xb9;  I  LINE No. AND  NOTES'S    APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I
(  PIPE/PIPE                              IB-J      (
na    (
VOL/UT6.02 2FMS-47-16. SM012          (
QISO 47-16            or OMG&#xb9; na in (89.11      (none      I  SUR/PT3.00/MT'0    I NHP2-24-1.219. Cs    I  LINE&#xb9; 2FMS-024-60-1 HTS: 15,17        INS            1    (
na /na I  PIPE/PIPE                              IB-J      I  na    I  VOL/UT6.02        I 2FMS-47-16-SM013          (
QISO 47-16            or DMG&#xb9; na  in (89.11    (none      (
SUR/PT3.00/Ml'4.00 (
NHP2-24-2.06-CS      I  LINE&#xb9; 2FMS-024-32-1 NTS: 3            INS                  (  na /na I  FLUEO ND/TEE  (*FTG1A)                IB-J      I na      I  VOL/UT6.02          I 2FMS-47-16-VM001          (
QISO  47-16          or OMG&#xb9; 048 in (89.11 (ID            (  SUR/PT3.00/MT4.00  (
Sc9 NMP2-30-2.90-CS      (
LINE&#xb9; 2FMS-024-51-1 NTS: 3,4          (AM/ber ( 1          (  na /
I  TEE/RED (*FTG1A)                      IB-J      (
na    (
VOL/UT6.02 2FMS-47-16-W002            I  QISO  47-16          or DMG&#xb9; 048 in (89.11 (ID            (
SUR/PT3.00/MT4.00  (
Sc9 NMP2-30.2.90-CS      (
LINE&#xb9; 2FMS-024 I NTS: 4,5          (AM/ber              (na/
I  TEE/THERMAL SLEEVE (*FTG1A)            IB J      (
na      (
voL/uT6.O2 2FMS-47-16-W003            I  QISO  47-16          or  DMG&#xb9; 048 in (89.31      (ID        (
SUR/PT3.00/HT4.00  (
Sc9 NHP2-10-1.00.CS      (  LINE&#xb9; 2FMS-024-51-1      NTS: 4,6      (AM/ber        1    (na/
I  PIPE/ELB                              IB-J      (
na      (
VOL/UT6.02 2FMS-47 FM001          (
QISO  47-17          or DMG&#xb9; na . in (89.11      (none      (
SUR/P'T3.00/MT4.00  (
NMP2-18-.938.CS      (
LINE&#xb9; 2FMS-018-35-1 NTS: 29,22          (NS                  (
na /na I  PIPE/PIPE                              IB-J      (  na      (
VOL/UT6.02 2FMS-47-17-FM002            (
QISO 47-17            or DMG&#xb9; na    in (89.11    (none      (
SuR/PT3.00/MT4.00  (
NMP2-12-.688.CS      (  LINE&#xb9;  2FMS-012-54-1    NTS: 24        (NS            1    (
na /na I ELB/PIPE                                IB-J        na      (
VOL/UT6.02 2FMS-47-17-FM003            (
QISO  47-17          or  DMG&#xb9;  na  in  (89.11    (none      (
SUR/PT3.00/MT4.00    (
NMP2-12-.688.CS      (
LINE&#xb9; 2FMS-012-54-1 NTS: 24,25          INS                  (
na /na
(
PIPE/SE  Q N4D  Az210 FEEDMATER        (8-J      I na      I VOL/UT6.02          I 2FMS-47-17-FM004            ( QISO 47-17          or  DMG&#xb9;  na  in  (89.11    (ID-E      (
SUR/PT3.00/HT4.00    (Sc8 NHP2-12-.688.CS      I LINE&#xb9; 2FMS-012-54-1 NTS 24 27          I TEV                (na/
 
NIAGARA HOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        14 of 19 HHP2-ISI-006, REV. 1, CH-000                                              SECOHD TEN YEAR INSERVICE INSPECTION            (ISI)    INTERVAL PLAN Change date:    07/29/1999                                                                        APPEHDIX G -  FMS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE                      iPERIOO  1                        RENARKS EXAHIHATIOH IDENTIFIER f ITS ISO LOCATOR, COHPONEHT DMG            &#xb9;,  [ITEN  &#xb9; JFREOY[ EX2/NDE PROCEDURE          ]PERIOD 2 USE CAL BLK  &#xb9; I    LINE  NO  AND  NOTES'S    APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE              IPERIOO 3  I I INTEG ATT JB-K      f  na    f  SUR/PT3.00/HT4.00  /
2FMS-47 FM306        (
QISO  47-17-16        or DMG&#xb9; na in /B10.20 ]ID              J na  /na f  LINE&#xb9; 2FMS.012-54-1 NTS: 24,26          JNS      /    1    [  na /na              I I IHTEG ATT                                /8-K      J na    J SUR/PT3.00/NT4 F 00 (
2FMS-47-17-FM307          )  QISO  47-17-16        or DMG&#xb9; na in (810.20 /ID              /  na  /na
                          )
LINE&#xb9; 2FMS-012-54-1 NTS: 24,26          ]HS            1    /  na/na                I I  IHTEG ATT                              IB K      I  na    I SUR/PT3.00/Hl'4.00  I 2FMS-47-17-FM308          f  QISO  47-17-16        or  DUG&#xb9; na    in [B10.20 /ID          /  na /na              I I  LINE&#xb9; 2FMS-012-54-1      HTS: 24,26    INS            1    /  na/na I INTEG ATT                                )8-K      f na        f  SUR/PT3.00/NT4.00    f 2FMS-47-17-FM309          I  QISO  47-17-16        or  DMG&#xb9; NA    in IB10.20  ]ID        f  na /na na                  I  LINE&#xb9; 2FMS.012-54-1 NTS: 24,26          INS      I    1    I  na  /na              I I IHTEG ATT                                IB K      I  na      I  SUR/PT3.00/MT4.00 2FMS-47-17-FM310            /  QISO 47-17-16        or  DMG&#xb9; NA    in /810.20 /ID          /  na  /na I  LINE&#xb9; 2FMS 012 54  1    NTS'4    26    IHS        I    1 I  na /na I  INTEG ATT                              IB-K      I  na      I SUR/PT3.00/HT4.00    I 2FMS-47-17-FM311            f  QISO 47-17-16        or DMG&#xb9; HA . in /810.20 /ID              / na /na I  LIHE&#xb9;  2FMS-012-54-1    NTS: 24,26      IHS            1      / na/na                I I  INTEG ATT                                [B-K      f  na      f SUR/PT3.00/Hl'4.00  f 2FMS-47 FM312          f  QISO  47-17-16        or DMG&#xb9; HA in /810.20 )ID                f na /na
[  LIHE&#xb9; 2FMS-012-54-1 NTS: 24,26          )NS        )
1      ) na /na                I I  INTEG ATT                              JB-K      [ na      ) SUR/PT3.00/NT4.00    f          I 2FMS.47 FM313          / QISO 47-17-16        or DMG&#xb9; HA in /B10.20 /ID                / na  /na                        I I  LINE&#xb9; 2FMS-012-54-1 NTS: 24,26          IHS        I  1      f na /na                I          I I PIPE/S'ML                                IB- J      (
na      [ VOL/UT6.02 2FMS-47-17-SM001            i QISO 47-17            or  DMG&#xb9; na    in (B9.31      [none      J SUR/PT3.00/NT4.00    J NHP2-18-.938-CS        LINE&#xb9; 2FMS-018-35-'I    HIS'9    18    IHS            1      / na  /na
 
NIAGARA HOHAWK POWER CORPORATION      -      HILE POINT'UCLEAR STATION - UNIT 2        15 of 19 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                              APPENDIX  G -  FWS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY (IGSCCI EX1/NDE PROCEDURE              IPERIOD 'I                      REHARKS I
EXAHINATION IDENTIFIER    J ITS ISO LOCATOR, COHPONENT DWG    &#xb9;, ]ITEN  &#xb9; )FREOYJ EX2/NDE PROCEDURE      ]PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3          I I  ELB/PIPE                            IB-J    I na    I  VOL/UT6.02          I 2FWS-47-17-SW002          I  QISO  47-17          or DMG&#xb9; na in JB9.11    ]none  [  SUR/PT3.00/HT4.00  J NHP2-18-.938-CS      i  LINE&#xb9; 2FMS-018-35-'I NTS: 22,20      iNS        1    /  na /na              I I  PIPE/RED                            IB-J    [ na    )
VOL/UT6.02 2FWS-47-17-SI$ 03.        I  QISO  47-17          or DMG&#xb9; na in )89.11    Inone  f  SUR/PT3.00/HT4.00  I NHP2-18-.938-CS      I  LINE&#xb9; 2FWS-018-35-1 NTS: 22,19      INS        1    /  na/na              I I  RED/PIPE                            IB-J    [ na    (
VOL/UT6.02 2FWS-47-17-SM004          I  QISO  47-17          or DWG&#xb9; na in )89.'ll    (none  ]  SUR/PT3.00/HT4.00  (
NHP2-12-.688.CS    I  LINE&#xb9; 2F'WS-012-54-1 NTS: 19,24      INS        1    f na/na PIPE/ELB                            IB-J    )
na    )
VOL/UI'6.02 2FWS.47-17-SM005            QISO  47-17          or DMG&#xb9; na in [89.11    )none    (
SUR/PT3.00/HT4.00  (
NHP2-12-.688-CS        LINE&#xb9; 2FWS-012-54-1 NTS: 24,25      INS        1    J na /na              I I  PIPE/ELB                            IB-J    [ na    ] VOL/UT6.02 2FWS.47-17-S'W007        i QISO  47-17          or DWG&#xb9; na  in (89.11  Inone    I SUR/PT3.00/HT4.00  I NHP2-12-.688-CS    [  LINE&#xb9; 2FMS-012-54-1 NTS: 24,25      (NS          1    J na /na              I I  ELB/PIPE                            IB-J      na    (
VOL/UT6.02                    I 2FMS-47-17-SW008          I  QISO  47-17          or DWG&#xb9; na . in (89.11  Inone    I SUR/PT3  00/HT4.00  I          )
NHP2-12-.688-CS        LINE&#xb9; 2FWS-012-54-1 NTS: 24,25      iNS          1    / na/na              I          I I  PIPE/PIPE                            IB-J    ] na    [ VOL/UT6.02 2FWS-47-17-Sl$ 09        i QISO  47-17          or DWG&#xb9; na  in ]B9.11  )none    (
SUR/PT3.00/Hl'4.00  )
NHP2-18-.938-CS    i  LINE&#xb9;  2FWS-018-35-1  NTS: 29      FANS              f na /na              I I SWL/PIPE                            IB-J    I na    I VOL/UT6.02          I 2FWS-47 Fl$ 01        I QISO  47-18          or DWG&#xb9; na in ]89.'l1    [none    )
SUR/PT3.00/HT4.00  (
NHP2-12-.688.CS        LINE&#xb9; 2FWS-012-37-1 NTS: 18,24      iNS          1    [ na /na              I I ELB/PIPE                            IB-J    [ na    [ VOL/UT6.02 2FWS-47-18-FI$ 02          i QISO  47-18          or DWG&#xb9; na  in JB9.11  ]none    ( SUR/PT3.00/HT4.00  J NHP2-12-.688-CS      [ LINE&#xb9; 2FMS-012-37-1 NTS: 24,25      iNS          1    / na /na
 
NIAGARA HOHAMK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        16 of 19 NNP2-ISI-006( REV. 1) CH-OOO                                            SECOHD TEN YEAR INSERVICE IHSPECTIOH          (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX G -  FMS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED      DESCRIPTIOH OF ITEN TO BE EXAHINED[CATGRY ] IGSCC( EX1/NDE PROCEDURE              (PERIOD    1                      RENARKS
                        )
EXANINATIOH IDENTIFIER f ITS ISO LOCATOR, CONPONENT OMG          &#xb9;,  )ITEN  &#xb9; JFREOYJ EX2/NDE PROCEDURE        ]PERIOD 2    J USE CAL BLK  &#xb9; i LINE HO. AND NOTES, AS APPLICABLE DESELECT )CLASS) EX3/NDE PROCEDURE                iPERIOO 3 I  PIPE/SE  Q N4E A2270  FEED'MATER      IB-J      f  na    f  VOL/UT6.02 2FMS-47-18-FM003        i QISO    47-18          or DWG&#xb9; na    in /89.11    IID-E    I  SUR/PT3.00/NT4.00  I HNP2-12-.688-CS    I  LINE&#xb9; 2FMS-012-37-1 HTS: 24,27          I TEV        1    /na/                  / Sc10 I  SML/PIPE                                IB- J    (  na    [  VOL/UT6.02 FANS 2FMS-47 FM004        i QISO    47-18          or DMG&#xb9; na in (89.11        (none    )
SUR/PT3.00/NT4.00  [
NNP2-12-.688.CS        LINE&#xb9; 2FMS-012-33-1 NTS: 18,24          iNS I  ELB/PIPE                                IB-J      (
na    )
VOL/UT6.02 2FMS-47-18-FWDDS          I  QISO 47-18            or  DMG&#xb9; na    in )89.11    [none    J SUR/PT3.00/HT4.00  )
NNP2-12-.688-CS        LINE&#xb9; 2FWS-012-33-'I    NTS: 24,25                  1    /  na/na              I I  ELB/PIPE                                IB-J      [  na    [  VOL/UT6.02 2FMS-47-18-FM006          I Q      4718            or  DMG&#xb9; na    in )89.11    ]none    J SUR/PT3.00/NT4.00  J HNP2-12-.688-CS        LINE&#xb9; 2Fl5-012-33-1      NTS: 24,25    (NS          1    f  na /na              I I  PIPE/SE  Q N4F A2330  FEEDWATER        IB-J      I  na    I  VOL/UT6.02          I 2FMS-47-18-FW007          i QISO 47-18            or  DMG&#xb9; na    in [89.11    IID-E    I  SUR/PT3.00/NT4.00  I HNP2-12-.688-CS    i LINE&#xb9; 2FMS-012-33-1      HTS: 24,27    iTEV          1    /na/                  I Sc10 I  PIPE/ELB                                IB J      [  na    [  VOL/UT6.02 2Fl5-47 FM008        i QISO  47-18          or DWG&#xb9; na .in ]89.11      (none    f  SUR/PT3.00/HT4.00  J HNP2-12-. 688-CS    I  LINE&#xb9; 2FMS 012-33-1 NTS: 24 ~ 23        IHS                                        I I  IHTEG ATT                              )8-K                  SUR/PT3.00/HT4.00  I 2FI5-47-18-FM300            QISO  47-18.13        or  DMG&#xb9; NA    in [810.20 /ID            na /na
                          /
I  LINE&#xb9; 2FMS 012 33  1    HT '4    13    IH        I  1 I na /na I
I I  IHTEG ATT                              JB-K      ( na      )
SUR/PT3.00/HT4.00  f    ~
2FMS-47 FM301          [ QISO  47-18-13        or DWG&#xb9; HA in JB10.20 (ID              ] na /na LINE&#xb9; 2FMS 012-33-1 NTS: 24,13          /NS      f  1    f na /na              I I  INTEG ATT                              IB-K      I na      I SUR/PT3.00/NT4.00  i 2FMS-47-18-FM302          / QISO 47-18-14        or DMG&#xb9; na in (810.20 ]ID              f na /na I LINE&#xb9; 2FMS.012-33-1 NTS: 24,13          INS      I  1    I na /na              I
 
NIAGARA HOHAWK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2        17 of 19 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION      (ISI) INTERVAL PLAN Change  date:  07/29/'1999                                                                APPENDIX G - FWS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REQ ) DESCRIPTION OF ITEH TO BE EXANINED)CATGRY )IGSCC)              EX1/HDE PROCEDURE )PERIOD  1                        REHARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'OMPONENT DWG            &#xb9;, IITEM  &#xb9; IFREQYI EX2/NDE PROCEDURE IPERIOD 2 I USE CAL BLK    &#xb9; I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I IHTEG ATT                          /8-K    / na    I SUR/PT3.00/HT4.00  I 2FMS-47-18-FM303            /  QISO 47-18-14      or DWG&#xb9; na  in /810.20 /ID      /  na  /na na                    I  LINE&#xb9; 2FWS-012-33-1 NTS: 24,13      INS      I  1    /  na /na              I I  INTEG ATT                          (8-K      f na    (
SUR/PT3.00/NT4.00  J 2Fl5-47 FM304          J QISO 47-18-15      or DWG&#xb9; na in (B10.20 [ID          [ na /na I  LINE&#xb9; 2FWS.012-33-1 NTS: 24,13      IHS      I  1    I na /na              I I  IHTEG ATT                          JB-K      / na    I SUR/PT3.00/HT4.00  I 2FWS.47-18-FM305            f  QISO 47-18-15      or DWG&#xb9; na in JB10 ~ 20 /ID        / na /na I  LINE&#xb9; 2FWS-012-33-1 HTS: 24,13      INS      I  1    / na /na              I I INTEG ATT                            IB-K      I na    I SUR/PT3.00/NT4.00  I 2FMS-47 F W316          / QISO  47-18-12      or DWG&#xb9; na in /810.20 /ID          / na /na              I i  LINE&#xb9; 2FWS-012-33-1  HTS: 24,13    iHS      i  1    / na /na              I I  INTEG ATT                          /8-K      / na    I SUR/PT3.00/NT    00  I 2FMS.47-18-FW317            )
QISO 47-18-12      or DWG&#xb9; na in (810.20 (ID          J na  /na              I I  LINE&#xb9; 2Fl5-012-33-1 NTS: 24,13      INS      I  1    / na /na              I I  INTEG ATT                          /8-K      / na    / SUR/PT3.00/NT4.00    J 2FI5-47-18-FW326            /  QISO 47-18-11      or DWG&#xb9; na .in /810.20 /ID        / na  /na I  LINE&#xb9; 2FWS-012-33-1 HTS: 24,13      INS      I  1    / na /na              I INTEG ATT                          )8-K      J na    I SUR/PT3.00/NT4.00    I 2FWS.47-18. FW327            f  QISO 47-18-11      or DWG&#xb9; na in /810.20 /ID          / na /na              I i  LINE&#xb9; 2FMS-012-33-1 NTS: 24, 13    iHS      i  1    ) na /na              I I IH'IEG ATT                          /8-K      / na    I SUR/PT3 F 00/HT4.00  I 2FI5.47    FM328        / QISO 47-18-10      or DWG&#xb9; na in /B10.20 /ID          / na  /na i LINE&#xb9; 2FWS-012-33-1    NTS: 24,28    iNS      i  1    / na  /na              I I INTEG ATT                          JB-K      / na    I SUR/PT3 00/HT4 00    I 2FMS-47-18-FM329              / QISO 47-18-10      or DMG&#xb9; na in /810.20 /ID          f na  /na
(
LINE&#xb9; 2Fl5-012-33-1 NTS: 24,28      [HS      [  1    f na  /na              I
 
NIAGARA NOHAMK POMER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        18 of 19 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEH YEAR INSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:  07/29/1999                                                                      APPENDIX G - Fl5    SYSTEN (sorted by Examination Identif ier) 2ND INTVL REL RED    )
DESCRIPTION OF ITEN TO BE EXANIHED]CATGRY ] IGSCC( EX1/NDE PROCEDURE            (PERIOD  1                      RENARKS EXAHINATIOH IDENTIFIER    J ITS ISO LOCATOR, COHPONEHT DMG    &#xb9;,  )ITEM  &#xb9; JFREOY( EX2/HDE PROCEDURE        ]PERIOD 2 USE CAL BLK  &#xb9;  i LINE HO. AND NOTES, AS APPLICABLE DESELECT        iCLASS( EX3/HDE PROCEDURE [PERIOD 3 INTEG ATT                              fB-K    f  na    )  SUR/PT3.00/HT4.00  f 2FMS-47 FM330          )
QISO 47-18-10        or DMG&#xb9; na in (810.20 [ID          ]  na  /na LINE&#xb9; 2Fl5-012-33-1 NTS: 24,28        fHS      f  1    f  na /na              I I  IHTEG ATT                              )8-K      J na    )
SUR/PT3.00/NT4.00  ]
2FMS-47 FM331          J QISO  47-18-10        or DMG&#xb9; na in )810.20 ]ID          J na  /na            I f  LINE&#xb9; 2F'MS-012-33-1 HTS: 24,28        (NS      J 1    /  na /na              I I  PIPE/ELB                              IB-J      I  na    I VOL/UT6.02          I 2FMS-47-18. SM001          i  QISO  47-18          or DMG&#xb9; na in [89.11      ]none    f SUR/PT3.00/HT4.00  f HHP2-12-.688.CS      I  LINE&#xb9; 2Fl5-012-37-1 NTS: 24,25        INS          1    / na  /na I  PIPE/ELB                              IB-J      I  na    I VOL/UT6.02          I 2FMS.47-18-SM003          I QISO    47-18          or DMG&#xb9; na in )89.11      ]none    J SUR/PT3.00/NT4.00  f NHP2-12-.688-CS      I  LINE&#xb9; 2FMS-012-37-1 NTS: 24,25        IHS          1    f na /na I  ELB/PIPE                              IB-J      [  na    )
VOL/UT6.02 2FMS-47-18-SM004            [  QISO  47-18          or DMG&#xb9; na in [89.11      Inone    I SUR/PT3.00/HT4 F 00 )
HHP2-12-.688.CS      i  LINE&#xb9; 2Fl5-012-37-1 NTS: 24,25        JHS      I  1    I na /na              I I  PIPE/ELB                              IB-J      )  na    [ Vol./UT6.02 2Fl5-47-18-SM006            I QISO  47-18          or DMG&#xb9; na . in iB9.11    ]none    J SUR/PT3.00/NT4.00    J NNP2-12-.688-CS      I  LINE&#xb9; 2FI5-012-33-1 HTS: 24,25        IHS                J na /na I  PIPE/ELB                              IB-J      (
na    [ VOL/UT6.02 2Fl5-47-18-SM008            i QISO  47-18          or DMG&#xb9; na in (89.11      (none    (
SUR/PT3.00/NT4.00    )
NHP2-12-.688  CS      i LINE&#xb9; 2Fl5-012-33-1 NTS: 24,25          iHS                ) na  /na              I I ELB/PIPE                              IB-J      (
na    (
VOL/U'I6.02 2FMS-47-18-SM009            I QISO  47-18          or DMG&#xb9; na in )89.11      )none    (
SUR/PT3.00/HT4.00    (
HHP2-12-.688.CS        I LIHE&#xb9; 2FMS-012-33-1 NTS: 24,25        IHS            1    J na/na I PIPE/PIPE                              IB-J      [ na    ] VOL/UT6.02 2FMS-47-18-SM010            i QISO  47-18          or DMG&#xb9; na    in [B9.11    Inone    I SUR/PT3.00/NT4.00    I HHP2-12-.688  CS      I LINE&#xb9; 2Fl5 012 33  1    HTS'4        INS                J na /na
 
NIAGARA NOHAMK POMER CORPORATION      -      NILE POINT NUCLEAR STATION - UNIT 2        19 of 19 HNP2-ISI-006, REV. 1, CH-000                                      SECOND TEH YEAR IHSERVICE INSPECTION      (ISI)  IN'IERVAL PLAN Change date: 07/29/1999                                                              APPENDIX G - FMS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED    DESCRIPTION OF ITEN TO BE EXAMINED(CATGRY [IGSCC) EX1/HDE PROCEDURE        )PERIOD  1                        RENARKS
(
EXAMINATION IDENTIFIER  )  ITS  ISO LOCATOR, CONPONEHT DMG  &#xb9;, (ITEN  &#xb9; )FREQY[ EX2/HDE PROCEDURE [PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AHD  NOTES'S    APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  PIPE/PIPE                          fB-J      (
na  J VOL/UT6.02 2FMS-47-18.SM011        i QISO 47-18          or DMG&#xb9; na  in /89.11    [none  J SUR/PT3.00/NT4.00  [          I HHP2-12-.688-CS  / LINE&#xb9; 2FMS-012-33-1 HTS: 24        (HS      /  1  /  na  /na                        I
(
PIPE/PIPE                            /B-J    / na    / VOL/UT6.02 2FMS-47-18.SM012        / QISO  47-18        or DMG&#xb9; na  in  JB9.11  /none  / SUR/PT3.00/NT4.00  /          I NNP2-12-.688-CS  I  LINE&#xb9; 2FMS-012-33-1 NTS: 24          INS      I  1    I na  /na            I          I J
PIPE/PIPE                            JB-J    f na    f VOL/UT6.02                    I 2FMS-47-18-SM013        (
QI SO 47-18        or  DMG&#xb9; na  in (89.11    (none  )
SUR/PT3.00/NT4.00  )          I NMP2-12-.688-CS    [ LINE&#xb9; 2FMS-012-33-1    NTS: 24      )HS      )
1    f na /na                        I EHD OF SYSTEN FMS
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI-006, Rev. 1, CH400 System: FWS General Notes
: 1. CLASS 1 BER WELD                                                        16. 24. SCH. 80 ELBOW, SA-234 WPB
: 2. CLASS 4 AUGMENTED BER WELD                                              17. 24" SCH. 80 SMLS PIPE, SA433 GR6
: 3. 24" SCH 140 SMLS PIPE, SA-106C                                          18. 24" X12" SCH.BOSWEEPOLET, SA-105
: 4. 24" GATE VALVE, SA-105                                                  19. 24" X 18" SCH. 80 CONC. RED. SA-234 WPB
: 5. 30" X 24" 1.804" MIN. WALLFLUED HD SA450 LF2                            20. 18" SCH. 80 SMLS PIPE, SA-106B
: 6. 30" X 10" 2.625" MIN. WALLTEE, SA<20 WPL6                              21. 18" X 12 SCH. 80 SWEEPOLET SA-105
: 7. 30" X 24" 1.804" MIN. WALLRED. SA450 LF2                                22. 18" SCH. 80 ELBOW, SA-234 WPB
: 8. 10" X 8" .793" MIN. WALLTHERM. SLV SA450 LF2                            23. 18" X 12" SCH. 80 CONC. RED., SA-234 WPB
: 9. 24" CHECK VALVE,SA-216 WC 8                                            24. 12" SCH. 80 SMLS PIPE, SA-106B
: 10. 24" PENETRATION, SA-508 CL2                                            25. 1Z SCH. 80 ELBOW, SA-234 WP8
: 11. 24" SCH. 160 SMLS PIPE, SA-508 CL2                                      26. 1.25" PLATE, SA416 GR 70
: 12. 24" SCH. 140 ELBOW, SA-234 WPL                                          27. 12" SAFE END EXTENSION, SA408 CL1
: 13. 1.50" PLATE, SA-516 GR70                                                28. 1.00" PLATE, SA416 GR 70
: 14. 24" ANGLE VALVE, SA452 LCB                                              29. 18 SCH.80SMLS PIPE,SA433GR6
: 15. 24" SCH. 80 SMLS PIPE, SA-106B
 
NIAGARA MOHAHK POHER CORPORATION - n              MILE POINT NUCLEAR STATION - UNIT 2                                              1 of 34 HMP2-ISI.006( REV. 1I CH-000                                                SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                            APPENDIX G - ICS  SYSTEM (sorted by Examination        Identifier) 2HD INTVL REL RED      DESCRIPTION OF ITEM TO BE EXAMINED(CATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD                    1                                  REMARKS
                          )
EXAMINATIOH IDEHI'IFIER [ ITS ISO LOCATOR, COMPONENT DUG            &#xb9;,  ]ITEM  &#xb9; ]FREOYJ EX2/HDE PROCEDURE        ]PERIOD 2 [
USE CAL BLK  &#xb9; I    LINE  NO    AND HOTESi  AS  APPLICABLE  ISELECT    ICLASSi EX3/NDE PROCEDURE        iPERIOD 3 i
(
                              <<AOV156 BLTG                            )8-G-2 ) na        )
VT1/VT2.01          I 2 I CS<<AOV156, VB514      (
QISO  57-07            or DUG&#xb9; 003 in (87.70 )ID            J na  /na                  Sc9 f    LINE&#xb9; 2ICS-006-60-1 NTS: (none) JGrp Rep] 1                  J na /na              I i <<AOV156 INT SUR                            /8-M-2 f na        f  VT3/VT2.01          /<<          J<< Examine when  dissassemble  for maintenance 2 I CS<<AOV156, VBY114    (
QISO  57-07            or  DUG&#xb9;  003 in  ]812.50 JDisG      f      /              /<<
[    LINE&#xb9;  2ICS-006-60-1    HTS: 4        JGrp Rep/      1    /      /              /<<
I
                              <<AOV157 BLTG                            /B-G-2    /  na        VT1/VT2.01, 2I CS*AOV157, VB515        / QISO    57-07          or  DHG&#xb9; 003  in  /87.70    /none    /  na /na
                          /  LINE&#xb9; 2ICS-006-33-1 HTS: (none) )HS                /  1        na /na I
                              *AOV1    INT SUR                        /8-M-2    /  na    /  VT3/VT2.01          I 2ICS<<AOV157,VBY115        (  QISO  57-07          or DWG&#xb9; 003 in (812      '0  ]none    ]      /              I i  LINE&#xb9; 2ICS-006-33-1 NTS: 4                iHS      i  1    )      /              I
                          )
                              *MOV121 INT SUR                          JB-M-2 ') na          VT3/VT2.01          IEX6 2 I CS'MOV121, VBY116      I Q        57 09          or  DUG&#xb9; 008  in )812.50    )DisG    J      /                I f  LINE&#xb9; 2ICS-010-70-1      NTS: 14        [Grp Repf    1            /                I i <<MOV126 INT SUR
                                                                        /8-M-2 / na            VT3/VT2.01          IEX6 2I CS<<MOV126, VBY117        )
QISO  57-07          or DWG&#xb9; 015. in )812.50 )DisG          )      /              I
                            )  LINE&#xb9; 2ICS-006-60-1 NTS: 1              /Grp Rep/ 1                /              I I *MOV128    INT SUR                        IB-M-2    I na      I VT3/VT2.01 2 I CS*MOV128, VBY118      (  QISO  57-09          or DUG&#xb9; 008 in (812.50 )none            J
                                                                                                    /
                            ]  LINE&#xb9; 2ICS-010-70-1 HTS: 14              )NS        )  1    )      /
I  PIPE/*MOV136                            JC-F-1    / na      / na  /na                          [PIPE llALL < 3/8"; Although it is not required to be examined (and has 2 1 CS<<MOV136-VHMOV136A        QISO  57-04          or DUG&#xb9; na in /none          /none    / na /na                            (no Code  Item No.) this weld was included in the total C.F-1 weld count
(
LINE&#xb9; 2ICS-006-19.2 NTS: 22,1            /HS      )  2    / na /na                            (to which the 7.5X sampling  rate was  applied.
i lllC-I      I
                                *Pl  MT FOOT/BARREL                      JC-C      f na      f SUR/PT3.00/MT4.00    f Sc7    IN20346 2ICS<<PI,PN400              )
QISO  57-05          or DUG&#xb9; 013 in /C3.30 (ID              f na /na                            I
                            /  LINE&#xb9; 2ICS-006-na-4 NTS: 54,55            iMandate/ 2        / na /na              I            I
 
NIAGARA HOHAWK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2                                              2 of 34 NHP2-ISI-006, REV. 1, CH-000                                                SECOHD TEH TEAR IHSERVICE INSPECTIOH          (ISI)  INTERVAL PLAN Change date:      07/29/1999                                                                    APPENDIX G - ICS    SYSTEN (sorted by Examination      Identifier) 2HD IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY              IIGSCCI EX1/NDE PROCEDURE IPERIDO        1  I                              REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG              &#xb9;,  iITEH  &#xb9;  iFREOYi EX2/NDE PROCEDURE      iPERIOO 2 USE CAL BLK    &#xb9; i  LINE  NO. AHD  NOTES,  AS  APPLICABLE    ]SELECT  iCLASS) EX3/HDE PROCEDURE      iPERIDO 3 i I WC-1      )
                                *P1 HT FOOT/BARREL                      JC-C      f  na  )
SUR/PT3.00/HT4.00  J Sc7    IN20346 2I CS*P1, PM401              (
QISO 57-05            or  DMG&#xb9; 013    in (C3.30    ]ID      f  na /na                          I f  LINE&#xb9; 2ICS-006-na-4      NTS: 54,55      (Handate)    2    J na /na              I            I IMC-1      i
                                <<P1 HT FOOT/BARREL                      /C-C      J na    /  SUR/PT3.00/NT4.00        Sc7    (N20346 2 I CS*P1, PM402            /  QISO 57-05            or  DWG&#xb9; 013    in /C3.30    )ID      /  na  /na            I            I
                            /  LINE&#xb9; 2ICS-006-na-4      HTS: 54,55      /Handate/    2    /  na /na              I            I IWC-1      I
                                *P1 HT FOOT/BARREL                      /C-C      /  na    /  SUR/PT3.00/HT4.00  /    Sc7    IH20346 2I CS*P1, PW403              I  QISO 57-05            or  DMG&#xb9; 013    in JC3.30    ]ID      J na /na              I            I J
LINE&#xb9; 2ICS-006-na-4      HTS: 54,55      JHandate)    2    J na /na              I            I
[
                                *P1  (discharge)  BARREL/HOZ            JC-F-2    I  na    I  SUR/PT3.00/HT4.00  I 2 I CS*P1, PW404              I QISO  57-05          or  DMG&#xb9; 013    in [C5.81    /none    /  na  /
LINE&#xb9;  2ICS-006-na-4    NTS: 53,7      ITE          2    /  na  /na            I
                              /
                                *P1  (suction)  NOZ/BARREL              /C-F-2    I  na    I  SUR/PT3.00/HT4.00  I 2 I CS*P1, PM405              / QISO  57-04          or  DMG&#xb9; 013    in [C5.81    /none    /  na  /              I I LIHE&#xb9; 2ICS-006-na-4 HTS: 54,53          I TE          2    )  na/na              I
                                <<P1  (suction)  MHF/ELB                  IC-F-2    )
na    [  VOL/UT6.02                      (gingham-Wiliamette  Dwg 8-29968 (16.350-001- 040A) infers 0.278" wall
(
2I CS*P1, PW406                QISO 57-04            or  DMG&#xb9; 013 in [none        )none      SUR/PT3.00/NT4.00                (thickness, and therefore, not required to be examined; included in HNP2-10-.719.CS
(
I LINE&#xb9; 2ICS 006 na 4      HT '1  ~ 52    Ina          2    ]
[
na  /na
[
I (C-F-2  for 7.5X criteria
(
                                *Pl (suction)  ELB/NOZ                  /C-F-2,    / na    / VOL/UT6.02 2I CS<<P1  PM407              / QISO  57-04          or DMG&#xb9; 013 in /C5.51        /none    / SUR/PT3.00/HT4.00    /
NHP2-10-.719-CS        / LINE&#xb9; 2ICS-006-na-4 HTS: 52,54          /SD        /  2    J na  /na I PIPE/PIPE                                IC-F-2    / na    / na/na                            [PIPE  'WALL < 3/8"; Although it is not required to be examined (and has 2ICS-57-01-FM002              i QISO 57-01            or DMG&#xb9; na      in )none      /none    ) na  /na                          (no Code Item  Ho.) this weld was included in the total C-F-2 weld count I LINE&#xb9; 2ICS-006-142 2 NTS'7              Ina        I  2    I na/na                            [to  which the 7.5X sampling rate was applied.
I ELB/PIPE                                IC-F-2    / na    / na  /na                          )PIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS-57-01-FW003              I QISO 57-01            or  DMG&#xb9; na    in  (none    /none    / na /na                          (no Code  Item No.) this weld was included in the total C-F-2 weld count na                    I LINE&#xb9; 2ICS 006 142 2    HTS'7    18    Ina          2    / na /na                          ]to which the 7.5X sampling rate was applied.
 
NIAGARA HOHAMK POMER CORPORATION    -      NILE POINT NUCLEAR STATION    - UNIT 2                                            3 of 34 NKP2-ISI-006( REV. 'I, CH-000                                      SECOND TEN YEAR INSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                          APPENDIX G - ICS  SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ  (
DESCRIPTIOH OF ITEN TO BE EXAMINED)CATGRY [IGSCC[ EXI/HDE PROCEDURE      IPERIOO  1  I                              REHARKS EXAHIHATION IDENTIFIER    ( ITS ISO LOCATOR, CONPONENT DMG  &#xb9;, [ITEN  &#xb9; JFREQYJ  EX2/NDE PROCEDURE ]PERIOD 2    J USE CAL BLK  &#xb9; I LINE  NO  AND NOTES'S  APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3        I I PIPE/ELB                            IC-F-2  / na  ( na  /na                        (PIPE MALL <  3/8"; Although it is not required to be examined (and has 2 I CS-57-01-FM009        i QISO 57-01          or DMG&#xb9; na  in )none    /none  (
na  /na                        )no Code Item  Ho.) this weld was included in the total C-F-2 weld count
[ LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    )na      ] 2    J na/na                          )to which the 7.5X sampling rate  was applied.
I PIPE/PIPE                          IC-F-2  / na  / na/na                          (PIPE WALL <  3/8"; Although it  is not required to  be examined (and has 2 I CS-57 FM010        I QISO 57-01          or DWG&#xb9; na  in ]none    [none  / na  /na                        )no Code Item No.) this weld was included in the    total  C-F-2 weld count
(
LINE&#xb9; 2ICS-006-142-2 NTS: 17        (na        2  / na/na                          (to which the 7.5X sampling rate was applied.
I PIPE/PIPE                          IC-F-1  [ na  / na/na                          )PIPE MALL < 3/8"; Cls2 CS to Cls4 SS; Although    it  is not required to 2ICS-57-01-FM011          I QISO 57-01          or DMG&#xb9; na  in / none  (none  / na  /na                        )be examined (and has no Code Item Ho.) weld was included      in the total LINE&#xb9; 2ICS-006-142-2 NTS: 16, 17    iNS        2  / na /na                          )C-F-I weld count to which the 7.5X sampling rate    was  applied.
PIPE/ELB                            IC-F-2  [
na  [ na  /na            I          )PIPE WALL <  3/8"; Although it  is not required to  be examined (and has 21CS.57.01-SW001            QISO 57-01          or DMG&#xb9; na  in ]none    ]none  [ na  /na            I          )no Code Item Ho.) this weld was included in the    total  C-F-2 weld count LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    /na        2  J na /na            I          )to which the 7.5X sampling rate was applied.
ELB/PIPE                            IC-F-2  ] na  [ na  /na                        (PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2ICS-57-01-SM002            QISO 57-01          or DMG&#xb9; na  in [none    )none  [ na  /na                        (no Code Item Ho.) this weld was included in the    total  C-F-2 weld count LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    dna        2  / na /na                          (to which the 7.5X, sampling rate was applied.
PIPE/ELB                            IC-F-2  / na  / na  /na                        )PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2I CS-57-01-SM003            QISO 57-01          or DMG&#xb9; na,in  /none    ]none  (
na  /na                        (no Code Item No.) this weld was included in the    total  C-F-2 weld  cant LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    /na      I  2  I na/                            )to which the 7.5X sampling rate was applied.
I ELB/PIPE                            IC-F-2  J na  ] na/na                          (PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2 1 CS-57-01-SM004        I QISO 57-01          or DMG&#xb9; na  in )none    Jn~    ) na  /na                        (no Code Item Ho.) this weld was included in the    total  C-F-2 weld count
                          ) LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    )na        2  J na/na                          (to which the 7.5X sampling rate was applied.
PIPE/ELB                            IC-F-2  / na  / na  /na                        ]PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2 I CS-57-01-SM005        I QI    57 01        or DWG&#xb9; na  in ]none    /none  / na  /na                        ]no Code Item No.) this weld was included in the    total  C-F-2 weld count I LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    (na        2  / na/na                          )to which the 7.5X sampling rate was applied.
I ELB/PIPE                            IC-F-2  / na  / na  /na                        )PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2ICS-57-01-SW007          I QISO 57-01          or DMG&#xb9; na  in ]none    /none  / na  /na                        )no Code Item No.) this weld was included in the    total  C-F-2 weld  cant na                  ( LINE&#xb9; 2ICS-006-142-2 NTS: 17,18    (na        2  / na/na                          (to which the 7.5X sampling rate was applied.
 
NIAGARA NOHAMK POMER CORPORATION      -      NILE POINT HUCLEAR STATION - UNIT 2                                                4  of 34 NHP2-ISI-006, REV. 1, CH.000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                APPEHDIX G - ICS  SYSTEN (sorted by Examination    Identifier) 2ND IHTVL REL RED  J DESCRIPTIOH OF ITEN TO BE EXANINED[CATGRY ( IGSCC[ EKl/NDE PROCEDURE        [PERIOD  1                                  REHARKS EXAHINATIOH IDENTIFIER    [  ITS ISO LOCATOR, COHPONEHI'MG    &#xb9;,  [ITEN &#xb9; JFREQYJ    EX2/HDE PROCEDURE  (PERIOD 2 f USE CAL BLK  &#xb9; f  LINE NO. AND NOTES, AS APPLICABLE )SELECT ]CLASS( EX3/HDE PROCEDURE          ]PERIOD 3 PIPE/ELB                            IC-F-2  /  na    /  na  /na                        (PIPE MALL <  3/84; Although  it  is not required to  be examined (and has 2ICS-57-01-SM008              QISO 57-01          or  DMG&#xb9; na  in /none    /none  J na  /na                        (no Code Item Ho.) this weld was included in the      total C-F-2 weld count LINE&#xb9; 2ICS-006-142-2 NTS: 17,18      Jna        2    J na/na                          (to which the 7.5X sampling rate was applied.
I  ELB/PIPE                            IC-F-2  / na    [  na/na                          (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and has 21 CS-57-01-SM009          I  QISO 57-01          or  DMG&#xb9; na  in  (none    /none  / na /na                          (no Code Item Ho.) this weld was included in the      total C-F-2 weld count I  LINE&#xb9; 2ICS-006-142-2 NTS: 17,18      Ina        2    /  na/na                          (to which the 7.5X sampling rate was applied.
I  PIPE/PIPE                            IC-F-2  / na    /  na/na                          (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and has 2ICS-57  FM001        I  QISO  57-02        or DMG&#xb9; na  in [none    /none  /  na  /na                        )no Code Item No.) this weld was included in the      total C-F-2 weld count I  LINE&#xb9; 2ICS.006-142-2 HTS: 17        Ina        2    J na/na                          (to which the 7.5X sampling rate was applied.
I  PIPE/PIPE                            IC  F 2  f na    )  na/na                          (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and has 2ICS-57-02-FM003            I  QISO 57-02          or  DMG&#xb9; na  in [none    ]none  f na  /na                        (no Code Item No.) this weld was included in the      total C-F-2 weld  cant LINE&#xb9; 2I CS-006-1-2    HTS: 17      (na        2    f  na/na                          )to which the 7.5X sampling rate was applied.
I  PIPE/PIPE                            IC-F-2  [ na    /  na/na                          )PIPE MALL <  3/8"; Although  it  is not required to be examined (and has 2I CS.57 FM004          J QISO 57-02          or DMG&#xb9; na    in )none    /none  /  na  /na                        )no Code Item  Ho.) this weld was included in the total C-F-2 weld count I  LINE&#xb9;  2ICS-006-1-2    HTS: 17      Ina        2    /  na/na                          )to which the 7.5X serpling rate was applied.
PIPE/PIPE                            IC-F-2  / na    /  na/na                          (PIPE MALL <  3/8"; Although  it  is not required to be examined (and has 2ICS-57-02-FM005              QI SO 57-02        or DMG&#xb9; na  .in  /none    /none  /  na  /na                        (no Code  Item No.) this weld was included in the total C-F-2 weld cunt LINE&#xb9; 2ICS-006-1-2    NTS: 17      )na        2    /  na/na                          (to which the 7.5X sampling rate was applied.
I  PIPE/PIPE                            IC-F-2  f na    /  na/na                          (PIPE MALL <  3/8"; Although  it  is not required to be examined (and has 2 I CS-57 FM006        i QISO 57-02          or  DMG&#xb9; na  in ]none    /none  /  na /na                          (no Code  Item  Ho.) this weld  was  included in the total C-F-2 weld count
(
LINE&#xb9; 2ICS-006-1-2    NTS: (none)  (na        2    J na/na                          (to which  the  7.5X sampling  rate  was applied.
[  PIPE/PIPE                            IC-F-2  / na    f na/na                          (PIPE MALL <  3/8"; Although  it  is not required to be examined (and has 2ICS-57 FM007          i QISO 57-02          or  DMG&#xb9; na  in ]none    (n~    )  na/na                          (no Code Item  No.) this weld  was  included in the total C-F-2 weld cmnt I  LINE&#xb9; 2ICS-006-1-2    NTS: 17      Ina        2    / na/na                          (to which the  7.5X sampling  rate  was applied.
I P I PE/ANOV129 IC-F-2  / na    f na  /na                        [PIPE MALL <  3/8"; Although  it is  not required to be examined (and has 2ICS-57-02-FM008            (
QISO 57-02          or  DMG&#xb9; na  in )none    /none    f na /na                          (no Code  Item No.) this  weld was included in the  total  C-F-2 weld  cant LINE&#xb9; 2ICS-006-142-2 NTS: 17,1      (na      I  2    I na/na                          (to which the 7.5X  sampling  rate was applied.
 
NIAGARA HOHAMK POMER CORPORATION -        NILE POINT NUCLEAR Sl'ATION - UHIT 2                                              5 of 34 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                            APPENDIX G - ICS  SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REO ( DESCRIPTION OF ITEN TO BE EXAHIHED(CATGRY (IGSCC( EK1/NDE PROCEDURE          (PERIOD  1                                  RENARKS EXAMINATION IDENTIFIER    ( ITS ISO LOCATOR, COHPOHEHT OMG &#xb9;, ( ITEN    &#xb9; (FREQY( EX2/HDE  PROCEDURE  (PERIOD 2  (
USE CAL BLK  &#xb9; (
LIHE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE      PROCEDURE  (PERIOD 3  (
(
                            *HOV129/PIPE                        IC-F-2  (
na  (
na  /na                        (PIPE MALL < 3/8"; Although  it  is not required to be examined (and has 2 I CS.57 FM009        (
QISO 57-02          or  DMG&#xb9; na  in (none    (none  (
na  /na                        (no  Code Item No.) this weld  was  included ih the total C-F-2 weld count
(
LIHE&#xb9; 2ICS-006-1 2    NTS: 17,1    (na        2  ( na/ns                          (to which the 7.5X sampling rate    was  applied.
(
PIPE/PIPE                            IC-F-2  (
na  ( na /na                          (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and has 2 I CS-57 FM011        I QISO 57-02          or  DMG&#xb9; na  in (none    (none  ( na /na                          (no Code Item No.) this weld was included in the    total  C-F-2 weld count I LINE&#xb9; 2ICS-006-1-2    NTS: 17      Ina        2  ( na  /na                        (to which the 7.5X sampling rate was applied.
(
PIPE/PIPE                            IC-F-2  ( na  ( na  /na                        (PIPE MALL < 3/84; Although  it  is not required to be examined (snd has 2 I CS-57 FM012        ( QISO  57-02        or DMG&#xb9; na in (none      (none  (
na /na                          (no Code Item No.) this weld was included in the total C-F-2 weld count I LINE&#xb9; 2ICS-006-1-2    HTS: (none)  Ina        2  (
na /na                          (to which the 7.5X sampling rate    was  applied.
I ELB/PIPE                            IC-F-2  (ns (ns/na                              (PIPE MALL < 3/8"; Although  it  is not required to be examined (ard has 2ICS-57  FM014        I QISO 57-02          or  DMG&#xb9; na  in (none    (none  (
na  /na                        (no Code Item No.) this weld was included in the total C-F-2 weld count
(
LINE&#xb9; 2ICS-006-142-2 NTS: 17,18      (na        2  ( na/na                          (to which the 7.5X sampling rate    was  applied.
(
PIPE/PIPE                            IC-F-2  (
na  (
na  /na                        (PIPE MALL <  3/8"; Although  it  is not required to  be examined (snd has 2ICS-57.02-  FM015        (
QISO 57-02          or  OMG&#xb9; na  in (none    (none  ( na  /na                        (no Code Item No.) this weld wss included in the    total C-F-2 weld count
(
LINE&#xb9; 2ICS-006-142-2 HTS: 17        (na        2  ( na/na                          (to which the 7.5X sampling rate was appl'led.
I PIPE/*V249                          IC-F-2  (na    (na/na                            (PIPE MALL <  3/8"; Although  it is  not required to be examined (snd has 2ICS-57-02-FM022          (
QISO 57-02          or DMG&#xb9; na in (none      (~e    (
na /na                          (no Code Item Ho.) this weld was included in the    total C-F-2 weld count
(
LIHE&#xb9; 2ICS-006-1-2    NTS: 17,19    (na        2  ( na/na                          (to which the 7.5X sampling rate was applied.
(
                            *V249/PIPE                          IC-F-2  (na    (na/na                            (PIPE MALL <  3/8"; Although  it  is not required to  be examined  (ard has 2ICS-57-02-FM023          I QISO 57-02          or  DMG&#xb9; na  in (none    (none  ( na  /na                        (no Code Item No.) this weld was included in the    total C-F-2 weld count I LINE&#xb9; 2ICS-006-1-2    NTS: 17,19    lna        2  ( na/na                          (to which the 7.5X sampling rate was applied.
I PIPE/ELB                            IC-F-2  ( na  ( na  /na                        (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and hss 2I CS-57-02-SM002          (
QISO  57-02        or DMG&#xb9; na in (none      (none  ( na /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld  cant
( LINE&#xb9; 2ICS-006-142.2 NTS: 17,18      (na        2  ( na/na                          (to which the 7.5X sampling rate was applied.
I PIPE/PIPE                            IC-F-2  ( na  ( na/na                          (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and has 2 I CS.57-02-SM004        I QISO 57-02          or  DMG&#xb9; na  in (none    (none  (
na  /na                        (no Code Item No.) this weld wss included in the    total C-F-2 weld count I LINE&#xb9; 2ICS-006-1-2    H'TS: 17      Ina        2  ( ns/na                          (to which the 7.5X sampling rate was applied.
 
NIAGARA NOHAWK POMER CORPORATION    -      NILE POINT NUCLEAR STATION - UNIT 2                                              6of  34 NNP2-ISI-006( REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                            APPENDIX G - ICS  SYSTEH (sorted by Examination Identifier)
ND IHTVL REL REQ  I  DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE      IPERIOD  1  I                              REHARKS EXAHINATIOH IDENTIFIER    J ITS ISO LOCATOR, COHPOHEHT DWG    &#xb9;, [ITEM &#xb9; JFREQY[ EX2/HDE PROCEDURE    (PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASSY EX3/NDE PROCEDURE        iPERIOD 3 P I PE/P I PE                        IC-F-2  [ na  f  na  /na                        (PIPE MALL <  3/8"; Although it is not required to be examined (and has 21 CS-57  FW001        )  QISO 57-03          or DMG&#xb9; na    in (none  /none  /  na /na                          )no Code  Item No.) this weld was included in the total C-F-2 weld cant
[  LIHE&#xb9; 2ICS-006-1-2    NTS: 17      ]na        2  /  na/na                          )to which the 7.5X sampling rate was applied.
I  ELB/PIPE                            IC-F-2  / na  /  na /na                          )PIPE  'WALL < 3/8"; Although it is not required to  be examined (and has 2I CS-57-03-FM002          I  QISO  57-03        or  DMS&#xb9; na  in [none  /none  /  na /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld count I  LINE&#xb9; 2ICS 006 1  2    NTS: 17,18    Ina        2  /  na/na                          (to which the 7.5X sampling rate was applied.
ELB/PIPE                            IC-F-2  / na  /  na/na                          )PIPE MALL    <<3/8"; Although it is not required to  be examined (and has 2 I CS-57 FM003          QISO  57-03        or DMG&#xb9; na in [none      /none  /  na /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld count LINE&#xb9; 2ICS-006-1-2    HTS: 17,18    (na        2  /  na./na                          (to which the 7.5X sampling rate was applied.
PIPE/ELB                            IC-F-2  J na  /  na /na                          (PIPE MALL < 3/8"; Although  it is not required to be examined (and has 2ICS-57-03-FM005              QISO  57-03        or DMG&#xb9; na in /none      /none  J na /na                          (no Code Item No.) this weld was included in the total C-F-2 weld count na                    LINE&#xb9; 2ICS-006-1-2    HTS: 17,18    /na        2  /  na/na                          (to which the 7.5X sanpling rate    was applied.
PIPE/PIPE                            IC-F-2  ) na    f na /na                          (PIPE MALL < 3/8"; Although  it is not required to be examined (and has 2ICS.57.03.FM006              QISO  57-03        or DMG&#xb9; na    in )none  (none  f na  /na                        (no Code Item No.) this weld was included in the total C-F-2 weld count LINE&#xb9; 2ICS-006-1-2    HTS: 17      ina        2    / na /na                          (to which the 7.5X sampling rate    was applied.
I  PIPE/PIPE                            IC-F-2  / na  /  na/na                          (PIPE WALL < 3/8"; Although  it is not required to be examined (and has 2ICS-57.03-FM007          I  QISO 57 03          or  DMG&#xb9; na  .in )none  /none  /  na /na                          [no Code Item Ho.) this weld was included in the total C-F-2 weld count I  LINE&#xb9; 2ICS-006-1-2    NTS: 17      Ina        2  /  na/na                          (to which the 7.5X sampling rate    was applied.
I  PIPE/PIPE                            IC-F-2  / na    f na  /na                        (PIPE WALL <  3/8"; Although it is not required to  be examined (and has 2I CS-57  FM009        [ QISO  57-03        or DMG&#xb9; na    in /none  (none  / na  /na                        (no Code Item No.) this weld was included in the    total C-F-2 weld count f LINE&#xb9; 2ICS-006-1-2    HTS: 17      (na        2    / na/na                          (to which the 7.5X sampling rate was applied.
PIPE/PIPE                            IC-F-2  / na    f na  /na                        )PIPE WALL <  3/8"; Although it is  not required to be examined (and has 2ICS-57-03-FM017              QISO  57-03        or DMG&#xb9; na in [none      /none  / na  /na                        (no Code Item Ho.) this weld was included in the    total C-F-2 weld coat LINE&#xb9; 2ICS-006-1-2    HTS: 17,18    (na        2    J na/na                          (to which the 7.5X sampling rate was applied.
I PIPE/PIPE                            IC-F-2  ] na    (
na  /na                        (PIPE MALL << 3/8"; Although  it is not required to be examined (and has 21CS.57-03-FW018            ) QISO  57-03        or DMG&#xb9; na    in (none  ]none  )
na  /na                        (no Code Item No.) this weld was included in the total C-F-2 weld coat
( LINE&#xb9; 2ICS-006-1-2    NTS: 17      (na        2    J na/na                          (to which the 7.5X sax@ling rate    was applied.
 
NIAGARA NONAMK POMER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2 NHP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR IHSERVICE IHSPECTIOH        (ISI)    INTERVAL PLAN Change date:    07/29/1999                                                                  APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RECI I DESCRIPTIOH OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE              (PERIOD  1  I                              REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, CONPONEHT DMG          &#xb9;,  ( ITEN &#xb9; (FREQY( EX2/NDE PROCEDURE      (PERIOD 2    (
USE CAL BLK  &#xb9; (  LINE NO. AHD NOTES, AS APPLICABLE (SELECT      (CLASS( EX3/HDE PROCEDURE (PERIOD 3          I PIPE/ELB                              IC-F-2    (
na  (
na/na                          (PIPE MALL  <<3/8";  Although it  is not required to  be examined (and has 2ICS-57-03-SM001              QISO 57-03          or  DMG&#xb9; na  in  (none    (none  (
na  /na                        (no Code Item No.) this weld was included in the    total C-F-2 weld cgnt LINE&#xb9; 2ICS.006-1-2    NTS: 17,18      (na          2    (
na/na                          (to which the 7.5X saapling rate was applied.
ELB/PIPE                              IC-F-2    (
na    (
na  /na                        (PIPE  'MALL < 3/8"; Although it  is not required to  be examined (and has 2I CS-57-03. SM002            QISO 57-03          or  DMG&#xb9; na  in  (none    (none    (
na  /na                        (no Code Item No.) this weld was included in the    total C-F-2 weld count LIHE&#xb9; 2ICS-006-1-2    NTS: 17,18      (na          2    (  na/na                          (to which the 7.5X sampling rate was applied.
I  PIPE/ELB                              IC-F-2    (  na    (
na /na                          (PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2ICS-57-03-SM003          I  QISO  57-03        or  DMG&#xb9; na  in  (none    (none    (
na /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld eeet I  LINE&#xb9; 2ICS.006-1-2    NTS: 17(18      (na          2    (
na/na                          (to which the 7.5X saapling rate was applied.
PIPE/ELB                              IC-F-2    (
na    (  na  /na            I          (PIPE MALL <  3/8"; Although it is not required to be examined (and has 2 I CS.57-03-SM004            QISO  57-03        or DMG&#xb9; na in (none          (none    (  na /na              I          (no Code Item  Ho.) this weld was included in the total C-F-2 weld cant LINE&#xb9; 2ICS-006-1-2      NTS: 17,18      (na          2    (
na/na              I          (to  which  the 7.5X sampling rate was applied.
PIPE/ELB                                IC-F-2  (  na    (
na  /na                        (PIPE MALL <  3/8"; Although it  is not required to be examined (and has 2ICS.57-03-SM005              QISO 57-03          or  DMG&#xb9; na    in (none    (none    (
na /na                          (no Code  Item Ho.) this weld was included in the total C.F-2 weld count LINE&#xb9; 2ICS-006-1-2      NTS: 17,18      (na          2    (  na /na                          (to which the 7.5X sampling rate was applied.
ELB/PIPE                                IC-F-2  (na      (na/na                          ~
(PIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS-57.03-SM006              QISO 57-03          or  DMG&#xb9; na  .in  (none    (none  (
na  /na                        (no Code Item  Ho.) this weld was included in the total C-F-2 weld cent LINE&#xb9; 2ICS-006-1-2      NTS: 17,18      (na          2    (
na/na                          (to which  the 7.5X sampling rate was applied.
I ELB/PIPE                                IC-F-2    (
na    (  na  /na                        (PIPE MALL <  3/8"; Although it is not required to be examined-(and has 2ICS-57-03-SM007            ( QISO 57-03          or  DMG&#xb9; na    in  (none    (none  (  na /na                          (no Code Item Ho.) this weld was included in the total C-F-2 weld count
(
LINE&#xb9; 2ICS-006-1-2      HTSt 17,18      (na          2    (
na/na                            (to which the 7.5X sampling rate was applied.
I PIPE/ELB                                IC-F-2    ( na    (
na  /na                          (PIPE MALL <  3/8"; Although it is  not required to be examined (and has 2I CS-57-03-SM008          I QISO 57-03          or  DMG&#xb9; na    in (none      (none    (
na /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld coat LIHE&#xb9; 2ICS-006 1-2      HTS: 17,18      (na          2    (
na /na                          (to which the 7.5X sampling rate was applied.
ELB/PIPE                                (C-F-2    (
na    (
na  /na                          (PIPE MALL <  3/8"; Although it is not required to be examined (and has 2 I CS-57 FM001          QI SO 57-04          or  DMG&#xb9; na    in  (none    (none    (
na /na                          (no Code Item No.) this weld was included in the total C-F-2 weld cent LINE&#xb9; 2ICS-006-1-2      NTS: 17,18      (na          2    ( na /na                          (to which the 7.5X sampling rate was applied.
 
0 NIAGARA HONAMK POWER CORPORATION          -      NILE POINT  NUCLEAR STATION    - UNIT 2                                          8 of 34 NHP2-1S1-006,    REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change    date:  07/29/1999                                                                      APPENDIX G - ICS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTIOH OF ITEN TO BE EXANINEDiCATGRY i IGSCCi EX1/HDE PROCEDURE                  iPERIOO  1  i                                  REHARKS EXANIHATION IDEHTIFIER I ITS ISO LOCATOR'OHPONEHT DMG              &#xb9;i  IITEH  &#xb9; IFREQYI EX2/NDE PROCEDURE      IPERIOO 2  I USE CAL BLK  &#xb9; i    LINE NO. AND NOTES,  AS  APPLICABLE    )SELECT  iCLASSi EX3/NDE PROCEDURE      IPERIOD 3 I I
PIPE/~V27                              IC-F-2  /  na  (
na/na                          (PIPE MALL <    3/8"; Although  it is not required to  be examined (and has 2 1 CS-57-04-FM002          i QISO 57-04              or  DMG&#xb9; na    in  [none    /none  / na    /na                        [no Code Item Ho.) this weld was included in the        total C-F-2 weld count I    LINE&#xb9; 2ICS-006-1-2      NTS: 17,19      Ina          2    /  na/na                          )to which the 7.5X sampling rate was applied.
(
                                *V27/PIPE                              IC-F-2    /  na    /  na  /na                        (PIPE MALL <    3/8"; Although  it is not required to  be examined (and has 2I CS-57 FM003          (
QISO 57-04          or  DWG&#xb9; na    in  [none    /none    /  na /na                        [no Code Item No.) this weld was included in the        total C-F-2 weld cant I    LINE&#xb9; 2ICS 006  1 2    NTS'7    19    Ina          2    /  na/na                          )to which the 7.5X sampling rate was appl'led.
J PIPE/'V83                              IC-F-2    [  na    (  na  /na                        (PIPE 'MALL <    3/8"; Although  it is not required to  be examined (and has 2ICS-57-04-FM004            i QISO 57 04            or  DMG&#xb9; na    in  ]none    (none    [  na  /na                        (no Code Item No.) this weld was included in the        total C-F-2 weld count
(
LIHE&#xb9; 2ICS-006-1-2      HTS: 1,17      Jna          2    /  na/na                          )to which the 7.5X sampling rate was applied.
                                *V83/PIPE                              IC-F-2    ]  na    )
na /na                          (PIPE WALL < 3/8"; Although    it  is not required to be examined (and has 21 CS-57    FW005            QISO 57.04          or DMG&#xb9; na    in  [none    [none    )  na /na                          (no Code Item No.) this weld was included in the total C-F-2 weld count LINE&#xb9; 2ICS-006-1-2      HTS: 1,17      (na          2    f  na/na                          (to which the 7.5X sampling rate      was applied.
I
                                *V28/PIPE                              IC-F-2    [  na    (
na/na                          )PIPE MALL <    3/8"; Although  it  is not required to  be examined (and has 21 CS-57.04- FW006                                    or DMG&#xb9; na in [none          (none f na /na                              )no Code Item Ho.) this weld was included in the      total C-F-2 weld count i QISO 57-04
                            )
LINE&#xb9; 2ICS-006-35-2 NTS: 17.19          Ina          2 f na /na                              (to which the 7.5X sampling rate was applied.
I  PENET  217/PIPE                          IC-F-1    J na    f na  /na                        )PIPE MALL <    3/8"; Although  it  is not required to be examined (and has 2I CS-57    FM010            QISO 57.04          or DMG&#xb9; na,    in  (none    )~e      )
na/na                          )no Code Item No.)    this weld  was  included in the total C-F-1 weld count
                              )
I  LINE&#xb9; 2ICS-006-19.2 HTS: 16,22          INS          2    / na/na                          [to  which  the  7.5X sampling  rate  was applied.
I  ELB/PIPE                                IC-F-2    (
na    (
na  /na                        (PIPE MALL <<3/8"; Although      it  is not required to be examined (and has 2ICS-57-04-FW012                QISO 57-04          or  DMG&#xb9; na    in  )none    )none    [ na /na                          (no  Code  Item  Ho.) this weld  was  included in the total C-F-2 weld cent
(
LINE&#xb9; 2ICS-006-35 2    HTS:  17,18      [na          2    / na /na                          [to  which the 7.5X sampling rate was applied.
I PIPE/PIPE                                IC-F-2    f na    (
na/na                          (PIPE MALL < 3/8"; Although    it  is not required to be examined (and has 2ICS-57-04-FM014                QISO 57-04          or  DMG&#xb9; na    in  [none    /none    / na  /na                        (no  Code  Item  Ho.) this weld  was  included in the total C-F-2 weld cent
(
I LINE&#xb9; 2ICS-006-1-2      NTS: 17          Ina          2    / na/na                          )to which the 7.5X sampling rate      was  applied.
I ELB/PIPE                                IC-F-2    / na    [ na  /na                        [PIPE MALL <    3/8"; Although  it is not required to be examined (and has 2 I CS-57 FM015          I QISO 57-04          or  DMG&#xb9; na    in  /none    /none    / na /na                          [no Code Item    No.) this weld was included in the total C-F-2 weld cent na                    (
LINE&#xb9; 2ICS-006-1-2    HTS: 17,18      [na          2    / na/na                          (to which the 7.5X sampling rate was applied.
 
NIAGARA HOHAMK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2                                                    9 of 34 NHP2-ISI-006, REV. 1( CH-000                                            SECOHD TEH YEAR IHSERVICE IHSPECTION          (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G - ICS  SYSTEN (sorted by Examination      Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE                    IPERIOO  1  I                                    REHARKS EXAHINATION IDEHT IF IER [ ITS ISO LOCATOR, COHPOHEHT DMG      &#xb9;,  ]ITEN  &#xb9; [FREOY] EX2/HDE PROCEDURE          ]PERIOD 2 f USE CAL BLK &#xb9; )  LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE                IPERIOO 3 I i PIPE/~V28                                IC-F-2    /  na    /  na  /na                        (PIPE WALL < 3/8"; Although      it  is not required to be examined (and has 2ICS-57-04-FI$ 16        ( QISO 57-04        or  DMG&#xb9; na    in [none      /none    /  na /na                          (no Code Item No.) this weld was included in the total C-F-2 weld count I  LIHE&#xb9; 2ICS-006-35-2    HTS: 17,19      Ina            2    /  na/na                          )to which the 7.5X sampling rate        was applied.
[ ~NOV136/PIPE
                                                                    )C-F-2    /  na    f  na/na                          (PIPE MALL <    3/8"; Although  it  is not required to  be examined (and has 2ICS-57-04-FM017        i QISO 57-04            or  DMG&#xb9; na    in /none      /none    /  na  /na                        (no Code Item Ho.) this weld was included in the          total C-F-2 weld count
                        ]  LINE&#xb9; 2ICS.006-35-2    HTS:  1,17      )na            2    /  na/na                          (to which the 7.5X sampling rate was applied.
I  FLG/PIPE                                IC-F-1    (
na    ]  na  /na                        (PIPE WALL <      3/84; Although  it  is not required to  be examined (and has 2ICS-57-04.fl$ 18        i QISO 57-04            or  DMG&#xb9; na    in /none      )none    (
na  /na                        )no Code Item Ho.) this weld was included in the          total C-F-1 weld count i  LINE&#xb9; 2ICS-006-19-2    NTS: 20,16      iNS            2    )  na /na                          )to which the 7.5X sampling rate was applied.
PIPE/ELB                                IC-F-I    /  na    /  na  /na            I            (PIPE MALL <    3/8"; Although  it  is not required to  be examined (and has 2 I CS-57 F WOI9        QISO 57-04          or  DMG&#xb9; na    in )none      )none    )
na  /na            I            (no Code Item Ho.) this weld was included in the        total C-F-1 weld count LINE&#xb9; 2ICS-006-19-2    NTS: 16,21      iHS            2    J na /na              I            (to which the 7.5X sampling rate was applied.
PIPE/PEHET 217                          IC-F-1    ]  na    [  na  /na                          ]PIPE MALL <    3/8"; Although  it  is not required to  be examined (and has 2ICS.57.04-Fl$ 20            QISO  57-04          or  DMG&#xb9;  na  in  )none      [none    [  na  /na                          )no Code Item No.) this weld was included in the        total C-F-1 weld count LINE&#xb9; 2ICS.006-76-2 NTS: 16,16          [NS          2    /  na/na                            (to which the 7.5X sampling rate was applied.
I  TEE/PIPE                                IC-F-2    f  na    /  na  /na                        (PIPE MALL <    3/8"; Although  it  is not required to  be examined (and has 2 I CS-57 FW024          QISO 57-04          or  DMG&#xb9; na  .in    /none    [none    f  na  /na                        (no Code Item Ho.) this weld was included in the        total C-F-2 weld count
                          /
                          /  LIHE&#xb9; 2ICS.006-35-2    NTS: 17,23      /na            2    f  na/na                            [to which the 7.5X sampling rate was applied.
I PIPE/TEE                                IC-F-2    /  na    /  na/na                            (PIPE MALL <    3/8"; Although  it  is not required to  be examined (and has 2ICS-57-04-FW025          i QISO 57-04          or  DMG&#xb9; na    in [none      /none    /  na  /na                        (no Code Item    Ho.) this weld was included in the    total C-F-2 weld count LINE&#xb9; 2ICS-006.35-2    NTS: 17,23      )na            2    /  na/na                            )to  which  the  7.5X sampling rate was applied.
I TEE/PIPE                                IC-F-2    f na    )  na  /na                        )PIPE MALL    <<3/8"; Although not required to be examined (and has no 2ICS-57-04-FW026            QISO 57-04          or  DMG&#xb9; na    in  (none      /none    f na /na                            (Code  Item  No.)  weld is included in the total C-F-2 weld count to which
                          )
I LINE&#xb9; 2ICS-006-35-2    NTS  17,23      Ina            2    / na/na                            (7.5X  sampling    rate is applied. (HisID'd as FW020 in 1st Intvl)
PIPE/ELB                                IC-F-2    f na      / na/na                            )PIPE MALL <    3/8"; Although it is not required to be examined (and has 2ICS-57-04-Sl$  01        QISO 57-04          or  DMG&#xb9; na    in [none      /none    / na /na                            )no Code Item    No.) this weld was included in the total C-F-2 weld count LINE&#xb9; 2ICS-006-1-2      HTS: 17,18      dna            2    / na/na                            )to which the 7.5X sampling rate      was applied.
 
NIAGARA HOHAMK POWER CORPORATION -            MILE POINT NUCLEAR STATION - UNIT 2                                            10 of 34 NHP2-IS1-006, REV. 1, CN-000                                        SECOHD TEH YEAR IHSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                              APPENDIX G - ICS  SYSTEH (sorted by Examination    Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY JIGSCCI EX'I/HDE PROCEDURE            IPERIDO  1  I                              REMARKS EXAHINATION IDENTIFIER      ITS ISO LOCATOR, COHPOHEHT DMG    &#xb9;, iITEH &#xb9; LFREQYi EX2/HDE PROCEDURE      )PERIOD 2 i USE CAL BLK  &#xb9; I  LINE HO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE          IPERIDO 3 I I  PIPE/ELB                              IC-F-2  i na    i na  /na                        iPIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS-57-04-SW003          i QISO  57-04        or DMG&#xb9; na    in inone  inone  i  na /na                          ino Code Item No.) this weld was included in the total C-F-2 weld count I  LIHE&#xb9; 2ICS-006-1-2    HTS: 17, 18    Ina        2  i  na/na                          ito which the 7.5X sampling rate was applied.
ELB/PIPE                              IC-F-2  i na    /  na /na              I          iPIPE MALL <  3/8"; Although it is not required to be examined (and has 21 CS-57-04-SM004            QISO 57-04          or  DMG&#xb9; na    in inone  inone i na /na                I          ino Code Item No.) this weld was included in the total C-F-2 weld count LINE&#xb9; 21CS 006 1  2    HTS'7i18      lna        2  /  na/na              I.          ito which the 7.5X sanpiing rate was applied.
I  PIPE/ELB                              IC-F-2  (  na    i na/na                          iPIPE MALL <  3/8"; Although it is not required to be examined (and has 21CS-57-04-SM010          I  QISO 57-04          or  DMG&#xb9; na    in inone  inone    i na  /na                        tno Code Item Ho.) this weld was included in the total C-F-2 weld count i  LINE&#xb9; 2ICS-006-1-2    NTS: 17,18    dna        2    i na/na                          ito which the 7.5X sampling rate was applied.
ELB/PIPE                              IC-F-2  i na    J.na /na              I          iPIPE  'MALL < 3/8"; Although it is not required to be examined (and has 2ICS.57.04-SW011            QISO 57-04          or  DMG&#xb9; na    in inone    inone  J na /na              I          ino Code Item No.) this weld was included in the total C-F-2 weld count na                    LINE&#xb9; 2ICS-006-1-2    NTS: 17,18    dna        2    J na/na              I          ito which the 7.5X sampling rate was applied.
I  PIPEIELB                              IC-F-2  i na    J na/na                          iPIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS.57-04-SW012          I  QISO 57-04          or  DMG&#xb9; na    in inone    inone i na /na                            ino Code Item No.) this weld was included in the total C-F-2 weld count i LINE&#xb9; 2ICS-006-1-2      NTS: 17,18    dna        2    L na/na                          ito which the 7.5X sampling rate was applied.
I  ELB/PIPE                              IC-F-2  i na    / na/na                          iPIPE  WALL < 3/8"; Although  it is not required to be examined (and has 21CS-57-04-SW013          I  QISO 57-04          or  DMG&#xb9; na  .in  inone    l~e    I na                              ino Code Item No.) this weld was included in the total C-F-2 weld count I  LINE&#xb9; 2ICS-006-1-2    HTS: 17,18    Ina        2    i na/na                          ito which the 7.5X sampling rate was applied.
I  PIPE/MNF                              IC-F-2  i na    i na/na                          iPIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS-57-04-SM015          i QISO  57.04        or DWG&#xb9; na in inone        i~e    i na  Ina                        ino Code Item No.) this weld was included in the total C-F-2 weld count
                          )  LINE&#xb9; 21CS-006-1-2    HTS: 17,25    dna        2    i na/na                          ito which the 7.5X serpiing rate was applied.
I MNF/PIPE                              IC-F-2  / na    i na/na                          iPIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS-57-04-SM016          I QISO 57-04          or  DMG&#xb9; na    in inone    inone  i na  /na                        ino Code Item No.) this weld was included in the total C-F-2 weld count i LINE&#xb9; 21CS-006-1-2      HTS: 17,25    dna        2    i na/na                          ito which the 7.5X sampling rate was applied.
PIPE/ELB                              IC-F-2  i na    i na  Ina                        iPIPE MALL <  3/8"; Although it is not required to be examined (and has 21 CS-57-04-SM017            QISO 57-04          or  DMG&#xb9; na    in inone    /none  i na  /na                        ino  Code Item  No.) this weld was included in the total C-F-2 weld cant LINE&#xb9; 2ICS-006-1-2    NTS: 17,18    dna        2    i na/na                          ito which the 7.5X sea@ling rate was applied.
 
NIAGARA NOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2                                              11 of 34 NHP2  ISI 006) REV 1 g CN 000                                            SECOND TEH YEAR        INSERVICE IHSPECTIOH  (ISI)    INTERVAL PLAH Change    date: 07/29/1999                                                                        APPENDIX G - ICS  SYSTEN (sorted by Examination      Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    IPERIOO  1  I                                REHARKS EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, COHPONENI'MG            &#xb9;,  ]ITEN  &#xb9; )FREOYJ EX2/HDE PROCEDURE          [PERIOD 2 USE CAL BLK &#xb9; I    LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3                  I I    ELB/PIPE                                IC-F-2    /  na    /  na/na                          )PIPE MALL <  3/84; Although  it is  not required to be examined (and has 21 CS-57-04-SM018              QISO  57-04          or DMG&#xb9; na in [none          /no'ne    /  na  /na                        (no Code Item No.) this weld was    included in the total C-F-2 weld count J
[  LIHE&#xb9; 2ICS-006-1-2      NTS: 17,18      (na            2    )  na/na                          )to which the 7.5X sampling rate was      applied.
I  PIPE/MNF                                IC-F-2    /  na    /  na  /na                        )PIPE WALL <  3/8"; Although  it is  not required to be examined (and has 2I CS-57-04-SM019          [ QISO 57-04            or  DMG&#xb9; na    in  ]none    /none    J na  /na                        )no Code Item.No.) this weld was included in the      total C-F-2 weld count
[  LIHE&#xb9; 2ICS.006-1-2      NTS: 17,25      (na            2    J na/na                          (to which the 7.5X saapiing rate was applied.
I  ELB/PIPE                                IC-F-2    i na      f  na/na                          )PIPE MALL <  3/8"; Although  it is  not required to be examined (and has 21CS-57-04-SW022          )
QISO 57-04          or  DMS&#xb9; na    in [none      /none    f  na  /na                        (no Code Item No.) this weld was included in the      total C-F-2 weld count i  LINE&#xb9; 2ICS-006.35-2    NTS: 17,18      ina            2    /  na/na                          (to which the 7.5X sampling rate was applied.
I  PIPE/ELB                                IC-F-2    f  na    f  na/na                          )PIPE MALL <  3/8"; Although  it is not required to  be examined (and has 2I CS.57-04-SM023              QISO 57-04          or DWG&#xb9; na in [none          ]none    f  na  /na                          (no Code Item Ho.) this weld was included in the    total C-F-2 weld count
                          )
LINE&#xb9; 2ICS  006-35-2    NTS: 17,18      (na            2    /  na/na                            )to which the 7.5X sampling rate was applied.
I  PIPE/ELB                                IC-F-2    )
na    J na/na                            (PIPE MALL <  3/8"; Although  it  is not required to  be examined (and has or              in (none                  na  /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld ccxat 2ICS-57-04-SM024          i QISO 57-04                DMG&#xb9; na                  /none    /
I  LINE&#xb9; 2ICS.006-35-2    NTS: 17 18      Ina            2    J na/na                            (to which the 7.5X sampling rate was applied.
I  ELB/PIPE                                IC-F-2    (
na    f  na/na                            (PIPE MALL <  3/8"; Although  it is  not required to be examined (and has or            .in                          na  /na                          (no Code Item Ho.) this weld was included in the    total C-F-2 weld count 2 I CS-57-04-SM025          i QISO 57-04                DMG&#xb9; na        )none    /none    f
                            )
LIHE&#xb9; 2ICS-006-35-2    NTS: 17,18      Ina            2    /  na/na                            (to which the 7.5X sanpling rate was applied.
                            )  PIPE/ELB                                IC-F-2    )
na    /  na/na                            )PIPE MALL  <<3/8";  Although it  is not required to be examined (and has 2I CS-57-04-SW026          i QISO 57-04            or  DMG&#xb9; na    in /none      ]none      f na  /na                        (no Code Item  Ho.) this weld was included in the total C-F-2 weld count I  LIHE&#xb9; 2ICS-006-35-2    HI'S: 17,18      Ina            2    / na/na                            )to which the 7.5X sampling rate was applied.
I PIPE/RED
                                                                        /C-F-2    f  na      / na  /na                        )PIPE MALL <  3/8"; Although  it  is not required to be examined (and has 2 I CS-57-04-SM028            QISO 57-04          or  DMS&#xb9; na    in ]none      /none      / na /na                          ]no Code  Item Ho.) this weld was included in the total C-F-2 weld count I
LINE&#xb9; 2ICS-006-35-2    NTS: 17,24      )na            2    / na/na                            )to which the 7.5X sampling rate was applied.
I ELB/PIPE                                /C-F-I    / na      / na  /na                        )PIPE MALL <  3/8"; Although  it  is not required to be examined (and has 2 I CS-57-04-SM031            QISO 57-04          or  DMG&#xb9; na    in  [none      /none    J na /na                            (no Code Item No.) this weld was included in the total C-F-1 weld coat
(
I  LINE&#xb9; 2ICS-006-1-2    HTS: 16,21      IHS            2    [ na /na                            (to which the 7.5X sampling rate was applied.
 
NIAGARA NOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2                                            12 of 34 NNP2-ISI-006, REV. 1, CH-OOO                                                SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                        APPENDIX G - ICS  SYSTEH (sorted by Examination        Identifier) 2ND INTVL REL REQ        DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY JIGSCC(                EX1/NDE PROCEDURE (PERICO    1                                REMARKS
                          )
EXANINATIOH IDENTIFIER    )    ITS ISO LOCATOR, COHPOHEHT DMG      &#xb9;,  ) ITEN
                                                                                &#xb9; ]FREOYJ EX2/NDE PROCEDURE )PERIOD 2            J USE CAL BLK  &#xb9; I    LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3                    I I    PIPE/TEE                                IC-F-2    )  na    f  na/na                          (PIPE MALL <  3/8"; Although it is not required to be examined (and has 2 I CS-57-04-SM036              QISO  57-04          or DMG&#xb9; na in [none          /none    /  na /na                          (no Code  Item No.) this weld was included in the total C-F-2 weld count
                          )
I    LIHE&#xb9;.2ICS-006-1-2      HTS: 17(23    Ina            2    /  na/na                          (to which the 7.5X sampling rate was  applied.
I    TEE/PIPE                                IC-F-2    /  na    )
na  /na                        )PIPE MALL <  3/84; Although it  is not required to be examined (and has 2I CS-57-04-$ 837              QISD 57-04            or  DMG&#xb9; na  in [none      /none    /  na /na                          (no Code  Item No.) this weld was included in the total C-F-2 weld count
                          )
                          ]    LINE&#xb9; 2ICS-006-1-2      HTS: 17,23    Ina            2    /  na/na                          (to which the 7.5X sampling rate was applied.
I  PIPE/'IEE                              IC-F-2    )
na    [  na /na                          )PIPE MALL < 3/8"; Although it  is not required to be examined (and has 2I CS-57-04-$ 538          /  QISO 57-04            or  DMG&#xb9; na  in /none      /none    /  na /na                          [no Code Item No.) this weld was included in the total C-F-2 weld count I  LINE&#xb9; 2ICS-006-35-2      NTS: 17,23      Ina            2    /  na/na                            )to which the 7.5X sampling rate was applied.
                            /  PIPE/~V9                                IC-F-2    (
na    )  VOL/UT6.02 2 I CS-57 FM001        I  QISO 57-05            or  DMG&#xb9; na  in  )C5.51    ]none    f  SUR/PT3.00/HT4.00  f HHP2.6-.562-CS      I  LINE&#xb9; 2ICS.006-41-2      HTS'iT          ISD            2    )  na /na I  <<V9/PIPE                                IC-F-2    I  na    I  VOL/UT6.02          I 2I CS-57 FM002          i QISO 57-05              or  DMG&#xb9; na    in  JC5.51    (none    f  SUR/PT3.00/NT4.00  [
NHP2.6-.562-CS          LINE&#xb9; 2ICS-006-41 2      HTS  7/1        [SD            2    /  na /na I  PIPE/ELB                                IC-F-2    I  na    I  VOL/UT6.02          I 2 I CS-57 FM003          i  QISO  57-05          or  DMG&#xb9; na  .in  ]C5.51    iID      J SUR/PT3.00/NT4.00 ]Sc8 NNP2-6-.562-CS      I  LINE&#xb9;  2ICS-006-41-2    HTS: 26,27      I SD 2    /  na /na I  PIPE/PIPE                                (C-F-2    )
na    )  VOL/UT6.02 2ICS-57-05-Fl$ 11            I  QISO 57-05            or  DMG&#xb9; na    in  (C5.51    [none    J SUR/PT3.00/NT4.00  J NHP2-6-.562-CS      )  LINE&#xb9; 2ICS-006.41-2      HTS: 26        (none          2    J na /na I  PIPE/ELB                                IC-F-2    (
na    (
VOL/UT6.02 2 I CS-57 FM012        I QISO    57-05          or DMG&#xb9; na in JC5.51          [ID      i  SUR/PT3.00/HT4.00  iSc8 NHP2-6-.562.CS      I  LINE&#xb9; 2ICS-006-41-2 NTS: 26,27          ISD            2    f  na  /na I  ELB/PIPE                                IC-F-2      [ na    )  VOL/UT6.02 2 I CS-57 FM017        i QISO 57-05            or  DMG&#xb9; na    in )C5.51      ]none    [ SUR/PT3.00/NT4.00    f NHP2-6-.562-CS        i  LINE&#xb9; 2ICS-006-41-2    HTS: 26,27      LSD            2    / na /na
 
NIAGARA HOHAMK POMER CORPORATION                -        ILE POINT  NUCLEAR STATION  - UNIT 2        13 of 34 NHP2  ISI 006~  REV  1 ~  CH    000                                        SECOND TEH YEAR IHSERVICE INSPECTION              (ISI)  INTERVAL PLAN Change  date:    07/29/1999                                                                              APPENDIX G -  ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED            DESCRIPTIOH OF ITEH TO BE EXAHINED)CATGRY (IGSCC) EX1/NDE PROCEDURE                    )PERIOD  1                          REHARKS
                              )
EXAHINATION IDENTIFIER        (
ITS ISO LOCATOR, COHPONENT DMG    &#xb9;,  JITEH    &#xb9; JFREOY) EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK    &#xb9; I    LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERI(X) 3                      I I MNF/PIPE IC-F-2    ]  na    [    VOL/UT6.02 2ICS-57-05-FM018              /    QISO 57-05          or DMG&#xb9; na    in  /C5.51    Inone    I    SUR/PT3.00/HT4.00    I NHP2 ~ 562-CS        I    LINE&#xb9;  2ICS-006-41=2    NTS: 7(26      ISD              2    /    na  /na
                              ] PIPE/MNF IC-F-2    [  na    ]    VOL/UT6.02 2 I CS-57 FM019            )    QISO 57-05          or  DMG&#xb9; na    in  )C5.51    ]none      (
SUR/PT3.00/HT4 F 00  J NHP2-6-.562-CS          I    LINE&#xb9; 2ICS-006 41-2    HTS: 7,26      ISD              2    J na  /na
                              /    MNF/PIPE                                IC-F-2    [  na    [    VOL/UT6.02 2 I CS-57-05-SM001            )    QISO 57-05          or  DMG&#xb9; na    in  [C5.51    (ID        J SUR/PT3.00/HT4.00    (Sce NHP2-6-.562-CS          I    LINE&#xb9; 2ICS.006-41-2    NTS: 7,26      ISD              2    )
na /na I    PIPE/ELB                                IC-F-2    )  na    )
VOL/UT6.02 2ICS-57-05-SM004              i QISO 57-05              or  DMG&#xb9; na    in  [C5.51      [none    [    SUR/PT3.00/HT4.00    /
NHP2-6-.562-CS          I  LINE&#xb9; 2ICS-006-41-2    NTS: 26,27      ISD              2    /    na/na                  I I  ELB/PIPE                                IC-F.-2    )
na      )
VOL/UT6.02 2I CS-57-05-SM005              )
QISO 57-05          or  DMG&#xb9; na    in  )C5 ~ 51  ]none      f  SUR/PT3.00/HT4.00      f NHP2-6-.562-CS          i LINE&#xb9; 2ICS-006-41-2      NTS: 7,27        LSD            2    /  na /na                I I    PIPE/ELB                                IC-F-2    I  na      I  VOL/UT6.02            I 2ICS-57-05-SM010                f  QISO 57-05          or  DMG&#xb9; na  ,in  JC5.51    /none      /  SUR/PT3.00/HT4.00      /
NHP2.6-.562-CS          I    LINE&#xb9; 2ICS-006-41-2    NTS: 26,27      ISD        I    2      I  na /na                I I  ELB/PIPE                                IC-F-2    (
na      J VOL/UT6.02 2I CS-57.05-SM011              I  QISO 57.05          or  DMG&#xb9; na    in /C5.51      ]none      )
SUR/PT3.00/HT4 F 00    f NHP2-6-.562-CS          i  LINE&#xb9; 2ICS-006.41-2    NTS:  26,27      LSD            2      /  na /na I  PIPE/ELB                                IC-F-2      [ na      J VOL/UT6.02 2I CS.57-05-SM012              (
QISO 57-05          or  DMG&#xb9; na    in  JC5.51      (none      [  SUR/PT3.00/HT4.00      J na /na NHP2.6..562-CS          i LINE&#xb9; 2ICS-006-41-2      NTS: 26,27      [SD            2      /
I  ELB/PIPE                                IC-F-2      J na      )
VOL/UT6.02 2ICS-57.05-SM013                i QISO 57-05            or  DMG&#xb9; na    in  ]C5.51      ]none      )
SUR/PT3.00/HT4.00      J NHP2-6-.562-CS            I  LINE&#xb9; 2ICS-006-41-2    NTS:  26I27      ISD            2      [  na /na
 
NIAGARA NOHAMK POWER CORPORATION -              NILE POINT NUCLEAR STATION - UNIT 2        14 of 34 HNP2    ISI 006, REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                  APPENDIX  G - ICS    SYSTEM (sorted by Exeminat ion      Identif ier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                  IPERIOD  1  I                  RENARKS EXANI NATION IDEHT I F IER    ITS ISO LOCATOR, CONPONENT DMG    &#xb9;,  iITEN  &#xb9; JFREOYi EX2/NDE PROCEDURE      iPERIOD 2    J USE CAL BLK  &#xb9; i LIHE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE  IPERIOD 3    I I  PIPE/ELB                              IC-F-2    i na    i VOL/UT6.O2 2ICS-57-05-SM014          i QISO    57.05        or DMG&#xb9; na in iC5.51        inone    i  SUR/PT3.00/NT4.00  )
NHP2-6-.562-CS    I  LIHE&#xb9; 2ICS-006-41-2 HTS: 26,27        ISD          2    i na  /na I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02          I 2 I CS-57-05-SM015        i QISO S7-OS            or  DMG&#xb9; na    in iC5.51    inone    )
SUR/PT3.00/HT4.00  i NNP2.6-.562-CS    i LINE&#xb9; 2ICS-006-41-2      NTS:  26,27    LSD          2    [  na /na I  PIPE/ELB                              IC-F-2    i na    i  VOL/UT6.02 2ICS-57-05.SM016          i QISO 57-05            or  DWG&#xb9;  na  in iC5.51    inone    i  SUR/PT3.00/NT4.00  i HNP2-6..562-CS      [  LINE&#xb9; 2ICS-006-41-2    NTS:  26,27    LSD          2    i na  /na              I ELB/PIPE                              IC-F-2    i na    i VOL/UT6.02 2ICS-57.05-SMO17              QISO 57-05          or DMG&#xb9; na in iC5.51        inone i SUR/P'I3.00/NT4.00      i HNP2-6..562-CS        LINE&#xb9; 2ICS 006 41 2 HIS'6i27          ISD          2    i na  /na I  ELB/PIPE                              IC-F-2    i  na    i  VOL/UT6.02 2ICS-57-05-SM018            i QISO  57.05        or DMG&#xb9; na in [C5.51        [none    J SUR/PT3.00/NT4.00  i NNP2-6-.562  CS    I  LINE&#xb9; 2ICS-006-41-2 HTS: 26I27        ISD          2    /  na /na
                            )  PIPE/MHF                              IC-F-2    i na    i  VOL/Ul'6.02 2 I CS-57-05-SM019          i QISO 57-05          or  DWG&#xb9;  na  .in  iC5.51    ilD      i  SUR/PT3.00/NT4.00  iSc8 NNP2.6-.562-CS      i LINE&#xb9; 2ICS-006.41-2    NTS:  7,26      ATE          2    i na  /na              I I MNF/PIPE IC-F-2    i na    i  VOL/UT6.02 2ICS.57-05.SM020            i QISO  57-05        or DMG&#xb9; na      in  iC5.51    inone  ]  SUR/PT3.00/NT4.00    [
HNP2-6-.562.CS      I  LINE&#xb9; 2ICS-006-41-2 HTS: 7(26          ISO          2    i na  /na              I i PIPE/ELB                                IC-F-2    i na    i VOL/UT6.02 2 I CS-57-05-SM022          i QISO 57-05          or  DMG&#xb9; na    in [C5.51    Inone    I SUR/PT3.00/HT4.00    I NNP2-6-.562-CS        LINE&#xb9; 2ICS-006.41-2    N'IS: 26,27      LSD          2    i na /na I ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2 I CS-57-05-SM023          )
QISO 57-05          or  DMG&#xb9; na    in  iC5.51    inone i SUR/PT3.00/NT4.00 i NNP2.6..562-CS      I LINE&#xb9; 2ICS-006-41-2    NTS: 26 27      I            2    i na/na
 
NIAGARA MOHAMK PDMER CORPORATION            -      MILE POINT NUCLEAR STATION      - UNIT 2        15 of 34 NMP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G - ICS    SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEM TO BE EXAMIHEDICATGRY IIGSCCI EX'I/HDE PROCEDURE                  IPERIDO  1  I                        REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPOHENT DMG            &#xb9;,  LITEM  &#xb9; iFREQYi EX2/HDE PROCEDURE      iPERIOD 2 USE CAL BLK &#xb9; I  LINE NO. AND NO'IES, AS APPLICABLE ISELECT ICLASSI EX3/NDE              PROCEDURE  IPERIOD 3    I I  PIPE/ELB                                  IC-F-2    i na    i VOL/UT6.02 2ICS-57-05-SM024          i  also sr-os          or  DMG&#xb9; na    in iC5.51    inane    )
SUR/PT3.00/MT4.00 i NMP2-6-.562-CS    I  LIHE&#xb9; 2ICS-006-41-2    NTS: 26(27        ISO          2    i na  /na i ELB/PIPE                                    IC-F-2    i na    i  VOL/UT6.02 2ICS-57-05-SM025          i  also sr-os          or  OMG&#xb9; na    in iC5.51    inone    J SUR/PT3.00/MT4.00 i NMP2-6-.562-CS    I  LINE&#xb9; 21CS-006.41.2      NTS: 26,27      ISO          2    )  na /na            I I  PIPE/ELB                                  IC-F-2    I  na I VOL/UT6.02              I 21CS-57-05-SM027          I  QISO 57-05            or  DUG&#xb9; na    in iC5.51    Inone I SUR/PT3.00/MT4.00      I NMP2-6-.562-CS    I  LINE&#xb9; 21CS  06 41 2    NTS'6    2      ISO          2 i na /na                  I I  ELB/PIPE                                  IC-F-2    )  na    i  VOL/UT6.02 21 CS-57  FM001      I  QISO  57-06          or  DMG&#xb9;  na    in  iC5.51    inone    i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS    i  LINE&#xb9;  2ICS-006-41-2    NTS: 27,26      LSD          2    J na /na            I I  ELB/PIPE                                  IC-F-2    i na      i  VOL/UT6.02 21CS-57-06-FM002          I  QISO  57.06          or DMG&#xb9; na in iC5.51          )none    i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS        LINE&#xb9; 2ICS-006-41-2 NTS: 27,26            LSD          2    i na /na              I I  PIPE/ELB                                  IC-F-2    i na    i VOL/UT6.02 21CS-57 FM003          I  QISO  57-06          or  DMG&#xb9;  na  ,in  [Cs.si    )none    i  SUR/PT3.00/MT4.00 i NMP2-6-.562-CS    I  LINE&#xb9; 2ICS  006  41 2    NTS'7    26      ISD          2    i n  /na I  PIPE/ELB                                  IC-F-2    i na    i  VOL/UT6.02 2 I CS. 57 FM004      i QISO  57-06          or  DMG&#xb9;  na    in  iC5.51    inone i SUR/PT3.00/MT4.00      J NMP2-6-.562-CS    ) LIHE&#xb9; 2ICS-006-41  2 HTS: 27,26          /SO          2    i na  /na I ELB/PIPE                                  IC-F-2    ( na      i VOL/UT6.02 2 1 CS-57 FM005        I QISO  57-06          or  DMG&#xb9;  na    in  iC5.51    inone i SUR/PT3.00/MT4.00 i NMP2-6-.562.CS      I LINE&#xb9; 2ICS-006-41-2 NTS: 27,26            ISD          2      J na /na              I I ELB/PIPE                                  iC-F-2 . i na      i VOL/UT6.02 21CS-57 FM006          i QISO 57-06            or  DMG&#xb9; na      in iC5.51 inone        i SUR/PT3.00/MT4.00  )
HMP2-6-.562-CS      i  LINE&#xb9; 2ICS-006.41-2    HTS:  27,26      LSD          2      i na /na
 
NIAGARA MOHAWK POWER CORPORATION            -      MILE POINT NUCLEAR STATION    - UNIT 2        16 of 34 NMP2-ISI-006, REV. 1, CH-000                                                SECOHD TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:    07/29/1999                                                                      APPENDIX G -  ICS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEM To BE EXAMIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    IPERIOO  1  I                        REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPOHEHT DWG            &#xb9;,  LITEM    &#xb9; iFREOY) EX2/NDE PROCEDURE      iPERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE              PROCEDURE  IPERIOD 3  I I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02          i    Sc7 2ICS-57-06-FW007            )  QISO 57-06          or  DWG&#xb9; na    in  iC5 ~ 51  i ID    i  SUR/PT3.00/Ml'4.00 i NMP2-6-.562-CS      i LINE&#xb9; 2ICS-006-41-2      HTS: 27,26      iso            2    )
na /na I  ELB/PIPE                                IC-F-2    I  na    I  VOL/UT6.02 2 I CS-57 F W008        i QISO 57-06            or  DWG&#xb9; na    in iC5.51      )none    i SUR/PT3.00/MT4.00    [
NMP2-6..562-CS      i  LINE&#xb9; 2ICS-006-4'I-2    NTS: 82(83      LSD            2    i na /na              I I  ELB/PIPE                                IC-F-2    i na      i VOL/uT6.02 2ICS-57-06-FW009            i QISO 57-06            or  DWG&#xb9;  na  in  iC5.51    iID      )
SUR/PT3.00/MT4.00 JSc8 NMP2-6-.562-CS          LINE&#xb9; 2ICS-006-41-2    HTS:  27,26    ATE            2    )
na  /na              I I  ELB/PIPE                                IC-F-2    i na      i voL/UT6.02 2ICS-57-06.FW010            i QISO 57-06            or  DWG&#xb9; na    in iC5.51      inone    i SUR/PT3.00/MT4.00 i NHP2-6-.562.CS        I  LINE&#xb9; 2ICS-006-41-2    NTS:  27,26    ISD            2    i na /na              I I  PIPE/PIPE                              IC-F-2    i  na    i VOL/UT6.02 2I CS-57  FW011          I  QISO  57-06          or DWG&#xb9; na    in  iC5.51    inone i SUR/PT3.00/MT'0          (
NMP2-6-.562-CS        i  LINE&#xb9;  2ICS-006-41-2    NTS: 27        inone      I    2    I na/na                I i ELB/PIPE                                IC-F-2    (
na    i voL/UT6.02 2ICS-57-06-FWD12            i QISO  57-06          or DWG&#xb9; na .in iC5.51        Inone    I SUR/PT3.00/MT4.00    I HMP2-6-.562.CS        I  LINE&#xb9; 2ICS 006 41 2 HTS'7i26            ISD            2    i na  /na              I I  INTEG ATT                              iC-C      i na      i SUR/PT3.00/MT4.00 I 2 I CS-57 F W320        / QISO  57-06-17      or DWG&#xb9; na in iC3.20 iID                i na /na              igc9 i  LINE&#xb9; 2ICS-006-41.2 HTS: 27,28          iMandatei 2          i na  /na              I I  PIPE/ELB                                ic-F-2    i na      i VOL/UT6.02 2 I CS-57-06-SW001          i QISO  57.06          or DWG&#xb9; na in iC5.51          inone    i SUR/PT3.00/MT4.00 i NMP2-6-.562-CS        I  LINE&#xb9; 2ICS-006-41-2 HTS: 27,26          ISO            2    i na /na              I I PIPE/ELB                                IC-F-2      i na    i VOL/UT6.02 2ICS-57-06-SW002              I QISO 57-06          or  DWG&#xb9; na    in  iC5.51    inone    i SUR/PT3.00/MT'0      i HMP2-6-.562-CS          LINE&#xb9; 2ICS.006.41-2    NTS: 27,26      i SD          2    / na /na
 
NIAGARA HONAMK POMER CORPORATION              -        ILE POINT NUCLEAR STATION - UNIT 2        17 of 34 NNP2-ISI-006( REV. 1, CH-000                                              SECOND TEH YEAR IHSERVICE INSPECTION                (ISI)  INTERVAL PLAN
                                                                                                              - ICS    SYSTEH Change date: 07/29/1999                                                                            APPENDIX G (sorted by Examination            Identifier)
ND  IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI                    EX1/NDE PROCEDURE  IPERIOO      1                    RENARKS EXANIHATIOH IDENTIFIER I ITS ISO LOCATOR'ONPONEHT DMG              &#xb9;i  IITEN  &#xb9; IFREQYI EX /NDE          PROCEDURE  IPERIOD      2 USE CAL BLK  &#xb9;  )
LINE NO. AND NOTES, AS APPLICABLE ]SELECT [CLASS( EX3/HDE PROCEDURE ]PERIOD 3 I    ELB/PIPE                                IC-F-2    I  na    I    VOL/UT6.02          I 21 CS-57-06-9503          J QISO  57-06          or DllG&#xb9; na in )C5.51      [none    ]    SUR/PT3.00/NT4.00    J NKP2-6-.562-CS          LIHE&#xb9; 2ICS 006.41-2 HTS: 27I26          ISD            2        na /na I                                                                J I    ELB/PIPE                                IC-F-2    I  na    I    VOL/UT6.02 2ICS-57-06-9005          (    QISO  57-06          or DllG&#xb9; na in )C5.51      [none      J SUR/PT3.00/NT4.00    J NNP2 ~ 562-CS    I    LINE&#xb9; 2ICS-006-41-2 H'IS: 27i26        I              2    /    na /na I  ELB/PIPE                                IC-F-2    [  na    [    VOL/UT6.02 2ICS-57-06-SM006          I  QISO  57-06          or DMG&#xb9; na in )C5.51        (none      (
SUR/PT3.00/NT4.00    )
HNP2-6-.562-CS      I  LINE&#xb9; 2ICS-006-41-2 N'IS: 27,26        I D            2    /    na /na I  PIPE/ELB                                IC-F-2    f  na    ]    VOL/UT6.02 21 CS-57-06-5'I$ 07        i QISO    57-06          or DMG&#xb9; na in (C5.51        ]none      J SUR/PT3.00/NT4.00    J NNP2-6..562.CS      I  LINE&#xb9; 2ICS 006 41 2 NTS'7i26            ISD            2    [  na  /na I  PIPE/ELB                                IC-F-2                [  VOL/UT6.02 2ICS-57-06-SM009            ]  QISO  57-06          or DMG&#xb9; na in (C5.51        ]none      J SUR/PT3.00/NT4.00    [
NNP2-6..562-CS        [  LINE&#xb9; 2ICS-006-41-2 HTS: 27,26          LSD            2      f  na  /na I  PIPE/ELB                                IC-F-2    [  na      [  VOL/UT6.02 2ICS-57-06.9810            (
QISO  57-06          or DMG&#xb9; na .in )C5.51        ]none      f  SUR/PT3.00/NT4.00      f NNP2-6-.562-CS      I  LINE&#xb9; 2ICS-006-41-2 HTS'7'6              ISO            2      /  na /na I  ELB/PIPE                                IC-F-2    [  na      )
VOL/UT6.02 2I CS-57-06-9811          i QISO  57-06          or  DMG&#xb9;  na  in  [C5.51    ]none      (
SUR/PT3.00/NT4.00      [
NNP2-6-.562.CS      (
LIHE&#xb9;  2ICS-006-41-2    NTS:  27,26    ISD      I    2      I  na/na                  I I PIPE/ELB                                IC-F-2    [ na      )  VOL/UT6.02 2ICS-57-06-SM012            )
QISO  57-06          or  DMG&#xb9;  na  in  JC5.51    ]none      f  SUR/PT3.00/NT4.00    J NNP2-6-.562-CS    'i    LINE&#xb9;  2ICS-006.41-2    NTS:  27,26    LSD            2      J na  /na              I I  PIPE/ELB                                IC-F-2    f  na      f  VOL/UT6.02 2ICS-57-06-SM013            (
QISO  57-06          or  DMG&#xb9;  na  in  ]C5.51    ]none      /  SUR/PT3.00/NT4.00      J NNP2-6-.562-CS        I  LINE&#xb9;  2ICS-006-41-2    NTS:  27,26    ISD            2      /  na  /na
 
NIAGARA NONAMK POMER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2        18 of 34 NNP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G - ICS  SYSTEN (sorted by Examination      Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN To BE EXANINEOiCATGRY ) IGSCCi EX1/HDE PROCEDURE                iPERIOO  1                      RENARKS EXANINATION IDENTIFIER I ITS ISO LOCATOR, CONPOHEHT DMG          &#xb9;,  IITEN  &#xb9; IFREQYI EX2/NDE PROCEDURE      IPERIOO 2 I USE CAL BLK &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE            IPERIOD 3 I I  PIPE/ELB                                IC-F-2  i na    (  VOL/UT6.02 21 CS-57-06-SM014          i QISO  57-06          or DMG&#xb9; na in iC5.51        Inone    I  SUR/PT3.0 /NTC.OO  I NNP2.6-.562-CS    i LINE&#xb9; 2ICS-006-C1-2 NTS: 27,26          ATE          2    i na  /na I  ELB/PIPE                                IC-F-2    i  na    i  VOL/UT6.02 2 1 CS;,57.06-SM015        i  also  57-OS        or  DMG&#xb9; na  in iC5.51    !none    I  SUR/PT3.00/NT4.00  I NNP2-6-.562.CS        LINE&#xb9; 21CS.006-41-2    HTS:  27,26    ISO          2    i na  /na            I
(  PIPE/ELB                                (C-F-2    i na    i  VOL/UT6.02 2ICS-57-06.SM016          i QISO    57-06        or DMG&#xb9; na in iC5.51        ilo      i  SUR/PT3.00/NT4.00  iSc8 HNP2-6..562.CS        LINE&#xb9; 21CS-006-41 2 NTS: 27,26          LSD          2    i na /na PIPE/ELB                                IC-F-2    i  na    i VOL/uTS.O2 2ICS-57-06-SM017              QISO  57-06        or DMG&#xb9; na in )C5.51        inone i SUR/PT3.00/NT4.00      i HNP2.6-.562.CS        LINE&#xb9; 21CS-006-41-2 NTS: 27,26          ISD          2    i na  /na PIPE/ELB                                IC-F-2    i na    i  VOL/UT6.02 2ICS-57-06-SM021              QISO  57-06        or DMG&#xb9; na in iC5.51        inone    J SUR/PT3.00/NT4.00  J NNP2-6-.562-CS        LINE&#xb9; 2ICS-006-41-2 NTS: 27,26          LSD          2    i na  /na PIPE/PIPE                              IC-F-2    I  na    I  VOL/UT6'02        I 21CS-57-06-SM022          i QISO    57-06        or DMG&#xb9; na    .in  )C5.51    inone    i SUR/PT3.00/HT4.00  i NNP2-6-.562-CS        LINE&#xb9; 21CS-006-41-2 NTS: 27            inone        2    i na /na i PIPE/PIPE                              IC-F-2    i  na    i VOL/uT6.O2 21CS-57 SM023          (
also 57-oS            or  DMG&#xb9; na    in iC5.51    inone    t  SUR/PT3.00/NT4.00  i NNP2-6-.562-CS        LINE&#xb9; 21CS-006-41-2      NTS: 27        inone        2    /  na /na P I PE/*NOV126                          IC-F-2    i na    i VOL/UT6.02 21 CS-57 FM001          i QISO  57-07          or DMG&#xb9; na in (C5.51        iID      i SUR/PT3.00/NT4.00  JSc8 NNP2-6..562.CS        LINE&#xb9; 21CS-006-41-2 NTS: 27,26          i So          2    i na /na I *NOV126/P IPE                          IB-J      i na    i VOL/UT6.02 21CS-57 FM002          i QISO  57-07          or DMG&#xb9; na in i89.11        inone    J SUR/PT3.00/NT4.00  i HMP2.6-.432-CS      I LINE&#xb9; 2ICS-006-60-1 NTS: I(2            IHS                ) na /na
 
NIAGARA HOHAMK POWER CORPORATION -              HILE POINT NUCLEAR STATION - UHIT 2        19 of 34 NHP2-ISI-006) REV. 'I, CH-000                                        SECOND TEH YEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX  G - ICS    SYSTEH (sorted by Examination      Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE              iPERIOO  1  I                    REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEH'I DMG      &#xb9;,  )
ITEN  &#xb9; iFREOYi EX2/NDE PROCEDURE      iPERIOD 2 i USE CAL BLK &#xb9; I  LINE No  AND NOTES) AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PENET    222/PIPE                      IB-J      i na    i VOL/UT6.O2          )
Scr 21CS-57-07-FM005        i QISO    57-07          or DMG&#xb9; na  in i89.11    IID      I  SUR/PT3.00/HT4 F 00 I NHP2-6-.432-CS    I  LINE&#xb9; 2ICS.006.67-1 NTS: 2,5          ITEV          1    dna/
I  ELB/PIPE                              IB-J      i na    i VOL/UT6.O2 21 CS-57 FM006      )
Qlso 5r-or          or DWG&#xb9; na  in i89.11    inone    i  SUR/PT3.00/HT4.00  i NHP2-6-.432-CS    I  LINE&#xb9; 2ICS-006-67-1 NTS: 2,6          INS          1    i  na /na I  ELB/PIPE                              IB-J      i na    i VOL/UT6.02 2ICS-57-07-FM007        I  QISO 57-07          or DMG&#xb9; na  in i89.11    inone i SUR/PT3.00/HT4.00        i NHP2-6-.432-CS        LINE&#xb9;  21CS-006.67-1  NTS: 2)6      iNS          1    i  na/na                I I  ELB/PIPE                              IB-J      i na    i  VOL/UT6.02 2ICS-57-07-FMOOB        i QISO    57-07          or DMG&#xb9; na  in [89.11    inone i SUR/PT3.00/MT4.00 NHP2-6-.432-CS        LINE&#xb9; 21CS-006.67-1    NTS: 2,6        iNS          1 i na /na                I I  ELB/PIPE                              IB-J    i na    i  VOL/U'l6.02                      ioeseiected 2 I Cs-57 FM009      i QISO  57-07          or DMG&#xb9; na    in i89.11    inone    i  SUR/PT3.00/HT4.00 i              I NHP2-6-.432-CS        LINE&#xb9; 2ICS-006.67-1 NTS: 2,6          /NS          1    [na/                    I            I
                          )  PIPE/*AOV157                          IB-J    i na    )  VOL/UT6.O2 21 Cs-57 FM011        i QISO  57-07          or DWG&#xb9; na .in /89.11      Inone    I  SUR/PT3.00/HT4 F 00  I NHP2-6-.432-CS    I  LINE&#xb9; 2ICS-006-33-1 NTS: 2,4          iNS          1    (
na /na              I i *AOV157/P IPE                          IB-J      i na    i VOL/UT6.02          i    Sc7 21 Cs-57 F M012      i QISO  57-07          or  DMG&#xb9; na  in i89.11    IID      I SUR/PT3.00/HT4.00    I NHP2-6-.432-CS    I  LINE>> 21CS-006-33-1    NT - 2.4      IHS          1    dna/
I  PIPE/PIPE                              IB-J      i na    ( VOL/UT6.02 21CS-57 FM013        i QISO  57-07          or DMG&#xb9; na    in /89.'ll    Inone    I SUR/PT3.00/HT4 F 00  I NHP2-6-.432-CS    I  LINE&#xb9; 2ICS-006-67-1 NTS: 2            iNS  =
( na /na              I i PIPE/MNF                                /8-J      i na    i VOL/UT6.O2 21 CS.57-07-FM014          i QISO  57-07          or DMG&#xb9; na    in i89.11    )none    I SUR/PT3 00/HT4 00 I NHP2-6-.432-CS    i  LINE&#xb9;  21CS.006.67-1    NTS: 2,7      /NS          1    i na/na
 
NIAGARA HONA'WK POWER CORPORATION -              HILE POINT    NUCLEAR STATION  - UNIT 2        20 of 34 NHP2-ISI-006( REV. 1, CH-000                                            SECOHD TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                    APPEHDIX G - ICS SYSTEH (sorted by Exenination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EXl/NDE PROCEDURE                    IPERIOO    1                          REMARKS EXAHIHATIOH IDENTIFIER I ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  IITEH  &#xb9; IFREOYI EX2/HDE PROCEDURE        IPERIOD 2    I USE CAL BLK  &#xb9; I    LINE No. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                  I I    ELB/PIPE                              IB-J    I  na    I  VOL/UT6.02 21 CS-57-07-FW017          I    QISO  57-07          or DWG&#xb9; na  in I89.11    Inone    I  SUR/PT3.00/MT'0    I HHP2-6-.432-CS      I    LINE&#xb9; 2ICS-006-33-1 NTS: 2,6          INS          1    I na /na I P IPE/<<AOV156                            IB-J      I  na    I  VOL/UT6.02          I 21CS-57 FWOI8          I  QISO  57-07          or DWG&#xb9; na  in  IB9.11    Inone    I  SUR/PT3.00/HT4 F 00  I NHP2-6-.432-CS      I  LINE&#xb9; 21CS-006-60-1 NTS: 2(4          IHS          1    I  na  /na I  <<AOVI56/P IPE                        IB-J      I  na    I  voL/uT6.O2 21CS-57-07-FW019            I QISO 57-07          or DMG&#xb9; na  in I89.11    Inone    I  SUR/PT3.00/HT4.00    I HHP2-6-.432-CS          LINE&#xb9; 21CS.006-60-1 NTS: 2,4          INS          1    I  na /na              I I  PIPE/PEHET 222                        IB-J      I  na    I  VOL/UT6.02          IEX6 21 CS.57-07-FW021          I  QISO  57-07          or DMG&#xb9; na    in I89.11    IID      I  SUR/PT3.00/HT4.00    I NHP2.6-.432.CS      I  LINE&#xb9; 2ICS-006.60-1 NTS 2,5          ITEV                                        I I  ELB/PIPE                              IB-J      I  na    I  VOL/UT6.02          I 2ICS.57-07-FW023            I  QISO 57-07          or DWG&#xb9; na    in IB9.11    Inone    I  SUR/PT3.00/HT4.00    I NMP2-6-.432.CS      I  LINE&#xb9;  2ICS-006-33-1  NTS: 2,6      INS      I    1    I na/na                I I ELB/MNF Q    Hl ALO RCIC TP ND SPRAY  IB-J      I  na      I voL/uT6.02 2 1 CS-57 FM024        I  QISO 57-07          or OWG&#xb9; na    in IB9.11    IID        I SUR/PT3.00/HT4.00    I NHP2-6-.432-CS        I  LINE&#xb9;  2ICS-006-33-1    NTS: 6,8      IMS      I    1    I na  /                ISc10 I  PIPE/ELB                              IB-J      I na      I VOL/UT6.02 21CS-57-07.FM025            I  QISO  57-07          or DMG&#xb9; na    in I89.11    Inone    I SUR/PT3.00/HT4.00    I NHP2-6-.432-CS          LINE&#xb9; 21CS-006-33-1 NTS: 2,6          IHS          1    I na  /na              I PIPE/MNF                              IB-J      I na      I VOL/UT6.02            I  Scl 21 CS-57  F W026        I  QISO  57-07          or DMG&#xb9; na    in IB9.11    IID      I SUR/PT3.00/HT4.00    I NHP2-6-.432-CS        I  LINE&#xb9; 2ICS-006-33-1 NTS: 2,7          IHS          1    Ina/
I
                                'MHF/ELB Q N7 ALO  Rclc  TP HD sPRAY  IB-J      I na      I voL/uT6.O2 2ICS-57-07-FW027            I  QISO  57-07          or DWG&#xb9; na    in I89.11    IID      I SUR/PT3.00/MT4.00    I NMP2-6-.432-CS        I LIHE&#xb9; 21CS-006.33-1 HTS: 6,7          IMS          1    I na  /                ISc10
 
NIAGARA NOHAWK POWER CORPORATION        - h. NILE POINT NUCLEAR STATION - UNIT 2        21 of 34 HHP2-181-006, REV. 1(      CH-OOO                                          SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:    07/29/1999                                                                    APPENDIX  G -  ICS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHIHEOICATGRY              IIGSCCI EX1/HDE      PROCEDURE    (PERIOD  1                      REHARKS EXAHINATION IDEHTIFIER i ITS ISO LOCATOR, COHPONEHT DWG              &#xb9;,  i ITEN &#xb9; iFREQYi EX2/HDE PROCEDURE        iPERIOO 2 USE CAL BLK    &#xb9;  I  LIHE  No. AHD NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE        IPERIOO 3  I I  PIPE/ELB                                IB J    i na      [  VOL/UT6.02 21CS-57 FM031            )
QISO  57-07          or DWG&#xb9; na    in i89.11    inone    i SUR/PT3.00/HT4.00 NHP2.6-.432-CS        J LINE&#xb9;  2ICS-006-33-1    HTS: 2,6      iHS          1    i na /na                I I  ELB/PIPE                                IB-J      i na    i  VOL/UT6.02 21 CS-57 F W032          i  Qiso 57-or            or  DMG&#xb9; na  in i89.11    [none    )  SUR/PT3.00/HT4.00  'i NHP2-6-.432-CS        I  LINE&#xb9; 21CS-006-33-1      NTS: 2,6      iHS          1    i na /na                I I  PIPE/PIPE                              IB-J      i  na    i  voL/uT6.02 21CS-57 FM033            i QISO 57.07              or  DWG&#xb9; na  in i89.11    inone    i  SUR/PT3.00/HT4 F 00 i NHP2-6-.432-CS        I LINE&#xb9; 2ICS 006 33    1    HIS            iHS I  PIPE/PIPE                              IB J      (
na    i VOL/UT6.02 2 1 CS-57 FW034          )
Qiso 57-or            or DWG&#xb9; na    in i89.11    inone i SUR/PT3.00/HT4.00        )
HHP2-6-.432-CS        I  LINE&#xb9; 2ICS-006-67-1 NTS: 2              JNS          1    i  na/na                I i  PIPE/PIPE                                IB-J    i na    J VOL/UT6.02 2ICS-57-07-FW035                QISO  57-07          or DWG&#xb9; na    in i89.11    /none      SUR/PT3.00/NT4.00 HHP2-6-.432-CS I
I  LINE&#xb9; 2ICS-006-67-1 NTS: 2              iHS          1 i
[  na/na              'Ii I  PIPE/ELB                                IB-J    i na    i  VOL/UT6.02 21 CS-57  F WSW01'I      I  QISO  57-07          or D'MG&#xb9; na ~  in )89.11    Inone    I  SUR/PT3.00/HT4.00    I NHP2.6-.432-CS        i  LINE&#xb9;  2ICS-006-67-1    HTS: 2,6        )Ns          1    i  na/na                I i PIPE/ELB                                  IB-J    i na    i VOL/uT6.O2 2 1 CS-57.07- FMSW012          i QISO  57-07          or DUG&#xb9; na    in i89.11    inone  (  SUR/PT3.00/NT4.00    i NHP2.6-.432-CS          LINE&#xb9; 2ICS-006-67-1 NTS: 2,6            iNS              i na /na                I I ELB/PIPE                                IB-J      I na    I VOL/UT6.02            I 2 1 CS-57 F WSW013        i QISO  57-07          or DWG&#xb9; na    in i89.11    inone    i SUR/PT3.00/HT4.00    i NHP2.6..432-CS        I LINE&#xb9; 2ICS-006-67-1 NTS: 2,6            iHS          1    i na /na                I J
PIPE/WNF                                IB-J      i na    i voL/uT6.O2 21 CS-57 FMSW034          i QISO  57-07          or DWG&#xb9; na    in i89.11    )none i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS          LINE&#xb9; 21CS-006-67-1 NTS: 2,7            JNS          1    i na /na
 
NIAGARA NOHAMK POMER CORPORATION      -      NILE POINT HUCLEAR STATION - UNIT 2        22 of 34 NHP2-1S1-006, REV. 1, CH-000                                        SECOHD TEH YEAR IHSERVICE INSPECTION      (Isl)  INTERVAL PLAN Change date: 07/29/1999                                                                APPENDIX G - ICS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ i DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY )IGSCCi EX1/HDE PROCEDURE          iPERIOD  1                        REHARKS EXAIIIHATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG      &#xb9;, i ITEH  &#xb9; iFREQYi EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK &#xb9; I  LINE  NO. AND NOTES,  AS  APPLICABLE ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I  MNF/PIPE                            IB-J      i na  J VOL/UT6.02 21CS-57-07-FMS'I$ 35    I  QISO  57-07          or DMG&#xb9; na  in i89.11    /none  /  SUR/PT3.00/HT4.00  i NHP2.6-.432-CS    i  LINE&#xb9; 21CS-006.67-1 HTS: 2,7        iHS              i na  /na I  PIPE/TEE                            IB-J      i na    i VOL/UT6.02 21 Cs-57-07-SM002        i QISO 57-07            or DUG&#xb9; na  in i89.11    inone  i SUR/PT3.00/HT4.00  i NHP2-6-.432-CS    i LINE&#xb9; 2ICS-006-60.1      HTS: 2,3    iNS I  TEE/PIPE                            IB-J      i na    i VOL/UT6.02          iEX6 21CS-57-07-SI$ 03        i QISO  57-07          or DMG&#xb9; na  in i89.11    IID    I SUR/PT3.00/HT4.00  I NHP2-6-.432.CS    i  LINE&#xb9; 21CS-006-60-1 NTS: 2(3        IAM I  PIPE/ELB                            IB-J      i na    i VOL/UT6.02 21CS-57-07-SM004        i QISO 57-07            or  DMG&#xb9; na  in i89.11    Inone  I SUR/PT3.00/NT4 00 I NHP2-6-.432-CS    I  LINE&#xb9; 2ICS-006-67-1    NTS: 2,6    iHS          1 i na /na              I I  ELB/PIPE                            iB-J      i na    i voL/uT6.02 21 CS-57-07-S'M005      i QISO  57-07          or DMG&#xb9; na  in (89.11    inone  f SUR/PT3.00/NT4.00  i HHP2.6-.432-CS    i  LINE&#xb9; 2ICS-006.67-1 NTS: 2,6        IHS              i na  /na I  PIPE/ELB                              IB-J    i na    [ VOL/UT6.02 21 CS-57-07-SM006        i QISO  57-07          or DMG&#xb9; na  .in  i89.11  (none i SUR/PT3.00/NT4.00    i HHP2-6-.432-CS    i  LINE&#xb9; 2ICS.006-67-1 NTS: 2,6          iNS              i na /na              I I  PIPE/ELB                              IB J    i na    i voL/UT6.02                    iDeseiected 21 Cs-57-07-SM007        i QISO  57-07          or DMG&#xb9; na  in i89.11    inone  i SUR/PT3.00/HT4.00  /
NHP2-6-.432-CS    i  LINE&#xb9;  2ICS-006-67-1    HTS: 2(6      /NS I  ELB/PIPE                              IB-J    i na    i voL/UT6.02 2ICS-57-07-9008          i QISO  57-07          or  DMG&#xb9; na  in i89.11    inone i SUR/PT3.00/MT'0      )
NHP2-6-.432-CS      LINE&#xb9; 21 CS-006-67-1    NTS: 2(6      iHS        1    / na  /na I PIPE/ELB                              IB-J    ) na    / VOL/UT6.02 2ICS-57-07-SM009          i QISO  57-07          or DUG&#xb9; na  in i89.11    Inone  I SUR/PT3.00/NT4.00  I HHP2-6-.432-CS    i LINE&#xb9; 2ICS-006-67-1 NTS: 2,6          iNS
 
0 NIAGARA NOHAMK POMER CORPORATION      -      NILE POINT NUCLEAR STATION - UNIT 2        23 of 34 NHP2-ISI-006, REV. 1,    CH.OOO                                      SECOND TEN YEAR IHSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX  G - ICS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REa  i DESCRIPTIOH OF ITEN To BE EXAHINED)CATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOD 1                                    REMARKS EXANIHATION IDENTIFIER J ITS ISO LOCATOR, CONPOHEHT DMG        &#xb9;,  iITEH  &#xb9; iFREOYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK &#xb9;  I  LINE No  AND NOTEsi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE          IPERIOO 3  I I  PIPE/ELB                              IB-J      i na  )  voL/UT6.02 2I CS-57-07-SM010          i  also 5r-or          or  DMG&#xb9; na  in i89.11    Inone  I  SUR/PT3.00/NT4.00  I NNP2.6-.432-CS      /  LINE&#xb9; 2ICS-006.67-1    NTS: 2,6      /HS              (  na  /na            I I  PIPE/ELB                              IB-J      i na    i VOL/UT6.02 2ICS-57-07-SM014          i QISO  57-07          or DMG&#xb9; na  in i89.11    Inone  I SUR/PT3.00/NT4 00  I NNP2.6-.432.CS        LINE&#xb9; 2ICS-006-67-1 HTS: 2,6          iNS          1    i na  /na            I I  ELB/PIPE                              IB-J      i na    i VOL/UT6.02 2 I CS-57.07-SM015        )  QISO  57-07          or DMG&#xb9; na  in )89.11    inone i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS      t  LINE&#xb9; 2ICS-006-67-1 NTS: 2,6          /HS              / na /na .
I  ELB/PIPE                              IB-J      i na    i VOL/UT6.O2 2 I CS-57-07-SM017        i QISO  57-07          or DMG&#xb9; na  in i89.11    Inone  I SUR/PT3.00/NT4 F 00  I NNP2-6-.432-CS        LINE&#xb9; 2ICS-006-67-1 NTS: 2,6          iNS          1    i na  /na              I I  PIPE/ELB                              I B.- J  I na I VOL/UT6.02              I 2ICS-57-07-SM018          I  also 57-07          or  DMG&#xb9; na  in i89.11    )none i SUR/PT3.00/HT4.00      i HHP2-6-.432-CS      I  LINE&#xb9; 2ICS-006-67-1    NTS: 2,6      IHS              i na  /na              I i ELB/PIPE                              IB-J      I na    I VOL/UT6.02          I 21 Cs-57-07-SM019          i QISO  57-07          or DMG&#xb9; na  .in  (89.'l1  inone  i SUR/PT3.00/MT4.00 i HNP2.6-.432-CS      i  LINE&#xb9; 2ICS-006.67-1 NTS: 2,6          iNS          1    i na  /na              I I
PIPE/MHF                              iB-J      i na    i VOL/UT6.02 2ICS-57-07-SM020            i QISO  57.07          or DMG&#xb9; na  in i89.11    /none  i SUR/PT3.00/NT4.00    /
NNP2.6-.432.CS      i LINE&#xb9; 2ICS-006.67-1 HTS: 2(7          JHS          1    i na  /na              I i MHF/PIPE                              IB-J      i na    i VOL/UT6.02 2ICS-57-07-SMD21            ) QISO  57-07          or DMG&#xb9; na    in /89.11    inone  ( SUR/PT3.00/NT4.00    i NHP2.6-.432-CS      i LINE&#xb9;  2ICS-006-33-1    HTS: 2,7      [HS i PIPE/ELB                              IB-J      I na    I VOL/UT6.02          I 2 I Cs-57-07-SM023          i also 5r-or          or  DMG&#xb9; na  in i89.11    Inone  I SUR/PT      /HT      I NNP2-6-.432-CS        LINE&#xb9; 2ICS-006-67-1    HTS: 2,6      iHS          1    i na  /na
 
NIAGARA HONAMK POMER CORPORATION        -      MILE POINT NUCLEAR STATION    - UHIT 2                                      24 of 34 NNP2-ISI-006, REV. Ii CH-000                                        SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G  - ICS  SYSTEH (sorted by Examination      Identifier) iPERIOD                                  REHARKS 2ND INTVL REL RED  i DESCRIPTIOH OF ITEN TO BE EXANINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE                        1 EXANIHATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG        &#xb9;,  iITEH  &#xb9; iFREOYi EX2/HDE PROCEDURE        )PERIOD 2 USE CAL BLK  &#xb9; i LIHE No. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/HDE PROCEDURE )PERIOD 3 I  PIPE/ELB                              IB-J      I  na  I  VOL/UT6.02          I 21 CS-57-07-SM026        I  QISO  57-07          or DMG&#xb9; na    in i89.11    inone  (  SUR/PT3.00/IIT4.00  i NNP2.6..432-CS    i  LINE&#xb9; 2ICS-006-33-1 Hl'S: 2,6          iNS          1  i na  /na              I I  MHF/PIPE                              IB-J      i na    i VOL/UT6.02 2I CS-57-07-SM031        i  also sr-or          or  DMG&#xb9; na  in i89.11    inone    i  SUR/PT3.00/NT4.00 i NNP2-6-.432-CS    )  LINE&#xb9; 2ICS-006-67-1    HTS: 2,7      iHS          1    i na  /na              I I  PIPE/ELB                              IC-F-2    i n      i VOL/UT6.O2 2ICS-57-08. FM001      I  QISO  57-08          or  DMG&#xb9; na  in  JC5.51    inone    i  SUR/PT3.00/HT4.00  i NHP2-12-.375.CS    I  LINE&#xb9;  2ICS-012-25-2    HTS: 34,37    I SD          2    i  na /na              I I  PIPE/ELB                              IC-F-2    i  na    i  VOL/UT6.02 2ICS-57-08-FM002          i QISO  57-08          or DMG&#xb9; na in iC5.51        inone    J SUR/PT3.00/HT4.00  i NNP2.12-.375-CS    i LINE&#xb9; 2ICS-012-25-2 NTS: 34(37          LSD          2    i na  /na              I I  ELB/PIPE                              IC-F-2    )  na    i VOL/UT6.02 2I CS-57  FM003      I  QISO  57-08          or DMG&#xb9; na in )C5.51        inone    i  SUR/PT3.00/NT4.00  i HNP2.12-.375-CS    i LINE&#xb9; 2ICS-012-25-2 NTS: 34,37          LSD          2    i  na /na              I i PIPE/~V29                              IC-F-2    i  na    i VOL/UT6.O2 2I CS.57  FM004        I QISO  57-08          or DMG&#xb9; na in iC5.51        Inone    I  SUR/PT3.00/NT4.00  I NHP2-12-.375-CS    i LINE&#xb9; 2ICS-012-25-2 NTS: 34,43        LSD          2    i na  /na              I I PIPE/~NOV122                          IC-F-2    i na    (  VOL/UT6.02 2 I CS-57 FM006        I QISO  57-08          or DMG&#xb9; na in iC5.51        /none    /  SUR/PT3.00/HT4.00  i NNP2-12-.375.CS    i LINE&#xb9; 2ICS-012-25.2 HTS: 34,44        tSD          2    i na /na              I I ELB/PIPE                                IC-F-2    i na    J na/na                          iPIPE MALL < 3/8"; Although it is not required to be examined (end has 21 CS-57 FM010        I QISO  57-08          or DMG&#xb9; na    in inone      [none  i na  /na                          ino Code Item Ho.) this weld was included in the total C-F-2 weld count LINE&#xb9; 2ICS-008-38-2 HTS: 31,32          dna          2    i  na/na                          ito which the 7.5X sampling rate was applied.
I ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2 I CS.57-08. FM012        i also sr-o8          or  DMG&#xb9; na    in iC5.51    )none i SUR/PT3.00/HT4.00      i NNP2-12-.375.CS    I LINE&#xb9; 2ICS 012 25 2    NTS'4i37        ISD          2    / na /na              I
 
NIAGARA HONAMK POMER CORPORATIOH          -      IIILE POINT    NUCLEAR STATION  - UHIT 2                                        25 of 34 HHP2-ISI-006, REV. 1, CH 000                                        SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - ICS  SYSTEM (sorted by Examination      Identifier) 2HD IHTVL REL RED ) DESCRIPTIOH OF ITEN TO BE EXAHINEO)CATGRY )IGSCC) EX1/NDE PROCEDURE              (PERIOD  1                                REHARKS EXAHIHATION IDENTIFIER i ITS lso LOCATOR, COHPOHENT DMG      &#xb9;,  (ITEN &#xb9;  iFREOYi EX2/NDE PROCEDURE        iPERIOD 2 i US  CAL BLK  I  LINE NO  AHD HOTES  AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE            ]PERIOD 3 I  ELB/PIPE                            IC-F-2    )  n      [  VOL/UT6.02 2ICS-57-08-FM013          )
QISO  57-08        or DMG&#xb9; na in )C5.51      )none    )
SUR/PT3.00/HT4.00  )
NHP2-12-.375-CS    )  LINE&#xb9; 2ICS-012-25-2 NTS: 34,37      [SD      ]    2    J na /na              I I  RED/PIPE                            IC-F-2    [  na    ]  VOL/UT6.02          [    Sc7 2 I CS-57-08-FM021        (
QISO  57-08        or OMG&#xb9; na in ]C5.51      IID      I  SUR/PT3.00/NT4.00  I NHP2-12-.375  ~
CS i  LINE&#xb9; 2ICS-012-51-2 HTS: 33,34      LSD            2    f  na /na              I I  PIPE/ELB                            IC-F-2    /  na    J na /na                          (PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2ICS-57-08-F'M022        i QISO  57-08        or DMG&#xb9; na  in  [none    /none    )
na /na                          )no Code Item Ho.) this weld was included in the    total C-F-2 weld cont I  LINE&#xb9; 2ICS-008-38-2 NTS: 30,31      Ina            2    /  na/na                            (to which the 7.5X sarrpiing rate was applied.
I  ELB/PIPE                            IC-F-2    f  na    /  na  /na                          (PIPE MALL < 3/8"; Although  it  is not required to be examined (and has 2ICS.57-08. FM023      I  QISO  57-08        or DMG&#xb9; na in (none        /none    f  na  /na                          (no Code Item No.) this weld was included in the total C-F-2 weld count
(  LINE&#xb9; 2ICS.008-38-2 NTS: 31,32      dna            2    /  na/na                            (to which the 7.5X sampling rate  was applied.
I  AV29/PIPE                            IC-F-2    )  na    [  VOL/UT6.02 2ICS-57.08.FM028          i QISO  57.08        or DMG&#xb9; na in JC5.51      (none    [  SUR/PT3.00/HT4.00  J HHP2-12-.375-CS    I  LINE&#xb9; 2ICS 012 25 2 NTS'4i43        ISO            2    /  na /na J
MHF/PIPE                            IC-F-2    f  na    /  na  /na                          (PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 2 I CS-57 FM029      i QISO  57-08        or OMG&#xb9; na in /none        /none    (  na  /na                          (no Code Item No.) this weld was included in the    total C-F-2 weld count na                  J LINE&#xb9; 2ICS-008-38-2 HTS: 30,31      (na            2    /  na/na                            )to which the 7.5X sampling rate was applied.
I PIPE/PIPE                            IC-F-2    /  na      / na  /na                          (PIPE MALL <  3/8"; Although it  is not required to  be examined (and has 21 CS-57 FM033        I QISO 57 08          or  DMG&#xb9; na  in /none    (none      J na  /na                          [no Code Item No.) this weld was included in the    total C-F-2 weld count
[ LIHE&#xb9; 2ICS-008-38-2    NTS: 31      /na      I    2    I na/na                            (to which the 7.5X sampling rate was applied.
I PIPE/RED                            IC-F-2    )
na      ] na  /na                          )PIPE MALL <  3/8"; (included in C-F-2 count for 7.5K sampling only) 2 I CS.57  FM034      i QISO  57-08        or DMG&#xb9; na in ]none        ]none    J na  /na I LINE&#xb9; 2ICS-008-38-2 HTS: 31,33      Ina            2    I na/
I INTEG ATT                            IC-C      I na      I SUR/PT3.00/HT4.00  I            I 2ICS-57.08-FM302          f QISO  57-08-8      or DMG&#xb9; NA in JC3.20 )ID              / na /na                          I na                  f LINE&#xb9; 2ICS-012-25-2 HTS: 34,42      JHandateJ      2    / na /na                    Sc10 /
 
NIAGARA NOHAMK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2                                            26 of 34 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - ICS  SYSTEH (sorted by Examination      Identifier) 2HD INTVL REL REO [ DESCRIPTION OF ITEN TO BE EXAHIHED]CATGRY )IGSCCJ            EX1/HDE PROCEDURE (PERIOD    1                                REHARKS EXAHINATION IDENI'IFIER f ITS ISO LOCATOR, CONPOHEHT DMG        &#xb9;,  ]ITEN  &#xb9; JFREOYJ    EX2/HDE PROCEDURE ]PERIOD 2    f USE CAL BLK &#xb9; (  LINE NO. AND NOTES, AS APPLICABLE      DESELECT iCLASSi EX3/HDE PROCEDURE [PERIOD 3 I  TEE/PIPE                                IC-F-2  /  na  /  na  /na                        (PIPE MALL <  3/8"; Although it is not required to  be examined (and has 21 CS-57 FMSM058    I  QISO  57-08          or DMG&#xb9; na in [none        /none  /  na  /na                        (no Code Item No.) this weld was included in the  total C-F-2 weld count na                [  LINE&#xb9; 2ICS-010-56-2 HTS: 38,39          (na          2  )  na/na                          (to which the 7.5X sampling rate was applied.
[  PIPE/CAP (conforms    to AHSI 816.9) )C-F-2      (  na    [  VOL/UT6.02 21 CS-57-08-9002        i  QISO  57-08          or  DMG&#xb9; na    in ]C5.51  Inone    I  SUR/PT3.00/HT4.00  )
NHP2-12-.375.CS  i  LINE&#xb9;  2ICS-012-51-2    NTS: 34,36      LSD          2    J na/na
(  TEE/PIPE                                IC-F-2  I  na    I  VOL/UT6 02          I          I 2ICS-57-08-SM005        I QISO  57-08          or DMG&#xb9; na in JC5.51        )none    [  SUR/PT3.00/HT4.00  J          I HHP2-12-.375-CS  I  LINE&#xb9; 2ICS-012-51-2 NTS: 34,35          ISO          2    /  na /na              I          I I  PIPE/TEE                                IC-F-2  [  na    [  VOL/UT6.02 2 I CS-57-08. SM006      i QISO  57-08          or DMG&#xb9; na in [C5.51        (none    ]  SUR/PT3.00/NT4.00  [
NHP2-12..375-CS      LINE&#xb9; 2ICS-012-51-2 HTS: 34,35          LSD          2    /  na  /na            I PIPE/ELB                                IC-F-2  /  na    J na/na                          (PIPE MALL <  3/8"; Although it is not required to be examined (and has 2ICS-57-08-SW013        i QISO 57-08            or  DMG&#xb9; na    in (none    /none    /  na  /na                        [no Code  Item No.) this weld was included in the total C-F-2 weld count I LINE&#xb9; 2ICS-008-38-2      HTS: 31,32    Ina          2    /  na  /na                        (to which the 7.5X sampling rate was applied.
I TEE/PIPE                                IC-F-2  [  na    [  VOL/UT6.02 2ICS-57-08-Sl$  15      [ QISO  57-08          or DMG&#xb9; na .in [C5.51      ]none    J SUR/PT3.00/NT4.00  J NHP2-12..375-CS    i LINE&#xb9; 2ICS-012-51-2 HTS: 34,35          LSD          2    /  na/na              I I ELB/PIPE                                IC-F-2  J na    )  VOL/UT6.02 2 I CS-57-08.9816        ) QISO  57-08          or DWG&#xb9; na in (C5.51      Inone    I  SUR/PT3.00/HT4.00  I NHP2-12..375.CS    I LINE&#xb9; 2ICS 012 25 2 NTS'4i37            ISD      i  2    i na  /na            I I PIPE/TEE                                IC-F-2    I na    I VOL/UT6.02          I 2ICS-57-08.SM024          i QISO  57-08          or  DMG&#xb9; na    in JC5.51    Inone    I SUR/Pl'3.00/NT4.00  I NHP2-12..375-CS    I LINE&#xb9; 2ICS 012 2    2    NTS'4    38    I            2    f na  /na PIPE/ELB                                IC-F-2    / na    / na  /na                          )PIPE MALL < 3/8"; Although it is not required to be examined (and has 2I CS-57-08. Sl$ 25        QISO  57-08          or DMG&#xb9; na in /none        [none    / na /na                          (no Code Item Ho.) this weld was included in the total C-F-2 weld coat LINE&#xb9; 2ICS-010-56-2 NTS: 39,40          /na          2    / na /na                          [to which the 7.5X sampling rate was  applied.
 
. ~
NIAGARA MOHAlK POMER CORPORATION        -      MILE POINT NUCLEAR STATION    - UNIT 2                                        27 of 34 NMP2-1SI-006, REV. 1,    CH-OOD                                      SECOHD TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                  APPENDIX G - ICS  SYSTEH (sorted by Examination    Identifier) 2HD INTVL REL RED        DESCRIPTIOH OF ITEH TO BE EXAMINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD            1                                  REMARKS
(
EXAMINATION IDENTIFIER    (  ITS ISO LOCATOR, COMPONENT DWG &#xb9;, (ITEM      &#xb9; (FREQY( EX2/NDE    PROCEDURE  (PERIOD 2  (
USE CAL BLK  &#xb9;  (
LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE          PROCEDURE  (PERIOD 3  (
ELB/PIPE                              Ic-F-2      na      na  /na                        (PIPE llALL < 3/8"; Although  it is not required to be examined (and has 21CS-57-08-SN026
(
(
QISO  57-08        or DUG&#xb9; na in (none LINE&#xb9; 21CS-010-56-2 NTS: 39,40        (na I~
(
2 I  na  /na na /na (no Code Item No.) this weld was included in'he total C-F-2 weld count (to which the 7.5X sampling rate  was  applied.
(                                                  I        I I  PIPE/SOF                              IC-F-2  (
na    (
na /na                          (Renamed  from SN07 to SM026.5 to address a typographic error (skipped 2ICS-57-08.$ 026.5        (
QISO  57-08        or DllG&#xb9; na in (none      (none    ( na /na                          (weld ID by ITT-G on the construction isometric)
(
LINE&#xb9; 21CS-010-56-2 NTS: 39,41        (na          2    (
na/na                          I I  SOF/PIPE                              IC-F-2  (na (na/na                                (There is no Code Item associated  with this record, as the nominal wall 21 CS-57-08-SU027          I Q      57 08        or  DUG&#xb9; na    in (none    (none    (
na  /na                        (thickness of 0.365" is less than the 3/8" required to qualify as an
(  LINE&#xb9; 21CS-010.57-2    NTS: 39,41    (na          2    ( na/na                          (Item no. It is EXEMPT (from examination only.)
PIPE/SOF                              IC-F-2  (na      (na/na                I          (There  is no Code Item associated with this record, as the nominal wall 2ICS-57-08-SN029              QISO  57-08        or DUG&#xb9; na in (none        (none    ( na /na              I          (thickness of 0.365" is less than the 3/8" required to qualify as an LINE&#xb9; 2ICS-010.57-2 NTS: 39,41        (na      (  2    I na/na              I          (Item no. It is EXEMPT (from examination only.)      )
I  ELB/PIPE                              IC-F-2  (
na    ( VOL/uT6.02 21CS-57-08-SN031            (
QISO  57-08        or DWG&#xb9; na in (C5.51      (none    (
SUR/PT3.00/MT4.00  (
NHP2-12-.375-CS      I  LINE&#xb9; 2ICS-012-25-2 HTS: 34,37        ISD      I  2    I na                  I I  PIPE/ELB                              IC-F-2  (  na    (
VDL/uT6.02 21 CS-57-08. SN032          I  QISO  57-08        or  DUG&#xb9; na  .in (C5.51  Inone    I SUR/PT3.00/MT4.00  I NMP2-12-.375.CS      (
LIHE&#xb9; 2ICS-012-25-2 NTS: 34,37        (SD      I  2    I                    I I  ELB/PIPE                              (C-F-2  (  na    (
VOL/UT6.02 2ICS-57-08-SN033            I QISO  57-08        or DMG&#xb9; na in (C5.51        (none  (
SUR/PT3.00/MT4.00  (
NMP2-12-.375.CS      I  LINE&#xb9; 2ICS-012-25-2 HTS: 34,37        ITE          2    (
na  /na I  PIPE/ELB                              IC-F-2    (
na    (
VOL/uT6.02          (
2ICS-57-08-SN034            I  QISO  57-08        or DMG&#xb9; na in (C5.51        (none  (
SUR/PT3.00/MT4.00  (
NMP2.12-.375-CS      (
LINE&#xb9; 2ICS-012-25-2 NTS: 34,37        (TE          2                          I I PIPE/ELB                              IC-F-2    (
na    ( VOL/uT6.02 2ICS-57-08-SN035            I QISO  57-08        or DUG&#xb9; na in (C5.51        Inone  I SUR/PT3  00/MT'0    I NMP2.12-.375-CS      I LINE&#xb9; 21CS-012-25-2 NTS: 34,37        ISD          2    ( na  /na
 
NIAGARA HOHAMK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        28 of 34 NHP2-ISI-006, REV. 1( CH-000                                            SECOND TEN TEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX  G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRZ IIGSCCI EX1/NDE PROCEDURE                IPERIOO  1  I                    REMARKS EXAHIHATIOH IDEHTIFIER I ITS ISO LOCATOR, COHPOHENT DMG          &#xb9;,  I ITEN  &#xb9; IFREOYI EX2/NDE PROCEDURE      IPERIOO 2  I USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                I I  ELB/PIPE                                IC-F-2    I  na  I  VOL/UT6.02 2ICS-57-08-9036          I QISO  57.08          or DMG&#xb9; na in IC5.51          Inone  I  SUR/PT3.00/HT4 F 00 I NHP2-12-.375-CS    I  LINE&#xb9; 21CS-012-25-2 NTS: 34,37          ISD            2  I  na  /na I  PIPE/ELB                              . Ic-F-2    I  na  I  VOL/UT6.02 21 CS-57-08-SW037        I  QiSO  57-08          or DWG&#xb9; na in IC5.51          Inone  I  SUR/PT3.00/HT4.00  I NHP2-12-.375.CS    I  LINE&#xb9; 2ICS-012-25-2 HTS: 34 37          ISD            2  I  na/na I  PIPE/ELB                                IC-F-2    I  na    I VOL/UT6.02          I 2ICS-57-08-$ 039          I  QISO  57-08          or DMG&#xb9; na in IC5.51          Inone    I SUR/Pl'3.00/HT4.00  I NHP2-12-.375-CS    I  LINE&#xb9; 2ICS-012-25-2 NTS: 34,37          ISD            2    I na  /na              I I  ELB/PIPE                                IC-F-2    I  na    I VOL/UT6.02 2 CS-57-08-SW041 1                      I QISO  57.08          or DMG&#xb9; na in IC5.51          Inone    I SUR/PT3 00/HT4 00    I NHP2-12-.375-CS    I  LINE&#xb9; 21CS-012-25-2 NTS: 34,37          ISD            2    I na  /na              I I  PIPE/ELB                                IC-F-2    I  na    I VOL/UT6.02 21CS-57-08-SW042          I QISO  57.08          or DMG&#xb9; na in IC5.51          Inone    I SUR/PT3.00/H'T4.00  I NHP2-12-.375-CS    I  LINE&#xb9; 2ICS-012-25-2 NTS: 34,37          ISD        I 2      I na/na                I I  PIPE/ELB                                IC-F-2    I  na    I VOL/UT6.02 2 1 CS-57-08-SW044        I aiso 57-08          or  DMG&#xb9; na    in IC5.51      Inone    I SUR/PT3 F 00/HT4.00 I NHP2-12-.375-CS    I LINE&#xb9; 21CS-012-25-2    NTS:  34,37    ISD            2    I na  /na              I I ELB/PIPE                                IC-F-2    I  na    I VOL/UT6.02 2ICS-57-08-SM045          I QISO  57-08          or  DMG&#xb9;  na    in IC5 ~ 51    Inone  I SUR/PT3.00/HT4.00    I NHP2-12-.375.CS    I LINE&#xb9;  2ICS.012-25.2    N'TS: 34,37      ISD          2    I na /na I PIPE/ELB                                IC-F-2    I na    I VOL/UT6'02          I 2ICS-57-08-$ 046          I QISO  57-08          or DWG&#xb9; na in IC5.51          Inone  I SUR/PT3.00/HT4.00    I NHP2-12-.375-CS    I LINE&#xb9; 2ICS-012-25-2 NTS: 34,37          ISD          2    I na /na I ELB/PIPE                                IC-F-2    I na    I VOL/UT6.02 2ICS-57-08-$ 547          I also 57-08          or  DMG&#xb9; na    in IC5.51      Inone  I SUR/PT3.00/HT4.00    I NHP2-12-.375-CS    I LINE&#xb9; 2ICS-012-25-2    NTS:  34,37      ISD          2    I na  /na
 
NIAGARA HONAWK POWER CORPORATION          -      HILE POINT NUCLEAR STATION    - UNIT 2        29 of 34 NNP2-ISI-006, REV. 1( CH-000                                            SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G - ICS    SYSTEH (sorted by Examination      Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY          i IGSCCi EX1/NDE PROCEDURE      iPERIOO  1                          RENARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG            &#xb9;, LITEM  &#xb9; iFREOYJ EX2/HDE PROCEDURE        iPERIOO 2 USE CAL BLK  &#xb9; i  LIHE  HO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE        IPERIOD 3    I I  PIPE/ELB                              IC-F-2  i  na    i  VOL/UT6.02        )    Sc7 2 I CS-57 SW048        I  QISO  57-08          or DMG&#xb9; na in iC5.51      (ID        I SUR/PT3.00/HT4.00  I NMP2-12-.375-CS      i  LINE&#xb9; 21CS-012-25-2 NTS: 34,37        LSD          2    i na /na I  ELB/PIPE                              IC-F-2    i  na    i VOL/UT6.02 21CS-57-08-SW049            I  QISO  57-08          or  DMG&#xb9; na    in iC5.51    inone i SUR/PT3.00/HT4.00      i HHP2 ~ 375-CS    i  LINE&#xb9; 2ICS-012-25-2 NTS: 34,37        LSD          2    i na  /na I  TEE/PIPE                              IC-F-2    i  na    J VOL/UT6.02 21CS-57-08.SM057            I  QISO  57-08          or DMG&#xb9; na in JC5.51        [none    J SUR/PT3.00/HT4.00  /
NHP2-12-.375-CS        LINE&#xb9; 21CS-012-51-2 NTS:-34,38        JSD          2    J na /na            I SML/PIPE                              IB-J      i  na    [  VOL/UT6.02 2ICS-57-09.FW001            I  QISO  57-09          or DWG&#xb9; na in i89.11        IID      I  SUR/PT3.00/HT4.00  I NHP2-10-.594    CS  I  LINE&#xb9; 2ICS-010.70-1 NTS: 9,10          IMS            I    dna/                  LSc10 I  ELB/PIPE                              IB-J      )  na    i  VOL/UT6.02          iEX6 2ICS-57-09-FM002            i QISO  57-09          or DUG&#xb9; na in i89.11        I ID      I  SUR/PT3.00/HT4.00  I NMP2-10-.594-CS      i LINE&#xb9; 21CS-010-70-1      HTS: 10,11    iNS                dna/
I  ELB/PIPE                              IB-J      i na      i VOL/UT6.02 21 CS-57 FW003          )  QISO  57-09          or  DUG&#xb9; na  -in  i89.11    ]none    i SUR/PT3.00/NT4 F 00 i NHP2-10-.594-CS      I  LINE&#xb9; 2ICS 010 70  1    NTS'    11    INS            1    i na /na I ELB/PIPE                              IB J      i  na    i  VOL/UT6.02 2ICS-57.09.FM004            I QISO  57-09          or DMG&#xb9; na in i89.11        inone    i  SUR/PT3.00/NT4.00 i NHP2-10-.594-CS      i LINE&#xb9; 2ICS-010-70-1 Hl'S: 10,11        )NS            1    i na  /na              i i PIPE/*HOV128                          IB-J      i na      )  VOL/UT6.02 2ICS-57-09.FM005            i QISO  57-09          or DMG&#xb9; na in i89.11 IID              I  SUR/PT3.00/HT4.00  I NMP2-10-.594-CS      J LINE&#xb9; 2ICS-010-70-1 HTS: 10, 14        JAW/ber      1    i na  /                igc10
                              *HOV128/PIPE                            iB-J    i na      i VOL/UT6.02 2ICS-57-09-FW006            i QISO  57-09          or DUG&#xb9; na in i89.11 LID              i SUR/PT3.00/HT4.00  J NHP2 10-.594-CS      i LINE&#xb9; 21CS-010-70-1 NTS: 10,14          iAW/ber i 1        i na /                igc10
 
NIAGARA HOHAMK POWER CORPORATION          -      HILE POINT  NUCLEAR STATION  - UNIT 2        30 of 34 NHP2-ISI-006, REV. 1, CN-000                                              SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:      07/29/1999                                                                      APPENDIX G - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ f DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY )IGSCC) EX1/NDE PROCEDURE                    (PERIOD  1                          REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT OWG            &#xb9;,  ]ITEN  &#xb9; JFREOY[ EX2/NDE PROCEDURE      )PERIOD 2  )
USE CAL BLK    &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i PIPE/PENET Z21A                          )8-J      f  na    J VOL/UT6.02 2 I CS-57.09. FI$ 07        /  QISO 57-09          or OMG&#xb9; na    in /89.11    /ID      /  SUR/PT3.00/HT4.00  [
NHP2-10-.594-CS      /  LINE&#xb9; 2ICS-010-70-1 NTS: 10,15        /TEV/ber/ 1        /  na  /              /SclO
                            )
PENET Z21A/*HOV121                    IB-J      I  na    I  VOL/UT6.02        I 2ICS-57-09-FW008            )
QISO 57-09          or  DMG&#xb9; na    in (89.11    JIO      /  SUR/PT3.00/HT4.00  /
NHP2-10-.594-CS      /  LINE&#xb9; 2ICS-010-70-1    NTS: 14,15    )TEV/ber[    1    / na    /              (Sc10
[  *HOVI21/PIPE                          JC-F-2    )  na    J VOL/UT6.02 2I CS-57 FM009          )  QISO 57-09          or  DMG&#xb9; na    in )C5.51    ]ID      J SUR/PT3.00/HT4.00  f  Sc9 NHP2. 10-. 719- CS    /  LINE&#xb9; 2ICS-010-62-2    NTS: 14,45    [SD/ber  f  2    ]  na  /na I  PIPE/ELB                              IC-F-2    )
na    [  VOL/UT6.02 2ICS-57-09-FI$ 10            J QISO 57-09          or  DWG&#xb9; na    in (C5.51    [none    (
SUR/PT3.00/HT4.00  ]
NNP2-10-.719-CS      I  LINE&#xb9; 2ICS.010-62-2    NTS: 45 '6    ISD          2    /  na  /na            I I  ELB/PIPE                              IC-F-2    [  na    J VOL/UT6.02 2 1 CS-57 F W011          )  QISO 57-09          or  DMG&#xb9; na    in [C5.51    [none    I  SUR/PT3.00/HT4.00  I NHP2-10-.719-CS      )  LINE&#xb9; 2ICS-010.62-2    NTS: 45,46    [SD          2    f  na  /na            I I  ELB/PIPE                              /C-F-2    [ na    [  VOL/UT6.02 2 I CS-57 Fl!012          i QISO  57-09          or  DMG&#xb9;  na .in  ]C5.51    )ID      )  SUR/PT3.00/HT4.00  i  Sc9 NHP2. 10-. 719- CS    i LINE&#xb9;  2ICS.010-62-2    NTS: 45,46    LSD        I  2    Ina/na                I I  PIPE/ELB                                IC-F-2    [ na      )
VOL/UT6.02 2 I CS.57 FW013          i QISO  57.09          or DWG&#xb9; na in [C5.51        ]none    J SUR/PT3.00/HT4.00  J KHP2-10-.719-CS      I LINE&#xb9; 2ICS.010.62-2      NTS: 45,46      ISD          2    / na  /na            I I  PIPE/ELB                                IC-F-2    (
na      (
VOL/UT6.02 2ICS.57-09-Fl$      16        )
QISO 57-09          or  OMG&#xb9;  na  in  )C5.51    (none    J SUR/PT3.00/HT4.00  f NHP2-10-.719-CS      I  LINE&#xb9; 2ICS.010-62-2    NTS: 45,46      ISD          2    f na/na              I I ELB/PIPE                                IC-F-2    [ na      ) VOL/UT6.02 2 I CS-57 FM017          I QISO  57-09          or  DMG&#xb9; na    in  JC5.51    [none    f SUR/PT3.00/HT4.00    J NHP2. 10..719-CS      i LINE&#xb9; 2ICS.010-62-2    NTS:  45,46    LSD          2    f na /na
 
NIAGARA HOHAMK POWER CORPORATION      -        NILE POINT NUCLEAR STATION - UHIT 2        31 of 34 NHP2-ISI-006, REV. 1, CH 000                                          SECOND TEN YEAR      INSERVICE INSPECTION    (ISI) INTERVAL PLAN Change date:    07/29/1999                                                                APPENDIX G  - ICS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTION OF ITEN TO BE EXAHINED]CATGRY (IGSCC[ EX1/NDE PROCEDURE                ]PERIOD  1                      REHARKS EXAHIHATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG          &#xb9;, )ITEN &#xb9; JFREOYJ EX2/NDE PROCEDURE        ]PERIOD 2 USE CAL BLK  &#xb9; f  LINE NO. AND NOTES, AS APPLICABLE [SELECT )CLASS] EX3/NDE PROCEDURE ]PERIOD 3 I  PIPE/TEE                              IC-F-2  )
na    [  VOL/UT6.02          )
Sc7 2ICS-57-09-FM020          (
QISO  57-09          or DMG&#xb9; na in JC5.51      IID    I  SUR/PT3.00/HT4.00    I NHP2-10-.719-CS    I  LINE&#xb9; 2ICS-010-62-2 HTS: 45,47        ISD        2    (  na  /na I  PIPE/SOL                              (8-J    f na    ]  SUR/PT3.00/HT4.00    f 2ICS-57-09-FM027          [ QISO  57-09          or DMG&#xb9; na in I89.32 IID            I na /na              I na                  /  LINE&#xb9;  2HSS-002-110-1    NTS: 10,13    JHS/ber f 1      f na /na              i Sc10 INTEG ATT                              IB-K    I na    I SUR/PT3.00/HT4.00    I 2I CS-57 FM300        J QISO 57-09-9          or DMG&#xb9; na in (810.20 )ID          J na /na na /na        '
na                  I  LINE&#xb9; 2ICS-010-70-1 NTS: 10,12        INS      I  1    I INTEG ATT                              JB-K    f na    [ SUR/PT3.00/HT4.00    /
2 I CS-57 FM301        / QISO  57-09-9        or DMG&#xb9; na in /810.20 ]ID          f na /na                I na                  /  LINE&#xb9; 2ICS.010.70-1 NTS: '10,12        /NS      J 1    f na /na                I I IHTEG ATT                              JB-K    ) na      SUR/PT3.00/HT4.00    I 2I CS-57  FM302        / QISO  57.09.9        or  DMG&#xb9; na  in /810.20 [IO        na /na                I I LINE&#xb9; 2ICS-010-70.1      NTS: 10,12    INS      I  1    I na /na                I IN'TEG ATT                            IB-K    I na    I SUR/PT3.00/HT4.00    I 2 I CS-57 FM303        f QISO  57-09-9        or DMG&#xb9; na in (810.20 ]ID
                                                                ~
J na /na I LINE&#xb9; 2ICS-010-70-1 NTS: 10, 12        INS      I  1    I na /na                I I INTEG ATT                              )8-K    f na    ( SUR/PT3.00/HT4.00    [
2 I CS-57 FW304        f QISD  57-09-9        or DMG&#xb9; na in /810.20 ]ID          f na /na f LINE&#xb9; 2ICS-010-70-1 NTS: 10,12        INS      J 1    I na  /na              I INTEG ATT                              (B.K    ) na    ) SUR/PT3.00/HT4.00    f 2I CS-57  FM305        / QISO  57-09-9        or DMG&#xb9; na in (810.20 /ID          f na /na                I I LINE&#xb9; 2ICS.010-70-1 NTS: 10(12        INS      I  1    I na /na                I I IHTEG ATT                              IB-K    I na    I SUR/PT3.00/Hl'4.00    I 2I CS-57  FM306        J QISO  57-09-9        or DMG&#xb9; na in (810.20 (ID          f na /na I LINE&#xb9; 2ICS-010-70-1 NTS: 10,12        INS      I  1    I na /na                I
 
HIAGARA MOHAMK POMER CORPORATION -              HILE POINT NUCLEAR STATION - UNIT 2        32 of 34 NMP2-ISI-006( REV. 1I CH-000                                                  SECOND TEH YEAR IHSERVICE INSPECTION        (ISI) INTERVAL PLAN Change  date:          07/29/1999                                                                APPENDIX  G  - ICS SYSTEH (sorted by Examination Identifier)
ND  IHTVL REL REQ        I  DESCRIPTIOH OF ITEH TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE.PROCEDURE (PERIOD              1                      REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR, COHPONENT DMG                &#xb9;,  I ITEH &#xb9; IFREQYI EX2/HDE PROCEDURE      (PERIOD 2 I USE CAL BLK        &#xb9; I  LINE  HO  AND NOTES  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE      I ERIOO 3 I I  IHTEG ATT                            IB-K    I  na  I  SUR/PT3.00/HT4.00    I 21 CS-57-09 FM307                I  QISO  57-09-9      or DMG&#xb9; na in IB10.20 IID          I  na  /na I  LINE&#xb9; 21CS-010-70-1 NTS: 10,12        INS      (  1  I  na /na              I I  PIPE/ELB                              IB-J    (
na  I  VOL/UT6.02 21CS-57-09. SMDOI                I QISO  57-09        or DMG&#xb9; na in (B9.11        (none  I  SUR/PT3.00/HT4.00    I NMP2-10-.594-CS            I  LINE&#xb9; 2ICS-010-70-1 HTS: 10,11        IHS          1  I  na  /na I  PIPE/ELB                              IB-J      I na  (
VOL/UT6.02 21 CS-57-09-SM004                (
QISO  57-09        or DMG&#xb9; na in IB9.11        (none  I SUR/PT3.00/HT4.00    I NMP2-10-.594-CS            I  LINE&#xb9; 2ICS-010-70.1 HTS: 10,11        (NS              I na /na I  PIPE/ELB                              IB-J      (
na    I VOL/UT6.02 2 1 CS-57-09-SM005                I QISO  57-09        or DMG&#xb9; na in (89.11        Inone  I SUR/PT3.00/HT4.00    (
NMP2-10-.594-CS              LINE&#xb9; 21CS-010-70-1    HTS: 10,11    IHS              I na /na I PIPE/ELB                              IB-J      I na    (
VOL/UT6.02 2ICS-57-09-SM006                  I QISO  57-09        or DMG&#xb9; na in IB9.11        Inone  I SUR/PT3.00/HT4 F 00  I NMP2-10-.594-CS            I LINE&#xb9; 2ICS-010-70-1 HTS: 10,11        INS I ELB/PIPE                              IB-J      I na    I VOL/UT6.02 I'1CS-57-09-SM009 I QISO  57-09        or  DMG&#xb9; na . in (B9.11    IID    I SUR/PT3.00/HT4.00    I NMP2-10-.594-CS            I LINE&#xb9; 2ICS-010-70-1 NTS: 10,11        IHS              I na  /                ISc10 I PIPE/ELB                              IB-J      I na    I VOL/UT6  02          I 2 I CS-57-09. SM010                (
QISO  57-09        or DMG&#xb9; na    in (89.11    (none  I SUR/PT3 F 00/H'14.00  I HHP2 ~ 594-CS          (
LINE&#xb9; 21CS-010-70-1 HTS: 10,11        (NS          1    I na  /na I ELB/PIPE                              IB-J      I na    (
VOL/UT6.02 21 Cs-57-09-SM011                  ( QISO  57-09        or DMG&#xb9; na in (89.11        (none  I SUR/PT3.00/HT4.00    I HMP2-10-.594-CS            I LINE&#xb9; 21CS-010-70-1 NTS: 10,11        INS I PIPE/ELB                              IC-F-2 I na      I VOL/UT6.02 21 Cs-57-09-SM015                  I QISO  57-09        or DMG&#xb9; na in IC5.51 IID            I SUR/PT3.00/HT4.00    I  Sc9 NHP2-10-.719-CS            I LINE&#xb9; 21CS-010-62-2 HTS: 45,46        ISD/ber I 2      I na /na
 
NIAGARA NONAWK POWER CORPORATION -                NILE POINT NUCLEAR STATION - UNIT 2        33 of 34 NHP2-ISI-006, REV. 1) CN-000                                                  SECOND TEN YEAR IHSERVICE IHSPECTIOH        (ISI)  INTERVAL PLAN Change date:      07/29/1999                                                                        APPENDIX G - ICS SYSTEN (sorted by Examination Identifier)
HD IHTVL REL RED    I  DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE                  IPERIOO  1  I                    RENARKS EXANINATIOH IDENTIFIER [ ITS ISO LOCATOR, CONPONEHT DWG                &#xb9;,  )
ITEN &#xb9; )FREOY) EX2/HDE PROCEDURE      (PERIOD 2 ]
USE CAL BLK    &#xb9; I  LINE  HO    AHD NOTES)  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE      IPERIOD 3 I I  ELB/PIPE                                  IC-F-2 I na        I  VOL/UT6.02          I 2ICS-57-09.SW016            /  QISO  57-09            or DWG&#xb9; na in /C5.51 /ID              /  SUR/PT3.00/HT4.00  /  Sc9 HNP2-10..719-CS          LINE&#xb9; 2ICS-010-62-2 NTS: 45,46            /SD/ber / 2        / na /na I  ELB/PIPE                                  IC-F-2    I  na    I VOL/UT6.02          I 2ICS-57-09-SM020            /  QISO  57-09            or  DMG&#xb9;  na  in  /C5.51    Inone    I SUR/PT3.00/NT4.00 NNP2-10-.719-CS          L I NE&#xb9; 2 I CS-010-62-2    NTS: 45) 46    )
SD        2    / na  /na
[  PIPE/ELB                                  IC-F-2    )
na    [ VOL/uT6.02 2 I CS-57-09-sl$ 21          )
QISO  57-09            or DWG&#xb9; na in JC5.51          ]none    ) SUR/PT3.00/NT4.00  )
NNP2-10-. 719- Cs    )  LINE&#xb9; 2ICS-010-62-2 HTS: 45,46            [SD            2    / na  /na            I I  TEE/PIPE                                  iC-F-2    ] na    [ voL/uT6.02 2ICS-57-09-SM024            (
QISO  57-09            or DWG&#xb9; na in [C5.51          ]none    )
SuR/PT3.00/NT4.00    )
HNP2 . 719- CS  I  LINE&#xb9; 2ICS-010-45-2 HTS: 45,47            ISD            2    J na/na                I I  PIPE/RED                                  IC-F-2      na    J VOL/uT6.02 2ICS-57-09.SW025            I Q      57 09            or DMG&#xb9; na in JC5.51          [none    (
SUR/PT3.00/NT4.00    f NNP2-10-.719-CS          L I HE&#xb9; 2 I CS-010-45-2    N TS  45,48    i SD          2    f na  /na              I I PIPE/RED                                    IC-F-2    (
na    )
VOL/UT6.02 2 I Cs-57-09. SW029          )
QISO  57-09            or DMG&#xb9; na in JC5.51
                                                                    ~                Inone    I SUR/PT3.00/HT4.00    I NHP2-10-.719-CS        ( LINE&#xb9; 2ICS-010.45-2 HTS: 45,47              iSO          2    / na  /na I PIPE/PIPE                                  IB-J        n      ) voL/UT6.02 2ICS-57-09.SM030              I QISO  57-09            or DMG&#xb9; na      in [89.11    [none    f SUR/PT3.00/HT4.00    )
HNP2-10-.594-CS        ) LINE&#xb9; 2 I CS. 010-70-1 N TS: 10            (
Hs          1    / na /na              I
( PIPE/PIPE                                  IB-J      [ na    [ voL/UT6.02 2ICS-57-09-sl$ 31            )
QISO  57-09            or DMG&#xb9; na      in (89.11    ]none    J SUR/PT3.00/NT4.00 NNP2-10-.594-CS        I LINE&#xb9; 2ICS-010-70-1 NTS: 1                  INS          1    / na  /na TEE/PIPE                                    IC-F-2    [ na    [ VOL/UT6.02 2ICS-57-09.SW033              I QISO  57-09            or DMG&#xb9; na in (C5.51          lnone    I SUR/PT3.00/HT4 F 00  I HNP2-10-.719-CS          LINE&#xb9; 2ICS-010-45-2 HTS: 45,4/              ]SD          2    ) na /na              I
 
NIAGARA HOHAMK POMER CORPORATION -              NILE POINT NUCLEAR STATION - UNIT 2        34 of 34 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION            (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX  G - ICS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ] DESCRIPTION OF ITEN TO BE EXAHIHED)CATGRY ( IGSCC) EX1/NDE PROCEDURE                )PERIOD  1                      REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHEHT DMG        &#xb9;,  ]ITEN  &#xb9; )FREOY] EX2/HDE PROCEDURE        )PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AHD NOTES, AS APPLICABLE      DESELECT iCLASSi EX3/HDE PROCEDURE [PERI(X) 3 I  FLG BLTG Q H7 Azo RCIC TP HD SPRA IB-G-2 I na          i  VT1/VT2.01          I 2ICS-PB100                f  QISO 57-07          or DMG&#xb9; na in /87.50 ]ID            )
na /na              I J
LIHE&#xb9; 2ICS-006-33-1 NTS: (none) /Handate/          1    )
na  /na              iSc10 I  FLG BLTG                            /8-0-2    (
na    (
VT1/VT2.01                Sc7 2ICS-PB101                /  QISO 57-07          or DMG&#xb9; na in /87.50 /ID            (  na /na              I
[  LINE&#xb9; 2ICS-006-33-1 NTS: (none) [Handate( 1            (
na /na              I FLG BLTG                            )8-0-2    [  na    I  VT1/VT2.01          I 2I CS-PB102              I  QISO 57-07          or DMG&#xb9; na in )87.70 (ID            )
na  /na              (Sc8
                          )
LINE&#xb9; 2ICS-006-67-1 NTS: (none) (Nandate)          1    ]  na /na              I FLG BLTG                            )B-G-2 f na        I  VT1/VT2.01          I 2ICS-PB103                    QISO 57-07          or  DMG&#xb9; na  in IB7.70 IID        ]  na  /na              isc8 na                      LIHE&#xb9; 2ICS-006-67-1 NTS: (none) [Mandate/ 1            ]  na /na              I FLG BLTG                                                I  VT1/VT2.01          I 21 CS-PB104                i QISO 57-07          or DMG&#xb9; na in JB7.70 ]ID            (
na /na              isc8
[ LINE&#xb9; 21CS-006-67-1    NTS: (none)  )Handate(          )
na /na              I
                          )  NOZ/FLG Q H7 AzO RCIC TP  HD SPRAY  (8-J      )  na    i VOL/UT6.13            I 2RPV-KB27                  (  QISO 57-07          or DMG&#xb9; 033 in (89.11      )ID      I SUR/HT4.00            I NHP2-9.3-1.77-CS    f LINE&#xb9; 21CS-006-33-1 HTS: (none) [TEV            [  1    / na/                  )Sc10 EHD OF SYSTEH  ICS
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System ICS: General Notes
: 1. 6 GATE VALVE, SA-105                                          29. 6 SCH. 160 PIPE, SA-106 B
: 2. 6" SCH. 80 SMLS PIPE, SA-106 B                                30. 8" 30% WN FLANGE, SA-105
: 3. 6 SCH. 80 TEE, SA-234 WPB                                      31. 8" STD. PIPE, SA-106 GR B
: 4. 6" CHECK VALVE, SA-216 WCB                                    32. 8" STD. ELBOW, SA-234 WP8
: 5. 6" SCH. 80 PENETRATION, SA408 CL1                              33. 12 X 8" STD. RED. ELBOW, SA-234 WPB
: 6. 6" SCH. 80 ELBOW, SA-234 WPB                                  34. 12" STD. PIPE, SA-106 GR B
: 7. 6" 90% WN FLANGE, SA-105                                      35. 12" STD. TEE, SA-234 WPB
: 8. 6" 900/I SPRAY NOZZLE FLANGE, SA-105                          36. 17 STD. CAP, SA-234 WP8
: 9. 26'X10 SCH.160SWEEPOLET,SA-105                                37. 12" STD. ELBOW, SA-234 WPB
: 10. 10" SCH. 80 SMLS PIPE, SA-106 B                                38. 12'X10" STD. RED. TEE, SA-234 WPB
: 11. 10" SCH. 80 ELBOW, SA-234 WP8                                  39. 10" STD. PIPE, SA-106 GR B
: 12. 1-1/2 THICK PLATE, SA416 GR 70                                40. 10" STD. ELBOW, SA-234 WPB
: 13. 2" 6000/I SOCKOLET, SA-105                                    41. 10 15% SO FLANGE, SA-105
: 14. 10" GATE VALVE, SA-105                                        42. 12" SCH. 120 PIPE, SA-106 GR B
: 15. 10" SCH. 80 PENETRATION, SA408 CL1                            43. 12" LIFT CHECK GLOBE VALVE, SA-216 WCB
: 16. 6" STD. PIPE, SA412 TP 304W                                    44. 12" GATE VALVE, SA-105
: 17. 6" STD. PIPE, SA-106 GR B                                      45. 10 SCH.100 PIPE, SA-106 GR B
: 18. 6" STD. ELBOW, SA-234 WPB                                      46. 10" SCH. 100 ELBOW, SA-234 WPB
: 19. 6 CHECK VALVE,SA-105                                          47. 10" SCH. 100 TEE, SA-234 WPB
: 20. 6 15% WN FLANGE, SA-182 F304                                  48. 10" X8" SCH. 100 CONC. REDUCER, SA-234 WPB
: 21. 6 STD. ELBOW,    SA~  WP304W                                  49. 16 X6" 15& SO FLANGE, SA0182 F304
: 22. 6" SCH. 80 PIPE, SA412 TP304                                  50. 6 19% SO FLANGE, SA-192 F304
: 23. 6" STD. TEE, SA-234 WPB                                        51. 6" 3KC WN FLANGE, SA-105
: 24. 6" X 4" STD. CONC. RED., SA-234 WP8                            52. 6 SCH. 160 ELBOW, SA-234 WPB
: 25. 6" 150// WN FLANGE, SA-105                                    53. OUTER BARREL, SA-105
: 26. 6" SCH. 120 PIPE, SA-106 GR B                                  54. 6" NOZZLE, SA-105
: 27. 6 SCH. 120 ELBOW, SA-234 WPB                                  55. MOUNTING FOOT, SA-216 WCB
: 28. 7/8" PLATE, SA415 GR. 65
 
NIAGARA MONAMK POMER CORPORATION            -      MILE POINT NUCLEAR STATION    - UNIT 2 NMP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                        APPENDIX  G - ISC  SYSTEM (sorted by Examination      Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEM TO BE EXAMIHEDiCATGRY i IGSCCi EX1/NDE PROCEDURE iPERIOO 1                                            REMARKS EXAMINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DMG        &#xb9;,  LITEM  &#xb9;    iFREQY) EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK &#xb9; i  LINE  No. AND  NOTES,  AS  APPLICABLE  DESELECT iCLASSi EX3/NDE PROCEDURE (PERIOD 3
J HOZ SOC MELD    a N148 Az      IHSTRUM  ie-F        J na    I  SUR/PT3.00                Sc7 2ISC-102CDA-FM001        I QISOHA                or  DMG&#xb9; 034  in F85.150    i ID    i na /na                I
[  LINE&#xb9; 2ISC-001-22-1      NTS: (none)  iMandatei        1 J
na /na              I i NOZ SOC MELD    a N14C Az      rNSTRUM  iB-F Mandated' i na    I  SUR/PT3.00                Sc7 2 I SC-102CDA-FM005      i arsoHA                  or  DMG&#xb9; 034  in F85.150 iID          l na  /na              I i  LIHE&#xb9; 2ISC-001-23-1      HTS: (none)  i                    / na  Ina              I
                        )
NOZ SOC MELD Q H138    Az    IHSTRUM  iB-F        i  na    I SUR/PT3.00                Sc7 21 SC-104CDA- FM001      I QISONA                  or  DMG&#xb9; 034  in (85.150 iro          i na  /na              I i  LINE&#xb9; 2ISC-750-104-2 NTS: (none)        (Mandated'            i na  /na              I NOZ SOC MELD Q N14A    Az    IHSTRUM IB F        I  na    i SUR/PT3.00          I 2I SC-105CDA- FM001        QISONA                or  DMG&#xb9; 034  in F85.150 tID          i na  /na                  Sc9 na                  LINE&#xb9; 2ISC-001-26-1      HTS: (none)  iMandatei        1    i na /na              I
                        )  HOZ SOC MELD    a H14D Az      IHSTRUM  IB-F        I  na    I SUR/PT3 F 00        I 2 I SC-105CDA-FM007      I QISOHA                  or  DMG&#xb9; 034  in )85.150 iID          f na  /na                  sc9
                        /  LINE&#xb9; 2ISC-001-25-1      HTS: (none)  /Mandated'            / na Ina              I i NOZ SOC MELD Q H13A Az        INSTRUM  iB-F        i na      i SUR/PT3.00          I 2ISC-107COA-FM001        I QISONA                or  DUG&#xb9; 034  in F85.150 iID          (
na /na                    Sc9 i LINE&#xb9; 2ISC-750-107-2 NTS: (none)        iMandatei        1    i na  /na              I i NOZ SOC
                                      'MELD Q N128 Az170 INSTRUM    iB-F        (  na    I SUR/PT3.00          I          I 2I SC-208CDA- FM001      I QI BONA                or DMG&#xb9; 034 in  F85.150 )ID          i na  /na              I          I i LINE&#xb9; 2ISC-750-208-2 HTS: (none)        iMandate/ 1          i na /na                      Sc11 i HOZ SOC MELD Q N12C    Az190 IHSTRUM )8-F          i na      I SUR/PT3.00          I          I 2I SC-210CDA-FM001        i arsoHA                or  DMG&#xb9; 034  in F85.150 (ID          i na  Ina              I          I i LINE&#xb9; 2ISC-750-210-2 NTS: (none)        iMandatei        1    i na  /na                    Sc11  i NOZ SOC MELD Q N12D    Az351 IHSTRUM iB-F          i na      i SUR/PT3.00          I          I 2 I SC-215CDA- FM001        arsoNA                or  DMG&#xb9; 034  in F85.150 iID          i na /na              I          I LINEN 2ISC-750-215-2 NTS: (none)        (Mandated'            i na  /na                    Sc11 i
 
NIAGARA NOHAMK PDMER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2 NNP2-ISI-006, REV. 1, CH-000                                          SECOHD TEH YEAR IHSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date:    07/27/1999                                                                  APPEHDIX G - ISC  SYSTEH (sorted by Examination      Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE                IPERIOO  1 I                    RENARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG        &#xb9;,  i ITEN &#xb9; iFREOYi EX2/HDE PROCEDURE        iPERIOD 2 i USE CAL BLK  &#xb9; I  LINE  HO  AND NOTES  AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE iPERIDD 3 i NOZ    SOC MELD Q N12A  At009  INSTRUH Je-F      i  na  J SUR/PT3.00          I          I 2ISC-217CDA-FM001        I QISONA                or  DMG&#xb9; 034 in  JB5.150 iID      i na    /na            I          I i  LINE&#xb9; 2ISC-750-217-2 NTS: (none)      iNandatei    1    i na  /na                  Sc11 I PIPE/RED                                IB-J      I  na    I  SUR/PT 2ISC-3228-FM019          i  also322-e            or DMG&#xb9; na  in i89.21    inone    )  na  /na I  LIHE&#xb9; 2ISC-150-400-1 NTS: 7 9        IHS      I  1    I na  /na I  ELB/PIPE                              IB-J      J na    i  SUR/PT3.00 2ISC-3228-FM020          i QIS0322-8              or  DMG&#xb9; na  in le9.21    inone    i na  /na i LINE&#xb9; 2ISC-'150-400-1 NTS: 7,8          iHS          1    i na /na I  PIPE/ELB                              IB J      i na    i SUR/PT3.00          I 2ISC-3228-FM021            I  QI S0322.8          or  DMG&#xb9; na  in /89.21    inone f na /na                  I I  LINE&#xb9; 2ISC-150-400-1 NTS: 7,8        iHS                i na  /na            I I RED/PIPE                              (8-J      i na    i  SUR/PT3.00                      iDeselected 2I SC-3228- FM022          i QISO322-8            or  DMG&#xb9; na  in ie9.21    (none i na      /na                        I I  LIHE&#xb9; 2ISC-150-400-1 NTS: 6,7        IHS      I  1    I na  /na                        I i SE/ELB    Q H11                        IB-J      I  na    I  SUR/PT3.00          I          I 2ISC-3228-9501            i also322-8            or  DMG&#xb9; na  in i89.21    iID      i na  /na            I          I i  LINE&#xb9; 2ISC-002-RPV-1 NTS: 1,2        )TEV          1    i  na/na                    Sc11  i I  ELB/PIPE  Q N11                      IB-J    i na    i SUR/PT3.00 2ISC-3228-SM002            i also322-8            or  DMG&#xb9; na  in i89.21    inone    i  na /na I  LINE&#xb9; 2ISC-002-RPV-1 HTS: 2 3          IHS          1 i na  /na i PIPE/TEE    Q N'l1                      Ie-J    i na    i  SUR/PI'3.00 2ISC-3228-SM003            i also322-e            or  DMG&#xb9; na  in /89.21    inone  i na  /na LINE&#xb9; 2ISC 002 RPV  1  HTS  324      /HS          1    i  na/na I TEE/RED Q N11                          IB-J      i na    J SUR/PT3.00 2ISC-3228-SI$ 04          I QIS0322-8            or DMG&#xb9; na    in /89.21    inone  J na  /na LIHE&#xb9; 2ISC-002-RPV-1 NTS: 4,5          INS                i na  /na
 
NIAGARA MOHAHK POMER CORPORATION      -      MILE POINT NUCLEAR STATION - UNIT 2        3 of 3 HMP2-ISI-0063 REV. 13  CH-000                                  SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                              APPENDIX  G - ISC  SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ    i DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EXl/NDE PROCEDURE        )PERIOD  1                      REMARKS EXAMINATIOH IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG      &#xb9;, [ITEM  &#xb9; iFREOYJ EX2/NDE PROCEDURE      iPERIOD 2 USE CAL BLK  &#xb9;  i LINE NO. AND NOTES,  AS APPLICABLE )SELECT  iCLASSi EX3/NDE PROCEDURE      iPERIOO 3 TEE/RED Q H11                      iB-J    i na    i  SUR/PT3.00          I          I 2ISC-3228-SN005              QIS0322-B            or DllG&#xb9; na in iB9.21  )ID    i na  /na              I          I J
LINE&#xb9; 2ISC-002-RPV-1 HTS: 4,6      IHS      I  1  I  na /na                    So11  i END OF SYSTEM ISC
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-1St~,    Rev. 1, CH400 System ISC: General Notes
: 1. 2" N11 NOZ SAFE END SA436 CLF8                                            6. 2" X 1-1/2" PIPE FITT. SA-182 F304 RED/ADAPTER
: 2. 2" PIPE FTNG SA-182 F304 SCH. 80904 EL                                    7. 1-1/2 PIPE MA'7L SA412 TP316L CL1 (SCH. 805)
: 3. 2" PIPE MAT'LSA412 TP304 (SCH. 80)                                        8. 1-1/7 PIPE FITT. SA-182 F31 6L <<3000 CL1 90'L
: 4. 2" PIPE FITI'. SA-182 F3042" X7X 7 TEE (SCH. 80)                          9. 1-1/2" X3/4" PIPE FITT. SA-182 F316L &#xb9;3000 CL1 RED. CPLG.
: 5. 7  X 1" PIPE FITT. SA-182 F304 RED/ADAPTER
 
NIAGARA HONAC POHER CORPORATION        -      HILE POINT NUCLEAR STATION - UNIT 2        E 1 of 65 HHP2-ISI-006, REV. 1( CH-000                                        SECOND TEN YEAR IHSERVICE INSPECTION        (Isl)  INTERVAL PLAN Change date:  07/27/1999                                                                  APPENDIX G - Hss SYSTEM (sorted by Examination    Identifier) 2HD IHTVL REL RED  )
DESCRIPTIOH OF ITEH TO BE EXAMINED(CATGRY )IGSCC(          EX1/HDE PROCEDURE  (PERIOD  1                      REHARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DUG        &#xb9;,  )ITEM  &#xb9; iFREOYi EX2/HDE PROCEDURE    iPERIOO 2 USE CAL BLK  &#xb9; I LINE NO AND NOTES'S APPLICABLE lsELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
(
                            *AOV6A BLTG                            IB-G-2  I na    I  VT1/VT2.01                      I 2HSS<<AOV6A,V8546        [  also 01-13          or  DUG&#xb9; 058  in )87.70    [none  [  na  /na                        I.
[  LINE&#xb9; 2MSS-026-43-1    NTS: (none)    (NS        1    J na  /na                        I
                        )
                            *AOV6A INT SUR                        IB-H-2  I na    I  VT3/VT2.01 2HSS*AOV6A,VBY178      i QISO 01-13            or  DUG&#xb9; 058  in )812.50 )none    J      /
I  LiNE&#xb9; 2HSS-026-43-1    HTS: 11        IHS      [  1    ]      /
I
                            *AOV68 BLTG                            IB-G-2  ( na    [ VT1/VT2.01 2MSS<<AOV6B,V8547        I  QISO 01-14          or  DUG&#xb9; 058  in )87.70    (none    )
na /na
(
LINE&#xb9; 2HSS-026-44-'I    NTS: (none)    (Ns        1    / na/na I
                            *AOV68 IHT SUR                        IB-M-2  [ na    [ VT3/VT2.01 2HSS*AOV6B,VBY179        I  QISO 01-14          or  DUG&#xb9; 058  in /812.50 /none      /    /
I  LINE&#xb9; 2MSS-026-44-1    NTS: 11        IHS      I  I    I I *AOV6C BLTG IB-G-2  I na    I VT1/VT2.01 2HSS*AOV6C,V8548        [  also 01-15          or  DUG&#xb9; 058  in )87.70    (none    (
na /na I  LINE&#xb9; 2MSS-026-45-1    HTS: (none)    IHS        1    / na/na
[ *AOV6C INT SUR IB-H-2  I na    I VT3/VT2.01 2HSS*AOV6C,VBY180        f QISO 01-15            or  DUG&#xb9; 05&  in )812.50 )none    /    /
i LINE&#xb9; 2HSS-026-45-1      NTS: 1'I      iNS      i  1    )    /
I
                            <<AOV6D BLTG                            IB-G-2  I na    I VT1/VT2.01 2HSS<<AOV6D,V8549        I  QISO 01-16          or  DWG&#xb9; 058  in )87.70  (~e      )
na/na I  LINE&#xb9;  2HSS 026-46-1    HTS: (none)    INS      I  1    I na  /na I
                            <<AOV6D IHT SUR                        IB-H-2  I na    I VT3/VT2.01 2MSS<<AOV6D,VBY181        (
also 01-16          or  DWG&#xb9; 058  in ]812.50  (none    (    /
i LINE&#xb9; 2HSS.026-46-1      HTS: 11        iNS      )  1    i    /
(
                            *AOV7A BLTG                            IB-G-2  I na    I VT1/VT2.01              sc7 2MSS*AOV7A,V8550          [ also 01-13          or  DIJG&#xb9; 058  in )87.70  )ID      ) na  /na            I f I.IHE&#xb9; 2HSS-026-152-1 NTS: (none)      /Grp Rep/    1
                                                                                    ) na  /na            I
 
NIAGARA MOHAMK POMER CORPORATION        -      HILE POINT NUCLEAR STATION - UHIT 2                                          E  2 of 65 NHP2- ISI-006, REV. 1 ~  CN-000                                        SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date: 07/27/1999                                                                      APPEHDIX G - HSS SYSTEH (sorted by Examination    Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEH TO BE EXAHINEDiCATGRY )IGSCC[                EX1/NDE PROCEDURE iPERIOO  1                                REHARKS EXAHINATIOH IDENTIFIER i ITS ISO LOCATOR, COHPOHENT DMG          &#xb9;,  LITEM  &#xb9; iFREGYi EX2/HDE PROCEDURE      iPERIOO 2 USE CAL BLK  &#xb9;  J LINE HO. AND NO'IES, AS APPLICABLE DESELECT    iCLASSi EX3/HDE PROCEDURE iPERIOD 3 i <<AOV7A IHT SUR iB.H-2 i na      )  VT3/VT2.01        i<<          i>> Examine when disassembled  for'maintenance.
2MSS>>AOV7A,VBY182          i  QISO 01-13          or DMG&#xb9; 058 in i812.50 (DisG        i      /              J<<
i  LIHE&#xb9; 2HSS-026-152-1 NTS: 11          iGrp Rep/ 1      i      /              J<<
I
                              *AOV78 BLTG (STEP STUDS)              IB  G    i na    i VOL/O'T6.04              Sc7    iCalBlock supports in  situ ISI examination;  Stud removal HOT required.
2HSS>>AOV7B,VB5518          i QISO 01-14            or DMG&#xb9; 058 in i86.210 inone ( na /na                      I          iMultiple Component  concept applies, however only vlv with step studs.
NHP2-2.24-15.88-STi LINE&#xb9; 2HSS-026-151-1 HTS: (none) iNS                          i na /na I
                              *AOV78 FLG SUR (STEP STUD HOLES)      IB-G-1  I  na    I  VT1/VT2.01        /<<          i<< Examine when disassembled for maintenance. Examine 1<< around each of 2HSS*AOV7B,VB551C          I Q      0114          or  DMG&#xb9; 058  in iB6.220 inone      i na  /na            i>>          i(20) 2 '5<< step studs. Multiple Component concept applies, however J
LINE&#xb9; 2HSS-026-151-1 NTS:    11        iNS      i  1    i na  /na            i<<          sonly vlv with step studs.
I
                              *AOV78 INT SUR                        IB-H-2  I  na    I  VT3/VT2.01        I 2HSS*AOV7B,VBY183          I  QISO 01-14          or  DMG&#xb9; 058  in i812.50 inone      i    /              I I  LIHE&#xb9; 2HSS-026-151-1 HTS:    11        INS      I  1    I    /              I I
                              *AOV7C BLTG                            IB-G-2  i na      j VT1/VT2.01 2HSS*AOV7C,VB552            I  QISO 01-15          or  DMG&#xb9; 058  in iB7.70    (none i na /na i  LIHE&#xb9; 2HSS-026-154-1 NTS: (none)      )HS          1    i na /na
                            )
                              <<AOV7C INT SUR                        iB-H-2  I  na    I  VT3/VT2.01 2MSS>>AOV7C,VBY184            i QISO 01-15          or  DMG&#xb9; 058. in i812.50 inone      i    /
I LINE&#xb9; 2HSS-026-154-1 NTS:    11        INS      I  1    I    /
i <<AOV7D BLTG                            IB.G-2  i na      ( VTl/VT2.01 2HSS>>AOV7D,VB553            i QISO 01-16          or  DMG&#xb9; 058  in F87.70  inone i na /na I LINE&#xb9; 2HSS-026-153-1    HTS: (none)    INS I
                              <<AOV7D INT SUR                        IB H 2    I na    I  VT3/VT2 01 2HSS<<AOV7D,VBY185            i QISO 01-16          or DMG&#xb9; 058 in i812.50 inone        J    /
j LINE&#xb9; 2HSS-026-153-1    HTS: ll        iHS      i  1 i    /
I
                              <<HOV111 BLTG                          IB-G-2    i na    i VT1/VT2.01 2HSS<<HOV111, VB103          I QISO 01-21          or DMG&#xb9; 009 in )87.70      [none i na /na
                            ) LINE&#xb9; 2HSS-006-150-1    NTS: (none)    LHS          1    i na/na
 
NIAGARA HOHAllK PONER CORPORATION        -      HILE POINT  NUCLEAR STATION  - UNIT 2                                  E 3 of 65 NHP2-IS1-006, REV. 'I, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date: 07/27/1999                                                                    APPENDIX G - MSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE              (PERIOD  1                                  REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DUG      &#xb9;,  ( ITEH  &#xb9; (FREOY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; (  LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3
(
                            <<MOV111 INT SUR                        (8-H-2    (
na    (  VT3/VT2.01 2HSS<<HOV111, VBY127    (  QISO 01-21          or  DNG&#xb9; 009  in  (812 F 50 (none    (      /
(
LINE&#xb9; 2HSS-006-150-1 NTS: 24          (NS      (  1    (    /
(
                            <<HOV112 BLTG                          (8-G-2 ( na        (  VT1/VT2.01        (Ex6        (VT-1 QRF0-6, ACCEPTED BY CORRECTION, Ref. DER 2-1998-1666.
2HSS<<HOV112,V8104      (
QISO  01-20        or DUG&#xb9; 009 in    (87.70 (ID          (  na /na
(
LINE&#xb9; 2HSS-006-150-1 NTS: (none)      (Grp Rep( 1        (
na /na I
                            *HOV112 INT SUR                        (8-H-2    (
na    (
VT3/VT2.01                    (*  Examine when disassembled for maintenance.
" 2HSS*HOV112, VBY128
(
QISO  01-20        or DUG&#xb9; 009    in (812.50    (DisG    (    /              (*
(
LINE&#xb9; 2HSS-006-150-1 NTS: 19          IGrP ReP(    1
(    /              (*
(
PIPE/<<HOV112                          IB-J      I  na    I  VOL/UT6.02 2HSS<<MOV112, VNMOV112  (
QISO 01-20          or  DUG&#xb9; na  in (89.11    (none    (
SUR/PT3.00/HT4.00  (
NMP2-6-.432-CS    I  LINE&#xb9; 2HSS-006-150-1 NTS: 18, 19        INS      I  1    I  na /na            I
                            <<HOV207 INT SUR                        (8-H-2  (
na    (
VT3/VT2.01        (*          (* Examine  when disassembled for maintenance.
2HSS*MOV207,VBY129      (
QISO 01-21          or  DWG&#xb9; 018  in (812.50    (DisG    (    /              (*
(
LINE&#xb9; 2HSS-006-150-1    NTS: 24        IGrp Repl    1    I    /              (*
                            <<PSV120 FLG BLTG                        (8-G-2    (
na    (
VT1/VT2.01        (Ex6        (VT-I QRF0-6.
2HSS*PSV120, PB107      I QISO 01-13          or  DUG&#xb9; 054. in (87.50      (ID      (  na /na            I          I
(
LINE&#xb9; 2HSS-026-43-1    NTS: (none)    (Grp Rep( 1        (  na /na            I          I I
                            *PSV120 VLV BLTG                        (8-G-2 ( na        (
VT1/VT2.01        (Ex6        (VT-1  QRFO 6.
2HSS<<PSV120,V8123        ( QISO  01-13          or  DUG&#xb9; 054  in  (87.70 (ID        (  na /na            I          I
( LINE&#xb9; 2HSS-026-43-1 NTS: (none) (Grp Rep( 1                (
na /na            I          I I
                            *PS 120 INT SUR                        (8-H-2 ( na        (
VT3/VT2.01                    (>> Examine  Ken disassembled for maintenance.
2HSS<<PSV120, VBY130      ( QISO 01-13          or DUG&#xb9; 054 in (812.50 (DisG          (    /
(  LINE&#xb9; 2HSS-026-43-1 NTS: 7            (Grp Rep( I        (    /              (>>
(
                              *PSV121 FLG BLTG                      (8-G-2    (
na      (
VT1/VT2.01 2HSS*PSV121,P8110        (
QISO  01-13          or DNG&#xb9; 054 in    (87.50    (none    (
na /na
(
LINE&#xb9; 2HSS-026-43-1 NTS: (none) (NS              (
1    (
na /na
 
NIAGARA NOHAMK POWER CORPORATION          - . NILE POINT NUCLEAR Sl'ATION - UNIT 2        4 of 65 NNP2-ISI-006, REV. 1, CH.OOO                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                    APPENDIX G - HSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED ) DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY )IGSCC)                EX1/NDE PROCEDURE (PERIOD  1                        RENARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  )ITEN  &#xb9; JFREOY[ EX2/NDE PROCEDURE )PERIOD 2        f USE CAL BLK &#xb9; I  LINE NO. AND  HOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3        I I
                          *PSV121 VLV BLTG                      IB-G-2    I  na    I  VT1/VT2.01 2HSS<<PSV121, VB124    [ QISO 01-13            or  DWG&#xb9; 054  in [B7.70    [none    J na /na
                      )
LINE&#xb9; 2HSS-026-43-1    NTS:  (none)  [NS            1    )  na/na
                      )
                          *PSV121 INT SUR                        fB-H-2    ]  na    (
VT3/VT2.01 2HSS*PSV121, VBY131    J QISO 01-13          or  DWG&#xb9; 054  in )B12.50 ]none        J
                                                                                            /
I  LINE&#xb9; 2NSS-026-43-1    NTS: 7        INS        I  1    I    /
I
                          *PSV122 FLG BLTG                      IB-G-2    J na    )  VT1/VT2.01 2NSS*PSV122, P 8113    I  QISO 01-13          or DWG&#xb9; 054 in JB7.50        )none    f  na /na na                I  LINE&#xb9; 2HSS-026-43-1 NTS: (none) [NS                  1    )  na /na I  *PSV122 VLV BLTG                      IB-G-2    [  na    [  VT1/VT2.01        I 2NSS*PSV122,VB125      i QISO 01-13            or  DWG&#xb9;  054  in IB7.70    /none    /  na /na            I
(
LINE&#xb9; 2HSS-026-43-1    NTS:  (none)  iNS            1    /  na./na            .I I
                          *PSV122 INT SUR                        IB H 2    I  na    I  VT3/ 2'01 2NSS*PSV122,VBY132      [ QISO  01-13          or DMG&#xb9; 054    in JB'l2.50  )none    (      /
na                I  LINE&#xb9; 2NSS-026-43-1 NTS: 7            INS        I  1    I      /
(
                          *PSV123 FLG BLTG                      IB-G-2    I  na    I  VT1/VT2.01 2HSS<<PSV123, PB116      i QISO 01-13            or  OMG&#xb9; 054  in /B7.50    /none    /  na /na
                        /  LINE&#xb9; 2HSS-026-43-1    NTS:  (none)  /NS I
                          <<PSV123 VLV BLTG                      (B-G-2    [  na    (  VT1/VT2.01 2HSS<<PSV123, VB126      i QISO 01-13            or  DMG&#xb9; 054  in )87.70    /none    (
na /na I  LINE&#xb9; 2HSS-026-43-1    HTS:  (none)    I NS                I  na  /
(
                          *PSV123 IN'I SUR                        (B-H-2 I na          I VT3/VT2.01 2HSS*PSV123, VBY133      i QISO 01-13          or  DMG&#xb9; 054  in  JB12.50 ]none        f    /
I LINE&#xb9; 2HSS.026-43-1    NTS: 7          INS        I  1    I    /
                        )
                          *PSV124 FLG BLTG                        IB-G-2    [ na      [ VT1/VT2.01 2HSS<<PSV124, PB119      f QISO 01-14          or  DWG&#xb9; 054  in IB7.50      )~e      [ na /na
(
LINE&#xb9; 2HSS-026-44-1    NTS:  (none)    /NS        (  1    / na/na
 
NIAGARA MOHAWK POWER CORPORATION    -      MILE POINT NUCLEAR STATION - UNIT 2        5 of 65 HNP2-ISI-006, REV. 1, CN.000                                    SECOND TEH YEAR INSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                            APPEHDIX G - HSS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED [ DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY (IGSCC( EX1/HDE PROCEDURE        )PERIOD  1                        REHARKS EXAMINATION IDENTIFIER ) ITS ISO LOCATOR, COHPOHENT DMG    &#xb9;, [ITEN  &#xb9; JFREGY( EX2/HDE PROCEDURE    )PERIOD 2 USE CAL BLK &#xb9; f  LIHE HO. AND NOTES, AS APPLICABLE (SELECT [CLASS[ EX3/HDE PROCEDURE [PERIOD 3 f i ~PSV124 VLV BLTG IB-G-2  I  na  I  VT1/VT2.01 2HSS*PSV124, VB127    J QISO 01-14          or DMG&#xb9; 054 in (87.70    /none    / na /na
                      )
LINE&#xb9; 2HSS-026-44-1 NTS: (none) (HS              1    / na/na
                      )
                          *PSV124 INT SUR                    )8-N-2  J na    J VT3/VT2.01 2HSS~PSV124, VBY134    I  QISO 01-14          or DIIG&#xb9; 054 in (812.50 (none    )    /
I  LINE&#xb9; 2NSS-026-44-1 HTS: 7          INS      I  1    I    /
I 4PSV125 FLG BLTG                    IB-G-2  (
na    f VT1/VT2.01 2NSS~PSV125,PB122      I  QISO 01-14          or DMG&#xb9; 054 in [87.50    /none    f na /na J
LINE&#xb9; 2MSS-026-44-1 NTS: (none) JNS              1    / na/na I
                          *PSV125 VLV BLTG                    IB-G-2    I na    I VT1/VT2.01        I 2NSS*PSV125, V8128    I  QISO 01-14          or DMG&#xb9; 054 in (87.70    ]none  J na /na            I
                      )
LINE&#xb9; 2NSS-026-44-1 HTS: (none) )NS              1 J
na/na              I
(
                          *PSV125 INT SUR                    (8-N-2    J na    ) VT3/VT2.01 2HSS*PSV125,VBY135    i QISO 01-14          or  DMG&#xb9; 054 in )812.50 ]none    )    /
I LINE&#xb9; 2NSS-026-44-1    NTS: 7      IHS      I  1    I    /
I 4PSV126 FLG BLTG                    iB-G-2            ) VT1/VT2.01                    I 2HSS*PSV126, P8125      i QISO 01-14          or DMG&#xb9; 054. in [87.50    [none  f na /na                        I
[ LINE&#xb9; 2HSS-026-44-1 NTS: (none) )HS              1    / na/na                        I I 0PSV126 VLV BLTG IB-G-2            [ VT1/VT2.01 2HSS~PSVI26,VB129      i QISO 01-14          or DWG&#xb9; 054 in )87.70    [none  [ na /na
(
LINE&#xb9; 2HSS-026-44-1 HTS: (none) [HS              1    / na /na
                        )
                          ~PSV126 INT SUR                      (B.N-2  J na    [ VT3/VT2.01 2HSS*PSV126,VBY'136    ) QISO 01-14          or DMG&#xb9; 054 in (812.50 (none      [    /
I LINE&#xb9; 2HSS-026-44-1 NTS: 7          IHS      I  1    I    /
i iPSV127 FLG BLTG                    IB.G-2  [ na    [ VT1/VT2.01 2NSS*PSV127,P8128      i QISO 01-14          or DMG&#xb9; 054 in (87.50    ]none  / na /na I LINE&#xb9; 2HSS-026-44-1 HTS: (none) IHS              1    ( na/na
 
NIAGARA MOHAC POMER CORPORATION          -      MILE POINT NUCLEAR STATION - UNIT 2        6 of 65 NMP2-ISI-006( REV. 'I, CH-000                                      SECOND TEH YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                  APPEHDIX G - MSS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAMINED(CATGRY (IGSCC( EX1/NDE PROCEDURE              (PERIOD  1                        REMARKS EXAMINATION IDENTIFIER  (
ITS ISO LOCATOR, COMPOHEHT DUG    &#xb9;,  (ITEM  &#xb9; (FREQY( EX2/HDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; (  LINE HO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3              (
I <<PSV127 VLV BLTG (8-0-2    I na    I  VTI/VT2.01 2MSS<<PSV127, V8130      (
QISO 01-14          or DIIG&#xb9; 054 in (87.70      (none    (
na /na I  LINE&#xb9; 2HSS-026-44-1 NTS: 10,14        IHS          1    (  na/na
(
                          *PSV127 INT SUR                      (B.M-2    ( na    (
VT3/VT2.01 2MSS*PSV127,VBY137      (  QISO 01-14          or  DUG&#xb9; 054  in (812.50    (none    (      /
(  LINE&#xb9; 2MSS-026-44-1    NTS: 7        (NS      (  1    (      /
(
                          <<PSV128 FLG BLTG                      IB-G-2    (
na    (  VT1/VT2.01 2MSS*PSV128,P8131      (
QISO 01-14          or DWG&#xb9; 054 in (87.50      (none    (
na /na na                (
LINE&#xb9; 2MSS-026-44-1 NTS: (none) (HS                      (. na /na I  *PSV128 VLV BLTG                      IB.G-2    ( na    (
VT1/VT2.01          I 2MSS*PSV128, VB131      (  QISO 01-14          or  DUG&#xb9;  054  in (87.70    (none    (
na  /na            I
(  LINE&#xb9; 2MSS-026-44-1 NTS: (none) (HS                1    (
na/na              I
                          *PSV128 INT SUR                      IB-M-2    I na    I  VT3/VT2.01 2MSS*PSV128,VBY138      (
QISO 01-14          or  DUG&#xb9; 054  in (812 ~ 50 (none    (      /
(
LINE&#xb9; 2MSS-026-44-1    HTS: 7        (HS      (
1    (      /
(
                          <<PSV129 FLG BLTG                      IB  G  2  ( na    (
Vl'1/VT2.01 2MSS*PSV129, PB134      I QISO 01-15          or  DUG&#xb9; 055  in (87.50    (none    (  na /na
( LINE&#xb9; 2MSS-026-45-1    NTS:  (none)  (NS          1
(
na /na I *PSV129 VLV BLTG                      IB-G-2    I na    I  VT1/VT2.01 2MSS<<PSV129,VB132        (
QISO 01-15          or  DMG&#xb9; 055  in (87.70    (none    (
na /na
(
LINE&#xb9; 2MSS-026-45-1    HTS:  (none)  (HS          1    (  na/na
(
                          <<PSVI29 INT SUR                      (B.M-2    (
na    (  VT3/VT2.01 2MSS<<PSV129, VBY139      I QISO 01-1          or  DMG&#xb9; 055  in (812.50  (none    (      /
(
LIHE&#xb9; 2MSS-026-45-1    NTS: 7        (NS      (  1    (      /
I
                          *PSV130 FLG BLTG                      IB-G-2    ( na      (
VT1/V'l2.01 2MSS<<P SV130, P 8137    (
QISO 01-15          or  DMG&#xb9; 055  in (87.50    (none    (
na  /na
( LINE&#xb9; 2MSS-026-45-1    HTS:  (none)  (HS                (
na /na
 
NIAGARA HOHAMK POMER CORPORATION        -      NILE POINT NUCLEAR STATION  - UNIT 2        7 of 65 NHP2-1SI-006, REV. 1, CH-000                                            SECOND TEH YEAR IHSERVICE INSPECTION      (ISI) INTERVAL PLAN Change date:    07/27/1999                                                                  APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED    (
DESCRIPTIOH OF ITEN TO BE EXAMINED(CATGRY )IGSCC) EX1/HDE PROCEDURE            (PERIOD  1                        RENARKS EXAHIHATIOH IDENTIFIER    J ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  ]ITEN  &#xb9; )FREQY( EX2/HDE PROCEDURE [PERIOD 2 f USE CAL BLK  &#xb9; I  LINE NO AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I f ~PSV130 VLV BLTG                        IB-G-2          [  VT1/VT2.01 2HSS*PSV130,VB133        I  Ql    0115          or  DMG&#xb9; 055  in (87.70    /none  /  na /na
                          ]  LINE&#xb9; 2HSS-026-45-1    N'IS: (none)    )NS          1  /  na/na I
                            *PSV130 IHI SUR                        IB H 2    I na  I  VT3/VT2.01 2HSS~PSV130,VBY140        J QISO 01-15          or  DMG&#xb9; 055  in [B12.50 [none    )      /
i  LINE&#xb9; 2NSS-026-45-1    NTS:  7        iHS      i  1  i      /
I
                            *PSV131 FLG BLTG                        IB-G-2    f na    J VT1/VT2.01 2HSS*PSV131, PB140        I  QISO 01-15          or  DMG&#xb9; 055    in /87.50    [none  J na  /na
(
LIHE&#xb9; 2HSS-026-45-1    HTS:  (none)    (HS          1    / na/na
                            *PSV131 VLV BLTG                        /B-C-2    I na    I VT1/VT2.01          I 2HSS*P SV131, VB134          QI SO 01-15          or  DMG&#xb9; 055    in (B7.70    [none  J na  /na            I LINE&#xb9; 2HSS-026-45-1    NTS:  (none)  [NS          1    / na /na              I
(
                            ~PSV131  INT SUR                      IB-H-2    I na    I VT3/VT2.01 2HSS~PSV131, VBY141      i QISO 01-15            or  D'MG&#xb9;  055  in )B12.50  ]none  f    /
i LINE&#xb9; 2HSS-026-45-'I    HTS: 7          iNS      I  I    I
                            *PSV132 FLG BLTG                        IB-G-2    I na    I VT1/VT2.01 2HSS~PSV132,PB143            QISO 01-15          or  DMG&#xb9; 055    in )B7.50    [none  [ na /na LINE&#xb9; 2NSS-026-45-1    NTS:  (none)  )
NS              J na /na
                          / *PSV132 VLV BLTG                        IB-G-2    I na. I VT1/VT2.01 2HSS*PSV132,VB135          i QISO 01-15          or  DMG&#xb9; 055    in [87.70    /none  / na /na I LINE&#xb9; 2HSS-026-45-1    HTS:  (none)  (HS          1    / na /na
                          )
                            *PSV132  INI'UR                        /B.H-2    / na    / VT3/VT2.01 2NSS~PSV132,VBY142        I QISO 01-15          or  DMG&#xb9; 055    in IB12.50  Inone  I    /
( LINE&#xb9; 2HSS-026-45-1    HTS: 7          iHS      i  1    i    /
                            *PSV133 FLG BLTG                        IB-G-2    I na    I VT1/VT2 01 2NSS*PSV133,PB146            QISO 01-15          or  DMG&#xb9; 055    in (B7.50    /none  / na /na LINE&#xb9; 2HSS-026-45-1    NTS: (none)    )HS              / na  /na
 
NIAGARA MOHANK POMER CORPORATION          -      MILE POINT NUCLEAR STATION - UNIT 2        Bof 65 HMP2-ISI-006, REV. 1, CH-000                                            SECOHD TEH YEAR INSERVICE INSPECTION        (Isl) IHTERVAL PLAH Change date:  07/27/1999                                                                      APPENDIX G - MSS SYSTEM (sorted by Exemination Identifier) 2ND IHTVL REL REa  I  DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EX1/HDE PROCEDURE              IPERIOO  1                        REMARKS ExAMIHATIDN IDENTIFIER  I  ITs Iso LocAToR,    coMPDNENT DNG    &#xb9;, IITEM  &#xb9; IFREOYI Ex2/HDE PRocEDURE        IPERIDD 2 I USE CAL BLK  &#xb9; I  LINE No. AND  NO'IES,  AS  APPLICABLE  ISELECT  ICLASSI      EX3/HDE  PROCEDURE IPERIOO 3 I
                            <<PSV133 VLV BLTG                        IB-G-2      na        VT1/VT2.01 2MSS<<PSV133,VB136 I
I  QISO 01-15 LINE&#xb9; 2MSS-026-45-1 or  DUG&#xb9; 055 HTS: (none) in I87.70 IHS l~
I 1
I I  na /na na/na I                                                    I        I I  *PSV133 IHT  SUR                      IB.M-2    I  na    I  VT3/VT2.01 2MSS<<PSV133, VBY143      I QISO 01-15              or  DMG&#xb9; 055  in I812.50 lnone      I      /
LINE&#xb9; 2MSS.026.45-1      HTS: 7        IHS      I  1    I      /
I  *PSV134 FLG BLTG                        IB-G-2    I  na    I  VT1/VT2 01 2MSS*PSV134, PB149        I  QISO 01-16            or DUG&#xb9; 055 in I87.50      Inone    I  na  /na I  LINE&#xb9; 2MSS-026-46-1 NTS: (none) INS                  1    I  na  /na I  *PSV134 VLV BLTG                        IB-G-2    I  na    I  VT1/VT2.01 2HSS*PSV134,V8137        I  QISO 01-16            or DMG&#xb9; 055 in I87.70      lnone    I  na /na na                  I  LINE&#xb9; 2MSS-026-46-1 HTS: (none) IHS                  1    I  na /na I  *PSV134 INT  SUR                      IB.M-2 I na        I  VT3/VT2.01 2MSS*PSV134, VBY144      I QISO  01-16            or DWG&#xb9;  055 in IB12.50 lnone      I      /
I  LINE&#xb9; 2MSS.026-46-1 NTS: 7              IHS      I    1 I      /
I
                            <<PSV135 FLG BLTG                        IB.G-2  I  na    I  VT1/VT2.01 2MSS*PSV135, P8152        I  alSO 01-16            or DUG&#xb9; 055- in IB7.50    Inone    I  na /na I  LINE&#xb9; 2MSS-026-46-1 NTS: (none) IHS                    1    I  na/na I  <<PSVI35 VLV BLTG                        IB-G-2  I  na    I  VT1/VT2.01 2MSS*PSV135,VB138        I QISO  01-16            or DWG&#xb9; 055 in I87.70      lnone    I  na /na I  LINE&#xb9; 2MSS-026-46-1 NTS: (none) INS                    1    I  na /na I
                            *PSV135 INT SUR                          IB-M-2 I na        I VT3/VT2.01 2MSS*PSV135, VBY145        I QISO  01-16            or DMG&#xb9; 055 in I812.50 Inone          I    /
I  LINE&#xb9; 2MSS-026-46-1 NTS: 7              IHS      I  1    I    /
I
                            *PSV136 FLG BLTG                        IB-G-2    I na      I VTI/VT2.O1 2MSS*PSV136,PB155        I QISO  01-16            or DUG&#xb9; 055 in I87.50      Inone    I na  /na I  LINE&#xb9; 2MSS-026-46-1 NTS: (none) IHS                        I na  /na
 
NIAGARA HOHAMK POWER CORPORATION              - i    HILE POINT  NUCLEAR STATION - UNIT 2        9 of 65 NHP2-1S1-006, REV. 1, CN-000                                                SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                                        APPENDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ    (
DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE                  (PER100  1                          REHARKS EXAHINATION IDENTIFIER    I ITS ISO LOCATOR'OHPONENT DMG          &#xb9;i    I ITEN  &#xb9; (FREQYI EX2/NDE PROCEDURE IPER100 2 I USE CAL BLK    &#xb9; I  LINE  NO  AND  NOTESi  AS  APPLICABLE      ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
                              *PSV136 VLV BLTG                          IB-G-2      na      VT1/VT2.01 2HSS*PSV136, VB139 I
(
QISO 01-16 LINE&#xb9; 2HSS.026-46-1 or  DMG&#xb9; 055 NTS: (none) in (87.70 INS l~
(
1
(
I  na  /na na/na I                                                                (
(
                              *PSV136 INT  SUR                          (B-H-2    (
na    (
VT3/VT2.01 2HSS*PSV136, VBY146        (
QISO  01-16          or DMG&#xb9; 055    in    (B12.50 (none      (    /
(  LINE&#xb9; 2HSS-026-46-1 NTS: 7                (NS      (  1    (    /
I
                              <<PSV137 FLG BLTG                          IB-G-2    (  na    (
VT1/VT2.01 2HSS<<PSV137, PB158        (
QISO 01-16            or  DMG&#xb9; 055  in (B7.50      (none    ( na  /na
(
LINE&#xb9; 2HSS-026-46-1      NTS: (none)      (NS      I  1    I na  /na
(
                              <<PSV137 VLV BLTG                          (B-0-2    I  na    I VT1/VT2.01 2HSS*PSV137,VB140          (  QISO 01-16            or DMG&#xb9; 055 in (87.70          (none    (
na  /na
(
LINE&#xb9;  2HSS-026-46-1    NTS: (none)      (NS          1    (
na/na I
                              *PSV137 INT  SUR                          IB H-2    I  na    I V  3/VT2 ~ 01 2HSS*PSV137, VBY147        (
QISO 01-16            or DMG&#xb9; 055    in (B12.50      (none    (    /
I  LINE&#xb9; 2HSS-026-46-1 NTS: 7                INS      I  1    I    /
I  OTLT/PIPE                                  IC-F-2    I  na    I VOL/UT6.02            I 2HSS-01-03-FM001            (  QISO 01-03            or  DMG&#xb9; na  ~ in    (C5.51    Inone    I SUR/PT3.00/HT4.00    I NHP2-16-1.031-CS      (  LINE&#xb9; 2HSS-016-26-4      NTS: 36,37        (SD          2    ( na /na I  ELB/PIPE                                . IC-F-2  (  na    (
VOL/UT6.02 2HSS-01-03-FM002            I  QISO 01-03            or  DMG&#xb9; na    in    (C5.51    (ID    (
SUR/PT3.00/HT4.00    (
Sc9 NHP2-16-1 ~ 031-CS    (
LINE&#xb9; 2NSS.016.26-4      NTS: 37,38        (SD      I  2    I na  /na              I
(  P IPE/<<AOV92A                              (C-F-2    I na    I VOL/UT6.02            I 2HSS-01-03-FW003            I  QISO 01-03            or  DWG&#xb9; na    in    (C5.51    (none  (
SUR/PT3.00/HT4.00    (
NHP2-16-1.031-CS      (
LINE&#xb9; 2HSS.016-26-4      NTS: 37,39        (SD          2    (
na  /na I  PIPE/PIPE                                  IC-F-2    I na    I VOL/Ul'6.02          I 2HSS-01-03-SM001            I QISO 01-03            or DMG&#xb9; na      in    (C5.51    Inone  I SUR/PT3.00/HT4.00    I NHP2-16-1. 031- CS      LINE&#xb9; 2NSS.016-26-4 NTS: 37                (none        2    (
na  /na
 
NIAGARA MOHAN PSIER CORPORATION          - I    HILE POINT NUCLEAR STATION - UNIT 2        10 of 65 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/'1999                                                                  APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2NO INTVL REL RED ) DESCRIPTION OF ITEH    To BE EXAMINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE )PERIOD          1                        REMARKS EXAMINATION IDENTIFIER  )
ITS ISO LOCATOR,  COHPONENT DNa    &#xb9;, )ITEH    &#xb9; )FREOY) EX2/NDE PROCEDURE    )PERIOD 2  )
USE CAL BLK  &#xb9; I  LINE  NO  AND NOTES'S    APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  PIPE/PIPE                            IC-F-2    )
na  )
VOL/uT6.02 2HSS-01-03. SlJ002      )
QISO Ol-O3          or  DUG&#xb9; na    in )C5 ~ 51  )none  )
SUR/PT3.00/HT4.00  )
NMP2-16-1.031-CS    I  LIHE&#xb9; 2HSS.016-26-4    NTS: 37        )none          2  )
na /na I  PIPE/ELB                              IC-F-2    )
na  )
voL/UT6.O2          )
2HSS-01-03-9503          I  QISO 01-03          or  DUG&#xb9; na    in )C5.51    )none    )
SUR/PT3.00/HT4.00  )
NMP2-16-1.031-CS  )
LINE&#xb9; 2HSS-016-26-4    NTS: 37,38    )SD            2    )
na  /na I  PIPE/ELB                              IC-F-2    )
na    )
VOL/UT6.02 2MSS-01-03-SNO05        I QISO 01-03          or  DUG&#xb9; na    in )C5.51    )none    I SUR/PT3.00/HT4.00  I NHP2-16-1.031-CS  )
LINE&#xb9; 2MSS.016-26-4    HTS: 37,38    )SD            2    )
na  /na I  ELB/PIPE                              IC-F-2    I  na    ) VOL/UT6.02          I 2HSS-01-03-SN006        I  QISO 01-03          or DNG&#xb9; na in )C5.51        )none    )
SUR/PT3.00/HT4.00  )
NHP2-16-1.031-CS  )
LINE&#xb9; 2MSS-016.26-4 NTS: 37,38        )SD            2    )
na /na              I I  PIPE/ELB                              IC-F-2    )  na    )
VOL/uT6.O2 2HSS-01-04-FNO01        )
QISO 01-04          or Olio&#xb9; na    in )C5.51    )none    )
SUR/PT3.00/HT4.00  )
NHP2-28-1.34-CS    )
LINE&#xb9; 2HSS-028-3-4    NTS: 40,41    )SD            2    ) na  /na I  PIPE/ELB                              IC-F-2        na    )
VOL/UT6.02 2HSS-01 FN002        )
also ol-o4          or  DWG&#xb9; na . in )C5 ~ 51  )none    ) SUR/PT3.00/HT4.00  )
NMp2-28-1.34-cs    )
LINE&#xb9; 2HSS-028-3-4    NTS: 40,41    )
SD          2    ) na  /na I PIPE/OTLT                            IC-F-2    )
na    )
VOL/UT6.02 2HSS-01 FlJ003        )
QISO 01-04          or  DUG&#xb9; na    in )C5.51      )none  )
SUR/PT3.00/MT4.00  )
NHP2-28-1.34-CS    I LINE&#xb9; 2HSS-028-3-4    NTS: 40,45    I SD          2    ) na  /na I PIPE/ELB                              IC-F-2      )
na    )
voL/uT6.O2                    )
Deseiected 2HSS-01-04-FN004          )
also ol-04          or  DNG&#xb9; na    in )C5.51      )none  ) SUR/PT3.00/HT4.00  )
NHP2-28-1.34-CS    I LINE  2HSS 028 1 4    NTS      41    ISD            2    ) na  /na I PIPE/ELB                              IC-F-2      I na    I VOL/UT6.02          I 2HSS-01-04-Fl$ 05        )
QISO 01-04          or  DUG&#xb9; na    in )C5.51      )none  )
SUR/PT3.00/HT4.00  )
NMP2-2e-1.34-cs    I LINE&#xb9; 2HSS-028-1-4    NTS: 40,41    ISD            2    )
na  /na
 
NIAGARA HONAMK POMER CORPORATION            -      HILE POINT NUCLEAR STATION - UNIT 2        11 of 65 NHP2-1SI-006, REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  IHTERVAL PLAN Change date:  07/27/1999                                                                      APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHINEO(CATGRY ( IGSCC( EX1/NDE PROCEDURE                  (PERIOD  1                        REHARKS EXAHINATION IDENTIFIER  ( ITS ISO LOCATOR, COHPONENT DMG    &#xb9;,  ( ITEH    &#xb9; (FREQY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3                I I  PIPE/OTLT                              Ic-F-2      (
na    (
VOL/UT6.02 2HSS-01 FM006        (
QISO 01-04          or  DMG&#xb9; na    in  (C5.51      (none    (
SUR/PT3.00/HT4.00  (
NHP2-28-1.34-CS    (
LINE&#xb9;  2HSS 028 1 4    NTS- 40r45      I              2    (
na /na I  PIPE/ELB                              Ic-F-2      I  na    I  VOL/UT6.02          I 2HSS-01-04-FMD07        (
QISO  01-04        or DMG&#xb9; na in (C5.51          (none    I  SUR/PT3 00/HT4 00  I NHP2-28-1.34-CS    I  LINE&#xb9; 2HSS-028-7-4    NTS: 40'1      ISD            2    (
na /na
(
PIPE/ELB                              Ic-F-2      (
na    (
VOL/UT6.02 2HSS-01-04  FMODB        I QISO 01-04            or  DMG&#xb9; na    in  (C5.51      (none    (
SUR/PT3.00/HT4.00  (
NHP2-28-1.34-CS    (
LINE&#xb9; 2HSS-028-7.4    NTS: 40,41      (SD            2    (  na  /na I  PIPE/OTLT                              Ic-F-2      (
na    (
VOL/UT6.02 2HSS-01-04-FM009          (
QISO 01-04          or DMG&#xb9; na in (C5.51          (none    I  SUR/PT3.00/HT4.00  I NHP2-28-1.34-CS        LINE&#xb9; 2HSS-028-7-4    NTS: 40,45      (SD        (  2    (
na /na
(  PIPE/ELB                              Ic-F-2      (
na    (
VOL/UT6.02 2HSS-01 F M010        I Q      01 04        or  DMG&#xb9; na    in  (C5.51      (none    (  SUR/PT3.00/HT4.00  (
NHP2-28-1.34-CS        LINE&#xb9; 2HSS-028-5-4    NTS: 40,41      (SD            2    (
na /na I  PIPE/ELB                                Ic-F-2    (
na    (  VOL/UT6.02 2HSS-01-04-FM011          (
QISO  01-04        or DMG&#xb9; na in (C5.51
                                                              ~                (none    (
SUR/PT3.00/Hl'4.00  (
NHP2-28-1.34-CS        LINE&#xb9; 2HSS-028.5-4    NTS: 40,41      (SD            2    (  na/na I  PIPE/OTLT                              Ic-F-2    (
na    (
VOL/UT6.02                    (Desel ected 2HSS.01-04-FM012          (
QISO 01-04          or  DMG&#xb9; na    in  (C5 ~ 51  (none    (
SUR/PT3.00/HT4.00  (Sc8      I NHP2-28-1.34-CS    (
LINE&#xb9; 2HSS-028-5-4    NTS: 40,45      (SD            2    (  na  /na                        I I  INTEG ATT                              (C-C        (
na    (  SUR/PT3.00/HT4.00  (
2HSS-01-04-FM300          (
QISO 01-04  &#xb9;20    or  DMG&#xb9; na    in  (C3 ~ 20    (ID      (
na  /na
(
LINE&#xb9; 2HSS-028-3.4    NTS: 40,44      (Handate(      2    (  na /na              I I IHTEG ATT                                (C-C        (
na    ( SUR/PT3.00/HT4.00  (
2HSS-01 FM301        (
QISO 01-04  &#xb9;20    or  DMG&#xb9; na    in  (C3.20 (ID          (
na /na
(
LINE&#xb9; 2HSS-028-3-4    NTS: 40,44      (Handate( 2          (
na /na              I
 
NIAGARA MONAVK PSIER CORPORATION          -        HILE POINT NUCLEAR STATION      - UNIT 2        12 of 65 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                      APPENDIX  G  HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED      DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD                    1                          REMARKS
(
EXAMINATION IDENTIFIER  I ITS ISO LOCATOR'OHPONENT DNG <<i IITEH        IFREQYI EX /NDE PROCEDURE (PERIOD              I USE CAL BLK  &#xb9; I  LINE  NO  AND  NOTES  AS  APPLICABLE    (SELECT  (CLASS(      EX3/NDE PROCEDURE (PERIOD 3 I I  INTEG ATT                                IC-C      I  na    I  SUR/PT3.00/HT4.00  (
2HSS.01 FM302        (
QISO 01-04  &#xb9;5      or  DUG&#xb9; na    in  (C3.20 (ID          (
na /na
(
LINE&#xb9; 2HSS-028-5-4      NTS: 40,44      (Handate( 2        (
na /na              I I  INTEG ATT                                (C-C      (
na    (  SUR/PT3.00/HT4.00  (
2HSS-01-04-FN303        (
QISO 01-04  &#xb9;5      or  DUG&#xb9; na    in  (C3.20 (ID          (
na /na
(
LINE&#xb9; 2HSS-028-5-4      NTS: 40,44      (Handate( 2        (
na /na              I I INTEG ATT                                  (C-C      (  na    (
SUR/PT3.00/HT4.00    (
2HSS-OI-04-FN304          (
QISO 01-04  &#xb9;18      or  DUG&#xb9; na    in  (C3.20 (ID          (
na /na
(
LINE&#xb9; 2HSS-028-3-4      NTS: 40,43      (Handate( 2        (
na /na              I I  INTEG ATT                                (C-C      (
na      SUR/PT3.00/MT4.00    I 2MSS.01-04-FN305          (  QISO 01-04 &#xb9;18      or DMG&#xb9; na in (C3.20 (ID                  na /na              I
(
LINE&#xb9;  2HSS-028-3-4    NTS: 40,43      (Mandate( 2            na /na              I I  INTEG ATT                                (C-C      (
na      SUR/PT3.00/Hl'4.00 2MSS-OI-04-Fl606          (
QISO 01-04 &#xb9;3        or DUG&#xb9; na      in  (C3.20 (ID            na /na              I
(  LINE&#xb9;  2MSS-028-5-4    N'TS: 40,43      (Handate( 2            na /na              I I  INTEG ATT                                IC C      I  na    I SUR/PT      /HT  00  I 2HSS-01 FM307        I QISO  01-04 &#xb9;3      or DUG&#xb9; na in (C3.20
                                                                .                I ID      I na /na              (
(  LINE&#xb9; 2HSS-028-5-4      NTS: 40,43        (Handate(    2    (
na /na              I I  INTEG ATT                                IC-C      I  na    I SUR/PT3.00/HT4.00    I 2MSS-01-04-FN308          (
QISO 01-04  &#xb9;13      or  DUG&#xb9; na    in (C3.20      (ID      (
na /na
(
LINE&#xb9; 2MSS-028-1-4      NTS: 40,46        (Mandate(      2    (
na /na              I I INTEG ATT                                IC-C      I na    I SUR/PT3.00/HT4.00    I 2MSS.01-04-FN309          (
QISO 01-04  &#xb9;13    or  DUG&#xb9; na    in  (C3.20 (ID          ( na /na
( LINE&#xb9; 2HSS-028-1-4      NTS:  40,46      (Handate( 2        ( na /na              I I  INTEG ATT                                (C-C      (
na      SUR/PT3.00/HT4.00    I 2MSS-01-04-FM310          (
QISO 01-04  &#xb9;8      or  DUG&#xb9; NA      in  (C3.20 (ID            na /na                I
(
LINE&#xb9; 2HSS-028-7-4    NTS:  40,46      (Handate( 2          na /na                I Sc10
 
NIAGARA HOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UHIT 2        13 of 65 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                      APPENDIX G - HSS SYSTEH (sorted by Exsnination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE              iPERIOD  1  I                    REHARKS EXAHINATION IDENTIFIER    ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,          &#xb9; ilTEH iFREOYi EX2/NDE PROCEDURE          iPERIOD 2 USE CAL BLK &#xb9; I  LINE NO. AND NO'IES, AS APPLICABLE (SELECT ICLASSI EX3/NDE              PROCEDURE IPERIOO 3    I INTEG ATT                              IC  C    I  na    I  SUR/PT3.00/HT4.00 I 2HSS-01-04-FM311        f QISO  01-04 &#xb9;8      or DMG&#xb9; NA in JC3.20 ']ID              f  na /na f  LINE&#xb9; 2HSS-028-7-4    NTS: 40,46      JHandatef      2    f  na /na            i Sc10 I  ELB/PIPE                                IC-F-2    [  na    [  VOL/UT6.02 2HSS-01-04-SM001        / QISO 01-04          or  DMG&#xb9; na    in  /C5.51    ]none    J SUR/PT3.00/H'l4.00  J NHP2-28-1.34-CS  [  LINE&#xb9; 2HSS-028-3-4    NTS: 40,41      (SD            2    /  na  /na            I I  ELB/PIPE                                IC-F-2    I  na    I  VOL/Ul'6.02        I 2HSS-01-04-SM002        (
QISO 01-04          or  DMG&#xb9; na    in (C5.51      )none    )
SUR/PT3.00/HT4.00  f NHP2-28-1.34-CS  I  LINE" 2HSS 028 3 4    NTS'0    41    ISD            2    i  na  /na I  ELB/PIPE                                IC-F-2    f  na    f  VOL/UT6.02 2HSS-01-04-SM003        I  QISO 01-04          or DMG&#xb9; na in [C5.51          ]none    f  SUR/PT3.00/HT4.00  f NHP2-28-1.34-CS  I  LINE&#xb9; 2HSS-028-1-4    NTS: 40(41      ISD            2    f  na  /na I  ELB/PIPE                                IC    F 2  ]  na    )  VOL/UT6.02 2HSS.01.04-SM004        (
QISO 01-04          or DMG&#xb9; na in JC5.51          ]none    f  SUR/PT3.00/HT4.00  J NHP2-28-1.34-CS    i LINE&#xb9; 2HSS-028-1-4    NTS: 40,41      LSD        I  2    I  na /na              I I ELB/PIPE                                IC-F-2    J na    f  VOL/UT6.02 2HSS-01-04-SM005        [ QISO 01-04          or  DMG&#xb9; na  .in  ]C5.51    ]none    f  SUR/PT3.00/HT4.00  )
NHP2-28-1.34-CS    I LINE&#xb9;  2HSS 028-7-4    NTS'0i41        ISD            2 I ELB/PIPE                                IC-F-2    [  na    ]  VOL/UT6.02 2HSS-01-04-SM006        I QISO 01-04          or  DMG&#xb9; na    in /C5.51    ]none    )  SUR/PT3.00/HT4.00    f NHP2-28-1.34.CS    I LINE&#xb9; 2HSS-028-7-4      NTS: 40,41      ISD            2    /  na /na I ELB/PIPE                                IC-F-2              [ VOL/UT6.02 2HSS-01-04-SM007        i QISO 01-04          or  DMG&#xb9; na    in JC5.51    [none    J SUR/PT3.00/H'T4.00  [
NHP2-28.1.34-CS    I LINE&#xb9;2H    02854      NT '4041        I D          2    / na  /na I ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02          I 2HSS-01-04-SM008        / QISO  01-04          or DMG&#xb9; na in (C5.51          ]none    [ SUR/PT3.00/HT4.00    f NHP2-28-1.34-CS    I LINE&#xb9; 2HSS-028.5.4      NTS: 40(41      I SD          2    / na /na
 
NIAGARA NOHAMK POMER CORPORATIOH          -  . HILE POINT NUCLEAR STATION - UNIT 2        14 of 65 NMP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTIOH          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX  G  - HSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE                    [PERIOD  1  I                    REMARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPOHENT DMG          &#xb9;,  LITEM  &#xb9;  iFREOYi EX2/NDE PROCEDURE        iPERIOO 2 USE CAL BLK  &#xb9; i LINE HO. AHD NOTES, AS APPLICABLE DESELECT          iCLASSi EX3/NDE PROCEDURE iPERIOD 3 I    OTLT/PIPE                              IC-F-2    I  na    I  VOL/UT6.02          I 2HSS-01-05-FM001        i QISO 01-05          or DMG&#xb9; na in iC5.51        inone    L SUR/PT3.00/HT4.00    i NMP2-28-1.34-CS    i    LINE&#xb9; 2MSS-028-4-4    HTS: 48,40      LSD          2    i  na /na                I
                        /    PIPE/*HSIV-1B                          IC-F-2    i na    i VOL/UT6.02 2HSS-01-05-FM002        I    olISO 01-05          or DMG&#xb9; na in iC5.51        inone    (  SUR/PT3.00/HT4.00 i NMP2-28-1.34-CS    i  LINE&#xb9; 2HSS-028-4-4      NTS: 40,48    LSD          2    i na /na I  OTLT/PIPE                              IC-F-2    I  na    I  VOL/UT6 02            I 2HSS-01-05-FM003          I  QISO 01-05          or  DMG&#xb9; na  in  iC5.51    inone i SUR/PT3.00/HT4.00 i HHP2-28-1.34-CS    i  LINE&#xb9; 2HSS-028-2-4      NTS: 48,40    LSD          2    i  na/na                I i PIPE/*MS IV-1A                          IC-F-2    i na    i  VOL/UT6.02                      iOesel ected 2HSS-01-05-FM004          i QISO    01-05          or DMG&#xb9; na in iC5.51        inone    J SUR/PT3.00/Ml'4.00 i NHP2-28.1.34-CS    i  LINE&#xb9; 2HSS 028-2-4      NTS: 40,48    LSD          2    (
na /na                I I  OTLT/PIPE                              IC-F-2    [ na    i  VOL/UT6.02 2HSS-01 FM005        i QISO    01-05          or DMG&#xb9; na in (C5.51        inone    i SUR/PT3.00/MT4.00      )
HMP2-28-1.34-CS    i  LINE&#xb9; 2HSS-028-8-4      NTS: 48,40    LSD          2    J na /na
[  PIPE/*NSI V-1D                        iC-F-2    i na    i  Vol./UT6.02 2HSS.01-05-FM006          I  QISO 01-05          or  DMG&#xb9; na  .in  [C5.51    [none    i  SUR/PT3.00/HT4.00      J NHP2-28-1.34-CS      I  LINE&#xb9;  2HSS  028 8 4    HTS: 40,48    ISD          2    i na  /na i OTLT/PIPE                              IC-F-2    i na    i VOL/UT6.02 2NSS-01-05-FM007          i also 01-0S            or  DMG&#xb9; na    in )C5.51    inone i SUR/PT3.00/NT4.00          i HHP2-28-1.34-CS      i LIHE&#xb9; 2HSS-028.6-4      NTS: 48,40    LSD            2    i  na/na i PIPE/~MSI V-1C IC-F-2    i na    t  VOL/UT6.02 2HSS-01-05-FM008          i  also 01-os          or  DMG&#xb9; na    in  iC5.51    inone i SUR/PT3.00/NT4.00          (
NHP2-28-1.34-CS      I  LINE&#xb9;  2HSS 028.6-4    NTS'0i48        I            2 i na /na I  PIPE/PIPE                              IC-F-2    i na      i VOL/UT6.02 2HSS-01-05-FM009          I  QISO 01-05          or  DMG&#xb9; na    in iC5.51    Inone i SUR/PT3 F 00/HT4 F 00 I HHP2-48-3.50-CS      I  LIHE&#xb9; 2HSS-048-9-4    NTS: 47        (none        2    i na /na
 
NIAGARA HONAWK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2        15 of 65 NHP2-ISI-006, REV. 1, CN-000                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                  APPENDIX G -  HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED [ DESCRIPTION OF ITEN TO BE EXAHINED[CATGRY [IGSCC] EX1/NDE PROCEDURE              [PERIOD 1                        REHARKS EXAHINATION IDEHTIFIER  f ITS ISO LOCATOR, COHPONENT DMG  &#xb9;,  JITEH  &#xb9;  JFREOY[ EX2/NDE PROCEDURE      ]PERIOD 2 f USE CAL  BLK.&#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  PIPE/PIPE                            /C-F-2    /  na  /  VOL/UT6.02 2HSS-01-05-FW014        f  QISO 01-05          or  DMG&#xb9; na  in  JC5.51    ]none  J SUR/PT3.00/HT4 F 00 /
NHP2-28-1.34-CS    /  LINE&#xb9; 2HSS-028-4-4    NTS: 40        /none    /  2  /  na /na I  PIPE/PIPE                            [C-F-2    f  na    f VOL/U'I6.02 2HSS-01 FW016        [  QISO 01-05          or  DWG&#xb9; na  in  [C5.51    [none    f SUR/PT3.00/HT4.00    /
NHP2-28-1.34-CS    /  LINE&#xb9; 2HSS-028-2-4    NTS: 40        /none    /  2    f na  /na I  PIPE/PIPE                            /C-F-2    /  na    / VOL/UT6.02 2HSS-01-05-FW018        I  QISO 01-05          or DWG&#xb9; na    in  JC5.51    /none    / SUR/PT3.00/HT4.00 NHP2-28-1.34-CS    f  LINE&#xb9; 2HSS-028-8-4    NTS: 40        [none    f  2    ) na /na i PIPE/PIPE                              IC-F-2    I  na    I VOL/UT6.02 2HSS-01-05-FW020        (
QISO 01-05          or DWG&#xb9; na    in  (C5.51    (none    )
SUR/PT3.00/HT4.00 NHP2-28-1.34-CS    [  LINE&#xb9;  2HSS-028-6-4    NTS: 40        [none    [  2    J na  /na INTEG ATT;  2" thick plate            (C-C      (
na      SUR/PT3.00/HT4.00    I 2HSS-01-05-FM300            QISO 01-05 &#xb9;4      or DWG&#xb9; na in JC3.20 ]ID              na  /na LINE&#xb9; 2HSS-028-4-4    NTS: 40,44    (Handate) 2          na /na              I
[ INTEG ATT; 2a  thick plate            )C-C      )  na    (
SUR/PT3.00/Hl'4.00  [
2HSS.01-05-FW301        (
QISO 01-05  &#xb9;4      or  DWG&#xb9; na  .in  IC3.20 IID        I na  /na              I f LINE&#xb9; 2HSS-028-4-4    NTS: 40,44    JHandatef    2    J na /na              I f INTEG ATT;  10" diam. 1" waII pipe JC-C          f na    / SUR/PT3.00/HT4.00    /
2HSS-Ol-05-FW304          / QISO 01-05 &#xb9;1/2    or DMG&#xb9; na in JC3.20 ]ID            [ na  /na              I
                          / LINE&#xb9; 2HSS-048-9-4    NTS: 47,50    JHandatef    2    f na /na              I INTEG ATT;  10" diam. 1" wall pipe iC-C          ) na    / SUR/PT3.00/HT4.00 2HSS-01-05-FM305          I QISO 01-05 &#xb9;1/2    or DWG&#xb9; na in IC3.20 lID            I na /na J
LINE&#xb9; 2HSS-048-9-4    NTS: 47,50    /Handate/ 2        / na /na f INTEG  ATT; 10" diam. 1"  vaII pipe  ]C-C      ( na    [ SUR/Pl'3.00/HT4.00 2HSS-01-05-FW308          J QISO 01-05  &#xb9;19/20  or  DWG&#xb9; na    in JC3.20    ]ID    ) na  /na J
LINE&#xb9; 2HSS-048-9-4    NTS: 47,50    JHandate)    2    [ na  /na
 
NIAGARA HOHAMK POWER CORPORATION        -        NILE POINT NUCLEAR STATION - UNIT 2        16 of 65 NHP2-ISI-006, REV. 1, CN-OOO                                          SECOND TEH YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                    APPENDIX  G  - Hss  S'YSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED  (
DESCRIPTION OF ITEH To BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE                (PERIOD  1                      REHARKS EXAHINATION IDENTIFIER  (
ITS ISO LOCATOR, COHPONENT    DMG  &#xb9;, (ITEN  &#xb9;  (FREOY( EX2/NDE PROCEDURE        (PERIOD 2    (
USE CAL BLK  &#xb9; I  LINE No. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I
(  IHTEG ATT;  10" diem. 1" wall pipe (C-C          (
na  (
SUR/PT3.00/HT4.00 2HSS-01-05-FW309        (
QISO 01-05  &#xb9;19/20  or  DWG&#xb9;  na    in (C3.20 (Io      (
na  /na
(  LINE&#xb9; 2HSS-048-9-4      HTS: 47,50      (Handate(    2  (
na  /na
(  LM                                      IC-F-2    I na  I  VOL/UT6.02            I 2HSS-01-05-LM01-1        (
also  O1-OS        or  DMG&#xb9; na    in (C5.52    (none  I SUR/PT        /HT      I NHP2-48-3.50.CS    I  LINE&#xb9; 2HSS-048-9-4      NTS'7          INS          2    (
na  /na
(
LM                                      (C-F-2    ( na    (
VOL/UT6.02 2HSS-01-05-LM01-2        (
also ol-os          or  DMG&#xb9; na    in (C5.52    (none  I SUR/PT3.00/HT4 F 00    I NHP2-48-3.50.CS    I  LINE&#xb9; 2HSS.048.9-4      NTS: 47        IHS          2    (
na  /na
(  LM                                      IC-F-2    (
na    (
VOL/UT6.02 2HSS-01-05-LM02-1        (
QISO 01-05          or  DMG&#xb9; na    in (C5.52    (none  ( SUR/PT3 F 00/HT4.00    (
NHP2-48-3.50.CS    (  LINE&#xb9; 2HSS-048-9-4      NTS  47        INS          2    (
na  /na
(
LM                                      IC-F-2    (
na    (
VOL/UT6.02 2HSS-01-05-LM02-2        I  QISO 01-05          or  DMG&#xb9; na    in (C5.52    (none  I SUR/PT      /HT  00  I NHP2-48-3.50.CS    I  LINE&#xb9; 2HSS-048-9.4      NTS: 47        (Ns          2    ( na  /na
(  PIPE/CAP (conforms  to  ANSI  B16.9) (C-F-2      (
na    ( VOL/UT6.02 2HSS-01-05-SM001        (
QISO 01-05          or  DMG&#xb9; na  ~ in (C5.51    (none  I SUR/PT3.00/HT4.00      I NHP2-48-3.50-CS    (  LINE&#xb9; 2HSS-048-9-4      NTS:  47,49    (SD          2    ( na /na
(
PIPE/CAP (conforms  to  ANSI  816.9) (C-F-2      (
na    ( VOL/UT6.02 2HSS-01-05-SM003        (
also ol-o5          or  DWG&#xb9; na    in (C5.51    (none  ( SUR/PT3.00/HT4.00      (
NHP2-48-3.50.CS    (
LIHE&#xb9; 2HSS-048-9-4      NTS:  47,49    (SD      I  2    I na /na                (
I  OTLT/PIPE                              IC-F-2    ( na    (
VOL/UT6.02 2HSS-01-06-FM001        (  also 01-06          or  DWG&#xb9;  na    in (C5.51    (none  ( SUR/PT3.00/HT4.00      (
NHP2-16-1.031-CS  I  LINE&#xb9; 2HSS-016-25-4    NTS:  36,37    ISD          2    ( na  /na
(  P IPE/~AOV928                          IC-F-2    (
na    ( VOL/UT6.O2 2HSS-01-06-FM002        (  QISO  01-06        or DMG&#xb9; na in (C5.51        (none  ( SUR/PT3.00/HT4.00      (
NHP2-16-1.031-CS    (
LINE&#xb9; 2HSS-016-25-4 NTS: 52,54          (SD          2    ( na  /na
 
NIAGARA HOHAMK POMER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2        17 of 65 NHP2-ISI-006, REV. 1, CH-OOO                                          SECOHD TEN YEAR IHSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:    07/27/1999                                                                    APPENDIX G - HSS SYSTEH (sorted by Examination      Identifier) 2HD INTVL REL REO i DESCRIPTIOH OF ITEN TO BE EXAHIHEOiCATGRY          iIGSCCi      EX1/HDE PROCEDURE  iPERIDO  1                      REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPOHEHT DMG          &#xb9;i  IITEH  &#xb9; IFREQYI EX2/HDE PROCEDURE        IPERIDD 2 I USE CAL BLK  &#xb9; I LINE NO AND NOTES AS APPLICABLE ISELECT ICLASSI EX3/HDE                PROCEDURE IPERIOO 3 I I  PIPE/PIPE                            IC-F-2    J na    i  VOL/UT6.02 2HSS-01 FM014        i QISO    01-06        or DMG&#xb9; na    in iC5.51    Jnone    I  SUR/PT3.00/HT4.00  I HHP2-16-'I.031-CS  i  LINE&#xb9; 2HSS-016-25-4 NTS: 37          inone    I    2    I  na  /na            I I  PIPE/ELB                              IC-F-2    i  na i VOL/UT6.02 2HSS-01 FM015        i QISO    01-06        or DMG&#xb9; na in iC5.51        Inone J SUR/PT3.00/HT4.00        I HHP2-16-1.031-CS    I  LINE&#xb9; 2HSS 016 25 4 NTS'7 38          ISD            2 i na /na I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02 2HSS-01-06-SM001          t QISO    01-06        or DMG&#xb9; na in JC5.51        inone i SUR/PT3.00/HT4.00        i HHP2-16-1.031-CS    i  LINE&#xb9; 2HSS-016-25-4 HTS: 37,38        /SD            2    )
na /na I  PIPE/ELB                              IC-F-2    i  na    )
VOL/UT6.02 2HSS-01-06-SM002          i QISO  01.06        or  DMG&#xb9; na  in iC5.51    inone i SUR/PT3.00/HT4.00 i HHP2-16.1.031-CS    I  LINE&#xb9; 2HSS-016-25-4    NTS: 37,38    I SD          2    i  na/na              I I  ELB/PIPE                              IC-F-2    i na      J VOL/UT6.02 2HSS-01-06-SM003          I  QISO  01-06        or DMG&#xb9; na in )C5 ~ 51      (none    J SUR/PT3.00/HT4.00  i NHP2-16-1.031-CS    i  LINE&#xb9; 2HSS-016-25-4 NTS: 37,38        ISO            2    i na  /na
                          )  PIPE/PIPE                            IC-F-2    i  na    i  VOL/UT6.02 2HSS-01-06-SM004          / QISO 01-06          or  DMG&#xb9; na  .in  iC5.51    /none    i SUR/PT3.00/HT4.00    i HHP2-16-1.031-CS    i  LIHE&#xb9; 2HSS-016-25-4    NTS: 37        inone          2    i na /na I  0'ILT/ELB                            IC-F-2    i  na. i VOL/UT6.02 2HSS-01 FM001          )  Qlso 01-or          or DMG&#xb9; na in iC5.51        inone i SUR/PT3.00/HT4.00 i HHP2-18-.938-CS        LINE&#xb9; 2HSS 018-34-4 NTS: 51,52        LSD            2    i na  /na I, PIPE/ELB                              IC-F-2    i  na    i VOL/UT6.02 2HSS-01-07-FM002          i Qlso 01-07          or  OMG&#xb9; na    in iC5.51    ilD      i SUR/PT3.00/HT4.00  i    Sc9 NHP2-18-.938-CS      i LINE&#xb9; 2HSS-018-34-4    HTS: 52,53    ISO            2    i na  /na I PIPE/ELB                              IC-F-2    i na      i VOL/UT6.02 2HSS-01-07-FM003            i QISO  01-07        or  DMG&#xb9; na    in iC5.51      inone i SUR/PT3.00/HT4 F 00 i HHP2-18-.938-CS      J LINE&#xb9; 2HSS-018-34-4 NTS: 52,53        LSD          2 i na/na
 
NIAGARA HOHAMK POMER CORPORATION            -          HILE POINT NUCLEAR STATION - UNIT 2        18 of 65 KHP2-ISI-006( REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION              (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                                        APPENDIX    G  - HSS SYSTEH (sorted by Exininat ion Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                          IPERIOD  1  I                    REHARKS EXAHINATION IDENT IF IER      ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  (ITEH    &#xb9; (FREQY( EX2/KDE PROCEDURE          (PERIOD 2 I USE CAL BLK  &#xb9; I  LIKE Ho  AND KOTES    AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE                  IPERIOO 3 I I  PIPE/ELB                                IC-F-2      (
na    (
VOL/UT6.02 2HSS-01 FM004        I QISO    01-07          or DMG&#xb9; na in IC5.51          (none    (
SUR/PT3.00/HT4 F 00    (
NHP2-18-.938-CS    (
LINE&#xb9; 2HSS-018-34-C HTS: 52,53          (SD              2    I  na  /na                I I PIPE/BYPASS CHEST IC-F-2      (  n      (
VOL/UT6.02 2HSS-01-07-FM005          I  QISO 01-07            or  DMG&#xb9; na  in  (C5.51                I  SUR/PT3.00/HT4.00-(
                                                                                                          'none NHP2-18-.938-CS    I  LINE&#xb9; 2HSS-018-34-4      NTS: 53,54    ISD        I    2    I  na /na                  I I  OTLT/ELB                                IC-F-2      I  na    I  VOL/UT6.02              I 2HSS-01 FM006          I  QISO  01-07          or  DMG&#xb9; na  in  (C5.51      (none    I SUR/PT3.00/HT4.00      I NHP2-18-.938-CS      I  LINE&#xb9; 2HSS 018  '10 4    Nl'S'i  2    ISO        I    2    I  na                      I I  PIPE/ELB                                IC-F-2      (  na    (
VOL/uT6.02                        I 2HSS.01-07-FM007          (
QISO O1-O7            or  DMG&#xb9; na  in  (C5.51      (none    (
SUR/PT3.00/HT4.00      (          I NHP2-18-.938-CS      I  LINE&#xb9; 2HSS-018-10.4      NTS: 52,53    ISO              2    I  na /na                  I          I.
I  PIPE/ELB                                IC-F-2      I  na    I  voL/uT6.o2 2HSS-01-07-FM008          I  QISO 01-07            or  DMG&#xb9; na    in (C5.51      (none    I SUR/PT3.00/HT4.00      (
NHP2-18-.938.CS      I  LINE&#xb9;  2HSS 018 10 4    N'IS'2i53      ISD              2    (
na  /na                I I  PIPE/BYPASS CHEST                      IC-F-2      (
na    (
voL/UT6.O2 2HSS-01-07-FM009          I  QISO  01.07          or DMG&#xb9; na .in (C5.51          (none    I  SUR/PT3.00/HTC.OO      (
NHP2-18-.938-CS      I  LIHE&#xb9; 2HSS-018-10-4 NTS: 53,54          (SD              2    I na /na                  I I  ELB/PIPE                                IC-F-2      (
na      (
VOL/uT6.O2 2HSS.01-07-SM001          I  QISO  01-07          or  DMG&#xb9; na    in  (C5.51      (none    (
SUR/P'T3.00/HT4 F 00    I KHP2-18-.938- CS    I  LINE&#xb9; 2HSS-018-3C-4 NTS: 52,53          (SD        I 2      I na /na                  I I PIPE/ELB                                IC-F-2      (
na      (
VOL/UT6.02 2HSS-01-07-SM002            I QISO 01-07            or  DMG&#xb9; na    in  IC5 ~ 51    (none    ( SUR/PT3.00/HT4.00        I KHP2-18-.938-CS      I LINE&#xb9; 2HSS-018-3C-4      HTS: 52,53      ISO            2    I na /na                  I I ELB/PIPE                                IC-F-2      (
na      (
voL/uT6.O2 2HSS-01-07-SM003          I QISO  01-07          or DMG&#xb9; na in (C5.51          (none    ( SUR/PT3.00/HT4 F 00      (
NHP2-18-.938-CS      I LINE&#xb9; 2HSS-018-34-4 NTS: 52,53          ISD        (  2    I na /na
 
NIAGARA HOHAMK POMER CORPORATION              -      HILE POINT NUCLEAR STATION - UNIT 2        19 of 65 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/27/1999                                                                        APPENDIX G - HSS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                      IPERIOO  1  I                    REHARKS EXAHIHAT ION IDEN'I IF IER    ITS ISO LOCATOR, COHPONEHT DMG      &#xb9;,  ]ITEN    &#xb9; JFREQY[ EX2/NDE PROCEDURE      [PERIOD 2 [
USE CAL BLK    &#xb9; I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  ELB/PIPE                                IC.F-2    [  na  [    VOL/UT6.02 2HSS-01-07-SM004          )  QISO 01-07          or DMG&#xb9; na in )C5.51          ]none  J SUR/PT3.00/HT4.00  J NHP2.18-.938-CS      I  LINE&#xb9; 2HSS 018 34 4 NTS'          3    ISO            2  f    na  /na I  ELB/PIPE                                IC-F-2    I  na    I  VOL/UT6.02 2HSS-01-07-Sl$ 05          I  QISO  01-07          or DMG&#xb9; na in )C5.51          (none    J SUR/PT3.00/HT4.00  J NHP2.'18-.938-CS    [  LIHE&#xb9; 2HSS.018-34-4 NTS: 52,53          [SO            2    /  na  /na I  ELB/PIPE                                IC-F-2    I  na    I  VOL/UT6.02 2HSS-01-07-SM006              QISO  01-07          or DMG&#xb9; na in [C5.51          [none        SUR/PT3.00/HT4.00 NHP2-18-.938.CS I
I  LINE&#xb9; 2HSS 018 34 4 NT      '2    53    ISD            2
                                                                                          )
                                                                                          /  na  /na f
(18")  PIPE/SML (6")                    IC-F-2    I  na    I  SUR/PT3.00/HT4.00  I 2HSS-01-07-SM007              QISO  01-07          or DMG&#xb9; na in (C5.81          (none    f  na  /              I LINE&#xb9; 2ASS-006-125-4 NTS: 53(55          LSD            2    /  na/na              I I  PIPE/ELB                                IC-F-2    I  na    I  VOL/UT6.02          I 2HSS-01-07-SM008          I QISO  01-07          or DMG&#xb9; na in (C5.51          ]none    f  SUR/PT3.00/HT4.00    f NHP2-18-.938-CS      i LINE&#xb9; 2HSS-018-34-4      HTS: 52,53      ISO        I  2    I  na/na                I I ELB/PIPE                                IC-F-2    )  na    )  VOL/UT6.02 2HSS-01-07-SM009            I QISO  01-07          or DMG&#xb9; na    .in  )C5.51    ]none    f  SUR/PT3.00/HT4.00    f NHP2-18-.938-CS      I LINE&#xb9; 2HSS 018 34 4 NTS'          53    ISD        I  2    I  na  /na              I I ELB/PIPE                                IC-F-2      (
na    [  VOL/UT6.02 2HSS-01-07-SI$ 12          i QISO  01-07          or DMG&#xb9; na in (C5.51          ]none    f  SUR/PT3.00/HT4.00    ]
NHP2-18-.938-CS      I LINE&#xb9; 2HSS-018-10.4 NTS: 52,53          ISD            2    /  na  /na I PIPE/ELB                                (C-F-2      [ na    ]  VOL/UT6.02 2HSS-01-07-9813            [ QISO  01-07          or DMG&#xb9; na in [C5.51          IID      I  SUR/PT3.00/HT4.00    I Sc9 NHP2-18-.938.CS      ) LINE&#xb9; 2HSS-018-10-4 NTS: 52,53            i SO      i  2    )
na /na I ELB/PIPE                                  IC-F-2    )
na    J VOL/UT6.02 2HSS-01-07-9514            i QISO 01-07            or  DMG&#xb9; na    in  )CS ~ 51  )none    )  SUR/PT3.00/HT4.00    J NHP2-18-.938.CS      I LINE&#xb9;  2HSS  018 10 4    NTS'2    53      ISD          2      f na /na
 
NIAGARA HOHAMK POMER CORPORATION          -    .c HILE POINT    NUCLEAR STATION  - UNIT 2            20 of 65 NHP2-ISI-006, REV. 1( CN-000                                            SECOND TEN YEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date: 07/27/'1999                                                                      APPENDIX G -  HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    IPERIOD  1  I                            REHARKS EXAHINATION IDENI'IFIER    ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  i ITEN  &#xb9; iFREQYi EX2/NDE PROCEDURE      iPERIOD 2 i USE CAL BLK  &#xb9; I  LINE  No. AND NOTES,  AS  APPLICABLE    ISELECT  ICLASSI      EX3/NDE PROCEDURE !PERIOD 3 I I  ELB/PIPE                                  IC-F-2    I  na    I  VOL/UT6.02          I 2HSS-01-07-SM015        I  QISO  01-07            or DMG&#xb9; na in iC5.51        inone i SUR/PT3.00/HT4.00        i NHP2-18-.938.CS    I  LINE&#xb9; 2HSS-018-10.4 NTS: 52I53            I SD          2 i. na /na                  I i ELB/PIPE                                  IC-F-2    I  na    I  VOL/UT6.02          I 2HSS-01-07-SM017        i  also o1-o7            or  DIIG&#xb9; na  in iC5.51    inone    i SUR/PT3.00/HT4.00    i NHP2-18-.938-CS    i  LINE&#xb9; 2HSS-018-10-4      NTS:  52,53    [SD          2    J na /na              I I  PIPE/ELB                                  IC-F-2    I  na    i  VOL/UT6.02          I 2HSS-01-07-SM018        I QISO  01-07            or DMG&#xb9; na in iC5.51        inone    i SUR/PT3.00/HT4.00    i NHP2-18-.938-CS    i LINE&#xb9; 2HSS-018-10.4        NTS: 52,53      JSD          2    i na /na              I I  ELB/PIPE                                  IC-F-2    I  na    I  VOL/UT6.02          I 2HSS-01-07-SM019        I  QISO  01-07            or  DMG&#xb9;  na  in  iC5.51    inone i SUR/PT3.00/HT4.00        i NHP2-18-.938-CS      LINE&#xb9;  2HSS-018-10.4      NTS:  52,53    i SD      I  2    I  na /na I  SE/PIPE  Q N3A Az072 HAIN STEAN          iB-J      i na      i VOL/UT6.O2                      ioeselected during 2nd 10-Year Update 2HSS.01-13-F'M001        i  QISO 01-13            or D'MG&#xb9; na    in i89.11    /none    i  SUR/PT3.00/HT4.00  i          I NHP2.26.1.26-CS      LINE&#xb9;  2HSS-026-43-1      NTS: 1,2        iNS            1    dna/                              I I  ELB/PIPE                                  IB-J      i na      i VOL/UT6.02          /Ex6        iHT/UT QRF0-6.
2HSS-01-13-FM002        i QISO 01-13              or  DMG&#xb9; na  .in  iB9.11    IID      I  SUR/PT3.00/HT4.00  I          I NHP2-26-1.26-CS      LINE&#xb9; 2HSS-026-43-1      NTS:  2,3        iHS                i  na/                            I I PIPE/ELB                                  IB-J    i na      i VOL/UT6.02 2HSS-01 FM003        i QISO 01-13            or  DMG&#xb9; na    in iB9.11    inone    i SUR/PT3.00/HT4.00  i NHP2-26-1.26  CS    I LINE&#xb9;  2HSS 026 43  1    NTS'    3        IN            1    i na /na I ELB/PIPE                                  IB-J      i n      i VOL/UT6.O2 2HSS.01-13-FM004          i also 01-13            or  DMG&#xb9; na    in iB9.11    inone    I SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS      LINE&#xb9;.2HSS-026-43-1      NTS:  2,3        iNS          1    [ na/na PIPE/ELB                                  IB J      i na      i VOL/UT6.02          iEx6        iHT/UT QRF0-6.
2HSS-01-13-FM005            QISO  01-13            or DMG&#xb9; na      in  189.11    iID      i SUR/PT3.00/HT4.00  i            I NHP2-26-1 '6.CS      LINE&#xb9; 2HSS-026-43-1 NTS: 2,3              i NS/ber            dna/                              I
 
NIAGARA MONAMK POMER CORPORATION -                HILE POINT  NUCLEAR STATION  - UNIT 2                                        21 of 65 NMP2- IS I-006( REV. 1 ~  CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change  date: OT/27/1999                                                                      APPENDIX G - Mss SYSTEH (sorted by Examination Identifier)
NO  INTVL REL RE4  I DESCRIPIION OF ITEH To BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD                1                                  REMARKS EXAHINATION IDENTIFIER      I ITS ISO LOCATOR,  COMPONENT DMG    &#xb9;, I ITEN &#xb9; IFRE4YI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK  &#xb9;  I LINE No  AND NOTEsi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I PIPE/PENET 21A                          IB-J    I  na    I  VOL/UT6.02          IEx6        IHT/UT QRFO  6.
2HSS-01-13-FM008            I QISO 01-13          or  DMG&#xb9; na    in IB9.11  IID      I  SUR/PT3.00/NT4.00  I          I NMP2-26-1.26-CS      I LINE&#xb9; 2HSS-026-43-1    Hl'S: 2,12      ITEV/berI 1        I  na  /                          I I PENET  21A/PIPE                        IB-J      I  na    I  VOL/UT6.02          I 2HSS-01 FM009          I QISO 01-13          or  DMG&#xb9; na    in IB9.11    IID      I  SUR/PT3.00/NT4.00  I NMP2-26-1.26-CS      I LINE&#xb9; 2HSS-026-152-1 NTS: 2,12          ITEV/berI 1        I  na  /              I    Scil I EXPANDER/PIPE                          IC-F-2    I  na    I  VOL/UT6.02          I          I 2NSS.01-13-FM020            I QISO 01-13          or  DMG&#xb9; na    in IC5.51    IID      I SUR/PT3.00/HT4.00  I          I NMP2-28-1.34-CS      I LINE&#xb9; 2HSS-028-1-4      NTS: 14,15      ISD/ber  I  2    I na  /na                  Scil  I PIPE/<<ADYTA                            IB-J      I  na      VOL/UT6.02          IEx6        INissed 1st  Intrvl UFSAR  Exam Cormltment, Ref DER2-1998-0090. MT/UT 2MSS-01 FM021            alSO 01-13          or DUG&#xb9; na      in IB9.11    I ID        SUR/PT3.00/MT4.00 I            IAutoUT QRFO-6  with no growth from prior Vol  exam. USFAR coma't being NMP2-26-1.26-CS        LINE&#xb9; 2HSS-026-152-1 NTS: 2,11          IBER      I    1    I na  /                    Scil Ichanged to comply    M/Code  Req's. Exam QRF0.11, then revert to once /loy I PIPE/PIPE                              IB-J      I  na    I VOL/UT6.O2 2MSS-01-13-FM022            I Qlso 01-13          or DMG&#xb9; na      in IB9.11    IID      I SUR/PT3.00/MT4 F 00 I NNP2-26-1.26-CS      I LINE&#xb9; 2MSS-026-152-1 NTS: 2            IBER                                          Scil I <<ADYTA/PLUG  (2")                      IB-J      I  na    I SUR/PT3.00/NT4.00  I 2MSS-01-13-FM023            I QISO 01-13          or  DMG&#xb9; na  .in  IB9.40    Inone    I na  /na            I I LINE&#xb9; 2HSS-002-152-1 NTS:.10      11    INS            1    I na/na              I
                              *AOV6A/PIPE (OLD SM014 LOCUS)          IB-J      I  na    I VOL/UT6.02          IEx6        INT/UT QRF0-6.
2HSS-01-13.FM025            I QISO O1-13          or  DMG&#xb9; na    in IB9.11    IID      I SUR/PT3 00/MT4 00  I          I NMP2-26.1 ~ 26.CS    I LINE&#xb9; 2HSS.026-43-1    NTS: 2,11      IBER                                                  I I
PIPE/<<AOV6A                            IB-J      I  na    I VOL/UT6.02          IEx6        IMT/UT QRF0.6.
2MSS-01 FM026          I QISO 01-13          or  DMG&#xb9; na    in IB9.11    IID      I SUR/PT3.00/NT4.00  I          I NHP2-26-1 ~ 26-CS    I LINE&#xb9; 2HSS-026-43-1    NTS: 2,11      IBER          1    Ina/                              I I HSS LOOP A SOL/PLUG  (2")              IB-J      I  na    I SUR/PT3  00/HT4 00  I 2MSS-01-13-FM027            I QISO  01-13          or DMG&#xb9; na      in IB9.40    Inone    I na  /na LINE&#xb9; 2NSS-002-43-1 NTS: 9,10          INS            1    I na /na              I
 
NIAGARA HOHAIC POWER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2        22 of 65 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX G - NSS SYSTEN (sorted by Examination Identifier)
ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1                  I                    REHARKS EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, COHPONENT DWG        &#xb9;,  [ ITEH &#xb9;  (FREQYJ EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE )SELECT        iCLASSi EX3/NDE PROCEDURE (PERIOD 3 I  ~AOV6A/PLUG  (2")                    )8-J      [  na    f  SUR/PT3.00/HT4.00  ]
2MSS-01-13-FN028        i QISO    01-13        or DNG&#xb9; na    in  (89 40    [none    (
na /na I  LINE&#xb9; 2HSS-002-43-1 NTS: 10,11        INS      I    1    I  na /na              I I INTEG ATT                              )8-K      ]  na    I  SUR/PT3.00/HT4.00 JEx6          iHT QRF0-6.
2HSS-01 Fl600        (
QISO 01-13  &#xb9;1      or  DUG&#xb9; na  in (810.20 ]ID          /  na /na I  LINE&#xb9; 2HSS-026-43-1    NTS: 2,5      )Mandate]      1  /  na /na              I I INTEG ATT                              IB-K      J na    f SUR/PT3.00/HT4.00  JEx6        IHT QRF0-6.
2MSS-01 FN301        [ QISO 01-13    &#xb9;1      or  DUG&#xb9; na  in )810.20 [ID          f na /na              I          I na                (  LINE&#xb9; 2HSS-026-43-1    NTS: 2c5      /Mandatej      1    / na /na              I          I INTEG ATT                            (8-K      [  na    f SUR/PT3.00/HT4.00 JEx6          IHT QRFO 6 2MSS-01 FW302        J QISO  01-13 &#xb9;1      or DUG&#xb9; na    in (810.20 (ID          i na /na na                  I  LINE&#xb9; 2HSS-026-43.'I NTS: 2,5        ]Mandate]      1    ) na /na              I I INTEG ATT                              [8  K    J na    ) SUR/PT3.00/HT4.00 )Ex6          IHT QRF0-6.
2HSS-01 Fl603        I QISO 01-13  &#xb9;1      or  DUG&#xb9; na  in (810.20 ]ID          f na /na na                  I  LINE&#xb9; 2HSS-026-43-1    NTS: 2(5      /Mandate)      1    J na /na              I I  INTEG ATT                            ]8-K      )
na    )
SUR/PT3.00/HT4.00    (Ex6      IHT QRF0.6.
2MSS-01 Fl604        J QISO  01-13 &#xb9;1      or DUG&#xb9; na  ~ in (810.20    JID        f na  /na              I          I na                  )
LINE&#xb9; 2MSS-026-43-1 NTS: 2,5          ]Mandate(      1    / na  /na              I          I I INTEG ATT                              )8-K      f  na    f SUR/PT3.00/MT4.00 JEx6          IHT cilRF0.6.
2MSS-01 Fl605        f  QISO 01-13  &#xb9;1      or  DUG&#xb9; na  in  JB10.20 ]ID          f na  /na na                  i  LINE&#xb9; 2HSS-026-43-1    NTS: 2,5      ]Mandate] 1          f na /na              I I INTEG ATT                              [8-K      f  na    f SUR/PT3.00/HT4.00    JEx6      iHT QRF0-6.
2MSS-01 FM306        )  QISO 01-13  &#xb9;1      or  DNG&#xb9; na    in [810.20    / ID      J na  /na
                          )  LINE&#xb9; 2MSS-026-43-1    NTS: 2,5        (Mandate/      1    f na /na              I I  INTEG ATT                            [8-K      f  na    [ SUR/PT3.00/NT4 F 00 (Ex6        iHT QRF0-6.
2HSS-01-13-Fl607          ( QISO 01-13  &#xb9;1      or  DWG&#xb9; na    in (810.20 )ID          f na /na LINE&#xb9; 2HSS-026-43-1    NTS: 2,5        /Mandate/      1    / na /na              I
 
NIAGARA MOHAIIK PNER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2        23 of 65 NHP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR INSERVICE INSPECTIOH          (ISI)  INTERVAL PLAH Change date: 07/27/1999                                                                          APPENDIX G - HSS SYSTEH (sorted by Examination Identifier)
ND INTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE iPERIDD 1                                            RENARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, CONPOHENT DUG          &#xb9;,  iITEH  &#xb9; iFREOYi EX2/NDE PROCEDURE )PERIOD 2 i USE CAL BLK &#xb9; f  LINE  NO. AND  NOTES,  AS  APPLICABLE    ]SELECT  [CLASS[ EX3/NDE PROCEDURE ]PERIOD 3 I  INTEG ATT                                /B-X      /  na        SUR/PT3.00/HT4.00  iEx6        iNT QRF0.6.
2NSS-01-13-Fl608        )
QISO 01-13  &#xb9;2        or  DMG&#xb9; na    in /B10.20 /ID          /  na /na                        I na                i LINE&#xb9; 2NSS-026-43-1        NTS: 2,5        /Mandate/      1    / na    /na            I          I INTEG ATT                                tB-X      /  na        SUR/PT3.00/HT4.00  iEx6      IMT QRFO  6.
2MSS-01-13-Fl609            QISO 01-13  &#xb9;2        or  DHG&#xb9; na    in [810.20 )ID          J na  /na            I          I na                    LINE&#xb9; 2NSS-026-43-1      NTS: 2(5        (Mandate)      1    J na /na              I          I I  INTEG ATT                                /8-K      /  na    [  SUR/PT3.00/HT4.00  iEx6      IMT QRFO 6 2MSS.01-13-Fl610        (
QISO 01-13  &#xb9;2        or  DUG&#xb9; na    in /810.20 /ID          /  na /na              I          I na                I  LINE&#xb9; 2MSS-026-43-1      NTS: 2,5        /Mandate/      1
                                                                                          /  na /na              I          I I  INTEG ATT                                /B-K      /  na        SUR/PT3.00/MT4.00 iEx6        IMT QRF0.6 2MSS-01-13-FM311        (
QISO 01-13 &#xb9;2          or DUG&#xb9; na    in /810.20 )ID          /  na /na              I          I na                i  LINE&#xb9;  2MSS-026-43-1      NTS: 2(5        /Mandate)      1    )  na /na              I          I I  INTEG ATT                                lB-K      I na      i  SUR/PT3.00/HT4.00 iEx6        IMT QRFO 6 2NSS-01 F W312      (
QISO 01-13  &#xb9;7/8      or  DUG&#xb9; na    in  /810.20 /ID          )
na /na              I          I i  LINE&#xb9; 2MSS-026.43-1      HTS: 2,8        /Mandate/      1    f  na /na              I          I I  IHTEG ATT                                JB-K      (  na        SUR/PT3.00/HT4.00  [Ex6      IMT ciIRFO 6.
2MSS-01 FN313        [  QISO 01-13  &#xb9;7/8      or  DWG&#xb9;  na ~  in JB10.20  (
ID      )
na /na              I          I na                f  LINE&#xb9; 2MSS-026-43-1      NTS:  2,8      ]Mandate]      1    /  na /na              I          I INTEG ATT                                /8-X        na        SUR/PT3.00/MT4.00 iEx6        )MT  QRF0-6.
I                                                      J 2MSS.01 Fl614        )
QISO 01-13  &#xb9;7/8      or  DUG&#xb9; na    in /810.20 /ID          (
na /na              I          I I  LINE&#xb9;  2NSS 026 43  1    NTS'    8        /Mandate[      1    )
na /na              I          I I  IHTEG ATT                                (B-X      /  na      I SUR/PT3  00/NI4 00 IEx6        iMT QRF0-6.
2MSS.01-13-FI615        [ QISO  01-13 &#xb9;7/8      or,DNG&#xb9; na      in )810.20 (ID          (
na  /na            I na                I  LINE&#xb9; 2HSS 026 43 I NTS'(8                IMandatel            f na  /na            I IHTEG ATT                                JB-X      /  na        SUR/PT3.00/MT4.00 iEx6          iNT QRF0-6.
2NSS.01 Fl616        )  QISO 01-13  &#xb9;12/13    or  DNG&#xb9; na    in /810.20 /ID          f na /na              I na                  I LINE&#xb9; 2MSS-026-43-1      NTS:  2(5        )Mandate/      1    J na /na              I
 
NIAGARA HOHAMK POMER CORPORATION -              HILE POINT NUCLEAR STATION - UNIT 2        24 of 65 NHP2 IS  I 006g REV 1 CH 000
                      ~                                                  SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date: 07/27/1999                                                                    APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCi EX1/NDE PROCEDURE                  I ERIOD  1  I                    REHARKS EXAHINATION IDENTIFIER      ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  iITEH &#xb9;  iFREOYi EX2/NDE PROCEDURE      iPERIOO 2 i USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  INTEG ATT                                ie-K    i na    i  SUR/PT3.00/HT4.00 iEx6          iHT QRF0.6.
2HSS.01 FM317        i QISO 01-13  &#xb9;12/13    or  DMG&#xb9; na    in I810.20 IID        I  na  /ns            I          I i LINE&#xb9; 2HSS-026.43-1      NTS:  2(5        iHandatei    1  i na  /na            I          I I IHTEG ATT                                  IB-K    I  na  I  SUR/PT3.00/HT4.00 lEx6          iHI'RF0-6.
2HSS-01-13-FM318          i QISO 01-13  &#xb9;12/13    or  DMG&#xb9; na    in ie10.20 ilD        i na  Ina                        I i LINE&#xb9; 2HSS-026-43-1      NTS: 2 5        iHandatei    1    i na  /na          ~
I          I INTEG ATT                                IB-K      I na    I SUR/PT3.00/HT4.00 iEx6          iHT QRFO  6.
2HSS-01-13-FM319          i  QISO 01-13 &#xb9;12/13 or DMG&#xb9; na        in i810.20 iID        i na /na              i LINE&#xb9; 2HSS.026.43-1 NTS: 2,5              iHsndatei    1    i na /na              I IN'TEG ATT                                ie-K      i na    i SUR/PT3.00/HT4.00  iEx6        IHT QRF0-6.
2HSS.01-13-FM320          i QISO  01-13 &#xb9;12/13 or DMG&#xb9; na        in i810.20 iID        i na  /na                        I I  LINE&#xb9; 2HSS.026.43-1      NTS 2 5          iHandatei 1      i ns  /na            I          I I  INTEG ATT                                iB-K      i na    i SUR/PT3.00/HT4.00  iEx6        IHT QRFO  6.
2HSS-01-13.FM321          i QISO  01-13 &#xb9;12/13 or DMG&#xb9; na        in ie10.20 ilD        i na Ina I  LINE&#xb9; 2HSS-026-43-1 NTS: 2                iHsndatei    1    i na  Ina            I I INTEG ATT                                  ie-K      i na    i SUR/PT3.00/HT4.00  iEx6        iHT QRF0-6.
2HSS-01-13-FM322          i QISO 01-13  &#xb9;12/13    or  DMG&#xb9; na  ~ in i810.20 iID        i na  /na                        I i LINE&#xb9; 2HSS-026-43-1      NTS:  2,5        iHandatei    1    i na /na              I          I I  INTEG ATT                                ie-K      i na    i SUR/PT3.00/HT4.00 iEx6          IHT QRFO  6.
2HSS-01=13.FM323          i QISO 01-13  &#xb9;12/13    or  DMG&#xb9; na    in i810.20 ilD        i na  /na na                  i  LINE&#xb9; 2HSS-026-43-1      N'IS: 2(5      .
iHsndatei    1 i na  /na            I I  INTEG ATT                                ie-K      i na    i SUR/PT3.00/Hl'4.00  iEx6        iHT QRFO  6.
2HSS.01 FM324        i QISO 01-13  &#xb9;14      or  DMG&#xb9; na    in ie10.20 ilD        i na Ina I  LINE&#xb9; 2HSS-026-43-1      NTS: 2 5        iHandatei                              I I  INTEG ATT                                iB-K      i na    i SUR/PT3.00/HT4.00  iEx6        iHT QRF0-6.
2HSS-01 FM325        i QISO 01-13  &#xb9;14      or  DMG&#xb9; na    in i810.20 ilD        i na Ins                          I I LINE&#xb9;  2HSS 026 43  1    NTS'            iHsndatei    1    i na  /na            I          I
 
NIAGARA MOHAMK POMER CORPORATION        -        ILE POINT NUCLEAR STATIOH - UNIT 2        25 of 65 NMP2-ISI-006( REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/27/1999                                                                  APPENDIX G - MSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE                  iPERIDO  1                        REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR> COMPONENT DMG        &#xb9;i  IITEM  &#xb9;  IFREQYI EX2/NDE PROCEDURE      IPERIDO 2 I                          II USE CAL BLK    &#xb9; I  LINE NO. AND  NOTES,  AS  APPLICABLE  ISELECT  ICLASSI    EX3/NDE  PROCEDURE  IPERIDO 3 I I IHTEG ATT                              IB K      I na    I  SUR/PT3.00/MT4.00 lEx6          IMT QRF0-6.
2MSS-01 F M326        i QISO 01-13 &#xb9;14        or  OMG&#xb9; na  in iB10.20 iID      )  na /na                          I I  LINE&#xb9; 2HSS-026.43-1      HTS: 2(5      JMandatei    1  i na  /na              I          I I  INTEG ATT                              IB-K      I na    I SUR/PT3.00/MT4.00 lEx6          IMT QRF0-6.
2MSS-01 FM327        i QISO  01-13 &#xb9;14      or DMG&#xb9; na    in [BI0.20 )IO        i na /na                I          I i  LINE&#xb9; 2HSS-026-43.1 NTS: 2,5          iMandate/    1    i na /na                I          I I  PIPE/ELB                              iB-J      i na    L VOL/UT6.02 2MSS-01 SM001        i QISO 01-13            or  DMG&#xb9; na  in iB9.11    inone i SUR/Pt3.00/MT4.00 i NMP2-26-1.26-CS    i  LINE&#xb9; 2HSS-026-43-1      NTS: 2,3      JNS          1    i na  /na I  ELB/PIPE                              IB-J      i na    i VOL/ut6.02 2MSS-01-13-SM002          i QISO 01-13            or  DMG&#xb9; na  in (89.11    inone    i SUR/PT3.00/Mt4.00    i NMP2-26-1.26-CS    i  LINE&#xb9; 2MSS-026-43-1      NTS: 2(3      iNS          1    J na  /na i PIPE/SOL  (26" to 2")                IB-J      i na    i SUR/PT3.00/Ml'4.00    [
2MSS-01-13-SM003          I QISO 01-13            or  OMG&#xb9; na  in iB9.32    iNS      [ na  /na I LINE&#xb9; 2MSS-002-107-1 NTS: 2(4          iNS          1    i na /na                I I PIPE/FLG  NOZ                          IB-J      J na    i VOL/Ut6.02            iEx6      iMT/UT QRF0-6.
2MSS-01-13-SM004          )
QISO 01-13            or  DMG&#xb9; na  .in iB9.31    !ID      I SUR/PT3 F 00/MT'0    I          I NMP2-26-1.26-CS      I LIHE&#xb9; 2HSS-026.43-1      HTS: 2,6      INS          1    dna/                              I i PIPE/FLG NOZ                          IB-J      / na    i VOL/UT6.02            iEx6      iMT/UT QRF0-6.
2MSS-01-13-SM005          i QISO 01-13            or  DMG&#xb9; na  in iB9.31    IID      I SUR/PT3.00/MT4.00    I          I NMP2-26-1.26-CS      i LINE&#xb9; 2HSS-026-43-1      NTS  2@6      IHS          1    )na/                              I PIPE/FLG  NOZ                        IB-J      i na    i VOL/UT6.02            JEx6      )MT/Ut  QRFO 6.
2HSS-01-13-SM006          I Ql    0113            or  DMG&#xb9; na  in /89.31    IIO      I SUR/PT3.00/MT4.00    I          I NMP2-26-1.26.CS      I LINE&#xb9; 2HSS-026-43-1      NTS: 2,6      [NS              dna/                              I I PIPE/FLG  NOZ                          IB-J    i na    i VOL/UT6.02            iEx6      iMT/Ut  QRFO 6.
2MSS-01-13-SM007          i QISO 01-13            or  DMG&#xb9; na  in iB9.31    IID      I SUR/PT3.00/MT4.00 I              I NMP2-26-1.26-CS        LINE&#xb9; 2MSS-026-43-1      NTS: 2,6      INS          1    dna/                              I
 
NIAGARA HOHAMK POMER CORPORATION            -      HILE POINT NUCLEAR STATION - UNIT 2        26 of 65 NHP2-1S1-006,  REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                                      APPENDIX  G - Hss    SYSTEH (sorted by Examination Identifier)
REHARKS 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY            i IGSCCi EX1/NDE PROCEDURE iPERIOO 1 EXAIIINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  iITEH  &#xb9; iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK  &#xb9; I  LINE  No. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  PIPE/ELB                                IB-J      i na      i VOL/UT6.02            iEx6        iHT/UT QRF0.6.
2HSS.01-13-SM008          [  also ol-13            or  DMG&#xb9; na  in i89.11    IID        I  SUR/PT3.00/HT4  F 00 I            I NHP2-26.1 '6-CS    I  LINE&#xb9; 2HSS-026-43-1      NTS: 2(3      IHS            1    dna/                    I            I I  ELB/PIPE                                (8-J      i na      i  VOL/Ul'6.02          [Ex6        IHT/UT QRFO 6 2HSS-01-13-SMOI0          )
also o1-13            or  DMG&#xb9; na  in i89.11    )ID        i SUR/PT3.00/HT4.00    i            I NMP2-26-1.26-CS      I  LINE&#xb9; 2HSS.026.43-1      NTS: 2,3      IBER                i  na/                              I i PIPE/SOL    (26" to 2") (PLUGGED)        (8-J      i na      i  SUR/PT3.00/HT4.00    i 2HSS-01-13-SM011          i  also ol-13            or DMG&#xb9; na in i89.32        inone      J na /na I  LINE&#xb9; 2HSS-002-43-1      NTS: 2,9      INS                  i na  /na I  PIPE/PIPE (HITRE CUT)                  IB-J      i na      i  VOL/UT6.02            iEx6        IHT/UT QRF0-6.
2HSS-01-13-SM013          i  also ol-13            or  DMG&#xb9; na  in /89.11    IID        I  SUR/PT3 F 00/HT4.00  I          I NHP2-26-1.26-CS      I  LINE&#xb9; 2HSS-026-43-1      NTS: 2        IBER          1    dna/                                I PIPE/PIPE (HITRE CUT)                  IB-J      i na      (
VOL/UT6.02 2HSS-O'I-13-SM015          I  QISO 01-13            or DMG&#xb9; na    in i89.11    )ID        i  SUR/PT3.00/MT4.00 i NHP2-26.1.26.CS      I  LINE&#xb9; 2HSS-026-152-1 NTS: 2            IBER          1    i na  /                  J Sc11 i *AOV7A/EXPANDER (26" to 28")          iB-J      i na      i  VOL/UT6.02 2HSS-01-13-SM020          [  also 01-13            or  DMG&#xb9; na ~  in i89.11    IID        I SUR/PT  '0 /HT4 0    I NHP2-26-1.26-CS      I  LINE&#xb9; 2HSS-026-152-1 NTS: 11,14          IBER                dna/                            Sc11 i SE/PIPE    Q N38 Az108 HAIN STEAH        iB-J      i na      i VOL/UT6.02 2HSS-01 FM001          (
QISO 01-14            or DMG&#xb9; na    in i89.11    i2P        J SUR/PT3.00/Hl'4.00 isc8 NHP2-26-1.26-CS      i  LINE&#xb9;  2HSS-026-44-1    NTS: 1,2        (AM          1      )na/
I ELB/PIPE                                IB-J      i na      / VOL/UT6.02 2HSS-01 FM002          )
also ol-14            or  DMG&#xb9; na    in i89.11    (none i SUR/PT3.00/HT4.00          I NHP2-26-1.26-CS      I LINE&#xb9; 2HSS.026-44-'I    NTS: 2,3        IHS      I  1      I na /na                I I ELB/PIPE                                IB-J      I na      I VOL/UT6.02            I 2HSS-01 FM003          i QISO 01-14            or  DMG&#xb9; na    sn (89.11    Inone      I SUR/PT3.00/HT4.00    I NHP2-26-1.26-CS      i LINE&#xb9; 2HSS-026-44-1      NTS: 2,3        INS            1 i na /na
 
NIAGARA HONAMK POWER CORPORATION          -      MILE POINT NUCLEAR STATION - UNIT 2        27 of 65 NHP2-ISI-006, REV. 1, CN-000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                  APPENDIX G - HSS SYSTEH (sorted by Examination    Identifier) 2ND INTVL REL RED [ DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY [ IGSCC(              EX1/NDE PROCEDURE  (PERIOD  1                      REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DllG      &#xb9;,  )ITEN  &#xb9; (FREOYJ EX2/NDE PROCEDURE      [PERIOD 2    J USE CAL BLK  &#xb9; I LINE NO    AND NOTESi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE            IPERIOO 3    I I  PIPE/ELB                              JB-J    f  na    f  VOL/UT6.02 2HSS-01 FM004        f  QISO  01-14        or DMG&#xb9; na    in )89.11    ]ID      (
SUR/PT3.00/HT4.00  f    Sc9 NHP2-26-1.26-CS    f  LINE&#xb9; 2HSS-026-44.1 NTS: 2,3          JNS/ber  J 1    /  na  /
I  PENET  218/PIPE                        (8-J    (
na    ]  VOL/UT6.02        J Sc7 2HSS-01 FM009        f QISO  01-14        or DMG&#xb9; na in (89.11 (10              f SUR/PT3.00/HT4.00  )
NHP2-26-1.26-CS    f  LINE&#xb9; 2HSS-026-151-1 NTS: 2,12        /TEV/berf 1        f na  /              I I  ELB/PIPE                              )8-J    J na    ] VOL/UT6.02 2HSS-01 FM013        I  QISO  01-14        or DMG&#xb9; na    in /89.11    ]none      f SUR/PT3.00/HT4.00  /
NHP2-26-1.26-CS    i  LINE&#xb9; 2HSS-026-44-1 NTS: 2,3          iNS            1    / na  /na
                        /  PIPE/ELB                              IB-J    I  na    I VOL/UT6 02 2HSS-01 FM014        i QISO  01-14        or DMG&#xb9; na    in )89.11    (
ID      J SUR/PT3.00/HT4.00  J Sc9 NHP2-26.1.26.CS    I  LINE&#xb9; 2HSS-026-44-1    NTS: 2,3      INS                f na/
I EXPANDER/PIPE                          IC-F-2 [ na        [ VOL/UT6.02          ]    Sc7 2HSS-01 FM020        I QISO  01-14          or DMG&#xb9; na in [C5.51 IID              I SUR/PT3.00/HT4.00  I NHP2-28-1.34-CS    [ LINE&#xb9; 2HSS-028-3-4      NTS: 14,15    )SD/ber      2    f na /na I PIPE/*AOV78                            IB-J    J na    (
VOL/UI'6.02        [    Sc7 2HSS-01-14-FM021          I Ql    01 14          or  DMG&#xb9; na . in (89.11    IID        I SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS    i LINE&#xb9; 2HSS.026-151-1    NTS: 2,11      ABER          1    /na/
I PIPE/PIPE                              IB-J    (  na    )
VOL/UT6.02          )
Sc7 2HSS-01-14-FM022          [ QISO  01-14          or DMG&#xb9; na    in (89.11    IID        I SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS    I LINE&#xb9; 2HSS-026-151-1 NTS: 2            IBER                / na/
i ~AOV78/PLUG  (2")                    IB-J      I  na    I SUR/PT3.00/HT4.00  I 2HSS-01 FM023        i QISO  01-14          or  DMG&#xb9; na    in )89.40    /none    / na /na
                          )
LINE&#xb9; 2HSS-002-151-1 NTS: 10,11        )NS            1    / na /na              I i iAOV68/PENET Z18                      (8-J      J na    [ VOL/UT6.02 2HSS-01 FM025        f QISO  01-14          or  DMG&#xb9; na    in (89.11 [ID          i SUR/PT3.00/HT4.00  (    Sc9 NHP2-26-1.26-CS    f LINE&#xb9; 2HSS-026-44-1 NTS: 11,12        JTEV/ber/ 1        )
na  /
 
NIAGARA HOHAHK POHER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        28 of 65 NMP2-ISI-006, REV. 1, CM-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                                    APPENDIX G - HSS SYSTEM (sorted by Examination    Identifier)
HD INTVL REL REO  I  DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE              (PERIOD  1  I                    REHARKS EXAHIHATIOH IDENTIFIER  (
ITS ISO LOCATOR,  COMPONENT DNG    &#xb9;,  (ITEH &#xb9;  (FREOY( EX2/NDE PROCEDURE (PERIOD 2 USE CAL BLK  " I  LINE  NO  AND  NOTES'S    APPLICABLE (SELECT (CLASS( EX /NDE PROCEDURE (PERIOD                I
(
PIPE/*AOV68                            IB-J      I  ns    I  VOL/UT6.02        I            I 2NSS-01 FN026        (
QISO 01-14          or  DMG&#xb9; ns    in (89.11    (ID      (
SUR/PT3.00/HT4.00  (
Sc9    I NMP2-26-1.26.CS    I  LINE&#xb9; 2HSS-026-44-1    HTS: 2,11      IBER      I  1    I ns  /              I          I I  PIPE/PIPE                              IB J      I  na    I VOL/UT6.02 2HSS-01 FH027        (
QISO 01-14          or  DUG&#xb9; na    in (89.11    (ID      (
SUR/PT3.00/NT4.00  (
Sc9 NNP2-26-1.26-CS    I  LIMES 2HSS.026-44-1    HTS: 2          IBER      I  1    I na  /              I I  *AOV68/PLUG  (2s)                      IB-J      I  ns    I SUR/PT3.00/MT'0    I 2MSS-01 FH028        (
QISO 01-14          or  DMG&#xb9; na    in (89.40    (none    ( na /na
(  LINE&#xb9; 2HSS-002-44-1    NTS: 10,11      (NS      (  1    ( na /na              I
(
                            *AOV68/PLUG  (2s)                      IB-J      I  na    I SUR/PT3.00/HT4.00  I 2HSS-01 FW030        (
QISO 01-14        ~ or  DHG&#xb9; na    in (89.40    (none    (
na  /na
(
LINE&#xb9; 2NSS-002-44-1    NTS: 10,11      (HS      (
1    (
na /na              I I  INTEG ATT                              IB-K      I  na    I SUR/PT3.00/HT4.00  I 2MSS-01 FW300        (
QISO 01-14  &#xb9;8/9    or  OIIG&#xb9; na  in (810.20 (ID          ( na  /na            I
(
LINE&#xb9; 2NSS-026-44-1    NTS:  2,8      (Hsndate(    1    (
na  /na            I I  IHTEG ATT                              (8-K      (
na    ( SUR/PT3.00/HT4.00  (
2MSS.01 FI601        (
QISO 01-14  &#xb9;8/9    or  DIIG&#xb9; na ~ in (810.20 (ID          (
na  /na
(
LINE&#xb9; 2HSS-026-44-1    NTS:  2,8      (Mandate(    1    (
na /na              I I  IHTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00  (
2MSS-01 FI602        (
QISO 01-14 &#xb9;8/9      or DMG&#xb9; na      in (810.20 (ID        (
na /na
(
LINE&#xb9;  2HSS-026-44-1    NTS: 2,8        (Hsndate(      1    ( na  /na            I I INTEG ATT                                IB K      I na    I SUR/PT3 00/HT4.00 I 2NSS-01-14-FI603          (  QISO 01-14 &#xb9;8/9      or DMG&#xb9; na      in (810.20 (ID        (
na  /na
(
LINE&#xb9;  2HSS-026-44-1    NTS: 2,8        (Mandate(      1    (
na  /na            I IHTEG ATT                              (8-K      (
na      SUR/PT3.00/HT4.00  I 2MSS-01 FI604          (
QISO 01-14 &#xb9;1        or  DUG&#xb9; na    in (810.20 (ID          na  /na            (
(
LINE&#xb9; 2HSS-026.44-1    NTS:  2,5      (Hsndate(      1      na  /na            I
 
NIAGARA HOHAMK POMER CORPORATION              -      HILE POINT NUCLEAR STATION - UNIT 2        29 of 65 NHP2-ISI-006, REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED  (
DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD                1                        REHARKS EXAHINATION IDENTIFIER  (
ITS ISO LOCATOR,  COHPONENT DMG    &#xb9;,  (ITEH &#xb9;  (FREQY( EX2/NDE PROCEDURE        (PERIOD 2  (
USE CAL BLK  &#xb9; (
LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I  INTEG ATT                              (8-K - ( na        I  SUR/PT3'00/HT    00  I 2HSS-01 FM305        (
QISO  01-14 &#xb9;1      or DMG&#xb9; na      in  (810.20 (ID        (
na  /na LINE&#xb9; 2HSS-026-44-1    HTS: 2,5        (Handate(      1    (
na /na              I I INTEG ATT                                (8-K      (
na    I  SUR/PT3.00/HT4.00    I 2HSS.01-14-FM306        (
QISO 01-14  &#xb9;1      or  DMG&#xb9; na    in (810.20 (ID          (
na /na              I I  LINE&#xb9; 2HSS-026-44-1    NTS:  2(5        (Handate(      1    (
na /na              I I  INTEG ATT                              (8-K      (
na    (  SUR/PT3'00/HT4 00    I 2HSS-01 FM307        (
QISO  01-14 &#xb9;1      or DMG&#xb9; na      in (810.20    ( ID      (
na /na              I
(
LINE&#xb9; 2HSS-026-44-1 NTS: 2,5            (Handate(      1    (
na  /na I  INTEG ATT                              (8-K      (
na    I  SUR/PT3.00/HT4.00    I 2HSS-01 FM308        (
QISO 01-14  &#xb9;1      or  DMG&#xb9; na    in (810.20 (ID          (
na /na LINE&#xb9; 2HSS-026-44-1    NTS:  2,5        (Handate(      1    (  na /na              I I INTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00    (
2HSS.01 FM309        (
QISO 01-14 &#xb9;1      or  D'MG&#xb9;  na    in (810.20 (ID        (  na  /na I LINE&#xb9; 2HSS-026-44-1    NTS:  2,5        (Handate(      1    (  na /na              I I INTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00    (
2HSS-01 FM310        (
QISO  01-14 &#xb9;1      or DMG&#xb9; na    ~  in (810.20 (ID        (
na /na              I
(
LINE&#xb9; 2HSS-026-44-1 NTS: 2,5            (Handate(      1    (
na /na              I I INTEG ATT                              (8-K      (
na    I SUR/PT3  F 00/HT4.00  I 2HSS-01-14-FM311          (
QISO 01-14 &#xb9;1      or DMG&#xb9; na      in (810.20 (ID        (  na  /na
(
LINE&#xb9; 2HSS-026-44-1 HTS: 2(5            (Handate(      1    (
na /na              I I INTEG ATT                              (8-K                I SUR/PT3.00/HT4.00    I 2HSS.01 FM312        (
QISO 01-14  &#xb9;2      or  DMG&#xb9; na      in (810.20 (ID          (
na /na
(
LINE&#xb9; 2HSS-026-44-1    NTS:  2,5      (Handate(      1    (
na /na              I I  INTEG ATT                              (8-K      (
na      I SUR/PT3.00/HT4.00    I 2HSS.01-14-FM313          (
QISO 01-14  &#xb9;2      or  DMG&#xb9; na      in (810.20 IID          (
na /na I LINE&#xb9; 2HSS-026-44-1    NTS:  2,5      (Handate(      1    (
na /na
 
NIAGARA HOHAMK POMER CORPORATION          -        NILE POINT NUCLEAR STATION - UNIT 2        30 of 65 NHP2-1S1-006, REV. 1, CH-000                                              SECOND TEH YEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change  date:  07/27/1999                                                                    APPENDIX  G  -  HSS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REa    (
DESCRIPTIOH OF ITEH TO BE EXAHINED(CATGRY (IGSCC( EX1/NDE PROCEDURE                (PERIOD  1                        REHARKS ExAHIHATIDH IDENTIFIER I ITs Iso LocAT0R, coHPDHENT DMG            &#xb9;,  (ITEN  &#xb9;  IFREaYI EX2/HDE PRocEDURE (PER100 2          (
USE CAL BLK  &#xb9; (
LINE  No. AND  NOTES,  AS  APPLICABLE  (SELECT  (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I IHTEG ATT                                IB K      I  na    I  SUR/PT3 00/HT4 00 I 2HSS-01  FM31C        (
QISO 01-14  &#xb9;2        or  DMG&#xb9; na  in  (BIO 2O (10        I  na  /na LINE&#xb9; 2HSS.026-44-1      NTS: 2(5      (Ha~tel      1    I na                      I I  INTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00      (
2HSS-01-14-FM315          (
QISO 01-14  &#xb9;2        or  DMG&#xb9; na  in (810.20    (10      (
na  /na I  LINE&#xb9; 2HSS.026-44-1      HTS: 2        (Handate(    1    (
na /na                I I
IH'IEG ATT                              (8-K      (  na    ( SUR/I T3.00/HTC.OO    (
2HSS.01-14-FM316            (
QISO 01-14  &#xb9;6/7      or  DMG&#xb9; na  in (810.20 IID          ( na  /na LINE&#xb9; 2HSS.026-44-1      NTS:,2,8      (Handate(    1
(
na /na I INTEG ATT                                IB K      I na    I SUR/PT    00/HT  'M  I 2HSS-01 FIG17          (  QISO 01-14 &#xb9;6/7      or DMG&#xb9; na    in (810.20 (ID          ( na  /na                I na                      LINE&#xb9;  2HSS-026-44-1    NTS: 2,8      (Handate(    1    I na /na                I IN'IEG ATT                              IB K      I na    I SUR/PT3-00/HT4 F 00    I 2HSS-01 FM318          (
QISO 01-14 &#xb9;6/7      or DMG&#xb9; na    in (B10.20 (ID          (
na  /na
(  LINE&#xb9; 2HSS-026 44-1 NTS: 2,8            IHandate(    1    (
na /na                I I  IHTEG ATT                              IB-K      I na    I SUR/PT3.00/HT4.00      I          I 2HSS-01 FM319          I QISO  01-14 &#xb9;6/7      or DMG&#xb9; na  ~  in (810.20 (ID        (
na  /na                            I
(
LINE&#xb9; 2HSS-026-44-1 HTS: 2,8            (Handate(      1    ( na /na                I          I-I  INTEG ATT                              (B-K      ( na    (
SUR/PT3.00/HTC F 00    (
2HSS.01-14-FM320            (  QISO 01-14  &#xb9;15      or  DMG&#xb9; na    in (810  '0  (ID      (
na  /na                I
(
LINE&#xb9; 2HSS-026-44-1      NTS: 2,5      (Handate(      1
(
na /na                I I INTEG ATT                                (B-K      I na    (
SUR/PT3.00/HT4.00      I 2HSS-O'I-14-FM321          (  QISO 01-14  &#xb9;15      or  DMG&#xb9; na    in (810.20 IID        (
na  /na LINE&#xb9; 2HSS.026.44-1      NTS: 2,5        (Handate(    1    I na /na                I I INTEG ATT                                IB-K      I na    I SUR/PT3.00/HT4.00      I 2HSS-01 FM322            (
QISO 01-14  &#xb9;15      or  DMG&#xb9; na    in IB10.20 IID        I na  /na                I I LINE&#xb9; 2HSS-026.44-1      HTS: 2IS        (Handate(    1    ( na /na                  I
 
NIAGARA MOHAN POWER CORPORATION          -      MILE POINT NUCLEAR STATION  - UNIT 2        31 of 65 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTIOH        (ISI) INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX  G - HSS SYSTEII (sorted by Examination Identifier) 2ND IHTVL REL RED  (
DESCRIPTION OF ITEH TO BE EXAMINED(CATGRY [IGSCC] EX1/HDE PROCEDURE              )PERIOD  1                        REMARKS EXAMINATION IDEHTIFIER f ITS ISO LOCATOR, COMPONENT DUG        &#xb9;,  )ITEM  &#xb9;  JFREOYJ    EX2/NDE PROCEDURE [PERIOD 2 USE CAL BLK  &#xb9; i  LINE  NO. AND  NOTES,  AS  APPLICABLE  DESELECT  iCLASS) EX3/NDE PROCEDURE iPERIOD 3 I  INTEG ATT                              iB-K      i na    i  SUR/PT3.00/HT4.00  i 2MSS-01 FN323        /  QISO 01-14  &#xb9;15      or  DUG&#xb9; na  in /810.20 /ID        f  na /na
                        )  LINE&#xb9; 2MSS-026-44-1      NTS: 2,5      /Mandate/    1'      na /na              I I INTEG ATT BOTTOM SOUTHEAST              (8-K      [  na    )
SUR/PT3.00/MT4.00  [
2MSS.01 FN324        (
QISO 01-14  &#xb9;14      or  DUG&#xb9; na  in (810.20 ]ID        )  na  /na i  LINE&#xb9; 2HSS-026-44-1      NTS: 2,5      [Mandate)    1    f  na /na              I INTEG ATT BOT'TOH NORTHEAST            JB-K      ]  na    f  SUR/PT3.00/HT4.00    f 2MSS-01-14-FM325          [  QISO 01-14  &#xb9;14      or  DNG&#xb9; na  in /810.20 ]ID        f  na /na              I I  LINE&#xb9;  2MSS 026 44  1    HTS'i5        /Mandate/    1    )
na /na              I I  IHTEG ATT BOTTOM NORTHNEST            IB-K      I  na    I  SUR/PT3.00/HT4.00    I 2MSS-01 FN326        )
QISO 01-14  &#xb9;'l4      or DllG&#xb9; na  in (810.20 [ID        J na  /na
                          )
LINE&#xb9; 2MSS-026-44-1      NTS: 2 5      /Mandate/    1
                                                                                      /  na /na              I INTEG ATT BOTTOM SOUIKNEST            [8-K      (
na    )
SUR/PT3.00/MT4.00    (
2MSS.01-14-FM327          [  QISO 01-14 &#xb9;14        or DUG&#xb9; na  in (810.20 ]ID        J na  /na-i  LINE&#xb9;  2MSS-026-44-1    NTS: 2(5      JMandatef    1    f  na  /na              I IHTEG ATT TOP SOUTHEASt                [8-K      )
na    [  SUR/PT3.00/HT4.00    ]
2MSS-01-14-Fl628          ] QISO  01-14 &#xb9;14      or DMG&#xb9; na    in [810.20 [ID        f  na /na f  LINE&#xb9; 2HSS-026-44-1 NTS: 2,5          )Mandate]    1    f  na /na              I I  INTEG ATT TOP NORTHEAST              IB K      I na    I  SUR/PT      /HT  00  I 2HSS-01 FN329        (
QISO 01-14  &#xb9;14      or  DUG&#xb9; na  in )810.20 ]ID        /  na  /na I  LINE&#xb9; 2MSS-026-44-1      NTS: 2,5      /Mandate/    1    / na /na              I IHTEG ATT TOP NORTHlIEST              IB-K      I na    I SUR/PT3.00/MT4.00    I 2MSS.01-14-Fl630          (
QISO 01-14  &#xb9;14      or  DNG&#xb9; na  in [810.20 /ID        f na /na I LINE&#xb9; 2HSS.026-44-1      HTS: 2,5      /Mandate/    1    / na  /na              I I IHTEG ATT TOP SOUTHWEST                18 K      I na    I SUR/PT3.00/MT4.00    I 2MSS-01 F1631          )
QISO 01-14  &#xb9;14      or  DUG&#xb9; na  in (810.20 [ID        ) na /na LINE&#xb9; 2MSS-026-44-1    HTS: 2,5      ]Mandate(    1    ( na /na              I
 
NIAGARA MONAMK POMER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2        32 of 65 NMP2-ISI-006, REV. 1, CN-000                                          SECOND TEH YEAR INSERVICE INSPECTION              (ISI) INTERVAL PLAN Change date:    07/27/1999                                                                      APPENDIX G  - Mss  SYSTEH (sorted by Examination        Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEH TO BE EXAMINEDiCATGRY i IGSCCi EX1/NDE PROCEDURE                    )PERIOD  1                      REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DUG        &#xb9;,  ilTEH  &#xb9;  iFREGYi EX2/NDE PROCEDURE          iPERIOO 2 USE CAL BLK  &#xb9; I  LINE  NO  AND  NOTES'S    APPLICABLE ISELECT ICLASS) EX3/NDE PROCEDURE iPERIOO 3 I  INTEG ATT                            IB K      I  na    I  SUR/PT    0/MT  ~
I 2MSS-01-14-FN332          i QISO 01-14    &#xb9;4/5    or  DMG&#xb9; na  in F810.20 iID          i na    /na i  LINE&#xb9; 2HSS-026-44-1    HTS: 2,8      iMandateJ      1    i na    /na              I I  INTEG ATT                            iB-K      i na      i  SUR/PT3.00/MT4.00 i 2MSS-01-14-FN333          i QISO  01-14 &#xb9;4/5    or DUG&#xb9; na  in F810.20 iID          J na  /na i  LINE&#xb9; 2HSS-026-44-1 NTS: 2,8          iMandatei      1    / na    /na              I I  PIPE/ELB                              IB-J      )
na    i  VOL/UT6.02 2MSS-01-14-FMSM012        I  QISO 01 14          or  DUG&#xb9; na  in )89.11    Inone      I  SUR/PT3.00/MT4.00    I NMP2-26-1.26.CS      I  LINE&#xb9; 2MSS-026-44-1    HTS: 2(3      iNS            1    i na    /na              I I  PIPE/ELB                              IB-J      i  na    i  VOL/UT6.02 2MSS-01-14-Sl$ 01          I  QISO 01-14          or DUG&#xb9; na  in /89.11    inone      i  SUR/PT3.00/HT4.00    i NMP2-26-1.26-CS      I  LINE&#xb9; 2HSS-026-44-1 NTS: 2(3          iNS                  i  na./na              I J
PIPE/SML                              IB-J      i na      i VOL/UT6.02 2MSS-01-14-SM003          I QISO  01-14          or DWG&#xb9; na    in i89.31    inone i SUR/PT3.00/MT'0              i NHP2-26-1.26-CS      i  LINE&#xb9; 2MSS-026-44-1 NTS: 2(16        )Ns            1    i na  /na              I I  ELB/PIPE                              IB-J      I  na      I  VOL/Ul'6.02          I 2MSS-01-14-SN005          )  QISO  01-14          or DHG&#xb9; na .in F89.11      Inone      I  SUR/PT3.00/HT4.00    I NMP2-26-1.26-CS      i LINE&#xb9; 2HSS-026-44-1 NTS: 2,3          iNS            1 i na  /na              I i PIPE/ELB                              (8-J      i na      i  VOL/Ul'6.02 2MSS-01-14-Sl$ 06          ) alSO 01-14          or  DWG&#xb9; na  in IB9.11    Inone      I  SUR/PT3.00/MT4.00    I NMP2.26-1  '6-CS        LINE&#xb9; 2HSS-026-44-1    NTS: 2 3      iNS            1    )
na  /na              I I PIPE/FLG  NOZ                        IB-J      )
na      i VOL/UT6.02 2MSS-01-14-SN007            i QISO 01-14          or  DMG&#xb9; na  in i89.31    ( ID        i SUR/PT3.00/HT4.00    i    Sc9 NMP2-26-1.26-CS      i LINE&#xb9; 2MSS-026-44-'I    NTS: 2,6      INS            1      dna/                    I I PIPE/FLG NOZ                          IB-J      I  na      I VOL/UT6.02            I 2MSS-01-14-SNDDB            i QISO  01-14          or DMG&#xb9; na    in i89.31    IID        I SUR/PT3.00/MT4 00    I    Sc9 NMP2-26-1.26-CS      i  LINE&#xb9; 2MSS-026-44-1    NTS: 2,6      INS            1      dna/
 
NIAGARA HOHAMX POMER CORPORATION -                  HILE POINT NUCLEAR STATION - UNIT 2                                          33 of 65 KHP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR INSERVICE IHSPECTION          (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                        APPENDIX G - Hss    SYSTEH (sorted by Examination      Identifier) 2KD INTVL REL REQ    DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE                )PERIOD  1
                                                                                                                            )
REHARKS
                      )
EXAHINATION IDENTIFIER )  ITS ISO LOCATOR,  COHPONENT  D'MG  &#xb9;,  )
ITEN &#xb9; )FREQY) EX2/KDE PROCEDURE        )PERIOD 2    )
USE CAL BLK  I  LINE  NO'ND NOTES'S        APPLICABLE )SELECT )CLASS) EX3/KDE PROCEDURE )PERIOD 3                I I  PIPE/FLG KOZ                              IB-J    )  na    )
VOL/UT6.02 2HSS-01 SM009      )
QISO 01-14            or  DMG&#xb9; na    in )89.31    IID      I  SUR/PT3.00/HT4.00  I    Sc9 NHP2-26-1.26.CS  )  LINE&#xb9; 2HSS.026-44-1      NTS: 2(6        IKS I  PIPE/FLG NOZ                              IB-J      )
na    )
VOL/UT6.02 2HSS-OI-14-SMOI0      )
QISO 01-14            or  DMG&#xb9; na    in )89.31    IID      I  SUR/PT3.00/HT4.00  I    Sc9 KHP2-26-1.26-CS  I  LIHE&#xb9; 2HSS.026-44-1      NTS: 2,6        IHS          1    )na/
I  PIPE/FLG  NOZ                            IB-J      )
na    )
VOL/UT6.02                      )Added  to Selected population (Ks) during 2nd 10-Year Update to match 2HSS.01-14.SM011        )
QISO 01-14            or  DMG&#xb9; na    in )89.31    IID      I  SUR/PT3.00/HT4.00    I    Sc9    )the other 17 analogous locations NHP2-26-1.26-CS      LINE&#xb9; 2HSS-026 44-1      NTS: 2)6        )KS          1    )na/                    I
                        )  ELB/SOL  (26" to 2")                      IB-J      I  na    I  SUR/PT3.00/HT4.00    I 2HSS-01-14-SM014        )  QISO 01-14            or  DMG&#xb9; na    in )89.32    IID      )  na  /na              I    Sc9 I  LINE&#xb9; 2HSS-002-48-1      NTS: 3,4        )BER                                        I I  ELB/PIPE                                  IB-J    )  na    )
VOL/UT6.02 2HSS-01-14-SM015        I  QISO 01-14            or  DMG&#xb9; na    in )89.11    IID      I  SUR/PT3.00/HT4.00    I    Sc9 NMP2-26-1.26.CS  I  LINE&#xb9;  2HSS 026 44  1    NTS'i3            IBER        1    )na/
I  PIPE/PIPE                                  IB-J    )
na    )  VOL/UT6.02          )
Scl 2HSS-01-14-SM019        I  QISO 01-14            or  DMG&#xb9; na  ~ in )89.11    )ID      )  SUR/PT3.00/HT4 F 00 KHP2-26-1.26-CS  )  LINE&#xb9; 2HSS.026-151-1 NTS: 2                )BER          1    )na/
I  PIPE/PIPE                                  IB J      )
na    )
VOL/UT6.02 2HSS-01-14-SM021        I  QISO 01-14            or  DMG&#xb9; na      in )89.11    )none    )
SUR/PT3.00/HT4.00    )
HHP2-26-1.26.CS  )
LIKE&#xb9; 2HSS.026-44-1    .
NTS: 2,2          )KS                )  na  /na
                        )  *AOV78/EXPANDER  (26a    to 28")          )8-J      )
na    )
VOL/UT6.02          )
Scl ZHss-01-14-SM022        )
QISO 01-14            or  DMG&#xb9; na      in )89.11    IID      I SUR/PT3.00/HT4.00    I NNP2-26-1.26-CS    )
LINE&#xb9; 2HSS-026-151-1 NTS: 11,14            )BER          1    )na/
                        ) SE/PIPE  Q N3C Az252 HAIN STEAH            )8-J      )
na      )
VOL/UT6.02 2HSS-OI-15-FMODI        ) QISO  Oi-is          or DMG&#xb9; na      in )89.11    )none    I SUR/PT3.00/HT4.00    I NHP2-26-1.26-CS    I LINE&#xb9; 2HSS-026.45-1      NTS: 1,2          INS          1    )na/
 
NIAGARA NOHAMK POMER CORPORATIOH            -  . NILE POINT NUCLEAR STATION - UNIT 2        34 of 65 NNP2-ISI-006( REV. 1, CH-000                                              SECOND TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                        APPENDIX G  - HSS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY i IGSCCi EX1/HDE PROCEDURE                      iPERIOD  1  i                    RENARKS EXAHIHATIOH IDENTIFIER f ITS ISO LOCATOR, COIPOHENT DMG            &#xb9;,  ]ITEN  &#xb9; JFREOY) EX2/NDE PROCEDURE (PERIOD 2            )
USE CAL BLK  &#xb9; I  LIHE  NO. AHD  NOTES,  AS  APPLICABLE    ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOD 3            I I  ELB/PIPE                                  IB-J      f  na    f  VOL/UT6.02 2NSS-01 FM002        i QISO 01-15              or DMG&#xb9; na      in (89.11    Inone      I  SUR/PT3.00/NT4.00    I HNP2-26-1.26-CS    i LINE&#xb9;    2NSS-026-45-1      HTS: 2,3        iNS I  PIPE/ELB                                  IB-J      J na    J VOL/UT6.02 2HSS-01-15-FM003        I  QISO 01-15            or  DMG&#xb9; na    in (89.11    ]none      f  SUR/PT3.00/NT4.00    f NNP2-26-1.26-CS    i LINE&#xb9; 2NSS-026-45-1        HTS: 2 3        (NS            1    /  na  /na I  ELB/PIPE                                  IB-J      )
na    )  VDL/UT6.02 2HSS-01-15-FM004          I  QISO 01-15            or  DUG&#xb9; na    in (89.11    (none      f  SUR/PT3.00/NT4.00    f NNP2-26-1.26-CS    i LINE&#xb9; 2NSS.026-45-1        NTS  2,3      iHS                  f  na /na I  PIPE/ELB                                  IB-J      I  .na    I  VOL/UT6.02            I  Sc7 2NSS-01 FM005        I  QISO  01-'l5          or  DMG&#xb9; na    in [89.11    [ID        )
SUR/PT3.00/HT4.00    [
NHP2-26-1.26-CS    f  LINE&#xb9; 2HSS-026-45-1      NTS:  2,3      JHS/ber  /    1    f  na  /
[ PENET  21C/PIPE                          IB J      I na      I  VOL/UT6.02            I 2NSS-01-15-FM009          f QISO  01-15            or DMG&#xb9; na in (89.11 ] ID              J SUR/PT3.00/NT4.00    ]
HNP2-26-1.26-CS    /  LINE&#xb9; 2NSS-026-154-1 HTS: 2,12            /TEV/ber/ 1          /  na  /                /    Sc11 I  EXPANDER/PIPE                            IC-F-2    /  na    (  VOL/UT6.02 2NSS-01 FM020        I Q      0115            or  DMG&#xb9; na    in [C5.51    IID      I SUR/PT3.00/NT4.00      I NHP2-28-1.34-CS    I  LINE&#xb9; 2NSS-028-5-4        NTS: 14,15      ISD/ber    ~
2    i na /na                      Sc11 I
PIPE/~AOV7C                              (8-J      (
na    ]  VOL/UT6.02            (
Sc7 2NSS-O'I-15-FM021        I  QISO  01-15            or DMG&#xb9; na      in )89.11    IID        I SUR/PT3.00/NT4.00    I NNP2-26-1.26-CS    (  LINE&#xb9; 2NSS-026-154-1 NTS: 2,11            (BER          1    )na/                    I I PIPE/PIPE                                  IB-J      f  na      f VOL/UT6.02 2NSS-01 FM022          I QISO 01-15            or  DMG&#xb9; na    in (89.11    iID        I SUR/PT3.00/HT4.00    I HNP2-26-1.26-CS      f LINE&#xb9; 2NSS-026-154-1 NTS: 2                (BER          1    f na  /                J Sc11 I *AOV7C/PLUG    (2")                        IB-J      I  na      I SUR/PT  '&#xc3;/NT4    00 I 2HSS-01 FM023          I QISO 01-15            or  DMG&#xb9; na    in (89.40    J~e        (
na /na I LINE&#xb9; 2NSS-002-154-1      H'TS:  11,10    INS            1    / na/na                I
 
NIAGARA HOHAMK POMER CORPORATION          -      HILE POIN'I NUCLEAR STATION - UNIT 2        35 of 65 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                  APPENDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED  J DESCRIPTION OF ITEH TO BE EXAMINED]CATGRY (IGSCC) EX1/NDE PROCEDURE            )PERIOD  1                        REMARKS EXAHINATION IDENTIFIER  )  ITS ISO LOCATOR,  COHPONENT DUG  &#xb9;,  JITEH  &#xb9; [FREOY) EX2/NDE PROCEDURE      [PERIOD 2  J USE CAL BLK  &#xb9; f  LINE NO. AND NOTES, AS APPLICABLE ]SELECT [CLASS] EX3/NDE PROCEDURE [PERIOD 3
[ *AOV6C/PENET 21C                        lB-J    I  na  I  VOL/UT6.02          I  Sc7 2HSS-01 Fll025      f QISO 01-15            or  DUG&#xb9; na  in (89.11    ]ID    (  SUR/PT3.00/HT4.00    f NMP2-26-1.26-CS    /  LINE&#xb9; 2MSS-026-45-1    NTS: 11,10    /TEV/ber/ 1      /  na  /
(
PIPE/*AOV6C                          IB J    I  na    I  VOL/UT6.02          I  Sc7 2HSS-01-15-Fll026      f  QISO 01-15          or  DUG&#xb9; na  in (89.11    [ID      f  SUR/PT3 F 00/HT4.00  J NHP2-26-1.26.CS  f  LINE&#xb9; 2HSS-026-45-1    NTS: 2,11      JAN/ber  /  1    J na  /
I  PIPE/PIPE                            )B J    (
na    [  VOL/UT6.02          [  Sc7 2HSS.01-15-FN027        I  QISO 01-'15        or  DUG&#xb9; na  in  JB9.11  )ID      J SUR/PT3.00/MT4.00    f NHP2-26-1.26.CS  ]  LINE&#xb9; 2HSS-026-45-1    NTS: 2        [BER      J 1    [  na  /
I *AOV6C/PLUG    (2")                    (B-J      J na    f  SUR/PT3.00/MT4.00    f 2MSS-01 FN028        i QISO  01-15        or DUG&#xb9; na in (89.40        [none  f  na  /na I  LINE&#xb9; 2HSS-002-45-1 NTS: 11,10        INS      I  1    I  na /na              I I
                            *AOV6C/PLUG  (2")                    (8-J      [ na    f  SUR/PT3.00/HT4.00    )
2HSS-01 FN030        I Q      0115          or  DUG&#xb9; na  in [89.40    ]none  f  na  /na
                        /  LINE&#xb9; 2HSS-002-45-1    NTS: 11,10    [NS      f  1    f  na /na              I INTEG ATT                            IB-K      I na    I  SUR/PT3.00/HT4.00    I 2HSS-01 FN300        )
QISO 01-15  &#xb9;06    or DlK&#xb9; na  .in  /810.20 ]ID      ]  na  /na
                        /  LINE&#xb9; 2HSS-026-45-1 NTS: 2,8          /Mandate/    1    /  na /na              I I  INTEG ATT                            IB-K      I na    I  SUR/PT3.00/HT4.00    I 2HSS-01 F l601      J QISO 01-15  &#xb9;06    or  DNG&#xb9; na  in  JB10.20 ]ID      f  na  /na
[  LINE&#xb9; 2MSS-026-45-1    NTS: 2,8      )Mandate)    1    [  na /na              I I  INTEG ATT                            IB K      I na    I SUR/PT    00/MT      I 2MSS-01 FN302        f  QISO 01-15  &#xb9;05    or  DNG&#xb9; na  in [B10.20 /ID        )  na /na                I
(
LINE&#xb9; 2HSS-026-45-1    NTS: 2,8      [Mandate(    1    )  na /na                I I  INTEG ATT                            (8-K - ( na        J SUR/PT3.00/HT4.00    J 2HSS.01-15-FN303          [ QISO 01-15  &#xb9;05    or  DNG&#xb9; na    in )810.20 ]ID      / na  /na
                        )  LINE&#xb9; 2HSS-026-45-1    NTS: 2,8      (Mandate] 1        f na  /na              I
 
NIAGARA HOHAMK POMER CORPORATION          -      ILE POINT NUCLEAR STATION - UNIT 2        36 of 65 NHP2-ISI-006, REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX  G - HSS SYSTEH (sorted by Examination        Identifier) 2ND INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC(                EX1/NDE PROCEDURE  (PERIOD    1                      REHARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  (ITEH  &#xb9;  (FREOY( EX2/NDE PROCEDURE        (PERIOD 2    (
USE CAL BLK  &#xb9; I  LINE NO  AND  NOTES'S      APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3              I I INTEG ATT                                (8-K      (
na    (
SUR/PT3.00/HT4.00  (
2HSS-01 FM304        (  QISO 01-15 &#xb9;10        or  DMG&#xb9; na  in (810.20 (ID        (
na /na              (
I  LINE&#xb9; 2HSS-026-45-1      NTS: 2,8      (Handate(    1    (
na /na              I I  INTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00    (
2HSS-01-15-FM305        (
QISO 01-15 &#xb9;10        or  DMG&#xb9; na  in (810.20 (ID          (
na  /na              I I  LINE&#xb9; 2HSS 026 45  1    NTS'i8        (Handate(    1    (
na /na              I I  INTEG ATT                              IB K      (
na    I  SUR/PT3.00/HI'4.00  (
2HSS-01-15-FM306          (
QISO 01-15 &#xb9;9        or  DUG&#xb9; na  in (810.20 (ID          (
na  /na LINE&#xb9; 2HSS-026-45-1      NTS: 2,8      (Handate(    1
(  na /na              I INTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00    (
2HSS-01 FM307        (
QISO 01-15 &#xb9;9        or  DMG&#xb9; na  in (810.20 (ID          (  na /na I  LINE&#xb9; 2HSS.026.45-1      NTS: 2,8      IHandatel    1    (  na /na              I INTEG ATT                              (8-K      (
na    (
SUR/P'I3.00/HT4.00  (
2HSS-01 FM308        (
QISO 01-15 &#xb9;14        or  DMG&#xb9; na  in (810.20 (ID        (  na /na              I I  LINE&#xb9; 2HSS-026-45-1      NTS: 2,8      (Handate(      1    (
na /na              I I INTEG ATT                              (8-K      (
na    (
SUR/PT3.00/HT4.00    (
2HSS-01 FM309        (
QISO 01-15 &#xb9;14        or  DMG&#xb9; na  in (810.20 (ID        (
na  /na
(
LINE&#xb9; 2HSS-026-45-1      NTS: 2,8      (Handate(      1    (
na /na              I I INTEG ATT                              IB K      I na      I SUR/PT  ~ 0 /HT4 00 I 2HSS-01-15-FM310          (  QISO 01-15 &#xb9; 2/3      or DMG&#xb9; na    in (810.20 (ID          (
na /na              I I LINE&#xb9; 2HSS-026-45-1      NTS: 2(5      (Handate(    1
(
na /na              I I INTEG ATT                              IB-K      I na      I SUR/PT3.00/IlT4.00    I 2HSS-01-15-FM311          ( QISO 01-15  &#xb9; 2/3    or  DMG&#xb9; na  in (810.20 (ID          (
na  /na I LINE&#xb9; 2HSS 026 4    1    NTS            (Handate(    1
(
na /na                I I INTEG ATT                              IB-K      I na      I SUR/PT3.00/Hl'4.00    I 2HSS-01-15-FM312          (
QISO 01-15 &#xb9;2/3      or  DMG&#xb9; na  in (810.20 (ID          ( na /na I LINE  2HSS    6 4  1    NTS            (Handate(    1    ( na /na                I
 
NIAGARA HONAMK POMER CORPORATION            -        ILE POINT    NUCLEAR STATION - UNIT 2        37 of 65 NHP2-ISI-006, REV. 1,  CN-OOO                                          SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                        APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REG [ DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY JIGSCC)                  EX1/NDE PROCEDURE  (PERIOD  1                          REHARKS EXAHINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  JITEH  &#xb9;  JFREOY(        EX2/NDE PROCEDURE  )PERIOD 2 ]
USE CAL BLK &#xb9;  i LINE NO. AND NOTES, AS APPLICABLE )SELECT          iCLASSJ EX3/NDE PROCEDURE          iPERIOO 3 i I  INTEG ATT                              (8-K      f na      f  SUR/PT3.00/HT4.00    J 2HSS-01-15-FM313        (
QISO 01-15  &#xb9; 2/3    or  DMG&#xb9; na  in )810.20 ]ID          f  na  /na i  LINE&#xb9; 2HSS-026-45.1    NTS: 2,5      )Handate)      1    /  na /na              I I INTEG ATT                                IB K      I  na    I  SUR/PT3.00/HT4.00    I 2HSS-01 FM314        )  QISO 01-15  &#xb9; 2/3    or  DMG&#xb9; na  in (810.20 ]ID          J na  /na i  LINE&#xb9; 2HSS-026-45-1    NTS: 2,5      [Handatef      1    )  na /na              I I INTEG ATT                                [8-K      )  na    [  SUR/PT3.00/HT4.00    ]
2HSS-01 FM315        )  QISO 01-15  &#xb9; 2/3    or  DMG&#xb9; na  in (810.20 [ID          f  na  /na              I LINE&#xb9; 2HSS-026.45-1    NTS: 2,5      (Handate)                                      I I  INTEG ATT                              )B K      [  na    )  SUR/PT3.00/HT4.00 2HSS-01 FM316      -
[  QISO  01-15 &#xb9; 2/3    or DMG&#xb9; na    in /B10.20 /ID          f  na  /na              I LINE&#xb9; 2HSS.026.45-1 NTS: 2,5          JHandatef      1    f  na /na                I I INTEG ATT IB-K      I  na    I  SUR/PT3.00/HT4.00    I 2HSS-01 FM317        (
QISO 01-15  &#xb9; 2/3    or  DMG&#xb9; na  in [810.20 ]ID          )  na /na LINE&#xb9; 2HSS-026-45-1    NTS: 2,5      JHandate(      1    /  na /na                I I INTEG ATT                              IB-K      I  na      I  SUR/PT3.00/HT4.00    (
2HSS-01 FM318        ] QISO 01-15  &#xb9;13      or  DMG&#xb9; na  .in )810.20 [ID            f  na  /na I  LINE&#xb9; 2HSS-026.45-1    NTS: 2,8      (Handate]      1    [  na /na                I I  INTEG ATT                            IB-K        I na      I  SUR/PT3.00/HT4.00      I 2HSS-01 FM319        (
QISO 01-15  &#xb9;13      or  DMG&#xb9; na  in [810.20 ]ID            f  na  /na                I i LINE&#xb9; 2HSS-026.45-1      NTS: 2,8      )Handatef      1    /  na  /na                I I INTEG ATT                                (B-K      (
na      (
SUR/PT3.00/HT4 F 00 2HSS-01-15-FM320          )
QISO 01-15  &#xb9;  17/18 or DMG&#xb9; na    in JBI0.20 )ID            J na  /na
                          )
LINE&#xb9;  2HSS-026-45-1    NTS: 2,5        )Handate]      1      f na /na                I I  INTEG ATT                              IB K      I na      I SUR/PT3  00/HT        I 2HSS.01-15-FM321          )
QISO 01-15 &#xb9; 17/18 or DMG&#xb9; na      in (810.20 )ID            f na  /na I  LINE&#xb9; 2HSS-026-45-1 NTS: 2,5          JHandate]      1      / na  /na              I
 
NIAGARA HOHAWK POWER CORPORATION              -      HILE POINT NUCLEAR STATION - UNIT 2        38 of 65 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                        APPENDIX  G - HSS SYSTEM (sorted by Examination 'Identifier) 2ND INTVL REL REO ( DESCRIPTION OF ITEH TO BE EXAMINED(CATGRY J IGSCC( EX1/NDE PROCEDURE                      (PERIOD  1                        REHARKS EXAHINATION IDENTIFIER  ) ITS ISO LOCATOR, COHPONENT DWG      &#xb9;,  [ITEM  &#xb9; JFREGYJ EX2/NDE PROCEDURE          ]PERIOD 2  )
USE CAL BLK  &#xb9; f    LINE NO. AND HOTES, AS APPLICABLE )SELECT ]CLASS] EX3/NDE PROCEDURE )PERIOD 3                    )
I    INTEG ATT                                IB-K    I    na    I  SUR/PT3.00/HT4.00    I 2HSS-01-15-FM322        )
QISO 01-15 &#xb9; 17/18 or DWG&#xb9; na        in (810.20  )  ID      f  na /na I    LINE&#xb9; 2HSS-026-45.1 NTS: 2,5            ]Mandate]      1    f  na /na                I I    INTEG ATT                                (8-K      )
na    )
SUR/PT3 F 00/HT4.00  (
2HSS.01 FM323        j QISO 01-15    &#xb9; 17/18 or    DWG&#xb9;  na  in [810.20    )
ID      f  na  /na na                i LINE&#xb9; 2HSS-026-45-1        NTS: 2(5        (Mandate[      1    f  na /na                I I  INTEG ATT                                IB-K      I  na    I  SUR/PT3.00/MT4.00    I 2HSS-01-15-FW324          [ QISO 01-15    &#xb9; 1      or  DWG&#xb9; na    in (810.20 ]ID          f  na  /na
(  LINE&#xb9; 2HSS.026-45-1      NTS: 2(5        /Mandate/      1    /  na /na                I I  INTEG ATT                                JB-K      f  na    /  SUR/PT3.00/HT4.00    f 2HSS-01 FM325        J QISO 01-15  &#xb9; 1      or  DWG&#xb9;  na  in /810.20 /ID          /  na  /na LINE&#xb9; 2HSS-026.45-1      NTS:  2,5      /Mandate/      1    /  na /na                I I  INTEG ATT                                IB K      I  na    I  SUR/PT      /HT  00 I 2HSS-01 FW326        [  QISO 01-15  &#xb9; 1      or  DMG&#xb9; na    in [810.20  LID        f na  /na              I na                  I  LINE&#xb9; 2HSS-026.45-1      NTS:  2I5      [Mandate/      1    [ na  /na              I INTEG ATT                                IB K      I  na    I  SUR/PT3 F 00/HT4.00 I 2MSS-01-15-FM327          f  alSO 01-15  &#xb9; 1      or  DWG&#xb9;  na ~  in )810.20 ]ID          f  na  /na I  LINE&#xb9;  2HSS 026 45  1    NTS'    5      IHandatej      1    I na  /na              I I INTEG ATT                                  (8-K      [  na      f SUR/PT3.00/MT4.00    ]
2HSS-01-15-FM328          / QISO 01-15    &#xb9; 15/16 or    DMG&#xb9; na    in (810.20 (ID          f na  /na i LINE&#xb9; 2HSS-026-45-1        NTS:  2,5      ]Mandate]      1    f na /na                I I  INTEG ATT                              IB.K      I  na      I SUR/PT3.00/HT4.00      I 2HSS-01 FW329          )
QISO 01-15  &#xb9; 15/16 or    DWG&#xb9;  na    in )810.20 )ID          f na  /na na                  i  LINE&#xb9; 2MSS-026-45-1      NTS:  2,5        ]Mandate)      1    ( na /na                I I  INTEG ATT                                IB K      I  na      I SUR/PT      /HT4      I 2MSS-01-15-F W330          )
QISO 01-15  &#xb9; 15/16 or    DWG&#xb9; na    in ]810.20 [ID          ] na  /na na                    i  LINE&#xb9; 2HSS-026-45-1    NTS:  2(5        ]Mandate]      1    J na  /na
 
NIAGARA HONAMK POMER CORPORATION            -        HILE POINT  NUCLEAR STATION  - UNIT 2        39 of 65 NHP2-IS1-006( REV. 1, CN-000                                            SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                                    APPENDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED        DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC] EX1/NDE PROCEDURE                (PERIOD  1                          REHARKS
                          )
EXAHINATION IDENI'IFIER  J ITS ISO LOCATOR, COHPONENT    DMG  &#xb9;,  ]ITEN  &#xb9;  JFREGY) EX2/NDE PROCEDURE        ]PERIOD 2  J USE CAL BLK  &#xb9; (  LINE NO. AND NOTES, AS APPLICABLE      DESELECT  iCLASS[ EX3/NDE PROCEDURE iPERIOO 3          )
I  INTEG ATT                              IB-K      I  na    I  SUR/PT3.00/HT4.00    I 2HSS-01-15-FM331          (
QISO 01-15  &#xb9; 15/16 or  DMG&#xb9; na    in (810.20 (ID        f  na  /na I  LINE&#xb9; 2HSS-026-45-1    NTS:  2(5        /Handate/    1    J na /na                I I  INTEG ATT                              (8-K      [  na    [ SUR/PT3.00/HT4.00    )
2HSS-01-15. FM332        f  QISO 01-15  &#xb9; 15/16 or DMG&#xb9; na      in (810.20 [ID          f na  /na              I i  LINE&#xb9; 2HSS-026-45.'I NTS: 2 5          )Handate]    1    [ na /na                I I INTEG ATT                                IB K      I  na    I SUR/PT      /HT4 00  I 2HSS-01-15-FM333          (  QISO 01-15  &#xb9; 15/16 or  DMG&#xb9; na    in (810.20 ]ID          f na  /na i LINE&#xb9; 2HSS-026.45-1      NTS:  2,5        /Handate/    1    / na /na I  INTEG ATT                              IB-K      I na      I SUR/PT3 F 00/HT4 F 00  I 2HSS-01-15-FM334          )
QISO 01-15 &#xb9; 15/16 or Dl}G&#xb9; na      in (810.20 (10          / na  /na I  LINE&#xb9; 2HSS-026.45-1 NTS: 2 5            )Ha~to(                                      I I  INTEG ATT                              IB K      I  na    I SUR/PT3.00/HT4 F 00    I 2HSS-01-15-FM335          [  QISO 01-15  &#xb9; 15/16 or DMG&#xb9; na      in [810.20 ]ID          ( na  /na LINE&#xb9; 2HSS-026-45-1 NTS: 2,5            JHandateJ    1    )
na /na                I I INTEG ATT                                IB-K      I  na    I SUR/PT3.00/HT4.00      I 2HSS-01 FM336          / QISO  01-15 &#xb9; 7/8 or DMG&#xb9; na      ~ in (810.20 /ID          f na  /na
                            / LINE&#xb9; 2HSS-026-45-1 NTS: 2,8            /Handate/    1    / na /na                I I INTEG ATT                              IB K      I  na    I SUR/PT    00/HT        I 2HSS-01 FM337          / QISO  01-15 &#xb9; 7/8 or DMG&#xb9; na        in /810.20 ]ID        f na  /na                I I LINE&#xb9; 2HSS-026-45-1 NTS: 2(8            /Handate/      1    )
na /na                I I PIPE/ELB                                IB-J      I  na    I VOL/UT6.02 2HSS-01-15-SM001            ) QISO 01-15          or  DMG&#xb9; na    in (89.11    ]none    f SUR/PT3.00/HT4.00      [
NHP2-26-1.26-CS      I LINE&#xb9; 2HSS-026-45-1    NTS: 2,3        /NS      /    1    / na /na I ELB/PIPE                                IB J      I na    I VOL/UT6'02            I 2HSS-01-15-SM002            i QISO 01-15          or  DMG&#xb9; na    in /89.11    ]none    f SUR/PI'3.00/HI'4.00    /
NHP2-26-1.26-CS      I  LINE&#xb9; 2HSS-026-45-1    NTS: 2,3        INS        I  1    I na/na                  I
 
NIAGARA HONAMK POMER CORPORATIOH      -      NILE POINT NUCLEAR STATION - UNIT 2        40 of 65 NHP2-ISI-006, REV. 1 ~ CN-000                                      SECOND TEN YEAR INSERVICE IHSPECTION        (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                APPENDIX G  HSS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL REQ ] DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY (IGSCC( EX1/NDE PROCEDURE            [PERIOD  1                        REHARKS EXAHINATION IDEHTIFIER  J ITS ISO LOCATOR, COHPONENT DMG    &#xb9;, JITEH  &#xb9; [FREQYJ EX2/NDE PROCEDURE      (PERIOD 2  f USE CAL BLK  &#xb9; [  LINE NO. AND NOTES, AS APPLICABLE /SELECT )CLASSi EX3/NDE PROCEDURE iPERIOO 3 I  PIPE/ELB                            IB-J    (  na    (
VOL/UT6.02          (
Sc7 2HSS-01-15-SM003        i QISO 01-15            or  DMG&#xb9; na  in /89.11  IID      I  SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS    I  LINE&#xb9; 2HSS-026.45-1    NTS: 2,3    IHS          1  /na/
I  ELB/PIPE                            /8-J    ]  na    ) VOL/UT6.02 2HSS.01-15-SM004        I  QISO 01-15          or  DMG&#xb9; na  in /89.11  Inone    I  SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS    I  LINE&#xb9; 2llSS-026-45-1    NTS: 2,3    /NS          1  ]  na/na I  PIPE/FLG NOZ                        IB-J    (
na    )
VOL/UT6.02          (
Sc7 2HSS-01-15-SM006        I QISO 01-15            or  DMG&#xb9; na  in /89.31  ] ID    ]  SUR/PT3.00/H'I4.00 ]
NHP2-26-1.26-CS      LINE&#xb9; 2HSS-026-45-1    NTS: 2,6    IHS          1  /na/
I  PIPE/FLG NOZ                        IB-J    ]  na    [ VOL/UT6.02          [  Sc7 2HSS-01-15-SM007        I  QISO 01-15          or DMG&#xb9; na  in /89.31  )ID      i SUR/PT3.00/HT4.00  i NHP2-26-1.26-CS    )  LINE&#xb9;  2HSS-026-45-1    NTS: 2(6    IHS              J na/
I  PIPE/FLG  NOZ                        IB-J    )  na    )
VOL/Ul'6.02        (  Sc7 2HSS-01-15-SM008        i  QISO 01-15          or DMG&#xb9; na  in /89.31  IID      I  SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS    i  LINE&#xb9; 2HSS-026-45-1 NTS: 2(6        INS          1  dna/
I  PIPE/FLG NOZ                        IB-J    (  na    J VOL/UT6.02          (
Sc7 2HSS-01-15-SM009        i QISO 01-15            or  DMG&#xb9; na  in (89.31  110      I  SUR/PT3.00/HT4.00  I NHP2-26-1.26-CS    [  LINE&#xb9; 2HSS-026-45-1    NTS: 2(6    (NS          1  /na/
I  PIPE/FLG  NOZ                        IB J    /  na    / VOL/UT6.02          /  Sc7 2HSS-01-15-SM010        i QISO 01-15            or  DMG&#xb9; na  in (89.31  110      I  SUR/PT3.00/HT4.00  I NHP2-26-1.26.CS    (  LIHE&#xb9; 2HSS-026-45-1    NTS: 2,6    /HS                                    I
                        ]  PIPE/ELB                            IB-J    [  na    )  VOL/UT6.02 2HSS-01-15-SM011        i QISO 01-15            or  DMG&#xb9; na  in /89.11  ]none    (  SUR/PT3.00/HT4.00  f NHP2-26-1.26-CS    i LINE&#xb9; 2HSS-026-45-1    HTS: 2,3    INS              /  na /na
                          ) ELB/SOL  (26" to 2")                IB-J    I  na    I SUR/PT  .M/HT  .N  I  Sc7 2HSS-01-15-SM013          ) QISO 01-15          or  DMG&#xb9; na  in /89.32  (ID      /  na  /na I LINE&#xb9; 2HSS-002-49-'I    NTS: 3,4    IBER          1
                                                                                  /  na/na              I
 
NIAGARA HONAMK POMER CORPORATION -                HILE POINT NUCLEAR STATION    UNIT 2        41 of 65 NHP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR      INSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date:    07/27/1999                                                                  APPENDIX  G -  HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE                  [PERIOD  1 I                      REHARKS EXAHINATION IDENTIFIER    J ITS ISO LOCATOR, COHPONENT DMG      &#xb9;, ]ITEN  &#xb9; iFREQYi EX2/NDE PROCEDURE        iPERIOO 2  J USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSl EX3/NDE PROCEDURE                IPERIOD 3  I I  ELB/PIPE                              IB-J      f na    f VOL/UT6.02            f  Sc7 2HSS-01-15-SM014          i QISO 01-15            or  DMG&#xb9; na  in /B9.11    IID      I SUR/PT3.00/HT4.00    I NHP2-26-1.26.CS    I  LINE&#xb9; 2HSS-026-45-1    NTS:  2,3      IBER I  PIPE/PIPE                              IB-J      [ na    [ VOL/UT6.02 2HSS-01-15-Sl$ 18        i QISO 01-15            or DMG&#xb9; na    in JB9.11    IID      I SUR/PT3 F 00/HT4.00  I NHP2-26-1 '6-CS    )  LINE&#xb9;  2HSS-026-154-1  NTS: 2        IBER      I  1    I na  /                I    Sc11
                          /  *AOV7C/EXPANDER  (26" to 28")        /B-J      f na    ] VOL/UT6.02 2HSS-01-15. SM020        i QISO 01-15            or DMG&#xb9; na    in )B9.11    IID      I SUR/PT3.00/HT4.00      I          I NHP2-26-1.26-CS    ]  LINE&#xb9; 2HSS-026-154-1    NTS: 11,14    [BER        1    / na  /                  /    Scil  /
i SE/PIPE    Q N3D  Az288 HAIN STEAH      iB-J      [ na    ] VOL/UT6.02 2HSS-01 FM001          [  QISO  01-16          or DMG&#xb9; na    in (89.11    ]none    J SUR/PT3 F 00/HT4.00    J NHP2-26-1.26-CS      i  LINE&#xb9; 2HSS-026-46-1 NTS: 1,2          iNS I  ELB/PIPE                              IB-J      [ na    ] Vol./UT6.02 2HSS-01 FI$ 02        i QISO  01-16          or DMG&#xb9; na    in ]B9.11    )none    J SUR/PT3 F 00/HT4 F 00  J NHP2-26-1.26-CS      i  LINE&#xb9; 2HSS-026-46-1 NTS: 2,3          INS          1    / na  /na                I I  PIPE/ELB                              IB-J      ( na    (
VOL/UT6.02 2HSS-01-16-FM003          i QISO  01-16          or  DMG&#xb9; na . in ( B9.11  IID      I SUR/PT3.00/HT4 F 00 ISc8 NHP2-26-1.26-CS      I LINE&#xb9; 2HSS-026-46-1    NTS: 2 3      IHS I  ELB/PIPE                              IB-J      I na    I VOL/UT6.02            I 2HSS-01 FI$ 04        I QISO 01-16            or DMG&#xb9; na    in /B9.11    [none    f SUR/PT3.00/HT4.00      [
NHP2-26-1.26-CS      i LINE&#xb9; 2HSS-026-46-1      NTS: 2,3      INS          1    / na/na                  I I  PIPE/ELB                              IB-J      I na    I VOL/UT6.02            I 2HSS-01 FM005          i QISO 01-16            or  DMG&#xb9; na  in JB9.1'l  [ID      f SUR/PT3.00/HT4.00 [Sc8 NHP2-26-1.26-CS        LINE&#xb9; 2HSS-026-46-1      NTS: 2,3      JNS/ber  /  1    f na  /                  I I PIPE/PENET  210                        IB-J      I na    I VOL/UT6.02 2HSS-01 Fl$ 08          [ QISO  01-16          or DMG&#xb9; na in )B9.11 )ID            (
SUR/PT3.00/HT4.00 ]Sc8 NHP2-26-1.26.CS      f LINE&#xb9; 2HSS-026-46-1 NTS: 2,12          JTEV/ber/ 1        f na  /
 
NIAGARA HOHAMK POMER CORPORATION            -      HILE POINT NUCLEAR STATION - UNIT 2        42 of 65 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date: 07/27/1999                                                                      APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEM TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE                  IPERIOD  1                      REHARKS EXAHIHATIOH IDEN'TIFIER i ITS ISO LOCATOR, COHPOHENT DMG      &#xb9;,  ) ITEN  &#xb9; iFREQVi EX2/NDE PROCEDURE )PERIOD 2 i USE CAL BLK &#xb9; i LIHE NO. AND NOTES, AS APPLICABLE        DESELECT  iCLASSi EX3/HDE PROCEDURE (PERIOD 3 I PENET  210/PIPE                        iB-J    . i na      i  VOL/UT6.02 2HSS-01 FM009      i QISO  01-16          or DMG&#xb9; na    in iB9.11    iID        i  SUR/PT3.00/HT4.00 i NHP2-26-1 '6-CS    i  LINE&#xb9; 2HSS-026-153-1 NTS: 2,12          /TEV/beri      1    i na  /              [    Sc11
                        )
EXPANDER/PIPE                          iC-F-2    J na    i VOL/UT6.02 2HSS-01-16-FM020        t QISO  01-16          or DMG&#xb9; na in iC5.5'l iID              i SUR/PT3.00/HT4.00    i HHP2-28-1  '4-CS  i  LINE&#xb9; 2HSS-028-7-4      H'TS: 14,15    LSD/ber i 2          i na /na                  Sc11 I  PIPE/*AOV7D                            iB-J      i na      i  VOL/UT6.02        I            I 2HSS.01-16-FM021        i  QISO 01-16          or DWG&#xb9; na in i89.11          iID        i SUR/PT3.00/HT4.00  I            I NHP2-26-1.26-CS  I  LIHE&#xb9; 2HSS-026-153-1 HTS: 2,11          IBER      I
                                                                                  'I I na  /                    Sc11    i I  PIPE/PIPE                              IB-J      i na      i  VOL/UT6.02 2HSS-01 FW022      i QISO  01-16          or DMG&#xb9; na    in iB9.11      IID        I  SUR/PT  0 /HT      I HHP2-26-1.26-CS  i  LINE&#xb9; 2HSS-026-153-1 HTS: 2              [BER          1    dna/                  I    Sc11 i *AOV6D/PLUG    (2")                      IB-J                )
SUR/PT3.00/HT4.00 i 2HSS.01 FM023        i QISO  01-16          or DMG&#xb9; na in i89.40          )none i na /na                  I I LINE&#xb9; 2HSS-002-153-1 HTS: 10,11          IHS            1    i  na/na              I i *AOV60/PIPE (OLD SW014 LOCUS)            iB-J      i na      i  VOL/UT6.02 2HSS-01-16-FM025        )
QISO 01-16            or DMG&#xb9; na -  in i89.11      iiD      i SUR/PT3.00/HT4.00  iSc8 HHP2-26-1.26-CS    I LIHE&#xb9; 2HSS.026.46-1    NTS: 2(11        I GER          1    /na/
I PIPE/*AOV6D                              IB-J      [  na    i  VOL/UT6.02 2HSS-01 FW026        i QISO  01-16          or DMG&#xb9; na in (B9.11          (ID      J SUR/PT3.00/HT4.00  iSc8 NHP2-26-1.26-CS    i LINE&#xb9; 2HSS-026-46-1    HTS: 2,11        ABER            1    )na/
i HSS LOOP  D SOL/PLUG  (2")              iB-J      i na      )
SUR/PT3.00/HT4.00  )            I 2HSS-01-16-FM027        i QISO  01-16          or DMG&#xb9; na in iB9.40          /none      i na /na                          I I LINE&#xb9; 2HSS-002-46-1 HTS: 4,10            IHS                  i na /na            I          . I
                        / ~AOV60/PLUG  (24)                      IB-J      I  na      I SUR/PI3 00/HT4 00 I 2HSS-01-16-FM028        i QISO  01-16          or DMG&#xb9; na in i89.40          inone    i na /na I LINE&#xb9; 2HSS-002-46-1 NTS: 10,'l1          INS            1    ) na /na              I
 
NIAGARA HOHAMK POMER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2        43 of 65 NHP2-ISI-006( REV. 1( CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE              IPERIOD  1  I REHARKS EXAHINATION IDENTIFIER I ITS ISO LOCATOR( COHPONENT DMG      &#xb9;(  I ITEH    IFREQYI EX2/NDE PROCEDURE        IPERIOD 2 I USE CAL BLK  &#xb9; )
LINE NO. AND NOTES,  AS  APPLICABLE  )SELECT  )CLASS) EX3/NDE PROCEDURE        )PERIOD 3 I INTEG ATT                              JB-K      [  na    J SUR/PT3.00/HT4.00  J 2HSS-01-16-FM300        [ QISO 01-16  &#xb9;6      or  DMG&#xb9; na  in )810.20 ]ID          )
na  /na i LINE&#xb9; 2HSS-026-46.1      NTS: 2,8      (Handate/      1    f  na /na              I INTEG ATT                            IB-K      I na      I  SUR/PT3.00/HT4.00  I 2HSS-01-16-FM301        (
QISO 01-16 &#xb9; 6      or DllG&#xb9; na  in  JB10.20 ]ID          )  na /na              I
[  LINE&#xb9; 2HSS-026-46-1 NTS: 2,8        /Handatef 1          (  na /na              I I  INTEG ATT                            JB-K      f  na    f  SUR/PT3.00/HT4.00  f 2HSS-01 FM302        [  QISO 01-16 &#xb9; 5      or DMG&#xb9; na    in IB10.20 IID          I  na  /              I LINE&#xb9; 2HSS-026-46-1    NTS: 2,8      /Handate/      1    /  na /na              I I INTEG ATT                            fB-K      J na    ]  SUR/PT3.00/HT4.00  )
2HSS-01 FM303        ] QISO  01-16 &#xb9; 5      or DMG&#xb9; na    in JB10.20 )ID          f  na  /na            I LINE&#xb9; 2HSS-026-46-1 NTS: 2,8        )Handate]      1    J na /na              I I INTEG ATT                            ]B-K      [  na    [
SUR/PT3.00/HT4.00    ]
2HSS-01-16.F'M304        [  QISO 01-16 &#xb9; 9      or DMG&#xb9; na    in [810.20 (ID          [  na  /na              I i  LINE&#xb9; 2HSS-026-46-1 NTS: 2,8          [Handatef      1    f  na /na              I I INTEG ATT                              IB-K      I na      I  SUR/PT3.00/HT4.00    I 2HSS-01 FM305        f  QISO 01-16 &#xb9; 9      or DMG&#xb9; na. in )810.20 /ID            J na /na              I
                          /  LINE&#xb9; 2HSS-026-46-1 NTS: 2,8          /Handate/ 1        /  na  /na              I I INTEG ATT                              IB-K      I  na      I SUR/PT3.00/HT4.00    I 2HSS-01 FM306        ] QISO  01-16 &#xb9; 8      or DMG&#xb9; na    in (810.20 /ID          f na /na              I i LINE&#xb9; 2HSS-026-46-1 NTS: 2,8          /Handate/      1    f na /na              I I INTEG ATT                            IB K      I na      I SUR/PT  00/HT4      I 2HSS.01-16-FM307          )
QISO 01-16 &#xb9; 8      or DMG&#xb9; na    in IB10.20 IID          I na  /na              I i LINE&#xb9; 2HSS.026-46-1 NTS: 2,8          )Handate)                                    I I INTEG ATT                            IB K      I na      I SUR/PT3 00/HT4        I 2HSS-01-16-FM308          (
QISO 01-16 &#xb9; 3      or DMG&#xb9; na    in )810.20 [ID          )
na  /na              I i LINE&#xb9; 2HSS-026-46-1 NTS: 2,8          )Handate/      1    ) na  /na              I
 
NIAGARA HOHAMK POMER CORPORATION            -        ILE POINT    NUCLEAR STATION  - UNIT 2        44 of 65 NHP2-1S1-006,  REV. 1( CH-000                                          SECOND TEN TEAR INSERVICE INSPECTION            (ISI)    INTERVAL PLAN Change  date:  07/27/1999                                                                      APPENDIX G - HSS SYSTEH (sorted by Examination        Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY I IGSCCI EX1/HDE PROCEDURE                    (PERIOD    1  I                        REMARKS EXAHINATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPOHENT DMG        &#xb9;,  (ITEH  &#xb9;  (FREQY( EX2/NDE PROCEDURE          (PERIOD 2    (
USE CAL BLK  &#xb9; (  LINE  NO  AND NOTES'S    APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE              (PERIOD 3    I I  IHTEG ATT                              IB-K      I  na    I  SUR/PT3.00/HT4.00    I 2NSS-01 FIG09        (
QISO  01-16 &#xb9; 3      or DMG&#xb9; na  in (810.20 IID          I  na Ina                I
(
LIHE&#xb9; 2HSS-026-46-1 NTS: 2,8          (Handate(      1    (  na /na                I IHTEG ATT                              IB-K      I  na    I  SUR/PT3.00/HT4 F 00  I 2HSS-01 FIG10          (
QISO  01-16 &#xb9; 3      or DMG&#xb9; na  in (810.20 (ID          (
na /na
(
LINE&#xb9; 2HSS-026-46-1 NTS: 2,8          (Handate(      1    (  na /na                I I INTEG ATT (B.K      (
na    (
SUR/PT3.00/HT4.00    (
2NSS-01 FIG11          (  QISO  01-16 &#xb9; 3      or DMG&#xb9; na  in (B10.20 (ID          (
na Ina
(
LINE&#xb9; 2HSS.026-46-1    NTS: 2,8      (Handate(      1    (
na /na                I I IHTEG ATI'                            IB-K      I  na    I  SUR/PT3.00/MT4.00    I 2HSS-01 FIG12            QISO  01-16 &#xb9; 3      or DMG&#xb9; na  in (810.20 (IO          (
na Ina na                  (
LINE&#xb9; 2HSS-026-46-1 HTS: 2,8          (Handate(      1    (
na  Ina              I I  INTEG ATT                              (B-K      (
na    (
SUR/PT3.00/M'T4.00    (
2HSS-01 FIG13          (  QISO  01-16 &#xb9; 3      or DMG&#xb9; na  in (810.20 IID          (
na /na                I
(  LINE&#xb9; 2HSS-026-46-1 NTS: 2,8          (Handate(      1    (
na /na                I
(
IHTEG ATT                              IB-K      I na      I SUR/PT3.00/NT4 F 00  I 2HSS.01-16-FIG14          (  QISO  01-16 &#xb9; 3      or DMG&#xb9; na  ,in  (B10.20 (ID          ( na /na
(
LINE&#xb9; 2HSS-026-46-1    HTS: 2,8      (Handate(      1    (
na Ina                I I  IHTEG ATT                            (B-K      (
na      ( SUR/PT3.00/HT4.00    (
2HSS.01-16-FIG15            ( QISO 01-16  &#xb9; 3      or DMG&#xb9; na  in (B10.20 (ID            (
na /na                I
( LINE&#xb9;  2NSS-026.46-1    NTS: 2,8        (Handate(      1    (
na /na                I I  IHTEG ATT                              IB-K      I na      I SUR/PT3.00/NT4.00      I 2HSS.01-16. FIG16          (
QISO 01-16  &#xb9;  13    or DMS&#xb9; na    in (810.20 (ID          ( na /na
( LINE&#xb9;  2HSS-026.46-'I  HTS: 2,5        (Mandate(      1    ( na /na                I I  INTEG ATT                              IB K      I na      I SUR/PT3.00/HT4.00 2NSS-01 FIG17          (
QISO  01-16 &#xb9;  13    or DMG&#xb9; na    in (B10.20 (IO          (
na /na na                  (  LINE&#xb9; 2MSS-026-46-1 HTS: 2,5          (Handate(      1    (
na /na                I
 
NIAGARA HONANK PSIER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2        45 of 65 NMP2  ISI 006'EV 1 g CH 000                                          SECOND TEH YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date: 07/27/1999                                                                      APPENDIX G  - HSS SYSTEH (sorted by Examination Identifier) 2ND IN'TVL REL RED ) DESCRIPTION OF ITEN TO BE EXAMINED(CATGRY (IGSCCJ                EXI/NDE PROCEDURE )PERIOD    1                        REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DIJG        &#xb9;,  ]ITEM &#xb9;  JFREOY( EX2/NDE PROCEDURE        )PERIOD 2  J USE CAL BLK &#xb9; I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE                  IPERIOO 3  I I  INTEG ATT                              /8-K      (  na    I  SUR/PT3.00/HT4.00  I 2HSS-01 FN318      (
QISO  01-16 &#xb9; 13      or  DUG&#xb9; na  in /810.20 /ID          /  na /na I  LINE&#xb9;  2HSS 026 46  1    NTS'i5        /Mandate/      1    /  na /na              I I INTEG ATT                                /8-K      /  na    I SUR/PT3.00/HT4.00  I 2HSS.01-16. FN319      )  QISO 01-16  &#xb9; 13      or DllG&#xb9; na  in /810.20 )ID          / na /na i  LINE&#xb9; 2HSS-026-46-1 NTS: 2,5            /Mandate(      1    / na /na              I I INTEG ATT                                /8-K      /  na    I SUR/PT  00/HT      I 2HSS-01 FN320      [ QISO    01-16 &#xb9; 12      or DNG&#xb9; na    in /810.20 /ID          ) na /na              I LINE&#xb9; 2HSS-026.46-1      NTS: 2,5      /Mandate/      1    ( na /na              I I  INTEG ATT                              JB-K      /  na    i SUR/PT3.00/HT4.00    i 2HSS-01-16. FN321        (
QISO 01-16  &#xb9; 12      or  DMG&#xb9; na  in /810.20 /ID          ) na /na              I I  LINE&#xb9; 2HSS-026-46-1      NTS: 2,5      /Mandate)      1    J na  /na              I INTEG ATT                              [B-K      f na      I SUR/PT3.00/HT4.00    I 2MSS-01 FN322        (
QISO  01-16 &#xb9; 12      or DUG&#xb9; na    in (810.20 /ID          J na /na              I LINE&#xb9; 2HSS.026-46-1 NTS: 2,5            (Mandate)      1    [ na /na              I I  INTEG ATT                              /B-K      /  na    I SUR/PT3.00/HT4 F 00  I          I 2HSS.01-16-FN323        /  QISO 01-16 &#xb9; 12      or DUG&#xb9; na  . in /810.20 /ID          / na /na                          I
                        /  LINE&#xb9;  2MSS-026.46-1    NTS: 2,5      ]Mandate/      1    / na  /na              I        .I I  INTEG ATT                              /8-K      [  na    I SUR/PT3.00/HT4.00    I 2HSS-01 Fl624        (
QISO O'1-16 &#xb9;  12    or  DUG&#xb9; na    in /810.20  )  ID      J na /na
                        )  LINE&#xb9; 2HSS-026-46.1      NTS: 2(8      /Mandate/      1
                                                                                        )
na  /na              I I INTEG ATT                                /8-K      /  na    I SUR/PT3.00/HT4.00    I 2HSS-01 FI625        (
QISO  01-16 &#xb9;  12    or DMG&#xb9; na    in /810.20 /ID          / na  /na LINE&#xb9; 2HSS-026-46-1 NTS: 2,8            /Mandate/      1    / na /na              I I INTEG ATT                                ]B-K      J na    I SUR/PT3 00/HT4 00 I 2HSS-01 FN326        / QISO  01-16 &#xb9;  12    or DllG&#xb9; na    in JB10.20 ]ID          / na  /na I LINE&#xb9; 2MSS-026-46-1 NTS: 2,8            [Mandate) 1          / na /na              I
 
NIAGARA MOHAHK POHER CORPORATION        -      MILE POINT NUCLEAR STATION  - UNIT 2        46 of 65 NMP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR IHSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:  07/27/1999                                                                  APPENDIX G - MSS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REO  J DESCRIPTIOH OF ITEM TO BE EXAMINED)CATGRY )IGSCC[ EX1/HDE PROCEDURE              ]PERIOD  1                        REMARKS EXAHIHATION IDENTIFIER i ITS    ISO LOCATOR, COMPONENT DWG    &#xb9;, LITEM &#xb9;  iFREQY) EX2/HDE PROCEDURE iPERIOO 2 USE CAL BLK  &#xb9; f LINE HO. AND NOTES, AS APPLICABLE [SELECT (CLASS[
EX3/NDE PROCEDURE    ]PERIOD 3 INTEG ATT                            IB-K    I  na    I  SUR/PT3'00/MT4'00    I 2MSS-01-16-FN327        (
QISO 01-16 &#xb9; 12      or DNG&#xb9; na  in /810.20  (  ID    f  na  /na I  LINE&#xb9; 2MSS-026-46-1 HTS: 2,8          [Mandate/      1  f  na /na              I I IHTEG ATT                              (8-K    ]  na    J SUR/PT3.00/MT4.00    f 2MSS-01 FN328        )  QISO 01-16  &#xb9; 12      or  DHG&#xb9; na  in (810 '0  ]ID      (
na  /na              I I  LIHE&#xb9; 2MSS-026.46-1      NTS: 2,5    ]Mandate] 1        [ na /na              I I  INTEG ATT                            (8-K      )
na    J SUR/PT3.00/MT4.00    J 2MSS-01-16-FN329        (
QISO 01-16  &#xb9; 12      or  DNG&#xb9; na  in /810.20 /ID        f na /na
[  LINE&#xb9; 2MSS-026-46-1      NTS: 2,5    [Mandate/      1    f na /na              I I INTEG ATT                              (8-K      f  na    f SUR/PT3.00/MT4.00    f 2MSS-01-16-FM330        [ QISO  01-16 &#xb9; 12      or DUG&#xb9; na  in )810.20 ]ID          na /na
                        )  LINE&#xb9; 2MSS-026-46-1 NTS: 2,5          /Mandate/      1 f
J na /na            'I I IHTEG ATT                            IB K      I  na    I SUR/PT3 00/MT4'00 2MSS-01 FN331        [ QISO 01-16  &#xb9; 12      or  DNG&#xb9; na  in [810.20 ]ID        )
na  /na I LINES 2MSS 026 46  1    HT '  ~5    [Mandate]      1    ( na  /na              I I PIPE/ELB                              IB-J      I  na    I VOL/UT6.02          I 2MSS-01-16-SN001          [ QISO  01-16          or DNG&#xb9; na  in /89.11    ]none    f SUR/PT3.00/MT4.00    f HMP2-26-1.26-CS    f LINE&#xb9; 2MSS-026-46-1 NTS: 2,3          /HS      /    1    f na /na I ELB/PIPE                              ]8-J      [  na    f VOL/UT6.02 2MSS-01.16-SN002          i QISO  01-16          or DWG&#xb9; na  in /89.11    /none    / SUR/PT3 F 00/MT4.00  /
HMP2-26-1.26-CS    i LINE&#xb9;  2MSS-026-46-1    HTS: 2,3    /HS      /    1    / na  /na I PIPE/FLG  HOZ                        IB J      I  na    I VOL/UT6  02        I 2MSS. 01-16-SN004        I QISO 01-16            or DllG&#xb9; na  in JB9.31    ]ID      ) SUR/PT3.00/Ml'4.00 JSc8 HMP2-26-1.26-CS    I LINE&#xb9; 2MSS-026-46-1 NTS: 2I6          JHS      I    1    I na  /                I I PIPE/FLG  HOZ                        [8-J      (
na    ) VOL/UT6.02 2MSS-01-16. SM005        I QI    0116            or  DHG&#xb9; na  in [89.31    ]ID      ( SUR/PT3.00/MT4.00 (ScB HMP2-26-1.26-CS      LIHE&#xb9; 2MSS-026-46-1      HTS: 2,6    JNS
 
NIAGARA MOHAMK POMER CORPORATION -              HILE POINT NUCLEAR STATION - UNIT 2          47 of 65 NMP2-ISI-006( REV. 1, CN.000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEM TO BE EXAMINEDICATGRY IIGSCCI                Exl/NDE  PROCEDURE IPERIOO  1 I                      REHARKS EXAHIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONENl'MG          &#xb9;,  LITEM  &#xb9; iFREOYi EX2/NDE PROCEDURE      iPERIOO 2 USE CAL BLK  &#xb9; I  LINE  NO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE      IPERIOD 3  I I  PIPE/FLG  NOZ                          IB-J      i na    i VOL/UT6.02 2HSS-01-16-SM006        i QISO 01-16            or  DMG&#xb9; na  in i89.31    )IO      i  SUR/PT3.00/HT4.00 iSc8 NMP2-26-1.26-CS    i  LINE&#xb9; 2MSS.026-46-1    HTS:  2,6      INS          1    /na/
I  PIPE/FLG  NOZ                          IB-J      I  na    I  VOL/UT6.02 2MSS-01-16-SM007        I QISO 01-16            or  DMG&#xb9; na  in iB9.31    iID      i SUR/PT3.00/MT4.00 iSc8 NMP2-26-1.26-CS    I  LINE&#xb9; 2MSS-026-46-1    NTS:  2,6      INS                i  na/
I  PIPE/ELB                              IB-J      I  na    I  VOL/UT6.02          I 2MSS-01-16-SM008        I  QISO 01-16          or DMG&#xb9; na    in l89.11    ilD      /  SUR/PT3.00/MT4.00 iSc8 NMP2-26-1.26-CS        LINE&#xb9;  2MSS-026.46-1    NTS: 2,3      IHS          1    /na/                    I I  ELB/PIPE                              IB-J      i na    i  VOL/UT6.02 2MSS.01-16-SM010          i QISO  01-16          or OMG&#xb9; na    in i89.11    iiO      i  SUR/PT3.00/MT4.00 iSc8 NMP2-26.1.26-CS    i  LINE&#xb9; 2MSS-026.46-1 NTS: 2,3          IBER      )  1    dna/
J PIPE/SOL (26"  to 2")  (PLUGGED)      IB-J      I  na    I  SUR/PT3.00/HT4.00    I          iNot examined in lstlPP 2MSS-01-16. SM011        I QISO  01-16          or DMG&#xb9; na    in iB9.32    inone    (  na  /na
(  LINE&#xb9; 2MSS-002-46-1 NTS: 2,4          iNS          1 i  na/na                I I  PIPE/PIPE (MITRE CUT)                  IB-J      i na    i  VOL/UT6.02 2HSS-01-16-QI013          i QISO 01-16            or  DMG&#xb9; na  in  JB9.11    iID      i  SUR/PT3.00/MT4.00 (Sc8 NMP2-26-1.26.CS    i LINE&#xb9; 2MSS.026-46-1      NTS: 2        ABER I  PIPE/PIPE (HITRE CUT)                  IB-J      /  na. i VOL/UT6.02 2MSS-01-16. QI015        I Q      0116          or  DMG&#xb9; na  in i89.11    IID    I SUR/PT      /HT4    I          I NMP2-26-1.26.CS    I  LINE&#xb9; 2HSS.026-153-1 NTS: 2            IBER          1    dna/                        Scil  i i <<AOV7D/EXPANDER (26<<    to 28")        iB-J      i na    i VOL/UT6.02 2MSS-01-16-QI020          i QISO  01-16          or DMG&#xb9; na in iB9.11        IID      I SUR/PT3.00/MT4.00    I          I NMP2-26-1.26-CS      i LINE&#xb9; 2MSS-026-153-1 NTS: 'll,'l4      ABER                dna/                        Scil (28")  PIPE/SML  (6")                  IC-F-2    I na    I SUR/PT3 F 00/HT4.00  I 2MSS-01-17-SM002          I QISO  01-17          or DMG&#xb9; na    in  iC5.81    inone    ) na  /
i LINE&#xb9;  2MSS-006-117-4  NTS: 1,2        LSD          2    i na  /na              I
 
NIAGARA HOHAMK POWER CORPORATION            -      HILE POIHT NUCLEAR STATION - UNIT 2        48 of 65 NHP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR INSERVICE IHSPECTIOH        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                        APPENDIX  G - HSS SYSTEH (sorted by Exemination Identifier)
KD INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/KDE PROCEDURE IPERIOO                  1  I                      REHARKS EXAHIKATION IDENTIFIER ] ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  [ITEN  &#xb9; (FREOY( EX2/NDE PROCEDURE [PERIOD 2 ]
USE CAL BLK &#xb9; I  LINE  NO. AKD NOTES,  AS  APPLICABLE    ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I (28")  PIPE/SML (64)                      IC-F-2    i  na    i  SUR/PT3.00/HT4.00 i 2HSS-01-17-SM004        (
Qrso 01-17            or DMG&#xb9; na in (C5.81          /none    /  na  /
(
LINE&#xb9; 2HSS-006-12-4 HTS: 40,56            )SD          2    /  na /na              I I  (28")  PIPE/SML (64)                      IC-F-2    I  na    I  SUR/PT3 F 00/HT4.00  I 2HSS-01-17-SW006        i QISO    01-17          or DMG&#xb9; na in [C5.81          )none    /  na  /                I I  LIHE&#xb9; 2HSS-006-21-4 NTS: 40,56            ISO          2    )  na/na                I I  (284) PIPE/SWL (6")                      IC-F-2    I  na    I  SUR/PT3.00/HT4.00    I 2HSS-01-17-SM008        I  QISO  01-'l7          or  DMG&#xb9;  na    in  JC5.81    /none    /  na  /                I J
LIKE&#xb9; 2HSS-006-18 4 NTS: 40,56            JSD          2    /  na /na              I I  SML/PIPE                                  JC-F-2    /  na    )
VOL/U'I6.02 2HSS-01 FM001      I Q      0119            or  DMG&#xb9; na    in  JC5.51    /none    /  SUR/PT3.00/HT4.00    [
KHP2.6..432-CS    (
LINE&#xb9; 2HSS-006-18.4      N'IS: 56,23      JSD      (  2    )  na  /na I S'WL/PIPE IC-F-2    f  na    ]  VOL/UT6.02 2HSS-01-19.FW002        i QISO 01-19              or  DMG&#xb9; na    in  [C5.51    [none    f  SUR/PT3.00/Hl'4.00  [
NHP2.6..432-CS    i LIKE&#xb9; 2HSS-006-21-4        NTS: 56,23      LSD          2    J na  /na I  SWL/PIPE                                  IC-F-2    [  na    f  VOL/UT6.02 2HSS-01-19-FM003        I  QISO  01-19          or  DMG&#xb9;  na  ~  in ]C5.51    ]none    (
SUR/PT3.00/HT4 F 00  )
NHP2-6-.432-CS    i  LIKE&#xb9;  2HSS-006-12.4    NTS:  56,23      LSD          2    f  na /na              I I  SWL/PIPE                                  IC-F-2  I  na    I  VOL/UT6.02          I 2HSS-01 FM004        [  QISO  01-19          or  DMG&#xb9;  na    in  (C5.51  ]none    f  SUR/PT3.00/HT4.00    ]
KHP2-6-.432-CS    i  LIHE&#xb9;  2HSS.006-117-4    NTS:  56,23      LSD          2    /  na /na
                        )
PIPE/CAP (conforms    to ANSI 816.9) iC-F-2        J na    [  VOL/UT6.02          (
Sc7 2HSS-01 FM005        )
QISO  01-19          or DWG&#xb9; na in [C5.51          IIO      I  SUR/PT3.00/HT4.00    I NHP2-6-.432-CS    i  LINE&#xb9; 2HSS-006-18-4 NTS: 23,57            LSD          2    /  na /na J
PIPE/CAP  (conforas to  ANSI $ 16.9)    (C-F-2    [ na    (
VOL/UT6.02 2HSS-01 FW006        [ QISO  01-19          or  OMG&#xb9; na      in  )C5.51    ]none    J SUR/PT3.00/HT4 F 00  J KHP2.6-.432-CS      I LINE&#xb9; 2HSS 006  21 4    NTS'3~57          ISD          2    / na /na
 
NIAGARA MONAUK POMER CORPORATION            -      HILE POINT NUCLEAR STATION - UNIT 2        49 of 65 NMP2-ISI-006( REV. I( CH-000                                          SECOND TEH YEAR INSERVICE IHSPECI'ION          (ISI)  IHTERVAL PLAN Change date: 07/27/1999                                                                        APPENDIX G - MSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAMINEDICATGRY I IGSCCI EX1/NDE PROCEDURE                  IPERI(X)  1  I                  RENARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATORi CONPONEHT DUG        &#xb9;i  I ITEM &#xb9; IFREOYI EX2/NDE PROCEDURE        IPERIOD 2    I USE CAL BLK &#xb9; I  LINE NO. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                      I i PIPE/CAP (conforms      to  ANSI  816.9) iC-F-2    i na        i VOL/UT6.02 2NSS-01-19-Fll007      [  also 01-19            or  DUG&#xb9; na    in iC5.51    inone i SUR/PT3.00/NT4.00        i NNP2-6-.432-CS  I  LINE&#xb9; 2MSS-006-117-4 HTS: 23 ~ 57        ISO            2    /  na /na            I i PIPE/CAP    (conforms to AHSI 816.9) (C-F-2        i  na    i VOL/UT6.02 2HSS-01 FN008      i QISO    01-19          or DUG&#xb9; na in iC5 ~ 51      !none      I  SUR/PT3.00/MT4.00  I NNP2-6-.432-CS  i LINE&#xb9; 2HSS-006-12-4 HTS: 23,57            LSD            2    J na  /na            I I  PENET  22/PIPE                          IB-J      i  na    i VOL/UT6.02 2MSS-01-20-FI$ 01      I  QISO  01-20          or  DllG&#xb9; na  in  i89.'ll  I  ID      I  SUR/PT3.00/HT4.00  I NMP2-6-.432-CS    i  LINE&#xb9;  2HSS-006-150-1    NTS:  17,18    iTEV                i na  /na            iSc10
                        )
PIPE/*MOV207                            IB-J      i na      )
voL/uT6.O2 2MSS-01 FN002      i QISO 01-21            or  DNG&#xb9; na    in i89.11    I ID      I  SUR/PT3.00/HT4.00  I NMP2.6-.432-CS    i  LINE&#xb9; 2MSS-006-150-1 N'IS: 23,24        iHS                                        isc10
                          *MOV207/PIPE                            IB-J      i  na    i VOL/uT6.OZ 2HSS.01-21.Fl$ 03      I  QISO 01-21            or  DNG&#xb9; na    in i89.11    Inone      I  SUR/PT3;00/HT4.00  I NMP2-6-.432-CS    i  LINE&#xb9; 2MSS-006-150-1 NTS: 23,24          iNS            1    i na /na              I i PIPE/*MOV111                              IB-J      i na      (
VOL/UT6.02 2HSS-01 Fll004      i QISO 01-21            or  DUG&#xb9; na    in i89.11    Inone      I SUR/PT  'M/MT4      I NNP2.6-.432-CS    i  LINE&#xb9; 2MSS-006-150-1 NTS: 23,24          iNS            1    i na  /na I  *MOV111/PIPE                            IB-J      i  na      i VOL/uT6.O2 2HSS.01-21-Fl$ 05      i QISO 01-21            or  DIIG&#xb9; na    in i89.11    )none      J SUR/PT3.00/MT4.00 i NNP2-6-.432-CS    i LINE&#xb9; 2HSS.006-150-1 NTS: 23 24          iNS                  i na /na              I I PIPE/PENET Z2                            IB-J    i na        i VOL/uT6.OZ 2HSS-01 Fl$ 06      I also 01-21            or  DWG&#xb9;  na    in i89.11    I ID        I SUR/PT3.00/HT4.00  I NMP2.6-.432-CS    i LINE&#xb9; 2HSS-006-150-1 NTS: 23(26          iTEV          1    i na  /na            ) Sc10 I RED/PIPE                                  IB-J      i  na      i VOL/UT6.02 2NSS-01 Fl$ 08      i also ol-21            or  DNG&#xb9; na    in i89.11    inone      i SUR/PT3.00/MT4.00 i NMP2-6-.432-CS    I LINE&#xb9;  2MSS  006 150  1 NTS'2i23        INS            1    i na  /na
 
NIAGARA HOHAMK POMER CORPORATION -              HILE POINT NUCLEAR STATION - UNIT 2        50 of 65 NHP2-1S1-006, REV. 1, CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                    APPEHDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ) DESCRIPTIOH OF ITEH TO BE EXAHIHEO)CATGRY [ IGSCC( EX1/NDE PROCEDURE              (PERIOD  1                        REHARKS EXAHIHATIOH IDENTIFIER J ITS ISO LOCATOR, CDHPOHENT DMG      &#xb9;,  ] ITEH &#xb9;  [FREOY) EX2/NDE PROCEDURE      )PERIOD 2 USE CAL BLK &#xb9; I  LINE Ho  AHD NOTES'S      APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIDO 3            I I  PIPE/RED                                IB-J      I na    I SUR/PT3.00/HT4.00  I 2HSS-01 FM009      i QISO 01-21            or  DMG&#xb9; na  in )89.21    ]none    f na /na f  LIHE&#xb9; 2HSS-003-298-1    NTS: 21,22      /Ns      f  1    f na /na              I i RED/PIPE                                  IB-J      I na    I SUR/PT3.00/HT4.00  I 2HSS-01 FM010      (  also 01-21          or  DMG&#xb9; na  in (89.21    ]none    f na /na              I I  LINE&#xb9; 2HSS.003-298-1    HTS: 20,21      IHS      I  1    I na /na              I I  INTEG ATT                              (8-K      f na    f SUR/PT3.00/HT4.00  f 2HSS-01 FM300      f  QISO 01-21  &#xb9; 4      or  DMG&#xb9; na  in  JB10.20 ]ID        f na /na              I.
f  LINE&#xb9; 2HSS-006-150-1 NTS: 23,24        /Handatef    1    f na /na              I I  INTEG ATT                              IB K      I na    I SUR/PT      /HT4    I 2HSS-01 FM301      f QISO    01-21 &#xb9; 4      or DMG&#xb9; na    in )810.20 ]ID        f na /na              I
[  LINE&#xb9; 2HSS-006-150-1 NTS: 23,24        [Handate/    1    / na /na              I I  IHTEG ATT                              (8-K      J na    f SUR/PT3.00/HT4.00    J 2HSS.01-21-FI602        J QISO 01-21  &#xb9; 4      or  DMG&#xb9; na  in )810.20 [ID        f na  /na f  LINE&#xb9; 2HSS-006-150-1    NTS: 23,24    JHandate/    1    / na /na              I I  IHTEG ATT                              (8-K      (
na    ] SUR/PT3.00/HT4.00    (
2HSS-01 FI603      ) alSO Ol-21 &#xb9; 4      or DMG&#xb9; na    in [810.20    JIO      J na  /na f  LINE&#xb9;  2HSS-006-150-1    NTS: 23,24    /Handatef    1    f na /na              I I  INTEG ATT                              (8-K      f na    J SUR/PT3.00/HT4.00    (
2HSS-01 FI604      / QISO 01-21  &#xb9; 4      or  OMG&#xb9; na  in )810.20 ]ID        / na /na
                        /  LINE&#xb9; 2HSS-006-150-1 NTS: 21,4          (Handate/    1    f na /na              I i IHTEG ATT                                IB-K,    I na    I SUR/PT3.00/HT4.00    I 2HSS-01-21-FI605        )
alSO 01-21  &#xb9; 4      or  DMG&#xb9; na  in )810.20 /ID        f na  /na f  LINE&#xb9; 2HSS-006-150-1 HTS: 21,4          JHandatef    1    f na /na              I INTEG Al'T                              /8-K      ) na    f SUR/PT3.00/HT4.00 2HSS-01-21-FI606        J QISO 01-21  &#xb9; 4      or  DMG&#xb9; na    in )810.20 (ID        f na /na f
LINE&#xb9; 2HSS-006-150-1    NTS: 21,4      /Handate/    1    f na /na              I
 
NIAGARA HOHAMK POMER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2                51 of 65 NNP2-1S1-006, REV. I,  CN.OOO                                        SECOND TEN YEAR INSERVICE INSPECTION                      (ISI)  INTERVAL PLAN Change date:    07/27/1999                                                                      APPENDIX G - Hss      SYSTEH (sorted by Examination          Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    IPERIOD              1  I              RENARKS EXAHINATION IDENI'IFIER J ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  iITEH  &#xb9;  iFREQYi EX2/NDE PROCEDURE      iPERIOO 2 USE CAL BLK    &#xb9;  i LINE NO. AND NOTES, AS APPLICABLE        DESELECT  JCLAssi EX3/NDE    PROCEDURE  )PERIOD 3 I  INTEG ATT                              iB-K      i na    )
SUR/PT3.00/HT4.00  i 2HSS-01-21-FM307            i aISO 01-21  &#xb9; 4      or  DMG&#xb9; na  in  F810.20    ilo    )  na /na i  LINE&#xb9; 2NSS-006-150-1 NTS: 21,4          iHandatei    1    )
na  /na            I I  ELB/PIPE                                IB-J      I na    I  VOL/UT6.02          I 2HSS-01 FMSM014        i also 01-21            or DMG&#xb9; na    in i89.11      inone i SUR/PT3.00/HT4.00      i NHP2-6-.432-CS        )  LINE&#xb9; 2HSS-006-150-1 NTS: 23,25        iNS            1    / na /na              I=
I  PIPE/PIPE                              (8-J      J na    i VOL/UT6.02 2HSS-01 FMSM017        i aiso o1-21            or  DMG&#xb9; na  in i89.11    . inone i SUR/PT3.00/NT4.00 i NNP2-6-.432-CS        i LINE&#xb9; 2HSS-006-150-1    NTS: 23        iNS        i  1    i na  /na            I I  PIPE/SOL                                ig-J      I na I SUR/PT3.00/HT4.00      I 2HSS-01-21-SI$ 04          i QISO  01-21          or DMG&#xb9; na    in ]89.32      inone i na /na                I I  LINE&#xb9; 2NSS-006-150-1 NTS: 23,4          INS            1    i na/na I  PIPE/SOL                                IB-J      i na    ( SUR/PT3.00/HT4.00  i i QISO  01-21          or DMG&#xb9; na    in i89.32      ino e i na /na I'NSS-01-21-SM005 I
i  LINE&#xb9;  2HSS-006-150-1  NTS: 23,4      [Ns            1    i na/na              I I  PIPE/SOL                                IB-J      i na    i SUR/PT3.00/HT4.00  i 2HSS-01-21-SM006            I  QISO 01-21          or  DMG&#xb9; na . in i89.32      inone    i na  /na            I I  LINE&#xb9; 2HSS-006-150-1    NTS: 23,4      INS            1    i na/na              I i PIPE/SOL                                IB-J      i na    i SUR/PT3.00/NT4.00  J 2HSS-01-21-SI$ 07          I QISO 01-21            or  DMG&#xb9; na  in i89.32      inone    J na  /na            I I  LINE&#xb9; 2HSS.006-150-1    NTS: 23 4      INS                i na /na              I I  PIPE/ELB                                IB-J      i na    i VOL/UT6.02 2HSS-01-21-SI$ 09          i  aiso o1-21            or  DMG&#xb9; na    in )89.11    inone    J SUR/PT3.00/HT4.00  i NHP2 432-CS        i  LINE&#xb9; 2HSS-006-150-1    NTS: 23,25    iNS            1    ) na  /na            I I  ELB/PIPE                                IB-J      i na    i VOL/UT6.02 2HSS-01-21-9010            i  aiso o1-21            or  DMG&#xb9; na    in i89.11    Inone    I SUR/PT3.00/HT4.00    I NHP2-6-.432-CS        i LINE&#xb9; 2HSS-006-150-1      NTS: 23,25    iNS            1    i na /na
 
NIAGARA MOHAMK POUER CORPORATION      -      HILE POINT NUCLEAR STATION - UNIT'        52 of 65 NMP2-ISI-006, REV. 1 ~ CH-000                                        SECOND TEN TEAR INSERVICE INSPECTION        (ISI) INTERVAL PLAN Change date:    07/27/1999                                                              APPENDIX  G - Mss  SYSTEM (sorted by Examination      Identifier) 2ND INTVL REL REQ ) DESCRIPTION OF ITEH TO BE EXAMINED)CATGRY (IGSCC( EX1/NDE PROCEDURE              (PERIOD  1                      REMARKS EXAHINATIOH IDENTIFIER J ITS ISO LOCATOR, COMPONENT DMG        &#xb9;, ]ITEM  &#xb9; JFREQY( EX2/NDE PROCEDURE      (PERIOD 2 [
USE CAL BLK  &#xb9; I  LINE No  AND NOTES'S    APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I  PIPE/ELB                              IB-J    I na  I  VOL/UT6.02          I 2HSS-01-21-Sli011        i  arso ol-21          or DllG&#xb9;  na  in l89.11  Inone  I  SUR/PT3 00/HT    00  I NHP2.6-.432-CS      i LINE&#xb9; 2HSS-006-150-1    NTS:  23,25    )Ns        1  [  na /na i ELB/PIPE                              IB-J    [ na  ]  VOL/UT6.02 2MSS-01-21-SN012          I QISO 01 21          or  DUG&#xb9; na  in (89.'ll ]none    f SUR/PT3.00/MT4.00    [
NMP2-6-.432-CS          LIHE&#xb9; 2MSS-006-150-1 NTS: 23,25      JNS        1  / na  /na I  PIPE/ELB                              IB-J    J na    J VOL/UT6.O2 2MSS-01-21-Sl013          i QISO 01-21          or  DMG&#xb9; na  in [89.11  Inone  I SUR/PT3.00/HT4.00    I NMP2-6-.432-CS      I  LINE&#xb9; 2HSS-006-150-1    NTS: 23,25    INS        1 f na  /na I  PIPE/ELB                              IB-J    J na    ( VOL/UT6.02 2NSS-01-21-SM015          i arso o1-21          or DllG&#xb9; na    in )89.11  [none  f SUR/PT3.00/HT4.00    [
NMP2-6-.432-CS      (
LIHE&#xb9; 2HSS-006-150-1 NTS: 23,25      )Ns        1    / na  /na I  ELB/PIPE                              )8-J    (
na    )
VOL/UT6.02 2MSS-01-21-SU016          i QISO  01-21          or  DUG&#xb9; na  in (89.11  Inone  I SUR/PT      /Ml' NMP2.6-.432-CS      I  LINE&#xb9; 2HSS-006-150.1 NTS: 23,25      INS              / na  /na              I
                          )  SOL/PIPE                              IB-J    J na    J SUR/PT3.00/MT4.00    (
Sc7 2MSS-047A-FN001A          (  arso 47-A            or  DUG&#xb9; na  in [89.40  ]ID    J na  /na              I I LINE&#xb9; 2MSS-002-49-1    NTS: 27(4    IHS      I  1    I na/na                I I PIPE/ELB                              IB-J      na    J SUR/PT3.00/HT4.00 2NSS-047A-FII0028          I QISO 47-A            or  DUG&#xb9; na  in [89.21  /none  J na  /na              I I LINE&#xb9; 2HSS-002-49-1    NTS: 27,28    INS        1    ) na/na                I I ELB/PIPE                              IB-J    I na    I SUR/PT3.00/NT4.00    I 2MSS-047A-FN003            J arso I7-A            or  DMG&#xb9; na  in (89.21  ]none  / na  /na i LINE&#xb9; 2HSS-002-49-1    NTS: 27,28    iNS      I  1    I na /na              I I prpE/*v1c                            IB-J    (
na    )
SUR/PT3.00/NT4 F 00  (
2HSS-047A- Fll004          i QISO 47-A            or  DUG&#xb9; na  in /89.21  /none  ( na  /na I LINE&#xb9; 2HSS-002-49-1    NTS: 27(29    INS              / na /na              I
 
NIAGARA NOHAMK POMER CORPORATION            -        NILE POINT NUCLEAR STATION - UNIT 2        53 of 65 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR        IHSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                      APPENDIX  G  - NSS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    (PERIOD  1  I                    RENARKS EXAHINATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPOHEHT OMG  &#xb9;,  (ITEN  &#xb9; (FREOY( EX2/NDE PROCEDURE          (PERIOD 2  (
USE CAL BLK &#xb9; I  LIHE  NO  AHD NOTES'S    APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3                  I I
4VIC/PIPE                                IB-J      I  na    I  SUR/PT3.00/NT4.00    I 2HSS-047A- FI$ 05      (
QISO 47-A            or DMG&#xb9; na in (89.21          (none    (
na  /na
(
LINE&#xb9; 2NSS-002-49-1 NTS: 27,29          (NS          1    (
na/na                I P I PE/ELB                              IB-J      I  na    I SUR/PT3        /IIT    I 2HSS-047A-FM006        (
QISO 47-A            or  DMG&#xb9; na    in (89.21    (none    (
na  /na              I
(
LINE&#xb9; 2HSS-002-49-1    NTS:  27,28      (NS          1    (  na/na                  I I  ELB/PIPE                                IB-J      (  na    I SUR/PT3  F 00/NT4.00    I 2HSS-047A-FM007A      (  QISO 47-A            or  DMG&#xb9; na    in (89.21    (none    (  na  /na                I
(
LIHE&#xb9; 2HSS-002-49-1    Nl'S: 27,28      (HS          1    (  na/na                  I I PIPE/RED                                  IB-J      I  na    I  SUR/PT3.00/MT4.00      I 2NSS-047A-FM008        I  QISO 47-A            or DMG&#xb9; na      in  (B9.21    (none    (
na /na                I na                I  LIHE&#xb9; 2NSS.002-49-1    NTS: 27,4        INS          1    (  na/na                  I I  PIPE/ELB                                IB-J      I  na    I  SUR/PT    00/NT    0  I 2HSS.047A-FM0128        I  QISO 47-A            or DMG&#xb9; na in (B9.21          (none    (
na  /na                I I  LINE&#xb9; 2NSS-002.82-1 NTS'7i28            IN            1    (  na/na                  I I  ELB/PIPE                                IB-J      (  na    (  SUR/PT3.00/NT4.00      (
2HSS-047A-Fl$ 13        I  QISO 47-A            or  DMG&#xb9; na  ~  in (B9.21    (none    (
na  /na                (
I  LINE&#xb9; 2HSS-002-82-1    HTS: 27(28      IHS            1    (  na /na                I I  PIPE/*V1D                                IB-J      (
na    (
SUR/PT3.00/HT4.00      (
2HSS-047A- FM014        (
QISO 47-A            or  DMG&#xb9; na      in (89.21    (none    (
na  /na
(
LINE&#xb9; 2HSS-002-82-1    N'IS: 27,29      (NS                (
na /na                I
(
                          *V1D/PIPE                                IB J      I na    I SUR/PT3  F 00/NT4.00    I 2HSS-047A-FM015          I QISO 47-A            or  DMG&#xb9; na      in  (B9.21    (none    (
na  /na LINE&#xb9; 2HSS.002-82-1    NTS: 27,29        (HS                (
na /na                  I I PIPE/ELB                                  IB-J      I na      I SUR/PT3.00/NT4.00      I 2HSS.047A-Fl$ 19A          QISO 47-A            or  DMG&#xb9; na      in  (B9.21    (none    (
na  /na na                (
LINE&#xb9; 2HSS-002-47-1    HTS:  27,28      (NS                ( na /na                  I
 
NIAGARA MOHANK PONER CORPORATION              -        MILE POINT NUCLEAR STATION    - UNIT 2        54 of 65 HMP2-ISI-006, REV. 1,    CN.ODD                                            SECOND TEN YEAR INSERVICE INSPECTIOH            (ISI)    INTERVAL PLAN Change  date:  07/27/1999                                                                          APPENDIX  G -  MSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REO ] DESCRIPTIOH OF ITEM TO BE EXAMINED)CATGRY )IGSCC) EX1/NDE PROCEDURE                          ]PERIOD  1                            REMARKS EXAMINATION IDENTIFIER    )  ITS ISO LOCATOR, COMPONENT DIIG      &#xb9;,  )ITEM  &#xb9; )FREOY) EX2/NDE PROCEDURE          (PERIOD 2  (
USE CAL BLK  &#xb9;  I  LINE  NO  AND NOTES'S      APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3                  I I  ELB/PIPE                                  IB-J      I  na    I  SUR/PT3.00/MT4.00    I 2MSS-047A-FN020A          )
QISO  47-A            or DNG&#xb9;    na  in  [B9.21    ]none      f  na  /na i  LINE&#xb9; 2MSS-002-47-1 HTS: 27,28            iHS            1    /  na /na                I PIPE/~VIA                                IB-J          na        SUR/PT3.00/MT4.00 2MSS-047A-FN021 I
I  QISO 47-A LIHE&#xb9; 2MSS-002-47-1 or  DNG&#xb9; na NTS'7'9 in )89.21 IHS l~
I          I I  na /na na  /na I
I I                                                                  /                        I I  *V1A/PIPE                                IB-J      f  na    f  SUR/PT3.00/MT4.00    [
2MSS-047A-FN022            I  QISO 47-A            or  DNG&#xb9; na    in (89.21    /none      /  na  /na i LINE&#xb9; 2MSS-002.47-1      NTS:  27,29      JHS                  (  na /na SOL/PIPE                                  IB-J      I  na    I  SUR/PT3.00/MT4.00    I 2MSS-047A- FN023A          i QISO 47-A              or  DNG&#xb9; na    in (89.40    /ID        /  na /na                /  Sc9 I  LINE&#xb9; 2MSS-002-48-1      NTS: 27,4      IMS            1    )  na /na                I I  PIPE/ELB                                  IB-J      I  na      I  SUR/PT  00/MT4      I          I 2MSS-047A-FN0248            i QISO 47-A              or  DWG&#xb9;  na  in )89.21      [none      J na  /na                          I I  LINE&#xb9; 2MSS-002.48-1      NTS: 27I28      INS            1    /  na /na                I          I I  ELB/PIPE                                  /B-J      J na      J SUR/PT3.00/MT'0        ]
2MSS-047A- FN025B          f  QISO 47-A              or  DNG&#xb9;  na, in    JB9.21    /none      /  na  /na LINE&#xb9; 2MSS-002-48-1      HTS:  27,28      JHS            1    )  na /na                I I PIPE/ELB                                  IB-J      I  na      I  SUR/PT3.00/MT4.00      I 2MSS-047A-FN026B            i QISO 47-A              or  DIIG&#xb9; na    in )89.21    ]none      f  na  /na i  LINE&#xb9; 2MSS-002-48-1      NTS:  27,28      iHS            1    )
na /na                I I ELB/PIPE                                  IB-J      i na      i  SUR/PT3.00/MT'0        i 2MSS-047A-Fll027A          i QISO 47-A            or  DUG&#xb9; na    in )89.21    /none      / na /na LINE&#xb9; 2MSS-002-48-'I    NTS: 27(28      IHS            1        na /na                I I                                                                  J PIPE/*V18                                /8-J      I  na      I SUR/PT      /MI'4 0    I I
2MSS-047A- FN028            I  QISO 47-A            or  DUG&#xb9; na    in ]89.21      /none      / na  /na I  LINE&#xb9; 2MSS 002 48  1    NTS'7i29        IHS                  / na /na                I
 
NIAGARA HOHAMK POMER CORPORATION        -      HILE POINT NUCLEAR STATION - UNIT 2        55 of 65 NHP2-ISI-006, REV. 1( CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date:    07/27/1999                                                                APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ ] DESCRIPTION OF ITEH TO BE EXAHINED[CATGRY [IGSCC[ EX1/NDE PROCEDURE                [PERIOD  1                        REHARKS EXAHINA'TION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  i ITEH &#xb9; iFREQYi EX2/NDE PROCEDURE      iPERIOO 2 USE CAL BLK    &#xb9; I  LINE  NO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE      IPERIOO 3 I I  ov1B/PIPE                              IB J    I  na  I  SUR/PT3.00/HT4.00  I 2HSS-047A-FM029          (  QISO 47-A            or  DMG&#xb9; na  in )89.21 I  LINE&#xb9; 2HSS-002-48-1    NTS: 27,29    iNS          1  /  na  /na            I I  PIPE/SOL                              IB-J    I  na  I  SUR/PT3.00/HT4.00  I 2HSS-047A-Fl$ 30          i QISO 47-A            or  DMG&#xb9; na  in /89.40    /none  )  na  /na LINE&#xb9; 2HSS-002-82-1    NTS: 27 4      INS          1-  (  n /na              I I
PIPE/SOL                              IB-J      f na  f  SUR/PT3.00/HT4.00  )
                                                                                                                        )Deselected 2HSS 047A-FM031          i QISO 47-A            or  DMG&#xb9; na  in (89.40    /none  f na  /na I  LINE&#xb9; 2HSS-002-47-1    NTS: 27,4      INS          1    / na /na              I I  PIPE/SOL                              IB-J      J na    J SUR/PT3.00/HT4 F 00            [Deseiected 2HSS-047A-FM032          I  QISO 47-A            or  DMG&#xb9; na  in (89.21    ]none  J na  /na na                  I  LINE&#xb9; 2HSS-002.48-1    NTS: 27,4      INS              J na /na              I I  ELB/ELB                                IB-J      )
na    [ SUR/PT3.00/HT4.00  ]
2HSS-047A-FM0338          )
QISO 47-A            or DMG&#xb9; na    in )89.21    [none  [ na  /na
                          )
LINE&#xb9;  2HSS-002-48-1    NTS: 28        [NS          1    [ na /na              I I ELB/PIPE                              IB-J      I na    I SUR/PT  0 /HT      I 2HSS-047A- Fl$ 34          [ QISO 47-A            or DMG&#xb9; na in )89.21        /none  / na  /na              I
                          )
LINE&#xb9; 2HSS-002-82-1 NTS: 27,28        (NS          1    / na /na              I I PIPE/ELB                              IB-J      I na    I SUR/PT3.00/HT4.00    I 2HSS-047A- Fl$ 35          / QISO 47-A            or  DMG&#xb9; na    in /89.21    ]none  ) na /na
                          / LINE&#xb9; 2HSS-002-82-1    NTS: 27,28    /NS          1    / na /na              I I ELB/PIPE                              IB-J      I na    I SUR/PT3.00/HT4.00    I 2HSS-047A- FM036          i QISO 47-A            or  DMG&#xb9; na    in /89.21    [none  / na  /na I LINE&#xb9; 2HSS-002-82-1    NTS: 27,28    INS                                      I I PIPE/ELB                              IB-J      I na    I SUR/PT  'M/HT        I 2HSS-047A-FM037            (
QISO 47-A            or  DMG&#xb9; na    in ]89.21    /none  / na  /na I LINE&#xb9; 2NSS-002-82-1    NTS: 27,28      INS      I  1    I na /na              I
 
N IAGARA HOHAMK POWER        CORPORATION    -      NILE POINT    NUCLEAR STATION  - UNIT 2        56 of 65 HHP2-ISI-006, REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                      APPENDIX G - Hss    SYSTEH (sorted by Examination      Identifier) 2ND INTVL REL REO I DESCRIPTION OF ITEN To BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE                IPERIOD  1  I                        REHARKS EXAHINATION IDENTIFIER [ ITS ISO LOCATOR, CDHPONENT DMG        &#xb9;,  (
ITEN  &#xb9; JFREQYJ EX2/NDE PROCEDURE        [PERIOD 2 USE CAL BLK &#xb9; i LINE NO. AND NOTES, AS APPLICABLE isELECT JCLASsi EX3/NDE PROCEDURE                  [PERIOD 3
[  *AOV60/PIPE                            IB-J      I  na    I  SUR/PT3.00/HT4.00  I 2HSS-047A- FM038      [  also 47-A            or  DMG&#xb9; na    in )89.40    /ID      /  na  /na            /Sc8 i LINE&#xb9; 2HSS-002-82-1      NTS: 11,27      iNS            1    J na /na              I I  ELB/PIPE                                IB-J      J na    [  SUR/PT3.00/HT4.00  J 2HSS-047A-FM039        (
also 47-A            or  DMG&#xb9; na    in )B9.21    ]none    f  na  /na J
LINE&#xb9; 2HSS-O02-47-1    NTS: 27,28      JNS            1
                                                                                      /  na /na              I
(  PIPE/ELB                                IB-J      I  na    I  SUR/PT3.00/HT4.00  I 2HSS-047A- FM040        [  also 47-A            or DMG&#xb9; na in )B9.21        /none    /  na /na              I J
LINE&#xb9; 2HSS-002-47-1 NTS: 27,28          JNS                /  na /na              I I  ELB/PIPE                                IB-J      )
na    (
SUR/PT3.00/HT4.00  )
2HSS-047A-FW041        I  QISO  47.A          or DMG&#xb9; na in JB9.21        )none    [  na  /na            I na                I  LIHE&#xb9; 2HSS-002-47-1 NTS: 27,28          INS                                        I I  PIPE/ELB                                IB-J      I  na    I  SUR/PT3.00/HT4.00    I 2HSS-047A-Fi$ 42A      i QISO  47-A          or DWG&#xb9; na in (89.21        )none    (
na /na              I LINE&#xb9; 2HSS-002-47-1 NTS: 27,28          JNS      I    1    I  na  /na              I I <<AOV6A/P IPE                            IB-J      I  na      I SUR/PT3.00/HT4 F 00 lEx6        iHT QRF0-6.
2HSS  047A-FI$ 43      I  QISO  47-A          or DMG&#xb9; na in (B9.40          /Io      / na  /na                          I I  LINE&#xb9; 2HSS-002-47-1 NTS: 11,27          INS            1    J na/na                I          I
[ MNF/RED                                  IB-J      f na      J VOL/UT6.02 2HSS-106A- FMDOIA      )
alsoIO6-A            or  DMG&#xb9; na    in  JB9.11    ilo      (
SUR/PT3.00/HT4.00    i    Sc9 NNP2-4-.337-CS    I  LINE&#xb9; 2HSS-002-107-1 NTS: 30,31          INS          1    / na /na I RED/PIPE                                IB-J      I na      I SUR/PT3.00/HT4.00    I 2HSS-106A.FM002          (
alsoio6-A            or  D'MG&#xb9; na    in [89.21    /ID      f na  /na              )
Sc9 I LINE&#xb9; 2HSS.002-107-1    NTS:  31,27      IHS          1    / na/na                I I PIPE/ELB                                IB-J      I na      I SUR/PT3.00/HT4.00    I 2HSS-106A- FI$ 03        )
QIS0106-A            or  DMG&#xb9;  na    in  (89.21    ]none    J na /na I LINE&#xb9;  2HSS-002-107-1  NTS:  27,28      INS          1    / na /na              I
 
NIAGARA HOHAWK POWER CORPORATION          -      HILE POINT NUCLEAR STATION - UNIT 2        57 of 65 NHP2-ISI 006, REV. 1 ~  CN  000                                        SECOND TEN YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                                      APPENDIX G - HSS SYSTEH (sorted by Exanination Identifier) 2ND INTVL REL RED    (
DESCRIPTION OF ITEM TO BE EXAMINED)CATGRY (IGSCC) EX1/NDE PROCEDURE (PERIOD              1                        REMARKS EXAMINATION IDENTIFIER    )
ITS ISO LOCATOR,  COHPONENT DWG    &#xb9;,  JITEH  &#xb9; [FREOYJ EX2/NDE PROCEDURE ]PERIOD 2        J USE CAL BLK  &#xb9;  I  LINE NO. AND NOTES, AS APPLICABLE ISELECT      ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  ELB/PIPE                                IB-J      f  na    f  SUR/PT3.00/MT4.00 /
2HSS.106A-FW004A          f QISO106-A            or DWG&#xb9; na in /B9.21        /ID        /  na /na            (
Sc9 i LINES 2HSS-002-107-1 NTS: 27,28          iHS          1    /  na /na            I I  PIPE/TEE                                IB-J      (
na    J SUR/PT3.00/HT4.00  J 2HSS-106A- FW0058          /
QISO106-A            or DWG&#xb9; na in /B9.21        ]none    f  na /na
                            )
LINE&#xb9; 2HSS-002-107-1 NTS: 27,32        )NS          1    /  na /na            I I  TEE/RED                                IB-J      I  na    I  SUR/PT3.00/MT'0    I 2MSS-106A- FW006            i QIS0106-A            or DWG&#xb9; na in (89.21        [none    )  na /na I  LINE&#xb9;  2HSS-002-107-1  NTS'2i33 INS                  1    /  na /na            I I  TEE/PIPE                                IB-J      f  na    J SUR/PT3.00/HT4.00  f 2HSS-106A-FW009A            i  QIS0106-A            or DWG&#xb9; na      in (B9.21    ]none    f  na /na            I I  LINE&#xb9;  2HSS-002-107-1    NTS: 27,32    INS          1    /  na/na              I I  PIPE/PIPE                              IB-J      i na      [  SUR/PT3.00/HT4.00  i 2MSS-106A- FW010            )
QISO106-A            or  DWG&#xb9; na    in (B9.21    ]none    f  na /na            I I  LINE&#xb9;  2HSS 002 107  1  Nl'  27        INS          1    f  na/na              I I  PIPE/ELB                                IB J      f  na    f  SUR/PT3.00/HT4.00  J 2HSS-106A-FW011            i  QIS0106-A            or  DWG&#xb9; na ~  in (B9.21    [none    J na /na i  LINE&#xb9;  2HSS-002-107-1    NTS: 27(28    iNS                )
na /na              I I ELB/PIPE                                IB-J      I Aa      I SUR/PT3.00/HT4.00  I 2HSS-106A-FW012              )
QIS0106-A            or DWG&#xb9; na    in [89.21    /none    / na /na
(
LINES 2MSS-002-107-1 NTS: 27,28        (NS            1    / na/na              I PIPE/WNF                                IB-J      f na      f SUR/PT3.00/HT4.00  /
2HSS-106A-FW013              [
QISO106-A            or  DUG&#xb9; na    in [89.21    tnone    / na /na
[ LINE&#xb9; 2MSS-002-107-1 NTS: 27,34        (NS            1    / na /na              I
                            ] WNF/PIPE                                IB-J      I na      I SUR/PT3.00/MT4.00  I 2HSS-106A- FW014            i QISO106-A            or DWG&#xb9; na    in (89.21    ]ID      f na /na              f Sc9 Aa                        LINE&#xb9; 2HSS-002-107-1 NTS: 27,34        iNS          1    / na /na              I
 
NIAGARA HOHAMK POMER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        58 of 65 HHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                          APPENDIX G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE                    IPERIOD  1  I                    REMARKS I
EXAHINATION IDEH IF IER        ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  (ITEN  &#xb9;  )FREOYJ EX2/NDE PROCEDURE        ]PERIOD 2 USE CAL BLK  &#xb9;  I    LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3                  I I    PIPE/ELB                                IB-J      I  na    I  SUR/PT3.00/HT4.00  I 2HSS-106A-FM018A          I    QI S0106-A          or  DMG&#xb9; na    in [89.21    [ID        f  na /na              f  Sc9
                          )
LIHE&#xb9; 2HSS-002-107.1 HTS: 27,28          iHS            1
                                                                                            /  na/na              I I    ELB/PIPE                                IB-J      I  na    I SUR/PT    0 /HT4    I 2HSS-106A- FM019        'i    QISO106-A            or DMG&#xb9; na in )89.21          )none      / na /na              I i LINE&#xb9; 2HSS-002-107-1 NTS: 27,28            FANS 1    /  na/na              I PIPE/PIPE                                IB-J      J na    J SUR/PT3.00/HT4.00  (
2HSS-106A-FM020            J QIS0106-A            or DMG&#xb9; na      in ]89.21    [none      [  na  /na            I na                  I  LINE&#xb9; 2MSS.002-107-1 HTS: 27            INS                  [  na /na              I I  INTEG ATT                                JB-K-1    f  na    f  SUR/PT3.00/HT4.00  J 2HSS-106A-FM021            i QIS0106 A              or  DMG&#xb9; NA    in )810.10 )ID          )  na  /na                qc9 na                  J LIHE&#xb9; 2HSS-002-107-1    N'IS: 27,35      JHandate)      'I
                                                                                            ]  na /na              I I  PIPE/PIPE                                IB-J      [  na    (
SUR/PT3.00/HT4.00  J 2HSS-106A-FM022            i QIS0106 A              or DMG&#xb9; na      in /89.21    ]none    f  na  /na            I I LINE&#xb9; 2HSS-002-107-1  NTS: 27          INS            1    /  na /na              I I  PIPE/PIPE                                IB-J      I  na    I  SUR/PT3.00/HT4.00  I 2HSS-106A-FM023            (
QIS0106-A            or DMG&#xb9; na  ~  in )89.21    )~e      (  na /na              I I  LINE&#xb9; 2HSS-002-107-1 NTS: 27            INS            1    / na /na              I I  PIPE/TEE                                  IB-J      /  na      J SUR/PT3.00/HT4.00    J 2HSS-107A- FM001A          i QISO107-A              or DMG&#xb9; na      in [89.21    /ID        / na  /na              I I  LINE&#xb9; 2HSS-002-107-1 HTS: 27,32          IHS            1    / na/na                    Sc11 I  TEE/PIPE                                  IB-J        na      i SUR/PT3.00/HT4.00    i 2HSS-107A.FM002A            I QIS0107-A            or DMG&#xb9; na      in /89.21    /ID        / na /na              I I  LINE&#xb9;  2HSS 002 107  1  HTS'7    32      IHS                  / na /na                  Sc11 f PIPE/*HOV108                              IB-J      I  na      I SUR/PT3.00/HT4.00    I 2HSS-107A-FM003A            / QISO107-A            or  DMG&#xb9; na    in /89.21      [none    / na /na LINE&#xb9; 2HSS-002-107-1 NTS: 27,29          iNS                  / na /na              I
 
NIAGARA HONAWK POWER CORPORATION              -        NILE POINT NUCLEAR STATION - UNIT 2        59 of 65 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR IHSERVICE INSPECTION            (ISI)    IHTERVAL PLAN Change date:    07/27/1999                                                                      APPENDIX  G  - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCl EX1/NDE PROCEDURE                        iPERIOO  1  I                    REHARKS EXAHIHAT ION IDENTIFIER  f ITS ISO LOCATOR, COHPONENT DWG  &#xb9;,  [ITEN  &#xb9; JFREOY) EX2/NDE PROCEDURE          ]PERIOD 2  f USE CAL BLK  &#xb9; f  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3                      I I  ~HOV108/PIPE                              IB-J    )
na    [  SUR/PT3.00/HT4.00    )
2HSS-107A- FW004          I  QIS0107-A            or DMG&#xb9; na in )89.21 I  LINE&#xb9; 2HSS.002-107-1 NTS: 27,29          INS                                          I I  PIPE/ELB                                  IB-J      I  na    I  SUR/PT3.00/HT4.00      I 2HSS-107A- FM005          i  QIS0107-A            or  DWG&#xb9;  na    in  (89.21    (none    [  na /na                I I  LINE&#xb9;  2HSS-002-107-1  NTS:  27  28    IN            1    /  na/na                  I I  ELB/PIPE                                  /8-J      I  na    I  SUR/PT3'00/HT4'00      I 2HSS-107A-FW006          i  QIS0107-A            or  DWG&#xb9;  na    in  )89.21    /ID      f  na /na I LINE&#xb9; 2HSS-002-107-1 NTS: 27I28          IHS          1 J
na /na                      Sc11 I PIPE/SOL                                  /8-J      I  na    I SUR/PT3  F 00/HT4.00    I 2HSS-107A-FW007            I QIS0107-A            or DWG&#xb9; na      in (89.40    [ID      /  na  /na LINE&#xb9; 2HSS-002-107-1 NTS: 27,4            )HS          1    /  na /na                      Sc11 I TEE/PIPE                                  IB-J      I  na    I  SUR/PT3.00/HT4.00      I 2HSS.107A-FW008            (
QIS0107-A            or  DMG&#xb9; na      in (89.21    ]none    J na /na                I I LINE&#xb9;  2HSS 002-54-1    NTS: 27,32      INS                /  na  /na                I I PIPE/ELB                                  IB-J      I  na    I  SUR/PT3.00/HT4.00      I 2HSS-107A- F W009          )
QIS0107-A            or  DWG&#xb9;  na    in (89.21    )none    [  na /na                I I LINE&#xb9; 2HSS-002-54-1      NTS:  27,28      INS            1    /  na/na                  I I ELB/PIPE                                  /8-J      /  na    /  SUR/PT3.00/HT4.00      /
2HSS-107A-FW010A          I QI S0107-A            or  DMG&#xb9; na      in [89.21    /none    (  na  /na                I I LINE&#xb9; 2HSS.002-54-1      NTS: 27,28      INS      I    1    I  na/na                  I
(
PIPE/*NOVI 18                              IB-J    I  na      I SUR/PT3 F 00/HT4.00    I          I 2HSS-107A- FW011          i QISO107-A            or  DWG&#xb9; na      in /89.21    /ID      / na /na                  I          I i LINE&#xb9; 2HSS-002-54-1      NTS: 27,29        iNS                / na /na                      Sc11  /
I iHOVI18/P IPE                              IB-J      I na      I SUR/PT3.00/HT4.00      I 2HSS-107A- FW012A            QI S0107-A            or  DWG&#xb9; na      in (89.21    )~e      I na /na                  I LINE&#xb9; 2HSS-002-54-1      NTS:  27,29      INS          1    f na/na                  I
 
NIAGARA HOHAMK POMER CORPORATION          -        HILE POINT NUCLEAR STATION - UNIT 2        60 of 65 NHP2-ISI-006, REV. 1, CN-000                                          SECOND TEN YEAR      INSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                  APPENDIX  G -  HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REO f DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY (IGSCC) EX1/NDE PROCEDURE                  [PERIOD  1                        REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG        &#xb9;, ]ITEN  &#xb9; JFREQYJ EX2/NDE PROCEDURE (PERIOD 2            f USE CAL BLK  &#xb9; I  LINE  NO  AND NOTES'S      APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3            I I P IPE/~HOV11                            IB-J    ]  na    f  SUR/PT3 F 00/HT4 F 00  f 2HSS-107A-F M013A        I QIS0107-A            or  DMG&#xb9; na  in (89.21    [none  f  na  /na I  LINE&#xb9;  2HSS 002 54  1    NTS'7i29      INS          1  J na/na                  I I  SOL/PIPE                              IB-J      I na    I  SUR/PT      /HT4'00  I          I 2HSS-110A-FM001A        i QIS0110-A              or  DMG&#xb9; na  in ]89.40    /ID      /  na  /na
(
LINE&#xb9; 2HSS-002-110-1 NTS: 4(27        )NS          1    /  na/na                      Seri  /
I  PIPE/ELB                              IB-J      I na    I  SUR/PT3.00/HT4 F 00    I 2HSS-110A-FM002          i QISO110-A              or  DMG&#xb9; na  in [89.21    ]none    J na  /na                I I  LINE&#xb9; 2HSS-002-110-1 NTS: 27,28        INS                J na /na                I I  ELB/PIPE                              IB J      I na    I  SUR/PT3.00/HT4.00      I 2HSS-110A-FM003          I  QIS0110-A            or DMG&#xb9; na in )89.21      )none    [  na  /na I LINE&#xb9; 2HSS-002-110-1 NTS: 27 28        INS          1    /  na /na                I I PIPE/ELB                              IB-J      I na    I  SUR/PT    0 /HT4 F 00  I 2HSS-110A-FM004          i QIS0110 A            or  DMG&#xb9; na  in (89.21    /none    /  na  /na I LINE&#xb9; 2HSS-002-110-1 NTS: 27,28        1NS          1    /  na /na                I I ELB/PIPE                              IB-J      / na    f  SUR/PT3.00/HT4.00      )
2HSS-IIOA-FM005          I QIS0110-A            or  DMG&#xb9; na. in [89.21    /none    /  na  /na                I i LINE&#xb9;  2HSS-002-110-1    NTS: 27,28    iNS          1    (  na/na                  I
                          )
PIPE/*HOV189                          IB-J      ] na    J SUR/PT3.00/HT4.00      [
2HSS-110A- FM006A        I QIS0110.A            or DMG&#xb9; na in (89.21      /IO      /  na  /na
                          ] LINE&#xb9; 2HSS-002-110-1 NTS: 27 29        ]HS                /  na /na                )    Sc11  i
(
                            *HOV189/PIPE                          IB-J      I na    I  SUR/PT3.00/HT4.00      I 2HSS-110A-FM007A          [ QIS0110-A            or DMG&#xb9; na in [89.21      ]none    J na  /na i LINE&#xb9;  2HSS-002-110-1    NTS: 27,29    iNS          1    J na /na                I I PIPE/ELB                              IB-J      (
na    J SUR/PT3.00/Hl'4.00    [
2HSS-110A-FM008          ] QIS0110-A            or  DMG&#xb9; na  in ]89.21    )n~      )  na  /na
                          )
LINE&#xb9; 2HSS-002-1'l0-1 NTS: 27(28        [NS          1    / na/na                  I
 
NIAGARA HONAMK POMER CORPORATION        -      HILE POINT NUCLEAR STATION - UNIT 2        61 of 65 NHP2-ISI-006, REV. 1, Ck-ooo                                      SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/27/1999                                                                APPENDIX  G - Hss  SYSTEH (sorted by Examination      Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY I IGSCCI EX1/kDE PROCEDURE            iPERIOD  1  I                    REHARKS EXAHlkATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  iITEH  &#xb9; iFREQYi EX2/NDE PROCEDURE      iPERIOD 2 USE CAL BLK &#xb9; I  LINE  ko. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/kDE PROCEDURE            IPERIOO 3  I I  ELB/PIPE                              IB-J    J na  i  SUR/PT3.00/HT4.00    i 2HSS->>OA-FM009        i  also>>o-A            or DllG&#xb9;  na  in i89.21    )none  i na  /na              I i  LlkE&#xb9; 2HSS-002->>0-1    NTS: 27,28      Jks      I  1  Ina/na                  I I  PIPE/ELB                              IB-J    i na    i SUR/PT3.00/HT4.00    i 2HSS->>OA-FM010        I QISO>>O.A            or  DMG&#xb9; na  in i89.21    inone    i na /na i LINE&#xb9;  2Hss-oo2->>o-1 NTs- 27 28        Iks              i na /na              I
                      /  ELB/PIPE                              IB-J    I  na    I SUR/PT3.00/HT4.00    I 2HSS->>OA-FMO>>          i  QISO>>0-A            or DMG&#xb9; na    in i89.21    inone    i na /na              I na              I  LINE&#xb9; 2HSS-002->>0-1 NTS: 2,3          Iks          1    i na/na I  PIPE/ELB                              IB-J    i na    (
SUR/PT3.00/HT4.00    i 2HSS->>OA-FM012A        i  QISO>>O.A            or OMG&#xb9; na in i89.21        i~e      i na  /na LINE&#xb9;  2HSS-002->>0-1    NTS: 27,28    [NS                                      I I  ELB/PIPE                              IB-J    I  na    I SUR/PT      /HT      I          I 2HSS->>OA- FM013        I  QISO>>O.A            or DMG&#xb9; na    in i89.21    inone i na    /na                          I.
i LINE&#xb9; 2HSS-002->>0-1 NTS: 27,28          iks              i na  /na              I          I I PIPE/PIPE                              IB-J    I  na    I SUR/PT3.00/HT4.00    I 2HSS->>OA-FII015A        i QISO>>0-A            or DMG&#xb9; na  .in  i89.21  in~      i na  /na J
LINE&#xb9; 2HSS-002->>0-1 NTS: 27            iks          1    J na/na                I I PIPE/ELB                              IB-J      i na    i SUR/PT3.00/HT4.00    i 2HSS->>OA-FM016          i also>>o-A            or  DMG&#xb9; na  in i89.21    inone i na /na                I i LINE&#xb9; 2HSS-002->>0-1 NTS:    27,28    iks          1    / na/na                I I ELB/PIPE                              IB-J      I na    I SUR/PT3.00/HT4.00    I 2HSS->>OA- Fll017A      i also>>0-A            or  DMG&#xb9; na  in i89.21    inone  i na  /na              I I LINE&#xb9; 2HSS.002->>0.1    NTS: 27,28    Iks              i na /na              I I PIPE/ELB                              IB-J      I na    I SUR/PT3 00/HT4 00 I 2HSS->>OA-FM018          i also>>0-A            or  DMG&#xb9; na    in i89.21    /none  i na  /na i LINE&#xb9; 2HSS-002-'>>0-1 NTS:    27,28    iks          1    i na  /na              I
 
NIAGARA HONAMK POMER CORPORATIOH          -      NILE POINT NUCLEAR STATION - UNIT 2.        62 of 65 NHP2-ISI-006( REV. 1( CH-000                                            SECOND TEH YEAR IHSERVICE INSPECI'IOH        (ISI)  INTERVAL PLAN Change date:  07/27/1999                                                                    APPENDIX  G - HSS SYSTEH (sorted by Examination      Identifier) 2ND INTVL REL REQ  J DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY [IGSCC) EX1/NDE PROCEDURE              (PERIM    1                        REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONEHT DMG          &#xb9;,  [ITEH  &#xb9; [FREOYJ EX2/NDE PROCEDURE        ]PERIOD 2  f USE CAL BLK  &#xb9; f LINE NO. AND NOTES, AS APPLICABLE )SELECT (CLASS]
EX3/NDE PROCEDURE  [PERIM 3    )
ELB/PIPE                                IB-J        na      SUR/PT3.00/HT4.00 2HSS-110A- FM019 I
i QIS0110-A LINE&#xb9;  2HSS 002 110 1 or  DMG&#xb9; na NTS'7(28 in (89.21 INS I~
f        [
I  na  /na na /na f
I I                                                              ]                      I
                        ]  PIPE/PIPE                              IB J      I  na    I SUR/PT    0 /HT    0  I 2HSS-110A-FM028A        [  QISO110-A            or  DMG&#xb9; na  in (89.21    /none    J na  /na              I I  LIHE&#xb9; 2HSS-002-110-1 NTS: 27            INS          1
                                                                                        /  na/na                I I  PIPE/ELB                                IB-J      J na    / SUR/PT3.00/HT4.00    I 2HSS.110B-FM004          i  QISO110-8            or  DMG&#xb9; na  in  /89.21    /none    / na /na              I I  LINE&#xb9;  2HSS-002-110-1    NTS: 27,28    INS          1    / na /na I  ELB/PIPE                                IB-J      /  na    )
SUR/PT3.00/HT4.00    /
2HSS-110B-FM005          I  QIS0110.B            or DMG&#xb9; na in /89.21        /none    ( na  /na
(
LINE&#xb9; 2HSS-002-110-1 NTS: 27,28        iNS                ( na /na              I I  PIPE/ELB                                IB-J      f  na    (
SUR/PT3.00/HT4.00    (
2HSS-110B-FM006          /  QISO110-8            or  DMG&#xb9; na  in  /89.21    )none    / na /na i  LINE&#xb9;  2HSS-002-110-'I  NTS: 27,28    iNS          1    / na /na              I I  ELB/PIPE                                IB-J      f  na    / SUR/PT3.00/HT4.00    /
2liSS-1108-FM007          i  QISO110-8            or  DMG&#xb9; na . in  (89.21    )none    f na  /na I  LINE&#xb9;  2HSS-002-110-1    NTS: 27(28    INS                J na  /na              I I PIPE/ELB                                IB J      I na    I SUR/PT3.00/HT4.00    I 2HSS-110B-FM008            )
QISO110-8            or DMG&#xb9; na in (89.21        /non'e  / na  /na I LINE&#xb9; 2HSS-002-110-1 NTS: 27,28        INS            1 J
na /na              I I ELB/PIPE                                IB-J      I na    I SUR/PT3 F 00/HT4.00  I 2HSS-1108- FM009          (
QIS0110-8            or DMG&#xb9; na in (89.21        /none    ) na  /na I LINE&#xb9; 2HSS-002-110-1 NTS: 27(28        INS                / na /na              I I PIPE/SOL                                IB-J      I na    I SUR/PT3.00/HT4.00    I 2HSS.110B-FM010A          i QIS0110.8            or DMG&#xb9; na    in /89.40    /none    f na /na LINE&#xb9; 2MSS-002-110-1 NTS: 28,4          (NS                / na /na              I
 
NIAGARA HOHAMK POMER CORPORATION -                NILE POINT NUCLEAR STATION - UNIT 2        63 of 65 NHP2-1S1-006, REV. 1, CN-000                                              SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/27/1999                                                                    APPENDIX  G - HSS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE                    iPERIOO  1                        REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG            &#xb9;,  iITEH  &#xb9; iFREOY) EX2/NDE PROCEDURE        iPERIOD 2 USE CAL BLK    &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT        ICLASSI EX3/NDE PROCEDURE IPERIOD 3          I I  PIPE/ELB                                IB-J    i  na i SUR/PT3.00/HT4.00        i 2HSS-1108-Fl$  11        )
ais0110-8            or  DMG&#xb9; na    in i89.21    /none i na /na
                          /  LINE&#xb9; 2HSS-002-110.1 NTS: 27,28          FANS 1    i na  /na              I I  ELB/PIPE                                IB-J      I na    I  SUR/PT3.00/HT4 F 00 I 2HSS-110B-Fl$ 12          i  ais0110-8            or  DMG&#xb9;  na  in  i89.21    inone i na /na i  LINE&#xb9; 2HSS-002-110-1    N'TS: 27,28      iNS          1    i  na/na              I
(  PIPE/ELB                                IB-J      I na    I SUR/PT3 F 00/HT4.00  i 2HSS-110B- Fl$ 13        i  QIS0110-8            or  DMG&#xb9;  na  in  i89.21    inone    i na  /na              I i  LINE&#xb9;  2HSS-002-110-1  NTS:  27,28      iNS          1    i  na/na                I I  ELB/PIPE                                IB-J      I na    I  SUR/PT    /HT4 00  I 2HSS-110B-Fl$ 14          i QISO'110-B            or  DMG&#xb9; na    in iB9.21    )none    i na  /na I  LINE&#xb9; 2HSS.002-110-1 N'IS: ?7,28        INS                                        I I  PIPE/ELB                                IB-J      I na    I  SUR/PT3.00/HT4.00    I 2HSS-110B- FM015          i  QIS0110-8            or  DMG&#xb9;  na  in  /89.21    inone    i na  /na I  LINE&#xb9;  2HSS-002-110-1    NTS: 27,28      INS          1    i  na /na              I I  ELB/PIPE                                IB-J      J na i SUR/PT3.00/Hl'4.00 i 2HSS-110B- FI$ 16          i  QIS0110-B            or  DMG&#xb9;  na ~ in  i89.21    inone i na /na                  I i LINE&#xb9; 2HSS-002-110.1 NTS: 27,28          iNS          1    (  na/na                I I  PIPE/ELB                                IB-J      i na    i SUR/PT3.00/Hl'4.00    i 2HSS-110B-Fl$ 17          i QIS0110-B              or DUG&#xb9; na in (B9.21        inone i na /na i LINE&#xb9; 2HSS-002-110-1 NTS: 27(28            iNS        1    i na  /na              I I  ELB/PIPE                                  IB-J    I na    I  SUR/PT3.00/HT4 F 00  I 2HSS-110B- FM018          i  ais0110-8            or  DMG&#xb9; na    in i89.21    inone i na /na I  LINE&#xb9;  2HSS 002 110  1  NTS  27i28      INS                                      I I PIPE/ELB                                  IB-J    i na      [ SUR/PT3.00/HT4.00 i 2HSS-110B-FM019            i QIS0110-8            or DMG&#xb9; na in i89.21        inone    i na /na I LINE&#xb9; 2HSS-002-110-1 NTS: 27,28          INS          1    i na/na                I
 
NIAGARA MOHAltK PONER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2        64 of 65 NMP2-ISI-006, REV. 1, CN-000                                            SECOND TEN YEAR INSERVICE INSPECTIOH          (ISI) INTERVAL PLAN Change date: 07/27/1999                                                                        APPENDIX  G - MSS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REO ) DESCRIPTIOH OF ITEH TO BE EXAMINED)CATGRY ) IGSCC) EX1/NDE PROCEDURE                    )PERI(X) 1                        REMARKS EXAHINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DUG          &#xb9;,  )
ITEM &#xb9; JFREOYJ EX2/NDE PROCEDURE        (PERIOD 2 [
USE CAL BLK &#xb9; i LINE NO. AND NOTES, AS APPLICABLE          DESELECT  iCLASSJ EX3/NDE PROCEDURE iPERIOO 3
                        /  ELB/PIPE                                IB-J      I  na    I  SUR/PT3    /MT' 2MSS-1108-FN020        i QIS0110 8              or DUG&#xb9; na in [89.2'I          /none    /  na /na I  LINE&#xb9; 2HSS-002-110-1    HTS: 27,28      INS            1    J na/na              I I  PIPE/ELB                                IB-J      I  na    I  SUR/PT3.00/MT4.00  I 2MSS-1108-FN021        i  QIS0110-8            or  DMG&#xb9;  na    in )89.21    )none    f  na /na i  LINE&#xb9;  2HSS-002-110-1  NTS:  27,28      iNS            1    /  na/na              I I  ELB/PIPE                                IB-J      )
na    )
SUR/PT3.00/MT4.00  J 2MSS-1108-FN022        i  QISO110-8            or  DMG&#xb9;  na    in ]89.21    ]none    f  na /na              I i LINE&#xb9;    2HSS-002-110-1    NTS: 27(28      iNS                  J na /na
                            <<AOV7C/SM RED IHSERT    (2" to 1")      iB-J      I  M      I  SUR/PT3.00/MT4.00  I 2MSS. 175A- FMI12        I  QISO 01-15            or  DUG&#xb9; na    in [89.40    /none      J na /na na                i  LINE&#xb9; 2MSS.002-154-1 NTS: 11, 13          iNS          1      )
na /na              I
(
                            <<AOV70/SW RED INSERT    (2" to 1")      )8-J      [  na      [  SUR/PT3.00/MT4.00  [
2MSS-175A- F l!126      I  QISO 01-16            or  DUG&#xb9; na    in )89.40    ]none      J na /na              I
                        )
LINE&#xb9; 2MSS-002-153-1 HTS: 11,14          )NS                  /  na /na              I
                        /
                            <<AOV7A/Ql  RED INSERT    (2" to 1")      /8-J      I na      I  SUR/PT3.00/MT4.00  I 2MSS-175A-FM142          i QISO 01-13            or  DUG&#xb9; na    in (89.40      )none    /  na /na              I na                I  LIHE&#xb9; 2HSS-002-152-1 NTS: 11,      13    INS        I  1      I na/na                I
                        )
                            <<AOV78/SH RED INSERT    (2" to 1")      (8-J      I na      I SUR/PT3.00/MT4.00    I 2MSS-175A- FII154        i QISO 01-14            or  DUG&#xb9; na    in (89.40      ]none      f na /na I LINE&#xb9; 2MSS-002-151-1 NTS: 11, 13          INS          1      f na /na              I
                          / NOZ/FLG BLTG Q NB TOP HEAD VENT            /B-G-2    / na        VT1/VT2.01          I 2MSS-P8105              I QISO106-A            or DUG&#xb9;        in /87.50 /ID              na  /na                Sc9 na                  / LINE&#xb9;  2MSS-002-107-1    NTS:  (none)      )Mandate/    1        na /na                I
                          )
NIF/WNF                                    (8-G-2    / na        VT1/VT2.01            I 2HSS-P8106              I QIS0106-A            or DUG&#xb9;        in )87.50 )ID              na /na                  Sc9 J
LINE&#xb9; 2MSS-002-107-1 NTS: (none) ]Mandate] 1                      na /na                I
 
NIAGARA HONAMK POMER CORPORATION        -      HILE POINT NUCLEAR STATION - UNIT 2                                      E 65 of 65 NHP2-ISI-006( REV. 1, CN-000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:  07/27/1999                                                              APPENDIX G - Hss SYSTEH (sorted by Exemination Identifier)
ND INTVL REL REQ  I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE          IPERIOO    1  I                            REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DMG      &#xb9;,  i ITEH &#xb9; iFREQY) EX2/NDE PROCEDURE      iPERIOD 2 i USE CAL BLK  &#xb9; i LINE No  AND NOTES,  AS  APPLICABLE  I  ELECT ICLASSI EX3/NDE PROCEDURE      IPERIOO      I i NOZ/SE Q N3A Az072 HAIN STEAH        iB-J    i  na    i  VOL/UT6.02          )Ex6          iRecategorized during 2nd 10-Year Update. HT/UT Q RFO-6.
2RPV-KB13                i QISO 01-13          or  DMG&#xb9; 031  in i89.11  /ID      i SUR/HT4.00          I            I NHP2-27-1 '7-CS    I LINE&#xb9; 2HSS-026-43-1    NTS: (none)  ITEV    I    1  I na  /              I            I
                          / NOZ/SE Q N38 Az108 HAIN STEAH        iB-J    t  na    i  VOL/UT6.02          I            iRecategorized during 2nd 10-Year Update 2RPV-K814                i QISO O1-14          or  DMG&#xb9; 031  in i89.11  iID      J SUR/HT4.00          igcB NHP2-27-1.57-CS    i LINE&#xb9; 2HSS-026-44-1    NTS: (none)  )TEV    i    1  J na  /              I            I I NOZ/SE Q N3C Az252 HAIN STEAH        IB-J    I  na    I  VOL/UT6.02          I            iRecategorized during 2nd 10-Year Update 2RPV-K815                i QISO 01-15          or DMG&#xb9; 031 in (89.11      iID    i SUR/PT3.00                Sc9 NHP2-27-1.57-CS    i LINE&#xb9; 2HSS-026-45-1 NTS: (none) iTEV          i  1  i na  /              I            I
                          / NOZ/SE Q N3D Az288 HAIN STEAN        iB-J      i na    / VOL/UT6.02          I            iRecategorized during 2nd 10-Year Update 2RPV-K816                i QISO 01-16          or DMG&#xb9; 031 in i89.11      iID      i SUR/HT4.00          I    .        I NNP2-27-1.57-CS    i LINE&#xb9; 2HSS-026-46-1    NTS: (none)  iTEV      i  1    i na  /              iSc10 I NOZ/FLG Q NB TOP HEAD VENT          IB-J      I na    I VOL/UT6.02          I            iRecategorized during 2nd 10-Year Update 2RPV-K828                i QIS0106-A          or DMG&#xb9; 032 in i89.11      i2P      i SUR/HT4.00          I      Sc9 NHP2-6.3-1.24-CS    J LINE&#xb9; 2HSS-002-107-1 NTS: (none) )TEV          )  1    i na  /              I            I END OF SYSTEH  Hss
 
NIAGARAMOHAWKPOWER CORPORATION Nine MiIe Point Unit 2 NMP2-ISI406, Rev. 1 ~
CH400 System MSS: General Notes
: 1. 26" SAFE END, SA408 CL1                                                              4" 90% WELD NECK FLANGE, SA-105
: 2. 26" X 1.177 MIN. WALLSMLS PIPE, SA-106C                                        31. 4" X2" SCH. 160 RED. ELBOW, SA-234 WPB
: 3. 26 X 1.177 MIN. WALLELBOW, SA-234 WPC                                          32. 2'CH. 160 STR. TEE, SA-234 WPB
: 4. 2" 600% SOCKOLET, SA-105                                                            2 X1" SCH.160CONC. REDUCER, SA-234WPB
: 5. 1" PLATE, SA416, GR. 70                                                              2" 1500// WELD NECK FLANGE, SA-105
: 6. 26" X8" 1500// FLANGE NOZZLE, SA-105                                                3/4" PLATE, SA41 6, GR. 70
: 7. 8" SAFETY RELIEF VALVE,SA-105                                                        16" EXTRUDED OUTLET, A516 GR. 70
: 8. 1-1/2" PLATE, SA416, GR. 70                                                    37. 16" SCH. 100 PIPE, SA-106 GR B
: 9. 2" 3$ XQ SOCKOLET, SA-125                                                            16" SCH. 100 ELBOW, SA-234 WPB
: 10. 2" PLUG, SA416, GR. 79                                                              16" GATE VALVE,A216 WCB
: 11. 26 Y GLOBE ISOLATION VALVE,SA-216 WCC                                                28" 1.245 MW, PIPE,A106CR. C
: 12. 26 X 1.156 MIN. WALLPENETRATION, SA408 CL1                                    41. 28" 1.245" MW ELBOW, A234 WPC
: 13. 2" X 1" 609% REDUCING INSERT, SA-105                                          42. 12 SCH. 120PIPE,A106GR. B BZ
: 14. 28 X1.339" NOMWALLX26 X1.266" NOM WALLREDUCER, SA-234WPC                            14" SCH. 120 PIPE, A106 GR. B BZ
: 15. 28" X1.33 NOM WALLSMLS PIPE, SA-106 C                                                2" PLATE, A515 GR. 65
: 16. 26" X1.177" MIN WALLX10" SCH. 80 SWEEPOLET, SA-105                                  28" EXTRUDED OUTLET, A516 GR. 70
: 17. 16" SCH. 80 PENETRATION, SA-508 CL1                                                  18" SCH. 160 PIPE, A106 GR. B '? BZ
: 18. 26" SCH. 80 SMLS PIPE, SA-106B                                                47. 48" EXTRUDED HEADER 48" (3 438" MW, (3-1/2" NW)) X 28" (1.245" MW) X 18"
: 19. 36" GLOBE VALVE,SA-182 F22                                                          (.820" MW) X 16" (.738" MW) A516 GR. 70
: 20. 3" X 2 SCH. 80 CONC. REDUCER, SA-234 WPB                                            28" VALVE,A216 WCB
: 21. 3" SCH. 80 SMLS PIPE SA-106B                                                        48" PIPE CAP 3.5" MW, A234 WPC
: 22. 6" X 3" SCH. 80 CONC. REDUCER, SA-234 WPB                                            10" SCH. 140 PIPE, A106 GR. B
: 23. 6 SCH.80SMLS PIPE SA-106 R                                                    51. 18" EXTRUDED OUTLET, A516 GR 70
: 24. 6" GLOBE VALVE, SA-105                                                        52. 18" SCH. 80 ELBOW, A234 WP8
: 25. 6" SCH. 80 ELBOW, SA-234 WPB                                                          18" SCH. 80 PIPING, A106 GR B
: 26. 6 SCH. 80 PENETRATION, SA408 CL1                                                    BYPASS CHEST
: 27. 2" SCH. 160 SMLS PIPE, SA-106B                                                        18" X 6'CH. 80 SWEEPOLET, A105
: 28. 7  SCH. 160 ELBOW, SA-234 WP8                                                        28" X 6" XS SWEEPOLET, A105
: 29. 2" GLOBE VALVE, SA-105                                                        57. 6" SCH. 80 CAP, A234 WPB
 
0 NIAGARA HOHAC POMER CORPORATION -        H    NILE POINT NUCLEAR STATION - UHIT 2                          1 of 26 NHP2-ISI-006, REV. 1, CH-000                                      SECOND TEH YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                APPENDIX  G - RCS SYSTEH (sorted by Examination identifier)
ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY I IGSCCI EXl/NDE PROCEDURE IPERIOO 1 I                                            REMARKS EXAMINATION IDENTIFIER ) ITS ISO LOCATOR, COHPONENT DNG      &#xb9;, )ITEN  &#xb9; (FREOYJ EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK &#xb9; i LINE HO. AND NOTES, AS APPLICABLE ]SELECT iCLASSi EX3/NDE PROCEDURE iPERIOD 3 I
                          *HYV17A BLTG                          )B-G-2  f  na  f  VT1/VT2.01          -I          I 2RCSAHYV17A,V8105      J QISO 64-00-2        or DUG&#xb9; 044 in )87.70 /ID          /  na /na                I          I
                      /  LINE&#xb9; 2RCS-024-2-1    NTS: (none)    JGrp Rep)    1  /  na  /na                    Scil  /
I
                          *HYV17A BLTG                          [B-G-2  /  na  /  VTl/VT2.01            I          I 2RCS*HYV17A,V8107      /  QISO 64-00-2        or  DllG&#xb9; 044  in /87.70  /ID    /  na  /na              I          I
                      /  LINE&#xb9; 2RCS-024-2-1    NTS: (none)    /Grp Rep/    1  /  na /na                      Scil  /
                      )
                          *HYV17A BLTG                          (B-G-2  )
na    J VT1/VT2.01            I          I 2RCS*HYV17A,V8109      f  QISO 64-00-2        or DWG&#xb9; 044 in /87.70 ]ID          f na  /na              I          I f  LINE&#xb9; 2RCS-024-2-1    NTS: (none)    JGrp Repf 1      / na /na                      Sc11 I
                          *HYV17A BLTG                          JB-G-2  J na    J VT1/VT2.01            I          I 2RCS*HYV17A,VB111      J QISO 64-00-2        or  DUG&#xb9; 044  in [87.70  ]ID      J na /na                I  ~      I J
LINE&#xb9; 2RCS-024-2-1    HTS:  (none)  ]Grp Rep)    1    J na /na                      Sc11
(
                          *HYV17A INT SUR                      [8-H-2  J na    J VT3/VT2.01            /*          (*  Examine Nhen dissassemble for maintenance 2RCS*HYV17A,VBY148      / QISO  64-00-2      or DHG&#xb9; 044 in (812.50 )DisG        f    /                /*
f  I.INE&#xb9; 2RCS-024-2-1    NTS: 13        JGrp Rep/    1    /    /                Ja I
                          *HYV178 BLTG                          (8-G-2    J na    J VT1/VT2.01 2RCS"HYV178,V8106      ]  QISO  64-00-5      or DUG&#xb9; 044 in )87.70      ]none  f na /na
[  LINE&#xb9; 2RCS-024-19-1 NTS: (none) JNS            f  1    f na /na I
                          *HYV178 BLTG                          /B-G.2    f na    f VT1/VT2.01 2RCS~HYV178,V8108      f  QISO  64-00-5      or  M&#xb9;    044 in /87.70    ]none  f na /na
                        /  LINE&#xb9; 2RCS-024-19-1 HTS: (none) [NS            /  1    / na  /na I
                          *HYV178 VLV BLTG                      (8-G-2    f na    f VT1/VT2~ 01 2RCS*HYV178, V8110      J Qlso 64-00-5        or DMG&#xb9; 044 in (87.70      (none  f na  /na f I.INE&#xb9; 2RCS-024-19-1 NTS: (none) JNS            /  1    / na  /na I *HYV178 BLTG
                                                                /8-0-2    / na      VT1/VT2.01 2RCS*HYV178, V8112      / QISO  64-00-5      or DMG&#xb9; 044 in /87.70      /none  / na /na
                        / LINE&#xb9; 2RCS-024-19-1 NTS: (none) )NS            /  1      na /na
 
NIAGARA MONAllK PONER CORPORATION        -      HILE POINI'UCLEAR STATION - UNIT 2                        2 of 26 NMP2-ISI-006( REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:  07/28/1999                                                                  APPENDIX G - RCS SYSTEH (sorted by Examination Identifier)
ND INTVL REL RED  I  DESCRIPTION OF ITEH TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE            IPERIOD  1  I                            REMARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONENT DUG        &#xb9;, )ITEM  &#xb9; iFREOYi EX2/NDE PROCEDURE      iPERIOO 2 i USE CAL BLK  &#xb9; i  LINE NO. AND  NOTES,  AS  APPLICABLE  /SELECT  iCLASSi EX3/NDE PROCEDURE      [PERIOD 3 i <<HYV178 INT    SUR                      [8-M-2    J na    [  VT3/VT2.01 2RCS*HYV178,VBY149      f  QISO 64-00-5        or DMG&#xb9; 044 in )812.50 [none        /      /
I  LINE&#xb9; 2RCS-024-19-1 NTS: 54          INS      I  1    I    /
I *HOVIOA VLV BLTG                        )8-G-2 / na        / VT1/VT2.01          I          I 2RCS<<MOV10A, VB113      (  QISO 64-00-1        or DHG&#xb9; 016 in /87.70 /ID            / na  /na            I          I
(
LIHE&#xb9; 2RCS-024-1-1      NTS: (none)  (Grp Rep/ 1        / na /na                  Scil  J
                            <<MOV10A INT SUR                      IB-M-2    I  na    I VT3/VT2.01                    )<< Examine when dissasseahle for maintenance 2RCS*MOV10A, VBY150      J QISO 64-00-1        or  DNG&#xb9; 016  in )812.50 /DisG      /    /              /<<
                        / LINEN  2RCS-024-1-1      NTS: 7        /Grp Repl    1    I    /              f<<
i <<MOV108 BLTG
                                                                  /8-G-2    f  na    f VT1/VT2.01          I 2RCS<<HOV10B, V8114        f  QISO 64-00-4        or DUG&#xb9; 016 in /87.70      ]none    f na /na              I f  LINE&#xb9; 2RCS-024-18-1 NTS: (none) /NS            [  1    J na /na              I J
                            <<MOV108 INT SUR                      /8-M-2 / na        / VT3/VT2.01 2RCS<<HOV108, VBY151      (
QISO 64-00-4        or  DWG&#xb9;  016 in /812.50 /none      /    /
na                  I  LINE&#xb9; 2RCS-024-18-1 NTS: 39          INS      I    1    I    /
I  <<MOV18A BLTG                          IB  G  2  I na    I VT1/VT2.01          I          I 2RCS<<MOV18A, V8115        f  QISO 64-00-2        or DUG&#xb9; 016.in [87.70 ]ID            f na  /na            I          I
                          /  LINE&#xb9; 2RCS-024-2-1      NTS: (none)  [Grp Rep) 1        f na /na                  Sc11 I <<MOVIBA INT SUR JB-M-2    / na    / VT3/VT2.01          IEX6 2RCS*MOV18A,VBY152        f  QISO 64-00-2        or DUG&#xb9; 016 in (812.50 /DisG        /    /              I J
LINE&#xb9; 2RCS-024-2-1      NTS: 24      )Grp Rep/ 1        /    /              I I *MOV188 VLV BLTG IB-G-2    I na    I VT1/VT2.01 2RCS*MOV18B,VB116        (  QISO 64-00-5        or DUG&#xb9; 016 in )87.70      ]none    f na /na na                  f LINE&#xb9; 2RCS-024-19-1 NTS: (none) /NS              f  1    f na /na
                          )
                            *MOV188 INT SUR                        /B.M-2 / na        / VT3/VT2.01 2RCS*HOV18B, VBY153      / QISO 64-00-5        or DWG&#xb9; 016 in /812.50 /none        /    /
i LINE&#xb9; 2RCS-024-19-1 NTS: 55            iNS      i  1    i    /
 
NIAGARA HOHAMK POMER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2                        3 of 26 NHP2-ISI-006, REV. 1I CH.OOO                                        SECOND TEH YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                      APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOO  1                                REHARKS EXAHINATIOH IDENTIFIER    J ITS ISO LOCATOR, C(NPOHEHT DMG  &#xb9;,  )ITEN  &#xb9;  [FREOV[ EX2/HDE PROCEDURE      ]PERIOD 2 USE CAL BLK  &#xb9;  i LINE HO. AND NOTES, AS APPLICABLE DESELECT (CLASS( EX3/HDE PROCEDURE iPERIOO 3
                          )
                              <<P1A PUHP CASING                    )8-L-2    J na    J VT3/VT2.01        /*          )*  Examine Ken dissassemble for maintenance 2RCS<<P1A, PC100A          f QISO 64-00-1        or DMG&#xb9;      in (812.20 [DisG        J
                                                                                              /              /<<          I
                          /  LIHE&#xb9; 2RCS-024-1-1    NTS: 8        /UponDis/      1
                                                                                      /      /              I*          I i
                              <<PIA STUDS                          JB-G-1    [  na    )  VOL/UT6.04            Sc7 2RCS*P1A,PPB101A          f QISO 64-00-1        or DMS&#xb9; 010 in )86.180 /EOI          / na /na              I NNP2-3.25-23.5-STUJ LINE&#xb9;      2RCS-024-1-1  NTS: 10        /Handatef 1        )
na /na              I I
                              <<P1A FLG SUR                        /B-G-1    /  na    / VT1/VT2.01            Sc7 2RCS*P1A,PPB102A          /  QISO 64-00-1        or DMG&#xb9;      in /86.190 /Dis        / na /na              I
                          /  LIHE&#xb9; 2RCS-024-1-1    NTS: (none)    /Handate/      1    J na /na              I I
                              <<P1A HUTS                            fB-G-'I  J na    ) VT1/VT2.01            Sc7 2RCS*P1A, PPB103A        ]  QISO 64-00-1        or DMG&#xb9; 010 in /86.200 [EOI          f na /na              I
[  LINE&#xb9; 2RCS-024-1-1    NTS: (none)  /Handate/      1 f na  /na            I
                              <<P18 PUHP CASING                    ]8-L-2    J na    J VT3/VT2.01                    (<< Examine Mhen dissassembie for maintenance 2RCS<<P1B, PC100B              QISO 64-00-4        or  DMG&#xb9;      in (812.20  JDisG      f    /              /<<
LINE&#xb9; 2RCS-024-18-1    HTS: 40      /Uponois/      1    /    /              I*
[
                              <<IIB  STUDS                          IB-G-I    I  na    I VOL/UT6.04 2RCS*P1B,PPB1018          f  QISO 64-00-4        or  DMG&#xb9; 010  in /86.180 /none        / na  /na NHP2-3.25-23.5-STUJ    LINE&#xb9; 2RCS-024-18-1    NTS: 41      [na      f    1    / na /na I  *P18 FLG  SUR                        (B-G-1    [  na. f VT1/VT2.01 2RCS*P1B, PP 81028        / QISO  64-00-4      or  DMG&#xb9;      in /86.190 /none        / na  /na
                          /  LINE&#xb9; 2RCS-024-18-1    HTS: (none)  (na        /    1    / na  /na
                            ]
                              <<PIB HUTS                            IB-G-1    I  na    I VT1/VT2.01 2RCS*P1B, PPB103B          )
QISO  64-00-4      or  DMG&#xb9; 010  in JB6.200 ]none        [ na  /na
                            / LINE&#xb9; 2RCS-024-18-1    HTS: (none)  /na        /    1    f na  /na I SE/PIPE  Q N18 Az180 RECIRC OUTLET IB-J        I A      I VOL/UT6.03          I 2RCS-64-00-FMA01            J QISO  64-00-1      or DMS&#xb9; na in [89.11        / ID-0    / SUR/PT3.00              Sc9 NHP2-24-1.002-SS      I LINE&#xb9; 2RCS-024-1-1    NTS: 1,11    ITEV/au    /    1
                                                                                        / na  /              I
 
HIAGARA HOHAMK POWER CORPORATION            -      HILE POINT NUCLEAR STATION - UNIT 2            4 of 26 HHP2-ISI-006, REV. 1, CH-000                                            SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date:  07/28/1999                                                                        APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED        DESCRIPTION OF ITEH TO BE EXAHIHED(CATGRY [IGSCC( EX1/HDE PROCEDURE                )PERIOD  1                            REHARKS J
EXAHINATIOH IDENTIFIER  I    ITS ISO LOCATOR,  COHPONENT DWG    &#xb9;,  IITEH  &#xb9; IFREQYI EX2/NDE PROCEDURE        IPERIOD 2  I USE CAL BLK  &#xb9; f    LINE NO. AND HOTES, AS APPLICABLE ]SELECT ]CLASS) EX3/NDE PROCEDURE [PERIOD 3 i PIPE/PIPE                                  IB-J      I A        I  VOL/UT6.03 2RCS-64-00-FMA02        / QISO 64-00-1        or  DWG&#xb9; na    in /89.11    [none      /  SUR/PT3.00 NHP2-24-1.002-SS  I    LINE&#xb9; 2RCS-024-1-1      NTS: 1        INS            1    )  na /na I ELB/*HOV10A                                IB-J      J A      i VOL/UT6.03          I 2RCS-64-00-FWA03          /  QISO  64-00.1        or DMG&#xb9; na    in /B9.11    IID        I SUR/PT3.00 Sc9 NHP2-24-1.002-SS    i  LINE&#xb9; 2RCS-024-1-1      NTS: 2,7      iHS/au              /  na/                I I
                              *HOV10A/PIPE                            IB-J      I  A      I  VOL/UT6.03 2RCS-64-00-FMA04          )
QISO  64-00-1        or DWG&#xb9; na    in /89.11    /none      /  SUR/PT3.00 NHP2-24-1.002-SS    i  LINE&#xb9; 2RCS-024-1-1      NTS: 1(7      iNS                  J na  /na IMB-6r1    I  ELB/*P1A                                IB-J      I A        I  VOL/UT6.03              Sc7    IGL88.01 CAT.A COHHITHENT 2RCS-64-00.FMA05          (  QISO  64-00-1        or DMG&#xb9; na    in )89.11    IID        I  SUR/PT3.00 NHP2.24-1.234-SS    )
LINE&#xb9; 2RCS-024-1-1      NTS: 3,8      )HS/au          1    /  na  /na I  ~P1A/PIPE                              /B-J      I  A      I  VOL/UT6.03          I          (GL88.01 CAT.A COHHITHENT 2RCS-64-00-FMA06          /  QISO  64-00-2        or  DMG&#xb9;  na  in /B9.11    IID      I  SUR/PT3.00          I          I NHP2-24-1.317.SS    [  LINE&#xb9;  2RCS.024-2-1      NTS: 12,22    )HS/au          1    (na/                  I    Sc11  I I  PIPE/~HYV17A                            IB-J      I D        I VOL/UT6.03              sc7 2RCS-64-00 FWA07          /  QISO  64-00-2        or DMG&#xb9; na .in /89.11        iONRO      J SUR/PT3.00              sc9 NHP2-24-1.317-SS    /  LIHE&#xb9; 2RCS-024-2-1      NTS: 12,23    /AW/au          1    (na/                      sc11 I  *HYV17A/PIPE                            iB-J      I A        I VOL/UT6.03 2RCS-64-00-FMA08          )
QISO  64-00-2        or  DMG&#xb9; na    in ]89.11    ]none      J SUR/PT3.00 NHP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-2-1      NTS: 12,13      INS            1    f na  /na
                          )
PIPE/*HOVIBA                            IB-J                ( VOL/UT6.03 2RCS-64-00.FMA09          [  QISO  64-00-2        or  DMG&#xb9; na    in [B9.11      )none    (
SUR/PT3.00 NHP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-2-1      NTS: 12,24      iNS            1    f na /na I  *HOVIBA/ELB                              IB-J      i A      i VOL/UT6.03          I          I 2RCS.64-00.FWA10          f QISO  64-00-2        or  DMG&#xb9; na    in /B9. 11    IID      I SUR/PT3.00          I          I
    'NHP2-24-1.234-SS        LINEN 2RCS 024 3  1    NTS  15@24    [HS/au        1 f na /na                  Sc11  )
 
NIAGARA NOHAWK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2                        Sof 26 NHP2-1SI-006, REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                    APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD IHTVL REL REa ) DESCRIPTIOH OF ITEN TO BE EXAHINED[CATGRY JIGSCCJ EX1/HDE PROCEDURE ]PERIOD 1                                                REMARKS EXAHIHATION IDENTIFIER / I'IS ISO LOCATOR, CONPOHENT DWG        &#xb9;, /ITEN  &#xb9; JFREOYJ EX2/HDE PROCEDURE ]PERIOD 2 USE CAL BLK  &#xb9; I  LIHE  HO. AHD NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3        I I  PIPE/RED                                IB-J    I A      I  VOL/UT6.03        I 2RCS-64-00-FMA11        [ QISO 64-00-2        or  DWG&#xb9; na    in (89.11    /none  /  SUR/PT3.00        I NHP2-24-1 '34-SS  I  LINE&#xb9; 2RCS 024 3  1    NTS'3i21      IHS          1    /  na  /na            I i SWPOL/PIPE    Q H2E Az150 RECRC INLT iB-J          [ A    (
VOL/UT6.03                    )Deseiected during 2nd 10-Year Update review 2RCS-64-00.FWA12        (
QISO  64-00-3        or DWG&#xb9; na in (89.11        [none  )  SUR/PT3.00 NNP2-12-.657-SS    i LINE&#xb9; 2RCS-012-7-1        NTS: 26,30    FANS 1  /na/
SWPOL/PIPE Q H20 Az120 RECRC IHLT      iB-J      I A    I  VOL/UT6.03                    (Deselected during 2nd 10-Year Update review 2RCS-64-00-FMA13        (
QISO 64-00-3          or DWG&#xb9; na in (89.11        [none    [ SUR/PT3.00 HHP2-12-.657-SS    I  LINE&#xb9; 2RCS.012-8.1      NTS: 26,30    INS          1    /na/
i RED/PIPE Q H2C    Az090 RECIRC INLET iB-J          I A      I VOL/UT6.03 2RCS-64-00-FMA14        )
QISO  64-00-3        or DMG&#xb9; na in )89.11        ]none    )
SUR/Pl'3.00 NHP2-12-.657-SS    )
LIHE&#xb9; 2RCS-012-9-1      NTS: 29,30    )NS          1    ) na  /na SWPOL/PIPE Q H28 Az060 RECRC IHLT      )8-J      I A      I VOL/UT6.03 2RCS-64-00.FWA15        )  QISO  64-00-3        or DMG&#xb9; na in )89.11        (none    (
SUR/PT3.00 HNP2-12-.657-SS    i  LINE&#xb9; 2RCS-012-10-1 NTS: 26,30          iNS          1
                                                                                      / na  /na I  SWPOL/PIPE Q N2A AZ030 RECRC IHLT      IB-J      I A      I VOL/UT6.03 2RCS-64-00-FWA16        f  QISO  64.00-3        or  DMG&#xb9; na  .in )89.11    )none    J SUR/PT3.00 HNP2-12-.657-SS    I  LIHE&#xb9; 2RCS-012-11-1      NTS: 26,30    IHS          1    f na  /na I  PIPE/SE  Q N2E Az150 RECIRC INLET      IB-J,    I A      I VOL/UT6.03          IEX6      ]GL88.01 CAT.A CONHITNENT; Do with LW32 2RCS-64.00-FWA17          f Qlso 64-00-3          or DMG&#xb9; na in )89.11 ]ID-E          [ SUR/PT3.00 NNP2-12-.657-SS    / LINE&#xb9; 2RCS-012-7-1      H'IS: 30,32    /TEV/au / 1        / na  /
I PIPE/SE  Q N2D Az120 RECIRC INLET IB-J          I A      I VOL/UT6.03              Sc7 2RCS-64-00-FMA18          / QISO 64-00        or DMG&#xb9; na in /89.11        ]ID-0    f SUR/PT3.00          I HHP2-12-.657-SS    f LINE&#xb9; 2RCS-012-8-1      NTS: 30,32    /TEV/au  f  1    f na  /              I I PIPE/SE  Q N2C A2090 RECIRC INLET IB-J          I A      I VOL/UT6.03          IEX6 2RCS-64 F'MA19        ) QISO  64-00-3        or DWG&#xb9; na in (89.11 /ID-E          f SUR/PT3.00          I HHP2-12-.657-SS    f LINE&#xb9; 2RCS-012-9-1      HTS: 30,32      JTEV/au / 1      [ na  /              I
 
NIAGARA MOHANK POMER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2                                            6 of 26 HMP2-ISI-006i REV. 1, CH-000                                                SECOND TEN YEAR IHSERVICE INSPECTION            (ISI)    INTERVAL PLAN Change date:  07/28/1999                                                                          APPEHDIX  G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ        DESCRIPTIOH OF ITEM TO BE EXAMIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOO                      1  I REMARKS I
EXAHINATION IDENTIFIER        ITS ISO LOCATOR, COMPONENT DUG &#xb9;, IITEM          &#xb9; IFREOYI EX2/NDE          PROCEDURE IPERIOO 2 I USE CAL BLK    &#xb9; i  LINE  HO. AND NOTES,    AS  APPLICABLE  ISELECT  ICLASSJ EX3/HDE          PROCEDURE iPERIOD 3 I  PIPE/SE  Q H28 A2060 RECIRC INLET        IB-J      I A      I  VOL/UT6.03          I 2RCS-64-00-FNA20          i QISO    64-00-3          or DNG&#xb9; na in i89.11 KAID-0            i SUR/PT3.00                  Sc9 NMP2-12-.657-SS      i  LINE&#xb9; 2RCS-012-10-1 NTS: 30,32            JTEV/au i 1        )
na  /                I J
PIPE/SE  Q N2A Az030 RECIRC INLET        ig-J      i A      i VOL/UT6.03            I            iGLBB-01 CAT.A COMMITMENT 2RCS-64-00-FNA21          i QISO    64-00-3          or DUG&#xb9; na in i89.11 iID-E            J SUR/PT3 F 00        I            I NMP2-12-.657-SS      i  LINE&#xb9;  2RCS-012-11-1      NTS: 30,32      iTEV/au i 1        i na    /                i Sc10      I i MOL/PIPE                                    IB J      i A      i VOL/UT6.03                          iThis was an original HMP2L-1263 GLBB-01 Cat.A comnitment, but was 2RCS-64-00-FNA24          (
QISO 64-00-1          or DUG&#xb9; na      in i89.31    [none    i SUR/PT3.00                          inever examined in the 1st Int in favor of another Cat.A Meld. <<There NMP2-24-1.002-SS        LINE&#xb9;  2RCS.024-1-1      HTS: 1,5        )HS                i na    /na                            ishaII be no branch outlet openings on Meld seam," 767E286.
SE/PIPE  Q H1A Az000 RECIRC OUTLET [8-J            i A      i VOL/UT6.03            I            iGL88-01 CAT.A  COMMITMEHT 2RCS-64-00-FWB01            [  QISO 64-00-4            or DNG&#xb9; na    in i89.11    iID-0    i SUR/PT3.00            I            I NMP2-24-1.002-SS      i  LIHE&#xb9; 2RCS-024-18-1 NTS: 33              iTEV/au i      1    i  na  /                      Scil  I I  PIPE/PIPE                                IB- J      i A      )  VOL/UT6.03 2RCS-64-00-FNB02            i QISO 64-00-4            or  DMG&#xb9; na    in i89.11    inone    (
SUR/PT3.00 NMP2-24-1.002-SS      I  LINE&#xb9; 2RCS-024-18-1        NTS: 33        IHS
                            )
ELB/<<MOV108                                IB-J      i A      i  VOL/UT6.03            I 2RCS-64-00-FMB03            i QISO  64-00-4          or DUG&#xb9; na . in )89.11      IID      I  SUR/PT3.00                Sc9 NMP2-24-1 ~ 002-SS    i LINE&#xb9; 2RCS-024-18-1        NTS: 34,39      iHS/au        1    dna/                    I i *MOV108/PIPE                              ig-J      ) A      i  VOL/UT6.03 2RCS.64.00-FNB04            i QISO 64-00-4          or DUG&#xb9; na in i89.11        inone    J SUR/PT3.00 NMP2-24-1.002-SS      J LINE&#xb9; 2RCS-024-18-1 NTS: 33,39            iNS                i na  /na I  ELB/*P18                                  IB-J      I A        I VOL/UT6.03 2RCS-64-00 FNB05            i QISO 64-00-4          or DUG&#xb9; na in /89.11        inone      i SUR/PT3.00 HMP2-24-1.234-SS          LINE&#xb9; 2RCS-024-18-1 NTS: 35,40            iHS          1      i na /na i <<PIB/PIPE                                  IB-J                i VOL/UT6.03            I 2RCS.64-00.FN06            )  QISO 64-00-5          or  DNG&#xb9; na    in i89.11    IID        I SUR/PT3.00            (Sc8 NMP2-24-1.317-SS      I  LINE&#xb9; 2RCS 024 19    1    NTS'3    53    IHS/au                                      I
 
NIAGARA NOHAMK POWER CORPORATION        -      HILE POINT NUCLEAR STATION - UNIT 2                                          7 of 26 HNP2-ISI-006( REV. 1, CH-000                                        SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                  APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REO I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE              IPERIOD  1                                RENARKS EXANINATIOH IDENTIFIER I ITS ISO LOCATOR, CONPONENT DWG        &#xb9;, IITEH  &#xb9; IFREQYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK  &#xb9; I  LINE  NO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I PIPE/*HYV178                          IB-J    I A    I  VOL/UT6.03 2RCS-64-00-FWB07            QISO  64-00-5        or DMG&#xb9; na in IB9.11      Inone  I  SUR/PT3.00 NHP2-24-1.317-SS      LINE&#xb9; 2RCS-024-19-1 HTS: 43,54        IHS      I  1    I  na /na I  <<NYV178/PIPE                          IB-J    I A    I  VOL/UT6.03                      IThis was an original NHP2L-1263 GLBB-01 Cat.A conmitment, but was 2RCS-64-00-FWBDB        I  QISO  64-00-5        or DWG&#xb9; na in I89.11      Inone    I SUR/PT3.00                      Inever examined in the 1st Interval in favor of another Cat.A weld NHP2-24-1.317-SS    I  LINE&#xb9; 2RCS.024-19-1 NTS: 43,54        INS          1 I na  /na                        Icoincidentally chosen pursuant to Cat B-J criteria.
I PIPE/<<NOV188                          IB-J    I A      I VOL/UT6.03 2RCS-64-00-FWB09        I  QISO  64-00-5        or DWG&#xb9; na in I89.1'I      Inone    I SUR/PT3.00 NNP2-24-1.317-SS      LINE&#xb9;  2RCS-024-19-1    NTS: 43,55    INS              I na /na I <<NOV188/ELB                            IB-J    I A      I VOL/UT6 03          I 2RCS-64-00-FWB10        I QISO  64-00-5        or DWG&#xb9; na in I89.11      IID      I SUR/PT              ISc8>
NHP2-24-1.234-SS      LINE&#xb9; 2RCS-024-20-1 NTS: 46,55 r INS/au            1'    na  /na I                                                                                I I  PIPE/RED                              IB-J    I A      I VOL/UT6.03 2RCS-64-00-FWB11        I  QISO  64-00-5        or DMG&#xb9; na in IB9.11      Inone    I SUR/PT3.00 NNP2-24-1 '34-SS  I  LINE&#xb9; 2RCS-024-20-1 NTS: 44(52        IHS          1    I na  /na I WOL/PIPE Q N2F  Az210 RECIRC IHLET IB-J        I A      I VOL/UT6.03                      IThis was an original HNP2L-1263 GLBB-01 Cat.A conmitment, but was 2RCS-64-00-FWB12        I QISO  64.00-6        or  DMG&#xb9; na . in IB9.11  Inone    I SUR/PT3.00                      Inever examined in the 1st Interval in favor of another Cat.A weld NNP2-12-.657-SS    I  LINE&#xb9; 2RCS.012.25-1    HTS: 57(61    IHS          1 I na/na                          Icoincidentally chosen pursuant to Cat 8-J criteria.
I  WOL/PIPE  Q H2G Az240 RECIRC INLET IB-J        I A      I VOL/UT6.03 2RCS-64-00-FWB13        I  QISO  64-00-6        or  DIIG&#xb9; na  in IB9.11  Inone    I SUR/PT3.00 NHP2-12-.657-SS      LINE&#xb9; 2RCS.012-26-1    NTS: 57,61    INS              I na /na I RED/PIPE Q H2H A?270 RECIRC INLET IB-J          I A      I VOL/UT6.03 2RCS-64-00-FWB14          I QISO  64-00-6        or  DWG&#xb9;  na  in I89.11  Inone    I SUR/PT3.00 NNP2-12-.657-SS    I LINE&#xb9; 2RCS-012-21-1    NTS: 60,61    INS          1    I na/na I SMPOL/PIPE Q N2J  A?300  RECRC  INLT IB-J    I A      I VOL/UT6.03                      IDeselected during 2nd 10-Year Update revie~
2RCS-64-00-FWB15          I QISO  64-00-6        or  DMG&#xb9; na    in IB9.11  Inone    I SUR/PT3.00 NNP2-12-.657-SS      LINE&#xb9; 2RCS-012-22-1    NTS: 56,61    INS          1    Ina/
 
NIAGARA HOHAMK POMER CORPORATIOH          -      NILE POINI'UCLEAR STATION - UNIT 2                                              8of 26 NHP2-1SI-006, REV. 1( CH-000                                            SECOND TEH YEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change  date:  07/28/1999                                                                      APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED [ DESCRIPTION OF ITEN TO BE EXAHIHED)CATGRY (IGSCC) EX1/NDE PROCEDURE                    (PERIOD    1                                REHARKS EXANIHATIOH IDENTIFIER ) ITS ISO LOCATOR, COHPONEHT DMG          &#xb9;,  ( ITEN &#xb9; [FREOY[ EX2/HDE PROCEDURE        ]PERIOD 2    f USE CAL BLK  &#xb9; I  LINE  HO  AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE              IPERIOD 3    I J
SMPOL/PIPE Q N2K Az330 RECRC INLT      iB-J      I  A    I  VOL/UT6.03                      )Deselected during 2nd 10-Year Update review 2RCS-64-00-FMB16          )
QISO  64-00-6        or  DMG&#xb9; na    in (89.11    )none    [  SUR/PT3.00 HHP2-12-.657-SS    (
LINE&#xb9; 2RCS-012-23-1    N'TS: 57,61    iNS            1    ]na/
I  PIPE/SE  Q H2F  A2210 RECIRC INLET      IB J      I  A      I  VOL/UT6.03          I 2RCS-64-00-FMB17          f  QISO  64-00-6        or  DMG&#xb9; na    in JB9.11    JIO-E    /  SUR/PT3.00          isc8 NHP2-12-.657-SS    /  LINE&#xb9; 2RCS-012-25-1    NTS:  61,63    iTEV/au  f    1    /  na  /              I
[  PIPE/SE  Q N2G  Az240 RECIRC INLET      IB-J      I A      I  VOL/UT6.03          I            I 2RCS-64-00-FMB18          (
QISO  64-00-6        or  DMG&#xb9; na    in IB9.11    1ID-O    I  SUR/PT3.00          I            I NHP2-12-.657-SS        LINE&#xb9; 2RCS-012-26-1    NTS:  61,63    /TEV/au  /    1    /  na  /              I      Scil  I I  PIPE/SE  Q N2H  Az270 RECIRC INLET IB-J          I A      I  VOL/UT6.03          I            IGL88-01 CAT.A COHHITHENT 2RCS-64-00-FMB19          / QISO    64-00-6        or DUG&#xb9; na in [89.11 )10-0            f  SUR/PT3.00              Sc9    I NHP2-12-.657-SS      (
LIHE&#xb9; 2RCS-012-21-1 NTS: 61,63          )TEV/au ) 1        (
na  /              I            I I  PIPE/SE  Q  H2J Az300 RECIRC INLET      IB-J    I  A      I  VOL/UT6.03          I 2RCS-64-00-FMB20          / QISO  64-00-6        or  DMG&#xb9; na    in /B9.11    ]ID-0    [  SUR/PT3.00              Sc9 NHP2-12-.657-SS      f  LINE&#xb9; 2RCS-012-22-1    NTS:  61,63      /TEV/au  /    1    f  na  /              I I  PIPE/SE  Q H2K  Az330 RECIRC INLET      IB J      I A      I  VOL/UT6.03          I 2RCS-64-00-FMB21          ] QISO 64-00-6        or  DUG&#xb9; na    .in  )B9.11 IIO-E      I  SUR/PT3.00          I NHP2-12-.657-SS      (
LINE&#xb9; 2RCS-012-23-1    N'IS: 61,63      )TEV/au      1    /na/                  i Sc10 i MOL/PIPE                                IB-J      ] A . ] VOL/UT6.03                            )"There shall be no branch outlet openings on veld seam," 767E286.
2RCS-64-00-FMB24            / QISO  64-00-4        or DMG&#xb9; na in )89.31          Inone    I SUR/PT3.00 NHP2-24-1.002-SS      I LINE&#xb9; 2RCS-024-18-1 NTS: 33,36          IHS          1    J na  /na i LM Q H1B  assoc w/FMA01 8 SM40          iB-J      (
na      [
VOL/Ul'6.03        I            (Do  with FMA01 B SM040 2RCS-64-00-LM01            f QISO 64-00-1        or DMG&#xb9; na      in /89.12    IID-O    I SUR/PT3.00              Sc9      I NHP2-24-1.002-SS    I LINE&#xb9; 2RCS.024-1-1      NTS: 1          IAL          1    (na/                  I            I
                            / LM Q H1B  assoc w/SM40 only            JB-J      ( na      J VOL/UT6.03          I            [Do  with SM40 2RCS-64-00-LM02A          f QISO 64-00-1        or DMG&#xb9; na      in /B9.12 IID 0        I SUR/PT3.00              Sc9      I HHP2-24-1.002-SS    I LINE&#xb9; 2RCS-024-1-1      HI'S: 2          IAL                / na/                  I            I
 
NIAGARA NOHAMK POWER CORPORATION            -      NILE POINT  NUCLEAR STATION    - UNIT 2                                    9 of 26 NNP2-IS1-006( REV. 1, CH-000                                                SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change  date:  07/28/1999                                                                        APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REO        DESCRIPl'ION OF ITEN TO BE EXANINED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD                1                                RENARKS
(
EXANIHATION IDENTIFIER    (
ITS ISO LOCATOR, CONPOHENT DMG &#xb9;, (ITEN          &#xb9;  (FREOY( EX2/HDE      PROCEDURE (PERIOD 2  (
USE CAL BLK  &#xb9; I    LINE NO AND NOTES'S APPLICABLE (SELECT (CLASS( EX3/NDE                    PROCEDURE (PERIOD 3 I
(
LM Q H18  assoc w/SM40 only              IB-J      (
na    (  VOL/UT6.03        I          (Do    with  SM40 2RCS-64-00-LW028          (
QISO 64-00-1          or  DMG&#xb9; na    in (89.12    I        I  SUR/PT  00            Sc9    I NNP2-24-1.002-SS    I    LINE&#xb9; 2RCS.024-1-1      NTS: 2                              (na/                  I          I
(
LM                                        IB-J      (
na    (  VOL/UT6.03 2RCS.64-00-LM03          (
QISO 64-00-1          or DMG&#xb9; na      in (89.12    (none    (
SUR/PT3.00 NNP2-24-1.002-SS    I    LINE&#xb9; 2RCS.024-1-1      NTS: 1          (NS      I  1    (
na  /na
(  LM  assoc w/sw38 only                    IB-J      (
na    (
VOL/UT6.03                    (Deselected during 2nd 10-Year update based on X's (as a result of the 2RCS.64-00-LM04            (
QISO 64-00-1          or DMG&#xb9; na      in (89.12    (none    (
SUR/PT3.00                    (deselection of sw38.)
HNP2-24-1.002-SS    (  LINE&#xb9; 2RCS.024-1-1      NTS: 1          (NS                (na/
(
LM  assoc w/sw36 & sw37                  IB-J      I  na    I  VOL/UT6.03 2RCS-64-00-LM05            (  QISO 64-00-1          or  DMG&#xb9; na    in (89.12    (none    I  SUR/PT3 00 NNP2-24-1.002.SS    (  LINE&#xb9; 2RCS.024-1-1      NTS:  1          (NS            1    (
na /na
(
LM  assoc w/FMA03 only                    IB-J      ( na    (  VOL/UT6.03          I          (Oo  with  FMA03 2RCS-64-00-LM06A          (
QISO 64-00-1          or  DWG&#xb9;  na  in (89.12      (IO      (  SUR/PT3.00              Sc9    I HNP2-24-1.002-SS    I  LINE    2RCS 024 1  1    NTS'                                  (na/                  I          I
(  LM  assoc w/FMA03 only                    IB-J      (
na      ( VOL/UT6.03          I          (Do  with  FMA03 2RCS-64-00-LM068          (
QISO  64-00-1        or DWG&#xb9; na    . in (89.12      (ID      (
SUR/PT3.00              Sc9    I HNP2-24-1.002-SS      (
LINE&#xb9; 2RCS-024-1-1      NTS: 2          (AL            1    (na/                  I          I
(  LM  assoc w/SW35 only                    IB-J      (
na      ( VOL/UT6.03              Sc7    (Do  with  SM35 2RCS.64-00 LM07            (
QISO  64-00-1        or DMG&#xb9; na      in (89.12      IID      I SUR/PT3.00          I          I HNP2-24-1.002-SS    (  LINE&#xb9; 2RCS-024-1-1      HTS:                                                        I          I LM assoc w/SM35 & FWA05                  IB-J      (
na      (
VOL/UT6.03              sc7      (Do  with SW35 & FMA05 2RCS 64-00-LWOBA            (
QISO  64-00-1        or OMG&#xb9; na      in (89.12    IID      I SUR/PT3.00 NNP2-24-1.002-SS    I  LINE&#xb9; 2RCS-024-1-1      HTS: 3            (AL          1    (na/
LM assoc w/Q65 & FMA05                    IB-J      (
na      (
VOL/UT6.03              Sc7      (Do  with SW35 & FMA05 2RCS-64 LISSB          (
QISO  64-00-1        or DWG&#xb9; na      in (89.12    (ID      ( SUR/PT3.00          I          I NNP2-24-1.002-SS      I  LINE&#xb9; 2RCS 024 1 1      HTS'              IAL                                        I          I
 
NIAGARA NOHAWK POMER CORPORATIOH          -      NILE POINT NUCLEAR STATION - UNIT 2        10 of 26 NNP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date:    07/28/'1999                                                                      APPEHDIX G - RCS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY I IGSCCI EX'I/HDE PROCEDURE                  IPERIOO  1                      REMARKS EXANINATIOH IDEHI'IFIER I ITS ISO LOCATOR'ONPOHEHT DMG              &#xb9;,  I ITEN &#xb9; IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK    &#xb9; I  LINE  NO. AHD NOTES,  AS  APPLICABLE    ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I  LM assoc w/FMA06 only                    IB-J      I  na    I  VOL/UT6.03        I          IDo  with FMA06 2RCS-64-00-L'M10          I QISO 64-00-2        or DMG&#xb9; na    in I89.12    I ID      I  SUR/PT3.00        I          I NNP2-24-1.317-SS        LINE&#xb9; 2RCS-024-2-1      NTS: 12        IAL                                            Sc11  I I
I  Lw assoc w/SM04 only                    IB-J      I  na    I  VOL/UT6.03        I          IDo  with SW04 2RCS-64-00-LWI1            I  QISO  64-00-2        or  DMG&#xb9; na    in I89.12    IID      I  SUR/PT3.00        I          I HNP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-2-1      NTS: 12                            Ina/                      Sc11  I I  Lw assoc w/SM04 only                    IB-J      I  na    I  VOL/UT6.03        I          IDo  with SM04 2RCS-64-00-LM12A            I QISO 64-00-2        or  DMG&#xb9; na    in I89.12    IID      I  SUR/PT3.00        I          I NNP2-24-1.317-SS      I  LINE&#xb9; 2RCS-024-2-1      HTS: 14        IAL                I  na/                    Sc11  I LM  assoc w/SM04 only                    IB-J      I  na    I  VOL/UT6.03        I          IDo  with SM04 2RCS-64-00.L'M128              QISO  64-00-2        or  DWG&#xb9; na    in I89.12    IID      I  SUR/PT3.00        I          I NNP2-24-1.317-SS        LINE&#xb9; 2RCS-024-2-1      NTS: 14          IAL                I  na/                    Sc11  I I  Lw                                        IB-J    I  na    I  VOL/UT6.03 2RCS-64-00-LM13            I QISO    64-00-2        or  DMG&#xb9; na    in I89.12    Inone      I SUR/PT3.00 NNP2-24-1.317-SS        LINE&#xb9; 2RCS-024-2-1      NTS: 12          INS          1    I na /na I  Lw  assoc w/FMA10 only                    IB-J    I  na      I VOL/UT6.03        I          IDo  with FMA10 2RCS-64-00.LM14A            I QISO    64-00-2        or  DMG&#xb9; na  .in  I89.12    IID      I SUR/PT3.00        I          I HNP2-24-1.234-SS      I LIHE&#xb9; 2RCS-024-3-1      NTS: 15          IAL                I na /na            I    Sc11  I I Lw  assoc w/FMA10 only                    IB-J      I na      I VOL/UT6.03          I          IDo  with FMA10 2RCS-64 LM148            I QISO  64-00-2        or  DMG&#xb9; na    in I89.'12    IID      I SUR/PT3.00          I          I NNP2-24-1.234-SS        LIHE&#xb9; 2RCS-024-3-1      HTS: 15          IAL                                          Sc11 I
j I Lw IB-J      I na      I VOL/UT6.03 2RCS-64-00.LM15              I QISO  64-00-2        or  DMG&#xb9; na    in I89.12    Inone    I SUR/PT3.00 NNP2-24-1.234-SS      I LINE&#xb9; 2RCS-024-3-1      NTS: 13          INS          1 I na /na I
LW Q H2C  At090 RECIRC INLET            IB J      I na      I VOL/UT6.03 2RCS-64-00-LM16              I QISO  64-00-3        or  DMG&#xb9; na -  in IB9.12 Inone        I SUR/PT3.00 HNP2-12-.657-SS      I  LINE&#xb9; 2RCS-012-9-1      HTS: 30          INS                I na /na
 
NIAGARA MOHAWK POWER CORPORATION        -      MILE POINT NUCLEAR STATION - UNIT 2        11 of 26 KMP2-ISI-006, REV. 1, CH-000                                      SECOHD TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                APPENDIX  G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL RED i DESCRIPTION OF ITEM TO BE EXAMIHEDiCATGRY        iIGSCCi EX1/NDE PROCEDURE (PERIOD        1                      REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG      &#xb9;, LITEM  &#xb9; iFREQYi EX2/HDE PROCEDURE iPERIOD 2 USE CAL BLK &#xb9; i  LIKE NO. AND NOTES,  AS  APPLICABLE  DESELECT iCLASSJ EX3/HDE PROCEDURE iPERIOO 3          (
                        / LM Q H2C  Az090 RECIRC INLET          IB-J    f na    f  VOL/UT6.03 2RCS.64-00-LW17A        i QISO  64-00-3        or DWG&#xb9; na    in /89.12  inone    [ SUR/PT3.00 NMP2-12-.657-SS  I  LINE&#xb9; 2RCS-012-9-1    NTS: 31        IHS          1
                                                                                  / na /na LW Q N2C Az090 RECIRC INLET          IB-J    (
na    i VOL/UT6.03 2RCS-64-00 LW178          QISO 64-00-3        or DMG&#xb9; na    in i89.12  /none    i SUR/PT3 F 00 HMP2-12-.657-SS      LINE&#xb9; 2RCS-012-9-1    NTS: 31        INS              i na /na
(
LM Q N2C Az090 assoc K/FMA19    only iB-J    I na    I VOL/UT6.03          IEX6          /Do  with FMA19 2RCS.64-00-LW18        i QISO 64-00-3        or  D'WG&#xb9; na  in i89.12  IID  E  I SUR/PT3.00          I            I HMP2-12-.657-SS  I  LIHE&#xb9; 2RCS-012-9-1    HTS: 30        IAL          1    dna/                  I            I L'M                                  IB-J    J na    / VOL/UT6.03          I 2RCS-64-00.LW19            QISO 64-00-3        or  DWG&#xb9;  na  in i89.12  inone    J SUR/PT3.00          I NMP2-16-.822-SS      LINE&#xb9; 2RCS-016-6-1    NTS: 25        IHS          1    f na /na              I j LM                                    IB-J    ) na    i VOL/UT6.03 2RCS-64-00-LM20        i QISO 64-00-3        or  DMG&#xb9; na    in 189.12  inone [ SUR/PT3.00 NMP2-16-.822-SS  I  LINE&#xb9; 2RCS-016-5-1    NTS: 25        IHS      I  1    I na /na I  LW Q H2A Az030 RECIRC INLET          IB J    i na    i VOL/UT6.03 2RCS.64-00-LW21        i QISO 64-00-3        or DMG&#xb9; na    .in i89.12  inone i SUR/PT3.00 NMP2-12-.657.SS  I LINE&#xb9; 2RCS-012-11-1    NTS: 30        INS          1    i na /na LW Q K2A Az030 RECIRC INLET          IB-J    I  na    I VOL/UT6.03 2RCS.64-00-LIQ2A        i QISO 64-00-3        or  DWG&#xb9;  na  in )89.12  /none    i SUR/PT3.00 NMP2-12-.657-SS    I LINE&#xb9; 2RCS-012-11-1    NTS: 31        IHS          1    i na /na
                        / LM Q H2A Az030 RECIRC INLET          IB-J    I  na    I VOL/UT6 03 2RCS-64-00-LW228        [ QISO 64-00-3        or DWG&#xb9; na    in i89.12  Inone    I SUR/PT3.00 HMP2-12-.657-SS    I LINE&#xb9; 2RCS-012-11-1 NTS: 31          INS              i na  /na LM Q N2A Az030 assoc v/FMA21    only iB-J    i na    i VOL/UT6.03          I            iDo  Kith FMA21 2RCS.64-00.LIQ3            QISO 64-00-3        or DWG&#xb9; na    in i89.12  IID  E I  SUR/PT3.00          I            I NMP2-12-.657-SS      LINE&#xb9; 2RCS.012-11-1 NTS: 30          IAL          1    dna/                  )
Sc10      I
 
NIAGARA NOHAMK POWER CORPORATION          -      NILE POIHl'UCLEAR STATION - UNIT 2                                          12 of 26 HNP2-ISI-006( REV. 1, CN-000                                        SECOND TEN YEAR IHSERVICE INSPECTIOH          (ISI)    INTERVAL PLAN Change date: 07/28/1999                                                                      APPEHDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXANIHEDICATGRY I IGSCCI EX1/NDE PROCEDURE                iPERIDO  1                                  REHARKS EXANIHATIOH IDENTIFIER  I  ITS ISO LOCATOR'ONPONENT DMG      &#xb9;i  IITEN  &#xb9;  IFREOYI EX2/NDE PROCEDURE        IPERIOD 2  I USE CAL BLK &#xb9; I  LINE HO. AHD HOlES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3                I LW Q H28 Az060 RECIRC IHLET          iB-J      I  na    I  VOL/UT6.03 2RCS-64-00.LM24        i QISO 64-00-3        or O'MG&#xb9; na  in /89.12    inone    i SUR/PT3.00 HNP2-12-.657-SS    I  LINE&#xb9; 2RCS.012-10-1 HTS: 30          INS                J na  /na LM Q N28  Az060 RECIRC INLET          IB-J      j na      i  VOL/UT6.03 2RCS-64-00-LM25A            QISO 64-00-3        or DMG&#xb9; na  in  L89.12    inone    i SUR/PT3.00 HNP2-12-.657-SS      LINE&#xb9; 2RCS-012-10-1 NTS: 31          INS          1    i na    /na LM Q H28  Az060 RECIRC INLET          iB-J        na    i VOL/UT6.03 2RCS-64-00.LM258        i QISO 64-00-3        or DMG&#xb9; na  in i89.12    inone i SUR/PT3.00 NNP2-12-.657-SS  i  LINE&#xb9; 2RCS-012-10-1 HTS: 31          iNS                i na    /na i LM Q N28    Az060 assoc w/FMA20 only /8-J        i na      i  VOL/UT6.03          I          iDo  with FMA20 2RCS-64-00-LM26        i QISO 64.00-3          or DMG&#xb9; na in i89.12      IID-O    I  SUR/PT3.00              Sc9    j HNP2-12-.657-SS  I LINE&#xb9; 2RCS-012-10-1      HTS: 30        IAL          1    dna/                    I          I i LM Q H2D  Az120 assoc w/fwA13 only iB-J        I  na      I  VOL/UT6.03                    iDeseiected during 2nd 10-Year update based on X's (as  a result of the 2RCS-64-00-LW27          i  QISO 64-00-3        or DMG&#xb9; na in [89.12      inone      i SUR/PT3.00                      ideseiection of fwA13.)
HNP2-12-.657-SS    i  LINE&#xb9;  2RCS-012-8-1    NTS: 30        iNS                  J na/
i LM Q N20  Az120 assoc w/fwA32 only iB-J        )
na      i  VOL/UT6.03                    iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64 LM28A        i  QISO 64-00-3        or DMG&#xb9; na .in l89.12      jnone      i SUR/PT3.00                      )deselection of fwA32.)
NNP2-12-.657-Ss    I  LINE&#xb9;  2RCS-012-8-1    HTS: 31      INS                                                    I i LW Q N20  Az120 assoc w/fwA32  only iB-J        I na      I  VOL/UT6.03                      iOeseiected during 2nd 10.Year update based on X's (as a result of the 2RCS-64-00-LM288        i QISO 64-00-3          or  DMG&#xb9; na in i89.12      inone i SUR/PT3.00                          ideseiection of fwA32.)
HNP2-12-.657-SS    i LINE&#xb9; 2RCS-012-8-1      HTS: 31      iNS            1    /na/                              I i LM Q H20  Az120 assoc w/FMA18&SM32 iB-J          I na      I VOL/UT6.03              sc7    iDo  with FWA18 2RCS-64-00-LM29          i QISO  64-00-3        or DMG&#xb9; na    in i89.12    IID-0      I SUR/PT3.00 NNP2-12-.657-SS    I LINE&#xb9; 2RCS-012-8-1      NTS: 30        IAL          1      dna/
J LM Q H2E  Az150 assoc w/fwA12&sw33 LB-J          i na      i VOL/UT6.03                      iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS.64-00 LW30          i QISO  64-00-3        or DUG&#xb9; na in )89. 12      Inone I SUR/PT3.00                          ideselection of fwA12 & sw33.)
NNP2-12-.657-SS        LIHE&#xb9; 2RCS-012-7-1    HTS: 30        iNS                  dna/
 
NIAGARA NOHAMK POMER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2                                          13  of      26 NMP2-ISI-006( REV. 1, CM-000                                            SECOHD TEN YEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date:  07/28/'l999                                                                      APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEM TO BE EXANIHEDICATGRY            IIGSCCI EX1/HDE PROCEDURE IPERIOO          1  I                              RENARKS EXANIHATIOH IDEHI'IFIER i ITS ISO LOCATOR, COMPONENT DMG          &#xb9;,  LITEM  &#xb9; (FREOYi EX2/HDE PROCEDURE iPERIOD 2 i USE CAL BLK    &#xb9; I  LIHE  NO. AND NOTES,    AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I
L'M Q N2E Azl50 assoc w/sw34&sw33        ig-J      J na    i  VOL/UT6.03                    iDeseiected during 2nd 10-Year update based on X(s (as a result, of the 2RCS-64-00.LIG1A            QISO  64-00-3        or DMG&#xb9; na in i 89.12        )none      i SUR/PT3.00                      ideselection of  sw34 & sw33.)
LINE&#xb9; 2RCS-012-7-1      NTS: 31        [HS            1    dna/                                                                                                  I'NP2-12-.657-SS i LM Q N2E  Az150 assoc w/sw3C&sw33,      IB-J      i  na    i  VOL/UT6.03                    [Deselected during 2nd 10-Year update based on X(s (as a result of the 2RCS-64-00 LIG1B          )
QISO 64-00-3          or DUG&#xb9; na    in  F89.12    Inone      I  UR/PT3 00                    ideseiection of sw34 & sw33.)
NMP2-12-.657.SS    I  LIHE&#xb9; 2RCS-012-7-1      HTS: 31        JHS            1    dna/
i LM Q H2E  Az150 assoc w/FMA17&sw34      /8-J      i na      i VOL/U'T6.03        IEX6        iDo  with FMA17 & SM34 2RCS-64-00.LIG2          i QISO 64-00-3          or DMG&#xb9; na    in i89.12    IID-E      I  SUR/PT3.00        I          I HMP2-12-.657-SS        LINE&#xb9; 2RCS-012-7-1      HTS: 30        iAL            1    dna/                  I          I LM Q H1A  assoc w/SM70    & FMB01      IB-J      i na      i  VOL/UT6.03        I          iDo  with SM70 & FMB01 2RCS-64.00-LIG3              QISO  64-00-4          or DMG&#xb9; na    in IB9.12    IID-0      I  SUR/PT3.00        I          I NMP2-24-1.002-SS      LIHE&#xb9; 2RCS-024-18-1 HTS: 33,42          IAL            1    dna/                        Sc11  I i LM Q N1A assoc w/SM70 only                ig-J      J na    i  VOL/UT6.03        I            iDo  with SM70 2RCS-64.00-LIG4A          i QISO 64-00-4            or DMG&#xb9; na    in i89.12    IID-O    I  SUR/PT3.00        I          I HMP2-24-1.002-SS    I LINE&#xb9; 2RCS-024-18-1      NTS: 34        IAL            1    dna/                        Sc11 i LM  Q N1A assoc w/SM70 only              iB-J      i na      i VOL/UT6.03          I            iDo  with SM70 2RCS-64-00-LIG4B          t QISO 64-00-4          or DMG&#xb9; na  .in i89.12      IID-O    I SUR/PT3.00          I            I NMP2-24-1.002-SS    i LIHE&#xb9;  2RCS-02C-18-1    HTS: 34          iAL                                            Sc11  I J
LM                                        IB J      i na.      i VOL/UT6.03                      I 2RCS-64-00-LM35            i QISO  64-00-4          or DMG&#xb9; na    in i89.12    Inone      I SUR/PT3.00                      I HMP2-24-1.002-SS    I LINE&#xb9; 2RCS-024-18-1 HTS: 33              INS                  i na /na                          I i LM iB-J      I na      I VOL/UT6.03                      I 2RCS.64-00-LM36            i QISO  64-00-4          or  DMG&#xb9; na    in IB9.12 inone          i SUR/PT3.00                      I NMP2-24-1.002-SS    I LINE&#xb9; 2RCS      18  1    HTS'3          iHS            1    ( na /na I.
i LM  assoc w/FMB03 only                    IB-J      ) na      i VOL/UT6.03        I            iDo  with FMB03 2RCS-64-00-LIG7A          i QISO 64-00-4          or DMG&#xb9; na    in /89.12      IID      I SUR/PT3.00              Sc9    I HMP2-24-1.002-SS    I LINE&#xb9; 2RCS-024-18-1 NTS: 34              IAL                  dna/                I            I
 
NIAGARA HOHAMK POWER CORPORATION            - N    IIILE POINT  NUCLEAR STATION    - UNIT 2                                      14 of 26 NHP2- ISI-006, REV. 1 ~ CH-000                                              SECOND TEH YEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date: 07/28/1999                                                                            APPENDIX  G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1                                                          REHARKS EXAHIHATIOH IDEHTIFIER I ITS ISO LOCATOR, COHPOHENT DMG              &#xb9;,  I ITEN &#xb9; IFREOYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK  &#xb9; I  LINE  HO. AND NOTES,    AS  APPLICABLE    ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I  LM  assoc w/FMB03  only                    IB-J      I  na    I  VOL/UT6.03          I            IDo  with FMB03 2RCS-64-00-LM378          I QISO 64-00-4          or DMG&#xb9; na      in IB9.12 IID          I  SUR/PT3.00                sc9    I HHP2-24-1.002-SS    I  LINE&#xb9;  2RCS-024-18-1      HTS: 34          IAL            1    Ina/                  I            I I  LM  assoc w/SM67 only                      IB-J      I  na    I  VOL/UT6.03          I            IDo  with SM67 2RCS-64-00-LM38          I  QISO 64-00-4            or  DWG&#xb9; na    in IB9.12    I ID      I SUR/PT3.00          I    Sc9    I HHP2-24-1.002-SS    I  LINE&#xb9; 2RCS 024 18    1    NT    33                        1    Ina/                  I            I I  LM  assoc w/SW67  only                      IB-J      I  na    I VOL/U'I6.03        I            IDo  with SM67 2RCS-64-00-LM39A          I QISO 64-00-4          or  DMG&#xb9; na    in IB9.12    IID      I  SUR/PT3.00                Sc9    I NHP2-24-1.234-SS    I  LINE&#xb9; 2RCS.024-18-1        HTS: 35          IAL            1 I  na /na              I            I I  LW  assoc w/SW67  only.                    IB-J      I  na    I  VOL/UT6.03          I          IDo  with SW67 2RCS-64-00-LW39B          I QISO    64-00-4          or  DWG&#xb9; na      in IB9.12    IID      I  SUR/PT3.00                sc9    I HNP2-24-1.234-SS    I  LIHE&#xb9; 2RCS-024-18-1        N'IS: 35        IAL            1    I  na /na              I          I I  LM  assoc w/FWB06 only                      IB-J    I  na    I  VOL/UT6.03          I            IDo  with FMB06 2RCS-64-00-LM41            I  QISO  64-00-5          or DMG&#xb9; na      in IB9.12    IID      I  SUR/PT3.00          ISc8        I HHP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-19-1 NTS: 43                  IAL      I    1    I  na/                  I            I I  LM                                          IB-J      I na      I VOL/UT6.03 2RCS-64-00-LM42            I QISO 64-00-5          or DMG&#xb9; na    . in IB9.12 Inone        I SUR/PT3.00 NHP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-19-1 NTS. 43                  IHS          1    I na /na I LM  assoc w/sw45  only                      IB-J      I na      I VOL/UT6.03                        IDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LM43A          I QISO 64-00-5          or  DMG&#xb9; na      in IB9.12    Inone    I SUR/PT3.00                        Ideselection of sw45.)
NHP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-19-1        HTS: 45          IHs I LM  assoc w/sw45  only                      IB-J      I na      I VOL/UT6.03                        IDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LW43B          I QISO  64-00-5          or  D'MG&#xb9;  na    in IB9.12    Inone    I SUR/PT3.00                        Ideselection of sw45 ~ )
NHP2-24-1.317-SS    I LINE&#xb9; 2RCS-024-19-1        HTS: 45          INs            1    Ina/
LM  assoc w/sw45 only                      IB-J      I na      I VOL/UT6.03                        IDeselected during 2nd 10-Year update based on Xis (as a result of the 2RCS-64-00-LM44            I QISO  64-00-5          or DMG&#xb9; na      in IB9.12    Inone    I SUR/PT3.00                        ldeselection of sw45 ~ )
NHP2-24-1.317-SS    I  LINE&#xb9; 2RCS-024-19-1 NTS: 43                INS            1    Ina/
 
NIAGARA HOHAMK POWER CORPORATION -                  MILE POINT NUCLEAR STATION - UNIT 2                                          15 of 26 NHP2-ISI-006t REV- 1) CH-000                                            SECOND TEN YEAR INSERVICE IHSPECTION            (ISI)    IHTERVAL PLAN Change date:    07/28/1999                                                                        APPENDIX G - RCS SYSTEH (sorted by Examination Identifier)
HD  INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1                                                      REHARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, CDHPOHEHT DMG          &#xb9;,  i ITEH &#xb9;  )FREOYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK  &#xb9; I  LINE  HO. AHD  NOTES,  AS  APPLICABLE  ISELECT    ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i LM assoc w/FMB10    only                IB J      J na    J VOL/UT6.03          I          iDo  with FMB10 2RCS-64-00-LM45A          i QISO 64-00-5            or  DMG&#xb9; na  in i89.12      ]ID      /  SUR/PT3.00          Jsc8        I NHP2-24-1.234-SS    I  LINE&#xb9; 2RCS-024-20-1      NTS: 46        IAL            1 i na  /na            I          I i I.M assoc w/FMB10    only                )8-J      i na      i VOL/UT6.03          I          iDo  with FM810 2RCS  64-00-LM458        (
QISO  64-00-5        or DMG&#xb9; na    in i89.12      iID        i SUR/PT3.00          isc8        I NHP2-24-1.234-SS    I  LINE&#xb9; 2RCS-024-20-1 NTS: 46            IAL            1    I  na  /na            I          I i LM                                      IB J      i na      i  VOL/UT6.03 2RCS.64-00-LM46            i QISO  64-00-5        or DMG&#xb9; na    in i89.12      inone      J SUR/PT3.00 NHP2-24-1.234-SS    i  LINE&#xb9; 2RCS 024-20-1 HTS: 44            /HS                  J na  /na I
L'W Q N2H Az270 RECIRC INLET            IB-J      i na      i  VOL/UT6.03          I 2RCS-64-00-LM47            ) QISO 64-00-6        or DMG&#xb9; na    in i89.12      Inone      I  SUR/PT3.00          I HHP2-12-.657-SS      i LINE&#xb9;  2RCS.012-21-1    HTS: 61        iHS                                          I I
L'W Q N2H A2270 RECIRC INLET            IB-J      I  na    I  VOL/UT6.03 2RCS-64-00-L'M48A          [  QISO 64-00-6          or DMG&#xb9; na    in i89.12      ]none    i SUR/PT3.00 NHP2-12-.657-SS      I  LINE&#xb9; 2RCS.012-21-1 NTS: 62              IHS            1 i na  /na LM Q H2H  Az270 RECIRC INLET            iB-J      i na      i VOL/UT6.03 2RCS.64-00-LM488          i QISO 64-00-6          or  DWG&#xb9; na . in i89.12      Inone I SUR/PT3.00 HHP2-12-.657-SS      I LINE&#xb9; 2RCS.012-21-1      HTS: 62        INS                  i na  /na i LM  Q H2H  Az270 assoc w/FM819    only iB-J        /  na      i VOL/Ul'6.03          I          iDo  with FMB19 2RCS.64-00-LM49            i QISO 64-00-6          or  DMG&#xb9; na    in i89.12      ilO.O      i SUR/PT3.00              Sc9    I NHP2-12-.657-SS      (
LINE&#xb9; 2RCS-012-21-1      NTS: 61        iAL                  dna/                  I          I J
LW  assoc w/SM59                        IB-J        I na      I VOL/UT6.03          I          [Do  with SM59 2RCS.64-00-LM50            i QISO 64-00-6          or  DWG&#xb9; na    in /89.12      IID      I SUR/PT3.00              Sc9    I HHP2-16..822-SS      I LINE&#xb9; 2RCS-016-24-1    NTS: 56        IAL            1    dna/                  I          I
                            ) LM Q N2K Az330  assoc w/sw63&fw816 iB-J            I na      I VOL/UT6.03                      iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LM51            )
QISO  64-00-6        or DMG&#xb9; na    in i89.12      )none    ) SUR/PT3.00                      ideseiection of sw63 & fw816.)
HHP2-12-.657-SS      I LINE&#xb9; 2RCS-012-23-1 HTS: 61              IHS        I  1 I na/                              I
 
NIAGARA NOHAMK POMER CORPORATION          - H  E  NILE POINT NUCLEAR STATION - UNIT 2                                          16 of 26 NHP2-1S1.006,  REV. 1, CH-000                                          SECOHD TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/28/1999                                                                    APPENDIX G -  RCS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ i DESCRIPTIOH OF ITEN TO BE EXAHIHEDiCATGRY            iIGSCCi EX1/NDE      PROCEDURE  iPERIOO    1                                RENARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, CONPONENT DMG          &#xb9;,  i ITEH &#xb9; iFREQYL EX2/NDE PROCEDURE )PERIOD 2 i USE CAL BLK  &#xb9; I  LINE HO  AHD  NOTESi  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I i LM  Q H2K Az330 assoc w/sw64&sw63        iB-J    I  na    I  VOL/UT6.03                        iOeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64 LI52A        i QISO  64-00-6          or  DMG&#xb9; na  in i89.12    inone i SUR/PT3 F 00                          ideselection of sw63 8 sw64.)
NNP2-12-.657-SS        LINE&#xb9; 2RCS-012-23-1      NTS: 62        iHS          1    dna/                                  I LM Q H2K Az330 assoc w/sw64&sw63 iB-J            I  na    I  VOL/UT6.03                        iDeselected during 2nd 10-Year update based on X's (as a result of the 2RCS-64-00-LI528        i QISO  64-00-6          or DUG&#xb9; na in i89.12        /none    i SUR/PT3.00                        ideselection of sw63 8 sw64.)
HHP2-12-.657-SS    /  LINE&#xb9; 2RCS-012-?3-1      HTS: 62        iHS          1    dna/                                I i LM Q H2K Az330  assoc w/FM821&sw64 LB-J          i na      i VOL/UT6.03            I            iDo  with FM821 & SM64 2RCS-64-00.LM53          /  QISO 64-00-6          or DMG&#xb9; na in (89.12        IID    E  I SUR/PT3.00            I            I NHP2-12-.657-SS    I  LINE&#xb9; 2RCS-012-23-1      NTS: 61        IAL          1    dna/                    / Sc10      I i LM Q N2J Az300  assoc w/fw815&sw93 iB-J          I  na    I VOL/UT6.03                        iDeselected during 2nd 10.Year update based on X's (as a result of the 2RCS-64-00-LM54          L QISO 64-00-6          or  DMG&#xb9; na  in i89.12    [none    i  SUR/PT3.00                        )deselection of fw815.)
NHP2-12-.657-SS    i  LIHE&#xb9; 2RCS-012-22-1      NTS: 61        iNS                dna/
i LM Q N2J Az300  assoc w/sw938sw94      (8-J      i na      )
VOL/UT6.03 2RCS-64-00-LI55A          i QISO  64-00-6          or  DMG&#xb9; na  in (89.12    inone i SUR/PT3.00 NHP2-12-.657-SS    i LINE&#xb9; 2RCS-012-22-1      HTS: 62        iHS          1    /  na /na
                          / LM Q H2J  Az300 assoc w/sw93&sw94 JB-J            i na      i  VOL/UT6.03 2RCS-64-00-LM558          i QISO  64-00-6          or DMG&#xb9; na . in /89.12      inone    i  SUR/PT3.00 HHP2-12-.657-SS    I  LINE&#xb9; 2RCS-012-22-1 HTS: 62            INS          1    i na  /na
                          / LM Q H2J  Az300 assoc w/FMB20      only [8-J      i na      i VOL/UT6.03            I            iDo  with FM820 2RCS-64-00-LI56          i QISO 64-00-6          or  DMG&#xb9; na    in i89.12    IID-O    I SUR/PT3.00                Sc9    I NNP2-12-.657-SS    I  LINE&#xb9; 2RCS.012-22-1      HTS: 61        IAL                dna/                    I            I I  LM Q H2G Az240 RECIRC INLET              IB-J    I  na    I  VOL/UT6.03 2RCS-64-00-LM57          i QISO  64-00-6          or  DUG&#xb9; na    in i89.12    Inone    I  SUR/PT3.00 NHP2-12-.657-SS    I  LIHE&#xb9; 2RCS  012 26  1    NTS'1          IHS          1    i  na/na I LM Q H2G A2240 RECIRC INLET              IB-J      i na    i VOL/UT6.03 2RCS-64-00-LI58A          i QISO 64-00-6          or  DMG&#xb9; na    in 189.12    inone i SUR/PT3.00 HHP2-12-.657-SS      i LINE&#xb9; 2RCS-012-26-1      NTS: 62        IHS          1    / na /na
 
NIAGARA MOHAWK POWER CORPORATION            - N    MILE POINT NUCLEAR S'IATION - UNIT 2                                          17 of 26 HMP2 IS I 006'EV 1 i CH      000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  IHTERVAL PLAN Change  date: 07/28/1999                                                                        APPENDIX G - RCS SYSTEM (sorted by Examination Identifier)
EX1/NDE PROCEDURE  iPERIOO                                    REMARKS 2HD INTVL REL REO    i DESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi 1
EXAMINATIOH IDENTIFIER i ITS ISO LOCATOR, COMPOHENT DMG          &#xb9;,  LITEM  &#xb9; iFREOYi EX2/HDE PROCEDURE        iPERIOD 2 i USE CAL BLK  &#xb9; i  LINE  HO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI        EX3/HDE  PROCEDURE IPERIOD 3 I i LM Q H2G Az240 RECIRC INLET              iB-J    )
na ) VOL/UT6.03 2RCS 64-00-LM588          i QISO 64-00-6          or DMG&#xb9; na    in [89.12    inone i SUR/PT3.00 HMP2- 12-.657-SS    i  LINE&#xb9; 2RCS.012-26-1    NTS: 62        INS          1    i na    /na i LM    Q H2G Az240 assoc w/FM818    only IB-J      I  na    I  VOL/UT6.03          I          )Do  with  FM818 2RCS-64-00.LM59          i QISO    64-00-6        or DWG&#xb9; na    in I89.12    !ID-O    I  SUR/PT3.00          I          I NMP2-12-.657-SS    i  LIHE&#xb9;  2RCS.012-26-1    HTS: 61        lAL          1    /na/                        Sc11  I I  LM Q N2F A2210 RECIRC INLET            IB-J      i na      i  VOL/UT6.03 2RCS-64-00 LM60          i QISO 64-00-6            or DMG&#xb9; na    in IB9.12 inone        J SUR/PT3.00 HMP2-12-.657-SS    I LINE&#xb9; 2RCS.012-25-1    NTS: 61        iHS          1    [  na  /na LM Q H2F Az210 RECIRC INLET            iB-J      i na      i  VOL/UT6.03 2RCS-64-00-LM61A              QISO  64-00-6        or  DWG&#xb9; na  in (89.12    inone i SUR/PT3.00 HMP2-12..657-SS        LINE&#xb9; 2RCS-012-25-1      NTS: 62        I Hs 1
                                                                                          )
na /na I  LW Q H2F  Az210 RECIRC INLET            IB-J      [  na    i  VOL/UT6.03 2RCS-64-00-LW618          i QISO  64-00-6        or DUG&#xb9; na    in i89.12    inone    i SUR/PT3.00 HMP2-12-.657-SS      I  LINE&#xb9; 2RCS-012-25-1 NTS: 62              IHS                i na    /na I  LM Q N2F A2210 RECIRC INLET              iB-J    )  na i VOL/UT6.03                I 2RCS-64-00-LM62            i QISO  64-00-6        or DMG&#xb9; na  .in i89.12    LID.E i SUR/PT3.00                igc8 NMP2-12-.657-SS      I  LINE&#xb9; 2RCS.012-25-1 NTS: 61              iAL      i  1    i na  /              I i LM                                        IB-J      i na      i  VOL/UT6.03 2RCS-64.00-LM63            i QISO 64-00-6        or DMG&#xb9; na    in i89.12    Inone    i SUR/PT3.00 HMP2.16-.822-SS      i  LIHE&#xb9;  2RCS.016-27-1    NTS: 56        )Ns i PIPE/WOL                                  IB J      I A      I  VOL/UT6.03                      i "There  shall be no branch outlet openings on weld seam," 767E286.
2RCS-64-00-SM01          i QISO 64-00-2        or DMG&#xb9; na in I89.31        inone    i SUR/PT3.00 HMP2-24-1.317-SS    I  LIHE&#xb9; 2RCS.024-2-1      HTS: 12,18      iNS          1    i na  /na I WOL/PIPE                                IB-J      I A        I VOL/UT6.03 2RCS-64-00-SW02            J QISO  64-00-2        or DUG&#xb9; na in i89.11        [none      i SUR/PT3.00 HMP2-4-.337-SS182      LIHE&#xb9; 2RCS-004-1'12-1 HTS: 17, 18      iHS          1      i na  /na
 
NIAGARA MOHAMK POMER CORPORATION -                MILE POIHZ NUCLEAR STATIOH - UNIT 2                                        18 of 26 HHP2-ISI-006( REV. 1( CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/28/1999                                                                  APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHZVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE                IPERIOO  1                              REMARKS EXAHIHATION IDENTIFIER  I ITS ISO LOCATOR, COMPONENT DMG      &#xb9;,  I ITEM &#xb9; IFREOYI EX2/HDE PROCEDURE      IPERIDO 2 I USE CAL BLK  &#xb9; I  LINE  NO  AHD NOTES( AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE            IPERIOO 3 I I  PIPE/FLG                                IB-J              I  VOL/UZ6.03 2RCS-64-00. SM03        I QISO 64-00-2        or DMG&#xb9; na in IB9.11        Inone    I  SUR/PT3.00 NHP2-4-.337-SS182  I  LINE&#xb9; 2RCS-004-112-1 NTS: 17,19        INS          1    I  na /na I  PIPE/ELB                                IB-J    I A      I  VOL/UT6.03          I          I 2RCS-64-00-SM04          I  QISO  64-00-2        or DMG&#xb9; na in I89.11        II      I SUR/PT3  00        I          I NHP2-24-1.317-SS      LINE&#xb9; 2RCS.024-2-1      NZS: 12,14      IHS/au            Ina/                        Sc11  I I  ELB/PIPE                                IB-J      I A      I VOL/UI'6.03 2RCS.64-00.Sl$ 5        I  QISO  64-00-2        or DMG&#xb9; na in I89.11        Inone    I SUR/PT3.00 NHP2-24-1.317.SS  I  LINE&#xb9; 2RCS-024-2-1      NTS: 12, 14    IHS          1    I na /na I'LB/PIPE                                  IB-J      I A      I VOL/UZ6.03          I 2RCS.64-00-SM06          I  QISO  64-00-2        or DMG&#xb9; na in IB9.11        Inone    I SUR/PT3.00          I NHP2.24-1.234-SS      LIHE&#xb9; 2RCS.024-3-1      NTS: 13,15      INS                I na  /na            I P IPE/MOL                              IB-J      I A      I VOL/UT6.03          I          I"There shall be no branch outlet openings on weld seam," 767E286.
2RCS-64.00-SM07            QISO 64-00-2        or DMG&#xb9; na in IB9.31        IID      I SUR/PT3.00          I          I NHP2-24-1.234-SS      LINE&#xb9; 2RCS-024-3-'I    HTS: 13(16      IHS/au        1    I na /na                    Sc11  I IHTEG ATT                              IB-K      I na    I SUR/PT3.00/HT4 F 00 I 2RCS-64-00.SI$ 8          I QISO 64-00-2        or DMG&#xb9; na  . in I810.20 IID        I na /na I LINE&#xb9; 2RCS-024-3-1      NTS: 20        INS      I  1    I na  /na            I I INTEG ATT                              IB-K      I na    I SUR/PT3.00/MT4.00  I 2RCS-64-00-SM09          I QISO  64-00-2      or DMG&#xb9; na    in IB10.20 IID        I na  /na            I I LINE&#xb9; 2RCS-024-3-1      NTS: 20        INS      I  1    I na /na              I I INTEG ATT                              IB-K      I na    I SUR/PT3.00/HT4.00  I 2RCS.64-00.SM10          I QISO  64-00-2      or DMG&#xb9; na      in IB10.20 IID        I na /na              I LINE&#xb9; 2RCS-024-3.1      HTS: 20          INS          1      na /na ATZ'B-K I                                                  I        I                    I I  INTEG                                            I na    I SUR/PT3.00/HT4.00  I 2RCS-64.00-SM11          I QISO  64-00-2        or DMG&#xb9; na    in I810.20 IID        I na  /na            I I LINE&#xb9; 2RCS-024-3-1      NTS: 20          INS              I na /na              I
 
NIAGARA MOHAWK POWER CORPORATION -              MILE POIN'I HUCLEAR STATION - UNIT 2                                          19 of 26 NHP2-ISI-006( REV. 1I CN-000                                          SECOND TEN YEAR INSERVICE INSPECTIOH        (ISI)  INTERVAL PLAN Change date:  07/28/1999                                                                  APPENDIX  G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REO  (
DESCRIPTION OF ITEM TO BE EXAMINED(CATGRY (IGSCC( EX1/HDE PROCEDURE              (PERIOD  1
(
REMARKS EXAHIHATION IDENTIFIER  (
ITS ISO LOCATOR,  COMPONENT DMG      &#xb9;, (ITEH  &#xb9; (FREOY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; (
LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3                (
I  RED/RED                                  (8-J-    (
A    (  VOL/UT6.03                      (Deselected during 2nd 10-Year update based on )('s.
2RCS.64-00-SW12          (
QISO  64-00-3        or  DWG&#xb9; na    in (89.11  (none  (
SUR/PT3.00 NHP2-24-1.234-SS  I  LINE&#xb9; 2RCS-024-3-1      NTS: 28,29      IHS        1    (
na  /na I  PIPE/ELB  Q N2C  A2090 RECIRC INLET IB J          ( A    (
VOL/UT6.03 2RCS-64-00-SW13          (
QISO  64-00-3        or DMG&#xb9; na in (89.11        (none  (
SUR/PT3.00 HHP2-12-.657-SS    I  LIHE&#xb9; 2RCS.012.9-1      NTS: 30,31      INS          1  (
na  /na I  ELB/PIPE  Q N2C  A2090 RECIRC INLET IB.J          (
A      (
VOL/UT6.03 2RCS.64-00-SW14          (
QISO  64-00-3        or  DWG&#xb9; na    in (89.11  (none    (
SUR/PT3.00 NMP2-12-.657-SS    I  LINE&#xb9; 2RCS-012-9-1      HTS: 30,31      INS              (
na /na I  RED/PIPE                                IB-J    I A      I VOL/UT6.03 2RCS-64-00-SM15          (
QISO  64-00-3        or  DWG&#xb9;  na    in (89.11  (none    (
SUR/PT3.00 NHP2-16-.822-SS    I  LIHE&#xb9; 2RCS-016.6-1      HTS  25,28    INS          1    ( na  /na I  PIPE/WOL                                IB-J    ( A      (
VOL/UT6.03                      (aThere  shall  be no branch outlet openings on weld seem,<< 767E286.
2RCS-64-00-SW16          (
QISO  64-00-3        or  DWG&#xb9;  na    in (89.31  (none    (
SUR/PT3.00 NMP2-16-.822.SS    I LINE&#xb9; 2RCS-016-6-1      HTS:  25,26    INS          1    ( na  /na PIPE/WOL                                IB-J    I A      I VOL/UT6.03                      (This was an original NHP2L-1263 GLBB-01 Cat.A coamitment, but was 2RCS-64-00-SW17          (
QISO  64-00-3        or  DMG&#xb9; na    .in (89.31  (none    (
SUR/PT3 F 00                    (never examined in the 1st Int in favor of another Cat.A weld. "There NMP2-16-.822-SS      LINE&#xb9; 2RCS-016-6-1      NTS:  25,26    (NS              (
na  /na                        (shall be no branch outlet openings on weld  seam,w 767E286.
I PIPE/ELB  Q  N28 A?060 RECIRC IHLET      IB-J    I A      I VOL/UT6.03 2RCS-64-00. SM18          (
QISO 64-00-3          or  DWG&#xb9; na    in (89.11  (none    (
SUR/PT3.00 NHP2-12-.657-SS    I LINE&#xb9; 2RCS 012  1  1    NTS'0    31    INS              (
na  /na I ELB/PIPE  Q H 8 A  06    RECIRC INLET IB J        I A      I VOL/UT6.03 2RCS-64-00-SM19          (
QISO  64-00-3        or  DWG&#xb9;  na    in (89.11  (none    I SUR/PT3.00 NMP2-12-.657-SS    I LINE&#xb9; 2RCS-012-10-1      HTS: 30,31      INS          1    (
na /na I PIPE/ELB  Q N2A  Az030 RECIRC IHLET IB-J          (
A      ( VOL/UT6.03                      (This was an original NMP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00-SM20          (
QISO  64-00-3        or DUG&#xb9; na in (89.11        (none    (
SUR/PT3.00                      (never examined in the 1st Interval in favor of another Cat.A weld NMP2-12-.657-SS    I LINE&#xb9; 2RCS-012-11-1 HTS: 30,31          INS          1    ( na /na                          (coincidentally chosen pursuant to Cat 8-J criteria.
 
NIAGARA NOHAMK POMER CORPORATION            -    NILE POINT NUCLEAR STATION - UNIT 2                                            20 of 26 NHP2-ISI-006, REV. 1 ~ CH 000                                          SECOHD TEN YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date:  07/28/'1999                                                                    APPENDIX G - RCS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REO ) DESCRIPTIOH OF ITEN TO BE EXANINED(CATGRY )IGSCC] EX1/HDE PROCEDURE                  )PERIOD  1                                  REHARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, CONPOHENI''MG        &#xb9;,  ]ITEN  &#xb9; JFREOYJ EX2/HDE PROCEDURE      ]PERIOD 2  J USE CAL BLK  &#xb9; I  LINE  HO  AHD NOTES'S    APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE      IPERIOD 3  I i ELB/PIPE Q N2A    Az030 RECIRC INLET    ig-J      I  A    I  VOL/UT6.03 2RCS-64-00-SM21          )
QISO  64-00-3      or DMG&#xb9; na in ]89.'l1      (none    [  SUR/PT3 F 00 HHP2-12-.657-SS    I  LINE&#xb9; 2RCS-012-11-1 NTS: 30,31        INS                /  na  /na I  INTEG ATT                            IB K      I  na    I  SUR/PT3.00/MT4. 0  I 2RCS-64-00-SM22          f  QISO  64-00-1      or DMG&#xb9; na    in (810.20 )ID          f  na  /na f  LIHE&#xb9; 2RCS-024-1-1    NTS: 1,9        [HS      I    1    I  na /na              I I INTEG ATT                              IB-K      I  na    I  SUR/PT3.00/HT4.00  I 2RCS-64-00-SM23            /  QISO  64-00-1      or DMG&#xb9; na    in /BI0.20 /ID          /  na  /na
                          /  LINE&#xb9;  2RCS.024-1-1  HTS: 1,9        JHS      /    1    /  na /na I INTEG ATT                              IB-K      I na      I  SUR/PT3.00/NT4.00  I 2RCS-64-00-SM24            f  QISO 64-00-1        or DMG&#xb9; na    in  [810.20 /ID        /  na /na              I I  LINE&#xb9; 2RCS-024-1-1    NTS: 1,9        INS      I    1    I  na /na              I INTEG ATT                            [B-K      [ na      ]  SUR/PT3.00/HT4.00 2RCS-64-00.SM25            f  QISO 64-00-1        or DMG&#xb9; na    in /810.20 ]ID        f  na  /na f  LINE&#xb9; 2RCS-024-1-1    NTS: 1,9        /HS      J 1    J na /na I  PIPE/CAP                              IB-J      I  A      I  VOL/UT6.03                      (This was an original HHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS.64-00-SM26            [  QISO  64-00-3      or DMG&#xb9; na .in JB9.11      [none    )
SUR/PT3.00                      )never examined in the 1st Interval in favor of another Cat.A Meld HHP2-16-.822-SS      I  LIHE&#xb9; 2RCS-016.6-1    HTS: 25(27    INS            1
[  na /na                          (coincidentally chosen pursuant to Cat B-J criteria.
I RED/PIPE                              /B-J      i A      i  VOL/UT6.03 2RCS-64-00-SM27            /  QISO  64-00-3      or DMG&#xb9; na in /B9.11        [none    J SUR/PT3.00 NNP2-16-.822-SS      I  LINE&#xb9; 2RCS.016.5-1    HTS: 25,28      IHS          1    f  na /na i PIPE/MOL                                IB-J    IA        I  VOL/UT6.03                      (aThere shall be no branch  outlet openings on Meld seam," 767E286.
2RCS-64-00.SM28            )
QISO  64-00-3      or  DMG&#xb9; na    in  (B9.31    /none    )  SUR/PT3.00                      I HMP2-16-.822-SS        LINE&#xb9; 2RCS-016-5-1    NTS: 25,26      )HS      I  1 I  na /na                          I J
PIPE/MOL                              IB-J      I A      I  VOL/UT6.03                      ("There shall  be no branch outlet openings on Meld seam,a 767E286.
2RCS-64-00-SM29            / QISO  64-00-3      or DMG&#xb9; na    in /89.31    ]none    f SUR/PT3.00                      I HNP2-16-.822-SS      I LINE&#xb9; 2RCS-016-5-1    HTS: 25,26      INS                / na /na                          I
 
NIAGARA MOHAC POMER CORPORATION              -      MILE POINT NUCLEAR STATIOH - UNIT 2                                        21 of 26 HMP2-ISI-006, REV. 1( CH-000                                            SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/28/1999                                                                      APPENDIX  G - RCS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RE4    i DESCRIPTIOH OF ITEM TO BE EXAMIHEDiCATGRY i IGSCCi EX1/HOE PROCEDURE                iPERIOO  1                                REMARKS EXAMINATION IDEHTIFIER    I  ITS ISO LOCATOR'OMPONENT DUG      &#xb9;i  I ITEM &#xb9; IFREOYI EX2/HDE PROCEDURE IPERIOO 2          I USE CAL BLK  &#xb9;  I  LIHE NO AHD NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3                    I I  PIPE/CAP                              IB-J    I  A      I  VOL/UT6.03 2RCS-64-00. QQO          i QISO 64-00-3      or DUG&#xb9; na in i89.11        inone      i SUR/PT3.00 HMP2-16-.822-SS      I  LINE&#xb9; 2RCS-016-5-1    NTS: 25,27      INS            1    i na  /na i PIPE/ELB    Q H2D Az120 RECIRC IHLET iB-J          i A        i  VOL/UT6.03 2RCS-64-00-SIQ1          i QISO    64-00-3      or  DUG&#xb9; na    in i89.11    inone      )  SUR/PT3.00 NMP2-12-.657-SS    I  LINE&#xb9; 2RCS-012-8-1    HTS: 30,31      INS            1    i na  /na I  ELB/PIPE  Q N2D Az120 RECIRC IHLET IB-J          I A        I VOL/UI'6.0                    iThis was an original HMP2L-1263 GLBB-01 Cat.A coanitment; 2RCS-64-00-SM32          i QISO 64-00-3          or  DNG&#xb9; na    in )89.11    inone      i SUR/PT3.00                      iNevertheiess, it was deselected during 2nd 10-Year update based on Xs.
NMP2-12-.657-SS    I  LIHE&#xb9; 2RCS-012-8-1    NTS: 30,31      (HS                  in /
I  PIPE/ELB  Q N2E Az150 RECIRC INLET IB-J          i A        i VOL/UT6.03          I          iDeselected during 2nd 10-Year Update revie~
2RCS-64-00-SIQ3          i QISO    64-00-3      or  DUG&#xb9; na    in JB9.'ll    inone I SUR/PT3.00                I          I NMP2-12-.657-SS    i LINE&#xb9; 2RCS-012-7-1      NTS: 30,31      JHS                  i  na/                I          j I  ELB/PIPE  Q H2E Az150 RECIRC INLET IB-J          i A        i  VOL/UT6.03                    iDeseiected during 2nd 10-Year Update review 2RCS-64-00-SIQ4            i QISO  64-00-3      or DUG&#xb9; na in i89.11        inone      )
SUR/PT3.00                    I HMP2-12-.657-SS      I  LINE&#xb9; 2RCS-012-7-1    NTS: 30,31      IHS            1    dna/                              I IN-14        t  PIPE/ELB                              IB-J      I A        I  VOL/UT6.0              Sc7 2RCS-64-00-SU35            i QISO 64-00-1      or DUG&#xb9; na  . in )89.11    IID        I  SUR/PT3.00          I HMP2-24-1.002-SS    i  LINE&#xb9; 2RCS-024-1-1    NTS: 1,3        lHS/au                                      I I  PIPE/ELB                                IB-J    I  A    ~
I VOL/UT6.03 2RCS-64-00.SIQ6            i QISO 64-00-1      or DNG&#xb9; na      in i89.11    inone      i SUR/PT3.00 NMP2-24-1.002-SS    I  LINE&#xb9; 2RCS-024-1-1    HTS: 1,2        INS          1      i na /na I  TEE/PIPE                                IB-J                i VOL/UT6.03 2RCS-64-00-SM37            i QISO 64-00-1      or DUG&#xb9; na      in i89.11    Inone      I SUR/PT3.00 NMP2-24-1.002-SS  .I  LINE&#xb9;  2RCS-024-1-1    HTS: 1,4        IHS          1      / na/na I  PIPE/TEE                                IB-J      I A        I VOL/UT6.03                      iDeselected during 2nd 10-Year update based on X's.
2RCS-64-00.SIQB            i QISO 64-00-1      or O'IK&#xb9; na    in i89.11    /none      i SUR/PT3.00 HMP2-24-1.002-SS      I LINE&#xb9; 2RCS-024-1-1    NTS: 1,4        IHS            1    dna/
 
NIAGARA NOHAMK POMER CORPORATION        -      NILE POINT  NUCLEAR STATION  - UNIT 2                                        22 of 26 HNP2-ISI-006( REV. 1I CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                    APPENDIX  G  - RCS SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RE4 I DESCRIPTIOH OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE                IPERIOO  1  I                                REHARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DMG            &#xb9;, IITEH  &#xb9; IFREQYI EX2/HDE PROCEDURE      IPERIOD 2  J USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT        iCLASSi EX3/HDE PROCEDURE iPERIOD 3 i
[  ELB/PIPE  Q  H18 Az000 RECIRC OUTLT    [8-J    I A    I  VOL/UT6.03 2RCS-64-00-SM39          )
QISO  64-00-1        or DMG&#xb9; na    in )89.11  /none  f  SUR/PT3.00 NHP2-24-1  '02-SS  I  LINE&#xb9; 2RCS-024-1-1      HTS: 1(2      IHS          1
                                                                                    /  na/na
                        /  PIPE/ELB  Q N1B  A7000 RECIRC OUTLT    /8-J    / A    /  VOL/UT6.03          I          JGL88-01 CAT.A COHNITNENT 2RCS-64-00.SM40          /  QISO  64-00-1        or DMG&#xb9; na    in /89.11  IID-0  I  SUR/PT3.00              Sc9    I HNP2-24-1.002-SS  i  LINE&#xb9; 2RCS-024-1-1      NTS: 1,2      iHS/au      1  /na/                    I          I J
PIPE/MOL                                IB-J    I A      I VOL/UT6.03                      )>>There  shall  be no branch  outlet openings on weld seam,>> 767E286.
2RCS-64-00;SM41          /  QISO  64-00-5        or DMG&#xb9; na in /89.31      Inone    I SUR/PT3.00 NNP2-24-1.317-SS  I  LINE&#xb9; 2RCS-024-19-1 NTS: 43,49          IHS              J na /na
                        )  MOL/PIPE                                IB-J    I A      I VOL/UT6.03            I 2RCS.64.00.SM42          / QISO  64-00-5        or  DMG&#xb9; na    in /89.11  /none    / SUR/PT3 F 00          I NNP2-4-.337-SS182  I  LINE&#xb9; 2RCS-004-39-1      NTS: 48(49    IHS          1    J na /na                I I  PIPE/FLG                                IB-J    I A      I VOL/UT6.03 2RCS-64-00-SM43          f  QISO  64-00-5        or  DMG&#xb9; na    in JB9.11  Inone    I SUR/PT3.00 NHP2-4-.337.SS182  i  LINE&#xb9; 2RCS-004-39-1      NTS  48,50    iHS          1    J na  /na I  PIPE/ELB                                IB-J    I A      I VOL/UT6.03 2RCS.64-00.SM44          /  QISO  64-00-5        or  DMG&#xb9; na  .in  JB9.11  (none    ( SUR/PT3.00 NNP2-24-1.317-SS  I  LINE&#xb9; 2RCS-024-19-1      HTS: 43,45    INS              / na  /na I  ELB/PIPE                                IB.J    I A      I VOL/UT6.03                        (This uas an original HNP2L-1263 GL88-01 Cat.A comnitmentl 2RCS-64-00-SM45            QISO 64-00-5          or  DMG&#xb9; na    in /B9.11  /none      SUR/PT3.00                        (Nevertheless,  it was deselected during 2nd 10-Year update based on Xs.
NNP2-24-1.317-SS
                        )
I  LINE&#xb9; 2RCS 024 19  1    NT  '3  45    IHS J
                                                                                      / na/
I  ELB/PIPE                                IB-J    I A      I VOL/UT6.03 2RCS-64-00.SM46          / QISO  64-00-5        or  DMG&#xb9; na    in /89.11  Inone    I SUR/PT3.00 NNP2-24-1.234-SS    I LINE&#xb9; 2RCS-024-20-1      NTS: 44,46    INS          1    f na /na I INTEG ATT                              IB.K    I na    I SUR/PT    00/NT      I 2RCS-64-00-S'M47          / QISO  64-00-5        or DMG&#xb9; na    in /B10.20 ]ID      / na  /na i LIHE&#xb9; 2RCS-024-20-1      HTS: 51        iHS          1    / na/na                I
 
NIAGARA HOHAMK POMER CORPORATION            -      MILE POINT NUCLEAR STATION - UNIT 2                                              23 of 26 HHP2-ISI-006( REV. 1, CH-000                                              SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date: 07/28/1999                                                                          APPENDIX G -  RCS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE                      (PERIOD  1                                  REHARKS EXAHIHATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPOHEHT DMG            &#xb9;,  (ITEH  &#xb9; (FREOY( EX2/HDE PROCEDURE        (PERIOD 2  (
USE CAL BLK  &#xb9; (
LIME NO. AND NO'IES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE (PERIOD 3 I  IHTEG ATT                                IB-K      I  na    I  SUR/PT3.00/HT4 F 00  I          I 2RCS-64-00-SM48          (
QISO    64-00-5        or DMG&#xb9; na    in (810.20 (ID          (
na  /na
(
LINE&#xb9; 2RCS-024-20-1 NTS: 51              (HS      (
1    (
na /na              I          I I IHTEG ATT                                  (8 K      I  na    I  SUR/PT3 00/HT4 00 I 2RCS-64-00-SM49          (
QISO    64-00-5        or DMG&#xb9; na    in  (810  '0  (ID      (
na /na I  LINE&#xb9; 2RCS-024-20-1 NTS: 51              INS      I  1    I na /na                I I INTEG AT'I                            (B-K      (
na    (
SUR/PT3.00/MT4.00    (
2RCS-64-00-SM50          (
QISO    64-00-5        or DMG&#xb9; na    in (810.20 (ID          (
na  /na              I
(
LINE&#xb9; 2RCS-024-20-1 NTS: 51              (HS      (
1    (
na /na              I I PIPE/MOL                                    IB-J      I  A      I  VOL/UT6.03          I          (This  was an  original NHP2L-1263 GL88-01 Cat.A carmitment. Neverthless, 2RCS-64-00-SI51          (
QISO    64-00-5        or DMG&#xb9; na in (89.31        (none    I  SUR/PT3.00          I          iit was  deselected during 2nd 10-Year update based on Xs. "There shall NHP2-24-1.234-SS    I  LINE&#xb9; 2RCS-024-20-1 NTS: 44i47            IHS      (    1    (
na  /na              I          (be no branch  outlet openings  on weld seam,>> 767E286.
I RED/RED                                    IB-J      I  A      I  VOL/UT6.03 2RCS-64-00-SM52          (
QISO    64-00-6        or  DMG&#xb9; na    in (89.11    (none      (
SUR/PT3.00 HHP2-24-1.234-SS    (
LINE&#xb9; 2RCS-024-20-1        NTS: 59,60    (HS            1    (
na  /na I  PIPE/ELB    Q N2H  A2270 RECIRC INLET IB-J          I A      I VOL/UT6.03 2RCS-64-00-SM53          (  QISO    64-00-6        or  DMG&#xb9; na  .in  (89.11    (none    (
SUR/PT3.00 NMP2-12-.657-SS        LINE&#xb9; 2RCS.012-21-1        NTS: 61        (HS          1    (
na  /na I ELB/PIPE      Q H2H A2270 RECIRC INLET IB-J          ( A      (
VOL/UT6.03                      (This was an original NHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00.SM54            (
QISO    64-00.6        or  DMG&#xb9; na    in (89.11    (none    (
SUR/PT3.00                      (never examined in the 1st Interval in favor of another Cat.A weld NMP2-12-.657-SS      (
LINE&#xb9; 2RCS-012-21-1        NTS: 61,62      (HS          1    (
na  /na                          (coincidentally chosen pursuant to Cat 8-J criteria.
( PIPE/MOL                                  IB J      (
A      (
VOL/UT6.03                      (>>There shall be no branch    outlet openings  on weld seam,>> 767E286.
2RCS-64-00-SM55            (
QISO    64-00-6        or  DMG&#xb9; na    in (89.31    (none    I  SUR/PT3.00                      I NHP2-16-.822.SS      I  LINE&#xb9; 2RCS-016-27-1      NTS: 56(57      IHS          1    (  na/na                            I P I PE/MOL                                IB-J      I A        I VOL/UT6.03                      (>>There shall be no branch    outlet openings  on weld seam,>> 767E286.
2RCS-64-00-SI56            (  QISO  64-00-6        or  DMG&#xb9; na    in (89.31    (none      (
SUR/PT3.00                      I HHP2-16-.822-SS      (  LIHE&#xb9; 2RCS-016-27-1      HTS: 56,57      IHS          1      (
na  /na                        I
 
NIAGARA HOHAWK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2                                          24 of 26 NHP2-ISI-006( REV. 1, CH 000                                            SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/28/1999                                                                    APPENDIX G - RCS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE                IPERIOD  1  I                              REMARKS EXAHINATI OH IDENTIFIER      ITS ISO LOCATOR, COHPONENT DWG      &#xb9;,  ]ITEN  &#xb9; [FREOY[ EX2/NDE PROCEDURE      ]PERIOD 2 USE CAL BLK  &#xb9; I  LINE  HO  AHD NOTES  AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE          IPERIOO 3 I i PIPE/CAP                                  IB J    ] A      (
VOL/UT6.03 2RCS-64-00-SW57          f  QISO  64-00-6        or DWG&#xb9; na in /89.11      )none    J SUR/PT3.00 NHP2-16-.822-SS    I  LIHE&#xb9; 2RCS-016-27-1 NTS: 56,58          INS              f na /na I RED/PIPE                                  IB-J    i A      i VOL/UT6.03 2RCS-64-00-SM58          J QISO  64-00-6        or  DWG&#xb9; na  in )89.11    Inone    I SUR/PT3.00 NHP2-16-.822-SS    I  LINE&#xb9; 2RCS-016-27-1      HTS: 56(59    INS                / na /na I RED/PIPE                                  IB-J    [  A      [ VOL/UT6.03          I 2RCS.64-00-SW59          / QISO    64-00-6        or DMG&#xb9; na in /89.11      IID      I SUR/PT3.00            Sc9 NHP2-16-.822-SS    (  LINE&#xb9; 2RCS-016-24-1 NTS: 56,59          (HS/au        1    /na/                  I P I PE/MOL                              IB-J    i A      i VOL/UT6.03          I          )"There shall be no branch outlet openings on weld sean," 767E286.
2RCS-64-00-SW60          /  QISO  64-00-6        or  DMG&#xb9; na  in /89.31    (none ( SUR/PT3.00              I          I NHP2-16-.822-SS    I  LINE&#xb9; 2RCS-016-24-1      NTS: 56(57    INS          1
                                                                                        / na /na              I          I PIPE/MOL                                IB J    I  A      I VOL/UT6.03                    ("There shall  be no branch outlet openings on weld seam," 767E286.
2RCS-64-00-SM61          /  QISO 64-00-6          or DMG&#xb9; na in /89.31      /none    / SUR/PT3.00                    I NHP2-16-.822  SS    I  LINE&#xb9; 2RCS-016-24-1 NTS: 56(57          INS                / na  /na                        I I  PIPE/CAP                                IB-J    I A      I VOL/Ul'6.03                    (This was an original NHP2L-1263 GLBB-01 Cat.A comnitment, but was 2RCS-64-00-S'W62          f  QISO    64-00-6        or DWG&#xb9; na . in /89.11  Inone    I SUR/PT3.00                    [never examined in the 1st Interval in favor of another Cat.A weld NHP2.16-.822-SS    I  LINE&#xb9; 2RCS-016-24-1 HTS: 56,58          IHS          1
                                                                                        / na /na                        [coincidentally chosen pursuant to Cat 8-J criteria.
I  PIPE/ELB    Q H2K Az330 RECIRC INLET IB-J        )
A      [ VOL/UT6.03                    (Deselected during 2nd 10-Year Update review 2RCS-64-00-SW63          f QISO 64-00-6        or DWG&#xb9; na in ]89.11      )none    )
SUR/PT3.00 HHP2-12-.657-SS    i  LINE&#xb9;    2RCS-012-23-1    HTS: 61,62    iHS                ( na/
I  ELB/PIPE    Q H2K A2330 RECIRC INLET IB-J        I A      I VOL/UT6.03                    )Deselected during 2nd 10-Year Update review 2RCS-64.00-SM64          ]  QISO    64-00-6        or  DMG&#xb9; na    in JB9.11    [none    (
SUR/PT3.00 NHP2-12-.657-SS      i LINE&#xb9; 2RCS-012-23-1      HTS: 61,62    iNS          1    dna/
I PIPE/ELB    Q H2G Az240 RECIRC INLET IB-J          I A      I VOL/UT6.03 2RCS-64-00-SM65            f QISO    64-00-6        or DMG&#xb9; na in (89.11        ]none    f SUR/P'T3.00 NHP2-12-.657-SS      l LINE&#xb9;    2RCS-012-26-1    NTS: 61,62    IHS          1    / na  /na
 
NIAGARA NOHAWK POWER CORPORATION -              NILE POINT NUCLEAR STATION - UNIT 2                                        25 of  26 NHP2  ISI 006'EV 1 g CH 000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/28/1999                                                                APPENDIX  G - RCS SYSTEN (sorted by Examination Identifier) 2ND INTVL REL REQ    (
DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE            (PERIOD  1                                REHARKS EXAHINATIOH IDEHTIFIER    (
ITS ISO LOCATOR, COHPOHEHT    DWG  &#xb9;, (ITEN  &#xb9; (FREOY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; (
LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3              (
I  ELB/PIPE  Q H2G  A2240 RECIRC INLET IB-J        ( A    (
VOL/UT6.03                      (This was an original HHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00-SM66          (  QISO  64-00-6        or  DMG&#xb9; na  in (89.11    (none  (
SUR/PT3.00                      (never examined in the 1st Interval in favor of another Cat.A weld .
HHP2-12-.657-SS    (  LINE&#xb9; 2RCS.012-26-1    NTS: 61,62    (HS          1  (
na /na                          (coincidentally chosen pursuant to Cat B-J criteria.
(  PIPE/ELB                              IB-J      ( A    (
VOL/UT6.03          I 2RCS-64-00-SW67          (  QISO  64-00-4        or DMG&#xb9; na in (89.11      IID    I  SUR/PT3.00              Sc9 NHP2-24-'1.002-SS  (  I.INE&#xb9; 2RCS-024-18-1 NTS: 33,35      (HS/au                                  I I  PIPE/ELB                              IB-J      I A      I VOL/UT6.03 2RCS-64-00-SM68          (
QISO  64-00-4        or  DWG&#xb9; na  in (B9.11    (none    (
SUR/PT3.00 HNP2-24-1.002-SS    (
LINE&#xb9; 2RCS-024.18-1    HTS: 33,34    IHS                (
na /na I
ELB/PIPE                              IB-J      I A      I VOL/UT6.03          I 2RCS.64-00-S'W69          (
QISO  64-00-4        or DMG&#xb9; na in (89.11      (none    (
SUR/PT3.00          I NHP2-24-1.002-SS    I  LIHE&#xb9; 2RCS-024.18-1    HTS: 33,34    (NS          1    (
na /na              I
(
PIPE/ELB  Q N1A Az000 RECIRC OUTLT (B-J        ( A      (
VOL/UT6.03          I          I 2RCS-64-00-SW70          (
QISO  64-00-4        or DWG&#xb9; na in (89.11      (ID-0    I SUR/PT3.00          I          I NHP2-24-1.002-SS    (
LINE&#xb9; 2RCS-024-18-1 NTS: 33,34        (HS/au            (na/                        Sc11
(
PIPE/ELB  Q N2F  Az210 RECIRC INLET (B-J        I A      I VOL/UT6.03 2RCS-64-00-SW82          (
QISO  64-00-6        or  DWG&#xb9; na. in (B9.11    (none    ( SUR/PT3.00 NNP2-12-.657-SS    (  LIHE&#xb9; 2RCS-012-25-1    NTS: 61,62    (NS          1    (
na  /na I ELB/PIPE  Q N2F  A2210 RECIRC INLET IB-J        I A      I VOL/UT6.03 2RCS.64-00-SW83            (
QISO  64-00-6        or  DWG&#xb9; na  in (89.11    (none    I SUR/PT3 F 00 HHP2-12-.657-SS      (
LINE&#xb9; 2RCS-012-25-1    NTS: 61,62    (HS          1    ( na  /na
( PIPE/ELB  Q  H2J Az300 RECIRC INLET (B-J        ( A      (
VOL/UT6.03 2RCS-64-00. SW93          (
QISO  64-00-6        or  DWG&#xb9; na  in (B9.11    (none    (
SUR/PT3.00 HNP2.12-.657-SS        LINE&#xb9; 2RCS-012-22-1    NTS: 61,62    (HS          1    (
na /na ELB/PIPE  Q  N2J Az300 RECIRC INLET  IB-J      I A      I VOL/UT6.03                      (This was an original NHP2L-1263 GL88-01 Cat.A comnitment, but was 2RCS-64-00-SM94              QISO  64-00-6        or  DMG&#xb9; na  in I 89.11  (none    ( SUR/PT3.00                      (never examined in the 1st Interval in favor of another Cat.A veld NMP2-12-.657-SS        LINE&#xb9; 2RCS-012-22-1    NTS: 61,62    (NS      (
1    (
na /na                          (coincidentally chosen pursuant to Cat 8-J criteria.
 
NIAGARA NONA'MK POMER CORPORATION        -      NILE POINT HUCLEAR STATION - UNIT 2        26 of 26 HHP2-ISI-006, REV. 1, CH-000                                    SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                APPENDIX G - RCS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE            IPERIOO  1                        REHARKS EXANIHATION IDENTIFIER i ITS ISO LOCATOR, CONPONENT DMG    &#xb9;, iITEN &#xb9;  iFREQYi EX2/HDE PROCEDURE      iPERIOO 2 i USE CAL BLK &#xb9; I LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I INTEG ATT                            iB-K    i na      i  SUR/PT3.00/NT4.00 i 2RCS-64-00-SM95        I QISO 64-00-4        or  DMG&#xb9; na  in F810.20  ilD      i na  /na                        I I LINE&#xb9; 2RCS-024-18-1    NTS: 33,38    IHS      I
                                                                            'I I  na  /na            I          I I INTEG ATT                            IB-K    I  na      I SUR/PT3.00/NT4.00  I          I 2RCS-64-00-SM96        / QISO 64-00-4        or  DMG&#xb9; na  in /810.20 /ID        i na  /na                        I I LINE&#xb9; 2RCS-024-18-1    HTS: 33,38    iHS      I    1    i na /na              I          I I INTEG ATT                            IB-K    I na      I SUR/PT3.00/NT4.00  I          I 2RCS-64-00-SM97        J QISO 64-00-4        or  DMG&#xb9; na  in F810.20 iID        / na /na                        I
                        )
LINE&#xb9; 2RCS-024-18-1    NTS: 33,38    /NS      i    1    i na /na                        I I IHTEG ATT                            IB.K    I  na      I SUR/PT3.00/NT4.00  I          I 2RCS-64-00.SM98        i QISO 64-00-4        or  DMG&#xb9; na  in iBI0.20  i IO      J na  /na i LINE&#xb9; 2RCS-024-18-1    HTS: 33,38    iHS      i    1    / na /na              I          I EHD OF SYSTEN RCS
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System RCS: General Notes
: 1. 24" PIPE MATERIALSA358GR.316CL1 WELDED PIPE MIN. WALL.877/BASIC MAT'L                            32  12" N2 NOZ SAFE END SA182 GR F 316 (1.00" THK)
SA240                                                                                            33  24" PIPE MAT'LSA358 GR 316 CL1 (.877" MW) WELDED PIPE
: 2. 24" PIPE FITTINGS 90'L    SA403 GR. WPW 316 MINWALL.877"                                          34  24" PIPE FTNG SA403 GR WPW 316  90'L  (.877 MINWALL)
: 3. 24" PIPE FITTINGS 90'L    SA403 GR. WPW 316 MINWALL1.053                                          35  24 PIPE FTNG SA403GR WPW 31690'L(1.053MW)
: 4. 24" PIPE FITTINGS 24" X 24" X 20" RED. TEE SA403 GR. F 316 24" X 24" MINWALL                      36  24" x 4 PIPE FTNG SA182 GR F 316 CWO-WOL (24".877MW) (4".167" MW)
    .877 20" MINWALL.732                                                                              37  1-1/4 PIPE FTNG SA182 GR F 316 S/W NOZ SOL
: 5. 24 X4" PIPE FITTINGS SA182GR F316CWD(WOL) 24".877MW4 .167MW                                      38  PLATE MATLSA182 GR F 316 2 THK.
: 6. 1-1/4" PIPE FITTINGS SA182 GR F 31 6 SOC WELD NOZZLE (SOL)                                        39  MOV10B-VALVEBODY SA351 GR CFBM
: 7. MOVIGA-BODYSA351 GR. CFBM WELD END 1.934" MIN COUNTERBORE TO 1.152                                40  P1B PUMP BODY SA351 GR CFBM
: 8. PIA PUMP BODY SA 351 CF8M                                                                        41  P1B BODY STUDS 3.75" DIA SA540 GR B2 QTY 16 LENGTH 32"
: 9. PLATE/LUGS SA182 GR. F 316 2 THK.                                                                42 N1 NOZ SAFE END SA336 CLBF THK 1.6P
: 10. PIA-STUDS 3.75 DIA. SA540 B23 C1. 532" LENGTH/QTY16                                              43 24 PIPE MAT'LSA358 GR 31 6 CL1 (1.153" MW)
: 11. N1 NOZ SAFE END SA336CL1 F8;T"-1.65"                                                              44 24" PIPE MAT L SA358 GR 316 CL1 (1.080" MW)
: 12. 24" PIPE MALSA358 GR 316 CL 1 (1.153" MW)                                                        45 24" PIPE FTNG SA403 GR WPW 3 16    90'L  (1.384" MW)
: 13. 24" PIPE MAT'LSA358 GR 316 CL1 (1.080" MW)                                                        46 24" PIPE FTNG SA403 GR WPW 316    90'L  (1.080" MW)
: 14. 24 PIPE FITTING SA403GR WPW31690'L (1.384 MW)                                                    47 24 X 12" PIPE FTNG SA182 GR F 316 CWO/WOL (24"-1.080/12" .575" MW)
: 15. 24" PIPE FITTING SA403 GR WPW 316    90'L  (1.080" MW)                                          48 4" PIPE MAT'LSA182 GR F 316 SMLS (217." MNfj
: 16. 24 X 12" PIPE FTNG SA 182 GR F316 CWO/WOL (24" 1.080/12" .575" MW)                                49 4" PIPE FTNG SA182 GR F 316 CWO/WOL (24" 1.153/4" .217" MW)
: 17. 4 APE MAT'LSA182 GR. F316 SMLS (217." MW)                                                        50 4" PIPE FTNG SA182 GR F 316 90% RF W/N FLANGE
: 18. 24" X 4" PIPE FTNG SA182 GR F316 CWO/WOL (24" 1.153"/4" .217 MW)                                  51  PLATE MAT L SA182 GR F 316 2 THK (LUGS)
: 19. 4" PIPE FTNG SA182 GR F316 90% RF W/N FLANGE                                                      52..24" PIPE MAT'LSA182 GR F 316 RED. CROSS (24-1.680" MW)
PLATE MAT'LSA182 GR F3162 THK(LUGS)                                                              53 2RCSP1B BODY SA351 CFBM
: 21. 24" PIPE MAT'LSA182 GR F316 RED. CRS (24" 1.080" MW)                                              54 HYV 17B BODY SA351 CFBM (1.491" AT WELD ZONE) 2RCS'P1A BODY SA351 CF8M                                                                          55 MOV18B SA351 GR CFBM (1 405" AT WELD ZONE)
HYV17A BIDT SA351 CFBM (1.491" @ WELD ZONE)                                                      56 16" PIPE MAT'LSA358 GR 316 CL1 (.720 MIN)
: 24. MOV18A SA351 CFBM (1 405" @ WELD ZONE)                                                            57 16" X 12" PIPE FTNG SA182 GR F 316 CWO/WOL (16"-.720" MW/12".575" MW) 16" PIPE MAT'LSA358 GR 316 CL1 (.720" MW)                                                        58 16 PIPE FTNG SA403GR WP316 CAP (.720 MW) 16" X 12" PIPE FTNG SA182 GR F316 CWO/WOL (16" .720" MW/12" .575" MW)                            59 24" X 16" PIPE FTNG SA182 GR F 316 RED. CROSS (24" 1.080" MW/16".720" MW)
: 27. 16'IPE CAP SA403 WP316 (.720" MW)                                                                60 24" X 12'IPE FTNG SA403 GR WP316 CONC RED (24" 1.080" MW/12".575" MW)
: 28. 24" X 16" PIPE FTNG SA182 GR F316 RED CROSS (24" 1.080" MW/1 6" .720" MW)                        61  12 PIPE MALSA358 GR 316 CL1 (.575 MW) 24" X 12" PIPE FTNG SA403 GR WP 316 CONC. RED (24" 1.080 MW/12" .575" MW)                        62 12" PIPE FTNG SA403 GR WPW 316    90'L  (.575" MW) 12 PIPE MAT'LSA358 GR 316 CL1 (.575" MW)                                                          63 NZ NOZ SAFE END SA182 GR F316 (1.00" THK)
: 31. 12 PIPE FTNG SA403 GR WPW 316      90'L
 
NIAGARA HOHAMK POMER CORPORATION    -  n      ILE POINT  NUCLEAR STATION  - UNIT 2        1 of 23 NHP2-ISI-006, REV. 1I CH-000                                    SECOND TEN YEAR IHSERVICE INSPECTIOH        (ISI) INTERVAL PLAN Change date: 07/28/1999                                                              APPENDIX  G - RDS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXANIHEDiCATGRY      iIGSCCi EX1/NDE  PROCEDURE    iPERIOO  1                        REHARKS EXANINATIOH IDEHTIFIER  ) ITS ISO LOCATOR, COHPOHENT DMG    &#xb9;,        &#xb9; iITEII iFREQYi EX2/HDE      PROCEDURE    [PERIOD 2 i USE CAL BLK &#xb9; J LINE NO. AHD NOTES, AS APPLICABLE DESELECT iCLAssi EX3/HDE      PROCEDURE    iPERIOO 3 I PIPE/ELB                            IC-F-2    J na i VOL/UT6.02 2RDS-65-00-FM001        i QISO  65-00-1      or DMG&#xb9; na    in iC5.51    )none i SUR/PT3.00/MT4.00      J NHP2-8-.594-CS    I LINE&#xb9; 2RDS-008-81-2 HTS: 2,4        /SO          2 i na /na                  I I PIPE/TEE                            IC-F-2    i na  i VOL/UT6.O2 2RDS-65-00-FM002        i QISO  65-00-1      or  DMG&#xb9; na  in /C5.51    inone  )
SUR/PT3.00/HT4.00    /
NHP2-8-.594-CS    I LINE  2RDS  08 75    NTS          /so          2  i na  /na I TEE/PIPE                            IC-F-2  I  na  I VOL/UT6.02          I 2RDS-65-00-FM003        i QISO 65-00-1        or  DMG&#xb9; na  in /C5.51  irO    i SUR/PT3.00/N'I4.00 i HHP2-8-.594-CS    I LINE&#xb9; 2RDS-008.81-2    NTS:  2,5    ISD          2  i na /na              i Sc10 I PIPE/TEE                            iC-F-2  i na    i VOL/UT6.O2 2RDS-65-00-FM004        i QISO  65.00-1      or DMG&#xb9; na    in iC5.51  inone i SUR/PT3.00/HT4.00      i NNP2-8-.594.CS    I LINE&#xb9; 2ROS-008-81-2 NTS: 2,5        ISD      (  2  / na/na I PIPE/TEE                            IC.F-2  I  na  I VOL/UT6.02          I 2RDS-65-00-FM005        (
QISO  65-00-1      or DMG&#xb9; na    in /C5.51  inone  i SUR/PT3.00/NT4.00    i NMP2-8-.594-CS    J LINE&#xb9; 2RDS.008-76-2 NTS: 2,5        iSO          2  i na /na              I I PIPE/TEE                            IC-F-2  / na    i VOL/UT6.O2 2ROS-65.00-FM006        J QISO 65-00-1        or  DMG&#xb9; na . in /C5.51  (none i SUR/PT3.00/HT4.00      i NNP2-8-.594-CS      LIHE&#xb9; 2RDS-008-81-2    HTS:  2,5    (SD          2 i na /na I PIPE/TEE                            IC-F-2  I  na  I VOL/UT6.02          I 2RDS-65-00-FM007        i QISO 65-00-1        or  DMG&#xb9; na  in iC5.51  Inone  I SUR/PT3.00/NT4.00    I HHP2-8-.594-CS    I LINE&#xb9; 2RDS-008-81-2    HTS:  2(5    )SO          2  J na /na I PIPE/TEE                            IC-F-2  I  na  I VOL/UT6.02          I 2RDS-65 00-FM008        i QISO 65-00-1        or  DMG&#xb9; na  in iC5.51  /none  / SUR/Pl'3.00/HT4.00 i NNP2-8-.594.CS      LIHE&#xb9; 2RDS-008-78-2    NTS:  2,5    (SO          2  ( na  /na I PIPE/TEE                            IC-F-2  J na  i VOL/UT6.02 2RDS-65-00-FM009        i QISO 65.00-1      or DMG&#xb9; na    in tC5.51  IID    I SUR/PT3.00/NT4.00    I NNP2-8-.594-CS    I LIHE&#xb9; 2RDS-008-79-2 NTS: 2,5        /SO          2  i na  /na              (Sclo
 
NIAGARA HOHAMK POMER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2        2 of 23 NHP2-ISI-006) REV. 1, CH-000                                          SECOND TEH YEAR INSERVICE INSPECTION      (ISI) INTERVAL PLAN Change date:    07/28/1999                                                                APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE                iPERIDO  1                        REHARKS EXAHINATION IDEHI'IFIER i ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  iITEH  &#xb9; iFREQYi EX2/NDE PROCEDURE    iPERIOO 2 i USE CAL BLK    &#xb9; I LINE HO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  PIPE/TEE                              IC-F-2  i na    i  VOL/UT6.02 2RDS-65-00-FM010          i QISO 65-00-1        or DUG&#xb9; na    in  /C5.51  inone i SUR/PT3.00/HT4.00    i NHP2-8-.594-CS      I  LINE&#xb9; 2RDS.008-81-2 NTS: 2)5          iSO          2  /  na  /na I  PIPE/TEE                              IC-F-2          i VOL/UT6.O2 2RDS-65-00.FM011          i QISO 65-00-1          or  DMG&#xb9; na  in  iC5.51  inone i SUR/PT3.00/HT4.00      i HHP2-8-.594-CS      I  LINE&#xb9; 2RDS-008-80-2    NTS: 2,5      iSO          2    i na  /na I  PIPE/ELB                              IC-F-2  I  na    I VOL/UT6.02          I 2RDS-65-00-FM012          i QISO 65-00-1        or  DMG&#xb9; na  in  (C5.51  )none    / SUR/PT3.00/HT4.00  (
HHP2-8-.594-CS      I  LINE&#xb9; 2RDS-008-81-2    NTS: 2,4      iSO          2    [ na /na              I I PIPE/ELB                              IC-F-2  /  na    i VOL/UT6.02 2RDS-65-00-FM013            i QISO 65-00-1        or  DMG&#xb9; na  in  JC5.51  /none    i SUR/PT3.00/HT4.00  i NHP2-8-.594-CS        I LINE&#xb9; 2RDS-008-81-2    NTS: 2,4      iSO          2    J na /na I PIPE/ELB                              IC-F-2  i na    i VOL/UT6.02 2ROS-65-00-FM014            i QISO 65-00-1        or  DMG&#xb9; na  in  iC5.51  inone i SUR/PT3.00/HT4.00 i NHP2-8-.594-CS          LINE&#xb9; 2RDS-008-81-2    HTS: 2,6      iSO          2    i na  /na i PIPE/ELB                              IC-F-2  i na    i voL/UT6.02          i  sc7 2RDS-65-00-FM015            i QISO  65-00-2        or DUG&#xb9; na  .in  iC5 51
                                                                        ~    IIO      I SUR/PT3.00/HT4.00  I NHP2 ~ 594.CS        LINE&#xb9;  2RDS-008-66-2    HTS: 2,4      JSD          2    i na  /na I TEE/PIPE                              IC-F-2  i na    i VOL/UT6.02 2RDS-65.00.FM016            i QISO 65-00-2        or DMG&#xb9; na    in  iC5.51  )none    ) SUR/PT3.00/HT4.00  i NHP2-8-.594-CS        I LINE&#xb9; 2RDS-008-66-2 HTS: 2,5          ISD          2    i na /na I PIPE/TEE                              IC-F-2  i na    i VOL/UT6.02 2RDS-65-00-FM017            )
QISO 65-00-2        or DMG&#xb9; na    in  iC5.51  Inone I SUR/PT3 00/MT4 00      I NHP2-8-.594-CS          LINE&#xb9; 2RDS-008-72-2 NTS: 2,5          [SO          2    i na/na I PIPE/TEE                              IC-F-2    i na    i VOL/UT6.02 2RDS-65.00-FM018            i QISO  65-00-2        or DMG&#xb9; na    in (C5.51    Inone  I SUR/PT3.00/HT4.00  I NHP2-8-.594-CS        I LINE&#xb9; 2ROS-008-71-2 NTS: 2,5          iSO          2    J na /na
 
NIAGARA NOHAMK POMER CORPORATION        -      ILE POINT NUCLEAR STATION    - UHIT 2        3 of 23 HNP2-ISI-006, REV. 1, CN-000                                        SECOHD TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/28/1999                                                                APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL REO    i DESCRIPTION OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE            iPERIOO  1                          RENARKS EXANIHATION IDENTIFIER I ITS ISO LOCATORi CONPONEHT DMG      &#xb9;i I ITEN    &#xb9; IFREOYI EX2/HDE PROCEDURE    IPERIOO 2 USE CAL BLK  &#xb9; I  LIHE  HO  AHD HOlES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3            I i TEE/PIPE IC-F-2      J na  )
VOL/UT6.02 2RDS-65-00-FM019A        i QISO  65-00-2      or DMG&#xb9; na  in iC5 ~ 51    inone i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS      i  LINE&#xb9; 2RDS.008.66.2 HTS: 2,5        iSO            2  i na  /na I  PIPE/TEE                            IC-F-2      i na    i VOL/UT6.02 2RDS.65.00-FM020          i QISO  65-00-2      or DIIG&#xb9; na  in iC5.51      )none    i SUR/PT3.00/HT4.00 i NNP2-8-.594-CS      I  LINE&#xb9; 2RDS-008-70-2 HTS: 2,5        /SO            2    i na /na            I I  PIPE/TEE                            IC-F-2      i na    i VOL/UT6.02 2RDS-65-00.FM021          i QISO 65-00-2      or DMG&#xb9; na  in iC5.51      inone    [ SUR/PT3.00/NT4.00  i NNP2-8-.594-CS      i  LINE&#xb9; 2RDS-008-69-2 HTS: 2,5        iso            2    / na/na              I I  TEE/PIPE                            IC-F-2      i na    i VOL/UT6.02 2RDS-65.00-FM022          )  QISO  65-00-2      or DMG&#xb9; na  in iC5.51      inone    i SUR/PT3.00/NT4.00  i HNP2-8..594-CS      )
LINE&#xb9; 2RDS-008-66-2 NI'S: 2,5      /SO            2    i na/na              I I PIPE/TEE                            IC-F-2      i na    i VOL/UT6.O2 2RDS-65-00-FM023          i QISO  65-00-2      or DMG&#xb9; na  in /C5.51      Inone    I SUR/PT3.00/NT4.00  )
NNP2-8-.594-CS      I LINE&#xb9; 2RDS.008-68-2 NTS: 2,5        /so            2    f na /na              I I PIPE/TEE                            IC-F-2      i na    i VOL/UT6.O2 2RDS-65-00.FM024          i QISO  65-00-2      or OMG&#xb9; na .in iC5.51        inone  i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS      i LINE&#xb9; 2RDS-008-67-2 HTS: 2,5        iSO            2    i na  /na I PIPE/ELB                            IC-F-2      i na    i VOL/UT6.02 2RDS-65-00-FM025          ) QISO 65-00-2      or DMG&#xb9; na  in  iC5 ~ 51    inone i SUR/PT3.00/NT4.00    (
HNP2-8-.594.CS      i LINE&#xb9; 2RDS-008.66-2 NTS: 2,4        iSO            2 i na /na I PIPE/ELB                            IC-F-2      / na    / VOL/UT6.02 2RDS-65-00-FM026          i QISO 65-00-2        or DMG&#xb9; na  in )C5.51      (none i SUR/PT3.00/NT4.00    i HNP2-8-.594-CS      I LIHE&#xb9; 2RDS-008-66-2 HTS: 2,4        iSO            2 i na /na I PIPE/PIPE                            (C-F-2      ( na    ( VOL/UT6.02 2RDS-65-00-FM027          i QISO 65-00-2        or  DMG&#xb9; na  in ic5.51      inone i SUR/PT3.00/NT4.00 i NNP2-8-.594-CS      I LINE&#xb9; 2RDS.008-66-2    HTS: 2        inone          2    ( na  /na
 
NIAGARA NONA'MK POWER CORPORATION -                ILE POINT NUCLEAR STATION    - UNIT 2        4 of 23 NKP2-IS1-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTIOH          (ISI)  INTERVAL PLAN Change  date:  07/28/1999                                                                  APPENDIX  G - RDS SYSTEN (sorted by Examination Identifier)
ND INTVL REL REQ      DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE            IPERIOO  1  I                        RENARKS I
EXANINATION IDENTIFIER  )
ITS ISO LOCATOR, COHPONENT  DWG &#xb9;,  iITEH    &#xb9; iFREOYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK  &#xb9; i LINE NO. AHD NOTES, AS APPLICABLE      DESELECT  JCLASSi EX3/NDE PROCEDURE iPERIOD 3 I  ELB/ELB                              IC-F-2    i na    i  VOL/UT6.02 2RDS-65-00-FW028        i QISO 65-00-2        or DWG&#xb9; na  in iC5.51    inone    )
SUR/PT3.00/NT4.00  )
NNP2-8-.594-CS    )
LINE&#xb9; 2RDS-008.66-2 NTS: 4,6        iSD            2    i na /na I IHTEG ATT                              )c-c      I  na    I  SUR/PT3.00/NT4.00  I 2RDS-65 IAll01B-12  i QISO    65-00-2        or DMG&#xb9; na  in iC3.20    iID      i  na /na              I i  LINE&#xb9;  2RDS-008-66-2  NTS: 1,2      INS            2    /  na/na              I INTEG ATT                            ic-c      I  na    I  SUR/PT3.00/HT4.00  I 2RDS.65 IAM018-13    i QISO    65-00-2        or DMG&#xb9; na  in lC3.20    KAID      i  na /na              I i  LINE&#xb9; 2RDS-008 66-2 HTS: 2,3        INS            2    i  na/na              I I  IHTEG ATT                            ic-c      i na      J SUR/PT3.00/HT4.00  J 2RDS-65 IAM01B-14    / QISO  65-00-2        or DWG&#xb9; na  in iC3.20    iID      [  na /na              I I  LINE&#xb9; 2RDS-008-66-2 NTS: 2I3        JNS            2    i  na /na              I I  IHTEG ATT                            ic-c      i na      i  SUR/PT3.00/NT4.00  i 2RDS-65.00- IAM01B-15    J QISO 65-00-2        or DWG&#xb9; na  in iC3.20    [ID      i na  /na              I I  LINE&#xb9;  2RDS-008-66-2  HTS: 2,3      iNS            2    J na/na              I I  IHTEG ATT                            ic-c      i na      i SUR/PT3 F 00/HT4.00 i 2RDS-65 IAM01B-16    i  QISO 65-00-2        or DMG&#xb9; na  .in )C3.20    iID      i na /na              I I  LINE&#xb9; 2RDS-008-66.2 NTS: 2,3        INS            2    i  na/na              I I  INTEG ATT                            ic-c      I  na    I  SUR/PT3.00/NT4.00  I 2RDS-65 IAM01B-17    i QISO 65-00-2        or DMG&#xb9; na  in iC3.20      ilD      i na  /na i LINE&#xb9; 2RDS-008-66-2 HTS: 2,3          /HS            2    (  na/na              I I  IHTEG ATT                            ic-c      I na    I  SUR/PT3.00/HT4.00  I 2RDS.65-00-IAM01B-18      i QISO 65-00-2        or DMG&#xb9; na  in  iC3 ~ 20  iID      i na  /na i LINE&#xb9; 2RDS-008-66-2 NTS: 2,3          /HS            2    i  na/na              I INTEG ATT                            ic-c      I na      i SUR/PT3.00/HT4.00  I 2RDS-65 IAM018-19      i QISO  65-00-2        or DMG&#xb9; na  in iC3.20      )ID      ) na /na i LINE&#xb9; 2RDS.008-66-2 HTS: 2,3          IHS            2    J na/na              I
 
NIAGARA MOHAMK POMER CORPORATION          -      MILE POINT NUCLEAR STATION - UNIT 2        5 of 23 HMP2-ISI-006, REV. 1, CH-000                                        SECOND TEH YEAR IHSERVICE INSPECTION        (ISI) INTERVAL PLAN Change  date:  07/28/1999                                                                  APPENDIX G - RDS SYSTEM (sorted by Examination Identif ier) 2HD IHTVL REL REQ    i DESCRIPTION OF ITEM TO BE EXAMIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE            iPERIOD  1                        REMARKS EXAMINATION IDENTIFIER J ITS ISO LOCATOR, COMPONENT OMG        &#xb9;,  )ITEM  &#xb9; iFREOY) EX2/NDE PROCEDURE      iPERIOO 2 USE CAL BLK  &#xb9; I  LINE HO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE            PROCEDURE IPERIOO 3 I I  IHTEG ATT                            ic-C    i na      I  SUR/PT3.00/MT4.00  I 2RDS-65 IAM03A-12    i QISO 65-00-1        or DMG&#xb9; na  in iC3.20    ilO      i na  /na na                      LINE&#xb9; 2RDS-008-80-2 NTS: 2,3          iNS          2    t  na /na            I I INTEG ATT                              )c-c    i na      I  SUR/PT3.00/MT4.00  I 2RDS-65-00-IAM03A-13      / QISO 65-00-1        or DMG&#xb9; na  in iC3.20    iiD        i na  /na            I i  LINE&#xb9; 2RDS-008.80-2 HTS: 2,3          INS          2    i na /na            I I  INTEG ATT                            ic-c    /  na    I SUR/PT3.00/MT4.00  I 2RDS-65.00- I AM03A-14    i QISO  65-00-1        or DMG&#xb9; na  in iC3.20    i ID      i na /na            I i  LINE&#xb9;  2RDS-008-80-2  NTS: 2,3      iNS      I    2    i na /na            I I  INTEG ATT                            ic-c    i na      i SUR/PT3.00/MT4.00  i 2RDS-65-00-IAM03A-15      i QISO  65-00-1        or DMG&#xb9; na  in iC3.20    /ID        i na /na              I I LINE&#xb9; 2RDS-008-80-2 NTS: 2,3          INS      I    2    i na  /na            I I INTEG ATT                            ic-c    j na      I SUR/PT3.00/MT4.00  I 2RDS-65 IAM03A-16      i QISO  65-00-1        or DMG&#xb9; na  in  JC3.20  (IO        i na /na              I na                  I LIHE&#xb9; 2RDS-008-80-2 HTS: 2,3          JNS      I    2    i na /na              I I IHTEG ATT                            (c-c    i na      I SUR/PT3.00/MT4.00  I 2RDS-65 IAM03A-17      i QISO 65-00-1        or DMG&#xb9; na . in [C3.20  iiD        i na  /na            I I LINE&#xb9;  2RDS-008-80-2  NTS: 2,3      INS          2    i na  /na            I I  INTEG ATT                            ic-c    (
na    I SUR/PT3.00/MT4.00  I 2RDS-65-00.IAM03A-18      i QISO 65-00-1        or DMG&#xb9; na    in ic3.20  (  ID      J na  /na            I LINE&#xb9; 2RDS-008-80-2 NTS: 2,3          IHS      I    2    i na /na              I I  IHTEG ATT                            [c-c    J na    I SUR/PT3.00/MT4.00  I 2RDS-65-00-IAM03A-19      i QISO 65-00-1        or DMG&#xb9; na    in iC3.20  I  ID      / na  /na I LINE&#xb9; 2RDS-008-80-2 HTS: 2,3          INS            2    i na /na              I I  INTEG ATT                            ic-c    J na    i SUR/PT3.00/MT4.00 i 2RDS-65-00.IAM048-12      i QISO 65-00-2        or DMG&#xb9; na    in iC3.20  ilO        i na  /na            I LINE&#xb9; 2RDS-008-72-2 HTS: 2,3          iNS      I    2    i na  /na            I
 
NIAGARA MOHAWK POWER CORPORATION -                MILE POINT NUCLEAR STATION - UHIT 2        6 of 23 SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN APPENDIX  G - RDS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED      DESCRIPTIOH OF ITEN TO BE EXAHINED)CATGRY (IGSCC( EX1/HDE PROCEDURE              (PERIOD  1                        REHARKS
(
EXAHIHATIOH IDENTIFIER  I  ITS ISO LOCATOR,  COHPONEHT DMG    &#xb9;,  IITEH  &#xb9; IFREQYI EX2/NDE PROCEDURE        IPERIOO 2  I USE CAL BLK  &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE            IPERIOO 3  I I  INTEG ATT                              ic-c      i na    i SUR/PT3.00/NT4.00    i 2RDS-65.00- IAW048-13    (
QISO  65-00-2        or DllG&#xb9; na  in  (C3.20    /ID      / na /na i  LIHE&#xb9;  2RDS-008-72-2  HTS: 2,3        /HS          2    /  na/na                I INTEG ATT                              ic-c      (  na    f  SUR/PT3.00/NT4.00    (
2RDS-65 IAW048-14    J QISO  65-00-2        or DMG&#xb9; na    in  /C3.20    ]ID      (
na  /na f  LINE&#xb9; 2RDS-008-72-2 NTS: 2,3          INS          2    /  na/na I IHTEG ATT                                (c-c      I  na    I SUR/PT      /NT  00 I 2RDS-65-00.IAW048-15    /  QISO 65-00-2        or DMG&#xb9; na    in  IC3.20    I ID    I na  /na              I I  LINE&#xb9;  2RDS-008-72-2  NTS: 2 3        /NS      ~
2    ~
na  /na I INTEG ATT                                ic-c      I  na    I  SUR/PT3.00/NT4.00    I 2RDS-65 IAW04B-16    )
QISO  65-00-2        or DMG&#xb9; na    in IC3.20    /ID      J na /na              I I  LINE&#xb9; 2RDS-008-72-2 NTS: 2,3          IHS          2    /  na/na                I I
IHTEG ATT                              ic-c      I  na    I  SUR/PT3.00/NT4.00    I 2RDS-65 IAW04B-17    f QISO  65-00-2        or  O'MG&#xb9; na  in /C3.20    /ID      /  na /na LINE&#xb9; 2RDS-008-72-2 NTS: 2,3          IHS          2    /  na/na                I I INTEG ATT ic-c      I  na    I SUR/PT      /NT  00  I 2RDS-65 IAW04B-18    (
QISO  65-00-2        or DWG&#xb9; na  .in  (C3.20    ]ID      J na /na I  LINE&#xb9; 2RDS-008-72-2 NTS: 2,3          INS            2  /  na/na I IHTEG ATT                              Jc-c      I na    I SUR/PT3.00/HT4.00    I 2RDS.65 IAW04B-19      / QISO  65-00-2        or DWG&#xb9; na    in  [C3.20    /ID      / na /na              I i LINE&#xb9; 2RDS.008-72-2 NTS: 2,3            IHS          2    [ na/na                I I  IHTEG ATT                              ic-c      I na    I SUR/PT      /NT4 00  I 2RDS-65 I AM06A-12    J QISO  65-00-'I      or DWG&#xb9; na    in /C3.20    /ID      / na  /na              I I LINE&#xb9; 2RDS 008 79 2 NTS'        3      INS          2    / na/na                I I  INTEG ATT                              ic-c      I na    I SUR/PT3.00/HT4.00    I 2RDS.65-00-IAW06A-13      / QISO 65-00-1        or  DWG&#xb9; na    in /C3.20    [ID      J na  /na              I na                  I  LINE&#xb9; 2RDS-008-79-2    HTS: 2 3        /NS          2    / na/na                I
 
HIAGARA HOHAMK POWER CORPORATION        -      NILE POINT HUCLEAR STATION - UNIT 2        7 of 23 NHP2-ISI-006, REV. 1( CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTIOH        (ISI)  INTERVAL PLAN Change date:    07/28/1999                                                                    APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REQ ( DESCRIPTIOH OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE                (PERIOD  1                        REHARKS EXAHIHATIOH IDENTIFIER    (
ITS ISO LOCATOR, CDHPONENT DMG    &#xb9;,  (ITEN  &#xb9; (FREQY( EX2/HOE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; (
LINE NO. AND NOTES, AS APPLICABLE (SELECT      (CLASS( EX3/HDE PROCEDURE      (PERIOD 3  (
I INTEG ATT                                (C-C    I  na    I  SUR/PT3.00/HT4.00  I 2RD S-65 I AM06A-14  (
Qrso 65-00-1        or  DMG&#xb9; na  in (C3.20    (ID      (
na  /na
(
LINE&#xb9; 2RDS-008-79-2    HTS: 2 3      (NS          2    (
na/na I  IHTEG ATT                              (C-C    (
na    (
SUR/PT3.00/HT4.00  (
2RDS  65-00-IAl$6A-15    (
QISO 65-00-1        or DMG&#xb9; na    in (C3.20    (IO      (.na /na
(  LINE&#xb9; 2RDS-008-79-2 HTS: 2,3          IHS          2    (
na /na              I I  IHTEG ATT                              (C-C    (
na    I SUR/PT3.00/HT4.00    I 2RDS-65 IAW06A-16      (
QISO  65-00-1        or DWG&#xb9; na    in (C3.20    (ro      (
na  /na            I I  LIHE&#xb9; 2ROS-008-79-2 HTS: 2,3          (NS          2    (
na /na I INTEG ATT                              (C-C    (
na    (
SUR/PT3.00/NT4.00    (
2RDS-65 IAM06A-17      (  QISO  65-00-1        or DMG&#xb9; na  in (C3.20    (IO      ( na /na              I na                  I  LINE&#xb9; 2RDS-008-79-2 NTS: 2,3          (HS          2    ( na /na              I I  INTEG ATT                              (C-C    (
na    I SUR/PT3.00/HT4 F 00  I 2RDS-65 IAM06A-18      (
QISO  65-00-1        or DMG&#xb9; na  in (C3.20    (ro      ( na  /na            I na                  I  LINE&#xb9; 2RDS-008-79-2 NTS: 2,3          INS      I    2    ( na /na              I I INTEG ATT                              (C-C    (  na    I  SUR/PT3 00/MT4 0    I 2RDS.65 I AM06A-19    (  QISO  65.00-1        or DMG&#xb9; na  .in  (C3.20  (IO      (
na /na              I na                  I  LINE&#xb9; 2RDS-008-79-2 HTS: 2,3          IHS          2    (
na  /na            I I INTEG ATT                              (C-C    (
na    (
SUR/PT3.00/HT4.00 2RDS-65-00-IAW078-12      (
QISO  65-00-2        or DWG&#xb9; na  in (C3.20    (ro      (
na  /na            I I  LINE&#xb9; 2RDS-008-71-2 N'TS: 2            INS          2    (
na  /na            I I  INTEG ATT                            (C-C      (
na    I  SUR/PT3.00/NT4.00  I 2RDS-65-00. IAW078-13      (
QISO  65-00-2        or  DWG&#xb9; na  in (C3.20    (IO      (
na  /na            I I  LIHE&#xb9;  2RDS  008 71 2    HT '  3      (HS      I  2    (  na /na              I I  IHTEG ATT                            (C-C      (
na    I  SUR/PT3.00/HT4.00  I 2RDS.65-00 IAM078-14      (
QISO  65-00-2        or  DMG&#xb9; na  in (C3.20    (ro      (  na /na              I I LINE&#xb9; 2ROS-008-71-2      NTS: 2,3      IHS          2    (  na /na              I
 
NIAGARA MOHAMK POWER CORPORATION        -      NILE POINT NUCLEAR STATION - UNIT 2        8 of 23 NNP2-ISI-006, REV. 1, CH.OOO                                          SECOHD TEH YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                    APPENDIX G -  RDS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOD  1  I                    REHARKS EXAHINATION IDENT I F IER    ITS ISO LOCATOR, CONPOHEHT DWG      &#xb9;,  iITEH  &#xb9; iFREOYi EX2/NDE PROCEDURE      iPERIOO 2  i.
USE CAL BLK  &#xb9; [  LINE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3              I I  INTEG ATT                              ic-c    / na    /  SUR/PT3.00/NT4.00  /
2RDS-65 IAW078-15    (
QISO  65-00-2        or DMG&#xb9; na    in /C3.20    /ID    / na /na I  LINE&#xb9; 2RDS-008-71-2 HTS: 2,3            iHS          2  ) na /na              I I INTEG ATT                                ic-c    I na    I SUR/PT3.00/NT4.00  I 2RDS-65-00-IAW07B-16      )
QISO  65-00-2        or DWG&#xb9; na    in )C3.20    ]ID      J na  /na i  LINE&#xb9;  2RDS-008-71-2    NTS: 2,3        )HS          2    / na/na              I I  INTEG ATT                              ic-c    I na    I SUR/PT3.00/HT4.00    I 2RDS-65 IAW078-17    /  QISO  65-00-2        or  DMG&#xb9; na    in /C3.20    /ID      J na /na              I I  LINE&#xb9; 2RDS-008-71-2    Nl'S: 2,3      /NS          2    / na/na                I I  INTEG ATT                              Jc-c    I na    I SUR/PI3.00/HI4 ~ 00  I 2RDS-65-00-IAl$ 7B-18    / QISO  65-00-2        or DMG&#xb9; na    in /C3.20    /10      / na  /na
                          /  LIHE&#xb9; 2RDS-008-71-2 HTS: 2,3            iNS          2    / na /na              I I  INTEG ATT                              ic-c    I na    I SUR/PT3.00/NT4.00    I 2RDS-65. 00- I AM078-19  f  QISO  65-00.2        or  DMG&#xb9; na    in /C3.20    ]ID      f na  /na I  LINE&#xb9; 2RDS-008-71-2    NTS:  2I3      /NS          2    / na /na              I I  IHTEG ATT                              ic-c    I na    I SUR/PT3.00/HT4.00    I 2RDS-65 IAM09A-16    /  QISO  65-00-1        or DMG&#xb9; na  . in /C3.20    ]ID      J na  /na I  LINE&#xb9; 2RDS-008-78.2 HTS: 2,3            INS          2    J na /na              I I  INTEG ATT                              Jc-c    I na    I SUR/PT3.00/HT4.00    I 2RDS-65 IAW09A-17    /  QISO  65-00-1        or DWG&#xb9; na    in  JC3.20  [ID      [ na  /na              I
                          )
LINE&#xb9; 2RDS-008-78-2 NTS: 2,3            /NS          2    / na/na                I I INTEG ATT                              ic-c    I na    I SUR/PT3.00/NT4.00    I 2RDS-65-00-IAl$ 9A-18      (
QISO  65-00-1        or DMG&#xb9; na    in /C3.20    ]ID      f na  /na LINE&#xb9; 2RDS-008-78-2 HTS: 2,3            INS          2    / na /na              I I  INTEG ATT                              ic-c    I na    I SUR/PT3.00/NT4 F 00  I 2RDS-65 IAM09A-19      )
QISO  65-00-1        or DWG&#xb9; na      in /C3.20  ]ID      f na  /na I LINE&#xb9; 2RDS-008-78-2 HTS: 2,3            /NS          2    / na/na                I
 
0 NIAGARA NOHAMK PDMER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        9 of 23 HHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTIOH        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                      APPENDIX G - RDS SYSTEH (sorted by Examination Identifier)
HD IHTVL REL REQ I DESCRIPTIOH OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD 1                                        RENARKS EXANIHATIOH IDENTIFIER f ITS ISO LOCATOR, CONPOHEHT DMG        &#xb9;,  ]ITEN    &#xb9; JFREQY[ EX2/HDE PROCEDURE )PERIOD 2 USE CAL BLK &#xb9; I LINE HO    AND NOTESi AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3              I IHTEG ATT                              iC-C      I  na    I SUR/PT3  00/HT4 00 I 2RDS-65 IAM09A-20  (
QISO  65-00-1        or DMG&#xb9; na    in  /C3 ~ 20  /ID      /  na  /na            I na                I  LINE&#xb9; 2RDS-008-78-2 NTS: 2 3          /NS            2    /  na/na              I I
IN'TEG ATT                            Jc-c      I  na    I  SUR/PT3.00/HT4.00  I 2RDS-65 IAM09A-21  )  QISO  65-00-1        or DMG&#xb9; na    In /C3.20      ]ID      /  na  /na            I
                        )
LINE&#xb9; 2RDS-008-78-2 NTS: 2(3          /NS            2    /  na/na              I I  IHTEG ATT                              iC-C      J na    (
SUR/PT3.00/HT4.00  [
2RDS.65-00-1AM09A-22    f  QISO  65-00-1        or DMG&#xb9; na    in /C3.20      (ID      J na  /na            I i  LINE&#xb9;  2RDS.008-78-2  HTS: 2,3        /HS            2    J na /na INTEG ATT                              iC-C      J na    [  SUR/PT3.00/NT4.00  J 2RDS-65.00. IAM09A-23  J QISO  65-00-1        or DMS&#xb9; na    in /C3.20      [ID      f  na /na              I I  LINE&#xb9; 2RDS.008-78-2 NTS: 2,3          JNS            2    f  na/na              I I  INTEG ATT                              iC-C      f  na    f  SUR/PT3.00/HT4.00  f 2RDS-65-00-IA'M09A-24    (
QISO  65-00-1        or DMS&#xb9; na    in /C3.20    [ID                            I I  LINE&#xb9; 2RDS-008-78-2 NTS: 2,3          INS            2    )
na/na              I INTEG ATT                              (c-c      I  na    I SUR/PT3.00/HT4.00  I 2RDS-65-00-IAM09A-25    / QISO  65-00-1        or DMG&#xb9; na  . in /C3.20    /ID      f na  /na            I i  LINE&#xb9; 2RDS-008-78-2 NTS: 2,3          iNS            2    / na/na              I INTEG ATT                              iC-C      I na    I SUR/PT3  00/HT4 00  I 2RDS-65-00-IAM10B-16    )
QISO  65-00-2        or  DMG&#xb9; na    in /C3.20      ]ID      ( na /na              I I  LIHE&#xb9; 2RDS-008-70-2    HTS: 2,3        /HS          2    / na /na              I I  IHTEG ATT                              iC-C      )
na    J SUR/PT3.00/HT4.00  J 2RDS-65 IAM10B-17    /  QISO 65-00-2        or DMG&#xb9; na    in  JC3.20    /ID      J na  /na na                I  LINE&#xb9; 2RDS-008-70-2 NTS: 2,3            INS          2    / na /na              I I INTEG ATT                                iC-C      J na    [ SUR/PT3.00/NT4.00    f 2RDS-65 IAM10B-18    [ QISO 65-00-2        or DMG&#xb9; na    in  [C3 ~ 20  )ID      f na /na i LINE&#xb9; 2RDS-008-70-2 NTS: 2,3            IHS        I  2    I na /na              I
 
N IAGARA HOHAMK POMER CORPORATION
                                                                                                          -        ILE POINT NUCLEAR STATION - UNIT 2        10 of 23 HHP2-ISI-006, REV. 1, CH-000                                              SECOND TEH YEAR INSERVICE INSPECTION              (ISI) INTERVAL PLAN Change date: 07/28/1999                                                                            APPENDIX G - RDS SYSTEH (sorted by Exemination Identifier) 2HD IHTVL REL REQ [ DESCRIPTIOH OF ITEN TO BE EXAHINEO[CATGRY [ IGSCC[ EX1/NDE PROCEDURE                      )PERIOD    1                      REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG          &#xb9;,  i ITEH  &#xb9; iFREGYi EX2/HDE PROCEDURE        (PERIOD 2 i USE CAL BLK  &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE                  PROCEDURE  IPERIOD 3 I INTEG ATT                                IC C      I  na    I  SUR/PT3 00/HT        I 2RDS-65-00-IAM108-19      )
QISO  65-00-2        or  DMG&#xb9; na    in /C3.20      (ID'          na  /na na                  I  LINE&#xb9; 2RDS-008-70-2      NTS: 2(3        )HS        J 2    [  na /na IHTEG ATT                                IC  C      I  na    I  SUR/PT '00/HT4      I I
2ROS-65. 00- I AMTOB-20  J QISO  65-00-2        or DMG&#xb9; na    in ]C3.20      )ID      )
na  /na
                          )  LINE&#xb9; 2RDS-008.70.2 HTS: 2,3            [NS        f    2    /  na /na              I I  IHTEG ATT                                JC-C      J na    J SUR/PT3.00/HT4.00    J 2RDS-65 I A'M10B-21  J QISO  65-00-2        or  DMG&#xb9; na    in  JC3.20    [ID      J na  /na              I I  LINE&#xb9; 2RDS-008-70-2      NTS: 2,3        )NS        /    2    /  na/na                I I  IHTEG ATT                                IC-C      I  na    I  SUR/PT3.00/NT4.00    I 2ROS-65-00. I A'MIOB-22  )
QISO  65-00-2        or DMG&#xb9; na    in [C3.20      [ID      f  na /na LINE&#xb9; 2RDS-008-70-2 HTS: 2,3            /HS        )    2    /  na/na                I I  INTEG ATT                                IC-C        I  na    I  SUR/PT3.00/HT4.00    I 2ROS-65-00-IA'M108-23      f  QISO  65-00-2        or DMG&#xb9; na    in /C3.20      /ID      /  na  /na
(
LINE&#xb9;  2RDS-008-70-2    NTS: 2,3        /NS        /  2    /  na /na              I I  INTEG ATT                                fC-C      J na    )
SUR/PT3.00/HT4.00    JEX6 2RDS-65-00-IAM12A-20      [  QISO 65-00-1          or DMG&#xb9; na    .in  [C3.20 [ID          ] na  /na I  LINE&#xb9;  2RDS-008-77-2    HTS: 2,3        JHandatef      2    f na  /na              I I  INTEG ATT                                )C-C      )  na    ]  SUR/PT3.00/HT4.00    JEX6 2RDS-65 IAM12A-21      (
QISO 65-00-1          or DMG&#xb9; na      in  IC3 ~ 20  IID      I na  /na I LINE&#xb9; 2RDS 008 77 2 NTS'i3                /Handatef      2    f na  /na              I I  IHTEG ATT                                IC-C        I na    I  SUR/PT3.00/HT4.00    IEX6 2RDS-65.00-IAM12A-22        f QISO  65.00-1        or DMG&#xb9; na      in (C3.20      ]ID      [  na  /na              I I  LIHE&#xb9; 2RDS-008-77-2 NTS: 2,3            (Handate/      2    /  na /na                I I
IN'TEG ATT                              IC C        I na    I  SUR/PT3.00/HT4.00      IEX6 2RDS-65-00-IAM12A-23        ] QISO  65-00-1        or DMG&#xb9; na      in  JC3.20      ]ID      J na  /na              I na                    I  LINE&#xb9; 2RDS-008-77-2 NTS: 2,3            ]Handate[      2    [ na /na                I
 
NIAGARA NOHAWK POWER CORPORATION          -      NILE POINT NUCLEAR STATION - UNIT 2        11 of 23 HNP2-ISI-006( REV. 1, CH.000                                          SECOHD TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/28/1999                                                                  APPENDIX  G - RDS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL REa      DESCRIPTION OF ITEN TO BE EXANINEDiCATGRY ilGSCC) EX1/HDE PROCEDURE IPERIOO              1  I                    RENARKS I
EXANINATIOH IDENTIFIER  I  ITS ISO LOCATOR'OHPOHEHT OMG ~ IITEN          &#xb9; IFREQYI EX /HDE      PROCEDURE  IPERIOD 2 USE CAL BLK  &#xb9; )  LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE            PROCEDURE  IPERIOD 3 I INTEG ATT                              IC  C    I  na  I  SUR/PT  00/HT4.00 IEX6 2ROS-65-00-IAM12A-24    )
QISO  65-00-1        or  OMG&#xb9; na  in /C3.20    /ID    / na  /na I  LINE&#xb9; 2RDS-008-77-2    NTS: 2 3      /Nandate/    2  / na  /na              I I  INTEG ATT                              IC-C      I  na    I  SUR/PT3.00/NT4.00 IEX6 2RDS-65-00-IAM12A-25    ] QISO 65-00-1        or  DMG&#xb9; na  in IC3.20    IID      I  na /na              I
[  LINE&#xb9; 2RDS-008-77-2    NTS: 2,3      (Nandate/    2    /  na /na              I I IHTEG ATT                                IC-C      I  na    I  SUR/PT3.00/NT4.00    lEX6 2RDS.65-00.IAW12A-26      f  QISO 65-00-1        or DMG&#xb9; na    in  JC3.20    )ID      f  na /na I  LINE&#xb9;  2RDS-008-77-2    NTS: 2,3      /Nandate)    2    J na /na INTEG ATT                              /C-C      f  na    f  SUR/PT3.00/HT4.00    JEX6 2RDS-65-00-IAW12A-27        QISO  65-00-1        or DMG&#xb9; na    in /C3.20    /ID      /  na /na LINE&#xb9; 2RDS-008-77-2 NTS: 2,3          /Nandate/    2    /  na /na              I I  INTEG ATT                            IC C      I  na    I  SUR/PT3.00/NT4.00 (EX6 2RDS-65-00-IAW12A-30      (
QISO 65-00-1        or  DWG&#xb9; na  in (C3.20    JIO      (  na /na I  LIHE&#xb9; 2RDS-008-77-2    NTS: 2,3      /Nandate/    2    /  na /na              I I IHTEG ATT                              )C-C      ]  na    )
SUR/PT3.00/NT4.00 JEX6 2RDS.65 I AW12A-31    [  QISO  65-00-1        or DMG&#xb9; na  .in  /C3.20    [ID    /  na /na
                          /  LINE&#xb9; 2RDS 008-77-2 NTS: 2,3          /HAHDATE/    2    /  na /na              I IHTEG ATT                            /C-C      / na    / SUR/PT3 F 00/NT4.00  /
2RDS-65-00-IA'M13B-20    (
QISO  65-00-2        or DMG&#xb9; na    in /C3.20      /ID      / na /na LINE&#xb9; 2RDS-008-69 2 HTS: 2,3          (NS        i  2    / na/na                I I IHTEG ATT                              IC-C      I na    I SUR/PT3.00/NT4.00    I 2RDS-65 IAW13B-21      )
QISO  65-00-2        or DWG&#xb9; na    in /C3.20      /ID      / na /na              I na                    LINE&#xb9; 2RDS-008.69-2 HTS: 2,3          JHS      f  2    f na/na                I I IHTEG ATT                              IC  C    I M      I SUR/PT3 00/HT4 F 00 I 2RDS.65 IAW13B-22    )
QISO 65-00-2        or DMG&#xb9; na    in  JC3.20    [ID      / na  /na I  LINE&#xb9; 2RDS-008-69-2 NTS: 2,3          JNS      /  2    / na  /na              I
 
NIAGARA HONAMK POMER CORPORATION        -      NILE POINl'UCLEAR STATION - UNIT 2        12 of 23 NHP2-ISI-006, REV. 1( CH-000                                        SECOND TEH YEAR INSERVICE INSPECTION        (ISI) INTERVAL PLAN Change date: 07/28/1999                                                                    APPENDIX G - RDS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REO  (  DESCRIPTION OF ITEN TO BE EXANINED)CATGRY ]IGSCC( EX1/HDE PROCEDURE          (PERIOD  1                      RENARKS EXAHINATIOH IDEHTIFIER    J ITS ISO LOCATOR, COHPOHENT DMG &#xb9;, )ITEN    &#xb9;  JFREOY) EX2/HDE      PROCEDURE [PERIOD 2 [
USE CAL BLK  &#xb9; I  LINE NO. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/HDE            PROCEDURE IPERIDO 3 I I  INTEG ATT                          ic-c      I na    I  SUR/PT3.00/NT4.00  I 2RDS-65-00-IAM13B-23      [ QISO 65-00-2        or DMG&#xb9; na  in /C3.20    ]ID    J na  /na na                  I  LINE&#xb9; 2RDS-008-69-2  HTS: 2,3      iNS          2    /  na/na              I IHTEG ATT                          ic-c      I na    I SUR/PT3.00/HT4.00  I 2RDS-65 IAM13B-24    [  QISO 65-00-2        or DMG&#xb9; na  in JC3.20    /ID      / na  /na I  LINE&#xb9; 2RDS-008-69-2 HTS: 2          (NS          2    / na/na              I I  IHTEG ATT                          ic-C      I na    I SUR/PT3.00/NT4.00  I 2RDS.65 IAM138-25    J QISO 65-00-2        or DMG&#xb9; na  in /C3.20    /ID      / na  /na I  LINE&#xb9; 2RDS.008-69-2 NTS: 2,3        INS          2    / na /na              I I  IHTEG ATT                          Jc-c      / na    )
SUR/PT3.00/HT4.00  /
2RDS-65 IAM13B-26    f  QISO 65-00-2        or OMG&#xb9; na  in JC3.20    /ID      / na  /na            I I  LINE&#xb9; 2RDS-008-69-2 NTS: 2,3        )NS          2    / na/na              I I  IHTEG ATT                          /c-c      I na    I SUR/PT3.00/NT4.00  I 2RDS-65 IAM13B-27    )  QISO 65-00-2        or DMG&#xb9; na  in [C3.20    /ID      / na  /na            I I  LINE&#xb9; 2RDS.008-69-2 NTS: 2,3        iNS          2    / na/na              I I INTEG ATT                            ic-c      / na    / SUR/PT3.00/NT4.00  /
2RD S-65 I AM13B-32    /  QISO 65-00-2        or DMG&#xb9; na  .in /C3.20    /ID      / na  /na I  LIHE&#xb9; 2RDS-008.69-2 HTS: 2,3        IHS            2    / na/na              I I IHTEG ATT                            )C-C      ) na    f SUR/PT3.00/NT4.00  J 2RDS-65-00-IA'M13B-33      (
QISO 65-00-2        or DMG&#xb9; na  in /C3.20    (ID      ( na  /na I  LINE&#xb9; 2RDS.008.69-2 NTS: 2,3        /HS          2    / na/na              I I  IHTEG ATT                            [C-C      / na    / SUR/PT3.00/HT4.00  JEX6 2RDS-65 IAM15A-20A    )
QISO 65-00-1        or  DMG&#xb9; na  in /C3.20    /ID      / na  /na I  LIHE&#xb9; 2RDS-008-76-2    NTS: 2,3      /Mandate/    2    / na /na              I INTEG ATT                            IC-C      I na    I SUR/PT3.00/NT4.00  1EX6 2RDS-65 IAM15A-21A      [ QISO 65-00-1        or  DMG&#xb9; na  in /C3.20    /ID      / na  /na I LINE&#xb9; 2RDS.008-76-2    HTS: 2,3      /Nandate/    2    J na /na              I
 
0 NIAGARA MONANK POHER CORPORATION          -  h    MILE POINT NUCLEAR STATION - UNIT 2        13 of 23 NMP2-IS1-006( REV. 1, CH-000                                        SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:  07/28/1999                                                                  APPENDIX  G - RDS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REO    (
DESCRIPTION OF ITEM TO BE EXAMIHEDJCATGRY )IGSCC) EX1/HDE PROCEDURE            )PERIOD  1                        REMARKS EXAMINATION IDENTIFIER    I  ITS ISO LOCATOR'OMPONENT    DUG &#xb9;n  I ITEM &#xb9;  IFREQYI EX2/NDE PROCEDURE        IPERIOD 2  I USE CAL BLK    I  LINE  NO  AND NOTESi AS APPLICABLE ISELECT    ICLASSI EX /HDE PROCEDURE IPERIOO            I I  INTEG ATT                            /C-C      /  na    I SUR/PT3.00/MT4.00 IEX6 2RDS-65 IAM15A-22A    / QISO  65-00-1        or DUG&#xb9; na  in /C3.20 /ID          / na  /na I  LINE&#xb9; 2RDS-008-76-2 NTS: 2,3        /Mandate/ 2          / na  /na            I INTEG ATT                            )C-C      J na    I SUR/PT3.00/MT4.00 IEX6 2RDS-65-00-IALI15A-23A    )
QISO  65-00-1        or DUG&#xb9; na  in /C3.20    /ID        / na  /na            I I  LINE&#xb9; 2RDS-008-76-2 NTS: 2,3        (Mandate/      2    / na  /na            I I  INTEG ATT                            /C-C      (
na    I SUR/PT3.00/MT4.00 IEX6 2RDS-65 IAW15A-24    / QISO  65-00-1        or DUG&#xb9; na  in /C3.20    /ID        [ na  /na na                  I  LINE&#xb9;  2RDS-008-76-2  HTS: 2,3      /Mandate/      2    / na  /na              I INTEG ATT                            JC-C      /  na    I SUR/PT3.00/MT4.00 lEX6 2RDS-65 IAM15A-25A    )  QISO 65-00-1        or DUG&#xb9; na  in )C3.20 (ID          / na  /na I  LINE&#xb9; 2RDS-008-76-2 NTS: 2,3        ]Mandate) 2          / na  /na              I I  IHTEG ATT                            /C-C      /  na    I SUR/PT      /MT'0    IEX6 2RDS-65 IAHISA-26A    )
QISO  65-00-1        or DUG&#xb9; na  in [C3.20 (ID          ( na  /na na                  (  LINE&#xb9; 2RDS.008-76-2 HTS: 2,3        ]Mandate/      2    )
na /na              I I IHTEG ATT                            /C-C      J na    i SUR/PT3.00/MT4.00    [EX6 2RDS-65 IAW15A-27A    / QISO  65-00-1        or DUG&#xb9; na  .in /C3.20    /IO        / na /na na                  i LINE&#xb9; 2RDS-008-76-2 NTS: 2,3        /Mandate/      2    / na  /na              I I INTEG ATT                            )C-C      /  na    I SUR/PT3.00/MT4.00 IEX6 2RDS-65 IAU15A-30      ) QISO  65-00-1        or DWG&#xb9; na  in /C3.20    /  IO      J na  /na              I I LINE&#xb9; 2RDS-008-76-2 HTS: 2,3        /Mandate/      2    / na  /na              I I INTEG ATT                            /C-C      (  na    I SUR/PT3.00/MT4.00 lEX6 2RDS-65 IAHI5A-31      [ QISO  65.00-1        or DUG&#xb9; na  in [C3.20 )ID          / na  /na na                  I LIHE&#xb9; 2RDS-008-76.2 HTS 2,3          (Mandate[      2    [ na  /na              I          I I  IHTEG ATT                          /C-C      /  na    [ SUR/PT3.00/MT4.00    /
2RDS  65-00-IAH168-20      f QISO  65-00-2        or DUG&#xb9; na  in /C3.20    /ID      / na  /na LINE&#xb9; 2RDS-008-68-2 NTS: 2,3        /HS        /    2    / na /na              I
 
NIAGARA HONAMK POWER CORPORATION          -          ILE POINT NUCLEAR STATION - UNIT 2        14 of 23 HHP2-ISI-006( REV. 1, CN-000                                          SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:  07/28/1999                                                                  APPENDIX  G -  RDS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ) DESCRIPTION OF ITEH TO BE EXAHIKEDiCATGRY )IGSCCi EX1/HDE PROCEDURE                    iPERIOO  1                        REHARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG        &#xb9;,  iITEH  &#xb9; iFREOYi EX2/NDE PROCEDURE        iPERIOO 2 i USE CAL BLK  &#xb9; i LIHE NO. AKD NOTES, AS APPLICABLE DESELECT        iCLASSi      EX3/HDE PROCEDURE    (PERIOD 3 I INTEG ATT                              ic-c      I  na  I    SUR/PT3.00/HT4 F 00  I 2RDS-65 IAM16B-21    i QISO 65-00-2          or  DMG&#xb9; na  in  JC3.20    iID      i na /na I  LIHE&#xb9; 2RDS.008.68-2    NTS: 2,3      IHS          2    i  na/M                  I I IHTEG ATT                              ic-c      I  M    I  SUR/PT3.00/HT4.00    I 2RDS-65 IA'W168-22    i QISO  65-00-2      or DMG&#xb9; na    in iC3.20    iID      i na  /na                I i  LIKE&#xb9; 2RDS-008-68-2 NTS: 2,3          IHS          2    J na/na                I I INTEG ATT ic-c      I  M    I SUR/PT3.00/HT4.00    I 2RDS-65 I AM16B-23    i QISO  65-00-2      or  DMG&#xb9; na  in iC3.20    )ID      i  na /na i LINE&#xb9; 2RDS-008-68-2    NTS: 2,3      iHS          2    i na /na                  I INTEG ATT                            ic-c      i na    i SUR/PT3.00/HT4.00      i          I 2RDS-65-00.IAW168-24      )  QISO  65-00.2      or  DWG&#xb9; na  in iC3.20    (ID      i na /na                  I          I LINE&#xb9; 2RDS-008-68.2    HTS: 2,3      iHS          2    i na  /na                I          I I  INTEG ATT                              [c-c    i na      [  SUR/PT3.00/HT4.00    i 2RDS-65 IAM16B-25      i QISO  65-00-2      or  DMG&#xb9; na  in iC3.20    /ID      i  na /na                I I  LIKES 2RDS-008-68-2    NTS: 2,3        iHS          2    i  na/na                I I INTEG ATT ic-c      I na    I  SUR/PT3 00/HT    0 I 2RDS-65 I AM16B-26    i QISO  65-00-2      or  DMG&#xb9; na  .in  )C3.20    iID      /  na /na i LINE&#xb9; 2RDS.008.68-2    NTS: 2,3        iHS          2    i  na/na                  I I INTEG ATT                              ic-c      I M      I  SUR/PT3.00/HT4.00      I 2RDS-65 IAM16B-27      i QISO  65-00-2      or  DMG&#xb9; na  in iC3.20      iID      i na  /na LINE&#xb9; 2RDS.008-68-2    HTS: 2 3        iNS          2    i  na/na                  I I IHTEG ATT                              ic-C      i na      i SUR/PT3.00/HT4.00      i 2RDS-65 I AM16B-32      i QISO 65-00-2      or  DMG&#xb9; na    in  JC3.20    iID      J na  /na I LIHE&#xb9; 2RDS-008-68-2    HTS: 2,3        iHS          2    J na/na                  I INTEG ATT                            ic-c      J na      I SUR/PT3.00/HT4 00 I 2RDS-65-00-IAM16B-33      i QISO 65-00-2      or  DMG&#xb9; na    in iC3.20    iID      i na  /na na                    LINE&#xb9; 2RDS-008-68-2    NTS: 2,3        INS          2    / na  /na                I
 
NIAGARA NONAMK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        15 of 23 HNP2-ISI-006( REV. 1, CH-000                                            SECOND TEH YEAR INSERVICE INSPECTION          (ISI) IHTERVAL PLAN Change date: 07/28/1999                                                                        APPENDIX  G - RDS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEN TO BE EXANIHEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPER100 1                                            RENARKS EXANINATIOH IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG          &#xb9;,  iITEN  &#xb9; iFREGYi EX2/HDE PROCEDURE iPERIOO 2 i USE CAL BLK    &#xb9; I  LINE  NO  AHD NOTES(  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I IH'TEG ATT                            ic-c      i na      I  SUR/PT3.00/NT4.00    i 2RD S-65-00. I A'W18A. 20  i QISO 65-00-1        or DMG&#xb9; na  in /C3.20    iiO        i  na /na i LIHE&#xb9;    2RDS-008-75-2    HTS: 2,3      iNS            2    )
na /na              I I  IHTEG ATT                            JC-C      J na    I SUR/PT3.00/HT4.00    I 2RDS-65 I A'W18A-21    i QISO 65-00-1          or  DWG&#xb9; na  in iC3.20    tiO        i na  /na              I i LINE&#xb9; 2RDS-008-75-2      NTS: 2,3      tNS            2    i na  /na              I I  INTEG ATT                            ic-c      i na      I  SUR/PT3.00/NT4.00    I 2ROS-65 I AMIBA-22      J QISO 65-00-1        or  OMG&#xb9; na  in IC3.20    )IO        i na  /na i LINE&#xb9; 2RDS-008-75-2      NTS: 2,3      )NS      I    2    J na /na              I I  INTEG ATT                            ic-c      i na      I  SUR/PT3.00/NT4.00    I 2RDS-65-00.IA'W18A.23      J QISO  65-00-1        or DMG&#xb9; na  in iC3.20    iiO        i na  /na              I I  LIHE&#xb9; 2RDS-008-75-2 HTS: 2,3          INS            2    i  na /na              I I  IHTEG ATT                            /c-c      /    na    I  SUR/PT3.00/NT4.00    I 2RDS-65-00 IAM18A-24        i QISO 65-00-1        or DWG&#xb9; na    in iC3.20    iiO    .
i na /na              I
                            )
LINE&#xb9; 2RDS-008-75-2 NTS: 2 3          iNS            2    i na /na              I I  IHTEG ATT                            /c-c      /  na    i SUR/PT3.00/NT4.00    i 2RDS-65-00-IAM18A-25        i QISO  65-00-1        or DMS&#xb9; na  .in  iC3.20    i IO      i na /na na                    i  LINE&#xb9; 2RDS-008-75-2 NTS: 2(3          iNS            2    ( na /na                I I IHTEG ATT                              ic-c      i na      I SUR/PT    00/NT  00  I 2RD S-65  I AM18A-26    i QISO  65-00-1        or DWG&#xb9; na    in /C3.20      [ IO      J na /na                I I LINE&#xb9; 2RDS-008-75-2 NTS: 2(3          iNS        I  2    i na /na                I I INTEG ATT ic-c      i na      I SUR/PT3.00/NT4.00    I 2ROS.65-00.IAW18A-27          ) QISO  65-00-1        or DWG&#xb9; na    in iC3.20      iIO      i na /na LINE&#xb9; 2RDS-008-75-2    HTS: 2,3      iHS            2    i na /na i                                                                                    I I  IHTEG ATT                            ic-c      /  na    J SUR/PT3 F 00/NT4.00 /
2RDS-65 I AM18A-31      i QrSO 65-O0-1        or  DMG&#xb9; na  in IC3.20      i io      / na /na i  LINE&#xb9; 2RDS-OM-75-2    NTS: 2,3      iNS            2    i na  /na              I
 
HIAGARA HOHAWK POWER CORPORATION            -        ILE POINT    NUCLEAR STATION  - UNIT 2        16 of 23 NHP2- ISI-006, REV. 'I, CH-000                                        SECOHD TEH YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change  date: 07/28/1999                                                                      APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REG  )
DESCRIPTION OF ITEN TO BE EXAHINED)CATGRY (IGSCC) EXl/HDE PROCEDURE              )PERIOD  1                          REHARKS EXAHIHATIOH IDEHI'IFIER  )
ITS ISO LOCATOR,  COMPONENT DWG  &#xb9;,  )ITEN  &#xb9; JFREGY] EX2/HDE PROCEDURE          [PERIOD 2    )
USE CAL BLK &#xb9; i LINE NO. AHD NOTES, AS APPLICABLE ]SELECT iCLASS[ EX3/HDE PROCEDURE  iPERIOO 3 I    IHTEG ATT                            ic-c      J na    I  SUR/PT3.00/HT4.00    I 2RDS-65-00 IAW18A-32                65-00-1        or DWG&#xb9; na  in /C3.20        ID'        na /na
                        / QISO                                              J          J na                i    LINE&#xb9;  2RDS-008-75-2  NTS: 2,3      JHS                  [  na /na              I I IHTEG ATT                            , ic-c      /    na    I SUR/PT3.00/HT4.00    I 2RDS-65.00.IAW198-20    (
QISO  65-00-2        or DWG&#xb9; na  in /C3.20    /ID        J na  /na              I
                        )
LINE&#xb9; 2RDS.008.67-2 NTS: 2,3        /HS      I    2    /  na /na              I I  IHTEG ATT                            ic-c      /    na    I  SUR/PT3.00/HT4.00    I 2RDS-65.00- IA'M198-21    /  QISO  65-00-2        or DWG&#xb9; na  in /C3.20    /ID        J na  /na I  LINE&#xb9;  2RDS-008.67-2  NTS: 2,3      JHS            2    /  na /na INTEG ATT                            ic-c      /    na    I  SUR/PT3.00/NT4.00    I 2RDS-65-00-IAM198-22          QISO 65-00-2        or DMG&#xb9; na  in /C3.20      /ID        /  na /na              I na                      LINE&#xb9; 2RDS-008.67-2 NTS: 2,3        iHS            2    /  na /na              I I  INTEG ATT                            /c-c      /  na    I SUR/PT3.00/HT4.00    I 2RDS-65-00.IAW198-23      /  QISO 65-00-2        or DMG&#xb9; na  in /C3.20    /ID        (  na  /na              I na                  I  LIHE&#xb9; 2RDS-008-67-2 HTS: 2,3        /NS        I    2    f  na /na              I I    INTEG ATT                          ic-c      J na    I  SUR/PT3.00/HT4.00    I 2RDS.65.00-IAW198-24      [  QISO  65-00-2        or DWG&#xb9; na .in )C3.20      I ID      ]  na /na                I na                  I  LINE&#xb9; 2RDS-008-67.2 HTS: 2,3        /HS        I  2      f na /na                I I  IHTEG ATT                            Jc-c      /  na      I SUR/PT3.00/HT4.00    I 2RDS-65-00. IAW198-25      )
QISO  65-00-2        or DMG&#xb9; na  in /C3.20      (ID        f na  /na              I I  LINE&#xb9; 2RDS-008.67-2 NTS 2 3          iHS            2      f na /na                I I  INTEG ATT                            Jc-c      /  na      I SUR/PT3 00/HT4 00    I 2RDS.65-00-IAW198-26      (
QISO  65-00-2        or DWG&#xb9; na  in  JC3.20    /ID        J na  /na
                          )
LINE&#xb9; 2RDS-008.67-2 HTS: 2,3        IHS        I  2      f na /na                I I  INTEG ATT                            ic-c      /  na        SUR/PT3.00/M'I4.00 2RDS-65-00-IA'M19B 27      (
QISO 65-00-2        or DWG&#xb9; na  in /C3.20      /ID        / na /na                I I  LIHE&#xb9; 2RDS 008 67 2 HTS'      3      /HS        I    2    / na /na                I
 
NIAGARA NONAWK POWER CORPORATION            -      NILE POINT NUCLEAR STATION - UNIT 2        17 of 23 SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN APPENDIX G - RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REO ( DESCRIPTIOH OF ITEN TO BE EXANIHED(CATGRY (IGSCC( EX1/HDE PROCEDURE                (PERIOD  1                        RENARKS EXANIHATIOH IDEHI'IFIER  (
ITS ISO LOCATOR, COMPONENT DWG    &#xb9;,  (ITEN    &#xb9; (FREOY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; I  LINE  NO  AHD NOTES  AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE            I ERIOD  3  I I  INTEG ATT                            (C-C      (  na  (
SUR/PT3.00/NT4.00  (
2RDS-65 IAM198-32    (  QISO  65-00-2        or DMG&#xb9; na  in  (C3.20    I ID      (
na /na
(  LINE&#xb9; 2RDS-008.67-2 NTS: 2,3          (NS            2    (
na /na            I I  IHTEG ATT                            (C-C      (
na    I  SUR/PT3.00/NT4.00  I 2RDS-65 IAW19B-33    (
QISO  65-00-2        or DMG&#xb9; na  in (C3.20      (ID      (
na  /na I  LINE&#xb9; 2RDS 008 67 2 NTS'i3            (NS        I    2    (
na /na            I I  INTEG ATT                            (C-C      (
na    I  SUR/PT3.00/NT4.00  I 2RDS-65 I AM22A-16  (
QISO 65-00-1        or DMG&#xb9; na  in  (C3.20    I ID-    (
na /na            I I  LINE&#xb9;  2RDS.008.81-2  NTS: 2,3      INS            2    (
na /na            I I  IHTEG ATT                            (C-C      (
na    (  SUR/PT3.00/MT4.00  I 2RDS.65.00.IA'W22A-17    (
QISO 65-00-1        or DWG&#xb9; na  in (C3.20      (ID      (  na /na na                    LINE&#xb9; 2RDS.008-81-2 NTS: 2,3          (HS            2    (
na /na              I I  INTEG ATT                            (C-C      (
na    I  SUR/PT3.00/NT4.00  I 2RDS-65 IAW22A-18    (
QISO  65-00-1        or DWG&#xb9; na  in  (C3 ~ 20  (ID      (
na /na I LINE&#xb9; 2RDS.008.81-2 NTS: 2            (HS            2    (
na /na              I I INTEG ATT                            (C-C      (
na    I  SUR/PT3.00/NT4.00  I 2RDS-65 IAM22A-19    ( QISO  65-00-1        or DWG&#xb9; na  .in  (C3.20    (ID      (  na  /na            I
( LINE&#xb9; 2RDS-008.81-2 NTS: 2,3          (HS        I    2    (
na /na              I I IHTEG ATT                            (C-C      (
na    (
SUR/PT3.00/NT4.00  (
2RDS-65-00-IAW22A-20      (
QISO  65-00-1        or DMG&#xb9; na    in (C3.20      (ID      (
na /na              (
I LINE&#xb9; 2RDS-008-81-2 NTS: 2 3          (HS            2    (
na /na              I I  INTEG ATI'                          (C-C        (
na    I  SUR/PT3.00/HT4.00  I 2RDS-65 I AW22A-21      QISO  65-00-1        or DMG&#xb9; na    in (C3.20      (ID      (  na  /na LINE&#xb9; 2RDS.008-81-2 NTS: 2,3          (HS            2    (  na /na              I I INTEG ATT                            (C-C        (
na    I  SUR/PT3.00/HT4 00  I 2RDS-65-00-IAW22A-22      ( QISO  65-00-1        or DWG&#xb9; na    in (C3.20      (ID      (
na  /na            I I LINE&#xb9; 2RDS-008.81-2 HTS: 2,3          (NS            2    (
na /na              I
 
NIAGARA MOHAMK POMER CORPORATION          -        ILE POINT  NUCLEAR STATION  - UHIT 2        18 of 23 NNP2-ISI-006,  REV ~ 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:  07/28/1999                                                                    APPENDIX G -  RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED i DESCRIPTIOH OF ITEN To BE EXANIHEoiCATGRY iIGSCCi EX'I/NDE PROCEDURE                  iPERICO  1                          REHARKS EXAHIHATIOH IDENTIFIER i ITS ISO LOCATOR, CONPONENT DMG          &#xb9;,  iITEH    &#xb9; iFREOYi EX2/HDE PROCEDURE      iPERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE              IPERIOD 3  I I  IHTEG ATT                              ic-c        I  M    I  SUR/PT3.00/HT4.00  I 2RDS-65-00.IAM22A-23      i QISO 65-00-1          or  DMG&#xb9; na  in iC3.20      iIO    i na  /na na                  I  LINE&#xb9; 2ROS-008.81-2      NTS: 2(3      iHS            2  i  na/na              I I INTEG ATT                                ic-c        I  na    I  SUR/PT3.00/NT4.00  I 2ROS-65-00-IAM22A-24      i QISO 65-00-1          or  DMG&#xb9; na  in iC3.20      iio      / na  /na I  LINE&#xb9; 2RDS-008-81-2      NTS: 2,3      iNS            2    i na  /na              I INTEG ATT                              ic-c        I  na    I  SUR/PT3.00/HT4.00  I 2RDS-65 00-IAM22A-25      i QISO 65-00-1          or  DMG&#xb9; na  in  iC3 ~ 20    iio      i na  /na              I na                  I  LINE&#xb9; 2RDS.008.81-2      NTS: 2,3      iNS            2    /  na /na              I I 'MHF/PIPE                              IC-F-2      i na    i VOL/UT6.02 2RDS-65-00.SM001          i QISO 65-00-1        or  DMG&#xb9; na  in iC5.51      [none    i  SUR/PT3.00/HT4.00 i NHP2-8-.594-CS      I LINE&#xb9; 2RDS.008-81-2      NTS: 1,2      iso            2    i na  /na              I I ELB/PIPE                                IC-F-2      i na    i VOL/UT6.02 2RDS-65-00.SM002          i QISO 65-00-1        or  DMG&#xb9; na  in  iC5.51      inone i SUR/PT3.00/NT4.00      i NHP2.8..594-CS      i LIHE&#xb9; 2RDS-008.81-2      HTS: 2,4      iso            2    i na  /na I PIPE/ELB                                IC-F-2      i na    i VOL/UT6.02 2RDS.65-00.S'M003          i QISO 65-00-1          or  DMG&#xb9; na  .in  iC5.51      inone    i  SUR/PT3.00/NT4.00  i NHP2-8-.594.CS          LINE&#xb9; 2RDS-008-81-2    NTS: 2,4      iso          i  2 ELB/PIPE                              IC-F-2      i na    i VOL/UT6.O2 2RDS.65-00-SM004          i QISO 65-00-1          or DMG&#xb9; na    in iC5.51      Inone    I SUR/PT3.00/NT4.00  I NHP2-8-.594-CS      I LINE&#xb9; 2RDS-008-81-2    NTS: 2,4      ISD            2    i na  /na i MHF/PIPE                                IC-F-2      i na    i VOL/UT6.02 2RDS-65-00.SM005          ) QISO 65-00-1        or  DMG&#xb9;'na    in  iC5.51      Inone    I SUR/PT3.00/NT4.00  I HNP2-8-.594-CS          LINE&#xb9; 2RDS-008-75-2    NTS: 1,2        iSO            2    i na /na PIPE/TEE                                IC-F-2      I na    I VOL/UT6.02          I 2RDS-65-00-SM006              QISO 65-00-1        or DMG&#xb9; na    in  [C5 ~ 51    inone i SUR/PT3.00/NT4.00      i NNP2-8-.594-CS          LINE&#xb9; 2RDS-008-81-2 NTS: 2,5            iso            2 i na /na
 
NIAGARA NOHAMK POMER CORPORATION        -      NILE POIN'I HUCLEAR STATION - UNIT 2        19 of 23 HNP2-ISI-006, REV. 1, CH-000                                    SECOND TEH YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                              APPEHDIX G -  RDS SYSTEN (sorted by Examination Identif ier) 2HD INTVL REL REO I DESCRIPTIOH OF ITEN TO BE EXANIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE          (PERIOD  1                        REHARKS EXANINATION IDENTIFIER ( ITS ISO LOCATOR, CONPOHEHT DMG  &#xb9;,  (ITEN    &#xb9; (FREOY( EX2/NDE PROCEDURE    (PERIOD 2  (
USE CAL BLK &#xb9; I  LINE NO. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3          I I  PIPE/ELB                          IC-F-2    (
na  (
VOL/UT6.02          (
2RDS-65-00-SM007        (  QISO  65-00-1      or DMG&#xb9; na  in (C5.51      (none  (  SUR/PT3.00/NT4,00  (
HNP2-8-.594-CS    (
LIHE&#xb9; 2RDS.008-81-2 NTS: 2,4      (SO          2  (
na  /na I  ELB/PIPE                          IC-F-2    I na  I  VOL/UT6.02          I 2RDS-65-00-SM008        (
QISO  65-00-1      or OMG&#xb9; na  in  (C5.51    (none  (
SUR/PT3.00/HT4.00  (
NNP2.8-.594-CS      LINE&#xb9; 2RDS-008-81-2 HTS: 2,4      ISD          2  (  na /na              I
(  MHF/PIPE                          IC-F-2    ( na    (
VOL/UT6.02 2RDS-65.00.SM009        (
QISO  65-00-1      or DMG&#xb9; na  in (C5.51      (none  I SUR/PT3.00/NT4 F 00 I HNP2-8-.594-CS      LINE&#xb9; 2RDS-008-76-2 NTS: 1,2      (SO        I  2    I na  /na            (
I  TEE/PIPE                          IC-F-2    I na    I VOL/UT6.02          I 2RDS-65-00-SM010        (
QISO  65-00-1      or DMG&#xb9; na  in  (C5 ~ 51  (none  (
SUR/PT3.00/NT4.00    (
NHP2-8-.594.CS    I  LINE&#xb9; 2RDS-008-81-2 NTS: 2,5      (SO          2    (
na  /na
(
MHF/PIPE                          IC-F-2    (
na    ( VOL/UT6.02 2RDS-65-00-SM011        (
QISO  65-00-1      or DMG&#xb9; na  in (C5.51      (none  ( SUR/PT3.00/NT4.00    I HNP2-8-.594-CS    I  LINE&#xb9; 2RDS-008-77-2 NTS: 1,2      (SO        I  2    I                      I I  PIPE/TEE                          IC-F-2    (
na    (
VOL/UT6.02 2RDS.65-00.SM012        (
QISO  65-00-1      or DMG&#xb9; na .in  (C5.51    (none  ( SUR/PT3.00/NT4.00    (
NHP2-8-.594-CS    I  LINE&#xb9; 2RDS-008-81-2 NTS: 2,5      ISD          2 I TEE/PIPE                          IC-F-2    ( na    (
VOL/UT6.02 2RDS-65-00-SM013        (
QISO  65-00-1      or DMG&#xb9; na  in (C5.51    (none  (
SUR/PT3.00/NT4.00    (
NHP2-8-.594-CS      LINE&#xb9; 2RDS.008.81-2 HTS: 2,5      (SO          2    ( na /na
( MHF/TEE                            IC-F-2    (
na    ( VOL/UT6.02 2RDS-65-00-SM014        ( QISO  65-00-1      or DMG&#xb9; na  in (C5.51    (none  I SUR/PT3.00/NT4.00    I NNP2-8-.594-CS    ( LIHE&#xb9; 2RDS-008-78-2 HTS: 1,2      (So          2    ( na /na I TEE/PIPE                          IC-F-2    (
na    (
VOL/UT6.02 2RDS-65-00 SM015        (
QISO  65-00-1      or DMG&#xb9; na  in (C5.51    (none  ( SUR/PT3.00/NT4.00    (
HNP2-8-.594-CS    I LINE&#xb9; 2ROS.008-81-2 HTS: 2,5      ISD          2    ( na /na
 
NIAGARA HOHAMK POMER CORPORATION          -      NILE POIHT  NUCLEAR STATION  - UNIT 2        20 of 23 HHP2-1S1-006, REV. 1, CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/28/1999                                                                    APPENDIX  G - RDS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY (IGSCCI EX1/NDE PROCEDURE                IPER100  1  I RENARKS EXANIHATIOH IDEH'TIFIER ( ITS ISO LOCATOR, CONPONENT DMG      &#xb9;,  (ITEH  &#xb9; (FREQY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK  &#xb9; I  LINE Ho. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I
(
MNF/PIPE                              IC-F-2    (  na  (
VOL/UT6.02 2RDS-65-00-Sl$ 16        (
QISO  65-00-1      or DMG&#xb9; na    in  (C5.51    (none  (
SUR/PT3 F 00/HT4.00 (
NNP2-8-.594-CS    (
LINE&#xb9; 2ROS-008-79-2 HTS: 1,2          (So          2  (
na /na I  PIPE/TEE                              IC-F-2    (
na    (
VOL/UT6.02 2RDS-65-00-9817          (
QISO  65-00-1      or  DMG&#xb9; na  in  (C5.51    (none    (
SUR/PT3.00/HT4.00    (
HNP2 ~ 594-CS  (
LINE&#xb9; 2RDS-008-81-2    HTS: 2,5      (SO          2    (
na  /na I  TEE/PIPE                              IC-F-2    (
na    (
VOL/UT6.02 2RDS-65-00-$ 818        (
QISO  65-00-1      or DMG&#xb9; na    in  (C5.51    (none    (
SUR/PT3.00/NT4.00    (
NHP2-8-.59C-CS    I  LINE&#xb9; 2Ros-008-81-2 NTs: 2,5          ISD          2    (
na /na              I
(
MNF/PIPE                              IC-F-2    (  na    (  VOL/uT6.02 2RDS-65-00-SM019        (
QISO  65-00-1      or DMG&#xb9; na    in  (C5.51    (none    (
SUR/PT3.00/HT4.00    (
HNP2.8-.594-CS    (
LINE&#xb9; 2RDS-008.80-2 NTS: 1,2          (SO          2    (
na  /na              I I  TEE/PIPE                              IC-F-2    (
na    (
VOL/UT6.02 2RDS-65.00-SM020          (
QISO  65.00-1      or  DMG&#xb9; na    in (C5.51    (none    (
SUR/PT3.00/HT4.00    (
HNP2.8..594-CS      (  LIHE&#xb9; 2RDS-008-81-2    HTS: 2,5      (SO          2    (  na /na              I ELB/PIPE                              IC-F-2    (
na    (
VOL/UT6.O2 2RDS-65-00-SM021            QISO 65-00-1        or DMG&#xb9; na  . in (C5.51    (none  (
SUR/PT3.00/HT4.00    (
HNP2 ~ 594-CS      LINE&#xb9; 2RDS-008-81-2 NTS: 2i4          ISD          2    (
na  /na              I I  PIPE/ELB                              IC-F-2    (
na    (  VOL/UT6.02 2RDS-65-00-Sl$ 22        (
QISO  65-00-1      or DMG&#xb9; na    in (C5.51    (none    (
SUR/PT3.00/HT4.00    (
NNP2-8-.594.CS      (  LINE&#xb9; 2RDS-008-81-2 HTS: 2,4          (SO          2    (
na /na              I I  ELB/PIPE                              IC-F-2    (
na    (
VOL/UT6.02 2RDS.65.00-SM023          (
QISO  65-00-1      or DMG&#xb9; na    in  (C5.51    (none    (
SUR/PT3.00/HT4.00    (
NNP2-8-.594-CS      I LINE&#xb9; 2RDS-008-81-2 NTS: 2,4          (SO          2    ( na /na I ELB/PIPE                              IC-F-2    (
na    (
VOL/UT6.02 2RDS-65-00-9024            ( QISO  65-00-1      or DMG&#xb9; na    in (C5.51    (none    (
SUR/P'T3.00/HT4.00    (
NHP2 ~ 594-CS    ( LIHE&#xb9; 2RDS-008-81-2 NTS: 2,4          (SO      I 2      I na /na                (
 
NIAGARA HONAWK POWER CORPORATION                  NILE POINT NUCLEAR STATION - UNIT 2        21 of 23 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEH YEAR IHSERVICE INSPECTION        (ISI) INTERVAL PLAN Change date:    07/28/1999                                                                    APPENDIX  G -  RDS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTION OF ITEN TO BE EXAHIHEOiCATGRY              iIGSCCi EX1/HDE    PROCEDURE  iPERIOO  1                        REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR ~ COHPOHEHT DIIG        &#xb9;,  I ITEN  &#xb9; IFREQYI EX2/HDE PROCEDURE IPERIOO 2 I USE CAL BLK  &#xb9; i LINE HO. AHD NOTES, AS APPLICABLE        DESELECT  iCLAssi EX3/HDE PROCEDURE iPERIOO 3 I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2RDS-65-00-QI027          i QISO 65-OO-1          or  OWG&#xb9;  na  in  iC5.51    inone    J SUR/PT3.00/HT4 F 00 i NHP2-12-.844-CS    i LIHE&#xb9; 2ROS-012-108-2 HTS:      6,7        )SO          2    J na /na i PIPE/CAP    (conforms to ANSI B16.9) iC-F-2        i na    /  VOL/UT6.02 2RDS-65-00-SW028          i QISO  65-00-1        or DWG&#xb9; na in JC5.51        inone    /  SUR/PT3.00/HT4.00  i NHP2-12-.844-CS    i  LINE&#xb9; 2RDS.012-108-2 NTS: 7,8          iso          2    i na  /na I WHF/PIPE IC-F-2    i na    i  VOL/UT6.02 2RDs-65-00-SM031          )  QISO  65-00-2        or DMG&#xb9; na    in  [C5.51    inone    i  SUR/PT3.00/HT4.00    [
NHP2-8-.594.CS      I  LINE&#xb9; 2RDS-008-66-2 NTS: 1,2            iSO          2    i na  /na ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2ROS-65-00-SW032              QISO 65-00.2        or DWG&#xb9; na    in iC5.51    inone i SUR/PT3.00/Hl'4.00      i HNP2-8-.594-CS          LINE&#xb9; 2RDS.008-66-2 NTS: 2,4            iSO          2    i na  /na I  PIPE/ELB                                IC-F-2    I  na    I  VOL/UT6.02          I 2RDS-65-00-9!033          i QISO 65-00-2          or DMG&#xb9; na    in iC5.51    inone    i  SUR/PT3.00/HT4.00    i NHP2-8-.594-CS          LINE&#xb9; 2RDS-008.66-2 NTS: 2,4            /so          2    i  na /na I  ELB/PIPE                                IC-F-2    i  na    )  VOL/UT6.02 2RDS.65-00.QI034          i QISO 65-00-2          or  OMG&#xb9;  na . in iC5.51    inone i SUR/PT3.00/HT4.00        i NHP2-8-.594-CS          LINE&#xb9; 2RDS.008.66-2    NTS:  2,4      iso          2    i na  /na I  PIPE/TEE                                IC-F-2    )  na    i VOL/UT6.02 2RDS-65-00-QI035          )
QISO  65-00-2        or DWG&#xb9; na      in iC5.51    [none i SUR/PT3.00/HT4.00        i NHP2-8-.594-CS      I  LINE&#xb9; 2RDS-008-66-2 HTS: 2,5            iSO          2 i na /na i WHF/PIPE IC-F-2  i  na    i VOL/UT6.02 2RDS-65-00-S'W036          i QISO 65-00-2        or DWG&#xb9; na      in iC5.51    inone    i SUR/PT3.00/HT4.00    i NHP2-8-.594-CS      i  LINE&#xb9;  2RDS-008-72-2    HTS: 1,2        iSO          2    J na /na I  PIPE/TEE                                IC-F-2  i na      i VOL/UT6.02 2RDS-65-00-QI037          i QISO  65-00-2        or DMG&#xb9; na      in  (C5.51  inone i SUR/PT3.00/HT4.00        i NHP2-8-.594-CS        I LIHE&#xb9; 2RDS 008 66 2 NTS'        5        iso          2    i na /na
 
NIAGARA MOHAWK POWER CORPORATION      -      MILE POINT NUCLEAR STATION  - UNIT 2        22 of 23 NMP2-ISI-006, REV. 1, CN-000                                          SECOND TEN YEAR INSERVICE INSPECTION      (ISI) INTERVAL PLAN Change date: 07/28/1999                                                                  APPENDIX G - ROS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REa  J DESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY tIGSCCi EX1/HDE PROCEDURE          iPERIOO  1                        REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR'OMPONENT DWG          &#xb9;, IITEM  &#xb9; IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK  &#xb9; i  LINE  NO. AND NOTES,  AS  APPLICABLE  isELECT  iCLAssi EX3/NDE PROCEDURE iPERIOO 3 I  TEE/PIPE                              iC-F-2  I  na  I  VOL/UT6.02        I 2RDS-65-00-9838          i QISO  65-00-2        or  DWG&#xb9; na    in iC5.51  inone  t  SUR/PT3.00/MT4.00  /
NMP2-8-.594-CS      i LINE&#xb9; 2RDS-008-66-2      NTS:  2,5      iSO          2    i na  /na I  WHF/PIPE                              IC-F-2  J na    i VOL/UT6.02 2RDS.65-00-Sl$ 39        i QISO  65-00-2        or  DWG&#xb9;  na  in iC5.51  inone    i SUR/PT3.00/MT4.00 i NMP2 ~ 594-CS    t  LINE&#xb9; 2RDS-008-71-2    NTS:  1,2      ISD          2    i na  /na I  PIPE/TEE                              IC-F-2    i na    / voL/UT6.02 2RDS-65-00.SW040        i QISO 65-OO-2        or  OWG&#xb9;  na  in [C5.51    [ID    i SUR/PT3.00/MT4.00  (
NMP2-8-.594-CS      I  LINE&#xb9; 2RDS-008-66-2    NTS:  2,5      iSO          2    i na  /na            )    Sc11 i WHF/PIPE                                IC.F-2    i na    ( VOL/UT6.O2 2RDS 65-00-SW041        i QISO  65-00-2        or  DWG&#xb9; na    in iC5.51    Inone  I SUR/PT3  00/MT4 00 I HMP2 ~ 594-CS  i  LINE&#xb9; 2RDS-008-70-2    HTS:  1,2      iSO          2    i na  /na            I I  PIPE/TEE                              iC-F-2    i na    i VOL/UT6.02 2RDS-65-00.SW042        i QISO  65-00-2        or  DWG&#xb9;  na  in iC5.51    inone  i SUR/PT3.00/MT4.00 i HMP2 ~ 594-CS      LINE&#xb9; 2RDS.008.66-2    HTS  2/5      iSO      I  2    I na /na              I I TEE/PIPE                              IC-F-2    / na    J VOL/Ul'6.02 2RDS.65-00-Sl$ 43        / QISO  65-00-2        or  DWG&#xb9; na  . in [C5.51    inone  J SUR/PT3.00/MT4.00  J HMP2-8-.594-CS      I LINE&#xb9; 2RDS-008-66-2    NTS:  2,5      Iso          2    J na  /na I WHF/PIPE IC-F-2    i na    i VOL/UT6.02 2ROS-65-00-SW044          i QISO  65-00-2        or  DWG&#xb9;  na  in iC5.51    IID    I SUR/PT3.00/MT4.00  I HMP2-8-.594-CS      i LINE&#xb9; 2RDS-008.69-2 H'TS: 1,2      iSO          2    J na /na              )
Sc11 I PIPE/TEE                              IC-F-2    i na    i VOL/UT6.02 2RDS-65-00-9845          i QISO  65-00-2        or DWG&#xb9; na    in iC5.51    [none  i SUR/PT3.00/Ml'4.00  i NMP2-8-.594-CS      I LINE&#xb9; 2RDS-008-66-2 HTS: 2 5          iSO          2    / na  /na
                          ) WNF/PIPE                              IC-F-2    I na    I VOL/UT6.02          I 2RDS-65-00.SW046          i QISO  65-00-2        or  DWG&#xb9; na    in /C5.51    inone  I SUR/PT3.00/Ml'4.00  I HMP2-8-.594-CS      i LIHE&#xb9; 2RDS-008-68-2    NTS:  1,2      iSO          2    [ na  /na
 
NIAGARA HOHAMK POWER CORPORATION      -      NILE POIHT NUCLEAR STATION - UNIT 2                          23 of 23 NNP2-ISI-006, REV. 1 ~ CH-000                                        SECOND TEH YEAR IHSERVICE IHSPECTIOH      (ISI)  INTERVAL PLAN Change date:    07/28/1999                                                                APPEHDIX G -  RDS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL REO ) DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY JIGSCC( EX1/HDE PROCEDURE              )PERIOD  1                              RENARKS EXANINATION IDEHTIFIER    J ITS ISO LOCATOR, COHPOHENT DMG    &#xb9;,  ]ITEN  &#xb9; ]FREQY[ EX2/NDE PROCEDURE    ]PERIOD 2  )
USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE iSELECT iCLASSi EX3/HDE PROCEDURE iPERIOO 3              (
I  PIPE/TEE                              IC-F-2  (
na  )  VOL/UT6.02 2RDS-65-00-Sl$ 47        f  QISO  65-00-2        or  DMG&#xb9; na  in /C5.51    [none  )
SUR/PT3.00/NT4.00  J HHP2-8-.594-CS      i LINE&#xb9; 2RDS-008-66.2      HTS:  2,5      /SD        2  /  na  /na I  TEE/PIPE                              IC-F-2  )
na  [  VOL/UT6.02 2RDS-65-00-SM048          )
QISO  65-00-2        or DMG&#xb9; na    in  (C5.51  [none  J SUR/PT3.00/NT4.00  f HNP2-8-.594-CS      i  LINE&#xb9;  2RDS-008-66-2    NTS: 2,5      LSD        2  J na/na I  MHF/PIPE                              IC-F-2  [ na  ]  VOL/UT6.02 2RDS-65-00-SW049          /  QISO  65-00-2        or  DMG&#xb9; na  in  /C5.51  [none  )
SUR/PT3.00/NT4.00  )
NHP2-8-.594-CS      J LINE&#xb9; 2RDS-008-67-2    NTS:  1,2      LSD        2  ]  na  /na I  ELB/PIPE                              IC-F-2  I na  I  VOL/UT6.02          I 2RDS.65-00.SI$ 50        J QISO  65.00-2        or  DMG&#xb9; na    in JC5.51  ]none  f  SUR/PT3.00/HT4 F 00 J HMP2-8..594-CS      I  LINE&#xb9; 2RDS-008-66-2    NTS:  2,4      ISD        2  /  na /na I  ELB/PIPE                              IC-F-2  (
na    [ VOL/UT6.02 2RDS-65-00-SM060          f  QISO  65.00.2        or  DIIG&#xb9; na  in /C5.51  IID    I SUR/PT3.00/HT4.00  I  Sc9 HNP2-12-.844-CS    )
LINE&#xb9; 2RDS-012-105-2 NTS: 6,7          )SD        2    f na  /na            I
(
PIPE/CAP (conforms  to  ANSI  B16.9) )C-F-2    / na    f VOL/UT6.02 2RDS-65-00-SM061          [  alSO 65-00-2        or DMG&#xb9; na. in (C5.51  /none  f SUR/PT3.00/NT4.00  f NNP2-12-.844-CS    I  LIHE&#xb9; 2RDS-012-105-2 HTS: 7,8          ISD        2    / na /na              I I HOZ/SE Q N10  Az180  CRDHS RETURN      IB-J    J na    (
SUR/PT3.00                      (Reclassified from 8-F during 2nd 10-Yr Update 2RPV-KB31                  [ QISOna              or DMG&#xb9; 004 in (89.21      ]none  )
na /na na                  J LINE&#xb9; na                NTS: (none)    )NS        1    J na/na
                          / SE/CAP Q N10 Az180 CRDHS RETURN        /8-J    I na    I SUR/PT3  00        I          (Reclassified from 8-F during 2nd 10-Yr Update 2RPV-KB31-A                / QISOna              or  DMG&#xb9; 005  in /B9.21          )
na  /na            I          I
                          / LINE&#xb9; na                H'IS: (none)  (DH        1    J na /na              I    Sc11  I END OF SYSTEN RDS
 
NIAGARAMOHAWKPOWER CORPORATION Nine Mile Point Unit 2 NMP2-ISI406, Rev. 1, CH400 System RDS: General Notes
: 1. 8" 900&#xb9; WN FLANGE, SA-105                                    5. 8" SCH. 100 TEE, SA-234 WPB
: 2. 8" SCH. 100 PIPE, SA-106 GR B                                6. 12" X 8" RED. ELBOW, SA-234 WPB
: 3. 1" PLATE, SA46/SA437                                          7. 12" SCH. 100 PIPE, SA-106 GR B
: 4. 8" SCH. 100 ELBOW, SA-234 WPB                                8. 12" SCH. 100 CAP, SA-234 WPB
 
NIAGARA HOHAMK POMER CORPORATION          -  . HILE POINT  NUCLEAR STATION  - UHIT 2                      1 of 135 HHP2-ISI-006, REV. 1( CH 000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED (
DESCRIPTION OF ITEH TO BE EXAHINED[CATGRY ) IGSCCJ EX1/NDE PROCEDURE              [PERIOD  1                                REMARKS EXAHINATIOH IDEHTIFIER J ITS ISO LOCATOR,  COHPOHENT DMG  &#xb9;,  i ITEH &#xb9; iFREQYi EX2/NDE PROCEDURE iPERIOO 2 i USE CAL BLK &#xb9; I  LINE No. AHD NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I
                          *AOV16A BLTG                          (8-G-2 f na        /  VT1/VT2.01          I 2RHS<<AOV16A,V8536      /  QISO 66-50          or DMG&#xb9; 003 in /87.70 /ID            )  na /na              )Sc8
                      /  LINE&#xb9; 2RHS-012-8-1      NTS: (none)    /Grp Rep/ 1        /  na /na              I
                          *AOV16A INT SUR                        IB-H-2    I  na    I  VT3/VT2.01            /<<        (>> Examine Mhen dissassemble  for maintenance 2RHS*AOV16A,VBY154    (  QISO 66-5O          or  DMG&#xb9; 003  in (812.50    )DisG    J
                                                                                            /                f<<
f  I.IME&#xb9; 2RHS-012-8-1    NTS: 13        JGrp Rep/    1    /      /
                        / <<AOV168 BLTG                            IB G 2    I  na    I  VT1/VT2 01 2RHS<<AOV168,V8537      )
QISO 66-51          or  DMG&#xb9;  003 in  )87.70    [none    (
na  /na
                        )
LINE&#xb9; 2RHS-012-163-1 NTS: (none) (Ns            f  1    f  na  /na
                          <<AOV168 INT SUR                        (8-H-2 ) na        J VT3/VT2.01 2RHS AOV168,VBY155        QISO 66-51          or  DMS&#xb9;  003 in [812.50 [none        f      /
LINE&#xb9; 2RHS-012-163-1 NTS: 5            INS      I  1    I      /
                          *AOV16C BLTG                          JB-G-2    J na    J VT1/VT2.01            I 2RHS>>AOV16C,V8538          QISO  66-52          or DMG&#xb9; 003 in ]87.70 )ID            f  na  /na              igc8 LINE&#xb9; 2RHS-012-125-1 NTS: (none) JGrp Rep) 1              f  na /na                I I *AOV16C INT SUR JB-H-2    [  na    [  VT3/VT2.01                      (<< Examine Ken dissassembte  for maintenance 2RHS*AOV16C, VBY156    (  QISO 66-52          or  DMS&#xb9;  003.in )812.50 [DisG        f      /                /<<
f LINE&#xb9; 2RHS-0'l2-125-1 NTS: 13          JGrp Repf      1 f      /                )<<
I <<AOV39A BLTG IB-G-2  I  na . I VT1/VT2.01            I 2RHS*AOV39A,V8527        ( QISO 66-53          or  DMS&#xb9; 003  in /87.70    /ID        / na  /na              isc8
( LINE&#xb9; 2RHS-012-10-1    NTS:  (none)    /Grp Rep/    1    / na /na                I
                          *AOV39A INT SUR                        IB-H-2 I na        I VT3/VT2.01            /<<        (<< Examine Mhen  dissasserble for maintenance 2RHS*AOV39A,VBY157      I Q    66 53          or DMG&#xb9; 003 in (812.50 [DisG          J    /                /<<
na                / LIHE&#xb9; 2RHS-012-10-1 NTS: 6              /Grp Rep/ 1        f    /                J<<
I >>AOV398 BLTG                            /B-G-2    / na      f VT1/VT2.01 2RHS*AOV39B,V8528        i QISO 66-54          or  DMG&#xb9; 003  in (87.70    ]none    [ na  /na J
LINE&#xb9; 2RHS-012-30-1    NTS:  (none)    JNS      f  1    [ na  /na
 
NIAGARA HOHAMK POWER CORPORATION              - H    ILE POINT NUCLEAR STATION - UNIT 2        2 of 135 NHP2-ISI-006, REV. I( CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION                (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX  G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ        DESCRIPTION OF ITEH TO BE EXAHIHED)CATGRY (IGSCC) EX1/HDE PROCEDURE                  )PERIOD    1                    REHARKS
                          )
EXAHIHATIOH IDENTIFIER    J ITS ISO LOCATOR,  COMPONENT DMG  &#xb9;,  JITEH    &#xb9; JFREGYJ      EX2/NDE PROCEDURE ]PERIOD 2 f USE CAL BLK  &#xb9;  I    LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I i <<AOV398 INT SUR                          /8-H-2 / na / VT3/VT2.01 2RHS*AOV39B,VBY158        i QISO    66-54          or  DMG&#xb9;  003 in  [812.50 )none [              /
                          / LINE&#xb9; 2RHS-012-30-1        NTS: 13        iNS        i 1 i            /
I    INTEGRAL ATTACHHEHT                    IC-C      I  na    I  SUR/                  I 2RHS*E1A,FM300            J QISO 66-            or  DMG&#xb9; 046  in /C3.10      /  ID      /      /PT3.00/HT4.00    /
I    LINE&#xb9; VESSEL            HTS:          JGrp Repl      2    I      /                ISclo I  95K *E1A HD/SHL (CODE CASE H-460) IC-A            I  na    I  VOL/U'T6.02          I 2RHS*E1A,HMIDOA            /  QISO 66-            or DMG&#xb9; 046 in /C1.20        /2P        /  na  /na                    Sc9 NHP2-RHS-.75-CS      /  LINE&#xb9; 2RHS-020-185-2 NTS: 155,156 JGrp Rep/            2    /  na /na                I INC-5      I  78K *E1A FLG/SHL (GRANTED RELIEF) IC-A            I  na    J VOL/Ul'6.02          I 2R HS*E1A, HM101A          i QISO 66-            or DMG&#xb9; 046 in /CI.IO /2P              /  na  /na              /Sc8 .
HHP2-RHS-.75-CS      /  LINE&#xb9; 2RHS-020-185-2 NTS: 156,157 /Grp Rep/ 2                /  na /na                I IMC-5      )  BOX NOZ/SHL Q  *E1A N4 (GRANTED R) IC-8          I  na    I  VOL/UT6.02            I    Sc7 2RHS*E1A,H'M102A            i QISO 66-            or  DWG&#xb9;  046 in  /C2 ~ 21  /ID        f  SUR/PT3.00/HT4.00    f NHP2-RHS-.75-CS      f  LINE&#xb9; 2RHS-018-4-2      HTS: 156,158 /GrP ReP[          2    /  na  /na I  *E1A H3 NOZ/HD                        (C-B      (
na    ]  VOL/UT6.02 2RHS<<E1A, HM103A            i QISO 66-            or DMG&#xb9; 046 .in JC2.21 ]ID              ] SUR/PT3  F 00/HT4.00 (Sc8 NHP2-RHS-.75-CS      f  LIHE&#xb9; 2RHS-020-185-2 NTS: 155,158 /Grp Rep) 2                f  na  /na I  *E1A N3 NOZ IR                          IC  B    I  na    I  VOL/UT6.07            I 2RHS<<E1A(HM104A            I  QISO 66              or  D'MG&#xb9; 046  in  JC2.22    ]ID      f na  /na              I NHP2-RHS-IR-3.75-CJ LINE&#xb9; 2RHS-020-185-2 NTS: 158              /Grp Repf      2    f na  /na              )
Sc10 I <<E1A N4 NOZ    IR                        [C-8      [  na      (
VOL/UT6.07            I 2RHS*E1A,HM105A            J QISO 66-            or  DMG&#xb9; 046  in (C2.22      )ID        J na  /na                I NHP2-RHS-IR-3.75-CJ      LINE&#xb9; 2RHS-018-4-2    NTS: 158        (Grp Rep/      2    / na /na                /Sc10 I INTEGRAL ATTACHMENT                      /C-C      /  na      / SUR/                  I 2RHS*E1B,FM300              i QISO 66-            or  DWG&#xb9;  046  in /C3.10      /ID-      /    /PT3.00/NT4.00    /
I  LINE&#xb9; VESSEL          NTS:            INS        I    2    I    /                  I
 
NIAGARA MOHAHK POMER CORPORATION -              MILE POINT NUCLEAR STATION - UNIT 2                                            3 of  135 HMP2-ISI-006, REV. 1( CH.OOD                                      SECOHD TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                  APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED    (
DESCRIPTION OF ITEM TO BE EXAMIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE (PERIOD          1                                REMARKS EXAMINATIOH IDENTIFIER    (
ITS ISO LOCATOR, COMPOHEHT DUG &#xb9;, (ITEM      &#xb9; (FREOY( EX2/NDE    PROCEDURE (PERIOD 2  (
USE CAL BLK  &#xb9; I  LINE NO  AND NOTES'S  APPLICABLE  (SELECT    (CLASS( EX3/HDE    PROCEDURE (PERIOD 3  I I
                            *E18 HD/SHL                        (C-A      (
na  (
VOL/UT6.02 2RHS*E1B,HH100B          (
QISO 66-            or DIIG&#xb9; 046 in (C1.20    (none  (
na  /na NMP2-RHS-.75-CS      (
LINE&#xb9; 2RHS-020-208-2 NTS: 155(156 (NS            2  (
na  /na
(
                            <<E18 FLG/SHL                        IC-A      I na  I  VOL/UT6.02 2RHS<<E18, HN1018          (  QISO 66-            or DIIG&#xb9; 046 in (C1.10    (none  (
na  /na NMP2-RHS-.75-CS    I  LINE&#xb9; 2RHS-020-208-2 NTS: 156(157 INS            2  (  na/na
(
NOZ/SHL Q <<E18 H4                  IC-B      ( na    (
VOL/UT6.02 2RHS*E18, HW1028          (
QISO 66-    .      or DWG&#xb9; 046 in (C2.21      (none  (
SUR/PT3.00/MT4.00  (
HMP2-RHS-.75-CS    (
LINE&#xb9; 2RHS-018-24-2  HTS  156,158 INS          2    (
na  /na            I
(
                            *E18 N3 NOZ/HD                      (C-8      (
na    (
VOL/UT6.02 2RHS<<E1B,HW103B          (
QISO 66-            or DUG&#xb9; 046 in (C2.21      (none  (
SUR/PT3.00/MT4.00  (
NMP2-RHS-.75-CS    I  LINE&#xb9; 2RHS-020-208.2 NTS: 155, 158 IHS            2    (
na /na              I I  *E1A N3  NOZ IR                    (C-8      ( na    (
VOL/UT6.07 2RHS*E18 HH1    B        I QISO 66-            or DNG&#xb9; 046 in (C2.22      (none  (
na /na NMP2-RHS-IR-3.75-CI LINE&#xb9; 2RHS-020-208.2 NTS: 158          IHS        I  2    I  na /na I
                            <<E18 H4 HOZ IR                      IC-8      ( na    (  VOL/UT6.07 2RHS<<ETB,HM1058          (
QISO 66-            or DUG&#xb9; 046 .in (C2.22    (none  (  na /na NMP2-RHS-IR-3.75-C( LINE&#xb9; 2RHS-018-24-2 NTS: 158          (NS RED/<<FV38A                          (C-F-2    ( na      VOL/UT6.02            Sc7    (Categorized as C-G when  PSI'd in 1985, therefore, only a surface PSI 2RHS<<F V38A, VNF V38A-A      QISO 66-16          or DUG&#xb9; 001 in IC5.51      (none  I .SUR/PT3.00/MT4.00              (was done; no UT was performed to backfit PSI when this weld was Unknown                LINE&#xb9; 2RHS-014-na-2 NTS: 90,91      (SD          2    (
na /na                        (recatagorized to C-F-2; Backfit UT PSI ASAP. (May use Vendor NDE)
(
                            <<FV38A/EXP                          IC-F-2    (
na      VOL/UT6.02            Sc7    (Categorized as C-G when  PSI'd in 1985, therefore, only a surface PSI 2RHS*FV38A,VNFV38A-B        QISO 66-16          or DUG&#xb9; 001 in IC5.51      (none      SUR/PT3.00/MT4.00              (was done; no UT was performed to backfit PSI when this weld was Unknown
(
(
LINE&#xb9; 2RHS-014-na-2 NTS: 91,92      (SD        (2(    (
na /na I
I          (recatagorized to C-F-2; Backfit UT PSI ASAP. (May use Vendor NDE)
RED/*VF38B                          IC-F-2    (
na      VOL/UT6.02              Sc7    (Categorized as C-G when  PSI'd in 1985, therefore, only  a surface  PSI 2RHS<<FV38B,VWFV38B-A        QISO 66-27          or DHG&#xb9; 001 in  ICS ~ 51  (none      SUR/PT3.00/MT4.00              (was done; no UT was performed to backfit PSI  when this  weld was Unknown                LINE&#xb9; 2RHS-014-na-2 NTS: 90,91      (SD        (2(    (
na /na I
I          (recatagorized to C-F-2; Backfit UT PSI ASAP.  (May use  Vendor  NDE)
 
NIAGARA MOHAMK POMER CORPORATION      -      MILE POINT NUCLEAR STATION - UNIT 2                                              4 of 135 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECI'ION    (Isl)  INTERVAL PLAN Change date:    07/29/1999                                                              APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED      DESCRIPTION OF ITEM TO BE EXAHINED(CATGRY (IGSCC( EX1/HDE PROCEDURE        (PERIOD  1                                  REMARKS
(                                                                                        (
EXAHINATION IDENTIFIER    (
ITS ISO LOCATOR, COHPONENT DUG &#xb9;, (ITEM    &#xb9;  (FREOY( EX2/NDE    PROCEDURE (PERIOD 2  (
USE CAL BLK    &#xb9; I LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE        PROCEDURE IPERIOD 3 I
                            <<FV388/EXP                          (C-F-2    ( na      VOL/UT6.02            sc7    (Categorized as  C-G when  PSI'd in 1985, therefore, only a surface  PSI 2RHS<<FV388, VNFV388-8        QISO 66-27          or DLIG&#xb9; 001 in (C5.51    (none  (
SUR/PT3.00/Ml'4.00 I          (was done; no UT was performed  to backfit PSI  when this weld was Unknown                LINE&#xb9; 2RHS-014-na-2 NTS: 91,92      (SD      (  2      na  /na            I          (recatagorized to C-F-2; Backfit UT PSI ASAP.    (May use Vendor NDE)
RED/*FV38C                          (C-F-2    (
na      VOL/UT6.02            Sc7    (Categorized as  C-G when  PSI'd in 1985, therefore, only  a surface PSI 2RHS*FV38C,WFV38C-A          QISO 66-27          or DllG&#xb9; 001 in (C5.51    (none  (
SUR/PT3.00/MT4.00  I          (was done; no UT was performed  to backfit PSI when this weld was Unknown                LINE&#xb9; 2RHS-014-na-2 NTS: 90,91      IsD      I  2      na /na            I          (recatagorized to C-F-2; Backfit UT PSI ASAP. (Hay use Vendor NDE)
                            <<FV38C/EXP                          (C-F-2    ( na    ( VOL/UT6.02            sc7    (Categorized as  C-G when  PSI'd in 1985, therefore, only  a surface  PSI 2RHS*F V38C, VIIFV38C- 8    QISO 66.27          or DMG&#xb9; 001 in (C5.51      (none  (  SUR/PT3.00/HT4.00  I          (was done; no UT was performed  to backfit PSI when this weld was Unknown                LIHE&#xb9; 2RHS-014-na-2 NTS: 91 92      ISD      I  2  I  na /na            I          (recatagorized to C-F-2; Backfit UT PSI ASAP'May use Vendor NDE)
(
                            *HCV131 INT SUR                      (8-M-2    (
na  (  VT3/VT2.01        (*          (*  Examine when dissassemble  for maintenance 2RHS*HCV131,VBY159        (
QISO 66-55          or  DNG&#xb9; 017  in (812.50 (DisG    (      /              (*
(
LINE&#xb9; 2RHS-020-159-1 NTS: 27        (Grp Rep(    1  (      /              (<<
I *NCV53A INT SUR                      (B-M.2 ( na      (
VT3/VT2.01        (*          (*  Examine when dissassemble  for maintenance 2RHS*HCV53A,VBY160        (
QISO 66-50          or DIIG&#xb9; 008 in (812.50 (DisG    (      /              (*
( LINE&#xb9; 2RHS-012-8-1    NTS: 9        (Grp Rep( 1      (      /
I <<HCV538 INT SUR                      (B.M-2    (
na  (
VT3/VT2.01 2RHS*HCV538, VBY161        ( QISO 66.51          or  DWG&#xb9;  008.in (812.50 (none    (      /
( LINE&#xb9; 2RHS-012-163-1 NTS: 9          (NS      (
1  (      /
(
                            <<HCV53C IHT SUR                      (8-M 2  (  na  (
VT3/VT2.01        (*          (*  Examine when dissassemble  for maintenance 2RHS*HCV53C,VBY162        (
QISO 66.52          or  DUG&#xb9; 008  in (812.50 (DisG    (      /              (*
(
LINN 2RHS-012-125-1    HTS: 9        (Grp Rep(    1
(      /              (*
I
                            <<HCV54A INT SUR                      (8-M-2 ( na      (  VT3/VT2.01        (*          (*  Examine when dissassemble  for maintenance 2RHS*HCV54A,VBY163        (
QISO 66-53          or DIIG&#xb9; 008 in (812.50 (DisG    (      /              (*
(
LiNE&#xb9; 2RHS-012-10-1 NTS: 9          (GrP ReP(    1  (      /              (*
I <<HCV548 INT SUR                      (8-H-2  (
na  (  VT3/VT2.01 2RHS*HCV54B,VBY164        (
QISO 66-54          or  DUG&#xb9; 008  in (812.50 (none    (      /
LINE&#xb9; 2RHS-012-30-1    NTS: 9        (NS      (
1  (      /
 
NIAGARA MOHAMK POMER CORPORATION      -      MILE POINT NUCLEAR STATION - UNIT 2                        5 of 135 NMP2-ISI-006, REV. 1, CH-000                                      SECOND TEH YEAR      IHSERVICE INSPECTION  (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL RED i DESCRIPTIOH OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE          )PERIOD  1                                REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONEHI'MG      &#xb9;, LITEM    &#xb9; iFREOYi EX2/NDE PROCEDURE    )PERIOD 2 USE CAL BLK &#xb9; I  LIHE HO  AHD NOTES'S    APPLICABLE ISELECT    ICLASSI EX3/NDE PROCEDURE    IPERIOO 3  I
(
                            *HOV104 IHT SUR                    IB  M  2  I na  I  VT3/VT2.01        i<<          i<<Examine Ken dissassemble    for maintenance 2RHS<<MOV 104, VBY165    i QISO  66-47          or DMG&#xb9; 018 in i812.50 iDisG      i    /              i<<
J LINE&#xb9; 2RHS-006-142-1 NTS: 5        iGrp Repi    1    i    /              i<<
i <<MOV112 INT SUR IB.M.2    I na    I VT3/VT2.01                    i<< Examine  Mhen dissassemble for maintenance 2RHS*MOV112, VBY166    i QISO 66-55            or DMG&#xb9; 007 in i812.50 iDisG      i    /                          I t  LINE&#xb9; 2RHS-020-159-1 NTS: 27      )GrP RePi    1    i    /                          I I
                            *MOV113 INT SUR                    IB M-2    I na    I VT3/VT2.01          IEX6 2RHS<<MOV113, VBY167    i QISO 66-21            or DMG&#xb9; 007 in i812.50 inone      i    /              I LINE&#xb9; 2RHS.020.114-1 NTS: 27      iHS        i  1    i    /              I i PIPE/<<MOV1C                          IC-F-I I na        I VOL/UT6.13          IEX6 2RHS*MOV1C, VMMOVIC-A  /  QISO 66-22          or DMG&#xb9; 020 in iC5.11 iID        i SUR/PT3.00          I NMP2-24-.500-SS  /  LINE&#xb9; 2RHS-024-334-2 HTS: 108,58 i7.5XMin) 2          i na  /              I
                            <<MOV1C BODY/SOF                    iC-F-2    i na    i SUR/PT3.00/MT4.00  i 2RHS<<MOV1C, VMMOV1C-8    i  QISO 66-22          or DMG&#xb9; 020 in iC5.70    inone i na    /              I i  LINE&#xb9; 2RHS-024-334-2 NTS: 58,59    LSD        i  2    i na  /na            I IMC-5    I <<MOVIC BODY/BEARING HECK            IC  G    I na    I SUR/PT3.00/MT4.00 IEX6 2RHS*MOV1C,VMMOV1C-C    i QISO  66-22          or DMG&#xb9; 020 in iC6.20 [ID        i na /na i  LIHE&#xb9; 2RHS-024-334-2 NTS: 58,60    iGrp Repi 2        i na /na              I IMC-5    I <<MOVIC BODY/BEARING HECK            IC  G    I na    I SUR/PT3.00/MT4.00 IEX6 2RHS*MOV1C,VMMOVIC D    I QISO  66-22          or DMG&#xb9; 020 in iC6.20 iID        ) na /na              I i  LINE&#xb9; 2RHS-024-334-2 NTS: 58,60    iGrp Repi 2      i na  /na            I IMC-5    I
                            *MOV1C BODY LM                      IC-G      I na    I SUR/PT3.00/MT4.00 lEX6 2RHS<<MOV1C,VNVIC.LM        QISO 66-22          or DMG&#xb9; 020 in JC6.20 iID        i na  /na J
LINE&#xb9; 2RHS-024-334-2 NTS: 58        iGrp Repi 2      i na  /na            I I
                            <<MOV24A IHT SUR                    IB-M-2    I na    I VT3/VT2.01          i<<        i<< Examine <ken dissassemble  for maintenance 2RHS<<MOV24A,VBY168        i QISO 66-19          or DMG&#xb9; 008 in i812.50 iDIsG      i    /              /<<
i LINE&#xb9; 2RHS-012-75-1 NTS: 9          iGrp Rep/ 1      i    /              I
 
NIAGARA HOHAMK POMER CORPORATION        -        ILE POINT NUCLEAR STATION - UNIT 2                      6 of 135 NHP2-ISI-006, REV. I( CH-000                                          SECOND TEN YEAR      INSERVICE INSPECTIOH  (Isl)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEM (sorted by Examination Identifier)
To BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD                                          REMARKS 2ND INTVL REL RE  I DESCRIPTION OF ITEH 1
I EXAHINATION IDEHTIFIER f ITS ISO LOCATOR, COMPONENT DMG        &#xb9;, ]ITEM  &#xb9; )FREOY[ EX2/NDE PROCEDURE )PERIOD 2 )
USE CAL BLK  &#xb9; I  LINE No. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I I
                            *HOV24B INT SUR                      /8-M-2  /  na  /  VT3/Vt2.01 2RHS<<MOV24B,VBY169        / QISO 66-31            or  DMG&#xb9; 008  in /012.50 )none    f      /
I  LINE&#xb9; 2RHS-012-28-1    HTS: 9        INS      I  1  I      /
i <<HOV24C  INt SUR                      IB H 2    I  na  I  VT3/VT2 01          I'<<        )<< Examine shen dissassemble for maintenance 2RHS*HOV24C,VBY170        i QISO  66-26          or DMG>> 008 in (812.50 [DisG      f      /
f  LINE&#xb9; 2RHS-012-44-1 NTS: 16          JGrp Repf 1        f    /
I <<HOV2A BODY/SOF
                                                                  /C-F-2    /  na    / SUR/PT3.00/HT4.00    /
2R HS*MOV2A,VNOV2A-A      )  QISO 66-13          or DMG&#xb9; 019 in (C5.70      ]ID      f na  /                  Sc9 t  LINE&#xb9; 2RHS-018-203-2 HtS: 68,69      ]SO      )  2    f na  /na I
                            *HOV2A BODY/SOF                      JC-F-2    [  na      SUR/PT3.00/MT4.00    I 2RHS*HOV2A,VNOV2A-B      i  QISO 66-13          or  DMG&#xb9;  019 in ]C5.70    [none    [ na  /                I na                )  LINE&#xb9; 2RHS-018-203-2 NTS: 68,69      iso      i  2      na /na              I IMC-5    ] *MOV2A BOOT/BEARING NECK              [C-G      f  na    f SUR/PT3.00/Ht4.00      sc7 2RHS*HOV2A,VNOV2A-C      i QISO 66-13            or OMG>>  019 in IC6.20    110      I na  /na              I J
LINE&#xb9; 2RHS-018-203-2 NTS: 68,70      JGrp Rep)    2    J na /na              I IMC-5    J
                            *MOV2A BODY/BEARING NECK              IC  G    I  na    I SUR/PT3.00/Mt4.00    I  Sc7 2R H S<<HOV2A, VNOV2A.D    i QISO 66-13          or DMG&#xb9; 019.in [C6.20 )ID          ( na  /na f LINE&#xb9; 2RHS-018-203-2 NTS: 68,70      (Grp Rep] 2        ) na  /na              I
                          / *HOV20 BODY/SOF IC-F-2    I  na . I SUR/PT3.00/HT4.00    I        I 2RHS*HOV2B, VNOV2B-A .    )
QISO 66-23          or DMG&#xb9; 019 in /C5.70      [none    f na  /                I        I, I LINE&#xb9; 2RHS-018-65-2 Hts: 68,116 ISD            I  2    I na  /na              I        I f
                            <<HOV2B BODY/SOF                      JC-F-2    I  na    I SUR/PT3.00/HT4.00    I 2RHS*MOV28, VNOV2B-B      / QISO 66-23          or DMG&#xb9; 019 in JC5.70      /none    J na  /
                          ) LINE&#xb9; 2RHS-018-65-2 NTS: 68,116 JSD              [  2    J na  /na              I f
                            *HOV20 BODY/BEARING NECK              /C-G      f na    / SUR/Pt3.00/IIT4.00  f 2RHS*MOV2B,VMHOV2B-C      )
QISO 66-23          or DMG&#xb9; 019 in [C6.20      [none  ] na  /na I LINE&#xb9; 2RNS-018.65-2 NTS: 68(70        INS      I  2    I na  /na              I
 
NIAGARA MOHAMK P(HIER CORPORATION -              ILE POINT NUCLEAR STATION - UNIT 2                        7 of 135 NMP2-ISI-006( REV. 1( CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND IN'IVL REL REQ i DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCC) EX1/NDE PROCEDURE iPERIOO                1                                REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COMPONENT DIIG        &#xb9;, [ITEM  &#xb9; JFREOY( EX2/NDE PROCEDURE (PERIOD 2 f USE CAL BLK  &#xb9; I  LINE HO  AHD NOTES  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I f
                            *MOV28 BODY/BEARIHG NECK              [C-G      f  na    [  SUR/PT3.00/MT4.00  [
2RHS<<MOV28, WMOV28-0    i QISO  66-23          or DUG&#xb9; 019 in (C6.20      )none    [  na /na
                        /  LINE&#xb9; 2RHS-018-65-2 NTS: 68,70        /NS      f  2    /  na /na              I
                            *MOV40A INT SUR                        [8-M-2 [ na        /  VT3/VT2~ 01                    (*  Examine shen dissassemble for maintenance 2RHS*MOV40A,VBY171      f  QISO 66-19          or DUG&#xb9; 018 in )812.50 (DisG        J      /                /<<
f  LINE&#xb9; 2RHS-012-119-1 NTS: 9            JGrp Repf 1        f      /
I *MOV4 8 INT SUR
                                                                    /8-M-2 / na        /  VT3/VT2.01                    I 2RHS<<MOV40B,VBY172      (
QISO 66-32          or DNG&#xb9; 018 in (812.50 [none        )      /                          I I  LINE&#xb9; 2RHS-012-219-1 HTS: 22          INS      I  1    I      /                          I J
                            *MOVBA BODY/SOF                        JC-F-2    ]  na    J SUR/PT3.00/MT4.00    J        I 2RHS*MOVBA,WHOVBA.A      i QISO 66-14            or DUG&#xb9; 019 in JC5.70      )none    f  na  /                I        I na                    LINE&#xb9;  2RHS-018-20-2    N'IS: 68,69    JSD      f  2    I  na  /na              I        I
                            <<MOVBA BODY/SOF                        (C-F-2    f  na    f  SUR/PT3.00/M'I4.00  f 2RHS*MOVBA,WMOVBA 8      i  QISO 66-14          or  DUG&#xb9;  019  in (C5.70    ]none    (
na  /                I f  LINE&#xb9; 2RHS-018-20-2 NTS: 68,69        JSD      f  2    /  na /na              I INC-5      I
                            *MOVBA BODY/BEARING NECK              IC  G    I  na    I SUR/PT    00/MT      I 2RHS*MOVBA,WMOVBA-C      I  QISO 66-14          or DUG&#xb9; 019 .in IC6.20 I ID          I  na /na                  Sc9 na                  /  LINE&#xb9;  2RHS-018-20-2    NTS: 68,70    [Grp Rep/ 2        /  na /na              I INC-5      I *MOVBA BODY/BEARING NECK                IC  G    I  na    I SUR/PT3.00/MT'0      I 2RHS*MOVBA WMOVBA-0      i QISO  66-14          or DUG&#xb9; 019 in JC6.20 ]ID            J na /na              f  Sc9 f  LINE&#xb9; 2RHS-018-20-2 HTS: 68,70        /Grp Repf 2        f na /na              I I *MOVBB BODY/SOF
                                                                    )C-F-2    f na    f SUR/P'l3.00/MT4.00  (
2RHS*MOVBB,WHOVBB-A      J QISO 66-29          or DNG&#xb9; 019 in )C5.70        ]none    f na  /                I LINE&#xb9; 2RHS-018-40-2 NTS: 68,116 /SD              /  2    [ na /na                I
                            *MOVBB BODY/SOF                        JC-F-2    f na    f SUR/PT3.00/MT4.00    f 2RHS<<MOVBB,WMOVBB-B      [ QISO  66-29          or DUG&#xb9; 019 in JC5.70        /none    f na  /
na                  f  LINE&#xb9; 2RHS-018-40-2 NTS: 68,116 JSD              /  2    f na /na                I
 
NIAGARA HOHAMK POWER CORPORATION -        N      ILE POINT    NUCLEAR STATION  - UNIT 2                      8 of 135 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH 'YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                  APPEHDIX G - RHS SYSTEN (sorted by Examination Identifier) 2ND IHTVL REL REO    (  DESCRIPTIOH OF ITEN TO BE EXANIHEO(CATGRY (IGSCC( EX1/NDE PROCEDURE            (PERIOD 'I                                  RENARKS EXANIHATIOH IDENTIFIER    (
ITS ISO LOCATOR, COMPONENT DMG  &#xb9;,  (ITEN  &#xb9; (FREOY( EX2/NDE PROCEDURE        (PERIOD 2    (
USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3
(
                              <<NOVBB BODY/BEARING NECK            (C-G      (
na  (
SUR/PT3.00/HT4.00    (
2RHS<<HOVBB,VWNOVBB-C      (
QISO 66-29          or DMG&#xb9; 019 in (C6.20      (none  (  na /na
(
LINE&#xb9; 2RHS 018 40 2 HTS: 68i70      (HS      (  2  (
na /na                I
(
                              <<HOVBB BODY/BEARING HECK            (C-G      (  na    (
SUR/PT3.00/HT4.00    (
2RHS<<HOVBB,VWNOVBB.D      (  QISO 66-29          or DMG&#xb9; 019 in (C6.20      (none    (
na /na
(  LINE&#xb9; 2RHS-018-40-2 NTS: 68,70      (NS      (
2    (
na /na                I
(
                              *P1A MNF/PIPE                        IC-F-2    I  na    I  VOL/UT6.02            I 2RHS<<P1A, PM100A          (
QISORef66-13        or DWG&#xb9; 026 in (C5.51      (none    (
SUR/PT3.00/NT4.00    (
HHP2-RHS-.75-CS      (  LINE&#xb9; 2RHS.024-na-2 NTS: 61, 145 (SD          (
2    (
na /na I
                              <<P1A PIPE/HD SHL                    (C-F-2    (
na    (  SUR/PT3.00/NT4.00    (
2RHS<<P1A,PW101A            (
QISORef66-13        or DWG&#xb9; 026 in (C5.81      (none    (
na  /                I
(
LIHE&#xb9; 2RHS-024-na-2 HTS: 145,146 (TE          (
2    (
na /na                I
(
                              *P1A PIPE/MNF                        IC-F-2    (  na    I  VOL/UT6.02            I 2RHS<<P1A,PM102A            (
QISO 66-14          or DMG&#xb9; 026 in (C5.51      (none    (
SUR/PT3.00/HT4.00    (
HHP2-18..500-CS      (
LINE&#xb9; 2RHS-018-na-2 NTS: 147,69 (SD            (
2    (
na /na
(
                              <<P1A HD  SHL/PIPE                  (C-F-2    (
na    (  SUR/PT3.00/NT4.00    (
2RHS*P1A, PM103A          (  QISO 66-14          or  DMG&#xb9; 026  in (C5.81    (none    (
na  /
(
LINE&#xb9; 2RHS-018-na-2    NTS: 146,147 (TE        (  2    (  na /na                I I <<P1A HD COVER/SHL                    (C-G      (  na    (
SUR/PT3.00/MT4.00    (
2RHS*P1A,PMIOBA            (
QISO 66-            or DWG&#xb9; 026 in (C6.10 (ID          (
na /na
(
LINE&#xb9; 2RHS-024-2-2    HTS: 146,148 (Grp Rep(      2    (
na /na                (Sc10 I
                              <<P1A HD/FLG                          (C  G    (
na    (
SUR/PT3 00/NT4 F 00 2RHS*P1A, PM110A            (
QISO  66-          or DMG&#xb9; 026 in (C6.10 (ID          (  na /na
(
LINE&#xb9; 2RHS-024-2-2    NTS: 146,149 (Grp Rep(      2    (
na /na                (Sc10 I WC-1      (
                              *P1A UPR BARREL SHL/FLG              (C-G      (
na      SUR/PT3.00/NT4.00      (*          (* Examine when dissassemble for maintenance 2RHS*P1A,PM111A            (
QISO  66-          or DMG&#xb9; 026 in (C6.10 (ID              na /na                (<<
(
LINE&#xb9; 2RHS-024-2-2    NTS: 150,151 (Grp Rep(      2      na /na                (*
 
NIAGARA HOHAMK POMER CORPORATION      - N      ILE POINT NUCLEAR STATION - UNIT 2                          9 of 135 NHP2 IS I 006'EV 1 CH ~      000                                    SECOND TEH YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date: 07/29/1999                                                                APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE              IPERIOD  1  I                              REHARKS EXAHIHATIOH IDEHTIFIER    f ITS ISO LOCATOR, COHPONEHT D'MG &#xb9;, ]ITEN  &#xb9; JFREQY] EX2/NDE PROCEDURE      )PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT    iCLASS[ EX3/HDE PROCEDURE [PERIOD 3 IMC-1      J
                            *P1A UPR/LMR BARREL SHL              /C-G    / na  /  SUR/PT3.00/HT4 F 00  /*          (*  Examine when dissasseahle for maintenance 2RHS*PlA,PM112A          J QISO 66-            or DMG&#xb9; 026 in /C6.10 /ID        /  na  /na              I*
J LINE&#xb9; 2RHS-024-2-2    HTS: 151      )Grp Rep) 2    /  na /na              /*
IMC-1      I
                            *P1A LMR BARREL  SHL/HD              /C-G    / na      SUR/PT3.00/HT4.00    /*          )*  Examine when dissassembie for maintenance 2RHS*P1A, PM113A          /  QISO 66-            or DMG&#xb9; 026 in (C6.10 /ID          na  /na
                          /  LIHE&#xb9; 2RHS-024-2-2    HTS: 151,152 )Grp Rep/ 2        na  /na              /*
I
                            *P1A LM HD/SHL                      /C-G    f na  f  SUR/PT3.00/HT4.00    f 2RHS*P1A,PM115A          /  QISO 66-            or DMG&#xb9; 026 in /C6.10 /ID        /  na  /na
                          /  LINE&#xb9; 2RHS-024-2-2    HTS: 146      /Grp Rep/ 2    /  na /na              isc10 IMC-1      I
                            *P1A LM UPR BARREL SHL              /C-G    / na  /  SUR/P'T3.00/HT4.00  /*              Examine when dissassemble for maintenance 2RHS<<P1A, PM116A          i QISO 66              or  OMG&#xb9; 026  in JC6.10  /ID    /  na  /na              /<<
                          /  LINE&#xb9; 2RHS-024-2-2    NTS: 151      /Grp Rep/ 2      / na /na              /<<
I'MC-1      I  *P1A LM  LMR BARREL SHL              JC-G    J na    f SUR/PT3.00/Hl'4.00 /<<            )*  Examine when dissassemble for maintenance 2RHS<<P1A, PM118A          i QISO 66-            or  DMG&#xb9; 026  in JC6.10  ]ID    f na /na              /<<
                          /  LIHE&#xb9; 2RHS-024-2-2    HTS: 151      JGrp Rep/  2    f na  /na              )*
IMC- I      I <<P1A BARREL SHL  PIN/HD              IC-C    I na    I SUR/PT3.00/HT4.00    I 2RHS*P1A, PM121A          i QISO 66-            or  DMG&#xb9; 026  in /C3.30  (ID    f na  /na              I f  LINE&#xb9; 2RHS-024-2-2    NTS: 152,153  IGrp Repl  2    I na  /                iSc10 i  <<PIA LM                              IC-F-2  I na    I VOL/UT6.02          I 2RHS*P1A, PM122A          / QISO 66-14          or  DMG&#xb9; 026  in JC5.52  ]none  / SUR/PT3.00/HT4.00    (
NHP2-RHS-.75-CS        LINE&#xb9; 2RHS-024-2-2    NTS: 145      /AL      /  2    f na  /na I
                            *P1B MNF/PIPE                        [C-F-2  f na    / VOL/UT6.02 2RHS*P1B,PM100B            f QISO 66-23          or  DMG&#xb9; 026  in JC5.51  ]none  / SUR/PT3.00/HT4.00 NHP2-RHS-.75-CS      I LINE&#xb9; 2RHS-024-na-2    NTS: 61,154  ISD      I  2    I na  /na I
                            <<P18 PIPE/HD SHL                    IC-F-2  I na    I SUR/PT3.00/HT4.00    I 2RHS*P18, PM101B          f QISO 66-23          or  DMG&#xb9; 026  in (C5.81  ]none  ( na  /
I LIHE&#xb9; 2RHS.024-na-2    NTS: 154,146  ITE      I  2    I na  /na              I
 
NIAGARA HOHAMK POMER CORPORATION        - N      ILE POINT  NUCLEAR STATION - UNIT 2        10 of 135 NHP2-ISI-006( REV. 'I, CH-000                                      SECOHD TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                  APPENDIX G - RHS S'YSTEH (sorted by Examination Identifier) 2ND INTVL REL REO    DESCRIPTIOH OF ITEH TO BE EXAHINED[CATGRY (IGSCC) EX1/NDE PROCEDURE            (PERIOD  1                          REHARKS
                        )
EXAHINATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DMG &#xb9;u IITEH          &#xb9; IFREQYI EX2/HDE PROCEDURE IPERIOD 2 I USE CAL BLK &#xb9; I  LINE NO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
                        ]  *P1B PIPE/MNF                        /C-F-2  ]  na  )
VOL/UT6.02 2RHS*P18, PM1028        (
QISO 66-24          or DUG&#xb9;  026  in )C5.51  ]none    [
SUR/PT3.00/HT4.00    J NHP2-18-.500-CS      LINE&#xb9; 2RHS-018-na-2 NTS: 147,69 JSD                2    f  na/na I
                          *PIB HD SHL/PIPE                      IC-F-2  I na    I  SUR/PT3 00/HT        I 2RHS*P1B, PM103B        )  QISO 66-24          or DMG&#xb9; 026 in (C5.81    [none    J na  /                I I  LINE&#xb9; 2RHS.018-na-2 NTS: 146 147 ITE              2    J na/na                I
                          *P18 HD COVER/HD SHL                  IC-G    I  na    I  SUR/PT3.00/HT4.00    I 2RHS*P1B, PM108B        I QISONA                or  DMG&#xb9; 026  in /C6.10  /none    /  na /na              I LINE&#xb9; 2RHS-024-22-2    HTS: 146,148  iNS          2    /  na/na                I I  *P1B HD  SHL/HD FLG                  IC-G    I  na    I  SUR/PT3.00/HT4.00    I 2RHS*P1B,PM1108        i QISONA                or  DMG&#xb9; 026  in /C6.10  ]none    )  na /na              I I  LINE&#xb9; 2RHS-024-22-2    NTS: 146(149  INS          2    )
na/na                I IMC-1    (
                          *P1B UPR BARREL SHL/FLG              )C-G    I  na    I  SUR/PT3.00/HT4.00    I 2RHS*P18, PM111B        i QISO  66-            or DMG&#xb9; 026 in [C6.10    (none    (
na  /na              I LINE&#xb9; 2RHS-024-22-2 NTS: 150,151 [NS              2    /  na/na                I IMC.1    I  *P18 UPR/LMR BARREL SHL              IC  G    (  na    J SUR/P'I3.00/HT4.00  (
2RHS*P1B, PM1128          QISO 66-            or DMG&#xb9; 026 in /C6.10    /none    )  na  /na              I I LINE&#xb9; 2RHS-024-22-2 HTS: 151          INS          2    /  na/na                I IMC-I    [
                          *P18 LMR BARREL SHL/HD                IC-G    J na    J SUR/PT3.00/HT4.00    ]
2RHS'P1B,PM1138          i QISO 66-            or DMG&#xb9; 026 in /C6.10    [none    f na  /na i LINE&#xb9; 2RHS-024-22-2 HTS: 151,152 (HS              2    / na /na                I I
                          *P1B L'M HD/SHL                      IC-G    f  na    (
SUR/PT3.00/HT4.00    f 2RHSAPTB,PM115B          / QISONA              or  DMG&#xb9; 026  in /C6.10  /none    f na /na I LINE&#xb9; 2RHS-024-22-2    HTS: 146      INS          2    J na /na                I IMC-1    I
                          *P1B LM UPR BARREL SHL                IC-G      f na    J SUR/PT3.00/HT4.00    f 2RHS*PTB, PM116B          QISO 66-            or DUG&#xb9; 026 in /C6.10      /none    ) na /na
                        ) LINE&#xb9; 2RHS-024-22-2 NTS: 151          )NS          2    / na/na                I
 
0 NIAGARA HOHAWK POWER CORPORATION        - N        ILE POINT NUCLEAR STATION - UNIT 2        11 of 135 NNP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION            (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED        DESCRIPTION OF ITEN TO BE EXAHIHED(CATGRY      )  IGSCC[ EX1/NDE PROCEDURE )PERIOD          1                      REHARKS
                          )
EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'ONPOHENT DWG            &#xb9;  I ITEN  &#xb9; IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK &#xb9; i  LIHE NO. AND HOTES,  AS  APPLICABLE DESELECT  iCLASSi EX3/NDE PROCEDURE iPERIOO 3 IWC-1    I
                              *P18 L'W LWR BARREL SHL              IC-G      I  na    I  SUR/PT3.00/HT4.00    I 2RHS*P1B,PM1188            i QISO 66-            or  DWG&#xb9; 026 in /C6.10    ]none    f  na /na I  LINE&#xb9; 2RHS-024-22-2    NTS: 151    INS            2    [  na /na                I IMC-1    I
                              *P1B BARREL SHL PIH/HD              /c-c      f  na    f  SUR/PT3.00/NT4.00      J 2RHS~P  I 8, PM121B        f  QISO 66-            or DMG&#xb9; 026 in /C3.30    /none    /  na /na                I na                  I  LINE&#xb9; 2RHS-024-22-2 NTS: 152,153 IHS                2    /  na/na                  I
                          /
                              *P1B LW                              IC-F-2  [  na    f  VOL/UI'6.02 2RHS*PlB,PM1228            i QISO  66-24          or DMG&#xb9; 026 in )C5.52    )none    f  SUR/P'T3.00/Ml'4.00    f HHP2-RHS-.75-CS      I  LINE&#xb9; 2RHS-024-22-2 NTS: 154          IAL          2    [  na  /na                I I
                              ~PIC WNF/PIPE                        IC-F-2  [  na    [  VOL/UT6.02 2R RSVP I C, PMI DOC      i QISO  66.22          or DMG&#xb9; 026 in (C5.51    ]none    f  SUR/PT3.00/HT4.00      /
NHP2-RHS-.75-CS          LINE&#xb9; 2RHS-024-na-2 NTS: 61(154 (SD                2    f  na/na P1C PIPE/HD SHL                      IC-F-2  I  na    I SUR/PT3  00/HT    0  I 2RHS~P  IC, PW101C        (  QISO 66-22          or  DMG&#xb9; 026 in  )C5.81  /none    )  na  /                  I
                          ]  LINE&#xb9; 2RHS-024-na-2 NTS: 154,146 (TE                2    (  na/na                  I i ~PIC PIPE/MNF                          IC-F-2    I  na    I  VOL/UT6.02            IEX6 2RHS*P1C, PW102C            )  QISO 66-25          or DWG&#xb9; 026 in (C5.51      IID      I  SUR/PT3.00/HT4.00 I NHP2-18-.500.CS      I  LINE&#xb9; 2RHS-018-na-2 NTS: 147,69 ISD                2    /  na /na I
                              ~PIC HD  SHL/PIPE                    IC-F-2    I  na    I  SUR/PT3.00/HT4.00 IEX6 2RHS*P1C, PW103C            i QISO  66-25          or DWG&#xb9; 026 in (C5.81      /ID      f na/                    I
                            ]  LINE&#xb9; 2RHS-018-na-2 NTS: 146,147 [TE                2    )  na  /na                I
                              *P1C HD COVER/HD                      JC-G      f  na    (  SUR/PT3.00/NT4.00      JEX6 2RHS*P1C, PW108C              QISO 66-            or DWG&#xb9; 026 in JC6.10 /ID            / na /na
                            /  LIHE&#xb9; 2RHS-024-334-2 NTS: 146,148 JNandate/        2    / na /na                  I I  ~PIC HD  SHL/FLG                      JC-G      J na    J SUR/PT3.00/HT4.00      )EX6 2RHSAP I C, PMI IOC        )
QISO 66-            or  DWG&#xb9; 026 in  JC6.10    [ID      f na /na f LINE&#xb9; 2RHS-024-334-2 NTS: 146,149 (Handate/        2    f na  /na                I
 
NIAGARA HOHAMK PDMER CORPORATIOH          -        ILE POINT NUCLEAR STATION - UNIT 2                        12 of 135 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX  G - RHS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REQ    I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY I IGSCCI EX1/NDE PROCEDURE  IPERIOO  1  I                              REHARKS EXAHINATIOH IDENTIFIER      f  ITS  ISO  LOCATOR, COHPONENT  DMG &#xb9;,  ] ITEN  &#xb9; JFREOYJ    EX2/HDE  PROCEDURE  [PERIOD 2 USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT          iCLASSJ EX3/HDE PROCEDURE        )PERIOD 3 i IMC-1      )
                                *P1C UPR BARREL FLG/SHL                ]C-G      /  na    f  SUR/PT3.00/HT4.00    f>>          )<<Examine when dissassemble  for maintenance 2RHS<<P1C, PM111C            )  QISO 66-              or  DMG&#xb9; 026  in IC6.10    IID      I  na /na              I<<
                            )
LINE&#xb9; 2RHS-024-334-2 NTS: 150,151 [Handate(          2    J na /na I WC-1    /
                                *P1C UPR/LMR BARREL SHL                /C-G      /  na      SUR/PT3.00/HT4.00    /<<        (>> Examine when dissassembie  for maintenance 2RHS<<P1C, PM112C            /  QISO 66-              or DMG&#xb9; 026  in /C6.10    /ID        na /na                />>
                            /  LINE&#xb9; 2RHS-024-334-2 NTS: 151          JHandate)    2      na /na                />>
f<<        )>> Examine when dissassemble  for maintenance IMC-1      I  *P1C  LMR BARREL SHL/HD                [C-G      [  na    f  SUR/PT3.00/HT4.00 2RHS<<P1C,P'M113C            i QISO 66-            or DMG&#xb9; 026 in /C6.10 /ID            /  na /na J
LINE&#xb9; 2RHS-024.334-2 NTS: 151,152 /Handate/ 2              /  na /na
                                <<P1C  HD L'M                          JC-G      /  na    )
SUR/PT3.00/HT4.00    IEX6 2R H S<<P1C, PM 115 C        i QISO 66-                or  DWG&#xb9;  026 in /C6.10    /ID      /  na /na                I
[  LINE&#xb9; 2RHS-024-334-2 HTS: 146          /Handate/    2    /  na /na                I I WC-1    I
                                <<P1C LM UPR BARREL SHL                  JC.G      f  na    J SUR/PT3.00/MT4.00    I*        (<< Examine when dissassemble  for maintenance 2RH S<<P I C, PM116C        / QISO 66-            or DWG&#xb9; 026 in JC6.10 ]ID            J na  /na              I*        I
                            )
LIHE&#xb9; 2RHS-024-334-2 NTS: 151          [Mandate] 2        f  na  /na              I          I IMC-1      i <<P1C LM LMR BARREL SHL                    ic-G                SUR/PT3.00/HT4.00    /<<        )<< Examine when dissassembie  for maintenance 2RHS*P1C,PM118C              /  QISO 66-              or DMG&#xb9; 026 in /C6.10 /ID              na /na                /<<
                            )
LIMES 2RHS-024-334-2 NTS: 151            /Handate/ 2          na /na                /<<
IMC-1      I
                                <<P1C BARREL SHL PIN/HD                  /C-C      / na      SUR/PT3.00/HT4.00 J>>              [>> Examine when dissassembie for maintenance 2RHS*P1C, PM121C            J QISO  66-            or DMG&#xb9; 026 in /C3.30 /ID              na  /na              )<<
                            /  LINE&#xb9; 2RHS-024-334-2 NTS: 152,153 )Handate/ 2                na  /na              />>
i <<P1C LM                                  (C-F-2    ) na    / VOL/UT6.02 2RHS<<P1C, PW122C            f  QISO 66-25            or  DMG&#xb9; 026  in  (C5.52    /none    / SUR/PT3 F 00/HT4.00  f NHP2-RHS-.75-CS      /  LINE&#xb9; 2RHS-024.na-2      N'IS: 154      JAL      /  2    f na  /na P I PE/*P V21A                          IC-F-2    I-na    I VOL/UT6.02 2R H S<<P V21A, VWP V21A-A    J QISO  66-09          or DMG&#xb9; 045 in JC5.51        ]none    J SUR/PT3.00/HT4.00 NHP2-8-.594-CS        I  LINE&#xb9; 2RHS-008-na-2 HTS: 31,36          ISD      I  2    I na /na
 
NIAGARA HOHAMK POWER CORPORATION        -        ILE POINT  NUCLEAR STATION  - UNIT 2        13 of 135 NHP2-ISI-006, REV. 1( CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                  APPENDIX  G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED  (
DESCRIPTION OF ITEH TO BE EXAHINED)CATGRY )IGSCC) EX1/NDE PROCEDURE            )PERIOD  1                            REHARKS EXAHINATION IDEHI'IFIER J ITS ISO LOCATOR, COMPONENT DMG    &#xb9;,  ]ITEN  &#xb9; JFREOY] EX2/NDE    PROCEDURE  ]PERIOD 2  )
USE CAL BLK  &#xb9; J LINE NO. AND NOTES, AS APPLICABLE )SELECT iCLASSi EX3/NDE            PROCEDURE  iPERIOD 3
(
                            *PV21A/PIPE                            IC-F-2    I na    I VOL/UT6 02          IEX6 2RHS PV21A,VMPV21A-B    / QISO    66.09        or DMG&#xb9; 045 in /C5.51        IID    I SUR/PT3 F 00/HT4.00  I NHP2-8-.594-CS    /  LINE&#xb9; 2RNS.008.na-2 NTS: 31,38        /SD          2    (
na/na I  PIPE/4PV218                            IC-F-2    I na    I VOL/UT6.02            I 2RHS~PV21B, VMPV21B-A      QISO  66.05        or DMG&#xb9; 045 in )C5.51        Inone  I SUR/PT3.00/HT4.00    I NHP2.8-.594.CS    I  LINE&#xb9; 2RHS-008-na-2 NTS: 31,37        )SD          2    / na  /na I
4PV218/PIPE                            IC-F-2    f na    / VOL/UT6.02 2RHS~PV21B VMPV2IB 8    I  QISO 66 05          or  DMG&#xb9; 045  in [C5.51    ]none  [ SUR/PT3.00/HT4.00    f NHP2.8-.500-CS    I  LINE&#xb9; 2RNS-008.na-2    NTS: 37,38    ISD          2    / na /na                I
                        / LM IC-F-2    / na    / VOL/UT6.02 2RHS*STRT1A,STRT-LMODIA( QISO 66-13            or  DMG&#xb9; 030  in [C5.52    /none  / SUR/PT3.00/HT4.00    /
NHP2-24-.500-CS    I  LINE&#xb9;  2RHS 024-2.2    NTS: 74        INS          2    / na /na f  WNF/PIPE                              (C-F-2    J na    f VOL/UT6.02 2RHS*STRTIA,STRTMLOOOIAJ QISO 66-13              or  DMG&#xb9; 030  in JC5.51    [none  ] SUR/PT3.00/HT4.00    J NHP2-24-.500.CS    I  LINE&#xb9; 2RHS-024-2-2      NTS: 61(74    I SD        2    ] na  /na              I I  PIPE/TEE                              IC-F-2    / na    f VOL/UT6.02 2RHS~STRTIA,STRTMLD002AI QISO    66.13          or  DMG&#xb9; 030  in )C5.51    Inone  I SUR/PT    00/HT      I NHP2-24-.500.CS    I LINE&#xb9; 2RHS.024-2-2    HTS: 73,74    ISD      J 2    ~
na  /na I *STRT18 LW IC-F-2            i VOL/UT6.02                        I 2RHS~STRTIB,STRT-LM001$ i  QISO 66-23          or DMG&#xb9; 030    in (C5.52    ]none  f SUR/PT3.00/HT4.00    /          I NHP2-24-.500-CS    i LINE&#xb9; 2RHS-024-22-2 HTS: 74            iNS      I  2    I na/na                I          I WNF/PIPE                              IC-F-2    f na    J VOL/UT6.02 2RHS~STRT1B,STRTMLD001BI QISO 66 23              or  DMG&#xb9; 030  in JC5.51    ]none  J SUR/PT3.00/HT4.00    J NHP2-24-.500-CS    i LINE&#xb9; 2RHS-024-22.2    NTS: 61,74    (SD          2    f na /na I PIPE/TEE                              IC-F-2    I na    I VOL/UT6.02            I 2RHS*STRTIB,STRTMLD002B( QISO 66-23              or  DWG&#xb9; 030  in  )C5.51  /none  J SUR/PT3.00/HT4.00    )
NHP2-24-.500.CS    I LINE&#xb9;  2RHS 024 22 2    NTS'3    74    ISD        2    f na  /na
 
NIAGARA MOHAWK POWER CORPORATION          - H.. MILE POINT NUCLEAR STATION - UNIT 2                                            14 of 135 HHP2-ISI-006( REV. 1, CH-000                                          SECOHD TEH YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX  G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTIOH OF ITEH TO BE EXAMINEDiCATGRY            iIGSCCi EX1/NDE      PROCEDURE  iPERIOO    1                                REMARKS EXAHINATION IDEHTIFIER i ITS ISO LOCATOR, COMPONENT OWG        &#xb9;,  LITEM  &#xb9; iFREQYi EX2/NDE PROCEDURE iPERIOD 2 i USE CAL BLK  &#xb9; i  LINE NO. AND  NOTES,  AS  APPLICABLE  DESELECT  JCLASSi EX3/NDE PROCEDURE iPERIOO 3 i LW IC-F-2    I  na  I  VOL/UT6.02          I 2RHS<<STRTIC,STRT-LWOOICi QISO  66.22            or OMG&#xb9; 030 in iC5.52      inone    i SUR/PT3 F 00/MT4.00  /
NMP2-24-.500-CS  i LINE&#xb9; 2RHS-024-42-2 NTS: 73              JHS      i  2    i na  /na i WNF/PIPE JC-F-2    i na    i  VOL/UT6.02 2RHS<<STRT1C,STRTMLD001Ci QISO  66-22            or  DWG&#xb9; 030  in /C5.51    )none i SUR/PT3.00/HT4.00 NHP2-24-.500.CS  I  LINE&#xb9; 2RHS.024-42-2 NTS: 61,73          ISD      I  2 I na    /
i PIPE/TEE                                  iC-F-2    i na    i VOL/UT6.02 2RHS*STRT1C,STRTWLD002CI QISO 66-22              or  DMG&#xb9; 030  in iC5.51    inone    i  SUR/PT3.00/MT4.00 i NMP2-24-.500-CS  i  LINE&#xb9; 2RHS-024-42-2      NTS: 73,73    iSO      J 2    J na /na
                          *V143 INT  SUR                          IB  M 2  I  na    I  VT3/VT2.01          J<<          i<< Examine when dissassemble for  maintenance 2RNS*V143,VBY173        i QISO  66-47            or DMG&#xb9; 003 in i812.50 [DisG        i    /                I i  LINE&#xb9; 2RHS-006-142-1 NTS: 5              /Grp Repi 1        i    /                i<<
I  PIPE/*V309                              iC-F-1    i na        na /na 2RHS<<V309,VWV309-A      J QISO 66-60      ,
or DWG&#xb9; na in inone        inone    i na  /na na                I  LIHE&#xb9; 2RHS.008-297-2 NTS: 128,143 INS              I  2    I  na /na I
                          *V376 BODY/SOF                          iC-F-2    i na    i SUR/PT3.00/MT4.00    i 2RNS<<V376,VNG76-A        i QISO 66-13            or DMG&#xb9; 057 in iC5.70      inone    i na  /
i LINE&#xb9; 2RHS-024-1-2        NTS: 58,59    LSD      i  2    i na  /na              I i *V376 BODY/BEARING NECK                  iC-G      i na        SUR/PT3.00/MT4.00    I            iNOTE NAHE CHANGE:  Called VM376-C in 1st Interval Plan (only) 2RHS<<V376(VMV376-C      i QISO 66-13            or DMG&#xb9; 057    in iC6.20    iID        na /na              I            I i LINE&#xb9; 2RHS-024-'1-2      HTS: 58,60    iGrp Rep)    2      na /na              iSc10        I I *V376 BODY/BEARING    NECK              IC-G      I  na    I  SUR/PT3.00/MT4.00 I              iNOTE NAME CHANGE:  Called VM376-0 in 1st Interval Plan (only) 2RHS<<V376(VMV376.0      i QISO  66-13            or DMG&#xb9; 057 in iC6.20 iID            i na /na i LINE&#xb9; 2RHS 024-1-2        NTS: 58,60    iGrp Repi 2        i na /na                i Sc10 IMC-5    i <<V376  BODY LW                          iC  G      i na    i SUR/PT3.00/MT4.00    I            iHOTE NAME CHANGE:  Called VM376-LM001  in 1st Ten-Year Plan (only);
2RHS<<V376,VNG76.LM      ) QISO  66-13            or DMG&#xb9; 057 in iC6.20 iIO            i na /na              I na                i LINE&#xb9;  2RHS-024-1-2      NTS: 58        iGrp Rep) 2        i na /na              i Sc10
 
NIAGARA NOHAWK POWER CORPORATION -                  ILE POINT  NUCLEAR STATION  - UNIT 2        15 of 135 HHP2-ISI-006, REV. 1, CH.OOO                                          SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX  G  - RHS SYSTEN (sorted by Examination Identifier) 2HD INTVL REL RED ( DESCRIPTION OF ITEN To BE EXANIHEO(CATGRY (IGSCC( EX1/NDE PROCEDURE                  (PERIOD  1                          RENARKS EXAHINATION IDEHTIFIER  ( ITS ISO LOCATOR, COHPOHEHT DWG    &#xb9;,  ( ITEN &#xb9; (FREOY( EX2/HDE PROCEDURE        (PERIOD 2  (
USE CAL BLK &#xb9; (
LIHE Ho. AHD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3                  (
I
                            *V377 BODY/SOF                          IC  F  I  na    I SUR/PT      0/NT        I 2RHS*V377  N/377-A      (
QISO  66-23          or DWG&#xb9; 057 in (C5.70      (none    (
na  /
I  LINE&#xb9; 2RHS-024-332-2 HTS: 58,59        ISD      I  2    I  na  /na                I I  'V377  BODY/BEARING HECK              IC-G      I na    I  SUR/PT3.00/NT4 F 00    I 2RHS<<V377,VWV377-C      (
QISO 66-23            or  DUG&#xb9; 057  in (C6.20    (none  (  na  /na                I
(  LINE&#xb9; 2RHS-024-332-2 NTS: 58,60        (NS      (
2    (
na /na                I
(
                            <<V377 BODY/BEARING NECK                IC-G      I na    I SUR/PT3.00/MT4.00      I 2RHS*V377, VWV377-0    (
QISO 66-23            or DMG&#xb9; 057 in (C6.20      (none    (
na  /na
(
LINE&#xb9;  2RHS-024-332-2  NTS: 58,60    (NS      (  2    (
na /na                (
(
                            *V377  BODY LM                        (C-G      (
na    ( SUR/PT3.00            I 2RHS<<V377,VMV377-LW    I  QISO 66-23            or DWG&#xb9; 057  in  (C6.20    (none    (
na /na                I I  LINE&#xb9; 2RHS.024-332-2 NTS: 58            IHS      I  2    I na  /na                I
(
                            *V378 BODY/SOF                          (C-F-2    ( na    (
SUR/PT3.00/HT4.00      (
2RHS<<V378, VWV378-A      (
QISO 66-22            or DUG&#xb9; 057 in (C5.70      (none    (
na  /                  I I  LINE&#xb9; 2RHS-024-169-2 HTS: 58,59          ISO      I  2    I na  /na                I
(
                            <<V378 BODY/BEARING NECK                  (C-G    (
na    ( SUR/PT3.00/NT4.00      (
2RHS<<V378, VWV378. C    (
QISO  66-22          or DWG&#xb9; 057 in IC6 20 IID            I na  /na                ISc8
(
LINE&#xb9; 2RHS-024-169-2 HTS: 58,60        (Grp Rep( 2      ( na /na                I
(
                            'V378 BODY/BEARING NECK                (C-G    (
na    (
SUR/PT3.00/NT4.00      I 2R HS<<V378( VWV378. 0    (
QISO  66-22          or DWG&#xb9; 057 in (C6.20 (IO            (
na /na                (Sc8
(
LINE&#xb9; 2RHS-024-169-2 NTS: 58,60        (Grp Rep( 2      (
na /na                I IWC-5    I
                            <<V378 BODY  LW                          (C-G    (
na    (
SUR/P'T3.00/HT4 F 00  (
2RHS<<V378, VWV378. LW    (
QISO  66-22          or DMG&#xb9; 057 in (C6.20 (ID            ( na  /na                (Sc8
(
LINE&#xb9; 2RHS-024-169-2 HTS: 58            (Grp Rep( 2      (
na /na                I
(  SOL/PIPE                                (8-J    ( na    (
SUR/PT3 F 00/NT4.00 2RHS-177A-FW001          (
QIS0177-A            or DWG&#xb9; na    in (89.40    (none    (
na  /na
(
LINE&#xb9; 2RHS-002-177-1 NTS: 1,2          (NS      (  1    (
na  /na
 
NIAGARA HOHAWK POWER CORPORA'TION        -      NILE POINT NUCLEAR STATION - UNIT 2        16 of 135 KHP2-ISI-006( REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:  07/29/1999                                                                      APPEKDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED ( DESCRIPTION OF ITEH TO BE EXAHINED[CATGRY ( IGSCC( EX1/KDE PROCEDURE                  (PERIOD  1                        REHARKS EXAHIKATION IDEN'TIFIER i ITS ISO LOCATOR, COHPONEHT DMG        &#xb9;,  i ITEH &#xb9; iFREOYi EX2/KDE PROCEDURE iPERIOD 2 i USE CAL BLK  &#xb9; I  LINE  NO  AND NOTES'S      APPLICABLE  ISELECT  ICLASSI EX3/KDE PROCEDURE IPERIOO 3 I I  PIPE/ELB                                IB-J    f  na    ]  SUR/PT3.00/HT4.00  ]
2RHS-177A-FW002          [  arso177-A            or DMG&#xb9; na    in i89.21    /none    /  na  /na I  LINE&#xb9; 2RHS-002-177-1 NTS: 2,3          IHS          1    /  na/na              I I  ELB/PIPE                                IB-J      f  na    J SUR/PT3.00/HT4.00  J 2RHS-177A-FW003          (
aisoTTT-A            or DIIG&#xb9; na  in /89.21    )none    f na /na I  LINE&#xb9;  2RHS-002-177-1  NTS: 2,3      iKS                / na /na              I I P  I PE/*HOV67A                          IB-J      f  na    f  SUR/PT3.00/HT4.00    f 2RHS-177A-FM004          I  QI S0177-A            or  DWG&#xb9; na  in (89.21    ]none    f  na  /na na                  i  LINE&#xb9; 2RHS-002-177-1 NTS: 2,4          iNS          1    /  na/na                I
                            <<HOV67A/PIPE                            IB-J      )
na [ SUR/PT3.00/HT4.00        [
2RHS-'I77A-FW005          [  QIS0177-A            or DWG&#xb9; na    in /89.21    ]none (-na /na na                  I  LINE&#xb9; 2RHS-002-177-1 NTS: 2,4          JNS                J na  /na              I I  *V224/PIPE                              IB-J      I  na    [  SUR/PT3.00/HT4 00    I 2RHS-177A-FM006          )
QIS0177-A            or DWG&#xb9; na    in /89.40    ]none    /  na /na I  LINE&#xb9; 2RHS-002-177-1 NTS: 2,4          INS          1    /  na/na                I I  P IPE/<<V224                            IB-J      f  na    )  SUR/PT3.00/HT4.00    f 2RHS-177A-FM007          I QIS0177-A            or OMG&#xb9; na    .in /89.40    )none    ]  na  /na I  LINE&#xb9; 2RHS-002-177-1 NTS 2 4            /NS      I    1    f na/na                I I  PIPE/ELB                                IB-J    I  na      I  UR/ T3 00/HT4 F 00  I 2RHS-177A-FM008          I  Ql S0177.A            or DWG&#xb9; na    in /89.21    )none      )
na  /na na                  I  LINE&#xb9; 2RHS-002-177-1 NTS: 2,3            /KS                [ na /na              I I ELB/PIPE                                IB J    I  na      I SUR/PT  00/HT4 00  I 2RHS-177A-FW009              Ql S0177-A            or  DMG&#xb9; na  In (89.21    /none      f na  /na LINE&#xb9; 2RHS-002-177-1 NTS: 2,3            /NS          1    / na/na                I I PIPE/SOL                                /8-J      I na      I SUR/PT3.00/HT4.00    I 2RHS-177A-FM010          i QIS017T-A              or DMG&#xb9; na    in /89.40    ]none    )
na /na na                  I  LINE&#xb9;  2RHS-002-177-1    NTS: 1,2      INS          1    J na/na                I
 
NIAGARA NOHAMX POMER CORPORATION -                ILE POINT  NUCLEAR STATION  - UNIT 2        17 of 135 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOD  1                          REHARKS EXANINATION IDENTIFIER f ITS ISO LOCATOR, CONPONENT DMG      &#xb9;,  )ITEN  &#xb9; [FREOY] EX2/HDE PROCEDURE ]PERIOD 2 f USE CAL BLK &#xb9; I  LINE  KO. AND NOTES,  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I
[  SOL/PIPE                              IB-J    I  na    I SUR/PT3.00/NT4.00    I 2RHS-177A-FM011        i QISO177-A            or  DMG&#xb9; na  in /89.40    /none    [  na /na i LINE&#xb9; 2RHS-002-188-'I NTS: 1,2          INS          1    /  na /na                I I  PIPE/ELB                              IB J      I na    I  SUR/PT3.00/NT4.00    I 2RHS-177A-FM012        I  QIS0177-A            or DMG&#xb9; na    in  JB9.21    /none    /  na  /na I  LINE&#xb9;  2RHS-002-188-1  NTS: 2,3      iNS          1    /  na /na                I I  ELB/PIPE                              IB-J      I na    I SUR/PT    00/HT        I 2RHS-177A- FM013        i QIS0177-A            or DMG&#xb9; na    in f89.21    /none    f  na  /na              I J
LINE&#xb9; 2RHS-002-188-1 NTS: 2,3          [NS          1    f  na/na                I I
PIPE/0HOV678                          IB-J      / na    /  SUR/PT3.00/NT4.00    /
2RHS-177A- FM014        i  QIS0177-A            or DMG&#xb9; na    in /89.21    )none    [  na  /na              I LINE&#xb9; 2RHS-002.188-1 NTS: 2,4          IHS          1    /  na /na                I
                          *HOV67B/PIPE                          IB-J      [ na    (
SUR/PT3.00/HT4.00    J        .I 2RHS-177A-FM015        i  QIS0177-A            or  DMG&#xb9; na  in l89.21    )none    f  na /na                I          I i LINE&#xb9; 2RHS 002-188-1 NTS:      2,4      INS          1
                                                                                    /  na/na                I          I I  PIPE/*V227                            IB-J      / na    J SUR/PT3.00/NT4 F 00  /  Sc7 2RHS-177A-FM016        i QIS0177-A            or  DMG&#xb9; na  in /89.40    /ID      f  na  /na i LINE&#xb9; 2RHS-002-188-1 NTS: 2(4          IHS                /  na /na                I
                          *V227/P I PE                          IB-J      I na    I  SUR/PT3.00/HT4.00    I 2RHS. 177A- FM017        i QIS0177-A            or DMG&#xb9; na    in /89.40    ]none    f  na /na                I I LINE&#xb9;  2RHS-002-188-1    NTS: 2,4      IHS          1    /  na /na                I I PIPE/ELB                                IB-J    I na    I  SUR/PT3.00/NT4.00    I 2RHS-'l77A-FM018        I QIS0177-A            or DMG&#xb9; na    in /89.21    ]none    J na  /na i LINE&#xb9;  2RHS.002-188-1    Nl'S 2 3      INS              ]  na  /n                I I ELB/PIPE                                IB-J    f na    /  SUR/PI3.00/HT4.00      f 2RHS-177A-FM019          I QIS0177-A            or  DMG&#xb9; na  in /89.21    [none    / na /na I LIHE&#xb9; 2RHS-002-188-1 NTS: 2,3          INS                                        I
 
NIAGARA NOHAWK POWER CORPORATION          - H    NILE POINT NUCLEAR STATION - WHIT 2        18 of 135 NHP2-ISI-006, REV. 1, CH-000                                          SECOHD TEN YEAR IHSERVICE IHSPECTION        (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEN (sorted by Examination Identifier) 2ND INTVL REL RED ( DESCRIPTIOH OF ITEN TO BE EXAHIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE                (PERIOD  1                        REHARKS EXAHINATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPONEHT DWG        &#xb9;,  ( ITEN  &#xb9; (FREQY( EX2/NDE PROCEDURE      (PERIOD 2  (
USE CAL BLK &#xb9; (
LINE HO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE              PROCEDURE (PERIOD 3  (
I  PIPE/SOL                                IB-J      (  na    (
SUR/PT3.00/HT4.00  (
2RHS-177A-FW020        (
QIS0177-A            or  DMG&#xb9; na  in (89.40    (none    (
na /na            I I  LINE&#xb9;  2RHS 002 188  1  NTS'    2      IN            1    (
na/na              I I INTEG ATT                                (C-C      (
na    (
SUR/PT3.00/N'I4.00 (
2RHS-5-CD-C-FW001      (  QISO  66-16-17        or DWG&#xb9; na in (C3.20        (ID      (
na  /na na              I  LINE&#xb9; 2RHS-016-5-2      NTS: 93,17    INS          2    (  na /na            I I  INTEG ATT                              (c-c      (
na    (
SUR/PT3.00/HT4.00  (
2RHS-5-CD-C-FW002      (
QISO  66-16.17        or DWG&#xb9; na in (C3.20        (ID      (
na /na na              I  LINE&#xb9; 2RHS-016.5-2      NTS: 93,17    INS          2    (
na /na              I I  PIPE/*NOV228                            IC-F-2    (  na    (
VOL/UT6.02 2RHS-66-05-FW002        (
QISO  66.05          or DWG&#xb9; na in (C5.51        (none    (
SUR/PT3.00/HT4.00  (
HHP2-8-.594-CS    I  LINE&#xb9; 2RHS-008.50-2 NTS: 31,32          ISD          2    (
na/na
(
                          *HOV228/PIPE                            IC-F-2    I  na    I  VOL/UT6.02          I 2RHS.66-05-FM003        (
QISO 66-05            or  DWG&#xb9; na  in  (C5.51    (none    (
SUR/PT3.00/NI'4.00  (
NHP2-8-.594-CS    I  LIHE&#xb9;  2RHS  008 50 2    NTS  31 32    ISD          2    (  na  /na I  PIPE/PIPE                              IC-F-2    (  na    (
VOL/UT6.02 2RHS-66-05-FW004        (
QISO 66-05            or  DWG&#xb9; na  in  (C5.51  (none    (
SUR/PT3.00/HT4.00  (
NHP2-8-.594-CS    (
LINE&#xb9; 2RHS-008-50-2      NTS: 31        (none        2    (
na /na I  ELB/PIPE                                IC-F-2    (
na    (  VOL/UT6.02 2RHS.66-05-FW005        (
QISO 66-05            or  DWG&#xb9; na  in  (C5.51    (none  (  SUR/PT3.00/HT4.00  (
NHP2-8..594-CS    I  LINE&#xb9; 2RHS.008-50-2      HTS: 31,33      ISD          2    (
na/na
(  ELB/PIPE                                IC-F-2    ( na    (
VOL/UT6.02                    'I 2RHS-66.05.FW006        (
QISO  66.05          or DMG&#xb9; na in (C5.51        (none    (
SUR/PT3.00/NT4.00  (          I NHP2-8-.594-CS    I  LINE&#xb9; 2RHS-008-50-2 Nl'S: 31,33          ISD          2    ( na  /na                        I I  ELB/PIPE                                IC-F-2    (
na    (
VOL/UT6.02 2RHS-66-05-FM007        (
QISO 66-05            or  DWG&#xb9; na    in  (C5.51    (ID      ( SUR/PT3.00/NT4.00  (Sc8 NHP2-8-.594.CS    I LINE&#xb9; 2RHS-008-50-2      NTS: 31,33      I            2    (
na /na
 
0 NIAGARA HOHAWK POWER CORPORATION        -        ILE POINT NUCLEAR STATIOII - UNIT 2        19 of 135 NHP2-ISI-006) REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                  APPENDIX  G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ      I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOD            1                          REHARKS EXAHINATION IDEHT  IF IER    ITS ISO LOCATOR,  COHPONENT DWG    &#xb9;, LITEM  &#xb9; iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK  &#xb9;  I LINE HO. AND NOTES, AS APPLICABLE ISELECT      ICLASSI EX3/NDE PROCEDURE IPERIOD 3      I I ELB/PIPE                              IC-F-2  i na  )
VOL/uT6.O2 2RHS-66.05-FW008            i QISO 66-05          or  DWG&#xb9; na    in iC5.51  inone i SUR/PT3.00/HT4.00      i NHP2-8-.594-CS        I LINE&#xb9; 2RHS-008-50-2    NTS: 31,33    ISD        2  /  na  /na              I PIPE/PIPE                              ic-F-2  i na  i  VOL/UT6.02 2RNS-66-05-FW009            i QISO 66-05          or  DMG&#xb9; na    in iC5.51  inone  i  SUR/PT3.00/HT4.00    J NHP2  8 .594-CS        i LINE&#xb9; 2RHS-008-50-2    NTS: 31        inone      2  i na /na
[ PIPE/*HOV238                          IC-F-2  i na  i  VOL/UT6.02 2RHS-66-05-FW010            i QISO 66-05          or  DWG&#xb9; na    in iC5.51  /none  i SUR/PT3  F 00/HT4.00 NHP2.8-.594-CS        I LINE&#xb9; 2RHS-008-295-2 HTS: 31,32        ISD        2  i na /na                I PIPE/PIPE                              IC-F-2  i na  i voL/uT6.O2 2RHS-66.05-FW011              QISO 66-05          or DWG&#xb9; na    in iC5.51  inone i SUR/PT3.00/HI'4.00      i NHP2-8-.594-CS          LINE&#xb9;  2RHS-008-50-2    NTS: 31        inone      2  /  na /na                I RED/PIPE                              IC-F-2  i na  (  VOL/UT6.02 2RHS-66.05-FM014            i QISO  66-05          or DWG&#xb9; na in iC5.51      inone i SUR/PT3.00/HT4.00      i NHP2-8-.594-CS        I LIHE&#xb9; 2RHS-008-50-2    HTS'59 31 ISD              2  /  na/na                I I TEE/PIPE                              IC-F-2  i na  J VOL/UT6.02 2RHS-66-05-FW015            i QISO  66.05          or  DUG&#xb9; na    in iC5.51  inone i SUR/PT3.00/HT4.00      J NHP2-8-.594-CS        I LINE  2RHS 0 8 295    HTS'1  ~ 160  ISD      I  2  I                        I I PIPE/TEE                              IC-F-2  i na  i VOL/UT6.02 2RHS-66-05-FW018            i QISO 66.05          or  DMG&#xb9; na    in iC5.51  inone  i SUR/PT3.00/HT4.00    J NHP2-8-.594-CS        I LINE&#xb9; 2RHS-008-50.2    NTS: 31, 160  ISD        2    i na  /na              I I TEE/PIPE                              IC-F-2  (
na    I VOL/UT6.02            I 2RHS-66.05-FW019              QISO 66-05          or  DWG&#xb9; na    in JC5.51  (none  J SUR/PT3.00/HT4.00    i NHP2.8-.594-CS        i LINE&#xb9; 2RHS-008.50.2    HTS: 31,160    LSD        2    i na/na                I I PIPE/ELB                              IC-F-2  i na    i VOI./uT6.O2 2RHS.66.05-FW026            (
QISO 66-05          or  DMG&#xb9; na    in iC5.51  (none  i SUR/PT3.00/HT4.00    )
NHP2-8-.594-CS          LINE&#xb9; 2RHS-008-50-2    NTS: 31,33    ]TE        2    i na  /na
 
0 NIAGARA NOHAMK POMER CORPORATION - NI            NILE POINT NUCLEAR STATION - UNIT 2        20 of 135 HNP2-ISI-006( REV. 1, CH-000                                          SECOND TEH TEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                  APPENDIX  G - RHS STSTEN (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTIOH OF ITEN TO BE EXANINED[CATGRY          J IGSCCJ  EX1/HDE PROCEDURE [PERIOD    1                        RENARKS EXAHINATION IDEHl'IFIER i ITS ISO LOCATOR, COHPOHEHT DMG        &#xb9;, iITEH  &#xb9;  iFREQYi EX2/NDE PROCEDURE      iPERIOD 2 USE CAL BLK  &#xb9; I  LINE  HO. AHD  NOTES,  AS APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE      IPERIOD 3  I INTEG ATT                            IC-C      I  na  I  SUR/PT3.00/NT4.00 2RHS-66.05-FM301        / QISO 66-05-20        or DMG&#xb9; na in /C3.20 /ID          )
na  /na J
LINE&#xb9; 2RHS-008-50-2 HTS: 31,36        /Nandate/ 2        / na  /na I  INTEG ATT                            [C-C      ]  na    [ SUR/PT3.00/NT4.00 2RHS-66-05-FM302        f  QISO  66-05-20        or DMG&#xb9; na in JC3.20 ] ID          f na /na
                        )
LINE&#xb9; 2RHS-008-50-2 NTS: 31,36        /Nandatef 2        f na /na              I I  IHTEG ATT                            (C.C      J na    / SUR/PT3.00/NT4.00  )
2RHS-66-05-FM303        f  QISO  66-05-20        or DMG&#xb9; na in JC3.20 )ID            / na /na f  LINE&#xb9; 2RHS-008-50-2 NTS: 31,36        ]Mandate[ 2        ( na /na              I I  INTEG ATT                            fC-C      [  na    ] SUR/PT3.00/MT4.00    J 2RHS-66-05-FM304        f  QISO  66-05-20        or D'MG&#xb9; na in JC3.20 (ID          ] na  /na f  LINE&#xb9; 2RHS-008-50-2 NTS: 31,36        JNandatef      2    J na  /na              I I
IN'IEG ATT                            IC-C      I  na    I SUR/PT3.00/NT4 F 00  I 2RHS-66-05-FM313          f  QISO  66-05-15        or DMG&#xb9; na in (C3.20 )ID            / na  /na f  LINE&#xb9; 2RHS-008-50-2 HTS: 31,36        (Nandate/ 2        / na  /na              I I INTEG ATT                              IC  C      I  na    I SUR/PT3 00/HT4 0    I 2RHS  66 FM314        / QISO 66-05-15        or DMG&#xb9; na in /C3.20 /ID            / na  /na
                          /  LINE&#xb9; 2RHS-008-50-2 NTS: 31,36        /Handate/ 2        / na /na              I I  INTEG ATT                            IC  C      I  na    I SUR/PT      /HT4' 2RHS-66.05-FM315          J QISO 66-05-15        or DMG&#xb9; na in /C3.20 ]ID            J na /na f  LINE&#xb9;  2RHS-008-50-2    HTS: 31,36    (Nandatef 2        J na /na              I I  IHTEG ATT                            JC-C      )  na    ) SUR/PT3.00/NT4.00    (
2RHS-66.05-FM316          f  QISO 66-05-15        or DMS&#xb9; na in JC3.20 (ID J
LIHE&#xb9; 2RHS-008-50-2 NTS: 31,36        JHandate/      2    / na  /na              I I  INTEG ATT                            JC-C      /  na      SUR/PT3.00/NT4.00    I 2RHS-66-05-FM321          /  QISO 66-05-14        or DMG&#xb9; na in /C3.20 /ID              na  /na              isc7
(
LINE&#xb9;  2RHS-008-50.2    NTS: 31,34    [Nandate] 2          na /na              I
 
NIAGARA MORA'MK POMER CORPORATION            - N      ILE POINT NUCLEAR STATION - UNIT 2        21 of 135 NMP2-ISI-006, REV. 'I, CH.000                                            SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G - RHS SYSTEM (sorted by Exemination Identifier) 2ND INTVL REL REQ i DESCRIP'TION OF ITEH TO BE EXAMINEDiCATGRY              iIGSCCi EX1/NDE      PROCEDURE  iPERIOD  1                        REHARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG          &#xb9;,    LITEM    &#xb9; iFREOYi EX2/NDE PROCEDURE      )PERIOD 2 USE CAL BLK &#xb9; I  LINE No. AND  NOTES,  AS  APPLICABLE    ISELECT    ICLASSI EX3/NDE PROCEDURE      IPERIOO 3  I I INTEG ATT                                  IC-C        I  na  I  SUR/PT3.00/HT4.00    I 2RHS-66-05-FM330        i QISO 66-05-16        or  DMG&#xb9; na  in iC3.20        iID    /  na  /na              isc7 i LINE&#xb9; 2RHS-008-50-2        NTS: 31,36      iMandatei      2    i  na /na              I I  INTEG ATT                              . iC-C        i na    i  SUR/Pt3.00/HT4.00    i 2RHS  66 05-FM331      /  QISO 66-05-16        or  DMG&#xb9; na  in    JC3.20      iID      i na  /na              isc7      I i  LINE&#xb9; 2RHS-008-50-2      NTS: 31,36      JMandatei      2    / na  /na              I'        I I  INTEG ATT                                iC-C        i na    i  SUR/PT3.00/MT4.00 i 2RHS-66-05-FM332        i QISO 66-05-16          or  DMG&#xb9; na  in iC3.20        iio      i na /na                isc7 i  LINE&#xb9; 2RHS-008-50-2      NTS: 31,36      iMandatei      2    i na /na I  INTEG ATT                                IC  C      I  na    I  SUR/Pt3 00/MT4 00 I 2RHS-66-05-FM333        i QISO 66-05-16        or  DMG&#xb9; na    in iC3.20        )ID      i na  /na              isc7 i LINE&#xb9; 2RHS-008-50-2        NTS: 31,36      iMandatei 2          J na  /na              I I  PIPE/ELB                                  IC-F-2      i na    i  VOL/ut6.O2 2RHS-66-05-SM003          i QISO  66.05          or DMG&#xb9; na in [C5.51            inone    i  SUR/PT3.00/MT4.00    i NHP2-8-.594-CS    I  LINE&#xb9; 2RHS.008.50-2 NTS: 31,33            ISO            2    i na  /na I  PIPE/ELB                                  IC-F-2      i na    i  VOL/ut6.02 2R H S-66-05-SM004        i QISO  66-05          or DMG&#xb9; na    in iC5.51        iID    J SUR/PT3.00/MT4.00 isc8 NHP2-8-.594-CS    I  LIHE&#xb9; 2RHS-008-50 2 NTS: 31,33            ISD            2    /  na /na I  PIPE/ELB                                  IC-F-2      i na    i VOL/Ul'6.02 2RHS.66-05.SM006          (
QISO  66-05          or DMG&#xb9; na    in    iC5 ~ 51    (none i SUR/PT3.00/Ht4.00        i NHP2-8-.594-CS    I  LINE&#xb9; 2RHS.008.50-2 Hts: 31,33            ISD            2 i na /na I  PIPE/ELB                                  IC-F-2      i na    i voL/ut6.O2 2RHS.66.05-SM007          i QISO  66-05          or DMG&#xb9; na    in iC5.51        [ID      ( SUR/PT3.00/MT4.00 isc8 NHP2-8-.594-CS    i  LINE&#xb9; 2RHS-008-50-2 N'IS: 31,33            (SO        I  2    I na/na                I I  ELB/PIPE                                  IC-F-2      i na    J VOL/UT6.02 2RHS-66-05-SM008          i QISO  66-05          or DMG&#xb9; na    in iC5.51        inone    i SUR/PT3.00/MT4.00 i NMP2-8-.594-CS    i LINE&#xb9; 2RHS-008-50-2 NTS: 31,33            iso            2    J na /na
 
NIAGARA HOHAMK POMER CORPORATIOH            - N      ILE POIHI'UCLEAR STATION - UNIT 2        22 of 135 HHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION              (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REQ      DESCRIPTIOH OF ITEN TO BE EXAHINED[CATGRY (IGSCCJ EX1/NDE PROCEDURE                (PERIOD    1                    REHARKS J
EXAHINATION IDENI'IFIER  (
ITS ISO LOCATOR, COHPONEHT DMG    &#xb9;,  JITEH  &#xb9; [FREOYJ EX2/NDE PROCEDURE        ]PERIOD 2 USE CAL BLK &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                    I
(
PIPE/PIPE                              IC-F-2    )
na    (
VOL/UT6.02 2RHS-66-06-FM001        /  QISO 66.06          or DMG&#xb9; na    in /C5.51    [none    f SUR/Pl'3.00/HT4.00  [
NHP2-8-.500.CS    I  LINE&#xb9;  2RHS-008-57-2  HTS: 39        Inone          2    J na  /na I  PIPE/TEE                              IC-F-2    I  na    I  VOL/UT6.02          I 2RHS.66-06-FM003        )  QISO  66-06          or DMG&#xb9; na    in  )C5.51    )none    J SUR/PT3.00/HT4.00    J HHP2-8 .500-CS      I  LINE&#xb9; 2RHS-008-57-2 N'TS: 39,35        I SD          2    f  na/na i ELB/PIPE IC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66-06-FM004          i QISO  66.06          or  DMG&#xb9; na  in  [C5.51    ]none    /  SUR/PT3.00/HT4.00    f NHP2-8-.500-CS      I  LINE&#xb9; 2RHS-008-57.2    NTS: 39,40    I SD          2    f  na /na I  ELB/PIPE                              IC-F-2    ]  na    [  VOL/UT6.02 2RHS-66-06-FM005          )  QISO 66-06          or  DMG&#xb9; na    in (C5.51    [none    f  SUR/PT3.00/MT4.00    J NHP2-8-.500-CS      I  LINE&#xb9; 2RHS-008-57-2    NTS: 39,40    ISD            2    f  na/na I  ELB/PIPE                              IC-F-2    J na    (
VOL/UT6.02 2RHS-66-06-FM006          )  QISO  66.06          or  DMG&#xb9; na    in /C5.51    [none      J SUR/Pl'3.00/HT4.00  f NHP2-8-.500-CS        LINE&#xb9; 2RHS-008-57-2    NTS: 39,40    i SD          2    /  na  /na              I I PIPE/PIPE                              IC-F-2    I  na    I  VOL/UT6.02            I 2RNS.66.06-FM007          i QISO  66-06          or DMG&#xb9; na    in )C5.51    /none    /  SUR/PT3.00/HT4.00    J NHP2-8-.500.CS      f LINE&#xb9; 2RHS-008-57-2 Hl'S: 39          /none          2    /  na/na
                          / RED/TEE IC-F-2    f  na    J VOL/UT6.02 2RHS-66-06-FM008          i QISO  66-06          or DMG&#xb9; na in [C5.51        /none      [ SUR/PT3.00/H'I4.00    f NHP2-20-.812.CS    I LINE&#xb9; 2RHS-020-208-2 HTS: 48,49        ISD          2      f na/na I PIPE/TEE                                IC  F 2  /  na      / VOL/UT6.02 2RHS-66-06. FM010          i QISO  66.06          or DMG&#xb9; na in [C5.51        ]none      / SUR/PT3.00/HT4.00    /
NHP2-8-.500-CS      I LINE&#xb9; 2RNS-008-336-2 HTS: 39,35        ISO      I    2    I na /na                I
                            *HOV23B/P I PE                          I C-F-2  (  na      (
VOL/Ul'6.02 2RHS  66-06-FM011        / QISO  66.06          or DMG&#xb9; na in /C5.51          IID      I SUR/PT3.00/HT4 F 00    I NHP2-8-.500-CS      I  LINE&#xb9; 2RHS-008.335-2 NTS: 39,41        ISD            2    J na /na                JSc10
 
NIAGARA HOHAMK POMER CORPORATION        -        ILE POINI'UCLEAR STATIOH - UNIT 2        23 of 135 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND  INIVL REL  RED I DESCRIPTION OF    ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/NDE          PROCEDURE  IPERIOD  1                      REHARKS EXAHINATIOH IDENTIFIER  f  ITS ISO LOCATOR, COHPOHEHT DMG &#xb9;, [ITEN      &#xb9; (FREOY( EX2/NDE      PROCEDURE  ]PERIOD 2 f USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE            PROCEDURE  IPERIOD 3 I I  TEE/PIPE                              IC-F-2  I  na    I  VOL/UT6.02          I 2RHS-66 FM014        J QISO  66.06          or DMG&#xb9; na in JC5.51      IID      I  SUR/PT3.00/HT4.00    I NHP2-8-.500-CS      i  LINE&#xb9; 2RHS.008.57-2 NTS: 39,35        LSD          2    J na  /na              i Sc10
(
PIPE/PIPE                              IC-F-2  /  na    /  VOL/UT6.02 2RHS-66-06-FM016        [  Qrso 66-06            or  DMG&#xb9; na  in )C5.51    /none  /  SUR/PT3.00/HT4.00    /
NHP2-8-.500.CS      I  LINE&#xb9; 2RHS-008-57-2      NTS: 39      Inone        2    /  na /na              I I  ELB/PIPE                              (C-F-2    ] na    [  VOL/UT6.02        , (
2RHS-66-06. FI$ 19      f  QISO  66.06          or  DMG&#xb9; na  in JC5.51    )none  (
SUR/PT3.00/HT4.00    [
HHP2-8-.500.CS        L IHE&#xb9;  2RHS-008.57-2    HTS: 39,40    i SD        2    J na  /na              I I  PIPE/ELB                              IC-F.2    [ na    (  VOL/UT6.02 2RHS-66-06-FM020        i QISO 66-06              or  DUG&#xb9; na  in /C5.51    ]none  /  SUR/PT3.00/HT4.00    f NHP2.8-.500-CS    /  LINE&#xb9; 2RHS-008-57-2      NTS: 39,40    (SD          2    [  na  /na              I (Ba) PIPE/SML (6")                    IC-F-2    I na    I  SUR/PT3 00/HT4 00    I 2RHS-66-06-FM021        i'ISO    66.06          or DMG&#xb9; na in [C5.8'I      )none  [  na  /                I i  LINE&#xb9; 2RHS.006-138.2 HTS: 39,163 ATE                2    f  na/na                I SML/PIPE                              IC-F-2    ( na    f  na/na 2RHS-66-06-FM022            QISO  66.06          or  DMG&#xb9; na  in /none    /none  /  na  /na LINE&#xb9; 2RHS.006-138-2 NTS: 44,163 Jna                2    /  na/na I  PIPE/PIPE                              IC-F-2    (
na    (  VOL/UT6.02 2RHS-66 FI$ 23        f  QISO 66-06            or DMG&#xb9; na    in (C5.51    ]none  f  SUR/PT3.00/HT4.00    (
NHP2-8-.500-CS      I  LIHE&#xb9; 2RHS-008.57-2 NTS: 39            Inone    I  2    I  na /na                I I  PIPE/PIPE                              IC-F-2    / na    (  VOL/UT6.02 2RHS-66 FM024        /  QISO 66-06            or DMG&#xb9; na    in /C5.51    Inane  I  SUR/PT3.00/H'I4.00    I NHP2.8-.500.CS      /  LINE&#xb9; 2RHS-008-57-2 NTS: 39            /none        2    /  na /na
[ PIPE/RED                              IC-F-2    / na    / VOL/UT6.02 2RHS-66-06 Fl$ 25          / QISO  66-06          or DMG&#xb9; na in )C5.51      /none    / SUR/PT3.00/HT4.00    /
NHP2-8-.500-CS      (
LINE&#xb9; 2RHS-012-307-2 NTS: 164,48 (SD            I  2    I  na /na                I
 
NIAGARA HOHAMK POMER CORPORATION - N                NILE POINT NUCLEAR STATION    - UNIT 2                                        24 of 135 NHP2-ISI-006( REV. I(  CH-000                                        SECOND TEH YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX  G -  RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE                    IPERIOD  1  I                              REHARKS EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPONEHT DMG        &#xb9;,  ( ITEN &#xb9; JFREQYJ EX2/HDE PROCEDURE          (PERIOD 2  J USE CAL BLK  &#xb9;  I  LINE NO. AND NOTES,  AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE              IPERIOO 3 I I PIPE/MHF IC-F-2  (
na    )
na /na 2RHS-66.06-FM027        i QISO    66 06          or DMG&#xb9; na    in (none    /none    /  na  /na I  LINE&#xb9; 2RHS-006-138-2 NTS: 44,45      Ina          2    J na  /na I  V4328/PIPE                            Ic-F-2    [  na    J VOL/UT6.02                        /Non-exempt veld added by PH2Y91HX027  ASHE XI Replacement Plan  &#xb9; 2RHS-66-06-FM033        i QISO 66-06            or  DMG&#xb9; na  in ]C5.51    Inone    I  SUR/PT3.00/HT4.00    I          /EDC2M104958 NIS-2  certification of 11-16-93 NHP2.8-.500-CS    I  LINE&#xb9; 2RHS-OM-57-2      NTS: (none)  ISD          2    /  na /na
                        ]  Pii E/V4328                          Ic-F-2    ]  na    )  VOL/UT6.02                        (Non-exempt Meld added by PN2Y91HX027  ASHE XI Replacement Plan  &#xb9; 2RHS-66-06-FM034        i  QISO 66-06          or  DMG&#xb9; na  in /C5.51    /none    /  SUR/PI'3.00/MT4.00    f          )EDC2H10495B NIS-2  certification  of 11-16-93 NHP2-8-.500.CS    /  LIHE&#xb9; 2RHS-008-57-2    NTS: (none)  /SD          2    ] na    /na                I I  INTEG ATT                              /C-C    I  "    I  SUR/PT    0 /HT4 F 00  I 2RHS-66-06-Fl600        )
QISO  66-06-10      or DMG&#xb9; na in (C3.20      ]ID      J na /na I  LIHE&#xb9; 2RHS-008-57-2 NTS: 39,162 INS                2    /  na  /na                I IHTEG ATT                              )C-C    I  na    I  SUR/PT3.00/HT4.00      I 2RHS-66-06-FM301          f  QISO  66-06-10      or DMG&#xb9; na in (C3.20      ]ID      f  na /na                I i  LINE&#xb9;  2RHS-008-57-2    NTS: 39,162    iNS          2    /  na/na                  I I INTEG ATT iC-C    f  na    )  SUR/PT3 F 00/HT4.00    (
2RHS-66.06- FM302        ] QISO  66-06-10      or DMG&#xb9; na in JC3.20      /ID      / na /na                  I i  LINE&#xb9;  2RHS-008-57-2    NTS: 39,162    tNS          2    I na /na                  I IHTEG ATT                              iC-C    I  na    I  SUR/PT3.00/HT4.00      I 2RHS.66-06-Fl603          [ QISO  66-06-10      or DMG&#xb9; na in JC3.20      ]ID      [  na /na                I I  LINE&#xb9; 2RHS-008-57-2 NTS: 39,162 IHS                2    /  na/na                  I I  IHTEG ATT                              iC-C      [ na    ]  SUR/PT3.00/HT4.00      ]
2RHS.66.06-Fl616          (
QISO  66-06-3        or DMG&#xb9; na in (C3 ~ 20      [ID      (  na  /na                I I  LINE&#xb9; 2RHS-008-57-2 HTS: 39,36        INS          2    / na/na                  I I INTEG ATT                              iC-C      I na      I SUR/PT3.00/HT4.00      I 2RHS-66-06-Fl617          / QISO  66-06-3        or DMG&#xb9; na in [C3.20        [ID      J na /na na                    LINE&#xb9; 2RHS-008-57-2 NTS: 39,36        /NS          2    f na  /na                I
 
NIAGARA HOHAMK POMER CORPORATION -                ILE POINT    NUCLEAR STATION  - UNIT 2        25 of 135 NHP2 IS I 006'EV 1 CH      000                                      SECOND TEH YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change  date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRII TION OF ITEN TO BE EXAHINED(CATGRY [IGSCC) EX1/NDE PROCEDURE                ]PERIOD    1                          REHARKS EXAHINATION IDENTIFIER  ) ITS ISO LOCATOR, COHPONEHT DMG  &#xb9;, )ITEN  &#xb9; )FREOY) EX2/HDE PROCEDURE        (PERIOD 2    (
USE CAL BLK &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3                  I I  INTEG ATT                            /c-c      f  na    f  SUR/PT3.00/HT4.00  f 2RHS-66-06-FM318        / QISO    66-06-3        or DMG&#xb9; na in /C3.20      /ID      /  na  /na I  LINE&#xb9;  2RHS-008-57-2  NTS: 39,36    INS            2    /  na /na              I I  INTEG ATT                            ic-c      J na    /  SUR/PT3.00/HT4.00  [
2RHS-66-06-FM319        /  QISO 66-06-3          or DMG&#xb9; na in /C3.20      (ID      J na  /na
                        /  LINE&#xb9; 2RHS.008-57-2 HTS: 39,36        /HS            2    /  na /na              I I  PIPE/ELB                              IC-F-2    [  na    [  VOL/UT6.02 2RHS-66-06-SM001        i QISO 66.06            or  DMG&#xb9; na  in JC5.51    )none    J SUR/PT3.00/HT4.00  f NHP2-8-.500-CS    I  LIHE&#xb9;  2RHS 008 57 2    NTS'9i40    ISD            2    /  na  /na I  ELB/PIPE                              /C-F-2    (
na    )
VOL/UT6.02 2RHS-66-06-SM002        i QISO  66-06          or DMG&#xb9; na in (C5.51      ]none    (
SUR/PT3.00/HT4.00  [
NHP2-8-.500-CS    i LINE&#xb9; 2RHS-008-57-2 NTS 39 40          LSD            2    f  na  /na            I I  PIPE/ELB                              IC-F-2    f  na    [  na/na 2RHS-66-06-S'M003        i QISO  66-06          or DMG&#xb9; na in ]none        ]none    /  na  /na
                        )
LINE&#xb9; 2RHS-006-296-2 NTS: 44,96      Jna            2    /  na/na I  ELB/PIPE                              IC-F-2    /  na    f  na  /na 2RHS-66-06-SM008        /  QISO  66-06          or DMG&#xb9; na in (none        /none    /  na  /na
[  LIHE&#xb9; 2RHS-006-296-2 Hl'S: 44,96      (na            2    /  na/na i PIPE/ELB IC-F-2    [  na    )
VOL/UT6.02 2RHS.66-06-SM011          i QISO  66-06          or DMG&#xb9; na in /C5.51      ]none    f  SUR/PT3.00/HT4.00    J NHP2-8-.500-CS      I  LINE&#xb9; 2RHS-008-57-2 HTS: 39,40        ISD            2    J na  /na              I I  PIPE/ELB                              IC-F-2    / na    )
VOL/UT6.02 2RHS-66-06-SM013        J QISO  66-06          or DMG&#xb9; na in JC5.51        IID      I SUR/PT3.00/HT4.00    I NHP2-8..500-CS        LINE&#xb9; 2RHS.008.57-2 NTS: 39,40        ISD        I  2    I na /na              ISc10 I
I  PIPE/ELB                              (C-F-2    I na      I VOL/UT6.02          I 2RHS-66-06-SM014        i QISO  66.06          or DMG&#xb9; na in JC5.51        (none    [ SUR/PT3.00/HT4.00    (
NHP2-8-.500-CS    I  LINE&#xb9; 2RHS.008-57-2 HTS: 39,40        ISD            2    ) na /na
 
NIAGARA HOHAMK POMER CORPORATION        -        ILE POINT NUCLEAR STATION - UHIT 2        26 of 135 NHP2-ISI-006, REV. I, CH-000                                      SECOND TEN YEAR IHSERVICE IHSPECTIOH        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                APPENDIX  G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY      IIGSCCI EX1/HDE PROCEDURE IPERIOO        1                        REHARKS EXAHIHATION IDENTIFIER  I ITS ISO LOCATOR, COHPOHENT DMG  &#xb9;,  I ITEH &#xb9; IFREQYI EX2/HDE PROCEDURE IPERIOD 2        I USE CAL BLK &#xb9; I LINE  NO  AHD NOTES'S  APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE          IPERIOO 3  I I PIPE/ELB                            IC-F-2  I  na  I  VOL/UT6.O2 2RHS.66-06-SM024        I Qlso 66-06          or DMG&#xb9; na in IC5.51      Inone  I  SUR/PT3.00/HT4.00    I NHP2-8-.500-CS    I LINE&#xb9; 2RHS-008-57-2 NTS: 39,40      ISD          2  I na /na I ELB/PIPE                          . IC-F-2  I  na  I  VOL/UT6.02 2R HS-66-06-SM025        I QISO  66-06        or DMG&#xb9; na in IC5.51      Inone  I  SUR/PT3.00/HT4.00    I NHP2-8-.5OO-CS    I LINE&#xb9; 2RHS 008 57 2 NTS'9 40        ISD          2  I  na /na              I I RED/ELB                              IC-F-2  I  na  I  VOL/UT6.02          I 2RHS-66-06-9526          I QISO  66-06        or DMG&#xb9; na in IC5.51      Inone  I  SUR/PT3 F 00/HT4.00  I NHP2-8..500.CS    I LINE&#xb9; 2RHS.012-307-2 Hl'S: 46,47    ISO          2  I  na /na I ELB/PIPE                            IC-F-2    I na  I  VOL/UT6.O2 2RHS-66-06-SM027        I QISO  66-06        or DMG&#xb9; na in IC5.51      Inone  I  SUR/PT3.00/HT4.00    I NHP2.8..500-CS    I LINE&#xb9; 2RHS-012-307-2 NTS: 47;164 ISO              2  I  na /na I PIPE/RED                            IC-F-2    I na    I VOL/UT6.02          I 2RHS-66-06-SM029        I QISO  66-06        or DMG&#xb9; na in IC5.51      Inone  I SUR/PT3.00/HT4.00    I NHP2-8-.500.CS    I LINE&#xb9; 2RHS-008-57-2 NTS: 39,46      ISD          2    I na /na              I I RED/PIPE                            IC-F-2    I na    I na /na 2RHS-66.06.9830          I QISO  66-06        or DMG&#xb9; na in Inone        Inone  I na /na I LINE&#xb9; 2RHS-006-296-2 HTS: 161,44 Ina              2  I  na /na I PIPE/REO                            IC-F-2    I na  I  VOL/UT6.02 2RHS-66-06-SI$ 31        I QISO  66-06        or DMG&#xb9; na in IC5.51      Inone  I SUR/PT3.00/HT4.00    I NHP2-8-.500-CS    I LINE&#xb9;.2RHS-008-335-2 NTS: 39,161 ISD          I  2    I na/na                I I PIPE/RED                            IC-F-2    I na    I na  /na 2RHS-66-06-9532          I QISO  66-06        or DMG&#xb9; na in Inone        Inone  I  na /na I LINE&#xb9; 2RHS-006-296-2 NTS: 161,44 Ina              2    I na /na I RED/PIPE                            IC-F-2    I na    I VOL/UT6.02 2RHS-66-06-Sl$ 33        I QISO  66-06        or DMG&#xb9; na in IC5.51      Inone  I SUR/PT3.00/HT4.00    I NHP2 F 500-CS  I LINE&#xb9; 2RHS-008-336-2 NTS: 39,161 ISD              2    I na /na
 
NIAGARA HOHAMK POWER CORPORATION        - N      ILE POINT NUCLEAR STATION - UHIT 2        27 of 'l35 NHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                  APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE              IPERIOO    1  I                  REHARKS EXAHINATIOH IDENTIFIER      ITS ISO LOCATOR, COHPOHENT DWG  &#xb9;,  )ITEN  &#xb9; JFREOY) EX2/NDE PROCEDURE      ]PERIOD 2    )
USE CAL BLK &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I RED/PIPE IC-F-2    (
na  )
VOL/UT6.02 2RHS-66 09-FM001        i QISO    66-09          or DMG&#xb9; na  in  )C5.51    Inone  I  SUR/PT    0/HT4 00  I NHP2-8-.594-CS    I  LINE&#xb9; 2RHS-008-53-2 NTS: 30,31      ISD          2    /  na  /na I  PIPE/*HOV22A                        IC-F-2    f  na    J VOL/UT6.02 2RHS.66.09-FW002        (
QISO  66-09          or DMG&#xb9; na in JC5.51      iID      J SUR/PT3.00/HT4.00    (    Sc9 NHP2-8-.594-CS        LINE&#xb9; 2RHS-008-53.2 NTS: 31,32      LSD          2    )
na /na
[  *HOV22A/PIPE                        ]C-F-2    [  na    ]  VOI./UT6.02 2RHS-66-09-FM003        (
QISO  66-09          or DWG&#xb9; na in ]C5.51      [none    J SUR/PT3.00/HT4.00    f NHP2-8-.594-CS    i  LINE&#xb9; 2RHS-008.53-2 NTS: 31,32      LSD          2    f  na /na              I I  PIPE/PIPE                            IC-F-2    (
na    [  VOL/UT6.02 2RHS-66.09-FM004        I  Q    66 09          or DMG&#xb9; na  in  [C5.51    )none    )
SUR/PT3.00/HT4.00    (
NHP2-8..594-CS    )
LINE&#xb9;  2RHS-008-53-2  NTS: 31      (none        2    ]  na /na I  PIPE/PIPE                            IC-F-2    [  na    )  VOL/UT6.02 2RHS.66-09-FM005        )  QISO 66-09          or DWG&#xb9; na  in /C5.51    (none    J SUR/PT3.00/HT4.00    I NHP2-8-.594-CS    I  LINE&#xb9;  2RHS-008-53-2  NTS: 31      Inone    I  2    I  na /na              I
[  PIPE/PIPE                            IC-F-2    [  na    [ VOL/UT6.02 2RHS.66-09-FW006        )  QISO  66.09          or DWG&#xb9; na  in [C5.51    )none    J SUR/PT3.00/HT4.00    f NHP2-8-.594-CS        LINE&#xb9; 2RHS-008-53.2 NTS: 31          [none        2    I na/na I  PIPE/PIPE                            IC-F-2    [ na    ) VOL/UT6.02 2RHS-66-09-FM007        I  Ql    66 09          or DWG&#xb9; na  in [C5.51    ]none    f SUR/PT3.00/HT4.00    f NHP2-8-.594-CS    (
LINE&#xb9; 2RHS-008-53-2 NTS: 31          [none        2    / na  /na              I I  ELB/PIPE                            IC-F-2    ) na    [ VOL/UT6.02 2RHS-66 FM008        )  QISO  66.09          or DMG&#xb9; na in [C5.51      iID      i SUR/PT3.00/HT4.00    iSc8 NHP2-8-.594-CS        LINE&#xb9; 2RHS-008-53-2 NTS: 31,33        ATE      ~
2    ~
na /na                I
(
PIPE/PIPE                            IC-F-2    [ na    [ VOL/UT6.02 2RHS-66-09-FM009        i QISO  66-09          or DMG&#xb9; na  in  JC5.51    Inone    I SUR/PT3.00/MT4.00    I NHP2-8-.594-CS      J LINE&#xb9; 2RHS-008-53-2 NTS: 31          )none        2    / na /na
 
NIAGARA MOHAIIK POMER CORPORATION      - H    MILE POINT NUCLEAR STATION - UNIT 2        28 of 135 NMP2  ISI 006'EV Ii CH 000                                            SECOND TEN YEAR IHSERVICE INSPECTION      (ISI)      INTERVAL PLAN Change  date: 07/29/1999                                                                  APPEHDIX G - RHS SYSTEM (sorted by Examination Identifier) 2HD INTVL REL REQ i DESCRIPTIOH OF ITEM To BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE              iPERIOO  1                        REMARKS EXAMINATION IOEHI'IFIER i ITS ISO LOCATOR, COMPONENT DNG      &#xb9;,  LITEM  &#xb9; JFREOYi EX2/NDE PROCEDURE      iPERIOD 2 i USE CAL BLK  &#xb9; I LINE    Ho. AND NOTES, AS APPLICABLE ISELECT    ICLASSI EX3/NDE PROCEDURE      IPERIOD 3 I i  PIPE/PIPE                            IC-F-2    i na    i  VOL/UT6.02 2RHS-66-09-FN011        i QISO 66-09            or  DWG&#xb9; na  in iC5.51    inone i SUR/PT3.00/MT4.00    )
NMP2 ~ 594-CS  i LINE&#xb9; 2RHS-008.53-2      NTS: 31      inone        2    /  na /na            I I  PIPE/PIPE                            iC-F-2    )  na    i  VOL/UT6.02 2RHS-66-09-FN012        i QISO    66-09          or DMG&#xb9; na    in iC5.51    inone    i  SUR/PT3.00/MT4.00 i NMP2 ~ 594-CS  i  LINE&#xb9;  2RHS-008-53-2    NTS: 31      (none        2    i na /na I  TEE/PIPE                              IC-F-2    i  na    /  VOL/uT6.O2 2RHS-66.09-FN013        i QISO    66-09          or DNG&#xb9; na    in iC5.51    inone i SUR/PT3 F 00/MT4.00 i NMP2-8-.594.CS    I  LINE&#xb9; 2RHS-008-293-2 HTS: 31,35      ISO          2    i na  /na            I
                        )
PIPE/*MOV23A                          IC.F-2    i na    J VOL/UT6.02 2RHS-66-09-FN014        i QISO    66-09          or DMG&#xb9; na in iC5.51      inone    J SUR/PT3.00/MT4.00 i NMP2-8-.594-CS    I  LINE&#xb9; 2RHS-008-293-2 NTS: 31,32      ISD          2    /  na/na              I I  TEE/PIPE                              IC-F-2    /  na    i  VOL/uT6.O2 2RHS-66-09-FW016        J QISO  66.09          or DUG&#xb9; na in JC5.51      inone    i  SUR/PT3.00/MT4.00 i NMP2-8-.594.CS    I  LINE&#xb9; 2RHS-008-53-2 NTS: 31,35        ISD          2    i na  /na            I I  PIPE/TEE                              IC-F-2    i  na    )  VOL/UT6.02                    I 2RHS-66 FM017        i QISO 66-09          or DNG&#xb9; na in iC5.51      inone i SUR/PT3.00/Ml'4.00    i          I NMP2.8-.594-CS      J LINE&#xb9; 2RHS-008-53-2 HTS: 31,35        LSD          2    i na  /na            I I  PIPE/ELB                              IC-F-2    i na      i VOL/UT6.02 i QISO  66.09          or DUG&#xb9; na in )C5.51        inone    i SUR/PT3.00/MT4.00  J I'RHS-66-09-FWDI8 NMP2.8-.594-CS      i  LINE&#xb9; 2RHS-008-293-2 HTS: 31,33      )SD          2    i na /na            I I  ELB/PIPE                              IC-F-2    i na    i VOL/UT6.02        )Ex6 2RHS-66 Fl!019        i QISO  66.09          or DMG&#xb9; na    in iC5.51    IID      I SUR/PT3.00/MT4.00 I NMP2-8-.594-CS    I  LINE&#xb9; 2RHS-008-293-2 NTS: 31    '3    ISD          2    ( na /na PIPE/ELB                              IC-F-2    i na    ) VOL/UT6.02 2RHS-66-09-FN020          i QISO  66-09          or DNG&#xb9; na in JC5.51        /none    / SUR/PT3.00/MT4.00  (
NMP2-8-.594-CS      I LINE&#xb9; 2RHS.008-293-2 HTS: 31,33        ISD          2    i na /na
 
NIAGARA MOHAWK POWER CORPORATION                - N    HILE POINT HUCLEAR STATION - UNIT 2        29 of 135 NMP2-ISI-006, REV. 1, CH-000                                                    SECOND TEN YEAR IHSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                          APPENDIX G - RNS SYSTEH (sorted by Examination Identifier) 2NO INTVL REL REQ    I D  SCRIPTION OF ITEM To BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    (PERIOD  1  I                    REMARKS EXAHINATION IDENTIFIER        ITS ISO LOCATOR,  COMPOHEHT DIIG  &#xb9;,  (      ITEH  &#xb9; (FREOY( EX2/HDE PROCEDURE      (PERIOD 2 USE CAL BLK  &#xb9; (
LINE No. AND NOTES, AS APPLICABLE (SELECT              (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I  ELB/PIPE                              IC-F-2            I  na  I  VOL/UT6.02        I 2RHS-66-09.FW021          (
QISO  66.09        or DWG&#xb9; na in (C5 ~ 51              (none  (
SUR/PT3.00/HI'4.00 (
NMP2-8-.594-CS      I  LINE&#xb9; 2RHS.008-293-2 NTS: 31,33        ISD                  2  (
na  /na            I I  PIPE/ELB                              IC-F-2            (
na  (  VOL/UT6.02 2RHS.66.09.FW022          (
QISO  66-09        or DWG&#xb9; na in (C5.51                (none    (
SUR/PT3.00/MT4.00  (
NMP2-8-.594-CS      (
LINE&#xb9; 2RHS-008-293-2 NTS: 31,33        (SD                  2    (
na  /na I  ELB/PIPE                              IC-F-2            (
na    (
VOL/UT6.02 2RHS-66-09-FW023          (
QISO  66-09        or DWG&#xb9; na in (C5.51                (none    (
SUR/PT3.00/MT4.00  (
NHP2-8..594-CS      I  LINE&#xb9; 2RHS-008-293-2 NTS: 31,33        (SD                  2    (
na/na              I I  INTEG ATT                              (C-C              (  na      SUR/PT3.00/MT4.00 IEX6 2RHS-66.09.FW300          (
QISO  66-09-22      or DWG&#xb9; na in (C3.20 (ID                        na  /na            I
(
LINE&#xb9; 2RHS-008-53-2 NTS: 31,36        (Mandate( 2                  na  /na            I INTEG ATT                              I C-C      I  na    I SUR/PT3.00/MT4.00 IEX6 I
2RHS.66-09.FW301          (
QISO  66-09-22      or DWG&#xb9; na in (C3.20 (ID                      ( na /na              I
(
LIHE&#xb9; 2RHS-008-53-2 NTS: 31,36        (Handate( 2                (
na /na              I PIPE/ELB                              IC-F-2'ISO
(
na    (
VOL/UT6.02 2RHS.66-09.SW004                    66.09        or DWG&#xb9; na in (C5.51                (none    I SUR/PT3.00/HT4.00  I NMP2-8-.594-CS          LINE&#xb9; 2RHS-008-53-2 NTS'1 33            ISD                  2    ( na  /na            I I  ELB/PIPE                                IC-F-2          I  na    I VOL/UT6  02 2RHS.66.09.SW005          (  QISO 66-O9          or  DWG&#xb9; na    in (C5.51            (none    ( SUR/PT3.00/MT4.00  (
NHP2-8-.594-CS      I  LIHE&#xb9; 2RHS-008-53-2    NTS: 31,33      (SD                  2    (
na/na I  PIPE/ELB                                IC-F-2          (
na    ( VOL/UT6.02 2RHS-66.09-SW006          (  QISO  66.09          or  DWG&#xb9; na    in  (C5 ~ 51        (none    (
SUR/PT3.00/MT4.00  (
NMP2-8-.594.CS      I  LINE&#xb9; 2RHS-008-53-2 NTS'1 33            ISO                  2    (
na /na I PIPE/PIPE                              IC-F-2          (  na    ( VOL/UT6.O2 2RHS.66-09-SW015            (
QISO  66-09          or DWG&#xb9; na    in  (C5.51            (none  ( SUR/PT3.00/MT4.00  (
NHP2-8-.594-CS        (
LINE&#xb9; 2RHS-008-53-2 NTS: 31            (none                2    ( na /na
 
NIAGARA HOHAMK POMER CORPORATION            - N      ILE POINT NUCLEAR STATION - UNIT 2        30 of 135 NMP2-ISI-006, REV. II CH.OOO                                            SECOHD TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX G - RHS SYSTEH (sorted by Examination Identifier)
HD  IHTVL REL REQ      DESCRIPtloN OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE iPERIOO                1                        REMARKS I
EXAHINATIOH IDENTIFIER    )
ITS ISO LOCATOR,  COHPONEHT DMG    &#xb9;,  iITEH  &#xb9; iFREQYJ EX2/NDE PROCEDURE        iPERIOD 2 USE CAL BLK    &#xb9; I  LINE No'ND NOTES'S        APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3              I I  PIPE/PIPE                              IC-F-2    i na      i VOL/ut6.02 2RHS-66 09-SM016          i QISO  66.09          or DIIG&#xb9; na  in iC5.51    inone i SUR/PT3.00/HT4.00          i HHP2-8-.594.CS      i  LIHE&#xb9;  2RHS-008-53-2  NTS: 31        inone          2    i na    /na              I I  PIPE/PIPE                              IC-F.2    i na      i  VOL/UT6.02 2RHS-66 FM001          i QISO    66.10          or DMG&#xb9; na    in iC5.51    inone i SUR/PT3.00/HT4.00          i NHP2-8-.500-CS        i  LINE&#xb9; 2RHS-008-54-2 NtS: 39            inone          2    )  na  /na              I i *HOV23A/PIPE IC-F-2    i na      i  VOL/ut6.OZ 2RHS-66-10-FM002            i QISO  66.10          or  DMG&#xb9; na  in  iC5.51    ]none    J SUR/PT3.00/HT4.00    i NHP2-8-.500-CS        I LINE&#xb9;  2RHS.008-294-2  NTS: 39,41    ISD            2    i na    /na I  ELB/PIPE                              IC-F-2    i na    i  VOL/ut6.02 2RHS-66-10-FM003            i  QISO  66-10          or DMG&#xb9; na in iC5.51        ]none    i  SUR/PT3.00/HT4.00    i NHP2-8-.500-CS        I  LIHE&#xb9; 2RHS-008.54-2 NTS: 39 40        ISD            2    J na /na              I i PIPE/ELB IC-F.2    i na      i  VOL/uT6.02 2RHS-66-10-FM004            i QISO  66.10          or DMG&#xb9; na in iC5.51        Inone    i  SUR/PT3.00/HT4.00    I NHP2-8-.500-CS        I  LINE&#xb9; 2RHS.008-54-2 NTS: 39,40          ISO          z I  ELB/PIPE                                IC-F-2    i na      (  VOL/UT6.02 2RHS-66-10-FM005            i QISO  66-10          or  DMG&#xb9; na    in  JC5.51    inone i SUR/PT3.00/HT4.00          i NHP2-8-.500-CS        i LINE&#xb9; 2RHS.008.54-2      HTS: 39,40      )SO          Z    i na  /na I ELB/PIPE                                IC-F-2    i na      i VOL/UT6.02 2RHS-66 10.FM006            i QISO  66-10          or OMG&#xb9; na in iC5 ~ 51      inone    [  SUR/PT3.00/HT4.00    i NHP2 ~ 500  CS      I LIHE&#xb9; 2RHS.008.54-2 NTS: 39,40          ISD          2    i  na/na I PIPE/PIPE                              IC-F-2    )  na    i  voL/UT6.02 2RHS 10. FMOO/          i QISO 66-10          or  DMG&#xb9; na    in iC5.51      inone    J SUR/PT3.00/Hl'4.00    i NHP2-8-.500-CS        I  LIHE&#xb9; 2RHS.008-54-2    NTS: 39        Inone        2      [ na /na I RED/TEE IC-F-2    i na      i VOL/UT6.02 2RHS-66-10-FM008            i QISO  66-10          or DMG&#xb9; na in ic5.51          inone    i SUR/PT3.00/HT4.00 i NHP2-20-.812.CS        i  LINE&#xb9; 2RHS-020-185-2 HTS: 48,49        iSO          2      i na /na
 
NIAGARA MOHAMK POMER CORPORATION          -        ILE POINT NUCLEAR STATION    - UNIT 2                                      31  of 135 NMP2-1SI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:    07/29/1999                                                                    APPEHDIX G - RHS SYSTEM (sorted by Examination Identifier) lIGSCCI EX1/NDE PROCEDURE iPERIOO                                          REMARKS 2ND IHTVL REL RE      I DESCRIPTION OF ITEH To BE EXAMINEDICATGRY 1  I EXAMINATIOH IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG            &#xb9;,  [ITEM  &#xb9; iFREOY) EX2/NDE PROCEDURE      iPERIOO 2 i USE CAL BLK    &#xb9; i  LINE  NO. AND NOTES,  AS  APPLICABLE    )SELECT  iCLASSi EX3/NDE PROCEDURE      iPERIOO 3 (
I  PIPE/PIPE                              IC-F-2    i na    i  voL/uT6.O2 2RHS-66-'lo-FM011          i QISO    66-10          or DMG&#xb9; na    in iC5.51      inone    i  SUR/PT3.00/MT4.00 i NHP2-8-.500-CS      i  LINE&#xb9; 2RHS-008-54-2 NTS: 39            inone          2    i na  /na I  ELB/PIPE                                IC-F-2    i na    i  VOL/uT6.O2 2RHS-66-10-FI$ 15          i  QISO  66-10          or DMG&#xb9; na in iC5.51          inone    i  SuR/PT3.00/MT4.00 i NMP2 ~ 500-CS    I  LINE&#xb9; 2RHS 008 54 2 NTS'9 40            ISD            2    i na  /na I  PIPE/TEE                                IC-F-2        na    (  VOL/UT6.02 2RHS-66 FM018          i QISO    66-10          or DUG&#xb9; na in [C5.51          inone i SUR/PT3.00/MT4.00 i NMP2-8-.500-CS      I  LINE&#xb9; 2RHS-008-54-2 NTS'9i35            ISD            2 i na /na                  I I  TEE/PIPE                                IC-F.2    J na    i  VOL/UT6.02 2R HS-66 F M019        i QISO 66-10            or  DMG&#xb9; na    in )C5.51      inone    i  SUR/PT3.00/MT4.00 i NHP2-8-.500.CS      I  LINE&#xb9; 2RHS-008-54-2    Nl'S: 39,35    ISO            2    i na /na              I I  PIPE/TEE                                IC-F-2              i  voL/uT6.o2 2RHS-66-10-FM020            I  Ql    6610          or  DMG&#xb9; na    in iC5.51      inone    i  SUR/PT3.00/MT4.00  J NMP2-8-.500.CS        (  LINE&#xb9; 2RHS-008-294-2 HTS: 39,35        LSD            2    i na  /na              I PIPE/MNF                                IC-F-2    i na    i na  /na 2RHS-66.10-FI$ 23          )
QISO  66-10          or  DMG&#xb9;  na    in inone      (~e M/M  (
i  LINE&#xb9;  2RHS-006-87-2    NTS:  44,45    dna            2    i na/na I  PIPE/RED                                IC-F-2    I na    I VOL/UT6.02          I 2RHS-66-10-FI$ 25          )
QISO  66-10          or DMG&#xb9; na in iC5.51          Inone    I SuR/PT3.00/HT4.00  I NMP2-8-.500.CS        I  LINE&#xb9; 2RHS-008-54-2 Nl'S: 39,46          I SD          2    / na /na i MOL/PIPE IC-F-2    i na    i na /na 2RHS-66 FM041          i QISO  66-10          or DMG&#xb9; na in inone            inone i na /na I LINE&#xb9; 2RHS-006-87-2 NTS: 43,44          Ina          2    i na /na PIPE/V432A                              IC-F-2    i na    i VOL/UT6.02                      iNon-exempt veld added by PN2Y91MX027 ASME XI Replacement Plan  &#xb9; 2RHS-66 FI$43              QISO  66-10          or DUG&#xb9; na in iC5.51          )none i SUR/PT3.00/MT4.00 i                iEDC2M10494B HIS-2 certification of 11-16-93 HHP2-8-.500.CS          LINE&#xb9; 2RHS-008-54-2 NTS: (none) I SD                I  2    I na /na              I
 
NIAGARA MOHAHK POMER CORPORATION        - N      ILE POINT NUCLEAR STATION - UNIT 2                                            32 of 135 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX G - RHS SYSTEH (sorted by Examination Identifier)
REMARKS 2ND INTVL REL RED  i DESCRIPTION OF ITEM TO BE EXAMINEDiCATGRY iIGSCCi EX1/NDE PROCEDURE iPERIOO 1 EXAHINATION IDEHTIFIER i ITS ISO LOCATOR, COHPONENT DUG          &#xb9;,  LITEM  &#xb9;  iFREQYi EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK  &#xb9; I LINE Ho. AND NOTES'S APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I I  V4328/PIPE                              IC-F-2    i na    i VOL/UT6.02                        iNon.exempt weld added by PN2Y91MX027 ASME XI Replacement Plan  &#xb9; or            in iC5.51                                                  iEDC2M10494B NIS-2 certification of 11-16-93 2RHS-66-10. FN044        i QISO 66-10                DUG&#xb9; na                  inone    i  SUR/PT3.00/MT4.00  J NMP2-8..500-CS    i LINE&#xb9; 2RNS-008-54-2      HTS:  (none)    LSD      I  2    I  na/na              I I  INTEG ATT                              IC-C      I  na    I  SUR/PT3.00/MT4.00  I 2RNS-66 FN306        i QISO 66-10.6        or  DMG&#xb9; na    in iC3.20    iio      i na  /na              I i LINE&#xb9; 2RHS-008-54-2      HTS:  39,42    iMandateJ    2    i  na /na              i Sc10 I  INTEG ATT                              IC-C      I  na    I  SUR/PT3.00/MT4.00 i 2RNS.66-10-FM307          i QISO 66-10-6        or DUG&#xb9; na in iC3.20 )ID              i na  /na J
LINE&#xb9; 2RHS-008-54-2 NTS: 39,42          iMandatei 2        i na  /na              iSc10 Integral Att                            IC-C      I na-  I  SUR/PT3.00/HT4.00  I 2RHS-66-10 FH308            QISO  66-10-5        or DUG&#xb9; na    in iC3.20    ilo      i na  /na              igc8    ,
LINE&#xb9; 2RNS-008-54-2 NTS:                iMandatei    2    i  na /na              I I  PIPE/ELB                                IC-F-2    i na    i VOL/uT6.O2 2RHS-66-10-SM001          i QISO 66-10            or  DUG&#xb9; na    in iC5.51    !ID      I  SUR/PT3.00/MT4.00  I HMP2-8-.500-CS        LINE&#xb9; 2RHS.008-54-2    Nl'S: 39,40    LSD          2    (  na /na              iSc10 I  ELB/PIPE                                IC-F-2    i na    i  VOL/UT6.02 2RHS-66-10-SN002          i QISO  66-10          or DNG&#xb9; na in )C5.51        Inone    I  SUR/PT3 00/MT4      I NMP2.8-.500-CS      I  LINE&#xb9; 2RHS 008 54 2 NTS'9 40            I 2    J na /na              I I PIPE/ELB                                IC-F-2    (  na    [ voL/UT6.O2 2RHS.66-10.SN009          i QISO  66-10          or DNG&#xb9; na in iC5.51        inone    i SUR/PT3.00/MT4.00 NMP2.8..500.CS      I LINE&#xb9; 2RHS-008-54-2 NTS: 39,40          ISD          2    i na/na              I I PIPE/ELB                                IC-F-2              i voL/uT6.O2 2RHS.66.10.SN010          i QISO  66-10          or DUG&#xb9; na in iC5.51          )none i SUR/PT3.00/MT4.00 i NMP2.8..500-CS      f LINE&#xb9; 2RHS.008-54-2 NTS 39 40          LSD          2    J na/na ELB/PIPE                                IC-F-2    I na    I VOL/UT6.02          I 2RHS-66-10-SW011            Ql So 66-10          or  DUG&#xb9; na    in IC5.51    inone    / SUR/PT3.00/MT4.00 i NHP2-8-.500-CS        L INE&#xb9; 2RNS-008.54-2    NTS:  39,40    ISD          2    ( na /na
 
NIAGARA HONAWK POWER CORPORATION            -  H    ILE POINT NUCLEAR STATION - UNIT 2        33 of 135 HHP2- IS1-006,  REV. 1 ~  CH.OOO                                            SECOHD TEH YEAR IHSERVICE IHSPECTIOH            (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                        APPENDIX    G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE                        IPERIOD  1  I                    REHARKS EXAHIHATIOH IDENTIFIER      J ITS ISO LOCATOR, COHPOHENT DWG      &#xb9;,  [ITEN  &#xb9; JFREOY[ EX2/HDE PROCEDURE          ]PERIOD 2 USE CAL BLK    &#xb9; i LINE NO. AND NOTES, AS APPLICABLE DESELECT          )CLASS) EX3/NDE PROCEDURE iPERIOO 3 I    ELB/PIPE                                IC-F-2  (  na  ]    VDL/UT6.02 2RHS.66-10-SW012            [    QISO  66-10          or  DWG&#xb9;  na  in  )C5.51    Inone    I  SUR/PT3.00/HT4.00    I NHP2-8-.500-CS        I    LINE&#xb9; 2RHS 008    4 2    NTS'            ISD          2    /  na/na                I
                            ]    PIPE/ELB                                IC-F-2    )  na    )
VOL/UT6.02 2RHS-66-10-SW014            i    QISO  66-10          or  DWG&#xb9;  na  in  )C5.51    ]none    J SUR/PT3.00/HT4.00    (
NHP2-8-.500.CS            LINE&#xb9; 2RHS-008-54-2 NTS: 39,40          i SD          2    /  na /na I  PIPE/ELB                                IC-F-2    [  na    [  VOL/UT6.02 2RHS  66-10-SW015            i QISO    66.10          or DMG&#xb9; na in [C5.51        [none    f  SUR/PT3.00/HT4.00    [
NHP2-8-.500-CS        I  LIHE&#xb9; 2RHS-008-54-2 NTS: 39,40          ISD          2    /  na /na I  PIPE/ELB                                IC-F-2    J na    )  VOL/UT6.02 2RHS.66-10-SM019            i QISO    66-10          or DWG&#xb9; na in JC5.51        IID      I  SUR/PT      /HT      I NHP2-8-.500.CS        I  LINE&#xb9; 2RHS-008-54-2 NTS: 39,40          ISD          2    f  na /na                /Sc10 I  PIPE/ELB                                IC-F-2    [  na    I  VOL/UT6.02            I 2RHS.66-10.SW025            i QISO 66-10              or  DWG&#xb9;  na    in JC5.51    ]none    [  SUR/PT3.00/HT4.00    [
NHP2-8-.500-CS          i  LINE&#xb9; 2RHS-008-54-2      NTS:  39,40    LSD      I  2    I  na/na                I I  ELB/PIPE                                IC-F-2    I  na    I  VOL/UT6.02            I 2RHS-66-10-SM026              i QISO  66-10          or DMG&#xb9; na in )C5.51          ]none    )  SUR/PT3.00/HT4.00      f NHP2-8-.500-CS          I  LINE&#xb9; 2RHS-008-54-2 HTS: 39,40          ISD          2    )  na /na I  ELB/RED                                  IC-F-2    I na    I  VOL/UT6.02 2RHS.66-10-SW029              [  QISO  66-10          or DWG&#xb9; na in (C5.51          (none    J SUR/PT3.00/HT4.00      J NHP2-12-.844-CS        I  LINE&#xb9; 2RHS.012-306-2 NTS: 47,48          ISD          2    /  na /na I  RED/ELB                                  IC-F-2    J na    f  VOL/UT6.02 2RHS.66-10-SM030              i QISO  66-10          or DWG&#xb9; na in (C5.51          )none    )
SUR/PT3 F 00/HT4.00    J NHP2-12-.844-CS        [  LINE&#xb9; 2RHS-0'I2-306-2 NTS: 46,47        LSD          2    f na/na PIPE/PIPE                                IC-F-2    [ na      ] VOL/UT6.02 2RHS-66-10-SW03'I                QISO 66-10          or DWG&#xb9; na      in  [C5.51    ]none    ] SUR/PT3.00/HT4.00      [
NHP2-8-.500-CS            LINE&#xb9; 2RHS-008-54-2 NTS: 39              (none        2    f na/na
 
NIAGARA KOHAMK POMER CORPORATIOH              - N      ILE POINT    NUCLEAR STATION  - UNIT 2        34 of 135 NHP2-1SI-006, REV. 1, CH-000                                              SECOND TEH YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                      APPENDIX  G - RHS SYSTEH (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTINI OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE                        IPERIOO  1  I REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG          &#xb9;,  IITEH  &#xb9;  IFREOYI EX2/NDE PROCEDURE          IPERIOO 2 I USE CAL BLK  &#xb9; I    LINE NO. AND NOTES, AS APPLICABLE ISELECI'CLASSI              EX3/NDE  PROCEDURE  IPERIOO 3 I I    (84) PIPE/MOL (64)                    IC-F-2    I  na    I  SUR/PT3.00/HT4.00      I 2RHS-66-10-SM032          I Q      6610          or  DMG&#xb9; na  in  IC5.81    Inone    I  na  /
I    LINE&#xb9; 2RHS-006-87-2    NTS: 39,43      ITE            2    I  na  /na                I I PEHET    Z5A/PIPE                        IC-F-1 I na        I  VOL/UT6.03                  Sc7 2RHS-66-13-FM002          I  QISO  66-13        or DMG&#xb9; na    in  IC5.11 I ID        I  SUR/PT3.00            I NHP2 ~ 500.SS    I  LINE&#xb9; 2RHS-024-1-2    NTS: 53,55      I7.5XHInI 2        I na  /                  I I  PIPE/ELB                              IC-F-2    I  na    I  VOL/UT6.02 2RHS-66 13-FM003          I  QISO  66-13        or DMG&#xb9; na    in  IC5.51    Inone    I SUR/Pl'3.00/HT4.00    I HHP2-24-.500-CS      I  LIHE&#xb9; 2RHS-024-2-2    NTS: 62,65      ISD            2    I  na  /na I  ELB/PIPE                              IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-13-FM004          I  QISO  66-13        or DMG&#xb9; na    in  IC5.51    IID      I  SUR/PT3.00/HT4.00      I NHP2-24-.500-CS      I  LINE&#xb9; 2RHS.024-2-2    NTS: 62,65      ISD            2    I  na /na                ISc10 I  PIPE/ELB                              IC-F-2      I na    I  VOL/UT6.02 2RHS-66-13.F'M005          I  QISO  66-13        or OMG&#xb9; na in IC5.51          Inone    I  SUR/PT3.00/HT4 F 00    I NNP2 F 500-CS    I  LINE&#xb9; 2RHS-024-2-2    NTS: 62,65      ISD            2    I  na  /na I  PIPE/TEE                                IC-F-2    I na    I  VOL/UT6.02 2RHS-66 FM006          I  aiso 66-13          or  DMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3  F 00/HT4.00    I NNP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-203-2 NTS: 67,72        ISD          2    I  na  /na I  PIPE/4STRTIA                            IC-F-2    I na    I  VOL/UT6.02 2RHS-66-13-FM008            I  QISO  66-13        or DMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/HT4.00      I NHP2.24-.500-CS      I  LINE&#xb9; 2RHS.024-2-2    NTS: 62,73      ISD          2    I  na  /na I RED/PIPE IC-F-2    I na    I  VOL/UT6.02 2RHS-66 FM010          I  QISO  66-13        or DMG&#xb9; na in IC5.51          Inone    I SUR/PT3.00/HT4.00      I NHP2-20..500.CS      I  LINE&#xb9; 2RHS.020.15-2 NTS 75,76          I SD          2    I  na /na                  I
                                *STRT1A/P I PE                        IC-F-2    I na    I  VOL/UI'6.02 2RHS-66 FM012          I aiso 66-13          or  DUG&#xb9; na    in  IC5.51    IID      I  SUR/PT3.00/HT4.00      I NNP2-24-.500-CS      I  LINE&#xb9; 2RHS-024-2-2    NTS'2    73      ISD            2    I  na  /na                ISc10
 
NIAGARA MOHAMK POMER CORPORATION              - N    ILE POINT NUCLEAR STATION - UNIT 2        35 of 135 NMP2-ISI-006( REV. 1, CH-000                                                SECOND TEN YEAR INSERVICE INSPECTION              (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                          APPENDIX G  - RHS SYSTEM (sorted by Examination Identifier) 2ND IHTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAMIHEDiCATGRY iIGSCC) EX1/HDE PROCEDURE                          (PERIOD    1                    REMARKS EXAMIHATION IDENTIFIER i ITS ISO LOCATOR, COMPONEH'I DMG            &#xb9;,  LITEM  &#xb9; iFREOYi EX2/HDE PROCEDURE          iPERIOO 2 USE CAL BLK    &#xb9; I LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3                    I P I PE/MNF                                ic-F-2    J na  i VOL/UT6.02 2RHS-66 FM013          i QISO 66-13          or  DMG&#xb9; na    in iC5.51 inone          J SUR/PT3.00/MT4.00 i NHP2-20-.500.CS      I  LIHE&#xb9; 2RMS-020-15-2      NTS:  76,79      I SD          2    i    na/na I  PIPE/ELB                                  iC-F-2    i na      i VOL/UT6.02 2RHS.66.13-FM015          i QISO 66-13              or  OMG&#xb9; na    in  iC5.51    inone    i    SUR/PT3.00/MT4.00 i HMP2-20..500.CS      i  LINE&#xb9; 2RHS-020-15-2      NTS:  76,77      LSD            2    i    na/na              I I MNF/PIPE IC-F-2    i na      i VOL/UT6.02 2RHS-66-13 FM016          i QISO 66-13              or  DMG&#xb9; na    in iC5.51      /none    i  SUR/PT3.00/MT4.00 i HMP2-24-.500-CS      i  LIHE&#xb9; 2RHS.024-2-2        NTS:  61,62      LSD            2    /  na/na              I i MNF/PIPE iC-F-I    i na          VOL/UT6.03                Sc7 2RHS-66-13-FM020            i QISO    66-13          or DMG&#xb9; na in JCS.I1 )ID                    SUR/PT3.00          I NMP2.24-.500-SS      /  LINE&#xb9; 2RHS-024-331-2 NTS: 50,53            /7.5XMini 2              na /                I I  PIPE/*V376                                  iC-F-I ) na            VOL/UT6.13                Sc7 2RHS.66.13-FM021            )
QISO 66-13            or D'MG&#xb9; na in PCS.'ll iID                  SUR/PT3.00          I NMP2-24-.500.SS      i  LINE&#xb9; 2RHS.024-1-2      HTS: 53,58        i7.SXMini 2            na /                I IMC-2r1    I  PIPE/ELB                                  IC-F-1    i na      i VOL/UT6.03            )Inacc 2RHS-66-13-FM023            i  QISO  66-13          or  DMG&#xb9;  na  in  iC5.11    IRR      I SUR/PT3.00            I NMP2.24-.500-SS          LINE&#xb9;  2RHS-024-80-2    NTS:  53,54      iHS            2    dna/                    I IMC-2r1                                                    IC-F-1    i na        VOL/UT6.03              lnacc i PIPE/MNF                                                        )                      J 2RHS-66-13-FM024              QISO 66-13            or DMG&#xb9; na      in  iC5.11    IRR      I  SUR/PT              I NMP2-24-.500.SS          LINE&#xb9;  2RHS-024-80-2    NTS: 50,51        iHS            2    dna/                    I IMC-2rl      I ELB/PENET ZSA iC-F-I    I na      I  VOL/UT6.03            i lnacc 2RHS-66-13-FM025            i QISO    66-13          or  DMG&#xb9; na    in iC5.11      IRR      I SUR/PT3 0              I NMP2.24-.500-SS      I  LINE&#xb9; 2RHS-024-80-2 HTS: 54 55            INS            2    dna/                    I IMC-2rl      I  PIPE/PIPE                                  IC-F-1    i na      i VOL/UT6.03            Ilnacc 2RHS-66-13-FM029            i QISO 66-13              or  DMG&#xb9; na    in iC5.11      IRR        I  SUR/PT3.00          I NHP2 F 500-SS    I  LINE&#xb9;  2RHS 024 80 2    HTS'      3      INS          2      dna/                    I
 
NIAGARA HOHAMK PDMER CORPORATION -              ILE POIHT NUCLEAR STATION - UNIT 2        36 of 135 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTIOH        (ISI)    INTERVAL PLAN Change date:    07/29/1999                                                                  APPEKDIX G -  RHS SYSTEM (sorted by Examination Identifier) 2KD INTVL REL RED I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/KDE PROCEDURE                  IPERIOO  1                        REMARKS EXAHIKATION IDENTIFIER I ITS ISO LOCATOR, COHPOKENT DMG          &#xb9;, I ITEN &#xb9; IFREOYI EX2/NDE PROCEDURE IPERIOD 2 USE CAL BLK    &#xb9; I LIKE  NO  AKD  NOTESi  AS  APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOD            I I PIPE/PIPE                                IC-F-1 I na      I  VOL/UT6.03              Sc7 2RHS-66-13-FM030          I QISO 66-13            or  DMG&#xb9; na    in IC5.11 IID        I  SUR/PT3.00          I NHP2-24'-.500-SS    I LINE&#xb9; 2RKS.024-1-2        NTS: 53        I7.5KHinI 2      I  na  /              I I P IPE/*HOV1A                            IC-F-1    I na    I  VOL/UT6.13              Sc7 2RHS-66-13-FM032          I QISO 66-13            or  DMG&#xb9; na    in IC5 11  II      I  SUR/ T3 00          I            I NHP2-24-.500-SS    I LINE&#xb9; 2RHS-024-331-2 NTS: 53,58          I7.5XHinI 2      I  na  /              I          .I I INTEG ATT                                Ic-c      I na    I  SUR/PT3.00/HT4.00  I 2RKS-66-13-FM309          I QISO  66-13-4        or DMG&#xb9; na in IC3.20        IID    I na /na I LINE&#xb9; 2RHS.024-2.2        NTS: 62,63    INS          2  I na /na I INTEG ATT                                IC-c      I na    I  SUR/PT3.00/HT4.00    I 2RHS-66-13-FM310          I QISO  66-13-4        or DMG&#xb9; na in IC3.20        IID    I na /na                I LINE&#xb9; 2RKS-024-2.2        NTS: 62,63    INS          2  I na /na                I I INTEG ATT                                IC-c      I na    I  SUR/PT3.00/H'14.00  I 2RHS-66-13-FM311          I QISO  66-13-4        or  DMG&#xb9;  na  in IC3.20    IID    I na  /na              I LINE&#xb9; 2RHS.024-2-2        N'IS: 62,64    INS          2  I na  /na              I I INTEG ATT                                Ic-c      I na    I  SUR/PT3.00/HT4.00    I 2RHS-66-13-FM312          I QISO  66-13-4        or DMG&#xb9; na in IC3.20        IID    I  na  /na              I I LINE&#xb9; 2RHS-024-2-2        NTS: 62,64    INS          2    I na/na                I INTEG ATT; 16a    dia., 1.219" thick    IC-C      I na    I SUR/PT3.00/HT4.00    I 2RHS-66 FM314          QISO 66-13-14          or DMG&#xb9; na in    IC3.20 IID        I na  /na            Isc8 LINE&#xb9; 2RHS-024-2-2        NTS:  62,166  IHandateI 2        I na /na              I IMC 3      I INTEG ATT                                IC-c      I na    I SUR/(inaccessible)IInacc 2RHS-66-13-FM316          I QISO  66-13-16        or DMG&#xb9; na in IC3.20        IRR    I  na /na              I na                  I LINE&#xb9; 2RHS.024-80-2 NTS: 51,52          IKS          2    I na/na                I INC-3      I INTEG ATT                                IC-c      I na    I  SUR/(inaccessible)IInacc 2RHS-66 FM317        I QISO  66-13-16        or DUG&#xb9; na in IC3.20        IRR    I  na  /na            I LINE&#xb9; 2RHS-024-80-2 NTS: 51,52          INS          2    I na/na              I
 
NIAGARA KOHAMK POWER CORPORATION            -      ILE POINT NUCLEAR STATION - UNIT 2        37 of 135 NHP2-ISI-006, REV. 1, CH-000                                              SECOHD TEH YEAR INSERVICE INSPECTION              (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX  G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/HDE PROCEDURE                      iPERIOD      1                    REMARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG          &#xb9;,  JITEH  &#xb9; JFREOYJ EX2/HDE PROCEDURE        [PERIOD 2 USE CAL BLK  &#xb9; i LINE HO. AND NOTES, AS APPLICABLE DESELECT          iCLASSi EX3/NDE PROCEDURE iPERIOD 3
                          /    LM                                      IC-F-1    [  na    [  VOL/UT6.03          /  Inacc 2RHS-66-13-LI$ 1          i QISO 66-13          or DMG&#xb9; na    in /C5.12    IRR      I  SUR/PT3.00          I NHP2-24-.500-SS    I    LINE&#xb9; 2RHS-024-80.2 NTS: 51            IHS          2    /na/                    I
                          / LM IC-F-I    I  na    I  VOL/UT6.03          /  Inacc 2RHS-66-13-LM02          i QISO    66-13          or DMG&#xb9; na    in /C5.12    ERR      f  SUR/PT3.00          I NHP2-24-.500-SS    I    LINE&#xb9; 2RNS-024-80-2 NTS: 53            /NS          2    /na/                    I I    LW  IR                                  IC-F-1    I  na    I VOL/UT6  03          J Inacc 2RHS-66-13-LW03          i QISO 66-13              or DMG&#xb9; na    in /C5.12    IRR      I  SUR/PT3.00          I NHP2-24-.500-SS    I LINE&#xb9; 2RHS.024-80-2  HTS: 54        JNS          2    /na/                    I I  LM OR                                  IC-F-I    (  na    (  VOL/UT6.03          /Inacc 2RHS-66 LI$4          i QISO 66-13              or DMG&#xb9; na    in /C5.12    [RR      ]  SUR/PT3.00          I NHP2.24-.500-SS      i LINE&#xb9; 2RHS-024-80-2 Nl'S: 5C        /NS            2    dna/                    I J
LW  assoc M/fM025 & FW002              IC-F-I      na    f  VOL/UT6.03                  Sc7 2RHS.66.13-LI$ 5          [  QISO 66-13            or DWG&#xb9; na    in /C5.12      1ID      I SUR/PT3.00            I NHP2.24-.500-SS      i  LINE&#xb9; 2RHS-02C-80-2 H'TS: 55            IAL            2    /na/                    I
                          )  LM  assoc w/FW002 & FM030              IC-F-I    f na      f VOL/UT6.03                  Sc7 2RHS-66-13-LM06            i  QISO 66-13            or DWG&#xb9; na    in  IC5.12    (ID      / SUR/PT3.00            I NHP2 F 500-SS    i  LINE&#xb9; 2RHS-024-1-2      HTS: 53        1AL            2    /na/                    I
                          / LM    assoc M/FI$21 & FM030                IC-F-1    (
na      [ VOL/UT6.03                  sc7 2RHS-66-13. LI$7          i  QISO 66-13            or DWG&#xb9; na    in  JC5.12    (ID      [ SUR/PT3.00            I NHP2-24-.500-SS      I  LIHE&#xb9; 2RHS-024-1-2      HTS: 53        IAL          2    /na/                    I J
LM assoc w/FW020 & FM032                IC-F-I      na      )
VOL/UT6.03                  Sc7 2RHS-66-13.LM09            i  QISO  66-13          or DMG&#xb9; na    in  JC5.12    IID      I SUR/PT3 F 00          I NHP2.24..500-SS        I  LINE&#xb9;  2RHS-024-331-2  NTS: 53        JAL          2    [na/                    I I  ELB/PIPE                                IC-F-2    [ na      [ VOL/UT6.02 2RHS-66 SM008          i QISO 66-13            or  DUG&#xb9; na    in ]C5.51    Inone    I SUR/PT3 00/HT4 00      I NHP2 ~ 500-CS      i LINE&#xb9; 2RHS-024-2-2      NTS: 62,65      LSD          2    f na /na
 
NIAGARA MOHANK POHER CORPORATION            - N    ILE POINT NUCLEAR STATION - UNIT 2        38 of 135 NMP2-ISI-006, REV. 1( CH.000                                          SECOND TEN YEAR INSERVICE IHSPECTIOH          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY I IGSCCI EX1/NDE PROCEDURE                  IPERIOO  1  I                    REMARKS EXAMINATION IDENTIFIER J ITS ISO LOCATOR, COMPOHENT DNG        &#xb9;,  ]ITEM  &#xb9; )FREGVJ EX2/HDE PROCEDURE        ]PERIOD 2  J USE CAL BLK &#xb9; I  LINE  NO  AND NOTESr AS APPLICABLE ISELECT ICLASSI EX /NDE PROCEDURE              IPERIOD    I I  PIPE/ELB                                IC-F-2    J na    J VOL/UT6.02        I 2RHS-66-13-SN009        i  QISO 66-'13          or  DNG&#xb9; na  in  ]C5.51    ]none    )  SUR/PT3.00/MT4.00  f NMP2-24-.500-CS  )
LINE&#xb9; 2RHS-024-2-2      HTS:  62,65    LSD            2    /  na  /na I  ELB/PIPE                                IC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66-13-SI010        (
QISO  66-13          or DUG&#xb9; na in [C5.51        /none    )
SUR/PT3.00/MT4.00  [
NMP2-24-.500.CS  )  LINE&#xb9; 2RHS-024-2-2      NTS'2 65 ISD              I    2    I  na /na              I I  PIPE/ELB                                IC-F-2    f  na    f VOL/UI'6.02 2RHS-66.13-Sl$ 11      i QISO    66-13          or DUG&#xb9; na in (C5.51        ]none    f  SUR/PT3.00/MT4.00  J NHP2-24-.500.CS      LINE&#xb9; 2RHS-024-2-2      NTS: 62,65      (SD            2    /  na  /na I  PIPE/ELB                                IC-F-2    ]  na    ]  VOL/UT6.02 2RHS-66-13-SN012        I QISO 66 13            or  DUG&#xb9; na  in  [C5.51    ]none    f  SUR/PT3.00/MT4.00  f NMP2-24-.500-CS    I  LINE&#xb9;    RHS 024 2      HTS'2i6        ISD            2    J na /na I  ELB/PIPE                                IC-F-2    [  na    [  VOL/UT6.02 2RHS-66-13-Sl$ 13        )
QISO  66-13          or  DUG&#xb9; na    in )C5.51    [none    f  SUR/PT3.00/MT4.00  /
HMP2-24-.500.CS    i  LINE&#xb9;  2RHS-024-2-2      NTS: 62,65    LSD            2    /  na  /na I  ELB/TEE                                IC-F-2    J na    J VOL/UT6.02 2RHS-66 SW014        i QISO  66-13          or DllG&#xb9; na in )C5.5'l      )none    )  SUR/PT3.00/MT4.00  J HMP2-24-.500.CS    i LINE&#xb9; 2RHS-024-2-2        HTS: 65,67    LSD        I  2      I na/na                I I  TEE/PIPE                                IC-F-2      f na      f VOL/UT6.02 2RHS.66.13-SN015        [ QISO  66.13          or DIIG&#xb9; na in [C5.51        ]none    f SUR/PT3.00/MT4.00    [
NHP2-24-.500-CS    I LINE&#xb9; 2RHS-024-2-2      HTS: 62,67      ISO            2    / na  /na I PIPE/TEE                                IC-F-2    J na      J VOL/UT6.02 2RHS-66-13-9817          i QISO  66-13          or DlIG&#xb9; na in (C5.51        ]none    J SUR/PT3.00/MT4.00    J HMP2-24-.500.CS    I LINE&#xb9; 2RHS-024-2-2      NTS: 62,73      ISO            2    / na /na I  TEE/PIPE                                IC-F-2    ] na      J VOL/UT6.02 2RHS-66-13-SN018        ) QISO 66-13            or  DUG&#xb9; na    in  JC5.51    ]none    [ SUR/PT3.00/MT4.00    J NHP2-24-.500.CS    I  LINE&#xb9;  2RHS 024 2 2    HTS'2(73        ISD            2    / na /na
 
NIAGARA HOHAMK POMER CORPORATIOH          - N      ILE POINT  NUCLEAR STATION - UNIT 2        39 of 135 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G -  RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL RELREQ I DESCRIPTION OF ITEH        To BE EXAHIHEDICATGRY IIGSCCI EX1/NDE PROCEDURE IPERIOD 1 I                                      REHARKS EXAHIHATION IDENTIFIER    I  ITS ISO LOCATOR'OHPONEHT DMG      &#xb9;i  I ITEN  &#xb9; IFREQYI EX2/NDE PROCEDURE IPERIOO 2 I USE CAL BLK    &#xb9; I  LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE iPERIOD 3 I  PIPE/ELB                                IC-F-2    I  na  I  VOL/UT6.02          I 2RHS 13-9819          i  also 66-13          or  DMG&#xb9; na    in  tC5 51~    inone    i  SUR/PT3.00/Hl'4.00 i NHP2-24-.500-CS      i  LINE&#xb9; 2RHS.024-2-2      NTS:  62,65    LSD        I  2    I  na  /na            I I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2RHS-66-13-$ 820          i  also  66-13        or OMG&#xb9; na in iC5.51          Inone    I  SUR/PT3.00/HT4.00  I NHP2-24-.500    CS      LIHE&#xb9; 2RHS-024-2-2    N'TS: 62,65    LSD            2    i na  /na PIPE/MNF                              IC-F-2    J na    i  VOL/UT6.02 2RHS-66-13-SM021          I QISO 66-13        or DMG&#xb9; na    in iC5.51      Inone    I  SUR/PT3 00/HT        I NHP2-24-.500-CS          LINE&#xb9; 2RHS-024-2-2    NTS: 61,62      i SD          2    i  na/na I  TEE/PIPE                              IC-F-2    i na    i VOL/UT6.02 2RHS-66-13-SM023          I  Ql    6613          or  OMG&#xb9; na    in iC5.51      inone    t  SUR/PT3.00/HT4.00    i NHP2-24-.500.CS      I  LINE&#xb9; 2RHS.024.2-2    NTS: 62,73      ISD            2    i na  /na I PIPE/RED IC-F-2    i na    i  voL/uT6.02 2RHS-66-13. $ 024          I  Ql    6613          or  DMG&#xb9; na    in iC5.51      inone    i  SUR/PT3.00/HT4.00    i NHP2-24-.500-CS      I  LINE&#xb9; 2RHS-024-2-2    NTS: 62,75      ISD            2    i na  /na I  ELB/PIPE                                IC-F-2    i na    i VOL/uT6.O2 2RHS-66-13-SM025            i QISO 66-13          or  OMG&#xb9; na    in  iC5.51    Inone    I  SUR/PT3.00/HT4.00    I NHP2 ~ 500.CS        LINE&#xb9; 2RHS-020-15-2    NTS:  76,77      LSD          2    /  na/na I  PIPE/ELB                                IC-F-2    i na    i  VOL/UI'6.02 2RHS-66-13-SM026            I QISO 66-13          or  DMG&#xb9; na    in  JC5.51    (none i SUR/PT3.00/HT4.00        i NHP2-20-.500-CS          LINE&#xb9; 2RHS.020-15-2    HTS: 76(77      i SD          2 ) na /na I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2RHS-66-13-9527            i  also 66-13          or  DMG&#xb9; na    in iC5.51      IID      I SUR/PT3.00/HT4.00    I NHP2 F 500-CS    i LINE&#xb9; 2RHS-020-15-2    NTS:  76,77      LSD          2    i na  /na              /Sc10 I  MNF/PIPE                                IC-F-2    J na    i VOL/uT6.O2 2RHS-66-13-SM028            i- QISO 66-13          or  DMG&#xb9; na    in  iC5.51    lnone    I SUR/PT3.00/HT4.00    I NHP2-18-.375-CS          LINE&#xb9; 2RHS-018-203-2 NTS: 71,73        LSD          2    i na  /na
 
NIAGARA HOHAMK POMER CORPORATION        - N i  NILE POINT NUCLEAR STATION - UNIT 2        40 of 135 NHP2-ISI-006, REV. 1, CH.000                                          SECOND TEN YEAR IHSERVICE INSPECTION      (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REO    )
DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE )PERIOD          1                        REHARKS EXAHINATION IDENTIFIER    J ITS ISO LOCATOR, COHPOHENT  DMG &#xb9;, ]ITEN &#xb9;    JFREOYJ EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK  &#xb9; i LIHE NO. AND NOTES, AS APPLICABLE )SELECT        ]CLASS) EX3/NDE PROCEDURE iPERIOD 3 IMC-3          INTEG ATT PENET Z5A SHOPMELD          /C-C    J na  [  SUR/(inaccessib(e))lnacc 2RHS-66-13-SM301          I Q      66 13          or DMG&#xb9; na in (C3.20      /RR    /  na /na              I na                  I  LINE&#xb9; 2RHS-024-80 2 NTS: 55,57        INS          2  /  na/na              I I  INTEG ATl PENET Z5A SHOPMELO          IC C    I na    [  SUR/PT3.00/HT4.00  I  Sc7 2RHS-66-13-SM302          i QISO 66-13            or  DMG&#xb9; na    in [C3.20 (ID      )  na  /na            I f  LIHE&#xb9; 2RHS-024-80-2    NTS: 55,57    /Handate/ 2      )  na /na              I I  PIPE/*V1                              IC-F-2  f  na    f VOL/UT6.02 2RHS-66.14-FM001          (
QISO 66.14          or DMG&#xb9; na in (C5.51      ]none    f SUR/PT3.00/HT4.00  J NHP2 ~ 500-CS  i  LINE&#xb9; 2RHS-018-3-2    NTS: 80,82    LSD          2    )
na /na              I I  ~V1/ELB                              IC-F-2  )
na    f VOL/UT6.02 2RHS-66-14.FI$ 02          i QISO  66-14          or DMG&#xb9; na in JC5.51      )none    f SUR/PT3.00/HT4.00    [
NHP2-18-.500-CS      I  LINE&#xb9; 2RHS-018-3-2    NTS: 82,83    ISO          2    [ na/na                I I
PIPE/*V4                              IC-F-2    [ na    [ VOL/UT6.02 2RHS-66-14-FM003          i QISO 66-14          or  DMG&#xb9; na    in [C5.51    (none  J SUR/PT3.00/HT4.00    J NHP2-18-.500-CS      )  LINE&#xb9; 2RHS-018-3-2    NTS: 80,84    (SD          2    / na /na              I I  ~V4/PIPE                              IC-F-2    (
na    ) VOL/UT6.02 2RHS-66 FM004          i QISO 66-14          or  OMG&#xb9; na  .in iC5.51    IID    I SUR/PT3.00/HT4.00    I NHP2-18-.500-CS      [  LINE&#xb9; 2RHS-018-3-2    NTS: 80,84    (SD          2    [ na /na              )  Sc11
(  PIPE/ELB                              IC-F-2    [ na    [ VOL/UT6.02 2RHS-66 FM006          i QISO  66-14        or D'MG&#xb9; na in [C5.51      [none  J SUR/PT3.00/HT4 F 00  (
NHP2 F 500-CS    I LINE&#xb9; 2RHS.018-3.2    NTS: 80 83    ISO          2    / na /na
                            ] PIPE/TEE                              IC-F-2    [ na    [ VOL/UT6.02                    I 2RHS.66-14-FM007            i QISO  66-14        or DMG&#xb9; na in [C5.51        (none  [ SUR/PT3.00/HT4.00    )        I.
NHP2-18-.500-CS      I LINE&#xb9; 2RHS-018-3.2    NTS: 80,85    ISO          2    (
na /na              I        I I ELB/PIPE                              IC-F-2    ( na    ] VOL/UT6.02 2RHS-66 Fl$ 08          i QISO  66-14        or OMG&#xb9; na in ]C5.51        ]none  )
SUR/PT3.00/H'I4.00  f NHP2-18-.500-CS      I LINE&#xb9; 2RHS 018 3 2    NTS'0 83 ISD                2    / na /na
 
NIAGARA HOHAMK POMER CORPORATION          - N      LE POIN'I NUCLEAR STATION  - UNIT 2        41 of 135 HHP2  ISI 006'EV 1 ~ CH 000                                            SECOND TEH YEAR IHSERVICE INSPECTION      (ISI)  IHTERVAL PLAN Change  date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEH (sorted by Examination Identifier)
REHARKS i DESCRIPTIOH OF ITEN TO BE EXAHINEDiCATGRY iIGSCCi EX1/NDE                        iPERIOO 2HD IHTVL REL REO                                                                            PROCEDURE          1 EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPONEHT DMG        &#xb9;,  i ITEH  &#xb9; iFREOYi EX2/NDE PROCEDURE    iPERIOO 2  J USE CAL BLK  &#xb9; i LINE No. AND NOTES, AS  APPLICABLE  DESELECT  iCLASSi EX3/NDE PROCEDURE iPERIOO 3 I  PIPE/ELB                              IC-F-2    i na    (  VOL/UT6.02 2RHS-66-14-FM009        i QISO 66-1C            or  DMG&#xb9; na  in iC5.51      inone i SUR/PT3.00/HT4.00 i NHP2-18-.500-CS    I LINE&#xb9; 2RHS-018-3-2    NTS:  80(83    LSD            2    i na  /na I  PIPE/ELB                              IC-F-2    i na    i VOL/UT6.02 2RHS-66-14-FM010        i QISO 66-1C            or  DUG&#xb9; na  in iC5.51      Inone    I  SUR/PT3.00/HT4-00 I NHP2-18-.500.CS    i  LINE&#xb9; 2RHS-018-3-2    NTS:  80,83    )SD        i 2      i na /na I TEE/HOZ IC-F-2    i na    i VOL/uT6.O2 2RHS-66-14-FM011        i QISO 66-14            or  DMG&#xb9; na  in iC5.51      inone    J SUR/PT3.00/HT4.00  J NHP2-20-.594-CS    I  LINE&#xb9; 2RHS-020-185-2 HTS: 49,87        ITE            2    J na/na I
PIPE/PIPE                              IC-F-2    i na    i  VOL/UT6.02 2RHS-66 FM012        i QISO 66-14        or DMG&#xb9; na    in iC5.51      inone    i  SUR/PT3.00/HT4.00  i NHP2-18-.500-CS    i  LINE&#xb9;  2RHS-018-3-2    NTS: 80        inone          2    i  na /na            I I  TEE/PIPE                              IC-F-2    i na    i voL/uT6.O2 2RHS-66-14-FM013          i QISO 66-14          or  DMG&#xb9; na  in iC5.51      inone    /  SUR/PT3.00/HT4.00  )
NHP2-18-.500-CS    I  LINE&#xb9; 2RHS-018-3-2    NTS:  80,85    ISD            2    J na /na PIPE/MHF                                IC-F-2    J na    i voL/UT6.02 2RHS-66-1C- FM018        i QISO  66-14        or  DMG&#xb9; na    in  iC5.51    lnone    I SUR/PT3 00/HT4 00  I NHP2-18-.500-CS    I LINE&#xb9;  2RHS-018-3-2    HTS:  69,80      ISO          2    J na/na I
                            'MNF/PIPE                              IC  F 2  i na    [ VOL/UT6.02 2RHS-66 FM020        i  QISO 66-14          or OMG&#xb9; na in iC5.51          IID      I SUR/PT3.00/HT4.00  I NHP2-18-.500.CS    I  LINE&#xb9; 2RHS-018-3-2    NTS: 69,80      I SD          2    i na /na            J Sc11 I  PIPE/PIPE                              IC-F-2    i na    i VOL/uT6.02 2RHS-66-14-FM021          i QISO 66.14            or DMG&#xb9; na    in iC5.51      )none i SUR/PT3.00/HT4.00      i NHP2-18-.500-CS    i LINE&#xb9;  2RHS-018-3-2    HTS: 80        inone      i 2 i na /na i MNF/PIPE IC-F-2    i na    i VOL/uT6.O2 2RHS-66-14-FM022          i QISO  66-14          or  DMG&#xb9; na    in iC5.51      inone    ( SUR/PT3.00/HT4.00  i NHP2-18-.500-CS    I  LINE&#xb9; 2RHS-018-3-2    NTS: 69,80      ISD          2    i na /na              I
 
NIAGARA MONANK PNER CORPORATION              - N    ILE POINT NUCLEAR STATION - UNIT 2        42 of 135 NMP2-1SI-006, REV. 1, CH-000                                                  SECOHD TEN YEAR IHSERVICE INSPECTION        (ISI)  IHTERVAL PLAN Change  date:  07/29/1999                                                                          APPEHDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAMINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                        IPERIOO  1  I                    REMARKS EXAMINATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT OllG            &#xb9;,  IITEM  &#xb9; IFREQYI EX2/HDE PROCEDURE      IPERIOD 2 USE CAL BLK  &#xb9; I  LIHE  NO. AND NOTES,  AS  APPLICABLE      ISELECT  ICLASSI EX3/NDE PROCEDURE      IPERIOO 3  I I  ( 18a) PIPE/NOL  (6")                      IC-F-2    I  M    I  SUR/PT3.00/MT4.00  I 2RHS-66-14-Si$ 02        I  QISO 66-14            or  DIJG&#xb9; na      in  IC5.81    Inone  I  na  /
I  LINE&#xb9; 2RHS-006-12-2      NTS: 80,81        ITE            2  I  na  /na            I I  ELB/PIPE                                    IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-14-Sll005        I  QISO  66-14          or DllG&#xb9; na in IC5 ~ 51          Inone    I  SUR/PT3.00/MT4.00  I NHP2-18-.500-CS    I  LINE&#xb9;  2RHS-018-3-2    NTS: 80,83        ISO            2    I  na  /na I  PIPE/ELB                                    IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-14-Sll010          I QISO    66-14          or DllG&#xb9; na in IC5.51            Inone    I  SUR/PT3.00/MT4.00  I NHP2-18-.500-CS      I  LINE&#xb9; 2RHS.018-3-2      NTS: 80,83        ISO            2    I  na/na I  ELB/PIPE                                    IC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66-14-SU011          I QISO    66-14          or DUG&#xb9; na        in  IC5.51    Inone    I  SUR/PT3.00/MT4.00  I NHP2-18-.500-CS      I  LINE&#xb9; 2RHS.018.3-2      NTS: 80,83        ISD            2    I  na/na I  ELB/PIPE                                    IC-F-2    I  na    I  VOL/UT6.02 2RHS-66. 14-SN012          I QISO 66-14          or  DWG&#xb9;  na    in  IC5.51    IID      I  SUR/PT3.00/MT4.00  I NMP2-18-.500-CS      I  LINE&#xb9; 2RHS.018-3-2      NTS:  80,83        ISD          2    I  na /na              I    Sc11 I  TEE/PIPE                                    IC-F-2    I na    I  VOL/UT6.02          I  Sc7 2RHS-66-14-SM013          I  QISO 66-14            or DllG&#xb9; na      in  IC5.51    IIO      I SUR/PT3.00/MT4.00    I NMP2-18-.500-CS      I  LINE&#xb9;  2RHS 018 20 2    NTS'0      8      ISO          2    I na /na I PIPE/ELB                                    IC-F-2    I na    I VOL/UT6.02 2RHS.66-14.SU014            I QISO 66-14            or DllG&#xb9; na      in IC5.51      Inone    I SUR/PT3.00/MT4.00    I NMP2-18..500-CS      I LINE&#xb9; 2RHS.018-20-2      HTS:  80,83        ISD          2    I na/na I ELB/PIPE                                    IC-F-2    I na    I VOL/UT6.02 2RHS.66-14-SN015          I QISO 66-14            or  DIJG&#xb9; na    in  IC5.51    Inone      SUR/PT3.00/MT4.00 NMP2-18-.500-CS      I  LINE&#xb9;  2RHS 018 20 2    N    '0  ~ 83      ISD            2 I
I na /na I
PIPE/llNF                                  IC-F-2    I na    I VOL/UT6.02 2RHS-66-14-SN016          I QISO 66-14            or  DIIG&#xb9; na      in  IC5.51    Inone    I SUR/PT3.00/MT4.00    I NMP2-18-.500.CS        LINE&#xb9; 2RNS-018-20-2    NTS:  69,80        I SD          2    I na /na
 
NIAGARA MOHAIIK PSIER CORPORATION        -      NILE POINT    NUCLEAR STATION  - UNIT 2        43 of 135 NMP2-ISI-006( REV. 1, CH-000                                      SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                  APPENDIX  G -  RMS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED  (
OESCRIPTIOH OF ITEM TO BE EXAMINED(CATGRY ( IGSCC( EX1/HDE PROCEDURE              (PERIOD  1                          REMARKS EXAMINATION IDENTIFIER  (
ITS ISO LOCATOR, COMPONENT DUG    &#xb9;,  (ITEM  &#xb9;  (FREOY( EX2/HDE PROCEDURE (PERIOD 2          (
USE CAL BLK &#xb9;  ( LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3
(  PIPE/ELB                              IC-F-2    (
na    ( VOL/UT6.02 2RMS-66-14-Sl$ 18      (
QISO  66-14        or DMG&#xb9; na in (C5.51        (none    ( SUR/PT3.00/MT'0        (
NMP2-18-.500-CS    (
LINE&#xb9; 2RHS-018-3-2    NTS: 80,83      (SD          2      na /na
(
I  PIPE/ELB                              IC-F-2    ( na    (
VOL/UT6.02 2RHS-66-14.SN022        (  QISO  66-14        or DIIG&#xb9; na in (C5.51        (none    ( SUR/PT3.00/HT4.00    (
NMP2-18-.500-CS    (
LINE&#xb9; 2RHS-018-3-2    NTS: 80,83    (SD            2    ( na /na I  ELB/PIPE                            IC-F-2    I na    I VOL/UT6'02            I 2RHS-66.14-SN023        (
QISO  66-14        or DUG&#xb9; na in (C5.51        (none    ( SUR/PT3.00/MT4.00    (
HMP2-18-.500.CS    (
LIHE&#xb9; 2RHS-018-3.2    Nl'S: 80,83    (SD          2    (
na/na I  ELB/PIPE                            IC-F-2    (
na    ( VOL/UT6.02 2RHS-66-14-SW024        (  QISO  66-14        or DIIG&#xb9; na in (C5.51      (none    (
SUR/PT3.00/MT4.00    (
NMP2-18-.500-CS      LINE&#xb9; 2RHS 018.3-2    NTS: 80,83    (SD          2    (
na /na I  PIPE/ELB                            IC-F-2    (  na    (  VOL/UT6.02 2RHS.66-14-SM025        (  QISO  66-14        or DWG&#xb9; na in (C5.51        (none    (
SUR/P'T3.00/MT4 F 00  (
NMP2-18-.500.CS    (
LINE&#xb9; 2RHS-018-3-2    NTS: 80,83    (SD          2    (  na /na I  ELB/PIPE                            IC-F-2    (
na    (  VOL/UT6.02 2RHS-66-14-SN026        (  QISO  66-14        or DUG&#xb9; na in (CS ~ 51      (none    (  SUR/PT3.00/MT4.00    (
NMP2-18-.500-CS    I  LINE&#xb9; 2RHS-018-3-2    HTS: 80,83    ISD          2    (  na /na I  PIPE/ELB                            IC-F-2    (
na    (  VOL/UT6.02 2RMS-66-14-SN027        (  QISO 66-14        or  DUG&#xb9; na    in (C5.51    (none    (  SUR/PT3.00/MT4.00    (
NMP2-18-.500-CS    I  LINE&#xb9; 2RHS-018-3-2    HTS: 80 83    ISD          2    (
na /na I  ELB/PIPE                            IC-F-2    (  na    (  VOL/UT6.02 2RMS-66-14-Sl$ 28      (  QISO 66-14        or DIIG&#xb9; na in (C5.51      (none    (  SUR/PT3.00/MT4.00    (
HMP2-18..500-CS    (
LINE&#xb9; 2RHS-018.3-2    NTS: 80,83    (SD          2    (
na /na I  ELB/PIPE                            IC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66. 14-SN29          QISO 66-14        or DUG&#xb9; na in (C5.51        (none    (  SUR/PT3.00/MT4.00    (
HMP2-18-.500.CS      LINE&#xb9; 2RHS-018-3-2  NTS'0 83 I                    2    (  na  /na
 
NIAGARA HOHANK POVER CORPORATION              - Nl    ILE POINT  NUCLEAR STATION  - UNIT 2        44 of 135 NHP2- ISI-006, REV. 1 ~ CH-000                                          SECOND TEH TEAR INSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change  date: 07/29/1999                                                                        APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED ) DESCRIPTIOH OF ITEH TO BE EXAHINED(CATGRY )IGSCC( EXI/NDE PROCEDURE                    ]PERIOD  1                          REHARKS EXAHIHATIOH IDENTIFIER ( ITS ISO LOCATOR, COHPONENT DWG        &#xb9;,  )ITEN  &#xb9; )FREOY( EX2/NDE PROCEDURE        (PERIOD 2  (
USE CAL BLK  &#xb9; I  LINE  NO'ND NOTES'S      APPLICABLE ISELECT ICLASSJ EX3/NDE PROCEDURE iPERIOO 3 i I  PIPE/RED                                IC-F-2    (  na    J VOL/UT6.02 2RHS-66-14-Sl$ 30        i QISO 66-14            or  DLIG&#xb9; na  in  )C5.51    ]none    f  SUR/PT3.00/HT4.00    f NHP2-18-.500.CS    [  LIHE&#xb9; 2RHS-018-3-2    NTS: 80,86      LSD            2    /  na  /na I  RED/TEE                              , IC-F-2    I  na'      VOL/UT6.02          I 2RHS-66-14-SW031        i QISO 66-14            or  DUG&#xb9; na    in  JC5.51    (none    J SUR/PT3.00/HT4.00    ]
NHP2-20-.594.CS    I  LINE&#xb9;  2RHS 020 185 2  NTS'6i49        ISD            2    ]  na  /na I  PIPE/ELB                                IC-F-2    )  na    [  VOL/UT6.02 2RHS-66-14-SN034        i QISO 66-14            or  DMG&#xb9; na    in (C5.51      ]none    J SUR/Pl'3.00/HT4.00  J NHP2-18..500.CS    i LINE&#xb9; 2RHS.018-3-2      NTS:  80,83      LSD                )
na  /na I  PIPE/PIPE                              iC-F-2    )  na    f  VOL/UT6.02 2RHS-66-14-SM035        J QISO 66-14          or DNG&#xb9; na      in /C5.51      ]none    f  SUR/PT3.00/HT4.00    f NHP2-18-.500.CS    [  LINE&#xb9; 2RHS-018-3-2    NTS: 80          (none          2    /  na  /na              I I  ELB/PIPE                                IC-F-2    )  na    ]  VOL/UT6.02 2RHS-66-14-SN036          i QISO 66-14          or  DMG&#xb9; na    in  /C5.51    [none    J SUR/PT3.00/HT4.00    f NHP2-18-.500-CS    i LINE&#xb9; 2RHS-018-3-2      NTS:  80,83      )SD            2    f  na /na              I I  NOZ/RED                                  IC-F-2    [  na    )  VOL/UT6.02 2RHS-66 Fl$ 01        i QISO 66-15          or  DNG&#xb9; na    in  /C5.51    Inone      I SUR/PT3 0/HT4 00      I NHP2-20-.594-CS    I  LINE&#xb9; 2RHS.020.4-2    NTS:  87(86      ITE      I  2      I na/na                I I  ELB/PIPE                                IC-F-2    I  na      I VOL/UT6.02            I 2RHS-66-15-Fll003        I QISO 66 15          or  DMG&#xb9; na    in [C5.51      (none      [ SUR/PT3.00/HT4.00    J NHP2-18-.500.CS    i  LINE&#xb9; 2RHS-018.4-2    NTS:  83,80      )SD            2    f na  /na              I I  PIPE/ELB                                IC-F-2    J na      J VOL/UT6.02 2RHS-66.15- Fl$ 15        i QISO 66-15          or  DllG&#xb9; na    in  [C5.51    ]none      )
SUR/PT3.00/HT4.00    f NHP2-18-.500.CS        LINE&#xb9; 2RHS-018-4-2    NTS:  83,80      [SD            2    / na  /na
                          / PIPE/ELB                                IC-F-2    / na      / VOL/UT6.02 2RHS-66 FII017        i QISO 66-15          or  DNG&#xb9; na    in )C5.51      /none    J SUR/PT3.00/HT4.00    /
NHP2-18-.500-CS    J LINE&#xb9; 2RHS-018-4-2    NTS:  83,80      )SD            2    J na /na
 
NIAGARA HOHAWK POWER CORPORATION            - N    ILE POINT NUCLEAR STATION - UHIT 2        45 of 135 NHP2-ISI-006, REV. I( CH 000                                          SECOND TEN YEAR IHSERVICE INSPECTION          (ISI)  INTERVAL PLAH Change date:  07/29/1999                                                                      APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY I IGSCCI EX1/HDE PROCEDURE                  IPERIOO  1                        REHARKS EXAHINATION IDEHTIFIER I ITS ISO LOCATOR, COHPONENT DWG        &#xb9;,  IITEH    &#xb9; IFREQYI EX2/NDE PROCEDURE      IPERIOO 2 USE CAL BLK  &#xb9; I  LINE  No  AND NOTES'S  APPLICABLE    ISELECT    ICLASSI EX3/NDE PROCEDURE      IPERIOO 3  I I  PIPE/PIPE                              Ic-F-2      I  na  I  VOL/UT6.O2 2RHS-66-15-FW018        I  QISO  66-15        or DUG&#xb9; na    in IC5.51      Inorie  I  SUR/PT3.00/HT4.00  I NHP2-18-.500.CS    I  LINE&#xb9; 2RHS-018-4-2    NTS: 80        Inone          2    I  na  /na I  PIPE/TEE                              IC-F-2      I  na    I  VOL/UT6.02 2RHS.66-15-FI$ 24        I  QISO  66-15        or DMG&#xb9; na in IC5.51          Inone    I  SUR/PT3.00/HT4.00  I NHP2-18-.500-CS    I  LINE&#xb9; 2RHS-018-4-2    HTS: 80,85      ISO            2    I  na  /na            I I  WNF/PIPE                              IC-F-2      I  na    I  VOL/UT6.02 2RHS.66.15-Fl$ 25        I  QISO 66-'15        or  DUG&#xb9; na    in IC5.51      Inone    I  SUR/PT3.00/HT4.00  I NHP2-18..500.CS    I  LINE&#xb9; 2RHS-018.4-2    NTS:  80,69    ISD            2    I  na /na I PIPE/WNF IC-F-2      I  na    I  VOL/UT6.02 2RHS-66-15-FMSM007        I  QISO  66-1        or  OMG&#xb9;  na  in  IC5.51      Inone    I  SUR/PT3.00/HT4.00  I NMP2-18-.500-CS        LINE&#xb9; 2RHS.018-4-2    NTS: 80,69      ISD            2    I  na  /na            I P I PE/MNF                            IC-F-2      I  na    I  VOL/UT6.02 2RHS-66-15-FWSl$ 11      I  QISO  66-15
* or  DMG&#xb9;  na  in  IC5.51      Inone    I  SUR/PT3.00/HT4.00  I NHP2-18-.500-CS    I  LINE&#xb9; 2RHS-018-4-2    NTS: 80,69      ISD        I  2    I  na/na              I I  WNF/PIPE                              IC-F-2      I  na    I  VOL/UT6.02 2RHS-66-15-SM002          I  QISO  66-15        or DWG&#xb9; na in IC5.51          Inone    I  SUR/PT3.00/HT4.00  I NKP2-18-.500-CS    I  LINE&#xb9; 2RHS.018-4-2    NTS: 80,69      ISD            2    I  na  /na I PIPE/WNF IC-F-2      I na    I  VOL/UT6.02 2RHS-66-15-SW003          I  QISO  66-15        or DWG&#xb9; na in IC5.51            Inone  I  SUR/PT3.00/HT4.00  I NHP2.18-.500-CS    I  LINE&#xb9; 2RHS-018.4-2    NTS: 80,69      ISO            2    I  na /na I  PIPE/ELB                                IC-F-2      I na    I VOL/UT6.O2 2RHS-66-15-SW004          I  aiso 66-15          or  DMG&#xb9; na    in IC5.51      Inone    I SUR/PT3.00/HT4.00  I NHP2-18-.500.CS      I LINE&#xb9; 2RHS-018.4-2    NTS:  83,80      ISD            2    I na /na I TEE/PIPE                                IC-F-2      I na    I voL/UT6.O2 2RHS-66-15-Sl$ 06          I also 66-15          or  DMG&#xb9; na    in  IC5 ~ 51    Inone    I SUR/PT3.00/HT4.00    I NHP2-18-.500-CS      I LINE&#xb9; 2RHS-018-4-2    N'TS: 80 85      ISD            2    I na /na
 
NIAGARA HOHAMK POMER CORPORATION          - N        ILE POINT NUCLEAR STATION    - UNIT 2        46 of 135 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION          (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G  - RHS SYSTEH (sorted by Examination        Identifier) 2ND INTVL REL REO      DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI            EX1/NDE PROCEDURE    IPERIOO    1 I REHARKS I
EXAHINATIOH IDENTIFIER        ITS ISO LOCATOR, COHPONENT DMG    &#xb9;,  iITEH  &#xb9; iFREOY( EX2/NDE PROCEDURE        iPERIOO 2 USE CAL BLK  &#xb9; i LINE NO. AND HOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3 I i TEE/PIPE                                  IC-F-2  I  na  I  VOL/UT6.02          I 2RHS.66-15-Sl$ 08        i QISO 66-15            or  DMG&#xb9; na  in  )C5.51    [none  i  SUR/PT3.00/HT4.00    i HHP2-18-.500-CS    i LINE&#xb9; 2RHS.018-4 2        NTS: 80,85      LSD          2  i na  /na                I I  ELB/PIPE                              ,
IC-F-2    i na    i  VOL/uT6.02 2RHS-66-15-SM012          i QISO 66-15            or  DMG&#xb9; na  in  iC5.51    Inone    I  SUR/PT3.00/HT4.00    I NHP2-18-.500  CS  I  LINE&#xb9; 2RHS-018-4-2      NTS: 83,80      ISD          2    i  na /na I  ELB/PIPE                                IC-F-2    i na    i VOL/uT6.02 2RHS-66-15-9818          I QISO 66-15            or  DMG&#xb9; na  in iC5.51      Inone    I  SUR/PT3.00/HT4.00    I NHP2-18-.500-CS        LINE&#xb9; 2RHS-018-4-2      NTS: 83,80      LSD          2    i  na /na                I I RED/ELB IC-F-2    I  na    I  VOL/UT6.02            I 2R HS 15- SM019      i QISO 66.15            or  DMG&#xb9; na  in iC5.51      inone i SUR/PT3.00/HT4.00        i NHP2-18-.500-CS        L INE&#xb9;  2RNS.018-4-2    NTS  86 83      i SD          2    (  na /na                I I  ELB/PIPE                                IC-F-2    i na    i  VOL/uT6.02 2RHS-66 FM001          i QISO  66-16          or DMG&#xb9; na in iC5.51        inone    J SUR/PT3.00/HI'4.00    i NHP2-18-.500-CS      i  LINE&#xb9; 2RNS-018-4-2      NTS: 83,80      LSD          2    i na  /na                I I  ELB/PIPE                                IC-F-2    i na    (
VOL/uT6.02 2RHS-66-16-FM002          i QISO  66-16          or DMG&#xb9; na in )C5.51        IID      I  SUR/PT3.00/HT4 F 00  I NHP2-18-.500-CS      I  LINE&#xb9; 2RNS-018-4-2      NTS: 83,80      ITE      I  2    I  na /na                iSc10 I  TEE/PIPE                                IC-F-2    i na    )
VOL/UT6.02 2RHS-66-16-Fl$ 03          i QISO    66-16        or DMG&#xb9; na in iC5.51          inone i SUR/PT3.00/HT4.00        i NHP2-16-.500-CS        LIHE&#xb9; 2RHS.016-5-2      HTS: 89,93      LSD          2    /  na/na                  I I  ELB/PIPE                                IC-F-2    i na    i VOL/UT6.02 2RHS-66-16-FM004          i QISO    66-16        or DMG&#xb9; na in iC5.51          inone    I SUR/PT3.00/Hl'4.00    I NHP2-18 .500-CS      I LINE&#xb9; 2RHS.018.11-2 NTS: 83,80          ISD          2    i na /na I PIPE/RED                                IC-F-2    I na    I VOL/UT6.02            I 2RHS-66-16-FM005            J QISO  66-16        or DMG&#xb9; na in /C5.51          )none    ) SUR/PT3.00/HT4 F 00 i NHP2-18-.500-CS      / LINE&#xb9; 2RHS 018-11-2 HTS: 80,90          LSD          2    i na/na
 
NIAGARA HOHAMK POMER CORPORATION          - N      ILE POINT NUCLEAR STATION - UNIT 2        47 of 135 NHP2-ISI-006, REV. 1, CH-OOO                                              SECOND TEN YEAR INSERVICE INSPECTION          (ISI) INTERVAL PLAN Change date:  07/29/1999                                                                        APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IN'IVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHINEOICATGRY IIGSCCI EX1/HDE PROCEDURE IPERIOO 1 I                                          REHARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR'OHPONEHT DMG              &#xb9;i  IITEH    &#xb9; IFREQYI EX2/HDE PROCEDURE IPERIDD 2 I USE CAL BLK  &#xb9; I  LINE  NO  AND  NOTES    AS  APPLICABLE  ISELECT    ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I  PIPE/ELB                                  IC-F-2    )  na  ]    VOL/UT6.02 2RHS-66-16. FM006        i QISO    66-16            or DMG&#xb9; na in [C5.51          ]ID    [    SUR/PT3.00/HT4.00 f NHP2-16-.500.CS    i LINE&#xb9; 2RHS-016-5-2          NTS: 93,94      ISO            2  /    na /na              iSc10 I  PIPE/ELB                                  IC-F-2    ]  na  f    VOL/UT6.02 2RHS-66-16-FM007        i QISO 66-16              or  DMG&#xb9; na  in  [C5.51    [none    J SUR/PT3.00/HT4.00  ]
NHP2-16-.500-CS    [  LINE&#xb9; 2RHS-016-5-2        HTS:  93,94    LSD            2    f  na/na              I I  PIPE/PIPE                                IC-F-2    )
na    ]  VOL/UT6.02 2RHS-66-16-FM008          i QISO 66-16              or  DMG&#xb9; na  in  JC5.51    )none    (
SUR/PT3.00/HT4.00  (
NHP2-16-.500-CS    )  LINE&#xb9; 2RHS-016-5-2        HTS: 93        ]none          2    J na /na              I RED/PIPE                                  IC-F-2    [  na    [  VOL/UT6.02 2RHS-66-16. FMD I 0      f  QISO  66-16            or  DMG&#xb9; na    in )C5.51    ]none    J SUR/PT3.00/HT4.00  J NHP2-18-.375-CS        LINE&#xb9; 2RHS-018-14-2 NTS: 92,72            LSD            2    J na /na              I PIPE/PIPE                                IC-F-2    ]  na    [  VOL/UT6.02 2RHS-66-16-FM011          J QISO 66-16            or DMS&#xb9; na      in )C5.51      Inone  I  SUR/PT3.00/HT4.00  I NHP2-16-.500-CS    I  LINE&#xb9; 2RHS-016-5-2        NTS'3          I              2    /  na /na INTEG ATT; 14"    dia., 1.094a thick )C-C            f na    (  SUR/PT3.00/HT4.00  J 2RHS-66-16-FM304            QISO  66-16-11  . or DMG&#xb9; na in (C3.20          [ID    /  na /na              I LINE&#xb9; 2RHS-016.5-2        NTS: 93,165      INS          2    /  na/na                I INTEG ATT;  3/4" thick plate              (C-C      J na    ]  SUR/PT3.00/HT4.00    f 2RHS-66-16-FM305          )
QISO  66.16.3          or DMG&#xb9; na      in  (C3.20    )ID      J na /na              I LIHE&#xb9; 2RHS.018-4-2        NTS: 80,63      iNS          2    /  na/na                I INTEG ATT;  10"  dia., 1.125" thick      )C-C      i na    i  SUR/PT3.00/HT4.00    i 2RHS-66 FM306 DEL      )
QISO 66-16              or  DMG&#xb9; na    in  (C3 ~ 20  ]ID      f  na /na
                          ) LINE&#xb9; 2RHS-018-4-2        NTS: 80,88      (NR          2    /  na/na                I IHTEG ATT;  3/4" thick plate              [C-C      I na    I  SUR/PT3.00/HT4.00    I 2RHS-66-16-FM307 DEL      i QISO  66-16            or DMG&#xb9; na in )C3.20          ]IO      f na /na              I LIHE&#xb9; 2RHS 018-4-2        NTS: 80,63      [NR            2    / na/na                I
 
NIAGARA MOHAWK POWER CORPORATION      -      ILE POINT  NUCLEAR STATION  - UNIT 2        48 of 135 NMP2-ISI-006( REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION    (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                              APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEM TO BE EXAMINEDICATGRY IIGSCCI EXl/NDE PROCEDURE          IPERIOO  1  I                        REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DWG        &#xb9;, LITEM  &#xb9; iFREOYi EX2/NDE PROCEDURE  iPERIOD 2 USE CAL BLK  &#xb9; J LINE NO. AHD NOTES, AS APPLICABLE (SELECT iCLASSJ EX3/NDE PROCEDURE        iPERIOO 3 i i INTEG ATT;  3/4" thick plate          (C-C    i na  i SUR/PT3.00/MT4.00 i 2RHS-66-16-FW308 DEL    i also 66-16          or DWG&#xb9; na    in (C3.20  iID'    na  /na i LINE&#xb9; 2RHS-018-4-2      NTS: 80,63    (NR        2  / na /na            I I PIPE/ELB                              IC-F-2  i na  i VOL/UT6.02 2RHS-66-16-SW001        ) also 66-16          or  DWG&#xb9; na    in iC5.51  inone  i SUR/PT3.00/MT4.00 i NMP2-18-.500-CS    I LINE&#xb9;  2RHS  018 4 2    HTS'3    80    ISD        2  / na /na            I I ELB/PIPE                              IC-F-2  i na  ( VOL/UT6.02 2RHS-66-16-SW002        i QISO 66-16          or  DWG&#xb9; na    in /C5.51  inone  / SUR/PT3.00/MT4.00 i NMP2-18-.500.CS    I LINE&#xb9; 2RHS.018.4-2      NTS: 83,80    ISD        2  t na /na I PIPE/ELB                              IC-F-2  I na  I VOL/UT6.02        I 2RHS-66-16-SW003        i QISO 66-16          or  DWG&#xb9; na    in iC5.51  inone  ( SUR/PT3.00/MT4.00 i NMP2-18-.500-CS      LINE&#xb9; 2RHS-018-4-2      NTS: 83,80    i SD        2  / na /na            I I ELB/PIPE                              IC-F-2  i na  ) VOL/uT6.O2 2RHS-66-16-SW004        i QISO 66-16          or  DWG&#xb9; na    in iC5.51  inone  / SUR/PT3.00/MT4.00  /
NMP2-18-.500-CS    I LIHE&#xb9; 2RHS.018.4-2      NTS: 83,80    ISD        2  J na /na i PIPE/ELB                              IC-F-2  I na  I VOL/UT6.02        I 2RHS-66-16-SW005        i QISO 66.'l6        or  OWG&#xb9; na    in (C5.51  inone  i SUR/PT3.00/MT4.00  [
NMP2-18-.500-CS    i LIHE&#xb9; 2RHS.018.4-2      NTS: 83,80    iso        2  i na  /na I PIPE/TEE                              IC-F-2  i na  i VOL/uT6.02 2RHS-66-16-SW006        i QISO  66-16          or DWG&#xb9; na in iC5.51      inone  i SUR/PT3.00/MT4.00  )
NMP2-18-.500-CS    I LINE&#xb9; 2RHS-018-4-2      NTS: 80,89    ISD        2  i na /na I TEE/PIPE                              IC-F-2  I na  I VOL/UT6.02        I 2RHS-66-16-SW007        i QISO  66-16          or DIIG&#xb9; na in iC5.51      /none  i SUR/PT3.00/MT4.00 i NHP2-18-.500.CS    I LINE&#xb9; 2RHS-018-11-2 NTS: 80,89        I SD        2  i na /na PIPE/ELB                              IC-F-2  I na  i VOL/UT6.02        I 2RHS-66-16-SW008          Ql So 66-16          or  DWG&#xb9; na    in iC5.51  inone i SUR/PT3.00/MT4.00 i NMP2-18-.500.CS      LINE&#xb9; 2RHS-018.11-2    NTS: 83,80    i SD        2  J na  /na
 
NIAGARA HONAMK POMER CORPORATION            - N      ILE POINT NUCLEAR S'TATION - UNIT 2        49 of 135 NHP2  ISI 006'EV 1 i CH 000                                            SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G -  RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO  )
DESCRIPTIOH OF ITEH TO BE EXAHINED)CATGRY          )  IGSCC) EX1/NDE PROCEDURE      )PERIOD  1                        REHARKS EXAHINATION IDENTIFIER    )
ITS ISO LOCATOR, COHPONEHT    DMG  &#xb9;,  )ITEH    &#xb9; )FREQY) EX2/NDE PROCEDURE        )PERIOD 2  )
USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE )SELECT )CLASS) EX3/HDE                PROCEDURE  )PERIOD 3  )
I  PIPE/ELB                              IC-F-2          na  )  VOL/UT6.02                      )
Desetected 2RHS-66-16-SM009          )
QISO  66-16          or DMG&#xb9; na in )C5.51          )none    )
SUR/PT3.00/HT4.00  )
NHP2-18-.500-CS    )  LINE&#xb9; 2RHS-018-11-2 HTS: 83,80        ISD              2    )
na  /na            I
                          )  ELB/PIPE                              IC-F-2      )
na    )
VOL/uT6.02 2R HS.66-16-SM010        )
QISO  66-16          or DMG&#xb9; na in )C5.51          )none    )
SUR/PT3.00/HT4.00    )
NHP2-18 .500-CS        L INE&#xb9; 2RHS-018-11-2    NTS: 83,80    ) SD            2    )
na  /na I  PIPE/ELB                              IC-F-2      )
na    )
VOL/UT6.02 2RHS-66-16-SM013          )  QISO  66-16          or  DMG&#xb9; na  in  )C5.51      )none    I  SUR/PT3 00/MT    0 I NHP2 ~ 500.CS  I  LINE&#xb9; 2RHS-016-5-2      NTS: 93 94    ISD              2    )
na  /na              I I  ELB/PIPE                              IC-F-2      )  na    )  VOL/uT6.02 2RHS-66-16-S'M014        )
QISO  66-16          or DMG&#xb9; na in )C5.51          )none    )
SUR/PT3.00/HT4.00    )
NHP2.16-.500-CS    I  LINE&#xb9; 2RHS-016-5-2      NTS'3i94 ISD                    2    )
na /na              I I  ELB/PIPE                              IC-F-2      I  na    I  VOL/UT6.02          )
2RHS.66-16-SM016          )
QISO  66-16          or DMG&#xb9; na in )C5.51          )none    )
suR/PT3.00/HI'4.00  )
NHP2-16-.500-CS      )
LINE&#xb9; 2RHS-016-5-2      NTS: 93,94    )SD              2    )
na /na              I I  PIPE/ELB                              IC-F-2      )
na    )  VOL/UT6.02 2RHS-66-16-SM017          )
QISO  66-16          or DMG&#xb9; na in )C5.51          )none    )
SUR/PT3.00/HT4.00    )
NHP2 ~ 500-CS    )  LINE&#xb9; 2RHS-016-5-2      NTS: 93,94    )SD              2    )
na  /na              I I  ELB/PIPE                              IC-F-2      )
na    )
VOL/UT6.02          )
2RHS-66-16-SM018          )
QISO  66-16          or DMG&#xb9; na in )C5.51          )none    )
SUR/PT3.00/HT4.00    )
NHP2-16-.500-CS      )
LINE&#xb9; 2RHS-016-5-2      NTS: 93,94    )SD              2    )
na  /na              I I  PIPE/ELB                              IC-F-2      )
na    )  VOL/UT6.02 2RNS-66-16-SM019          )
QISO  66-16          or DMG&#xb9; na in )C5 ~ 51        )none    )
SUR/PT3.00/HI'4.00  )
NHP2-16-.500.CS      I  LINE&#xb9; 2RHS-016-5-2      NTS: 93,94      ISD            2    )  na  /na              I
                          )  PIPE/PIPE                              IC-F-2      )
na    )
VOL/UT6.02 2RHS-66-16-SM022          )  QISO  66-16          or DMG&#xb9; na    in  )C5 ~ 51    )none    I SUR/PT3.00/HT4.00    I NHP2-16-.500.CS      )
LIHE&#xb9; 2RHS-016-5-2      NTS: 93        )none          2    ) na /na
 
NIAGARA MOHAWK POWER CORPORATION              - N      ILE POINT    NUCLEAR STATIOH  - UHIT 2        50 of 135 NHP2- ISI-006, REV. ~ CH-000
                    'I                                                    SECOHD TEN YEAR INSERVICE INSPECTION              (ISI)    INTERVAL PLAN Change  date: 07/29/1999                                                                            APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ ( DESCRIPTION OF ITEM TO BE EXAHINED(CATGRY (IGSCC( EX1/HDE PROCEDURE                        (PERIOD  1  (
REMARKS EXAMINATION IDENTIFIER ( ITS ISO LOCATOR, COMPONENT DWG            &#xb9;,  (ITEM  &#xb9; (FREQY( EX2/NDE PROCEDURE          (PERIOD 2    (
USE CAL BLK  &#xb9; (
LINE HO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I    ELB/PIPE                                (C-F-2    (
na    (
VOL/uT6.O2 2RHS-66-16-SW023          (
QISO 66-16          or  DWG&#xb9; na    in  (C5.51    (none      (
SUR/PT3.00/MT4.00    (
HMP2-16-.500-CS    I    LIHE&#xb9; 2RHS-016-5-2      NTS:  93,94      ISD            2    (
na  /na
(
2CSL*V9/PIPE                            IC-F-2    (
na    (
VOL/UI'6.02 2RHS.66-17-FW004          (
QISO  66-17          or DWG&#xb9; na in (C5.51          (ID        (
SUR/PT3.00/MT4.00    (
NHP2-18-.375-CS    (
LIHE&#xb9; 2CSL.012-9-2      NTS: 99,100      (SD            2    (  na /na                (Sc10 I    ELB/PIPE                                IC-F-2    (
na    (
VOL/uT6.O2                        I 2RHS-66-17-FW005          (
QISO  66-17          or DWG&#xb9; na in (C5.51          (none      (
SUR/PT3.00/HT4 F 00  (            I NHP2-18-.375-CS      I  LIHE&#xb9; 2RHS-018-14-2 NTS: 72,101 (TE                      2    (
na/na                I            I I  PIPE/PIPE                                IC.F-2    (
na    (
VOL/UT6.02 2RHS-66-17-FW006          (
QISO 66-17          or DWG&#xb9; na      in  (C5.51    (none      (
SUR/PT3.00/HT4.00    (
NMP2-18-.375-CS    (
LINE&#xb9; 2RHS-018-14-2 NTS: 72              (none          2    (
na  /na                I I  PIPE/PIPE                                IC-F-2    (
na      (  VOL/UT6.02 2RHS-66-17-FW007            (
QISO 66-17          or DWG&#xb9; na      in  (C5.51    (none      (
SUR/PT3.00/MT4.00      (
NHP2-18..375-CS      (
LINE&#xb9;  2RHS-018-14-2    NTS: 72          (none          2    (
na /na                I
(  ELB/PIPE                                  IC-F-2    (
na      (
VOL/uT6.O2 2RHS-66-17-FW008            (
QISO  66-17          or  DWG&#xb9;  na  in  (C5.51    (none      (
SUR/PT3.00/MT4.00      (
NHP2-18-.375-CS      I  LINE&#xb9; 2RNS.018-14-2 NTS: 72(101 ISD                      2    (
na/na I  PIPE/PIPE                                IC-F-2    I  na      I  VOL/UT6.02            I 2RHS-66-17-FW011          (  QISO 66-17          or  DWG&#xb9; na    in  (C5.51    (none      (
SUR/PT3.00/HT4.00      (
NMP2-18-.375-CS      (
LINE&#xb9; 2RHS-018-14-2    HTS: 72          (none          2      (
na  /na
(
PIPE/WHF                                  IC-F-2    (
na      ( VOL/UT6.02 2RNS-66-17-FW016          (
QISO  66-17          or DWG&#xb9; na in (C5.51            (none      (
SUR/PT3.00/MT4.00      (
NMP2-18..375-CS      I  LINE&#xb9; 2RHS-018.14-2 HTS: 72,71          ISO            2    (
na  /na I  ELB/PIPE                                IC-F-2    (  na      (
na/na 2RHS-66-17-FW031            (
QISO 66-17          or  DWG&#xb9;  na    in (none      (none      (
na  /na LINE&#xb9; 2RHS-006-13-2    NTS:  96,97      (na            2    (
na  /na
 
NIAGARA HOHAMK POWER CORPORATION          - N      ILE POINT NUCLEAR STATION  - UNIT 2                              5'I of 135 NHP2-ISI-006, REV. 1 ~ CH-000                                          SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G - RHS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY iIGSCCi EX1/HDE PROCEDURE iPERIOD 1                                                  REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPOHEHT DMG        &#xb9;,  i ITEH  &#xb9; iFREOYt EX2/NDE PROCEDURE iPERIOO 2 i USE CAL 'BLK &#xb9; I  LINE NO    AND NOTES'S    APPLICABLE  ISELECT  ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I  PIPE/PIPE                              IC.F.2    I  na I VOL/UT6.02              I 2RHS-66-17-Fl$ 32        i QISO  66-17          or DMG&#xb9; na    in  iC5.51    )none i SUR/PT3.00/HT4.00        i NHP2-18-.375-CS    I  LINE&#xb9; 2RHS-018-14-? NTS: 72            Inone        2 i na /na (6") l$L/PIPE (18")                    iC-F-2    I  na    I  SUR/PT3.00/HT4.00    I        i6" veld reinforced to  1S" equivalent Mall thickness 2RHS-66 FMQ$ 04      i QISO 66-'17        or DMG&#xb9; na in JC5.81        inone    i  na  /
i LIHE&#xb9;    2RHS-006-13-2  HTS: 97,72      lTE          2    i  na /na              I I  PIPE/ELB                              IC-F-2    i na    i na  /na 2RHS-66-17-Sl$ 02        i QISO    66-17          or DWG&#xb9; na    in inone      inone i na      /na I  LINE&#xb9; 2RHS-006-13.2 NTS: 44(96        Ina          2    i  na/na I  PIPE/TEE                                IC.F-2  I  na    I  VOL/UT6.02          I 2RHS-66-17-SW005          i QISO  66.17          or DWG&#xb9; na in iC5.51        inone i SUR/PT3.00/HT4.00        i NHP2.18-.375-CS    i  LINE&#xb9; 2RHS-018-14-2 HTS: 72,98          LSD          2    i  na/na                I I  TEE/ELB                                IC-F-2    i na    i  VOL/UT6.02 2RHS-66-17-SW006          i QISO  66.17          or  DMG&#xb9; na    in iC5.51    inone i SUR/PT3.00/HT4.00        i NHP2-18-.375-CS    I  LIHE&#xb9; 2RHS.018-14-2    NTS: 98,101    ISO          2 i na /na I  ELB/PIPE                                IC-F-2    i na    i  VOL/UT6.02 2RHS-66-17-QI007          I  QISO  66-17          or  DWG&#xb9; na  .in  iC5.51    inone i SUR/PT3.00/HT4.00        (
NHP2-18-.375-CS    j  LINE&#xb9;  2RHS-018-14-2    NTS: 72,101    LSD      i  2    i na  /na I  PIPE/ELB                                IC-F-2    i na    i VOL/UT6.02 2RHS-66-17-QI008          i QISO  66-17          or DMG&#xb9; na in iC5.51        inone    )
SUR/PT3.00/HT4.00    i NHP2-18 .375-CS    I  LINE&#xb9; 2RHS-018-14-2 NTS: 72 ~ 101 ISD                2    i na  /na I ELB/PIPE                                IC-F-2    ) na    i VOL/UT6.02 2RHS-66-17-Sl$ 09          i Qrso 66-17          or  DMG&#xb9; na    in  (C5.51    inone    i SUR/PT3.00/Hl'4.00    J NHP2-'I8-.375.CS    I LINE&#xb9; 2RHS-018-14-2    NTS: 72,101    ISO          2    J na  /na              I I PIPE/ELB                                LC-F-2    i na    ( VOL/UT6.02 2RHS-66-17-SM010          / QISO  66-17          or DMG&#xb9; na in (C5.51        Inone    I SUR/PT3.00/HT4.00    I NHP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-14-2 NTS: 72,101 ISD                  2    i na /na
 
NIAGARA HOHAMK POMER CORPORATION      -        ILE POINT NUCLEAR STATION - UNIT 2        52 of 135 NHP2-ISI-006, REV. 1, CH.000                                        SECOHD TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                  APPENDIX G - RHS SYSTEH (sorted by Exemination Identifier) 2ND INTVL REL REQ I DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE              IPERIOD  1                        REHARKS EXAHINATIOH IDEN'TIF ER    I ITS ISO LOCATOR'OHPONENT DMG        i IITEH    IFREQYI EX /NDE PROCEDURE      IPERIOO    I USE CAL BLK    &#xb9; I  LINE NO- AND NOTESs AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE iPERIOD 3 I  PIPE/ELB                            IC-F-2  I na    I VOL/UT6.02          I 2RHS-66-17-SM011          i QISO  66-17        or DMG&#xb9; na in [C5.51      Inone  I SUR/PT3.00/HT4.00    I NHP2-18-.375-CS      I  LINE&#xb9; 2RHS 018-14-2 NTS: 72,101 ISO              2    / na /na I  PIPE/TEE                            IC-F-2  [ na    [ VOL/UT6.02 2RHS.66-17-SM018          i QISO  66-17        or DMG&#xb9; na in [C5.51      ]none  f SUR/PT3.00/HT4.00    J HHP2-18-.375-CS      I  LINE&#xb9; 2CSL-012-9-2    NTS: 98,100  ISD        2    ( na/na i PIPE/MOL                              IC-F-2  / na    / na/na 2RHS-66-17-SM019          [  QISO  66-17        or DMG&#xb9; na in [none      /none  / na /na na                  I  LINE&#xb9; 2RHS-006-13-2 HTS: 97,72      Ina        2    / na/na i ELB/PIPE                              IC.F-2  [ na    )
VOL/UT6.02 2RHS-66 FM001          i QISO  66-18        or DMG&#xb9; na in [C5 ~ 51    [none  J SUR/PT3.00/HT4.00    f NHP2-16-.500-CS      i  LIHE&#xb9; 2RHS.016.5-2    NTS: 94,93    [SD        2    J na/na I  PIPE/PIPE                            IC.F-2  (
na    ) VOL/UT6.02 2RHS-66-18-FM002          I QISO 66 18          or  DMG&#xb9; na  in JC5.51  ]none  f SUR/PT3.00/HT4 F 00  )
NHP2-16-.500-CS      I  LINE&#xb9; 2RHS-016-5-2    NTS: 93      Inone      2    / na /na                I I  ELB/PIPE                            IC-F-2  / na    f VOL/UT6.02 2RHS-66 FM003          i QISO  66-18        or DMG&#xb9; na in    JC5 ~ 51 Inone  I SUR/PT3.00/HT4 00    I NHP2-16-.500    CS  I  LINE&#xb9;  2RHS-016-5-2    HTS: 94,93    ISD        2    / na /na I TEE/PIPE                              IC-F-2  f na    f VOL/UT6.02 2RHS-66-18-FM004            i QISO  66-18        or DMG&#xb9; na in JC5.51      ]none  f SUR/PT3.00/HT4.00    f NHP2 ~ 500.CS    I LINE&#xb9; 2RHS.016-5-2    NTS: 93,103  ISD        2    f na  /na I PIPE/TEE                            IC-F-2  ) na    J VOL/UT6.02 2RHS-66-18-FM005            f QISO  66-18      - or DMG&#xb9; na in /C5.51      ]none  (
SUR/PT3.00/HT4.00    (
NHP2 F 500.CS    f LINE&#xb9; 2RHS-016-5-2    NTS: 93,103  (SD        2    J na/na I PIPE/ELB                            IC-F-2  I na    I VOL/UT6.02            I 2RHS-66-18-FM006            i QISO  66-18        or DMG&#xb9; na in (C5.51      ]none  J SUR/PT3.00/HT4.00    J NHP2-16-.500-CS      I LINE&#xb9; 2RHS-016-5-2    NTS: 94,93    ISD        2    J na  /na
 
NIAGARA HOHAMK POMER CORPORATION            - N      ILE POINT NUCLEAR STATION - UNIT 2        53 of 135 NHP2-ISI-006, REV. 1, CH.OOO                                          SECOND TEH YEAR INSERVICE INSPECTION            (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                      APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTION OF ITEN TO BE EXAHINED(CATGRY )IGSCC( EX1/NDE PROCEDURE                  ]PERIOD    1                      REHARKS EXAHINATION IDENTIFIER  ) ITS ISO LOCATOR, COHPONEHT DMG  &#xb9;,  (
ITEN  &#xb9; )FREOY] EX2/NDE PROCEDURE      )PERIOD 2 USE CAL BLK  &#xb9; I  LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3 I I  PIPE/*HOV15A                          IC-F-2      [  na  )
VOL/UT6.02 2RHS-66-18-FM009        i QISO    66-18        or DMG&#xb9; na in /C5.51          Inone    I  SUR/PT    0/HT      I NHP2-16-.500-CS    i  LINE&#xb9; 2RHS-016-5-2    NTS: 93,105    LSD            2    /  na  /na i <<HOV15A/PIPE IC-F-2      [  na    (
VOL/UT6.02 2RHS-66-18-FM010        I  QISO  66-18        or DMG&#xb9; na in JC5.51          (none    )
SUR/PT3.00/HT4.00    [
NHP2-16-.500-CS    i  LINE&#xb9; 2RHS-016-5-2    NTS: 93,105    LSD            2    /  na  /na              I PIPE/<<HOV25A                          IC-F-2      I  na    I  VOL/UT6.02          I 2RHS-66-18-FM011        I QISO    66-18        or DMG&#xb9; na in )C5.51          ]none    f  SUR/PT3.00/HT4.00    f NHP2-16-.500.CS    i  LINE&#xb9; 2RHS 016-5-2    NTS: 93,105      LSD            2    J na  /na              I I  ELB/PIPE                              IC-F-2    J na    [  VOL/UT6.02 2RHS-66-18. FM014        i  QISO  66-18        or DMG&#xb9; na in (C5.51          )none    [  SUR/PT3.00/HT4.00    )
NHP2-16-.500  CS    I  LIHE&#xb9; 2RHS.016.5-2    NTS 94,93      ISD            2    f  na  /na              I I  PIPE/ELB                              IC-F-2      f na    /  VOL/UT6.02 2RHS-66-18-FM024          J QISO  66.18        or  DMG&#xb9; na    in  ]C5 ~ 5'I  [none    [ SUR/PT3.00/HT4.00    f NHP2-16-.500-CS    i LINE&#xb9; 2RHS-016-5-2      NTS: 94,93      LSD            2    / na /na              I I  PIPE/TEE                              IC-F-2      [ na    [ VOL/UT6.02          ]    Sc7 2RNS-66-18.FM025          i QISO  66-18        or DMG&#xb9; na .in JC5.51          IID      I SUR/PT3.00/HT4.00    I NHP2-16-.500-CS    I  LINE&#xb9; 2RHS-016-5-2    NTS: 93,103    ISO            2    [ na  /na              I I  TEE/PIPE                              IC-F-2      )
na    (
VOL/UT6.02 2RHS-66-18-FM026          i QISO  66-18        or DMG&#xb9; na in (C5.51          ]none    J SUR/PT3.00/HT4.00    J NHP2-12-.375-CS      I LINE&#xb9; 2RHS.012-7-2    HTS: 103,100 ISD              2    J na  /na              I I PIPE/MNF                              IC-F-2      )
na    (
VOL/UT6.02            (
Sc7 2RHS.66-18-FM027          i QISO  66-18        or OMG&#xb9; na in JC5.51          )IO      f SUR/PT3.00/HT4.00    )
NHP2-12-.375-CS      ) LINE&#xb9; 2RNS-012-7-2    NTS: 100(104 )SD                2    / na  /na I  INTEG ATT                              IC-C      I na    I SUR/PT3.00/HT4 F 00  I 2RHS-66-18-FM306          [ QISO  66-18-3      or  DMG&#xb9; na    in  JC3.20    [ID      f na  /na              [Sc8
[  LINE&#xb9; 2RHS-016-5-2    NTS: 93,63      )Handate(      2    ( na  /na              I
 
NIAGARA HOKAWK POWER CORPORATION              -        ILE POINT NUCLEAR STATIOH - UNIT 2        54 of 135 HHP2-ISI-006, REV. 1, CH-000                                        SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                        APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED      DESCRIPTIOH OF ITEH TO BE EXAHINED)CATGRY          IGSCC) EX1/NDE PROCEDURE )PERIOD        1                        REHARKS
(                                                  )
EXAMINATION IDENTIFIER  (
ITS ISO LOCATOR, COHPONENT DWG &#xb9;, ]ITEN      &#xb9; (FREOY) EX2/HDE          PROCEDURE  (PERIOD 2 USE CAL BLK &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE                PROCEDURE  IPERIOO 3 I I INTEG ATT                              ic-c    I    na    I  SUR/PT3.00/HT4.00  I 2RHS-66-18-FW309        /  QISO aS-18-4        or DMG&#xb9; na in /C3.20      /ID          /  na /na I  LINE&#xb9; 2RHS-016-5-2    NTS: 93,63    INS              2    /  na/na                I I  TEE/ELB                              IC-F-2    J na    J VOL/UT6.02 2RHS-66-18-FWSW005      i  QISO  66-18        or  DWG&#xb9;  na  in JC5.51    ]none      f  SUR/PT3.00/HT4.00    f NHP2-16-.500-CS  J LINE&#xb9; 2RHS-016-5-2    HTS: 94,103    JSD              2    )
na  /na              I I  PIPE/ELB                              IC-F-2    J na    (  VOL/UT6.02                      I 2RHS-66-18-SW001        i QISO 66-18            or  DWG&#xb9; na    in [C5.51    Inone      I SUR/PT3.00/Hj'4.00  I          I NHP2-16-.500-CS  I  LINE&#xb9; 2RHS-016-5-2    NTS: 94,93    I SD            2    f  na /na              I          I I  ELB/PIPE                              IC-F-2    J na    )
VOL/UT6.02 2RHS-66.18.SW006        i QISO 66-18            or  DWG&#xb9; na    in )C5.51    (none      f  SUR/PT3.00/HT4.00    )
NHP2-16-.500-CS  )  LINE&#xb9; 2RHS-016-5-2    NTS:  94,93    [SD              2    f  na /na              I I  ELB/PIPE                              IC-F-2    f    na    f  VOL/UT6.02 2RHS-66-18.SW007        i QISO  66-18        or DMG&#xb9; na in /C5.51        /none      /  SUR/PT3.00/HT4.00    [
NHP2-16-.500-CS    I  LINE&#xb9; 2RHS-016-5-2    NTS: 94,93    ISO              2    /  na /na              I I  TEE/PIPE                              IC-F-2    [  na    (
VOL/UT6.02 2RHS-66-19.FW001        i QISO  66-19        or DMG&#xb9; na .in )C5.51        ]none      J SUR/PT3.00/HT4.00    J NHP2-12-.375.CS    I  LINE&#xb9; 2RHS-012-9-2. HTS: 100,103 ISO                  2    /  na/na                I I  PIPE/TEE                              IC-F-2    )
na      J VOL/UT6.02 2RHS-66-19.FW002        i QISO  66-19        or OWG&#xb9; na in )C5.51        IIO        I  SUR/PT3.00/HT4.00    I NHP2-12-.375.CS    I  LINE&#xb9; 2RHS-012-9-2    NTS: 100,106 ISD                2    f  na  /na              I    Sc11 i PIPE/~HOV40A                            IC-F-2    [  na      [  VOL/UT6.02 2RHS.66-19-FW003        I QISO  66-19        or DWG&#xb9; na in )C5.51        Inone      I SUR/P'T3 00/HT4.00    I NHP2-12-.375-CS    I  LINE&#xb9; 2RHS-012-9-2    NTS: 100,9      ITE            2    f  na /na                I
                          )
                            *HOV40A/PIPE                          IB-J      [  na    )  VOL/UT6.02 2RHS-66 FW004        )
QISO  66-19        or DWG&#xb9; na in )89.11          [none      )
SUR/PT3.00/HT4.00    f NHP2-12-.844-CS    I LINE&#xb9; 2RHS-012-119-1 NTS: 9,17        INS            1      / na/na                I
 
NIAGARA HOHAMK POMER CORPORATION          - N      ILE POINT NUCLEAR STATION - UNIT 2        55 of 135 NHP2-1SI-006, REV. 1,    CH.OOO                                        SECOND TEN YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                  APPENDIX G -  RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                  IPERIOD  1 I                    REHARKS EXAHIHATION IDENT IF IER      ITS ISO LOCATOR, COHPOHEHT DMG    &#xb9;,  (ITEN  &#xb9; (FREOY( EX2/NDE PROCEDURE        (PERIOD 2 USE CAL BLK  &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOO 3              I I  PIPE/PEHET 210A                      IB-J    I  na    I  VOL/UT6.02 2RHS-66-19-FM005          I  QISO  66-19        or DMG&#xb9; na in (89.11      IID      I  SUR/PT3.00/HT4.00  ISc8 NHP2-12-.844-CS    I  LINE&#xb9; 2RHS-012-119-1 NTS: 17,18      ITEV      I  1(na/                        I I  ELB/PIPE                              IC-F-2    (
na    (
VOL/UT6.02 2RHS-66-19-FM008          I  QISO  66-19        or DMG&#xb9; na in IC5.51        (none    (
SUR/PT3.00/HT4.00  I NHP2-12-.375-CS    (  LINE&#xb9; 2RHS-012-7-2    NTS: 100,101 (SD        (  2    I  na /na I PIPE/~HOV24A IC-F-2    (
na    (
VOL/UT6.02 2RHS-66-19-FMOO9          I  QISO 66-19          or  DMG&#xb9; na    in IC5.51    (none    I  SUR/PT3.00/HT4.00  I NHP2-12-.375-CS      I  LINE&#xb9; 2RHS  12  7-2    NTS'00    9    ITE          2    I  na/na              I I 4HOV24A/PIPE                          IB-J      I  na    I  VOL/UT6.02          I 2RHS-66 FM010          I  QISO  66-19        or DMG&#xb9; na in (89.11        (none    I  SUR/PT3.00/HT4.00  I NHP2-12-.688-CS      I  LINE&#xb9; 2RHS-012-75-1 NTS: 9,10        INS                I  na /na              I I  PIPE/PENET Z9A                        IB-J      I  na    I  VOL/UT6 02          I 2RHS.66-19-FM011          I QISO  66-19        or DMG&#xb9; na    in (89.11    IID      I SUR/PT3.00/MT4.00  I  Sc9 NHP2-12-.688-CS      I  LINE&#xb9; 2RHS-012-75-1 NTS: 10,11        ITEV          1    Ina/
I  PIPE/PIPE                            IC-F-2    (
na    I  voL/uT6.02 2RHS-66-19-FM016          I  QISO  66-19        or DMG&#xb9; na    in (C5.51    Inone    I  SUR/PT3.00/HT4.00  I NHP2-12-.375-CS      I  LINE&#xb9; 2RHS.012.9-2    HTS: 100      (none    I  2    I  na /na              I I  PIPE/ELB                              IC-F-2    I  na    I  VOL/UT6.02 2RHS-66.19- FM019          I QISO  66-19        or DMG&#xb9; na in IC5.51        (none    I  SUR/PT3.00/HT4.00  I NHP2-12-.375-CS    (
LINE&#xb9; 2RHS.012-9.2    NTS: 100(101 ISD            2    I  na /na I PIPE/PIPE                            IC-F-2    I na    I  VOL/UT6.02 2RHS.66-19. FM020          (
QISO  66-19        or DMG&#xb9; na    in IC5.51    Inone    I suR/PT3.00/HT4-00  I NHP2-12-.375-CS      (
LINE&#xb9; 2RHS-012-9-2    NTS: 100        (none        2    I na/na              I I  INTEG ATT                            Ic-c      (
na      I SUR/PT3.00/HT4.00    (
2RHS-66-19-FM303 <TKS      I QISO  66-19        or  DMG&#xb9; na    in IC3.20    (ID      (
na /na I'LINE&#xb9; 2RHS-012-9-2    NTS: 100,95    INR          2    I na /na              I
 
NIAGARA HOHAMK POMER CORPORATION            - N      ILE POINT NUCLEAR STATION - UNIT 2        56 of 135 NHP2-ISI-006, REV. 1, CH.OOO                                            SECOHD TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED        DESCRIPTIOH OF ITEN TO BE EXAHIHED(CATGRY (IGSCC( EX1/NDE PROCEDURE                (PERIOD  1                        REHARKS
(
EXAHINATION IDENTIFIER    (
ITS ISO LOCATOR, COHPOHENT    DMG &#xb9;,  (ITEN    &#xb9; (FREOY( EX2/NDE PROCEDURE        (PERIOD 2  (
USE CAL BLK  &#xb9; I    LINE NO. AND NOTES, AS APPLICABLE (SELECT (CLASS( EX3/NDE PROCEDURE (PERIOD 3 I I    ELB/PIPE                              IC-F-2    (
na    (  VOL/UT6.02 2RHS-66-19-FMSM015        (
QISO  66-19          or DUG&#xb9; na in (C5.51        (none      (
SUR/PT3.00/HT4.00  (
NHP2-12-.375-CS      (
LINE&#xb9; 2RHS.012.9-2    HTS: 100,101 (SD                2    (  na/na
(
MHF/PIPE                              (C-F-2    (
na    (
VOL/UT6.02 2RHS-66-19-SM001          I QISO    66-19          or DUG&#xb9; na in (C5 ~ 51      (none      I  SUR/PT3.00/HT4.00  I NHP2-12-.375-CS          LINE&#xb9; 2RHS.012-7-2      NTS: 104,100 (SD              2    (
na /na I  PIPE/ELB                              IC-F-2    (
na    (  VOL/UT6.02 2RHS.66-19-SM002          (
QISO  66-19          or  DMG&#xb9; na  in (C5 ~ 51  (none      (
SUR/PT3.00/HT4.00  (
NHP2 ~ 375-CS    (
LINE&#xb9;  2RHS.012-7-2    NTS: 100,101  (SD              2    (
na /na              I I  ELB/PIPE                              IC-F-2    (
na      (
VOL/UT6.02 2RHS-66-19.SM003          (
QISO  66-19          or  DMG&#xb9; na  in (C5.51      (none      (
SUR/PT3.00/HT4.00  (
    -NHP2-12-.375-CS          LINE&#xb9; 2RHS.012-7-2      NTS: 100,101 (SD              2    (
na /na
(
(
PIPE/ELB                              IC-F-2      (  na      (  VOL/UT6.02 2RHS-66-19-SM004            (
QISO  66-19          or DMG&#xb9; na    in (C5.51      (none      I  SUR/PT3.00/HT4.00    I NHP2.12..375-CS          LINE&#xb9; 2RHS-012-7-2      NTS: 100,101  ISD            2    (
na /na I
I  ELB/PIPE                              IC-F-2    (  na      (  VOL/UT6.02 2RHS-66-19-SM005            (
QISO  66-19          or DMG&#xb9; na in (C5.51        (none      (
SUR/PT3.00/MT4.00    (
NHP2.12-.375-CS          LINE&#xb9; 2RHS-012-7-2      NTS: 100,101 ISD              2    (
na /na              I I
I  PIPE/ELB                              IC-F-2      (
na      (
VOL/UT6.02 2RHS-66-19-SM008          (
QISO  66-19          or DMG&#xb9; na in (C5.51          (none    I  SUR/PT3.00/HT4.00    I NHP2-12-.375-CS          LINE&#xb9; 2RHS.012-7-2    NTS: 100,101 (SD              2    (
na /na I  ELB/PIPE                              IC-F-2      ( na      (  VOL/UT6.02 2RHS-66-19-SM009            (
QISO  66-19        or DMG&#xb9; na in (C5.51          (none      (
SUR/PT3.00/HT4.00    (
NHP2-12-.375-CS        I  LINE&#xb9; 2RHS.012-7-2    NTS: 100,101 ISD                2    (
na  /na I  PIPE/ELB                              IC-F-2      (
na      I VOL/UI6.02            I 2RHS-66-19-SM012            (
QISO  66-19        or DMG&#xb9; na in (C5.51          (none      (
SUR/PT3.00/HT4.00    (
NHP2-12-.375-CS        I  LINE&#xb9; 2RHS-012-9-2    NTS 100 101 ISD                2    (
na  /na
 
NIAGARA MONAMK POMER CORPORATION          - h      ILE POINT NUCLEAR STATION    - UNIT 2        57 of 135 NHP2- ISI-006, REV. 1 ~  CH-000                                        SECOND TEN TEAR INSERVICE INSPECTION        (ISI)  IHTERVAL PLAN Change  date:  07/29/1999                                                                      APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    IPERIOO  1  I                        REHARKS EXAHIHAT ION IDENT IF IER J ITS ISO LOCATOR, COHPONEHT DMG        &#xb9;,  ]ITEN  &#xb9; JFREOYJ EX2/NDE PROCEDURE      ]PERIOD 2  J USE CAL BLK    &#xb9; i LIHE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE  IPERIOO 3 I I  ELB/PIPE                              IC-F-2    f  na  f  VOL/UT6.02 2RHS-66.'I9-SM013          i QISO    66-19        or DMG&#xb9; na in )C5.51        ]none  f  SUR/PT3.00/HT4.00    f NHP2-12-.375-CS      I  LINE&#xb9; 2RHS-012.9-2    NTS: 100,101 ISD              2    /  na  /na I  PIPE/ELB                              IC-F-2    f  na    [  VOL/UT6.02 2RHS-66-19-SM014            i QISO    66-19        or DMG&#xb9; na in [C5.51        /none    /  SUR/PT3.00/HT4.00    f NHP2-12-.375.CS      J LINE&#xb9; 2RHS-012.9-2    HTS: 100,101 iSO              2    )  na  /na              I I  TEE/PIPE                              IC-F-2    [  na    ]  VOL/UT6.02 2RHS-66-19-SM016            i QISO    66.19        or DMG&#xb9; na in )C5.51        [none    f  SUR/PT3.00/HT4.00    J HHP2-12-.375-CS      I  LINE&#xb9; 2RHS-012.9-2    HTS: 100,106 ISD              2    /  na/na                I I  ELB/PIPE                              IC.F-2    [  na    [  VOL/UT6.02 2RHS-66-19-SM018            f  QISO  66-19        or DMG&#xb9; na in /C5.51        ]none    J SUR/PT3.00/HT4.00    [
NHP2-12..375-CS      I  LINE&#xb9; 2RHS-012-9-2    NTS: 100(101 ISO              2    [  na/na                I I  ELB/PIPE                              IC.F-2    [ na    [  VOL/UT6.02 2RHS-66-19-SM024            i QISO  66-19        or DMG&#xb9; na in [C5.51          (none  (
SUR/PT3.00/HT4.00    [
NHP2-12-.375.CS          LINE&#xb9; 2RHS-012-7-2    NTS: 100/101 ]SO              2    [  na  /na              I I  PIPE/ELB                              IC-F-2    [ na    ]  VOL/UT6.02 2RHS-66-19-SM025            i QISO 66-19          or DUG&#xb9; na in )C5.51        ]none  )
SUR/PT3.00/HT4.00    [
NHP2-12-.375-CS      (
LINE&#xb9; 2RHS-012-7-2    NTS: 100,101 (SD          I  2    I na/na                I I TEE/REO                                IC-F-2    )
na    )
VOL/UT6.02 2RHS-66-19-SM026            i QISO  66-19          or DMG&#xb9; na in [C5.5'l        [ID      f SUR/PT3.00/HT4.00    f NHP2-12-.375-CS        I LINE&#xb9; 2RHS-012-9-2    NTS: 95,46      ISD          2    / na/na                    Sc11 I PIPE/ELB                                IC-F-2    [ na    [
VOL/Ul'6.02 2RHS-66-19-SM028            i QISO  66-19          or DMG&#xb9; na in [C5.51        ]none    J SUR/PT3.00/HT4.00    f HHP2-12-.375-CS        I LINE&#xb9; 2RHS.012-7-2      HTS: 100,'101 ISD            2    J na /na                I I TEE/PIPE                                IC-F-2    )
na    (
VOL/UT6.02            J Sc7 2RHS-66-20-FM001            i QISO  66-20          or  DUG&#xb9;  na  in  (C5.51    IID      I SUR/PT3.00/HT4.00    I NHP2-18-.375.CS        i LINE&#xb9;  2RHS-018-203-2  HTS:  107,100  LSD          2    / na /na
 
NIAGARA HOHAMK POWER CORPORATIOH            - HI    HILE POINT NUCLEAR STATION - UNIT 2        58 of 135 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE IHSPECTIOH          (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                  APPENDIX  G  - RHS SYSTEH (sorted by Examination        Identifier) 2ND IHTVL REL RED ) DESCRIPTION OF ITEN TO BE EXANIHED(CATGRY (IGSCC)              EX1/HDE PROCEDURE    )PERIOD    1                      REHARKS EXAHINATION IDENTIFIER f ITS ISO LOCATOR, COMPONENT DMG      &#xb9;,  )ITEN  &#xb9; JFREOY)    EX2/NDE PROCEDURE ]PERIOD 2 USE CAL BLK  &#xb9; f  LINE NO. AND NOTES, AS APPLICABLE ]SELECT ]CLASS] EX3/NDE PROCEDURE (PERIOD 3                f I  PIPE/PIPE                            IC-F-2    )  na  [  VOL/UT6.02 2RHS-66-20-FM002        )
QISO 66-20          or DMG&#xb9; na    in [C5.51    ]none  )  SUR/PT3.00/HT4.00    J NHP2-18-.375-CS    ]  LINE&#xb9; 2RHS-018-203-2 NTS: 100        )none        2  /  na  /na I  PIPE/PIPE                            IC-F-2    I  na    I  VOL/UT6.02            I 2RHS-66-20-FM003        / QISO 66-20            or  DMG&#xb9; na  in  (C5.51    Inone    I  SUR/PT3.00/NT4.00    I NHP2.18-.375.CS    (
LINE&#xb9; 2RHS-018-203-2 NTS: 100        )none        2    )  na /na I  PIPE/ELB                              IC-F-2    )
na    [  VOL/UT6.02 2RHS-66-20.FW004          (  QISO  66-20        or DMG&#xb9; na in [C5.51        ]none    f  SUR/PT3.00/NT4.00    f NHP2-18-.375-CS    i  LIHE&#xb9; 2RHS-018-203-2 NTS: 100,101 LSD              2    f  na/na I  PIPE/ELB                              IC-F-2    I  na    I  VOL/UT6.02 2RHS.66-20-FM005          (
QISO  66.20        or DWG&#xb9; na in JC5.51        Inone    I  SUR/PT3.00/HT4.00    I NHP2-18-.375-CS    I  LINE&#xb9; 2RHS-018-203-2 HTS: 100,101 ISD              2    f  na/na I  PIPE/ELB                              IC-F-2    (
na    )
VOL/UT6.02 2RHS.66-20-FM006          )
QISO 66-20          or  DWG&#xb9; na    in )C5.51    ]none    (  SUR/PT3.00/HT4.00    )
NHP2-18-.375-CS        LINE&#xb9; 2RHS.018.203-2  NTS  100,101  )SD        I  2    I  na /na                I I  PIPE/PIPE                            IC-F-2    i na    i  VOL/UT6.02            I 2RHS-66-20-FW009          i QISO 66-20          or  DMG&#xb9; na  .in ]C5.51    [none  J SUR/PT3.00/NT4.00    J NHP2-18..375-CS    I  LINE&#xb9; 2RHS-018-203-2 HTS: 100        Inone        2    [ na/na I ELB/PIPE                              IC-F-2    I na    I VOL/UT6.02            I 2RHS-66-20-FM010          i QISO 66-20          or  DWG&#xb9; na    in  [C5.51    Inone    I SUR/PT3.00/HT4.00    (
NHP2-18-.375-CS      i LIHE&#xb9; 2RHS-018-203-2 NTS: 100,101      )SD          2    f na/na I PIPE/ELB                              IC-F.2    [ na    ) VOL/UT6.02 2RHS-66-20-FW011          J QISO 66-20          or  DMG&#xb9; na    in  JC5.51    ]none    f SUR/PT3.00/MT4.00      J NHP2-18-.375-CS      / LINE&#xb9; 2RHS-018-203-2 NTS: 100,101      JSD          2    / na  /na I ELB/PIPE                              IC-F-2    ) na    ) VOL/UT6.02 2RHS-66-20-FM012          f QISO 66-20          or  DMG&#xb9; na    in  )C5.51    Inone    I SUR/PT3 F 00/NT4.00    I NHP2-18-.375-CS      I LIHE&#xb9; 2RHS.018-203-2 HTS: 100,101 ISD                2    f na/na
 
NIAGARA HOHAMK PDMER CORPORATIOH            -      ILE POINT NUCLEAR STATION - UNIT 2        59 of 135 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTIOH        (ISI)  INTERVAL PLAN Change date:    07/29/'1999                                                                    APPEHDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED [ DESCRIPTION OF ITEH TO BE EXAHINED(CATGRY )IGSCC) EX1/NDE PROCEDURE                    )PERIOD  1                        REHARKS EXAHINATION IDENTIFIER    )
ITS ISO LOCATOR, COHPOHEHT DMG    &#xb9;,  [ITEN  &#xb9; )FREOY) EX2/HDE PROCEDURE      [PERIOD 2  [
USE CAL BLK  &#xb9;  I  LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOD 3                I I  PIPE/PIPE                              JC-F-2    [  na    [  VOL/UT6.02 2RNS-66-20.FM013          I QISO    66-20          or DMG&#xb9; na    in  ]C5.51    [none    f  SUR/PT3.00/HI'4.00  J NHP2-18..375-CS      (
LINE&#xb9;  2RHS-018-203-2  HTS: 100        (none        2    /  na  /na i ELB/PIPE IC-F-2            [  VDL/UT6.02 2RNS-66-20-FM014            [  QISO  66-20          or DMG&#xb9; na    in  (C5.51    ]none    [  SUR/PT3.00/HT4.00    J NHP2 ~ 375-CS    I  LIHE&#xb9; 2RHS-018-203-2 NTS: 100,101 ISD                2    (
na  /na
[ INTEG  ATT; 1" thick plate              [C-C      I  na    I  SUR/PT3.00/HT4.00    I 2RNS-66-20.FM303            )
QISO  66-20-7        or  DMG&#xb9; na    in )C3.20    [ID      )
na /na I  LINE&#xb9; 2RHS.018.203-2    NTS'2    36    INS          2    /  na  /na INTEG ATT;  1" thick plate              JC-C      f  na    f  SUR/PT3.00/HT4.00    f 2RHS-66-20-FM304            )
Qlso 66-20-7        or DMG&#xb9; na in )C3.20        /ID      J na /na                I na                    I  LINE&#xb9; 2RHS-018-203-2 NTS 72,36          INS          2    /  na/na                I
[ INTEG  ATT; 1" thick plate              [C-C      I na    I SUR/PT3.00/HT4.00    I 2RNS-66-20.FM305            (
QISO  66-20-7        or DMG&#xb9; na in )C3.20          ]ID      f na /na i  LINE&#xb9;  2RHS.018-203-2  NTS: 72,36      INS            2    / na/na                I
[ IHTEG  ATT; 1" thick plate              (C-C      ] na    (
SUR/PT3.00/HT4.00    (
2RNS-66-20-FM306            f QISO 66-20-7        or  DMG&#xb9; na    .in [C3.20    ]ID      ) na /na
                            ]  LIHE&#xb9;  2RHS 018-203-2 NTS: 72,36        (NS          2    / na/na                  I I ELB/PIPE                                IC-F-2    I na    I VOL/UT6.02            I 2RHS.66-20-SM001            i QISO 66-20          or DMG&#xb9; na in /C5 51    ~    ]none    J SUR/PT3.00/HT4.00      J NHP2-18-.375-CS          LINE&#xb9; 2RHS.018-203-2 NTS: 100,101 /SD                  2    / na /na I PIPE/ELB                                /C-F-2    )
na    ( VOL/UT6.02 2RHS.66-20-SM003            (
QISO 66-20            or DMG&#xb9; na    in  (C5.51    ]none    J SUR/PT3 F 00/HT4.00    )
NHP2-18-.375-CS        I  LINE&#xb9; 2RHS-018-203-2 NTS: 100,101      ISD          2    / na  /na i PIPE/ELB IC-F-2    ) na    ( VOL/UT6.02 2RHS.66-20 SM005            /  QISO 66-20          or DMG&#xb9; na in /C5.51        )none    )
SUR/PT3.00/HT4 F 00    (
NHP2-18-.375.CS          LINE&#xb9; 2RHS-018-203-2 NTS: 100,101 LSD                2    ] na /na
 
NIAGARA MONAMK POMER CORPORATION        - N    MILE POINl'UCLEAR STATION - UNIT 2        60 of 135 NMP2-ISI-006, REV. 1, CH.000                                          SECOND TEN YEAR IHSERVICE INSPECTION      (ISI)    INTERVAL PLAN Change date: 07/29/1999                                                                    APPENDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEM TO BE EXAMINEDICATGRY            IIGSCCI EX1/NDE PROCEDURE IPERIOO      1  I                    REMARKS EXAMINATION IDENTIFIER i ITS ISO LOCATOR, COMPONENT DMG        &#xb9;,  LITEM  &#xb9; )FREOY( EX2/NDE PROCEDURE iPERIOO 2 USE CAL BLK  &#xb9; I  LINE  NO  AND  NOTES  AS  APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE IPERIOO 3      I I  ELB/PIPE                              IC-F-2    i na    )
VOL/uT6.02 2RNS-66-20-SM006        [ QISO    66-20          or  DMG&#xb9; na  in (C5.51    )none i SUR/PT3.00/MT4.00 i NHP2-18-.375-CS    )
LINES 2RHS-018-203-2 NTS: 100,101      LSD          2 i na /na J
PIPE/MNF                              /C-F-2    i na    i VOL/uT6.O2 2RHS.66-20. SM008        i QISO 66-20              or  DUG&#xb9; na  in iC5.51    Inone    I  SUR/PT3.00/MT4.00  I NMP2-18-.375-CS    i  LINE&#xb9; 2RHS-018-203-2 NTS: 100,69      LSD          2    )  na /na I  ELB/PIPE                              IC-F-2    i na    i  VOL/uT6.O2 2RHS-66-20-SM011        i QISO 66-20              or  DUG&#xb9; na  in iC5.51    inone    i  SUR/PT3.00/MT4.00 i NMP2-18-.375-CS    I  LINE&#xb9; 2RHS-018-203-2 NTS: 100,101 ISD                2    i na /na I PENET    211/PIPE                        IB-J      i na    i VOL/UT6.02 2RHS-66-21-FM002        i QISO 66-21              or  DUG&#xb9; na  in iB9.11    iID      i SUR/PT3.00/MT4.00  (Sc8 ,
NMP2-20.1.031-CS      LINE&#xb9; 2RHS-020-114-1 NTS: 26,29        iTEV PIPE/*MOV113                          IB-J      i na    t voL/UT6.02 2RHS-66-21-FM003        i QISO 66-21              or  DMG&#xb9; na  in i89.11    inone i SUR/P'13.00/MT4.00    i NHP2-20-1.031-CS  I  LINE&#xb9; 2RHS-020-114-1 NTS: 26,27        INS                /  na /na            I I
                            *MOV113/PIPE                          IC-F-2    i na    i  VOL/UT6.02 2RHS-66 FM004        i QISO 66-21            or DMG&#xb9; na in (C5.51        inone  i SUR/PT3.00/Ml'4.00 i NMP2-20-.500.CS    I  LINE&#xb9;  2RHS-020  64-2    NTS: 27,76    ISD          2    i na /na I  PIPE/ELB                                IC-F-2    I na    I  VOL/UT6.02        I          I 2RHS-66-21-FM007          i QISO  66-21          or  DMG&#xb9; na  in  iC5.51    IID      I SUR/PT3.00/MT4.00  I          I I LINE&#xb9; 2RHS-020-64-2      NTS: 76,77 NMP2-20..500.CS                                                ISD          2                              Sc11 I RED/PIPE                                )C-F-2    J na    i VOL/uT6.O2 2RHS-66-21-FM008          I QISO 66 21            or  DUG&#xb9; na  in iC5.51    inone i SUR/PT3.00/MT4.00      i NMP2-18-.375-CS      i LINE&#xb9; 2RHS-018-203-2 NTS: 109,72        LSD          2    i na /na I RED/PIPE                                ic-F-2    i na    i VOL/uT6.O2 2RNS-66-21-FM009          i QISO 66-21            or DMG&#xb9; na in iC5.51        inone i SUR/PT3.00/MT4.00 i NMP2-18-.375-CS        LINE&#xb9;  2RHS-018-65-2    HTS: 109,72    LSD          2    i na /na
 
NIAGARA NONAMK POMER CORPORATION            -        ILE POINT    NUCLEAR STATION - UNIT 2        61 of 135 NHP2-ISI-006, REV. 1, CH.OOO                                              SECOHD TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                          APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED        DESCRIPTIOH OF ITEH TO BE EXAHIHED)CATGRY            IGSCC) EX1/NDE PROCEDURE        (PERIOD  1                          REMARKS
(                                                      (
EXAHINATION IDENTIFIER f      Il'S ISO  LOCATOR, COHPOHENI'MG    &#xb9;,  )ITEN  &#xb9; )FREOYJ        EX2/NDE PROCEDURE  )PERIOD 2 USE CAL BLK  &#xb9; I    LINE HO. AND NOTES, AS APPLICABLE ISELECT      ICLASSI EX3/HDE PROCEDURE IPERIOD 3 I I    PIPE/PIPE                              IC-F-2    (    na    [  VOL/UT6.02 2RHS-66 FM010        (
QISO 66-21            or  DMG&#xb9; na  in  )C5.51    ]none      f  SUR/PT3.00/HT4.00  f NHP2-18-.375-CS    J LINE&#xb9; 2RNS-018-65.2      NTS: 72        ]none            2 I    PIPE/ELB                                IC-F-2    I    na    I  VOL/UT6.02          I 2RHS-66 FM012        i    QISO  66-21          or  DMG&#xb9; na  in  [C5.51    ]none      [  SUR/PT3.00/HT4.00  [
NHP2-18-.375.CS    I    LINE&#xb9;  2RHS-018-65-2    NTS: 72(110    I TE            2    /  na /na I    PIPE/ELB                                IC-F-2    )    na    )
VOL/UT6.02 2RHS-66 FM013        i    QISO 66-21            or DMG&#xb9; na in /C5.51        Inone      I  SUR/PT3 00/HT4 00  I NHP2-18-.375-CS    )    LINE&#xb9;  2RHS-018-65-2    HTS: 72,110    (SD        I    2    I  na/n                I I
PIPE/*V57                              IC-F-2    ]  na    [  VOL/UT6.02 2RHS-66-21-FM014          i QISO    66-21          or  OMG&#xb9; na    in )C5.51    (none      )
SUR/PT3.00/HT4.00  )
NMP2.18-.375-CS      i LINE&#xb9;    2RHS-018.67-2    HTS: 72,84    LSD              2    (
na /na I  PIPE/PIPE                                IC-F-2    [  na      I  VOL/UT6.02          I 2RHS-66 FM015          i QISO 66-21              or  DMG&#xb9; na    in  [C5.51    ]none      f  SUR/PT3.00/HT4.00    f NKP2-18-.375-CS      I LIHE&#xb9; 2RHS-018-65-2    NTS: 72        Inone          2    )
na /na I  ELB/PIPE                                IC-F-2    ]    na    ]  VOL/UT6.02 2RHS-66 FM017          [  QISO 66-21            or  DMG&#xb9; na  .in ]C5.51      Inone      I  SUR/PT3 00/HT4  0 I NHP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-65-2      HTS: 72,110    ISD            2    f  na/na
[  PIPE/ELB                                IC-F-2    [  na    f  VOL/UT6.02 2RHS-66 FM018          i QISO 66-21            or  DMG&#xb9; na    in  JC5.51    ]none      J SUR/PT3.00/HT4.00    /
NHP2-18-.375-CS      i LIHE&#xb9; 2RHS.018-65-2      HTS: 72, 110    LSD        I    2    Ina/n                  I I  ELB/PIPE                                iC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66-21-FM019          )
QISO 66-21          or  DMG&#xb9; na    in  [C5.51    Inone      I  SUR/PT3.00/HT4.00    I NHP2-18..375-CS      I  LINE&#xb9; 2RHS-018-67-2    HTS: 72,110    ISD            2    f  na /na I  PIPE/PIPE                              IC-F-2    (  na      (
VOL/UT6.02 2RHS-66-21-FM020            (
QISO 66-21          or D'MG&#xb9; na    in  [C5.51    ]none      J SUR/PT3.00/HT4.00    J NHP2-20-.500-CS          LINE&#xb9; 2RHS-020-64-2 NTS: 76            (none            2    ] na/na
 
NIAGARA NOHAMK POMER CORPORATION          -        ILE POINT NUCLEAR STATION - UHIT 2        62 of 135 NHP2-ISI-006( REV. 1, CH.OOO                                              SECOND TEH YEAR IHSERVICE INSPECTION          (ISI)    INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX G -  RHS SYSTEN (sorted by Examination Identifier) 2HD IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                      IPERIOO  1                        REMARKS EXAHINATIOH IDENTIFIER I ITS ISO LOCATOR, CONPOHEHT DMG            &#xb9;,  IITEN  &#xb9;  IFREOYI EX2/HDE PROCEDURE        IPERIOO 2  I USE CAL BLK    &#xb9; I    LIHE NO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE IPERIOD 3 I    PIPE/ELB                                Ic-F-2    I  na    I  VOL/UT6.02 2RHS-66 FM022          I    QISO 66-21          or  DMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/NT4.00    I NHP2 ~ 500-CS        LINE&#xb9; 2RHS-020.64.2    NTS'6i?7        I SD      I 2    I  na/na                I I  PIPE/PIPE                              IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-21-FM028            I  QISO 66-21          or  DMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/HT4.00    I NHP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-65-2    NTS: 72        lnone          2    I  na /na I  PIPE/MHF                                IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-21-FM029            I  QISO 66-21          or  DUG&#xb9; na    in IC5.51    lnone    I  SUR/PT3.00/NT4.00    I HHP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-65-2    HTS: 72,71      ISD            2    I  na /na              I I  PIPE/PIPE                              IC-F.2    I  na    I  VOL/UT6.02 2RHS-66 FM031          I QISO 66.21            or  DMG&#xb9; na    in IC5.51    Inone    I  SUR/PT3.00/NT4.00    I HHP2-20-.500-CS      I  LINE&#xb9; 2RHS-020-64-2    NTS: 76        lnone          2    I  na/na I  ELB/PIPE                                IC-F-2    I  na    I VOL/UT6.02          I 2RHS-66-21-SM004            I QISO 66-21            or  DMG&#xb9; na    in IC5.51      Inone    I SUR/PT3.00/NT4.00    I NHP2-20-.500-CS          LINE&#xb9; 2RHS-020.64-2    NTS: 76,77      ISD      I  2    I na /na              I I  ELB/PIPE                                IC-F-2    I  na    I VOL/UT6.02            I          I 2RHS-66-21-SM007            I QISO 66 21            or  DUG&#xb9; na  ,in IC5.51      lnone    I SUR/PT3.00/HT4.00    I          I NHP2-20..500-CS          LINE&#xb9; 2RHS-020  64-2    NTS: 76,77      ISD            2    I na /na                          I I  PIPE/TEE                                IC-F-2    I  na    I VOL/UT6.02 2RHS-66-21-SM008            I  QISO 66-21          or  DUG&#xb9; na    in IC5.51      lnone    I SUR/PT3.00/Hl'4.00    I NHP2-20-.500-CS        I  LINE&#xb9; 2RHS-020.64-2    NTS: 76,108      ISD      I    2    I na /na                I I  PIPE/TEE                                IC-F-2    I  na    I VOL/UT6.02 2RHS-66-21-SM009            I  QISO 66-21          or  DMG&#xb9; na    in  IC5.51    IID      I SUR/PT3.00/HT4.00    I HHP2-18-.375-CS        I  LINE&#xb9; 2RHS.018-203-2 NTS: 72,107        ISD            2    I na /na                I  Sc11 I  TEE/RED                                IC-F-2    I  na    I VOL/UT6.02 2RHS-66-21-SM010              QISO 66-21          or  DMG&#xb9; na    in IC5.51      Inone    I SUR/PT3.00/NT4.00    I NHP2 F 500-CS      I  LINE&#xb9; 2RHS-020 234-2  NTS  108i109    I              2    I na  /na
 
NIAGARA HOHAMK POWER CORPORATION -                -  NILE POINT NUCLEAR STATION - UNIT 2        63 of 135 HHP2-ISI-006, REV. 1, CH-OOO                                              SECOHD TEH YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:      07/29/1999                                                                        APPEHDIX G -  RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTIDH OF ITEN TO BE EXANINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                        IPERIOD  1  I REMARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG            &#xb9;,  ) ITEN    &#xb9; )FREOYJ EX2/HDE PROCEDURE        )PERIOD 2  f USE CAL BLK    &#xb9; I  LINE NO. AND NOTES, AS APPLICABLE (SELECT          ICLASSI EX3/NDE PROCEDURE IPERIOD 3          I I  TEE/RED                                IC-F-2      f  na  )
VOI./UT6.02 2RHS-66-21-SM011            i  QISO 66-21          or DMG&#xb9; na in (C5.51          Inone    I  SUR/PT3.00/NT4.00    I NHP2-20..500-CS      )
LINE&#xb9;  2RHS.020-234-2  NTS: 108 109 I                  2    /  na  /na              I I  PIPE/ELB                                IC-F-2      f  na    f  VOL/UT6.02 2R H S.66 SI$ 12        i QISO 66-21            or  DMG&#xb9; na  in ]C5.51      ]none    f  SUR/PT3.00/NT4 F 00  f HHP2-18-.375-CS      I LINE&#xb9; 2RHS-018-65.2      HTS: 72,110    ISO            2    J na  /na I  ELB/PIPE                                IC-F'-2    ]  na    )
VOL/UT6.02 2RHS-66-21-SM014            /  QISO 66-21    . or  DMG&#xb9; na  in /C5.51      ]none    (
SUR/PT3.00/HT4.00    J NHP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-65-2    HTS  72 110    ISD            2    f  na /na                I I  ELB/PIPE                                IC-F-2    /  na    /  VOL/UT6.02 2RHS-66-21-Sl$ 15            i QISO 66.21            or  DMG&#xb9; na  in /C5.51      /none    /  SUR/PT3.00/HT4.00    [
NNP2-18-.375-CS      I  LINE&#xb9; 2RHS-018-65-2    HTS: 72, 110    ISD        I  2    I  na  /na              I I  ELB/TEE                                  IC-F-2    I  na    I  >>L/UT6.02            I  Sc7 2RHS-66-21-SW016            [  QISO 66-21          or  DWG&#xb9; na    in ]C5.51      IID      I  SUR/PT3.00/HT4.00    I NNP2-18..375-CS      i  LINE&#xb9; 2RHS-018-65-2    NTS: 110,106    LSD            2    /  na /na                I I  TEE/PIPE                                IC-F-2      (
na    J VOL/UI'6.02 2RHS-66-21-SWOT 7            i QISO 66-21            or  DMG&#xb9; na  .in  /C5 ~ 51    [none  ]  SUR/PT3.00/NT4.00    J NHP2-'18-.375-CS    I  LINE&#xb9; 2RHS-018-67-2    NTS: 72,106      ISO            2    f  na  /na              I I PIPE/ELB                                IC-F-2      ] na    (
VOL/UT6.02 2RHS-66-21-Sl$ 18            i QISO 66-21          or  DMG&#xb9; na    in  JC5.51      Inone    I  SUR/PT3.00/NT4.00    I NNP2-18-.375-CS      )
LINE&#xb9; 2RHS-018.67-2      NTS: 72,110    (SD        i  2    i na  /na              I I TEE/PIPE                                IC-F-2      [ na    [  VOL/UT6.02 2RHS-66-21-SW021              i QISO 66-21            or  DUG&#xb9; na    in [C5.51      ]none    J SUR/PT3.00/HT4.00      J NHP2-18-.375-CS      I LINE&#xb9; 2RHS-018.65-2      HTS: 72,106    ISD        J 2    )
na  /na i PIPE/PIPE                                IC-F-2      )
na      [ VOL/UT6.02 2RHS-66.21-SM022            i QISO 66-21            or  DMG&#xb9; na    in  [C5.51      ]none    [ SUR/PT3.00/NT4 F 00    f NHP2-18-.375-CS          LINE&#xb9; 2RHS-018-65-2    HTS: 72        )none          2    / na /na
 
HIAGARA MOHAWK POWER CORPORATION              -        ILE POINT NUCLEAR STATION - UNIT 2        64 of 135 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION            (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2HD INTVL REL REQ I DESCRIPTION OF ITEH TO BE EXAHIHEDICATGRY I IGSCCI                    EXl/HDE  PROCEDURE  IPERIOO  1                      REMARKS EXAMINATION IDEHTIFIER I ITS ISO LOCATORi COMPONEHT DMG          &#xb9;i  IITEH  &#xb9; IFREQYI EX2/NDE          PROCEDURE  IPERIOD 2 USE CAL BLK &#xb9; I  LINE  NO. AND NOTES,  AS  APPLICABLE    ISELECT    ICLASSI EX3/NDE        PROCEDURE  IPERIOD 3 I  ELB/PIPE                                IC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66 FM004      I  QISO 66-22            or  DMG&#xb9; na    in IC5.51    Inone      I  SUR/PT3.00/HT4.00    I NMP2-24-.500-CS  I  LINE&#xb9; 2RHS 024 42        NTS'2    65    I                2    I  na  /na              I I
                            *V57/PIPE                                IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-22-FM005            QISO 66-22            or DMG&#xb9; na in IC5.51          Inone      I  SUR/PT3.00/HT4.00    I NMP2-18-.375-CS  I  LIHE&#xb9; 2RHS-018-67-2 NTS: 84,72          ISD        I    2    I  na  /na              I I  PIPE/ELB                                IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-22-FM006        I QISO    66-22          or DMG&#xb9; na in IC5.51          Inone      I  SUR/PT3.00/MT4.00    I NMP2-24-.500-CS    I  LINE&#xb9; 2RHS-024-42-2 NTS: 62,65          ISD              2    I  na  /na              I I  PIPE/ELB                                  IC-F-2    I  na    I  VOL/UT6.02 2RHS-66-22-FW007        I QISO  66-22          or DMG&#xb9; na in IC5.51          Inone      I  SUR/PT3.00/HT4.00    I NHP2-24-.500-CS    I  LINE&#xb9; 2RHS-024-42-2 NTS: 62,65            ISD            2    I  na/na I  PIPE/~V378                                IC-F-1 I na              VOL/UT6.13            I 2RHS-66-22-FM009        I QISO  66-22          or DMG&#xb9; na in IC5.11 IID                    SUR/PT3.00                Sc9 NMP2-24-.500-SS    I  LINE&#xb9; 2RHS-024-169-2 NTS: 112,58 I7.5XMinI 2                      na  /                I I  PIPE/TEE                                  IC-F-2    I  na      I  VOL/UT6.02 2RHS-66-22-FM010        I QISO 66-22            or  DMG&#xb9; na    in  IC5.51    Inone      I  SUR/PT3.00/MT4.00    I NMP2-24-.500-CS    I  LINE&#xb9; 2RHS-024-42-2      NTS: 62 ~ 73    ISD            2    I  na  /na I TEE/PIPE                                  IC-F.2    I  na      I  VOL/UT6.02 2RHS-66-22-FM011        I QISO  66-22          or DMG&#xb9; na in IC5.51          Inone      I  SUR/PT3.00/MT4.00    I NMP2-24-.500.CS    I LINE&#xb9; 2RHS-024-42-2 NTS: 62,73            ISD            2    I  na  /na I PIPE/PIPE                                Ic-F-1    I  na      I VOL/UT6.03                Sc7 2RMS-66 FM012        I QISO  66-22          or DMG&#xb9; na in IC5.11 IID                      SUR/PT3.00            I NMP2-24-.500-SS    I  LINE&#xb9; 2RHS-024-334-2 NTS: 108,112 I7.5XMInl 2                  I  na  /                I I  PIPE/ELB                                  Ic-F-2    I  na      I  VOL/UT6.02 2RHS-66-22-FM013        I QISO  66-22          or DMG&#xb9; na in IC5.51            Inone      I  SUR/PT3.00/MT4.00    I NHP2-24-.500.CS        LINE&#xb9; 2RHS-024-42-2 NTS: 62,65            ISD            2    I  na/na
 
NIAGARA HONAWK POWER CORPORATION            -        ILE POINT NUCLEAR STATION - UNIT 2        65 oE 135 NHP2-ISI-006, REV. 1, CH-000                                              SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date: 07/29/1999                                                                          APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2HD IH'IVL REL REQ ) DESCRIPTION OF ITEN TO BE EXAHINEDiCATGRY              iIGSCCi EXI/HDE      PROCEDURE  lPERIOD    1                      REHARKS EXAHINATION IDENTIFIER i ITS ISO LOCATOR, COHPONEHT DMG          &#xb9;,  )
ITEN  &#xb9; iFREOYi EX2/HDE PROCEDURE iPERIOO 2            )
USE CAL BLK    &#xb9; i LINE NO. AND NOTES, AS APPLICABLE        DESELECT  iCLASSi EX3/NDE PROCEDURE iPERIOO 3 j I  ELB/PIPE                                iC-F-2    i na      J VOL/UT6.02          iEX6 2RNS-66-22-FI$ 14        i QISO 66-22            or  DWG&#xb9; na    in  JC5.51    iID        i  SUR/PT3.00/HI'4.00  i NHP2-24-.500-CS    i LINE&#xb9; 2RHS-024-42.2      HTS: 62,65      LSD        j    2    i na /na I WNF/PIPE iC-F-2    i na      i  VOL/UT6.02 2RHS-66-22-FI$  15      i QISO    66-22          or  DWG&#xb9;  na  in iC5.51      inone i SUR/PT3.00/HT4.00          i HHP2 ~ 500-CS  i LINE&#xb9; 2RHS-024-42-2      NTS: 61,62      ISD        I    2 I na /na                    I I  PIPE/TEE                                iC-F-2    i na      i  VOL/UT6.02          I 2RHS.66-22-FWOI7              QISO  66-22          or  DWG&#xb9;  na  in  PCS.SI    inone i SUR/PT3.00/HT4.00 i NHP2-18-.375-CS    i LINE&#xb9; 2RHS-018.67-2      NTS: 67,72      LSD        i 2 i na /na INC-5      i MHF/PIPE                                  ic-F-I    i na      i VOL/UT6.03            I 2RNS-66-22-FW019              QISO 66-22          or  DWG&#xb9;  na    in IC5.11      I ID      I .SUR/PT3.00          [Sc8 NHP2-24..500-SS      i  LINE&#xb9; 2RHS-024-334-2 NTS: 50,112        i7.5XHinJ      2    J na /                I IWC-2r1        PIPE/ELB                                IC-F-I    I  na      I VOL/UT6.03          i  inacc 2RHS-66-22-FI$ 21            QISO  66-22          or DMG&#xb9; na in LC5.11 ERR                  i SUR/PT3.00          j NHP2-24-.500-SS        LINE&#xb9; 2RHS-024-41-2 HTS: 112,54 )Handatei 2                    i na /                I IWC-2r1    i WHF/PIPE                                  IC  F 1  I  na      I VOL/UT6 03            i lnacc 2RHS-66-22.FI$ 22          i QISO 66-22            or  DMG&#xb9; na    In iC5.11      ERR        i SUR/PT3.00            I NHP2-24-.500-SS      )
LINE&#xb9; 2RHS-024-41-2    NTS: 50,108      iHandatei      2    i na /                  I IWC-2r1    I  ELB/PENET ZSC                            iC-F-1    i na      i VOL/UT6.03            ilnacc 2RHS-66-22-FI$ 23          )  QISO 66-22          or  DWG&#xb9;  na    in iC5.11      ERR        ) SUR/PT3.00            I NHP2-24-.500-SS        LINE&#xb9; 2RHS-024-41-2    NTS:  54,55      )Handatei      2    i na /                  l I ELB/PIPE                                  iC-F-2    i na      J VOL/UT6.02 2RHS.66-22-FM025            ) QISO  66-22          or  DMG&#xb9;  na    in  PCS.SI    )none i SUR/PT3.00/HT4.00          J NHP2-24-.500-CS      i LINE&#xb9;  2RHS-024-42-2    NTS:  62,65      JSD      i 2        J na /na I PENET ZSC/PIPE                            IC-F-1    I na      I VOL/UT6.03            I.
2RHS.66-22.FI$ 27          i QISO 66-22          or  DWG&#xb9; na    in  iC5.11    iID      i SUR/PT3.00                Sc9 NHP2-24-.500-SS      i LIHE&#xb9; 2RHS-024-169-2 NTS: 112,55          i7.5XHini 2          i na /                  I
 
NIAGARA HOHAWK POWER CORPORATION      -      NILE POINT NUCLEAR STATION - UNIT 2        66 of 135 HHP2-ISI-006, REV. 1, CH-000                                          SECOHD TEN YEAR IHSERVICE INSPECTIOH      (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                APPEHDIX G - RHS SYSTEM (sorted by Examination Identifier) 2ND INTVL REL RED    I  DESCRIPTION OF ITEN TO BE EXAHIHEDICATGRY IIGSCCI EX1/HDE PROCEDURE          IPERIOD  1                      REHARKS EXAHIHATION IDENTIFIER      ITS ISO LOCATOR,  CONPONEHT DMG  &#xb9;,  (ITEN  &#xb9; JFREOYJ    EX2/HDE PROCEDURE  [PERIOD 2 USE CAL BLK  &#xb9; I  LINE HO. AHD NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE IPERIOO 3            I IWC-2r1    I  PIPE/PIPE                            JC-F-I  J na    J VOL/UT6.03          flnacc 2RHS-66.22-FW029          (
QISO 66-22          or DMG&#xb9; na in JC5.11 JRR          J SUR/PT3.00          I HHP2-24-.500-SS      J LINE&#xb9; 2RHS-024-41-2 NTS: 108,112 JNandateJ        2  J na  /              I I  IHTEG ATT                            ic-c    ] na    f  SUR/PT3.00/NT4.00  f 2RHS-66-22-FW303          (
QISO 66-22-2/3      or  DWG&#xb9; na  in (C3.20  [ID    f  na /na              I na                  i LINE&#xb9; 2RHS-024-334-2 NTS: 112,56      iNS          2  f  na /na              I I IHTEG ATT                              ic-c    I na    I  SUR/PT3.00/MT4.00  I 2RHS.66.22-FM304          /  QISO  66-22-2/3      or  DWG&#xb9; na  in /C3.20  [ID    J na /na na                  I  LINE&#xb9; 2RHS-024-334-2 NTS: 112,56      INS          2  J na/na              I IMC-3      I  IHTEG ATT                            )c-c    (
na    )  SUR/(inaccessible)(lnacc 2RHS-66-22-FW310          (
QISO  66-22-21      or DWG&#xb9; na in (C3.20      ERR    )  na  /na            I LINE&#xb9; 2RHS-024-41-2 N'IS: 108,52 iNS              2  /  na/na              I I WC-3      I INTEG ATT                              (c-c    [ na    (  SUR/(inaccessible)[lnacc 2RHS-66-22-FW311          / QISO  66-22-21      or DMG&#xb9; na in /C3.20      ERR    J na  /na            I I  LINE&#xb9; 2RHS-024-41-2 HTS: 108,52 INS                2  /  na/na              I I  INTEG ATT                            ic-c    f na    f  SUR/PT3.00/NT4.00  [
2RHS-66-22-FW3X7          /  QISO 66-22-17        or DWG&#xb9; na .in /C3.20    /ID      / na  /na i  LINE&#xb9;  2RHS-024-42-2    HTS: 62,114  FANS 2    / na/na              I INTEG ATT                            ic-c    I na    I  SUR/PT3.00/NT4.00  I 2RHS-66-22-FM3XB          /  QISO 66-22-17        or DWG&#xb9; na in /C3.20      /ID      / na  /na
                          /  LINE&#xb9; 2RHS-024-42-2 HTS: 62,114 iHS                2    / na/na              I
                          / LM                                    IC-F-1  / na    /  VOL/UT6.03          flnacc 2RHS-66-22-LWOI            [ QISO 66-22          or  DMG&#xb9; na  in )C5.12  IRR      I SUR/PT3.00          I NHP2-24-.500.SS      i LINE&#xb9; 2RHS.024-41-2    NTS: 108      JNS          2  /na/                  I
                          / LW                                    IC-F-1  )
na    (  VOL/UT6.03          flnacc 2RHS.66-22-LW02            ] QISO 66-22          or  DWG&#xb9; na  in (C5.12  IRR    I  SUR/PT3.00          I NHP2-24-.500-SS      I LINE&#xb9; 2RHS.024-41-2    NTS: 112      IHS          2  (na/                  I
 
NIAGARA MOHAMK POMER CORPORATION          -        ILE POINT      NUCLEAR STATION  - UNIT 2        67 of 135 NMP2-1SI-006, REV. 1, CH-000                                              SECOND TEN TEAR IHSERVICE INSPECTION                (ISI)  INTERVAL PLAN Change  date:  07/29/1999                                                                        APPENDIX  G - RHS SYSTEM (sorted by Examination Identifier)
ND IHTVL REL RE4        DESCRIPTION OF ITEM TO BE EXAMIHEDICATGRY I IGSCCI EX1/NDE PROCEDURE                IPERIOD      1                          REMARKS I
EXAMINATION IDENTIFIER I ITS ISO LOCATOR, COMPONENT DMG            &#xb9;,  I ITEM &#xb9;  IFREOYI EX2/NDE PROCEDURE          IPERIOO 2      I USE CAL BLK  &#xb9; I    LINE  NO. AND NOTES,  AS APPLICABLE  ISELECT  ICLASSI EX3/NDE PROCEDURE          IPERIOO 3 I I LM      IR                                  IC-F-1    I  na    I  VOL/UT6.03          Ilnacc 2RHS-66-22-LM03            I    QISO  66-22            or DMG&#xb9; na  in IC5.12    IRR        I  SUR/PT3.00          I NHP2-24-.500-SS      I    LINE&#xb9; 2RHS-024-41-2 NTS: 54            INS            2    Ina/                    I I    LM OR                                  IC-F-1    I  na    I  VOL/UT6.03          I  lnacc 2RHS.66-22-LM04            I QISO      66-22          or DMG&#xb9; na  in IC5.12    IRR        I  SUR/PT3.00          I HMP2-24-.500.SS      I    LIHE&#xb9; 2RHS-024-41-2 NTS: 54            INS            2    Ina/                    I I LM    assoc v/f423 8 FI$ 27              IC-F-1    I  na    I  VOL/UT6.03          I 2RHS-66-22-LM05                QISO  66-22          or DMG&#xb9; na  in IC5.12    IID            SUR/PT3.00                  Sc9 NMP2-24-.500-SS I
I    LINE    2RHS    41      NTS'AL                        2 I
Ina/                    I I  LM  assoc w/FM027 8 Fl$ 09              IC-F-1  I  na      I VOL/UT6.03            I 2RHS-66-22 LM06            I  QISO 66-22            or DMG&#xb9; na    in IC5.12    IID        I  SUR/PT3.00                  Sc9 NMP2-24-.500-SS      I  LINE&#xb9;    2RHS-024-169-2  NTS: 112      IAL            2    Ina/                    I I LM    assoc M/FM019 8 Fl$ 12              IC-F-1    I  na      I  VOL/UT6.03            I 2RHS-66-22-LM07            I  QISO 66-22            or DMG&#xb9; na    in IC5.12    IID        I  SUR/PT3.00            ISc8 NHP2-24-.500-SS      I  LIHE&#xb9;    2RHS-024-334-2  HTS: 112      IAL            2    Ina/                    I LM  assoc w/FM012                        IC-F-1    I  na      I  VOL/UT6.03                  Sc7 I
2RHS.66-22 LM08            I  QISO 66-22            or DMG&#xb9; na    jn IC5.12    I ID      I SUR/PT3.00            I NMP2-24-.500-SS      I    LINE&#xb9;  2RHS-024-334-2  HTS: 112      IAL      I    2    I  na/                  I I
PIPE/ELB                                IC-F-2    I  na      I VOL/UT6.02 2RHS.66.22-SM003            I  QISO  66-22          or DMG&#xb9; na in IC5.51        Inone      I SUR/PT3.00/MT4.00    I NMP2-24-.500-CS      I  LIHE&#xb9; 2RHS-024.42-2 NTS: 62,65          ISD            2      I na  /na                I I  PIPE/TEE                                IC-F-2    I  na      I VOL/UT6.02 2RHS.66-22-Sl$ 08          I QISO    66-22            or DMG&#xb9; na in IC5.51        Inone      I SUR/PT3.00/MT4.00      I NMP2-24-.500-CS      I  LINE&#xb9; 2RHS-024-42-2 NTS: 62,67          ISD            2    I na /na I  TEE/PIPE                                IC-F-2    I  na      I VOL/UT6.02 2RHS-66-22-SM009            I  QISO  66-22          or OMG&#xb9; na in IC5.51        Inone      I  SUR/PT3.00/MT4.00    I NMP2-24-.500-CS          LINE&#xb9; 2RHS-024-42-2 HTS: 62,67          ISD      I    2    I  na /na I
 
NIAGARA HOHAWK POWER CORPORATION          - N    ILE POINT  NUCLEAR STATION  - UNIT 2        68 of 135 NHP2-ISI-006, REV. 1 ~ CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                  APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED I DESCRIPTION OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOO  1  I                        REMARKS EXAHIHATION IDENTIFIER I ITS ISO LOCATOR'OHPONENT DWG          &#xb9;,  IITEH  &#xb9; IFREOYI EX2/NDE PROCEDURE      IPERIOO 2 i USE CAL BLK  &#xb9; i LIHE NO. AND NOTES, AS APPLICABLE [SELECT iCLASSi EX3/HDE PROCEDURE              )PERIOD 3 i I  ELB/PIPE                              IC-F-2    ]  na    [  VOL/UT6.02 2RHS.66-22-SW011          i QISO  66-22        or DWG&#xb9; na in (C5.51        ]none    f  SUR/PT3.00/HT4.00  f NHP2-24-.500.CS        LINE&#xb9; 2RHS-024-42-2 NTS: 62,65        LSD      I  2    I  na  /na I  PIPE/ELB                              IC-F-2    /  na    /  VOL/UT6.02 2RHS-66-22-Sl$ 12        i QISO 66-22          or  OWG&#xb9; na    in [C5.51    /none    /  SUR/PT3.00/HT4.00  /
NHP2-24-.500-CS    I  LIHE&#xb9; 2RHS-024-42-2    NTS:  62,65    ISO            2  (  na  /na I  ELB/PIPE                              IC-F-2    (  na    f VOL/UT6.02 2RHS.66-22.$ 013          )
QISO 66-22          or  OWG&#xb9;  na  in  JC5.51    (none    f SUR/PT3.00/HT4.00  f NHP2-24-.500-CS    I  LINE&#xb9; 2RHS-024-42-2    NTS: 62,65      ISO            2    / na /na              I I ELB/PIPE                              IC-F-2    )
na    [ VOL/UT6.02 2RHS-66-22-SM014          i QISO 66-22          or  DWG&#xb9; na    in  JC5.51    ]none    f SUR/PT3.00/HT4.00  J NHP2.24-.500-CS      i LINE&#xb9; 2RHS.024.42-2    NTS:  62,65    LSD            2    ( na  /na PIPE/ELB                                C- F-2  [  na      VOL/UT6.02 I                                        /                  [
2RHS-66-22-SW017          I QISO 66 22          or  DWG&#xb9;  na  in ]C5.51    )ID      i SUR/PT3.00/HT4.00  i  Sc9 NHP2-24-.500-CS      I LINE&#xb9; 2RHS-024.42-2    NTS: 62,65      ISD            2    / na  /na I ELB/PIPE                              IC-F-2    )  na    ( VOL/UT6.02 2RHS-66-22-Sl$ 19          i QISO 66-22          or  DWG&#xb9; na    in  )C5.51    ]none    f SUR/PT3.00/HT4.00  [
NHP2-24-.500-CS      )
LINE&#xb9; 2RHS.024-42-2    NTS: 62,65      (SD            2    / na /na I PIPE/WNF                              IC  F 2  f  na    J VOL/UT6.02 2RHS.66.22-SW021          i QISO 66-22          or  OWG&#xb9;  na  in  [C5.51    (none    f SUR/PT3.00/HT4.00  /
NHP2.24-.500-CS      I LINE&#xb9; 2RHS-024.42.2    NTS:  61,62    ISO            2    / na  /na I PIPE/ELB                              IC-F-2    (
na    (
VOL/UT6.02 2RHS-66-22-SM023          ) QISO 66-22          or  DWG&#xb9; na    in [C5.5'l    ]none    f SUR/PT3.00/HT4.00  f NHP2-24-.500-CS      i LIHE&#xb9; 2RHS-024-42-2    Nl'S: 62,65    LSD            2    / na /na IMC-3      I IHTEG ATT PEHET ZSC SHOPWELD          IC-C      (
na    f SUR/(inaccessible)(inacc 2RHS-66-22-SW301          i QISO 66-22          or  DWG&#xb9; na    in JC3.20    ERR      / na /na              I LINE&#xb9; 2RHS-024-41-2    NTS:  55,56    iNS        I  2    I na /na              I
 
NIAGARA NOHAMX POWER CORPORATION              -        ILE POINT NUCLEAR STATION - UNIT 2        69 of 135 KHP2-ISI-006, REV. 1, CH-000                                              SECOHD TEN YEAR IHSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                          APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO        DESCRIPTION OF ITEN TO BE EXANIKED(CATGRY (IGSCC( EXI/KDE PROCEDURE                  (PERIOD    1                      REHARKS
(
EXAMINATION IDENTIFIER  (
ITS ISO LOCATOR,  COHPOHEHT DMG    &#xb9;,  (ITEM  &#xb9;  (FREQY( EX2/HDE PROCEDURE          (PERIOD 2    (
USE CAL BLK  &#xb9; I    LINE  KO  AKD NOTES, AS APPLICABLE (SELECT (CLASS( EX3/HDE PROCEDURE                  (PERIOD 3 I INTEG ATT PENET 25C SHOPMELD            (C-C      (
na    (
SUR/PT3.00/HT4.00    (
Sc7
(
2RNS-66-22-SW302        (
QISO  66-22        - or DMG&#xb9; na      in (C3.20 (ID            (
na /na
(
LINE&#xb9; 2RKS-024-41-2 NTS: 55,57          (Nandate(      2    (  na /na              I I PEHET    Z5B/PIPE                        (C-F-I    (  na        VOL/UT6.03          I          I 2RHS-66-23-FW002          (
QISO 66-23            or  DMG&#xb9; na    in  (C5.11    (ID            SUR/PT3.00          I          I NNP2-24-.500-SS    (
LIHE&#xb9; 2RKS-024-167-2 NTS: 53,55          (7.5XHin( 2              na  /                      Sc11  (
I  PIPE/ELB                                IC-F-2    (  na    (
VOL/UT6.02 2RKS-66-23-FM005          (
QISO 66-23            or DWG&#xb9; na    in  (C5.51    (none      (
SUR/PT3.00/HT4.00    (
HKP2.24-.500-CS        LINE&#xb9;  2RKS-024-22-2    NTS: 62,65      ISO            2    (
na /na              I I
I  ELB/PIPE                                (C-F-2    (
na    (
VOL/UT6.02 2RHS-66 23-FW006          I  QISO 66-2            or DMG&#xb9; na    in  (C5.51    (none    (
SUR/PT3.00/HT4.00    (
HKP2-24-.500-CS        LIKE&#xb9; 2RNS-024-22 2 NTS: 62,65          (SD            2    (  na/na                I I  ELB/PIPE                                IC-F-2    (
na      (
VOL/UT6.02            (
Sc7 2RHS-66-23-FW007          (
QISO 66-23            or  D'MG&#xb9; na  in  (C5.51    IID        I  SUR/PT3.00/MT4.00    I NHP2-24-.500-CS      (
LINE&#xb9; 2RHS-024-22-2      HTS: 62,65      (SD            2    (
na /na                (
STR1B/PIPE                              IC-F-2    (
na      (
VOL/UT6.02 2RKS-66.23-FM009          (  QISO 66-23            or  DMG&#xb9; na    ,in (C5.51    (none      I  SUR/PT3-00/HT4 00    I NNP2-24-.500-CS      I  LINE&#xb9; 2RKS-024-22-2      NTS:  62,73      (SD            2    (  na /na I  PIPE/*STRTI 0                            (C-F-2    (
na      (
VOL/UT6.02 2RKS-66 FM010          (  QISO  66-23          or DMG&#xb9; na in (C5.51          (none      (
SUR/PT3.00/HT4.00    (
NKP2-24-.500-CS      (
LINE&#xb9; 2RKS-024-22-2 HTS: 62,73          (SD            2    (  na /na                I I  PIPE/PIPE                                IC-F-2    (
na      (
VOL/UT6.02 2RKS-66-23-FM011          I  QISO 66              or DMG&#xb9; na      in  (C5.51    (none      (
SUR/PT3.00/HT4.00    (
NKP2-24-.500-CS      (  LINE&#xb9; 2RKS-024-332-2 HTS: 62            (none      (
2      I na                    I I  TEE/PIPE                                IC-F-2    (  na      (
VOL/UT6.02 2RKS-66-23-FW012          (
QISO  66-23          or DMG&#xb9; na in (C5.51          (none      (
SUR/PT3.00/NT4.00    (
NMP2-24-.500-CS          LINE&#xb9; 2RKS-024-22-2 NTS: 62,67          (SD            2    (
na /na
 
NIAGARA HONAMK POWER CORPORATION              -    NILE POINT NUCLEAR STATION - UNIT 2        70 of 135 NHP2-ISI-006, REV. 1, CH-000                                          SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:    07/29/1999                                                                      APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL RED I DESCRIPTIOH OF ITEN TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    iPERIOO    1                      REHARKS EXAMINATION IDENTIFIER f ITS ISO LOCATOR, COHPONENT DMG        &#xb9;,  [ ITEH    &#xb9; )FREOYJ EX2/NDE PROCEDURE      ]PERIOD 2 ]
USE CAL BLK  &#xb9; i LINE NO. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/NDE PROCEDURE                IPERIOD 3 I I MNF/PIPE JC-F-2      )
na  )  VOL/UT6.02 2RHS.66-23-FM013          f  QISO  66-23        or DUG&#xb9;  na  in  [C5.51      ]none    f  SUR/PT3.00/HT4.00  f NHP2-24-.500-CS    I  LINE&#xb9; 2RNS-024-22-2 NTS: 61,62        ISD        I    2    I  na  /na            I I  ELB/PIPE                              ]C-F-2      J na    f  VOL/UT6.02 2RHS-66-23-FM014          (
QISO 66-23          or  DMG&#xb9; na  in  JC5.51      /none    f  SUR/PT3.00/HT4.00  [
NHP2-24-.500.CS    f  LINE&#xb9; 2RHS-024-332-2 NTS: 62,65      JSD        f    2    f  na  /na PIPE/*V377                            ]C-F-1      J na    J VOL/UT6.13          I            I 2RHS.66-23-FM017              QI SO 66.23        or DWG&#xb9; na in IC5.11 IID                I  SUR/PT3.00          I            I NHP2-24-.500-SS        LINE&#xb9; 2RHS-024-167-2 NTS: 53,58      (7.5XHinf 2          f  na  /                      Sc11  (
I'MC-2r1    I  WNF/PIPE                              /C-F-I    ]  na    /  VOL/UT6.03          J Inacc 2RHS-66-23-FM018              QISO  66.23        or DMG&#xb9; na in /C5.'ll /RR              /  SUR/PT3.00          I NHP2-24-.500-SS      [  LINE&#xb9; 2RHS.024-21-2 Nl'S: 50,115 /Handate) 2                /  na  /              I IWC-2r1    I  PIPE/ELB                              IC-F-1      I  na    I  VOL/UT6.03          /Inacc 2RHS.66-23-FM019          i QISO 66-23          or  DMG&#xb9; na    in JC5.11      [RR      f SUR/P'T3.00        I NHP2-24-.500.SS      /  LINE&#xb9; 2RHS-024-21-2    NTS: 53,54    /Handatef        2    J na  /              I IWC-2r1    I  ELB/PENET 25B                        IC-F-1      I  na    I  VOL/UT6.03          )  Inacc 2RHS-66-23-FM020          f  QISO 66-23          or  DUG&#xb9; na  .in  JCS ~ 11    ERR      f SUR/PT3.00          I NHP2-24-.500-SS      /  LINE&#xb9; 2RNS-024-21-2    NTS: 54,55      JHandate/      2    f na  /              I IMC-2r1    I  PIPE/PIPE                              JC-F-1      (
na    J VOL/UT6.03          flnacc 2RHS.66-23-FM022          i QISO 66-23          or  DMG&#xb9; na    in  [C5.11 JRR            )
SUR/PT3 F 00        I NHP2 ~ 500-SS    / LIHE&#xb9; 2RHS-024-21-2    NTS: 115,53    (Mandate] 2          f na  /              I I PIPE/PIPE                              IC-F-I      I  na    I VOL/UT6.03          I            I 2RHS.66-23-FM024          f QISO 66-23          or DWG&#xb9; na    in  JC5.11      ]ID      f SUR/PT3.00          I            I NHP2-24-.500-SS      f LINE&#xb9; 2RNS-024-167-2 NTS: 53          J7.5XHinf 2          f na  /                    Sc11 P IPE/*HOV1B                          (C-F-2      f na    / VOL/UT6.02 2RHS-66-23-FM025          I QISO 66 23          or  DWG&#xb9;  na  in  (C5.51      ]none    ) SUR/PT3.00/HT4.00    f NHP2-24-.500-CS        LINE&#xb9; 2RHS-024-332-2 NTS: 62,58        JSD          J 2    ( na /na
 
0 NIAGARA HOHAMX POMER CORPORATION            - H      ILE POINT    NUCLEAR STATION  - UNIT 2        71 of 135 NHP2-ISI-006, REV. 1, CH-000                                            SECOND TEN YEAR INSERVICE INSPECTION            (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                      APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL REQ I DESCRIPTIOH OF ITEH TO BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                    iPERIOD    1  I REHARKS EXAHIHATION IDENTIFIER J ITS ISO LOCATOR, COHPONENT O'MG        &#xb9;,  J ITEM  &#xb9; [FREOY[ EX2/NDE PROCEDURE        ]PERIOD 2 USE CAL BLK  &#xb9; I  LINE  KO  AND NOTES'S APPLICABLE      ISELECT ICLASSI EX3/HDE PROCEDURE            IPERICO 3 I INTEG ATT:  1.781" thick trunnion ]C-C          ] na    )
SUR/PT3.00/NT4.00  f 2RHS-66-23-FM307            QISO  66-23-16      or DMG&#xb9; na in JC3.20 )ID              f    na  /na              JSc8 LINE&#xb9; 2RHS-024-22-2 NTS: 62,111 [Mandate] 2                J na /na              I INTEG ATT:  1.781" thick trunnion (C-C          )
na    [  SUR/PT3.00/NT4.00    [
2RHS-66-23-FM308            QISO  66-23-16      or DMG&#xb9; na in JC3.20 ]ID              /  na  /na              /Sc8 LINE&#xb9; 2RHS-024-22-2 NTS: 62,111 JHandate/              2    /  na /na              I IMC-3      I  IHTEG ATT                              )c-c      [  na    [  SUR/(inaccessib(e)  ]  lnacc 2RHS-66-23-FM313          f  QISO  66-23-23      or DMG&#xb9; na in (C3.20        (RR      ]  na  /na              I na                  I  LINE&#xb9; 2RHS.024-2'I-2 NTS: 115,52 INS                  2    /  na/na                I I'MC-3        INTEG ATT                              )c-c      )  na    (
SUR/(inaccessible))lnacc 2RHS-66-23-FM314            QISO  66-23-23      or DMG&#xb9; na in )C3.20        /RR      f  na /na              I na                    LINE&#xb9; 2RHS-024-21-2 HTS: 115,52 INS                    2    /  na /na              I J
LM                                      JC-F-I        na    J VOL/UT6.03          (  Inacc 2RHS-66-23-LM01          )
QISO 66-23          or  DMG&#xb9; na  in ]CS.'l2    )RR        [  SUR/PT3.00          I NHP2-24-.500-SS    I  LINE&#xb9; 2RHS.024-21-2    NTS: 115        INS          2    /na/                    I
                          /  LM                                      IC-F-1    I  na    I  VOL/UT6.03          flnacc 2RHS-66-23-LM02          [ QISO 66-23            or  DMG&#xb9; na  .in (C5.12      IRR      I  SUR/PT3.00          I NHP2-24-.500-SS    I  LINE&#xb9; 2RHS-024-21-2      NTS: 53        INS          2    /na/                    I I  LM IR                                    IC-F-1    I  na    I  VOL/UT6.03            f inacc 2RHS-66.23-LM03          I  Ql    6623            or  DMG&#xb9; na  in  JC5.12    IRR      I  SUR/PT3.00            I NHP2-24-.500-SS      I LINE&#xb9; 2RHS-024.21-2      HTS: 54        INS          2    /na/                    I I LM OR                                    IC-F-1    I  na      I VOL/UT6.03            Jlnacc 2RHS.66-23-LM04              Ql SO 66-23          or  DMG&#xb9; na  in )C5.12      IRR      I SUR/PT                I NHP2-24-.500-SS        LINE&#xb9; 2RHS-024-21-2      NTS: 54        iNS          2      dna/                    I LM  assoc w/fw020  & FM002              iC-F-1    [  na      [ VOL/UT6.03                Sc7 2RHS-66-23-LM05              QISO 66-23            or  DMG&#xb9; na  in [C5.12      I ID        SUR/PT3.00 NHP2-24-.500-SS        LINE&#xb9;  2RNS 024 21 2    NTS'AL                        2 I
                                                                                          )na/
I I
 
NIAGARA HOHAWK POMER CORPORATION          -      HILE POINT HUCLEAR STATION - UNIT 2        72 of 135 NHP2-ISI-006( REV. 1, CH-000                                          SECOND TEH YEAR IHSERVICE INSPECTION        (ISI)  INTERVAL PLAN Change date:  07/29/1999                                                                    APPENDIX G - RHS SYSTEH (sorted by Examination Identifier) 2ND IHTVL REL REO I DESCRIPTION OF ITEH To BE EXAHINEDICATGRY IIGSCCI EX1/NDE PROCEDURE                IPERIOO  1                      REHARKS EXAHINATIOH IDENTIFIER  I ITS ISO LOCATOR, COHPOHEHT DMG      &#xb9;,  IITEH  &#xb9; IFREQYI EX2/HDE PROCEDURE      IPERIOO 2  I USE CAL BLK  &#xb9; I  LINE No. AND NOTES, AS APPLICABLE ISELECT ICLASSI EX3/HDE PROCEDURE            IPERIOO 3 I LM  assoc M/FM002 8 FM024              Ic-F-1  I  na  I  VOL/UT6.03        I          I 2RNS-66-23-LM06          I QISO 66-23          or  DWG&#xb9; na  in IC5.12 IID          I  SUR/PT3.00        I          I NHP2-24-.500-SS    I  LINE&#xb9; 2RHS-024-167-2 HTS: 53          IAL          2    Ina/                        Sc11  I LW assoc M/FW024 F. FM017              IC-F-1    I  na    I  VOL/UT6.03          I          I 2RHS-66-23-LM07          I  QISO 66-23          or DMG&#xb9; na    in IC5.12    IID      I  SUR/PT3.00          I          I NHP2-24-.500-SS    I  LINE&#xb9; 2RNS.024-167-2 NTS: 53          IAL          2    Ina/                        Sc11  I I  PIPE/ELB                              IC-F-2    I  na    I  VOL/UT6.02          I 2RHS-66-23-S'M006        I QISO  66.23        or DMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/HT4.00  I NHP2-24-.500.CS    I  LINE&#xb9; 2RHS-024-332.2 NTS: 62,65        ISD          2    I  na  /na            I I  ELB/PIPE                              IC-F-2    I  na    I  voL/uT6.O2 2RHS.66.23-SM007          I QISO  66            or OMG&#xb9; na    in  IC5.51    Inone    I  SUR/PT3.00/HT4.00  I NHP2-24-.500-CS    I LINE&#xb9; 2RHS-024-332.2 NTS: 62,65        ISD          2    I  na /na              I I  PIPE/ELB                              IC-F-2    I  na    I  voL/uT6.o2 2RHS-66-23-SM008          I QISO 66-23          or  DMG&#xb9; na    in IC5.51    Inone    I  SUR/PT3.00/HT4.00  I NHP2-24-.500-CS    I  LINE&#xb9; 2RHS-024-332-2 NTS: 62,65        ISD          2    I  na  /na I  PIPE/TEE                              IC-F-2    I  na    I  voL/uT6.o2 2RHS.66-23-SM009          I QISO 66-23            or  DMG&#xb9; na  in  IC5.51    Inone    I  SUR/PT3.00/HT4.OO  I NHP2-24-.500-CS    I  LINE&#xb9; 2RHS.024.22-2    NTS: 62,67    ISD          2    I  na  /na I  PIPE/TEE                              IC-F-2    I  na    I VOL/U'I6.02 2RHS.66-23-SM010          I QISO 66-23            or  DWG&#xb9; na    in IC5.5'I  Inone    I SUR/PT3.00/HT4.00  I NHP2-18-.375-CS    I  LINE&#xb9; 2RHS.018.65-2    NTS: 67,72      ISD          2    I na  /na I ELB/PIPE                                IC-F-2    I na    I VOL/UT6.02 2RHS-66-23.SM011          I QISO 66-23          or  DMG&#xb9; na    in IC5.51    Inone    I SUR/PT3.00/HT4.00    I NHP2-18-.375-CS      I LINE&#xb9; 2RHS.018-65-2    NTS: 72,101    ISD          2    I na  /na              I I PIPE/ELB                                IC-F-2    I na    I VOL/UT6.02 2RHS-66-23.SM012          I QISO 66-23          or  DMG&#xb9; na    in  IC5.51    Inone    I SUR/PT3.00/HT4.00    I NHP2-18-.375-CS      I LINE&#xb9; 2RHS-018-65-2    NTS: 72,101    ISD          2    I na /na
 
V
      ~
        'I  <<4
            >1g P I
sf<i /
 
NIAGARA HOHAMK POWER CORPORATION              -        ILE POIN'I NUCLEAR STATION - UNIT 2        73 of 135 NHP2-ISI-006( REV. 1, CH-000                                              SECOHD TEN YEAR INSERVICE INSPECTION            (ISI) INTERVAL PLAN Change date: 07/29/1999                                                                            APPENDIX G  - RHS SYSTEH (sorted by Examination Identifier) 2ND INTVL REL RED i DESCRIPTION OF ITEH TO BE EXAHINEDiCATGRY                iIGSCCi EX1/NDE      PROCEDURE  iPERIOO  1                        REHARKS EXAHINATION IDENTIFIER  I ITS ISO LOCATOR'OHPONENT DMG &#xb9;( l ITEH            &#xb9; IFREOYI EX2/HDE      PROCEDURE    iPERIOO 2 i USE CAL BLK &#xb9; I    LINE  No. AND NOTES,  AS  APPLICABLE    ISELECT    ICLAssl EX3/NDE      PROCEDURE    IPERIOD 3 I i MNF/PIPE IC-F-2      i na      i  VOL/UT6.02 2RHS-66-23-SW013        )
QISO  66-23          or DMG&#xb9; na in iC5.51            inone i SUR/PT3.00/HT4.00          i NHP2-18-.375-CS  i    LINE&#xb9;  2RHS-018-65-2    NTS: 69,72      LSD              2    i na  /na I    ELB/PIPE                                  IC-F-2      i na      i VOL/UT6.02 2RHS-66-23-SW016        i    aiso 66-23            or  DMG&#xb9; na    in iC5.51      lnone    I  SUR/PT3.00/Hl'4.00  I NHP2-24-.500-CS  i LIHE&#xb9; 2RHS-024-22-2        NTS: 62(65      LSD        I    2    I  >>/na                I I  PIPE/ELB                                  IC-F-2      I  na    I  VOL/UT6.02          I 2RHS-66-23-SW017        i QISO    66-23          or  DMG&#xb9;  na  in  iC5.51      lnone        SUR/PT3 0 /HT4 00    I NHP2-24-.500-CS    i LINE&#xb9;    2RHS.024-22-2    NTS:  62,65      iso          i  2    i>>/>>
I I  PIPE/ELB                                  IC-F-2      i na      i  VOL/UT6.02            i  Sc7 2RHS-66-23-SM018        i QISO 66-23              or DMG&#xb9; na in iC5.51            IID      I  SUR/PT3.00/HT4.00    I NHP2-24-.500-CS    I LINE&#xb9; 2RHS-024-22-2    NTS: 62,65        ISO            2    i na  /na I  PIPE/ELB                                  IC-F-2      i na      i VOL/UT6.02 2RHS-66.23-SW020        i QISO    66-23          or DMG&#xb9; na      in iC5.51        inone i SUR/PT3.00/MT4 F 00        )
NHP2-24-.500-CS    i  LINE&#xb9; 2RHS-024-22-2 NTS: 62,65            iso            2    i-na /na                I I  ELB/PIPE                                  IC-F-2      i na      i VOL/UT6.02 2RHs-66-23-SM021          i QISO    66-23          or DMG&#xb9; na .in iC5.51            inone    i  SUR/PT3.00/HT4.00    (
NHP2-24-.500.CS    I  LINE&#xb9; 2RHS-024-22-2 NTS: 62,65            ISD            2    i na  /na I  ELB/PIPE                                  IC-F.2      i na    i VOL/UT6.02 2RHS.66-23-SM022        i QISO    66-23          or DMG&#xb9; na in iC5.51              inone    i SUR/PT3.00/HT4.00      [
NHP2-24-.500-CS    I  LINE&#xb9; 2RHS-024-22-2 NTS: 62,65            ISD            2      J na  /na I  PIPE/ELB                                  IC    F 2    i na      i VOL/UT6.02 2RHS-66-23-SM023        i  also 66-23            or  DMG&#xb9; na    in iC5.51        lnone    i SUR/PT3.00/HT4.00      (
NHP2-24-.500-CS    i  LINE&#xb9; 2RHS.024-22-2      NTS:  62,65      LSD            2    i na  /na I  PIPE/FLG                                  IC-F-2      I na      I VOL/UT6.02            I 2RHS-66-23-SM024          (  QISO 66-23            or  DMG&#xb9; na    in  JC5 ~ 51    inone    i SUR/PT3.00/HT4.00      i NHP2.24-.500.CS      I  LINE&#xb9; 2RHS-024-22-2      NTS:  61(62      I SD        I  2    I >>/na                  I
 
0 0}}

Latest revision as of 11:02, 6 January 2025

Rev 1 to NMP2-ISI-006, Second Ten Year Interval Inservice Insp Program Plan for Nine Mile Point Nuclear Power Station Unit 2
ML18041A073
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 07/27/1999
From: Brombach T, Mcclain E, Perkins G
NIAGARA MOHAWK POWER CORP.
To:
Shared Package
ML18041A072 List:
References
NMP2-ISI-006, NUDOCS 9908050106
Download: ML18041A073 (902)