ML18057A162: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(7 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18057A162
| number = ML18057A162
| issue date = 03/26/2018
| issue date = 03/26/2018
| title = Acceptance for Review Regarding Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, (EPID L-2018-PMP-0001)
| title = Acceptance for Review Regarding Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems,
| author name = Honcharik M C
| author name = Honcharik M
| author affiliation = NRC/NRR/DSS/STSB
| author affiliation = NRC/NRR/DSS/STSB
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = PROJ0753
| docket = PROJ0753
| license number =  
| license number =  
| contact person = Honcharik M C
| contact person = Honcharik M
| case reference number = EPID L-2018-PMP-0001
| case reference number = EPID L-2018-PMP-0001
| document type = Acceptance Review Letter
| document type = Acceptance Review Letter
Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:
{{#Wiki_filter:March 26, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852  
March 26, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852


==SUBJECT:==
==SUBJECT:==
ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-566, "REVISE ACTIONS FOR INOPERABLE RHR SHUTDOWN COOLING SUBSYSTEMS" (EPID L-2018-PMP-0001)
ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-566, REVISE ACTIONS FOR INOPERABLE RHR SHUTDOWN COOLING SUBSYSTEMS (EPID L-2018-PMP-0001)  


==Dear Members of the Technical Specifications Task Force:==
==Dear Members of the Technical Specifications Task Force:==
By {{letter dated|date=January 19, 2018|text=letter dated January 19, 2018}} (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18019B187), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, into the standard technical specifications.
Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 420 staff hours including project management time.
The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.
MILESTONE SCHEDULE DATE Issue Request for Additional Information May 4, 2018 Issue Draft Safety Evaluation October 16, 2018 Issue Final Safety Evaluation January 18, 2019 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.
Sincerely, R/A Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753


By letter dated January 19, 2018 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18019B187), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-566, "Revise Actions for Inoperable RHR Shutdown Cooling Subsystems," into the standard technical specifications.
ML18057A162; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB*
Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 420 staff hours including project management time. The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.
NAME MHoncharik VCusumano DATE 3/22/2018 3/26/2018 Technical Specifications Task Force Project No. 753 cc:
MILESTONE SCHEDULE DATE Issue Request for Additional Information May 4, 2018 Issue Draft Safety Evaluation October 16, 2018 Issue Final Safety Evaluation January 18, 2019  The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.        Sincerely, R/A        Michelle C. Honcharik, Senior Project Manager      Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753 
Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
 
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com}}
ML18057A162;   *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB* NAME MHoncharik VCusumano DATE 3/22/2018 3/26/2018 Technical Specifications Task Force Project No. 753     cc: Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.
Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com  
 
Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com  
 
Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com
 
}}

Latest revision as of 09:03, 6 January 2025

Acceptance for Review Regarding Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems,
ML18057A162
Person / Time
Site: Technical Specifications Task Force
Issue date: 03/26/2018
From: Michelle Honcharik
NRC/NRR/DSS/STSB
To:
Technical Specifications Task Force
Honcharik M
References
EPID L-2018-PMP-0001
Download: ML18057A162 (3)


Text

March 26, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852

SUBJECT:

ACCEPTANCE FOR REVIEW REGARDING TRAVELER TSTF-566, REVISE ACTIONS FOR INOPERABLE RHR SHUTDOWN COOLING SUBSYSTEMS (EPID L-2018-PMP-0001)

Dear Members of the Technical Specifications Task Force:

By "TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR [[system" contains a listed "[" character as part of the property label and has therefore been classified as invalid. Subsystems|letter dated January 19, 2018]] (Agencywide Documents Access and Management System (ADAMS) Accession No. ML18019B187), you submitted to the U.S. Nuclear Regulatory Commission (NRC) a request to incorporate Traveler TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems, into the standard technical specifications.

Section 170.21 of Title 10 of the Code of Federal Regulations requires that Travelers are subject to fees based on the full cost of the review. You did not request a fee waiver; therefore, NRC staff hours have been billed accordingly. The NRC staff estimates that the review will require approximately 420 staff hours including project management time.

The NRC staff has completed a preliminary review of your submission and determined it is sufficiently complete and appropriate to initiate a more comprehensive review. The review will generally follow the schedule below.

MILESTONE SCHEDULE DATE Issue Request for Additional Information May 4, 2018 Issue Draft Safety Evaluation October 16, 2018 Issue Final Safety Evaluation January 18, 2019 The dates are provided for draft and final safety evaluations (SEs) have been expedited at your request. In order to meet these dates the TSTF will need to respond to RAIs in 30 days and provide comments to the draft SE in 15 days. If you have any questions, please contact me at (301) 415-1774 or via e-mail to Michelle.Honcharik@nrc.gov.

Sincerely, R/A Michelle C. Honcharik, Senior Project Manager Technical Specifications Branch Division of Safety Systems Office of Nuclear Reactor Regulation Project No. 753

ML18057A162; *concurred via e-mail NRR-106 OFFICE DSS/STSB DSS/STSB*

NAME MHoncharik VCusumano DATE 3/22/2018 3/26/2018 Technical Specifications Task Force Project No. 753 cc:

Technical Specifications Task Force c/o EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Attention: Brian D. Mann E-mail: brian.mann@excelservices.com James P. Miksa Entergy Nuclear Operations, Inc.

Palisades Nuclear Power Plant 27780 Blue Star Memorial Highway Covert, MI 49043 Email: jmiksa@entergy.com Jordan L. Vaughan Duke Energy EC2ZF / P.O. Box 1006 Charlotte, NC 28202 Email: jordan.vaughan@duke-energy.com Lisa L. Williams Energy Northwest Columbia Generating Station PO Box 968 Mail Drop PE20 Richland, WA 99352-0968 E-mail: llwilliams@energy-northwest.com David M. Gullott Exelon Generation 4300 Winfield Road Warrenville IL 60555 Email: David.Gullott@exeloncorp.com Wesley Sparkman Southern Nuclear Operating Company 42 Inverness Center Parkway / Bin B237 Birmingham, AL 35242 Email: wasparkm@southernco.com