| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, ILLINOIS 60532 | | {{#Wiki_filter:March 2, 2018 |
| -4352 March 2, 2018 Mr. Robert Craven Plant General Manager NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000 301/20 17 00 6) D ear M r. Craven: The NRC has completed its end
| |
| -of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2 , reviewing performance indicators (PIs)
| |
| , inspection results
| |
| , and enforcement actions from January 1, 20 17 through December 31, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Point Beach Nuclear Plant, Units 1 a nd 2 , during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
| |
| 's Reactor Oversight Process (ROP) Action Matrix
| |
| , because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31
| |
| , 20 1 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last 12 months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 201 The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, "Problem Identification and Resolution." A triennial team inspection will be conducted in September 2018 using IP 71111.17T, "Evaluations of Changes, Tests and Experiments
| |
| ."
| |
| R. Craven -2- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading
| |
| -rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."
| |
|
| |
|
| Please contact me at 630-829-9833 with any questions you have regarding this lette
| | ==SUBJECT:== |
| | ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000301/2017006) |
|
| |
|
| Sincerely,
| | ==Dear Mr. Craven:== |
| /RA/ Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50
| | The NRC has completed its end-of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety. |
| -266 and 50
| |
| -301 License Nos. DPR
| |
| -24 and DPR
| |
| -27 Enclosure:
| |
| Inspection Plan cc: Distribution via LISTSERV R. Craven -3- Letter to Robert Craven from Jamnes Cameron dated March 2, 2018 SUBJECT: ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000 301/2 0 17 00 6) DISTRIBUTION
| |
| : Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18058B360 OFFICE RIII NAME JCameron:lg DATE 2/21/2018 OFFICIAL RECORD COPY
| |
|
| |
|
| 07200005 - Point Beach (ISFSI)
| | The NRC determined the performance at Point Beach Nuclear Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. |
|
| |
|
| 03/01/2018 - 12/31/2019
| | The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. |
|
| |
|
| Unit Start End Activity CAC Title Staff Count
| | The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 2018. The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, Problem Identification and Resolution. A triennial team inspection will be conducted in September 2018 using IP 71111.17T, Evaluations of Changes, Tests and Experiments. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding. |
|
| |
|
| ISFSI Security Inspection
| | Please contact me at 630-829-9833 with any questions you have regarding this letter. |
|
| |
|
| 1 07/09/2018
| | Sincerely, |
| | | /RA/ |
| 07/13/2018
| |
| | |
| IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations
| |
| | |
| 2/22/2018 7:56:09 AM
| |
| | |
| Page
| |
| | |
| of
| |
| | |
| This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
| |
| | |
| Point Beach
| |
| | |
| 03/01/2018 - 12/31/2019
| |
| | |
| Unit Start End Activity CAC Title Staff Count
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1, 2 02/26/2018
| |
| | |
| 03/02/2018
| |
| | |
| IP 71124.05
| |
| | |
| 000729 Radiation Monitoring Instrumentation
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1, 2 03/19/2018
| |
| | |
| 03/23/2018
| |
| | |
| IP 71130.01
| |
| | |
| 000733 Access Authorization
| |
| | |
| 1, 2 03/19/2018
| |
| | |
| 03/23/2018
| |
| | |
| IP 71151 001338 Performance Indicator Verification
| |
| | |
| 1, 2 03/19/2018
| |
| | |
| 03/23/2018
| |
| | |
| IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
| |
| | |
| FORCE-ON-FORCE PLANNING & EXERCISE WEEK
| |
| | |
| 1, 2 04/30/2018
| |
| | |
| 05/04/2018
| |
| | |
| IP 71130.03
| |
| | |
| 000735 Contingency Response - Force-On-Force Testing
| |
| | |
| 1, 2 05/21/2018
| |
| | |
| 05/25/2018
| |
| | |
| IP 71130.03
| |
| | |
| 000735 Contingency Response - Force-On-Force Testing
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1, 2 06/18/2018
| |
| | |
| 06/22/2018
| |
| | |
| IP 71124.08
| |
| | |
| 000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
| |
| | |
| Transportation
| |
| | |
| ISFSI Cask Loading Inspection
| |
| | |
| 1, 2 06/25/2018
| |
| | |
| 06/29/2018
| |
| | |
| IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
| |
| | |
| RP Baseline
| |
| | |
| 1, 2 08/13/2018
| |
| | |
| 08/17/2018
| |
| | |
| IP 71124.06
| |
| | |
| 000730 Radioactive Gaseous and Liquid Effluent Treatment
| |
| | |
| 1, 2 08/13/2018
| |
| | |
| 08/17/2018
| |
| | |
| IP 71124.07
| |
| | |
| 000731 Radiological Environmental Monitoring Program
| |
| | |
| BIENNIAL PI&R INSPECTION
| |
| | |
| 1 08/13/2018
| |
| | |
| 08/31/2018
| |
| | |
| IP 71152B 000747 Problem Identification and Resolution
| |
| | |
| TRIENNIAL 50.59 INSPECTION
| |
| | |
| 1, 2 09/10/2018
| |
| | |
| 09/14/2018
| |
| | |
| IP 71111.17T
| |
| | |
| 000709 Evaluations of Changes, Tests, and Experiments
| |
| | |
| BIENNIAL REQUAL PROGRAM INSPECTION
| |
| | |
| 1, 2 09/17/2018
| |
| | |
| 09/21/2018
| |
| | |
| IP 71111.11B
| |
| | |
| 000704 Licensed Operator Requalification Program and Licensed Operator Performance -
| |
| | |
| Biennial INSERVICE INSPECTION UNIT 2
| |
| | |
| 2 10/08/2018
| |
| | |
| 11/04/2018
| |
| | |
| IP 71111.08P
| |
| | |
| 000702 Inservice Inspection Activities - PWR
| |
| | |
| 2/22/2018 7:56:09 AM
| |
| | |
| Page
| |
| | |
| of
| |
| | |
| This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
| |
| | |
| Point Beach
| |
| | |
| 03/01/2018 - 12/31/2019
| |
| | |
| Unit Start End Activity CAC Title Staff Count
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1, 2 10/22/2018
| |
| | |
| 10/26/2018
| |
| | |
| IP 71124.01
| |
| | |
| 000725 Radiological Hazard Assessment and Exposure Controls
| |
| | |
| 1, 2 10/22/2018
| |
| | |
| 10/26/2018
| |
| | |
| IP 71124.02
| |
| | |
| 000726 Occupational ALARA Planning and Controls
| |
| | |
| 1, 2 10/22/2018
| |
| | |
| 10/26/2018
| |
| | |
| IP 71151 000746 Performance Indicator Verification
| |
| | |
| EP BASELINE INSPECTION / PI VERIFICATION
| |
| | |
| 1, 2 11/05/2018
| |
| | |
| 11/09/2018
| |
| | |
| IP 71114.02
| |
| | |
| 000717 Alert and Notification System Testing
| |
| | |
| 1, 2 11/05/2018
| |
| | |
| 11/09/2018
| |
| | |
| IP 71114.03
| |
| | |
| 000718 Emergency Response Organization Staffing and Augmentation System
| |
| | |
| 1, 2 11/05/2018
| |
| | |
| 11/09/2018
| |
| | |
| IP 71114.05
| |
| | |
| 000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
| |
| | |
| 1, 2 11/05/2018
| |
| | |
| 11/09/2018
| |
| | |
| IP 71151 001397 Performance Indicator Verification
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1, 2 11/05/2018
| |
| | |
| 11/09/2018
| |
| | |
| IP 71130.02
| |
| | |
| 000734 Access Control
| |
| | |
| 1, 2 11/26/2018
| |
| | |
| 11/30/2018
| |
| | |
| IP 71130.04
| |
| | |
| 000736 Equipment Performance, Testing, and Maintenance
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1, 2 03/11/2019
| |
| | |
| 03/15/2019
| |
| | |
| IP 71130.02
| |
| | |
| 000734 Access Control
| |
| | |
| INSERVICE INSPECTION UNIT 1
| |
| | |
| 1 03/23/2019
| |
| | |
| 04/19/2019
| |
| | |
| IP 71111.08P
| |
| | |
| 000702 Inservice Inspection Activities - PWR
| |
| | |
| RADIATION PROTECTION BASELINE INSPECTION
| |
| | |
| 1, 2 04/01/2019
| |
| | |
| 04/05/2019
| |
| | |
| IP 71124.01
| |
| | |
| 000725 Radiological Hazard Assessment and Exposure Controls
| |
| | |
| 1, 2 04/01/2019
| |
| | |
| 04/05/2019
| |
| | |
| IP 71124.03
| |
| | |
| 000727 In-Plant Airborne Radioactivity Control and Mitigation
| |
| | |
| 1, 2 04/01/2019
| |
| | |
| 04/05/2019
| |
| | |
| IP 71124.04
| |
| | |
| 000729 Occupational Dose Assessment
| |
| | |
| PHASE 4
| |
| | |
| 1, 2 04/15/2019
| |
| | |
| 04/19/2019
| |
| | |
| IP 71003 000687 Post-Approval Site Inspection for License Renewal
| |
| | |
| EP EXERCISE INSPECTION / PI VERIFICATION
| |
| | |
| 1 05/13/2019
| |
| | |
| 05/17/2019
| |
| | |
| IP 71114.01
| |
| | |
| 000716 Exercise Evaluation
| |
| | |
| 05/13/2019
| |
| | |
| 05/17/2019
| |
| | |
| IP 71114.06
| |
| | |
| 000721 Drill Evaluation
| |
| | |
| 05/13/2019
| |
| | |
| 05/17/2019
| |
| | |
| IP 71151 001397 Performance Indicator Verification
| |
| | |
| CYBER SECURITY INSPECTION
| |
| | |
| 1 06/03/2019
| |
| | |
| 06/21/2019
| |
| | |
| IP 71130.10P
| |
| | |
| 000741 Cyber Security
| |
| | |
| 2/22/2018 7:56:09 AM
| |
| | |
| Page
| |
| | |
| of
| |
| | |
| This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
| |
| | |
| Point Beach
| |
| | |
| 03/01/2018 - 12/31/2019
| |
| | |
| Unit Start End Activity CAC Title Staff Count
| |
| | |
| 2019 PBNPS Exam
| |
| | |
| 1, 2 06/10/2019
| |
| | |
| 06/15/2019
| |
| | |
| OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
| |
| | |
| 1, 2 07/14/2019
| |
| | |
| 07/26/2019
| |
| | |
| EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
| |
| | |
| DBA PROGRAM
| |
| | |
| 1, 2 06/24/2019
| |
| | |
| 07/12/2019
| |
| | |
| IP 71111.21N
| |
| | |
| 000714 Design Bases Assurance Inspection (Programs)
| |
| | |
| RP Baseline
| |
| | |
| 1, 2 09/16/2019
| |
| | |
| 09/20/2019
| |
| | |
| IP 71124.02
| |
| | |
| 000726 Occupational ALARA Planning and Controls
| |
| | |
| 1, 2 09/16/2019
| |
| | |
| 09/20/2019
| |
| | |
| IP 71151 000746 Performance Indicator Verification
| |
| | |
| SECURITY BASELINE INSPECTION
| |
| | |
| 1, 2 09/16/2019
| |
| | |
| 09/20/2019
| |
| | |
| IP 71130.06
| |
| | |
| 000738 Protection of Safeguards Information
| |
| | |
| 1, 2 09/16/2019
| |
| | |
| 09/20/2019
| |
| | |
| IP 71130.07
| |
| | |
| 000739 Security Training
| |
| | |
| 1, 2 09/16/2019
| |
| | |
| 09/20/2019
| |
| | |
| IP 71151 001338 Performance Indicator Verification
| |
| | |
| TRIENNIAL HEAT SINK INSPECTION
| |
| | |
| 1, 2 09/30/2019
| |
| | |
| 10/04/2019
| |
| | |
| IP 71111.07T
| |
| | |
| 000700 Heat Sink Performance -Triennial
| |
| | |
| TRIENNIAL FIRE PROTECTION INSPECTION
| |
| | |
| 1 10/07/2019
| |
| | |
| 11/08/2019
| |
| | |
| IP 71111.05XT
| |
| | |
| 000697 Fire Protection - NFPA 805 (Triennial)
| |
|
| |
|
| 2/22/2018 7:56:09 AM
| | Jamnes Cameron, Chief Branch 4 Division of Reactor Projects |
|
| |
|
| Page
| | Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27 |
|
| |
|
| of
| | Enclosure: |
| | Inspection Plan |
|
| |
|
| This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
| | cc: Distribution via LISTSERV |
| }} | | }} |
Text
March 2, 2018
SUBJECT:
ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000301/2017006)
Dear Mr. Craven:
The NRC has completed its end-of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
The NRC determined the performance at Point Beach Nuclear Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.
The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 2018. The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, Problem Identification and Resolution. A triennial team inspection will be conducted in September 2018 using IP 71111.17T, Evaluations of Changes, Tests and Experiments. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
Please contact me at 630-829-9833 with any questions you have regarding this letter.
Sincerely,
/RA/
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects
Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27
Enclosure:
Inspection Plan