{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, ILLINOIS 60532
{{#Wiki_filter:March 2, 2018
-4352 March 2, 2018 Mr. Robert Craven Plant General Manager NextEra Energy Point Beach, LLC 6610 Nuclear Road Two Rivers, WI 54241 SUBJECT: ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000 301/20 17 00 6) D ear M r. Craven: The NRC has completed its end
-of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2 , reviewing performance indicators (PIs)
, inspection results
, and enforcement actions from January 1, 20 17 through December 31, 20 1 This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facilit The NRC concluded that overall performance at your facility preserved public health and safet The NRC determined the performance at Point Beach Nuclear Plant, Units 1 a nd 2 , during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRC
's Reactor Oversight Process (ROP) Action Matrix
, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facilit The enclosed inspection plan lists the inspections scheduled through December 31
, 20 1 This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondenc The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issue Routine inspections performed by resident inspectors are not included in the inspection pla The inspections listed during the last 12 months of the inspection plan are tentative and may be revise The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any change The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 201 The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, "Problem Identification and Resolution." A triennial team inspection will be conducted in September 2018 using IP 71111.17T, "Evaluations of Changes, Tests and Experiments
."
R. Craven -2- This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading
-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding."


Please contact me at 630-829-9833 with any questions you have regarding this lette
==SUBJECT:==
ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000301/2017006)


Sincerely,
==Dear Mr. Craven:==
/RA/ Jamnes Cameron, Chief Branch 4 Division of Reactor Projects Docket Nos. 50
The NRC has completed its end-of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.
-266 and 50
-301 License Nos. DPR
-24 and DPR
-27 Enclosure:
Inspection Plan cc: Distribution via LISTSERV R. Craven -3- Letter to Robert Craven from Jamnes Cameron dated March 2, 2018 SUBJECT: ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000 301/2 0 17 00 6) DISTRIBUTION
: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMPointBeach RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII ROPassessment.Resource@nrc.gov ADAMS Accession Number: ML18058B360 OFFICE RIII NAME JCameron:lg DATE 2/21/2018 OFFICIAL RECORD COPY


07200005 - Point Beach (ISFSI)
The NRC determined the performance at Point Beach Nuclear Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.


03/01/2018 - 12/31/2019
The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.


Unit Start End Activity CAC Title Staff Count
The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 2018. The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, Problem Identification and Resolution. A triennial team inspection will be conducted in September 2018 using IP 71111.17T, Evaluations of Changes, Tests and Experiments. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.


ISFSI Security Inspection
Please contact me at 630-829-9833 with any questions you have regarding this letter.


1 07/09/2018
Sincerely,
 
/RA/  
07/13/2018
 
IP 81311 001006 Physical Security Requirements for Independent Spent Fuel Storage Installations
 
2/22/2018 7:56:09 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Point Beach
 
03/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RADIATION PROTECTION BASELINE INSPECTION
 
1, 2 02/26/2018
 
03/02/2018
 
IP 71124.05
 
000729 Radiation Monitoring Instrumentation
 
SECURITY BASELINE INSPECTION
 
1, 2 03/19/2018
 
03/23/2018
 
IP 71130.01
 
000733 Access Authorization
 
1, 2 03/19/2018
 
03/23/2018
 
IP 71151 001338 Performance Indicator Verification
 
1, 2 03/19/2018
 
03/23/2018
 
IP 81311 000831 Physical Security Requirements for Independent Spent Fuel Storage Installations
 
FORCE-ON-FORCE PLANNING & EXERCISE WEEK
 
1, 2 04/30/2018
 
05/04/2018
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
1, 2 05/21/2018
 
05/25/2018
 
IP 71130.03
 
000735 Contingency Response - Force-On-Force Testing
 
RADIATION PROTECTION BASELINE INSPECTION
 
1, 2 06/18/2018
 
06/22/2018
 
IP 71124.08
 
000732 Radioactive Solid Waste Processing and Radioactive Material Handling, Storage, and
 
Transportation
 
ISFSI Cask Loading Inspection
 
1, 2 06/25/2018
 
06/29/2018
 
IP 6085 Operation of an Independent Spent Fuel Storage Installation at Operating Plants
 
RP Baseline
 
1, 2 08/13/2018
 
08/17/2018
 
IP 71124.06
 
000730 Radioactive Gaseous and Liquid Effluent Treatment
 
1, 2 08/13/2018
 
08/17/2018
 
IP 71124.07
 
000731 Radiological Environmental Monitoring Program
 
BIENNIAL PI&R INSPECTION
 
1 08/13/2018
 
08/31/2018
 
IP 71152B 000747 Problem Identification and Resolution
 
TRIENNIAL 50.59 INSPECTION
 
1, 2 09/10/2018
 
09/14/2018
 
IP 71111.17T
 
000709 Evaluations of Changes, Tests, and Experiments
 
BIENNIAL REQUAL PROGRAM INSPECTION
 
1, 2 09/17/2018
 
09/21/2018
 
IP 71111.11B
 
000704 Licensed Operator Requalification Program and Licensed Operator Performance -
 
Biennial INSERVICE INSPECTION UNIT 2
 
2 10/08/2018
 
11/04/2018
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
2/22/2018 7:56:09 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Point Beach
 
03/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
RADIATION PROTECTION BASELINE INSPECTION
 
1, 2 10/22/2018
 
10/26/2018
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 10/22/2018
 
10/26/2018
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 10/22/2018
 
10/26/2018
 
IP 71151 000746 Performance Indicator Verification
 
EP BASELINE INSPECTION / PI VERIFICATION
 
1, 2 11/05/2018
 
11/09/2018
 
IP 71114.02
 
000717 Alert and Notification System Testing
 
1, 2 11/05/2018
 
11/09/2018
 
IP 71114.03
 
000718 Emergency Response Organization Staffing and Augmentation System
 
1, 2 11/05/2018
 
11/09/2018
 
IP 71114.05
 
000720 Correction of Emergency Preparedness Weaknesses and Deficiencies
 
1, 2 11/05/2018
 
11/09/2018
 
IP 71151 001397 Performance Indicator Verification
 
SECURITY BASELINE INSPECTION
 
1, 2 11/05/2018
 
11/09/2018
 
IP 71130.02
 
000734 Access Control
 
1, 2 11/26/2018
 
11/30/2018
 
IP 71130.04
 
000736 Equipment Performance, Testing, and Maintenance
 
SECURITY BASELINE INSPECTION
 
1, 2 03/11/2019
 
03/15/2019
 
IP 71130.02
 
000734 Access Control
 
INSERVICE INSPECTION UNIT 1
 
1 03/23/2019
 
04/19/2019
 
IP 71111.08P
 
000702 Inservice Inspection Activities - PWR
 
RADIATION PROTECTION BASELINE INSPECTION
 
1, 2 04/01/2019
 
04/05/2019
 
IP 71124.01
 
000725 Radiological Hazard Assessment and Exposure Controls
 
1, 2 04/01/2019
 
04/05/2019
 
IP 71124.03
 
000727 In-Plant Airborne Radioactivity Control and Mitigation
 
1, 2 04/01/2019
 
04/05/2019
 
IP 71124.04
 
000729 Occupational Dose Assessment
 
PHASE 4
 
1, 2 04/15/2019
 
04/19/2019
 
IP 71003 000687 Post-Approval Site Inspection for License Renewal
 
EP EXERCISE INSPECTION / PI VERIFICATION
 
1 05/13/2019
 
05/17/2019
 
IP 71114.01
 
000716 Exercise Evaluation
 
05/13/2019
 
05/17/2019
 
IP 71114.06
 
000721 Drill Evaluation
 
05/13/2019
 
05/17/2019
 
IP 71151 001397 Performance Indicator Verification
 
CYBER SECURITY INSPECTION
 
1 06/03/2019
 
06/21/2019
 
IP 71130.10P
 
000741 Cyber Security
 
2/22/2018 7:56:09 AM
 
Page
 
of
 
This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
 
Point Beach
 
03/01/2018 - 12/31/2019
 
Unit Start End Activity CAC Title Staff Count
 
2019 PBNPS Exam
 
1, 2 06/10/2019
 
06/15/2019
 
OV 000956 VALIDATION OF INITIAL LICENSE EXAMINATION (OV)
 
1, 2 07/14/2019
 
07/26/2019
 
EXAD 000500 LICENSE EXAM ADMINISTRATION (EXAD)
 
DBA PROGRAM
 
1, 2 06/24/2019
 
07/12/2019
 
IP 71111.21N
 
000714 Design Bases Assurance Inspection (Programs)
 
RP Baseline
 
1, 2 09/16/2019
 
09/20/2019
 
IP 71124.02
 
000726 Occupational ALARA Planning and Controls
 
1, 2 09/16/2019
 
09/20/2019
 
IP 71151 000746 Performance Indicator Verification
 
SECURITY BASELINE INSPECTION
 
1, 2 09/16/2019
 
09/20/2019
 
IP 71130.06
 
000738 Protection of Safeguards Information
 
1, 2 09/16/2019
 
09/20/2019
 
IP 71130.07
 
000739 Security Training
 
1, 2 09/16/2019
 
09/20/2019
 
IP 71151 001338 Performance Indicator Verification
 
TRIENNIAL HEAT SINK INSPECTION
 
1, 2 09/30/2019
 
10/04/2019
 
IP 71111.07T
 
000700 Heat Sink Performance -Triennial
 
TRIENNIAL FIRE PROTECTION INSPECTION
 
1 10/07/2019
 
11/08/2019
 
IP 71111.05XT
 
000697 Fire Protection - NFPA 805 (Triennial)


2/22/2018 7:56:09 AM
Jamnes Cameron, Chief Branch 4 Division of Reactor Projects


Page
Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27


of
Enclosure:
Inspection Plan


This report does not include INPO and OUTAGE activitie This report shows only on-site and announced inspection procedure IP 22 Inspection Activity Plan Report
cc: Distribution via LISTSERV
}}
}}

Latest revision as of 08:02, 6 January 2025

Annual Assessment Letter for Point Beach Plant, Units 1 and 2 (Report 05000266/2017006 and 05000301/2017006)
ML18058B360
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 03/02/2018
From: Jamnes Cameron
Reactor Projects Region 3 Branch 4
To: Craven R
Point Beach
Shared Package
ML18057B065 List:
References
IR 2017006
Download: ML18058B360 (7)


Text

March 2, 2018

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2 (REPORT 05000266/2017006 AND 05000301/2017006)

Dear Mr. Craven:

The NRC has completed its end-of-cycle performance assessment of Point Beach Nuclear Plant, Units 1 and 2, reviewing performance indicators (PIs), inspection results, and enforcement actions from January 1, 2017 through December 31, 2017. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility. The NRC concluded that overall performance at your facility preserved public health and safety.

The NRC determined the performance at Point Beach Nuclear Plant, Units 1 and 2, during the most recent quarter was within the Licensee Response Column, the highest performance category of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low safety significance (i.e., Green), and all PIs were within the expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility.

The enclosed inspection plan lists the inspections scheduled through December 31, 2019. This updated inspection plan now includes planned security inspections which were formerly transmitted under separate correspondence. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last 12 months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

The enclosed inspection includes, among other things, a biennial Problem Identification and Resolution team inspection in August 2018. The inspection will be conducted in accordance with NRC inspection procedure (IP) 71152, Problem Identification and Resolution. A triennial team inspection will be conducted in September 2018 using IP 71111.17T, Evaluations of Changes, Tests and Experiments. This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact me at 630-829-9833 with any questions you have regarding this letter.

Sincerely,

/RA/

Jamnes Cameron, Chief Branch 4 Division of Reactor Projects

Docket Nos. 50-266 and 50-301 License Nos. DPR-24 and DPR-27

Enclosure:

Inspection Plan

cc: Distribution via LISTSERV