{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES  
                              NUCLEAR REGULATORY COMMISSION
NUCLEAR REGULATORY COMMISSION  
                                                  REGION III
REGION III  
                                      2443 WARRENVILLE RD. SUITE 210
2443 WARRENVILLE RD. SUITE 210  
                                        LISLE, ILLINOIS 60532-4352
LISLE, ILLINOIS 60532-4352  
                                            March 23, 2018
Mr. Bryan C. Hanson
March 23, 2018  
Senior VP, Exelon Generation Company, LLC
Mr. Bryan C. Hanson  
President and CNO, Exelon Nuclear
Senior VP, Exelon Generation Company, LLC  
4300 Winfield Road
President and CNO, Exelon Nuclear  
Warrenville, IL 60555
4300 Winfield Road  
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC
Warrenville, IL 60555  
              TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC  
              INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR  
Dear Mr. Hanson:
INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002
On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
Dear Mr. Hanson:  
of the Triennial Heat Sink Performance Inspection at your LaSalle County Station, Units 1 and
On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion  
2. This inspection will be performed in accordance with NRC Baseline Inspection Procedure
of the Triennial Heat Sink Performance Inspection at your LaSalle County Station, Units 1 and  
71111.07.
2. This inspection will be performed in accordance with NRC Baseline Inspection Procedure  
In order to minimize the impact that the inspection has on the site and to ensure a productive
71111.07.  
inspection, we have enclosed a request for documents needed for the inspection. The
In order to minimize the impact that the inspection has on the site and to ensure a productive  
documents have been divided into three groups.
inspection, we have enclosed a request for documents needed for the inspection. The  
    The first group lists information necessary for our initial inspection scoping activities.
documents have been divided into three groups.  
    This information should be available to the lead inspector no later than April 23, 2018.
    By May 4, 2018, the inspector will communicate the initial selected set of approximately
The first group lists information necessary for our initial inspection scoping activities.
    2-3 risk-significant heat exchangers.
This information should be available to the lead inspector no later than April 23, 2018.
    The second group is needed to support our in-office preparation activities. This set of
By May 4, 2018, the inspector will communicate the initial selected set of approximately  
    documents, including the calculations associated with the selected heat exchangers, should
2-3 risk-significant heat exchangers.  
    be available at the Regional Office no later than June 4, 2018. This information should be
    separated for each selected component, especially if provided electronically (e.g., folder with
The second group is needed to support our in-office preparation activities. This set of  
    component name that includes calculations, condition reports, maintenance history, etc.).
documents, including the calculations associated with the selected heat exchangers, should  
    During the in-office preparation activities, the inspector may identify additional information
be available at the Regional Office no later than June 4, 2018. This information should be  
    needed to support the inspection.
separated for each selected component, especially if provided electronically (e.g., folder with  
    The last group includes the additional information above as well as plant specific
component name that includes calculations, condition reports, maintenance history, etc.).
    reference material. This information should be available at the Regional Office no later than
During the in-office preparation activities, the inspector may identify additional information  
    June 11, 2018. It is also requested that corrective action documents and/or questions
needed to support the inspection.  
    developed during the inspection be provided to the inspector as the documents are
    generated during the inspection.
The last group includes the additional information above as well as plant specific  
All requested documents are to be for the time period from the onsite inspection period back
reference material. This information should be available at the Regional Office no later than  
to the documents that were provided in response to the previous Heat Sink Performance
June 11, 2018. It is also requested that corrective action documents and/or questions  
Inspection. If no activities were accomplished in that time period, then the request applies to the
developed during the inspection be provided to the inspector as the documents are  
last applicable document in the previous time period. It is important that these documents be as
generated during the inspection.  
complete as possible, in order to minimize the number of documents requested during the
All requested documents are to be for the time period from the onsite inspection period back  
preparation week or during the onsite inspection.
to the documents that were provided in response to the previous Heat Sink Performance  
Inspection. If no activities were accomplished in that time period, then the request applies to the  
last applicable document in the previous time period. It is important that these documents be as  
complete as possible, in order to minimize the number of documents requested during the  
preparation week or during the onsite inspection.  


B. Hanson                                     -2-
B. Hanson  
The lead inspector for this inspection is Vance Petrella. We understand that our licensing
-2-  
contact for this inspection is Terry Lanc of your organization. If there are any questions about
The lead inspector for this inspection is Vance Petrella. We understand that our licensing  
the inspection or the material requested in the enclosure, please contact the lead inspector at
contact for this inspection is Terry Lanc of your organization. If there are any questions about  
630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.
the inspection or the material requested in the enclosure, please contact the lead inspector at  
This letter does not contain new or amended information collection requirements subject
630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
This letter does not contain new or amended information collection requirements subject  
collection requirements were approved by the Office of Management and Budget, Control
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
collection requirements were approved by the Office of Management and Budget, Control  
respond to, a request for information or an information collection requirement unless the
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
requesting document displays a currently valid Office of Management and Budget Control
respond to, a request for information or an information collection requirement unless the  
Number.
requesting document displays a currently valid Office of Management and Budget Control  
This letter and its enclosure will be made available for public inspection and copying at
Number.  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
This letter and its enclosure will be made available for public inspection and copying at  
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                              Sincerely,
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.  
                                              /RA/
Sincerely,  
                                              Vance Petrella, Reactor Engineer
                                              Engineering Branch 2
/RA/  
                                              Division of Reactor Safety
Docket Nos. 50-373; 50-374
License Nos. NPF-11; NPF-18
Vance Petrella, Reactor Engineer  
Enclosure:
Engineering Branch 2  
Document Request for Triennial Heat Sink
Division of Reactor Safety  
   Performance Inspection
Docket Nos. 50-373; 50-374  
cc: Distribution via LISTSERV
License Nos. NPF-11; NPF-18  
Enclosure:  
Document Request for Triennial Heat Sink  
   Performance Inspection  
cc: Distribution via LISTSERV  


B. Hanson                                 -3-
B. Hanson  
Letter to Bryan C. Hanson from Vance Petrella dated March 23, 2018
-3-  
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC
Letter to Bryan C. Hanson from Vance Petrella dated March 23, 2018  
            TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC  
            INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002
TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR  
DISTRIBUTION:
INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002  
Jeremy Bowen
DISTRIBUTION:  
RidsNrrDorlLpl3
Jeremy Bowen  
RidsNrrPMLaSalle
RidsNrrDorlLpl3  
RidsNrrDirsIrib Resource
RidsNrrPMLaSalle  
Steven West
RidsNrrDirsIrib Resource  
Darrell Roberts
Steven West  
Richard Skokowski
Darrell Roberts  
Allan Barker
Richard Skokowski  
DRPIII
Allan Barker  
DRSIII
DRPIII  
ADAMS Accession Number ML: 18082B381
DRSIII  
  OFFICE RIII                   RIII               RIII           RIII
  NAME       VPetrella:cl
  DATE       03/23/18
                                OFFICIAL RECORD COPY
ADAMS Accession Number ML: 18082B381  
OFFICE  
RIII  
RIII  
RIII  
RIII  
NAME  
VPetrella:cl  
DATE  
03/23/18  
OFFICIAL RECORD COPY  


    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
Inspection Report:             05000373/2018002; 05000374/2018002
Enclosure
Inspection Dates:               June 18-22, 2018
Inspection Report:  
Inspection Procedure:           IP 71111.07, Heat Sink Performance
05000373/2018002; 05000374/2018002  
Lead Inspector:                 Vance Petrella
Inspection Dates:  
                                630-829-9847
June 18-22, 2018  
                                Vance.Petrella@nrc.gov
Inspection Procedure:  
Please provide the information electronically in pdf files, Excel, or other searchable formats,
IP 71111.07, Heat Sink Performance  
preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic
Lead Inspector:  
media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
Vance Petrella  
use. Information in lists should contain enough information to be easily understood by
630-829-9847  
someone who has knowledge of light water reactor technology.
Vance.Petrella@nrc.gov  
I.     Information Requested By April 23, 2018
Please provide the information electronically in pdf files, Excel, or other searchable formats,  
        1.     List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic  
              Safety-Related Equipment, heat exchangers in order of risk significance.
media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of  
        2.     Copy of heat exchanger performance trending data tracked for each GL 89-13
use. Information in lists should contain enough information to be easily understood by  
              heat exchanger.
someone who has knowledge of light water reactor technology.  
        3.     List of Corrective Action Program documents (with a short description)
I.  
              associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,
Information Requested By April 23, 2018  
              aging, heat exchanger testing, and safety-related service water systems for the
1.  
              previous 3 years or since the last Corrective Action Program document list was
List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting  
              sent to the NRC for the previous heat sink performance inspection. The list
Safety-Related Equipment, heat exchangers in order of risk significance.  
              should include all corrective action program documents not on the last Corrective
2.  
              Action Program document list.
Copy of heat exchanger performance trending data tracked for each GL 89-13  
        4.     Copy of any self-assessment done on any of GL 89-13 heat exchangers,
heat exchanger.  
              Ultimate Heat Sink (UHS), and safety-related service water systems since the
3.  
              last heat sink performance inspection.
List of Corrective Action Program documents (with a short description)  
        5.     Last two System Health Report(s) and maintenance rule system notebooks for all
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,  
              the GL 89-13 heat exchangers, UHS, and safety-related service water systems.
aging, heat exchanger testing, and safety-related service water systems for the  
        6.     List of engineering-related operator workarounds (with a short description)
previous 3 years or since the last Corrective Action Program document list was  
              associated with GL 89-13 heat exchangers. The requested documents are to be
sent to the NRC for the previous heat sink performance inspection. The list  
              for the time period from the onsite inspection period back to the documents that
should include all corrective action program documents not on the last Corrective  
              were provided in response to the previous heat sink performance inspection.
Action Program document list.  
        7.     List of permanent and temporary modifications (with a short description)
4.  
              associated with GL 89-13 heat exchangers, UHS, and safety-related service
Copy of any self-assessment done on any of GL 89-13 heat exchangers,  
              water systems. The requested documents are to be for the time period from the
Ultimate Heat Sink (UHS), and safety-related service water systems since the  
              onsite inspection period back to the documents that were provided in response to
last heat sink performance inspection.  
              the previous heat sink performance inspection.
5.  
                                                                                          Enclosure
Last two System Health Report(s) and maintenance rule system notebooks for all  
the GL 89-13 heat exchangers, UHS, and safety-related service water systems.  
6.  
List of engineering-related operator workarounds (with a short description)  
associated with GL 89-13 heat exchangers. The requested documents are to be  
for the time period from the onsite inspection period back to the documents that  
were provided in response to the previous heat sink performance inspection.  
7.  
List of permanent and temporary modifications (with a short description)  
associated with GL 89-13 heat exchangers, UHS, and safety-related service  
water systems. The requested documents are to be for the time period from the  
onsite inspection period back to the documents that were provided in response to  
the previous heat sink performance inspection.  


    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
      8.   Electronic copies of the current Final Safety Analysis Report, Technical
2
            Specifications, Technical Specifications Basis, and Technical Report Manual.
8.  
      9.   List of enhancements and/or commitments made during license renewal for
Electronic copies of the current Final Safety Analysis Report, Technical  
            GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
Specifications, Technical Specifications Basis, and Technical Report Manual.
            water systems (as applicable).
9.  
II.   Information Requested By June 4, 2018
List of enhancements and/or commitments made during license renewal for  
      1.   Copies of the GL 89-13 responses.
GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling  
      2.   Copies of procedures developed to implement the recommendations of GL 89-13
water systems (as applicable).
            (e.g., the GL 89-13 Heat Exchanger Program description).
II.  
      3.   Copies of the selected corrective action program documents.
Information Requested By June 4, 2018  
      4.   For the specific heat exchangers selected:
1.  
            a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections
Copies of the GL 89-13 responses.
                applicable for each heat exchanger.
2.  
            b. Copy of system description and design basis document for the heat
Copies of procedures developed to implement the recommendations of GL 89-13  
                exchangers (as applicable).
(e.g., the GL 89-13 Heat Exchanger Program description).
            c. Provide the calculations or evaluations that:
3.  
                  i. establish the limiting design basis heat load required to be removed by
Copies of the selected corrective action program documents.  
                    each of these heat exchangers;
4.  
                ii. demonstrate the heat exchangers capacity to remove the limiting heat
For the specific heat exchangers selected:  
                    load;
a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections  
                iii. correlate surveillance testing and/or inspection results from these heat
applicable for each heat exchanger.  
                    exchangers with design basis heat removal capability (e.g., basis for
b. Copy of system description and design basis document for the heat  
                    surveillance test and/or inspection acceptance criteria);
exchangers (as applicable).  
                iv. evaluate the potential for water hammer in each heat exchanger or
c. Provide the calculations or evaluations that:  
                    associated piping; and
i. establish the limiting design basis heat load required to be removed by  
                v. evaluate excessive tube vibration in each heat exchanger.
each of these heat exchangers;  
            d. Copy of any operability determinations or other documentation of degradation
ii. demonstrate the heat exchangers capacity to remove the limiting heat  
                associated with the heat exchangers or the systems that support the
load;  
                operation for the selected heat exchangers.
iii. correlate surveillance testing and/or inspection results from these heat  
            e. Copy of the construction code, design specification, heat exchanger data
exchangers with design basis heat removal capability (e.g., basis for  
                sheets, and vendor documents including component drawings applicable for
surveillance test and/or inspection acceptance criteria);  
                the heat exchangers.
iv. evaluate the potential for water hammer in each heat exchanger or  
            f.   Copies of normal, abnormal, and emergency operating procedures
associated piping; and
                associated with the selected heat exchangers.
v. evaluate excessive tube vibration in each heat exchanger.  
                                                2
d. Copy of any operability determinations or other documentation of degradation  
associated with the heat exchangers or the systems that support the  
operation for the selected heat exchangers.  
e. Copy of the construction code, design specification, heat exchanger data  
sheets, and vendor documents including component drawings applicable for  
the heat exchangers.  
f. Copies of normal, abnormal, and emergency operating procedures  
associated with the selected heat exchangers.  


DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
      g. Copies of the Aging Management Programs (AMP) and the implementing
3
          procedures that manage aging of the selected heat exchangers (as
g. Copies of the Aging Management Programs (AMP) and the implementing  
          applicable).
procedures that manage aging of the selected heat exchangers (as  
  5. For the UHS and the safety-related service water system (or equivalent):
applicable).
      a. Copies of the applicable UFSAR sections.
5.  
      b. Copy of system description and design basis document (as applicable).
For the UHS and the safety-related service water system (or equivalent):  
      c. Copy of any operability determinations or other documentation of degradation
a. Copies of the applicable UFSAR sections.  
          associated with the UHS and the safety-related service water system.
b. Copy of system description and design basis document (as applicable).  
      d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
c. Copy of any operability determinations or other documentation of degradation  
          states the maximum cooling water system inlet temperature limit that still
associated with the UHS and the safety-related service water system.  
          allows full licensed power operation of the nuclear reactor.
d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that  
      e. Copy of system description and design basis document (as applicable).
states the maximum cooling water system inlet temperature limit that still  
      f. Copy of the construction code and design specification.
allows full licensed power operation of the nuclear reactor.  
      g. Copies of normal, abnormal, and emergency operating procedures
e. Copy of system description and design basis document (as applicable).  
          associated with the UHS and safety-related service water systems including
f. Copy of the construction code and design specification.  
          procedures for loss of these systems.
g. Copies of normal, abnormal, and emergency operating procedures  
      h. Copies of corrective action documents associated with waterhammer or
associated with the UHS and safety-related service water systems including  
          hydraulic transients in the service water system since the last Heat Sink
procedures for loss of these systems.  
          Inspection.
h. Copies of corrective action documents associated with waterhammer or  
      i. If available, provide an electronic copy of piping and instrumentation
hydraulic transients in the service water system since the last Heat Sink  
          diagrams for the service water system, including the intake structure.
Inspection.  
      j. Provide a list of calculations (with a short description), which currently apply
i.  
          to UHS and safety-related service water system.
If available, provide an electronic copy of piping and instrumentation  
      k. Provide a list of instruments (with a short description) associated with
diagrams for the service water system, including the intake structure.  
          automatic or alarm functions for the safety-related service water system
j.  
          and/or UHS.
Provide a list of calculations (with a short description), which currently apply  
      l. Provide a list of any design change (with a short description) performed on
to UHS and safety-related service water system.  
          the UHS or safety-related service water system since the last heat sink
k. Provide a list of instruments (with a short description) associated with  
          performance inspection.
automatic or alarm functions for the safety-related service water system  
      m. Copies of the AMPs and the implementing procedures that manage aging of
and/or UHS.  
          the UHS (including the intake structure) and the safety-related service and
l.  
          closed cooling water systems (as applicable).
Provide a list of any design change (with a short description) performed on  
  6. A schedule of all inspections, cleanings, maintenance, or testing of any
the UHS or safety-related service water system since the last heat sink  
      safety-related plant heat exchanger to be performed during the onsite portion
performance inspection.  
      of the inspection.
m. Copies of the AMPs and the implementing procedures that manage aging of  
                                          3
the UHS (including the intake structure) and the safety-related service and  
closed cooling water systems (as applicable).
6.  
A schedule of all inspections, cleanings, maintenance, or testing of any  
safety-related plant heat exchanger to be performed during the onsite portion  
of the inspection.  


    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
III.   Information Requested By June 11, 2018
4
      1.   For the specific heat exchangers selected.
III.  
            a. Copies of the two most recent completed tests and evaluation data
Information Requested By June 11, 2018  
                confirming thermal performance for those heat exchangers which are
1.  
                performance tested.
For the specific heat exchangers selected.  
            b. Documentation and procedures that identify the types, accuracy, and location
a. Copies of the two most recent completed tests and evaluation data  
                of any special instrumentation used for the two most recently completed
confirming thermal performance for those heat exchangers which are  
                thermal performance tests for the heat exchangers (e.g., high accuracy
performance tested.  
                ultrasonic flow instruments or temperature instruments). Include calibration
b. Documentation and procedures that identify the types, accuracy, and location  
                records for the instruments used during these tests.
of any special instrumentation used for the two most recently completed  
            c. Information regarding any alarms which monitor on-line performance.
thermal performance tests for the heat exchangers (e.g., high accuracy  
            d. Copy of the document describing the inspection results of each heat
ultrasonic flow instruments or temperature instruments). Include calibration  
                exchanger. The requested documents are to be for the time period from the
records for the instruments used during these tests.  
                onsite inspection period back to the documents that were provided in
c. Information regarding any alarms which monitor on-line performance.  
                response to the previous heat sink performance inspection.
d. Copy of the document describing the inspection results of each heat  
            e. The cleaning and inspection maintenance schedule for each heat exchanger
exchanger. The requested documents are to be for the time period from the  
                for the next 5 years.
onsite inspection period back to the documents that were provided in  
            f. Copy of the operating procedure that ensures that the maximum cooling
response to the previous heat sink performance inspection.  
                water system inlet temperature limit is not exceeded.
e. The cleaning and inspection maintenance schedule for each heat exchanger  
            g. The documents that describe the controls that prevent heat exchanger
for the next 5 years.    
                degradation due to excessive flow induced vibration during operation.
f. Copy of the operating procedure that ensures that the maximum cooling  
            h. Copy of the periodic flow testing at or near maximum design flow. The
water system inlet temperature limit is not exceeded.  
                requested documents are to be for the time period from the onsite inspection
g. The documents that describe the controls that prevent heat exchanger  
                period back to the documents that were provided in response to the previous
degradation due to excessive flow induced vibration during operation.  
                heat sink performance inspection.
h. Copy of the periodic flow testing at or near maximum design flow. The  
            i. Copy of the document which identifies the current number of tubes in service
requested documents are to be for the time period from the onsite inspection  
                for each heat exchanger and the supporting calculation which establishes the
period back to the documents that were provided in response to the previous  
                maximum number of tubes which can be plugged in each heat exchanger.
heat sink performance inspection.  
            j. Copy of the document establishing the repair criteria (plugging limit) for
i.  
                degraded tubes which are identified in each heat exchanger.
Copy of the document which identifies the current number of tubes in service  
            k. Copies of the documents that verify the structural integrity of the heat
for each heat exchanger and the supporting calculation which establishes the  
                exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and
maximum number of tubes which can be plugged in each heat exchanger.  
                visual inspection results).
j.  
            l. Copies of those documents that describe the methods taken to control water
Copy of the document establishing the repair criteria (plugging limit) for  
                chemistry in the heat exchangers, including those credited by any AMPs (as
degraded tubes which are identified in each heat exchanger.  
                applicable).
k. Copies of the documents that verify the structural integrity of the heat  
                                              4
exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and  
visual inspection results).    
l.  
Copies of those documents that describe the methods taken to control water  
chemistry in the heat exchangers, including those credited by any AMPs (as  
applicable).


DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
      m. Copies of any credited AMP monitoring/inspection results for the selected
5
          heat exchangers (as applicable). The requested documents are to be for any
m. Copies of any credited AMP monitoring/inspection results for the selected  
          completed monitoring/inspection in the time period from the onsite inspection
heat exchangers (as applicable). The requested documents are to be for any  
          period back to the documents that were provided in response to the previous
completed monitoring/inspection in the time period from the onsite inspection  
          heat sink performance inspection.
period back to the documents that were provided in response to the previous  
  2. For the UHS:
heat sink performance inspection.
      a. Copies of the inspection procedures for the verification of the structural
2.  
          integrity of underwater UHS and the associated results. The requested
For the UHS:  
          documents are to be for the time period from the onsite inspection period
a. Copies of the inspection procedures for the verification of the structural  
          back to the documents that were provided in response to the previous heat
integrity of underwater UHS and the associated results. The requested  
          sink performance inspection.
documents are to be for the time period from the onsite inspection period  
      b. Copies of the maintenance and/or inspection procedures for underwater UHS
back to the documents that were provided in response to the previous heat  
          sediment intrusion and the associated results including underwater diving
sink performance inspection.  
          inspections and/or sediment removal activities. The requested documents
b. Copies of the maintenance and/or inspection procedures for underwater UHS  
          are to be for the time period from the onsite inspection period back to the
sediment intrusion and the associated results including underwater diving  
          documents that were provided in response to the previous heat sink
inspections and/or sediment removal activities. The requested documents  
          performance inspection.
are to be for the time period from the onsite inspection period back to the  
      c. Copies of calculations and surveillances that determine the UHS reservoir
documents that were provided in response to the previous heat sink  
          capacity and heat transfer capability.
performance inspection.  
      d. Copies of surveillance procedures and testing results performed on the
c. Copies of calculations and surveillances that determine the UHS reservoir  
          instrumentation relied upon to determine UHS reservoir capability. The
capacity and heat transfer capability.  
          requested documents are to be for the time period from the onsite inspection
d. Copies of surveillance procedures and testing results performed on the  
          period back to the documents that were provided in response to the previous
instrumentation relied upon to determine UHS reservoir capability. The  
          heat sink performance inspection.
requested documents are to be for the time period from the onsite inspection  
  3. For the review associated with the system walkdown of the service water intake
period back to the documents that were provided in response to the previous  
      structure:
heat sink performance inspection.  
      a. Copies of corrective maintenance for the last 6 years associated with service
3.  
          water strainers, traveling screens and trash racks.
For the review associated with the system walkdown of the service water intake  
      b. Copies of the last two inspections and/or surveillances associated with
structure:  
          service water strainers, traveling screens and trash racks.
a. Copies of corrective maintenance for the last 6 years associated with service  
      c. List of preventive maintenance, including frequency, associated with service
water strainers, traveling screens and trash racks.  
          water strainers, traveling screens and trash racks.
b. Copies of the last two inspections and/or surveillances associated with  
      d. Copies of abnormal procedures for the traveling screens and service water
service water strainers, traveling screens and trash racks.  
          strainers.
c. List of preventive maintenance, including frequency, associated with service  
      e. Copies of the last two inspections and/or surveillances documenting that
water strainers, traveling screens and trash racks.  
          component mounts have not excessively degraded (i.e., due to corrosion).
d. Copies of abnormal procedures for the traveling screens and service water  
          For example, inspections for the mounts for the, Service water pumps,
strainers.
          service water strainers, traveling screens and trash racks.
e. Copies of the last two inspections and/or surveillances documenting that  
      f. Copies of the documents associated with the monitoring, trending, and
component mounts have not excessively degraded (i.e., due to corrosion).
          remediation of silt accumulation at the service water pump bay.
For example, inspections for the mounts for the, Service water pumps,  
                                        5
service water strainers, traveling screens and trash racks.  
f. Copies of the documents associated with the monitoring, trending, and  
remediation of silt accumulation at the service water pump bay.  


    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
                g. Copies of surveillance procedures and testing results performed on the
6
                    service water pump bay water level instruments. The requested documents
g. Copies of surveillance procedures and testing results performed on the  
                    are to be for the time period from the onsite inspection period back to the
service water pump bay water level instruments. The requested documents  
                    documents that were provided in response to the previous heat sink
are to be for the time period from the onsite inspection period back to the  
                    performance inspection.
documents that were provided in response to the previous heat sink  
                h. Copies of procedures associated with operating during adverse weather
performance inspection.  
                    conditions (e.g. icing, high temperatures, or low level).
h. Copies of procedures associated with operating during adverse weather  
                i. Copy of the evaluation for the potential effects of low flow/level on underwater
conditions (e.g. icing, high temperatures, or low level).  
                    weir walls intended to limit silt or sand intake, if applicable.
i.  
                j. Copies of any credited AMP monitoring/inspection results for the
Copy of the evaluation for the potential effects of low flow/level on underwater  
                    safety-related service and closed cooling water systems, and the UHS (as
weir walls intended to limit silt or sand intake, if applicable.  
                    applicable). The requested documents are to be for any completed
j.  
                    monitoring/inspection in the time period from the onsite inspection period
Copies of any credited AMP monitoring/inspection results for the  
                    back to the documents that were provided in response to the previous heat
safety-related service and closed cooling water systems, and the UHS (as  
                    sink performance inspection.
applicable). The requested documents are to be for any completed  
If the information requested above will not be available, please contact Vance Petrella as soon
monitoring/inspection in the time period from the onsite inspection period  
back to the documents that were provided in response to the previous heat  
sink performance inspection.
If the information requested above will not be available, please contact Vance Petrella as soon  
as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.
as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.
                                                    6
}}
}}

Latest revision as of 05:29, 6 January 2025

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2018002; 05000374/2018002 (DRS-V.Petrella)
ML18082B381
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/23/2018
From: Vance Petrella
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018002
Download: ML18082B381 (9)


See also: IR 05000373/2018002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

March 23, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002

Dear Mr. Hanson:

On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion

of the Triennial Heat Sink Performance Inspection at your LaSalle County Station, Units 1 and

2. This inspection will be performed in accordance with NRC Baseline Inspection Procedure

71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than April 23, 2018.

By May 4, 2018, the inspector will communicate the initial selected set of approximately

2-3 risk-significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers, should

be available at the Regional Office no later than June 4, 2018. This information should be

separated for each selected component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance history, etc.).

During the in-office preparation activities, the inspector may identify additional information

needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available at the Regional Office no later than

June 11, 2018. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated during the inspection.

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

B. Hanson

-2-

The lead inspector for this inspection is Vance Petrella. We understand that our licensing

contact for this inspection is Terry Lanc of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Vance Petrella, Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Document Request for Triennial Heat Sink

Performance Inspection

cc: Distribution via LISTSERV

B. Hanson

-3-

Letter to Bryan C. Hanson from Vance Petrella dated March 23, 2018

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18082B381

OFFICE

RIII

RIII

RIII

RIII

NAME

VPetrella:cl

DATE

03/23/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

Inspection Report: 05000373/2018002; 05000374/2018002

Inspection Dates:

June 18-22, 2018

Inspection Procedure:

IP 71111.07, Heat Sink Performance

Lead Inspector:

Vance Petrella

630-829-9847

Vance.Petrella@nrc.gov

Please provide the information electronically in pdf files, Excel, or other searchable formats,

preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic

media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

I.

Information Requested By April 23, 2018

1.

List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2.

Copy of heat exchanger performance trending data tracked for each GL 89-13

heat exchanger.

3.

List of Corrective Action Program documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,

aging, heat exchanger testing, and safety-related service water systems for the

previous 3 years or since the last Corrective Action Program document list was

sent to the NRC for the previous heat sink performance inspection. The list

should include all corrective action program documents not on the last Corrective

Action Program document list.

4.

Copy of any self-assessment done on any of GL 89-13 heat exchangers,

Ultimate Heat Sink (UHS), and safety-related service water systems since the

last heat sink performance inspection.

5.

Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers, UHS, and safety-related service water systems.

6.

List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

7.

List of permanent and temporary modifications (with a short description)

associated with GL 89-13 heat exchangers, UHS, and safety-related service

water systems. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response to

the previous heat sink performance inspection.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

2

8.

Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, and Technical Report Manual.

9.

List of enhancements and/or commitments made during license renewal for

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems (as applicable).

II.

Information Requested By June 4, 2018

1.

Copies of the GL 89-13 responses.

2.

Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3.

Copies of the selected corrective action program documents.

4.

For the specific heat exchangers selected:

a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections

applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat

exchangers (as applicable).

c. Provide the calculations or evaluations that:

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the

operation for the selected heat exchangers.

e. Copy of the construction code, design specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for

the heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures

associated with the selected heat exchangers.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

3

g. Copies of the Aging Management Programs (AMP) and the implementing

procedures that manage aging of the selected heat exchangers (as

applicable).

5.

For the UHS and the safety-related service water system (or equivalent):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still

allows full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

f. Copy of the construction code and design specification.

g. Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems including

procedures for loss of these systems.

h. Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

i.

If available, provide an electronic copy of piping and instrumentation

diagrams for the service water system, including the intake structure.

j.

Provide a list of calculations (with a short description), which currently apply

to UHS and safety-related service water system.

k. Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

l.

Provide a list of any design change (with a short description) performed on

the UHS or safety-related service water system since the last heat sink

performance inspection.

m. Copies of the AMPs and the implementing procedures that manage aging of

the UHS (including the intake structure) and the safety-related service and

closed cooling water systems (as applicable).

6.

A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion

of the inspection.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

4

III.

Information Requested By June 11, 2018

1.

For the specific heat exchangers selected.

a. Copies of the two most recent completed tests and evaluation data

confirming thermal performance for those heat exchangers which are

performance tested.

b. Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

records for the instruments used during these tests.

c. Information regarding any alarms which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat

exchanger. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

e. The cleaning and inspection maintenance schedule for each heat exchanger

for the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

g. The documents that describe the controls that prevent heat exchanger

degradation due to excessive flow induced vibration during operation.

h. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

i.

Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

j.

Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger.

k. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and

visual inspection results).

l.

Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers, including those credited by any AMPs (as

applicable).

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

5

m. Copies of any credited AMP monitoring/inspection results for the selected

heat exchangers (as applicable). The requested documents are to be for any

completed monitoring/inspection in the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

2.

For the UHS:

a. Copies of the inspection procedures for the verification of the structural

integrity of underwater UHS and the associated results. The requested

documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat

sink performance inspection.

b. Copies of the maintenance and/or inspection procedures for underwater UHS

sediment intrusion and the associated results including underwater diving

inspections and/or sediment removal activities. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

c. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

d. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

3.

For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years associated with service

water strainers, traveling screens and trash racks.

b. Copies of the last two inspections and/or surveillances associated with

service water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service water

strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion).

For example, inspections for the mounts for the, Service water pumps,

service water strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

6

g. Copies of surveillance procedures and testing results performed on the

service water pump bay water level instruments. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g. icing, high temperatures, or low level).

i.

Copy of the evaluation for the potential effects of low flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

j.

Copies of any credited AMP monitoring/inspection results for the

safety-related service and closed cooling water systems, and the UHS (as

applicable). The requested documents are to be for any completed

monitoring/inspection in the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat

sink performance inspection.

If the information requested above will not be available, please contact Vance Petrella as soon

as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.