ML18204A085: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:P 5 S~Q~f..g Washin on Public Power Supply Syst~A JOINT OPERATING AGENCY P O BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONC(5091 946~1611 December 9, 1976 G02-76-540 Nuclear Regulatory Commission Region V Suite 202, Walnut Creek Plaza 1900 N.California Boulevard Walnut Creek, California 94596~C~"o.o~o<j-'""<wy v'~-Cg I Attention:
{{#Wiki_filter:P 5S
Mr.R.H.Engelken Director  
~ Q~f..g Washin on Public Power Supply Syst~
A JOINT OPERATING AGENCY P
O BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONC(5091 946 ~ 1611 December 9,
1976 G02-76-540 Nuclear Regulatory Commission Region V
Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596
~C~ "o.o~o<
j-'""<wy v'
~-
Cg I
Attention:
Mr. R.
H. Engelken Director


==Subject:==
==Subject:==
WPPSS NUCLEAR PROJECT NO.2 IE CIRCULAR NO.76-05 DOCKET NUMBER 50-397  
WPPSS NUCLEAR PROJECT NO.
2 IE CIRCULAR NO. 76-05 DOCKET NUMBER 50-397


==Reference:==
==Reference:==
Letter, R.H.
Engelken to J.J.
: Stein, same subject, dated October 8, 1976


Letter, R.H.Engelken to J.J.Stein, same subject, dated October 8, 1976
==Dear Mr. Engelken:==
 
The Supply System has requested our A/E to review the appli-cability of the subject circular to Project WNP-2.
==Dear Mr.Engelken:==
Our A/E reports that IE Circular 76-02 does not apply to WNP-2, since shock suppressors of the hydraulic type are not utilized for this project.
The Supply System has requested our A/E to review the appli-cability of the subject circular to Project WNP-2.Our A/E reports that IE Circular 76-02 does not apply to WNP-2, since shock suppressors of the hydraulic type are not utilized for this project.Very truly yours, DLR:GLC:ho D.L.RENBERGER Assistant Director Gener ation and Technology cc: Mr.D.iRoe-Bon'neville Power Administration NRC-Office of Inspection 5 Enforcement (Washington, D.C.)}}
Very truly yours, DLR:GLC:ho D. L.
RENBERGER Assistant Director Gener ation and Technology cc:
Mr. D.iRoe - Bon'neville Power Administration NRC - Office of Inspection 5 Enforcement (Washington, D.C.)}}

Latest revision as of 17:13, 5 January 2025

Concerning IE Circular 76-02, Shock Suppressors of the Hydraulic Type Are Not Used for Project WNP-2
ML18204A085
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 12/09/1976
From: Renberger D
Washington Public Power Supply System
To: Engelken R
NRC/RGN-V
References
IEC-76-02
Download: ML18204A085 (1)


Text

P 5S

~ Q~f..g Washin on Public Power Supply Syst~

A JOINT OPERATING AGENCY P

O BOX 968 3000 GEO, WASHINGTON WAY RICHLAND, WASHINGTON 99352 PHONC(5091 946 ~ 1611 December 9,

1976 G02-76-540 Nuclear Regulatory Commission Region V

Suite 202, Walnut Creek Plaza 1900 N. California Boulevard Walnut Creek, California 94596

~C~ "o.o~o<

j-'""<wy v'

~-

Cg I

Attention:

Mr. R.

H. Engelken Director

Subject:

WPPSS NUCLEAR PROJECT NO.

2 IE CIRCULAR NO. 76-05 DOCKET NUMBER 50-397

Reference:

Letter, R.H.

Engelken to J.J.

Stein, same subject, dated October 8, 1976

Dear Mr. Engelken:

The Supply System has requested our A/E to review the appli-cability of the subject circular to Project WNP-2.

Our A/E reports that IE Circular 76-02 does not apply to WNP-2, since shock suppressors of the hydraulic type are not utilized for this project.

Very truly yours, DLR:GLC:ho D. L.

RENBERGER Assistant Director Gener ation and Technology cc:

Mr. D.iRoe - Bon'neville Power Administration NRC - Office of Inspection 5 Enforcement (Washington, D.C.)