ML18219E097: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(StriderTol Bot change)
 
Line 17: Line 17:
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)
{{#Wiki_filter:NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
CONTROL NO:
FILE'ROM American   Electric   Pwr     DATE OF DOC        DATE REC'D      LTR    TWX          RPT        OTHE R New York,   NY                   2-26-75         3-4-75 TO:                                             ORIG         CC   OTHER       SENT AEC PDR Mr Giambusso                    one signed CLASS     UNCLASS         PROPINFO             INPUT       NO CYS REC'D         DOCKET NO:
FILE'ROM American Electric Pwr New York, NY DATE OF DOC 2-26-75 DATE REC'D 3-4-75 LTR TWX RPT OTHE R TO:
1              50-315 DESCRIPTION:                                                ENCLOSURES:
Mr Giambusso ORIG one signed CC OTHER SENT AEC PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D 1
Ltr trans     the following;                                 Reactor Containment Buklding Integrated Leak Rate Test (Pre-Operational........
DOCKET NO:
pm e~          -<-+                          (15 cys encl   rec'd) p ~)-
50-315 DESCRIPTION:
PLANT NAME:       D C Dook fP1 FOR ACTION/INFORMATION             3-<-75             ehf BUTLER (L)               SCHWENCER (L) ZIEMANN (L)                 REGAN (E)
Ltr trans the following; p ~)-
W/ Copies               W/ Copies            W/ Copies             W/ Copies CLARK (L)                STOLZ (L(           DICKER (EI           LEAR (L(     ((lJQQQg               pppf(p((rr(
pm e~ -<-+
W/ Copies               W/ Copies            W/ Copies             W/ Copies PARR (L)                  VASSALLO (L)         KNIGHTON (E)         SPE LS         )y, W/ Copies               W/ Copies           W/ Copies                                              "'
ENCLOSURES:
NIEL (L)                PURPLE (L)           YOUNGBLOOD (E)         g. Sen~ J~+                         ~r'>':-~'.~5 W/t Copies               W/ Copies           W/ Copies             W/ Copies INTERNAL DISTRIBUTION EG Fl                   TECH REVIEW          DENTON                LIC ASST                      A/T IND-OGC, ROOM P-506A SCHROEDER MACCARY
Reactor Containment Buklding Integrated Leak Rate Test (Pre-Operational........
                                            ~   G R IMESt'a)
(15 cys encl rec'd)
GAMM ILL R. DIGGS (L)
PLANT NAME:
D C Dook fP1 FOR ACTION/INFORMATION 3-<-75 ehf BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies NIEL (L)
W/t Copies SCHWENCER (L)
ZIEMANN (L)
REGAN (E)
W/ Copies W/ Copies W/ Copies STOLZ (L(
DICKER (EI LEAR (L(
((lJQQQg pppf(p((rr(
W/ Copies W/ Copies W/ Copies VASSALLO (L)
KNIGHTON (E)
SPE LS
)y, W/ Copies W/ Copies PURPLE (L)
YOUNGBLOOD (E)
: g. Sen~ J~+
~r'>':-~'.~5 W/ Copies W/ Copies W/ Copies INTERNALDISTRIBUTION EG Fl OGC, ROOM P-506A GOSSI CK/STAF F CASE G IAMBUSSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE REG OPR F I LE 5 R EG ION (2)
T.R. WILSON STEE LE TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLO HOUSTON NOVAK ROSS
~ IPPOLITO TEDESCO LONG ALAINAS(Z)
BENAROYA VOLLMER DENTON
~ G R IMESt'a)
GAMM ILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD REGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)
H. GEARIN (L)
H. GEARIN (L)
BRAITMAN SA LTZMAN GOSSI CK/STA F F          KNIGHT              KASTNER          E. GOULBOURNE (L)                 ME LTZ CASE                      PAWLICKI            BALLARD          P. KREUTZER (E)
E. GOULBOURNE (L)
G I AMBUSSO              SHAO                SPANGLER          J. LEE (L)                         PLANS BOYD                      STE LLO                                M. MAIGRET (L)                     MCDONALD MOORE (L)                HOUSTON              ENVI RO          S. REED (E)                       CHAPMAN DEYOUNG (L)              NOVAK                MULLER            M. SERVICE (L)                     DUBE (Ltr).
P. KREUTZER (E)
SKOVHOLT (L)              ROSS                DICKER            S. SHEPPARD (L)                   E. COUPE GOLLER (L) (Ltr)
J. LEE (L)
P. COLLINS
M. MAIGRET (L)
                        ~  IPPOLITO TEDESCO KNIGHTON YOUNG B LOOD M. SLATER (E)
S. REED (E)
M. SERVICE (L)
S. SHEPPARD (L)
M. SLATER (E)
H. SMITH (L)
H. SMITH (L)
PETERSON HARTFIELD (2)
S. TEETS (L)
DENISE                    LONG                REGAN            S. TEETS (L)                       KLECKER REG OPR                ALAINAS(Z)            PROJECT LDR      G. WILLIAMS(F-)                   EISENHUT F I LE 5 R EG ION (2)    BENAROYA                              V'. WILSON (I.)                   W I GG INTO N T.R. WILSON              VOLLMER              HAR LESS          R. INGRAM (L)
G. WILLIAMS(F-)
STEE LE EXTERNAL DISTRIBUTION
V'. WILSON (I.)
~1 LOCAL PDR~75$ %                                                                 P D R-SAN/LA/NY 1 TIC (ABERNATHY) (1)(2)(10) NATIONALLABS                                     1 NSIC (BUCHANAN)                 1 W. PENNINGTON,     Rm E-201 GT         1 BROOKHAVEN NAT LAB 1
R. INGRAM (L)
1  ASLB                            1  CONSULTANTS                             1 G. ULRIKSON, ORNL 1 Newton Anderson                       NEWMARK/BLUME/AGBABIAN                 1 AGMED (RUTH GUSSMAN)
A/T IND-BRAITMAN SA LTZMAN ME LTZ PLANS MCDONALD CHAPMAN DUBE (Ltr).
Rm B-127 GT
E. COUPE PETERSON HARTFIELD (2)
~+ ACRS HQ4%44i/SENT                                                                J.         D. RUNKLES, Rm E-201 gO <,A. gZWu(cg                                                            1 GT
KLECKER EISENHUT W IGG INTO N EXTERNALDISTRIBUTION
~1 LOCALPDR~75$ %
1 TIC (ABERNATHY)
(1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWMARK/BLUME/AGBABIAN
~+ACRS HQ4%44i/SENT gO <,A. gZWu(cg 1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH GUSSMAN)
Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT


~ ~ o ~ e o ~ u E
~
~
o
~
e o
~
u E


AMERICAN ELECTRIC POWER Service Corp o r ati o n CO 2 Broadway, New     York, N. Y. 10004 ROBERT S. HUNTER VICC RRCCIDCNT NVCI.CAR CN4INCCRIN4
AMERICAN ELECTRIC POWER Service Corp o rati o n CO 2 Broadway, New York, N. Y. 10004 ROBERT S. HUNTER VICC RRCCIDCNT NVCI.CAR CN4INCCRIN4
                                                                                                              ~~gg St%
~ASCII(atOPj Qlo 'PV
Qlo  'PV
~~gg St%
                                                                                                                  @JllW
@JllW Docket No.
                                                            ~ASCII(atOPj Docket No.                 50-318'PR No. 58                                                                     February 26, 1975 Mr. A. Giambusso,                       Deputy Director
50-318'PR No. 58 February 26, 1975 Mr. A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing U.S; Nuclear Regulatory Commission Washington, D.C.
                                                                              ~~'~                      ~
20555
for     Reactor Projects Directorate of Licensing                                           g g gg"pygmy QCGCLATOBY GctlBISSIO U.S; Nuclear Regulatory Commission Washington, D.C. 20555
                                                                                    ~    7(i


==Dear Mr. Giambusso:==
==Dear Mr. Giambusso:==
~~'~ ~
g g gg"pygmy QCGCLATOBY GctlBISSIO
~ 7(i Contained herein are fifteen (15) copies of the American Electric Power Service Corporation report "Reactor Containment Building Integrated Leak Rate Test (Pre-Operational)" for the Donald C.
Cook Nuclear Plant'Unit 1:
'This test was successfully completed on November 24, 1974 by personnel of the Indiana and Michigan Power Company and the American Electric Power'Service Corporation.
By submittal of this report, all requirements set'forth in 10CFR50, Appendix J are satisfied with respect to the pre-operational contain-ment integrated leak rate test for'Unit l.
Very truly yours, RSH kb cc:
Gerald Charnoff Ronald C. Callen Peter Steketee'obertJ; Vollen Richard Walsh R.
W. Jurgensen
- Bridgman R. S. Hunter


Contained herein are                  fifteen  (15) copies of the American Electric        Power Service Corporation                    report "Reactor Containment Building        Integrated Leak Rate Test                    (Pre-Operational)" for the Donald C. Cook Nuclear Plant'Unit 1:                            'This test was successfully completed on November 24, 1974 by personnel                          of the Indiana and Michigan Power Company and the American Electric                          Power'Service Corporation.              By submittal of this report, all requirements set'forth in 10CFR50, Appendix J are satisfied with respect to the pre-operational contain-ment integrated leak rate test for'Unit l.
~<'
Very    truly yours, R. S.      Hunter RSH    kb cc:      Gerald Charnoff Ronald C. Callen Peter J; Vollen Steketee'obert Richard Walsh R. W. Jurgensen                  - Bridgman
~
 
~
      ~
~
                        ~
1 1
                    ~ ~
4 l
1 b
b 1
1 4
l1 I
* l 1
II}}
l1 I II}}

Latest revision as of 15:29, 5 January 2025

Enclosed Report, Reactor Containment Building Integrated Leak Rate Test (Pre-Operational), for Donald C. Cook Nuclear Plant Unit 1
ML18219E097
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 02/26/1975
From: Hunter R
American Electric Power Service Corp
To: Anthony Giambusso
Office of Nuclear Reactor Regulation
References
Download: ML18219E097 (4)


Text

NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)

CONTROL NO:

FILE'ROM American Electric Pwr New York, NY DATE OF DOC 2-26-75 DATE REC'D 3-4-75 LTR TWX RPT OTHE R TO:

Mr Giambusso ORIG one signed CC OTHER SENT AEC PDR CLASS UNCLASS PROPINFO INPUT NO CYS REC'D 1

DOCKET NO:

50-315 DESCRIPTION:

Ltr trans the following; p ~)-

pm e~ -<-+

ENCLOSURES:

Reactor Containment Buklding Integrated Leak Rate Test (Pre-Operational........

(15 cys encl rec'd)

PLANT NAME:

D C Dook fP1 FOR ACTION/INFORMATION 3-<-75 ehf BUTLER (L)

W/ Copies CLARK (L)

W/ Copies PARR (L)

W/ Copies NIEL (L)

W/t Copies SCHWENCER (L)

ZIEMANN (L)

REGAN (E)

W/ Copies W/ Copies W/ Copies STOLZ (L(

DICKER (EI LEAR (L(

((lJQQQg pppf(p((rr(

W/ Copies W/ Copies W/ Copies VASSALLO (L)

KNIGHTON (E)

SPE LS

)y, W/ Copies W/ Copies PURPLE (L)

YOUNGBLOOD (E)

g. Sen~ J~+

~r'>':-~'.~5 W/ Copies W/ Copies W/ Copies INTERNALDISTRIBUTION EG Fl OGC, ROOM P-506A GOSSI CK/STAF F CASE G IAMBUSSO BOYD MOORE (L)

DEYOUNG (L)

SKOVHOLT (L)

GOLLER (L) (Ltr)

P. COLLINS DENISE REG OPR F I LE 5 R EG ION (2)

T.R. WILSON STEE LE TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLO HOUSTON NOVAK ROSS

~ IPPOLITO TEDESCO LONG ALAINAS(Z)

BENAROYA VOLLMER DENTON

~ G R IMESt'a)

GAMM ILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGB LOOD REGAN PROJECT LDR HAR LESS LIC ASST R. DIGGS (L)

H. GEARIN (L)

E. GOULBOURNE (L)

P. KREUTZER (E)

J. LEE (L)

M. MAIGRET (L)

S. REED (E)

M. SERVICE (L)

S. SHEPPARD (L)

M. SLATER (E)

H. SMITH (L)

S. TEETS (L)

G. WILLIAMS(F-)

V'. WILSON (I.)

R. INGRAM (L)

A/T IND-BRAITMAN SA LTZMAN ME LTZ PLANS MCDONALD CHAPMAN DUBE (Ltr).

E. COUPE PETERSON HARTFIELD (2)

KLECKER EISENHUT W IGG INTO N EXTERNALDISTRIBUTION

~1 LOCALPDR~75$ %

1 TIC (ABERNATHY)

(1)(2)(10) NATIONALLABS 1 NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1

CONSULTANTS 1 Newton Anderson NEWMARK/BLUME/AGBABIAN

~+ACRS HQ4%44i/SENT gO <,A. gZWu(cg 1 P DR-SAN/LA/NY 1 BROOKHAVEN NAT LAB 1 G. ULRIKSON, ORNL 1 AGMED (RUTH GUSSMAN)

Rm B-127 GT 1 J. D. RUNKLES, Rm E-201 GT

~

~

o

~

e o

~

u E

AMERICAN ELECTRIC POWER Service Corp o rati o n CO 2 Broadway, New York, N. Y. 10004 ROBERT S. HUNTER VICC RRCCIDCNT NVCI.CAR CN4INCCRIN4

~ASCII(atOPj Qlo 'PV

~~gg St%

@JllW Docket No.

50-318'PR No. 58 February 26, 1975 Mr. A. Giambusso, Deputy Director for Reactor Projects Directorate of Licensing U.S; Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Giambusso:

~~'~ ~

g g gg"pygmy QCGCLATOBY GctlBISSIO

~ 7(i Contained herein are fifteen (15) copies of the American Electric Power Service Corporation report "Reactor Containment Building Integrated Leak Rate Test (Pre-Operational)" for the Donald C.

Cook Nuclear Plant'Unit 1:

'This test was successfully completed on November 24, 1974 by personnel of the Indiana and Michigan Power Company and the American Electric Power'Service Corporation.

By submittal of this report, all requirements set'forth in 10CFR50, Appendix J are satisfied with respect to the pre-operational contain-ment integrated leak rate test for'Unit l.

Very truly yours, RSH kb cc:

Gerald Charnoff Ronald C. Callen Peter Steketee'obertJ; Vollen Richard Walsh R.

W. Jurgensen

- Bridgman R. S. Hunter

~<'

~

~

~

1 1

4 l

b 1

l1 I

II