{{#Wiki_filter:September 28, 2018  Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL  60555  SUBJECT:  BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000456/2019410; 05000457/2019410  Dear Hanson:  On February 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection in accordance with Inspection Procedure 71130.10P -Security, issued May 15, 2017, at your Braidwood Station, Units 1 and 2.  The inspection will be performed to evaluate and verify your ability to meet full implementation requirements of the N-Security Rule, Title 10 of the Code of Federal Regulations, Part 73, Section   The onsite portion of the inspection will take place during the weeks of February 11, 2019, and February 25, 2019.  Experience has shown that these inspections are extremely resource intensive, both for the NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for documents needed for the inspection.  These documents have been divided into four groups.  The first group specifies information necessary to assist the inspection team in choosing the focus areas (i.e., ) to be inspected by the Cyber-Security Inspection Procedure.  This information should be made available via compact disc and delivered to the regional office no later than November 19, 2018.  The inspection team will review this information and, by December 17, 2018, will request the specific items that should be provided for review.  The second group of additional requested documents will assist the inspection team in the evaluation of the critical systems and critical digital assets, defensive architecture, and the areas of your plantCyber-Security Program selected for the Cyber-Security Inspection.  This information will be requested for review in the regional office prior to the inspection by January 14, 2019.  The third group of requested documents consists of those items that the inspection team will review, or need access to, during the inspection.  Please have this information available by the first day of the onsite inspection, February 11, 2019.    
{{#Wiki_filter:September 28, 2018  
B. Hanson -2-  The fourth group of information is necessary to aid the inspection team in tracking issues identified as a result of the inspection.  It is requested that this information be provided to the lead inspector as the information is generated during the inspection.  It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection.  The lead inspector for this inspection is Mr. Dariusz Szwarc.  We understand that our regulatory contact for this inspection is Mr. Richard Schliessmann of your organization.  If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.  This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part   Sincerely,  /RA/   Dariusz Szwarc, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety  Docket Nos. 50456; 50457 License Nos. NPF72; NPF77 Enclosure: Document Request for Cyber Security  Inspection  cc:  Distribution via LISTSERV
   
B. Hanson -3-  Letter to Bryan C. Hanson from Dariusz Szwarc dated September 28, 2018.  SUBJECT:  BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION TO PERFORM INSPECTION 05000456/2019410; 05000457/2019410  DISTRIBUTION: Christopher Cook RidsNrrDorlLpl3 RidsNrrPMBraidwood Resource RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII                             ADAMS Accession Number: ML18275A059 OFFICE RIII        NAME DSzwarc:cl    DATE 09/28/18    OFFICIAL RECORD COPY  
Mr. Bryan C. Hanson  
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION Enclosure Inspection Report: 05000456/2019410; 05000457/2019410  Inspection Dates: Weeks of February 11, 2019, and February 25, 2019  Inspection Procedure: IP 71130.10PCyber-Security, Issue Date: May 15, 2017  Reference: Guidance Document for Development of the Request for Information and Notification Letter for Full-Implementation of the Cyber-Security Inspection, Issue Date October 26, 2017 (ML17156A215)  NRC Inspectors: Dariusz Szwarc, Lead Alan K. Dahbur 630-829-9803 630-829-9810 Dariusz.Szwarc@nrc.gov Alan.Dahbur@nrc.gov  NRC Contractors: Cynthia DeBisschop Timothy Marshall 301-287-3710 703-964-6891 Cynthia.DeBisschop@nrc.gov Timothy.Marshall@nrc.gov   Observers: James D. Beardsley Robert C. Daley 301-287-0908 630-829-9749 James.Beardsley@nrc.gov Robert.Daley@nrc.gov   I. Information Requested for In-Office Preparation  The initial request for information (i.e., first Request for Information (RFI)) concentrates on providing the inspection team with the general information necessary to select appropriate components and Cyber-Security Program (CSP) elements to develop a site-specific inspection plan.  The first RFI is used to identify the list of critical systems and critical digital assets (CSs/CDAs) plus operational and management (O&M) security ired to be inspected by the Cyber-Security Inspection Procedure (IP).  The first RFI requested information is specified below in Table RFI #1.  The Table RFI #1 information is requested to be provided to the regional office by November 19, 2018, or sooner, to facilitate the selection of the specific items that will be reviewed during the onsite inspection weeks.  The inspection team will examine the returned documentation from the first RFI and identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more focused follow-up request to develop the second RFI.  The inspection team will submit the specific systems and equipment list to your staff by December 17, 2018, which will identify the specific systems and equipment that will be utilized to evaluate the Cyber-Security Inspection.  All requests for this information shall follow the Table RFI #1 and the guidance document referenced above.
Senior VP, Exelon Generation Company, LLC  
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION 2 The required Table RFI #1 information shall be provided on compact disc (CD) to the lead inspector by November 19, 2018.  Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).  The preferred file format for all lists is a searchable Excel spreadsheet file.  These CDs should be indexed and hyper-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.  Table RFI #1 Reference Section 3, Paragraph Number/Title: Items 1 List All Identified CSs and CDAs All 2 List CDA Facility and Site EthernetTransmission Control Protocol/Internet Protocol Based Local Area Networks (LANs) and Identify Those LANs That Have Non-CDAs On Them All 3 List CDA Facility and Site Non-Ethernet Transmission Control Protocol/Internet Protocol Based LANs Including Those Industrial Networks and Identify LANs That Have Non-CDAs On Them All 4 Network Topology Diagrams (Be Sure To Include All NIDs and Security Information and Event Managements (SIEM) for EP Networks and Security Level 3 and 4 Networks) All 8 List All Network Security Boundary Devices for EP Networks and All Network Security Boundary Devices for Levels 3 and 4 All 9 List CDA Wireless Industrial Networks All 11 Network Intrusion Detection System Documentation for CSs That Have CDAs Associated with Them 11.a.1) 11.a.2) 12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.1) 12.a.2) 14 List EP and Security Onsite and Offsite Digital Communication Systems All 25 Cyber-Security Assessment and Cyber-Security Incident Response Teams All 28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To Support Changes To That Plan All 29 Copy Of Any Licensee-Identified Violations and Associated Corrective Action Program (CAP) Documentation To Resolve Issue(s) All  In addition to the above information please provide the following:  (1) Electronic copy of the Updated Finals Safety Analysis Report and technical specifications. (2) Name(s) and phone numbers for the regulatory and technical contacts. (3) Current management and engineering organizational charts.  Based on this information, the inspection team will identify and select specific systems and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and submit a list of specific systems and equipment to your staff by December 17, 2018, for the second RFI (i.e., Table RFI #2).
President and CNO, Exelon Nuclear  
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION 3 II. Additional Information Requested to be Available Prior to Inspection  As stated above, in Section I. of this enclosure, the inspection team will examine the returned documentation requested from Table RFI #1 and submit the list of specific systems and equipment to your staff by December 17, 2018, for the second RFI (i.e., Table RFI #2).  The second RFI will request additional information required to evaluate the CSs/selected for the Cyber-Security Inspection.  The additional information requested for the specific systems and equipment is identified in Table RFI #2.  All requests for this information shall follow the Table RFI #2 and the guidance document referenced above.  The Table RFI #2 information shall be provided on CD to the lead inspector by January 14, 2019.  Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).  The preferred file format for all lists is a searchable Excel spreadsheet file.  These CDs should be indexed and hyper-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.  Table RFI #2 Reference Section 3, Paragraph Number/Title: Items 5 Plant Computer System Block Diagram (If Plant Computer System Is Selected for Inspection) All 6 Plant Security System Block Diagram (If Security Computer System Is Selected for Inspection) All 7 Systems That Are Distributed Block Diagrams (For Systems Selected for  Inspection) All 10 Host-Based Intrusion Detection System Documentation (For CDAs for Systems Selected for Inspection) 10.a.1) 10.a.2) 13 List All Maintenance and Test Equipment Used On CDAs for Systems Selected for Inspection All 15 Configuration Management All 16 Supply Chain Management 16.b. 16.c.1) 16.c.5) 16.c.6) 17 Portable Media and Mobile Device Control All 18 Software Management All 20 Vendor Access and Monitoring All 21 Work Control All 22 Device Access and Key Control All 23 Password/Authenticator Policy All 24 User Account/Credential Policy All 26 Corrective Actions Since Last NRC Inspection All 27 Cyber Security Assessments for Selected Systems All
4300 Winfield Road  
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION 4 III. Information Requested to be Available on First Day of Inspection  For the specific systems and equipment identified in this Section II., provide the following RFI (i.e., Table 1ST Week Onsite) on CD by February 11, 2019, the first day of the inspection.  All requests for this information shall follow the Table 1ST Week Onsite and the guidance document referenced above.  Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).  The preferred file format for all lists is a searchable Excel spreadsheet file.  These CDs should be indexed and hyper-linked to facilitate ease of use.  If you have any questions regarding this information, please call the inspection team leader as soon as possible.  Table 1st Week Onsite Reference Section 3, Paragraph Number/Title: Items 10 Host-Based Intrusion Detection System Documentation for CDAs for Systems Selected for Inspection 10.a.3) thru 10.a.12) 11 Network Intrusion Detection System Documentation for CSs That Have CDAs Associated with Them 11.a.3) thru 11.a.15) 12 SIEM Documentation for CSs That Have CDAs Associated with Them 12.a.3) thru 12.a.14) 16 Supply Chain Management 16.c.2) 16.c.3) 16.c.4) 19 Cyber-Security Event Notifications All 29 Update to Licensee Identified Violations and CAP Actions Taken Since the Initial Request Was Made All  In addition to the above information please provide the following:  (1) Copies of the following documents do not need to be solely available to the inspection team as long as the inspectors have easy and unrestrained access to them.  a. Original Final Safety Analysis Report Volumes; b. Original Safety Evaluation Report and Supplements; c. Final Safety Analysis Report Question and Answers; d. Quality Assurance Plan; e. Latest IPE/PRA Report; and f. Vendor Manuals.  
Warrenville, IL  60555  
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION 5 (2) Assessment and Corrective Actions:  a. The most recent Cyber-Security Quality Assurance audit and/or self-assessment; and b. Corrective action documents (e.g., condition reports, including status of corrective actions) generate as a result of the most recent Cyber-Security Quality Assurance audit and/or self-assessment.  IV. Information Requested To Be Provided Throughout the Inspection  (1) Copies of any corrective action documents generated as a result of the inspection e inspection.  (2) Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).  If you have any questions regarding the information requested, please contact the inspection team leader.
   
SUBJECT:  BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE  
CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION  
TO PERFORM INSPECTION 05000456/2019410; 05000457/2019410  
   
Dear Hanson:  
   
On February 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection  
in accordance with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at  
your Braidwood Station, Units 1 and 2.  The inspection will be performed to evaluate and verify  
your ability to meet full implementation requirements of the NRCs Cyber-Security Rule,  
Title 10 of the Code of Federal Regulations, Part 73, Section 54, Protection of Digital Computer
and Communication Systems and Networks.  The onsite portion of the inspection will take  
place during the weeks of February 11, 2019, and February 25, 2019.  
   
Experience has shown that these inspections are extremely resource intensive, both for the  
NRC inspectors and the licensee staff.  In order to minimize the inspection impact on the site  
and to ensure a productive inspection for both parties, we have enclosed a request for  
documents needed for the inspection.  These documents have been divided into four groups.  
   
The first group specifies information necessary to assist the inspection team in choosing  
the focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection  
Procedure.  This information should be made available via compact disc and delivered to  
the regional office no later than November 19, 2018.  The inspection team will review  
this information and, by December 17, 2018, will request the specific items that should  
be provided for review.  
   
The second group of additional requested documents will assist the inspection team in  
the evaluation of the critical systems and critical digital assets, defensive architecture,  
and the areas of your plants Cyber-Security Program selected for the Cyber-Security  
Inspection.  This information will be requested for review in the regional office prior to the  
inspection by January 14, 2019.  
   
The third group of requested documents consists of those items that the inspection team  
will review, or need access to, during the inspection.  Please have this information  
available by the first day of the onsite inspection, February 11, 2019.  
 
B. Hanson  
-2-  
   
The fourth group of information is necessary to aid the inspection team in tracking issues  
identified as a result of the inspection.  It is requested that this information be provided to  
the lead inspector as the information is generated during the inspection.  It is important  
that all of these documents are up to date and complete in order to minimize the number  
of additional documents requested during the preparation and/or the onsite portions of  
the inspection.  
   
The lead inspector for this inspection is Mr. Dariusz Szwarc.  We understand that our regulatory  
contact for this inspection is Mr. Richard Schliessmann of your organization.  If there are any  
questions about the inspection or the material requested, please contact the lead inspector at  
630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.  
   
This letter does not contain new or amended information collection requirements subject  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
collection requirements were approved by the Office of Management and Budget, Control  
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  
respond to, a request for information or an information collection requirement unless the  
requesting document displays a currently valid Office of Management and Budget Control  
Number.  
This letter and its enclosure will be made available for public inspection and copying at  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Exemptions, Requests for Withholding.
Sincerely,  
   
/RA/  
Dariusz Szwarc, Senior Reactor Inspector  
Engineering Branch 3  
Division of Reactor Safety  
   
Docket Nos. 50-456; 50-457
License Nos. NPF-72; NPF-77
   
Enclosure:  
Document Request for Cyber Security  
   Inspection  
   
cc:  Distribution via LISTSERV  
 
B. Hanson  
-3-  
   
Letter to Bryan C. Hanson from Dariusz Szwarc dated September 28, 2018.  
   
SUBJECT:  BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE  
CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION  
TO PERFORM INSPECTION 05000456/2019410; 05000457/2019410  
   
DISTRIBUTION:  
Christopher Cook  
RidsNrrDorlLpl3  
RidsNrrPMBraidwood Resource  
RidsNrrDirsIrib Resource  
Steven West  
Darrell Roberts  
Richard Skokowski  
Allan Barker  
DRPIII  
DRSIII  
   
   
ADAMS Accession Number: ML18275A059
OFFICE
RIII
NAME
DSzwarc:cl
DATE
09/28/18
OFFICIAL RECORD COPY
 
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION
Enclosure
Inspection Report:
05000456/2019410; 05000457/2019410
Inspection Dates:
Weeks of February 11, 2019, and February 25, 2019
Inspection Procedure:
IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017
Reference:  
Guidance Document for Development of the Request for
Information and Notification Letter for Full-Implementation of
the Cyber-Security Inspection, Issue Date October 26, 2017
(ML17156A215)
   
NRC Inspectors:
Dariusz Szwarc, Lead
Alan K. Dahbur
630-829-9803
630-829-9810
Dariusz.Szwarc@nrc.gov  
Alan.Dahbur@nrc.gov
NRC Contractors:
Cynthia DeBisschop
Timothy Marshall
301-287-3710
703-964-6891
Cynthia.DeBisschop@nrc.gov
Timothy.Marshall@nrc.gov  
Observers:
James D. Beardsley
Robert C. Daley
301-287-0908
630-829-9749
James.Beardsley@nrc.gov
Robert.Daley@nrc.gov
I.
Information Requested for In-Office Preparation
The initial request for information (i.e., first Request for Information (RFI)) concentrates  
on providing the inspection team with the general information necessary to select  
appropriate components and Cyber-Security Program (CSP) elements to develop a  
site-specific inspection plan.  The first RFI is used to identify the list of critical systems  
and critical digital assets (CSs/CDAs) plus operational and management (O&M) security  
control portions of the CSP to be chosen as the sample set required to be inspected by  
the Cyber-Security Inspection Procedure (IP).  The first RFIs requested information is  
specified below in Table RFI #1.  The Table RFI #1 information is requested to be  
provided to the regional office by November 19, 2018, or sooner, to facilitate the  
selection of the specific items that will be reviewed during the onsite inspection weeks.  
   
The inspection team will examine the returned documentation from the first RFI and  
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more  
focused follow-up request to develop the second RFI.  The inspection team will submit  
the specific systems and equipment list to your staff by December 17, 2018, which will  
identify the specific systems and equipment that will be utilized to evaluate the  
CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the
Cyber-Security Inspection.  All requests for this information shall follow the Table RFI #1  
and the guidance document referenced above.  
 
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION  
2  
The required Table RFI #1 information shall be provided on compact disc (CD) to the  
lead inspector by November 19, 2018.  Please provide five copies of each CD submitted  
(i.e., one for each inspector/contractor).  The preferred file format for all lists is a  
searchable Excel spreadsheet file.  These CDs should be indexed and hyper-linked to  
facilitate ease of use.  If you have any questions regarding this information, please call  
the inspection team leader as soon as possible.  
   
Table RFI #1  
Reference Section 3, Paragraph Number/Title:  
Items  
1  
List All Identified CSs and CDAs  
All  
2  
List CDA Facility and Site EthernetTransmission Control  
Protocol/Internet Protocol Based Local Area Networks (LANs) and  
Identify Those LANs That Have Non-CDAs On Them  
All  
3  
List CDA Facility and Site Non-Ethernet Transmission Control  
Protocol/Internet Protocol Based LANs Including Those Industrial  
Networks and Identify LANs That Have Non-CDAs On Them  
All  
4  
Network Topology Diagrams (Be Sure To Include All NIDs and Security  
Information and Event Managements (SIEM) for EP Networks and  
Security Level 3 and 4 Networks)  
All  
8  
List All Network Security Boundary Devices for EP Networks and All  
Network Security Boundary Devices for Levels 3 and 4  
All  
9  
List CDA Wireless Industrial Networks  
All  
11 Network Intrusion Detection System Documentation for CSs That Have  
CDAs Associated with Them  
11.a.1)  
11.a.2)  
12 SIEM Documentation for CSs That Have CDAs Associated with Them  
12.a.1)  
12.a.2)  
14 List EP and Security Onsite and Offsite Digital Communication Systems  
All  
25 Cyber-Security Assessment and Cyber-Security Incident Response  
Teams  
All  
28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To  
Support Changes To That Plan  
All  
29 Copy Of Any Licensee-Identified Violations and Associated Corrective  
Action Program (CAP) Documentation To Resolve Issue(s)  
All  
   
In addition to the above information please provide the following:  
   
(1) Electronic copy of the Updated Finals Safety Analysis Report and technical  
specifications.  
(2) Name(s) and phone numbers for the regulatory and technical contacts.  
(3) Current management and engineering organizational charts.  
   
Based on this information, the inspection team will identify and select specific systems  
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and  
submit a list of specific systems and equipment to your staff by December 17, 2018, for  
the second RFI (i.e., Table RFI #2).  
 
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION  
3  
II.  
Additional Information Requested to be Available Prior to Inspection  
   
As stated above, in Section I. of this enclosure, the inspection team will examine the  
returned documentation requested from Table RFI #1 and submit the list of specific  
systems and equipment to your staff by December 17, 2018, for the second RFI  
(i.e., Table RFI #2).  The second RFI will request additional information required to  
evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP
selected for the Cyber-Security Inspection.  The additional information requested for  
the specific systems and equipment is identified in Table RFI #2.  All requests for this  
information shall follow the Table RFI #2 and the guidance document referenced above.  
   
The Table RFI #2 information shall be provided on CD to the lead inspector by  
January 14, 2019.  Please provide five copies of each CD submitted (i.e., one for  
each inspector/contractor).  The preferred file format for all lists is a searchable Excel  
spreadsheet file.  These CDs should be indexed and hyper-linked to facilitate ease of  
use.  If you have any questions regarding this information, please call the inspection  
team leader as soon as possible.  
   
Table RFI #2  
Reference Section 3, Paragraph Number/Title:  
Items  
5  
Plant Computer System Block Diagram (If Plant Computer System Is  
Selected for Inspection)  
All  
6  
Plant Security System Block Diagram (If Security Computer System Is  
Selected for Inspection)  
All  
7  
Systems That Are Distributed Block Diagrams (For Systems Selected  
for  Inspection)  
All  
10 Host-Based Intrusion Detection System Documentation (For CDAs for  
Systems Selected for Inspection)  
10.a.1)  
10.a.2)  
13 List All Maintenance and Test Equipment Used On CDAs for Systems  
Selected for Inspection  
All  
15 Configuration Management  
All  
16 Supply Chain Management  
16.b.  
16.c.1)  
16.c.5)  
16.c.6)  
17 Portable Media and Mobile Device Control  
All  
18 Software Management  
All  
20 Vendor Access and Monitoring  
All  
21 Work Control  
All  
22 Device Access and Key Control  
All  
23 Password/Authenticator Policy  
All  
24 User Account/Credential Policy  
All  
26 Corrective Actions Since Last NRC Inspection  
All  
27 Cyber Security Assessments for Selected Systems  
All  
 
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION  
4  
III.  
Information Requested to be Available on First Day of Inspection  
   
For the specific systems and equipment identified in this enclosures Section II., provide  
the following RFI (i.e., Table 1ST Week Onsite) on CD by February 11, 2019, the first day  
of the inspection.  All requests for this information shall follow the Table 1ST Week Onsite  
and the guidance document referenced above.  
   
Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).   
The preferred file format for all lists is a searchable Excel spreadsheet file.  These CDs  
should be indexed and hyper-linked to facilitate ease of use.  If you have any questions  
regarding this information, please call the inspection team leader as soon as possible.  
   
Table 1st Week Onsite  
Reference Section 3, Paragraph Number/Title:  
Items  
10 Host-Based Intrusion Detection System Documentation for CDAs for  
Systems Selected for Inspection  
10.a.3)  
thru  
10.a.12)  
11 Network Intrusion Detection System Documentation for CSs That Have  
CDAs Associated with Them  
11.a.3)  
thru  
11.a.15)  
12 SIEM Documentation for CSs That Have CDAs Associated with Them  
12.a.3)  
thru  
12.a.14)  
16 Supply Chain Management  
16.c.2)  
16.c.3)  
16.c.4)  
19 Cyber-Security Event Notifications  
All  
29 Update to Licensee Identified Violations and CAP Actions Taken Since  
the Initial Request Was Made  
All  
   
In addition to the above information please provide the following:  
   
(1) Copies of the following documents do not need to be solely available to the  
inspection team as long as the inspectors have easy and unrestrained access  
to them.  
   
a. Original Final Safety Analysis Report Volumes;  
b. Original Safety Evaluation Report and Supplements;  
c. Final Safety Analysis Report Question and Answers;  
d. Quality Assurance Plan;  
e. Latest IPE/PRA Report; and  
f. Vendor Manuals.  
 
DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION  
5  
(2) Assessment and Corrective Actions:  
   
a. The most recent Cyber-Security Quality Assurance audit and/or self-assessment;  
and  
b. Corrective action documents (e.g., condition reports, including status of  
corrective actions) generate as a result of the most recent Cyber-Security Quality  
Assurance audit and/or self-assessment.  
   
IV.  
Information Requested To Be Provided Throughout the Inspection  
   
(1) Copies of any corrective action documents generated as a result of the inspection  
teams questions or queries during the inspection.  
   
(2) Copies of the list of questions submitted by the inspection team members and the  
status/resolution of the information requested (provided daily during the inspection to  
each inspection team member).  
   
If you have any questions regarding the information requested, please contact the inspection  
team leader.
}}
}}

Latest revision as of 12:44, 5 January 2025

Ltr. 09/28/18 Braidwood Station, Units 1 and 2 - Information Request for the Cyber-Security Full Implementation Inspection, Notification to Perform Inspection 05000456/2019410; 05000457/2019410 (DRS-D.Szwarc)
ML18275A059
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 09/28/2018
From: Dariusz Szwarc
Engineering Branch 3
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2019410
Download: ML18275A059 (8)


See also: IR 05000456/2019410

Text

September 28, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE

CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION

TO PERFORM INSPECTION 05000456/2019410; 05000457/2019410

Dear Hanson:

On February 11, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin an inspection

in accordance with Inspection Procedure 71130.10P Cyber-Security, issued May 15, 2017, at

your Braidwood Station, Units 1 and 2. The inspection will be performed to evaluate and verify

your ability to meet full implementation requirements of the NRCs Cyber-Security Rule,

Title 10 of the Code of Federal Regulations, Part 73, Section 54, Protection of Digital Computer

and Communication Systems and Networks. The onsite portion of the inspection will take

place during the weeks of February 11, 2019, and February 25, 2019.

Experience has shown that these inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing

the focus areas (i.e., sample set) to be inspected by the Cyber-Security Inspection

Procedure. This information should be made available via compact disc and delivered to

the regional office no later than November 19, 2018. The inspection team will review

this information and, by December 17, 2018, will request the specific items that should

be provided for review.

The second group of additional requested documents will assist the inspection team in

the evaluation of the critical systems and critical digital assets, defensive architecture,

and the areas of your plants Cyber-Security Program selected for the Cyber-Security

Inspection. This information will be requested for review in the regional office prior to the

inspection by January 14, 2019.

The third group of requested documents consists of those items that the inspection team

will review, or need access to, during the inspection. Please have this information

available by the first day of the onsite inspection, February 11, 2019.

B. Hanson

-2-

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important

that all of these documents are up to date and complete in order to minimize the number

of additional documents requested during the preparation and/or the onsite portions of

the inspection.

The lead inspector for this inspection is Mr. Dariusz Szwarc. We understand that our regulatory

contact for this inspection is Mr. Richard Schliessmann of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector at

630-829-9803 or via e-mail at Dariusz.Szwarc@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA/

Dariusz Szwarc, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket Nos. 50-456; 50-457

License Nos. NPF-72; NPF-77

Enclosure:

Document Request for Cyber Security

Inspection

cc: Distribution via LISTSERV

B. Hanson

-3-

Letter to Bryan C. Hanson from Dariusz Szwarc dated September 28, 2018.

SUBJECT: BRAIDWOOD STATION, UNITS 1 AND 2INFORMATION REQUEST FOR THE

CYBER-SECURITY FULL IMPLEMENTATION INSPECTION, NOTIFICATION

TO PERFORM INSPECTION 05000456/2019410; 05000457/2019410

DISTRIBUTION:

Christopher Cook

RidsNrrDorlLpl3

RidsNrrPMBraidwood Resource

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML18275A059

OFFICE

RIII

NAME

DSzwarc:cl

DATE

09/28/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION

Enclosure

Inspection Report: 05000456/2019410; 05000457/2019410

Inspection Dates:

Weeks of February 11, 2019, and February 25, 2019

Inspection Procedure:

IP 71130.10P, Cyber-Security, Issue Date: May 15, 2017

Reference:

Guidance Document for Development of the Request for

Information and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Issue Date October 26, 2017

(ML17156A215)

NRC Inspectors:

Dariusz Szwarc, Lead

Alan K. Dahbur

630-829-9803

630-829-9810

Dariusz.Szwarc@nrc.gov

Alan.Dahbur@nrc.gov

NRC Contractors:

Cynthia DeBisschop

Timothy Marshall

301-287-3710

703-964-6891

Cynthia.DeBisschop@nrc.gov

Timothy.Marshall@nrc.gov

Observers:

James D. Beardsley

Robert C. Daley

301-287-0908

630-829-9749

James.Beardsley@nrc.gov

Robert.Daley@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first Request for Information (RFI)) concentrates

on providing the inspection team with the general information necessary to select

appropriate components and Cyber-Security Program (CSP) elements to develop a

site-specific inspection plan. The first RFI is used to identify the list of critical systems

and critical digital assets (CSs/CDAs) plus operational and management (O&M) security

control portions of the CSP to be chosen as the sample set required to be inspected by

the Cyber-Security Inspection Procedure (IP). The first RFIs requested information is

specified below in Table RFI #1. The Table RFI #1 information is requested to be

provided to the regional office by November 19, 2018, or sooner, to facilitate the

selection of the specific items that will be reviewed during the onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by December 17, 2018, which will

identify the specific systems and equipment that will be utilized to evaluate the

CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the

Cyber-Security Inspection. All requests for this information shall follow the Table RFI #1

and the guidance document referenced above.

DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION

2

The required Table RFI #1 information shall be provided on compact disc (CD) to the

lead inspector by November 19, 2018. Please provide five copies of each CD submitted

(i.e., one for each inspector/contractor). The preferred file format for all lists is a

searchable Excel spreadsheet file. These CDs should be indexed and hyper-linked to

facilitate ease of use. If you have any questions regarding this information, please call

the inspection team leader as soon as possible.

Table RFI #1

Reference Section 3, Paragraph Number/Title:

Items

1

List All Identified CSs and CDAs

All

2

List CDA Facility and Site EthernetTransmission Control

Protocol/Internet Protocol Based Local Area Networks (LANs) and

Identify Those LANs That Have Non-CDAs On Them

All

3

List CDA Facility and Site Non-Ethernet Transmission Control

Protocol/Internet Protocol Based LANs Including Those Industrial

Networks and Identify LANs That Have Non-CDAs On Them

All

4

Network Topology Diagrams (Be Sure To Include All NIDs and Security

Information and Event Managements (SIEM) for EP Networks and

Security Level 3 and 4 Networks)

All

8

List All Network Security Boundary Devices for EP Networks and All

Network Security Boundary Devices for Levels 3 and 4

All

9

List CDA Wireless Industrial Networks

All

11 Network Intrusion Detection System Documentation for CSs That Have

CDAs Associated with Them

11.a.1)

11.a.2)

12 SIEM Documentation for CSs That Have CDAs Associated with Them

12.a.1)

12.a.2)

14 List EP and Security Onsite and Offsite Digital Communication Systems

All

25 Cyber-Security Assessment and Cyber-Security Incident Response

Teams

All

28 Copy of Current Cyber Security Plan and Copy of 50.54(p) Analysis To

Support Changes To That Plan

All

29 Copy Of Any Licensee-Identified Violations and Associated Corrective

Action Program (CAP) Documentation To Resolve Issue(s)

All

In addition to the above information please provide the following:

(1) Electronic copy of the Updated Finals Safety Analysis Report and technical

specifications.

(2) Name(s) and phone numbers for the regulatory and technical contacts.

(3) Current management and engineering organizational charts.

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by December 17, 2018, for

the second RFI (i.e., Table RFI #2).

DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION

3

II.

Additional Information Requested to be Available Prior to Inspection

As stated above, in Section I. of this enclosure, the inspection team will examine the

returned documentation requested from Table RFI #1 and submit the list of specific

systems and equipment to your staff by December 17, 2018, for the second RFI

(i.e., Table RFI #2). The second RFI will request additional information required to

evaluate the CSs/CDAs, defensive architecture, and the areas of the licensees CSP

selected for the Cyber-Security Inspection. The additional information requested for

the specific systems and equipment is identified in Table RFI #2. All requests for this

information shall follow the Table RFI #2 and the guidance document referenced above.

The Table RFI #2 information shall be provided on CD to the lead inspector by

January 14, 2019. Please provide five copies of each CD submitted (i.e., one for

each inspector/contractor). The preferred file format for all lists is a searchable Excel

spreadsheet file. These CDs should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

Table RFI #2

Reference Section 3, Paragraph Number/Title:

Items

5

Plant Computer System Block Diagram (If Plant Computer System Is

Selected for Inspection)

All

6

Plant Security System Block Diagram (If Security Computer System Is

Selected for Inspection)

All

7

Systems That Are Distributed Block Diagrams (For Systems Selected

for Inspection)

All

10 Host-Based Intrusion Detection System Documentation (For CDAs for

Systems Selected for Inspection)

10.a.1)

10.a.2)

13 List All Maintenance and Test Equipment Used On CDAs for Systems

Selected for Inspection

All

15 Configuration Management

All

16 Supply Chain Management

16.b.

16.c.1)

16.c.5)

16.c.6)

17 Portable Media and Mobile Device Control

All

18 Software Management

All

20 Vendor Access and Monitoring

All

21 Work Control

All

22 Device Access and Key Control

All

23 Password/Authenticator Policy

All

24 User Account/Credential Policy

All

26 Corrective Actions Since Last NRC Inspection

All

27 Cyber Security Assessments for Selected Systems

All

DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION

4

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in this enclosuresSection II., provide

the following RFI (i.e., Table 1ST Week Onsite) on CD by February 11, 2019, the first day

of the inspection. All requests for this information shall follow the Table 1ST Week Onsite

and the guidance document referenced above.

Please provide five copies of each CD submitted (i.e., one for each inspector/contractor).

The preferred file format for all lists is a searchable Excel spreadsheet file. These CDs

should be indexed and hyper-linked to facilitate ease of use. If you have any questions

regarding this information, please call the inspection team leader as soon as possible.

Table 1st Week Onsite

Reference Section 3, Paragraph Number/Title:

Items

10 Host-Based Intrusion Detection System Documentation for CDAs for

Systems Selected for Inspection

10.a.3)

thru

10.a.12)

11 Network Intrusion Detection System Documentation for CSs That Have

CDAs Associated with Them

11.a.3)

thru

11.a.15)

12 SIEM Documentation for CSs That Have CDAs Associated with Them

12.a.3)

thru

12.a.14)

16 Supply Chain Management

16.c.2)

16.c.3)

16.c.4)

19 Cyber-Security Event Notifications

All

29 Update to Licensee Identified Violations and CAP Actions Taken Since

the Initial Request Was Made

All

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a. Original Final Safety Analysis Report Volumes;

b. Original Safety Evaluation Report and Supplements;

c. Final Safety Analysis Report Question and Answers;

d. Quality Assurance Plan;

e. Latest IPE/PRA Report; and

f. Vendor Manuals.

DOCUMENT REQUEST FOR CYBER SECURITY INSPECTION

5

(2) Assessment and Corrective Actions:

a. The most recent Cyber-Security Quality Assurance audit and/or self-assessment;

and

b. Corrective action documents (e.g., condition reports, including status of

corrective actions) generate as a result of the most recent Cyber-Security Quality

Assurance audit and/or self-assessment.

IV.

Information Requested To Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection to

each inspection team member).

If you have any questions regarding the information requested, please contact the inspection

team leader.