{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION ber 9, 2018
{{#Wiki_filter:October 9, 2018


==SUBJECT:==
==SUBJECT:==
Line 31: Line 31:


Sincerely,
Sincerely,
/RA/
/RA/  
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Docket Numbers: 50-352 and 50-353 License Numbers: NPF-39 and NPF-85
 
Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety  
 
Docket Numbers: 50-352 and 50-353 License Numbers: NPF-39 and NPF-85  


===Enclosure:===
===Enclosure:===
Inspection Report 05000352/2018010 and 05000353/2018010
Inspection Report 05000352/2018010 and 05000353/2018010  


==Inspection Report==
==Inspection Report==
Docket Numbers: 50-352 and 50-353 License Numbers: NPF-39 and NPF-85 Report Numbers: 05000352/2018010 and 05000353/2018010 Enterprise Identifier: I-2018-010-0033 Licensee: Exelon Generation Company, LLC Facility: Limerick Generating Station, Units 1 & 2 Location: Sanatoga, PA 19464 Inspection Dates: July 16, 2018 through August 30, 2018 Inspectors: S. Pindale, Senior Reactor Inspector, Division of Reactor Safety (DRS), Team Leader J. Ayala, Allegations/Enforcement Specialist, Office of the Regional Administrator E. Burket, Reactor Inspector, DRS L. McKown, Resident Inspector (Millstone), Division of Reactor Projects S. Kobylarz, NRC Electrical Contractor M. Yeminy, NRC Mechanical Contractor Approved By: Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety Enclosure
Docket Numbers:  
 
50-352 and 50-353  
 
License Numbers:  
 
NPF-39 and NPF-85  
 
Report Numbers:  
 
05000352/2018010 and 05000353/2018010  
 
Enterprise Identifier:
I-2018-010-0033  
 
Licensee:  
 
Exelon Generation Company, LLC  
 
Facility:  
 
Limerick Generating Station, Units 1 & 2  
 
Location:  
 
Sanatoga, PA 19464  
 
Inspection Dates:  
 
July 16, 2018 through August 30, 2018  
 
Inspectors:
S. Pindale, Senior Reactor Inspector, Division of Reactor Safety  
(DRS), Team Leader  
 
J. Ayala, Allegations/Enforcement Specialist, Office of the  
 
Regional Administrator  
 
E. Burket, Reactor Inspector, DRS  
 
L. McKown, Resident Inspector (Millstone), Division of Reactor  
 
Projects  
 
S. Kobylarz, NRC Electrical Contractor  
 
M. Yeminy, NRC Mechanical Contractor  
 
Approved By:  
 
Mel Gray, Chief  
 
Engineering Branch 1  
 
Division of Reactor Safety  


=SUMMARY=
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at  


Limerick Generating Station, Units 1 and 2 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
Limerick Generating Station, Units 1 and 2 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.
Line 49: Line 107:
=INSPECTION SCOPES=
=INSPECTION SCOPES=


===This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.
This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.


Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==REACTOR SAFETY==
==REACTOR SAFETY==
===71111.21M - Design Bases Assurance Inspection (Teams)


===71111.21M - Design Bases Assurance Inspection (Teams)
The team evaluated the following components, permanent modifications, and operating experience during the weeks of July 16, 2018, and July 30, 2018.
The team evaluated the following components, permanent modifications, and operating experience during the weeks of July 16, 2018, and July 30, 2018.


Line 62: Line 120:
Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations.
Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations.


Components ===
Components===
{{IP sample|IP=IP 71111.21|count=4}}
{{IP sample|IP=IP 71111.21|count=4}}
Unit 2 High Pressure Coolant Injection System (Turbine Controls)o  Material condition and installed configuration (e.g., visual inspection/walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency among design and licensing bases and other documents/procedures o  System health report, maintenance effectiveness and records, and corrective action history o  Control logic o  Equipment/environmental controls and qualification o  Operator actions o  Design calculations o  Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and Electrical Loads.


Unit 2 Division II 125/250 Volt DC Bus, MCC 20D202 and MCC 20D203 o   Material condition and installed configuration (e.g., visual inspection/walkdown)o   Operating procedures o   Consistency among design and licensing bases and other documents/procedures o   System health report, maintenance effectiveness and records, and corrective action history o   Design calculations o   Equipment protection (sealing of cable and conduits)o Environmental conditions o Contactor and fuse ratings; Component adequacy for minimum voltage o Protection coordination; Load in-rush and full load current The team used Appendix B guidance for Circuit Breakers and Fuses, Electrical Loads, Motor Control Centers, and As-Built System.
Unit 2 High Pressure Coolant Injection System (Turbine Controls)
 
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Control logic o Equipment/environmental controls and qualification o Operator actions o Design calculations o Surveillance testing and recent test results
 
The team used Appendix B guidance for Valves, Instrumentation, and Electrical Loads.
 
Unit 2 Division II 125/250 Volt DC Bus, MCC 20D202 and MCC 20D203 o Material condition and installed configuration (e.g., visual inspection/walkdown)o Operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Equipment protection (sealing of cable and conduits)o Environmental conditions o Contactor and fuse ratings; Component adequacy for minimum voltage o Protection coordination; Load in-rush and full load current  
 
The team used Appendix B guidance for Circuit Breakers and Fuses, Electrical Loads, Motor Control Centers, and As-Built System.
 
D12 Emergency Diesel Generator Mechanical Components
 
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results o System and component level performance monitoring o Range, accuracy, and setpoint of installed instrumentation o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation o Energy sources, fuel and air (e.g., engine start, operation, and control)


D12 Emergency Diesel Generator Mechanical Components o  Material condition and installed configuration (e.g., visual inspection/walkdown)o  Normal, abnormal, and emergency operating procedures o  Consistency among design and licensing bases and other documents/procedures o  System health report, maintenance effectiveness and records, and corrective action history o  Design calculations o  Surveillance testing and recent test results o  System and component level performance monitoring o  Range, accuracy, and setpoint of installed instrumentation o  Equipment protection from fire, flood, and water intrusion or spray o  Heat removal cooling water and ventilation o  Energy sources, fuel and air (e.g., engine start, operation, and control)
The team used Appendix B guidance for Valves, Pumps, Instrumentation, Electric Loads, and As-Built System.
The team used Appendix B guidance for Valves, Pumps, Instrumentation, Electric Loads, and As-Built System.


Unit 1 Residual Heat Removal Pump 1BP202 o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
Unit 1 Residual Heat Removal Pump 1BP202  
 
o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results  
 
The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.
 
===Component, Large Early Release Frequency (1 Sample)===
Unit 2 A Primary Containment Vacuum Relief Valves (PSV-57-237A-1 and -2)
 
o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results


Component, Large Early Release Frequency (1 Sample)===
The team used Appendix B guidance for Valves, Instrumentation, and As-Built System.
Unit 2 A Primary Containment Vacuum Relief Valves (PSV-57-237A-1 and -2)


===o  Normal, abnormal, and emergency operating procedures o  Consistency among design and licensing bases and other documents/procedures o  System health report, maintenance effectiveness and records, and corrective action history o  Design calculations o  Surveillance testing and recent test results The team used Appendix B guidance for Valves, Instrumentation, and As-Built System.
===Permanent Modifications (5 Samples)===
EC 622874, Change Trip Setpoint for Unit Auxiliary Transformer Hi Side OC Relay 350/351-X102A(B)(C)


Permanent Modifications (5 Samples)===
EC 422309, E/S X-M1-21014 and E/S X-M1-11015 Inverter Replacement
EC 622874, Change Trip Setpoint for Unit Auxiliary Transformer Hi Side OC Relay


===350/351-X102A(B)(C)
EC 617493, Reactor Core Isolation Cooling Pump Room Environmental Condition during Station Blackout (calculation)  
EC 422309, E/S X-M1-21014 and E/S X-M1-11015 Inverter Replacement EC 617493, Reactor Core Isolation Cooling Pump Room Environmental Condition during Station Blackout (calculation)
 
EC 620491, Change Motor-Operated Valve HV-011-015A to Manual Valve 011-0124A and Convert Manual Valve 011-0124A to Motor-Operated Valve HV-011-015A EC 422109, Component Design Bases Inspection Update, Reactor Core Isolation Cooling System Calculations per 834202 (calculation)
EC 620491, Change Motor-Operated Valve HV-011-015A to Manual Valve 011-0124A and Convert Manual Valve 011-0124A to Motor-Operated Valve HV-011-015A  
Operating Experience (2 Samples)===
 
NRC Information Notice 2010-23, Malfunctions of Emergency Diesel Generator Speed Switch Circuits, dated November 1, 2010 NRC Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations, dated April 24, 2012
EC 422109, Component Design Bases Inspection Update, Reactor Core Isolation Cooling System Calculations per 834202 (calculation)  
 
===Operating Experience (2 Samples)===
NRC Information Notice 2010-23, Malfunctions of Emergency Diesel Generator Speed Switch Circuits, dated November 1, 2010  
 
NRC Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations, dated April 24,


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Observations and Minor Violations                           71111.21M Problem Identification and Resolution Area Review: The team identified observations/minor violations during their review of the effectiveness of corrective actions taken by Exelon associated with an item from a previous component design bases inspection. In particular, the team reviewed Exelons actions for non-cited violation (NCV) 05000352 &
Observations and Minor Violations 71111.21M Problem Identification and Resolution Area Review: The team identified observations/minor violations during their review of the effectiveness of corrective actions taken by Exelon associated with an item from a previous component design bases inspection. In particular, the team reviewed Exelons actions for non-cited violation (NCV) 05000352 &
05000353/2015-01.
05000353/2015-01.


Line 146: Line 227:
MEL-0119, WS-3 Drywell Spray Initiation Limit, Revision 3
MEL-0119, WS-3 Drywell Spray Initiation Limit, Revision 3
Corrective Action Documents (*initiated in response to inspection)
Corrective Action Documents (*initiated in response to inspection)
0834202             2492785               3748138             4080668         4155343
0834202
0976165            2523623              3960107              4080689          4156363*
0976165
1156200            2525662              3972856              4081816          4157103*
1156200
207412            2530129              3988061              4081882          4159154*
207412
1359061            2534799              3998656              4088017          4159914*
1359061
1656919            2538760              4003629              4100277          4160819*
1656919
1681458            2548445              4005781              4105039*        4161192*
1681458
2395541            2548571              4018891              4105177          4161542*
2395541
26256            2619807              4046506              4135458          4164579*
26256
2485871            2623215              4056984              4149998          4169044*
2485871
2487741            2656682              4063568              4151872
2487741
2489907            2728448              4074188              4154379
2489907
2492785
23623
25662
2530129
2534799
2538760
2548445
2548571
2619807
23215
2656682
28448
3748138
3960107
3972856
3988061
3998656
4003629
4005781
4018891
4046506
4056984
4063568
4074188
4080668
4080689
4081816
4081882
4088017
4100277
4105039*
4105177
4135458
4149998
4151872
4154379
4155343
4156363*
4157103*
4159154*
4159914*
4160819*
4161192*
4161542*
4164579*
4169044*  
 
Design and Licensing Basis
Design and Licensing Basis
Limerick Generating Station Updated Final Safety Analysis Report, Revision 17
Limerick Generating Station Updated Final Safety Analysis Report, Revision 17
Line 207: Line 335:
D-Calibration Functional Test, performed 6/21/18
D-Calibration Functional Test, performed 6/21/18
ST-2-051-611-1, ECCS LPCI Division II Header dP Functional Test (PDISH-51-1N660B, PDSL-
ST-2-051-611-1, ECCS LPCI Division II Header dP Functional Test (PDISH-51-1N660B, PDSL-
51-1N661B), performed 6/19/18
51-1N661B), performed 6/19/18  
 
ST-2-051-621-1, ECCS RHR Injection Valve Differential Pressure - Low (Permissive) Channel
ST-2-051-621-1, ECCS RHR Injection Valve Differential Pressure - Low (Permissive) Channel
B Functional Test, performed 5/9/18
B Functional Test, performed 5/9/18
Line 257: Line 386:
S55.1.D, Appendix 1, Starting HPCI for Pressure Control During a Plant Event, Revision 0
S55.1.D, Appendix 1, Starting HPCI for Pressure Control During a Plant Event, Revision 0
S55.2.A, HPCI Shutdown from Automatic or Manual Initiation, Revision 15
S55.2.A, HPCI Shutdown from Automatic or Manual Initiation, Revision 15
S92.1.N, Diesel Generator Set Up for Automatic Operation Following Maintenance, Revision 42
S92.1.N, Diesel Generator Set Up for Automatic Operation Following Maintenance, Revision 42  
 
ST-2-055-230-2, HPCI Pump, Valve and Flow Test, Revision 80
ST-2-055-230-2, HPCI Pump, Valve and Flow Test, Revision 80
ST-2-055-810-2, HPCI System Response Time Testing, Revision 14
ST-2-055-810-2, HPCI System Response Time Testing, Revision 14
Line 287: Line 417:
Fairbanks Morris Opposed Piston Diesel Generator and Auxiliary Systems Service Manual
Fairbanks Morris Opposed Piston Diesel Generator and Auxiliary Systems Service Manual
Work Orders
Work Orders
244320                   1129275                  4293060                4733271
244320
251173                   1258164                  4317116                4733278
251173
257009                   1258165                  4622888                4733280
257009
257352                   1307274                   4714852                 4744915
257352
257358                    4250513                  4726307                4755349
257358
259170                    4272955                  4732758                4758950
259170
259181                    4283122                  4732760                4763461
259181
2527                    4292975                  4733270                4767535
2527
29275
258164
258165
1307274
250513
272955
283122
292975
293060
4317116
22888
4714852
26307
4732758
4732760
4733270
4733271
4733278
4733280
4744915
4755349
4758950
4763461
4767535
}}
}}

Latest revision as of 12:38, 5 January 2025

Design Bases Assurance Inspection (Teams) Report 05000352/2018010 and 05000353/2018010
ML18282A211
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/09/2018
From: Mel Gray
Engineering Region 1 Branch 1
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
Gray M
References
IR 2018010
Download: ML18282A211 (12)


Text

October 9, 2018

SUBJECT:

LIMERICK GENERATING STATION - DESIGN BASES ASSURANCE INSPECTION (TEAMS) REPORT 05000352/2018010 AND 05000353/2018010

Dear Mr. Hanson:

On August 2, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed the onsite portion of an inspection at Limerick Generating Station, Units 1 and 2. On August 2, 2018, the NRC inspectors discussed the preliminary results of this inspection with Mr. Frank Sturniolo, Plant Manager, and other members of your staff. After additional review of specific items, the team discussed the final results of this inspection with Mr. Rick Libra, Site Vice President, and other Exelon staff on August 30, 2018. The results of this inspection are documented in the enclosed report.

NRC inspectors did not identify any finding or violation of more than minor significance.

This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and the NRCs Public Document Room in accordance with Title 10 of the Code of Federal Regulations (10 CFR), Part 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Mel Gray, Chief Engineering Branch 1 Division of Reactor Safety

Docket Numbers: 50-352 and 50-353 License Numbers: NPF-39 and NPF-85

Enclosure:

Inspection Report 05000352/2018010 and 05000353/2018010

Inspection Report

Docket Numbers:

50-352 and 50-353

License Numbers:

NPF-39 and NPF-85

Report Numbers:

05000352/2018010 and 05000353/2018010

Enterprise Identifier:

I-2018-010-0033

Licensee:

Exelon Generation Company, LLC

Facility:

Limerick Generating Station, Units 1 & 2

Location:

Sanatoga, PA 19464

Inspection Dates:

July 16, 2018 through August 30, 2018

Inspectors:

S. Pindale, Senior Reactor Inspector, Division of Reactor Safety

(DRS), Team Leader

J. Ayala, Allegations/Enforcement Specialist, Office of the

Regional Administrator

E. Burket, Reactor Inspector, DRS

L. McKown, Resident Inspector (Millstone), Division of Reactor

Projects

S. Kobylarz, NRC Electrical Contractor

M. Yeminy, NRC Mechanical Contractor

Approved By:

Mel Gray, Chief

Engineering Branch 1

Division of Reactor Safety

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring Exelons performance at

Limerick Generating Station, Units 1 and 2 by conducting a design bases assurance inspection in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information.

No findings or more-than-minor violations were identified.

INSPECTION SCOPES

This inspection was conducted using the appropriate portions of the inspection procedure in effect at the beginning of the inspection unless otherwise noted. Currently approved inspection procedures with their attached revision histories are located on the public website at http://www.nrc.gov/reading-rm/doc-collections/insp-manual/inspection-procedure/index.html.

Samples were declared complete when the inspection procedure requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter 2515, Light-Water Reactor Inspection Program - Operations Phase. The team reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

REACTOR SAFETY

===71111.21M - Design Bases Assurance Inspection (Teams)

The team evaluated the following components, permanent modifications, and operating experience during the weeks of July 16, 2018, and July 30, 2018.

For the components, the team reviewed the attributes listed in Inspection Procedure 71111.21M, Appendix A, Component Review Attributes, such as those listed below.

Specifically, the team evaluated these attributes as per 71111.21M, Appendix B, Component Design Review Considerations and 71111.21M, Appendix C, Component Walkdown Considerations.

Components===

Unit 2 High Pressure Coolant Injection System (Turbine Controls)

o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Control logic o Equipment/environmental controls and qualification o Operator actions o Design calculations o Surveillance testing and recent test results

The team used Appendix B guidance for Valves, Instrumentation, and Electrical Loads.

Unit 2 Division II 125/250 Volt DC Bus, MCC 20D202 and MCC 20D203 o Material condition and installed configuration (e.g., visual inspection/walkdown)o Operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Equipment protection (sealing of cable and conduits)o Environmental conditions o Contactor and fuse ratings; Component adequacy for minimum voltage o Protection coordination; Load in-rush and full load current

The team used Appendix B guidance for Circuit Breakers and Fuses, Electrical Loads, Motor Control Centers, and As-Built System.

D12 Emergency Diesel Generator Mechanical Components

o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results o System and component level performance monitoring o Range, accuracy, and setpoint of installed instrumentation o Equipment protection from fire, flood, and water intrusion or spray o Heat removal cooling water and ventilation o Energy sources, fuel and air (e.g., engine start, operation, and control)

The team used Appendix B guidance for Valves, Pumps, Instrumentation, Electric Loads, and As-Built System.

Unit 1 Residual Heat Removal Pump 1BP202

o Material condition and installed configuration (e.g., visual inspection/walkdown)o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results

The team used Appendix B guidance for Valves, Instrumentation, Electric Loads, and As-Built System.

Component, Large Early Release Frequency (1 Sample)

Unit 2 A Primary Containment Vacuum Relief Valves (PSV-57-237A-1 and -2)

o Normal, abnormal, and emergency operating procedures o Consistency among design and licensing bases and other documents/procedures o System health report, maintenance effectiveness and records, and corrective action history o Design calculations o Surveillance testing and recent test results

The team used Appendix B guidance for Valves, Instrumentation, and As-Built System.

Permanent Modifications (5 Samples)

EC 622874, Change Trip Setpoint for Unit Auxiliary Transformer Hi Side OC Relay 350/351-X102A(B)(C)

EC 422309, E/S X-M1-21014 and E/S X-M1-11015 Inverter Replacement

EC 617493, Reactor Core Isolation Cooling Pump Room Environmental Condition during Station Blackout (calculation)

EC 620491, Change Motor-Operated Valve HV-011-015A to Manual Valve 011-0124A and Convert Manual Valve 011-0124A to Motor-Operated Valve HV-011-015A

EC 422109, Component Design Bases Inspection Update, Reactor Core Isolation Cooling System Calculations per 834202 (calculation)

Operating Experience (2 Samples)

NRC Information Notice 2010-23, Malfunctions of Emergency Diesel Generator Speed Switch Circuits, dated November 1, 2010

NRC Information Notice 2012-06, Ineffective Use of Vendor Technical Recommendations, dated April 24,

INSPECTION RESULTS

Observations and Minor Violations 71111.21M Problem Identification and Resolution Area Review: The team identified observations/minor violations during their review of the effectiveness of corrective actions taken by Exelon associated with an item from a previous component design bases inspection. In particular, the team reviewed Exelons actions for non-cited violation (NCV) 05000352 &

05000353/2015-01.

The NCV was related to non-conservative values in technical specifications (TSs) associated with the emergency diesel generators (EDGs), both for EDG voltage and frequency. The 2015 report also documented the applicability of NRC Administrative Letter 98-10, Dispositioning of TSs that are Insufficient to Assure Plant Safety, which discussed short term compensatory measures to be followed by a TS amendment request. Following the prior inspection, Exelon evaluated and confirmed the appropriate voltage and frequency values to be used in EDG surveillance procedures (as compensatory measures). They also developed a corrective action assignment to process a TS amendment to correct the TS values and ensure the voltage and frequency values are consistent with the design and licensing bases and with surveillance procedure acceptance criteria (IR 1402947, Assign #2).

WCAP-17308-NP, Treatment of Diesel Generator Technical Specification Frequency and Voltage Tolerances, was developed to evaluate this issue for several affected nuclear plants and was submitted to the NRC for review. The NRC staff subsequently issued a safety evaluation in a letter dated April 17, 2017, in which the NRC documented general agreement with the methodology prescribed in WCAP-17308-NP.

During this inspection, the team reviewed the details and status of Exelons corrective actions.

Relative to EDG voltage, the TSs specified a lower limit of 4160 Vac; however, Exelons existing analysis determined the lower EDG voltage limit should be 4235 Vac. Exelon determined that this higher voltage value was necessary in order to ensure full EDG operability and qualification when considering a specific criteria (voltage drop during the loading sequence) as per NRC Regulatory Guide 1.9, Application and Testing of Safety-Related Diesel Generators in Nuclear Power Plants. The team determined that there was not an operability concern because Exelon determined that, although the voltage drop during the starting of the largest electrical load was slightly below the Regulatory Guide 1.9 value, all required loads would, in fact, successfully start and run as designed when started at the 4160 Vac level. Further, the EDG voltage regulators are designed and calibrated to operate the EDGs at 4235 Vac. Notwithstanding, the team identified that the associated EDG surveillance procedures did not contain the higher, administrative limit of 4235 Vac as an acceptance criterion (4160 Vac was specified). The team reviewed this issue using Inspection Manual Chapter 0612, Appendix B, Issue Screening, and determined that the use of non-conservative acceptance criterion was a minor procedure violation because the EDGs were controlled and operated to maintain voltage at 4235 Vac (and 4160 Vac does not render the EDGs inoperable), and EDG reliability or availability were not adversely affected. Exelon entered this minor violation in their corrective action program as IR 4164579 to document and correct this deficiency.

For EDG frequency, the TSs allowed an acceptance band (58.8 - 61.2 Hertz), which is a range typical of EDG transient loading conditions. However, as described in WCAP-17308-NP, and as determined by Exelon engineering staff, a more narrow band (59.9 - 60.2 Hertz)is the appropriate operating range for steady state EDG operation. Exelon has appropriately maintained the narrow band as the acceptance criteria in the associated EDG surveillance procedures (compensatory action until TSs are revised). However, during this inspection, the team identified that in 2016, Exelon had slightly widened the acceptable band a one-tenth hertz to 59.8 - 60.2 Hertz. Further review by the team identified that this change was not properly evaluated in accordance with Exelons procedure change process. In particular, the procedure change received a less rigorous review than a 10 CFR 50.59 screen would have provided; and the team concluded that this screen should have been performed. In response, Exelon evaluated past surveillance results and analyzed the lower frequency value of 59.8 Hertz, and determined there to be no adverse consequence at 59.8 Hertz. The team reviewed Exelons analysis and similarly concluded that there was no adverse safety impact.

The team reviewed this issue using Inspection Manual Chapter 0612, Appendix B, Issue Screening, and determined that the improper procedure change was a minor procedure violation because there were no adverse consequences and EDG reliability or availability were not adversely affected. Exelon entered this minor violation in there corrective action program as IR 4160819 and IR 4161542 to document and correct this deficiency.

At the conclusion of the inspection, Exelon discussed their plans to submit to the NRC the appropriate TS changes associated with EDG voltage and frequency values in accordance with the guidance documented in NRC Administrative Letter 98-10.

EXIT MEETINGS AND DEBRIEFS

The team verified no proprietary information was retained or documented in this report.

On August 2, 2018, the team presented the Design Bases Assurance Inspection (Teams)preliminary results to Mr. Frank Sturniolo, Plant Manager, and other members of Exelon staff. The team subsequently discussed the final results of this inspection with Mr. Rick Libra, Site Vice President, and other Exelon staff on August 30, 2018.

DOCUMENTS REVIEWED

71111.21M - Design Bases Assurance Inspection (Teams)

Calculations

2-016-LIM, Evaluation of Stroke Time and Actuator Capability for DC MOVs, Revision 1

6380E.07, Diesel Generator Loading, Revision 015-A

6900E.15, 125/250Vdc System Fuse Selection and Coordination, Undervoltage Relay Setting,

and Safeguards Short Circuit Calculation, Revision 9

EC-90-1401, Inadvertent Spray Actuation, Drywell Depressurization Analysis, Revision 11

ECR LG03-00295, Analysis of DC MOVs for NRC RIS 2001-15, Revision 0

ECR LG08-00146, 111-02282 ARI NLI Inverter, Revision 0

LE-0018, Recirculation ASD 1A/2A-G109 and 1B/2B-G109 13.2 kV Input Setting Calculation,

Revision 4

LE-0069, Class 1E 125Vdc System Voltage Analysis, Revision 170 and 17P

LE-0069, Class 1E 125Vdc System Voltage Analysis, Revision 17

LE-0104, DC MCC Manual Control Circuit Calculation, Revision 1

LE-052, Class 1E Battery Load Duty Cycle Determination, Revision 18

LM-0007, Diesel Generator Fuel Oil Consumption, Revision 6

LM-0597, RHR NPSHa during FPCA and ADHR Modes, Revision 0

LM-0600, Station Blackout Analysis for the RCIC and HPCI Pump Rooms, Revision 2

LM-0663, Diesel Generator Day Tank Minimum Level, Revision 2

LM-0667, Diesel Generator Fuel Oil Storage Tank Volume, Revision 0

LS2004E001, 50.59 Evaluation for ECR LG03-00295 Revision 0, Revision 0

M-49-03, RCIC Pump Discharge Pressure Drop, Revision 6

M-49-04, RCIC Pump Pressure NPSH Allowable Degradation and Pipe Volumes, Revision 0

M-49-08, RCIC Steam Supply Pressure Drop, Revision 5

M-49-09, RCIC Turbine Exhaust Modes A - D Pressure Drops, Revision 0

M-49-15, RCIC Thermal Modes, Revision 4

M-51-08, RHR LPCI and Containment Spray Pressure Drop, Revision 4

M-51-11, RHR Mode D Available NPSH, Revision 6

M-51-35, RHR Shutdown Cooling Mode (D) Flow Calculation, Revision 3

M-51-62, RHR NPSH From Suppression Pool, Revision 6

M-55-10, HPCI Pump Performance Curves and Degradation Limits, Revision 6

M-55-20, HPCI Pump Discharge Maximum Pressure, Revision 6

MEL-0119, WS-3 Drywell Spray Initiation Limit, Revision 3

Corrective Action Documents (*initiated in response to inspection)

0834202

0976165

1156200

207412

1359061

1656919

1681458

2395541

26256

2485871

2487741

2489907

2492785

23623

25662

2530129

2534799

2538760

2548445

2548571

2619807

23215

2656682

28448

3748138

3960107

3972856

3988061

3998656

4003629

4005781

4018891

4046506

4056984

4063568

4074188

4080668

4080689

4081816

4081882

4088017

4100277

4105039*

4105177

4135458

4149998

4151872

4154379

4155343

4156363*

4157103*

4159154*

4159914*

4160819*

4161192*

4161542*

4164579*

4169044*

Design and Licensing Basis

Limerick Generating Station Updated Final Safety Analysis Report, Revision 17

L-S-01A, Class 1E 125/250 Vdc System, Revision 9

L-S-02, Emergency Service Water System, Revision 15

L-S-03, High Pressure Coolant Injection System, Rev. 20

L-S-07, Diesel Generator and Auxiliary Systems, Revision 15

L-S-09, Residual Heat Removal System, Revision 21

L-S-25A, Primary Containment Pressure Suppression System, Revision 6

L-S-39, Reactor Core Isolation Cooling System, Revision 13

Technical Specifications (Amendment 229 - Unit 1; Amendment 192 - Unit 2)

Drawings

8031-E-34, Single Line Diagram Instrumentation AC System Unit 2, Revision 40

8031-M-1-H12-P640-C-002, DIV 3 RHR & Core Spray Relay VB Unit 2, Revision 23

8031-M-1-H12-P640-E-012, DIV 3 RHR & Core Spray Relay VB Unit 2, Revision 23

8031-M-1-H12-P640-E-016, DIV 3 RHR & Core Spray Relay VB Unit 2, Revision 13

8031-M-1-H12-P640-E-018, DIV 3 RHR & Core Spray Relay VB Unit 2, Revision 14

8031-M-1-H12-P641-C-001, DIV 4 RHR & Core Spray Relay VB, Revision 20

8031-M-1-H12-P641-E-003, DIV 4 RHR & Core Spray Relay VB, Revision 33

8031-M-1-H12-P641-E-004, DIV 4 RHR & Core Spray Relay VB, Revision 31

8031-M-1-H12-P641-E-005, DIV 4 RHR & Core Spray Relay VB, Revision 20

8031-M-1-H12-P641-E-006, DIV 4 RHR & Core Spray Relay VB, Revision 32

8031-M-50, Sht. 1, RCIC Pump Turbine, Revision 37

8031-M-50, Sht. 4, RCIC Pump Turbine Unit 2 Lube Oil and Control System, Revision 2

8031-M-51, Sht. 1, Residual Heat Removal, Revision 66

8031-M-51, Sht. 2, Residual Heat Removal, Revision 68

8031-M-51, Sht. 3, Residual Heat Removal, Revision 69

8031-M-51, Sht. 4, Residual Heat Removal, Revision 67

8031-M-55, High Pressure Control System (Unit 2), Revision 57

8031-M-56, Sht. 2, HPCI Pump/Turbine, Revision 12

8031-M-56, Sht. 4, HPCI Pump/Turbine (Lube Oil and Control Systems), Revision 6

8031-M-57, Containment Atmospheric Control, Revision 44

93-13377, 18 inch 300 pound Carbon Steel Swing Check Valve with Test Lever, Revision N

E-1, Sht. 1, Single Line Diagram, Revision 31

E21-1040-E-023, Elementary Diagram Core Spray System Unit 2, Revision 11

E41-1040-E-020, Sht.4, Elementary Diagram HPCI System, Revision 11

M-0012, Emergency Service Water/RHR Service Water Overview, Revision 13

M-0020, Sht. 001 through 0014, Diesel Generator and Auxiliary Systems

M-1-E41-1030-F-004, Functional Control Diagram High Pressure Control System, Revision 27

M-1-E41-1040-C-027, Sht. 6, Elementary Diagram HPCI System, Revision 0

M-1-E41-1040-E-020, Elementary Diagram HPCI, Revision 11

M-1-E41-1040-E-025, Elementary Diagram HPCI, Revision 11

T-101, Reactor Pressure Vessel Control, Revision 25

T-102, Primary Containment Control, Revision 27

Functional, Surveillance and Modification Acceptance Testing

RT-2-050-406-1, RCIC Turbine Exhaust Pressure - High Channel A Calibration/Functional

Test, performed 6/4/16

ST-2-051-423-1, ECCS RHR Injection Valve Differential Pressure - Low (Permissive) Channel

D-Calibration Functional Test, performed 6/21/18

ST-2-051-611-1, ECCS LPCI Division II Header dP Functional Test (PDISH-51-1N660B, PDSL-

51-1N661B), performed 6/19/18

ST-2-051-621-1, ECCS RHR Injection Valve Differential Pressure - Low (Permissive) Channel

B Functional Test, performed 5/9/18

ST-2-051-624-1, Operational Leakage - High/Low Pressure Interface - Valve Leakage Monitor

Functional Test, performed 5/9/18

ST-2-060-400-2, Containment Systems, Suppression Chamber/Drywell Vacuum Breaker

Setpoint Check and Channel Calibration Test (PSV57-237A through -237D, and ZS-57-

237A through -237D), performed 5/3/17 and 4/27/15

ST-5-020-810-0, Attachment 1, Diesel Generator Fuel Receipt Analysis, performed 7/20/18,

7/13/18, 6/1/18, 4/2718, 3/2318, 3/16/18, 3/2/18, 2/9/18, 1/18/18, and 11/30/17

ST-6-092-315-1, D11 Diesel Generator Fast Start Operability Test Run, performed 7/30/17

Modifications and Design Changes

EC 422109, Component Design Bases Inspection Update, Reactor Core Isolation Cooling

System Calculations per 834202 (calculation), Revision 1

EC 422309, E/S X-M1-21014 and E/S X-M1-11015 Inverter Replacement, Revision 0

EC 617493, Reactor Core Isolation Cooling Pump Room Environmental Condition during

Station Blackout (calculation), Revision 0

EC 617696, E/S X-M1-21014 Inverter Replacement, Revision 0

EC 620491, Change Motor-Operated Valve HV-011-015A to Manual Valve 011-0124A and

Convert Manual Valve 011-0124A to Motor-Operated Valve HV-011-015A, Revision 0

EC 622874, Change Trip Setpoint for Unit Auxiliary Transformer Hi Side OC Relay 350/351-

X102A(B)(C), Revision 0

EC 624360, Fairbanks Morse EDG Maintenance Inspection Program Review, Revision 0

ECR LG 09-00471, CDBI Update RCIC Calculations per 834202-22, Revision 1

ECR LG 14-00177, Install Isolation Valves Upstream of HV-011-015A/B, Revision 9

Procedures

ARC-MCR-222, 2DB-1 250Vdc MCC Undervoltage G2, Revision 0

ARC-MCR-222, 2DB-2 250Vdc MCC Undervoltage G3, Revision 0

E-1, Attachment 4, Alternate Power Supply for any 4kV Safeguard Bus using any Diesel

Generator, Revision 52

EN-AA-501-0001, Controlled Material Program Approval and Evaluation Process, Revision 2

ER-AA-5400-1001, Raw Water Piping Integrity Management Guide, Revision 11

IC-C-11-04067, Testing and/or Replacement of AGASTAT Series GP, TR, and 7000 Series

Relays, Revision 12

IP-ENG-001, Standard Design Process, Revision 0

M-095-002, 250 Vdc Westinghouse MCC Maintenance, Revision 8

MA-AA-716-230-1001, Attachment 93, Fairbanks Morse Opposed Piston Diesel Lubricating Oil

Monitoring Program, Revision 20

MA-LG-716-1017, Control of Bolting/Torqueing/Tensioning, Revision 4

PI-AA-115-1003, Processing of Level 3 OPEX Evaluations, Revision 4

S51.6.A, Swapping RHR Pumps in RHR-SDC Mode, Revision 18

S51.8.A, Suppression Pool Cooling Operation (Startup and Shutdown) and Level Control,

Revision 49

S51.8.H, Use of Dedicated LPCI Pumps for Shutdown Cooling / Reactor Coolant Circulation

Operation, Revision 44

S51.8.I, Use of Dedicated LPCI Pumps for Suppression Pool Cooling Operation and Level

Control, Revision 41

S55.1.A, Normal HPCI Line-Up for Automatic Operation, Revision 37

S55.1.D, Appendix 1, Starting HPCI for Pressure Control During a Plant Event, Revision 0

S55.2.A, HPCI Shutdown from Automatic or Manual Initiation, Revision 15

S92.1.N, Diesel Generator Set Up for Automatic Operation Following Maintenance, Revision 42

ST-2-055-230-2, HPCI Pump, Valve and Flow Test, Revision 80

ST-2-055-810-2, HPCI System Response Time Testing, Revision 14

T-225, Startup and Shutdown of Suppression Pool and Drywell Spray Operation, Revision 25

Miscellaneous

2A1495AC, GE Design Specification, Revision 2

A-C-72, Emergency Diesel Generator Reliability Program, Revision 0

Agastat EGP/EML/ETR Series, Nuclear Qualified Control Relays, March 2013

GEH-1788L, Time Overcurrent Relays, November 1991

Limerick Emergency Diesel Generator Performance Monitoring Plan/Performance Monitoring

Maintenance Rule System Basis Document, Diesel Generators and Auxiliaries

Maintenance Rule System Basis Document, HPCI

NERC-PRC-025-1, Generator Relay Loadability, Revision 0

Operations Standing Order 18-05, Check of EDG Lube Oil Heaters Prior to Making a Diesel

Generator Inoperable, Revision 0

Operations Standing Order 18-05, Diesel Generator Rounds During Diesel Testing, Revision 1

PCM Template HPCI Pressure Sensor and Transmitter, Revision 2

PCM Template Relays - Control/Timing, Revision 1

PCM Template, HPCI Controllers - Electronic (Analog and Digital), Revision 5

P-J00, Limerick Generating Station, Environmental Qualification, Revision 5

Product Data Sheet, Rosemount 1151 Pressure Transmitter, Revision JB

Specification P-300, Piping Class Sheets, Revision 45

System Health Report, Diesel Generator / Fuel Oil / EDG HVAC, 2Q18

Vendor Manuals

8031-M-1-E11-C002-J-12.1, Residual Heat Removal Pump Ingersol Rand Head Capacity

Curve, 3/3/84

8031-M-81-47-10, Operation and Maintenance Manual for Vacuum Relief Valve, Type CV1-L,

24-Inch and Auxiliaries, 6/3/93

Fairbanks Morris Opposed Piston Diesel Generator and Auxiliary Systems Service Manual

Work Orders

244320

251173

257009

257352

257358

259170

259181

2527

29275

258164

258165

1307274

250513

272955

283122

292975

293060

4317116

22888

4714852

26307

4732758

4732760

4733270

4733271

4733278

4733280

4744915

4755349

4758950

4763461

4767535