ML18285A063: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML18285A063
| number = ML18285A063
| issue date = 09/27/2018
| issue date = 09/27/2018
| title = Revision 54 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program
| title = 4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program
| author name =  
| author name =  
| author affiliation = Virginia Electric & Power Co (VEPCO), Dominion Energy Virginia
| author affiliation = Virginia Electric & Power Co (VEPCO), Dominion Energy Virginia
Line 19: Line 19:
{{#Wiki_filter:North Anna Power Station Updated Final Safety Analysis Report Chapter 17
{{#Wiki_filter:North Anna Power Station Updated Final Safety Analysis Report Chapter 17


Intentionally Blank Revision 54--09/27/18                                     NAPS UFSAR                       17-1 CHAPTER 17             QUALITY ASSURANCE PROGRAM The Quality Assurance Program is described in Topical Report DOM-QA-1, Dominion Nuclear Facility Quality Assurance Program Description (QAPD). This topical report provides the QAPD for Dominions nuclear power stations and independent spent fuel storage installations.
Intentionally Blank Intentionally Blank
The Dominion QAPD conforms to applicable regulatory requirements, such as 10 CFR 50, Appendix B, and approved industry standards, including equivalent alternatives, where identified.
 
Revision 54--09/27/18 NAPS UFSAR 17-1 CHAPTER 17 QUALITY ASSURANCE PROGRAM The Quality Assurance Program is described in Topical Report DOM-QA-1, Dominion Nuclear Facility Quality Assurance Program Description (QAPD). This topical report provides the QAPD for Dominions nuclear power stations and independent spent fuel storage installations.
The Dominion QAPD conforms to applicable regulatory requirements, such as 10CFR50, AppendixB, and approved industry standards, including equivalent alternatives, where identified.
This program applies to activities during design, construction, operation, and decommissioning as well as siting.
This program applies to activities during design, construction, operation, and decommissioning as well as siting.


Revision 54--09/27/18                   NAPS UFSAR 17-2 Intentionally Blank}}
Revision 54--09/27/18 NAPS UFSAR 17-2 Intentionally Blank}}

Latest revision as of 12:17, 5 January 2025

4 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program
ML18285A063
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/27/2018
From:
Virginia Electric & Power Co (VEPCO), Dominion Energy Virginia
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18285A084 List:
References
18-292
Download: ML18285A063 (4)


Text

North Anna Power Station Updated Final Safety Analysis Report Chapter 17

Intentionally Blank Intentionally Blank

Revision 54--09/27/18 NAPS UFSAR 17-1 CHAPTER 17 QUALITY ASSURANCE PROGRAM The Quality Assurance Program is described in Topical Report DOM-QA-1, Dominion Nuclear Facility Quality Assurance Program Description (QAPD). This topical report provides the QAPD for Dominions nuclear power stations and independent spent fuel storage installations.

The Dominion QAPD conforms to applicable regulatory requirements, such as 10CFR50, AppendixB, and approved industry standards, including equivalent alternatives, where identified.

This program applies to activities during design, construction, operation, and decommissioning as well as siting.

Revision 54--09/27/18 NAPS UFSAR 17-2 Intentionally Blank