{{#Wiki_filter:November 20, 2018
{{#Wiki_filter:November 20, 2018  
Mr. Scott Sharp
Site Vice President
Mr. Scott Sharp  
Prairie Island Nuclear Generating Plant
Site Vice President  
Northern States Power Company, Minnesota
Prairie Island Nuclear Generating Plant  
1717 Wakonade Drive East
Northern States Power Company, Minnesota  
Welch, MN 55089-9642
1717 Wakonade Drive East  
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
Welch, MN 55089-9642  
            NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE
            INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2  
            REPORT 05000282/2019001 AND 05000306/2019001
NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE  
Dear Mr. Sharp:
INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
On Monday, March 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the
REPORT 05000282/2019001 AND 05000306/2019001  
onsite portion of the Triennial Heat Sink Performance Inspection at your Prairie Island Nuclear
Generating Plant, Units 1 and 2. This inspection will be performed in accordance with NRC
Dear Mr. Sharp:  
baseline Inspection Procedure 71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
On Monday, March 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the  
inspection, we have enclosed a request for documents needed for the inspection. The
onsite portion of the Triennial Heat Sink Performance Inspection at your Prairie Island Nuclear  
document request have been divided into three groups.
Generating Plant, Units 1 and 2. This inspection will be performed in accordance with NRC  
    *   The first group lists information necessary for our initial inspection scoping activities.
baseline Inspection Procedure 71111.07.  
        This information should be available to the lead inspector no later than January 7, 2019.
        By January 18, 2019, the lead inspector will communicate the initial selected set of
In order to minimize the impact that the inspection has on the site and to ensure a productive  
        approximately 2-3 risk significant heat exchangers.
inspection, we have enclosed a request for documents needed for the inspection. The  
    *   The second group is needed to support our in-office preparation activities. This set of
document request have been divided into three groups.  
        documents, including the calculations associated with the selected heat exchangers,
        should be available at the Regional Office no later than February 18, 2019. This
*  
        information should be separated for each selected component, especially if provided
The first group lists information necessary for our initial inspection scoping activities.
        electronically (e.g., folder with component name that includes calculations, condition
This information should be available to the lead inspector no later than January 7, 2019.
        reports, maintenance history, etc.). During the in-office preparation activities, the
By January 18, 2019, the lead inspector will communicate the initial selected set of  
        inspector may identify additional information needed to support the inspection.
approximately 2-3 risk significant heat exchangers.  
    *   The last group is the needed additional information identified during our in-office
        preparation activities. This information should be available onsite to the inspector on
*  
        March 4, 2019. It is also requested that corrective action documents and/or questions
The second group is needed to support our in-office preparation activities. This set of  
        developed during the inspection be provided to the inspector as the documents are
documents, including the calculations associated with the selected heat exchangers,  
        generated.
should be available at the Regional Office no later than February 18, 2019. This  
information should be separated for each selected component, especially if provided  
electronically (e.g., folder with component name that includes calculations, condition  
reports, maintenance history, etc.). During the in-office preparation activities, the  
inspector may identify additional information needed to support the inspection.  
*  
The last group is the needed additional information identified during our in-office  
preparation activities. This information should be available onsite to the inspector on  
March 4, 2019. It is also requested that corrective action documents and/or questions  
developed during the inspection be provided to the inspector as the documents are  
generated.  


S. Sharp                                     -2-
S. Sharp  
All requested documents are to be for the time period from the onsite inspection period back
-2-  
to the documents that were provided in response to the previous Heat Sink Performance
All requested documents are to be for the time period from the onsite inspection period back  
Inspection. If no activities were accomplished in that time period, then the request applies to the
to the documents that were provided in response to the previous Heat Sink Performance  
last applicable document in the previous time period. It is important that these documents be as
Inspection. If no activities were accomplished in that time period, then the request applies to the  
complete as possible, in order to minimize the number of documents requested during the
last applicable document in the previous time period. It is important that these documents be as  
preparation week or during the onsite inspection.
complete as possible, in order to minimize the number of documents requested during the  
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our
preparation week or during the onsite inspection.  
licensing contact for this inspection is Pamela Johnson of your organization. If there are any
questions about the inspection or the material requested in the enclosure, please contact the
The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our  
lead inspector at 630-829-9739 or via e-mail at Nestor.Feliz-Adorno@nrc.gov.
licensing contact for this inspection is Pamela Johnson of your organization. If there are any  
This letter does not contain new or amended information collection requirements subject
questions about the inspection or the material requested in the enclosure, please contact the  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
lead inspector at 630-829-9739 or via e-mail at Nestor.Feliz-Adorno@nrc.gov.  
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
This letter does not contain new or amended information collection requirements subject  
respond to, a request for information or an information collection requirement unless the
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information  
requesting document displays a currently valid Office of Management and Budget Control
collection requirements were approved by the Office of Management and Budget, Control  
Number.
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to  
This letter and its enclosure will be made available for public inspection and copying at
respond to, a request for information or an information collection requirement unless the  
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
requesting document displays a currently valid Office of Management and Budget Control  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
Number.  
Exemptions, Requests for Withholding.
                                              Sincerely,
This letter and its enclosure will be made available for public inspection and copying at  
                                              /RA Michael A. Jones Acting for/
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
                                              Néstor J. Féliz Adorno, Senior Reactor Engineer
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
                                              Engineering Branch 2
Exemptions, Requests for Withholding.  
                                              Division of Reactor Safety
Docket No. 50-282; 50-306
Sincerely,  
License No. DPR-42; DPR-60
Enclosure:
/RA Michael A. Jones Acting for/  
Document Request for Triennial Heat Sink
   Performance Inspection
cc: Distribution via LISTSERV
Néstor J. Féliz Adorno, Senior Reactor Engineer  
Engineering Branch 2  
Division of Reactor Safety  
Docket No. 50-282; 50-306  
License No. DPR-42; DPR-60  
Enclosure:  
Document Request for Triennial Heat Sink  
   Performance Inspection  
cc: Distribution via LISTSERV  


S. Sharp                                     -3-
S. Sharp  
Letter to Scott Sharp from Néstor J. Féliz Adorno dated November 20, 2018.
-3-  
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
Letter to Scott Sharp from Néstor J. Féliz Adorno dated November 20, 2018.  
            NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE
            INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2  
            REPORT 05000282/2019001 AND 05000306/2019001
NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE  
DISTRIBUTION:
INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
Christopher Cook
REPORT 05000282/2019001 AND 05000306/2019001  
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3
DISTRIBUTION:  
RidsNrrDirsIrib Resource
Christopher Cook  
Steven West
RidsNrrPMPrairieIsland Resource  
Darrell Roberts
RidsNrrDorlLpl3  
Jamnes Cameron
RidsNrrDirsIrib Resource  
Allan Barker
Steven West  
DRPIII
Darrell Roberts  
DRSIII
Jamnes Cameron  
ADAMS Accession Number: ML18324A612
Allan Barker  
OFFICE RIII
DRPIII  
  NAME       MJones for NFéliz
DRSIII  
            Adorno:cl
  DATE       11/20/18
                                  OFFICIAL RECORD COPY
ADAMS Accession Number: ML18324A612  
OFFICE  
RIII  
   
NAME  
MJones for NFéliz  
Adorno:cl  
   
DATE  
11/20/18  
OFFICIAL RECORD COPY  


  DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
Inspection Report:           05000282/2019001; 05000306/2019001
Enclosure
Inspection Dates:           March 4, 2019, through March 8, 2019
Inspection Report:  
Inspection Procedure:       Inspection Procedure 71111.07, Heat Sink Performance
05000282/2019001; 05000306/2019001  
Lead Inspector:             Néstor J. Féliz Adorno
                            630-829-9739
                            Nestor.Feliz-Adorno@nrc.gov
Inspection Dates:  
I.     Information Requested By January 7, 2019
March 4, 2019, through March 8, 2019  
      1.   List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
            Safety-Related Equipment, heat exchangers in order of risk significance.
      2.   Copy of heat exchanger performance trending data tracked for each GL 89-13
Inspection Procedure:  
            heat exchanger.
Inspection Procedure 71111.07, Heat Sink Performance  
      3.   List of Corrective Action Program documents (with a short description)
            associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,
            or heat exchanger testing, for the previous 3 years or since the last Corrective
Lead Inspector:  
            Action Program document list was sent to the U.S. Nuclear Regulatory
Néstor J. Féliz Adorno  
            Commission for the previous heat sink performance inspection.
630-829-9739  
      4.   Copy of any self-assessment done on any of GL 89-13 heat exchangers.
Nestor.Feliz-Adorno@nrc.gov  
      5.   Last two System Health Report(s) and maintenance rule system notebooks for all
            the GL 89-13 heat exchangers.
      6.   List of engineering-related operator workarounds (with a short description)
I.  
            associated with GL 89-13 heat exchangers. The requested documents are to be
Information Requested By January 7, 2019  
            for the time period from the onsite inspection period back to the documents that
            were provided in response to the previous heat sink performance inspection.
1.  
      7.   List of permanent and temporary modifications (with a short description)
List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting  
            associated with GL 89-13 heat exchangers. The requested documents are to be
Safety-Related Equipment, heat exchangers in order of risk significance.  
            for the time period from the onsite inspection period back to the documents that
            were provided in response to the previous heat sink performance inspection.
2.  
      8.   Provide a list of any design change (with a short description) performed on
Copy of heat exchanger performance trending data tracked for each GL 89-13  
            the Ultimate Heat Sink (UHS) or safety-related service water systems. The
heat exchanger.  
            requested documents are to be for the time period from the onsite inspection
            period back to the documents that were provided in response to the previous
3.  
            heat sink performance inspection.
List of Corrective Action Program documents (with a short description)  
                                                                                      Enclosure
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,  
or heat exchanger testing, for the previous 3 years or since the last Corrective  
Action Program document list was sent to the U.S. Nuclear Regulatory  
Commission for the previous heat sink performance inspection.  
4.  
Copy of any self-assessment done on any of GL 89-13 heat exchangers.  
5.  
Last two System Health Report(s) and maintenance rule system notebooks for all  
the GL 89-13 heat exchangers.  
6.  
List of engineering-related operator workarounds (with a short description)  
associated with GL 89-13 heat exchangers. The requested documents are to be  
for the time period from the onsite inspection period back to the documents that  
were provided in response to the previous heat sink performance inspection.  
7.  
List of permanent and temporary modifications (with a short description)  
associated with GL 89-13 heat exchangers. The requested documents are to be  
for the time period from the onsite inspection period back to the documents that  
were provided in response to the previous heat sink performance inspection.  
8.  
Provide a list of any design change (with a short description) performed on  
the Ultimate Heat Sink (UHS) or safety-related service water systems. The  
requested documents are to be for the time period from the onsite inspection  
period back to the documents that were provided in response to the previous  
heat sink performance inspection.  


  DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
    9.   Electronic copies of Updated Final Safety Analysis Report, Technical
2
          Specifications, Technical Specifications Bases, and Technical Requirements
9.  
          Manual.
Electronic copies of Updated Final Safety Analysis Report, Technical  
II   Information Requested By February 18, 2019
Specifications, Technical Specifications Bases, and Technical Requirements  
    1.   Copies of the GL 89-13 responses.
Manual.  
    2.   Copies of procedures developed to implement the recommendations of GL 89-13
          (e.g., the GL 89-13 Heat Exchanger Program description).
II  
    3.   Copies of the selected corrective action program documents.
Information Requested By February 18, 2019  
    4.   Copies of the selected modifications, if any.
    5.   For the specific heat exchangers selected:
1.  
          a. Copy of system description and design basis document for the heat
Copies of the GL 89-13 responses.  
                exchangers (as applicable).
          b. Copy of the construction code, Design Specification, heat exchanger data
2.  
                sheets, and vendor documents including component drawings applicable for
Copies of procedures developed to implement the recommendations of GL 89-13  
                the heat exchangers.
(e.g., the GL 89-13 Heat Exchanger Program description).  
          c. Copy of the following calculations for each selected heat exchanger that:
                i. establish the limiting design basis heat load required to be removed by
3.  
                    each of these heat exchangers;
Copies of the selected corrective action program documents.  
                ii. demonstrate the heat exchangers capacity to remove the limiting heat
                    load;
4.  
              iii. correlate surveillance testing and/or inspection results from these heat
Copies of the selected modifications, if any.  
                    exchangers with design basis heat removal capability (e.g., basis for
                    surveillance test and/or inspection acceptance criteria);
5.  
              iv. evaluate the potential for water hammer in each heat exchanger or
For the specific heat exchangers selected:  
                    associated piping; and
                v. evaluate excessive tube vibration in each heat exchanger.
a. Copy of system description and design basis document for the heat  
          d. Copy of any operability determinations or other documentation of degradation
exchangers (as applicable).  
                associated with the heat exchangers or the systems that support the
                operation for the selected heat exchangers.
b. Copy of the construction code, Design Specification, heat exchanger data  
          e. Copies of normal, abnormal, and emergency operating procedures
sheets, and vendor documents including component drawings applicable for  
                associated with the selected heat exchangers.
the heat exchangers.  
          f.   Copy of the operating procedure that ensures that the maximum cooling
                water system inlet temperature limit is not exceeded.
c. Copy of the following calculations for each selected heat exchanger that:  
                                              2
i. establish the limiting design basis heat load required to be removed by  
each of these heat exchangers;  
ii. demonstrate the heat exchangers capacity to remove the limiting heat  
load;  
iii. correlate surveillance testing and/or inspection results from these heat  
exchangers with design basis heat removal capability (e.g., basis for  
surveillance test and/or inspection acceptance criteria);  
iv. evaluate the potential for water hammer in each heat exchanger or  
associated piping; and
v. evaluate excessive tube vibration in each heat exchanger.  
d. Copy of any operability determinations or other documentation of degradation  
associated with the heat exchangers or the systems that support the  
operation for the selected heat exchangers.  
e. Copies of normal, abnormal, and emergency operating procedures  
associated with the selected heat exchangers.  
f. Copy of the operating procedure that ensures that the maximum cooling  
water system inlet temperature limit is not exceeded.  


DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
      g. Copies of those documents that describe the methods taken to control water
3
          chemistry in the heat exchangers.
g. Copies of those documents that describe the methods taken to control water  
      h. Copies of the two most recent completed tests and evaluation data
chemistry in the heat exchangers.  
          confirming thermal performance for those heat exchangers which are
          performance tested.
h. Copies of the two most recent completed tests and evaluation data  
      i. Documentation and procedures that identify the types, accuracy, and location
confirming thermal performance for those heat exchangers which are  
          of any special instrumentation used for the two most recently completed
performance tested.  
          thermal performance tests for the heat exchangers (e.g., high accuracy
          ultrasonic flow instruments or temperature instruments). Include calibration
i.  
          records for the instruments used during these tests.
Documentation and procedures that identify the types, accuracy, and location  
      j. Information regarding any alarms which monitor on-line performance.
of any special instrumentation used for the two most recently completed  
      k. Copy of the periodic flow testing at or near maximum design flow. The
thermal performance tests for the heat exchangers (e.g., high accuracy  
          requested documents are to be for the time period from the onsite inspection
ultrasonic flow instruments or temperature instruments). Include calibration  
          period back to the documents that were provided in response to the previous
records for the instruments used during these tests.  
          heat sink performance inspection.
      l. Copy of the document which identifies the current number of tubes in service
j.  
          for each heat exchanger and the supporting calculation which establishes the
Information regarding any alarms which monitor on-line performance.  
          maximum number of tubes which can be plugged in each heat exchanger.
      m. Copy of the document establishing the repair criteria (plugging limit) for
k. Copy of the periodic flow testing at or near maximum design flow. The  
          degraded tubes which are identified in each heat exchanger.
requested documents are to be for the time period from the onsite inspection  
      n. Copies of the documents that verify the structural integrity of the heat
period back to the documents that were provided in response to the previous  
          exchanger (e.g., eddy current summary sheets, ultrasonic testing results,
heat sink performance inspection.  
          and visual inspection results).
      o. The cleaning and inspection maintenance schedule for each heat exchanger
l.  
          for the next 5 years.
Copy of the document which identifies the current number of tubes in service  
  6. For the UHS and the safety-related service water system (or equivalent):
for each heat exchanger and the supporting calculation which establishes the  
      a. Copy of system description and design basis document (as applicable).
maximum number of tubes which can be plugged in each heat exchanger.  
      b. Copy of any operability determinations or other documentation of degradation
          associated with the UHS and the safety-related service water system.
m. Copy of the document establishing the repair criteria (plugging limit) for  
      c. Copy of the document (e.g., Technical Requirements Manual, procedure) that
degraded tubes which are identified in each heat exchanger.  
          states the maximum cooling water system inlet temperature limit that still
          allows full licensed power operation of the nuclear reactor.
n. Copies of the documents that verify the structural integrity of the heat  
      d. Copy of the construction code and Design Specification.
exchanger (e.g., eddy current summary sheets, ultrasonic testing results,  
      e. Copies of normal, abnormal, and emergency operating procedures
and visual inspection results).  
          associated with the UHS and safety-related service water systems including
          procedures for loss of these systems.
o. The cleaning and inspection maintenance schedule for each heat exchanger  
                                        3
for the next 5 years.  
6.  
For the UHS and the safety-related service water system (or equivalent):  
a. Copy of system description and design basis document (as applicable).  
b. Copy of any operability determinations or other documentation of degradation  
associated with the UHS and the safety-related service water system.  
c. Copy of the document (e.g., Technical Requirements Manual, procedure) that  
states the maximum cooling water system inlet temperature limit that still  
allows full licensed power operation of the nuclear reactor.  
d. Copy of the construction code and Design Specification.  
e. Copies of normal, abnormal, and emergency operating procedures  
associated with the UHS and safety-related service water systems including  
procedures for loss of these systems.  


DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
      f. Copies of corrective action documents associated with waterhammer or
4
          hydraulic transients in the service water system since the last Heat Sink
f. Copies of corrective action documents associated with waterhammer or  
          Inspection.
hydraulic transients in the service water system since the last Heat Sink  
      g. If available, provide an electronic copy of piping and instrumentation
Inspection.  
          diagrams for the service water system, including the intake structure.
      h. Provide a list of calculations (with a short description), which currently apply
g. If available, provide an electronic copy of piping and instrumentation  
          to UHS and safety-related service water system.
diagrams for the service water system, including the intake structure.  
      i. Provide a list of instruments (with a short description) associated with
          automatic or alarm functions for the safety-related service water system
h. Provide a list of calculations (with a short description), which currently apply  
          and/or UHS.
to UHS and safety-related service water system.  
      j. Copies of calculations and surveillances that determine the UHS reservoir
          capacity and heat transfer capability.
i.  
      k. Copies of the documents associated with the monitoring, trending, and
Provide a list of instruments (with a short description) associated with  
          remediation of silt accumulation at the service water pump bay.
automatic or alarm functions for the safety-related service water system  
      l. Copies of surveillance procedures and testing results performed on the
and/or UHS.  
          instrumentation relied upon to determine UHS reservoir capability. The
          requested documents are to be for the time period from the onsite inspection
j.  
          period back to the documents that were provided in response to the previous
Copies of calculations and surveillances that determine the UHS reservoir  
          heat sink performance inspection.
capacity and heat transfer capability.  
      m. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,
          dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or
k. Copies of the documents associated with the monitoring, trending, and  
          kelp). The requested documents are to be for the time period from the onsite
remediation of silt accumulation at the service water pump bay.  
          inspection period back to the documents that were provided in response to
          the previous heat sink performance inspection.
l.  
      n. Copies of documents associated with the monitoring of pump performance for
Copies of surveillance procedures and testing results performed on the  
          potential strong-pump vs. weak-pump interaction.
instrumentation relied upon to determine UHS reservoir capability. The  
      o. Copies of the last two performance tests, such as the American Society of
requested documents are to be for the time period from the onsite inspection  
          Mechanical Engineers in-service test, for the pumps and valves. If the
period back to the documents that were provided in response to the previous  
          components are not performance tested, please provide documentation
heat sink performance inspection.  
          verifying performance by the methods actually used.
      p. Copies of the documents that demonstrate that flow balance testing was
m. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,  
          performed during the last 3 years. If the last flow test was performed longer
dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or  
          than 3 years, then provide the last flow test.
kelp). The requested documents are to be for the time period from the onsite  
      q. Copies of procedures used to monitor interface valves between the
inspection period back to the documents that were provided in response to  
          safety-related section of the service water system and the nonsafety-related
the previous heat sink performance inspection.  
          section and the associated results. The requested documents are to be for
          the time period from the onsite inspection period back to the documents that
n. Copies of documents associated with the monitoring of pump performance for  
          were provided in response to the previous heat sink performance inspection.
potential strong-pump vs. weak-pump interaction.  
                                        4
o. Copies of the last two performance tests, such as the American Society of  
Mechanical Engineers in-service test, for the pumps and valves. If the  
components are not performance tested, please provide documentation  
verifying performance by the methods actually used.  
p. Copies of the documents that demonstrate that flow balance testing was  
performed during the last 3 years. If the last flow test was performed longer  
than 3 years, then provide the last flow test.  
q. Copies of procedures used to monitor interface valves between the  
safety-related section of the service water system and the nonsafety-related  
section and the associated results. The requested documents are to be for  
the time period from the onsite inspection period back to the documents that  
were provided in response to the previous heat sink performance inspection.  


    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION  
              r. Copies of the procedures that verify the performance of risk significant
5
                  non-safety functions and the associated results. The requested documents
r. Copies of the procedures that verify the performance of risk significant  
                  are to be for the time period from the onsite inspection period back to the
non-safety functions and the associated results. The requested documents  
                  documents that were provided in response to the previous heat sink
are to be for the time period from the onsite inspection period back to the  
                  performance inspection.
documents that were provided in response to the previous heat sink  
              s. Copies of the testing, inspection, or monitoring program procedures for buried
performance inspection.  
                  or inaccessible piping and the associated results. The requested documents
                  are to be for the time period from the onsite inspection period back to the
s. Copies of the testing, inspection, or monitoring program procedures for buried  
                  documents that were provided in response to the previous heat sink
or inaccessible piping and the associated results. The requested documents  
                  performance inspection.
are to be for the time period from the onsite inspection period back to the  
              t. History of any thru wall pipe leak on the system. The requested documents
documents that were provided in response to the previous heat sink  
                  are to be for the time period from the onsite inspection period back to the
performance inspection.  
                  documents that were provided in response to the previous heat sink
                  performance inspection.
t. History of any thru wall pipe leak on the system. The requested documents  
              u. Copies of the documents associated with the Periodic Inspection Program
are to be for the time period from the onsite inspection period back to the  
                  used to detect protective coating failure, corrosion, and erosion.
documents that were provided in response to the previous heat sink  
              v. Copies of the in-service test vibration monitoring results and operational
performance inspection.  
                  history for deep draft vertical pumps, if applicable. The requested documents
                  are to be for the time period from the onsite inspection period back to the
u. Copies of the documents associated with the Periodic Inspection Program  
                  documents that were provided in response to the previous heat sink
used to detect protective coating failure, corrosion, and erosion.  
                  performance inspection.
        7.     A schedule of all inspections, cleanings, maintenance, or testing of any
v. Copies of the in-service test vibration monitoring results and operational  
              safety-related plant heat exchanger to be performed during the onsite portion
history for deep draft vertical pumps, if applicable. The requested documents  
              of the inspection.
are to be for the time period from the onsite inspection period back to the  
III     Information Requested to be Available on First Day of Inspection, March 4, 2019
documents that were provided in response to the previous heat sink  
            1. During the in-office preparation activities, the team will be making final selections
performance inspection.  
              and may identify additional information needed to support the inspection. The
              lead inspector will provide a list of any additional information needed during the
7.  
              week of February 25, 2019.
A schedule of all inspections, cleanings, maintenance, or testing of any  
safety-related plant heat exchanger to be performed during the onsite portion  
of the inspection.  
III  
Information Requested to be Available on First Day of Inspection, March 4, 2019  
1. During the in-office preparation activities, the team will be making final selections  
and may identify additional information needed to support the inspection. The  
lead inspector will provide a list of any additional information needed during the  
week of February 25, 2019.  
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                  5
}}
}}

Latest revision as of 09:09, 5 January 2025

Ltr. 11/20/18 Prairie Island Nuclear Generating Plant, Units 1 and 2 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000282/2019001 and 05000306/2019001 (DRS-N.Feliz-Adorn
ML18324A612
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/20/2018
From: Nestor Feliz-Adorno
NRC/RGN-III/DRS/EB2
To: Sharp S
Northern States Power Company, Minnesota
References
IR 2019001
Download: ML18324A612 (8)


See also: IR 05000282/2019001

Text

November 20, 2018

Mr. Scott Sharp

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089-9642

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000282/2019001 AND 05000306/2019001

Dear Mr. Sharp:

On Monday, March 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the

onsite portion of the Triennial Heat Sink Performance Inspection at your Prairie Island Nuclear

Generating Plant, Units 1 and 2. This inspection will be performed in accordance with NRC

baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

document request have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than January 7, 2019.

By January 18, 2019, the lead inspector will communicate the initial selected set of

approximately 2-3 risk significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than February 18, 2019. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the

inspector may identify additional information needed to support the inspection.

The last group is the needed additional information identified during our in-office

preparation activities. This information should be available onsite to the inspector on

March 4, 2019. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

S. Sharp

-2-

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our

licensing contact for this inspection is Pamela Johnson of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at 630-829-9739 or via e-mail at Nestor.Feliz-Adorno@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA Michael A. Jones Acting for/

Néstor J. Féliz Adorno, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-282; 50-306

License No. DPR-42; DPR-60

Enclosure:

Document Request for Triennial Heat Sink

Performance Inspection

cc: Distribution via LISTSERV

S. Sharp

-3-

Letter to Scott Sharp from Néstor J. Féliz Adorno dated November 20, 2018.

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000282/2019001 AND 05000306/2019001

DISTRIBUTION:

Christopher Cook

RidsNrrPMPrairieIsland Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML18324A612

OFFICE

RIII

NAME

MJones for NFéliz

Adorno:cl

DATE

11/20/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

Inspection Report: 05000282/2019001; 05000306/2019001

Inspection Dates:

March 4, 2019, through March 8, 2019

Inspection Procedure:

Inspection Procedure 71111.07, Heat Sink Performance

Lead Inspector:

Néstor J. Féliz Adorno

630-829-9739

Nestor.Feliz-Adorno@nrc.gov

I.

Information Requested By January 7, 2019

1.

List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2.

Copy of heat exchanger performance trending data tracked for each GL 89-13

heat exchanger.

3.

List of Corrective Action Program documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,

or heat exchanger testing, for the previous 3 years or since the last Corrective

Action Program document list was sent to the U.S. Nuclear Regulatory

Commission for the previous heat sink performance inspection.

4.

Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5.

Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers.

6.

List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

7.

List of permanent and temporary modifications (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

8.

Provide a list of any design change (with a short description) performed on

the Ultimate Heat Sink (UHS) or safety-related service water systems. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

2

9.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

II

Information Requested By February 18, 2019

1.

Copies of the GL 89-13 responses.

2.

Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3.

Copies of the selected corrective action program documents.

4.

Copies of the selected modifications, if any.

5.

For the specific heat exchangers selected:

a. Copy of system description and design basis document for the heat

exchangers (as applicable).

b. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for

the heat exchangers.

c. Copy of the following calculations for each selected heat exchanger that:

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the

operation for the selected heat exchangers.

e. Copies of normal, abnormal, and emergency operating procedures

associated with the selected heat exchangers.

f. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

3

g. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

h. Copies of the two most recent completed tests and evaluation data

confirming thermal performance for those heat exchangers which are

performance tested.

i.

Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

records for the instruments used during these tests.

j.

Information regarding any alarms which monitor on-line performance.

k. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

l.

Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

m. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger.

n. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g., eddy current summary sheets, ultrasonic testing results,

and visual inspection results).

o. The cleaning and inspection maintenance schedule for each heat exchanger

for the next 5 years.

6.

For the UHS and the safety-related service water system (or equivalent):

a. Copy of system description and design basis document (as applicable).

b. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

c. Copy of the document (e.g., Technical Requirements Manual, procedure) that

states the maximum cooling water system inlet temperature limit that still

allows full licensed power operation of the nuclear reactor.

d. Copy of the construction code and Design Specification.

e. Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems including

procedures for loss of these systems.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

4

f. Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

g. If available, provide an electronic copy of piping and instrumentation

diagrams for the service water system, including the intake structure.

h. Provide a list of calculations (with a short description), which currently apply

to UHS and safety-related service water system.

i.

Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

j.

Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

k. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

l.

Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

m. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or

kelp). The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to

the previous heat sink performance inspection.

n. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

o. Copies of the last two performance tests, such as the American Society of

Mechanical Engineers in-service test, for the pumps and valves. If the

components are not performance tested, please provide documentation

verifying performance by the methods actually used.

p. Copies of the documents that demonstrate that flow balance testing was

performed during the last 3 years. If the last flow test was performed longer

than 3 years, then provide the last flow test.

q. Copies of procedures used to monitor interface valves between the

safety-related section of the service water system and the nonsafety-related

section and the associated results. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

5

r. Copies of the procedures that verify the performance of risk significant

non-safety functions and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

s. Copies of the testing, inspection, or monitoring program procedures for buried

or inaccessible piping and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

t. History of any thru wall pipe leak on the system. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

u. Copies of the documents associated with the Periodic Inspection Program

used to detect protective coating failure, corrosion, and erosion.

v. Copies of the in-service test vibration monitoring results and operational

history for deep draft vertical pumps, if applicable. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

7.

A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion

of the inspection.

III

Information Requested to be Available on First Day of Inspection, March 4, 2019

1. During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of any additional information needed during the

week of February 25, 2019.

If you have questions regarding the information requested, please contact the lead inspector.