{{#Wiki_filter:November 20, 2018
{{#Wiki_filter:November 20, 2018  
  Mr. Scott Sharp
Site Vice President
Mr. Scott Sharp  
Prairie Island Nuclear Generating Plant
Site Vice President  
Northern States Power Company, Minnesota
Prairie Island Nuclear Generating Plant  
1717 Wakonade Drive East
Northern States Power Company, Minnesota  
Welch, MN   
1717 Wakonade Drive East  
55089-9642  SUBJECT:  PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
Welch, MN  55089-9642  
NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000282/2019001 AND 05000306/2019001
   
  Dear Mr. Sharp:  On Monday, March 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Triennial Heat Sink Performance Inspection at your
SUBJECT:  PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2  
Prairie Island Nuclear Generating Plant, Units 1 and 2.  This inspection will be performed in accordance with NRC baseline Inspection Procedure
NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE  
71111.07.  In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection.  The document request
INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
have been divided into three groups.
REPORT 05000282/2019001 AND 05000306/2019001  
  The first group lists information necessary for our initial inspection scoping activities.  This information should be available to the lead inspector no later than January 7, 2019.  By January 18, 2019, the lead inspector will communicate the initial selected set of approximately 2
-3 risk significant heat exchangers.
Dear Mr. Sharp:  
  The second group  
   
is needed to support our in
On Monday, March 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the  
-office preparation activities.  This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than
onsite portion of the Triennial Heat Sink Performance Inspection at your Prairie Island Nuclear  
February 18, 2019.  This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
Generating Plant, Units 1 and 2.  This inspection will be performed in accordance with NRC  
.).  During the in
baseline Inspection Procedure 71111.07.  
-office preparation activities, the inspector may identify additional information needed to support the inspection.
   
  The last group  
In order to minimize the impact that the inspection has on the site and to ensure a productive  
is the needed additional information identified during our in
inspection, we have enclosed a request for documents needed for the inspection.  The  
-office preparation activities.  This information should be available onsite to the inspector on
document request have been divided into three groups.  
March 4, 2019.  It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated.
 
*
S. Sharp -2- All requested documents are to be for the time period from the onsite inspection period
The first group lists information necessary for our initial inspection scoping activities.   
back to the documents that were provided in response to the previous
This information should be available to the lead inspector no later than January 7, 2019.   
Heat Sink Performance Inspection.  If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period.
By January 18, 2019, the lead inspector will communicate the initial selected set of  
It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection.
approximately 2-3 risk significant heat exchangers.  
  The lead inspector for this inspection is
Néstor J. Féliz Adorno.  We understand that our licensing contact for this inspection is Pamela Johnson
*
of your organization.  If there are any questions about the inspection or the material requested in the enclosure, please
The second group is needed to support our in-office preparation activities.  This set of  
contact the lead inspector at  
documents, including the calculations associated with the selected heat exchangers,  
630-829-9739 or via e-mail at Nestor.Feliz
should be available at the Regional Office no later than February 18, 2019.  This  
-Adorno@nrc.gov
information should be separated for each selected component, especially if provided  
. This letter does not contain new or amended information collection requirements subject  
electronically (e.g., folder with component name that includes calculations, condition  
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150
reports, maintenance history, etc.).  During the in-office preparation activities, the  
-0011.  The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading
inspector may identify additional information needed to support the inspection.  
-rm/adams.html
and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations, Part 2.390, "Public Inspections, Exemptions, Requests for Withholding."
*
  Sincerely,  /RA Michael A. Jones Acting fo
The last group is the needed additional information identified during our in-office  
r/  Néstor J. Féliz Adorno , Senior Reactor Engineer
preparation activities.  This information should be available onsite to the inspector on  
Engineering Branch 2
March 4, 2019.  It is also requested that corrective action documents and/or questions  
Division of Reactor Safety
developed during the inspection be provided to the inspector as the documents are  
  Docket No. 50
generated.  
-282; 50-306 License No. DPR-42; DPR-60  Enclosure:
 
Document Request for Triennial Heat Sink
S. Sharp  
  Performance Inspection
-2-  
  cc:  Distribution via LISTSERV
All requested documents are to be for the time period from the onsite inspection period back
S. Sharp -3- Letter to Scott Sharp
to the documents that were provided in response to the previous Heat Sink Performance  
from Néstor J. Féliz Adorno
Inspection.  If no activities were accomplished in that time period, then the request applies to the  
dated November 20, 2018.  SUBJECT:  PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
last applicable document in the previous time period. It is important that these documents be as  
NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000282/2019001 AND 05000306/2019001
complete as possible, in order to minimize the number of documents requested during the  
  DISTRIBUTION
preparation week or during the onsite inspection.  
: Christopher Cook
RidsNrrPMPrairieIsland Resource
The lead inspector for this inspection is Néstor J. Féliz Adorno.  We understand that our  
RidsNrrDorlLpl3
licensing contact for this inspection is Pamela Johnson of your organization.  If there are any  
RidsNrrDirsIrib Resource
questions about the inspection or the material requested in the enclosure, please contact the  
Steven West
lead inspector at 630-829-9739 or via e-mail at Nestor.Feliz-Adorno@nrc.gov.
Darrell Roberts
   
Jamnes Cameron
This letter does not contain new or amended information collection requirements subject  
Allan Barker
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).  Existing information  
DRPIII DRSIII                           ADAMS Accession Number: ML18324A612
collection requirements were approved by the Office of Management and Budget, Control  
  OFFICE RIII        NAME MJones for
Number 3150-0011.  The NRC may not conduct or sponsor, and a person is not required to  
NFéliz Adorno:cl    DATE 11/20/18    OFFICIAL RECORD COPY
respond to, a request for information or an information collection requirement unless the  
 
requesting document displays a currently valid Office of Management and Budget Control  
DOCUMENT REQUEST FOR
Number.  
TRIENNIAL HEAT
  SINK PERFORMANCE INSPECTION
This letter and its enclosure will be made available for public inspection and copying at  
  Enclosure Inspection Report
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
: 05000282/2019001; 05000306/2019001
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
  Inspection Dates
Exemptions, Requests for Withholding.  
: March 4, 2019, through March 8, 2019  Inspection Procedure
: Inspection
Sincerely,  
Procedure 71111.07, "Heat Sink Performance"
   
  Lead Inspector
/RA Michael A. Jones Acting for/
: Néstor J. Féliz Adorno
  630-829-9739 Nestor.Feliz
-Adorno@nrc.gov
Néstor J. Féliz Adorno, Senior Reactor Engineer  
  I. Information Requested By January 7, 2019
Engineering Branch 2  
  1. List of the Generic Letter (GL) 8
Division of Reactor Safety  
9-13, "Service Water System Problems Affecting Safety-Related Equipment,"
  heat exchangers in order of risk significance.
Docket No. 50-282; 50-306  
  2. Copy of heat exchanger performance trending data tracked for each GL 89
License No. DPR-42; DPR-60  
-13 heat exchanger.
   
  3. List of Corrective Action Program
Enclosure:  
  documents (with a short description) associated with GL 89
Document Request for Triennial Heat Sink  
-13 heat exchangers, heat sinks, silting, corrosion, fouling, or heat exchanger testing, for the previous
  Performance Inspection  
3 years or since the last Corrective Action Program document list was sent to the
  U.S. Nuclear Regulatory Commission for the previous heat sink performance inspection.
cc:  Distribution via LISTSERV  
  4. Copy of any self
 
-assessment done on any of GL 89
S. Sharp  
-13 heat exchangers.
-3-  
  5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers.
Letter to Scott Sharp from Néstor J. Féliz Adorno dated November 20, 2018.  
  6. List of engineering
   
-related operator workarounds
SUBJECT:  PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2  
  (with a short description)
NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE  
  associated with GL 89
INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the
REPORT 05000282/2019001 AND 05000306/2019001  
  documents that were provided in response to the previous
heat sink performance
DISTRIBUTION:
inspectio n7. List of permanent and temporary modifications
Christopher Cook  
  (with a short description)
RidsNrrPMPrairieIsland Resource  
associated with GL 89
RidsNrrDorlLpl3  
-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the
RidsNrrDirsIrib Resource  
  documents that were provided in response to the previous
Steven West  
  heat sink performance
Darrell Roberts  
inspectio n8. Provide a list of any design change (with a short description) performed on the Ultimate Heat Sink (UHS) or safety-related service water systems.   
Jamnes Cameron  
The requested documents are to be for the time period from the onsite inspection period back to the
Allan Barker  
documents that were provided in response to the previous
DRPIII  
heat sink performance inspectio n.   
DRSIII  
DOCUMENT REQUEST FOR
TRIENNIAL HEAT
SINK PERFORMANCE INSPECTION
2 9. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual.  II Information Requested By February 18, 2019
   
  1. Copies of the GL 89
   
-13 responses.
  2. Copies of procedures developed to implement the recommendations of GL 89
-13 (e.g., the GL 89-13 Heat Exchanger Program description).
  3. Copies of the selected corrective action program documents.
  4. Copies of the selected modifications, if any.
   
  5. For the specific heat exchangers selected:
   
  a. Copy of system description and design basis document for the heat exchangers (as applicable).
  b. Copy of the construction code, Design Specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the heat exchangers.
  c. Copy of the following calculations for each selected heat exchanger
  that:  i. establish the limiting design basis heat load required to be removed by each of these heat exchangers;
  ii. demonstrate the heat exchangers capacity to remove the limiting heat load;  iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis
heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria);
  iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and
  v. evaluate excessive tube vibration in each heat exchanger.
  d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers.
  e. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers.
   
  f. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded.
 
DOCUMENT REQUEST FOR
TRIENNIAL HEAT
  SINK PERFORMANCE INSPECTION
   
3 g. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers
ADAMS Accession Number:  ML18324A612
. h. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers which are performance tested.
OFFICE
  i. Documentation and procedures that identify the types, accuracy, and location
RIII
of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments).  Include calibration records for the instruments used during these tests.
  j. Information regarding any alarms which monitor on
-line performance.
   
  k. Copy of the periodic flow testing at or near maximum design flow. The
requested documents are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous
  heat sink performance
   
inspectio n. l. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger
NAME
. m. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger
MJones for NFéliz
. n. Copies of the documents that verify the structural integrity of the heat exchanger (e.g., eddy current summary sheets, ultrasonic testing results, and visual inspection results)
Adorno:cl
o. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years.
  6. For the UHS and the safety
-related service water system (or equivalent):
  a. Copy of system description and design basis document (as applicable).
DATE
  b. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety
11/20/18
-related service water system
c. Copy of the document (e.g., Technical Requirements Manual, procedure) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor. 
  d. Copy of the construction code and Design Specification.
   
  e. Copies of normal, abnormal, and emergency operating procedures associated with the UHS and safety
OFFICIAL RECORD COPY
-related service water systems including procedures for loss of these systems.
 
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
DOCUMENT REQUEST FOR
Enclosure
TRIENNIAL HEAT
Inspection Report:
  SINK PERFORMANCE INSPECTION
05000282/2019001; 05000306/2019001
4 f. Copies of corrective action documents associated with waterhammer or hydraulic transients in the service water system since the last Heat Sink Inspection.
   
  g. If available, provide an electronic copy of piping and instrumentation diagrams for the service water system, including the intake structure.
   
  h. Provide a list of calculations (with a short description), which currently apply to UHS and safety-related service water system.
Inspection Dates:
  i. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety
March 4, 2019, through March 8, 2019
-related service water system and/or UHS.
  j. Copies of calculations and surveillances that determine the UHS reservoir capacity and heat transfer capability.
   
  k. Copies of the documents associated with the monitoring, trending, and remediation of silt accumulation at the
Inspection Procedure:
  service water pump bay.
Inspection Procedure 71111.07, Heat Sink Performance
  l. Copies of surveillance procedures and testing results performed
   
  on the instrumentation relied upon to determine UHS reservoir capabilityThe requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous
   
  heat sink performance
Lead Inspector:
inspectio n. m. Inspections and/or maintenance related to preventing macrofouling (e.g.
Néstor J. Féliz Adorno
, silt, dead mussel shells, or debris) and biotic fouling (e.g.
630-829-9739
, fish, algae, grass, or kelp).  The requested documents are to be for the time period from the onsite inspection period back to the
Nestor.Feliz-Adorno@nrc.gov
documents that were provided in response to the previous
   
  heat sink performance
   
inspectio n.  n. Copies of documents associated with the monitoring of pump performance for potential strong
I.  
-pump vs. weak
Information Requested By January 7, 2019
-pump interaction.
   
  o. Copies of the last two performance tests, such as the American Society of Mechanical Engineers
1.  
  in-service test, for the pumps and valves. If the components are not performance tested, please provide documentation verifying performance by the methods actually used.
List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
  p. Copies of the documents that demonstrate that flow balance testing was performed during the last
Safety-Related Equipment, heat exchangers in order of risk significance.  
3 yearsIf the last flow test was performed longer than 3 years, then provide the last flow test.
   
  q. Copies of procedures used to monitor interface valves between the safety-related section of the service water system and the nonsafety-related section and the associated resultsThe requested documents are to be for the time period from the onsite inspection period back to the
2.
  documents that were provided in response to the previous
Copy of heat exchanger performance trending data tracked for each GL 89-13
heat sink performance
heat exchanger.  
inspectio n.  
   
DOCUMENT REQUEST FOR
3.
TRIENNIAL HEAT
List of Corrective Action Program documents (with a short description)
  SINK PERFORMANCE INSPECTION
associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,  
5 r. Copies of the procedures that verify the performance of risk significant
or heat exchanger testing, for the previous 3 years or since the last Corrective
non-safety functions and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the
Action Program document list was sent to the U.S. Nuclear Regulatory
documents that were provided in response to the previous heat sink performance  
Commission for the previous heat sink performance inspection.
inspectio n. s. Copies of the testing, inspection, or monitoring program procedures for buried or inaccessible piping and the associated results.  The requested documents are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous
4.
heat sink performance  
Copy of any self-assessment done on any of GL 89-13 heat exchangers.  
inspectio n. t. History of any thru wall pipe leak on the systemThe requested documents are to be for the time period from the onsite inspection period back to th
e documents that were provided in response to the previous
5.  
heat sink performance  
Last two System Health Report(s) and maintenance rule system notebooks for all
inspectio nu. Copies of the documents associated with the Periodic Inspection Program used to detect protective coating failure, corrosion, and erosion.
the GL 89-13 heat exchangers.  
  v. Copies of the
in-service test vibration monitoring results and operational history for deep draft vertical pumps, if applicable.  The requested documents are to be for the time period from the onsite inspection period back to the
6.  
documents that were provided in response to the previous heat sink performance  
List of engineering-related operator workarounds (with a short description)
inspectio n. 7. A schedule of all inspections, cleanings, maintenance, or testing of  
associated with GL 89-13 heat exchangers.  The requested documents are to be
any safety-related plant
for the time period from the onsite inspection period back to the documents that
heat exchanger to be performed during the onsite portion  
were provided in response to the previous heat sink performance inspection.
of the inspection
. III Information Requested to be Available on First Day of Inspection, March 4, 2019
7.  
  1. During the in
List of permanent and temporary modifications (with a short description)  
-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.  The lead inspector will provide a list of  
associated with GL 89-13 heat exchangers. The requested documents are to be
any additional information needed during the week of February 25, 2019.
for the time period from the onsite inspection period back to the documents that
  If you have questions regarding the information requested, please contact the lead inspector.
were provided in response to the previous heat sink performance inspection.
   
8.  
Provide a list of any design change (with a short description) performed on
the Ultimate Heat Sink (UHS) or safety-related service water systems.  The
requested documents are to be for the time period from the onsite inspection  
period back to the documents that were provided in response to the previous
heat sink performance inspection.  
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
2
9.  
Electronic copies of Updated Final Safety Analysis Report, Technical
Specifications, Technical Specifications Bases, and Technical Requirements
Manual.  
II
Information Requested By February 18, 2019
1.  
Copies of the GL 89-13 responses.  
2.  
Copies of procedures developed to implement the recommendations of GL 89-13
(e.g., the GL 89-13 Heat Exchanger Program description).  
   
3.  
Copies of the selected corrective action program documents.
   
4.  
Copies of the selected modifications, if any.
5.
For the specific heat exchangers selected:
a. Copy of system description and design basis document for the heat
exchangers (as applicable).  
b. Copy of the construction code, Design Specification, heat exchanger data
sheets, and vendor documents including component drawings applicable for  
the heat exchangers.  
c. Copy of the following calculations for each selected heat exchanger that:
i. establish the limiting design basis heat load required to be removed by
each of these heat exchangers;
   
ii. demonstrate the heat exchangers capacity to remove the limiting heat
load;
   
iii. correlate surveillance testing and/or inspection results from these heat
exchangers with design basis heat removal capability (e.g., basis for  
surveillance test and/or inspection acceptance criteria);
iv. evaluate the potential for water hammer in each heat exchanger or
associated piping; and  
v. evaluate excessive tube vibration in each heat exchanger.
   
d. Copy of any operability determinations or other documentation of degradation
associated with the heat exchangers or the systems that support the  
operation for the selected heat exchangers.
e. Copies of normal, abnormal, and emergency operating procedures
associated with the selected heat exchangers.  
   
f. Copy of the operating procedure that ensures that the maximum cooling
water system inlet temperature limit is not exceeded.
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
3
g. Copies of those documents that describe the methods taken to control water  
chemistry in the heat exchangers.  
   
h. Copies of the two most recent completed tests and evaluation data
confirming thermal performance for those heat exchangers which are
performance tested.  
i.  
Documentation and procedures that identify the types, accuracy, and location
of any special instrumentation used for the two most recently completed
thermal performance tests for the heat exchangers (e.g., high accuracy
ultrasonic flow instruments or temperature instruments).  Include calibration
records for the instruments used during these tests.  
   
j.  
Information regarding any alarms which monitor on-line performance.  
k. Copy of the periodic flow testing at or near maximum design flow. The
requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous
heat sink performance inspection.
l.  
Copy of the document which identifies the current number of tubes in service  
for each heat exchanger and the supporting calculation which establishes the
maximum number of tubes which can be plugged in each heat exchanger.  
m. Copy of the document establishing the repair criteria (plugging limit) for
degraded tubes which are identified in each heat exchanger.
   
n. Copies of the documents that verify the structural integrity of the heat
exchanger (e.g., eddy current summary sheets, ultrasonic testing results,
and visual inspection results).
   
o. The cleaning and inspection maintenance schedule for each heat exchanger
for the next 5 years.  
   
6.
For the UHS and the safety-related service water system (or equivalent):
   
a. Copy of system description and design basis document (as applicable).  
b. Copy of any operability determinations or other documentation of degradation
associated with the UHS and the safety-related service water system.
c. Copy of the document (e.g., Technical Requirements Manual, procedure) that
states the maximum cooling water system inlet temperature limit that still
allows full licensed power operation of the nuclear reactor.  
   
d. Copy of the construction code and Design Specification.
   
e. Copies of normal, abnormal, and emergency operating procedures
associated with the UHS and safety-related service water systems including
procedures for loss of these systems.  
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
4
f. Copies of corrective action documents associated with waterhammer or
hydraulic transients in the service water system since the last Heat Sink
Inspection.
   
g. If available, provide an electronic copy of piping and instrumentation
diagrams for the service water system, including the intake structure.  
h. Provide a list of calculations (with a short description), which currently apply
to UHS and safety-related service water system.  
   
i.
Provide a list of instruments (with a short description) associated with
automatic or alarm functions for the safety-related service water system
and/or UHS.
j.  
Copies of calculations and surveillances that determine the UHS reservoir
capacity and heat transfer capability.  
   
k. Copies of the documents associated with the monitoring, trending, and
remediation of silt accumulation at the service water pump bay.
   
l.  
Copies of surveillance procedures and testing results performed on the
instrumentation relied upon to determine UHS reservoir capability. The
requested documents are to be for the time period from the onsite inspection
period back to the documents that were provided in response to the previous  
heat sink performance inspection.
   
m. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,  
dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or
kelp).  The requested documents are to be for the time period from the onsite  
inspection period back to the documents that were provided in response to  
the previous heat sink performance inspection.
n. Copies of documents associated with the monitoring of pump performance for
potential strong-pump vs. weak-pump interaction.  
   
o. Copies of the last two performance tests, such as the American Society of
Mechanical Engineers in-service test, for the pumps and valves.  If the  
components are not performance tested, please provide documentation
verifying performance by the methods actually used.  
   
p. Copies of the documents that demonstrate that flow balance testing was
performed during the last 3 years.  If the last flow test was performed longer
than 3 years, then provide the last flow test.
q. Copies of procedures used to monitor interface valves between the
safety-related section of the service water system and the nonsafety-related
section and the associated results.  The requested documents are to be for
the time period from the onsite inspection period back to the documents that
were provided in response to the previous heat sink performance inspection.
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
5
r. Copies of the procedures that verify the performance of risk significant
non-safety functions and the associated results.  The requested documents
are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink
performance inspection.
s. Copies of the testing, inspection, or monitoring program procedures for buried
or inaccessible piping and the associated results.  The requested documents
are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink
performance inspection.
t. History of any thru wall pipe leak on the system.  The requested documents
are to be for the time period from the onsite inspection period back to the
documents that were provided in response to the previous heat sink
performance inspection.
u. Copies of the documents associated with the Periodic Inspection Program
used to detect protective coating failure, corrosion, and erosion.
v. Copies of the in-service test vibration monitoring results and operational
history for deep draft vertical pumps, if applicable.  The requested documents
are to be for the time period from the onsite inspection period back to the  
documents that were provided in response to the previous heat sink  
performance inspection.
   
7.  
A schedule of all inspections, cleanings, maintenance, or testing of any
safety-related plant heat exchanger to be performed during the onsite portion  
of the inspection.
   
III  
Information Requested to be Available on First Day of Inspection, March 4, 2019  
1. During the in-office preparation activities, the team will be making final selections  
and may identify additional information needed to support the inspection.  The  
lead inspector will provide a list of any additional information needed during the  
week of February 25, 2019.  
If you have questions regarding the information requested, please contact the lead inspector.
}}
}}

Latest revision as of 09:09, 5 January 2025

Ltr. 11/20/18 Prairie Island Nuclear Generating Plant, Units 1 and 2 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000282/2019001 and 05000306/2019001 (DRS-N.Feliz-Adorn
ML18324A612
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 11/20/2018
From: Nestor Feliz-Adorno
NRC/RGN-III/DRS/EB2
To: Sharp S
Northern States Power Company, Minnesota
References
IR 2019001
Download: ML18324A612 (8)


See also: IR 05000282/2019001

Text

November 20, 2018

Mr. Scott Sharp

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089-9642

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000282/2019001 AND 05000306/2019001

Dear Mr. Sharp:

On Monday, March 4, 2019, the U.S. Nuclear Regulatory Commission (NRC) will begin the

onsite portion of the Triennial Heat Sink Performance Inspection at your Prairie Island Nuclear

Generating Plant, Units 1 and 2. This inspection will be performed in accordance with NRC

baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

document request have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than January 7, 2019.

By January 18, 2019, the lead inspector will communicate the initial selected set of

approximately 2-3 risk significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers,

should be available at the Regional Office no later than February 18, 2019. This

information should be separated for each selected component, especially if provided

electronically (e.g., folder with component name that includes calculations, condition

reports, maintenance history, etc.). During the in-office preparation activities, the

inspector may identify additional information needed to support the inspection.

The last group is the needed additional information identified during our in-office

preparation activities. This information should be available onsite to the inspector on

March 4, 2019. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated.

S. Sharp

-2-

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

The lead inspector for this inspection is Néstor J. Féliz Adorno. We understand that our

licensing contact for this inspection is Pamela Johnson of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at 630-829-9739 or via e-mail at Nestor.Feliz-Adorno@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

/RA Michael A. Jones Acting for/

Néstor J. Féliz Adorno, Senior Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket No. 50-282; 50-306

License No. DPR-42; DPR-60

Enclosure:

Document Request for Triennial Heat Sink

Performance Inspection

cc: Distribution via LISTSERV

S. Sharp

-3-

Letter to Scott Sharp from Néstor J. Féliz Adorno dated November 20, 2018.

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2

NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE

INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000282/2019001 AND 05000306/2019001

DISTRIBUTION:

Christopher Cook

RidsNrrPMPrairieIsland Resource

RidsNrrDorlLpl3

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Jamnes Cameron

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number: ML18324A612

OFFICE

RIII

NAME

MJones for NFéliz

Adorno:cl

DATE

11/20/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Enclosure

Inspection Report: 05000282/2019001; 05000306/2019001

Inspection Dates:

March 4, 2019, through March 8, 2019

Inspection Procedure:

Inspection Procedure 71111.07, Heat Sink Performance

Lead Inspector:

Néstor J. Féliz Adorno

630-829-9739

Nestor.Feliz-Adorno@nrc.gov

I.

Information Requested By January 7, 2019

1.

List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2.

Copy of heat exchanger performance trending data tracked for each GL 89-13

heat exchanger.

3.

List of Corrective Action Program documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,

or heat exchanger testing, for the previous 3 years or since the last Corrective

Action Program document list was sent to the U.S. Nuclear Regulatory

Commission for the previous heat sink performance inspection.

4.

Copy of any self-assessment done on any of GL 89-13 heat exchangers.

5.

Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers.

6.

List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

7.

List of permanent and temporary modifications (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

8.

Provide a list of any design change (with a short description) performed on

the Ultimate Heat Sink (UHS) or safety-related service water systems. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

2

9.

Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

II

Information Requested By February 18, 2019

1.

Copies of the GL 89-13 responses.

2.

Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3.

Copies of the selected corrective action program documents.

4.

Copies of the selected modifications, if any.

5.

For the specific heat exchangers selected:

a. Copy of system description and design basis document for the heat

exchangers (as applicable).

b. Copy of the construction code, Design Specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for

the heat exchangers.

c. Copy of the following calculations for each selected heat exchanger that:

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the

operation for the selected heat exchangers.

e. Copies of normal, abnormal, and emergency operating procedures

associated with the selected heat exchangers.

f. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

3

g. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers.

h. Copies of the two most recent completed tests and evaluation data

confirming thermal performance for those heat exchangers which are

performance tested.

i.

Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

records for the instruments used during these tests.

j.

Information regarding any alarms which monitor on-line performance.

k. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

l.

Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

m. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger.

n. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g., eddy current summary sheets, ultrasonic testing results,

and visual inspection results).

o. The cleaning and inspection maintenance schedule for each heat exchanger

for the next 5 years.

6.

For the UHS and the safety-related service water system (or equivalent):

a. Copy of system description and design basis document (as applicable).

b. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

c. Copy of the document (e.g., Technical Requirements Manual, procedure) that

states the maximum cooling water system inlet temperature limit that still

allows full licensed power operation of the nuclear reactor.

d. Copy of the construction code and Design Specification.

e. Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems including

procedures for loss of these systems.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

4

f. Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

g. If available, provide an electronic copy of piping and instrumentation

diagrams for the service water system, including the intake structure.

h. Provide a list of calculations (with a short description), which currently apply

to UHS and safety-related service water system.

i.

Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

j.

Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

k. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

l.

Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

m. Inspections and/or maintenance related to preventing macrofouling (e.g., silt,

dead mussel shells, or debris) and biotic fouling (e.g., fish, algae, grass, or

kelp). The requested documents are to be for the time period from the onsite

inspection period back to the documents that were provided in response to

the previous heat sink performance inspection.

n. Copies of documents associated with the monitoring of pump performance for

potential strong-pump vs. weak-pump interaction.

o. Copies of the last two performance tests, such as the American Society of

Mechanical Engineers in-service test, for the pumps and valves. If the

components are not performance tested, please provide documentation

verifying performance by the methods actually used.

p. Copies of the documents that demonstrate that flow balance testing was

performed during the last 3 years. If the last flow test was performed longer

than 3 years, then provide the last flow test.

q. Copies of procedures used to monitor interface valves between the

safety-related section of the service water system and the nonsafety-related

section and the associated results. The requested documents are to be for

the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

5

r. Copies of the procedures that verify the performance of risk significant

non-safety functions and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

s. Copies of the testing, inspection, or monitoring program procedures for buried

or inaccessible piping and the associated results. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

t. History of any thru wall pipe leak on the system. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

u. Copies of the documents associated with the Periodic Inspection Program

used to detect protective coating failure, corrosion, and erosion.

v. Copies of the in-service test vibration monitoring results and operational

history for deep draft vertical pumps, if applicable. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

7.

A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion

of the inspection.

III

Information Requested to be Available on First Day of Inspection, March 4, 2019

1. During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of any additional information needed during the

week of February 25, 2019.