{{#Wiki_filter:Reactor Oversight Process Enhancement November 2018 1
{{#Wiki_filter:1 Reactor Oversight Process Enhancement November 2018


Assessment - Alex Garmoe
Assessment - Alex Garmoe Description 2A Revise Public Communications on White Findings 2B Revise the Structure of the Action Matrix 2B.1 Combine Columns 1 and 2 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.5 Promptly Close White Findings 2B.6 Redefine Finding Labels 4C Open Up Communications about Inspection Results 2
#    Description 2A   Revise Public Communications on White Findings 2B   Revise the Structure of the Action Matrix 2B.1 Combine Columns 1 and 2 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.5 Promptly Close White Findings 2B.6 Redefine Finding Labels 4C   Open Up Communications about Inspection Results 2


3 MSPI - Alex Garmoe
3
#  Description 1G  Revise Use of Mitigating Systems Performance Index 4


5 ROP Inspection - Ami Agrawal
MSPI - Alex Garmoe Description 1G Revise Use of Mitigating Systems Performance Index 4
#    Description 1D  Reduce Baseline Hours for Higher Performers 1E  Remove PI&R Inspection from Baseline Program 1F  Refrain from Expanding Baseline Inspection Effort in Future 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.3 Redirect IP 95001: Change the IP 95001 from a stand-alone supplemental procedure for Whites to become a follow-up to Yellow or Red findings as an initial inspection 2B.4 Revise IP 71152 to be reactive 6


Radiation Protection - David Garmon
5
#    Description 1A  Revise RP Inspections 3A.1 Expand 3A Approach to All Deterministic SDPs 7


Security - Alonzo Richardson
ROP Inspection - Ami Agrawal Description 1D Reduce Baseline Hours for Higher Performers 1E Remove PI&R Inspection from Baseline Program 1F Refrain from Expanding Baseline Inspection Effort in Future 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.3 Redirect IP 95001: Change the IP 95001 from a stand-alone supplemental procedure for Whites to become a follow-up to Yellow or Red findings as an initial inspection 2B.4 Revise IP 71152 to be reactive 6
#    Description 1C  Revise Security Inspections 3A.1 Expand 3A Approach to All Deterministic SDPs 8


SDP Infrastructure - Antonios Zoulis
Radiation Protection - David Garmon Description 1A Revise RP Inspections 3A.1 Expand 3A Approach to All Deterministic SDPs 7
#    Description 3B  Combine BDB into One SDP 3D  Standardize PRA Inputs to SDP 3E  Develop Procedure to Align on PRA Inputs Early 3F  Develop NRC Interface for Licensee PRAs 3G  Eliminate Use of SPAR in SDP 9


ISFSI - Carla Roque-Cruz
Security - Alonzo Richardson Description 1C Revise Security Inspections 3A.1 Expand 3A Approach to All Deterministic SDPs 8
#    Description 1H  Eliminate Materials Inspections of ISFSIs 10


Licensing/Backfit - Tim Reed
SDP Infrastructure - Antonios Zoulis Description 3B Combine BDB into One SDP 3D Standardize PRA Inputs to SDP 3E Develop Procedure to Align on PRA Inputs Early 3F Develop NRC Interface for Licensee PRAs 3G Eliminate Use of SPAR in SDP 9
#    Description 4A  Establish Policy to Respect Licensing Basis 4B  Establish Means of Resolving Very Low-Risk Licensing Basis Concerns 11


Emergency Preparedness - Don Johnson
ISFSI - Carla Roque-Cruz Description 1H Eliminate Materials Inspections of ISFSIs 10
Description 1B Revise EP Inspections 3A Revise EP SDP 12}}
 
Licensing/Backfit - Tim Reed Description 4A Establish Policy to Respect Licensing Basis 4B Establish Means of Resolving Very Low-Risk Licensing Basis Concerns 11
 
Emergency Preparedness - Don Johnson Description 1B Revise EP Inspections 3A Revise EP SDP 12}}

Latest revision as of 08:57, 5 January 2025

ROP Enhancement_Public Meeting_11_15_2018
ML18334A344
Person / Time
Issue date: 11/30/2018
From: Mary Anderson
NRC/NRR/DIRS/IRGB
To:
Anderson M, 415-7126, NRR/DIRS
References
Download: ML18334A344 (12)


Text

1 Reactor Oversight Process Enhancement November 2018

Assessment - Alex Garmoe Description 2A Revise Public Communications on White Findings 2B Revise the Structure of the Action Matrix 2B.1 Combine Columns 1 and 2 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.5 Promptly Close White Findings 2B.6 Redefine Finding Labels 4C Open Up Communications about Inspection Results 2

3

MSPI - Alex Garmoe Description 1G Revise Use of Mitigating Systems Performance Index 4

5

ROP Inspection - Ami Agrawal Description 1D Reduce Baseline Hours for Higher Performers 1E Remove PI&R Inspection from Baseline Program 1F Refrain from Expanding Baseline Inspection Effort in Future 2B.2 Follow-Up via Resident Inspectors: Establish the follow-up and closure for White findings through the resident inspector inspecting the causal analysis. (Shared) 2B.3 Redirect IP 95001: Change the IP 95001 from a stand-alone supplemental procedure for Whites to become a follow-up to Yellow or Red findings as an initial inspection 2B.4 Revise IP 71152 to be reactive 6

Radiation Protection - David Garmon Description 1A Revise RP Inspections 3A.1 Expand 3A Approach to All Deterministic SDPs 7

Security - Alonzo Richardson Description 1C Revise Security Inspections 3A.1 Expand 3A Approach to All Deterministic SDPs 8

SDP Infrastructure - Antonios Zoulis Description 3B Combine BDB into One SDP 3D Standardize PRA Inputs to SDP 3E Develop Procedure to Align on PRA Inputs Early 3F Develop NRC Interface for Licensee PRAs 3G Eliminate Use of SPAR in SDP 9

ISFSI - Carla Roque-Cruz Description 1H Eliminate Materials Inspections of ISFSIs 10

Licensing/Backfit - Tim Reed Description 4A Establish Policy to Respect Licensing Basis 4B Establish Means of Resolving Very Low-Risk Licensing Basis Concerns 11

Emergency Preparedness - Don Johnson Description 1B Revise EP Inspections 3A Revise EP SDP 12