IR 05000324/2018006: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter:W. Gideon | {{#Wiki_filter:W. Gideon | ||
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2-NRC INSPECTION REPORT 05000325/2018006 AND 05000324/2018006 March 4. 2019 DISTRIBUTION: | |||
M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO) | ||
ADAMS Accession No. ML19063C604 OFFICE | ADAMS Accession No. ML19063C604 OFFICE Rll:DRP Rll:DRP Rll:DRP NAME DJackson JDodson PNiebaum DATE 2/26/2019 2/26/2019 2/26/2019 Rll:DRP LPressley 2/26/2019 OFFICIAL AGENCY RECORD | ||
}} | }} | ||
Latest revision as of 04:30, 5 January 2025
| ML19063C604 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/04/2019 |
| From: | Lundy Pressley NRC/RGN-II/DRP/RPB4 |
| To: | William Gideon Duke Energy Progress |
| Geanette D | |
| References | |
| IR 2018006 | |
| Download: ML19063C604 (6) | |
Text
W. Gideon
SUBJECT: ANNUAL ASSESSMENT LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNITS 1 AND 2-NRC INSPECTION REPORT 05000325/2018006 AND 05000324/2018006 March 4. 2019 DISTRIBUTION:
M. Kowal, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource Institute of Nuclear Power Operations (INPO)
ADAMS Accession No. ML19063C604 OFFICE Rll:DRP Rll:DRP Rll:DRP NAME DJackson JDodson PNiebaum DATE 2/26/2019 2/26/2019 2/26/2019 Rll:DRP LPressley 2/26/2019 OFFICIAL AGENCY RECORD