ASSESSMENT FOLLOW-UP LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NRC INSPECTION REPORT 05000325/2019007
ASSESSMENT FOLLOW-UP LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NRC INSPECTION REPORT 05000325/2019007


Line 31: Line 33:


Sincerely,
Sincerely,
/RA/
/RA/  
Joel T. Munday, Director Division of Reactor Projects Docket No. 50-325 License No. DPR-71 cc: Distribution via ListServ SUBJECT: ASSESSMENT FOLLOW-UP LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NRC INSPECTION REPORT 05000325/2019007 May 15, 2019 DISTRIBUTION:
 
M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource ADAMS Accession No. ML19136A321 OFFICE RII:DRP RII:DRP RII: DRP RII: DRP NAME DJackson JDodson PNiebaum BDavis DATE 5/8/2019 5/10/2019 5/13/2019 05/15/2019 OFFICIAL AGENCY RECORD
Joel T. Munday, Director Division of Reactor Projects  
 
Docket No. 50-325 License No. DPR-71  
 
cc: Distribution via ListServ SUBJECT: ASSESSMENT FOLLOW-UP LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NRC INSPECTION REPORT 05000325/2019007 May 15, 2019  
 
DISTRIBUTION:
M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource  
 
ADAMS Accession No. ML19136A321 OFFICE RII:DRP RII:DRP RII: DRP RII: DRP  
 
NAME DJackson JDodson PNiebaum BDavis  
 
DATE 5/8/2019 5/10/2019 5/13/2019 05/15/2019  
 
OFFICIAL AGENCY RECORD
}}
}}

Latest revision as of 02:27, 5 January 2025

Assessment Follow-Up for Brunswick Steam Electric Plant, Unit 1 - NRC Inspection Report 05000325/2019007
ML19136A321
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/15/2019
From: Joel Munday
Division Reactor Projects II
To: William Gideon
Progress Energy Carolinas
Geanette D
References
IR 2019007
Download: ML19136A321 (3)


Text

May 15, 2019

SUBJECT:

ASSESSMENT FOLLOW-UP LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NRC INSPECTION REPORT 05000325/2019007

Dear Mr. Gideon:

As a result of its quarterly review of plant performance, which was completed on April 26, 2019, the NRC updated its assessment of Brunswick Steam Electric Plant, Unit 1. The NRCs evaluation consisted of a review of performance indicators and inspection results. This letter informs you of the NRCs assessment and its plans for a future inspection at your facility. This letter supplements, but does not supersede, the annual assessment letter issued on March 4, 2019.

The NRCs review of Brunswick Steam Electric Plant, Unit 1 identified that the Reactor Coolant System (RCS) Leakage performance indicator has crossed the green-to-white threshold. This was the result of increased RCS leakage in the Unit 1 drywell from the March 2019 Cryofit coupling failure.

The NRC determined the performance at Brunswick Steam Electric Plant, Unit 1 during the most recent quarter was within the Regulatory Response Column of the NRCs Reactor Oversight Process (ROP) Action Matrix. Therefore, in addition to ROP baseline inspections, the NRC plans to conduct a supplemental inspection in accordance with Inspection Procedure 95001, Supplemental Inspection Response to Action Matrix Column 2 Inputs. This inspection procedure is conducted to provide assurance that the root cause and contributing cause of risk significant performance issues are understood, the extent of condition and the extent of cause are identified, and the corrective actions are sufficient to prevent recurrence. This inspection will be scheduled after you notify the NRC of your readiness. This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Please contact Bradley Davis at 404-997-4428 with any questions you have regarding this letter.

Sincerely,

/RA/

Joel T. Munday, Director Division of Reactor Projects

Docket No. 50-325 License No. DPR-71

cc: Distribution via ListServ SUBJECT: ASSESSMENT FOLLOW-UP LETTER FOR BRUNSWICK STEAM ELECTRIC PLANT, UNIT 1 - NRC INSPECTION REPORT 05000325/2019007 May 15, 2019

DISTRIBUTION:

M. Kowal, RII S. Price, RII OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMBrunswick Resource ROPassessment Resource ROPreports Resource

ADAMS Accession No. ML19136A321 OFFICE RII:DRP RII:DRP RII: DRP RII: DRP

NAME DJackson JDodson PNiebaum BDavis

DATE 5/8/2019 5/10/2019 5/13/2019 05/15/2019