ML19224C362: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:/. . . _ _ . . _ . _ . . _
{{#Wiki_filter:/
.,-..BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199
BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199
: a. cas .v.oon=w.
: a. cas.v.oon=w.
ac=NWCLEAS OPCRATIOMs DEPAAT,eCNT May 15, 1979 BECo. Ltr. #79- 93 Mr. Boyce H. Grier Office of Sspection and Enforce =ent Region I U.S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, PA.
ac=
19406 License No. DPR-35 Docket No. 50-293 Surelenentarv Resconse to IE Bulletin No. 79-08 Ref. a) Boston Edison Cc=pany letter to Mr. Boyce Grier dated April 25, 1979 titled " Response to II Sulletin 79-08"  
NWCLEAS OPCRATIOMs DEPAAT,eCNT May 15, 1979 BECo. Ltr. #79-93 Mr. Boyce H. Grier Office of Sspection and Enforce =ent Region I U.S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, PA.
19406 License No. DPR-35 Docket No. 50-293 Surelenentarv Resconse to IE Bulletin No. 79-08 Ref. a) Boston Edison Cc=pany letter to Mr. Boyce Grier dated April 25, 1979 titled " Response to II Sulletin 79-08"


==Dear Sir:==
==Dear Sir:==
Line 27: Line 28:
Ite= 11 was to be addressed in a subsequent letter within 30 days of the date of the Sulletin and is as follows:
Ite= 11 was to be addressed in a subsequent letter within 30 days of the date of the Sulletin and is as follows:
Item 11 Propose changes, as required, to those Technical Specifications which cast be = edified as a result of your implementing Ite=s 1-10.
Item 11 Propose changes, as required, to those Technical Specifications which cast be = edified as a result of your implementing Ite=s 1-10.
Response No Technical Specificatien changes were required as a result of imple=enting te=s 1-10.
 
===Response===
No Technical Specificatien changes were required as a result of imple=enting te=s 1-10.
However, certain Station Procedures required modificatica and have been changed accord.ingly.
However, certain Station Procedures required modificatica and have been changed accord.ingly.
Should you have any further questions or concerns please do not hesitate to Contact US.
Should you have any further questions or concerns please do not hesitate to Contact US.
7ery : uly yours, 2 h h[l ['g_e'K/Gh cc: Director
7ery : uly yours, 2 h h
.1K/0'5 #Office of Inspection and Enforc.enen:
[l ['g
.'Division of Reactor Operatiens Inspection Washington, D. C.
_e'K/Gh cc: Director 1K
20555 7907020 #,, , A? ?&~}}
/
0'5 #
Office of Inspection and Enforc.enen:
Division of Reactor Operatiens Inspection Washington, D. C.
20555 7907020 #
,,, A? ?
~}}

Latest revision as of 16:22, 4 January 2025

Submits Supplemental Response to IE Bulletin 79-08.No Tech Spec Changes Required as Result of Implementing Items 1-10
ML19224C362
Person / Time
Site: Pilgrim
Issue date: 05/15/1979
From: Andognini G
BOSTON EDISON CO.
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
FOIA-79-98 79-93, NUDOCS 7907020221
Download: ML19224C362 (1)


Text

/

BOSTON EDISON CO M PANY ornce omets aco scytamm stucrr sostem. Mas sacwus trTo o2199

a. cas.v.oon=w.

ac=

NWCLEAS OPCRATIOMs DEPAAT,eCNT May 15, 1979 BECo. Ltr. #79-93 Mr. Boyce H. Grier Office of Sspection and Enforce =ent Region I U.S. Nuclear Regulatory Co= mission 631 Park Avenue King of Prussia, PA.

19406 License No. DPR-35 Docket No. 50-293 Surelenentarv Resconse to IE Bulletin No. 79-08 Ref. a) Boston Edison Cc=pany letter to Mr. Boyce Grier dated April 25, 1979 titled " Response to II Sulletin 79-08"

Dear Sir:

Boston Edison Co=pany's initial response to II Eulletin 79-08 (Ref. a) included Ite=s 1-10.

Ite= 11 was to be addressed in a subsequent letter within 30 days of the date of the Sulletin and is as follows:

Item 11 Propose changes, as required, to those Technical Specifications which cast be = edified as a result of your implementing Ite=s 1-10.

Response

No Technical Specificatien changes were required as a result of imple=enting te=s 1-10.

However, certain Station Procedures required modificatica and have been changed accord.ingly.

Should you have any further questions or concerns please do not hesitate to Contact US.