{{#Wiki_filter:s         a
{{#Wiki_filter:s a
        .
DOSTON EDISON COMPANY oENERAL oFFICEE Goo SQYLSTON sTNEET BasTON. M AES ACNUSETTs o2199
DOSTON EDISON COMPANY oENERAL oFFICEE Goo SQYLSTON sTNEET BasTON. M AES ACNUSETTs o2199
: o. C AmL ANDOONeNe S u PE RI NTEND E N T NUCLE AM OPERATIONS DEPARTMENT February 5,   1980 BECo. Ltr. #80-25 Mr. Thomas A. Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D. C.             20555 License No. DPR-35 Docket No. 50-293 Review of Proj ected and Backlog Licensing Items Ref. a)   U.S. NRC Letter (T. A.       Ippolito) to Boston Edison Company (G. C. Andognini) dated August 20, 1979.
: o. C AmL ANDOONeNe S u PE RI NTEND E N T NUCLE AM OPERATIONS DEPARTMENT February 5, 1980 BECo. Ltr. #80-25 Mr. Thomas A.
Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293 Review of Proj ected and Backlog Licensing Items Ref. a)
U.S. NRC Letter (T. A.
Ippolito) to Boston Edison Company (G. C. Andognini) dated August 20, 1979.
1950 060


==Dear Sir:==
==Dear Sir:==
1950 060 Reference a) requested Boston Edison Company to review backlog licensing items and designate priorities accordingly. As a result, several items with the highest priority were identified via verbal communication with your staff and were subsequer.cly approved and issued as Technical Specification amendments.
Reference a) requested Boston Edison Company to review backlog licensing items and designate priorities accordingly. As a result, several items with the highest priority were identified via verbal communication with your staff and were subsequer.cly approved and issued as Technical Specification amendments.
The following subjects include both projected and backlog licensing items, listed according to their respective priority:
The following subjects include both projected and backlog licensing items, listed according to their respective priority:
Priority                           Subject                         Submittal Date             Comments
Priority Subject Submittal Date Comments 1.
: 1.                   Multiple Control Rod                       11/20/79             Desired By Removal                                                         Feb. 15, 1980
Multiple Control Rod 11/20/79 Desired By Removal Feb. 15, 1980 2.
: 2.                   Projected Package of                   Near Future             Necessary for Tech. Spec. changes per                                         starr.up from Refueling Outage                                               refueling outage Modifications
Projected Package of Near Future Necessary for Tech. Spec. changes per starr.up from Refueling Outage refueling outage Modifications 3.
: 3.                     Reload IV Submittal                       12/12/79             Necessary for Startup from refueling outage 4                     Miscellaneous T.S. Changes                 7/ 6/79 a) APRM Setpoints b) ILRT Change 00l g             Desired prior to startup from
Reload IV Submittal 12/12/79 Necessary for Startup from refueling outage 4
                                                                                    //D           refueling outag h           8002120          5 2.2.
Miscellaneous T.S. Changes 7/ 6/79 a) APRM Setpoints 00l b) ILRT Change g
Desired prior to startup from
//D refueling outag h
8002 20 5 2.2.
1


.
BOSTON EDISON COMPANY Mr. Thomas A.
BOSTON EDISON COMPANY Mr. Thomas A. Ippolito, Chief February 5, 1980 Page 2 Priority               Subject                 Submittal Date       Comments c) Snubbers                                       Updates Tech.
Ippolito, Chief February 5, 1980 Page 2 Priority Subject Submittal Date Comments c) Snubbers Updates Tech.
Specs. to cur-rent "As Built" d) Adminis trative                               Updates Tech.
Specs. to cur-rent "As Built" d) Adminis trative Updates Tech.
Specs. to cur-rent Staffing e) Auto Blowdoun Timer                           Desired prior to startup from refueling f) In Sequence Criticals g) IRM Channel Calibration                     Per Request of
Specs. to cur-rent Staffing e) Auto Blowdoun Timer Desired prior to startup from refueling f)
                                                                  'RC I&E h) MSIV Closure Time                             Clarification on previous Tech.
In Sequence Criticals g)
IRM Channel Calibration Per Request of
'RC I&E h) MSIV Closure Time Clarification on previous Tech.
Spec.
Spec.
: 4.         18 Month Cycle                       12/31/79   Desired by March 1980
4.
: 5.         Administrative                       9/27/79   Updates Tech.
18 Month Cycle 12/31/79 Desired by March 1980 5.
Specs. to cur-rent staffing
Administrative 9/27/79 Updates Tech.
: 6.         Fire Protection Modifica-tion Implementation                   2/ 5/79
Specs. to cur-rent staffing 6.
: 7.         Radiation Protection                 12/27/79 Manager
Fire Protection Modifica-tion Implementation 2/ 5/79 7.
: 8.         Reactor Coolant Chemistry             3/22/78   Clarifies un-and Hydraulic Snubbers                           resolved items per I&E Inspec-tions O       Snubber section
Radiation Protection 12/27/79 Manager 8.
                                              \gl ikh can be deleted per misc. T.S. changes 7-6-79
Reactor Coolant Chemistry 3/22/78 Clarifies un-and Hydraulic Snubbers resolved items per I&E Inspec-tions O
: 9.         Diesel Fuel Quality                   2/ 1/78
Snubber section ikh can be deleted per
: 10.         Single Loop Operation                 3/19/76   To be supplemented with frrther analysis
\\gl misc. T.S. changes 7-6-79 9.
Diesel Fuel Quality 2/ 1/78 10.
Single Loop Operation 3/19/76 To be supplemented with frrther analysis


SasTcN EDISON COMPANY Mr. Thomas A. Ippolito, Chief February 5, 1980 Page 3 Priority               Subject                 Submittal Date               Comments
SasTcN EDISON COMPANY Mr. Thomas A.
: 11.           10 CFR 50.55a (g)                   3/15/79             Revision in process to be resubmitted
Ippolito, Chief February 5, 1980 Page 3 Priority Subject Submittal Date Comments 11.
: 12.           Emergency Plan                     11/ 4/76             FSAR Amendment #38 (App. N) Revision in process - to be resubmitted The following item should be deleted from your list:
10 CFR 50.55a (g) 3/15/79 Revision in process to be resubmitted 12.
Diesel Generator Surveillance     11/12/76 We trust that those items of highest priority will receive prompt review and approval. Should you require further information on any submittal, please do not hesitate to contact us.
Emergency Plan 11/ 4/76 FSAR Amendment #38 (App. N) Revision in process - to be resubmitted The following item should be deleted from your list:
Diesel Generator Surveillance 11/12/76 We trust that those items of highest priority will receive prompt review and approval.
Should you require further information on any submittal, please do not hesitate to contact us.
Very truly yours,
Very truly yours,
                                          .C<~     ,' ~;5.y :     ,9 ",' .i _i
.C<~
                                                                        .
,' ~;5.y :
                                                        -
,9 ",'.i _i r}}
r}}

Latest revision as of 12:27, 3 January 2025

Submits Projected & Backlog Licensing Item Review Schedule in Response to NRC 790820 Request
ML19260D863
Person / Time
Site: Pilgrim
Issue date: 02/05/1980
From: Angognini G
BOSTON EDISON CO.
To: Ippolito T
Office of Nuclear Reactor Regulation
References
80-25, NUDOCS 8002120522
Download: ML19260D863 (3)


Text

s a

DOSTON EDISON COMPANY oENERAL oFFICEE Goo SQYLSTON sTNEET BasTON. M AES ACNUSETTs o2199

o. C AmL ANDOONeNe S u PE RI NTEND E N T NUCLE AM OPERATIONS DEPARTMENT February 5, 1980 BECo. Ltr. #80-25 Mr. Thomas A.

Ippolito, Chief Operating Reactors Branch #3 Division of Operating Reactors Office of Nuclear Regulatory Commission Washington, D. C.

20555 License No. DPR-35 Docket No. 50-293 Review of Proj ected and Backlog Licensing Items Ref. a)

U.S. NRC Letter (T. A.

Ippolito) to Boston Edison Company (G. C. Andognini) dated August 20, 1979.

1950 060

Dear Sir:

Reference a) requested Boston Edison Company to review backlog licensing items and designate priorities accordingly. As a result, several items with the highest priority were identified via verbal communication with your staff and were subsequer.cly approved and issued as Technical Specification amendments.

The following subjects include both projected and backlog licensing items, listed according to their respective priority:

Priority Subject Submittal Date Comments 1.

Multiple Control Rod 11/20/79 Desired By Removal Feb. 15, 1980 2.

Projected Package of Near Future Necessary for Tech. Spec. changes per starr.up from Refueling Outage refueling outage Modifications 3.

Reload IV Submittal 12/12/79 Necessary for Startup from refueling outage 4

Miscellaneous T.S. Changes 7/ 6/79 a) APRM Setpoints 00l b) ILRT Change g

Desired prior to startup from

//D refueling outag h

8002 20 5 2.2.

1

BOSTON EDISON COMPANY Mr. Thomas A.

Ippolito, Chief February 5, 1980 Page 2 Priority Subject Submittal Date Comments c) Snubbers Updates Tech.

Specs. to cur-rent "As Built" d) Adminis trative Updates Tech.

Specs. to cur-rent Staffing e) Auto Blowdoun Timer Desired prior to startup from refueling f)

In Sequence Criticals g)

IRM Channel Calibration Per Request of

'RC I&E h) MSIV Closure Time Clarification on previous Tech.

Spec.

4.

18 Month Cycle 12/31/79 Desired by March 1980 5.

Administrative 9/27/79 Updates Tech.

Specs. to cur-rent staffing 6.

Fire Protection Modifica-tion Implementation 2/ 5/79 7.

Radiation Protection 12/27/79 Manager 8.

Reactor Coolant Chemistry 3/22/78 Clarifies un-and Hydraulic Snubbers resolved items per I&E Inspec-tions O

Snubber section ikh can be deleted per

\\gl misc. T.S. changes 7-6-79 9.

Diesel Fuel Quality 2/ 1/78 10.

Single Loop Operation 3/19/76 To be supplemented with frrther analysis

SasTcN EDISON COMPANY Mr. Thomas A.

Ippolito, Chief February 5, 1980 Page 3 Priority Subject Submittal Date Comments 11.

10 CFR 50.55a (g) 3/15/79 Revision in process to be resubmitted 12.

Emergency Plan 11/ 4/76 FSAR Amendment #38 (App. N) Revision in process - to be resubmitted The following item should be deleted from your list:

Diesel Generator Surveillance 11/12/76 We trust that those items of highest priority will receive prompt review and approval.

Should you require further information on any submittal, please do not hesitate to contact us.

Very truly yours,