{{#Wiki_filter:June 28, 2022
{{#Wiki_filter:Mr. Robert T. Simril
Mr. Robert T. Simril
Site Vice President
Site Vice President
Duke Energy Carolinas, LLC
Duke Energy Carolinas, LLC
Catawba Nuclear Station
Catawba Nuclear Station
4800 Concord Road
4800 Concord Road
York, SC 29745
York, SC 29745
SUBJECT: CATAWBA NUCLEAR STATION - INFORMATION REQUEST FOR THE CYBER-
SUBJECT: CATAWBA NUCLEAR STATION - INFORMATION REQUEST FOR THE CYBER-
              SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM
SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM  
              INSPECTION 05000413/2022403 AND 05000414/2022403
INSPECTION 05000413/2022403 AND 05000414/2022403
Dear Mr. Simril:
Dear Mr. Simril:
On October 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline
On October 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline  
inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0,
inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0,  
at your Catawba Nuclear Station. The inspection will be performed to evaluate and verify your
at your Catawba Nuclear Station. The inspection will be performed to evaluate and verify your  
ability to provide assurance that your digital computer and communication systems and
ability to provide assurance that your digital computer and communication systems and  
networks associated with safety, security, or emergency preparedness (SSEP) functions are
networks associated with safety, security, or emergency preparedness (SSEP) functions are  
adequately protected against cyber-attacks in accordance with Title 10 of the Code of Federal
adequately protected against cyber-attacks in accordance with Title 10 of the Code of Federal  
Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved
Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved  
cyber security plan (CSP). The onsite portion of the inspection will take place during the week
cyber security plan (CSP). The onsite portion of the inspection will take place during the week  
of October 24, 2022.
of October 24, 2022.
Experience has shown that baseline inspections are extremely resource intensive, both for the
Experience has shown that baseline inspections are extremely resource intensive, both for the  
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site
NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site  
and to ensure a productive inspection for both parties, we have enclosed a request for
and to ensure a productive inspection for both parties, we have enclosed a request for  
documents needed for the inspection. These documents have been divided into four groups.
documents needed for the inspection. These documents have been divided into four groups.
The first group specifies information necessary to assist the inspection team in choosing the
The first group specifies information necessary to assist the inspection team in choosing the  
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should
focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should  
be made available electronically no later than August 29, 2022. The inspection team will
be made available electronically no later than August 29, 2022. The inspection team will  
review this information and, by September 12, 2022, will request the specific items that should
review this information and, by September 12, 2022, will request the specific items that should  
be provided for review. The second group of additional requested documents will assist the
be provided for review. The second group of additional requested documents will assist the  
inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs),
inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs),  
defensive architecture, and the areas of the licensees CSP selected for the cyber-security
defensive architecture, and the areas of the licensees CSP selected for the cyber-security  
inspection. This information will be requested for review in the regional office prior to the
inspection. This information will be requested for review in the regional office prior to the  
inspection by October 14, 2022, as identified above.
inspection by October 14, 2022, as identified above.
June 28, 2022


R. Simril                                         2
R. Simril
The third group of requested documents consists of those items that the inspection team will
2
review, or need access to, during the inspection. Please have this information available by the
The third group of requested documents consists of those items that the inspection team will  
review, or need access to, during the inspection. Please have this information available by the  
first day of the onsite inspection, October 24, 2022.
first day of the onsite inspection, October 24, 2022.
The fourth group of information is necessary to aid the inspection team in tracking issues
The fourth group of information is necessary to aid the inspection team in tracking issues  
identified as a result of the inspection. It is requested that this information be provided to the
identified as a result of the inspection. It is requested that this information be provided to the  
lead inspector as the information is generated during the inspection. It is important that all of
lead inspector as the information is generated during the inspection. It is important that all of  
these documents are up to date and complete in order to minimize the number of additional
these documents are up to date and complete in order to minimize the number of additional  
documents requested during the preparation and/or the onsite portions of the inspection.
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is William Monk. We understand that our regulatory
The lead inspector for this inspection is William Monk. We understand that our regulatory  
contact for this inspection is Sherry Andrews, Licensing Manager of your organization. If there
contact for this inspection is Sherry Andrews, Licensing Manager of your organization. If there  
are any questions about the inspection or the material requested, please contact the lead
are any questions about the inspection or the material requested, please contact the lead  
inspector at (404) 997-4579 or via e-mail at william.monk@nrc.gov.
inspector at (404) 997-4579 or via e-mail at william.monk@nrc.gov.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, control number
requirements were approved by the Office of Management and Budget, control number  
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,  
a request for information or an information collection requirement unless the requesting
a request for information or an information collection requirement unless the requesting  
document displays a currently valid Office of Management and Budget control number.
document displays a currently valid Office of Management and Budget control number.
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,
In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,  
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available
of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available  
electronically for public inspection in the NRCs Public Document Room or from the Publicly
electronically for public inspection in the NRCs Public Document Room or from the Publicly  
Available Records (PARS) component of the NRC's Agencywide Documents Access and
Available Records (PARS) component of the NRC's Agencywide Documents Access and  
Management System (ADAMS). ADAMS is accessible from the NRC Web site at
Management System (ADAMS). ADAMS is accessible from the NRC Web site at  
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                Sincerely,
Sincerely,
                                                                        Signed by McCoy, Gerald
Gerald J. McCoy, Branch Chief  
                                                                        on 06/28/22
Engineering Branch 2
                                                Gerald J. McCoy, Branch Chief
Division of Reactor Safety
                                                Engineering Branch 2
Docket Nos. 50-413 & 50-414
                                                Division of Reactor Safety
License Nos. NPF-35 & NPF-52
Docket Nos. 50-413 & 50-414
License Nos. NPF-35 & NPF-52
Enclosure:
Enclosure:
Catawba Nuclear Station Cyber-Security Inspection Document Request
Catawba Nuclear Station Cyber-Security Inspection Document Request
cc w/encl: Distribution via LISTSERV
cc w/encl: Distribution via LISTSERV
Signed by McCoy, Gerald
on 06/28/22




  ML________________
  ML________________
                              X   Non-Sensitive           X   Publicly Available
X
    X    SUNSI Review
SUNSI Review
                                  Sensitive                  Non-Publicly Available
X
    OFFICE RII/DRS         RII/DRS             RII/DRS
Non-Sensitive
    NAME   W. Monk         P. Braaten           G. McCoy
 
    DATE   06/27/2022     06/27/2022           06/272022
Sensitive
                                 
X
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
Publicly Available
Inspection Report:            05000413/2022-403 & 05000414/2022-403
 
Inspection Dates:              October 24-28, 2022
Non-Publicly Available
Inspection Procedure:          IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)
OFFICE RII/DRS
Reference:                    Guidance Document for Development of the Request for
RII/DRS
                              Information (RFI) and Notification Letter for Full-Implementation of
RII/DRS
                              the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)
NAME
NRC Inspectors:                William Monk, Lead                      Phil Braaten
W. Monk
                              404-909-4579                            404-997-4651
P. Braaten
                              william.monk@nrc.gov                    philipp.braaten@nrc.gov
G. McCoy
NRC Contractors:              Tim Marshall                            Balla Barro
DATE
                              301-415-7000                            301-415-7000
06/27/2022
                              timothy.marshall@nrc.gov                balla.barro@nrc.gov
06/27/2022
I.    Information Requested for In-Office Preparation
06/272022
      The initial request for information (i.e., first RFI) concentrates on providing the inspection
      team with the general information necessary to select appropriate components and CSP
      elements to develop a site-specific inspection plan. The first RFI is used to identify the
      list of critical systems and critical digital assets (CSs/CDAs) plus operational and
      management (O&M) security control portions of the CSP to be chosen as the sample
      set required to be inspected by the cyber-security IP. The first RFIs requested
      information is specified below in Table: RFI #1. The Table RFI #1 information is
      requested to be provided electronically to the inspection team by August 29, 2022, or
      sooner, to facilitate the selection of the specific items that will be reviewed during the
      onsite inspection weeks.
      The inspection team will examine the returned documentation from the first RFI and
      identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
      focused follow-up request to develop the second RFI. The inspection team will submit
      the specific systems and equipment list to your staff by September 12, 2022, which will
      identify the specific systems and equipment that will be utilized to evaluate the
      CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the
      cyber-security inspection. We request that the additional information provided from the
      second RFI be made available to the inspection team by October 14, 2022. All requests
      for information shall follow the guidance document U.S. NRC - Guidance Document for
      Development of the Request for Information (RFI) and Notification Letter for Full
      Implementation of the Cyber-Security Inspection, referenced above.
                                                                                          Enclosure


CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
      The required Table: RFI 1 information shall be provided electronically to the lead
Enclosure
      inspector by August 29, 2022. The preferred file format for all lists is a searchable
Inspection Report:
      Excel spreadsheet file. The information should be indexed and hyper-linked to facilitate
05000413/2022-403 & 05000414/2022-403
      ease of use. If you have any questions regarding this information, please call the
Inspection Dates:
      inspection team leader as soon as possible.
October 24-28, 2022
                                            Table: RFI #1
Inspection Procedure:
Paragraph Number/Title:                                                             IP Ref
IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)
      A list of all Identified Critical Systems and Critical Digital Assets, -
Reference:
    highlight/note any additions, deletions, reclassifications due to new
Guidance Document for Development of the Request for  
  1                                                                                Overall
Information (RFI) and Notification Letter for Full-Implementation of
    guidance from white papers, changes to NEI 10-04, 13-10, etc. since
the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)
    the last cyber security inspection.
NRC Inspectors:
      A list of EP and Security onsite and offsite digital communication
William Monk, Lead
  2                                                                                Overall
Phil Braaten
    systems.
404-909-4579
      Network Topology Diagrams to include information and data flow for
404-997-4651
  3                                                                                Overall
william.monk@nrc.gov
    critical systems in levels 2, 3, and 4 (If available).
philipp.braaten@nrc.gov
  4  Ongoing Monitoring and Assessment program documentation.                      03.01(a)
NRC Contractors:
  5 The most recent effectiveness analysis of the Cyber Security Program.        03.01(b)
Tim Marshall
  6 Vulnerability screening/assessment and scan program documentation.            03.01(c)
Balla Barro
    Cyber Security Incident Response documentation, including incident
301-415-7000
    detection, response, and recovery documentation as well as                    03.02(a)
301-415-7000
  7 contingency plan development, implementation, and including any                  and
timothy.marshall@nrc.gov
    program documentation that requires testing of security boundary              03.04(b)
balla.barro@nrc.gov
    device functionality.
I.
  8 Device Access and Key Control program documentation.                          03.02(c)
Information Requested for In-Office Preparation
  9  Password/Authenticator program documentation.                                 03.02(c)
The initial request for information (i.e., first RFI) concentrates on providing the inspection
  10 User Account/Credential and Authentication program documentation.            03.02(d)
team with the general information necessary to select appropriate components and CSP
      Portable Media and Mobile Device (PMMD) control documentation,
elements to develop a site-specific inspection plan.  The first RFI is used to identify the
  11                                                                                03.02(e)
list of critical systems and critical digital assets (CSs/CDAs) plus operational and
    including kiosk security control assessment/documentation.
management (O&M) security control portions of the CSP to be chosen as the sample
      Design change / modification program documentation and a list of all
set required to be inspected by the cyber-security IP. The first RFIs requested
    design changes completed since the last cyber security inspection,
information is specified below in Table: RFI #1The Table RFI #1 information is
  12                                                                                03.03(a)
requested to be provided electronically to the inspection team by August 29, 2022, or
    including either a summary of the design change or the 50.59
sooner, to facilitate the selection of the specific items that will be reviewed during the
    documentation for the change.
onsite inspection weeks.
      Supply Chain Management program documentation, including any                  03.03(a),
The inspection team will examine the returned documentation from the first RFI and  
13
identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more
    security impact analysis for new acquisitions.                                (b) and (c)
focused follow-up request to develop the second RFI. The inspection team will submit
                                                  2
the specific systems and equipment list to your staff by September 12, 2022, which will
identify the specific systems and equipment that will be utilized to evaluate the
CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the
cyber-security inspection. We request that the additional information provided from the
second RFI be made available to the inspection team by October 14, 2022. All requests
for information shall follow the guidance document U.S. NRC - Guidance Document for
Development of the Request for Information (RFI) and Notification Letter for Full
Implementation of the Cyber-Security Inspection, referenced above.


CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                          Table: RFI #1
2
  Paragraph Number/Title:                                                             IP Ref
The required Table: RFI 1 information shall be provided electronically to the lead
        Configuration Management documentation including any security
inspector by August 29, 2022.  The preferred file format for all lists is a searchable
                                                                                      03.03(a)
Excel spreadsheet file.  The information should be indexed and hyper-linked to facilitate
    14 impact analysis performed due to configuration changes since the last
ease of use.  If you have any questions regarding this information, please call the
                                                                                      and (b)
inspection team leader as soon as possible.
      cyber inspection.
Table: RFI #1
        Cyber Security Plan and any 50.54(p) analysis to support changes to
Paragraph Number/Title:
    15                                                                                03.04(a)
IP Ref
      the plan since the last inspection.
1
    16 Cyber Security Performance Metrics tracked (if applicable).                   03.06(b)
A list of all Identified Critical Systems and Critical Digital Assets, -
        Provide documentation describing any cyber security changes to the
highlight/note any additions, deletions, reclassifications due to new
    17                                                                                Overall
guidance from white papers, changes to NEI 10-04, 13-10, etc. since  
      access authorization program since the last cyber security inspection.
the last cyber security inspection.
        Provide a list of all procedures and policies provided to the NRC with
Overall
    18                                                                                Overall
2
      their descriptive name and associated number (if available).
A list of EP and Security onsite and offsite digital communication
    19 Performance testing report (if applicable).                                   03.06(a)
systems.  
        In addition to the above information, please provide the following:
Overall
            (1) electronic copy of the UFSAR and technical specifications
3
            (2) name(s) and phone numbers for the regulatory and technical contacts
Network Topology Diagrams to include information and data flow for
            (3) current management and engineering organizational charts
critical systems in levels 2, 3, and 4 (If available).
        Based on this information, the inspection team will identify and select specific systems
Overall
        and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
4
        submit a list of specific systems and equipment to your staff by September 12, 2022, for
Ongoing Monitoring and Assessment program documentation.
        the second RFI (i.e., RFI #2).
03.01(a)
II.    Additional Information Requested to be Available Prior to Inspection.
5
        As stated in Section I above, the inspection team will examine the returned
The most recent effectiveness analysis of the Cyber Security Program.
        documentation requested from Table: RFI #1 and submit the list of specific systems and
03.01(b)
        equipment to your staff by September 12, 2022, for the second RFI (i.e., RFI #2). The
6
        second RFI will request additional information required to evaluate the CSs/CDAs,
Vulnerability screening/assessment and scan program documentation.
        defensive architecture, and the areas of the licensees CSP selected for the cyber-
03.01(c)
        security inspection. The additional information requested for the specific systems and
7
        equipment is identified in Table: RFI #2. All requested information shall follow the
Cyber Security Incident Response documentation, including incident
        guidance document referenced above.
detection, response, and recovery documentation as well as
        The Table: RFI 2 information shall be provided to the lead inspector by
contingency plan development, implementation, and including any
        October 14, 2022. The preferred file format for all lists is a searchable Excel
program documentation that requires testing of security boundary
        spreadsheet. The information should be indexed and hyper-linked to facilitate ease of
device functionality.  
        use. If you have any questions regarding this information, please call the inspection
03.02(a)  
         team leader as soon as possible.
and
                                                  3
03.04(b)
8
Device Access and Key Control program documentation. 
03.02(c)
9
Password/Authenticator program documentation.
03.02(c)
10
User Account/Credential and Authentication program documentation.  
03.02(d)
11 Portable Media and Mobile Device (PMMD) control documentation,  
including kiosk security control assessment/documentation.
03.02(e)
12
Design change / modification program documentation and a list of all
design changes completed since the last cyber security inspection,  
including either a summary of the design change or the 50.59
documentation for the change.  
03.03(a)
13
Supply Chain Management program documentation, including any
security impact analysis for new acquisitions.  
03.03(a),  
(b) and (c)          


CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
                                          Table: RFI #2
3
    Paragraph Number/Title:                                                       Items
Table: RFI #1
          For the Critical Systems / CDAs chosen for inspection provide:
Paragraph Number/Title:
          Ongoing Monitoring and Assessment activity performed on the
IP Ref
      1                                                                          03.01(a)
14
          selected inspection samples system(s).
Configuration Management documentation including any security
      2 All Security Control Assessments for the selected system(s).            03.01(a)
impact analysis performed due to configuration changes since the last
          All vulnerability screenings/assessments associated with or scans
cyber inspection.
      3 performed on the selected systems since the last cyber security          03.01(c)
03.03(a)  
          inspection.
and (b)
          Documentation (including configuration files and rules sets) for
15
          Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
Cyber Security Plan and any 50.54(p) analysis to support changes to
      4 Host-based Intrusion Detection Systems (HIDS), and Security              03.02(b)
the plan since the last inspection.
          Information and Event Management (SIEM) systems for systems
03.04(a)
          chosen for inspection.
16
          Documentation (including configuration files and rule sets) for intra-
Cyber Security Performance Metrics tracked (if applicable).
      5 security level firewalls and boundary devices used to protect the       03.02(c)
03.06(b)
          selected systems.
17
          Copies of all periodic reviews of the access authorization list for the
Provide documentation describing any cyber security changes to the
      6                                                                          03.02(d)
access authorization program since the last cyber security inspection.
          selected systems since the last cyber inspection.
Overall
      7 Baseline configuration data sheets for the selected CDAs.                03.03(a)
18
          Documentation on any changes, including Security Impact Analyses,
Provide a list of all procedures and policies provided to the NRC with
      8                                                                          03.03(b)
their descriptive name and associated number (if available).
          performed on the selected systems since the last inspection.
Overall
          Copies of the purchase order documentation for any new equipment
19
      9                                                                          03.03(c)
Performance testing report (if applicable).
          purchased for the selected systems since the last inspection.
03.06(a)
          Copies of any reports/assessment for cyber security drills performed    03.02(a)
In addition to the above information, please provide the following:
      10
(1) electronic copy of the UFSAR and technical specifications
          since the last inspection.                                              03.04(b)
(2) name(s) and phone numbers for the regulatory and technical contacts
          Copy of the individual recovery plan(s) for the selected system(s)     03.02(a)
(3) current management and engineering organizational charts
      11 including documentation of the results the last time the backups
Based on this information, the inspection team will identify and select specific systems  
          were executed.                                                         03.04(b)
and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and
          Corrective actions taken as a result of cyber security incidents/issues
submit a list of specific systems and equipment to your staff by September 12, 2022, for  
      12 to include previous NRC violations and Licensee Identified Violations    03.05
the second RFI (i.e., RFI #2).
          since the last cyber security inspection.
II.
                                            4
Additional Information Requested to be Available Prior to Inspection.
As stated in Section I above, the inspection team will examine the returned
documentation requested from Table: RFI #1 and submit the list of specific systems and
equipment to your staff by September 12, 2022, for the second RFI (i.e., RFI #2). The
second RFI will request additional information required to evaluate the CSs/CDAs,
defensive architecture, and the areas of the licensees CSP selected for the cyber-
security inspection.  The additional information requested for the specific systems and
equipment is identified in Table: RFI #2. All requested information shall follow the
guidance document referenced above.
The Table: RFI 2 information shall be provided to the lead inspector by
October 14, 2022.  The preferred file format for all lists is a searchable Excel
spreadsheet.  The information should be indexed and hyper-linked to facilitate ease of  
use. If you have any questions regarding this information, please call the inspection  
team leader as soon as possible.


CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
III. Information Requested to be Available on First Day of Inspection
4
    For the specific systems and equipment identified in Section II above, provide the
Table: RFI #2
    following RFI (i.e., Table: Week Onsite) to the team by October 24, 2022, the first day
Paragraph Number/Title:
    of the inspection. All requested information shall follow the guidance document
Items
    referenced above.
For the Critical Systems / CDAs chosen for inspection provide:
    The preferred file format for all lists is a searchable Excel spreadsheet file. The
1
    information should be indexed and hyper-linked to facilitate ease of use. If you have any
Ongoing Monitoring and Assessment activity performed on the  
    questions regarding this information, please call the inspection team leader as soon as
selected inspection samples system(s).
    possible.
03.01(a)
                                          Table: Week Onsite
2
      Paragraph Number/Title:                                                          Items
All Security Control Assessments for the selected system(s).
            Any cyber security event reports submitted in accordance with 10
03.01(a)
        1                                                                            03.04(a)
3
            CFR 73.77, since the last cyber security inspection.
All vulnerability screenings/assessments associated with or scans
            Updated copies of corrective actions taken as a result of cyber
performed on the selected systems since the last cyber security
            security incidents/issues, to include previous NRC violations and
inspection.  
        2                                                                              03.05
03.01(c)
            Licensee Identified Violations since the last cyber security
4
            inspection, as well as vulnerability-related corrective actions.
Documentation (including configuration files and rules sets) for
    In addition to the above information please provide the following:
Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),
          (1) Copies of the following documents do not need to be solely available to the
Host-based Intrusion Detection Systems (HIDS), and Security
              inspection team as long as the inspectors have easy and unrestrained access
Information and Event Management (SIEM) systems for systems
              to them.
chosen for inspection.
              a. Updated Final Safety Analysis Report (UFSAR), if not previously provided
03.02(b)
              b. original FSAR Volumes
5
              c. original SER and Supplements
Documentation (including configuration files and rule sets) for intra-
              d. FSAR Question and Answers
security level firewalls and boundary devices used to protect the
              e.  Quality Assurance (QA) Plan
selected systems.
              f. Technical Specifications, if not previously provided
03.02(c)
              g. latest IPE/PRA Report
6
          (2) Vendor Manuals, Assessment and Corrective Actions:
Copies of all periodic reviews of the access authorization list for the
              a. The most recent Cyber-Security Quality Assurance (QA) audit and/or
selected systems since the last cyber inspection.
                  self-assessment; and
03.02(d)
              b. Corrective action documents (e.g., condition reports, including status of
7
                  corrective actions) generated as a result of the most recent Cyber-Security
Baseline configuration data sheets for the selected CDAs.
                  Quality Assurance (QA) audit and/or self-assessment.
03.03(a)
                                                  5
8
Documentation on any changes, including Security Impact Analyses,
performed on the selected systems since the last inspection.
03.03(b)
9
Copies of the purchase order documentation for any new equipment
purchased for the selected systems since the last inspection.
03.03(c)
10
Copies of any reports/assessment for cyber security drills performed
since the last inspection.
03.02(a)
03.04(b)
11
Copy of the individual recovery plan(s) for the selected system(s)  
including documentation of the results the last time the backups
were executed.
03.02(a)
03.04(b)
12
Corrective actions taken as a result of cyber security incidents/issues
to include previous NRC violations and Licensee Identified Violations
since the last cyber security inspection.  
03.05


  CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
IV.     Information Requested to Be Provided Throughout the Inspection
5
            (1) Copies of any corrective action documents generated as a result of the
III.
                inspection teams questions or queries during the inspection.
Information Requested to be Available on First Day of Inspection
            (2) Copies of the list of questions submitted by the inspection team members and
For the specific systems and equipment identified in Section II above, provide the
                the status/resolution of the information requested (provided daily during the
following RFI (i.e., Table: Week Onsite) to the team by October 24, 2022, the first day
                inspection to each inspection team member during daily de-brief meetings).
of the inspection. All requested information shall follow the guidance document
If you have any questions regarding the information requested, please contact the inspection
referenced above.
The preferred file format for all lists is a searchable Excel spreadsheet file.  The
information should be indexed and hyper-linked to facilitate ease of use.  If you have any
questions regarding this information, please call the inspection team leader as soon as
possible.
Table: Week Onsite
Paragraph Number/Title:
Items
1
Any cyber security event reports submitted in accordance with 10
CFR 73.77, since the last cyber security inspection.
03.04(a)
2
Updated copies of corrective actions taken as a result of cyber
security incidents/issues, to include previous NRC violations and
Licensee Identified Violations since the last cyber security
inspection, as well as vulnerability-related corrective actions.
03.05
In addition to the above information please provide the following:
(1) Copies of the following documents do not need to be solely available to the
inspection team as long as the inspectors have easy and unrestrained access
to them.
a.
Updated Final Safety Analysis Report (UFSAR), if not previously provided
b.
original FSAR Volumes
c.
original SER and Supplements
d.
FSAR Question and Answers
e.
Quality Assurance (QA) Plan
f.
Technical Specifications, if not previously provided
g.
latest IPE/PRA Report
(2) Vendor Manuals, Assessment and Corrective Actions:
a.
The most recent Cyber-Security Quality Assurance (QA) audit and/or
self-assessment; and
b.
Corrective action documents (e.g., condition reports, including status of
corrective actions) generated as a result of the most recent Cyber-Security
Quality Assurance (QA) audit and/or self-assessment.
 
CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST
6
IV.
Information Requested to Be Provided Throughout the Inspection
(1) Copies of any corrective action documents generated as a result of the  
inspection teams questions or queries during the inspection.
(2) Copies of the list of questions submitted by the inspection team members and  
the status/resolution of the information requested (provided daily during the  
inspection to each inspection team member during daily de-brief meetings).
If you have any questions regarding the information requested, please contact the inspection  
team leader.
team leader.
                                                  6
}}
}}

Latest revision as of 20:41, 2 January 2025

Information Request for the Cyber-Security Baseline Inspection Notification to Perform Inspection 05000413/2022403 and 05000414/2022403
ML22175A034
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 06/28/2022
From: Gerald Mccoy
NRC/RGN-II/DRS/EB2
To: Simril R
Duke Energy Carolinas
References
IR 2022403
Download: ML22175A034 (9)


See also: IR 05000413/2022403

Text

Mr. Robert T. Simril

Site Vice President

Duke Energy Carolinas, LLC

Catawba Nuclear Station

4800 Concord Road

York, SC 29745

SUBJECT: CATAWBA NUCLEAR STATION - INFORMATION REQUEST FOR THE CYBER-

SECURITY BASELINE INSPECTION, NOTIFICATION TO PERFORM

INSPECTION 05000413/2022403 AND 05000414/2022403

Dear Mr. Simril:

On October 24, 2022, the U.S. Nuclear Regulatory Commission (NRC) will begin a baseline

inspection in accordance with Inspection Procedure (IP) 71130.10 Cyber-Security, Revision 0,

at your Catawba Nuclear Station. The inspection will be performed to evaluate and verify your

ability to provide assurance that your digital computer and communication systems and

networks associated with safety, security, or emergency preparedness (SSEP) functions are

adequately protected against cyber-attacks in accordance with Title 10 of the Code of Federal

Regulations (10 CFR) 73.54 and the U.S. Nuclear Regulatory Commission (NRC) approved

cyber security plan (CSP). The onsite portion of the inspection will take place during the week

of October 24, 2022.

Experience has shown that baseline inspections are extremely resource intensive, both for the

NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site

and to ensure a productive inspection for both parties, we have enclosed a request for

documents needed for the inspection. These documents have been divided into four groups.

The first group specifies information necessary to assist the inspection team in choosing the

focus areas (i.e., sample set) to be inspected by the cyber-security IP. This information should

be made available electronically no later than August 29, 2022. The inspection team will

review this information and, by September 12, 2022, will request the specific items that should

be provided for review. The second group of additional requested documents will assist the

inspection team in the evaluation of the critical systems and critical digital assets (CSs/CDAs),

defensive architecture, and the areas of the licensees CSP selected for the cyber-security

inspection. This information will be requested for review in the regional office prior to the

inspection by October 14, 2022, as identified above.

June 28, 2022

R. Simril

2

The third group of requested documents consists of those items that the inspection team will

review, or need access to, during the inspection. Please have this information available by the

first day of the onsite inspection, October 24, 2022.

The fourth group of information is necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is William Monk. We understand that our regulatory

contact for this inspection is Sherry Andrews, Licensing Manager of your organization. If there

are any questions about the inspection or the material requested, please contact the lead

inspector at (404) 997-4579 or via e-mail at william.monk@nrc.gov.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, control number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget control number.

In accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding,

of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available

electronically for public inspection in the NRCs Public Document Room or from the Publicly

Available Records (PARS) component of the NRC's Agencywide Documents Access and

Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

Gerald J. McCoy, Branch Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-413 & 50-414

License Nos. NPF-35 & NPF-52

Enclosure:

Catawba Nuclear Station Cyber-Security Inspection Document Request

cc w/encl: Distribution via LISTSERV

Signed by McCoy, Gerald

on 06/28/22

ML________________

X

SUNSI Review

X

Non-Sensitive

Sensitive

X

Publicly Available

Non-Publicly Available

OFFICE RII/DRS

RII/DRS

RII/DRS

NAME

W. Monk

P. Braaten

G. McCoy

DATE

06/27/2022

06/27/2022

06/272022

CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000413/2022-403 & 05000414/2022-403

Inspection Dates:

October 24-28, 2022

Inspection Procedure:

IP 71130.10, Cyber-Security, Revision 0 (Effective: 01/01/2022)

Reference:

Guidance Document for Development of the Request for

Information (RFI) and Notification Letter for Full-Implementation of

the Cyber-Security Inspection, Rev. 2 (Issued: 11/22/2021)

NRC Inspectors:

William Monk, Lead

Phil Braaten

404-909-4579

404-997-4651

william.monk@nrc.gov

philipp.braaten@nrc.gov

NRC Contractors:

Tim Marshall

Balla Barro

301-415-7000

301-415-7000

timothy.marshall@nrc.gov

balla.barro@nrc.gov

I.

Information Requested for In-Office Preparation

The initial request for information (i.e., first RFI) concentrates on providing the inspection

team with the general information necessary to select appropriate components and CSP

elements to develop a site-specific inspection plan. The first RFI is used to identify the

list of critical systems and critical digital assets (CSs/CDAs) plus operational and

management (O&M) security control portions of the CSP to be chosen as the sample

set required to be inspected by the cyber-security IP. The first RFIs requested

information is specified below in Table: RFI #1. The Table RFI #1 information is

requested to be provided electronically to the inspection team by August 29, 2022, or

sooner, to facilitate the selection of the specific items that will be reviewed during the

onsite inspection weeks.

The inspection team will examine the returned documentation from the first RFI and

identify/select specific systems and equipment (e.g., CSs/CDAs) to provide a more

focused follow-up request to develop the second RFI. The inspection team will submit

the specific systems and equipment list to your staff by September 12, 2022, which will

identify the specific systems and equipment that will be utilized to evaluate the

CSs/CDAs, defensive architecture, and the areas of the licensees CSP selected for the

cyber-security inspection. We request that the additional information provided from the

second RFI be made available to the inspection team by October 14, 2022. All requests

for information shall follow the guidance document U.S. NRC - Guidance Document for

Development of the Request for Information (RFI) and Notification Letter for Full

Implementation of the Cyber-Security Inspection, referenced above.

CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

2

The required Table: RFI 1 information shall be provided electronically to the lead

inspector by August 29, 2022. The preferred file format for all lists is a searchable

Excel spreadsheet file. The information should be indexed and hyper-linked to facilitate

ease of use. If you have any questions regarding this information, please call the

inspection team leader as soon as possible.

Table: RFI #1

Paragraph Number/Title:

IP Ref

1

A list of all Identified Critical Systems and Critical Digital Assets, -

highlight/note any additions, deletions, reclassifications due to new

guidance from white papers, changes to NEI 10-04, 13-10, etc. since

the last cyber security inspection.

Overall

2

A list of EP and Security onsite and offsite digital communication

systems.

Overall

3

Network Topology Diagrams to include information and data flow for

critical systems in levels 2, 3, and 4 (If available).

Overall

4

Ongoing Monitoring and Assessment program documentation.

03.01(a)

5

The most recent effectiveness analysis of the Cyber Security Program.

03.01(b)

6

Vulnerability screening/assessment and scan program documentation.

03.01(c)

7

Cyber Security Incident Response documentation, including incident

detection, response, and recovery documentation as well as

contingency plan development, implementation, and including any

program documentation that requires testing of security boundary

device functionality.

03.02(a)

and

03.04(b)

8

Device Access and Key Control program documentation.

03.02(c)

9

Password/Authenticator program documentation.

03.02(c)

10

User Account/Credential and Authentication program documentation.

03.02(d)

11 Portable Media and Mobile Device (PMMD) control documentation,

including kiosk security control assessment/documentation.

03.02(e)

12

Design change / modification program documentation and a list of all

design changes completed since the last cyber security inspection,

including either a summary of the design change or the 50.59

documentation for the change.

03.03(a)

13

Supply Chain Management program documentation, including any

security impact analysis for new acquisitions.

03.03(a),

(b) and (c)

CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

3

Table: RFI #1

Paragraph Number/Title:

IP Ref

14

Configuration Management documentation including any security

impact analysis performed due to configuration changes since the last

cyber inspection.

03.03(a)

and (b)

15

Cyber Security Plan and any 50.54(p) analysis to support changes to

the plan since the last inspection.

03.04(a)

16

Cyber Security Performance Metrics tracked (if applicable).

03.06(b)

17

Provide documentation describing any cyber security changes to the

access authorization program since the last cyber security inspection.

Overall

18

Provide a list of all procedures and policies provided to the NRC with

their descriptive name and associated number (if available).

Overall

19

Performance testing report (if applicable).

03.06(a)

In addition to the above information, please provide the following:

(1) electronic copy of the UFSAR and technical specifications

(2) name(s) and phone numbers for the regulatory and technical contacts

(3) current management and engineering organizational charts

Based on this information, the inspection team will identify and select specific systems

and equipment (e.g., CSs/CDAs) from the information requested by Table RFI #1 and

submit a list of specific systems and equipment to your staff by September 12, 2022, for

the second RFI (i.e., RFI #2).

II.

Additional Information Requested to be Available Prior to Inspection.

As stated in Section I above, the inspection team will examine the returned

documentation requested from Table: RFI #1 and submit the list of specific systems and

equipment to your staff by September 12, 2022, for the second RFI (i.e., RFI #2). The

second RFI will request additional information required to evaluate the CSs/CDAs,

defensive architecture, and the areas of the licensees CSP selected for the cyber-

security inspection. The additional information requested for the specific systems and

equipment is identified in Table: RFI #2. All requested information shall follow the

guidance document referenced above.

The Table: RFI 2 information shall be provided to the lead inspector by

October 14, 2022. The preferred file format for all lists is a searchable Excel

spreadsheet. The information should be indexed and hyper-linked to facilitate ease of

use. If you have any questions regarding this information, please call the inspection

team leader as soon as possible.

CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

4

Table: RFI #2

Paragraph Number/Title:

Items

For the Critical Systems / CDAs chosen for inspection provide:

1

Ongoing Monitoring and Assessment activity performed on the

selected inspection samples system(s).

03.01(a)

2

All Security Control Assessments for the selected system(s).

03.01(a)

3

All vulnerability screenings/assessments associated with or scans

performed on the selected systems since the last cyber security

inspection.

03.01(c)

4

Documentation (including configuration files and rules sets) for

Network-based Intrusion Detection/Protection Systems (NIDS/NIPS),

Host-based Intrusion Detection Systems (HIDS), and Security

Information and Event Management (SIEM) systems for systems

chosen for inspection.

03.02(b)

5

Documentation (including configuration files and rule sets) for intra-

security level firewalls and boundary devices used to protect the

selected systems.

03.02(c)

6

Copies of all periodic reviews of the access authorization list for the

selected systems since the last cyber inspection.

03.02(d)

7

Baseline configuration data sheets for the selected CDAs.

03.03(a)

8

Documentation on any changes, including Security Impact Analyses,

performed on the selected systems since the last inspection.

03.03(b)

9

Copies of the purchase order documentation for any new equipment

purchased for the selected systems since the last inspection.

03.03(c)

10

Copies of any reports/assessment for cyber security drills performed

since the last inspection.

03.02(a)

03.04(b)

11

Copy of the individual recovery plan(s) for the selected system(s)

including documentation of the results the last time the backups

were executed.

03.02(a)

03.04(b)

12

Corrective actions taken as a result of cyber security incidents/issues

to include previous NRC violations and Licensee Identified Violations

since the last cyber security inspection.

03.05

CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

5

III.

Information Requested to be Available on First Day of Inspection

For the specific systems and equipment identified in Section II above, provide the

following RFI (i.e., Table: Week Onsite) to the team by October 24, 2022, the first day

of the inspection. All requested information shall follow the guidance document

referenced above.

The preferred file format for all lists is a searchable Excel spreadsheet file. The

information should be indexed and hyper-linked to facilitate ease of use. If you have any

questions regarding this information, please call the inspection team leader as soon as

possible.

Table: Week Onsite

Paragraph Number/Title:

Items

1

Any cyber security event reports submitted in accordance with 10

CFR 73.77, since the last cyber security inspection.

03.04(a)

2

Updated copies of corrective actions taken as a result of cyber

security incidents/issues, to include previous NRC violations and

Licensee Identified Violations since the last cyber security

inspection, as well as vulnerability-related corrective actions.

03.05

In addition to the above information please provide the following:

(1) Copies of the following documents do not need to be solely available to the

inspection team as long as the inspectors have easy and unrestrained access

to them.

a.

Updated Final Safety Analysis Report (UFSAR), if not previously provided

b.

original FSAR Volumes

c.

original SER and Supplements

d.

FSAR Question and Answers

e.

Quality Assurance (QA) Plan

f.

Technical Specifications, if not previously provided

g.

latest IPE/PRA Report

(2) Vendor Manuals, Assessment and Corrective Actions:

a.

The most recent Cyber-Security Quality Assurance (QA) audit and/or

self-assessment; and

b.

Corrective action documents (e.g., condition reports, including status of

corrective actions) generated as a result of the most recent Cyber-Security

Quality Assurance (QA) audit and/or self-assessment.

CATAWBA NUCLEAR STATION CYBER-SECURITY INSPECTION DOCUMENT REQUEST

6

IV.

Information Requested to Be Provided Throughout the Inspection

(1) Copies of any corrective action documents generated as a result of the

inspection teams questions or queries during the inspection.

(2) Copies of the list of questions submitted by the inspection team members and

the status/resolution of the information requested (provided daily during the

inspection to each inspection team member during daily de-brief meetings).

If you have any questions regarding the information requested, please contact the inspection