{{#Wiki_filter:January 17, 2023
{{#Wiki_filter:David Rhoades
David Rhoades
Senior Vice President
Senior Vice President
Constellation Energy Generation, LLC
Constellation Energy Generation, LLC  
President and Chief Nuclear Office (CNO)
President and Chief Nuclear Office (CNO)  
Constellation Nuclear
Constellation Nuclear
4300 Winfield Road
4300 Winfield Road
Warrenville, IL 60555
Warrenville, IL 60555
SUBJECT:       QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC
SUBJECT:
                BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC  
                REPORT 05000254/2023002
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
REPORT 05000254/2023002
Dear David Rhoades:
Dear David Rhoades:
On March 27, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline
On March 27, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline  
Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed March
Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed March  
27, 2023, through March 31, 2023.
27, 2023, through March 31, 2023.
Experience has shown that this inspection is resource intensive both for the NRC inspector and
Experience has shown that this inspection is resource intensive both for the NRC inspector and  
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive
your staff. In order to minimize the impact to your onsite resources, and to ensure a productive  
inspection for both sides, we have enclosed a request for documents needed for this inspection.
inspection for both sides, we have enclosed a request for documents needed for this inspection.  
These documents have been divided into two groups.
These documents have been divided into two groups.
The first group identifies information necessary to ensure that the inspector is adequately
The first group identifies information necessary to ensure that the inspector is adequately  
prepared. The second group identifies the information the inspector will need upon arrival at the
prepared. The second group identifies the information the inspector will need upon arrival at the  
site. It is important that all of these documents are up-to-date, and complete, in order to
site. It is important that all of these documents are up-to-date, and complete, in order to  
minimize the number of additional documents requested during the preparation and/or the
minimize the number of additional documents requested during the preparation and/or the  
onsite portions of the inspection.
onsite portions of the inspection.
We have discussed the schedule for inspection activities with your staff and understand that our
We have discussed the schedule for inspection activities with your staff and understand that our  
regulatory contact for this inspection will be R. Swart, of your organization. If there are any
regulatory contact for this inspection will be R. Swart, of your organization. If there are any  
questions about this inspection or the material requested, please contact the lead inspector
questions about this inspection or the material requested, please contact the lead inspector
John V. Bozga at 630-829-9613.
John V. Bozga at 630-829-9613.
This letter does not contain new or amended information collection requirements subject to the
This letter does not contain new or amended information collection requirements subject to the  
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection  
requirements were approved by the Office of Management and Budget, Control Number
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a  
request for information or an information collection requirement unless the requesting document
request for information or an information collection requirement unless the requesting document  
displays a currently valid Office of Management and Budget Control Number.
displays a currently valid Office of Management and Budget Control Number.
January 17, 2023


D. Rhoades                                       2
D. Rhoades
This letter and its enclosure will be made available for public inspection and copying at
2
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
This letter and its enclosure will be made available for public inspection and copying at  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in  
accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,  
Exemptions, Requests for Withholding.
Exemptions, Requests for Withholding.
                                              Sincerely,
Sincerely,
                                                                        Signed by Bozga, John
John V. Bozga, Senior  
                                                                        on 01/17/23
Reactor Inspector  
                                              John V. Bozga, Senior
Division of Operating Reactor Safety
                                                  Reactor Inspector
Engineering Reactor Projects Branch
                                              Division of Operating Reactor Safety
                                              Engineering Reactor Projects Branch
Docket No. 50-254
Docket No. 50-254
License No. DPR-29
License No. DPR-29
Enclosure:
Enclosure:
Document Request for Baseline
Document Request for Baseline
  Inservice Inspection
Inservice Inspection
cc: Distribution via LISTSERV
cc: Distribution via LISTSERV
Signed by Bozga, John
on 01/17/23


D. Rhoades                                   3
D. Rhoades
3
Letter to David Rhoades from John V. Bozga dated January 17, 2023.
Letter to David Rhoades from John V. Bozga dated January 17, 2023.
SUBJECT:     QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC
SUBJECT:
              BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION
QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC  
              REPORT 05000254/2023002
BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION  
REPORT 05000254/2023002
DISTRIBUTION:
DISTRIBUTION:
Jessie Quichocho
Jessie Quichocho
Line 88: Line 92:
R3-DORS
R3-DORS
ADAMS Accession Number: ML23013A150
ADAMS Accession Number: ML23013A150
    Publicly Available     Non-Publicly Available       Sensitive Non-Sensitive
Publicly Available
OFFICE       RIII
Non-Publicly Available
NAME         JBozga:sw
Sensitive
DATE         01/17/2023
Non-Sensitive
                                OFFICIAL RECORD COPY
OFFICE
RIII
NAME
JBozga:sw
DATE
01/17/2023
OFFICIAL RECORD COPY


              BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
Inspection Report:                 05000254/2023002
Enclosure
Inspection Dates:                 March 27, 2023 - March 31, 2023
Inspection Report:
Inspection Procedures:             Inspection Procedure 71111-08, Inservice Inspection
05000254/2023002
Lead Inspector:                   John V. Bozga, DORS
Inspection Dates:
                                  630-829-9613
March 27, 2023 - March 31, 2023
                                  john.bozga@nrc.gov
Inspection Procedures:
  A. Information for the In-Office Preparation Week
Inspection Procedure 71111-08, Inservice Inspection
      The following information (electronic copy) is requested by March 13, 2023, to facilitate
Lead Inspector:
      the selection of specific items that will be reviewed during the onsite inspection week.
John V. Bozga, DORS
      The inspector will select specific items from the information requested below and request
630-829-9613
      a list of additional documents needed onsite to your staff. We request that the specific
john.bozga@nrc.gov
      items selected from the lists be available and ready for review on the first day of
A.
      inspection. If you have any questions regarding this information, please call the inspector
Information for the In-Office Preparation Week
      as soon as possible.
The following information (electronic copy) is requested by March 13, 2023, to facilitate  
      1. For the upcoming outage, a detailed schedule and description of:
the selection of specific items that will be reviewed during the onsite inspection week.  
              a. Non-Destructive Examinations (NDEs) planned for Class 1 and 2
The inspector will select specific items from the information requested below and request  
                  Systems and containment, performed as part of your American Society
a list of additional documents needed onsite to your staff. We request that the specific  
                  of MechanicalEngineers (ASME) Code Inservice Inspection (ISI)
items selected from the lists be available and ready for review on the first day of  
                  Program (include edition and addenda of Code committed to), and
inspection. If you have any questions regarding this information, please call the inspector  
                  NDEs planned for other systems performed as part of a Risk-Informed
as soon as possible.
                  ISI Program, or other augmented inspection programs commitments, as
1.
                  part of an industry initiative; and
For the upcoming outage, a detailed schedule and description of:
              b. Welding on Code Class 1, 2, or 3 components. For each weld
a.
                  examination, include the weld identification number, description of weld
Non-Destructive Examinations (NDEs) planned for Class 1 and 2  
                  (component name), category, class, type of exam and procedure number,
Systems and containment, performed as part of your American Society  
                  and date of examination.
of Mechanical Engineers (ASME) Code Inservice Inspection (ISI)  
      2. A copy of the NDE procedures and welding procedures used to perform the activities
Program (include edition and addenda of Code committed to), and  
            identified in A.1 (including NDE calibration and flaw characterization/sizing
NDEs planned for other systems performed as part of a Risk-Informed  
            procedures and Welding Procedure Qualification Records). For ultrasonic
ISI Program, or other augmented inspection programs commitments, as  
            examination procedures qualified in accordance with Appendix VIII, of Section XI
part of an industry initiative; and
            of the ASME Code, provide documentation supporting the procedure qualification
b.
            (e.g., the Electric Power Research Institute performance demonstration qualification
Welding on Code Class 1, 2, or 3 components. For each weld  
            summary sheets).
examination, include the weld identification number, description of weld  
      3. A copy of ASME Section XI, Code Relief Requests applicable to the examinations
(component name), category, class, type of exam and procedure number,  
            identified in A.1.
and date of examination.
                                                                                          Enclosure
2.
A copy of the NDE procedures and welding procedures used to perform the activities  
identified in A.1 (including NDE calibration and flaw characterization/sizing  
procedures and Welding Procedure Qualification Records). For ultrasonic  
examination procedures qualified in accordance with Appendix VIII, of Section XI  
of the ASME Code, provide documentation supporting the procedure qualification  
(e.g., the Electric Power Research Institute performance demonstration qualification  
summary sheets).
3.
A copy of ASME Section XI, Code Relief Requests applicable to the examinations  
identified in A.1.


            BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
    4. A copy of the 10-year ISI Program showing those required exams scheduled to be
2
        performed this outage, and those which have been completed.
4.
    5. A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye
A copy of the 10-year ISI Program showing those required exams scheduled to be  
        penetrant), which have identified relevant indications on Code Class 1 and 2 systems
performed this outage, and those which have been completed.
        since the beginning of the last refueling outage.
5.
    6. List with short description of the welds in Code Class 1, 2 and 3 systems, which have
A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye  
        been fabricated due to component repair/replacement activities since the beginning
penetrant), which have identified relevant indications on Code Class 1 and 2 systems  
        of the last refueling outage and identify the system, weld number, and reference
since the beginning of the last refueling outage.
        applicable documentation (e.g., NIS-2 forms with definitions of system and
6.
        component acronyms).
List with short description of the welds in Code Class 1, 2 and 3 systems, which have  
    7. If reactor vessel weld examinations required by the ASME Code are scheduled to
been fabricated due to component repair/replacement activities since the beginning  
        occur during the inspection period, provide a detailed description of the welds to be
of the last refueling outage and identify the system, weld number, and reference  
        examined, and the extent of the planned examination.
applicable documentation (e.g., NIS-2 forms with definitions of system and  
    8. List with description of ISI-related issues such as piping degradation or damage
component acronyms).
        (e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors
7.
        identified in piping examinations that have been entered into your corrective action
If reactor vessel weld examinations required by the ASME Code are scheduled to  
        system since the beginning of the last refueling outage. Also, include a list of
occur during the inspection period, provide a detailed description of the welds to be  
        corrective action records associated with foreign material introduced/identified in the
examined, and the extent of the planned examination.
        reactor vessel or reactor coolant system since the beginning of the last refueling
8.
        outage. In addition, include a list of corrective action records associated with reactor
List with description of ISI-related issues such as piping degradation or damage  
        vessel and internals inspections since the beginning of the last refueling outage.
(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors  
    9. Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to
identified in piping examinations that have been entered into your corrective action  
        your structures, systems, or components within the scope of Section XI of the ASME
system since the beginning of the last refueling outage. Also, include a list of  
        Code that have been identified since the beginning of the last refueling outage.
corrective action records associated with foreign material introduced/identified in the  
    10. Point of contact information (name and site number) for the Inservice Inspection
reactor vessel or reactor coolant system since the beginning of the last refueling  
        Program, Aging Management Programs, Site Welding Engineer, and Reactor
outage. In addition, include a list of corrective action records associated with reactor  
        Internals Inspection ProgramsSite and vendor leads.
vessel and internals inspections since the beginning of the last refueling outage.
B. Onsite Information to Be Provided to the Inspector on the First Day of the
9.
  Inspection (e.g., Following the Entrance Meeting). Please Provide Hard
Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to  
  Copies(e.g., Paper Records) of the Following Documents:
your structures, systems, or components within the scope of Section XI of the ASME  
      1. For welds selected by the inspector from A.1.b and A.6 above, provide copies
Code that have been identified since the beginning of the last refueling outage.
          of the following documents:
10. Point of contact information (name and site number) for the Inservice Inspection  
          a. Document of the weld number and location (e.g., system, train, branch);
Program, Aging Management Programs, Site Welding Engineer, and Reactor  
          b. Document with a detail of the weld construction (e.g., drawing);
Internals Inspection ProgramsSite and vendor leads.
          c. Applicable portions of the Design Specification and applicable
B.
              Code of construction for the weldment (e.g., B31.1 or ASME
Onsite Information to Be Provided to the Inspector on the First Day of the  
              Section III);
Inspection (e.g., Following the Entrance Meeting). Please Provide Hard  
          d. Applicable Code Edition and Addenda for weld procedure qualification;
Copies (e.g., Paper Records) of the Following Documents:
                                                2
1.
For welds selected by the inspector from A.1.b and A.6 above, provide copies  
of the following documents:
a.
Document of the weld number and location (e.g., system, train, branch);
b.
Document with a detail of the weld construction (e.g., drawing);
c.
Applicable portions of the Design Specification and applicable  
Code of construction for the weldment (e.g., B31.1 or ASME  
Section III);
d.
Applicable Code Edition and Addenda for weld procedure qualification;


    BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
  e. Applicable weld procedure specifications and completed weld data sheets
3
        used to fabricate the welds;
e.
  f.   Copies of procedure qualification records supporting the weld
Applicable weld procedure specifications and completed weld data sheets  
        procedure specifications;
used to fabricate the welds;
  g. Copies of welders performance qualification records;
f.
  h. Copies of mechanical test reports identified in the procedure
Copies of procedure qualification records supporting the weld  
        qualification records above;
procedure     specifications;
  i.   Copies of the non-conformance reports for the selected welds;
g.
  j. Access to radiographs and equipment to view radiographs of the selected
Copies of welders performance qualification records;
      welds;
h.
  k. ASME Code Section XI repair replacement plan and
Copies of mechanical test reports identified in the procedure  
        reconciliation for replacement components/materials;
qualification records above;
  l. Certified Material Test Reports for replacement pressure boundary materials;
i.
      and
Copies of the non-conformance reports for the selected welds;
  m. Copies of the NDE required by the construction Code and the pre-service
j.
        examination records required by the ASME Code Section XI for the selected
Access to radiographs and equipment to view radiographs of the selected  
        welds.
welds;
2. For the ISI-related corrective action issues selected by the inspector from
k.
  Item A.8 above, provide a copy of the corrective actions and supporting
ASME Code Section XI repair replacement plan and  
  documentation.
reconciliation for replacement components/materials;
3. For the NDE reports with relevant indications on Code Class 1 and 2
l.
  systems selected by the inspector from Item A.5 above, provide a copy of
Certified Material Test Reports for replacement pressure boundary materials;  
  the examination records and associated corrective action documents.
and
4. Updated schedules for Item A.1 (including schedule showing contingency
m. Copies of the NDE required by the construction Code and the pre-service  
  repair plans if available).
examination records required by the ASME Code Section XI for the selected  
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be
welds.
  examined during the outage. Also provide any drawings used by NDE vendors
2.
  to locate these welds.
For the ISI-related corrective action issues selected by the inspector from  
6. Provide copies of the following standards at the onsite U.S. Nuclear
Item A.8 above, provide a copy of the corrective actions and supporting  
  Regulatory Commission inspection location for the duration of the
documentation.
  inspection:
3. For the NDE reports with relevant indications on Code Class 1 and 2  
  a. Sections V, IX, and XI of the ASME Code with Editions applicable to
systems selected by the inspector from Item A.5 above, provide a copy of  
        the ISI Program and the Repair/Replacement Program; and
the examination records and associated corrective action documents.
                                        3
4. Updated schedules for Item A.1 (including schedule showing contingency  
repair plans if available).
5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be  
examined during the outage. Also provide any drawings used by NDE vendors  
to locate these welds.
6. Provide copies of the following standards at the onsite U.S. Nuclear  
Regulatory Commission inspection location for the duration of the  
inspection:
a. Sections V, IX, and XI of the ASME Code with Editions applicable to  
the ISI Program and the Repair/Replacement Program; and


              BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
BASELINE INSERVICE INSPECTION DOCUMENT REQUEST
            b. Copy of the performance demonstration initiative (PDI) generic procedures
4
                withthe latest applicable Revisions that support site qualified ultrasonic
b. Copy of the performance demonstration initiative (PDI) generic procedures  
                examinationof piping welds and components (e.g., PDI-UT-1, PDI-UT-2,
with the latest applicable Revisions that support site qualified ultrasonic  
                PDI-UT-3, PDI-UT-10 etc.).
examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,  
PDI-UT-3, PDI-UT-10 etc.).
If you have questions regarding the information requested, please contact the lead inspector.
If you have questions regarding the information requested, please contact the lead inspector.
                                                4
}}
}}

Latest revision as of 19:19, 2 January 2025

Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000254/2023002
ML23013A150
Person / Time
Site: Quad Cities Constellation icon.png
Issue date: 01/17/2023
From: John Bozga
NRC/RGN-III/DORS/ERPB
To: Rhoades D
Constellation Energy Generation, Constellation Nuclear
References
IR 2023002
Download: ML23013A150 (1)


See also: IR 05000254/2023002

Text

David Rhoades

Senior Vice President

Constellation Energy Generation, LLC

President and Chief Nuclear Office (CNO)

Constellation Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000254/2023002

Dear David Rhoades:

On March 27, 2023, the U.S. Nuclear Regulatory Commission (NRC) will begin the Baseline

Inservice Inspection Procedure 71111.08. This inspection is scheduled to be performed March

27, 2023, through March 31, 2023.

Experience has shown that this inspection is resource intensive both for the NRC inspector and

your staff. In order to minimize the impact to your onsite resources, and to ensure a productive

inspection for both sides, we have enclosed a request for documents needed for this inspection.

These documents have been divided into two groups.

The first group identifies information necessary to ensure that the inspector is adequately

prepared. The second group identifies the information the inspector will need upon arrival at the

site. It is important that all of these documents are up-to-date, and complete, in order to

minimize the number of additional documents requested during the preparation and/or the

onsite portions of the inspection.

We have discussed the schedule for inspection activities with your staff and understand that our

regulatory contact for this inspection will be R. Swart, of your organization. If there are any

questions about this inspection or the material requested, please contact the lead inspector

John V. Bozga at 630-829-9613.

This letter does not contain new or amended information collection requirements subject to the

Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a

request for information or an information collection requirement unless the requesting document

displays a currently valid Office of Management and Budget Control Number.

January 17, 2023

D. Rhoades

2

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with Title 10 of the Code of Federal Regulations, Part 2.390, Public Inspections,

Exemptions, Requests for Withholding.

Sincerely,

John V. Bozga, Senior

Reactor Inspector

Division of Operating Reactor Safety

Engineering Reactor Projects Branch

Docket No. 50-254

License No. DPR-29

Enclosure:

Document Request for Baseline

Inservice Inspection

cc: Distribution via LISTSERV

Signed by Bozga, John

on 01/17/23

D. Rhoades

3

Letter to David Rhoades from John V. Bozga dated January 17, 2023.

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION UNIT 1 - NOTIFICATION OF NRC

BASELINE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION

REPORT 05000254/2023002

DISTRIBUTION:

Jessie Quichocho

Marc Ferdas

RidsNrrDorlLpl3

RidsNrrPMQuadCities Resource

RidsNrrDroIrib Resource

John Giessner

Julio Lara

Diana Betancourt-Roldan

Allan Barker

R3-DORS

ADAMS Accession Number: ML23013A150

Publicly Available

Non-Publicly Available

Sensitive

Non-Sensitive

OFFICE

RIII

NAME

JBozga:sw

DATE

01/17/2023

OFFICIAL RECORD COPY

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

Enclosure

Inspection Report: 05000254/2023002

Inspection Dates:

March 27, 2023 - March 31, 2023

Inspection Procedures:

Inspection Procedure 71111-08, Inservice Inspection

Lead Inspector:

John V. Bozga, DORS

630-829-9613

john.bozga@nrc.gov

A.

Information for the In-Office Preparation Week

The following information (electronic copy) is requested by March 13, 2023, to facilitate

the selection of specific items that will be reviewed during the onsite inspection week.

The inspector will select specific items from the information requested below and request

a list of additional documents needed onsite to your staff. We request that the specific

items selected from the lists be available and ready for review on the first day of

inspection. If you have any questions regarding this information, please call the inspector

as soon as possible.

1.

For the upcoming outage, a detailed schedule and description of:

a.

Non-Destructive Examinations (NDEs) planned for Class 1 and 2

Systems and containment, performed as part of your American Society

of Mechanical Engineers (ASME) Code Inservice Inspection (ISI)

Program (include edition and addenda of Code committed to), and

NDEs planned for other systems performed as part of a Risk-Informed

ISI Program, or other augmented inspection programs commitments, as

part of an industry initiative; and

b.

Welding on Code Class 1, 2, or 3 components. For each weld

examination, include the weld identification number, description of weld

(component name), category, class, type of exam and procedure number,

and date of examination.

2.

A copy of the NDE procedures and welding procedures used to perform the activities

identified in A.1 (including NDE calibration and flaw characterization/sizing

procedures and Welding Procedure Qualification Records). For ultrasonic

examination procedures qualified in accordance with Appendix VIII, of Section XI

of the ASME Code, provide documentation supporting the procedure qualification

(e.g., the Electric Power Research Institute performance demonstration qualification

summary sheets).

3.

A copy of ASME Section XI, Code Relief Requests applicable to the examinations

identified in A.1.

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

2

4.

A copy of the 10-year ISI Program showing those required exams scheduled to be

performed this outage, and those which have been completed.

5.

A list identifying NDE reports (ultrasonic, radiography, magnetic particle, or dye

penetrant), which have identified relevant indications on Code Class 1 and 2 systems

since the beginning of the last refueling outage.

6.

List with short description of the welds in Code Class 1, 2 and 3 systems, which have

been fabricated due to component repair/replacement activities since the beginning

of the last refueling outage and identify the system, weld number, and reference

applicable documentation (e.g., NIS-2 forms with definitions of system and

component acronyms).

7.

If reactor vessel weld examinations required by the ASME Code are scheduled to

occur during the inspection period, provide a detailed description of the welds to be

examined, and the extent of the planned examination.

8.

List with description of ISI-related issues such as piping degradation or damage

(e.g., cracks, wall thinning, wear, microbiologically induced corrosion) or errors

identified in piping examinations that have been entered into your corrective action

system since the beginning of the last refueling outage. Also, include a list of

corrective action records associated with foreign material introduced/identified in the

reactor vessel or reactor coolant system since the beginning of the last refueling

outage. In addition, include a list of corrective action records associated with reactor

vessel and internals inspections since the beginning of the last refueling outage.

9.

Copy of any Title 10 of the Code of Federal Regulations, Part 21 reports applicable to

your structures, systems, or components within the scope of Section XI of the ASME

Code that have been identified since the beginning of the last refueling outage.

10. Point of contact information (name and site number) for the Inservice Inspection

Program, Aging Management Programs, Site Welding Engineer, and Reactor

Internals Inspection ProgramsSite and vendor leads.

B.

Onsite Information to Be Provided to the Inspector on the First Day of the

Inspection (e.g., Following the Entrance Meeting). Please Provide Hard

Copies (e.g., Paper Records) of the Following Documents:

1.

For welds selected by the inspector from A.1.b and A.6 above, provide copies

of the following documents:

a.

Document of the weld number and location (e.g., system, train, branch);

b.

Document with a detail of the weld construction (e.g., drawing);

c.

Applicable portions of the Design Specification and applicable

Code of construction for the weldment (e.g., B31.1 or ASME

Section III);

d.

Applicable Code Edition and Addenda for weld procedure qualification;

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

3

e.

Applicable weld procedure specifications and completed weld data sheets

used to fabricate the welds;

f.

Copies of procedure qualification records supporting the weld

procedure specifications;

g.

Copies of welders performance qualification records;

h.

Copies of mechanical test reports identified in the procedure

qualification records above;

i.

Copies of the non-conformance reports for the selected welds;

j.

Access to radiographs and equipment to view radiographs of the selected

welds;

k.

ASME Code Section XI repair replacement plan and

reconciliation for replacement components/materials;

l.

Certified Material Test Reports for replacement pressure boundary materials;

and

m. Copies of the NDE required by the construction Code and the pre-service

examination records required by the ASME Code Section XI for the selected

welds.

2.

For the ISI-related corrective action issues selected by the inspector from

Item A.8 above, provide a copy of the corrective actions and supporting

documentation.

3. For the NDE reports with relevant indications on Code Class 1 and 2

systems selected by the inspector from Item A.5 above, provide a copy of

the examination records and associated corrective action documents.

4. Updated schedules for Item A.1 (including schedule showing contingency

repair plans if available).

5. Fabrication Drawings (D size) of the reactor vessel welds if any are to be

examined during the outage. Also provide any drawings used by NDE vendors

to locate these welds.

6. Provide copies of the following standards at the onsite U.S. Nuclear

Regulatory Commission inspection location for the duration of the

inspection:

a. Sections V, IX, and XI of the ASME Code with Editions applicable to

the ISI Program and the Repair/Replacement Program; and

BASELINE INSERVICE INSPECTION DOCUMENT REQUEST

4

b. Copy of the performance demonstration initiative (PDI) generic procedures

with the latest applicable Revisions that support site qualified ultrasonic

examination of piping welds and components (e.g., PDI-UT-1, PDI-UT-2,

PDI-UT-3, PDI-UT-10 etc.).

If you have questions regarding the information requested, please contact the lead inspector.