ML19347F303: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
(2 intermediate revisions by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:O NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT II
{{#Wiki_filter:O NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT II
  .
. INSERVICE INSPECTION - EXAMINATION  
  .
                          . INSERVICE INSPECTION - EXAMINATION  


==SUMMARY==
==SUMMARY==
 
RRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT II February 23 to March 23, 1981 REFUELING OUTAGE No. 5 INSPECTION PERIOD 2
RRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT II February 23 to March 23, 1981 REFUELING OUTAGE No. 5 INSPECTION PERIOD 2                                       ]
]
Report Date:                             Prepared by: L C Dahlman,                   a April 27, 1981                                         M&SP Specialist D B Hansen Assoc M&SP Engineer Commercial Service                       Reviewed by:                     M '[/T' Date: December 21, l'/74                                 PJKrpmds/)         !
Report Date:
Superintendent Mh,e  cerials and Special Processes
Prepared by: L C Dahlman, a
      -
April 27, 1981 M&SP Specialist D B Hansen Assoc M&SP Engineer Commercial Service Reviewed by:
l
M '[/T' Date: December 21, l'/74 PJKrpmds/)
  ,
Superintendent Mh,ecerials and Special Processes l
i j
i j
* Approved by:    A
                                                                      /
lm
lm
                                                                          /hv ze
/
                                                                                          '
Approved by:
I
A
'                                                              Jf W Ariddrson
/hv ze Jf W Ariddrson I
                                                              / eneral Superintendent Production Plant Maintenance
/ eneral Superintendent Production Plant Maintenance I
!
l
I l
%nos/Koss
'
_
                %nos/Koss
                        -    .  . .                    -          .  .    .- _.


                                                                            ,
INSERVICE INSPECTION - EXAMINATION  
INSERVICE INSPECTION - EXAMINATION  


==SUMMARY==
==SUMMARY==
PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 2
PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 2
                                          - INDEX -
- INDEX -
.
1.0 Introduction 2.0 Summary of Results 3.0 ASME Class 1 and 2 Components 3.1 Examination Plan 3.2 Examination Methods 3.3 Examination Pcocedures 3.4 Equipment and Materials 3.5 Personnel 3.6 Evaluation 3.7 Examination Reports and Documentation 4.0 Examination of Reactor Pressure Vessel and Outlet Nozzles 5.0 Seismic Bolting Appendix A - ASME Class 1 Examination Inservice Inspection - Examination Summary Tables:
1.0   Introduction
Table Sl.1
-
- Reactor Vessels Table S1.2
2.0 Summary of Results 3.0 ASME Class 1 and 2 Components 3.1 Examination Plan 3.2 Examination Methods 3.3 Examination Pcocedures 3.4 Equipment and Materials 3.5 Personnel 3.6 Evaluation 3.7 Examination Reports and Documentation 4.0 Examination of Reactor Pressure Vessel and Outlet Nozzles 5.0   Seismic Bolting Appendix A - ASME Class 1 Examination Inservice Inspection - Examination Summary Tables:
- Pressurizer Table Sl.3.1
Table Sl.1         - Reactor Vessels Table S1.2         - Pressurizer Table Sl.3.1       - Steam Generators Table Sl.3.2       - Regenerative Heat Exchanger
- Steam Generators Table Sl.3.2
* Table S1.3.3       - Excess Letdown Heat Exchanger Table Sl.4         - Piping Pressure Boundary Table St.5         - Reactor Coolant Pumps Table Sl.6         - Valve Pressure Boundary Table II - Baseline Comparison Summary Table III - Isometric Summary Appendix B - ASME Class 2 Examins*; ion Inservice Inspection - Examination Summary Tables:
- Regenerative Heat Exchanger Table S1.3.3
Table S2.1         - Pressure Vessels - Steam Generators Table S2.2.1       - Piping-Circumferential Butt Welds
- Excess Letdown Heat Exchanger Table Sl.4
-
- Piping Pressure Boundary Table St.5
Table S2.2.2       - Longitudinal Weld Joints in Fittings Table S2.2.3       - Branch Pipe to Pipe Weld Joints       <
- Reactor Coolant Pumps Table Sl.6
Table S2.2.4       - Piping - Pressure Retaining Bolting
- Valve Pressure Boundary Table II - Baseline Comparison Summary Table III - Isometric Summary Appendix B - ASME Class 2 Examins*; ion Inservice Inspection - Examination Summary Tables:
-
Table S2.1
Table S2.2.5       - Piping - Integrally Welded Supports Table S2.2.6       - Piping - Nonwelded Supports Table S2.3         - Pumps Table S2.4         - Valves Table II - Baseline Comparison Summary Table III - Isometric Summary Page 1 of 2
- Pressure Vessels - Steam Generators Table S2.2.1
      -
- Piping-Circumferential Butt Welds Table S2.2.2
- Longitudinal Weld Joints in Fittings Table S2.2.3
- Branch Pipe to Pipe Weld Joints Table S2.2.4
- Piping - Pressure Retaining Bolting Table S2.2.5
- Piping - Integrally Welded Supports Table S2.2.6
- Piping - Nonwelded Supports Table S2.3
- Pumps Table S2.4
- Valves Table II - Baseline Comparison Summary Table III - Isometric Summary Page 1 of 2


_. _                _  _
__
Appendix C - FSAR Augmented hamination
Appendix C - FSAR Augmented hamination
                                                              - No examinations scheduled this outage Appendix D - Seismic Bolting Ex==4 nation Inservice Inrpection - Examination Susumary Table:
- No examinations scheduled this outage Appendix D - Seismic Bolting Ex==4 nation Inservice Inrpection - Examination Susumary Table:
.                                                            Table SB - Seismic Bolting Table II - Baseline Comparison Summary Table III - Isometric Susunary
Table SB - Seismic Bolting Table II - Baseline Comparison Summary Table III - Isometric Susunary Appendix E Table I
.
- Personnel Listing Table II - Ultrasonic Calibration Blocks Table III - Procedure Listing Table IV - Equipment and Materials Appendix F Form NIS-1, Owners' Data Report for Inservice Inspections 9
Appendix E Table I     - Personnel Listing Table II - Ultrasonic Calibration Blocks Table III - Procedure Listing Table IV - Equipment and Materials Appendix F Form NIS-1, Owners' Data Report for Inservice Inspections
e a
                                                                                                                                                                        .
9 Page 2 of 2
9 e
a 9
.
                                                        , -.
Page 2 of 2
    -- - . __ _ _ -- . - , . - .-_. _ _ _ -__-.                                  . . . - _ - _        . . . - . . . . - - _ _ - . _ _ - - . _    . - _ _ . - - -


                                                '
INSERVICE INSPECTION - EXAMINATION  
INSERVICE INSPECTION - EXAMINATION  


==SUMMARY==
==SUMMARY==
PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 2 February 23 to March 23, 1981
PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 2 February 23 to March 23, 1981


==1.0 INTRODUCTION==
==1.0 INTRODUCTION==
  .
This report is a summary of the examinations performed during the fifth inservice inspection at the Prairie Island Nuclear Generating Plant -
This report is a summary of the examinations performed during the fifth inservice inspection at the Prairie Island Nuclear Generating Plant -
  -
Unit 2.
Unit 2. This was the last inservice inspection conducted for inspec-tion period two. The examinations were performed during the plant's fif th refueling outage from February 23 to March 23, 1981. Prairie Island - Unit 2 began commercial operation on December 21, 1974.
This was the last inservice inspection conducted for inspec-tion period two.
The examinations were performed during the plant's fif th refueling outage from February 23 to March 23, 1981. Prairie Island - Unit 2 began commercial operation on December 21, 1974.
This report identifies the components examined, the examination met:iods used, the examination number; and, summarizes the examination results of each of the following areas:
This report identifies the components examined, the examination met:iods used, the examination number; and, summarizes the examination results of each of the following areas:
: 1. Pressure retaining components and supports of the reactor coolant and associated systems cicssified as ASME Class 1 and ASME Class 2.
1.
: 2. Reactor pressure vessel examinations; including examination of nozzle bores for underclad cracking.
Pressure retaining components and supports of the reactor coolant and associated systems cicssified as ASME Class 1 and ASME Class 2.
: 3. Bolting of seismic supports classified as ASME Class 1.
2.
2.0  
Reactor pressure vessel examinations; including examination of nozzle bores for underclad cracking.
3.
Bolting of seismic supports classified as ASME Class 1.
2.0


==SUMMARY==
==SUMMARY==
OF RESULTS
OF RESULTS The evaluation of all the results from the inservice examinations indicated that the integrity of these systems has been maintained. ine following is a list of all anomalies detected:
                                                                                        .
System Item ID Exam Method Type & Number of Indications PER Safety A W-1 PT 2 linear W-1A S.E.
The evaluation of all the results from the inservice examinations indicated that the integrity of these systems has been maintained. ine following is a list of all anomalies detected:
PT 2 linear & several rounded PER Safety B W-1 PT 1 linear W-1B S.E.
                                                                                        .
PT 6 linear PER Spray W-22B PT 3 linear FW Loop A W-177 MT 4 linear A, Hanger MT 1 linear FW coop B W-133 MT 22 linears PT 23 linears l
System             Item ID         Exam Method     Type & Number of Indications PER Safety A     W-1                       PT       2 linear W-1A S.E.                 PT       2 linear & several rounded PER Safety B     W-1                       PT       1 linear W-1B S.E.                 PT       6 linear PER Spray         W-22B                     PT       3 linear FW Loop A         W-177                     MT       4 linear A, Hanger                 MT       1 linear
l MS Loop A G, Hanger VT Loose bolt H. Hanger MT 2 linears MS Loop B 0, Hanger VT Nut not flush with base RCC Loop A RCC-A-6 PT 14 linears 1
  .
RVSI B, Hanger PT 6 linear Page 1 of e
FW coop B         W-133                     MT       22 linears PT       23 linears
* l l    MS Loop A         G, Hanger                 VT       Loose bolt
'
H. Hanger                 MT       2 linears MS Loop B         0, Hanger                 VT       Nut not flush with base RCC Loop A       RCC-A-6                   PT       14 linears 1
'
RVSI             B, Hanger                 PT       6 linear
,
Page 1 of e


System             Item ID     _, Exam Method   Tvpe & Number of Indications RTD Loop A       B1, Hanger               VT       Hanger tilted S/G 21&22         Primary                 MT       1 bolt - 1 linear, 1 bolt-Manway Bolts                       dented threads S/G 21&22         Secondary               VT       6 bolts - dented threadr
System Item ID
  .
_, Exam Method Tvpe & Number of Indications RTD Loop A B1, Hanger VT Hanger tilted S/G 21&22 Primary MT 1 bolt - 1 linear, 1 bolt-Manway Bolts dented threads S/G 21&22 Secondary VT 6 bolts - dented threadr Manway Bolts 21 bolts gouged S/G 21 Upper Ring VT 2 loose bolts Grinder Connec-ting Bolts S/G 22 Top Column VT 2 loose nuts Connecting Bolts RCP 21 Tie Back Bolts VT 1 loose nut RDV Loop A Outlet Nozzle UT 22 indications Bore Region RPV Loop B Outlet Nozzle UT 83 indicatiorm Bore Region All anomalies, with the exception of the rounded PT indications on Pressurizer Safety Line A and the indications on the Reactor Pressure Vessel Outlet Nozzle Bore Region, were corrected. The loose nuts and bolts were tightened, and the tilted hanger was straightened. The linear MT and PT indications were removed by light hand grinding and blending the surface smooth. The bolts with major steam gouges and linear indication were replaced. All indications were correctad and reexamined with the same method that located them.
Manway Bolts                       21 bolts     gouged S/G 21           Upper Ring               VT       2 loose bolts Grinder Connec-
The several rounded indications on Pressurizer Safety Line A were accepted as is, based on Westinghouse's evaluation conducted in the January 1980 outage. The indications on the Reactor Pressure Vessel outlet Nozzle Bore Region was also accepted as is, See section 4 for acceptance analysis, i
    -
3.0 ASME CLASS 1 AND 2 COMPONENTS 1
ting Bolts S/G 22           Top Column               VT       2 loose nuts Connecting Bolts RCP 21           Tie Back Bolts           VT       1 loose nut RDV Loop A       Outlet Nozzle           UT       22 indications Bore Region RPV Loop B       Outlet Nozzle           UT       83 indicatiorm Bore Region All anomalies , with the exception of the rounded PT indications on Pressurizer Safety Line A and the indications on the Reactor Pressure Vessel Outlet Nozzle Bore Region, were corrected. The loose nuts and bolts were tightened, and the tilted hanger was straightened. The linear MT and PT indications were removed by light hand grinding and blending the surface smooth. The bolts with major steam gouges and         -
l 3.1 Examination Plan l
linear indication were replaced. All indications were correctad and reexamined with the same method that located them.
The examination plan focused on the pressure-retaining components i
The several rounded indications on Pressurizer Safety Line A were accepted as is, based on Westinghouse's evaluation conducted in the January 1980
and their suppor s of tha reactor coolant and associated auxiliary systems classified as A5!P Class 1 and Class 2.
* outage. The indications on the Reactor Pressure Vessel outlet Nozzle Bore Region was also accepted as is, See section 4 for acceptance analysis, i     3.0 ASME CLASS 1 AND 2 COMPONENTS 1
t l -
l 3.1 Examination Plan l                 The examination plan focused on the pressure-retaining components i                 and their suppor s of tha reactor coolant and associated auxiliary systems classified as A5!P Class 1 and Class 2.
The examination plan was based on the examination requirements of the ASME Boiler and Pressure Vessel Code Section XI, 1974 l
t l -               The examination plan was based on the examination requirements of the ASME Boiler and Pressure Vessel Code Section XI, 1974 l                 Edition through and including the Summer 1975 Addenda, and com-l
Edition through and including the Summer 1975 Addenda, and com-l plied with Prairie Island's Technical Specification, Section TS 4.2.
  -
l The examination is in accordance with the program submitted to the l
plied with Prairie Island's Technical Specification, Section TS 4.2.
l                 The examination is in accordance with the program submitted to the l
United States Nuclear Regulatory Commission on February 1, 1978 I
United States Nuclear Regulatory Commission on February 1, 1978 I
l entitled, "ASME Code Section XI Inservice inspection and Testing Program and Information Required for NRC Review of Requests for l                 Relief from ASME Code Section XI Requirements."
entitled, "ASME Code Section XI Inservice inspection and Testing l
Program and Information Required for NRC Review of Requests for l
Relief from ASME Code Section XI Requirements."
l l
l l
l
l Page 2 of 8
,
Page 2 of 8


          .
3.2 Examination Methods Ultrasonic examination methods and techniques were used to perform the volumetric examinations. The ultrasonic test systems consisted of an ultrasonic digital analog tester and a two channel strip chart recorder. One channel of the recorder was calibrated to reflect ultrasonic screen height (amplitude) and the second channel was calibrated to indicate metal path (range) to the reflector.
3.2 Examination Methods Ultrasonic examination methods and techniques were used to perform the volumetric examinations. The ultrasonic test systems consisted of an ultrasonic digital analog tester and a two channel strip chart recorder. One channel of the recorder was calibrated to reflect ultrasonic screen height (amplitude) and the second channel was calibrated to indicate metal path (range) to the reflector.
  -
This approach to the examination gives a permanent record to the extent possible.
This approach to the examination gives a permanent record to the extent possible.
    ~
~
Liquid penetrant or magnetic particle examination methods were used to perform the surface examinations. The liquid penetrant examinations were performed using color contrast-solvent removable materials. Magnetic particle examinations were performed using e: ther a yote with dry powder or an A-C L-10 coil with fluorescent prepared batn.
Liquid penetrant or magnetic particle examination methods were used to perform the surface examinations. The liquid penetrant examinations were performed using color contrast-solvent removable materials. Magnetic particle examinations were performed using e: ther a yote with dry powder or an A-C L-10 coil with fluorescent prepared batn.
All v_sual examinations were aided when necessary with artificial light 1ng and verified for adequacy with an 18% neutral grey card with a 1/32 inch black line.
All v_sual examinations were aided when necessary with artificial light 1ng and verified for adequacy with an 18% neutral grey card with a 1/32 inch black line.
3.3 Examination Procedures The ultrasonic examination procedure for pipe welds complied with the requirements of Appendix III of ASME Section XI that was issued in the Winter 1975 Addenda. All other examination proce-dures complied with the requirements of the 1974 Edition through ard including the Summer 1975 Addenda of ASME Section XI.     A listing of the procedures used for the examinations is shown in     -
3.3 Examination Procedures The ultrasonic examination procedure for pipe welds complied with the requirements of Appendix III of ASME Section XI that was issued in the Winter 1975 Addenda. All other examination proce-dures complied with the requirements of the 1974 Edition through ard including the Summer 1975 Addenda of ASME Section XI.
Table III of Appendix E.
A listing of the procedures used for the examinations is shown in Table III of Appendix E.
3.4 Equipment and Materials All equipment and expendable materials used in the examinations are -
3.4 Equipment and Materials All equipment and expendable materials used in the examinations are listed by either serial number or type along with their respective calibration date or batch number in Table IV of Appendix E.
listed by either serial number or type along with their respective calibration date or batch number in Table IV of Appendix E.
l The ultrasonic calibration standards used in the examination are l
l             The ultrasonic calibration standards used in the examination are l             listed in Table II of Appendix E. These standards are owned and l
listed in Table II of Appendix E.
These standards are owned and l
maintained by NSP at the plant cite.
maintained by NSP at the plant cite.
3.5 Personnel Northern States Power Company contracted Lambert, MacGill, Thomas, Inc. to perform the examinations. Hartford Steam Boiler Inspec-
3.5 Personnel Northern States Power Company contracted Lambert, MacGill, Thomas, Inc. to perform the examinations. Hartford Steam Boiler Inspec-tion and Insurance Company, representing ANI, provided the a
  ,
a        tion and Insurance Company, representing ANI, provided the l
Authorized Inspection.
Authorized Inspection.
All personnel involved in the performance or evaluation of exami-
l All personnel involved in the performance or evaluation of exami-nations are listed along with their title, organization, and ASNT l
!.            nations are listed along with their title, organization, and ASNT l             Level cf certification in Table I of Appendix E.
Level cf certification in Table I of Appendix E.
Certifications for examination personnel are maintained on file by Northern States Power Company.
Certifications for examination personnel are maintained on file by Northern States Power Company.
Page 3 of 8
Page 3 of 8
                                                                  -


                                                                                -
3.6 Evaluation Any indications disc 1ceed in the examinations were evaluated by the examiner at the time, in accordance with the rules of the procedure and ASME Section XI.
3.6 Evaluation Any indications disc 1ceed in the examinations were evaluated by the examiner at the time, in accordance with the rules of the procedure and ASME Section XI.
The ultrasonic examiner was aided in his evaluation by a calibra-tion performed on a standard reference before each day's examina-tion, checked before and after each individual examination, and at intervals net exceeding four (4) hours. In addition, the ultrasonic data was recorded on strip charts which were made a part of the inspection report, and permitted further evaluation.
The ultrasonic examiner was aided in his evaluation by a calibra-tion performed on a standard reference before each day's examina-tion, checked before and after each individual examination, and at intervals net exceeding four (4) hours.
In addition, the ultrasonic data was recorded on strip charts which were made a part of the inspection report, and permitted further evaluation.
3.7 Examination Reports and Docurggiation All examination reports and docamentation are maintained on file by Northern States Power Compeny. Table I of Appendices A, B and D identifies the examinat. ion report number (s) for each item examined. Many of the iteus identify more than one examination report because of the different types of examinations performed on the item.
3.7 Examination Reports and Docurggiation All examination reports and docamentation are maintained on file by Northern States Power Compeny. Table I of Appendices A, B and D identifies the examinat. ion report number (s) for each item examined. Many of the iteus identify more than one examination report because of the different types of examinations performed on the item.
Table I of Appendix A, B, and D summarizes all the examinations that have been performed to date and identifies the amount that will be examined in the future to complete the ten year examina-tion requirements. For retrieval purposes, the prefix of the inspection report number corresponds with the year that the insp-ection was performed. The examination report numbers for this outage are prefixed with "81 ".                                    .
Table I of Appendix A, B, and D summarizes all the examinations that have been performed to date and identifies the amount that will be examined in the future to complete the ten year examina-tion requirements. For retrieval purposes, the prefix of the inspection report number corresponds with the year that the insp-ection was performed. The examination report numbers for this outage are prefixed with "81 ".
Table II of Appendix A, B, and D compares the baseline examination results with *.he results obtained during this examination. Table III of Appendix A, B, and D identifies the isometric drawings that were used for the examinations. The personnel, ultrasonic cali-     .
Table II of Appendix A, B, and D compares the baseline examination results with *.he results obtained during this examination. Table III of Appendix A, B, and D identifies the isometric drawings that were used for the examinations. The personnel, ultrasonic cali-bration blocks, procedures, equipment and materials that were used for the inspection are identified in the tables of Appendix E.
bration blocks, procedures, equipment and materials that were used for the inspection are identified in the tables of Appendix E.
Appendix F contains the Form NIS-1, entitled " Owners" Data Report for Inservice Inspections".
Appendix F contains the Form NIS-1, entitled " Owners" Data Report for Inservice Inspections".
4.0 EXAMINATION OF THE REACTOR PRESSURE VESSEL AND OUTLET N0ZZLES Westinghnuse was contracted to perform the remote ultrasonic and visual examinations of the reactor pressure vessel. The visual examina-tion program consisted of two reactor vessel shell clad patches each bein3 36 square inches. The rer.otely operated ultrasonic device was utilized to perform examinations on the shell-to-flange weld, vessel flange ligaments, outlet nozzle-to-weld, and for investigating for
4.0 EXAMINATION OF THE REACTOR PRESSURE VESSEL AND OUTLET N0ZZLES Westinghnuse was contracted to perform the remote ultrasonic and visual examinations of the reactor pressure vessel. The visual examina-tion program consisted of two reactor vessel shell clad patches each bein3 36 square inches. The rer.otely operated ultrasonic device was utilized to perform examinations on the shell-to-flange weld, vessel flange ligaments, outlet nozzle-to-weld, and for investigating for the presence of underclad cracking in the reactor vessel outlet nozzle bore region, ihe examinations were performed in accordance with the applicable requirements of Prairie Island's Technical Specification, Section TS 4.2, and the 1974 Edition of ASME Section XI through and including the Summer 1975 Addenda. There was no reportable indications revealed during all the examinations with the exception of the outlet nozzle underclad cracking examinations.
-
These examinations disclosed 22 discrete reflectors in the cylindrical section of the Loop A nozzle bore and 83 discrete reflectors in the Loop B nozzle bore. There was no Pace 4 of 8
the presence of underclad cracking in the reactor vessel outlet nozzle
,
bore region,
* ihe examinations were performed in accordance with the applicable requirements of Prairie Island's Technical Specification, Section TS 4.2, and the 1974 Edition of ASME Section XI through and including the Summer 1975 Addenda. There was no reportable indications revealed during all the examinations with the exception of the outlet nozzle underclad cracking examinations. These examinations disclosed 22 discrete reflectors in the cylindrical section of the Loop A nozzle bore and 83 discrete reflectors in the Loop B nozzle bore. There was no Pace 4 of 8


                                                                                    .
reportable indications detected in the taper regions of either loop A or B nozzles.
reportable indications detected in the taper regions of either loop A or B nozzles.
The following is a summary of the underciad examination results and bases for evaluation. This information was received by letter from Mr. J.A. Vano, Manager Inspection Services, Westinghouse Electric Corp.
The following is a summary of the underciad examination results and bases for evaluation. This information was received by letter from Mr. J.A. Vano, Manager Inspection Services, Westinghouse Electric Corp.
Examinations were conducted from the inside diameter of the nozzle using dual element, transmit-receive, 2.25 MHz, focused immersion search units
Examinations were conducted from the inside diameter of the nozzle using dual element, transmit-receive, 2.25 MHz, focused immersion search units inclined to generate lonaitudinal waves at a refrac.ed' angle of 55 to 60. Test sensitivit.y was established on the flat bottom of a 2mm diameter hole drilled just below the clad / base metal interface in a representative calibration block. Secnning was conducted on 3/16 inch increments in both circumferential directions. Any indications equal to or exceeding the primary reference response was recorded. Reflector lengths were measured via a 12 dB drop method. This procedure provides a sensitivity 14 - 16 dB greater than current ASME XI requirements and has been demonstrated capable of resolving reflectors as small as 1 to 2mm deep and 3 to 4tr long.
  .
The fact that reflectors are' confined to areas in the nozzles clad with two layers suggests they may indicate the presence of underclad cold cracking. However, the reflector. are located at depths which indicate they may be confined to the cladding, and further, only half of the reflectors are detectable in both scanning directions. Laboratory studies have consistantly shown that sub-clad cracking is detectable from both directions. Since a definite conclusion regarding the nature of the ultrasonic reflectors is not available, all will be conservatively assumed to be planar surface defects just beneath the cladding for analysis purposes.
inclined to generate lonaitudinal waves at a refrac.ed' angle of 55 to 60 . Test sensitivit.y was established on the flat bottom of a 2mm
An ASME XI evaluatibn of these reflectors requires a measurement of their through-wall extent. Current NDE technology does not permit a direct, accurate, measurement of this dimension thus a reliable method of estimating these depths is necessary.
    -
diameter hole drilled just below the clad / base metal interface in a representative calibration block. Secnning was conducted on 3/16 inch increments in both circumferential directions. Any indications equal to or exceeding the primary reference response was recorded. Reflector lengths were measured via a 12 dB drop method. This procedure provides a sensitivity 14 - 16 dB greater than current ASME XI requirements and has been demonstrated capable of resolving reflectors as small as 1 to 2mm deep and 3 to 4tr long.
The fact that reflectors are' confined to areas in the nozzles clad with two layers suggests they may indicate the presence of underclad cold cracking. However, the reflector. are located at depths which indicate they may be confined to the cladding, and further, only half of the reflectors are detectable in both scanning directions. Laboratory studies have consistantly shown that sub-clad cracking is detectable from both directions. Since a definite conclusion regarding the nature of the ultrasonic reflectors is not available, all will be conservatively -
        .
assumed to be planar surface defects just beneath the cladding for analysis purposes.
An ASME XI evaluatibn of these reflectors requires a measurement of their through-wall extent. Current NDE technology does not permit a
* direct, accurate, measurement of this dimension thus a reliable method of estimating these depths is necessary.
,
Assuming the worst case, that of underclad cold cracking, exhaustive l
Assuming the worst case, that of underclad cold cracking, exhaustive l
destructive analysis of nozzle strip clad with multiple layers have demonstrated these cracks are always confined to the depth of the heat affected zone of the second layer of cladding, 0.295 inches (7.5mm) maximum. The Prairie Island Unit II nozzles were clad using a process j         with a lower heat input, dual-wire / submerged-arc. Thus an essumption that all reflectors are 0.295 inches deep is conservative for ASME XI
destructive analysis of nozzle strip clad with multiple layers have demonstrated these cracks are always confined to the depth of the heat affected zone of the second layer of cladding, 0.295 inches (7.5mm) maximum. The Prairie Island Unit II nozzles were clad using a process j
'
with a lower heat input, dual-wire / submerged-arc. Thus an essumption that all reflectors are 0.295 inches deep is conservative for ASME XI l
l          inservice evaluation purposes.
inservice evaluation purposes.
l-         The criteria of I;'A-3330 for multiple planar flaws have been applied
l -
'
The criteria of I;'A-3330 for multiple planar flaws have been applied where necessary and all reflectors or groups of multiple reflectors have been characterized as surface flaws, IWA-3310, with depths equal to O.295".
where necessary and all reflectors or groups of multiple reflectors have
l The thickness of the bore region of the Prairie Island Unit II nozzles i
    '
been characterized as surface flaws, IWA-3310, with depths equal to O.295".
l         The thickness of the bore region of the Prairie Island Unit II nozzles i
is 10 inches. This thickness is determined per Table IWB ~n12, note 2, where t=tni + cn2 Dimension ent' and tn2 were btained from nozzle 2
is 10 inches. This thickness is determined per Table IWB ~n12, note 2, where t=tni + cn2 Dimension ent' and tn2 were btained from nozzle 2
l fabricacion drawings.
l fabricacion drawings.
* i Page 5 of 8
i Page 5 of 8


  .
Th3 long3st ultrestnically meccur:d rafisctor obsarv:d in tho outist nozzle bore regions was 1.0".
Th3 long3st ultrestnically meccur:d rafisctor obsarv:d in tho outist nozzle bore regions was 1.0". These reflectors have been evaluated per IWB-3512, ASME XI, 1977 Edition. Assuming a depth of 0.295", the allowable a/t value is 3.5% while the actual a/t value for this case is 2.95%.
These reflectors have been evaluated per IWB-3512, ASME XI, 1977 Edition. Assuming a depth of 0.295", the allowable a/t value is 3.5% while the actual a/t value for this case is 2.95%.
Reflectors in the vicinity of the safe end welds have been evaluated per IWB-3514.4 (a), which refers to Table IWB-3514.2. The longest reflector detected in these areas was 0.86". Assuming a depth of 0.295", the allowable a/t value is 14.2%, while the actual a/t value for this case is 12.3%.
Reflectors in the vicinity of the safe end welds have been evaluated per IWB-3514.4 (a), which refers to Table IWB-3514.2. The longest reflector detected in these areas was 0.86".
Assuming a depth of 0.295", the allowable a/t value is 14.2%, while the actual a/t value for this case is 12.3%.
Thus, based on the conservative assumption that reflector depths are 0.295" (7.5mm), it is concluded that all ultrasonic reflectors detected in the Prairie Island loop A and B outlet nozzle bores meet the inservice acceptance criteria of IWB-3500, ASME XI, 1977 Edition.
Thus, based on the conservative assumption that reflector depths are 0.295" (7.5mm), it is concluded that all ultrasonic reflectors detected in the Prairie Island loop A and B outlet nozzle bores meet the inservice acceptance criteria of IWB-3500, ASME XI, 1977 Edition.
Structural Materials Engineering (W. Bamford) perfocmed a fractute evaluation on the locations where the indications were detected, even though it was not required by the rules of Section XI of the code because the indications were small. In the nozzle bore region the critical flaw depth was found to be equal to the wall thickness for normal and upset transients, and to be equal to 2.53 inches for the governing accident condition, the larger LOCA. The crack growth of indications beneath the cladding is negligible, so the following results obtain:
Structural Materials Engineering (W. Bamford) perfocmed a fractute evaluation on the locations where the indications were detected, even though it was not required by the rules of Section XI of the code because the indications were small. In the nozzle bore region the critical flaw depth was found to be equal to the wall thickness for normal and upset transients, and to be equal to 2.53 inches for the governing accident condition, the larger LOCA. The crack growth of indications beneath the cladding is negligible, so the following results obtain:
ai = 2.55 ac  = 12.15 (wall thickness)                     ,
ai = 2.55 a
ag = 0.295 Therefore the evaluation criteria of IWB 3600 are met:
= 12.15 (wall thickness) c ag = 0.295 Therefore the evaluation criteria of IWB 3600 are met:
                                                                            .
ag < 0.5 at ag < 0.1 a
ag < 0.5 at
~
                                ~
e In the nozzle safe end region, the critical flaw size for both normal upset and faulted conditions is equal to the wall thickness, because the stresses are very low.
ag < 0.1 a e In the nozzle safe end region, the critical flaw size for both normal upset and faulted conditions is equal to the wall thickness, because the stresses are very low. The fatigue crack growth is also negligible in this case, so the fellowing results are obtained:
The fatigue crack growth is also negligible in this case, so the fellowing results are obtained:
ag = 0.295
ag = 0.295 a
-
= 2.53 c
ac  = 2.53
.
ai = 2.53 Page 6 of 8
ai = 2.53 Page 6 of 8


I The criteria used here are based on the calculated stress intensity factors for the observed indication for faulted conditions         Kg (a=.295) = 33.0 kai 9in for normal upset conditions Kt (a=.295) = 36.0 kai E K y3 =Kyc = 200 kai Nin at the governing time for both normal
I The criteria used here are based on the calculated stress intensity factors for the observed indication for faulted conditions Kg (a=.295) = 33.0 kai 9in for normal upset conditions Kt (a=.295) = 36.0 kai E K
  .
=Kyc = 200 kai Nin at the governing time for both normal y3 and faulted conditions.
and faulted conditions.
Therefore the criteria for integrity are met:
Therefore the criteria for integrity are met:
410 Kr (nomal-upset) = 36 Q 10         =  114 < 200 7K (f..lted)       =
410 Kr (nomal-upset) = 36 Q 10 114 < 200
33 Q 2 46.7 < 200.
=
7K (f..lted) 33 Q 2 46.7 < 200.
=
=
In conclusion, the reflectors meet the acceptance standards of ASME Section XI 1977 Edition. This conclusion was verified by a detailed fracture mechanics analysis perfomed by Westinghouse for Northern States Power Company. Copies of the procedures, inspection programs, inspection data and evaluation, and personnel certificatio a are con-tained under a separate report prepared by Westinghouse. This report will be maintained on file by Northern States Power Company.
In conclusion, the reflectors meet the acceptance standards of ASME Section XI 1977 Edition. This conclusion was verified by a detailed fracture mechanics analysis perfomed by Westinghouse for Northern States Power Company. Copies of the procedures, inspection programs, inspection data and evaluation, and personnel certificatio a are con-tained under a separate report prepared by Westinghouse. This report will be maintained on file by Northern States Power Company.
5.0 EXAMINATION OF SEISMIC BOLTING The entire seismic bolting program, partially due to the problems that       .
5.0 EXAMINATION OF SEISMIC BOLTING The entire seismic bolting program, partially due to the problems that have bear occuring with high strength bolting materials, was scheduled for examination.
have bear occuring with high strength bolting materials, was scheduled for examination. This program includes the bolting, anchors, nuts, and pins on tne steam generator, reactor coolant pumps, accumulators, and pressurizer support structures. All items were examined visually, and where feasible, by ultrasonic examination techniques.                         .
This program includes the bolting, anchors, nuts, and pins on tne steam generator, reactor coolant pumps, accumulators, and pressurizer support structures. All items were examined visually, and where feasible, by ultrasonic examination techniques.
                                                                                    '
la addition, a program for replacing each of the 48 helicoil bolts was scheduled for implementation during this outage. The helicoil bolts (so named because of the helicoil insert utilized in the base metal) form the connection between the steam generator channel head casting and the support structure it rests on.
la addition, a program for replacing each of the 48 helicoil bolts was scheduled for implementation during this outage. The helicoil bolts (so named because of the helicoil insert utilized in the base metal) form the connection between the steam generator channel head casting and the support structure it rests on.         This replacement was scheduled due to the problems encountered during the detensioning program on Unit I's bolts during the September 1980 cutage.
This replacement was scheduled due to the problems encountered during the detensioning program on Unit I's bolts during the September 1980 cutage.
When the problem on Unit I's helicoil boles was identified (September 1980 outage), Unit 11 was shut down and the helicoil bolts on both steam generators were ultrasonically examined. The examinations revealed 1
When the problem on Unit I's helicoil boles was identified (September 1980 outage), Unit 11 was shut down and the helicoil bolts on both steam generators were ultrasonically examined. The examinations revealed 1 bolt without a back reflection, that subsequently sheared off during detensioning, and 2 bolts with a reduced back reflection. These two
  -
~
    ,      bolt without a back reflection, that subsequently sheared off during detensioning, and 2 bolts with a reduced back reflection. These two
  ~
bolts were removed and a fluorescent magnetic particle examination was perfomed on them revealing a linear indication in the thread relief area adjacent to the bolt head on each bolt. Two of the other 45 bolts were removed and a magnetic particle examination was perfomed on them with no apparent indications. These two bolts were used to replace the two with indications (beca use all three of the bolts with indications were on the same support leg). The remaining bolts were detensioned and reexamined ultrasonically with no further indications.
bolts were removed and a fluorescent magnetic particle examination was perfomed on them revealing a linear indication in the thread relief area adjacent to the bolt head on each bolt. Two of the other 45 bolts were removed and a magnetic particle examination was perfomed on them with no apparent indications. These two bolts were used to replace the two with indications (beca use all three of the bolts with indications were on the same support leg). The remaining bolts were detensioned and reexamined ultrasonically with no further indications.
Page 7 of 8 l
Page 7 of 8 l
\                                           _ -_
\\


These bolts were all removed during this outage and fluorescent magnetic particle and an ultrasonic examination was performed on each bolt. The ultrasonic examinations revealed one bolt with a reduced back reflection from the head end. The magnetic particle examinations revealed linear indications in the thread relief area adjacent to the bolt head on 36 of the 45 bolts. The majority of these indications were very small and inter-mittent. All the helicoil bolts were replaced with bolts of an approved design.
These bolts were all removed during this outage and fluorescent magnetic particle and an ultrasonic examination was performed on each bolt. The ultrasonic examinations revealed one bolt with a reduced back reflection from the head end.
  .
The magnetic particle examinations revealed linear indications in the thread relief area adjacent to the bolt head on 36 of the 45 bolts. The majority of these indications were very small and inter-mittent. All the helicoil bolts were replaced with bolts of an approved design.
All other indications disclosed during the examinations were resolved prior to plant heat up. The loose nuts and bolts were tightened. All indications
All other indications disclosed during the examinations were resolved prior to plant heat up.
    -
The loose nuts and bolts were tightened. All indications were corrected and the areas were reexamined with the same method that located them.
were corrected and the areas were reexamined with the same method that located them.
i Page 8 of 8
                                                                                    .
                                                                                    .
i
  .
  .
Page 8 of 8


_ _ ._ .                    ._                                                                ._- - _ _ _ _ --.
APPENDIX A ASME CLASS 1 - EXAMLNATION Page 1 of 1
        .
-er-r---,,---w.v,-,-----,,-
APPENDIX A
-,r_,_,_-,-.,-,,,n----,_.-,,_,,____,-..-~.,________._._-w,-.---_.--_.---+~,,,-ve,,
                                                                                                                                                                                                                  !
- -, -... -,..,. ~. -, - - __
ASME CLASS 1 - EXAMLNATION
                                                                                                                                                        .
                                                                                                                                                                                                                .
                                                                                                                                                                                                                  .
Page 1 of 1
                                                                                                                                                                                                              .
-er-r---,,---w.v,-,-----,,-         . -,r_,_,_-,-.,-,,,n----,_.-,,_,,____,-..-~.,________._._-w,-.---_.--_.---+~,,,-ve,,                       -                    -
                                                                                                                                                                        - - , - . . . - ,.. , . ~ . - , - - __


                                                          ,'                                i!
i!
_
S T
_                                                                                                              .
T T.
                                                                                                                        .
NO.
_
R R
                                                                                                                        .
ON IN O
S T     T T. NO.                                                                               R     R F          O IN                                                                               O     O         .
O F
I     P TT                                                                               E     E ONV        CR EO P P R    R          .
O I
1               S E
P TT E
      -        <    N IR                                                                               W    W 1     1 u                                                                                      R    R S
E CR R
cA t
R EO V
  .
P P W
W_    W_
W 1
                                                                                                        -    -
S E N
                                                                                                      /     1 E         E                                                                                       T     8 LEI BG AA                                                                                                 5 6
u IR R
TP                                                                                                 3 4
R 1
0 1     O N                                                                                    I O                                                                                   '
1 S
:      I 9
tc W_
T                                                                              2     5 M         A                                                                                   3 E     MC                                                       245                 : &
W_
T      EIF I     TI                                                           . . .            E I2
A
                                                                                                            &
/
IT R        N                                                      OOO                 O2       2 O         E           -                                    -  NNN                 H       1 EEDDD                      D10 J         D           E A
1 E
M I
E T
O                                   NNLLL NNEEE U
8 LEI BG AA 5
I2 O
TP 3
I
64 0
                                                                                                            '
N 1
O I
O I
9 T
2 5
M A
3 E
MC T
EI 245 E
F I
TI I2 IT OOO O2 2
R N
O E
NNN H
1 0
J D
E EEDDD D1 O
A I
O NNLLL U
I' NNEEE I2 M
t
t
                                    -                                    - - % W%                 S1       9 T .M                                                                             %    %
- - % W%
MA X            -  -                                - - - - -                  3 3
S1 9
.M TMA 3
0 -
0 -
3 AE D.
X A
Q'MT.             %                                      %%%                    %    %%
3 3
E                                                         555                     3     06 RA              - 0                                  -
E D.
5                                                               3     33
Q' T.
                      ..              E                                       E                                  E PR S                E                                       E                                 E N
M E A 0
IP E             R                                       R                       E     OR I
555 3
H                                      H
06 R
                                                                          - - T                      N C
5 3
WH I I
33 E
                                    - '                                                                      ' '
E E
                                                                                                                              ~
PR E
Y R
E E
A              -        S                                      S M   M DE    ME         D               L                       D M                R     I                                      I U    S      N W   O   S E       S   A- A         D T
S E R
S     E W       D S
R E
YqI M    R   C   D l       D N     N          A      BS                  D        E S      OA    I       I         I A B I L M E A   T              N    I N          X C N E l
OR N
L A
IP H
E H W I' Y D A 0 I I 1 l
N WH IH I I
E   EDL WI A A    E W
- - T C
G N
~
D       R R P P E     S                   E             A LDEI E            I O             m                       O          O R O         P         G     L N L E N I           E    S   L T                                                               I N E A         F NLE N T           B A   D   A N   A A % G           E B U N    A N          I 1 E         R   S I                     G A N IT            1 A       EO       I     E                           '
Y RA S
C-                              0
S M
_
M D ME D
N       DT   L E A W I
D L
D R
I R
E L T 1 T A N 0 A    O E t
I W O S
N F I D I N I AR DNE I
E S
F A N         1 .
A A D
O
S E
_
S M
_
E N
      .      I          M N       U F h I E ( C     A M       C A B UCF               I   E O         M           E T IL     T M       R               S   H TI M           O F R         LN C         A           I D A     I U   D E L F ) G D            T    IDU            T    E        E
U S
_
D N
_
- N A T B
R         X             U   I   G C   U   F L O C I I  R  m  R  GIC RR        L D P      SD T      R      M E               A R O                   1 M         SI N           H E B C E
W D
_
D S
T              I             -
YqI R C D
E2       E                 N N    I   I'                      E G       I        E              EE W           -
l T S N
I G   E I f
I E
I G W S S R   O O O A M D N N A I 1 D EC I              S D W S A R VW                      .
M I
N             N  R G        N O                                            N              E E                     E E I
I I
  ,
A B I
PTO   I I I
L M E A O
I E E F R       I T. CIIAMSH(OAC I   N  I VHC
EDL A
_
E G
SNT
A C N E
_  EUC T        E ADP           ME.Y A
L E H D A 0 l
TNSN                  C A-            B                                           C-                              .
A W I' Y I
                                                                                                                        ,.
I 1
SAI                   G                 -
E WI A W
B                               .
N N
L                B             B N SE                                                                                                               .
X I
                                                                                                                        . 1 RI C                                                                                                                     -
l E
EEI HI V             BM                    2                                            3                              . A-
I D
. T HR l          UE 1
R R P P E S EI E
9 P
A O
.
m E N O R O LD P G
RA E     S ST I l
L I
B l
S L
B l
T N L O
B                                 P
I E
_
E B U N A
OR NPI N                                                                                                              ,
N N E A F
                                                                                                                      ,
T B
j      a             iiJ 1             i
A D A
N A A G
1 E R
S I
NLE A G I
1 A
EO I
N E
I O E N D C
I AR I
N T 0
N DT L E I
R L
T 1
T F
I I
N DNE F A N 1.
A W D
E A N 0 A t
M N
U F h E
(
I E
O C A M C A B UCF I
O M
E IL T
M I
R S
H TI M O F R
LN G D m R
GIC D P SD T
C T
Y IDU T
E E
A I
D A I
U D E L F
)
R X
U I G
C U F L O C R I
E A R O RR L
1 M
SI N N N
R I
M E I
T T
D EC f
I I'
EE I
ES D W VW E2 E
I H E B C E G W S S M D N N W
G E
I I
C G
I O
N N R G N R O O O A A I
1 S A R
CIIAMSH(OA I
N N E E E E I
E E
I PTO I
I C
VHC I
F R T.
I I SNT E U C T
E ADP ME.YA TNS C
A B
C N
SAI G
L B
B B
N SE RI C 1
EEI HI V A-T HR BM 1
2 3
. 9 UE l
P RA E ST S
I l
l l
B B
B P
OR N NPI j
a iiJ 1
i


_ _ . ._            -
NORTilERN STATES POWER CO.
                                  .                                                                            .      .
TABLE SI I PRAIRIE ISLAND UNIT 2
NORTilERN STATES POWER CO.                                                                               TABLE SI I PRAIRIE ISLAND UNIT         2                                                                             PAGE       2     op       5 INSERVICE INSPECTION-EXAMINATION  
PAGE 2
op 5
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:             REACIOR VESSEL p        SUB
MAJOR ITEM:
                        ^                         YS M       INSP.       R EQ*D. AfAT.           ITEM                   INSPECTtDN TE-             D E   I IO AMT. EXAM       IDENTIFICATION             REPORT NO.
REACIOR VESSEL
ITEM        GORY           ITEM TO BE EXAMINED     PER.
^
  '
YS M p
                                                                                                                                          .
SUB INSP.
1 Bl.3       B-C     (00tfr'D)
R EQ*D.
AfAT.
ITEM INSPECTtDN TE-D E I IO ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED 1
Bl.3 B-C (00tfr'D)
SIUD HOLE:
SIUD HOLE:
HEAD 'IO FIANGE             WE             33%     33%   1'IEIU 16               77-W RPV REPORT &
HEAD 'IO FIANGE WE 33%
  !                            EID NO. 6                                                                           77-74,73,75 TO             33%       33% 16 'IHRU 34             B1-141,143,144
33%
                                                          'IMREE         33%       -
1'IEIU 16 77-W RPV REPORT &
I     Bl.4       B-D     PRIMARY N ZZIE 'IO-VESSEL WEIDS A10 NOZFLE ,7NSIDE RADIUSED SECTIONS j                             REACIOR CNE COOUNf N0ZZIES CUTIET FOZZIES         OE               1         1 BCC-A-1                 77-W RPV REEORT
EID NO. 6 77-74,73,75 TO 33%
!                                                        'IWO             1         1 BCC-B-1                 81 _W RPV REPORT INIEP N0ZZIES         'IHREE           2         -
33%
SAFETY IMJECTION       'DIREE           1       -
16 'IHRU 34 B1-141,143,144
FOZZIES               TIREE             1       -
'IMREE 33%
l     B1.5       B-E     VESSEL PENEffRATINS, INCIDDING OCNIiOL HOD DRIVE Ato INSPIUMENTATIN PFNETTRATIWS
I Bl.4 B-D PRIMARY N ZZIE 'IO-VESSEL WEIDS A10 NOZFLE,7NSIDE RADIUSED SECTIONS j
!                              GWrROL ROD PErd.'IY@.TIQE   GE           '
REACIOR CNE COOUNf N0ZZIES CUTIET FOZZIES OE 1
3%     *3                             *EACH ITEM IIEPECMD
1 BCC-A-1 77-W RPV REEORT
                                                          'IWO             3%     *3                             BY PUNP PERS0tMEL
'IWO 1
                                                          'IMREE           4%       -
1 BCC-B-1 81 _W RPV REPORT INIEP N0ZZIES
'IHREE 2
SAFETY IMJECTION
'DIREE 1
FOZZIES TIREE 1
l B1.5 B-E VESSEL PENEffRATINS, INCIDDING OCNIiOL HOD DRIVE Ato INSPIUMENTATIN PFNETTRATIWS GWrROL ROD PErd.'IY@.TIQE GE 3%
*3
*EACH ITEM IIEPECMD
'IWO 3%
*3 BY PUNP PERS0tMEL
'IMREE 4%
DURItG EAOi REACIOR VESSEL IEAKAGE
DURItG EAOi REACIOR VESSEL IEAKAGE
                                                                                                                  'IEST i
'IEST i
l   rosses a7-247e e/7s                                                                                                       Fosses poo. ese-sees PP9-A-2
l rosses a7-247e e/7s Fosses poo. ese-sees PP9-A-2
                                                        .


    . - - . .          _ --          - _ _ .              _
NORTHERN STATES POWER CO.
_ -                                            - _. _    _
TABLE S101 PRAIRIE ISLAND UNIT 2
                              .      .                                                                                        .
PAGE 3
NORTHERN STATES POWER CO.                                                                                           TABLE S101 PRAIRIE ISLAND UNIT               2                                                                                 PAGE       3       OF   5
OF 5
INSERVICE INSPECTION-EXAMINATION  
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:           IEACIW VESSEL SUS                               N DE      TION          INSP. REQ D. AMT.           BTEM                 $NSPECTION ITEM                                                       PER. AMT. EXAM       IDENTIFICATION           REPORT NO.
M AJOR ITEM:
GORY                       ITEM TO BE EXAMINED I.
IEACIW VESSEL SUS INSP.
B1.5       B-E         (CONP'D) mSTRUMENPATIN PENE1BATIW S                       OE           3%         *3                           *EACH ITEM INSPECPED
REQ D.
                                                                      'INO         3%         *3                           BY PUNP PERSCIAEL
AMT.
                                                                      '1HREE       3%         -
BTEM
mRING EAG REACIOR VESSEL EAIOGE *1TET REACIOR VESSEL LEAD VENP           *-          1           *1 1-21C-36 'IO 2-RC-8-5 Bl.6     B-F         N0ZZLE TO SAFE END WEIDS REACIOR CWE COGANT 20ZZES OtrPLET N0ZZES           OE           1         1   ICC-A-1 S.E.             77-W R W REPORT &
$NSPECTION N DE TION ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED I.
B1.5 B-E (CONP'D) mSTRUMENPATIN PENE1BATIW S OE 3%
*3
*EACH ITEM INSPECPED
'INO 3%
*3 BY PUNP PERSCIAEL
'1HREE 3%
mRING EAG REACIOR VESSEL EAIOGE *1TET REACIOR VESSEL LEAD VENP 1
*1 1-21C-36 'IO 2-RC-8-5 Bl.6 B-F N0ZZLE TO SAFE END WEIDS REACIOR CWE COGANT 20ZZES OtrPLET N0ZZES OE 1
1 ICC-A-1 S.E.
77-W R W REPORT &
77420,112
77420,112
'
'IWO 1
                                                                      'IWO         1         1   BCC-B-1 S.E.             81-W RW REPORT &
1 BCC-B-1 S.E.
81-21 INLET N0ZZES           'IHREE       2         -
81-W RW REPORT &
REACIOR VESSEL SAEETY INJECTIN N0ZZES lOZZ E A S.E.             OE           1           1 10. 1                   77-W RW REPORT &
81-21 INLET N0ZZES
77423,113 IOZZE B S.E.             'IHREE       1         -
'IHREE 2
Bl.8     B-G-1       CIDSURE STUDS AND NLfrS               QE         16         16   il 'IERU 616             77-W RW REPORP &
REACIOR VESSEL SAEETY INJECTIN N0ZZES lOZZ E A S.E.
77-106 il '1HHU 616         ' 78-84,99 (Mr WIX)
OE 1
                                                                      'IWO       16           16 617 'INRU #32           81-162,163,165,166 i
1
1HREE     16           -
: 10. 1 77-W RW REPORT &
FORD 4 4 7-245 S S/78                                                                                                               FOftta 960. 8S8-4 948 PP9-A-3
77423,113 IOZZE B S.E.
                                                                    .          .
'IHREE 1
_
Bl.8 B-G-1 CIDSURE STUDS AND NLfrS QE 16 16 il 'IERU 616 77-W RW REPORP &
77-106 il '1HHU 616
' 78-84,99 (Mr WIX)
'IWO 16 16 617 'INRU #32 81-162,163,165,166 1HREE 16 i
FORD 4 4 7-245 S S/78 FOftta 960. 8S8-4 948 PP9-A-3


_ - _ _ . ..- _ _ _ -__ - _ . _ _ _ _ _ _                        _        _ _ _ _ _ _ .                  _
NORTHERN STATES POWER CO.
  -
Tall.E S1.1 PRAIRIE ISLAND UNIT.
                                                    .      .                                                                                ,      ,
2 PAGE 4
NORTHERN STATES POWER CO.                                                                                                                 Tall.E S1.1 PRAIRIE ISLAND UNIT. 2                                                                                                                   PAGE       4     OF   5 INSERVICE INSPECTION-EXAMINATION  
OF 5
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:           REAC'IOR VESSEL M                 N         YS SUB E.            N D,E* Al TIOq                    INSP. R Eb'D. AMT.         ITEM                   INSPECTION ITEM                                 GORY            ITEM TO BE EXAMINED                  PER.       AMT. EXAM     IDENTIFICATION             REPORT NO.
MAJOR ITEM:
SIUD HOIES:
REAC'IOR VESSEL M
Bl.9                             B-C-1         LIGAMENTS BEDEEN                         OE           16       16 12-22 & 29-35           77-H RW REPORT HIREADED SIUD fl0LES
N YS D,E INSP.
                                                                                                'INO         14       14 9-11 & 36-46           81-W RW REPORT DIREE       18       -
R Eb'D.
B1.10                             B-G-1         CIOSURE WASHERS AN_D_
AMT.
Bl!SHINGS
ITEM INSPECTION SUB E.
,                                                                                                                                                                      .
N
WPSHERS                               WE           16       16 PAIRS,1 'HIRU 16       77-W RW RdKRT
* Al TIOq ITEM PER.
                                                                                                'INO         16       16 PAIRS,17 TIRU 32       81-164 MIREE       16       -
AMT.
BUSHINGS                             -            -        -
EXAM IDENTIFICATION REPORT NO.
                                                                                                                          -NCtE-B1.11                             B-G-2         PRESSURE RETAINING BOLTING               NE           3       9 ALL 9 BOLTS             77-W RW REPORT
GORY ITEM TO BE EXAMINED SIUD HOIES:
                                                                                                'IWO         3       9 ALL 9 BOLTS             81-T70 MIREE         3       -
Bl.9 B-C-1 LIGAMENTS BEDEEN OE 16 16 12-22 & 29-35 77-H RW REPORT HIREADED SIUD fl0LES
Bl.12                             B-H           INTEGRALLY WELDED VESSEL SUPPORTS                           MIREE         2       -
'INO 14 14 9-11 & 36-46 81-W RW REPORT DIREE 18 B1.10 B-G-1 CIOSURE WASHERS AN_D_
31.13                             B-I-1         CIDSURE HEAD CLADDING                     CE           2       2 HCP-1 & HCP-2           77-W RW REPORT
Bl!SHINGS WPSHERS WE 16 16 PAIRS,1 'HIRU 16 77-W RW RdKRT
                                                                                                'INO         2       3 liCP-1,HCP-3 & HCP-4   81-T55 TIREE         2       -
'INO 16 16 PAIRS,17 TIRU 32 81-164 MIREE 16 BUSHINGS
Bl.14                             B-I-1         VESSEL CIADDING                           CNE           2       2 VCP-1 & VCP-2           76-W INTERNALS RPF
-NCtE-B1.11 B-G-2 PRESSURE RETAINING BOLTING NE 3
_
9 ALL 9 BOLTS 77-W RW REPORT
                                                                                                'IWO         2       2 VCP-3 (2 PA'ICHES)     81-W RW REPORT
'IWO 3
_
9 ALL 9 BOLTS 81-T70 MIREE 3
MIREE         2       -
Bl.12 B-H INTEGRALLY WELDED VESSEL SUPPORTS MIREE 2
i roa = i1-. eve sire                                                                                   .                                                    con   . isi-i...
31.13 B-I-1 CIDSURE HEAD CLADDING CE 2
PP9-A-4                                                                                 .            .
2 HCP-1 & HCP-2 77-W RW REPORT
'INO 2
3 liCP-1,HCP-3 & HCP-4 81-T55 TIREE 2
Bl.14 B-I-1 VESSEL CIADDING CNE 2
2 VCP-1 & VCP-2 76-W INTERNALS RPF
'IWO 2
2 VCP-3 (2 PA'ICHES) 81-W RW REPORT MIREE 2
i roa = i1-. eve sire con
. isi-i...
PP9-A-4


_ _              -.                              __ _    __          ,_            .                                  _                _
2 NOllTHERN STATES POWER CO.
                                .      .                                                                                .      .
TA!LE S1 1 PRAIRIE ISLAND UNIT 2
!
PAGE 5
2
op,,. 5 INSERVICE INSPECTION-EXAMINATION  
-      NOllTHERN STATES POWER CO.                                                                                       TA!LE S1 1 PRAIRIE ISLAND UNIT           2                                                                                 PAGE       5     op,, . 5 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:               REACIOR VESSEL N
MAJOR ITEM:
* SUS-             E.            N DE    I TION        INSP. R EO'D. AMT.               ITEM                       INSPECTION ITEM                                                     PER.     AMT. EXAM           IGENTIFICATION                 REPORT NO.
REACIOR VESSEL N
GORY           ITEM TO BE EXAMINED i
SUS-INSP.
R EO'D.
AMT.
ITEM INSPECTION E.
N DE I TION ITEM PER.
AMT.
EXAM IGENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED i
1 4
1 4
'
Bl.15 B-N-1 VESSEL INTERIOR UPPER IN1ERHAIS AND OiE 76-W INIEINAIS RPr IDWER INTERNAIS
Bl.15       B-N-1       VESSEL INTERIOR
'IWO
'
~
UPPER IN1ERHAIS AND         OiE         *          *
i 91REE 80-W INIERIAIS RPf
* 76-W INIEINAIS RPr
~
                                                                                                                                ~
, REPPESENTATIVE REGICNS CF '11M INPERIOR SWFACES i
IDWER INTERNAIS             'IWO         *          *
Ato INTERNAIS MADC NYTRSIBW BY THE j
* 80-W INIERIAIS RPf
REMOVAL OF CX)MEON-l ENTS DURING NCRMAL l
                                                                                                                                ~
REEUE11sU OPEilATION 31.16 B-N-2 INTERIOR ATTACHMENTS IDF APPLICABE AND CORE SUPPORT POR PWR'S 2
i                                                                91REE        *'        -                                    *    , REPPESENTATIVE
STRUCIURES B1.17 B-N-3 REMOVABM CORE SUPPORT WIREE
_
*100% OF DIE VISU-APO VISUALLY ACCES-l SIB m SURFACES OF ME CORE SUPPORT
REGICNS CF '11M INPERIOR SWFACES i                                                                                                                             Ato INTERNAIS MADC
)
'
S110CIURE 1
NYTRSIBW BY THE j                                                                                                                             REMOVAL OF CX)MEON-l                                                                                                                             ENTS DURING NCRMAL l                                                                                                                             REEUE11sU OPEilATION
{
-.
Bl.18 B-O CONTROL ICD DRIVE HOUSINGS PERIPHERAL CRD HOUSINGS DIREE 2
!
;        31.16         B-N-2     INTERIOR ATTACHMENTS           -            -          -
IDF APPLICABE
;
AND CORE SUPPORT                                               POR PWR'S 2                                 STRUCIURES
.        B1.17         B-N-3     REMOVABM CORE SUPPORT         WIREE       *-        -
                                                                                                  *100% OF DIE VISU-APO VISUALLY ACCES-l                                                                                                 SIB m SURFACES OF ME CORE SUPPORT
)                                                                                                 S110CIURE 1
{       Bl.18         B-O       CONTROL ICD DRIVE HOUSINGS
,                                    PERIPHERAL CRD HOUSINGS     DIREE       2         -
t i
t i
'
5 B1.19 B-P EXEMPTED COMPONENFS
B1.19         B-P       EXEMPTED COMPONENFS           -            *-        -
*ALL COMPOtlafrS
                                                                                                  *ALL COMPOtlafrS           *PERFOPMED BY ILANT
*PERFOPMED BY ILANT EXEMPTED FROM PE3EiOtML IN ACCORD-l NOWBETRIC APO ANCE WIMI IWA-5000 j
;                                                                                                EXEMPTED FROM               PE3EiOtML IN ACCORD-ANCE WIMI IWA-5000
SURFACE EXAMINATION DURING EACH SYSTEM i
'
BY I m-1233 MAKAGE 'IES"' AND EAG SYSTEM HYDID-SfATIC TEST REQUIhED BY IWB-5000 l
NOWBETRIC APO j                                                                                                SURFACE EXAMINATION         DURING EACH SYSTEM i                                                                                                 BY I m-1233                 MAKAGE 'IES"' AND EAG SYSTEM HYDID-SfATIC TEST REQUIhED BY IWB-5000 l
FORM I 7-24 76 s/70 FORM MO.458+9998 N ~
FORM I 7-24 76 s/70                                                                                                               FORM MO.458+9998 N ~           .                      -                                    .      - , ,    _            , _ ,


                                                                                      . .        _,
4 NORTHERN STATES POWER CO.
                        .      .                                                                          .
TABLE SI 2 PRA'RIE ISLAND UNIT _ 2 __...
                                                                                                                                        ,
PAGE 1
4 NORTHERN STATES POWER CO.                                                                         TABLE SI 2
OF 2
PRA'RIE ISLAND UNIT _ 2 __ . ..                                                                   PAGE         1 OF     2
'
INSERVICE 3NSPECTION-EXAMINATION  
INSERVICE 3NSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:             PRESSURIZER
MAJOR ITEM:
__
PRESSURIZER I
'
SUB INSP.
                                        "                                                              I SUB         E-                DE      TION      INSP. R EQ'b. AMT.           ITEM                     INSPECTION ITEM     GORY                                    PER. AMT. EXAM     IDENTIFICATION                 REPORT NO.
R EQ'b.
ITEM TO BE EXAMuaED
AMT.
                                                                                                              ----
ITEM INSPECTION E-DE TION ITEM PER.
i
AMT.
,
EXAM IDENTIFICATION REPORT NO.
B2.1   B-B         IONGI'IUDINAL AND i                         CIPI1]MFERElff1AL WEIDS 4                            IINGI'IUDINAL NEIBS j                                 ELD NO. 1           'IEREE     5'%       -
GORY ITEM TO BE EXAMuaED i
!                                                    'IUREE     5%         -
B2.1 B-B IONGI'IUDINAL AND i
)                                 ELD NO. 2           NE         5%         5% BorICH 'IO 'IOP           76-45,67 t
CIPI1]MFERElff1AL WEIDS IINGI'IUDINAL NEIBS 4
                                                      'IND       5%       8% W-5 DO E 11"             78-104,112,118
j ELD NO. 1
*
'IEREE 5'%
'IUREE 5%
)
ELD NO. 2 NE 5%
5%
BorICH 'IO 'IOP 76-45,67
'IND 5%
8%
W-5 DO E 11" 78-104,112,118 t
(W)
(W)
'
CIRCUMFERENTIAL WEIDS EBOM NAMEPLATE:
CIRCUMFERENTIAL WEIDS                             EBOM NAMEPLATE:
NELD NO. 3 INE 1.7%
NELD NO. 3           INE         1.7%   33% +10 ' 'i0 +18 '           76-43,69
33%
                                                      'IM)       1.7%     13% +7'6" 'IO +10'8"         78-105,115,122
+10 ' 'i0 +18 '
;                                                      'IMEE       1.8%     -
76-43,69
1 EID W). 4           WE         1.7%   33% +8 ' 'IO +16 '           76-44,66
'IM) 1.7%
                                                      'IWO         l.7%     6% +8 '4" 'IO +9 ' 10"       78-103,114,119 g                                                      'IHREE     1.8%     -
13%
1                                 NEID NO. 5           CNE         1.7%
+7'6" 'IO +10'8" 78-105,115,122
                                                                        '  33% +10 ' 'IO +18 '           76-29,68                 ,
'IMEE 1.8%
)                                                     'IND       1.7%     12% +6 ' 10" 'IO +9 '9"       78-113,116,121
1 EID W). 4 WE 1.7%
;                                                      'IHREE     1.8%     -
33%
B2.2     B-D     N0ZZLE 'IO VESSEL WEIDS       -        -          -
+8 ' 'IO +16 '
                                                                                -NONE-
76-44,66
!
'IWO l.7%
j      R2.3     B-E     HEA'IER PENETRATIN           *                    *                            *EACH ITEM INSPEC'IED 25/10 BY PLANT PERS0ttiEL
6%
'
+8 '4" 'IO +9 ' 10" 78-103,114,119
YRS-
'IHREE 1.8%
  !    B2.4     B-F     N0ZZLE 'IO SAFE END WEIDS   WE         2         2 W-1A S.E.(8010A)         76-26,53 j                                                                             W-1A S.E.(80108)         76-61,52 i                                                     'INO       5         5 W-15 S.E.                 78-31,100
g 1
;                                                                              W-1A S.E.(RELIEF)         80-58,87,170 W-22A S.E.(SPRAY)         80-57,85,168
NEID NO. 5 CNE 1.7%
-
33%
W-1A S.E.(8010A)         80-188,192,192R,192Ra W-1A S.E.(80108)         80-189,131,191R 2 W-1A S.E.(8010A)         81-6,6R,37,63 W-1B S.E.(80108)         81-23,23R,39,62
+10 ' 'IO +18 '
  !                                                    mm       2           -
76-29,68
raggg;gg .m i                                                                                                             .... ..........
)
                                                                                                                                    .
'IND 1.7%
12%
+6 ' 10" 'IO +9 '9" 78-113,116,121
'IHREE 1.8%
B2.2 B-D N0ZZLE 'IO VESSEL WEIDS
-NONE-25/10 j
R2.3 B-E HEA'IER PENETRATIN
*EACH ITEM INSPEC'IED YRS-BY PLANT PERS0ttiEL B2.4 B-F N0ZZLE 'IO SAFE END WEIDS WE 2
2 W-1A S.E.(8010A) 76-26,53 j
W-1A S.E.(80108) 76-61,52 i
'INO 5
5 W-15 S.E.
78-31,100 W-1A S.E.(RELIEF) 80-58,87,170 W-22A S.E.(SPRAY) 80-57,85,168 W-1A S.E.(8010A) 80-188,192,192R,192Ra W-1A S.E.(80108) 80-189,131,191R 2
W-1A S.E.(8010A) 81-6,6R,37,63 W-1B S.E.(80108) 81-23,23R,39,62 mm 2
raggg;gg.m i


                                                                                                                                      . - . - . .-
i NORTHERN STATES POWER CO.
                        .        .                                                                            .
TA"iLE S1.2 PRAIRIE ISLAND UNIT 2
_
PAGE 2
i NORTHERN STATES POWER CO.                                                                           TA"iLE S1.2 PRAIRIE ISLAND UNIT         2                                                                       PAGE     2     OF     2
OF 2
INSERVICE INSPECTION-EXAMINATION SUfAMARY                                       MAJOR ITEM:             PRESSURIZER
INSERVICE INSPECTION-EXAMINATION SUfAMARY MAJOR ITEM:
!
PRESSURIZER EXAM COWMENT OR SYSTEM SUS INSP.
!
R EQ*D.
SUS EXAM             COWMENT OR SYSTEM       INSP. R EQ*D. AMT.             ITEM                 INSPECTION ITEM           y'                                   PER. AMT. EXAM         IDENTIFICATION           REPORTNO.
AMT.
;
ITEM INSPECTION mfd ITEM y'
I mfd EE M NED
I PER.
:
AMT.
!
EXAM IDENTIFICATION REPORTNO.
B2.5     B-G-1     PRESSURE-RETAINING BOLTS     -          -      -
EE M NED B2.5 B-G-1 PRESSURE-RETAINING BOLTS
                                                                                  -NOTE-
-NOTE-B2.6 Ato S' IUDS (> 2 IN. DIA.)
'
{
B2.6                 Ato S' IUDS (> 2 IN. DIA.)
AND B2.7 (W)
{   AND B2.7 (W)
FROM NAMEPLWE:
FROM NAMEPLWE:
B2.8     B-H       INTEGRALLY WEIDED VESSEL WEID SKIRT WEID                 WE         3.3%   3.3%   +8"'IO -8"               76-77
B2.8 B-H INTEGRALLY WEIDED VESSEL WEID SKIRT WEID WE 3.3%
                                                        'INO       3.3%   23%   +6 ' 'IO +11 ' 9"       78-106,107,117
3.3%
.                                                      'IHREE     3.4%   -
+8"'IO -8" 76-77
4 i   B2.9     B-I-2     VESSEL CLADDIt1G             'HIREE     36 SQ.   -
'INO 3.3%
'                                                                  IN.
23%
PA'IGi B2.10     B-P       EXEMPIED COMPWENIS
+6 ' 'IO +11 ' 9" 78-106,107,117
* N') . 5A 'DIRD SH       *EAOi ITEM INSPECTED INSTRUMENT N0ZZE                      -      -
'IHREE 3.4%
PENE'IRATIWS                                                                   BY PLAlff PERSONEL SAMPLE N0ZZE               *          -      -
4 i
: 10. 6                   *EACH ITEM INSPECTED PENETRATIN                                                                     BY PLAlff PERSQt4EL B2.11     B-G-2     PhESSURE REffAINING EOLTING MANNAY BOLTS               04E         5       5     BOLTS 1 'DIRO 6         76-30 2                                                      'INO       5       5     BOLTS 6 'DIRU 10         78-82 BOLTS 1 'DIRU 16         81-60
B2.9 B-I-2 VESSEL CLADDIt1G
                                                        'HIREE     6       -
'HIREE 36 SQ.
                                                                                ,
IN.
FORM 37 2476 5/78                                                                                                   FOnan No. ess-teel
PA'IGi B2.10 B-P EXEMPIED COMPWENIS INSTRUMENT N0ZZE N'). 5A 'DIRD SH
,
*EAOi ITEM INSPECTED PENE'IRATIWS BY PLAlff PERSONEL SAMPLE N0ZZE
PP9-A-7                                                     ,
: 10. 6
                                                      .                                                                                            ,
*EACH ITEM INSPECTED PENETRATIN BY PLAlff PERSQt4EL B2.11 B-G-2 PhESSURE REffAINING EOLTING MANNAY BOLTS 04E 5
5 BOLTS 1 'DIRO 6 76-30
'INO 5
5 BOLTS 6 'DIRU 10 78-82 2
BOLTS 1 'DIRU 16 81-60
'HIREE 6
FORM 37 2476 5/78 FOnan No. ess-teel PP9-A-7


_ _ _ _ _ - - - - - - - - - . _ _ _ _ _ __ - - _ _ _ _ _ _________________ _ _ _ _______
NORTHERN STATES POWER CO.
                                                                                                                                                                                        .
TATLE s1.3 1 0
                                                                                                        -                                                                            .
PRAIRSE ISL AND UNIT _ ?
<
PAGE 1
NORTHERN STATES POWER CO.                                                                                                             TATLE s1.3 01 4
OF 3
PRAIRSE ISL AND UNIT _ ?                                                                                                             PAGE     1     OF   3
4 INSERV(CE !?iSPECTION-EXAMINATION  
<
INSERV(CE !?iSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:       STEAM GENERATORS
M AJOR ITEM:
                                                                                              ^M                 N         8             I SUB                     TE-              DE R Tl N            INSP. R EQ'D. AM1.           STEM                 INSPECTION ITEM                                                             PER. AMT. EXAM       IDENTIFICATION           REPORT NO.
STEAM GENERATORS I
.                                                                                          GORY           ITEM TO BE EXAMINED I
^M N
B3.1                           B-B     IINGITUDINAL MO CIRCUMFERENPIAL WEIDS (N TIE PRIMARY SICZ IINGITUDINAL WEIDS         -          -        -
8 SUB INSP.
                                                                                                                                                            -NONE-
R EQ'D.
,
AM1.
(CW)
STEM INSPECTION TE-DE R Tl N ITEM PER.
CIRCLMPERENPIAL WELDS                               ImOM NAMEPLATE:
AMT.
SIEAM GENERA'IOR NO. 21   OE           1.9%   37% +8" 10 +13'8"           76-111,101,118 IWO         1.9%     8% +23'8" "IO +26'8"       78-108,110,120 THREE       1.8%     -
EXAM IDENTIFICATION REPORT NO.
SPEAM GENERATOR NO. 22     OE           1.9%   31% +2' 10 +13'             76-112,102,119 4WO         1.9%     17% +21'10" 10 +28'         78-109,111,123 1HREE       1.8%     -
GORY ITEM TO BE EXAMINED I
93.2                         B-D     NOZZLE TO IIEAD WEIDS         -          -          -
B3.1 B-B IINGITUDINAL MO CIRCUMFERENPIAL WEIDS (N TIE PRIMARY SICZ IINGITUDINAL WEIDS
                                                                                                                                                            -NONP.-
-NONE-(CW)
,
CIRCLMPERENPIAL WELDS ImOM NAMEPLATE:
B3.3                         D-F     NOZZLE TO SAFE END WEIDS JII:AM GENERATOR NO. 21   TWO           1         1 ROC-A-5 S.E.           81-116,125 THREE       1 SPEAM GENERATOR NO. 22     CNE           1         1 BCC-B-5 S.E.           76,136,139 THREE         1
SIEAM GENERA'IOR NO. 21 OE 1.9%
                                                                                                                                                        -
37%
B3.4                         B-G-1   PRESSURE RETAINING BOLTS       -            -        -
+8" 10 +13'8" 76-111,101,118 IWO 1.9%
                                                                                                                                                            -tKNE-B3.5                                 AND STUDS (> 2 IN. DIA.)
8%
.
+23'8" "IO +26'8" 78-108,110,120 THREE 1.8%
'
SPEAM GENERATOR NO. 22 OE 1.9%
AND B3.6                                                                                                                                               .
31%
B3.7                       B-II     INTEGRALLY IELDED             -          -          -
+2' 10 +13' 76-112,102,119 4WO 1.9%
                                                                                                                                                            -NONE-VESSEL SUPPORTS roam ar-asis sire                                                                                                                                 ronu no.........
17%
PP9-A-8                                                         .          .
+21'10" 10 +28' 78-109,111,123 1HREE 1.8%
93.2 B-D NOZZLE TO IIEAD WEIDS
-NONP.-
B3.3 D-F NOZZLE TO SAFE END WEIDS JII:AM GENERATOR NO. 21 TWO 1
1 ROC-A-5 S.E.
81-116,125 THREE 1
SPEAM GENERATOR NO. 22 CNE 1
1 BCC-B-5 S.E.
76,136,139 THREE 1
B3.4 B-G-1 PRESSURE RETAINING BOLTS
-tKNE-B3.5 AND STUDS (> 2 IN. DIA.)
AND B3.6
-NONE-B3.7 B-II INTEGRALLY IELDED VESSEL SUPPORTS roam ar-asis sire ronu no.........
PP9-A-8


_ _ . - _ _ _ _ _ _ _ _ _ _ _ _ - _ _                    - _. .
NORTHERN STATES POWER CO.
                                                                                                                                  . _
TA'lLE S1.3.1 PRAIRIE ISLAND UNIT 2
                                                                                                                                        -
PAG.E 2
_ .
OF 3
                                            .            .                                                                      .        .
INSERVICE INSPECTION-EXAMINATION  
NORTHERN STATES POWER CO.                                                                                                     TA'lLE         S1.3.1 PRAIRIE ISLAND UNIT                                     2                                                                     PAG.E           2     OF       3 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:         SIEAM GENERA'IQlS SUB EXAM                                     COMPONENT OR SYSTEM               R EQ'D, AMT.           ITEM                         INSPECTION INSP.
M AJOR ITEM:
ITEM                   RY                                                        PER. AMT. EXAM       IDENTIFICATION                 REPORT NO.
SIEAM GENERA'IQlS EXAM COMPONENT OR SYSTEM SUB INSP.
IT M O E EX M NED i
R EQ'D, AMT.
B3.8       B-I-2                               VESSEL CLADDING
ITEM INSPECTION ITEM PER.
* SrEAM GENERA'IOR NO. 21 INIEP SIDE             04E       36 SQ. 36 SQ. CP-1, BEIIM MANEY         76-124 IN.     IN.
AMT.
PA'IO1 OLTPLET SIDE           QE         36 SQ. 36 SQ. CP-2, BEIIM MANEY         76-124 IM.     IN.
EXAM IDENTIFICATION REPORT NO.
PNIOl STEAM GENERNIOR NO. 22
RY IT M O E EX M NED i
,
B3.8 B-I-2 VESSEL CLADDING SrEAM GENERA'IOR NO. 21 INIEP SIDE 04E 36 SQ.
INLET SIDE             04E       36 SQ. 36 SQ. CP-3, BEIIM MANEY         76-123 IN.     IN.
36 SQ. CP-1, BEIIM MANEY 76-124 IN.
PNIOi
IN.
!                                                            QJTLET SIDE           QiB       36 SQ. 36 SQ. CP-4, BEIIM MANEY         76-123 IN.     IN.
PA'IO1 OLTPLET SIDE QE 36 SQ.
PA'IOl B3.9       B-P                                   EXEMPPED COMKNENPS           -          -        -
36 SQ. CP-2, BEIIM MANEY 76-124 IM.
                                                                                                              -NONE-                   ,
IN.
B3.10     B-G-2                                 PRESSURE RETAINING l                                                     BOLTING (< 2 IN. DIA.)
PNIOl STEAM GENERNIOR NO. 22 INLET SIDE 04E 36 SQ.
S'IEAM GENERA'IOR NO. 21 MANWAY BOLTING INIEP MANEY           OE         5       6   BOLTS 1 'HIRU 6           76-99
36 SQ. CP-3, BEIIM MANEY 76-123 IN.
                                                                                    'INO       5       5   BOLTS 6 'HIRU 10           78-83 BOLTS 1 'HIRU 16           81-25,31,45
IN.
                                                                                    'HIREE     6       -
PNIOi QJTLET SIDE QiB 36 SQ.
ronu s7-aere s/7s                                                                                                                                     ronu no. ess-soes PP9-A-9                                                                                 .
36 SQ. CP-4, BEIIM MANEY 76-123 IN.
                                                                                  .
IN.
_      __    _m - -___ --
PA'IOl B3.9 B-P EXEMPPED COMKNENPS
-NONE-B3.10 B-G-2 PRESSURE RETAINING l
BOLTING (< 2 IN. DIA.)
S'IEAM GENERA'IOR NO. 21 MANWAY BOLTING INIEP MANEY OE 5
6 BOLTS 1 'HIRU 6 76-99
'INO 5
5 BOLTS 6 'HIRU 10 78-83 BOLTS 1 'HIRU 16 81-25,31,45
'HIREE 6
ronu s7-aere s/7s ronu no. ess-soes PP9-A-9 m


8 4
8 49 9-8 5
9 9
8 3
                                                                                                    -
O NO.
8 5
N M
8 3                                                                                       O N
S ON p R I
NO.
R oO TT 5
p S       ON                                                                           M R     I R
O CR F
oO         TT CR                          5                                               O F
EO 4,
1       T A     EO P P 4,
T 1
3        R     S E                          1                     4               4 E     N IR                           3,                   4, 1    3  N                                                  0             0       4, S       E                           935                   279           279 G                           982                   1 72         1 72
A P P 3
    .                                        - - -                - - -          - - -
R S
E      M                           681                   681           681 LE A                                 778                   778           778
1 4
      !GET
4 E
    .
E N
AAS TP N                     05                   06             06
1 3
:
N IR 3,
O I
4, 4,
61 1                 61 1         61 1 T                 UUU                   UUU           UUU M        A                  RRR                   RRR           RRR E      MC T
0 0
I EIF TI I
S E
MTT UH                I MTD UI        HHU T1T IT R         N                 1 61                 161           1 61 E
935 279 279 G
O J        D                  SSS                   SSS           SSS A
982 1 72 1 72 E
I TTT LLL TTT LLL TTT LLL M                           OOO                   OOO           OOO BBB                   BBB           BBB T.MA MX                    65         -          65         - 65             -
M 681 681 681 LE A 778 778 778
AE D.
!GET AAS TP N
O'MT.
05 06 06 I
E RA                    5 5'     6           55       6   55             6 P. R S
61 1 61 1 61 1 O
                          .
T M
A UUU UUU UUU E
MC RRR RRR RRR I
I UH UI HHU T
EI MTT MTD T1T F
I TI IT R
N 1 61 161 1 61 O
E J
I SSS SSS SSS D
TTT TTT TTT A
LLL LLL LLL M
OOO OOO OOO BBB BBB BBB T.MA M
65 65 65 X
A E D.
O' T.
MA 5 5' 6
55 6
55 6
E R
P.
E E
E E
E R
E E
E E
E SNE EO R
Eo R
EO R
IP NW H
iw N
I 1
O
'I 1
OT T
OT 1
1 YRA 22 M
D M
E N
O U
N NI S
M Y
Y lA A
R Y
A N
TX W
O G A
W O
IE N
T N W
N I
E A
A I N
A T
B M
R T A
M A
EO E L M
N P
N O P
N DT E
B T
E E
E E
NE IP                    EO        R          Eo        R    EO            R NW        H          iw            OTN I                  1 O  'I    1          OT        T                  1 1
)
                                                                                                          .
I M
Y R                                        2 A                                        2 M          D                              .
D I
M          E N                            O U        NIM                              N S                            Y                                    Y lA                  A            R        Y              A N        TX                  W            O  G    A              W O        IE                  N            T N      W              N I           E                A            A I      N              A T          B                M            R T      A              M A        EO                              E L      M N                      P            N  O                  P N        DT                                  B    T
G E
        . I           M
1 O
                                )
M NE I
D          E            E G       E              E O       M       NET      '
Y L
I I                Y   L 1I C       A           I     f         J           M A     N             T R      X f
I T
0 e        Q           A W E N I              Q E2     E                 0                       T A W           -            (                       S M O       N PTO I I                                                                 '
T C
    ,
A I
SNT E
f J
T UC    E ADP             E. Y R
M A N
2 TN S   N          O     G-
Q Q
                                  -
A W I
6 SAI                 G                                                                       7
f R
                                                                                                    /
X 0
L                     B                                                                 6 N SE                                                                                         6 0 RI C                                                                                         71 4 -
E N e
EEI HI V           BM 0                                                                   -
E2 E
3 A-7 T RR I E      UE ST 1                                                                 9 MP 9
0 T A S M W
3 RAS              I B                                                                 RP OR NPI N O
(
F
O N
                                                                                                  '
PTO I I SNT E U C T
4 :                         ,I;
E
                                    ;liij'                   ,4                 ''      ,'
. Y 2
ADP E
TN S R
O G
6 N
SAI G
7
/
L B
6 N SE 6 0 RI C 71 4 -
EEI 3 A-HI V 0
7 T RR BM 1
9 9
UE I
R A S I
3 MP E
ST B
RP OR N O
NPI F
4 :
,I;
;liij'
,4 l;
4 i


_ _ - - _ - - _ _ - _ - _ _ -                    . _ _ _ _ _ _ - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _                          . - _ _ - _ _ - _ _ _ _ _                  _
NORTHERN STATES POWER CO.
                                                                                                                                                                                                                -                        . . .
TAILE S1.4 PRAIRIE ISLAND UNIT 2
                                                                                          .                                  -                                                                                            .,      .
PAGE 1
'
OF 19 INSERVICE INSPECTION-EXAMINATION  
NORTHERN STATES POWER CO.                                                                                                                                                                 TAILE     S1.4                   __
,
PRAIRIE ISLAND UNIT                                                                         2                                                                                             PAGE       1       OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:           PIPING PRESSURE BO(.EDARY I
MAJOR ITEM:
SUB                 E.                                                                        N DE    I I N                                INSP. H EQ'D. AMT.           BTEM                 INSPECTION
PIPING PRESSURE BO(.EDARY I
.
SUB INSP.
ITEM         GORY                                                                            ITEM TO BE EXAMINED                              PER. AMT. EXAM     IDENTIFICATION             REPORT NO.
H EQ'D.
;                                                                                                                                                                                            ._
AMT.
!
BTEM INSPECTION E.
:                                  B4.1       B-F                                                         SAFE Em 'IO PIPING Am SAGE END IN BRANCH
N DE I I N ITEM PER.
.                                                                                                          PIPING WEIDS
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED B4.1 B-F SAFE Em 'IO PIPING Am SAGE END IN BRANCH PIPING WEIDS
)
)
REACIOR VESSEL REACIOR CORE COOLANT                               OE           1       1   W -1 A, 29-2BC-1 A       77 _W RW REPORT &
REACIOR VESSEL REACIOR CORE COOLANT OE 1
77-022,112
1 W -1 A, 29-2BC-1 A 77 _W RW REPORT &
'
77-022,112 SYS'IEMS
'
'INO 1
SYS'IEMS                                           'INO         1       1 BCC-B-1 S.E.             81-W RW REPORT L 81-21
1 BCC-B-1 S.E.
                                                                                                                                                                                'IEREE       2       -
81-W RW REPORT L 81-21
4                                                                                                                           SAFETY IMJECTION                                   QE           1       1 W-2, 4-2RC-14A           77 _W RW REPORT &
'IEREE 2
77-024,113 SYSIEMS                                           'IHREE       1
4 SAFETY IMJECTION QE 1
                                                                                                                                                                                                    -
1 W-2, 4-2RC-14A 77 _W RW REPORT &
I STEAM GENERA'IOR NO. 21 i                                                                                                                           REACIOR CORE COOLAMP                               'INO         1         1 BCC-A-5 S.E.             81-116,125 I                                                                                                                           SYS'IEM                                           'IHREE       1       -
77-024,113 SYSIEMS
SIEAM GENERA'IOR No. 22 REACIOR GEE COOLANP                                 QE         1         1 W-5, 31-2HC-2B           76-136,139 i                                                                                                                           SYSTEM                                             'IHREE     1       -
'IHREE 1
!
I STEAM GENERA'IOR NO. 21 i
!                                                                                                              PRESSURIZER
REACIOR CORE COOLAMP
,
'INO 1
SAFETY LINES                                       OE         2       2 W-1, (8010A)             76-26,53 W-1, (8010B)             76-61,52
1 BCC-A-5 S.E.
                                                                                                                                                                                'INO       2       2 W-1, (8010A)             80-187,192,192R,192Ra W-1, (80108)             80-190,191,191R
81-116,125 I
'
SYS'IEM
W-1, (8010A)             01-7,7R,38,61
'IHREE 1
,
SIEAM GENERA'IOR No. 22 REACIOR GEE COOLANP QE 1
W-1, (8010B)             81-22,22R,40,64 SURGE LINE                                         'IND         1       1 W-15 SE, 10-2RC-4       78-31,100 RELIEF LINE                                         'IND         1       1 W-1B                     80-58,88,169 1                                                                                                                                                                               'DIREE       1       -
1 W-5, 31-2HC-2B 76-136,139 i
4 FORM s 7-as7e e/7s                                                                                                                                                                                           ronne no.ess-soas PP9-A-13                                                                                                                   .                        .
SYSTEM
                                                                                                                                                                                                                                                                  ;
'IHREE 1
PRESSURIZER SAFETY LINES OE 2
2 W-1, (8010A) 76-26,53 W-1, (8010B) 76-61,52
'INO 2
2 W-1, (8010A) 80-187,192,192R,192Ra W-1, (80108) 80-190,191,191R 2
W-1, (8010A) 01-7,7R,38,61 W-1, (8010B) 81-22,22R,40,64 SURGE LINE
'IND 1
1 W-15 SE, 10-2RC-4 78-31,100 RELIEF LINE
'IND 1
1 W-1B 80-58,88,169 1
'DIREE 1
4 FORM s 7-as7e e/7s ronne no.ess-soas PP9-A-13


  - _ _ _ . - _ _            _ .-_ _ _ _                                      .          _ ._
l NORTHERN STATES POWER CO.
                                                  ,    .                                                                                .
TATLE S1.4 PRAIRIE ISLAND UNIT 2
l NORTHERN STATES POWER CO.                                                                                       TATLE   S1.4
PAGE 2
!                  PRAIRIE ISLAND UNIT                   2                                                                       PAGE     2     OF 19 i                 INSERVICE INSPECTION-EXAMINATION  
OF 19 i
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PIPING PRESSURE BOUNDARY t
MAJOR ITEM:
EUS
PIPING PRESSURE BOUNDARY t
                                                                        " 8 "         INSP.     R EO'D, AMT.         ITEM                 INSPECTION
" 8 "
!                                              E-             N DE R TI N ITEM                 GORY            ITEM TO 8E EXAMINED        PER.       AMT. EXAM-     IDENTIFICATION           REPORT NO.
EUS INSP.
j
R EO'D, AMT.
                                                                                                                            ~
ITEM INSPECTION E-N DE R TI N ITEM PER.
.i
AMT.
.
EXAM-IDENTIFICATION REPORT NO.
B4.1                 B-F     (00tff'D) i
j GORY ITEM TO 8E EXAMINED
~
.i B4.1 B-F (00tff'D) i
^
^
SPRAY LINE                   'IWO           1       1 W-228                   80-56,56R,86,167 W-22B                   81-5,5R,24
SPRAY LINE
                                                                                    'IHREE         1       -
'IWO 1
!
1 W-228 80-56,56R,86,167 W-22B 81-5,5R,24
B4.2                 B-G-1   PRESSURE REMAINING BOLTS       -              -        -
'IHREE 1
                                                                                                                -N WE-B4.3                         Ato S' IUDS ( >2 IN. DIA.)                                                       l AND
B4.2 B-G-1 PRESSURE REMAINING BOLTS
,                    B4.4
-N WE-B4.3 Ato S' IUDS ( >2 IN. DIA.)
!
l AND B4.4 B4.5 B-J CIRCUMPERENPIAL AIO I
B4.5                 B-J     CIRCUMPERENPIAL AIO I                                                   LONGIWDINAL PIPE WEIDS LONGI'IUDINAL WEIDS         -              -        -
LONGIWDINAL PIPE WEIDS LONGI'IUDINAL WEIDS
                                                                                                                -NONE-CIRCUMFERENPIAL WELDS (1.5 IM. NOM.DIA.' SYS'IEMS)
-NONE-CIRCUMFERENPIAL WELDS (1.5 IM. NOM.DIA.' SYS'IEMS)
;
I SEAL INJECTION A (NE l
I SEAL INJECTION A           (NE           -        -
'IWO 1
l                                                                                  'IWO           1       1 W-4                   78-12 mREE         i       -
1 W-4 78-12 mREE i
4 SEAL INJECTION B           (NB             1       1 W-9                   77-57
4 SEAL INJECTION B (NB 1
'
1 W-9 77-57
                                                                                    <1yo           _        _
<1yo
                                                                                    'IHREE         1       -
'IHREE 1
(2.0 IN. NOM DIA. SYS.)
(2.0 IN. NOM DIA. SYS.)
;                                                      SEAL INJECTION A             mE             3       3 W-21,22,24             77-18,19,20
SEAL INJECTION A mE 3
                                                                                    'IWO           3       3 W-34,35,36             78-14,16,17
3 W-21,22,24 77-18,19,20
                                                                                    'IHREE         4       -
'IWO 3
SEAL INJECTION B             OE             4       4 W-54,55,58,59           77-10,11,13,12
3 W-34,35,36 78-14,16,17
                                                                                    'IWO           5       5 W,29,33,34,36,37       80-91,90,89,92,93
'IHREE 4
                                                                                    'mREE         4       -
SEAL INJECTION B OE 4
Fonu s7 a47s e/7e                                                                                                             ronu no.ess-sees PP9-A-14                                                   .            .
4 W-54,55,58,59 77-10,11,13,12
'IWO 5
5 W,29,33,34,36,37 80-91,90,89,92,93
'mREE 4
Fonu s7 a47s e/7e ronu no.ess-sees PP9-A-14


  - _ _ _ - - _ _ _ _ _ .. . _ - . _ _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ _ _ - . _                                                    .-            -
i NORTHERN STATES POWER CO.
                                                                                                .
TABLE St.4 PRAIRIE ISLAND UNIT
                                                                                                        .                                                                          .
?
i                                     NORTHERN STATES POWER CO.                                                                                                             TABLE   St.4 PRAIRIE ISLAND UNIT                                             ?                                                                     PAGE       'l     OF 19 INSERVICE INSPECTION-EXAMINATION  
PAGE
'l OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:         PIPING PDFR91RE BOLNDARY SUB
M AJOR ITEM:
                                                                                            ^                             I INSP. R EQ'D. AMT.         STEM                   INSPECTION TE.             N DE   I Ti N EXAM      IDENTIFICATION
PIPING PDFR91RE BOLNDARY
,
^
ITEM                                GORY                ITEM TO BE EXAMINED    PER. AMT.                                           REPORT NO.
I SUB INSP.
_
R EQ'D.
B4.5                               B-J               (00tff'D)
AMT.
OIARGING LINE           WE         6           6   W-81,82A,80,83B,       77-9,8,7,6,5,4 CVCS                                               83A,83
STEM INSPECTION TE.
-
N DE I Ti N ITEM PER.
4WO       6           6   W-32,33,36             78-20,21,22
AMT.
;                                                                                                                                                        W-37,38,39             80-96,97,98
EXAM IDENTIFICATION REPORT NO.
                                                                                                                              'IHREE     6           -
GORY ITEM TO BE EXAMINED B4.5 B-J (00tff'D)
2 IEIDOM4 LINE AND         WE         1           1 W-22                   77-27 NAIN LINE               TWO       2           2   W-6,7                   80-94,95 I                                                                                                                             WIREE     2           -
OIARGING LINE WE 6
l                                                                                                     AUXILIARY SPRAY         WE         1           1 W-1                     77-28 10 PRESSURIZER           TWO         1           1 W-11                   78-71
6 W-81,82A,80,83B, 77-9,8,7,6,5,4 CVCS 83A,83 4WO 6
;
6 W-32,33,36 78-20,21,22 W-37,38,39 80-96,97,98
DIREE     2           -
'IHREE 6
RESIDUAL 'IEMPERATURE   WE         1           1 W-20                   77-42 DE1ECTOR SAKE OFF-       4WO         1           1 W-6                     80-177 ODID IEG A               THREE     1
2 IEIDOM4 LINE AND WE 1
                                                                                                                                                      -
1 W-22 77-27 NAIN LINE TWO 2
RESILE TEMPERATURE       WE         1           1 W-18                   77-60 DE'IEClOR 1AKE OFF-     4WD         2           2 W-8,9                   80-116,117
2 W-6,7 80-94,95 I
,
WIREE 2
00ID IEG B               11REE     1
l AUXILIARY SPRAY WE 1
                                                                                                                                                      -
1 W-1 77-28 10 PRESSURIZER TWO 1
i
1 W-11 78-71 DIREE 2
'
RESIDUAL 'IEMPERATURE WE 1
RESIDUAL 1EMPERATURE     WE         1           1 W-24                   77-58
1 W-20 77-42 DE1ECTOR SAKE OFF-4WO 1
'
1 W-6 80-177 ODID IEG A THREE 1
IEIEC10R 1AKE OFF-       1ND       1           1 W-29                   80-178 IDP LEG A                 'IHREE     2           -
RESILE TEMPERATURE WE 1
'
1 W-18 77-60 DE'IEClOR 1AKE OFF-4WD 2
RESIDUAL TEMPERA'IURE     WE         1           1 W-19                   77-59 DETECTOR 'IRKE OFP-       1ND       1           1 W-23                   80-104 IDP IEG B                 'IHREE     2           -
2 W-8,9 80-116,117 00ID IEG B 11REE 1
!                                                                                                    SAFETY INJECPION         OE       -            -
i RESIDUAL 1EMPERATURE WE 1
HIGi HEAD A               TWO       1           1 W-2                     78-15 MIREE     1
1 W-24 77-58 IEIEC10R 1AKE OFF-1ND 1
                                                                                                                                                      -
1 W-29 80-178 IDP LEG A
!
'IHREE 2
FORMI                         476 4/78                                                                                                                 FOR04 NO. ISI-S tel
RESIDUAL TEMPERA'IURE WE 1
1 W-19 77-59 DETECTOR 'IRKE OFP-1ND 1
1 W-23 80-104 IDP IEG B
'IHREE 2
SAFETY INJECPION OE HIGi HEAD A TWO 1
1 W-2 78-15 MIREE 1
FORMI 476 4/78 FOR04 NO. ISI-S tel


  - _ _ _ _ _ - _ _ - _ _ . _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ - _ -                                        _ _ _ _ _
NORTHERN STATES POWER CO.
                                                                                                      ,      .                                                                ,    ,
TATLE R1_4 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                 TATLE   R1_4 PRAIRIE ISLAND UNIT     2                                                                 PAGE     a     OF to INSERVICE INSPECTION-EXAMINATION  
PAGE a
OF to INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PTPTNG PRFRRIIRE InNDARY SUB                                             INSP. R EO'D. AMT.         ITEM                 INSPECTION ITEM E               N DESCRI Tl N                       EXAM GORY            ITEM TO BE EXAMINED    PER. AMT.           IDENTIFICATION           REPORT NO.
MAJOR ITEM:
B4.5     B-J     (CONP'D)
PTPTNG PRFRRIIRE InNDARY SUB INSP.
SAFETY INJECTIN           WE         1       1 W-7                   77-43 IIIGi llEAD B             TWO           .
R EO'D.
                                                                                                                                                        -
AMT.
111REE     1     -
ITEM INSPECTION E
'
N DESCRI Tl N ITEM PER.
DRAIN LINE W               WE         1       1 W-14                   77-26 CROSSOVER A               TWO       1       1 W-7                   78-13 DIREE     1     -
AMT.
8 REACIOR VESSEL             WE         1       1 W-12                   77-17 SA M INJECTIW             'IWO       1       1 W-9                   78-19 IDW llEAD A               WIREE     1     -
EXAM IDENTIFICATION REPORT NO.
'
GORY ITEM TO BE EXAMINED B4.5 B-J (CONP'D)
REACTOR VESSEL           WE       -      -
SAFETY INJECTIN WE 1
SAFET1Y INJECTION         TWO       1       1 W-2                   78-23 ION HEAD B               'DIREE     1     -
1 W-7 77-43 IIIGi llEAD B TWO 111REE 1
;                                                                                                        (3.0 IN. NOM. DIA. SYSTEMS) l l                                                                                                           SPRAY 'IO PRESSURIZER     WE       3       3 W-5,7,8               77-38,40,39
DRAIN LINE W WE 1
'
1 W-14 77-26 CROSSOVER A TWO 1
BRANCII A                 iWO       3       3 W-20,24,25             80-121,120,119
1 W-7 78-13 DIREE 1
                                                                                                                                      'HiREE   4       -
8 REACIOR VESSEL WE 1
:                                                                                                          SPRAY 'IO PRESSURIZER     NE       2       2 W-18,19               77-48,46 l                                                                                                           BRAN 01 B                 'INO       3       3 W-3,4,5               80-118,122,103 TIREE     2
1 W-12 77-17 SA M INJECTIW
'
'IWO 1
                                                                                                                                                          -
1 W-9 78-19 IDW llEAD A WIREE 1
RESIDUAL TEMPERATURE     WB         1       1 W-5                   77-41
REACTOR VESSEL WE SAFET1Y INJECTION TWO 1
,                                                                                                          DETECTOR IEIURN A         4WD         1       1 W-2                   78-66
1 W-2 78-23 ION HEAD B
'
'DIREE 1
11REE       1
(3.0 IN. NOM. DIA. SYSTEMS) l l
                                                                                                                                                        -
SPRAY 'IO PRESSURIZER WE 3
l                                                                                                           RESIDUAT. TEMPERATURE     WE         1       1 W-7                   77-56 l                                                                                                           DETECTOR RETURN B         4WD       1       1 W-6                   78-85 l                                                                                                                                     UIREE     1     -
3 W-5,7,8 77-38,40,39 BRANCII A iWO 3
1 raggs eneg vanu na.,s,.....
3 W-20,24,25 80-121,120,119
'HiREE 4
SPRAY 'IO PRESSURIZER NE 2
2 W-18,19 77-48,46 l
BRAN 01 B
'INO 3
3 W-3,4,5 80-118,122,103 TIREE 2
RESIDUAL TEMPERATURE WB 1
1 W-5 77-41 DETECTOR IEIURN A 4WD 1
1 W-2 78-66 11REE 1
l RESIDUAT. TEMPERATURE WE 1
1 W-7 77-56 l
DETECTOR RETURN B 4WD 1
1 W-6 78-85 l
UIREE 1
1 raggs ene vanu na.,s,.....
g


  - -      _ _      _ - _ - _ _ _ _ _ _ _ _ , _                          .      _          . _ _ _
NORTHERN STATES POWER CC.
                                                .        .                                                                            ,      .
TA!LE Sl+4 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CC.                                                                                                       TA!LE Sl+4 PRAIRIE ISLAND UNIT                               2                                                                             PAGE       5     op 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 5
op 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PIPING PRESSURF. 0011DARY
MAJOR ITEM:
                                                                                                                                                              .
PIPING PRESSURF. 0011DARY M
SUB M                                      ""                  INSP.           R EO'O. AMT.         ITEM                   INSPfC'ItON E.                                   N DESC I Ti N ITEM                                                                         PER.             AMT. EXAM     IDENTIFICATION           SEPOH1 NO.
SUB INSP.
GORY                                     ITEM TO BE EXAMINED B4.5   B ,J                               (OWT'D)
R EO'O.
PRESSURIZER RELIEF           WE                 -      -
AMT.
LINE A                       'INO               -      -
ITEM INSPfC'ItON E.
TIREE               1     -
N DESC I Ti N ITEM PER.
PRESSURIZER RELIEF           WE                   1       1 W-4                     77-47 LINE B,                     'IND                 1       1 W-9                     80-99 THREE               1     -
AMT.
EXAM IDENTIFICATION SEPOH1 NO.
GORY ITEM TO BE EXAMINED B4.5 B,J (OWT'D)
PRESSURIZER RELIEF WE LINE A
'INO TIREE 1
PRESSURIZER RELIEF WE 1
1 W-4 77-47 LINE B,
'IND 1
1 W-9 80-99 THREE 1
(4.0 IN. NOM. DIA. SYSTEMS)
(4.0 IN. NOM. DIA. SYSTEMS)
SAFETY INJECTIm               WE                   1     -
SAFETY INJECTIm WE 1
NONE m 'mESE IDW HEAD A                   TWO                 -      -
NONE m 'mESE IDW HEAD A TWO WFTIE ARE ACCES-WIREE SIBIE; TIEY ARE IOCA'IED WITHIN ME ONCREfB SHIELD WALL SAFETY INJECTIm QE (SAME AS IOOP A)
WFTIE ARE ACCES-WIREE               -      -
ION HEAD B
SIBIE; TIEY ARE IOCA'IED WITHIN ME ONCREfB SHIELD WALL SAFETY INJECTIm               QE                 -      -
'IWO DIREE 1
(SAME AS IOOP A)
(6.0 IN. NOM. DIA. SYSIEMS) i REACTOR VESSEL OE SAFETY INJECTIm SWO 1
ION HEAD B                   'IWO               -      -
1 W-6 80-100 IDWHEAD A MIREE 1
DIREE               1     -
REACTOR VESSEL WE 1
(6.0 IN. NOM. DIA. SYSIEMS) i
1 W-9
'
(+W-8) 76-37 (+76-38)
REACTOR VESSEL               OE                 -      -
SAFETY INJECTION
SAFETY INJECTIm               SWO                 1       1 W-6                     80-100 IDWHEAD A                   MIREE               1     --
'IWO l
REACTOR VESSEL               WE                   1       1 W-9   (+W-8)           76-37 (+76-38)
IOW HEAD B UIREE 1
,
i SAFELY INJECTION OE l
SAFETY INJECTION             'IWO               -      -
HIGi LEAD A
l                                                      IOW HEAD B                   UIREE               1     -
'lWO i
i SAFELY INJECTION             OE                 -      -
HIREE 1
l                                                    HIGi LEAD A                   'lWO               -      -
l l
i                                                                                  HIREE               1     -
roggggene l
l     -
l     roggggene                                                                                                                                        ,.      . ........
                                                                                .                    .
,.                                                              .


                          .      .                                                                            .
l NORTHERN STATES POWER CO.
l
TAOLE S1 4 PRAIRIE ISLAND UNIT
                                                                                                        .
?
* NORTHERN STATES POWER CO.                                                                           TAOLE S1 4                           '
PAGE 6
PRAIRIE ISLAND UNIT ?                                                                               PAGE     6       OF 19 INSERVICE INSPECTION-EXAMINATION  
OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:       PIPING PRESSURE BOLNDARY M                   "          8               R EQ'O, SUB E-               N DE     I Tl N         INSP.          AMT.        ITEM                   INSPECTION ITEM          GORY              ITEM TO BE EXAMINED      PER. AMT. EXAM     IDENTIFICATION           REPORT NO.
M AJOR ITEM:
3 I   B4.5       B-J       (00tff'D)
PIPING PRESSURE BOLNDARY M
SAFETY INJECTIN           OE           1       1 W-1                     76-143
8 SUB INSP.
;
R EQ'O, AMT.
HIG1 IEAD B               1WO             .
ITEM INSPECTION E-N DE I Tl N ITEM PER.
                                                                                -
AMT.
i
EXAM IDENTIFICATION REPORT NO.
                                                            'HIREE       -      -
GORY ITEM TO BE EXAMINED 3
i PRESSURIZER SAFE 71Y       OE           -      -
I B4.5 B-J (00tff'D)
i                                LINE A.                   'INO         3       3   W-8,W-3,4               80-102,81-59,58
SAFETY INJECTIN OE 1
                                                            'I11REE       1     -
1 W-1 76-143 HIG1 IEAD B 1WO
!
'HIREE i
!                                PRESSURIZER SAEETY         OE           2       2   W-1,2                   76-54,61 i                               LINE B                     1NO         2       2   W-6,7                   81-57,56
i PRESSURIZER SAFE 71Y OE i
'
LINE A.
1HREE         1     -
'INO 3
1 PID-CAP A                 QE           -      -
3 W-8,W-3,4 80-102,81-59,58
L' gye         _      _
'I11REE 1
g 1
PRESSURIZER SAEETY OE 2
                                                            'HIREE       1
2 W-1,2 76-54,61 i
                                                                                -
LINE B 1NO 2
4 PID-CAP B                   QE         -      -
2 W-6,7 81-57,56 1HREE 1
1NO         1       1 W-1                     80-101
1 PID-CAP A QE L'
-                                                            'niREE     -      -
gye g
,
'HIREE 1
,                          (8.0 IN. NOM. DIL. SYSTEMS)
1 PID-CAP B QE 4
RESIDUAL HEAT REMOVAL       OE           2       2 W-11,12                 77-33,32 l                               'mKE OFF A                 1WO         3       3 W-5,6,8                 78-90,94,92
1NO 1
'
1 W-1 80-101
                                                            'nmEE       3       -
'niREE (8.0 IN. NOM. DIL. SYSTEMS)
IESIDUAL 1 RAT RENNAL       OE           3       8 W-25,27,28             76-74,58,56 l                               'mKE OPP B                                         (+W-8,10,11,12,26 )     (+76-70,71,72,73,58)
RESIDUAL HEAT REMOVAL OE 2
!                                                            'INO         2       2 W-12,14                 78-95,91
2 W-11,12 77-33,32 l
'
'mKE OFF A 1WO 3
                                                            'DIREE       3       -
3 W-5,6,8 78-90,94,92
,
'nmEE 3
'
IESIDUAL 1 RAT RENNAL OE 3
FOftM 3 7-2474 e/78                                                                                                   FOftM 000. BSt-leet PP9-A-18
8 W-25,27,28 76-74,58,56 l
                                                          .          .
'mKE OPP B
                              ,
(+W-8,10,11,12,26 )
(+76-70,71,72,73,58)
'INO 2
2 W-12,14 78-95,91
'DIREE 3
FOftM 3 7-2474 e/78 FOftM 000. BSt-leet PP9-A-18


____ _ __    .-_          _          _ _ _ _ _ _
NORTHERN STATES POWER CO.
                                  .                .                                                              ,      .
TABLE SI 4 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                             TABLE SI 4 PRAIRIE ISLAND UNIT               2                                                                   PAGE       7       OF 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 7
OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PIPING PRESSURE BOWDARY M
MAJOR ITEM:
SUB           E-                      N  E    IT N        INSP. R EQ'D. AMT.         ITEM                   INSPECTION ITEM       GORY                                              PER. AMT. EXAM     IDENTIFICATION             REPORT NO.
PIPING PRESSURE BOWDARY M
ITEM TO BE EXAMINED
SUB INSP.
.
R EQ'D.
B4.5     B-J         (CONF'D)
AMT.
ITEM INSPECTION E-N E
IT N ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED B4.5 B-J (CONF'D)
(10.0 IN. NOM. DIA. SYSTEMS)
(10.0 IN. NOM. DIA. SYSTEMS)
RESIDUAL HEAT BEiCVAL             WE         l'     2 W-1   (+W-9)           76-9 (+76-7)
RESIDUAL HEAT BEiCVAL WE l'
RETURN B                         'INO       1       1 W-7                     78-102
2 W-1
                                                                        'IHREE     1       -
(+W-9) 76-9 (+76-7)
PRESSURIZER SURGE                 WE         1       4 W-12 (+W-11,13,14)     76-81 (+76-78,81,79)
RETURN B
,                                      LINE B                           'IND       1       1 W-14                   78-101
'INO 1
                                                                        'IHREE   2       -
1 W-7 78-102
,                                  (12.0 IN. NOM. DIA. SYSTEMS)
'IHREE 1
!
PRESSURIZER SURGE WE 1
!
4 W-12 (+W-11,13,14) 76-81 (+76-78,81,79)
'
LINE B
ACCWULA'IOR DISCHARGE A           WE         1       1 W-11                   77-35 TWO       1       1 W-7                     80-35,36
'IND 1
                                                                        'IHREE     1     -
1 W-14 78-101
l ACCUPULATOR DISchARG B           OE       2       5 W-1,15 (+W-13,14,       76-146,18 (+76-20,
'IHREE 2
: 16)                     21,19)
(12.0 IN. NOM. DIA. SYSTEMS)
THO       1       1 W-13                     80-34,37 THREE     2       -
ACCWULA'IOR DISCHARGE A WE 1
i                                   (27.5 IN. NOM. DIA. SYSTEMS)
1 W-11 77-35 TWO 1
REACIOR CORE COXMr               OE       -        -
1 W-7 80-35,36
CDID EG (INLET) A                 INO       -        -
'IHREE 1
THREE     1       -
l ACCUPULATOR DISchARG B OE 2
REACIOR CORE COOLANT             WE       -        -
5 W-1,15 (+W-13,14, 76-146,18 (+76-20, 16) 21,19)
COID EG (INIEf) B                 1NO       1       1 BCC-B-12                 81-87,94 4                                                                       THREE    -        -
THO 1
l rapp9'_rg g */r*                                                                                                       ranu no. isi-issi
1 W-13 80-34,37 THREE 2
i (27.5 IN. NOM. DIA. SYSTEMS)
REACIOR CORE COXMr OE CDID EG (INLET) A INO THREE 1
REACIOR CORE COOLANT WE COID EG (INIEf) B 1NO 1
1 BCC-B-12 81-87,94 THREE 4
l ra p9'_rg g */r*
ranu no. isi-issi p


_ _ - _ _ - _ - _ _ _ _ _ _ _ _ _ _ _ __ -_________ - _______ ___________
I NORTHERN STATES POWER CO.
                                                                                  .      .                                                                    ,      ,
TACLE S1.4 PRAIRIE ISLAND UNIT 2
I NORTHERN STATES POWER CO.                                                                                                                             TACLE S1.4 PRAIRIE ISLAND UNIT                                                               2                                                                   PAGE       8     OF 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 8
OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ll EM:         PIPING PRESSURE BOLNDARY SUB                                                               N DE RI TIO              INSP. R EO'D. AMT.         ITEM                   INSPECTION E
MAJOR ll EM:
IT EM                                                             ITEM TO E;E EXAMINED      PER. AMT. EXAM     IDENTIFICATION             REPORT NO.
PIPING PRESSURE BOLNDARY SUB INSP.
GORY B4.5                                                   B-J     (CONT'D)
R EO'D.
;                                                                                    (29.0 IN. NOM. DIA. SYSTEMS)
AMT.
!                                                                                      REACIOR CORE COOLAMP       WE         1       1 W-3, 29-2RC-1A         77-044 l
ITEM INSPECTION E
IUP IEG (OUILET) A         1NO       -        -
N DE RI TIO IT EM PER.
                                                                                                                    'DIREE     -        -
AMT.
REPCIOR CORE COOLAMP       WE         -        -
EXAM IDENTIFICATION REPORT NO.
IDP IEG (OUTIEP) B         1WO       -        -
GORY ITEM TO E;E EXAMINED B4.5 B-J (CONT'D)
.                                                                                                                  'niREE     1       -
(29.0 IN. NOM. DIA. SYSTEMS)
REACIOR CORE COOLAMP WE 1
1 W-3, 29-2RC-1A 77-044 l
IUP IEG (OUILET) A 1NO
'DIREE REPCIOR CORE COOLAMP WE IDP IEG (OUTIEP) B 1WO
'niREE 1
i (31.0 IN. NOM. DIA. SYSTEMS)
i (31.0 IN. NOM. DIA. SYSTEMS)
,
REACIOR CWE COOIMP WE 1
REACIOR CWE COOIMP         WE         -        -
CROSSOVER A
1 CROSSOVER A                 'INO       2       2 BCC-A-6                 81-1'15,115R,152 BCC-A-7                 81-117,124
'INO 2
                                                                                                                    'HIREE     -        -
2 BCC-A-6 81-1'15,115R,152 BCC-A-7 81-117,124
l                                                                                      REACIOR CORE COOLAMP         WE         1       3 W-6 (+W-7,8 )           76-140 (+76-141,142)
'HIREE l
CROSSOVER B                 1WO       -        -
REACIOR CORE COOLAMP WE 1
                                                                                                                    'HIREE     1     -
3 W-6 (+W-7,8 )
B4.6                                                 B-J     BRANCil PIPE CONNECTICH WEIDS EXCEEDING SIX INCH DIAFEER ACCLMJIKIOR DISC!!AIGE A     -          -        -
76-140 (+76-141,142)
ACCtMJLATOR DISCilABGE B   WE         1       1 W-R                     76-145,137
CROSSOVER B 1WO
'
'HIREE 1
RESIDUAL HEAT REMOVAL       -        -        -
B4.6 B-J BRANCil PIPE CONNECTICH WEIDS EXCEEDING SIX INCH DIAFEER ACCLMJIKIOR DISC!!AIGE A ACCtMJLATOR DISCilABGE B WE 1
TAKE OFF A RESIDUAL IIEAT REMOVAL     IND         1       1 W-Roor                 81-113,121,126 TAKE OFF B r o u s7-a47s e/7s                                                                                                                                                   ronu wo. sse-soos 79-A-20
1 W-R 76-145,137 RESIDUAL HEAT REMOVAL TAKE OFF A RESIDUAL IIEAT REMOVAL IND 1
                                                                                                                  .
1 W-Roor 81-113,121,126 TAKE OFF B r o u s7-a47s e/7s ronu wo. sse-soos 79-A-20


_ _ _ _ _ _ _ - _ - _ _ _            _ _ - _ - - - _ - _ - _ _ _ _ _ _ _ _ _ _ _ _                            ____ - _
NORTHERN STATES POWER CO.
___ -                  -    __                _      - _      .-.      -_
TA!LE S1.4 PRAIRIE ISLAND UNIT 2
                                                                                      .      -                                                                                .          .
PAGE 9
NORTHERN STATES POWER CO.                                                                                                                       TA!LE S1.4 PRAIRIE ISLAND UNIT                                             2                                                                               PAGE         9       OF 19
OF 19 INSERVICE INSPECTION-EXAMINATION  
:                            INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:         PIPING PRESSURE BOUNDARY 4
M AJOR ITEM:
3UB                                     E-                          DE    I TION                INSP. R EO'O. AMT.           ITEM                         INSPECTION
PIPING PRESSURE BOUNDARY 3UB INSP.
.                              ITEM               GORY                                                                            PER. AMT. EXAM       IDENTIFICATION                   REPCRT NO.
R EO'O.
ITEM TO 8E EXAMINED
AMT.
'
ITEM INSPECTION 4
B4.6       B ,J                                           (CONF'D)
E-DE I TION ITEM PER.
PRESSURIZER SURGE                   'HIREE       1     -
AMT.
I                                                                                           ME B l                             B4.7       B-J                                           BRANCH PIPE C0tt4ECTION
EXAM IDENTIFICATION REPCRT NO.
'
GORY ITEM TO 8E EXAMINED B4.6 B,J (CONF'D)
WEIDS SIX INCH DIMF11TR AND SMALLER (6.0 IN. NOM. DIA. SYS'IDE)
PRESSURIZER SURGE
PID-CAP A                           -          -      -
'HIREE 1
PID-CAP B                           -          -      -
I ME B l
;                                                                                          SMEIY IMJECTION                     -          -      -
B4.7 B-J BRANCH PIPE C0tt4ECTION WEIDS SIX INCH DIMF11TR AND SMALLER (6.0 IN. NOM. DIA. SYS'IDE)
i                                                                                          HIGi HEAD A SAFETY IMJECTION                     03E         1       1   W-R                       76-138,144 HIGi HEAD B i
PID-CAP A PID-CAP B SMEIY IMJECTION i
HIGi HEAD A SAFETY IMJECTION 03E 1
1 W-R 76-138,144 HIGi HEAD B i
(3.0 IN. NOM. DIA. SYSTEMS)
(3.0 IN. NOM. DIA. SYSTEMS)
.
SPRAY 'IO PRESSURIZER BRANCH A SPRAY 'IO PRESSURIZER
SPRAY 'IO PRESSURIZER               -          -      -
'DIREE 1
"
BHANCH B RESIDUAL 'IEMPERA'1VRE DETEC'IOR RE'IURN A l
BRANCH A SPRAY 'IO PRESSURIZER               'DIREE       1       -
RESIDUAL 'IEMPERA'IURE DE'IEC'IOR RE'IURN B j
BHANCH B
i 4
                                                                                                          .
FORM i7-2476 4/78 rwg pg g33.gg3, i
!                                                                                            RESIDUAL 'IEMPERA'1VRE               -          -        -
PP9-A-21
!                                                                                          DETEC'IOR RE'IURN A l                                                                                           RESIDUAL 'IEMPERA'IURE               -          -      --
                                                                                                                                                                                        ,
j                                                                                          DE'IEC'IOR RE'IURN B i
4
',                          FORM i7-2476 4/78                                                                                                                                                     rwg pg g33.gg3, i
'
PP9-A-21                                                                                   .              .


__ _ - _ _ . - _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                              _ - - _ -_.
NORTHERN STATES POWER CO.
                                                                                                              . _
TABLE S1.4 PRAIRIE ISLAND UNIT
                                                                .                                                                                .      .
~)
NORTHERN STATES POWER CO.                                                                                                           TABLE S1.4 PRAIRIE ISLAND UNIT                                     ~)                                                                         PAGE     10     OF 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 10 OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PIPING PRESSURE BOUNDARY SUB EXAM           COMPONENT OR SYSTEM INSP. R EO'D. AMT.         ITEM                 INSPECTION ITEM                                                             PER.       AMT. EXAM     IDENTIFICATION           REPORT NO.
MAJOR ITEM:
[ORY            IT M TO E EX M NED B4.7                         B-J     (OONT'D)
PIPING PRESSURE BOUNDARY EXAM COMPONENT OR SYSTEM SUB INSP.
R EO'D.
AMT.
ITEM INSPECTION
[ORY ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
IT M TO E EX M NED B4.7 B-J (OONT'D)
(2.0 IN. NOM. DIA. SYS'IEMS)
(2.0 IN. NOM. DIA. SYS'IEMS)
IESIDUAL TEMPERATURE           -            -      -
IESIDUAL TEMPERATURE DETECTOR 'IAKE OFF OOLD IEG A BESIDUAL 'IEMPERATURE TWO 1
DETECTOR 'IAKE OFF OOLD IEG A BESIDUAL 'IEMPERATURE           TWO           1       1 W-ROOP                 81-89 DETECIOR 'IRKE OFF ODED IEG B NAIN LINS W                     -            -      -
1 W-ROOP 81-89 DETECIOR 'IRKE OFF ODED IEG B NAIN LINS W CROSSOVER A DRAIN LINE W WE 1
CROSSOVER A DRAIN LINE W                   WE             1       1 W-R                   76-131 CHOSSOVER B CHAIGING LINE CVCS             -            -      -
1 W-R 76-131 CHOSSOVER B CHAIGING LINE CVCS REACTOR VESSEL SAFETY INJECTION IDW HEAD A REACIOR VESSEL
REACTOR VESSEL                 -            -      -
'IHREE 1
SAFETY INJECTION IDW HEAD A REACIOR VESSEL                 'IHREE         1     -
SAFETY INJECTION IDW HEAD B B4.8 B-J SOCKET WEIDS (2.0 IN. NOM. DIA. SYSTEMS)
SAFETY INJECTION IDW HEAD B B4.8                       B-J     SOCKET WEIDS
SEAL INJECTIN A OE
                                                                                                                                                                                    ,
'INO 1
(2.0 IN. NOM. DIA. SYSTEMS)
1 SW-9 78-25 THREE 1
SEAL INJECTIN A                 OE           -      -
ronne s 7-a47s e/ss ronas peo.ess-seos PP9-A-22 1
                                                                                                      'INO           1       1 SW-9                   78-25 THREE         1     -
___
ronne s 7-a47s e/ss                                                                                                                                 ronas peo.ess-seos PP9-A-22
* 1


_ _ _ _ _ _ _ _ - _ ____ ______-__ _ _______ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _                                        . _ _ _ _ _ -
NORTHERN STATES POWER CO.
                                                                                                              ,                                                                                        ,      .
TACLE SI 4 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                                                                 TACLE SI 4 PRAIRIE ISLAND UNIT                                     2                                                                                 PAGE     11       OF 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 11 OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:       PIPING PRESSURE BOUNDARY SUB N
M AJOR ITEM:
E-              N DE    I I N                      INSP. R EO'O. AMT.         ITEM                   INSPECTION ITEM               GORY                                                  PER. AMT. EXAM     IDENTIFICATICN             REPOR T NO.
PIPING PRESSURE BOUNDARY N
ITEM TO BE EXAMINED B4.8                       D-J     (CCNf'D)
SUB INSP.
SEAL INJECTION B                         04E         1       1 SW-64                 76-5
R EO'O.
                                                                                                                                                            'INO           ,
AMT.
                                                                                                                                                                                -
ITEM INSPECTION E-N DE I I N ITEM PER.
DIREE       1     -
AMT.
OlARGING LINE B                         WE           1       1 SW-54 (+SW-57,87)     76-49 (+76-49,6)
EXAM IDENTIFICATICN REPOR T NO.
                                                                                                                                                            'IWO         1       1 SW-27                 78-28 MIREE       1     -
GORY ITEM TO BE EXAMINED B4.8 D-J (CCNf'D)
DRAIN LINE AND                           WE           1       1 SW-1 (+SW-24)         76-131 (*76-40)
SEAL INJECTION B 04E 1
[EIDOW1 LINE B                           'IWO         1       1 SW-10                 80-158 TIREE       1     -
1 SW-64 76-5
AUXILIARY SPRAY                         OE           1       1 SW-4                   76-42
'INO DIREE 1
                                                                                                                  'IO PRESSURI?ER                         'INO       -      -
OlARGING LINE B WE 1
MIREE       -      -
1 SW-54 (+SW-57,87) 76-49 (+76-49,6)
RESIDUAL 'IEMPERA'IURE                   QE           1       1 SW-13                 77-117 Iriullutt 1AKE OFF                       4WD         1       1 SW-4                   78-27 COLD IEG A                               TIREE       1     -
'IWO 1
RESIDUAL TEMPERNIURE                     QE           1       1 SW-15                 77-120 DE'IEC' LOR 1AKE OFF                     TWO         1       1 SW-4                   78-26 COED IEG B                               UIREE       1     -
1 SW-27 78-28 MIREE 1
RESIDUAL TEMPERATURE                     OE         -      -
DRAIN LINE AND WE 1
Dtriu;1un TAKE OFF                       'INO         1       1 SW-31                 80-154 IUr LEG A                               MIREE       1
1 SW-1 (+SW-24) 76-131 (*76-40)
                                                                                                                                                                                -
[EIDOW1 LINE B
l RESIDUAL TEMPERATURE                     OE         -      -
'IWO 1
l                                                                                                                  DETECIOR 1AKE OFF                       'IWO         1       1 SW-29                 80-157 IDP LEG B                               TIREE       1     -
1 SW-10 80-158 TIREE 1
                                                                                                                                                                                                                                            '
AUXILIARY SPRAY OE 1
SAFErY INJECTION                         OE         -        -
1 SW-4 76-42
llIGI LEAD A                             'INO       -        -
'IO PRESSURI?ER
91REE       1     -
'INO MIREE RESIDUAL 'IEMPERA'IURE QE 1
                                                          "y9'jy*3 *In                                                                                                                                                 va ,, na , ,,,. .. ,
1 SW-13 77-117 Iriullutt 1AKE OFF 4WD 1
                                                                                                                                            .                      .
1 SW-4 78-27 COLD IEG A TIREE 1
RESIDUAL TEMPERNIURE QE 1
1 SW-15 77-120 DE'IEC' LOR 1AKE OFF TWO 1
1 SW-4 78-26 COED IEG B UIREE 1
RESIDUAL TEMPERATURE OE Dtriu;1un TAKE OFF
'INO 1
1 SW-31 80-154 l
IUr LEG A MIREE 1
RESIDUAL TEMPERATURE OE l
DETECIOR 1AKE OFF
'IWO 1
1 SW-29 80-157 IDP LEG B TIREE 1
SAFErY INJECTION OE llIGI LEAD A
'INO 91REE 1
*In va,, na,,,,...,
"y9'jy*3


                                                                                      . _ _ - .___
4 NORTHERN STATES POWER CO.
                  .      .                                                                              .
Tall.E. S1.4 PRAIRIE ISLAND UNIT 2
4 NORTHERN STATES POWER CO.                                                                       Tall.E. S1.4 PRAIRIE ISLAND UNIT   2                                                                       PAGE     12     OF 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 12 OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:               PIPING PRESSURE BOUNDARY SUB XAM           MwONEM OR SYSTEM         INSP. R EQ'D. AMT.         BTEM                         INSPECTnON ITEM    [ORY                                   PER. AMT. EXAM     IDENTIFICATION                   REPORT NO.
M AJOR ITEM:
f                            IT M O E EX M NED B4.8   B-J     (CONr'D)
PIPING PRESSURE BOUNDARY XAM MwONEM OR SYSTEM SUB INSP.
SAFETY IMIECTI N         OE         1       1 SW-8                           77-110 HIGI IIEAD B             'INO       -        -
R EQ'D.
                                                  'IHREE     -        -
AMT.
DRAIN LINE W             WE         1       1 SW-13                         77-114
BTEM INSPECTnON
',                      CROSSOVER A               'lWO       -        -
[ORY f
4 mingg      _        _
ITEM PER.
REACIOR VESSEL           OE         1       1 SW-13                         77-111 SAFETY INJECTION         'INO       -        -
AMT.
IDW HEAD A               'IIIREE   -        -
EXAM IDENTIFICATION REPORT NO.
REACIOR VESSEL           WE         -        -
IT M O E EX M NED B4.8 B-J (CONr'D)
SAFETY IMJECTION         'INO       -        -
SAFETY IMIECTI N OE 1
IDW HEAD B               'IIIREE     1       -
1 SW-8 77-110 HIGI IIEAD B
B4.9   B-K-1   INIERALLY WEIDED SUPPORTS SEAL INJECTION A         'IND       1       1 H                             78-18,30,39 RESIDUAL 'IEMPERNIURE   -          -        -
'INO
DE'IECIOR 'IRKE OFF IDPIE A SAFETY IMJECTION         -          -        -
'IHREE DRAIN LINE W WE 1
HIGI HEAD A SPRAY 'IO PRESSURIZER BRANCil A               'IND       1       1 L                             80-76,123,156 BRANCH B                 *111REE     1       -
1 SW-13 77-114 CROSSOVER A
RESIDUAL HEAT           'IND       1     '1 U                             78-29,50,93 REMWAL TAKE OFF A ragogy4 .n=                                                                                                     , . . . . . . . . . . . .
'lWO mingg 4
                                                .
REACIOR VESSEL OE 1
1 SW-13 77-111 SAFETY INJECTION
'INO IDW HEAD A
'IIIREE REACIOR VESSEL WE SAFETY IMJECTION
'INO IDW HEAD B
'IIIREE 1
B4.9 B-K-1 INIERALLY WEIDED SUPPORTS SEAL INJECTION A
'IND 1
1 H
78-18,30,39 RESIDUAL 'IEMPERNIURE DE'IECIOR 'IRKE OFF IDPIE A SAFETY IMJECTION HIGI HEAD A SPRAY 'IO PRESSURIZER BRANCil A
'IND 1
1 L
80-76,123,156 BRANCH B
*111REE 1
RESIDUAL HEAT
'IND 1
'1 U
78-29,50,93 REMWAL TAKE OFF A
.n=
ragogy4


__  _        _            _
l l
                                .                                                                      .    .
NORTHERN STATES POWER CO.
l                         .
TATLE R1.4 PRAIRIE ISLAND UNIT
l
?
!
PAGE 13 OF 19 INSERVICE INSPECTION-EXAMINATION  
NORTHERN STATES POWER CO.                                                                           TATLE   R1.4
,
PRAIRIE ISLAND UNIT           ?                                                                   PAGE     13     OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:           PIPING PRESSURE BOUNDARY j       SUB E.              N DE    i i N        INSP. R EO'D. AMT.         ITEM                   INSPECTION
MAJOR ITEM:
,      ITEM         GORY                                      PER. AMT. EXAM     IDENTIFICATION             REPORT NO.
PIPING PRESSURE BOUNDARY j
ITEM TO BE EXAMINED
SUB INSP.
!
R EO'D.
,
AMT.
'
ITEM INSPECTION E.
B4.9       B-K-1     (CONF'D) ifCUl0LA10R DISCHAPGE A     -          -        -
N DE i i N ITEM PER.
SEAL INJECTION 5           TWO         1       1 A                       80-49,105,155                   .
AMT.
;
EXAM IDENTIFICATION REPORT NO.
I                              OIABGING LINE CVCS         QE           1       2 Z (+X)                   76-109,106(+76-110-6) 1                                                         'IWO       -        -
GORY ITEM TO BE EXAMINED B4.9 B-K-1 (CONF'D) ifCUl0LA10R DISCHAPGE A SEAL INJECTION 5 TWO 1
,                                                          SHREE       1       -
1 A
!
80-49,105,155 I
RESIDUAL 'IEMPERA1'JRE     -          -        -
OIABGING LINE CVCS QE 1
l                              DETIEC'IOR 'IRKE OFF                                                                                         ,
2 Z (+X) 76-109,106(+76-110-6) 1
;                              CDID IEG B
'IWO SHREE 1
'                              RESIDUAL TEMPERATURE       -          -        -
RESIDUAL 'IEMPERA1'JRE l
it'p2.'wR 'IKKE OFF l                             IOP IEG B RESIDUAL HEAT             QE           1       1 Q                       76-60,59                         t REMOVAL TAKE OFF B 4                               RESIDUAL HEAT             THREE       1       -
DETIEC'IOR 'IRKE OFF CDID IEG B RESIDUAL TEMPERATURE it'p2.'wR 'IKKE OFF l
  ,                            RENNAL RETIURN B I
IOP IEG B RESIDUAL HEAT QE 1
j                             ACCUMULATOR DISCHARGE B     OE           1       1 B1                       76,39-3 SAFETIY IMJECTIQ1           -          -        -
1 Q
HIGH HEAD B AUXILIAPY SPRAY             -          -        -
76-60,59 t
CWS 1
REMOVAL TAKE OFF B 4
REACTOR VESSEL             'IHREE       1       -
RESIDUAL HEAT THREE 1
SAFE'IT IMJDCT!ON A
RENNAL RETIURN B I
                "
j ACCUMULATOR DISCHARGE B OE 1
i FORM i7-34 74 4/73                                                                                                 FOR M 900. 858-9 Ge t PP9-A-25
1 B1 76,39-3 SAFETIY IMJECTIQ1 HIGH HEAD B AUXILIAPY SPRAY CWS 1
                                                        .          .
REACTOR VESSEL
'IHREE 1
SAFE'IT IMJDCT!ON A i
FORM i7-34 74 4/73 FOR M 900. 858-9 Ge t PP9-A-25


  -_______ _ _ _ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                        _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -__  __    _
NORTHERN STATES POWER CO.
                                                                            ,    ,                                                                                              ,    .
TAILE SI 4 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                                                     TAILE SI 4 PRAIRIE ISLAND UNIT               2                                                                                           PAGE     14     OF 19 INSERVICE INSPECTION-EXATA NATION SilMMARY                                                                   M AJOR ITEM:       PIPING PRESSURE BOUNDARY SUB     E.            N DESCRI T4 N                                      INSP. R EQ'D. AMT.           ITEM                 INSPECTION ITEM GORY            ITEM TO BE EXAMINED                                  PER. AMT. EXAM     IDENTIFICATION             REPORT NO.
PAGE 14 OF 19 INSERVICE INSPECTION-EXATA NATION SilMMARY M AJOR ITEM:
B4.10     B-K-2   SUPPORT COMPONENTS SEAL INJECTION A                                       WE       4       3 A1, N/G               76-96/77-133 (IER J ADDED,PER.2)
PIPING PRESSURE BOUNDARY SUB INSP.
                                                                                                                                        'INO     5       6 F,I,J                 78-38,40,65 A,B,C                   80-148,147 4
R EQ'D.
TIREE     6       -
AMT.
ITEM INSPECTION E.
N DESCRI T4 N ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED B4.10 B-K-2 SUPPORT COMPONENTS SEAL INJECTION A WE 4
3 A1, N/G 76-96/77-133 (IER J ADDED,PER.2)
'INO 5
6 F,I,J 78-38,40,65 A,B,C 80-148,147 TIREE 6
4
^
^
DRAIN LINE W                                           WE       -        -
DRAIN LINE W WE CROSSOVER A 7WO TIREE 1
CROSSOVER A                                           7WO       -        -
RESIDUAL TFJiPERATURE 04E 1
TIREE     1       -
1 A
4 RESIDUAL TFJiPERATURE                                 04E       1       1 A                     76-97 IEIECTOR TAKE OFF                                     'INO       1       1 B1                     80-144,144R B1                     81-139,139R ODID IEG A                                             TIREE     2       -
76-97 4
RESIDUAL TEMPERA'IURE                                 04E       ?.       2 C,D                   77-144 Dt;m;wK TAKE OFF                                       7WO       2       2 G,H                     80-146 IDP IEG A                                             TIREE     3       -
IEIECTOR TAKE OFF
SAFE'IY I!UECTION                                     OE         1       1 C                       77-131 11101 LEAD A                                           'INO       1       1 D                       80-132 TIREE     1       -
'INO 1
i
1 B1 80-144,144R B1 81-139,139R ODID IEG A TIREE 2
'
RESIDUAL TEMPERA'IURE 04E
RESIDUAL TEMPERATURE                                   Q4E       1       1 C                       76-98 DETECTOR RL'IURN A                                     TWO       1       1 B                       78-41 illREE     1       -
?.
;                                                                                SPRAY 70 PRESSURIZER                                   Q4E       4       4 J/h,N,0                 76-107/77-151 BRANOI A                                               'INO     5       5 B,C ,D,Il               78-42,43,44,45 V                       80-135 TIREE     5       -
2 C,D 77-144 Dt;m;wK TAKE OFF 7WO 2
l SPRAY TO PRESSURIZER                                   WE       3         3 G,H,F                   76-107 BRANCil B                                             7WO       3       3 D,E,F1                 80,129,130,131 TIREE     3'       -
2 G,H 80-146 IDP IEG A TIREE 3
roppffg g */n                                                                                                                                   ron   o.isi-ies
SAFE'IY I!UECTION OE 1
                                                                                                                                      .
1 C
77-131 11101 LEAD A
'INO 1
1 D
80-132 TIREE 1
i RESIDUAL TEMPERATURE Q4E 1
1 C
76-98 DETECTOR RL'IURN A TWO 1
1 B
78-41 illREE 1
SPRAY 70 PRESSURIZER Q4E 4
4 J/h,N,0 76-107/77-151 BRANOI A
'INO 5
5 B,C,D,Il 78-42,43,44,45 V
80-135 l
TIREE 5
SPRAY TO PRESSURIZER WE 3
3 G,H,F 76-107 BRANCil B 7WO 3
3 D,E,F1 80,129,130,131 TIREE 3'
roppffg g */n ron o.isi-ies


  - - . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____        _ _ _ _ _ _ _____ _                    _-.___                                              _ _          _
NORTHERN STATES POWER CO.
                                                      ,                      .                                                                        .      .
TA'LE SI 4 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                                                 TA'LE SI 4 PRAIRIE ISLAND UNIT                               2                                                                       PAGE       15     Op 19 INSERVICE INSPECTION-EXAMINATION  
PAGE 15 Op 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:           PIPING PRESSURE BOUNDARY EXAM                           COMPONENT OR SYSTEM SUB T                              ^                        INSP. R E Q'D. AMT.         8 TEM                     INSPECTION ITEM                                                                 PER. AMT. EXAM     JOENTIFICATION                 REPORT NO.
M AJOR ITEM:
RY                             lT M TO BE EX M NFD B4.10         B-K-2                     (00h*P'D)
PIPING PRESSURE BOUNDARY EXAM COMPONENT OR SYSTEM SUB INSP.
IESIDUAL lEAT             OE       5           5 O,P,Q,S,T                   76-41 REMOVAL TAKE OFF A         'IWO     5           5 B,o,D,Il                   78-46,47,48,49 C,E                         80-54,23 UIREE   6           -
R E Q'D.
ACCUMULA'IOR D1 'CilARGE A       WE       2           2 H,I                       76-33
AMT.
                                                                                                        'IWO     3           3 D,E,G                       80-25,50,51 DIREE   3           -
8 TEM INSPECTION T
SEAL INJECTIN B                 WE       4           4 O,P,N/Q                     76-32/77-157
^
                                                                                                        'IWO     4           4 D,E,b,M                     80,53,52,47,46 TIREE   5           -
ITEM PER.
OIAIGING LINE CVCS               WE       5           5 R,S,V,W,Y                   76-51,85
AMT.
                                                                                                        'IWO     7           7 K,M,N,0                     78-53,53,52,51 O,Q,T,V                     80-80,127,126,125 TIREE   8           -
EXAM JOENTIFICATION REPORT NO.
RESIDUAL 'IEMPERA'IURE         WE       2           2 A,A1                       77-156 Dtan'10u TAKE OFF               'IND     2           2 B,C/C                       78-54,55/80-145 CDID IEG B                       HIREE   2           -
RY lT M TO BE EX M NFD B4.10 B-K-2 (00h*P'D)
RESIDUAL 'IEMPERA'IURE         WE       1           1 A2                         77-134 DETIECTOR TAKE OFF               'INO     2           2 A1,A                       80-73,73R,72 A1                         81-140 IDP IEG B                       TIREE   2           -
IESIDUAL lEAT OE 5
DRAIN LINE AND                 PE       2           2 F/C                         77-135/76-108
5 O,P,Q,S,T 76-41 REMOVAL TAKE OFF A
,
'IWO 5
IE'ID0ldi LINE B                   .0   2           2 A,B                         80-73,78 i                                                                                                       MIREE   2           -
5 B,o,D,Il 78-46,47,48,49 C,E 80-54,23 UIREE 6
IESIDUAL TEMPERA'IURE           OE       -          -
ACCUMULA'IOR D1 'CilARGE A WE 2
DETECTOR RETURN B               'IND     1           1 A                           78-56 MIREE   -          -
2 H,I 76-33
rogif-ag ein                                                                                                                               ,o.. o.........
'IWO 3
                                                                                                      .
3 D,E,G 80-25,50,51 DIREE 3
                                                                                                                                                                                - - _ _ _ _ _ _ _
SEAL INJECTIN B WE 4
4 O,P,N/Q 76-32/77-157
'IWO 4
4 D,E,b,M 80,53,52,47,46 TIREE 5
OIAIGING LINE CVCS WE 5
5 R,S,V,W,Y 76-51,85
'IWO 7
7 K,M,N,0 78-53,53,52,51 O,Q,T,V 80-80,127,126,125 TIREE 8
RESIDUAL 'IEMPERA'IURE WE 2
2 A,A1 77-156 Dtan'10u TAKE OFF
'IND 2
2 B,C/C 78-54,55/80-145 CDID IEG B HIREE 2
RESIDUAL 'IEMPERA'IURE WE 1
1 A2 77-134 DETIECTOR TAKE OFF
'INO 2
2 A1,A 80-73,73R,72 A1 81-140 IDP IEG B TIREE 2
DRAIN LINE AND PE 2
2 F/C 77-135/76-108 IE'ID0ldi LINE B
.0 2
2 A,B 80-73,78 i
MIREE 2
IESIDUAL TEMPERA'IURE OE DETECTOR RETURN B
'IND 1
1 A
78-56 MIREE rogif-ag ein
,o..
o.........


                    .                                                                            .      .
NORTHERN STATES POWER CO.
NORTHERN STATES POWER CO.                                                                     TAILE SI 4
TAILE SI 4 PRAIRIE ISLAND UNIT 2
'
PAGE 16 op 19 INSERVICE INSPECTION-EXAMINATION  
2                                                                    PAGE     16     op 19 PRAIRIE ISLAND UNIT INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PIPING PRESSURE DOUNMY SUB M                   "      " S M     INSP. R E Q'D. AMT.             ITEM                 INSPECTION i                E-               N DE     i TI N PER. AMT. EXAM       IDENTIFICATION           REPORT NO.
MAJOR ITEM:
ITEM    GORY             ITEM TO BE EXAMINED t
PIPING PRESSURE DOUNMY M
B4.10   D-K-2   (CONP'D)                                                                                                     ,
" S M i
RESIDUAL IIEAT REMOVAL     WE         5       5     It/L ,M,N,0             76-63/77-145,149 TAKE OFF B                 'IWO       5       5     A,B,C                   78-57,57,58 C,D,K                   80-65,64,133 MIREE     6       -
SUB INSP.
RESIDUAL lEAT RDIOVAL     WE         1       1   A                       77-132 RE'IURN ,B                'IWO        1        1    B                        78-59
R E Q'D.
AMT.
ITEM INSPECTION E-N DE i TI N ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
t GORY ITEM TO BE EXAMINED B4.10 D-K-2 (CONP'D)
RESIDUAL IIEAT REMOVAL WE 5
5 It/L,M,N,0 76-63/77-145,149 TAKE OFF B
'IWO 5
5 A,B,C 78-57,57,58 C,D,K 80-65,64,133 MIREE 6
RESIDUAL lEAT RDIOVAL WE 1
1 A
77-132
]
]
TIREE      1
RE'IURN,B
                                                                        -
'IWO 1
* ACCUeULA'IOR DISC 11ARGE B UE         3       3     E,F,C                   77-138
1 B
                                                    'INO       3       3     B,B1/A                   78-60/80-48 MIPEE     4       -
78-59 TIREE 1
SAFETY INJECTION           WE         1         1   C                       77-127 IIIW IEAD B               'INO       -        -
ACCUeULA'IOR DISC 11ARGE B UE 3
MIREE       1       -
3 E,F,C 77-138
NJXILIARY SPRAY           WE           1       1   A                       76-46
'INO 3
                        'IO PRESSURIZEP.           'IWO       1         1   B                       78-61 WIREE       2       -
3 B,B1/A 78-60/80-48 MIPEE 4
REACIOR VESSEL             WE           1       1   A                       77-128 SAITI"I INJECTION         'Iwo       -        -
SAFETY INJECTION WE 1
IOW IIEAD A                 HIREE     -        -
1 C
REACIOR VESSEL             WE       -        -
77-127 IIIW IEAD B
!                        SAFETY INJECTION           'INO       1       1   A                       80-134 IIM llEAD B               WIREE     -
'INO MIREE 1
                                                                        ,-
NJXILIARY SPRAY WE 1
PRESSURIZER RELIEF         WE       -            -
1 A
LINE B                     'INO     -        -
76-46
VIREE       1     -
'IO PRESSURIZEP.
PEACIOR VESSEL             WE         1       1   D                       77-130 SAFF11"I INJECTION         'IWO       1       1   B                     l 78-62 IDWIEAD 3 (6 x 4")         91REE     2       -
'IWO 1
_
1 B
78-61 WIREE 2
REACIOR VESSEL WE 1
1 A
77-128 SAITI"I INJECTION
'Iwo IOW IIEAD A HIREE REACIOR VESSEL WE SAFETY INJECTION
'INO 1
1 A
80-134 IIM llEAD B WIREE PRESSURIZER RELIEF WE LINE B
'INO VIREE 1
PEACIOR VESSEL WE 1
1 D
77-130 SAFF11"I INJECTION
'IWO 1
1 B
l 78-62 IDWIEAD 3 (6 x 4")
91REE 2
l ogg.y.g.n.
l ogg.y.g.n.
_
                                                                                                                  .... ...........


- - . .  . -_        _ _ _ _ _ _ _ - - _ _ _ _ _ _ - - _ _ _ _ _ _ _ _                              _ _
NORTHERN STATES POWER CO.
                                                                        .      ,                                                                          ,      .
TA2LE S1.4 PR AIRIE ISLAND UNIT _ 2 PAGE 17 _ OF 19 INSERVICE INSPECTION-EXAMINATION  
NORTHERN STATES POWER CO.                                                                                                                           TA2LE S1.4 PR AIRIE ISLAND UNIT _ 2                                                                                                                           PAGE     17 _ OF 19 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:         PIPItG PRESSURE DOUNDARY ll
MAJOR ITEM:
                                                                                          "
PIPItG PRESSURE DOUNDARY ll SUB f
SUB ITEM f                             N DE Ri Tl N            INSP.
INSP.
PER.
R EQ'D.
R EQ'D.
AMT.
AMT.
BTEM INSPECTION N DE Ri Tl N ITEM GGAh ITEM TO BE EXAMINED PER.
AMT.
AMT.
EXAM BTEM IDENTIFICATION INSPECTION REPORT NO.
EXAM IDENTIFICATION REPORT NO.
GGAh                                                ITEM TO BE EXAMINED 84.10       B-K-2                                               (OCNP'D)
84.10 B-K-2 (OCNP'D)
REAC'IOR VESSEL               WE             1       1 D                       77-129 SAFETY ITUECTION             'ItD           1,       1 A                       80-75 IIM llEAD A (6x4")           HIREE         2       -
REAC'IOR VESSEL WE 1
PRESSURIZER SAFETY           WE             1       1 A1                     77-152 LINES A & B                   'INO           1       1 A2                     80-128
1 D
                                                                                                            'DIREE         -      -
77-129 SAFETY ITUECTION
PRESSURIZER SUHGE B           WE             3       3 K,J,I                   76-48
'ItD 1,
                                                                                                            'INO           4       4 A,B/C,D                 78-64,63/80-70,71 TIREE         5       -
1 A
REACIOR (DRE C00RNr           WE             -      -
80-75 IIM llEAD A (6x4")
CROSSOVER A                   'IND           1       1 A1                       81-138
HIREE 2
                                                                                                            'HIREE         1     -
PRESSURIZER SAFETY WE 1
REACIDR CORE COOU NP         WE             1       1 B1                     76-106 C.NB                         'INO           -        -
1 A1 77-152 LINES A & B
                                                                                                            'I11REE         1
'INO 1
                                                                                                                                    -
1 A2 80-128
B-P
'DIREE PRESSURIZER SUHGE B WE 3
* B4.11                                                            EXEMPP AND NON-EXEMPP             -                      -
3 K,J,I 76-48
                                                                                                                                        *ALL COMPONEN'IS       PERFORMED BY COMPWEN_IS                                                   EXAMINED IN             PLANT PERSOWEL ACCORDANCE WI'I11 HYDROSTATICALLY PRESSURE                                 IWA-5000 AND
'INO 4
                                                                              'IES'IED 'IO IWA-5000 AT                                 IWB-5000 DURING END OF 'IEN YEAR INTERVAL               ;              SYSTEM IEAKAGE PLUS SYS'IEM IEAKEAGE                     4
4 A,B/C,D 78-64,63/80-70,71 TIREE 5
                                                                                                                                        'IEST EXAM EACH SCHEDUED REFUELING OUTAGE FORM 9 7-2474 S/78                                                                                                                                                 FORM NO. ISt-lGGS PP9-A-29
REACIOR (DRE C00RNr WE CROSSOVER A
                                                                                                          .          .
'IND 1
                                                                            ,
1 A1 81-138
'HIREE 1
REACIDR CORE COOU NP WE 1
1 B1 76-106 C.NB
'INO
'I11REE 1
B4.11 B-P EXEMPP AND NON-EXEMPP
*ALL COMPONEN'IS PERFORMED BY COMPWEN_IS EXAMINED IN PLANT PERSOWEL ACCORDANCE WI'I11 HYDROSTATICALLY PRESSURE IWA-5000 AND
'IES'IED 'IO IWA-5000 AT IWB-5000 DURING SYSTEM IEAKAGE END OF 'IEN YEAR INTERVAL PLUS SYS'IEM IEAKEAGE
'IEST 4
EXAM EACH SCHEDUED REFUELING OUTAGE FORM 9 7-2474 S/78 FORM NO. ISt-lGGS PP9-A-29


                                      -    ._          . _                        _.      .-      .    .  - _ _ _ - -
NORTHERN STATES POWER CO.
                            .                                                                                          .    .
TATLE S1.4 PRAIRIE ISLAND UNIT 2
  ,
PAGE 18 OF 19 INSERVICE INTECTION-EXAMINATION  
NORTHERN STATES POWER CO.                                                                                           TATLE S1.4 PRAIRIE ISLAND UNIT             2               __                                                                  PAGE     18     OF 19 INSERVICE INTECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:                 PIPING PRESSURE BOUNDARY SUS
MAJOR ITEM:
                        ^                     "
PIPING PRESSURE BOUNDARY
INSP. R EQ'D. AMT.           ITEM                         INSPECTION ITEM E-               N DES I       N PER. AMT.     EXAM     IDENTIFICATION                     REPORT NO.
^
i                 GORY                 ITEM TO BE EXAMINED B4.11       B-P         (OCNf'D)
SUS INSP.
R EQ'D.
AMT.
ITEM INSPECTION E-N DES I N
ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
i GORY ITEM TO BE EXAMINED B4.11 B-P (OCNf'D)
EXEMPF:
EXEMPF:
1 RESISTANCE 'IEMPERA'IURE DETIEC'IOR 'IRKE OFF 1-2RC-7A EXCESS IEIDOW LINE A 1-2RC-8 1-2VC-7 1-2VC-9 3
1 RESISTANCE 'IEMPERA'IURE DETIEC'IOR 'IRKE OFF 1-2RC-7A EXCESS IEIDOW LINE A 1-2RC-8 1-2VC-7 1-2VC-9 RESISTANCC 'IEMPERA'IURE 3
RESISTANCC 'IEMPERA'IURE
'
DE1EC10R TAKE OFF
DE1EC10R TAKE OFF
]                                       1-2BC-7B
]
!
1-2BC-7B BEAC'IOR VESSEL CILSURE IEAD VENP 1-2RC-36 REACTOR VESSEL CICSURE IEAD FIANGE i
!                                BEAC'IOR VESSEL CILSURE
1-2RC-9A 1-2RC-9B B4.12 B-G-2 PRESSURE RETAINING BOLTING (ONLY SYSTEMS APPLICABIE
'
'IO 'nlIS I'IEM ARE LIS'IED) l SEAL INJECTION A i QE 4
IEAD VENP 1-2RC-36 REACTOR VESSEL CICSURE
4 BOLTS 1-4 9 W-2 76-76
:                                IEAD FIANGE i                                       1-2RC-9A 1-2RC-9B
'IWO 4
'
4 BOLTS 1-4 0 W-4 78-81 RESISTANCE 'IEMPERATURE
B4.12       B-G-2       PRESSURE RETAINING BOLTING             -
'DIREE 8
(ONLY SYSTEMS APPLICABIE
DETECTOR RETURN A ronne a 7-move e/7e conne no. sse-s ee n PP9-A-30 1
                                  'IO 'nlIS I'IEM ARE LIS'IED) l                                 SEAL INJECTION A               i QE       4           4   BOLTS 1-4 9 W-2                 76-76 78-81
 
'
J P
                                                                  'IWO     4           4   BOLTS 1-4 0 W-4 RESISTANCE 'IEMPERATURE         'DIREE   8         -
A DN U
DETECTOR RETURN A
9 OB 1
.
NO E
ronne a 7-move e/7e                                                                                                                 conne no. sse-s ee n PP9-A-30 1
O FR tN OJ TT M
* J P
CR E'
                                                                      .
EO P P 4
                                                                      .
P S E P
A                                                 .
N I
                                                                      .
9 P
D N                                                  .
IR 5
U 9     O 1     B          .
2 S_1 3
E     NO O                                           .
7 7
FR         tN                                           .
G 1
OJM        TT CR
1 1
                                                                      .
N E
                                                                      .
I 0
E'   EO P P 4             P     S E
0 6
        -          P    N IR I       9     P                   5     2 3     7             7 S_1            G                   1     1             1
LEP 8
  .
8 7
_      N                     -    -              -
I EGP AA TP N
E            I                   0     0             6 LEPI                              8     8             7 EGP
2 O
  . AA TP N               2 O                 -
-W I
:      I T         0 W
0 T
M         A               @
M A
E     MC           2                   2 T
E MC 2
I EIF TI 1     4             1 IT                   -              -
2 T
R        N         1   A 1             1 E             0 O
EI 1
J        D          s1   s             S A
4 1
I t0   t             T L
F I
l8   l M                   o-   o             O B2   B             B T.M           2                   2 MA  X 1     4 -     -    1 AE I
TI A
                          .
IT R
D.
N 1
Q' M T        2                   2 E                   44     8 RA 1                   1
1 1
                                                                        .
O E
P
0 D
                          ..                    E E
s1 s
_                        SR                       E E E         D     DR     R       E
S J
-
I t0 t
T A
l8 l
L M
o-o O
B2 B
B
.M 2
2 T A 1
4 -
1 M X A E I
.D.
Q' TM 2
2 E A 1
44 8
1 R
E E
P SR E
E E
D DR R
E N
IP N
IP N
                                      'I WH I
WH H
                                            ' 'I H
N
I
'I I I C
                                                    '
I Y
N C
R E
_                                                                        .
A R
-
M U
.
D I
.                  Y R                               E A                               R M           D                   U I
M E
                                                    '
Y i
M           E N      i           A       Y U                   r           RB       I S     NI 0M 8A rr  B     E PN E
A N
E N     TX           A     N     MR       A O       IE         S     O     EU     S RE                 I      I I I
U r
T          B       R     T     ' E     R A                  E     C     ER     E "EO DT          Z     E     C       Z N                   I     J     NR     I
RB I
          .        I           M       R     N     mO       R O            M       NET        UA   I         T   Ub C            A          I  )  S           S' C   S D SE   L     IEI'    SE R             X                 EN     A     S       EN
NI S
  ,
0M r
E2           E               'P RI   E     EE       RI N PL   S     RD       PL W            N
B E
                      -
E 8A r
O O                            C
PN E
  ,
N TX A
PTO     I I
N MR A
O IE S
O EU S
RE I
I I T
B R
T
' E R
I E
C ER E
A "EO Z
E C
Z N
DT I
J NR I
O I
M R
N mO R
M NE UA I
T Ub S
S' C S
C T
A I
)
D SE L
IE SE R
X EN A
S I'
EN E2 E
'P RI E
EE RI W
N PL S
RD PL O
O N
C PTO
(
(
SNT E
I I SNT E U C T
T UC
E
_
.Y 2
_
ADP E R TNS
E E.Y ADP                     R 2
^
TNSN                    ^   G-
G N
                                    -                                ,
n.
_
SAI G
SAI     L G
L B
B                                 n.
N SE RI C y
_
EEI y
.
HI V 2
_
T RR BM 1
N SE                                                           .
y UE I
y
RA E ST 4
_    RI C
p S
_    EEI HI V                         2                                 y
I 8
_
p OR N o
_
NPI r
T RR               BM UE 1
' i j
y I
l 1
p RA E         S ST  I     4 8                                 p o
i J
OR NPI N                                                          r
-
_
.
.
_
.
.
1    J !
      ' i                     j l                         i


                                    ._
NORTHERN STATES POWER CO.
                              .                                                                      .    .
TASLE St.5 PRAlHIE ISLAND UNIT.
NORTHERN STATES POWER CO.                                                                           TASLE St.5 PRAlHIE ISLAND UNIT.         2                                                                     PAGE     1     OF 3 INSERVICE INSPECTION-EXAMINATION  
2 PAGE 1
OF 3 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:     IEACIOR CORE CODIRTP PUMPS 8                                                   INSP. R EO*D. AMT.           ITEM                   INSPECTION TE.           N DE RI 1 N                         EXAM IT W         GORY            ITEM TO BE EXAMINED      PER. AMT.             IDENTIFICATION             REPORT NO.
M AJOR ITEM:
B5.1       IFG-1   PRESSURE RETAINING BOLTS AND                 AND S' IUDS, IN PIACE B5.3                 (2: 2 IN. DIA.)
IEACIOR CORE CODIRTP PUMPS 8
FLANGE BOLTS PUMP A                     WE       8       8   BOLTS 1 THRU 8           76-87
INSP.
                                                      'IwO     8       8   BOLTS 9 'HIRU 16         78-67 MIREE     8       -
R EO*D.
PUMP B                     OiB       8       8   BOLTS 1 THRU 8           76-86
AMT.
                                                      'Iwo     8       8   BO[.TS 9 'HIRD 16       78-68
ITEM INSPECTION TE.
                                                      'I11REE   ITEM     -
N DE RI 1 N IT W PER.
B5.2 SEAL HOUSE BOLTING PUMP A                     04E       4       4   BOLTS 1 'HIRD 4           76-89
AMT.
                                                      'INO     4       4   BOLTS 5 'HIRD 8         78-69
EXAM IDENTIFICATION REPORT NO.
                                                      'HIREE I 4         -
GORY ITEM TO BE EXAMINED B5.1 IFG-1 PRESSURE RETAINING BOLTS AND AND S' IUDS, IN PIACE B5.3 (2: 2 IN. DIA.)
IUMP B                     04E       4       4   BOL'IS 1 'HIRU 4         76-88
FLANGE BOLTS PUMP A WE 8
                                                      'IWO     4       4   BDLTS 5 ' HIP.0 8         78-70
8 BOLTS 1 THRU 8 76-87
                                                      'HIREE   4       -
'IwO 8
B5.2         B-G-1   PRESSURE RETAINING BOLTS AND                 AND SIUDS, NHEN REMNED B5.3                     (2 IN. DIA.)
8 BOLTS 9 'HIRU 16 78-67 MIREE 8
PUMP A                     'INO     12       12   BOLT 1 'HIRU 12         81-46,47 SEAL IlOUSE BOLTING PUMP B                     MIREE   24       -
PUMP B OiB 8
FIANGE BOLTING IUMP B                     Mir;rE   12       -
8 BOLTS 1 THRU 8 76-86
SEAL IKXJSE BOLTING roam s t-aste sire                                                                                               com u ....- ...
'Iwo 8
PP9-B-2                                           .
8 BO[.TS 9 'HIRD 16 78-68
__
'I11REE ITEM B5.2 SEAL HOUSE BOLTING PUMP A 04E 4
_
4 BOLTS 1 'HIRD 4 76-89
'INO 4
4 BOLTS 5 'HIRD 8 78-69
'HIREE I 4 IUMP B 04E 4
4 BOL'IS 1 'HIRU 4 76-88
'IWO 4
4 BDLTS 5 ' HIP.0 8 78-70
'HIREE 4
B5.2 B-G-1 PRESSURE RETAINING BOLTS AND AND SIUDS, NHEN REMNED B5.3 (2 IN. DIA.)
PUMP A
'INO 12 12 BOLT 1 'HIRU 12 81-46,47 SEAL IlOUSE BOLTING PUMP B MIREE 24 FIANGE BOLTING IUMP B Mir;rE 12 SEAL IKXJSE BOLTING roam s t-aste sire com u PP9-B-2


_    -  _ . _      _ _ _ - -      _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _              . _ _ _ _ _ _ _        _  . _ _ _ _  _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
@ $)
                @ $)                                                                                                                                                                       ,
                                                                                      '
s
s
                <>          ---
+
TEST TARGET (MT-3)
TEST TARGET (MT-3)
                                                                                                                                                                                  +
' a EM s
                                                                                                      .
l.0 e "a HE==
                              "
3
l.0                                   s a EM
,_ n l,l ''. f, IN ll!llN l
                                                                        '
3 e n"a
                                                                        ,_          HE==
l l,l '' . f , IN ll!llN                                                                                                                             .
                                                                        "'
l
l
                                -
/
                                                                    /                            l.8 1.25                                 I   l.4                     l.6 l       _
l.8 1.25 I l.4 l.6 l
l
l l
                                                                                                                                                                                          '
/
l
6" e
    /                                                                 6"
l l
* e l
1 4ll*%y
l 1
/ S4%
4ll*%y,,                                                                                          / S4%
* hk
* hk 'h> .
#34<p kIh
                    /                                                          -
'h>
                                                                                                                      #34<p,                                                      kIh
/
                $777,
. $777,
,                                                                                                                                                                                        >
                                  -..


  . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - - ,
NORTHERN STATES POWER CO.
                                                                                                                                                  .
TACLE St.5 PRAIRIE ISLAND UNIT 2
                                                              .      .                                                                  .    .
PAGE 2
NORTHERN STATES POWER CO.                                                                     TACLE St.5 PRAIRIE ISLAND UNIT         2                                                                 PAGE     2       op 3 INSERVICE INSPECTION-EXAMINATION  
op 3 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM: REACIM OCRE COONf PUMP,S__
M AJOR ITEM: REACIM OCRE COONf PUMP,S__
E                   N         8 SUB                                     N        INSP. R EQ'O AMT.         BTEM                   INSPFCTION E               DE ITEM       GORY          ITEM TO BE EXAMINED      PER. AM T. EXAM     IDENTIFICATION             REPORT NO.
E N
B5.4       B-K-1   INIM RALLY WELDED SUPPORTS PUMP A                   'IWO     3       3 SUPIORT A,B,C           RELIEP No. 47 81-129,131,130 PUMP B                   'IWO     3       3 SUPIORT A,B,C           81-132,134,137 UIREE     3       -
8 SUB INSP.
B5.5       B-K-2   SUPPORT COMPONENTS *                                                       *(DINCIDENT WITil SEISMIC BOLTING PUMP A (DWM AND                 WE         1       1 00WW 1                     77-67,163,158 IATERAL SUPPORTS         'IWO       1       1 00W W 2                     80-181,107,174 DIREE     1     -
R EQ'O AMT.
WMP B 00W E AND                 WE         I       1 COWM 1                     77-64,162,161 IATERAL SUPPOR'IE         'IWO       1       1 OOWm 2                     80-181,107,108 TIREE     1     -
BTEM INSPFCTION E
B5.6       B-L-1   PUMP CASING WEW S WMP A                     -        -      -
DE N
                                                                                                                    -NONE-WMP B                     -        -      -
ITEM PER.
                                                                                                                    -NNE-B5.7       B-L-2   PUMP CASINGS                                                         .
AM T.
WMP A & B             -
EXAM IDENTIFICATION REPORT NO.
TIREE      1
GORY ITEM TO BE EXAMINED B5.4 B-K-1 INIM RALLY WELDED SUPPORTS PUMP A
                                                                                                                -
'IWO 3
B5.8       B-P     EXEMPIED COMRNENIS           -        -      -
3 SUPIORT A,B,C RELIEP No. 47 81-129,131,130 PUMP B
                                                                                                                    -NONE-B5.9       B-G-2   PRESSURE RETAINING           -        -      -
'IWO 3
                                                                                                                    -NONE-BOLTING (< 2 IN. DIA.)
3 SUPIORT A,B,C 81-132,134,137 UIREE 3
,                                        ronM s 7-a47s etre                                                                                             ronu seo.sse-seos
B5.5 B-K-2 SUPPORT COMPONENTS *
!
*(DINCIDENT WITil SEISMIC BOLTING PUMP A (DWM AND WE 1
PP9-B-3                                         -
1 00WW 1 77-67,163,158 IATERAL SUPPORTS
'IWO 1
1 00W W 2 80-181,107,174 DIREE 1
WMP B 00W E AND WE I
1 COWM 1 77-64,162,161 IATERAL SUPPOR'IE
'IWO 1
1 OOWm 2 80-181,107,108 TIREE 1
B5.6 B-L-1 PUMP CASING WEW S WMP A
-NONE-WMP B
-NNE-B5.7 B-L-2 PUMP CASINGS TIREE 1
WMP A & B B5.8 B-P EXEMPIED COMRNENIS
-NONE-B5.9 B-G-2 PRESSURE RETAINING
-NONE-BOLTING (< 2 IN. DIA.)
ronM s 7-a47s etre ronu seo.sse-seos PP9-B-3


______
NORTHERN STATES POWER CO.
                                      .      .                                                                .      .
TABLE S1.5 PRAIRIE ISLAND UNIT
                                                .
~1 PAGE 3
NORTHERN STATES POWER CO.                                                                     TABLE     S1.5 PRAIRIE ISLAND UNIT         ~1                                                               PAGE       3         OF 3 INSERVICE INSPECTION-EXAMINATION  
OF 3 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:     REACIOR CORE 000U@TP PCMPS SUS M                 "        8Y8 "
MAJOR ITEM:
E.            N DE    I T10N        INSP. R EO'D. AMT.       ITEM                     INSPECT 60N ITEM       GORY          ITEM TO 8E EXAMINED      PER. AMT. EXAM   IDENTIFICATION               REPORT NO.
REACIOR CORE 000U@TP PCMPS M
                  -
8Y8 "
* PtNP FLYMEEIS RMP A & B                 OE       2       2* PLMP-21, FLMIEEL         76-113,117,116 IUMP-22, FLYWHEEL       76-93,82,92
SUS INSP.
                                                                      'INO     2       2 R MP-21, FLYWHEEL       80-141,142,143
R EO'D.
                                                                      'AIREE    -      -
AMT.
RMP-22, FLYWHEEL       80-124,139,140
ITEM INSPECT 60N E.
                                                                                                                    *BDI11 FLYWiEEIS WERE BENOVED AS A RESULT OF MODIFICA-TION 'IO 'DE PLEP IAERICATION SYS'I1M
N DE I T10N ITEM PER.
                                                                                                                    'nE BORE AND KEY-WAY'S WERE Fr EXAM-INED & 'IllE REMAIN-DG SURFICES WERE MT EXR4INED. U.T.
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO 8E EXAMINED PtNP FLYMEEIS RMP A & B OE 2
2*
PLMP-21, FLMIEEL 76-113,117,116 IUMP-22, FLYWHEEL 76-93,82,92
'INO 2
2 R MP-21, FLYWHEEL 80-141,142,143 RMP-22, FLYWHEEL 80-124,139,140
'AIREE
*BDI11 FLYWiEEIS WERE BENOVED AS A RESULT OF MODIFICA-TION 'IO 'DE PLEP IAERICATION SYS'I1M
'nE BORE AND KEY-WAY'S WERE Fr EXAM-INED & 'IllE REMAIN-DG SURFICES WERE MT EXR4INED.
U.T.
WAS USED 'IO VOWME-
WAS USED 'IO VOWME-
                                                                                                                    'I1UCALLY EX.BMINE
'I1UCALLY EX.BMINE
                                                                                                                    'I1E FLYWIIEEIS (!K7IE
'I1E FLYWIIEEIS (!K7IE
                                                                                                                    'IECH SPT 4.2-1)
'IECH SPT 4.2-1)
FORM 9 7-2476 6/74                                                                                               FORM sec. ISt-9 001 PP9-B-4                                           .
FORM 9 7-2476 6/74 FORM sec. ISt-9 001 PP9-B-4
. _ _ _ _                                                                                                                      _ _              _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _


                                                            ._
4 NORTHERN STATES POWER CO.
                                                                                  .      .                                                                        .      .
TABLE S1.6 PRAIRIE ISLAND UNIT 2
4 NORTHERN STATES POWER CO.                                                                             TABLE   S1.6 PRAIRIE ISLAND UNIT       2                                                                       PAGE     1     OF 4       _
PAGE 1
>
OF 4 INSERVICE INSPECTION-EXAMINATION  
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM:       VALVE PRESSURE BOLNDARY SUS        ^M                   PON         8 M TE.                  N DES I Tl N          INSP. R EO*D. AMT,         ITEM                   INSPECTION ITEM                                                     PER. AMT. EXAM     IDENTIFICATION             REPORT NO.
M AJOR ITEM:
CORY                 ITEM TO BE EXAMINED B6.1       B-G-1   PRESSURE RETAINING                 -          -      -
VALVE PRESSURE BOLNDARY
                                                                                                                                              -10NE-B6.2               BOLTS Ato SIUDS AND                 (< 2 IN. DIA.)
^M PON 8 M SUS INSP.
B6.3 B6.4       B-K-1   INTEGRALLY WEIDED                 -          -      -
R EO*D.
                                                                                                                                              -NONE-SUPPORTS B-K-2                                                   *          *INCLIOE IN B6.5                SUPIORP OCNPCNENTS                -                  -
: AMT, ITEM INSPECTION TE.
                                                                                                                                              'mBIE 1.4 UNDER B4.10 E6.6       B-M-1   VALVE BmY WEIDS                   -          -      -
N DES I Tl N ITEM PER.
                                                                                                                                              -Note-B6.7       B-M-2   VALVE BODIES
AMT.
EXAM IDENTIFICATION REPORT NO.
CORY ITEM TO BE EXAMINED B6.1 B-G-1 PRESSURE RETAINING
-10NE-B6.2 BOLTS Ato SIUDS AND
(< 2 IN. DIA.)
B6.3
-NONE-B6.4 B-K-1 INTEGRALLY WEIDED SUPPORTS B6.5 B-K-2 SUPIORP OCNPCNENTS
*INCLIOE IN
'mBIE 1.4 UNDER B4.10
-Note-E6.6 B-M-1 VALVE BmY WEIDS B6.7 B-M-2 VALVE BODIES
(> 4 IN. NOM. PIPE SIZE)
(> 4 IN. NOM. PIPE SIZE)
REACIOR VESSEL                 DREE       1     -
REACIOR VESSEL DREE 1
SAFETY INJECTIW IDW HEAD A RESIDUAL HEAT                 DREE       1     -
SAFETY INJECTIW IDW HEAD A RESIDUAL HEAT DREE 1
RDOVAL TAKE OFF A PRESSURIZER SAFETY             'IHREE     1     -
RDOVAL TAKE OFF A PRESSURIZER SAFETY
LINE A RESIDUAL HEAT                 'IHREE     1     -
'IHREE 1
REMNAL REIURN B ACCtMULATOR DISCHARG A         'IHREE     1     -
LINE A RESIDUAL HEAT
                                                                                                                        *
'IHREE 1
* ITEMS INSPECTED          INSPECIED BY B6.8       B-P     -EXEMPPED COMPONENTS                       100%
REMNAL REIURN B ACCtMULATOR DISCHARG A
DURING EACH             PIANT PERSCNNEL IEAWE 'IEST roa u sv-34 s sire                                                                                                   ro m ...........
'IHREE 1
PP9-B-5                                             .
B6.8 B-P
_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ - _                                _ _ _    -                                                                        -                _ _ _ - - _
-EXEMPPED COMPONENTS 100%
ITEMS INSPECTED INSPECIED BY DURING EACH PIANT PERSCNNEL IEAWE 'IEST roa u sv-34 s sire ro m...........
PP9-B-5


_ - -- _ _-__-_            -    __            _ _ _
NORTHERN STATES POWER CD.
                                      .      .                                                                            .      .
TABLE SI.6 PRAIRIE ISLAND UNIT 2
                                                                                                            .
PAGE 2,
NORTHERN STATES POWER CD.                                                                                 TABLE     SI.6 PRAIRIE ISLAND UNIT         2                                                                           PAGE     2,     OF 4 INSERVICE INSPECTION-EXAMINATION  
OF 4 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITElWI:     VALVE PRESSURE BOLNDARY M                       "E       S M                                                             INSPEOTION Suir E-                  ND DE        q        INSP. H EQ'D. AMT.           BTEM ITEM       GORY                    ITEM TO 8E EXAMINED      PfR.     AMT. EXAM     IDENTIFICATION             REPORT NO.
MAJOR ITElWI:
B6.9     B-G-2       PRESSURE RF? RAINING                                                                 *tDIE SUPPLEMENT BOLTING
VALVE PRESSURE BOLNDARY M
* B6.9 AT 3.4.3 AOCUMUIROR DISQiART             OE           16       16 QiECK,       2-8841A   76-12 LOOP A - 12"                   'I11REE       16     -
"E S M Suir INSP.
ACCtNUIATOR DISCHAH2           'INO         16       16 OlECK,       2-8841B   80-82 IOOP B.- 12"                   'DIREE       16     -
H EQ'D.
RESIDUAL HEAT                   OE           16       16 M.O. GNIE, 2-8703       76-13 REMOVAL Rfm]RN B-10" RESIDUAL HEAT                   'IWO         16     16   M.O. GAIE, 2-8701 A     78-80 RENOVAL TAKE OFF A-8"           'HIREE       16     -
AMT.
PCSIDUAL HEAT                   OE           16       16 M.O. GATE, 2-8701B       76-16 RENOVAL TAKE OFF B-3"           OE           16       16 M.O. GA3E, 2-8702B       76-16 SAFETY INJECTIO4               'INO         12       12 OlECK,       2-8842A   80-166 HIGl HEAD A - 6" SAFETY INJECFION               'DIREE       12     -
BTEM INSPEOTION E-ND DE q
HIG1 HEAD B - 6"
ITEM PfR.
                                                                                    ?
AMT.
PRESSURIZER SPRAY IOOP A - 3"                     'HIREE       8       -
EXAM IDENTIFICATION REPORT NO.
IOOP B - 3"                     OE           8       8 runRR(2-PCV-431B)       76-28
GORY ITEM TO 8E EXAMINED B6.9 B-G-2 PRESSURE RF? RAINING
                                                                            'DIREE       8       -                                                        '
*tDIE SUPPLEMENT BOLTING B6.9 AT 3.4.3 AOCUMUIROR DISQiART OE 16 16
RESISTANCE YEMPERA7URE           TWO         12     12   GATE, 2-8001 A           78-79 DETECIOR RETURN IOOP A - 3" RESISTANCE 'ITNPERA'IURE         'IND         12     12   GAIE, 2-8001B           78-78 DEmrIOR RET. URN IOOP B - 3" ronne 32-34n ein                                                                                                           ronu no. ise-i.es
: QiECK, 2-8841A 76-12 LOOP A - 12"
                                                                                      -
'I11REE 16 ACCtNUIATOR DISCHAH2
Pn9-B-6                                               -
'INO 16 16
: OlECK, 2-8841B 80-82 IOOP B.- 12"
'DIREE 16 RESIDUAL HEAT OE 16 16 M.O. GNIE, 2-8703 76-13 REMOVAL Rfm]RN B-10" RESIDUAL HEAT
'IWO 16 16 M.O. GAIE, 2-8701 A 78-80 RENOVAL TAKE OFF A-8"
'HIREE 16 PCSIDUAL HEAT OE 16 16 M.O. GATE, 2-8701B 76-16 RENOVAL TAKE OFF B-3" OE 16 16 M.O. GA3E, 2-8702B 76-16 SAFETY INJECTIO4
'INO 12 12
: OlECK, 2-8842A 80-166 HIGl HEAD A - 6" SAFETY INJECFION
'DIREE 12 HIG1 HEAD B - 6"
?
PRESSURIZER SPRAY IOOP A - 3"
'HIREE 8
IOOP B - 3" OE 8
8 runRR(2-PCV-431B) 76-28
'DIREE 8
RESISTANCE YEMPERA7URE TWO 12 12 GATE, 2-8001 A 78-79 DETECIOR RETURN IOOP A - 3" RESISTANCE 'ITNPERA'IURE
'IND 12 12 GAIE, 2-8001B 78-78 DEmrIOR RET. URN IOOP B - 3" ronne 32-34n ein ronu no. ise-i.es Pn9-B-6


_ _ _ _ _ _ _ _ . - _ - - _ _ . - .
e NORTHERN STATES POWER CO.
e       .                                                                      .    .
TABLE St.6 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                           TABLE     St.6 PRAIRIE ISLAND UNIT           2                                                                     PAGE     3       OF 4 INSERVICE INSPECTION-EXAMINATION  
PAGE 3
OF 4 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:       VALVE PRESSURE BOIN RRY M                 "
MAJOR ITEM:
SUB E-              O DE      I N      INSP. . R EO'D. AM1.         ITEM                     INSPECTION ITEM         GORY            ITEM TO BE EXAMINED    PER. AMT. Ex/ M     :DENTIFICATION               REPORT NO.
VALVE PRESSURE BOIN RRY M
I B6.9         B-G-2   (ODNr'D)
SUB INSP.
RESI3TANCE 'IYMPERATURE   DE         2       2   2r58,       2RC-1-6     76-95 DETIECTOR 'IME OFF         'INO       2       2   2T58,       2HC-1-7     80-152 ODID IEG A - 2"           MIREE       2       -
R EO'D.
RESISTANCE TEMPERATURE     'INO       2       2   2T58,       2RC-1-15   80-137 DETECTOR 'IME OFF         qwo         2       2   2r58,       2RC-1-16   80-165 ODID IEG B - 2"           DIREE       2       -
AM1.
RESISTANCE 'IYMPERA'IURE   'IW         2       2   2r58,       2RC-1-9     80-150 DETECTOR 'IME OFF         INO         2       2   2r58,       2ac-1-10   80-151 IDr LEG A - 2"             MIREE       2       -
ITEM INSPECTION E-O DE I N ITEM PER.
RESISTANCE TYMPERATURE     OE         2       2   2r58,       2RC-1-12   76-103 DETECTOR 'IME OFF         TWO         2       2   2r58,         2BC-1-13   80-136 IUP IEG B - 2"             DIREE       2       -
AMT.
PRESSURIZER RELIEF         OE         12     12   M.O. GATE, 2-8000B       76-14 LINES           3"       QE         6       6   GOBE, 2PCV-431C         76-14
Ex/ M
                                                                                          'INO       6       6   GDBE, 2PCV-430           80-149 UiREE     12       -
:DENTIFICATION REPORT NO.
REACIOR VESSEL SAFETY INJECTION IOW IIEAD A - 6"           OE         12       12 OIECK,       2-8843A   76-91 INO         12       12 OIECK,       2-8844A     80-171 IDW HEAD B - 6"           OE         12       12 OIECK,       '2-8843R   76-36 MIREE       12       -
GORY ITEM TO BE EXAMINED I
AUXILIARY SPRAY           DIREE       6       -
B6.9 B-G-2 (ODNr'D)
CVCS - 2" Popes MO. ISO-8 84 8 FOR84 5 7-1476 6/78 PP9-B-7                                           ,
RESI3TANCE 'IYMPERATURE DE 2
2
: 2r58, 2RC-1-6 76-95 DETIECTOR 'IME OFF
'INO 2
2
: 2T58, 2HC-1-7 80-152 ODID IEG A - 2" MIREE 2
RESISTANCE TEMPERATURE
'INO 2
2
: 2T58, 2RC-1-15 80-137 DETECTOR 'IME OFF qwo 2
2
: 2r58, 2RC-1-16 80-165 ODID IEG B - 2" DIREE 2
RESISTANCE 'IYMPERA'IURE
'IW 2
2
: 2r58, 2RC-1-9 80-150 DETECTOR 'IME OFF INO 2
2
: 2r58, 2ac-1-10 80-151 IDr LEG A - 2" MIREE 2
RESISTANCE TYMPERATURE OE 2
2
: 2r58, 2RC-1-12 76-103 DETECTOR 'IME OFF TWO 2
2
: 2r58, 2BC-1-13 80-136 IUP IEG B - 2" DIREE 2
PRESSURIZER RELIEF OE 12 12 M.O. GATE, 2-8000B 76-14 LINES 3"
QE 6
6 GOBE, 2PCV-431C 76-14
'INO 6
6 GDBE, 2PCV-430 80-149 UiREE 12 REACIOR VESSEL SAFETY INJECTION IOW IIEAD A - 6" OE 12 12
: OIECK, 2-8843A 76-91 INO 12 12
: OIECK, 2-8844A 80-171 IDW HEAD B - 6" OE 12 12
: OIECK,
'2-8843R 76-36 MIREE 12 AUXILIARY SPRAY DIREE 6
CVCS - 2" FOR84 5 7-1476 6/78 Popes MO. ISO-8 84 8 PP9-B-7


                                    . _-_
NORTHERN STATES POWER CO.
                      .      .                                                                    .              .
TABLE SI.6 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                         TABLE             SI.6 PRAIRIE ISLAND UNIT           2                                                                   PAGE               4       OF 4 INSERVICE INSPECTION-EXAMINATION StJMMARY                                     M AJOR ITEM:       VALVE PRESSURE BOLNDARY SU8                               "
PAGE 4
E-            N DE      I Tl N      INSP. R EQ'O. AMT.         ITEM                             INSPECTION ITW         GORY                                      PEN. AMT. EXAH   IDENTIF8 CATION                       REPORT NO.
OF 4 INSERVICE INSPECTION-EXAMINATION StJMMARY M AJOR ITEM:
ITEM TO BE EXAMINED B6.9       B-G-2   (ODNP'D)-
VALVE PRESSURE BOLNDARY SU8 INSP.
DRAIN LINE                 DE       2       2 2r58,         2RC-1-3     76-11 CN CROSSOVER B             'IHREE   2       -
R EQ'O.
                          ' DRAIN LINE                 GE       2       2 2r58,         2RC-1-2     76-15 ON CROSSOVER A- 2"         'IHREE   2       -
AMT.
IEI006ti LINE B - 2"       OE       8       8 A.O. GOBE,               76-10 2ILV-427
ITEM INSPECTION E-N DE I Tl N ITW PEN.
                                                        'INO     2       2 2r58,         2RC-1-5     80-81
AMT.
                                                        'IEREE   8       -
EXAH IDENTIF8 CATION REPORT NO.
CHAIGING LINE B - 2"       'INO     6       6 A.O. GLBE,               78-24 2-8142 SEAL INJECTION A - 2"       OE       2       2 2T-58, 2VC-7-18           76-94 SEM. IMJECTIOJ B - 2"       OE       2       2 2P-58, 2VC-7-19           76-84 L
GORY ITEM TO BE EXAMINED B6.9 B-G-2 (ODNP'D)-
ro'ene a r-aeva sus                                                                                                         rones no, ess-s ees PP9-B-8                                           ,
DRAIN LINE DE 2
                                                    .                                              --  - _ _ _ .            - - _ _ _ _ _ _ _
2
: 2r58, 2RC-1-3 76-11 CN CROSSOVER B
'IHREE 2
' DRAIN LINE GE 2
2
: 2r58, 2RC-1-2 76-15 ON CROSSOVER A-2"
'IHREE 2
IEI006ti LINE B - 2" OE 8
8 A.O. GOBE, 76-10 2ILV-427
'INO 2
2
: 2r58, 2RC-1-5 80-81
'IEREE 8
CHAIGING LINE B - 2"
'INO 6
6 A.O. GLBE, 78-24 2-8142 SEAL INJECTION A - 2" OE 2
2 2T-58, 2VC-7-18 76-94 SEM. IMJECTIOJ B - 2" OE 2
2 2P-58, 2VC-7-19 76-84 L
ro'ene a r-aeva sus rones no, ess-s ees PP9-B-8


__ _ --.                  _ _ _ . _ _ _ _
NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISI.AND UNIT II PAGE 1
__ - . _ . ,            ._      _
0F 7
_ _ - - - -            -    __    _ _ _ _ - - _ _ - - _  .
BASELINE COMPARISON  
                          .    .                                                                                              .  .
NORTHERN STATES POWER COMPANY                                                                                                   TABLE           II PRAIRIE ISI.AND UNIT                   II                                                                                       PAGE       1     0F                       7 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT /SYSTM ISO METHOD IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS REACTOR VESSEL Bl.3 VESSEL-TO-FLANGE AND llEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANCE 42 UT W-1 81-W NONE NONE NONE RPV REPORT llEAD-TO-FLANCE 41 UT W-6 81-141 NONE NONE NONE 81-144 NONE NONE NO S-1 FLANCE
('l-143 NONE NONE NO S-1 FLANCE Bl.4 PRIMARY N0ZZLE-TO-VESSEL WELDS AND N0ZZLE INSIDE RADIUSED SECTION REACTOR CORE COOLANT OUTLET 40 UT RCC-B-1 81-W NONE NONE NONE N0ZZLE i(PV REPORT I
i
* UNDERCLAD CRACKING 50 UT N0ZZLE A 81-W N/A
# INDICATION
' NONE RPV i
REPORT (SEE SECTION 4 0F INTRODUCTIO I
FOR AHALYSIS) 1 i
l FORM NO. ISI-1003


NSP          NDE    W BASELINE    REPORT  BASELINE                      ISI        EXAMINATION COMPONENT /SYSTM ISO        METHOD    IDENT.        NO. INDICATIONS    INDICATIONS                LIMITATIONS
NORTHERN STATES POWER COMPANY TABl.E II PRAIRIE ISLAND UNIT II PAGE 2
_
0F 7
REACTOR VESSEL Bl.3 VESSEL-TO-FLANGE AND llEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANCE                                42          UT          W-1    81-W      NONE          NONE                            NONE RPV REPORT llEAD-TO-FLANCE                                  41          UT          W-6    81-141    NONE          NONE                            NONE 81-144    NONE          NONE                    NO S-1 FLANCE
BASELINE COMPARISON  
('l-143      NONE          NONE                    NO S-1 FLANCE Bl.4 PRIMARY N0ZZLE-TO-VESSEL WELDS AND N0ZZLE INSIDE RADIUSED SECTION REACTOR CORE COOLANT OUTLET                      40          UT    RCC-B-1      81-W      NONE          NONE                            NONE N0ZZLE                                                                            i(PV
:                                                                                    REPORT i
* UNDERCLAD CRACKING                              50          UT    N0ZZLE A    81-W      N/A      # INDICATION I        ' NONE RPV                                                                                          i REPORT              (SEE SECTION 4 0F INTRODUCTIO              I FOR AHALYSIS)
:
.
1 i
l
                                                                      .          .                                                    FORM NO. ISI-1003
 
  ._ ___            __.
                        .      .                                                                    .  .
NORTHERN STATES POWER COMPANY                                                                     TABl.E       II PRAIRIE ISLAND UNIT         II                                                                   PAGE     2   0F   7 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS N0ZZLE B 81-W
# INDICATION RPV REPORT N/A (SEE SECTION 4 NONE OF'INTRrDUCTIO 4
~
FOR AN.. LYSIS)
Bl.6 N0ZZLE-TO-SAFE END WELDS REACTOR CORE COOLANT 40 UT RCC-B-1 S. E. 81-W NONE NONE NONE OUTLET N0ZZLE RPV REPORT PT RCC-B-1 S.E. 81-21 NONE NONE NONE Bl.8 CLOSURE STUDS AND NUTS STUDS 39 UT 17,18,20,21 81-162 NONE NONE NONE
& 24 UT 19,22,23,25 81-167 NONE NONE NONE TilRU 32 MT li TilRU 32 81-165 NONE NONE NONE NUTS 39 UT 17 TilRU 32 81-163 NONE NONE NONE MT 17 TilRU 32 81-166 NONE NONE NONE Bl.9 LIGAMENTS BETWEEN TilREADED STUD 110LES LICAMENTS 42 JT 9 TO 11 81-W NONE NONE NONE UT 36 TO 46 RPV" l
REPORT Bl.10 CLOSURE WASilERS AND BUSilINGS WASilERS 39 VT 17 TilRU 32 81-164 NONE NONE NONE Bl.11 PRESSURE RETAINING BOLTING l
MARMON CLAMP 38 VT NO. 2 81-170 NONE NONE NONE FORM NO. ISI-1003


NSP  NDE    W BASELINE      REPORT  BASELINE              ISI        EXAMINATION COMPONENT / SYSTEM ISO METHOD      IDENT.          NO. INDICATIONS    INDICATIONS        LIMITATIONS N0ZZLE B      81-W              # INDICATION
I NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 1
!                                                                  RPV REPORT    N/A      (SEE SECTION 4          NONE OF'INTRrDUCTIO
0F 7
                                                                                            ~
BASELINE COMPARISON  
                                                                                                  -
4 FOR AN.. LYSIS)
Bl.6 N0ZZLE-TO-SAFE END WELDS REACTOR CORE COOLANT          40  UT    RCC-B-1 S . E . 81-W      NONE            NONE            NONE OUTLET N0ZZLE                                              RPV REPORT
,                                            PT    RCC-B-1 S .E . 81-21      NONE            NONE                NONE Bl.8 CLOSURE STUDS AND NUTS STUDS                          39  UT    17,18,20,21 81-162        NONE            NONE                NONE
                                                    & 24 UT    19,22,23,25 81-167        NONE            NONE                NONE TilRU 32 MT    li TilRU 32    81-165    NONE            NONE                NONE NUTS                          39  UT    17 TilRU 32    81-163    NONE            NONE                NONE MT    17 TilRU 32    81-166    NONE            NONE                NONE Bl.9 LIGAMENTS BETWEEN TilREADED STUD 110LES LICAMENTS                      42  JT      9 TO 11        81-W      NONE            NONE                NONE l
UT      36 TO 46      RPV" REPORT Bl.10 CLOSURE WASilERS AND BUSilINGS WASilERS                      39  VT    17 TilRU 32    81-164    NONE            NONE                NONE
                                                                                                                              .
Bl.11 PRESSURE RETAINING
,
BOLTING l        MARMON CLAMP                  38  VT      NO. 2          81-170    NONE            NONE                NONE
:
                                                  -            -                                            FORM NO. ISI-1003
 
                                                                                        ._        -                . _ _        .
__ - _ -. . ._ -
                                    .      .                                                                            . .
I NORTHERN STATES POWER COMPANY                                                                         TABLE             II PRAIRIE ISLAND UNIT       II                                                                           PAGE     1 0F                   7 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METil0D IDENT.
NO.
INDICATIONS ATIONS LIMITATIONS MARMON CLAMP 38 VT NO. 1 81-170 NONE NONE NONE MARMON CLAMP 38 VT NO. 3 81-170 NONE COR(ODED TliREADS NONE Bl.13 CLOSURE IIEAD CLADDIN(
47 VT llCP-3 81-155 NONE NONE NONE IICP-4 81-155 NONE NONE N0i10 llCP-1 81-155 NONE NONE NONE Bl.14 VESSEL CLADDING 48 VT VCP-3 81-W-NONE NONE NONE (2 PATCllES)
RPV REPORT PRESSURIZER B2.4 N0ZZLE-TO-SAFE END WELD l
SAFETY LINE A 30 UT W-1A S.E.
81-37 NONE NONE BEST EFFORT S-1 &
l S-2 LIMITED SCAN AREA UT 81-63 NONE NONE B.E. ALL SCANS j
CONFIGURATION PT 81-6 3 LINEAR 2 LINEAP.
NONE
-l SEVERAL SEVERAL ROUNDED ROUNDED PT 81-6R AS ABOVE SEVERAL ROUNDED NONE SAFETY LINE B 30 UT W-1B S.E.
81-39 NONE NONE B.E. S-1 & S-2 LIMITED SCAN AREA UT 81-62 NONE NONE B.E. ALL SCANS CONFIGURATION PT 81-23 NONE 1 LINEAR NONE PT 81-23R NONE NONE NONE FORM NO. ISI-1003


NSP  NDE      W BASELINE  REPORT  BASELINE                      ISI          EXAMINATION COMPONENT / SYSTEM ISO METil0D      IDENT.      NO. INDICATIONS                ATIONS            LIMITATIONS
NORTNERN SIATdS POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 4
_ . . .
0F 7
MARMON CLAMP                  38  VT      NO. 1      81-170      NONE              NONE                      NONE MARMON CLAMP                  38  VT      NO. 3      81-170      NONE      COR(ODED TliREADS                  NONE Bl.13 CLOSURE IIEAD CLADDIN(  47  VT      llCP-3      81-155      NONE              NONE                      NONE IICP-4      81-155      NONE              NONE                      N0i10
BASELINE COMPARISON SUMMARE NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT /3YSTEM
;                                                                  llCP-1      81-155      NONE              NONE                      NONE Bl.14 VESSEL CLADDING        48  VT      VCP-3      81-W-      NONE              NONE                      NONE (2 PATCllES) RPV REPORT PRESSURIZER B2.4 N0ZZLE-TO-SAFE END WELD l                      SAFETY LINE A                30  UT      W-1A S.E. 81-37      NONE              NONE            BEST EFFORT S-1 &
_ IDENT.
l                                                                                                                              S-2 LIMITED SCAN
NO.
'
INDICATIONS INDICATIONS LIMITATIONS ISO METHOD B2.11 PRESSURE RETAINING BOLTING PRESSURIZER MANWAY BOLTS 36 UT BOLT 1-16 81-60 NONE NONE NONE STEAM CENERATORS B3.3 N0ZZLE-To-SAFE END WELDS STEAM GENERATOR 21 32 UT RCC-A-5 S.E. 81-125 NONE S-2 ID GEO. 75%
AREA UT                  81-63      NONE              NONE            B.E. ALL SCANS j                                                                                                                              CONFIGURATION PT                  81-6  3 LINEAR        2 LINEAP.                        NONE
NO S-1 N0ZZLE CROSSOVER PT 81-116 NONE NONE NONE
-l                                                                                    SEVERAL        SEVERAL ROUNDED        ROUNDED PT                  81-6R  AS ABOVE      SEVERAL ROUNDED                    NONE SAFETY LINE B                30  UT      W-1B S.E. 81-39      NONE              NONE            B.E. S-1 & S-2 LIMITED SCAN AREA UT                  81-62      NONE                NONE            B.E. ALL SCANS CONFIGURATION PT                  81-23      NONE      1 LINEAR                          NONE PT                  81-23R      NONE                NONE                    NONE
                                                                .          .                                                  FORM NO. ISI-1003
    .. . - _ _ . _ ,                      -                                                    -                                        - _ _ _ _ _ _ _ _ _ _ _ _
 
  - - - - - -
                                                -    . - _ .
                              .      .                                                                        .    .
NORTNERN SIATdS POWER COMPANY                                                                       TABLE       II PRAIRIE ISLAND UNIT     II                                                                         PAGE   4       0F 7 BASELINE COMPARISON SUMMARE
                                                                                                                                        ,
NSP NDE           W BASELINE     REPORT BASELINE             ISI         EXAMINATION COMPONENT /3YSTEM ISO METHOD          _ IDENT.         NO. INDICATIONS   INDICATIONS         LIMITATIONS B2.11 PRESSURE RETAINING BOLTING PRESSURIZER MANWAY BOLTS     36   UT           BOLT 1-16     81-60     NONE         NONE                 NONE
!              STEAM CENERATORS B3.3 N0ZZLE-To-SAFE END WELDS STEAM GENERATOR 21           32   UT           RCC-A-5 S.E . 81-125     NONE     S-2 ID GEO. 75%   NO S-1 N0ZZLE CROSSOVER                         PT                           81-116   NONE         NONE                 NONE
]
]
B3.10 PRESSURE RETAINING l                       BOLTING K2 INCil DIA.)
B3.10 PRESSURE RETAINING l
STEAM GENERATOR NO. 21 MAINAY A BOLTS               37   Ur           BOLTS 1-16     81-45     N/A           NONE                 NONE       i MT           BOLTS 1-16     81-25     N/A           NONE                 NONE MAINAY B BOLTS               37   UT           BOLTS 1-15     81-45     N/A           NONE                 NONE MT           BOLTS 162       81-31     N/A     1 BOLT LINEAR             NONE
BOLTING K2 INCil DIA.)
              '
STEAM GENERATOR NO. 21 MAINAY A BOLTS 37 Ur BOLTS 1-16 81-45 N/A NONE NONE i
MT           BOLTS 3-15     81-25     N/A           NONE               ' NONE B4.1   SAFE END-TO-PIPING AND SAFE END IN BRANCll PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT         33   UT           RCC-B-1 S . E . 81-W     NONE         NONE                 NONE RPV REPORT PT                           81-21     NONE         NONE                 NONE
MT BOLTS 1-16 81-25 N/A NONE NONE MAINAY B BOLTS 37 UT BOLTS 1-15 81-45 N/A NONE NONE MT BOLTS 162 81-31 N/A 1 BOLT LINEAR NONE MT BOLTS 3-15 81-25 N/A NONE
                                                              .                                                        FORM NO. ISI-1003
' NONE B4.1 SAFE END-TO-PIPING AND SAFE END IN BRANCll PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT 33 UT RCC-B-1 S. E. 81-W NONE NONE NONE RPV REPORT PT 81-21 NONE NONE NONE FORM NO. ISI-1003


  . _ _ _ _ _ _ _ _ _ _ _ _ _ -
NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 5 OF 7
                                              .      .                                                                  .    .
BASELINE COMPARISON  
NORTHERN STATES POWER COMPANY                                                                 TABLE     II PRAIRIE ISLAND UNIT II                                                                         PAGE     5 OF     7 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
 
NSl' NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM
NSl' NDE     W BASELINE   REPORT   BASELINE               ISI         EXAMINATION COMPONENT / SYSTEM ISO  METHOD    _ IDENT.     NO. INDICATIONS     INDICATIONS       LIMITATIONS STEAM GENERATOR NO. 21 REACTOR CORE COOLANT         32   UT     RCC-A-5 S.E. 81-125     NONE     GEO. @l:00, 75%   NO S-1 SAFE END PRESSURIZER SAFETY LINE A                 30   UT     W-1           81-38   OD.GEO 401         NONE         NO S-1 SAFE END UT     (8010A)     81-61   (SAME)           NONE         NO S-1 SAFE END PT                   81-7       NONE       2 LINEAR               NONE PT                   81-7R               NONE-INDICATIONS         NONE BUFFED OUT SAFETY LINE B                 30   UT     W-1           81-40 S-2 OD GEO         NONE         NO S-1 REDUCER (80108)             40%
_ IDENT.
UT                   81-64   (SAME)           NONE         NO S-1 REDUCER PT                   81-22     NONE           LINEAR               NONE PT                   81-22R               NONE-INDICATION           NONE BUFFED OUT SPRAY LINE                   7C   UT     W-22B         81-24 S-1,ID GEO. S-2,OD GEO. 60%     B.E. ALL SCANS 45%                             REDUCER
NO.
* S-2,ID GEO.
INDICATIONS INDICATIONS LIMITATIONS ISO METHOD STEAM GENERATOR NO. 21 REACTOR CORE COOLANT 32 UT RCC-A-5 S.E.
81-125 NONE GEO. @l:00, 75%
NO S-1 SAFE END PRESSURIZER SAFETY LINE A 30 UT W-1 81-38 OD.GEO 401 NONE NO S-1 SAFE END UT (8010A) 81-61 (SAME)
NONE NO S-1 SAFE END PT 81-7 NONE 2 LINEAR NONE PT 81-7R NONE-INDICATIONS NONE BUFFED OUT SAFETY LINE B 30 UT W-1 81-40 S-2 OD GEO NONE NO S-1 REDUCER (80108) 40%
UT 81-64 (SAME)
NONE NO S-1 REDUCER PT 81-22 NONE LINEAR NONE PT 81-22R NONE-INDICATION NONE BUFFED OUT I
SPRAY LINE 7C UT W-22B 81-24 S-1,ID GEO.
S-2,OD GEO. 60%
B.E. ALL SCANS 45%
REDUCER S-2,ID GEO.
25%
25%
S-2 OD GEO.
S-2 OD GEO.
44%
44%
;
PT 81-5 3/16'i.INEAR 4 LINEARS NONE PT 81-SR 4NONE-INDICATIONS NONE BUFFED OUT B4.5 CIRCUMFERENTIAL AND LONGITUDINAL PIPE WELDS i
'
REACTOR CORE COOLANT 33 UT RCC-B-12 81-94 NONE NONE ALL SCANS LIMITED COLD LEG (INLET) B 11:45-12:15 & 8:45-9:15 BRANCil CONNECT PT 81-87 NONE NONE NONE 1
PT                   81-5   3/16'i.INEAR   4 LINEARS               NONE PT                   81-SR               4NONE-INDICATIONS         NONE BUFFED OUT
FORM NO. ISI-100.'
!
'
B4.5 CIRCUMFERENTIAL AND LONGITUDINAL PIPE i                                       WELDS REACTOR CORE COOLANT         33   UT     RCC-B-12     81-94     NONE             NONE       ALL SCANS LIMITED COLD LEG (INLET) B                                                                               11:45-12:15 & 8:45-
,
9:15 BRANCil CONNECT PT                   81-87     NONE             NONE               NONE 1
                                                                          .                                                        FORM NO. ISI-100.'


_ _ _ _ - - - _            _ _ _ ._ - - - _
NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 6
                                                . .                                                                    .  .
0F 7
NORTHERN STATES POWER COMPANY                                                                           TABLE         II PRAIRIE ISLAND UNIT             II                                                                     PAGE   6     0F   7 BASELINE COMFARISON  
BASELINE COMFARISON  


==SUMMARY==
==SUMMARY==
COMPCNENT/ SYSTEM
-I NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION ISO MET 110D IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS REACTOR CORE COOLANT 32 UT RCC-A-6 81-152 NONE NONE B.E. ALL SCANS CROSSOVER A MACllINING TAPER Pi 81-115 NONE NUMEROUS LINEARS NONE PT 81-115h NONE-INDICATIONS NONE BUFFED OUT 32 UT RCC-A-7 81-124 NONE NONE NO S-1 MACllINING TAPER PT 81-117 NONE NONE NONE PRESFURIZER SAFETY A 30 UT W-3 81-59 NONE S-1, ID GEO. 30%
B.E. S-2 ELBOW S-1, OD GEO. 35%
INNER RADIUS S-2, OD GEO. 30%
30 UT W-4 81-58 NONE S-1, ID GEO. 30%
B.E. S-1 & S-2 S-2, ID GEO. 20%
E.I.R.
PRESSURIZER SAFETY B 30 UT W-6 81-57 N/A S-1, OD GEO. 30%
B.E. S-2 S-2, ID GEO. 30%
E.I.R.
30 UT W-7 81-56 N/A NONE B.E. S-1 6 S-2 E.I.R.
S-2 6:00 FITTING j
l B4.6 BRAi4Cll PIPE CONNEC-
~
TION WELDS EXCEEDING SIX INCil DIAMETER RESIDUAL llEAT REMOVAL 20A UT W-ROOT 81-121 NONE S-2, ID CEO. 50%
NO S-1 BRANCH TAKE OFF B 81-126 NONE NONE NO S-2 BRANCH PT 81-113 NONE NONE NONE B4.7 BRANCil PIPE CONNEC-TION WELDS SIX INCll l
DIAMETER AND SMALLER l
RESISTANCE TEMPERAT*JLE 14 PT W-ROOT 81-89 NONE NONE NONE DETECTOR TAKE OFF B FORM NO. ISI-1003


                                                      -I NSP  NDE      W BASELINE REPORT    BASELINE              ISI          EXAMINATION COMPCNENT/ SYSTEM ISO  MET 110D    IDENT. NO. INDICATIONS    INDICATIONS        LIMITATIONS REACTOR CORE COOLANT                  32    UT      RCC-A-6    81-152    NONE          NONE          B.E. ALL SCANS CROSSOVER A                                                                                              MACllINING TAPER Pi                  81-115    NONE    NUMEROUS LINEARS            NONE PT                  81-115h            NONE-INDICATIONS            NONE BUFFED OUT 32    UT      RCC-A-7    81-124    NONE          NONE          NO S-1 MACllINING TAPER PT                  81-117    NONE          NONE                  NONE PRESFURIZER SAFETY A                  30    UT      W-3        81-59      NONE    S-1, ID GEO. 30%    B.E. S-2 ELBOW S-1, OD GEO. 35%    INNER RADIUS S-2, OD GEO. 30%
MORTHERN FTATES POWER COMPANY T.GLE II PRAIRIE ISLAND UNIT II PACE 7 0F 7
30    UT      W-4        81-58      NONE    S-1, ID GEO. 30%    B.E. S-1 & S-2 S-2, ID GEO. 20%    E.I.R.
BASELINE COMPARISON  
PRESSURIZER SAFETY B                  30    UT      W-6        81-57      N/A      S-1, OD GEO. 30%    B.E. S-2 S-2, ID GEO. 30%    E.I.R.
30    UT      W-7        81-56      N/A            NONE          B.E. S-1 6 S-2 E.I.R.
S-2 6:00 FITTING    j l'
B4.6 BRAi4Cll PIPE CONNEC-                                                                                    ~
TION WELDS EXCEEDING
.                          SIX INCil DIAMETER                          '
!
RESIDUAL llEAT REMOVAL                20A  UT      W-ROOT      81-121    NONE    S-2, ID CEO. 50%    NO S-1 BRANCH
,
TAKE OFF B                                                      81-126    NONE          NONE          NO S-2 BRANCH
,
PT                  81-113    NONE          NONE                  NONE B4.7 BRANCil PIPE CONNEC-
;                          TION WELDS SIX INCll l                          DIAMETER AND SMALLER l                    RESISTANCE TEMPERAT*JLE                14  PT      W-ROOT      81-89      NONE          NONE                  NONE DETECTOR TAKE OFF B
                                                                        .                                                      FORM NO. ISI-1003
 
_ _ _ _ _ _ _ _ _ . _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ - -
__
                                                                                  .    .                                                                      .  .
MORTHERN FTATES POWER COMPANY                                                                     T.GLE         II PRAIRIE ISLAND UNIT       II                                                                     PACE 7       0F   7 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
 
I NSP NDE
I NSP     NDE   ( W BASELINE REPORT   BASELINE               ISI         EXAMINATION COMPONENT / SYSTEM ISO     METHOD     IDENT.     NO. INDICATIONS     INDICATIONS         LIMITATIONS B4.10 SUPPORT COMPONENTS RESISTANCE TEMPERATURE       3       VT         B1       81-139 NUT NOT     liANGER TILTED             NONE
( W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD IDENT.
                                                              ,
NO.
DETECTOR COLD LEG A                                               FLUSli 81-139R             NONE - IIANGER             NONE STRAICitTENED RESISTANCE TEMPERATURE         15     VT         A1       81-140 LOOSE BOLTS       NONE                 NONE DETECTOR 110T LEG B REACTOR CORE COOLANT         32       VT         A1       81-138     N/A           NONE                 NONE       '
INDICATIONS INDICATIONS LIMITATIONS B4.10 SUPPORT COMPONENTS RESISTANCE TEMPERATURE 3
CROSSOVER A l
VT B1 81-139 NUT NOT liANGER TILTED NONE DETECTOR COLD LEG A FLUSli 81-139R NONE - IIANGER NONE STRAICitTENED RESISTANCE TEMPERATURE 15 VT A1 81-140 LOOSE BOLTS NONE NONE DETECTOR 110T LEG B REACTOR CORE COOLANT 32 VT A1 81-138 N/A NONE NONE CROSSOVER A l
'
REACTOR CORE COOLANT PUMPS B5.2 P_RESSURE RETAINING BOLTS AND STUDS WilEN REMOVED (&2 IN DIAMETER)
REACTOR CORE COOLANT PUMPS B5.2 P_RESSURE RETAINING BOLTS AND STUDS WilEN REMOVED (&2 IN DIAMETER)
SEAL 110USE BOLTING PUMP A     12     UT     12 BOLTS     81-47     NONE           NONE                 NONE MT                 81-46     NONE     2 BOLTS CORRO-             NONE SION ON THREADS i
SEAL 110USE BOLTING PUMP A 12 UT 12 BOLTS 81-47 NONE NONE NONE MT 81-46 NONE 2 BOLTS CORRO-NONE SION ON THREADS i
B5.4     INTEGRALLY WELDED                                                                               -
B5.4 INTEGRALLY WELDED j
j                                                                          SUPPORTS PUMP A                       -
SUPPORTS PUMP A PT SUPPORT A 81-129 N/A NONE 4" UNACCESSIBLE TT SUPPORT B 81-131 N/A NONE NONE PT SUPPORT C 81-130 N/A NONE 4" UNACCESSIBLE PITclP B PT SUPPORT A 81-132 N/A NONE 4" UNACCESSIBLE PT SUPPORT B 81-134 N/A NONE NONE PT SUPPORT C 81-137 N/A NONE 4" UNACCESSIBLE i
PT     SUPPORT A   81-129     N/A           NONE         4" UNACCESSIBLE TT     SUPPORT B   81-131     N/A           NONE                 NONE PT     SUPPORT C   81-130     N/A           NONE         4" UNACCESSIBLE PITclP B                     -
I FORM NO. ISI-1003 i
PT     SUPPORT A   81-132     N/A             NONE         4" UNACCESSIBLE PT     SUPPORT B   81-134     N/A             NONE                 NONE PT     SUPPORT C   81-137     N/A             NONE         4" UNACCESSIBLE i
I
                                                                                                                        .
                                                                                                              .          .                                          FORM NO. ISI-1003 ,
i


_ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _            _ _ _  - _ _ _ . - _ _ _ -
o s
o
Table III N0 h 1ERN STATES POWER CO.
                                                          ..                  s
PAE 1
                                                                                      .
0F 4
                                                                                                                                                                                                              .
PRAIRIE IS1AND UNIT 2 ISOMETRIC SLM1ARY CLASS 1
                                                                                                                                                                                .    .                    .
~
Table III N0 h 1ERN STATES POWER CO.                                                                                                                                             PAE         1           0F             4 PRAIRIE IS1AND UNIT 2 ISOMETRIC SLM1ARY CLASS 1
REVISIW 00MPONDE OR SYSTD4 IDOP R
                                                                                                                                                                                                                                                            ~
2-ISI-1 0
00MPONDE OR SYSTD4                                             IDOP                                                     R REVISIW 0         SEAL INJECTION (GENERAL VIEW)                                                   A             1 "62"                             -                            -
SEAL INJECTION (GENERAL VIEW)
2-ISI-1                                                                                                                        A              1"                       1 -2VC-21A                           1 2-ISI-1A                           0                                                                                                                                   2-2VC-21A                             3 A              2" 2-ISI-1B                           0                                                                                                                                   2-2VC-21A                             3 A              2" 2-ISI-1C                           0 2"                       2-2RC-10A                             3 A
A 1 "62" A
2-ISI-2                             0         CROSSOVER DRAIN                                                                                                                                                 3 2-2RC-11A A               2"                     2-2RC-8A                               3 2-ISI-3                             0         RTD TAKEOFF COLD LEG 2"                     2-2RC-7A                               3 A
1" 1 -2VC-21A 1
2-I3I-4                             0         RTD TAKEOFF 110T LEC A               2"                     2-2SI-35A                               3 2-ISI-5                           0           SAFETY INJECTION HIGH HEAD 3"                       3-2RC-6A                               4 A
2-ISI-1A 0
2-ISI-6                             0           RTD RETURN
A 2"
                                                                                                                                                                                                                                                      -
2-2VC-21A 3
A6B               3"                               -
2-ISI-1B 0
2-1SI-7                            0          SPRAY TO PRESSURIZER (GENE.7AL VIEW)                                           A               3"                     3-2RC-5                               4 3-2RC-5                                4 2-ISI-7A                           0                                                                                         A               3" 4
A 2"
2-ISI-7B                           0                                                                                         A               3"                       3-2RC-5 0                                                                                                                                    3-2RC-5                               4 2-ISI-7C                                                                                                                       8               3" 2-ISI-7D                             0 6"                       6-2RC-13B                             6 A
2-2VC-21A 3
2-ISI-8                             0           SAFETY INJECTION HICll HEAD 6"
2-ISI-1C 0
                                                                                                                                                                                                        '
A 2"
6-2RC-13A                             6 A
2-2RC-10A 3
2-ISI-9                             0           PLO-CAP
2-ISI-2 0
                                                                                                                                                                                                                                                        -
CROSSOVER DRAIN 2-2RC-11A 3
A              8"                                 -
A 2"
0            RHR TAKE OFF (GENERAL VIEM)                                                                   8"                       8-2RC-15A                             8 2-ISI-10                                                                                                                                                                                                       8 2-ISI-10A                           0                                                                                                           8"                       8-2Ril-1A 0                                                                                                           8"                     8-25tH-1 A                             8 2-ISI-10B 2-ISI-10C                           0 12-2RC-16A                             11 A            12" 0             ACCUMULATOR DISCHARGE                                                                                               12-2SI-27A                             11 2-ISI-11
2-2RC-8A 3
                                                                                                                                                    .
2-ISI-3 0
_-.__----__---_---__---__---m-                                                 - - - - - - -    - - - - , - - - - - - - - - -_ _ , - - - - - - ,  -
RTD TAKEOFF COLD LEG A
                                                                                                                                                        -- - - . ,      - - _ -            - - - - - - - -                  _ - - - _ - - - . _        __ _ _ ___..- -__
2" 2-2RC-7A 3
2-I3I-4 0
RTD TAKEOFF 110T LEC A
2" 2-2SI-35A 3
2-ISI-5 0
SAFETY INJECTION HIGH HEAD A
3" 3-2RC-6A 4
2-ISI-6 0
RTD RETURN A6B 3"
SPRAY TO PRESSURIZER (GENE.7AL VIEW)
A 3"
3-2RC-5 4
2-1SI-7 0
2-ISI-7A 0
A 3"
3-2RC-5 4
2-ISI-7B 0
A 3"
3-2RC-5 4
2-ISI-7C 0
8 3"
3-2RC-5 4
2-ISI-7D 0
A 6"
6-2RC-13B 6
2-ISI-8 0
SAFETY INJECTION HICll HEAD A
6" 6-2RC-13A 6
2-ISI-9 0
PLO-CAP A
8" RHR TAKE OFF (GENERAL VIEM) 8" 8-2RC-15A 8
2-ISI-10 0
2-ISI-10A 0
8" 8-2Ril-1A 8
2-ISI-10B 0
8" 8-25tH-1 A 8
2-ISI-10C 0
A 12" 12-2RC-16A 11 2-ISI-11 0
ACCUMULATOR DISCHARGE 12-2SI-27A 11
---m-


_
i e
i                                               .        .                                                              .        e
Table III PORTHEPN STATES PWDt CD.
                                                                                                .
PAq 2 0F 4 PRAIRIE ISLAND INIT 2 ISOMETRIC SLM4ARY SIh I
Table III
REVISICN (XHOENT OR SYSTDI ILOP ER 2-ISI-12 0
:                    PORTHEPN STATES PWDt CD.                                                             PAq 2                   0F 4 PRAIRIE ISLAND INIT 2
SEAL INJECTION (CENERAL VIEW)
:                    ISOMETRIC SLM4ARY I                                                         '
B lb"&2" 2-ISI-12A 0
REVISICN               (XHOENT OR SYSTDI   ILOP     SIh                          ER 2-ISI-12             0   SEAL INJECTION (CENERAL VIEW)   B     lb"&2"                     -                              -
5 2"
2-ISI-12A           0                                   5       2"                     2-2VC-21B                       3 2-ISI-128           0                                   B       2"                     2-2VC-21B                       3 2-ISI-12C           0                                   B       1\"                 lb-2VC-21B                         1 i                                 2-ISI-13             0   CHARGING LINE (GENERAL VIEW)   B       2"                       -                              -
2-2VC-21B 3
2-ISI-13A           0                                   B       2"                     2-2RC-17                         3 2-ISI-138           0                                   B       2"                     2-2VC-5                         3 2-ISI-13C           0                                   5       2"                     2-2VC-6                         3 2-ISI-13D           0                                   B       2"                     2-2VC-6                           3 2-ISI-14             0   RTD TAKEOFF COLD LEG           B       2"                     2-2RC-8B                         3 2-ISI-15             0   RTD TAFIOFF HOT LEC             B       2"                     2-2RC-7B                         3 2-ISI-16             0   CROSSOVER DRAIN AND LETDOWN     B       2"                     2-2RC-10B                       3 2-2RC-115                       3 2-2RC-12                         3 2-ISI-17             0   RTD RETURN                     B       3"                     3-2RC-6B                         4 2-ISI-18             0   SAFETY INJECTION HIGH HEAD     B       6"                     6-2RC-13D                       6 2-ISI-19             0   PLO-CAP                         B       6"                     6-2RC-13C                       6 2-ISI-20           0   RHR TAKEOFF (GENERAL VIEW)     B       8"                       -                            -
2-ISI-128 0
2-ISI-20A           0                                   B       8"                     8-2RC-155                       8   ,
B 2"
2-ISI-203           0                                   B       8"                     8-2RH-15                         8 2-151-20C           0                                   8       8" i 8-2RH-15                         8 2-1S1-21           O   RHR RETURN                     B       10"                   10-2SI-26                 10 2-ISI-22           0   ACCUMULATOR DISCHARGE           B     12"                   22-2RC-165               11 12-25I-27B               11
2-2VC-21B 3
,
2-ISI-12C 0
I                                                                               *
B 1\\"
  - _ . . . , . _ - . . _ . . . . . . - .        - . -                                        __          _ _ _ . _ _ _                _  _ _ _ _ _ _ - . _
lb-2VC-21B 1
i 2-ISI-13 0
CHARGING LINE (GENERAL VIEW)
B 2"
2-ISI-13A 0
B 2"
2-2RC-17 3
2-ISI-138 0
B 2"
2-2VC-5 3
2-ISI-13C 0
5 2"
2-2VC-6 3
2-ISI-13D 0
B 2"
2-2VC-6 3
2-ISI-14 0
RTD TAKEOFF COLD LEG B
2" 2-2RC-8B 3
2-ISI-15 0
RTD TAFIOFF HOT LEC B
2" 2-2RC-7B 3
2-ISI-16 0
CROSSOVER DRAIN AND LETDOWN B
2" 2-2RC-10B 3
2-2RC-115 3
2-2RC-12 3
2-ISI-17 0
RTD RETURN B
3" 3-2RC-6B 4
2-ISI-18 0
SAFETY INJECTION HIGH HEAD B
6" 6-2RC-13D 6
2-ISI-19 0
PLO-CAP B
6" 6-2RC-13C 6
2-ISI-20 0
RHR TAKEOFF (GENERAL VIEW)
B 8"
2-ISI-20A 0
B 8"
8-2RC-155 8
2-ISI-203 0
B 8"
8-2RH-15 8
2-151-20C 0
8 8"
i 8-2RH-15 8
2-1S1-21 O
RHR RETURN B
10" 10-2SI-26 10 2-ISI-22 0
ACCUMULATOR DISCHARGE B
12" 22-2RC-165 11 12-25I-27B 11 I


_ _.
Tablo III NORIHERN STATES POWER CO.
_
PAE 3 0F 4 PRAIRIE ISLAND LNIT 2 ISOMETRIC SlMMRY fife Ab REVISI(N COMPONENT OR SYSTDI 1DOP R
                          .                  .                                                              .        .
2-ISI-23 0
                                                                                                    .
SAFETY INJECTION HICll HEAD B
Tablo III NORIHERN STATES POWER CO.                                                                               PAE 3         0F 4 PRAIRIE ISLAND LNIT 2 ISOMETRIC SlMMRY REVISI(N                                 COMPONENT OR SYSTDI         1DOP fife              R
2" 2-2SI-35B 2
_
2-ISI-24 0
Ab 0                  SAFETY INJECTION HICll HEAD                     B     2"       2-2SI-35B         2 2-ISI-23 2
AUXILIARY SPRAY 2"
0                  AUXILIARY SPRAY
2-2RC-19 3
                                                                                              -      2"       2-2RC-19         3 2-ISI-24 2-2VC-4           3 A     2"       2-2SI-24A       3 2-ISI-25          0                 F.EACTOR VESSEL SAFETY INJECTION 0                  REACTOR VESSEL SAFETY INJECTION                 B     2"       2-2SI-24B       3 2-ISI-26 PRESSURIZER RELIEF                             A6B     3"       3-2RC-21         4 2-ISI-27          0 0                  REACTOR VESSEL SAFETY INJECTION                 B     4"       4-2RC-14B       5 2-ISI-28 B     6"       6-2RC-14B       6 B     6"       6-2SI-25B       6 0                 REACTOR VESSEL SAFETY INJECTION                   A     4"       4-2RC-14A       5 2-1S1-29                                                                                      6"       6-2RC-14A       6 A
2 2-2VC-4 3
A     6"       6-2SI-25A       6 0                 PRESSURIZER SAFETY                               A     6"       6-2RC-20A       6 2-ISI-30                                                                                                                6 B     6"       6-2RC-20R B   10"     10-2RC-4         10 2-ISI-31          0                 PRESSURIZER SURCE A   29"     29-2RC-1A       15 2-ISI-32          0                REACTOR COOLANT A   31'-     31-2RC-2A       15 j'
2-ISI-25 0
A   27h" 27h-2RC-3A         15 B   29"     29-2RC-1B       15 2-ISI-33          0                  REACTOR COOLANT B   31"     31-2RC-2B       15 B   27b"   27 -2RC- 3B       15
F.EACTOR VESSEL SAFETY INJECTION A
                                                                                                -      -        -              6 2-ISI-34           0                     RECENERATIVE HEAT EXCilANGER
2" 2-2SI-24A 3
                                                                                                                  -              -
2-ISI-26 0
                                                                                                  -      -
REACTOR VESSEL SAFETY INJECTION B
2-ISI-35           0                     PRESSURIZER SAFETY AND RELIEF N0ZZLES
2" 2-2SI-24B 3
                                                                          .
2-ISI-27 0
  *        * - --- '--      - - - . . - . .  . _ _ _ , . , _ ,
PRESSURIZER RELIEF A6B 3"
3-2RC-21 4
2-ISI-28 0
REACTOR VESSEL SAFETY INJECTION B
4" 4-2RC-14B 5
B 6"
6-2RC-14B 6
B 6"
6-2SI-25B 6
2-1S1-29 0
REACTOR VESSEL SAFETY INJECTION A
4" 4-2RC-14A 5
A 6"
6-2RC-14A 6
A 6"
6-2SI-25A 6
2-ISI-30 0
PRESSURIZER SAFETY A
6" 6-2RC-20A 6
B 6"
6-2RC-20R 6
2-ISI-31 0
PRESSURIZER SURCE B
10" 10-2RC-4 10 2-ISI-32 0
REACTOR COOLANT A
29" 29-2RC-1A 15 A
31'-
31-2RC-2A 15 j
A 27h" 27h-2RC-3A 15 2-ISI-33 0
REACTOR COOLANT B
29" 29-2RC-1B 15 B
31" 31-2RC-2B 15 B
27b" 27 -2RC-3B 15 6
2-ISI-34 0
RECENERATIVE HEAT EXCilANGER 2-ISI-35 0
PRESSURIZER SAFETY AND RELIEF N0ZZLES


                                        .      . .                                                    .        .
l Table III
l Table III
'
'NORlHERN STATES POWER 00.
    'NORlHERN STATES POWER 00.                                                                     PAG       4     OF 4 PRAIRIE ISIAND INIT 2 l     ISOMETRIC SLM4ARY                                                                                               ,
PAG 4
LINE         LINE           LTT - CAL' NSP ISO   ISI                           N     I                       NtNBER           STANDARD SIZE i                               MNBER PRESSURIZER
OF 4
                                                                                      -      -            -              25A/16 2-ISI-36     0 A&B    -            -              25A 2-ISI-37       0   STEAM GENERATORS
PRAIRIE ISIAND INIT 2 l
                                                                                                          -                -
ISOMETRIC SLM4ARY LINE LINE LTT - CAL' NSP ISO ISI N
                                                                                        -    -
I SIZE NtNBER STANDARD MNBER i
2-ISI-38       0   REACTOR VESSEL CONOSEAL BOLTING REACTOR VESSEL STUDS, NUTS & WASHERS  -    -            -              STUDS-17 2-ISI-39     0
25A/16 2-ISI-36 0
                                                                                              -            -              -
PRESSURIZER 25A 2-ISI-37 0
                                                                                        -
STEAM GENERATORS A&B 2-ISI-38 0
2-ISI-40     0   REACTOR VESSEL N0ZZLES
REACTOR VESSEL CONOSEAL BOLTING STUDS-17 2-ISI-39 0
                                                                                        -      -            -            25A 2-ISI-41     0   REACTOR VESSEL HEAD WELD
REACTOR VESSEL STUDS, NUTS & WASHERS 2-ISI-40 0
                                                                                        -    -            -                -
REACTOR VESSEL N0ZZLES 25A 2-ISI-41 0
2-ISI-42     0   REACTOR VESSEL SHELL WELDS
REACTOR VESSEL HEAD WELD 2-ISI-42 0
!
REACTOR VESSEL SHELL WELDS 2-ISI-43 0
                                                                                                            -                 -
RC PUMP SEAL !!0USING BOLTIt;G A&B 2-ISI-44 0
0    RC PUMP SEAL !!0USING BOLTIt;G       A&B      -
RC PUMP FLANCE BOLTING A&B 2-ISI-45 0
2-ISI-43
RC PUMP FLYWHEEL A&B 6
                                                                                                                              -
2-ISI-46 0
A&B       -            -
EXCESS LETDOWN HEAT CL-1 EXCHANGER 2-ISI-47 0
2-ISI-44     0     RC PUMP FLANCE BOLTING
REACTOR VESSEL CLOSURE CL-1 HEAD CLAD PATCHES 2-ISI-48 0
                                                                                                            -                -
REACTOR VESSEL CLAD CL-1 PATCH IDENTIFICATION i
A&B     -
2-ISI-45     0     RC PUMP FLYWHEEL
                                                                                          -    -            -                6 2-ISI-46     0     EXCESS LETDOWN HEAT CL-1             EXCHANGER
                                                                                                -            -              -
                                                                                          -
2-ISI-47     0     REACTOR VESSEL CLOSURE CL-1             HEAD CLAD PATCHES
                                                                                                  -          -              -
                                                                                          -
2-ISI-48     0     REACTOR VESSEL CLAD CL-1             PATCH IDENTIFICATION
                                                                .
                                    .
O
O
__ _ _ _ _ _ _ _ _ _ _ _ _ _                                                                                    _            _ _ _ _ _ . . _ _ _ . _ . _ . _


__-______-________ _ _-.
Table III NORIHERN STATES POWER 00.
                                                  .          .                                                                                                                                                                                                      .        .
PAGE I
                                                                          ,
OF 1
                                                            .                                                                                                                                                                                            .,.
PRAIRIE ISIAND LEIT 2 ISO!ETRIC SENARY - SEIS;iIC BOLTING AUGMENTED NSP ISO LINE LINE trf - CAL.
                        '
REVISI(N 00EONENT OR SYSTBI IDOP NtNBER SIZE NIMBER STANDARD 2-ISI-77 0
Table III NORIHERN STATES POWER 00.                                                                                                                                                                                                               PAGE     I OF         1 PRAIRIE ISIAND LEIT 2 ISO!ETRIC SENARY - SEIS;iIC BOLTING AUGMENTED NSP ISO                                                                                                                                                                                                                         LINE       LINE               trf - CAL.
STEAM GENERATOR SUPPORT BASE A&B 4/ GENERATOR 2-ISI-78 0
REVISI(N                                                                 00EONENT OR SYSTBI                                                                                                   IDOP SIZE     NIMBER               STANDARD NtNBER 2-ISI-77                 0                   STEAM GENERATOR SUPPORT BASE                                                                                                                                       A&B               -
STEAM GENERATOR SUPPORT TOP A&B 4/ GENERATOR 2-ISI-79 C
4/ GENERATOR                 -
REACTOR COOLANT PUMP SUPPORT BASE A&B 3/ PUMP 3/ PUMP 2-ISI-80 0
2-ISI-78                 0                   STEAM GENERATOR SUPPORT TOP                                                                                                                                         A&B               -
REACTOR COOLANT PUMP SUPPORT TOP A&B 2-ISI-81 0
4/ GENERATOR                 -
R.C. PUMP #22 LOWER LATERAL SUPPORT B
2-ISI-79                 C                   REACTOR COOLANT PUMP SUPPORT BASE                                                                                                                                   A&B               -
2-ISI-84 0
3/ PUMP                     -
R.C. PUMP #21 LOWER LATERAL SUPPORT A
2-ISI-80                 0                   REACTOR COOLANT PUMP SUPPORT TOP                                                                                                                                   A&B               -
2-ISI-85 0
3/ PUMP                      -
STEAM GENERATOR UPPER SUPPORT A&B 2-ISI-86 0
2-ISI-81                 0                   R.C. PUMP #22 LOWER LATERAL SUPPORT                                                                                                                                       B           -            -                    -
STEAM GENERATOR UPPER SUPPORT SNUBBERS A&B 2-ISI-87 0
2-ISI-84                 0                   R.C. PUMP #21 LOWER LATERAL SUPPORT                                                                                                                                       A           -            -                    -
STEAM CENERATOR SUPPORT PAD A&B 4/CENERATOR 2-ISI-853 0
2-ISI-85                 0                   STEAM GENERATOR UPPER SUPPORT                                                                                                                                       A&B               -            -                    -
PRESSURIZER BASE 2-ISI-89 0
2-ISI-86                 0                   STEAM GENERATOR UPPER SUPPORT SNUBBERS                                                                                                                               A&B               -            -                    -
ACCUMULATOR BASE A&B
2-ISI-87                 0                   STEAM CENERATOR SUPPORT PAD                                                                                                                                         A&B               -
--.___-y_
4/CENERATOR                 -
2-ISI-853               0                   PRESSURIZER BASE                                                                                                                                                           -            -          -                    -
2-ISI-89                 0                   ACCUMULATOR BASE                                                                                                                                                     A&B               -            -                    -
                                                                                                                            .
                              - -    --  - - _ - _  . _ _ , --.___-y_     _ - , _ _ . - _ . . _ _ _ - , _ , . _ - . _ _      . _ _ _ , , . _ _ , , , . _ . , _ , . , , _ _ _ _ . _ . _ , , _ , , , , , _ _ , _ , , , , , , , , , _ _ , , _ , , _ , , _                      , , _ _


_. _ _
l
                                                                                                                            .
=
l                                                          =
I<.
                                      .
I
< .
                      .
l l
l l
l
1 APPENDIX B ASPE CLASS 2 EXAMINATION i
                                                                                                                                  .
'
I 1
APPENDIX B ASPE CLASS 2 EXAMINATION i
i I
i I
l l
l l
l
                                                                                                                                .
1 i
1 i
i i
i i
l I
l l
l l
,
l Page 1 of 1
I
                        -
l l
l
                        .
;
Page 1 of 1
  . _ _ - _ _ _ _ _ _ _ _ - _ _ _ _ _  __        _. . _ _  _ . _ _ _ _ .    . _ _ _ _ . . _. .__ _ _ _ _ __. _. .. _. -_  .


_ _ _ - _ _ _ _          _ - _ _ _ _ _ _ _ _ _ _ _ _
NORTHERN STATES POWER CO.
                            .                                                                      .                  .
TABLE S2.1 PRALRIE ISLAND i: NIT 2
                    .
PAGE I
NORTHERN STATES POWER CO.                                                                         TABLE S2.1 2                                                                       PAGE                 I     OF 2 PRALRIE ISLAND i: NIT INSERVICE INSPECTION-EXAMINATIOf4  
OF 2 INSERVICE INSPECTION-EXAMINATIOf4  


==SUMMARY==
==SUMMARY==
MAJOR ITEM. PRESSURE VESSELS-S115AlfCElHA101 -
MAJOR ITEM. PRESSURE VESSELS-S115AlfCElHA101 -
SUB M                   " T       8       INSP. R EO'D. AMT.           ITEM                               INSPECTION ITEM E-               ND DE R     N PER. AMT. EXAM       IDEr;TIFICATION                         REPORT NO.
M
i GORY               ITEM TO 8E EXAMINED l
" T 8
C1.1   C-A         CIRCUMFERENPIAL RTPP WEMS *                           *(3 AREAS, EQUALLY DIVIDED) l SPEAM GENERA'IOR No. 21 NEW B                   'INO     82"     180.5" 0" 10 48",129" 10             81-127,128,133 189",270" 10 330"
SUB INSP.
                                                                              & 439 '10 0" NEW F                   -
R EO'D.
111"       -
AMT.
SPEAM GENERATOR NO. 22 NE[D C                 -
ITEM INSPECTION E-ND DE R N
82" NEID E                   -
ITEM PER.
82" iEID 11                 'HIREE   111" C1.2   C-B         NOzzm 10 VESSEL WEIDS STEAM GENERA'IOR 10. 21 MAIN S2 SAM Nozzm       -        -        -                          .
AMT.
stEDmita NOzzm           -        -        -
EXAM IDEr;TIFICATION REPORT NO.
SPFAM GENERATOR NO. 22 MAIN STEAM NCzzm         111REE     1       -
GORY ITEM TO 8E EXAMINED i
stErweta mzzm           -         -        -
l l
C1.3   C-C         IN1EGRALLY WEIDED             -        -        -
C1.1 C-A CIRCUMFERENPIAL RTPP WEMS *
                                                                              -NONE-SupeoarS I
*(3 AREAS, EQUALLY DIVIDED) l SPEAM GENERA'IOR No. 21 NEW B
                                                                                                                                ,o. - o.........
'INO 82" 180.5" 0" 10 48",129" 10 81-127,128,133 189",270" 10 330"
& 439 '10 0" NEW F 111" SPEAM GENERATOR NO. 22 NE[D C 82" NEID E 82" iEID 11
'HIREE 111" C1.2 C-B NOzzm 10 VESSEL WEIDS STEAM GENERA'IOR 10. 21 MAIN S2 SAM Nozzm stEDmita NOzzm SPFAM GENERATOR NO. 22 MAIN STEAM NCzzm 111REE 1
stErweta mzzm
-NONE-C1.3 C-C IN1EGRALLY WEIDED SupeoarS I
,o. - o.........
rappp g g n-
rappp g g n-
                                                    .


                                                                                ,
R TIA R
                                                                                                        .
E D
_
G 2
R T
M A
I A                                                                        '
d*O E
R                                                                         "
I pT ON oS TT CR EO S
E                                                                         '
PP 6
                                                                                        '
L S
                                                                                          '
1 E
D                                                                         '
E IR 4,
G                                                                         '
N 2
                                                                                          "
S S 2 S
2 M                                                                           '
08 97 1 5 77 E
                                                                                        '
77 67 77 44 V
A        d
1 1 1 1 1 1 1 1 ELEE 88 88 88 88 R
                        *O
BGU AAS TPS ER P_
                              .
NO I
                                                                                        "
T M
pTE          ON I                                                                "
A E
oS-          TT CR                                                               '
MC T
S        EO PP 1          L       S                                             6 E       NE IR                                             4, 2         S S 2 S                                 08     97         1 5     77
EIF I
  .            E                          77     67         77     44 V                           - -
TI IT R
1 1
N
                                                    - -
)
1 1
)
                                                                - -
)
1 1
)
                                                                        - -
1 1 E                                                                88 LEER                                88     88         88 BGU
  . AAS TPS     E R
P_           N O
                    .
:          I T
M            A E       MC T
I EIF TI IT                                             )
R            N            )
P)
P)
                                                  )
P)
P)
                                                              )
F) f)
F)     f)         )
)
O J
O N.
* 0             M     . M    . N .  .
M M
M    .       .
0 M
(      (
J 8
A 8            (
(
                                          )  T.
A T.
T.
T.
T. ) T.
(
(
(
(
                                                  )   T.      )   T.  )   T. ) T.
)
M                         VU
)
)
)
M VU VU VU VUVU
((
((
VU
((
((
VU
((
((
VUVU
((((
((((
T .M MA  X            77     00         88     88   - -
.M TMA 77 00 88 88 - -
AE                1 1     22         1 1     1 1
X A
                          .                  )       )           )       )       )
1 1 22 1 1 1 1 E
0*T                   N       N           N       N       N QM E                0M I
)
0M I
)
0M I
)
0M0M I      I                -.
)
RA                2(     2(         2(     2(2(
)
2       2           2       2       2
0*T N
                          ..
N N
P R                                                   E S                                                     E                      -
N N
NE                 O       O                   O      R                  -
QM I
IP W
I I
1 W
I I
I' W
A 0M 0M 0M 0M0M E
1 W
R 2(
2(
2(
2(2(
2 2
2 2
2 E
P R E
S O
R NE O
O W
W W
W IP 1
1 1
I' 1
4 1
4 1
1 1
Y R
                                                                                              .
1 2
Y R                     1                   2                                       -
A 2
A                     2                   2                                     .
2 M
M              D                   G           G       G M              E
D G
                                        . G               .
G G
N     0     N       N     O   N       N U     8 NI        1    I       I     N   I       I                         ,
G M
S             M           T       T           T       T A G   E     L       L     R   L       L N              X N    T    O       O     O   O       O O              E I   T     D       B     I   D       B                         .
E N
E N   A                   A' A      B I
0 N
T              B I    R     A       B     R A     E         A    E                   E N EO r
N O
DT    T   N     Y       Y     N   Y       Y N               E   E     A       A     E   A       A O
N N
        .      I MNE M R   G     W       H     G   W       W N
U 8
                                                                                                  .
I I
N       N           N
N I
                                                                                                  .
I NI 1
C         M            T                                A                                -
S M
A             I E   M     A       A     M           A R G A     M       M     A   M       M                         -
T T
                                                                                                  -
T T
  . R          X               U N E                   E E2         E               S I I                   I S                    S
A G
                                                                                                    .
E L
W           -            S T                                                           %
L R
N              E L                                                             ,
L L
O                          R O                                                             -
O O
                                                                                                  -
O O
                                                                                                  ,
O N
  .
X N
PTO I I P  B                                                            .
T E
SNT                                                                                         -
I T
EU T         C E
D B
                                                                                                  .
I D
                                                                                                  .
B O
                                                                                                  .
I E
ADP             MEY     R
N A
                                                                                                  -
A' T
                                                                                                  -
B I
TNSN                    O D                                                       *
R A
                                                                                                  -
B R
                                                                                                  -
A B
                                                                                                  ,
A EO A
SAI                     G                                                         #'
E E
                                                                                          *      -
E r
L                     C-                                                               ,
N T
N SE
N Y
                                                                                                  ,
Y N
                                                                                          *0     -
Y Y
p,
N DT E
                                                                                                  .
E A
                                                                                                -
A E
RI C EEI                                                                                       ,
A A
HI V               B      4 7
M R
g_
G W
                                                                                                  .
H G
_
W W
_    T RR I             J                                                                g -
O I
RA E
MNE N
                                                                                                .
N N
.
N M
S      EU     1 g .-
T C
C
A I
                                                                                                -
E M
                                                                                                -
A A
OR NPI N o
M A
r
A R G A
                                                                                                  .
M M
_                                                                                                ,
A M
                                                                                                  -
M R
                                                                                                  -
X U N E
_
E E2 E
                                                                                                  .
S I
                                                                                                  .
I I
W S T S
S E L O
N R O PTO P B I I SNT EU C T
E ADP MEY R
TNS O
D N
SAI G
L C-N SE
*0 p,
RI C EEI HI V 7
4 g_
T RR B
J I
g -
RA E EU 1
S C
g.--
OR N o
NPI r
l
l


_ _ _ _ _ _ _ _ _ _ _ _ - _ . -__-_ __ ___                _ _ _
NORTHERN STATES POWER CO.
                                                                                        .      .                                                                          .    .
TABLE S2.2.1 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                                                                     TABLE   S2.2.1 PRAIRIE ISLAND UNIT                                                 2                                                                         PAGE     1     OF 5 INSERVICE INSPECTION-EXAMINATION  
PAGE 1
OF 5 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM: PIPItG-CIRCUMEERENPIAL BUIT_WEILS SUS                                                                     INSP. R EO'D. AMT.         ITEM                   INSPECTION ITEM                            E.                 N DE     I I N         PER. AMT. EXAM     IDENTIFIC# TION           REPORT NO.
MAJOR ITEM: PIPItG-CIRCUMEERENPIAL BUIT_WEILS SUS INSP.
GORY                 ITEM TO 8E EXAMINED C2.1                             C-G     CIRCUMFERENPIAL BUIT WEIDS MAIN STEAM A 32-2MS-1                 -          -        -
R EO'D.
MIN SIEAM B 32-2MS-2                 -          -        -
AMT.
MAIN SIEAM A                   'IND         1       1 MS-11                 81-123 30-2MS-1                 'IHREE       1
ITEM INSPECTION E.
                                                                                                                                                  -
N DE I I N ITEM PER.
MAIN STEAM B                   'INO         1       1 MS-83                 81-43,55 30-2MS-2 MAIN STEAM A                   OE           1       1 MS-17                 77-101,31 31-2MS-1                 'INO         1     6   MS-16,17,18             81-52,83,4,54,85 MAIN SIEAM B                                           M3-19,20,174           81-50,84,51,92,53,86 31-2MS-2               'IWO         1       1 MS-117                 81-93 MAIN SIEAM A                   OE           1       1 MS-188                 77-99,15 RELIEF HDR., 30-2MS-1 MAIN STEAM B RELIEF HDR., 30-2MS-2   -          -      -
AMT.
MAIN STEAM A
EXAM IDENTIFIC# TION REPORT NO.
!                                                                                                      6-2MS-1               -          -        -
GORY ITEM TO 8E EXAMINED C2.1 C-G CIRCUMFERENPIAL BUIT WEIDS MAIN STEAM A 32-2MS-1 MIN SIEAM B 32-2MS-2 MAIN SIEAM A
MAIN SIEAM B 6-2MS-2             OE             1       1 MS-113                 77-96,37 EEEDWA'IER A 16-2EW-13             OE           1       1 EW-161                 77-45,55 16-2EW-12             'IWO         2       2 EW-161                 80-20,27,83,185 16-2EW-11             -          -        -
'IND 1
EW-174                 80-18,31,84,160 EW-177                 80-19,29,40,162 EW-177                 81-10,32,36,42,42R romu o-un ein                                                                                                                                             ro..                         o.........
1 MS-11 81-123 30-2MS-1
PP9-B-11                                                                 .          .
'IHREE 1
- _ _ _ _ _ _ _ - _ _ _ _ - - - _ _ _ _ _ _ -                                            -.                                                                          _                    _ - _ - _ - - _ _ _ _ _ _ _ _ _ _ _ _ _
MAIN STEAM B
'INO 1
1 MS-83 81-43,55 30-2MS-2 MAIN STEAM A OE 1
1 MS-17 77-101,31 31-2MS-1
'INO 1
6 MS-16,17,18 81-52,83,4,54,85 MAIN SIEAM B M3-19,20,174 81-50,84,51,92,53,86 31-2MS-2
'IWO 1
1 MS-117 81-93 MAIN SIEAM A OE 1
1 MS-188 77-99,15 RELIEF HDR., 30-2MS-1 MAIN STEAM B RELIEF HDR., 30-2MS-2 MAIN STEAM A 6-2MS-1 MAIN SIEAM B 6-2MS-2 OE 1
1 MS-113 77-96,37 EEEDWA'IER A 16-2EW-13 OE 1
1 EW-161 77-45,55 16-2EW-12
'IWO 2
2 EW-161 80-20,27,83,185 16-2EW-11 EW-174 80-18,31,84,160 EW-177 80-19,29,40,162 EW-177 81-10,32,36,42,42R romu o-un ein ro..
o.........
PP9-B-11


- _ _ _ _ _ _ - _ - _ _ _ _ - _ - _ _ _                                    _-____
NORTl!ERN STATES POWER CO.
                                                                  .            .                                                                              .    .
TABLE S2.2.1
NORTl!ERN STATES POWER CO.                                                                                           TABLE   S2.2.1
?RAIRIE ISLAND UNIT 2
                                        ?RAIRIE ISLAND UNIT                 2                                                                               PAGE     2       op 5 INSERVICE INSPECTION-EXAMINATION  
PAGE 2
op 5 PIPING-61EUlGE16NfIAL Burr WEILS INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:_ PIPING-61EUlGE16NfIAL Burr WEILS YS SUB             E-                        N DE    I TION O      INSP. R EO'D. AMT.             ITEM                   INSPECTICN ITEM         GORY                                                PER.       AMT. EXAM         IDENTIFICATION             REPORT NO.
MAJOR ITEM:_
ITEM TO BE EXAMINED C2.1           C-G       (CONT'D)
YS SUB INSP.
EEE0m ER B 16-2EW-16             OE             1       1     EW-116                 77-97,3
R EO'D.
                                                    ,                            16-2EW-15             TWO           1       1     EW-133                 80,21,38,41,161 EW-133                 81-11,37,35,41,41 R EEEDE'IER A (8 in) 3-2AF-11       -            -        -
AMT.
EEEDWA'IER B (8 in) 3-2AF-12       -            -        -
ITEM INSPECTICN E-N DE I TION O ITEM PER.
REFUELING WATER SIORAGE
AMT.
                                                                        'IENK DISOIA'0E 14-2S1-1                 'IND           1         1 W-58 (Pt only)             79-41 12-2SI-3A               'IWO           1         1 W-60                       79-83 12-2S1-3B             -            -          -
EXAM IDENTIFICATION REPORT NO.
12-2S-11                 -              -        -
GORY ITEM TO BE EXAMINED C2.1 C-G (CONT'D)
12-2SI-4                 'RIREE         1       -
EEE0m ER B 16-2EW-16 OE 1
10-2S1-8                 1NO             1       1   W-68W                     79-84 STREAM 1             '1HREE         1       -
1 EW-116 77-97,3 16-2EW-15 TWO 1
STREldt 2           'IWO           2       2     W-88,289                   79-77, 76 OCNTAINN Nr SUMP B DIS 01AR3E LINES 14-2S1-33A               -              -        -
1 EW-133 80,21,38,41,161 EW-133 81-11,37,35,41,41 R EEEDE'IER A (8 in) 3-2AF-11 EEEDWA'IER B (8 in) 3-2AF-12 REFUELING WATER SIORAGE
14-2S1-33B               -              -        -
'IENK DISOIA'0E 14-2S1-1
12-2SI-34A               'INO           1       1   W-17                       79-25 12-2SI-34B               'IND           1       1   W-5                       79-26 12-2Ril-6A               -              -        -
'IND 1
12-2Ril-6B               -              -        -
1 W-58 (Pt only) 79-41 12-2SI-3A
Fon u s7-aers e/7s                                                                                                                   ronu no sss-seen PP9-B-12                                                     .            .
'IWO 1
                                                              ._    . ._,              .                    -  -                                      -                  . _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ - _ _ .
1 W-60 79-83 12-2S1-3B 12-2S-11 12-2SI-4
'RIREE 1
10-2S1-8 1NO 1
1 W-68W 79-84 STREAM 1
'1HREE 1
STREldt 2
'IWO 2
2 W-88,289 79-77, 76 OCNTAINN Nr SUMP B DIS 01AR3E LINES 14-2S1-33A 14-2S1-33B 12-2SI-34A
'INO 1
1 W-17 79-25 12-2SI-34B
'IND 1
1 W-5 79-26 12-2Ril-6A 12-2Ril-6B Fon u s7-aers e/7s ronu no sss-seen PP9-B-12


                                            .      .                                                                                    .      .
NORTHERN STATES POWER CO.
NORTHERN STATES POWER CO.                                                                                                   T/ ELE   S2.2.1 PRAIRIE ISLAND UNIT                   2                                                                                     PAGE     3     OF 5 INSERVICE INSPECTION-EXAMINATION  
T/ ELE S2.2.1 PRAIRIE ISLAND UNIT 2
PAGE 3
OF 5 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM: PIPING 4'IRCUMFERENTIAL BUl"r WEIES SUB E M                         MPON T                     S M INSP. R EQ'D. AMT.         ITEM                 INSPECTION ITEM E-                 D DE R                 I N PER. AMT. EXAM     IDENTIFICATION           REPORT NO.
MAJOR ITEM: PIPING 4'IRCUMFERENTIAL BUl"r WEIES E M MPON T S M SUB INSP.
GORY                     ITEM TO BE EXAMINED C2.1       C-G                 (00Nr'D)
R EQ'D.
AMT.
ITEM INSPECTION E-D DE R I N ITEM PER.
AMT.
EXAM IDENTIFICATION REPORT NO.
GORY ITEM TO BE EXAMINED C2.1 C-G (00Nr'D)
SAFETY IM ECTION
SAFETY IM ECTION
                                                'UIP NO. 21 SUCTION 6-2Ril-10A BRANCII 1                     'IWO       5'       5   W-285,93,161,96,95     79-59,78,79,82,80 BRANCH 2                       'I11REE     1
'UIP NO. 21 SUCTION 6-2Ril-10A BRANCII 1
                                                                                                                  -
'IWO 5'
SAFETY IM ECTIN RJMP NO. 22 SUCTIN 6-2Ril-10B BRANCH 1                       'IWO       2       2   W-286, 135             79-57, 81 BRANCH 2                       DIREE       1
5 W-285,93,161,96,95 79-59,78,79,82,80 BRANCH 2
                                                                                                                  -
'I11REE 1
                                    ,
SAFETY IM ECTIN RJMP NO. 22 SUCTIN 6-2Ril-10B BRANCH 1
RESIDUAL HEAT REMOVAL DISCHARGE 8-2REl-9A                           'IWO       1       1 W-68                   79-67 8-2Ril-9B                           'I11RSE     1
'IWO 2
                                                                                                                  -
2 W-286, 135 79-57, 81 BRANCH 2 DIREE 1
                                                                                              'IND         1       1 W-53                   79-65 8-2Ril-7A                           -        -        -
RESIDUAL HEAT REMOVAL DISCHARGE 8-2REl-9A
8-2RIl-7B                           'INO       1         1 W-201                 79-63 BORIC ACID SUPPLY 'IO SAFETY INJECTIN 6-2SI-13A                           'IWO       1       1 W-272R                 79-53 mires       t       -
'IWO 1
6-2SI-13B                           'IWO       1       1 W-271                 79-52 8-2S1-17                             -          -        -
1 W-68 79-67 8-2Ril-9B
8-2S1-18                             'IND       1       1 W-85                   79-94
'I11RSE 1
                                                                                                                  -
'IND 1
                                                                                              '111REE     1 RESIDUAL IIEAT RDUIAL SUClIN 10-2S1-9A                             'INO       1       1 W-212                 79-54 10-2SI-9B                             'INO       1       1 W-143                 79-55
1 W-53 79-65 8-2Ril-7A 8-2RIl-7B
                                                            -
'INO 1
ronu o.........
1 W-201 79-63 BORIC ACID SUPPLY 'IO SAFETY INJECTIN i
rogy;gussin 3
6-2SI-13A
.- _- . _ .          . . . . _ . . - . .          -. .-          . _ - - - - . .        . . -.
'IWO 1
1 W-272R 79-53 mires t
6-2SI-13B
'IWO 1
1 W-271 79-52 8-2S1-17 8-2S1-18
'IND 1
1 W-85 79-94
'111REE 1
RESIDUAL IIEAT RDUIAL SUClIN 10-2S1-9A
'INO 1
1 W-212 79-54 10-2SI-9B
'INO 1
1 W-143 79-55 rogy;gussin ronu o.........
3


_ - _ _ - - _ _ - _ _ - _ _ _                          ._      . - - __
NORTHERN STATES POWER CO.
                                                          .              .                                                                        .        .
TABLE S2.2.1 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                                           TABLE                             S2.2.1 PRAIRIE ISLAND UNIT                       2                                                                         PAGE                             4                   OF 5 INSERVICE INSPECTION-EXAMINATION  
PAGE 4
OF 5 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
M AJOR ITEM: PIPING-CIRCUMFERENTIAL BUIT WEILS SUB M                     COM     E OR YS M         tNSP. R EO'D. AMT.         ITEM                                                         INSPECTION
M AJOR ITEM: PIPING-CIRCUMFERENTIAL BUIT WEILS M
                                                    ,
COM E OR YS M ITEM tNSP.
ITEM        GORY                          ITEM TO SE EXAMih*D      PER. AMT. IXAM     IDENTIFICATION                                                   REPORT NO.
R EO'D.
C2.1       C-G             (GNP'D)
AMT.
N~JMJIA'IOR DISOIAIG LINES 12-2SI-28A             -            -        -
ITEM INSPECTION SUB PER.
12-2SI-288             -            -        -
AMT.
                              '
IXAM IDENTIFICATION REPORT NO.
12-2SI-29A             -            -        -
GORY ITEM TO SE EXAMih*D C2.1 C-G (GNP'D)
12-2SI-29B             OE           1       1 SI-316                   77-49 C2.1       C-F                       IESIDUAL llEAT REMOVAL DISOIABGE 10-2Ril-11             OE           1       1 NI-294                   77-33                                                             '
N~JMJIA'IOR DISOIAIG LINES 12-2SI-28A 12-2SI-288 12-2SI-29A 12-2SI-29B OE 1
                                                                                                  'Iwo         1       1 W-176                     79-30
1 SI-316 77-49 C2.1 C-F IESIDUAL llEAT REMOVAL DISOIABGE 10-2Ril-11 OE 1
                                                                                                  'IliREE       1       -
1 NI-294 77-33
6-2MI-12             'Iwo         1       1 W-331                     81-66 6-2S1-10B           'IIIREE       1
'Iwo 1
                                                                                                                        -
1 W-176 79-30
RESIDUAL llEAT REMOVAL SUCTIOi 12-2MI r>A             'INO         1       1 W-105                     79-27 12-2RII-5B             TWO           1       1 W-142                     79-47,50 8-2RH-4A             '1ho         1       1 W-100                     79-68 8-2Ril-4B           '111REE   I   1
'IliREE 1
                                                                                                                        -
6-2MI-12
10-2Ril-3             OE           2       2 Mi-255,Ril-256             77-50,51
'Iwo 1
                                                                                                  'INO         2       2 W-225,226                 79-28,29
1 W-331 81-66 6-2S1-10B
                                                                                                  'IHREE       2       -
'IIIREE 1
8-2Ril-5A               'IW           1       1 W-104                     79-69 8-2RIl-5B               'IND           1       1 W-138                     79-64 rOnu 3 7-se7e e/7s                                                                                                                                                       FORM PeO tSI 9449 PP9-B-14                                                       ,
RESIDUAL llEAT REMOVAL SUCTIOi 12-2MI r>A
                                        -.    - .        _
'INO 1
                                                                                .                                                              __      _ _ - - _ _ _ _ _ - _ - _ _ _ _ _ _ _ _ _ .
1 W-105 79-27 12-2RII-5B TWO 1
1 W-142 79-47,50 8-2RH-4A
'1ho 1
1 W-100 79-68 8-2Ril-4B
'111REE I
1 10-2Ril-3 OE 2
2 Mi-255,Ril-256 77-50,51
'INO 2
2 W-225,226 79-28,29
'IHREE 2
8-2Ril-5A
'IW 1
1 W-104 79-69 8-2RIl-5B
'IND 1
1 W-138 79-64 rOnu 3 7-se7e e/7s FORM PeO tSI 9449 PP9-B-14


l!   ! !    ;]
l!
;]
E J
E J
J F
JFW t,o T
W                                                    t, o
T I
o s
o s
                                                                      -
IT M
T                                                    a s
as s.
M                                              -    s.
o 5
5 L                                                       os e
L se A
A I      NO.                                           s e
NO.
p I'       O IN                                             n 1
s I
oNE        TT CR o
O e
r R     EO P P 2         E E
p I' IN n
S E N
oN TT o
2        M       IR                             A S 5 U                                 25         6 C                           56         4
E CR r
  .          R                             - -        -
1 R
E        I                            11         7 LE<                                  78         7 BGG
EO P P 2
  .
E S E E
AAN TPI P I
N 2
P          N
M IR A
:
S 5 U
OI T
25 6
M          A E       MC T       EIF
C 56 4
.
R I
I      TI IT R           N               2 E
11 7
O J          D                39         6 I
E 78 7
34         2 A                               3
LE<
                                                  -    I
BGG AAN TPI P
                                                        -
IP NO I
M                           I SW         S T.M MA  X 1 1 -     1 AE
T M
-
A E
D.
MC T
.-
EIF I
O'MT.
TI IT R
E                   1 1 1     1 RA
N 2
                                                                                ,
O ED 39 6
F.   .                      E SR                           E NE IP                   EOR  WH   E Q I'   'I O
J I
                                                                                .
34 2
Y R
A 3
A M   U DE M           N U   8 NI
I I
_
M SW S
S            M         N A         O N       IX         LI O       IE         ETA               8                         _
.M T A 1 1 -
I           E       SC5                5 T           B       SD I 2             2 EJ -                -
1 M X A E D.
A   N EODT          VNI               1
O' T.
-      .
M E
N I
1 1 1 1
* M             R IS 2
A R
S 2                         _
E F.
O                     E OY
E SR EOR E
                                                                                  .
NE IP WH Q '
M                      T6-
'I O
                                                          -
I Y
C       A T )    I                  6                          _
RA M
CE I
U D M
-
E N
D
U 8 NI S
-
M N
R        X                   A
A O
  .
N IX LI O
E2       E             'P N
IE ETA 8
EW RS
SC5 5
_
I E
                                                                                    -
T B
W       N
SD 2 2
                  -            O
I EJ -
_
A N EO VNI 1
O                        C PTO I I
N DT IS S
(                                                   _
I
  .
* M R
SNT                                                                         .
2 2
E T UC    E         .
O M
_
E OY -
ADP           MEY    R TNSN                  O F                                     s           _
T T6 6
SAI L G
C A
C
I
                                -                                    7
)
                                                                      /
I D
e N SE                                                           s     5 RI EEI C                                                     7 4
CE R
a-1
X EW A
                                                                              -
'P E2 E
HI V                                                           7 B
W N
BM     1                                             -
RS O
T RRI          UE         .
O N
s e    9     ,
C PTO
RA E     S ST  I 2
(
C                                     n PP n
I I SNT E U C T
_
E ADP MEYR TNS O
GR NPI N o
F s
r           _
N SAI G
_
7
_
/
_
L C
e N SE s
5 RI C 7
1 4
EEI a
HI V
- B T RR BM 1
7 s
UE 9
I RA E ST 2
ne P _
S I
C n P GR N o
NPI r


_
S G
S G
                                                                                              .
N I
                                                                                              .
T T
N                                                                               -
I t
I                                                                               .
F t
_
e N
T                                                                               -
t I
T
I S
                                                                                              -
I                                                                               _
F                                                                   t t
_
                                                                                              -
e N                                                                   t
                                                                                    -
I                                                                    I S
B.
B.
1     S                                                                   O T                                           )
1 S
N N      NO.
O T
R I     O                                     3                      M IN                                  9 2
)
N NO.
R N
3 M
I O
F%
F%
O.         TT CR
IN 9
                                                            +
R O.
TT
+
O 2
CR
(
(
R O
F D
F         -
IO P P 0
D      IO P P 2         I     S E                                   0 2    1    W N
2 I
IR                         3         3, S                                           2         3
S E W
  .            L                                1         9 A                                   -          -
IR 3
E        N                                 1         7 I                                 8         7 LED
N 3,
  .
2 1
BGU AAI
S 2
                                                                                              -
3 L
                                                                                              -
1 9
T P'G    I
A E
          - N GO NI               N                      2         8 I      :
N 7
O I                     1         1                               -
1 I
PM I
8 7
T A                     S
LED BGU AAI T P' IG
                                                  -
- N GO N
S
NI O
                                                              -
2 8
PE            MC                         M         M T     EIF                                                                  .
I 1
TI I
1 I
IT                       O         O R         N                       I'       I
T PM A
                                                            '
S S
E O
IPE MC M
J         D                     1          7 I                     1         1 A                                  -          -
M T
M                                S         S M         M T .M MA X
EI F
                                      -      -  1     -    1      -    -      -
I TI IT O
AE D.
O R
Q'MT.
N I'
E             -,    -  l
I O
                                                        -  1     -    -      -
E 1
RA
7 J
                                                                                            -
D A
                                                                                            -
I 1
_
1 M
                        ..                                                                  .
S S
P SR                         O NE                                  E IP
M M
                                      -    -
.M T A 1
W I
1 M X A E D.
                                                  '    -  G 4
Q' T.
                                                                  -    -      -
MA E
                                                                                          .
1 l
                                                                                            .
R P
Y                                                      1       2 R                                                     S
SR NE O
                                                                        -
E IP W
S
4 I
                                                                                -
G Y
A            S                                        M      M 2       2 M   MD      I N                                          -      -
1 2
M          E N I                                       0       0 U   8 NI  O                                       3       3 S           M J                                           ,      ,
R S
A N       4E X D L                                         R
S A
                                                                          .
S M
R
M M
                                                                                  .
M D N
O I          E E   A     B     A 1 B     A     B   ADBD
I 2
                                                                                            -
2 M
T          B W      1     2          2     1   2   H       H             .
E I
A                  M     M-   M- M -     M     M-   M       M N EODT  L   ASAS       ASAS       ASAS       AFAF A S CMEM       EMEM       EMEM       EEEE
0 0
      .        IN
N U
* M     N G T2I 2       T2T2       T2T2       TITI O          M       NET  I N S     S' - S-   S - S-1 S- SLSL C         A          I D I   2     2     0   0               E     E             -
8 O
U T N3N3       N3N3       N3N3       NRNPI R         X             I T I     I     I     I   I     I   I
3 3
                                                                                            -
NI S
  .
M J
E2         E             I' I A     A     A     A   A     A   A       A               .
A N
G F M     M     M     M   M     M   M       M               .
X D
W          N
O 4E L
                  -
R R
N
E A
                                                                                            -
B A
                                                                                            .
B A
                                                                                            .
B ADBD I
O                       O  N                                                           -
E 1
  .
2 1
PTO   I I I I
2 1
                                                                                            .
2 H
SNT E
H T
T UC      E ADP             ME.Y                                                                   .
B W
R TN S       N          O G                                                     8
M M-M-M -
                                                                                            -
M M-M M
                                                                                            .
A EO L
                                                                                            .
ASAS ASAS ASAS AFAF N
SAI                   G C
O IN DT A S CMEM EMEM EMEM EEEE
                              -                                                    /
* M N G T2I 2 T2T2 T2T2 TITI M
7       -
NE I
                                                                                            .
N S
L                                                                         4       .
S' -
N SE                                                                           4   6 .-
S-S -
RI C                                                                           7 4
S-S-SLSL C
1
T D
                                                                                          -
I 2
                                                                                            .
2 0
EEI                                                                            2
0 1
                                                                                      - B .
1 E
                                                                                            -
E A
HI V             BM    2                                                    7     - -
I U T N3N3 N3N3 N3N3 NRNP R
T RR  I          UE 3
X I T I
9 .
I I
_
I I
RA E       S ST I 2
I I
C M P R P
I E2 E
                                                                                            .
I' I A
                                                                                            .
A A
_
A A
_
A A
.
A W
OR NPI N O
G F M
F
M M
.
M M
                                                                                            .
M M
                                                                                            .
M N
_
O N
_
O N PTO I
I I I SNT E U C T
E ADP ME.Y TN S R
O G
8 N
SAI G
7
/
L C
4 N SE 4
6.
RI C 7
1 4
EEI 2
T RR BM 2
- B.
HI V 7
UE 9.
3 I
RA E ST 2
M P S
I C
R P OR N O
NPI F


_ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ . .
NORTHERN STATES POWER CO.
__
TABLE s2.4 PRAIRIE ISLAND UNIT 2
                                                              .      .                                                                        .    .
PAGE 1
NORTHERN STATES POWER CO.                                                                             TABLE   s2.4 PRAIRIE ISLAND UNIT         2                                                                       PAGE     1                               OF         2 INSERVICE INSPECTION-EXAMINATION  
OF 2
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:               VALVES SUB M                 N         8 M       INSP. R EO*D. AMT.         ITEM                 INSPECTION ITEM E-             N DE     Tl N PER.     AMT. E%AM     IDENTIFICATION           REPORT NO.
MAJOR ITEM:
GORY           ITEM TO BE EXAMINED C4.1         C-F       VALVE BODY WEWS                 -          -        -
VALVES M
                                                                                                                          -NONE-
N 8 M SUB INSP.
                                                      #U C-G C4.2         C-D       PRESSURE RETAINING BOLTING MAIN STEAM A 31-2MS-1             'INO       26       26   (V)                   81-9                                               .
R EO*D.
3(MIN)   26   (Ur)                   81-9 MAIN STEAM B 31-2MS-2             -            -        -
AMT.
MAIN STEAM A (6") (OFF) RELIEF HDR   Q1E         12       12   (V)     RS-21-11     77-54 30-2MS-1                       2(MIN)     2   (UP)   RS-2-11       77-54
ITEM INSPECTION E-N DE Tl N ITEM PER.
                                                                                                'INO       12       12   (V)     RS-21-14     81-73 2(MIN)   12 (Uf)     RS-21-14       81-73 MAIN STEAM B (6") (OFF) RELIEF IIDR 30-2MS-2             'INO       12       12   (V)     RS-21-20     81-8 2(MIN)   12   (UP)   RS-21-20       81-8
AMT.
                                                                                                'IHREE     24       -
E%AM IDENTIFICATION REPORT NO.
(V) 4(MIN)     -
GORY ITEM TO BE EXAMINED C4.1 C-F VALVE BODY WEWS
-NONE-
#U C-G C4.2 C-D PRESSURE RETAINING BOLTING MAIN STEAM A 31-2MS-1
'INO 26 26 (V) 81-9 3(MIN) 26 (Ur) 81-9 MAIN STEAM B 31-2MS-2 MAIN STEAM A (6") (OFF) RELIEF HDR Q1E 12 12 (V)
RS-21-11 77-54 30-2MS-1 2(MIN) 2 (UP)
RS-2-11 77-54
'INO 12 12 (V)
RS-21-14 81-73 2(MIN) 12 (Uf)
RS-21-14 81-73 MAIN STEAM B (6") (OFF) RELIEF IIDR 30-2MS-2
'INO 12 12 (V)
RS-21-20 81-8 2(MIN) 12 (UP)
RS-21-20 81-8
'IHREE 24 (V) 4(MIN)
(UP)
(UP)
RESICUAL IIEAT REMOVAL WMP A 6-2Ril-12           -            -        -
RESICUAL IIEAT REMOVAL WMP A 6-2Ril-12 WMP B 6-2S1-10B OE 12 12 (V) 2-88038 77-63 2(MIN) 2 (Ur) 2-8803B 77-63 FORM 9 7-24 74 6/TS FORM 800. 050-9 99 9 PP9-B-26
WMP B 6-2S1-10B           OE         12       12   (V)     2-88038       77-63 2(MIN)     2   (Ur)     2-8803B       77-63 FORM 9 7-24 74 6/TS                                                                                                                       FORM 800. 050-9 99 9 PP9-B-26                                             -          -
                                                                                                                                                          . . _ _ - _ _ _ _ - . _ _ _ _ _ _ _ _ - _


_ _ _ . - - - . --
NOR1 N STATES POWER CO.
                                            .    .                                                                          *    *
TABLE S2.4 PRAIR ISLAND UNIT 2 PAGE 2
                                                                            ,
op 2
NOR1       N STATES POWER CO.                                         .                                TABLE S2.4 PRAIR     ISLAND UNIT 2                                                                                 PAGE   2     op     2 INSERVICE INSPECTION-EXAMINATION  
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:               VALVES Sus          ^
MAJOR ITEM:
E                      E  I 4 N      t hSP. REO 0. AMT.           ITEM               INSPECTION 61E M GORY             8 TEM TO BE EXAMINED     PER.     AMT. EXAM       IDENTIFICATION         REMT W.
VALVES
C4.2     C-D         (CONT'D)
^
ACCLMRATOR DISOIAIEE LINES 12-2S1-29A     'HIREE     16         -
Sus t hSP.
(V) 2(MIN)     -
REO 0.
(Lfr) 12-2SI-298     -          -        -
AMT.
C4.3     C-E-1     INTEGRALLY WEIDED SUPPORTS                         -          -        -
ITEM INSPECTION E
                                                                                                          -NCNE-C4.4       C-E-2     SUPIORT 00HPOtOfrS               -          -        -
E I 4 N 61E M GORY 8 TEM TO BE EXAMINED PER.
                                                                                                          -NONE-
AMT.
                  ?
EXAM IDENTIFICATION REMT W.
                  'T 8
C4.2 C-D (CONT'D)
                                            .  .
ACCLMRATOR DISOIAIEE LINES 12-2S1-29A
                                                                                                  .
'HIREE 16 (V) 2(MIN)
                                                                                                                          .
(Lfr) 12-2SI-298 C4.3 C-E-1 INTEGRALLY WEIDED SUPPORTS
            .
-NCNE-C4.4 C-E-2 SUPIORT 00HPOtOfrS
                                                              --
-NONE-
ro - .,.,...
?
ro =   .  . .
'T 8
PP9-B-27                                             ,
ro -.,.,...
                                    ._                  ._ . -.
ro =
PP9-B-27


_ _ _ _ _ _ _ _ _ _ _ _ _ _ __                  _ _ _ _ _
NORTHERN STATES POWER CO.
                                        ,      ,                                                                                .    .
TABLE S2.2.5 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                                                       TABLE S2.2.5 PRAIRIE ISLAND UNIT 2                                                                                                           PAGE     1 OF     3 INSERVICE INSPECTION-EXAMINATION  
PAGE 1
OF 3
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM: PIPING-INIEGRALLY lEILED SUPPOR'IS SUB
MAJOR ITEM: PIPING-INIEGRALLY lEILED SUPPOR'IS SUB INSP.
                                      "                                  "      "                                    ITEM                  INSPECTION E-                        DE        I N          INSP. R EO'D. AMT.
R EO'D.
ITEM                     GORY                                                  PER.     AMT. EXAM     IDENTIFICATION           REPORT NO.
AMT.
ITEM TO 8E EXAMINED C2.5                           C-E-1     INIEGRALLY WEIDED SUPPORTS MAIN S'IEAM A                       'IWO         2       1   P,H,A                 81-16,48,48R,14,74, 74R,16 30-2MS-1                 MIREE       2,       -
ITEM INSPECTION E-DE I N ITEM PER.
MAIN SIEAM B                         OE             1       1 I                     77-147 30-2MS-2                 'INO         2       2   A,H                   81-13,30,15,34 MIREE       3       -
AMT.
MAIN SIEAM A                         OE           3       3   J,K,M                 77-154,140 31-2MS-1                 'IWO           1       1 S                     81-2,3 MAIN SIEAM B-31-2MS-2                 DIREE       2       -
EXAM IDENTIFICATION REPORT NO.
MAIN STEAM A 30-2MS-1 (R-HDR)       MIREE         1       -
GORY ITEM TO 8E EXAMINED C2.5 C-E-1 INIEGRALLY WEIDED SUPPORTS MAIN S'IEAM A
MAINS'IEAM B 30-2MS-2 (R-LOR)         -          -        -
'IWO 2
MAIN STEAM A 6-2MS-1               -            -        -
1 P,H,A 81-16,48,48R,14,74, 74R,16 30-2MS-1 MIREE 2,
                                                                                              ?
MAIN SIEAM B OE 1
MAIN STEAM B 6-2MS-2               OE           1       1 P                     77-103 EEEDWATER A 16-2EW-13               OE           1       1 K                     77-105 16-2EW-12               'INO       10       10   A                     80-5,5R,32 16-2EW-11                                         B,C                   80-2,33,6,62 E,P                   80-1,28,68,63 H,I                   80-67,61,66,59 J,K,L                 80-77,60,3,3R,44 80-8,26 A,K                   81-19,67,67R,20,68 DIREE       3       -
1 I
roppt31.yfgens                                                                                                                                 ro== no....-i...
77-147 30-2MS-2
                                                                                  .          .
'INO 2
__ _-  _ _ _ _
2 A,H 81-13,30,15,34 MIREE 3
MAIN SIEAM A OE 3
3 J,K,M 77-154,140 31-2MS-1
'IWO 1
1 S
81-2,3 MAIN SIEAM B-31-2MS-2 DIREE 2
MAIN STEAM A 30-2MS-1 (R-HDR)
MIREE 1
MAINS'IEAM B 30-2MS-2 (R-LOR)
MAIN STEAM A 6-2MS-1
?
MAIN STEAM B 6-2MS-2 OE 1
1 P
77-103 EEEDWATER A 16-2EW-13 OE 1
1 K
77-105 16-2EW-12
'INO 10 10 A
80-5,5R,32 16-2EW-11 B,C 80-2,33,6,62 E,P 80-1,28,68,63 H,I 80-67,61,66,59 J,K,L 80-77,60,3,3R,44 80-8,26 A,K 81-19,67,67R,20,68 DIREE 3
roppt31.yfgens ro== no....-i...


                                      .              .                                                                    .    .
NORTHERN STATES POWER CO.
NORTHERN STATES POWER CO.                                                                                 TABLE S2.2.5 PRAIRIE ISLAND UNIT 2                                                                                   PAGE     2 _op       3 j                INSERVICE INSPECTION-EXAMINATION  
TABLE S2.2.5 PRAIRIE ISLAND UNIT 2
PAGE 2 _op 3
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM: PIPING-INIEGRAILY wJr2n SUPPORTS
MAJOR ITEM: PIPING-INIEGRAILY wJr2n SUPPORTS j
.
EN Spg",
I sua      Spg",                 i,"@gsEN    i IO O        INSP.
i,"@gs INSP.
PER.
R EO'D.
R EO'D.
AMT.
AMT.
ITE M INSPECTION sua i IO O I
PER.
AMT.
AMT.
EXAM ITE M IDENTIFICATION INSPECTION REPORT NO.
EXAM IDENTIFICATION REPORT NO.
GORY                   ITEM TO 8E EXAMINEO l
GORY ITEM TO 8E EXAMINEO l
l                    C2.5   C-E-1     (CONF'D',
C2.5 C-E-1 (CONF'D',
l                                                 EEEDWA'IER B 16-2EW-16               ONE       2       2   "G,H                   77-104,148 16-2EW-15               SWO       8       8   A                     80-16,16R B,C,D,E,P             80-9,10,42,74 G,H                   80-11,11R,12 A,G                   81-18,17
l l
                                                                                'IUREE     1
EEEDWA'IER B 16-2EW-16 ONE 2
                                                                                                  -
2 "G,H 77-104,148 16-2EW-15 SWO 8
8 A
80-16,16R B,C,D,E,P 80-9,10,42,74 G,H 80-11,11R,12 A,G 81-18,17
'IUREE 1
REEUELING WA'IER SIORAGE
REEUELING WA'IER SIORAGE
                                                  'IRNK DISCHAICE 12-2SI-4               'IWO       1       1   C                     79-42,34 OWTAINPENT SUMP B DISCHARGE LINES 12-2S1-33A             -        -      -
'IRNK DISCHAICE 12-2SI-4
12-2S1-33B             -        -      -
'IWO 1
SAFETY INJECTION IUMP NO. 21 SUCTIN BRANCH 1 6-2Ril-10A             GE         1       1   B                     77-119 BRANOI 2 6-2RH-10A             WE         1       1   G                     77-119 SAFETY IMJECTIm PUMP NO. 22 SUCTION                                                 '
1 C
BRANCH 1 6-2RH-1GB             'IWO       1       1   D                     79-35,38,38R BRANCH 2 6-2RH-10B             'IHREE     1     -
79-42,34 OWTAINPENT SUMP B DISCHARGE LINES 12-2S1-33A 12-2S1-33B SAFETY INJECTION IUMP NO. 21 SUCTIN BRANCH 1 6-2Ril-10A GE 1
RESIDUAL HEAT REMNAL SUCTIm PUMP A 8-2RH-4A               'IWO       1       1 A                     79-19,44
1 B
                                                                          .-                                            ,.
77-119 BRANOI 2 6-2RH-10A WE 1
g ._g.g .n.                                                                                                         ..    .,......
1 G
                                                                              .
77-119 SAFETY IMJECTIm PUMP NO. 22 SUCTION BRANCH 1 6-2RH-1GB
_ _ _ _ _ _ _ _ _ _          .          _ _ _ _
'IWO 1
1 D
79-35,38,38R BRANCH 2 6-2RH-10B
'IHREE 1
RESIDUAL HEAT REMNAL SUCTIm PUMP A 8-2RH-4A
'IWO 1
1 A
79-19,44 i
g._g.g.n.


                      .      .                                                                  .    .
NORTHERN ?TATES POWER CO.
NORTHERN ?TATES POWER CO.                                                                     TABLE S2 2.5 l PRAIRIE ISLAND UNIT 2                                                                         PAGE     3     op                   3 l lNSERVICE INSPECTION-EXAMINATION  
TABLE S2 2.5 l
PRAIRIE ISLAND UNIT 2
PAGE 3
op 3
l lNSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM: PIPING-INEGRALLY wrIFn SUPPORTS i                 EXAM         COMPONENT OR SYSTEM
MAJOR ITEM: PIPING-INEGRALLY wrIFn SUPPORTS i
    '                          ^                             PE .' A   EXANI   IDEN FICATION           EP   NO.
EXAM COMPONENT OR SYSTEM
                  $RY            IT     O     EXAM 1NED C2.5       C-E-1     (CONT'D)
$RY EXAM 1NED
RESIDUAL llEAT REM 0/AL DISCIPIGE PUMP B 8-L'ui-98                 -        -    -
^
RESIOUAL llEAT RENNE DISCHARGE PUMP A 1 0 - 2161- 1 1           NE         1   1   L                   77-115
PE.'
                                                          'HIREE     1
A EXANI IDEN FICATION EP NO.
                                                                          -
IT O
RESIDUAL HEAT REMCNAL DISCHARGE PUMP B 6-2SI-10B                 -        -    -
C2.5 C-E-1 (CONT'D)
                                                                              -NONE-RESIDUAL HEAT RE2KNAL SUCTIN 14]MP B 10-2Ril-3                 (IE       1   1   C                   77-118
RESIDUAL llEAT REM 0/AL DISCIPIGE PUMP B 8-L'ui-98 RESIOUAL llEAT RENNE DISCHARGE PUMP A 1 0 - 2161-1 1 NE 1
                                                          '19 0     1   1   E                   79-37,40,40R 8-2Ril-4B                 'INO       1   1 J                   79-36,39,39R
1 L
                                                          'IHREE     1   -
77-115
REACDOR VESSEL SAFETY IMJECTIN A 6-2S1-25A                 WE         1   1 A                   77-109
'HIREE 1
                                                          'IWO       1   1 B                   81-27,49,49R
RESIDUAL HEAT REMCNAL DISCHARGE PUMP B 6-2SI-10B
                                                            ' DIRE     1   -
-NONE-RESIDUAL HEAT RE2KNAL SUCTIN 14]MP B 10-2Ril-3 (IE 1
REACIOR VESSEL SAFETY INJECTIW B 6-2S1-25B                   WE         1   1 A                   77-108 ronu 37-asts afra                                                                                           ronae no.sse-seet PP9- B-21                                           -
1 C
                                                                                                                  - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
77-118
'19 0 1
1 E
79-37,40,40R 8-2Ril-4B
'INO 1
1 J
79-36,39,39R
'IHREE 1
REACDOR VESSEL SAFETY IMJECTIN A 6-2S1-25A WE 1
1 A
77-109
'IWO 1
1 B
81-27,49,49R
' DIRE 1
REACIOR VESSEL SAFETY INJECTIW B 6-2S1-25B WE 1
1 A
77-108 ronu 37-asts afra ronae no.sse-seet PP9-B-21


                      .    .                                                                      .    .
NORTHERN STATES POWER CO.
NORTHERN STATES POWER CO.                                                                         TABLE   92.2.6 PR AIRIE ISLAND UNIT       ?                                                                     PAGE       1     OF     3 INSERVICE INSPECTION-EXAMINATION  
TABLE 92.2.6 PR AIRIE ISLAND UNIT
?
PAGE 1
OF 3
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:       PIPING-N31 IIEIReD SUPPGtTS
MAJOR ITEM:
_
PIPING-N31 IIEIReD SUPPGtTS M
SUB M              M "           I "               R EO'D. AMT.         ITEM                 INSPECTION E-             N DE     I I N         INSP.
M "
ITEM        GORY            ITEM TO 8E EXAMINED        PER. AMT. EXAM     IDENTIFICA(ION           REPORT NO.
I "
C2.6       C-E-2     SUPPORT COMPONCNIS MAIN STEAM A 31-2MS-1                 'IHREE       1       -
SUB INSP.
MAIN STEAM B                                                                                   ,
R EO'D.
31-2MS-2                 'HIREE       1       -
AMT.
MAIN S'IEAM A 30-2MS-1               'Iwo         1
ITEM INSPECTION E-N DE I I N ITEM PER.
                                                                            -
AMT.
G                       81-12,128 MAIN S'IEAM B 30-2MS-2               'IHREE       1       -
EXAM IDENTIFICA(ION REPORT NO.
MAIN STEAM A RELIEF HDR. , 30-2MS-1   QE           1       1 O                       77-140 MAIN STEAM B RELIEF HDR., 30-2MS-2   'Iwo         1       1 0                       81-1,1R FEED 4NIER A 16-2EW-13               'Iwo       2         2 D,G                     80-4,69
GORY ITEM TO 8E EXAMINED C2.6 C-E-2 SUPPORT COMPONCNIS MAIN STEAM A 31-2MS-1
                                                      'IIIREE     1
'IHREE 1
                                                                            -
MAIN STEAM B 31-2MS-2
REFUELING WNIER S10 RAGE TANK DISCilARGE 12-2S1-4               'Iwo         1         1 B                       79-45 ro n u ir-ser eir.                                                                                                 ronu no. isi-i...
'HIREE 1
PP9-B-22                                         .          .
MAIN S'IEAM A 30-2MS-1
'Iwo 1
G 81-12,128 MAIN S'IEAM B 30-2MS-2
'IHREE 1
MAIN STEAM A RELIEF HDR., 30-2MS-1 QE 1
1 O
77-140 MAIN STEAM B RELIEF HDR., 30-2MS-2
'Iwo 1
1 0
81-1,1R FEED 4NIER A 16-2EW-13
'Iwo 2
2 D,G 80-4,69
'IIIREE 1
REFUELING WNIER S10 RAGE TANK DISCilARGE 12-2S1-4
'Iwo 1
1 B
79-45 ro n u ir-ser eir.
ronu no. isi-i...
PP9-B-22


_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _              _ _ _ _        -      _ _ _ _ _ _
NORTH 5RN STATES POWER CO.
                                                                .                .                                                                .    .
TABLE S2.2.6 PRAIRIE ISLAND UNIT 2
NORTH 5RN STATES POWER CO.                                                                                     TABLE     S2.2.6 PRAIRIE ISLAND UNIT                     2                                                                     PAGE       2     op   3 INSERVICE INSPECTION-EXAMINATION  
PAGE 2
op 3
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:       PIPING-tKN wrre SUPFORTS YI SUS E.                          DE    I ON          INSP. R EO*a AMT.         ITEM                 INSPECTION ITEM               GORY                        STEM TO BE EXAMINED    PER. MT. EXM     IDENTIFICAT10N           REMT NO.
MAJOR ITEM:
C2.6             C-E-2     (CONT'D) 10-2S1-8
PIPING-tKN wrre SUPFORTS YI SUS INSP.
                                                                                  '
R EO*a AMT.
BRANCH I           DIREE     1     -
ITEM INSPECTION E.
BRANCH 2           -        -      -
DE I ON ITEM PER.
SAFETI IRTECTION RNP NO. 21 SUCCICN BRANCH I 6-2Mi-10A     -        -      -
MT.
                                                                                                                              -ERE-BRANOi 2 6-2RH-10A     'IWD       1     1 E                     79-46
EXM IDENTIFICAT10N REMT NO.
                                                                                                          'DiBEE     1     -
GORY STEM TO BE EXAMINED C2.6 C-E-2 (CONT'D) 10-2S1-8 BRANCH I DIREE 1
SAFETI IRTECTION RMP NO. 22 SUCTICM BRANCH 1 6-2Mi-108     -        -      -
BRANCH 2 SAFETI IRTECTION RNP NO. 21 SUCCICN BRANCH I 6-2Mi-10A
                                                                                                                              -TOE-DRANOi 2 6-2RH-10B     'INO       1     1 A                     79-33,33R TIREE     1     -
-ERE-BRANOi 2 6-2RH-10A
RESIDUAL EEAT RDD/AL DISOIAICE RNP A 6-2Mi-12     CNE       1       1 M                     77-136 RMP B 6-2SI-108     -        -      -
'IWD 1
RESIDUAL HEAT REMOVAL SUCTICN RMP B 10-2RH-3       CNE       2     2 A,B                   77-155
1 E
                                                                                                          'IWO       1       1 F                     79-9 TGiEE     2       -
79-46
RMP A 8-2Mi-4A     'IWO       1     1 B                     79-18 RMP B 8-2Mi-4B     DIREE       1     -
'DiBEE 1
roa u is-u r. .ir.                                                                                                             io== ....-i...
SAFETI IRTECTION RMP NO. 22 SUCTICM BRANCH 1 6-2Mi-108
-TOE-DRANOi 2 6-2RH-10B
'INO 1
1 A
79-33,33R TIREE 1
RESIDUAL EEAT RDD/AL DISOIAICE RNP A 6-2Mi-12 CNE 1
1 M
77-136 RMP B 6-2SI-108 RESIDUAL HEAT REMOVAL SUCTICN RMP B 10-2RH-3 CNE 2
2 A,B 77-155
'IWO 1
1 F
79-9 TGiEE 2
RMP A 8-2Mi-4A
'IWO 1
1 B
79-18 RMP B 8-2Mi-4B DIREE 1
roa u is-u r..ir.
io==
....-i...
PP9-B-23
PP9-B-23
                                                                                                        .


_.
NORTHERN STATES POWER CO.
                      .      .                                                                        .      .
TABLE S2.2.6 PRAIRIE ISLAND UNIT 2
NORTHERN STATES POWER CO.                                                                             TABLE S2.2.6 PRAIRIE ISLAND UNIT 2                                               ,
P.",G E 3
P.",G E   3       OF   3 INSERVICE INSPECTION-EXAMINATION  
OF 3
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:     PIPING-tKN WEIDED SUPPORIS SUB M                             YS M       INSP. R CO*D. AMT.         STEM                 INSP2CTION E-               N DE     I TIOq ITEM                                                       PER.       AMT. EXAM   IDENTIFICATION             REPORT NO.
MAJOR ITEM:
GORY             ITEM TO 8E EXAMINED
PIPING-tKN WEIDED SUPPORIS M
_
YS M SUB INSP.
C2.6       C-E-2     (CONr'D)
R CO*D.
RESIDUAL HEAT REM (NAL                   '
AMT.
DISCHARGE PWP A 8-2Ril-9A       -            -        -
STEM INSP2CTION E-N DE I TIOq ITEM PER.
IUMP B 8-2Ril-9B       'II.REE       1
AMT.
                                                                                -
EXAM IDENTIFICATION REPORT NO.
ACOMJLMOR DISCilAFCE LINES LINE A 12-2SI-28A         OE             1       1 B,                     77-137 12-2S1-29A         -            -        -
GORY ITEM TO 8E EXAMINED C2.6 C-E-2 (CONr'D)
LINE D 12-2S1-28B         'HIREE         1
RESIDUAL HEAT REM (NAL DISCHARGE PWP A 8-2Ril-9A IUMP B 8-2Ril-9B
                                                                                -
'II.REE 1
12-2SI-29B         -            -        --
ACOMJLMOR DISCilAFCE LINES LINE A 12-2SI-28A OE 1
BORIC ACID SUPPLY
1 B,
                            'IO SAFETY INJECTIOi 6-2SI-13A         CNE           1       1 B                       77-153 6-2SI-13B         -            -        -
77-137 12-2S1-29A LINE D 12-2S1-28B
REAC'IOR VESSEL SAFETY IRJECTION LINE A 6-2SI-25A           CNE           1       1 H                       77-150 LINE B 6-2SI-25B         'IWO           1         1 B OCNTAINMENT SUMP DISOIAKE LINES LINE A                   -            -        -
'HIREE 1
                                                                                    -NOE-LINE B                   -            -        -
12-2SI-29B BORIC ACID SUPPLY
                                                                                    -NOE-FORM 9 7-24 76 6/78                                                                                                     FONM MO. SSI-9 99 9 PP9-B-24                                             ,
'IO SAFETY INJECTIOi 6-2SI-13A CNE 1
1 B
77-153 6-2SI-13B REAC'IOR VESSEL SAFETY IRJECTION LINE A 6-2SI-25A CNE 1
1 H
77-150 LINE B 6-2SI-25B
'IWO 1
1 B
OCNTAINMENT SUMP DISOIAKE LINES LINE A
-NOE-LINE B
-NOE-FORM 9 7-24 76 6/78 FONM MO. SSI-9 99 9 PP9-B-24


_ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _
NORTHERN STATES PONER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 3_OF 6
_ , _ _ _ , _ _            .          _            _ , _  -  _,
l BASELINE COMPARISON  
                                                                                                                ,      .                                                                                  ..  .
NORTHERN STATES PONER COMPANY                                                                                               TABLE         II PRAIRIE ISLAND UNIT                     II                                                                                 PAGE       3_OF     6 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD
_ IDENT, NO.
INDICATIONS INDICATIONS LIMITATIONS PRESSURE VESSELS
' STEAM CENERATORS l
C1.1 CIRCUMFERENTIAL BUTT WELDS STEAM CENERATOR NO. 21 37 UT W-B 81-127 N/A NONE NONE WELD B 81-128 TUBE SilEET GSO NONE 81-133 TUBE SIIEET GEO NONE i
C1.4 PRESSURE RETAINING BOLTING STEAM GENERATOR No. 21 36 UT MANWAY A 81-78 N/A 1 BOLT 65% LOSS NONE 17 BOLTS OF BACK WALL MT 81-70 N/A 16 BOLTS STEAM i40NE C')UGES UT MANWA7 B 81-77 N/A NONE NONE 20 BOLIS MT 81-69 N/A 3 DOLTS DENTED NONE i
THREADS STEAM CENERATOR No. 22 36 UT MANWAY A 81-76 N/A NONE NONE 18 BOLTS MT 81-71 N/A 10 BOLTS STEAM NONE COUGES r
UT MANWAY B 81-75 N/A NONE NONE l
18 BOLTS MT 81-72 N/A 3 BOLTS DENTED NONE THREADS 1
i 9ts' FORM NO. ISI-1003


NSP    NDE    W BASELINE              REPORT  BASELINE            ISI            EXAMINATION COMPONENT / SYSTEM ISO METHOD    _ IDENT,                  NO. INDICATIONS    INDICATIONS            LIMITATIONS PRESSURE VESSELS
NDRTPERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 2
                                                                                                  ' STEAM CENERATORS C1.1 CIRCUMFERENTIAL BUTT WELDS STEAM CENERATOR NO. 21            37      UT                    W-B    81-127    N/A          NONE                    NONE WELD B                                                                    81-128            TUBE SilEET GSO              NONE 81-133            TUBE SIIEET GEO              NONE i
OF 6
C1.4 PRESSURE RETAINING BOLTING
,                                                                                                  STEAM GENERATOR No. 21            36      UT  MANWAY A                81-78    N/A      1 BOLT 65% LOSS              NONE 17 BOLTS                                    OF BACK WALL MT                            81-70    N/A      16 BOLTS STEAM              i40NE C')UGES UT  MANWA7 B                81-77    N/A          NONE                    NONE
'
20 BOLIS MT                            81-69    N/A      3 DOLTS DENTED              NONE i                                                                                                                                                                                              THREADS STEAM CENERATOR No. 22            36      UT  MANWAY A                81-76    N/A          NONE                    NONE
;                                                                                                                                                  18 BOLTS
'
MT                            81-71    N/A      10 BOLTS STEAM              NONE
                                                                                                                                                                          !                    COUGES r
,
UT  MANWAY B                81-75    N/A          NONE                    NONE l                                                                                                                                                  18 BOLTS MT                            81-72    N/A      3 BOLTS DENTED              NONE THREADS
.
i 9ts'
                                                                                                                                                  .                                                                  FORM NO. ISI-1003
  . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _                                                                          --    - -.
 
                                          .      .                                                                .    .
NDRTPERN STATES POWER COMPANY                                                                 TABLE       II PRAIRIE ISLAND UNIT       II                                                                   PAGE     2     OF 6 ,
BASELINE COMPARISON  
BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM
_ IDENT.
FO.
INDICATIONS INDIC%TIONS LIMITATIONS ISO MET 110D PIPING - CIRCUMFERENTIAL BUTT WELDS C2.1 CIRCUMFERENTIAL BUTT WEl.DS MAIN STEAM A 46A UT MS-II 81-123 N/A S-2, ID GEO.50%
NONE 46B UT MS-17 81-4 NONE NONE NONE UT MS-16 81-83 MONE NONE NO S-1 PENETRATION S-2 LIMITED SCAN ADJACEh'i WELD MT 81-52 NOWE NONE 46B UT MS-18 81-85 NONE S-1, OD GEO.30%
LIMITED SCAN S-2, OD GEO.35%
5:30 TO 6:30 IIANGER MT 81-54 ARC STRIKE NONE 81-54R NONE-INDICATION NONE BUFFED OUT UT MS-19 81-84 NCNE NONE B.E. S-1 ENCAPSUL-l ATED NO S-2, S-3, S-4 MT 81-50 NONE B.E. LNCAPSULATED UT MS-20 81-92 NONE NONE No S-1, S-3, S-4 ENCAPSULATION B.E.
S-2 LIMITED SCAN AREA 5:30 - 6:30 llANGER MT 81-51 NONE B.E. ENCAPSULATED l
l UT HS-174 81-55 NONE S-1, OD CEO.35%
S-1 LIMITED ADJACENT j
WELD S-2 LIMITED AT 12:00 BRANCil MT 81-53 NONE NONE l
I FORM NO. ISI-1003


NSP  NDE        W BASELINE REPORT  BASELINE            ISI          EXAMINATION COMPONENT / SYSTEM ISO  MET 110D      _ IDENT. FO. INDICATIONS  INDIC%TIONS          LIMITATIONS
NORTHERN STATES POWER COMPANY TABLE PRAIRIE ISLAND UNIT II PACE 3
                                                                                ,
0F 6
PIPING - CIRCUMFERENTIAL BUTT WELDS C2.1 CIRCUMFERENTIAL BUTT WEl.DS MAIN STEAM A                46A  UT        MS-II      81-123    N/A      S-2, ID GEO.50%            NONE 46B  UT        MS-17      81-4      NONE          NONE                  NONE UT        MS-16      81-83    MONE          NONE        NO  S-1 PENETRATION S-2 LIMITED SCAN ADJACEh'i WELD MT                    81-52                  NOWE                  NONE 46B  UT        MS-18      81-85    NONE    S-1, OD GEO.30%  LIMITED SCAN S-2, OD GEO.35%  5:30 TO 6:30 IIANGER MT                    81-54              ARC STRIKE                  NONE 81-54R            NONE-INDICATION            NONE BUFFED OUT UT        MS-19      81-84    NCNE          NONE        B.E. S-1 ENCAPSUL-l                                                  ATED NO S-2, S-3, S-4 MT                    81-50                  NONE        B.E. LNCAPSULATED UT        MS-20      81-92    NONE          NONE        No S-1, S-3, S-4 ENCAPSULATION B.E.
i BASELINE COMPARISON  
S-2 LIMITED SCAN AREA 5:30 - 6:30 llANGER MT                    81-51                  NONE        B.E. ENCAPSULATED l
l                                                              UT        HS-174      81-55    NONE    S-1, OD CEO.35%  S-1 LIMITED ADJACENT j                                                                                                                          WELD S-2 LIMITED AT
-
12:00 BRANCil MT                    81-53                  NONE                  NONE l
I
                                                                      .                                                      FORM NO. ISI-1003
  - ___ _____ - ____ _ _ _
 
                                    *                                                    .
                  .      .                                                                  .
NORTHERN STATES POWER COMPANY                                                             TABLE PRAIRIE ISLAND UNIT     II                                                               PACE     3     0F   6 i   BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
 
' l NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD:
                                                                                                'l NSP   NDE   W BASELINE REPORT   BASELINE             ISI           EXAMINATION COMPONENT / SYSTEM ISO METHOD:   IDENT. NO. INDICATIONS     INDICATIONS           LIMITATIONS MAIN STEAM B                 47A   UT   MS-83       81-55     N/A     S-1 OD GEO. 30%               NONE S-2 ID CEO.70%
IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS MAIN STEAM B 47A UT MS-83 81-55 N/A S-1 OD GEO. 30%
NONE S-2 ID CEO.70%
E-2 OD GEO. 30%
E-2 OD GEO. 30%
MT               S1-43             DISSIMILAR METAL             NONE   .
MT S1-43 DISSIMILAR METAL NONE 47B UT MS-117 81-93 N/A S-2 OD GEO. 25%
47B   UT   MS-117     81-93     N/A     S-2 OD GEO. 25%     NO S-1 " TEE" S-2 LIMITED VALVE B.E. S-3, S-4 VALVE FEEDWATER A                 48A   UT   W-177       81-32 S-1 ID GEO. S-1 ID GEO. 90%               NONE 50%
NO S-1 " TEE" S-2 LIMITED VALVE B.E. S-3, S-4 VALVE FEEDWATER A 48A UT W-177 81-32 S-1 ID GEO. S-1 ID GEO. 90%
NONE 50%
S-1 ID CEO. S-2 ID GEO. 60%
S-1 ID CEO. S-2 ID GEO. 60%
60%
60%
S-2 ID CEO. S-2 OD GEO. 60%
S-2 ID CEO.
S-2 OD GEO. 60%
40%
40%
                                                                                                                        '
S-2 OD CEO.
S-2 OD CEO.
50%
50%
UT               81-36 (AS ABOVE) S-1 ID GEO. 50%               NONE S-2 OD GEO. 60%
UT 81-36 (AS ABOVE)
PT               81-10     N/A           NONE                   NONE MT               81-42     N/A       4 LINEARS                   NONE MT               81-42R             NONE-INDICATIONS             NONE BUFFFD OUT                 .
S-1 ID GEO. 50%
FEEDWATER B                 49A   UT   W-133       81-33 S-1 ID CEO. S-1 ID CEO. 90%               NONE 39%
NONE S-2 OD GEO. 60%
PT 81-10 N/A NONE NONE MT 81-42 N/A 4 LINEARS NONE MT 81-42R NONE-INDICATIONS NONE BUFFFD OUT FEEDWATER B 49A UT W-133 81-33 S-1 ID CEO. S-1 ID CEO. 90%
NONE 39%
S-1 OD GEO. S-2 ID CEO. 60%
S-1 OD GEO. S-2 ID CEO. 60%
a 43%
43%
S-1 ID CEO.                                         '
a S-1 ID CEO.
39%
39%
-l                                                               S-2 ID GEO.
-l S-2 ID GEO.
l                                                               44%
l 44%
                                                                                                                        '
i S-2 OD GEO.
i                                                               S-2 OD GEO.
I 39%
I 39%
S-2 ID GEO.
S-2 ID GEO.
j                                                              48%
48%
J
j J
                                            .                                                      FORM NO. ISI-1003
FORM NO. ISI-1003


_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - .                _ _ _ _
o NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAVD UNIT II PAGE 4 OF 6
                  .    .                                                                    o       .
BASELINE COMPARISON  
NORTHERN STATES POWER COMPANY                                                                         TABLE                                   II PRAIRIE ISLAVD UNIT     II                                                                             PAGE                               4 OF           6 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
 
NSP NDE
NSP   NDE     }{ BASELINE REPORT   BASELINE             ISI                                       EXAMINATION CGMPONENT/SYSTDI ISO METHOD       IDENT. h0. INDICATIONS     INDICATIONS                                       LIMITATIONS
}{ BASELINE REPORT BASELINE ISI EXAMINATION CGMPONENT/SYSTDI ISO METHOD IDENT.
'
h0.
FEEDWATER B (CONT)         l           UT                 81-35 (SAME AS   S-1 ID GEO. 70%                                             UONE ABOVE)     S-1 OD GEO. 70%
INDICATIONS INDICATIONS LIMITATIONS FEEDWATER B (CONT) l UT 81-35 (SAME AS S-1 ID GEO. 70%
UONE ABOVE)
S-1 OD GEO. 70%
S-2 ID CEO. 40%
S-2 ID CEO. 40%
S-2 OD GEO. 40%
S-2 OD GEO. 40%
PT                 81-11     N/A     NUMEROUS LI"(EARS                                           NONE
PT 81-11 N/A NUMEROUS LI"(EARS NONE MT 81-41 9 LINEARS 23 LINEAT'S NONE MT 81-41R NONE-INDICATIONS BUFFED OUT 9"91 DUAL IIEAT REMOVAL 56 UT W-331 81-66 N/A S-2 OD CEO. 50%
'
B.E.
MT                 81-41 9 LINEARS   23 LINEAT'S                                                 NONE MT                 81-41R             NONE-INDICATIONS BUFFED OUT 9"91 DUAL IIEAT REMOVAL         56   UT     W-331       81-66     N/A     S-2 OD CEO. 50%                             B.E. S-2 VALVE Df SCliARGE REACTOR VZSSEL SAFETY           72   UT     W-349       81-65     N/A     S-1 OD GEO. 40%                           NO S-2 VALVE INJECTION A C2.2 LONGITUDINAL WELD JOINTS IN FITTINGS
S-2 VALVE Df SCliARGE REACTOR VZSSEL SAFETY 72 UT W-349 81-65 N/A S-1 OD GEO. 40%
MAIN STEAM A                     46A   UT     MS-11 TO     81-123     N/A           NONE                                 NO SCANS CN ELBOW MS-12                                                                     OUTER RADIUS AT AREA 0F SUPPORT ATTLCHMENT
NO S-2 VALVE INJECTION A C2.2 LONGITUDINAL WELD JOINTS IN FITTINGS MAIN STEAM A 46A UT MS-11 TO 81-123 N/A NONE NO SCANS CN ELBOW MS-12 OUTER RADIUS AT AREA 0F SUPPORT ATTLCHMENT C2.5 INTEGRALLY LTJLDED SUPPORTS MAIN STEAM A 46A MT F
                                                                                                                                          '
81-48 N/A ARC STRIKE NOI-S MT 81-48R N/A NhE-INDICATION NONE BUFFED OUT
C2.5 INTEGRALLY LTJLDED SUPPORTS MAIN STEAM A                     46A   MT           F     81-48     N/A     ARC STRIKE                                                 NOI-S MT                 81-48R     N/A     NhE-INDICATION                                             NONE BUFFED OUT                                               ~
~
VT                 81-16     N/A           NONE                                                 NONE MT           11     81-74     N/A     1/2" LINEAR                                 1 PAD INACCESSIBLE ON BOTTOM SIDE
VT 81-16 N/A NONE NONE MT 11 81-74 N/A 1/2" LINEAR 1 PAD INACCESSIBLE ON BOTTOM SIDE
                                          !!T                 81-74R             NONE-INDICATION                                             NONE BUFFED OUT VT                 81-14     N/A           NONE                                                 NONE l
!!T 81-74R NONE-INDICATION NONE BUFFED OUT VT 81-14 N/A NONE NONE l
                                                .                                                                                    FORM NO. ISI-1003
FORM NO. ISI-1003


_                            ._.                  -                                                    ..
o NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLlJiD UNIT II PAGE 5
                    .    .                                                                      o   .
0F 6 MASELINE COMPARISON  
NORTHERN STATES POWER COMPANY                                                                     TABLE           II PRAIRIE ISLlJiD UNIT   II                                                                         PAGE     5     0F 6 MASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT /SYSTDi
_ IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS ISO MET 110D MAIN STEAM A (CONT)
MT S
81-2 N/A NONE NONE VT 81-3 N/A NONE NONE MAIN STEAM B 47A MT A
81-30 N/A NONE INACCESSIBLE AREA ADJACENT llANGER VT 81-13 N/A NONE NONE MT 11 81-34 N/A NONE GUARD PIPE VT 81-45 N/A NONE GUARD PIPE VT A
81-26 N/A NONE NONE FEEDWATER A 48A MT A
81-67 NONE 1/2" LINEAR NONE MT 81-67R NONE INDICATION NONE BUFEED OllT VT 81-19 LOASE BOLTS NONE NONE MT K
81-68 NONE NONE NONE VT 81-20 MISSING NUT NONE NONE EXTRA NUT FEEDWATER B 49A VT A
81-18 LOOSE NUT NONE
,i3ARD PIPE VT C
81-17 1/4" GAP ON NONE NONE BASE PLATE, NUT NOT FLUSil REACTOR VESSEL SAFETY 73 PT B
81-49 N/A 7 LINEARS NONE INJECTION PT 81-49R NONE-INDICATIONS NONE BUFFE9 OUT p
B2.6 SUPPORT COMPONENTS i
MAIN STEAM A 46A VT G
81-12 N/A LOOSE BOLTS NONE 81-12R NONE-BOLTS l
TIGitTENED I
1 l
FORM NO. ISI-1003


                                                                                                    ,                          -
NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 6
NSP  NDE      W BASELINE REPORT    BASELINE              ISI            EXAMINATION COMPONENT /SYSTDi ISO  MET 110D  _ IDENT. NO. INDICATIONS    INDICATIONS            LIMITATIONS MAIN STEAM A (CONT)                  MT          S      81-2        N/A            NONE                    NONE VT                  81-3        N/A            NONE                    NONE MAIN STEAM B                  47A  MT          A      81-30      N/A            NONE          INACCESSIBLE AREA ADJACENT llANGER VT                  81-13      N/A            NONE                    NONE MT          11      81-34      N/A            NONE          GUARD PIPE VT                  81-45      N/A            NONE          GUARD PIPE VT          A      81-26      N/A            NONE                    NONE FEEDWATER A                    48A  MT          A      81-67      NONE    1/2" LINEAR                    NONE MT                  81-67R              NONE INDICATION                NONE BUFEED OllT VT                  81-19  LOASE BOLTS        NONE                    NONE MT          K      81-68      NONE          NONE                    NONE VT                  81-20  MISSING NUT        NONE                    NONE EXTRA NUT FEEDWATER B                    49A  VT          A      81-18  LOOSE NUT          NONE        ,i3ARD PIPE
0F 6 BASELINE COMPARISON  
                                                                                                          ,
VT          C  '
81-17    1/4" GAP ON      NONE                    NONE BASE PLATE,                              -
NUT NOT FLUSil REACTOR VESSEL SAFETY          73    PT          B      81-49        N/A    7 LINEARS                      NONE INJECTION                            PT                  81-49R              NONE-INDICATIONS              NONE BUFFE9 OUT p
.      B2.6 SUPPORT COMPONENTS i
MAIN STEAM A                  46A  VT          G      81-12        N/A    LOOSE BOLTS                    NONE
,                                                                81-12R              NONE-BOLTS l                                                                                    TIGitTENED I
1 l                                                  .                                                          FORM NO. ISI-1003
 
_ _ _            _ - _ - _ .                      . _ .                  _  .    . _ -
                                .          .                                                                                        .  .
NORTHERN STATES POWER COMPANY                                                                                                     TABLE       II PRAIRIE ISLAND UNIT II                                                                                                             PAGE   6     0F 6 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
 
a-NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION Cel W NENT/ SYSTEM ISO HETHOD IDENT.
a-Cel W NENT/ SYSTEM NSP         NDE   W BASELINE REPORT       BASELINE                     ISI         EXAMINATION ISO         HETHOD   IDENT.       NO.       INDICATIONS           INDICATIONS       LIMITATIONS I
NO.
MAIN STEAM B                                 47B         VT       0       81-1           N/A             LOOSE BOLTS               NONE           i 81-1R                         NONE - BOLTS               NONE TIGHTENED REACTOR VESSEL SAFETY                         71           VT       B       81-28         N/A                   NONE                 NONE INJECTION B
INDICATIONS INDICATIONS LIMITATIONS I
,
MAIN STEAM B 47B VT 0
VALVES C4.2       R P_RESSURE         RETAINING BOLTING i
81-1 N/A LOOSE BOLTS NONE i
MAIN STEAM A                                 46B         UT   26 BOLTS G   81-9           N/A                   NONE         ONE END ONLY CV-31116 UT   12 BOLTS @   81-73         N/A                   NONE         ONE END ONLY RS-12-14 MAIN STEAM B                                 47B         UT   12 BOLTS @   81-8           N/A                   NONE         ONE END ONLY RS-21-20
81-1R NONE - BOLTS NONE TIGHTENED REACTOR VESSEL SAFETY 71 VT B
                                                                                                                                                  ~
81-28 N/A NONE NONE INJECTION B VALVES C4.2 P_RESSURE RETAINING R
.
BOLTING i
1
MAIN STEAM A 46B UT 26 BOLTS G 81-9 N/A NONE ONE END ONLY CV-31116 UT 12 BOLTS @
;
81-73 N/A NONE ONE END ONLY RS-12-14 MAIN STEAM B 47B UT 12 BOLTS @
l
81-8 N/A NONE ONE END ONLY RS-21-20
                                                                                                                                                                    >
~
1 l
l l
l l
l                                                                           .                                                                  FORM NO. ISI-1003
l FORM NO. ISI-1003
__- _ _ __      _    _                          . _ .    -                                                  _ ____ __                                _ _ _ .


                .      .                                                        .        .
TABLE III NOREEIW STATES PGiER CG.
TABLE           III NOREEIW STATES PGiER CG.                                                       pag         3 op   3 PIMJRIE ISIAND 1 HIT 2 ISLt41HRIC S!!+1ARY - CLASS 2
pag 3 op 3
-
PIMJRIE ISIAND 1 HIT 2 ISLt41HRIC S!!+1ARY - CLASS 2 n
n tes? ISO                                                            LINE           LIFE           IIT - CAL.
LINE LIFE IIT - CAL.
REVISIQ1                 00MPONDir OR SYSTDI   1DOP               tati3ER         STNRIARD PAFBER
tes? ISO REVISIQ1 00MPONDir OR SYSTDI 1DOP SIZE tati3ER STNRIARD PAFBER 26 2-1S1-37 0
                                        ,                              SIZE 26
STEAM GENERATORS A6 '4 2-ISI-46 0
                                                                                          -
MAIN STEAM (CENERAL VIEW)
2-1S1-37           0         STEAM GENERATORS                 A6 '4   -
A 2-ISI-46A 0
                                                                                                            -
A 32'-
2-ISI-46           0         MAIN STEAM (CENERAL VIEW)         A     -                -    -
32-2MS-1 NO.
2-ISI-46A         0                                           A   32'-       32-2MS-1             NO.
2-ISI-46B 0
A   31"         31-2MS-1               24 2-ISI-46B          0 30"         30-2MS-1               23 6"         6-2MS-1                 7
A 31" 31-2MS-1 24 30" 30-2MS-1 23 6"
                                                                                          -                -
6-2MS-1 7
0                                            B    -
2-1S1-47 0
2-1S1-47                     MAIN STEAM (CENERAL VIEW) 2-ISI-47A         0                                             B   32"       32-2MS-2           NO.
MAIN STEAM (CENERAL VIEW)
2-ISI-47B         0                                             B   31"       31-2MS-2                 24 30"       30-2MS-2                 23 6"         6-2MS-2                 7 0         FEEDWATER (CENERAL VIEW)           A     -                -
B 2-ISI-47A 0
2-ISI-48                                                                                            13/16 2-151-48A         0                                             A   16"       16-2 W-13 2-ISI-48B         0                                             A   16"       '16-2W-12                 13 16"       16-2 W-11               11 8"       3-2AF-11         NO.
B 32" 32-2MS-2 NO.
2-ISI-49           0         FEEDWATER (GENERAL VIEW)           8       -              -
2-ISI-47B 0
13736 2-ISI-49A         0                                             E   16"       16-2 W-16 2-ISI-49B         0                                             L   16"       16-2W-15                 13     ,
B 31" 31-2MS-2 24 30" 30-2MS-2 23 6"
8"       3-2AF-12         NO.
6-2MS-2 7
22-2-ISI-50           0         RilR PUMP B SUCTION (WELDS)         B   10"       10-2Rii -3 8"      8-2RH-4B                29 2-I31-51           0         Ri!R PUMP B SUCTION (IIANCERS)     B 29 B       8"       8-2RH-5B 32 B   12"       12-2RH-5B 10-2SI-98                 22 B    10" 8"        8-2RH *A              29 2-IS1-52           0       Ri!R PUMP A SUCTION (WELDS)     ,  A A       8"       8-2RH-5A                29 2-ISI-53           0       RHR PUMP A SUCTION (HANGERS)                                                 32 A   12"       12-2RJ-5A 10"       10-2SI-9A                 22 A
2-ISI-48 0
I
FEEDWATER (CENERAL VIEW)
                                                .
A 13/16 2-151-48A 0
A 16" 16-2 W-13 2-ISI-48B 0
A 16"
'16-2W-12 13 16" 16-2 W-11 11 8"
3-2AF-11 NO.
2-ISI-49 0
FEEDWATER (GENERAL VIEW) 8 13736 2-ISI-49A 0
E 16" 16-2 W-16 2-ISI-49B 0
L 16" 16-2W-15 13 8"
3-2AF-12 NO.
22-2-ISI-50 0
RilR PUMP B SUCTION (WELDS)
B 10" 10-2Rii -3 29 2-I31-51 0
Ri!R PUMP B SUCTION (IIANCERS)
B 8"
8-2RH-4B 29 B
8" 8-2RH-5B 32 B
12" 12-2RH-5B 22 B
10" 10-2SI-98 2-IS1-52 0
Ri!R PUMP A SUCTION (WELDS)
A 8"
8-2RH *A 29 29 2-ISI-53 0
RHR PUMP A SUCTION (HANGERS)
A 8"
8-2RH-5A 32 A
12" 12-2RJ-5A A
10" 10-2SI-9A 22 I
O
O


                                                                                                                                    .
TABLE III NOR11!ERN STATES NWER CO.
                                    .        .                                                                    .      .
PAGE 2 0F 3 PRAIRIE IS!AND INIT 2 ISGEIRIC SlM1ARY - CLASS 2 I
TABLE III NOR11!ERN STATES NWER CO.                                                                   PAGE 2       0F 3 PRAIRIE IS!AND INIT 2 ISGEIRIC SlM1ARY-
LINE 1.INE IIT - CAL.
                                        - CLASS 2                                                             .
REVISI m 00MPONIWT OR SYSUN ILOP SIZE NINllEll STANDARD g
I
29 2-ISI-54 0
                                                                                                  ;
RllR PUMP B DISCllARGE (WELDS)
                            >                                                                              LINE       1.INE       IIT - CAL.
B 8"
REVISI m               00MPONIWT OR SYSUN                   ILOP SIZE     NINllEll       STANDARD g
8-2Ril+78 29 2-ISI-55 0
8-2Ril+78        29 2-ISI-54           0       RllR PUMP B DISCllARGE (WELDS)                       B   8" 8"      8-2RIl-98        29 2-ISI-55           0       RilR PUMP B DISCllARGE (llANGERS)                   a 27 B   6"       6-251-10B 8"      8-2RH-7A          29 2-ISI-56           0       RilR PUMP A DISINARGE (WELDS)                       A 8"       8-2Ril-9A        29 2-ISI-57           0       RiiR PUMP A DISCIIARGE (llANGERS)                   A 10-2Rii-11         22 A 10" 6"       6-2RH-12           27 A
RilR PUMP B DISCllARGE (llANGERS) a 8"
32 2-ISI-58           0       CONTAINHENT SU.T B DISCllARGE (WELDS)               B   12"     12-2 Ril--6 B 2-ISI-59           0       CONTAIhl!ENT S'JMP B DISCliARGE (llANGERS)           B 14"     14-2SI-33B         NO.
8-2RIl-98 27 B
B 12"     12-2SI-34B         NO.
6" 6-251-10B 2-ISI-56 0
A  12"    12-2RH-6A            32 2-ISI-60           0       CONTAINNENT SUMP B DISCHARGE (WELDS) 2-ISI-61           0       CONTAINMENT SUMP B DISCllARGE (llANGERS)             A   14"     14-2SI-33A         NO.
RilR PUMP A DISINARGE (WELDS)
A   12"     12-2SI-34A         NO.
A 8"
B    6"      6-2RH-10B          27 2-ISI-62           0       SAFETY IN?ECTION PUMP 22 SUCTION (WELDS) 2-ISI-63           0       SAFETY IN.IECTION PUMP 22 SUCTION (llANGERS) 6"      6-2R11-10A        27 2-ISI-64           0       SAFETY INJECTION PUMP 21 Si:CTION (WELDS)           A 2-ISI-65           0       SAFETY INJECTION PUMP 21 SUCTION (HANGERS) 2-ISI-66           0       REFUELING WATER STORAGE (WELDS)
8-2RH-7A 29 2-ISI-57 0
                                                                                                        -
RiiR PUMP A DISCIIARGE (llANGERS)
14"     14-2SI-1         NO.
A 8"
12"     12-2SI-3A           35 TANK DISCHARGE                                                                    33 2-ISI-67           0       REFl!LI.ING WATER STORAGE (HANGERS)                     12"     12-2SI-3B 12"     12-251-4             33 TANK DISCllARGE                                                                    31 10"     10-2SI-8 12"     12-2SI-11           33 6"      6-2SI-13A          28 2-ISI-68           0       BORIC ACID SUPPLY TO                 (WELDS)       -
8-2Ril-9A 29 22 A
6"       6-2SI-13B          28 l
10" 10-2Rii-11 27 A
SAFETY INJECTION                                                                   30 2-ISI-69           0       BORIC ACID SUPPLY TO                 (HANCERS)           8"       8-2SI-17 8"       8-2SI-18           30 SAFETY INJECTION
6" 6-2RH-12 32 2-ISI-58 0
                                                                                                                                                $
CONTAINHENT SU.T B DISCllARGE (WELDS)
_
B 12" 12-2 Ril--6 B 2-ISI-59 0
* 4
CONTAIhl!ENT S'JMP B DISCliARGE (llANGERS)
- - _ _ - - _ _ _ .                      . _.
B 14" 14-2SI-33B NO.
                                          .
B 12" 12-2SI-34B NO.
2-ISI-60 0
CONTAINNENT SUMP B DISCHARGE (WELDS)
A 12" 12-2RH-6A 32 2-ISI-61 0
CONTAINMENT SUMP B DISCllARGE (llANGERS)
A 14" 14-2SI-33A NO.
A 12" 12-2SI-34A NO.
2-ISI-62 0
SAFETY IN?ECTION PUMP 22 SUCTION (WELDS)
B 6"
6-2RH-10B 27 2-ISI-63 0
SAFETY IN.IECTION PUMP 22 SUCTION (llANGERS) 2-ISI-64 0
SAFETY INJECTION PUMP 21 Si:CTION (WELDS)
A 6"
6-2R11-10A 27 2-ISI-65 0
SAFETY INJECTION PUMP 21 SUCTION (HANGERS) 2-ISI-66 0
REFUELING WATER STORAGE (WELDS) 14" 14-2SI-1 NO.
TANK DISCHARGE 12" 12-2SI-3A 35 2-ISI-67 0
REFl!LI.ING WATER STORAGE (HANGERS) 12" 12-2SI-3B 33 TANK DISCllARGE 12" 12-251-4 33 10" 10-2SI-8 31 12" 12-2SI-11 33 2-ISI-68 0
BORIC ACID SUPPLY TO (WELDS) 6" 6-2SI-13A 28 l
SAFETY INJECTION 6"
6-2SI-13B 28 2-ISI-69 0
BORIC ACID SUPPLY TO (HANCERS) 8" 8-2SI-17 30 SAFETY INJECTION 8"
8-2SI-18 30 4


_                      __                                      _
TABLE III NOCIllERN STATES POWER 00.
                  .      .                                                            .        .
PAE 3 0F 3 PRulRIE ISLAND UNIT 2 ISOf4ETRIC SitMRY - CLASS 2 REVISIO4 00MPdNDIT OR SYSTkN ILOP j
TABLE       III NOCIllERN STATES POWER 00.                                                         PAE 3         0F 3 PRulRIE ISLAND UNIT 2 ISOf4ETRIC SitMRY - CLASS 2
h II R STN
        ,y,        REVISIO4           , 00MPdNDIT OR SYSTkN             ILOP   j     h II R         STN 2-ISI-70           0     REACTOR VESSEL SAFETY INJECTION   (WELDS)     B   6"       6-2SI-25fi       6 2-ISI-71           0     REACTOR VESSEL SAFETY INJECTION   (llANGERS) 2-1S1-72           0     REACTOR \ESSEL SAFETY INJECTICN   (WELDS)     A   6"       6-2SI-25A         6 2-ISI-73           0     REACTOR VESSEL SAFETY INJECTION   (llANGERS) 8"       8-251-18       30 2-ISI-74           0     BORIC ACID SUPPLY         ,
,y, 2-ISI-70 0
(WELDS)'     -
REACTOR VESSEL SAFETY INJECTION (WELDS)
2-ISI-75           0     ACCIR!ULATOR DISCllARCE           (WELDS)     A 12"     12-2SI-28A         11 2-ISI-76           0     ACCUWJLATOR DISCllARGE             (llANGERS)     12"     12-2SI-29A         11 B 12"     12-2SI-73B         11 12"     12-2SI-29B         11
B 6"
                                                                                  .
6-2SI-25fi 6
                                                                                                              ~
2-ISI-71 0
                '
REACTOR VESSEL SAFETY INJECTION (llANGERS) 2-1S1-72 0
l                                                                                       .
REACTOR \\ESSEL SAFETY INJECTICN (WELDS)
                                                  .        .
A 6"
6-2SI-25A 6
2-ISI-73 0
REACTOR VESSEL SAFETY INJECTION (llANGERS) 8" 8-251-18 30 2-ISI-74 0
BORIC ACID SUPPLY (WELDS)'
2-ISI-75 0
ACCIR!ULATOR DISCllARCE (WELDS)
A 12" 12-2SI-28A 11 2-ISI-76 0
ACCUWJLATOR DISCllARGE (llANGERS) 12" 12-2SI-29A 11 B
12" 12-2SI-73B 11 12" 12-2SI-29B 11
~
l


--.  . - _ -- - --      _                  -                      _-  .-.            .--
i A?PENDII C FSAR AUGMETTED EXAMINATION NO EXAMINATIONS SCHEDULED THIS OUTAGE -
i
                                                                                                                                    .
    .
                                                                                                                                        !
    .                                                      A?PENDII C FSAR AUGMETTED EXAMINATION
                                  -
NO EXAMINATIONS SCHEDULED THIS OUTAGE -
                                                                                                                                      '
l
                                                                              .
l l
    .
PAGE 1 of 1
PAGE 1 of 1
                                                                                                                                    .
-,_.c.
              - - - - ,  -,_.c.   -
-_.-.*,.,..,-*y
                                              ,  - , . -    , - .    -    -  - - - -    ,- -_.-.*,.,..,-*y - .,-- -.- _, -.. --


        ._  _ _                          _ _ _ ._ _ ,  ____ _
f l
f l
!
h i
h
.i 1
            .
l i
    -
APPENDIX D SEISMIC BOLTING EXAMINATION i
i
t d
:
I t
      .                                                              l
i l
.i                                                                   1 l
i 9
    .                                                                i APPENDIX D SEISMIC BOLTING EXAMINATION i
Page 1 of 1
                                                                    ,
                                                                  .
t
  ,                                                                d I
t i
l
    .
i
    .
9 Page 1 of 1
_            ._


                                                                                                                . .        _ _ . _ _ _ _ _ _ _ _ . _ _ _
NORTHERN STATE 3 POWER CO.
.
TABLE 2 PRAIRIE ISLAND UNIT 2
                        .      .                                                                      .    .
PAGE I
NORTHERN STATE 3 POWER CO.                                                                         TABLE 2 PRAIRIE ISLAND UNIT 2                                                                               PAGE       I       OF 6 INSERVICE INSPECTION-EXAMINATION  
OF 6
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:             SEISMIC BOLTING sus            "                                     INSP. R E Q'D. AMT.           ITEM                     INSPECTION ITEM cNE-            N DE     I Tl N PER. AMT,   EXAM       aO8ENT'J3CATf0N               9EPCMT NO.
MAJOR ITEM:
GORY           ITEM TO BE EXAMINED N/A         N/A       STEAM GENERA'IORS SIEA14 GFNERA' LOR NO. 21 UPPER RING GIRDER         WE         2       2   SNUBBER 1               77-72 (SNUBBER PINS)           'INO       2'       2   WUBBER 2                 80-180 8   SNUBBER I 'I11RU 4       81-97 TIREE     4       -
SEISMIC BOLTING cNE-"
UPPER RING GIRDER         WE         5       5   'IOP ROW                 77-143 (SNUBBER WALL BOLTS)     'INO       b       5   GWIER ROW               80-110 15   ALL BOLTS               81-106 UIRLE     5       -
INSP.
UPPER RING GIRDER         WE         8       8   'IOP ROW W GIRDER       77-143 (SNUBBER BOLTS)           'INO       8       8   'JOP ROW CN WALL         80-176 32   ALL BOLTS               81-98 TIREE     16       -
R E Q'D.
UPPER RING GIRDER         WE       10       10   RING 00N. 2             77-159 (RING 00tNECT BOLTS)     'IND     10       10   RING 00N. I             80-110 40   PAD 1 THRU 4             81-119,114,114R TIREE     20       -
AMT.
brPER RING GIRDER         WE       10       10     10 EXAMINED           77-159 (RING WALL BOLTS)         'IWO     10       10     10 EXAMINED             80-110 30   PAD 1 UlRU 4             81-107,108,109,110
ITEM INSPECTION sus N DE I Tl N ITEM PER.
                                                        'IIIREE   10       -
: AMT, EXAM aO8ENT'J3CATf0N 9EPCMT NO.
(REPEAT INSP.)
GORY ITEM TO BE EXAMINED N/A N/A STEAM GENERA'IORS SIEA14 GFNERA' LOR NO. 21 UPPER RING GIRDER WE 2
ODIDW PINS                 WE         2       2   B0r COL 1/10P OLL 4     77-69,70
2 SNUBBER 1 77-72 (SNUBBER PINS)
                                                        'INO       2       2   Bor & 'IOP CDL 2         80-182 8   00 WPW 1 DIRU 4               81-135
'INO 2'
                                                                                'IOP & BOPIOK
2 WUBBER 2 80-180 8
                                                        'IliREE   4       -
SNUBBER I 'I11RU 4 81-97 TIREE 4
FORM 9 7-34 74 S/70                                                                                                   FOftM NO. SSt-lett PP8-B-22                                         ,
UPPER RING GIRDER WE 5
5
'IOP ROW 77-143 (SNUBBER WALL BOLTS)
'INO b
5 GWIER ROW 80-110 15 ALL BOLTS 81-106 UIRLE 5
UPPER RING GIRDER WE 8
8
'IOP ROW W GIRDER 77-143 (SNUBBER BOLTS)
'INO 8
8
'JOP ROW CN WALL 80-176 32 ALL BOLTS 81-98 TIREE 16 UPPER RING GIRDER WE 10 10 RING 00N. 2 77-159 (RING 00tNECT BOLTS)
'IND 10 10 RING 00N. I 80-110 40 PAD 1 THRU 4 81-119,114,114R TIREE 20 brPER RING GIRDER WE 10 10 10 EXAMINED 77-159 (RING WALL BOLTS)
'IWO 10 10 10 EXAMINED 80-110 30 PAD 1 UlRU 4 81-107,108,109,110
'IIIREE 10 (REPEAT INSP.)
ODIDW PINS WE 2
2 B0r COL 1/10P OLL 4 77-69,70
'INO 2
2 Bor & 'IOP CDL 2 80-182 8
00 WPW 1 DIRU 4 81-135
'IOP & BOPIOK
'IliREE 4
FORM 9 7-34 74 S/70 FOftM NO. SSt-lett PP8-B-22


_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ .
TABLE SB NORTHERN STATES POWpR CO.
_
2 op b
                                                                                                                                                                                          *
PRAWlE ISLAND UNIT PAGE_
                                                              .      .                                                                              .    .
INSERVICE INSPECTION-EXAMINATION  
NORTHERN STATES POWpR CO.                                                                                   TABLE SB PAGE_    2                   op b PRAWlE ISLAND UNIT                                                                                               st;ISMIC BOLTING INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:
MAJOR ITEM:
SUB NE T     S M         INSP. R EO'O. AMT.           BTEM                       INSPECTION E-               D   p   q ITEM       GORY                                      PER.       AMT. EXAM       IDENTIFICATION                 REPORT NO.
st;ISMIC BOLTING NE T S M SUB INSP.
ITEM TO DE EXAMINED N/A       N/A       (S.G. NO. 21 CONP'D)                       i BASE ANCHOR BOLTS           CNE           8       8   BASE OF 00W m 1             77-143
R EO'O.
                                                    .                                          UNO           8       8   BASE OF GXUm 2               80-106 32   BASE OF OQU M4 1             81-80 WIRL) 4 711REE       16       -
AMT.
                                                                    'IOP 00WW                   04E           4       4   TOP OF 00W M 1               77-165 00m ECTING BOUIS           'IWO           4       4   'IOP OF 00w m 2             80-173 16   TOP OF CDwm 1               81-136,149 TH10 4
BTEM INSPECTION E-D p
                                                                                              . 'IHREE       8       -
q ITEM PER.
UPPER RING GIRDER                                 2   SGH-2,SGH-4                 81-111,112 (SPRING HANGER)
AMT.
SUPPORT PAD                 04E           6       6   (Dwm 1                       77-62 HELI-CDIL SCREWS           'INO           6       6   COWW 2                       80-183
EXAM IDENTIFICATION REPORT NO.
                                                                                                          -
GORY ITEM TO DE EXAMINED N/A N/A (S.G. NO. 21 CONP'D) i BASE ANCHOR BOLTS CNE 8
24   ALL HELIODIL SCREW           81-122 111REE       12       -
8 BASE OF 00W m 1 77-143 UNO 8
STEAM GENERA'IOR NO. 22 UPPER RING GIRDER           Q4E           2       2   SNUBBER 1                   77-71
8 BASE OF GXUm 2 80-106 32 BASE OF OQU M4 1 81-80 WIRL) 4 711REE 16
*
'IOP 00WW 04E 4
(SNUBBER PINS)             'INO           2       2   94UBBER 2                   80-180 8   fNUBBER 1711RU 4             81-96
4 TOP OF 00W M 1 77-165 00m ECTING BOUIS
                                                                                                ':IIREE       4       -
'IWO 4
UPPER RING GIRDER           Q4E           5       5   'IOP ROW                     77-142 (SNUBBER WALL BOLTS)       'INO           5       5   CENIER ROW                   80-111 15   ALL BOLTS                     81-99 111REE         5       -
4
UPPER RING GIhDER           Q4E           8       8   TOP B0 lion GIRDER           77-142 (SNUBBER BOLTS)             'INO           8       8   'IOP ROW ON WALL             80-112 32   AIL BOLTS                     81-95 111REE       16       -
'IOP OF 00w m 2 80-173 16 TOP OF CDwm 1 81-136,149 TH10 4
ronM 37-a47s e/re                                                                                                                   rones no. ess-s ees
. 'IHREE 8
,
UPPER RING GIRDER 2
PP8-B-23                                         ,
SGH-2,SGH-4 81-111,112 (SPRING HANGER)
_ _ _ _              _ _ _ _ _ _ _ _ _ _ .
SUPPORT PAD 04E 6
6 (Dwm 1 77-62 HELI-CDIL SCREWS
'INO 6
6 COWW 2 80-183 24 ALL HELIODIL SCREW 81-122 111REE 12 STEAM GENERA'IOR NO. 22 UPPER RING GIRDER Q4E 2
2 SNUBBER 1 77-71 (SNUBBER PINS)
'INO 2
2 94UBBER 2 80-180 8
fNUBBER 1711RU 4 81-96
':IIREE 4
UPPER RING GIRDER Q4E 5
5
'IOP ROW 77-142 (SNUBBER WALL BOLTS)
'INO 5
5 CENIER ROW 80-111 15 ALL BOLTS 81-99 111REE 5
UPPER RING GIhDER Q4E 8
8 TOP B0 lion GIRDER 77-142 (SNUBBER BOLTS)
'INO 8
8
'IOP ROW ON WALL 80-112 32 AIL BOLTS 81-95 111REE 16 ronM 37-a47s e/re rones no. ess-s ees PP8-B-23


                                  .                .                                                                      .    .
\\
                                                                                                      \
NORTHERN STATES POWER CO.
NORTHERN STATES POWER CO.                                                                         ,                      TABLE SB PRAIRIE ISLAND UNIT _2
TABLE SB PRAIRIE ISLAND UNIT _2 PAGE 3
                                                                                                    '
OF_6___
                                                                                                    .                      PAGE     3       OF_6___
INSERVICE INSPECTION-EXAMINATION  
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:             SEISMIC BOLTING 8                                                               INSPECTION SUB E.                        N DE    PTl0N        INSP. R E O'D. AMT.           BTEM ITEM                   GORY PER,   AMT. 2XAM       IDENTIFICATION           REPORT NO.
MAJOR ITEM:
ITEM TO BE EXAMINED N/A                   N/A       (S.G. NO. 22 00NF'D)
SEISMIC BOLTING 8
UPPER RING GIRDER           @E       10       10     RI!G OQN. 4           77-160 (RING CONECT BOLTS)       'IND     10       10     RING G A. 1           80-111
SUB INSP.
'
R E O'D.
40     PAD 1 'HIRU 4         81-118,120
AMT.
                                                                              'HiREE   20         -
BTEM INSPECTION E.
UPPER RING GIRDER           04E     10       10     10 EXAMINED           77-160 (RING WAIJ. BOLTS)         'IWO     10       10     10 EXAMINED           80-111 30     PAD 1 'DiRU 4         81-102,103,104,105
N DE PTl0N ITEM
                                                                              'IHREE   10         -
: PER, AMT.
(REPEAT INSP.)
2XAM IDENTIFICATION REPORT NO.
00W M PINS                 Q4E       2         2   Cows 1                 77-65
GORY ITEM TO BE EXAMINED N/A N/A (S.G. NO. 22 00NF'D)
                                                                              'IWO     2         2   00wm 2                 80-182 8   00mm 1 'IHRU 4         81-135
UPPER RING GIRDER
                                                                                                        'IOP & BOI'IOM
@E 10 10 RI!G OQN. 4 77-160 (RING CONECT BOLTS)
                                                                              'IHREE   4         -
'IND 10 10 RING G A. 1 80-111 40 PAD 1 'HIRU 4 81-118,120
BASE ANOIOR BOLTS           OE       8         8   BASE OR COW m 1         77-160
'HiREE 20 UPPER RING GIRDER 04E 10 10 10 EXAMINED 77-160 (RING WAIJ. BOLTS)
                                                                              'IWO     8         8   BASE OF QXUm 2         80-106 32     BASE OF COwm 1         81-79
'IWO 10 10 10 EXAMINED 80-111 30 PAD 1 'DiRU 4 81-102,103,104,105
                                                                                                        'DIRU 4
'IHREE 10 (REPEAT INSP.)
                                                                              'DIREE   16         -
00W M PINS Q4E 2
UPPER RING GIRDER                               2   SCH-2,SGH-4           81-100,101 (SPRING HANGER)
2 Cows 1 77-65
                                                  'IOP COLUM                 WE       4         4   'DOP OF 00w!N 1         77-165 CONNECTING BOLTS           'INO     4         4   'IOP OF Cows 2           80-113 16     'IOP OF COWN 1           81-137,148
'IWO 2
                                                                                                        'DIRU 4
2 00wm 2 80-182 8
                                                                              'IHREE   8         -
00mm 1 'IHRU 4 81-135
SUPPORT PAD                 WE       6         6   OOwm 1                   77-61 IELI-COIL SCREWS           'INO     6         6   00wm 2                   80-184 24 ,
'IOP & BOI'IOM
ALL HELIODIL SCREWS     81-151
'IHREE 4
  , , m ..n.                                                                                                                               ...  ..........
BASE ANOIOR BOLTS OE 8
                                                                            .
8 BASE OR COW m 1 77-160
_ _ _ _ _ _ _ _ _ _          - - - - - - -                                                                                                            --
'IWO 8
8 BASE OF QXUm 2 80-106 32 BASE OF COwm 1 81-79
'DIRU 4
'DIREE 16 UPPER RING GIRDER 2
SCH-2,SGH-4 81-100,101 (SPRING HANGER)
'IOP COLUM WE 4
4
'DOP OF 00w!N 1 77-165 CONNECTING BOLTS
'INO 4
4
'IOP OF Cows 2 80-113 16
'IOP OF COWN 1 81-137,148
'DIRU 4
'IHREE 8
SUPPORT PAD WE 6
6 OOwm 1 77-61 IELI-COIL SCREWS
'INO 6
6 00wm 2 80-184 24 ALL HELIODIL SCREWS 81-151
,, m..n.


_.                . _ .          _
TABLE 2 NORTHERN STATES POWgR CO.
__                                __            _
PRAIRIE ISLAND UNIT PAGE 4
                                                                                          .    .                                                                        .    .
OF 6
NORTHERN STATES POWgR CO.
INSERVICE INSPECTION-EXAMINATION  
TABLE 2 PRAIRIE ISLAND UNIT                                                                                         PAGE     4     OF 6 INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:             SEISMIC BOLTING EXAM               COMPONENT OR SYSTEM                 ft EO'D. AMT             ITEM               INSPECTION SUB            E-               A D DE g p.9'
MAJOR ITEM:
                                                                                                                                .
SEISMIC BOLTING EXAM COMPONENT OR SYSTEM SUB g p.9' ft EO'D.
ITEM             y                      yO EE              Pert.       AMT. EXAM     IDENTIFICATION           REPORT NO.
AMT ITEM INSPECTION E-A D DE ITEM Pert.
A NED N/A         N/A             (PUMP NO. 21 GNf'D)
AMT.
PRESSURIZER BASE ANOIOR BOLTS         OE             8       8   1-8 BOLTS               77-146 1NO             8       8   9-16 BOLTS               80-114 24   AIL BOIIIS               81-91
EXAM IDENTIFICATION REPORT NO.
,                                                                                                                        VIREE           8       -
y yO EE A NED N/A N/A (PUMP NO. 21 GNf'D)
ACCUMJIATOR A BASE ANOlOR BOLTS         OE             8       8   1-8 BOLTS               77-141
PRESSURIZER BASE ANOIOR BOLTS OE 8
                                                                                                                          'INO           8       8   9-15 BOLTS               80-115 24   AIL BOLTS               81-90 THREE           8       -
8 1-8 BOLTS 77-146 1NO 8
,
8 9-16 BOLTS 80-114 24 AIL BOIIIS 81-91 VIREE 8
'
ACCUMJIATOR A BASE ANOlOR BOLTS OE 8
ACCUMJIA'IOR B BASE ANO10R BOLTS         JE             8       8   1-8 IK>LTS               77-141 INO             8       8   9-16 BOLTS               80-115 24   AIL BOLS                 81-88 TIREE           8       -
8 1-8 BOLTS 77-141
N/A         N/A           REACIOR COOLANT PUMPS PUMP NO. 21 CDIAM1 PINS               OE               2       2   00WW 1                 77-67
'INO 8
                                                                                                                          'INO           2       2   00W W 2                 80-?81 6   00WW 1 DIRU 3           81-135
8 9-15 BOLTS 80-115 24 AIL BOLTS 81-90 THREE 8
                                                                                                                                                      'IOP & B0frIOM THREE           2       -
ACCUMJIA'IOR B BASE ANO10R BOLTS JE 8
BASE ANOIOR BOLTS         OE               8       8 BASE OF 00WMN' 1       77-158 TWO             8       8   BASE OF 00WW 2         80-107 24   BASE OF 00W W 1         81-82
8 1-8 IK>LTS 77-141 INO 8
                                                                                                                                                      'IHRU 3 TIREE           8       -
8 9-16 BOLTS 80-115 24 AIL BOLS 81-88 TIREE 8
_
N/A N/A REACIOR COOLANT PUMPS PUMP NO. 21 CDIAM1 PINS OE 2
roned s 7-sere e/7e                                                                                                         roame eso. ese-s ees PP8-B-25                                               .              .
2 00WW 1 77-67
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ -                                                                                                                                          _ - - -
'INO 2
2 00W W 2 80-?81 6
00WW 1 DIRU 3 81-135
'IOP & B0frIOM THREE 2
BASE ANOIOR BOLTS OE 8
8 BASE OF 00WMN' 1 77-158 TWO 8
8 BASE OF 00WW 2 80-107 24 BASE OF 00W W 1 81-82
'IHRU 3 TIREE 8
roned s 7-sere e/7e roame eso. ese-s ees PP8-B-25


                    .        .                                                                      .    .
A 2
                                                                                                                      .
TABLE NORTHERN STATES POWpR CO.
A TABLE   2 NORTHERN STATES POWpR CO.                                                                                     D Of
D PRAIRIE ISLAND UNIT PAGE Of
* PRAIRIE ISLAND UNIT                                                                                 PAGE
""C NN INSERVICE INSPECTION-EXAMINATION  
                                                                                                          ""C       NN INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:_
MAJOR ITEM:_
SUB                                                 INSP. R EO'D. AMT.             ITEM                 INSPECTION E.             N DE     I Tl N PER. AMT. EXAM       IDENTIFICATION           REPORT NO.
SUB INSP.
ITEM      GORY             ITEM TO BE EXAMINED N/A     N/A       (PtXP NO. 21 00NP'D) 00mm CONNECPING             OE       6         6   'IOP OF 00WM 1         77-163 BOLTS                       'INO     6         6   'IOP OF 00wm 2         80-174 18     'IOP OF CDwm 1         81-154,156 MiW 3
R EO'D.
                                                      '111REE   6         -
AMT.
TIE BACK BOLTS               OE         1         1   PAD 1                 77-77
ITEM INSPECTION E.
                                                      'INO       1         1   PAD 2                 80-179 3   PAD 1 MiRU 3           81-150,157,160,161
N DE I Tl N ITEM PER.
                                                                          -
AMT.
                                                      '111REE   1 TIE BACK PINS               GE         1         1   PAD 1                 71-6 8
EXAM IDENTIFICATION REPORT NO.
                                                      'INO       1         1   PAD 2                 80-186 3   PAD 1 DIRU 3           81-135
GORY ITEM TO BE EXAMINED N/A N/A (PtXP NO. 21 00NP'D) 00mm CONNECPING OE 6
                                                      'IliREE   1
6
                                                                          -
'IOP OF 00WM 1 77-163 BOLTS
                          'IllD00Gil ANCIKE           QE         2       2   PAD 1, SOUrti 2       77-161 BOIES                       'INO       2       2   PAD 1, CENIER 2         80-175 6     PAD 1, ALL BOLTS       81-157,168 DIREE     2       -
'INO 6
IA'IERAL SUPPORP AND         OE         4       4     PAD 2                 7/-158 ELL BC.LTS                   'IW)       3         3   PAD 3, 'IOP ROW       80-175 10     PAD 2 & 3,ALL BOLTS   81-160,161 DIREE     3       -
6
PlTAP NO. 22 00wMN PINS                 'OE         2         2   00W M 1               77-64
'IOP OF 00wm 2 80-174 18
                                                        'IWO     2         2   Comm 2                 80-181 6   Cows 1 DIRU 3         81-135
'IOP OF CDwm 1 81-154,156 MiW 3
                                                                                'IOP & LCfl0M DIREE     2         -
'111REE 6
                                                                              .
TIE BACK BOLTS OE 1
_.
1 PAD 1 77-77
FORM 37 2476 6/78                                                                                                   FORM AO. B51-9 99 9 PP8-B-26                                       ,
'INO 1
1 PAD 2 80-179 3
PAD 1 MiRU 3 81-150,157,160,161
'111REE 1
TIE BACK PINS GE 1
1 PAD 1 71-6 8
'INO 1
1 PAD 2 80-186 3
PAD 1 DIRU 3 81-135
'IliREE 1
'IllD00Gil ANCIKE QE 2
2 PAD 1, SOUrti 2 77-161 BOIES
'INO 2
2 PAD 1, CENIER 2 80-175 6
PAD 1, ALL BOLTS 81-157,168 DIREE 2
IA'IERAL SUPPORP AND OE 4
4 PAD 2 7/-158 ELL BC.LTS
'IW) 3 3
PAD 3, 'IOP ROW 80-175 10 PAD 2 & 3,ALL BOLTS 81-160,161 DIREE 3
PlTAP NO. 22 00wMN PINS
'OE 2
2 00W M 1 77-64
'IWO 2
2 Comm 2 80-181 6
Cows 1 DIRU 3 81-135
'IOP & LCfl0M DIREE 2
FORM 37 2476 6/78 FORM AO. B51-9 99 9 PP8-B-26


    .                                                                            _
NORTHERN STATES POWER CO.
                                    .        .                                                                    .    .
TABLE SB PRAIRIE ISLAND UNIT _ 2 PAGE 6
NORTHERN STATES POWER CO.                                                                           TABLE SB PRAIRIE ISLAND UNIT _ 2                                                                             PAGE     6     op 6 INSERVICE INSPECTION-EXAMINATION  
op 6
INSERVICE INSPECTION-EXAMINATION  


==SUMMARY==
==SUMMARY==
MAJOR ITEM:           SEISMIC BOLTING         _
MAJOR ITEM:
SUB                                                   INSP. R EO'D. AMT.         ITEM               tNSPECTION ITEM E-             N DE RI I N             PER.     AMT. EXAM     IDENTIFICATION           REPORT NO.
SEISMIC BOLTING SUB INSP.
GORY             ITEM TO BE EXAMINED N/A         N/A       (PUMP NO. 22 00Nr'D)                                                                                         ,
R EO'D.
BASE ANCHOR BOLTS           WE           8       8   BASE OF 00w s 1       77-161
AMT.
                                                                      'IWD         8       8   BASE OP 00w m 2       80-107 24   BASE OF 00w m 1       81-81 DIRU 3 DIREE         8       -
ITEM tNSPECTION E-N DE RI I N ITEM PER.
00w m 00m ECTING           WE           6       6   'IOP OP OXUm 1       77-162 BOLTS                       'IWO         6       6   'IOP OP 00w m 2       80-108 18   'IOP OF ODwm 1       81-142,153 DiRU 3 UIREE         C       -
AMT.
TIE BACK BOLTS             WE           1       1 PAD 1                 77-76
EXAM IDENTIFICATION REPORT NO.
                                                                      'IWO         1       1 PAD 2                 80-179 3   PAD 1 DIRU 3         81-145,147,158,159 DIREE         1
GORY ITEM TO BE EXAMINED N/A N/A (PUMP NO. 22 00Nr'D)
                                                                                            -
BASE ANCHOR BOLTS WE 8
TIE BACK PINS               WE           1       1 PAD 1                 77-66
8 BASE OF 00w s 1 77-161
                                                                      'IWO         1       1 PAD 2                 80-186 3   PAD 1 DIRU 3         81-135 "IIIREE       1       -
'IWD 8
                                          'IIIROUGil ANCHOR           WE           2       2   PAD 1, SOLTI112       77-158 BOLTS                       'IWO         2       2   PAD 1, CENIER 2       80-109,109R 6   PAD 1, ALL BOLTS     81-145,168
8 BASE OP 00w m 2 80-107 24 BASE OF 00w m 1 81-81 DIRU 3 DIREE 8
                                                                      'I11REE       2       -
00w m 00m ECTING WE 6
LATERAL SUPPORT AND         QE           4       4   PAD 2                 77-161 WALL BOLTS                 'IWO         3       3   PAD 3,'IOP ROW       80-109 10   PAD 2 & 3,ALL BOLTS   81-158,159
6
                                                                      'IliREE       3       -
'IOP OP OXUm 1 77-162 BOLTS
ronne a 7 247e e/7s                                                                                                 rones seo.ese-seos PP8-B-27                                           ,
'IWO 6
                                                                                .
6
___  - _ _ _
'IOP OP 00w m 2 80-108 18
'IOP OF ODwm 1 81-142,153 DiRU 3 UIREE C
TIE BACK BOLTS WE 1
1 PAD 1 77-76
'IWO 1
1 PAD 2 80-179 3
PAD 1 DIRU 3 81-145,147,158,159 DIREE 1
TIE BACK PINS WE 1
1 PAD 1 77-66
'IWO 1
1 PAD 2 80-186 3
PAD 1 DIRU 3 81-135 "IIIREE 1
'IIIROUGil ANCHOR WE 2
2 PAD 1, SOLTI112 77-158 BOLTS
'IWO 2
2 PAD 1, CENIER 2 80-109,109R 6
PAD 1, ALL BOLTS 81-145,168
'I11REE 2
LATERAL SUPPORT AND QE 4
4 PAD 2 77-161 WALL BOLTS
'IWO 3
3 PAD 3,'IOP ROW 80-109 10 PAD 2 & 3,ALL BOLTS 81-158,159
'IliREE 3
ronne a 7 247e e/7s rones seo.ese-seos PP8-B-27


_ _ _ _  _
NORTNERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 1
                              .      ,                                                                .  .
OF 4
NORTNERN STATES POWER COMPANY                                                               TABLE       II PRAIRIE ISLAND UNIT II                                                                     PAGE   1     OF 4 BASELINE COMPARISON  
BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPO N / SYSTEM
_ IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS ISO MET 110D SEISMIC BOLTING PRGURAM STEAM GENERATOR NO. 21 UPPER RING GIRDER 85 UT 8 PINS 81-97 NONE NONE NONE SNUBBER PINS UPPER RING GIRDER 86 UT 15 BOLTS 81-106 NONE NONE NONE SNUBBER WALL BOLTS UPPER RING GIRDER 85 UT 32 BOLTS 81-98 NONE NONE NONE SNUBBER BOLTS UPPER RING GIRDER 85 UT 40 BOLTS 81-119 NONE NONE NONE RING CONNECT BOLTS VT 40 BOLTS 81-114 NONE LOOSE NUT NONE 81-114R NONE - NUTS NONE TIGitTENED UPnER RING GIRDER 85 UT 10 BOLTS 81-107 NONE NOME NONE WALL BOLTS UT 4 BOLTS 81-108 NONE NONE NONE UT 10 BOLTS 81-109 NONE NONE NONE UT 6 BOLTS 81-1M NONE NONE NONE COLUMN PINS 78 UT 4 PINS-TOP 81-135 NONE NONE NONE 77 UT 4 PINS-BOT 81-135 NONE NONE NONE BASE ANCllGR BOLTS 77 UT 32 BOLTS 81-80 NONE NONE NONE
~l TOP COLUMN CONNECTING 87 UT 16 BOLTS 81-136 NONE NONE NONE BOLTS VT 16 BOLTS 81-149 NONE NONE NONE IIELI-COIL SCREWS 87 UT 24 SCREWS 81-122 N/A NONE-BASELINE NONE t
UPPER RING GIRDER 85 VT SGil-2 81-100 N/A NONE NOME SPRING llANGER VT SGil-4 81-101 N/A NONE Nc Mf; I
FORM NO. ISI-1003


NSP  NDE      W BASELINE REPORT    BASELINE              ISI      EXAMINATION COMPO N / SYSTEM ISO MET 110D  _ IDENT. NO. INDICATIONS    INDICATIONS      LIMITATIONS
NORTHERN STATES POWEh COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 2
                                        -
0F 4
SEISMIC BOLTING PRGURAM STEAM GENERATOR NO. 21 UPPER RING GIRDER            85  UT      8 PINS      81-97      NONE          NONE              NONE SNUBBER PINS UPPER RING GIRDER            86  UT      15 BOLTS    81-106    NONE          NONE              NONE SNUBBER WALL BOLTS                                                                                                '
BASELINE COMPARISON SUMMART NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM I
UPPER RING GIRDER            85  UT      32 BOLTS    81-98      NONE          NONE              NONE SNUBBER BOLTS UPPER RING GIRDER            85  UT      40 BOLTS    81-119    NONE          NONE              NONE RING CONNECT BOLTS                VT      40 BOLTS    81-114    NONE    LOOSE NUT                NONE 81-114R            NONE - NUTS              NONE
ISO MET 110D IDENT.
* TIGitTENED UPnER RING GIRDER            85  UT      10 BOLTS    81-107    NONE          NOME              NONE WALL BOLTS                        UT        4 BOLTS    81-108    NONE          NONE              NONE UT      10 BOLTS    81-109    NONE          NONE              NONE UT        6 BOLTS    81-1M      NONE          NONE              NONE COLUMN PINS                  78  UT      4 PINS-TOP  81-135    NONE          NONE              NONE 77  UT      4 PINS-BOT  81-135    NONE          NONE              NONE BASE ANCllGR BOLTS          77  UT      32 BOLTS    81-80      NONE          NONE              NONE
NO.
~l              TOP COLUMN CONNECTING        87  UT      16 BOLTS    81-136    NONE          NONE              NONE BOLTS                            VT      16 BOLTS    81-149    NONE          NONE              NONE IIELI-COIL SCREWS            87  UT      24 SCREWS  81-122    N/A      NONE-BASELINE            NONE t
INDICATIONS INDICATIONS LIMTTATIONS STEAM GENERATOR NO. 22 TIPPER RING GIRDER 85 UT 8 PINS 81-96 NONE NONE NONE SNUBBER PINS UPPER RING GIRDER 86 UT 15 BOLTS 81-99 NONE NONE NONE l
UPPER RING GIRDER            85  VT      SGil-2      81-100    N/A            NONE              NOME SPRING llANGER                    VT      SGil-4      81-101    N/A            NONE              Nc Mf;
'
I                                              .                                                    FORM NO. ISI-1003
 
_ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _                          __        -._                        -                                            -    _        _ . - _        _              _ .      - _-
                                                                  .                                                                                            .          .
                                                                                                    .
NORTHERN STATES POWEh COMPANY                                                                                                   TABLE                     II PRAIRIE ISLAND UNIT                 II                                                                                         PAGE         2               0F 4 BASELINE COMPARISON SUMMART
!
NSP   NDE     W BASELINE       REPORT                 BASELINE               ISI               EXAMINATION COMPONENT / SYSTEM I
ISO MET 110D     IDENT.           NO.         INDICATIONS           INDICATIONS                 LIMTTATIONS
* STEAM GENERATOR NO. 22 TIPPER RING GIRDER                   85     UT     8 PINS             81-96                       NONE       NONE                                   NONE SNUBBER PINS
,
UPPER RING GIRDER                     86     UT     15 BOLTS           81-99                       NONE       NONE                                   NONE l
SNUBBER WALL BOLTS l
SNUBBER WALL BOLTS l
I l                                        UPPER RING GIRDER                     85     UT     32 BOLTS           81-95                       NONE       NONE                                   NONE SNUBBER BOLTS UPPER RING GIRDER                     85     UT     40 BOLTS           81-120                     NONE       NONE                 B.E. " TIT" ilING CONNECT BOLTS                         VT     40 BOLTS           81-118                     NONE       NONE                                   NONE UPPER RING GIRDER                     85     UT     10 BOLTS           81-102                     NONE       NONE                                   NONE WALL BOLTS                                   UT       4 BOLTS           81-103                     NONE       NONE                                   NONE UT     10 EOLTS           81-104                     NONE       NONE                                   NONE UT       b BOLTS           81-105                     NONE       NONE                                   NONE COLUMN PINS                           78   UT     4 PINS-TOP         81-135                     NONE       NONE                                   NONE
l I
* 77   UT     4 PINS-BOT         81-135                     NONE       NONE                                   NONE BASE ANCi!0R BOLTS                     77   UT     32 EOLTS           81-79                       NONE       NONE                                 ,NONE TOP COLUMN                           87     UT     16 BOLTS           81-137                     NONE       NONE                                   NONE
UPPER RING GIRDER 85 UT 32 BOLTS 81-95 NONE NONE NONE SNUBBER BOLTS UPPER RING GIRDER 85 UT 40 BOLTS 81-120 NONE NONE B.E. " TIT" ilING CONNECT BOLTS VT 40 BOLTS 81-118 NONE NONE NONE UPPER RING GIRDER 85 UT 10 BOLTS 81-102 NONE NONE NONE WALL BOLTS UT 4 BOLTS 81-103 NONE NONE NONE UT 10 EOLTS 81-104 NONE NONE NONE UT b BOLTS 81-105 NONE NONE NONE COLUMN PINS 78 UT 4 PINS-TOP 81-135 NONE NONE NONE
  ,
* 77 UT 4 PINS-BOT 81-135 NONE NONE NONE BASE ANCi!0R BOLTS 77 UT 32 EOLTS 81-79 NONE NONE
  '
,NONE TOP COLUMN 87 UT 16 BOLTS 81-137 NONE NONE NONE CONNECTING BOLTS VT 16 BOLTS 81-148 NONE LOOSE BOLTS NONE 81-148R-NONE-BOLTS NONE TIGllTENED llELI-COIL SCREWS 87 UT 24 SCREWS 81-151 N/A NONE-BASELINE NONE UPPER RING GIRDER 85 VT scil-2 81-111 N/A NONE NONE SPRING llANGER VT SGH-4 81-112 N/A NONE NONE I
CONNECTING BOLTS                             VT     16 BOLTS           81-148                     NONE   LOOSE BOLTS                                 NONE 81-148R-                           NONE- BOLTS                                 NONE TIGllTENED llELI-COIL SCREWS                     87     UT     24 SCREWS         81-151                     N/A   NONE-BASELINE                               NONE UPPER RING GIRDER                     85     VT     scil-2             81-111                     N/A         NONE                                   NONE
g
-
~
SPRING llANGER                               VT     SGH-4             81-112                     N/A         NONE                                   NONE
FORM NO.1S1-1003 r
                  .
g                  ~
I r                                                                        .          .                                                                      FORM NO.1S1-1003
_ _ _ _ _ _ _ _ .                ._  .                      --  .
_ -____ - - __ _ -                                      _ _ _ _ _ _


                                                              . . _    _ _                            _ _ _ _ _ _ _ _ _                    - - - _ _ _ _ _ _ - -
I II NORTHERN STATES POWER COMEANY TABLE PRAIRIE ISLAND UNIT II PAGE 3 0F 4
                      .        .                                                                      .                  .
BASELINE COMPARISON  
I NORTHERN STATES POWER COMEANY                                                                                       TABLE   II PRAIRIE ISLAND UNIT       II                                                                                       PAGE     3 0F     4 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONEN'I'/ SYSTEM
. IDENT.
NO.
INDICATION.9 INDICATIONS LIMITATIONS ISO METilOD PRESSURIZER BASE ANCll0R BOLTS 88 UT 24 BOLTS 81-91 NONE NONE NONE ACCUMULATOR A BASE ANC110R BOLTS 88 UT 24 BOLTS 81-90 NONE BOLT #13 & 14 NONE 5% BACK REFLEC-TION ACCUMULATOR B BASE ANC110R BOUfS 89 UT 24 BOLTS 81-88 NONE NONE NONE REACTOR COOLANT PUMP NO. 21 COLUMN PINS 80 uT 3 PINS-TOP 81-135 NONE NONE nolle 79 UT 3 PINS-EUT 81-135 NONE NONE NONE BASE ANC110R BOLTS 79 UT 24 BOLTS 81-82 NONE NONE NONE COLUMN CONNECTING BOLTS 80 UT 18 BOLTS 81-156 NONE NONE NONE VT 18 BOLTS 81-154 NONE NONE NONE TIE BACK BOLTS 81 UT 1 BOLT 81-160 NONE NONE NONE j
UT 1 BOLI 81-161 NONE NONE NONE UT
'l ILOLT 81-157 NONE NONE NONE VT 3 BOLTS 81-150 NONE LOOSE NUT NONE 81-150R NONE - NUT TIGitTENED TIE BACK PINS 84 UT 3 PINS 81-135 NONE NONE NONE T11RU ANC110R BOLTS 84 UT 6 BOLTS 81-157 NONE NONE NONE VT 5 BOLTS 81-168 NONE NONE NOME FORM NO. ISI-1003


NSP  NDE      W BASELINE    REPORT      BASELINE                ISI                        EXAMINATION COMPONEN'I'/ SYSTEM ISO METilOD      . IDENT.        NO. INDICATION.9    INDICATIONS                        LIMITATIONS PRESSURIZER BASE ANCll0R BOLTS          88  UT      24 BOLTS        81-91      NONE            NONE                                NONE ACCUMULATOR A BASE ANC110R BOLTS          88  UT      24 BOLTS        81-90      NONE      BOLT #13 & 14                            NONE 5% BACK REFLEC-TION
,      ACCUMULATOR B BASE ANC110R BOUfS          89  UT      24 BOLTS        81-88      NONE            NONE                                NONE
,
REACTOR COOLANT PUMP NO. 21
,
COLUMN PINS                  80  uT      3 PINS-TOP      81-135    NONE            NONE                                nolle 79  UT      3 PINS-EUT      81-135    NONE            NONE                                NONE BASE ANC110R BOLTS          79  UT      24 BOLTS        81-82      NONE            NONE                                NONE COLUMN CONNECTING BOLTS      80  UT        18 BOLTS        81-156    NONE            NONE                              NONE VT        18 BOLTS        81-154    NONE            NONE                              NONE
  ,
TIE BACK BOLTS              81  UT        1 BOLT          81-160    NONE            NONE                              NONE j                                        UT        1 BOLI          81-161    NONE            NONE                              NONE
'
UT      'l ILOLT          81-157    NONE            NONE                              NONE VT      3 BOLTS          81-150    NONE      LOOSE NUT                                NONE 81-150R              NONE - NUT TIGitTENED TIE BACK PINS                84  UT        3 PINS          81-135    NONE            NONE                              NONE
    . T11RU ANC110R BOLTS          84  UT      6 BOLTS          81-157    NONE            NONE                              NONE VT      5 BOLTS          81-168    NONE            NONE                              NOME
,
                                                .                                                                            FORM NO. ISI-1003
                                                                        .                  _          _      _                            _      __                .
                        .                  .                                                                                                .      ,
l t
l t
l I
l I
NOR111E15 STATES POWER COMPANY                                                                                                               TABLE         II l       PRAIRIL ISIAND UNIT II                                                                                                                       PACE,       4 0F 4 BASELINE COMPARISON  
NOR111E15 STATES POWER COMPANY TABLE II l
PRAIRIL ISIAND UNIT II
: PACE, 4 0F 4 BASELINE COMPARISON  


==SUMMARY==
==SUMMARY==
NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM
_ IDENT.
NO.
INDICATIONS INDICATIONS LIMITATIONS ISO METHOD l
LATERIAL SUPPORT 84 UT 4 BOLTS 81-161 NONE NONE NONE WALL BOLTS UT 6 BOLTS 81-160 NONE NONE NONE REACTOR COOLANT PUK? NO. 22 COLUMN PINS 80 UT 3 PINS-TOP 81-135 NONE NONE NONE 79 UT 3 PINS-BOT 81-135 NONE NONE NONE BASE ANC110R BOLTS 79 UT 24 BOLTS 81-81 tiONE NONE NONE COLUMN CONNECTING BOLTS 80 UT 18 BOLTS 81-142 NONE NONE NONE VT 18 BOLTS 81-153 NONE NONE NONE TIE BACK BOLTS 81 UT 1 BOLT 81-145 NONE NONE NONE UT 1 BOLT 81-159 NONE NONE NONE UT 1 BOLT 81-158 NONE NONE
!!ONE VT 3 BOLTS 81-147 NONE NONE NONE TIE BACK PINS 81 UT 3 PINS 81-135 NONE NONE NONE TilRU ANC110R BOLTS 81 UT 6 BOLTS 81-145 NUTS NOT NONE NONE FLUSil VT 6 BOLTS 81-168 NONE
,NONE LATERIAL SUPPORT 81 UT 4 BOLTS 81-159 NONE NONE NONE WALL BOLTS UT 6 BOLTS 81-158 NONE NONE NONE FORM NO. ISI-1003


NSP                NDE    W BASELINE REPORT    BASELINE                                ISI              EXAMINATION COMPONENT / SYSTEM ISO                METHOD    _ IDENT. NO. INDICATIONS                        INDICATIONS            LIMITATIONS l
LATERIAL SUPPORT                          84                  UT    4 BOLTS    81-161    NONE                              NONE                      NONE WALL BOLTS                                                    UT    6 BOLTS    81-160    NONE                              NONE                      NONE REACTOR COOLANT PUK? NO. 22
.-;
COLUMN PINS                              80                  UT    3 PINS-TOP  81-135    NONE                              NONE                      NONE 79                  UT    3 PINS-BOT  81-135    NONE                              NONE                      NONE BASE ANC110R BOLTS                        79                  UT    24 BOLTS    81-81      tiONE                            NONE                      NONE COLUMN CONNECTING BOLTS                  80                  UT    18 BOLTS    81-142    NONE                              NONE                      NONE VT    18 BOLTS    81-153    NONE                              NONE                      NONE TIE BACK BOLTS                            81                  UT    1 BOLT      81-145    NONE                              NONE                      NONE UT    1 BOLT      81-159    NONE                              NONE                      NONE UT    1 BOLT      81-158    NONE                              NONE                      !!ONE VT    3 BOLTS    81-147    NONE                              NONE                      NONE TIE BACK PINS                            81                  UT    3 PINS      81-135    NONE                              NONE                      NONE TilRU ANC110R BOLTS                      81                  UT    6 BOLTS    81-145    NUTS NOT                          NONE                      NONE FLUSil VT    6 BOLTS    81-168                                      NONE                    ,NONE
'
LATERIAL SUPPORT                          81                  UT    4 BOLTS    81-159    NONE                              NONE                      NONE WALL BOLTS                                                    UT    6 BOLTS    81-158    NONE                              NONE                      NONE
                                                                                                                                                                                ,
                                                                                                                                                                              .
    '
                                                                            .                                                                            FORM NO. ISI-1003
_                      _ _ _ _ _ _ _ _ _ .-_  _____ ____ ___ _              _ _          _            _ _ _ _ __ _ _ _ _ _ .            _
                                                                                                                                                            ._            _ __
                                                ~
l l
l
l
\
~
    .
l
  .
\\
  .
APPENDIX E TABE I
APPENDIX E TABE I     - PERSONNEL LISTING l
- PERSONNEL LISTING l
TABE II - ULTRASONIC CALIBRATION BLOCKS TABE III - PROCEDURE LISTriG TABE IV - EQUIfMENT AND MATERIALS
TABE II - ULTRASONIC CALIBRATION BLOCKS TABE III - PROCEDURE LISTriG TABE IV - EQUIfMENT AND MATERIALS Page 1 of 1
                                                  .
  .
  .
Page 1 of 1
                                  . . _ . . _.


_ _ _ - .
1 NORTHERN STATES POWER COMPANY APPENDIX E
                                                                                                        ,
~
                                                                                                        !
PRAIRIE ISLAND UNIT II TABLE
1 NORTHERN STATES POWER COMPANY                                             APPENDIX E
~
                                                                                      ~
PERSONNEL LISTING PAGE 1 0F 1 ASNT LEVEL EXAMINER TITLE ORGANIZATION UT PT MT VT II II II (lb)
                                                                                          ~
F. Abrigo Technician LMT (2)
PRAIRIE ISLAND UNIT II                                                     TABLE PERSONNEL LISTING                                                         PAGE 1 0F 1 ASNT LEVEL EXAMINER                 TITLE     ORGANIZATION     UT   PT     MT     VT
L.R. Davis Technician LMT I
* F. Abrigo             Technician         LMT (2)        -
II I
II    II      II (lb)
R.A. Kellerhall Technician LMT II II II II (la,b)
L.R. Davis             Technician         LMT           I     II     I       -
R.W. Pechacek Techn cian LMT II II I '.
R.A. Kellerhall       Technician         LMT           II   II     II       II (la,b)
II (lb) d E.L. Thomas Supervisor LMT III III 111 III (la,b)
* R.W. Pechacek         Technd cian         LMT           II   II     I '. II (lb)
W.M. Tighe Technician IJIT II I
E.L. Thomas           Supervisor         LMT           III   III   111     III (la,b)
I G.T. Lenertz Production NSP II II II (lb)
W.M. Tighe             Technician         IJIT         II   I     I       -
Engineer II (la,b)
G.T. Lenertz           Production         NSP                 II     II       II (lb)
L.C. Dahlman M&SP Special-NSP II II list D.B. Hansen Assoc M&SP NSP III III III III (lb)
Engineer L.C. Dahlman           M&SP Special-       NSP           II    II     -        II (la,b) list D.B. Hansen           Assoc M&SP         NSP           III   III   III     III (lb)
Engineer C. Lindstrom ANII Hartford Steam Boiler Inspection
Engineer C. Lindstrom           ANII           Hartford Steam Boiler Inspection
& Insurance Co.
                        '
                                        & Insurance Co.
                                                                                                      .
                                                                                                      .
FOOTNOTES:
FOOTNOTES:
*
(la) Certified by NSP to perform Visual Determination of Structural Integrity for Hanger Assemblies in accordance with NSP-VT-2.
(la) Certified by NSP to perform Visual Determination of Structural Integrity for Hanger Assemblies in accordance with NSP-VT-2.
-
(lb) Inspection experience and NDE Qualifications were judged to be adequate to perform Visual Examinations in accordance with NSP-VT-1.
(lb) Inspection experience and NDE Qualifications were judged to be adequate to perform Visual Examinations in accordance with NSP-VT-1.
(2)   Organization:     Lambert, MacGill, Thomas, Inc. (LMT) 771 Brokaw Road San Jose, CA 95&l2                                                 ,
(2)
l
Organization:
Lambert, MacGill, Thomas, Inc. (LMT) 771 Brokaw Road San Jose, CA 95&l2


  - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _              _ __
10RTllERN STATES POWER COMPANY APPENDIX E PRAIRIE ISLAND UNIT II TABLE II ULTRASONIC CALIBRATION BLOCKS F! SE 1 0F 2 PIPE SCllEDULE SERIt.L OR 1
                                                                    >    .                                                                  .  .
NSP NO.
10RTllERN STATES POWER COMPANY                                                                         APPENDIX E PRAIRIE ISLAND UNIT II                                                                                 TABLE   II ULTRASONIC CALIBRATION BLOCKS                                                                           F! SE 1 0F 2 PIPE SCllEDULE                     SERIt.L OR NSP NO.         SIZE & DIA.       & TilICKNESS       MATERIAL   llEAT NUMBER CALIBRATION REPORTS     DATE 4                   3"     Scil 160       .438"       316       M5900         hK-1             2-26-81 6                   6"     Scil 160       .718       316       M3715         BMT-4             3-2-81 RK-2             2-28-81 RWP-7             2-28-81 RWP-8             3-2-81 8                   8"     SCll 120       .719       316       J2338         ELT-1             3-11-81 15               CAST     R.C. PIPE                 A-351     B2877         RK-7             3-5-81 CF8A                     RK-14             3-10-81 RK-20             3-17-81 23                 30"                   1.045"       A-515     88526         ELT-3             3-11-81 CR. 70                   RWP-6             2-28-81 24                 31"                   1.534"       A515       79114         BMT-1             2-24-81       ,
SIZE & DIA.
CR. 70                   RWP-10           3-3-81 RWP-12           3-4-81 25A           5-5/16" +                               SA533     C2220/1       EMT-8           3-14-81 Cl.AD (T) X                         CR. B CL. 1                 RK-15             3-13-81 7-1/16" (W)                                                       RK-16             3-13-81 X 17-3/4" (W) 26           3-1/2"(T)                   ,
& TilICKNESS MATERIAL llEAT NUMBER CALIBRATION REPORTS DATE 4
A-533     52391         BMT-6           3-11-81
3" Scil 160
;                                                              X 6" (W) X                           CR. A CL. 2                   BMT-7           3-12-81
.438" 316 M5900 hK-1 2-26-81 6
'
6" Scil 160
12" (L)                                                           DBil-1           3-11-81 27                 6"     SCll 40       .280"       304       2P5951         RWP-9           3-2-81 36                 16"     Scil 100     1.031" &     A-106     45124A         RWP-3           2-27-81
.718 316 M3715 BMT-4 3-2-81 RK-2 2-28-81 RWP-7 2-28-81 RWP-8 3-2-81 8
                                                                                            .585"       CR. C                     RWP-4           2-27-81
8" SCll 120
                                                                                                      ~
.719 316 J2338 ELT-1 3-11-81 15 CAST R.C. PIPE A-351 B2877 RK-7 3-5-81 CF8A RK-14 3-10-81 RK-20 3-17-81 23 30" 1.045" A-515 88526 ELT-3 3-11-81 CR. 70 RWP-6 2-28-81 24 31" 1.534" A515 79114 BMT-1 2-24-81 CR. 70 RWP-10 3-3-81 RWP-12 3-4-81 25A 5-5/16" +
                                                                        .
SA533 C2220/1 EMT-8 3-14-81 Cl.AD (T) X CR. B CL. 1 RK-15 3-13-81 7-1/16" (W)
RK-16 3-13-81 X 17-3/4" (W) 26 3-1/2"(T)
A-533 52391 BMT-6 3-11-81 X 6" (W) X CR. A CL. 2 BMT-7 3-12-81 12" (L)
DBil-1 3-11-81 27 6"
SCll 40
.280" 304 2P5951 RWP-9 3-2-81 36 16" Scil 100 1.031" &
A-106 45124A RWP-3 2-27-81
.585" CR. C RWP-4 2-27-81
~


                                                              -
i h
i h !
2_
                                                      ,
M E
-
1 F
.
1 O_
_
X I
_
2 1 1 D
-                      2_
88 NE E
_
ELE T
_
67 PBG A
1   F 1                                                 M O_
1 1 PAA D
X I       2                 1 1 D                         88 NE                   E       - -
ATP 33 S
ELE                   T   67 PBG                 A   1 1 PAA                 D       - -
TRO PE R
ATP                       33
N 34 O
    .
1 1 I
    .                               S T
T PP A
WW R
RR B
ILAC
.R RE OBM 0
LIR 4
At S
I A
RT S
EA SE l
l L
D A
U I
T R
S E
T A
V.
M R
ELS US DE EN 1
K 1CC SI l
ET P
I &
Y S
P N
T.
A C
P O
M L
O B
.)
CI A
AL IN I
1(
R O
R O
P E
D D"
R N    34 O    1 1 I        - -
ETI 2
T      PP A      WW R      RR B
WTT OI A 4
I L
PNR E
A C
/ '5 UB Z
                                    .R RE OB M      0 LIR At 4
3 S
S I          A RT          S EA SE l l
I I
_
EDL S
L        D A        U                        .
5X TNA
_
!'. AC TL SSC I I N
I        T R        S E
N REO O
T          .
0 N
A M        V.
EI S 5
R E
lIRA TI R PS RAT H
LS US DE EN 1
ORL NPU tl IT1 lI l}ll lll
1  K CC SI !
l ET                                      _
P                                      .
I &                                    -
Y        S        P                                      -
N      T.
A      C                                                -
    .          P      O M      L O      B              .        .)
CI                  A        AL IN                I        1(
R      O            D       D"
      .        ETI                               2 WTT                 &      "
OI A                         4 PNR                 E S
UBI              Z I
                                            /3 '5
                                              -
EDL                 S       5X TNA
              !'. AC                     '
TL SSC                                 .
I I               .
N      N REO                 O       0 EI S                 N        5 l
IRA                  P TI R                 S RAT                 H ORL NPU
                                                                  .
_
                                                                          .
tl   IT1 lI               l}ll       lll
                                                                !
                                                                    ,


                      .      .                                                          .      .
NORTilERN STATES POWER COMPANY APPENDIX E
APPENDIX    E NORTilERN STATES POWER COMPANY PRAIRIE ISLAND UNIT II                                                                         TABLE     III PROCEDURE LISTING                                                                             PAGE I   0F   1 PROCEDURE NUMBER     FIELD                             PLANT APPROVAL FIELD CilANGE                           j AND REVISION       CllANGE     PROCEDURE TITLE           DATE       REMARKS     CIIANGE DESCRIPTION     ,
PRAIRIE ISLAND UNIT II TABLE III PROCEDURE LISTING PAGE I 0F 1
_
PROCEDURE NUMBER FIELD PLANT APPROVAL FIELD CilANGE j
                                                                                                                  >
AND REVISION CllANGE PROCEDURE TITLE DATE REMARKS CIIANGE DESCRIPTION NSP-MT-1, REV. 2 N/A MAGNETIC PARTICLE l-8-81 NONE EXAMINATION NSP-MT-2, REV. O N/A WET MAGNETIC PARTICLE l-8-81 NONE EXAMINATION NSP-FT-1, REV. 2 N/A LIQUID PENETRANT l-8-81 NONE EXAMINATION NSP-UT-1, REV. 1 N/A ULTRASONIC EXAMINATION 1-8-81 NONE OF PIPE WELDS NSP-UT-2, REV. 1 N/A AU'IDMATIC DATA RECORDING 1-8-81 N')NE NSP-UT-3, REV. 1 N/A ULTRASONIC EXAMINATION 2-20-81 NONE OF FERRITIC VESSELS NSP-UT-4, REV. 1 N/A UL*1RASONIC EXAMINATION 1-8-81 NONE 0F STUDS, BOLTS AND NUTS NSP-UT-4B, REV. 1 N/A AXIAL ULTRASONIC EXAMINA-2-20-81 NONE TION OF S' IUDS AND BOLTS NSP-UT-11, REV. 1 N/A UL'IRASONIC EXAMINATION 2-20-81 NONE OF CAST STAINLESS STEEL PIPING NSP-VT-1, REV. 2 N/A VISUAL EXAMINATION 1-8-81 NONE l
NSP-MT-1, REV. 2       N/A   MAGNETIC PARTICLE           l-8-81         NONE EXAMINATION NSP-MT-2, REV. O       N/A   WET MAGNETIC PARTICLE       l-8-81         NONE EXAMINATION NSP-FT-1, REV. 2       N/A   LIQUID PENETRANT             l-8-81         NONE EXAMINATION NSP-UT-1, REV. 1       N/A   ULTRASONIC EXAMINATION       1-8-81         NONE OF PIPE WELDS NSP-UT-2, REV. 1       N/A   AU'IDMATIC DATA RECORDING   1-8-81         N')NE NSP-UT-3, REV. 1       N/A   ULTRASONIC EXAMINATION       2-20-81         NONE                               ,
NSP-VT-2, REV. 2 N/A VISUAL EXAMINATION OF 1-8-81 NONE I! ANGER ASSEMBLIES g
OF FERRITIC VESSELS                                                             ,
I
NSP-UT-4, REV. 1       N/A   UL*1RASONIC EXAMINATION     1-8-81         NONE                               !
                                                                                                  '
0F STUDS, BOLTS AND NUTS NSP-UT-4B, REV. 1       N/A   AXIAL ULTRASONIC EXAMINA-   2-20-81         NONE TION OF S' IUDS AND BOLTS                                                       ,
NSP-UT- 11, REV. 1     N/A   UL'IRASONIC EXAMINATION     2-20-81         NONE OF CAST STAINLESS STEEL PIPING                                                                         ,
NSP- VT-1, REV. 2       N/A   VISUAL EXAMINATION           1-8-81         NONE
                                                                                                                !
NSP-VT-2, REV . 2       N/A   VISUAL EXAMINATION OF       1-8-81         NONE l
I! ANGER ASSEMBLIES I
g    .


NORTHERN STATES POWER COMPANY                             APPENDIX     E PRAIRIE ISLAND - UNIT 2                                   TABLE         IV EQUIPMENT AND MATERIALS                                   PAGE       1 0F     2 MATERIAL OR           TYPE OR         CALIBRATION DATE         REMARKS EQUIPMENT         SERIAL NUMBER     OR BATCH NUMBER 1
NORTHERN STATES POWER COMPANY APPENDIX E
PRAIRIE ISLAND - UNIT 2 TABLE IV EQUIPMENT AND MATERIALS PAGE 1 0F 2
MATERIAL OR TYPE OR CALIBRATION DATE REMARKS EQUIPMENT SERIAL NUMBER OR BATCH NUMBER 1
ULTPASONIC:
ULTPASONIC:
.
NORTEC 130 S/N 130-60 CAL:
NORTEC 130           S/N 130-60           CAL:   1-6-81 NORTEC 130D         S/N 130-63-D         CAL:   1-6-81
1-6-81 NORTEC 130D S/N 130-63-D CAL:
. NORTEC 131D         S/N 128               CAL:   1-2-81 NORTEC 131D         S/N 311               CAL:   2-18-81 NORTEC 131D         S/N 322               CAL:   12-2-80 0FF SITE   3-7-81 NORTEC 131D         S/N 322               CAL:   3-9-81 NORTEC 131D         S/N 360               CAL:   9-19-80 RECAL ON SITE 3-13-81 SONIC FTSMK1         S/N 755111           CAL:   12-24-80 RECORDERS:
1-6-81 NORTEC 131D S/N 128 CAL:
GOULD 222           S/N 928               CAL:   2-20-81 GOULD 222           S/N 929               CAL:   2-20-81 COULL 222           S/N 1382             CAL:   2-20-81 TEMPERATURE CAUCES:
1-2-81 NORTEC 131D S/N 311 CAL:
PTC SURFACE         S/N 237               CAL:   5-28-80 CERTIFIED BY THERMOMETER         S/N 240               CAL   5-28-80 MANUFACTURER S/N 256               CAL:   5-28-80
2-18-81 NORTEC 131D S/N 322 CAL:
  ~
12-2-80 0FF SITE 3-7-81 NORTEC 131D S/N 322 CAL:
S/N 271               CAL:   12-3-80 S/N 353               CAL:   1-12-81 S/N 356               CAL:   1-12-81 MAGNETIC PARTICLE:
3-9-81 NORTEC 131D S/N 360 CAL:
                                                                                        .
9-19-80 RECAL ON SITE 3-13-81 SONIC FTSMK1 S/N 755111 CAL:
MAGNAFLUX YOKE       S/N LMT-100           CAL:   2-23-81 ON SITE QUALIFICATION MAGNAFLUX YOKE       S/N GTL 001           CAL:   3-20-81 ON SITE QUALIFICATION MAGNAFLUX COIL       S/N GTL-2 BLACK RAY METER     S/N 14935             CAL:   9-29-80 ROMPAS BLOCKS 304 S/S             S/N 4                 CERT 9-13-76   BY ORLA' S ??AC9INE SHOP 304 S/S             S/N 14               CERT 5-17-78   BY ORLA'S MACH 1NE SHOP 4140 C/S             S/N 17               CERT 5-17-78   BY ORLA'S MACHINE SHOP
12-24-80 RECORDERS:
-
GOULD 222 S/N 928 CAL:
IIW BLOCK ASTM-A-36           S/N LMT-2             CERT 5-09-80   BY DIMAC MACHINE CO.
2-20-81 GOULD 222 S/N 929 CAL:
.
2-20-81 COULL 222 S/N 1382 CAL:
2-20-81 TEMPERATURE CAUCES:
PTC SURFACE S/N 237 CAL:
5-28-80 CERTIFIED BY THERMOMETER S/N 240 CAL 5-28-80 MANUFACTURER S/N 256 CAL:
5-28-80
~
S/N 271 CAL:
12-3-80 S/N 353 CAL:
1-12-81 S/N 356 CAL:
1-12-81 MAGNETIC PARTICLE:
MAGNAFLUX YOKE S/N LMT-100 CAL:
2-23-81 ON SITE QUALIFICATION MAGNAFLUX YOKE S/N GTL 001 CAL:
3-20-81 ON SITE QUALIFICATION MAGNAFLUX COIL S/N GTL-2 BLACK RAY METER S/N 14935 CAL:
9-29-80 ROMPAS BLOCKS 304 S/S S/N 4 CERT 9-13-76 BY ORLA' S ??AC9INE SHOP 304 S/S S/N 14 CERT 5-17-78 BY ORLA'S MACH 1NE SHOP 4140 C/S S/N 17 CERT 5-17-78 BY ORLA'S MACHINE SHOP IIW BLOCK ASTM-A-36 S/N LMT-2 CERT 5-09-80 BY DIMAC MACHINE CO.
MATERIALS:
MATERIALS:
MAGNAFLUX           PENETRANT SKL-HF/S   BATCH NO.
MAGNAFLUX PENETRANT SKL-HF/S BATCH NO.
80C094
80C094


NORTHERN STATES POWER COMPANY                           APPENDIX       E PRAIRIE ISLAND - UNIT 2                                 TABLE         IV EQUIPMENT AND MATERIALS                                 PAGE     2 0F   2   .
NORTHERN STATES POWER COMPANY APPENDIX E
  .
PRAIRIE ISLAND - UNIT 2 TABLE IV EQUIPMENT AND MATERIALS PAGE 2
MATERIAL OR           TYPE OR     CALIBRATION DATE         REMARKS EQUIPMENT         SERIAL NUMBER   OR BATCH NUMBER
0F 2
                                                                                  !
MATERIAL OR TYPE OR CALIBRATION DATE REMARKS EQUIPMENT SERIAL NUMBER OR BATCH NUMBER MATERIALS (CONT'D)
                                                                                  '
SPOTCHECK DEVELOPER SKD-NF BATCH NO 80H091 CLEANER SKC-NF BATCH No.79M015 MAGNAFLUX
MATERIALS (CONT'D)
#14AM FLUORESCENT BATCH No.79J109 PREPARED BATH MAGNAGLO
.
#20A FLUORESCENT BATCH NO.80C149 UATER MIX ULTRASON'.C LMT CEL BATCH NO.
SPOTCHECK           DEVELOPER SKD-NF   BATCH NO 80H091 CLEANER SKC-NF     BATCH No.79M015
COUPLANT LMT 979152 ULTRASONIC TRANSDUCERS:
* MAGNAFLUX            #14AM FLUORESCENT BATCH No.79J109 PREPARED BATH MAGNAGLO             #20A FLUORESCENT   BATCH NO.80C149 UATER MIX ULTRASON'.C         LMT CEL           BATCH NO.
SIZE FREQUENCY HARISONIC3 013570
COUPLANT                               LMT 979152 ULTRASONIC TRANSDUCERS:                           SIZE           FREQUENCY HARISONIC3           013570             .250"           5 MHE HARIS0NICS           N1126             .750"           2.25 MHE HARIS0NICS           P377               .5" x .5"       2.25 MHE HARIS0NICS           P8120             .5" x .5"       2.23 MHE HARIS0NICS           Q1032             .5" x .5" DUAL 1.5 MHE HARIS0NICS           Q1265             .5" x .5" DUAL 1.5 MHB HARIS0NICS           R9167             .25" x .25"     5 MHE HARIS0NICS           R10021             .5" x 0         2.".5 MHE HARIS0NICS           R12200             .25" x .25"     2.25 MHE HARIS0NICS           R9159A & B         1" x 1" DUAL   1 MHB PANAMETRIC           A $34 -S           .5"             2.25 MHE AER0 TECH           015450             .5"             2.25 MHE AER0 TECH           015*)63           .5"             2.25 MEE AER0 TECH           016575             1"             2.25 MHZ
.250" 5 MHE HARIS0NICS N1126
* NORTEC               983               .5" x 1"       2.25 MHE NORTEC               1386             1" x 1"         2.25 MHE NORTEC               6807             .75"           2.25 MHE NORTEC               6948             .5"             2.25 MHE NORTEC               CSS-679           1"             1 MHE
.750" 2.25 MHE HARIS0NICS P377
.
.5" x.5" 2.25 MHE HARIS0NICS P8120
.
.5" x.5" 2.23 MHE HARIS0NICS Q1032
l I
.5" x.5" DUAL 1.5 MHE HARIS0NICS Q1265
                                                                                  !
.5" x.5" DUAL 1.5 MHB HARIS0NICS R9167
:
.25" x.25" 5 MHE HARIS0NICS R10021
l
.5" x 0 2.".5 MHE HARIS0NICS R12200
.25" x.25" 2.25 MHE HARIS0NICS R9159A & B 1" x 1" DUAL 1 MHB PANAMETRIC A $34 -S
.5" 2.25 MHE AER0 TECH 015450
.5" 2.25 MHE AER0 TECH 015*)63
.5" 2.25 MEE AER0 TECH 016575 1"
2.25 MHZ NORTEC 983
.5" x 1" 2.25 MHE NORTEC 1386 1" x 1" 2.25 MHE NORTEC 6807
.75" 2.25 MHE NORTEC 6948
.5" 2.25 MHE NORTEC CSS-679 1"
1 MHE l
I


  . _ _ _ _ _
APPENDIX F FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTION I
                  -_ ___. _. .                              . _ _ _ _  __
l l
                                                                                        .
                                              .
,
              -
APPENDIX F
              .                                  FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTION I
                              .
l
                                                                                          .
                                                                                            !
l
                                                                                            .
                                                                                            !
                                                                                            '
l l
l l
f
f L
                                                                                            ,
.
L
              .
i t
i t
                .
(
,
PAGE 1 0F 1 i
(                                                PAGE 1 0F 1                                 :
;
i
                                    --    --                              - _ _ _ _- -


_ _
1 l
1 l
FORM NIS-1 OWNERS' DATA RE? ORT FOR INSERVICE INSPECTIONS l
FORM NIS-1 OWNERS' DATA RE? ORT FOR INSERVICE INSPECTIONS l
l                       (As Required by the Provisions of the ASME Code Rules)
l (As Required by the Provisions of the ASME Code Rules)
                                                                                -
I 1.)
I                                                                 .
Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN 2.)
1.)   Owner       NORTHERN STATES POWER COMPANY
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)
* Address     414 NICOLLET MALL, MINNEAPOLIS, MINN 2.)   Piant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II
Plant Unit II 4.)
  .
Owner (Certificate of Authorization) 5.)
Address     WELCH, MINNESOTA 3.)   Plant Unit         II           4.)   Owner (Certificate of Authorization)     --
Comercial Service Date 12-21-74 6.)
5.)   Comercial Service Date 12-21-74           6.) National Board Number for Unit -
National Board Number for Unit -
7.)   Components Inspected Manu facturer Component or       Manu facturer     or Installer           State or         National Appureenance       or Installer         Serial No.         Province No.       Board No.
7.)
Bl.0 REACTOR VESSEL       CREUSOT-LOIRE         687             MINN. 200-51       --
Components Inspected Manu facturer Component or Manu facturer or Installer State or National Appureenance or Installer Serial No.
Bl.3 VESSEL-TO-FLANGE AND HEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANGE     CREUSOT-LOIRE         --                  --              --
Province No.
                                                                                                    .
Board No.
W-1                                                                           e HEAD-TO-FLANGE       CREUSOT-LOIRE         -                    --              --
Bl.0 REACTOR VESSEL CREUSOT-LOIRE 687 MINN. 200-51 Bl.3 VESSEL-TO-FLANGE AND HEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANGE CREUSOT-LOIRE W-1 e
W-6
HEAD-TO-FLANGE CREUSOT-LOIRE W-6 Bl.4 PRIMARY N0ZZLE-TO-VESSEL AND N0ZZLE INSIDE RADIUSED REACTOR CORE COOLANT CREUSOT-LOIRE N0ZZLE (OUTLET)
                                                                                                    '
RCC-B-1 UNDERCLAD CRACKING EXAMINATION REACTOR CORE COOLANT CREUSOT-LOIRE I
Bl.4 PRIMARY N0ZZLE-TO-VESSEL AND N0ZZLE INSIDE RADIUSED REACTOR CORE COOLANT               CREUSOT-LOIRE         --                  --              --
N0ZZLE (OUTLET)
RCC-B-1 UNDERCLAD CRACKING EXAMINATION REACTOR CORE COOLANT               CREUSOT-LOIRE         --                  --              --
I   N0ZZLE (OUTLET)
N0ZZLE A N0ZZLE B
  .
31.6 N0ZZLE-TO-SAFE END WELDS REACTOR CURE
  . COOLANT              CREUSOT-LOIRE        --                  --              --
N0ZZLE (OUTLET)
N0ZZLE (OUTLET)
N0ZZLE A N0ZZLE B 31.6 N0ZZLE-TO-SAFE END WELDS REACTOR CURE COOLANT CREUSOT-LOIRE N0ZZLE (OUTLET)
RCC-B-13.E.
RCC-B-13.E.
Bl.8 CLOSURE STUDS AND NUTS STUDS 17-32           CREUSOT-LOIRE         --                  --              --
Bl.8 CLOSURE STUDS AND NUTS STUDS 17-32 CREUSOT-LOIRE NUTS 17-32 Bl.9 LIGAMENTS BETWEEN THREADED STUDE HOLES 9 TO 11 & 36 TO 40 CREUSOT-LOIRE ISI-1019, Rev. O Page 1 of 15
NUTS 17-32 Bl.9 LIGAMENTS BETWEEN THREADED STUDE HOLES 9 TO 11 & 36 TO 40 CREUSOT-LOIRE           --                  --              --
ISI-1019, Rev. O                                                     Page 1 of 15
                    .


_ _ _ _ - _ - _  - - _ _ _ _ _ - _ _
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.)
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.
                                                                                                                    '
2.)
                                                                                                      .
Plant PRAIRIE ISLAND NUCLEAR GENERATING PLANT,-UNIT II Addreas WELCH, MINNESOTA 3.)
1.)     Owner       NORTHERN STATES POWER COMPANY
Plant Unit II 4.)
* Address     414 NICOLLET MALL, MINNEAPOLIS, MINN.                                 _
Owner (Certificate of Authorization) --
2.)     Plant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT,-UNIT II
5.)
                  .
Comercial Service Date 12-21-74 6.)
Addreas     WELCH, MINNESOTA 3.)     Plant Unit         II           4.)   Owner (Certificate of Authorization) --
National Board Number for Unit -
5.)     Comercial Service Date     12-21-74         6.) National Board Number for Unit -
7.)
7.)     Components Inspected Manu facturer Component or       Manufacturer       or Installer           State or       National Appurtenance         or Installer         Serial No.         Province No.     Board No.
Components Inspected Manu facturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No.
Bl.10 CLOSURE WASHERS AND BUSHINGS WASHERS L7-32         CREUSOT-LOIRE l
Province No.
'
Board No.
Bl.ll PRESSURE RETAINING BOLTING CONSEAL BOLTS         CREUSOT-LOIRE           -                    --              --
Bl.10 CLOSURE WASHERS AND BUSHINGS WASHERS L7-32 CREUSOT-LOIRE l
                                                                                                                                    '
Bl.ll PRESSURE RETAINING BOLTING CONSEAL BOLTS CREUSOT-LOIRE PER MARMON CLAMP l-3 Bl.13 CLOSURE HEAD CLADDING HCP-3 CREUSOT-LOIRE HCP-4 HCP-1 Bl.14 VESSEL CLADDING VCP-3 CREUSOT-LOIRE 2 PATCHES B2.0 PRESSURIZER WESTINGHOUSE 1191 68-57 B2.4 N0ZZLE-TO-SAFE-END WELDS SAFE'lY LINE A NAVC0 W-1A S.E.
PER MARMON CLAMP l-3               ,
SAFETY LINE B NAVC0 W-1B S.E.
Bl.13 CLOSURE HEAD CLADDING HCP-3                 CREUSOT-LOIRE         --                    --              --
B2.ll PRESSURE RETAINING BOLTING PRESSURIZER MANWAY BOLTS NAVC0 B3.0 STEAM GENERATOR WESTINGHOUSE 1181 68-39 ISI-1019, Rev. O Page 2 f
HCP-4
15
* HCP-1 Bl.14 VESSEL CLADDING VCP-3                 CREUSOT-LOIRE         --                    --              --
2 PATCHES B2.0 PRESSURIZER           WESTINGHOUSE             1191                 --
68-57 B2.4 N0ZZLE-TO-SAFE-END WELDS SAFE'lY LINE A         NAVC0                   --                  --              --
W-1A S.E.
SAFETY LINE B         NAVC0
                                                                                        --                    --              --
!-                                        W-1B S.E.
B2.ll PRESSURE RETAINING BOLTING PRESSURIZER
                                                                                        --                    -              --
MANWAY BOLTS           NAVC0 B3.0 STEAM GENERATOR       WESTINGHOUSE           1181                 --
68-39 ISI-1019, Rev. O                                                         Page 2 f   15


l t
l t
{
{
,
I i
                                                                                    -
I FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
I
NORTHERN STATES POWER COMPANY 1.)
                                                                                                '
Owner Address 414 NICOLLET MALL, HINNEAPOLIS, MINN.
i I                         FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
2.)
                                                                                  .
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA II 4.)
                                                                      '
Owner (Certificate of Authorization) --
NORTHERN STATES POWER COMPANY 1.)   Owner
3.)
* Address   414 NICOLLET MALL, HINNEAPOLIS, MINN.
Plant Unit 5.)
2.)   Piant     PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II
Comercial Service Date 12-21-74 6.)
  .
Nartonal Board Number for Unit--
WELCH, MINNESOTA Address 3.)    Plant Unit        II           4.)   Owner (Certificate of Authorization) --
7.)
5.)   Comercial Service Date 12-21-74           6.) Nartonal Board Number for Unit--
Components Inspected Mantfacturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.
7.)   Components Inspected Mantfacturer Component or       Manu facturer     or Installer           State or       National Appurtenance       or Installer         Serial No.         Province No.     Board No.
Province No.
B3.3 N0ZZLE-TO-SAFE END WELDS STEAM GENERATOR NO. 21 RCC-A-5 S.E.         NAVC0                 --                  --            ---
Board No.
                                                                                                      .
B3.3 N0ZZLE-TO-SAFE END WELDS STEAM GENERATOR NO. 21 RCC-A-5 S.E.
B3.10 PRESSURE RETAINING BOLTING (42 INCH DIAMETER)
NAVC0 B3.10 PRESSURE RETAINING BOLTING (42 INCH DIAMETER)
STEAM GENERATOR NO. 21               WESTINGHOUSE           1181               --
STEAM GENERATOR NO. 21 WESTINGHOUSE 1181 68-19 MANWAY A BOLTS MANWAY B BOLTS 4
68-19 MANWAY A BOLTS
B4.0 PIPING PRESSURE BOUNDARY B4.1 SAFE END TO PIPING AND SAFE END IN BRACH PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT RCC-B-1 S.E.
                                                                                                      '
NAVC0 STEAM CENERATOR NO. 21 RCC-A-5 S.E.
MANWAY B BOLTS 4
NAVC0 PZR SAFETY LINE A W-1 NAVC0 PZR SAFETY LINE B W-1 NAVC0 PZR SPRAY LINE W-22B NAVC0 I
B4.0 PIPING PRESSURE BOUNDARY B4.1 SAFE END TO PIPING AND SAFE END IN BRACH PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT RCC-B-1 S.E.         NAVC0                 --                  --              --
ISI-1019, Rev. O Page 3 f 15
STEAM CENERATOR NO. 21
  ,
RCC-A-5 S.E.         NAVC0                 --                  --              --
PZR SAFETY LINE A W-1                   NAVC0                 --                  --              --
* PZR SAFETY LINE B                                                                           ;
W-1                   NAVC0                 --                  --              --
PZR SPRAY LINE W-22B                 NAVC0                 --                  --              --
                                                                                                        !
I
_
ISI-1019, Rev. O                                                     Page 3 f 15
    . .                                    _


                                                          -
FCRM N.5-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As gaquired by the Provisions of the ASME Code Rules) 1.)
                                                                                                ..
Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.
* FCRM N .5-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As gaquired by the Provisions of the ASME Code Rules)
2.)
                                                                .                            .
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)
1.)   Owner       NORTHERN STATES POWER COMPANY
Plant Unit II 4.)
* Address     414 NICOLLET MALL, MINNEAPOLIS, MINN.
Owner (Certificate of Authorization) --
2.)   Piant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II
5.)
.
Cournercial Service Date 12-21-74 6.)
Address     WELCH, MINNESOTA 3.)   Plant Unit           II         4.)   Owner (Certificate of Authorization) --
National Board Number for Unit --
5.)   Cournercial Service Date   12-21-74         6.) National Board Number for Unit --
7.\\
7.\   Components Inspected Manu fa cturer Component or     Manufacturer       or Installer             State or         National Aopurtenance
Components Inspected Manu fa cturer Component or Manufacturer or Installer State or National Aopurtenance or Installer Serial No.
_
Prov! nee No.
or Installer         Serial No.           Prov! nee No.     Board No.
Board No.
B4.5 CIRCUMFERENTIAL AND LONGITUDINAL PIPE WELDS REACTOR CORE COOLANT CROSSOVER LINE B RCC-B-12           NAVC0                   -                      --              --      -
B4.5 CIRCUMFERENTIAL AND LONGITUDINAL PIPE WELDS REACTOR CORE COOLANT CROSSOVER LINE B RCC-B-12 NAVC0 LINE A RCC-A-6 NAVCO RCC-A-7 NAVC0 PZR SAFETY LINE A W-3 NAVC0 W-4 NAVC0 PZR SAFETY LINE 5 W-6 NAVC0 W-7 NAVC0 B4.6 BRANCH PIPE CONNECTION WELDS EXCEEDING SIX INCH DIAMETER RESIDUAL HEAT REM 07AL TAKE OFF W-ROOT NAVC0 B4.7 BRANCH PIPE CONNECTION WELDS SIX INCH DIAMETER AND SMALLER RESIDUAL TEMPERATURE DETECTOR TAKE OFF W-ROOT NAVC0 B4 10 SUI >
LINE A RCC-A-6             NAVCO                 --                    --                --
T COMPONENTS RE'iIDUAL ' JERATURE DEW CTOR.and 0FF COLD LEG B1, PRRCH-281 NAVC0 ISI-1019, Rev. O Page 4 of 15
RCC-A-7             NAVC0                 -                      --                --
PZR SAFETY LINE A
* W-3                 NAVC0                 --                      --              --
W-4                 NAVC0                   --                    --              --
PZR SAFETY LINE 5 W-6                   NAVC0                 --                      --              --
W-7                   NAVC0                 --                      --                --
B4.6 BRANCH PIPE CONNECTION WELDS EXCEEDING SIX INCH DIAMETER RESIDUAL HEAT REM 07AL TAKE OFF W-ROOT               NAVC0                 -                      --              --
* B4.7 BRANCH PIPE CONNECTION WELDS SIX INCH DIAMETER AND SMALLER RESIDUAL TEMPERATURE DETECTOR TAKE OFF
* W-ROOT               NAVC0                   --                    --              --
B4 10 SUI > T COMPONENTS RE'iIDUAL ' JERATURE DEW CTOR .and 0FF COLD LEG B1, PRRCH-281       NAVC0                   --                    --              --
ISI-1019, Rev. O                                                         Page 4 of   15
                            .,                    --


FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTICNS (As Required by the Provisions of tne ASME Code Rules)
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTICNS (As Required by the Provisions of tne ASME Code Rules) 1.)
                                                                          .
Owner NORTHERN STATES POWER COMPANY Address PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II p
1.)   Owner       NORTHERN STATES POWER COMPANY
Address WELCH, MINNESOTA 3.)
                                                  *              *      *
Plant Unt:
  ,              Address p
II 4.)
PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II
Owner (Certificate of Authorization) 5.)
  *
Connercial Service Date 12-21-74 6.)
                                                                                                            '
National Board Number for Unit--
Address     WELCH, MINNESOTA 3.)   Plant Unt:         II             4.)   Owner (Certificate of Authorization)   -
7.)
5.)   Connercial Service Date     12-21-74       6.)   National Board Number for Unit--
Components Inspected Manu facturer Component or Maau facturer or Installer S ta te or National Appurtenance or Installer Serial No.
7.)   Components Inspected Manu facturer Component or       Maau facturer         or Installer           S ta te or     National Appurtenance       or Installer           Serial No.         Province No.     Board No.
Province No.
Board No.
B4.10 (CONT)
B4.10 (CONT)
RESIDUAL TEMPERATURE DETECTOR TAKE OFF HOT LEG A1, 137-2RTD-5       NAVC0                   --                    --              --
RESIDUAL TEMPERATURE DETECTOR TAKE OFF HOT LEG A1, 137-2RTD-5 NAVC0 REACTOR CORE COOLANT A Al NAVC0 B5.0 REACTOR CORE COOLANT PUMPS B5.2 PRESSURE RETAINING BOLTS AND STUDS, WHEN REMOVI') (22 INCH DIAMETER)
                                                                                                        .
SEAL HOUSE BOLTING PllMF A B5.4 INTEGRALLY WELDED SUPPORTS PUMP A SUPPORT A SUPPORT B s
REACTOR CORE COOLANT A Al                   NAVC0                   --                    --              --
SUPPORT C I
* B5.0 REACTOR CORE COOLANT PUMPS B5.2 PRESSURE RETAINING BOLTS AND STUDS, WHEN REMOVI') (22 INCH DIAMETER)
PUMP B SUPPORT A SUI-PORT B SUPPORT C I
* SEAL HOUSE BOLTING PllMF A B5.4 INTEGRALLY WELDED SUPPORTS PUMP A SUPPORT A                                     --                    --              --
ISI-1U19, Rev. O Page 5 of 15 i
s        SUPPORT B                                     --                    --              --
SUPPORT C                                     --                    -              --
I            PUMP B
* SUPPORT A                                     -                      -              --
SUI-PORT B                                   -                      --              --
SUPPORT C                                     --                    --              --
  .
      .
I
!
          -                                                                                                ,
ISI-1U19, Rev. O                                                         Page 5 of   15       i
                                          ._.                      .                    -


            --
6 i
!
FORM NIS-L OWNERS' DA".A REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) i NORTHERN STATES F0WER COMPANY l.)
'
Owner Address 414 NICOLLET MALL HINNEAPOLIS MINN.
i 6
2.)
'
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II Address, '. 4LCH, MINNESOTA 3.)
:
Plant' snit II 4.)
FORM NIS-L OWNERS' DA".A REPORT FOR INSERVICE INSPECTIONS i                            (As Required by the Provisions of the ASME Code Rules)
Owner (Certificate of Authorization) __
                                                                                                            '
S.)
                                                                                      .
Commercial Service Date 12/21/74 6.)
                                                                        '
National Board Number for Unit-o 7.)
l.)    Owner        NORTHERN STATES F0WER COMPANY
Componeries Inspected Manu fa cturer Coisponent or Manufacturer or Installer State or National i
  .            Address       414 NICOLLET MALL HINNEAPOLIS MINN.
Appurtenance or Installer Serial No.
2.)     Piant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II
Province No.
  .
Board No.
Address , '. 4LCH, MINNESOTA
                                                                                                            '
3.)     Plant' snit         II             4.)   Owner (Certificate of Authorization) __
    .
S.)     Commercial Service Date 12/21/74             6.) National Board Number for Unit-o 7.)     Componeries Inspected Manu fa cturer Coisponent or         Manufacturer         or Installer           State or       National     i Appurtenance         or Installer           Serial No.         Province No.     Board No.
ASF3 CLASS 2
ASF3 CLASS 2
("   3 PRESSURE VESSELS, C1.1 CIRCUMFERENTIAL BUTI W'JLDS                                                             ,
("
STEAM GENERATOR No. 21                                                                                           l W-B                     WESTINGHOUSE             1181                 --
3 PRESSURE VESSELS, C1.1 CIRCUMFERENTIAL BUTI W'JLDS STEAM GENERATOR No. 21 l
68-39 C1.4 PRESSURE RETAINING BOLTING                                                               ,
W-B WESTINGHOUSE 1181 68-39 C1.4 PRESSURE RETAINING BOLTING STEAM GENERATOR NO. 21 1181 68-39 MANWAY A WESTINGHOUSE MANWAY B WESTINGHOUSE STEAM GENERATOR NO. 22 1
STEAM GENERATOR NO. 21                                           1181                 --
MANWAY A WESTINGHOUSE 1182 68-40 MANWAY B WESTINGHOUSE j
68-39 MANWAY A               WESTINGHOUSE MANWAY B               WESTINGHOUSE STEAM GENERATOR NO. 22                                                                                           1 MANWAY A               WESTINGHOUSE             1182                 --
C2.0 PIPING C2.1 CIRCUMFERENTIAL BUTT WELDS MAIN STEAM A e
68-40         l MANWAY B               WESTINGHOUSE                                                             j
MS-ll NAVC0 MS-l7 NAVC0 MS-16 NAVC0 MS-18 NAVC0 MS-19 NAVC0 MS-20 NAVC0 MS-174 NAVC0 MAIN STEAM B MS-83 NAVCO MS-117 NAVC0 f
                                                                                                            !
ISI-1019, Rev. O Page 6 15
C2.0 PIPING
  ,
C2.1 CIRCUMFERENTIAL BUTT WELDS MAIN STEAM A                                                                                     e MS-ll                   NAVC0                   --                    --              --
  ,
MS-l7                   NAVC0                   --                    --              --
MS-16                   NAVC0                   --                    --              --
MS-18                   NAVC0                   --                    --              --
MS-19                   NAVC0                   --                    --              --
MS-20                   NAVC0                   --                    --              --
MS-174                 NAVC0                   --                    --              --
MAIN STEAM B MS-83                   NAVCO                   --                    --              --
MS-117                 NAVC0                   --                    --              --
ISI-1019, Rev. O                                                           Page 6 f 15


-. ____ .                          -
FORM MIS-L OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rulcs)
FORM MIS-L OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rulcs)
                                                                    '
NORTHERN STATES POWER COMPANY 1.)
NORTHERN STATES POWER COMPANY 1.)   Owner
Owner Address 414 NICOLLET MALL, MINNEAPOLIS, MINNESOTA i
  -            Address     414 NICOLLET MALL, MINNEAPOLIS, MINNESOTA                                     i 2.)   Piant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II                             '
2.)
I
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II Address WELCH, MINNESOTA l
  -
l 3.)
Address     WELCH, MINNESOTA                                                             l 1
Plant Unit II 4.)
l 3.)   Plant Unit       II             4.)   Owner (Certificate of Authorization) --           ;
Owner (Certificate of Authorization) --
                                                                                                          !
5.)
5.)   Cournercial Service Date   12-21-74       6.) National Board Number for Unit--           l 7.)   Components Inspected                                                                     i Manu fa cturer Component or     Manu facturer       or Installer           State or       National       ,
Cournercial Service Date 12-21-74 6.)
Appurtenance     or Installer         Serial No.         Province No.     Board No.       l
National Board Number for Unit--
                                                                                                          !
l 7.)
Components Inspected i
Manu fa cturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.
Province No.
Board No.
C2.1 (CONT)
C2.1 (CONT)
FEEDWATER A FW-177             NAVC0                   --                  --              --
FEEDWATER A FW-177 NAVC0 FEEDWATER B FW-133 NAVC0 RESIDUAL HEAT REMOVAL DISCHARGE W-331 NAVC0 REACTOR \\ESSEL
FEEDWATER B                                                                                 .
. SAFETY INJECTION W-349 NAVC0 C2.2 LONGITUDINAL WELD JOINTS IN FITTINGS MAIN STLAM A MS-ll TO MS-12 NAVC0 C2.5 INTEGRALLY WELDED SUPPORTS MAIN STEAM A F, MSH-39 NAVC0 H, MSH-42 NAVCO S, MSH-17 NAVC0 MAIN STEAM B A, MSH-48 NAVC0 H, MSH-41 NAVCO A, MSH-50 NAVC0 FEEDWATER A A, FWH-66 NAVC0 K, FWH-58 NAVCO of ISI-1019, Rev. O Page 7 15
FW-133             NAVC0                   -                    --              --
RESIDUAL HEAT REMOVAL DISCHARGE W-331             NAVC0                   -                    -              -,
                                                                                                        .
REACTOR \ESSEL
          . SAFETY INJECTION W-349             NAVC0                   --                  --              --
C2.2 LONGITUDINAL WELD JOINTS IN FITTINGS MAIN STLAM A MS-ll TO MS-12     NAVC0                   --                  --              --
C2.5 INTEGRALLY WELDED SUPPORTS MAIN STEAM A F, MSH-39         NAVC0                   --                  -              --
  ,
H, MSH-42         NAVCO                   --                  --              --
S, MSH-17         NAVC0                   --                  --              --
MAIN STEAM B
  -
A, MSH-48         NAVC0                   --                  --              --
H, MSH-41         NAVCO                   --                  --              --
A, MSH-50         NAVC0                   --                  --              --
FEEDWATER A A, FWH-66         NAVC0                   --                  --              --
K, FWH-58         NAVCO                   --                  --              --
ISI-1019, Rev. O                                                     Page 7 of 15
                                                                                                . - _ .


FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
                                                                '
NORTHERN STATES POWER COMPANY 1.)
NORTHERN STATES POWER COMPANY 1.)   Owner
Owner 414 NICOLLET MALL, MINNEAPOLIS, MINN.
  -      Address      414 NICOLLET MALL, MINNEAPOLIS, MINN.
Address 2.)
2.)   Piant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT,. UNIT II
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT,. UNIT II Address WELCH, MINNESOTA II 4.)
  .
Owner (Certificate of Authorization) 3.)
WELCH, MINNESOTA Address 3.)  Plant Unit      II               4.)   Owner (Certificate of Authorization) --
Plant Unit 5.)
5.)   Commercial Service Date     12-21-74       6.) National Board Number for Unit--
Commercial Service Date 12-21-74 6.)
7.)   Components Inspected Manu facturer Component or       Manu fac turer       or Installer         State or         National Appurtenance       or Installer           Serial No.       Province No.       Board No.
National Board Number for Unit--
7.)
Components Inspected Manu facturer Component or Manu fac turer or Installer State or National Appurtenance or Installer Serial No.
Province No.
Board No.
C2.5 (CONT)
C2.5 (CONT)
FEEDWATER B A, FWH-67           NAVC0                   --                  --              -
FEEDWATER B A, FWH-67 NAVC0 G, FWH-59 NAVC0 REACTOR VESSEL SAFETY INJECTION B, RHRRH-25 NAVC0 C2.6 SUPPORT COMPONENTS MAIN STEAM A G, MSH-54 NAVC0 MAIN STEAM B 0, MSH-82 NAVC0 i
G, FWH-59           NAVC0                   -                    --              --
EEACTOR VESSEL SAFETY INJECTION B, SIRH-6 NAVC0 C4.0 VALVES C4.2 PRESSURE RETAINING BOLTING
REACTOR VESSEL SAFETY INJECTION B, RHRRH-25         NAVC0                   --                  --              --
~
C2.6 SUPPORT COMPONENTS                                                                   ,
HAIN STEAM A CV-31116 NAVC0 MAIN STEAM A RELIEF HEADER RS-21-14 NAVC0 MAIN STEAM B RELIEF HEADER RS-21-20 l
MAIN STEAM A         .
ISI-1019, Rev. O Page 8 f
G, MSH-54           NAVC0                   -                    --              --
15
MAIN STEAM B                                                                               ,
0, MSH-82           NAVC0                   --                  --              --      i EEACTOR VESSEL SAFETY INJECTION                                                                           !
B, SIRH-6           NAVC0                     -                  --              --
                                                                                                  !
C4.0 VALVES C4.2 PRESSURE RETAINING BOLTING
  ~
HAIN STEAM A                                                                               '
CV-31116           NAVC0                   --                  -                -
  . MAIN STEAM A RELIEF HEADER RS-21-14           NAVC0                   --                  --              --
MAIN STEAM B RELIEF HEADER RS-21-20                                     --                  --              --
l    ISI-1019, Rev. O                                                     Page 8   f 15
_  _


l-                                     FORM NI3-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS
l-FORM NI3-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.)
!
Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.
(As Required by the Provisions of the ASME Code Rules)
2.)
                                                                                      .
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II Address WELCH, MINNESOTA 3.)
1.)   Owner       NORTHERN STATES POWER COMPANY
Plant Unit II 4.)
            -
Owner (Certificate of Authorization) --
Address     414 NICOLLET MALL, MINNEAPOLIS, MINN.
5.)
2.)   Piant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II
Connercial Service Date 12-21-74 6.)
            .
National Board Number for Unit -
Address     WELCH, MINNESOTA 3.)   Plant Unit         II             4.)   Owner (Certificate of Authorization) --
a 7.)
5.)   Connercial Service Date     12-21-74       6.) National Board Number for Unit -
Components Inspected Manu facturer Component or Manu facturer or Installer State or National or Installer Serial No.
a 7.)   Components Inspected Manu facturer Component or     Manu facturer       or Installer             State or         National Appurtenance
Province No.
_
Board No.
or Installer           Serial No.           Province No.       Board No.
Appurtenance SEISMIC BOLTING COMPONENTS STEAM GENERATOR 68-39 No. 21 WESTINGHOUSE 1181 SNUBBERS 1-4 8 PINS SNUBBER WALL BOLTS 15 BOLTS SNUBBER BOLTS
                                                      ,
.)
                                                                                                                                  !
32 BOLTS RING CONNECT BOLTS PAD 1-4 40 BOLTS RING WALL BOLTS PAD 1-4 30 BOLTS COLUMN PINS COLUMN 1-4 8 PINS BASE INCHOR BOLTS COLUMN 1-4 32 BOLTS COLUMN CONNECT BOLTS COLUMN 1-4 16 BOLTS HELI-COIL SCREWS COLU)ci 1-4 24 SCREWS l
SEISMIC BOLTING COMPONENTS STEAM GENERATOR No. 21             WESTINGHOUSE             1181                   --
ISI-1019, Rev. O Page 9 of 15
68-39 SNUBBERS 1-4                                 --                      --              --
8 PINS SNUBBER WALL BOLTS 15 BOLTS                                     --                      --              --
SNUBBER BOLTS                                                                                           .)
32 BOLTS                                     --                      --              --
                                                                                                                                  ;
RING CONNECT BOLTS                                                                                       !
PAD 1-4                                                                                                   l 40 BOLTS                                     -                      --              --
RING WALL BOLTS PAD 1-4 30 BOLTS                                     --                    --              -
                    '
COLUMN PINS COLUMN 1-4 8 PINS                                       --                    --              --
              .
BASE INCHOR BOLTS COLUMN 1-4
              .        32 BOLTS                                     --                    --                --
COLUMN CONNECT BOLTS COLUMN 1-4 16 BOLTS                                     --                      --              --
HELI-COIL SCREWS COLU)ci 1-4 24 SCREWS                                     --                      --              --
l ISI-1019, Rev. O                                                           Page 9 of   15
_ . _ .
____________ _ __          _ _ _ _    _  --                    _            - - -                  _


FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
                                                                  '                                  '
NORTHERN STATES POWER COMPANY 1.)
NORTHERN STATES POWER COMPANY 1.)   Wnn
Wnn Address 414 NICOLLET MALL, MINNEAPOLIS, MINN 2.)
  -        Address       414 NICOLLET MALL, MINNEAPOLIS, MINN
Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)
_
Plant Unit II 4.)
2.)   Piant         PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II
Owner (Certificate of Authorization) --
  .
5.)
Address       WELCH, MINNESOTA 3.)   Plant Unit           II           4.)   Owner (Certificate of Authorization) --
Consnercial Service Date 12-21-74 6.)
5.)   Consnercial Service Date     12-21-74       6.) National Board Number for Unit-"'
National Board Number for Unit-"'
7.)   Components Inspected
7.)
,                                              Manu facturer C.enponent or       Manu facturer       or Installer           State or           National       l Appurtenance       or Installer           Serial No.         Province No.         Board No.     !
Components Inspected Manu facturer C.enponent or Manu facturer or Installer State or National l
I STEAM GENERATOR                                                                                     l NO. 21 (CONT)                                                                                       l SPRING HANGER                                                                                       l
Appurtenance or Installer Serial No.
                                                                                                          '
Province No.
SGH-2                 NAVCO                   --                    --                  --
Board No.
;    SCH-4                 NAVC0                   -                      --                  --      -i
I STEAM GENERATOR l
                                                                                                          '
NO. 21 (CONT)
STEAM GENERATOR NO. 22                                                                                 68-40
SPRING HANGER l
                                                                                                          '
SGH-2 NAVCO SCH-4 NAVC0
WESTINCHOUSE              1182                  --
-i STEAM GENERATOR NO. 22 WESTINCHOUSE 1182 68-40 I
                                                                                                          ,
SNUBBERS 1-4
I SNUBBERS 1-4                                                                                         ;
*l 8 PINS SNUBBER WALL BOLTS 15 BOLTS
8 PINS                                         --                    --                  --      *l SNUBBER WALL BOLTS 15 BOLTS                                     --                    --                  --
{
{
SNUBBER BOLTS                                                                                       ,
SNUBBER BOLTS 32 BOLTS l
32 BOLTS                                       --                    --                  --
RING CONNECT BOLTS i
l RING CONNECT BOLTS                                                                                   i PAD 1-4 40 BOLTS                                       --                    --                  --
PAD 1-4 40 BOLTS RING WALL BOLTS
RING WALL BOLTS                                                                                     [
[
.
PAD 1-4 I
'
30 BOLTS COLUMN PINS COLUMN 1-4 I
PAD 1-4                                                                                             I
8 PINS l
  . 30 BOLTS                                       --                    --                  --
BASE ANCHOR BOLTS COLUMN 1-4 32 BOLTS COLUEN CONNECT BOLTS l
COLUMN PINS                                                                                         !
COLUMN 1-4 l
COLUMN 1-4                                                                                           I
(
* 8 PINS                                         --                    --                  --
16 BOLTS f
l
ISI-1019, Rev. O Page 10 *f 15 6
                                                                                                          !
BASE ANCHOR BOLTS COLUMN 1-4                                                                                           (
32 BOLTS                                       --                      --                --
,
COLUEN CONNECT BOLTS                                                                                 ;
l    COLUMN 1-4                                                                                           l
(     16 BOLTS                                       -                      --                --
f
:
                                                                                                          >
ISI-1019, Rev. O                                                           Page 10 *f   15
                                                                                                          !
6
                                                          ..              _          . _ _
I
I


                                                                              ._
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
                                                                                        ~
~
                                                                          .
NORTHERN STATES POWER COMPANY 1.)
1.)   Owner       NORTHERN STATES POWER COMPANY l
Owner l
, .
Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.
Address     414 NICOLLET MALL, MINNEAPOLIS, MINN.
2.)
2.)   Plant       PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II
Plant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)
    .
Plant Unit Il 4.)
Address     WELCH, MINNESOTA 3.)   Plant Unit         Il               4.)     Owner (Certificate of Authorization)     --
Owner (Certificate of Authorization) 5.)
5.)   Commercial Service Date       12-21-74             6.) Na tional beard Number for Unit --
Commercial Service Date 12-21-74 6.)
7.)   Components Inspected Manu f acturer Component or       Manu facturer           or Installer             State or       National Appurtenance       or Installer             Serial No.           Province No.     Board No.
Na tional beard Number for Unit --
'
7.)
Components Inspected Manu f acturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.
Province No.
Board No.
STEAM GENERATOR No. 22 (CONT)
STEAM GENERATOR No. 22 (CONT)
HELI-COIL SCREWS COLUMN 1-4 24 SCREWS                                         --                      --              --
HELI-COIL SCREWS COLUMN 1-4 24 SCREWS SPRING HANGER SCH-2 NAVC0 SGH-4 NAVC0 PRESSURIZER WESTINGHOUSE 1191 68-57 BASE ANCHOK BOLTS 24 BOLTS ACCUMULATOR A DELTA SOUTHERN BASE ANCHOR BOLTS 24 BOLTS ACCUMULATOR B DELTA SOUTHERN BASE ANCHOR BOLTS 24 BOLTS REACTOR COOLANT PUMP 21 WESTINGHOUSE W510 COLUMN PINS COLUMN 1-3 6 PINS BASE ANCHOR BOLTS COLUMN 1-3 24 BOLTS l
SPRING HANGER SCH-2                 NAVC0                     -                        --              --
l ISI-iO19, Rev. O Page of 7
SGH-4                 NAVC0                       --                      --              --
15
                                                                                                          .
PRESSURIZER           WESTINGHOUSE               1191                   --
68-57 BASE ANCHOK BOLTS 24 BOLTS ACCUMULATOR A         DELTA SOUTHERN             --                      --
BASE ANCHOR BOLTS 24 BOLTS ACCUMULATOR B         DELTA SOUTHERN             --                      --
BASE ANCHOR BOLTS
    . 24 BOLTS REACTOR COOLANT
    . PUMP 21               WESTINGHOUSE               W510                     --              --
COLUMN PINS COLUMN 1-3 6 PINS                                           --                      --              --
BASE ANCHOR BOLTS COLUMN 1-3 24 BOLTS                                         --                      --              --
l l      ISI-iO19, Rev. O                                                               Page   of 7     15
                    ..-                    -    - --        . - -


FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)
FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.)
                                                                .
Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL. MINNEAPOLIS. MINNESOTA 2.)
1.)   Owner     NORTHERN STATES POWER COMPANY
Piant PRAIRIE ISLAh*D NUCLEAR GENERATING PLANT. UNIT TT Address WELCH, MINNESOTA 3.)
  .          Address   414 NICOLLET MALL. MINNEAPOLIS. MINNESOTA 2.)   Piant     PRAIRIE ISLAh*D NUCLEAR GENERATING PLANT. UNIT TT
Plant Unit II 4.)
  .
Owner (Certifieste of Authorization) __
Address   WELCH, MINNESOTA 3.)   Plant Unit     II               4.)   Owner (Certifieste of Authorization) __
5.)
5.)   Consnercial Service Date   12-21-74       6.) National Board Number for Unit __
Consnercial Service Date 12-21-74 6.)
7.)   Coeponents Inspected Manu facturer Component or     Manu facturer       or Installer         State or         National Appurtenance     or Installer         Serial No.       Province No.       Board No.
National Board Number for Unit __
REACTOR COOLANT PUMP 21 (CONT)                                                           ,
7.)
COLUMN CONNECT BOLTS COLUMN 1-3 18 BOLTS                                   -                    --                --
Coeponents Inspected Manu facturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.
TIE BACK BOLTS COLUMN 1-3 3 BOLTS                                     --                  --                --
Province No.
TIE BACK PINS COLUMN 1-3                                                                                 .
Board No.
3 PINS                                     --                  --                --
REACTOR COOLANT PUMP 21 (CONT)
THRU ANCHOR BOLTS PAD 1 6 BOLTS                                     --
COLUMN CONNECT BOLTS COLUMN 1-3 18 BOLTS TIE BACK BOLTS COLUMN 1-3 3 BOLTS TIE BACK PINS COLUMN 1-3 3 PINS THRU ANCHOR BOLTS PAD 1 6 BOLTS LATERAL SUPPORT WALL BOLTS PAD 2 & 3 10 BOLTS REACTOR COOLANT PUMP No. 22 WESTINGHOUSE W-515
                                                                        -,                --
~
LATERAL SUPPORT WALL BOLTS PAD 2 & 3 10 BOLTS                                   --                  --                --
COLUMN PINS COLUMN 1-3 6 PINS BASE A!!CHOR BOLTS COLUMN 1-3 24 BOLTS COLUMN CONNECT BOLTS 1
REACTOR COOLANT PUMP No. 22           WESTINGHOUSE         W-515               -                --
COLUMN 1-3 18 BOLTS l
  ~
ISI-1019, Rev. O Page 12 o f 15
'
COLUMN PINS COLUMN 1-3
  ,
6 PINS                                     --                  --                --
BASE A!!CHOR BOLTS COLUMN 1-3 24 BOLTS                                   --                  --                --
COLUMN CONNECT BOLTS 1       COLUMN 1-3 18 BOLTS                                   --                  --                --
l ISI-1019, Rev. O                                                     Page 12 o f 15


_
4 FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECIIONS l
4 FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECIIONS l
(As Required by the Provisions of the ASME Code Rules)
(As Required by the Provisions of the ASME Code Rules) 1.)
                                                                  .
Owner NORTHERN STATES POWER LCy?ANY Address _ 414 NICOLLET MALL, MINNEAPOLIS, MINNESOTA 2.)
1.)   Owner         NORTHERN STATES POWER LCy?ANY
Plant PRAIRIE ISLAND NUCLEAR GENERATING PLANT,-UNIT II Address WELCH, MINNESOTA 3.)
* Address _ 414 NICOLLET MALL, MINNEAPOLIS, MINNESOTA                             ,
Plant Unit II 4.)
2.)   Plant         PRAIRIE ISLAND NUCLEAR GENERATING PLANT,-UNIT II                         _
Owner (Certificate of Authorization) --
.
5.)
Address       WELCH, MINNESOTA 3.)   Plant Unit       II                 4.)   Owner (Certificate of Authorization) --
Consnercial Service Date 12-21-74 6.)
5.)   Consnercial Service Date       12-21-74       6.) National Board Number for Unit--
National Board Number for Unit--
7.)   Components Inspected                                                                       :
7.)
Manu facturer Compor, ant or     Manu facturer         or Installer           State or         National Appurtenance         or Installer _         Serial No.         Province No.       Board No.
Components Inspected Manu facturer Compor, ant or Manu facturer or Installer State or National Appurtenance or Installer _
Serial No.
Province No.
Board No.
REACT 0.1 COOLANT PUMP NO. 22 (CONT)
REACT 0.1 COOLANT PUMP NO. 22 (CONT)
TIE BACK BOLTS COLUMN 1-3 3 BOLTS                                         -                    --                --
TIE BACK BOLTS COLUMN 1-3 3 BOLTS TIE BACK PINS COLUMN 1-3 3 PINS THRU ANCHOR BOLTS PAD 1 6 BO L'is LATERAL SUPPORT "ALL 3OLTS PAD 2 & 3 10 BOLTS ISI-1019, Rev. O Page 13 of 15
TIE BACK PINS COLUMN 1-3 3 PINS                                           -                    --                --
THRU ANCHOR BOLTS PAD 1                                                                                         .
6 BO L'is                                       --                  --                --
LATERAL SUPPORT "ALL 3OLTS PAD 2 & 3 10 BOLTS                                       -                    --              --
* l
.
ISI-1019, Rev. O                                                           Page 13 of 15


        .                                                                          _
FORM NIS-1 (back) 8.)
FORM NIS-1 (back) 8.) Examination Dates 2-23-81 to 3-23-81   9.) Inspection Interval 12-21-74 to 12-21-84 10.) Abstract of Examinations. Include a list of examinations and a statement concerning status of work required for current interval.
Examination Dates 2-23-81 to 3-23-81 9.)
* This was the last inservice inspection in the Second Period of the First Ten Year Interval. The examinations completed the required pressure retaining components
Inspection Interval 12-21-74 to 12-21-84 10.) Abstract of Examinations.
  ,
Include a list of examinations and a statement concerning status of work required for current interval.
and their supports of the reactor coolant and associated auxillary systems classi-fied as ASME Class 1 and Class 2,100% of the Seismic Bolting program, and 100%
This was the last inservice inspection in the Second Period of the First Ten Year Interval. The examinations completed the required pressure retaining components and their supports of the reactor coolant and associated auxillary systems classi-fied as ASME Class 1 and Class 2,100% of the Seismic Bolting program, and 100%
of the required volumetric, surface, and visual examinations of the reactor vessel welds, studs and cladding we.s performed. In addition, both reactor vessel outlet nozzle bore area 3 were examined for the presence of underclad cracking.
of the required volumetric, surface, and visual examinations of the reactor vessel welds, studs and cladding we.s performed.
In addition, both reactor vessel outlet nozzle bore area 3 were examined for the presence of underclad cracking.
11.) Abstract of Conditions Noted.
11.) Abstract of Conditions Noted.
The results of these examinations indicated that the integrity of these systems was maintained. The following is a list of all anomalies detected:
The results of these examinations indicated that the integrity of these systems was maintained. The following is a list of all anomalies detected:
System           Item ID         Exam Method     Type & Number of Indications PER Safety A     W-1                   PT             2 linear W-1A S.E.             PT             2 linear & several rounded PER Safety B     W-1                   PT             1 linear W-1B S.E.             PT           6 linear PER Spray         W-22B                 PT             3 linear FW Loop A         W-177                 MT           4 linear A, Hanger             MT             1 linear FW Loop B         W-133                 MT             23 linears                     .
System Item ID Exam Method Type & Number of Indications PER Safety A W-1 PT 2 linear W-1A S.E.
PT             23 linears MS Loop A         G, Hanger             VT             Loose bolt H, Hanger             MT             2 linears MS Loop B         0, Hanger             VT             Nut not flush with base RCC Loop A       RCC-A-6               PT             14 linears RVSI             B, Hanger             PT             6 lin1ar RTD Loop A       B1, Hanger             VT             Hanger tilted a
PT 2 linear & several rounded PER Safety B W-1 PT 1 linear W-1B S.E.
S/G 21&22         Primary               MT             1 bolt - 1 linear, 1 bolt-Manway Bolts                         dented threads
PT 6 linear PER Spray W-22B PT 3 linear FW Loop A W-177 MT 4 linear A, Hanger MT 1 linear FW Loop B W-133 MT 23 linears PT 23 linears MS Loop A G, Hanger VT Loose bolt H, Hanger MT 2 linears MS Loop B 0, Hanger VT Nut not flush with base RCC Loop A RCC-A-6 PT 14 linears RVSI B, Hanger PT 6 lin1ar RTD Loop A B1, Hanger VT Hanger tilted a
  ^
S/G 21&22 Primary MT 1 bolt - 1 linear, 1 bolt-Manway Bolts dented threads
S/G 21&22         Secondary             VT             6 bolts - dented threads Manway Bolts                         21 bolts   gouged S/C 21           Upper Ring             VT             2 loose bolts                   )
^
Grinder Connec-                                                       ;
S/G 21&22 Secondary VT 6 bolts - dented threads Manway Bolts 21 bolts gouged S/C 21 Upper Ring VT 2 loose bolts Grinder Connec-ting Bolts l
ting Bolts                                                             l l
!
Page 14 of 15
Page 14 of 15


System               Item ID         Exam Method     Type & Number of Indications S/G 22               Top Column             VT             2 loose nuts Connecting Bolts RCP 21               Tie Back Bolts         VT             1 loose nut O
System Item ID Exam Method Type & Number of Indications S/G 22 Top Column VT 2 loose nuts Connecting Bolts RCP 21 Tie Back Bolts VT 1 loose nut O
RPV Loop A           Outlet Noz;1e         UT             22 indications Bore Region
RPV Loop A Outlet Noz;1e UT 22 indications Bore Region RPV Loop B Outlet Nozzle UT 83 indications Bore Region 12.) Abstract of Corrective Measures Recommended and Taken.
* RPV Loop B           Outlet Nozzle         UT             83 indications Bore Region 12.) Abstract of Corrective Measures Recommended and Taken.
All anomalies, with the exception of the rounded PT indications on Pressurizer Safety Line A and the indications on the Reactor Pressure Vessel Outlet Nozzle Bore Region, were corrected. The loose nuts and bolts were tightened, and the tilted hanger was straightened. The lirear MT and PT indications were removed by light hand grinding and blending the surface smooth. The bolts with major steam goug(.s and linear indication were replaced. All indications were corre;'.ted and reexamined with the same method that located them.
All anomalies, with the exception of the rounded PT indications on Pressurizer Safety Line A and the indications on the Reactor Pressure Vessel Outlet Nozzle Bore Region, were corrected. The loose nuts and bolts were tightened, and the tilted hanger was straightened. The lirear MT and PT indications were removed by light hand grinding and blending the surface smooth. The bolts with major steam goug(.s and linear indication were replaced. All indications were corre;'.ted and reexamined with the same method that located them.
The several rounded indicaticns on Pressurizer Safety Line A were accepted as is, based on Westinghouse's evaluation conducted in the January 1980 outage. The indications on the Reactor Pressure Vessei Outlet Nozzle Bore Region was also accepted as is, See section 4 for acceptance analysis.
The several rounded indicaticns on Pressurizer Safety Line A were accepted as is, based on Westinghouse's evaluation conducted in the January 1980 outage. The indications on the Reactor Pressure Vessei Outlet Nozzle Bore Region was also accepted as is, See section 4 for acceptance analysis.
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of he ASME Code, Section XI.                     ,
We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of he ASME Code, Section XI.
Date Afe2 M               19 F SignedM7uculOmres ff m;m d). By M / A %
Date Afe2 M
                                                -
19 F SignedM7uculOmres ff m;m d). By M / A %
Owner             V Cert.ificate of Authorization No. (if applicable)         --
Owner V
Expiration Date   --
Cert.ificate of Authorization No. (if applicable)
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Mecuesel4 and employed by 64f.,1 Si . Gl..L ,a.4 Ls. 0       of U,1 f., d Po e a .         have inspected the com-ponents described in this owner's Data Report during the period A. 23 9 I             to 3 23 P/,
Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Mecuesel4 and employed by 64f.,1 Si. Gl..L,a.4 Ls. 0 of U,1 f., d Po e a.
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the
have inspected the com-ponents described in this owner's Data Report during the period A. 23 9 I to 3 23 P/,
* requirements of the ASME Code, Section XI.
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty,
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connecting with this inspection.
  , expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connecting with this inspection.
Da M oco l M
Da     M oco l   M                 19 Y I l                 .          -
19 Y I l
Commissions h t$ bi 3 2.       c. 300 . b 9 Ins'pector's Signature                                     National Board, State, Province & No.
Commissions h t$ bi 3 2.
c.
300. b 9 Ins'pector's Signature National Board, State, Province & No.
Page 15 of 15}}
Page 15 of 15}}

Latest revision as of 05:12, 24 December 2024

Inservice Insp Rept on 810223-0323.Describes Exam Results of Pressure Retaining Components & Supports of Reactor Coolant, Reactor Pressure Vessel & Bolting of Seismic Supports. Integrity of Sys Has Been Maintained
ML19347F303
Person / Time
Site: Prairie Island Xcel Energy icon.png
Issue date: 04/27/1981
From: Dahlman L, Hansen D, Krumpos P
NORTHERN STATES POWER CO.
To:
Shared Package
ML19347F302 List:
References
NUDOCS 8105180306
Download: ML19347F303 (200)


Text

O NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT II

. INSERVICE INSPECTION - EXAMINATION

SUMMARY

RRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT II February 23 to March 23, 1981 REFUELING OUTAGE No. 5 INSPECTION PERIOD 2

]

Report Date:

Prepared by: L C Dahlman, a

April 27, 1981 M&SP Specialist D B Hansen Assoc M&SP Engineer Commercial Service Reviewed by:

M '[/T' Date: December 21, l'/74 PJKrpmds/)

Superintendent Mh,ecerials and Special Processes l

i j

lm

/

Approved by:

A

/hv ze Jf W Ariddrson I

/ eneral Superintendent Production Plant Maintenance I

l

%nos/Koss

INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 2

- INDEX -

1.0 Introduction 2.0 Summary of Results 3.0 ASME Class 1 and 2 Components 3.1 Examination Plan 3.2 Examination Methods 3.3 Examination Pcocedures 3.4 Equipment and Materials 3.5 Personnel 3.6 Evaluation 3.7 Examination Reports and Documentation 4.0 Examination of Reactor Pressure Vessel and Outlet Nozzles 5.0 Seismic Bolting Appendix A - ASME Class 1 Examination Inservice Inspection - Examination Summary Tables:

Table Sl.1

- Reactor Vessels Table S1.2

- Pressurizer Table Sl.3.1

- Steam Generators Table Sl.3.2

- Regenerative Heat Exchanger Table S1.3.3

- Excess Letdown Heat Exchanger Table Sl.4

- Piping Pressure Boundary Table St.5

- Reactor Coolant Pumps Table Sl.6

- Valve Pressure Boundary Table II - Baseline Comparison Summary Table III - Isometric Summary Appendix B - ASME Class 2 Examins*; ion Inservice Inspection - Examination Summary Tables:

Table S2.1

- Pressure Vessels - Steam Generators Table S2.2.1

- Piping-Circumferential Butt Welds Table S2.2.2

- Longitudinal Weld Joints in Fittings Table S2.2.3

- Branch Pipe to Pipe Weld Joints Table S2.2.4

- Piping - Pressure Retaining Bolting Table S2.2.5

- Piping - Integrally Welded Supports Table S2.2.6

- Piping - Nonwelded Supports Table S2.3

- Pumps Table S2.4

- Valves Table II - Baseline Comparison Summary Table III - Isometric Summary Page 1 of 2

Appendix C - FSAR Augmented hamination

- No examinations scheduled this outage Appendix D - Seismic Bolting Ex==4 nation Inservice Inrpection - Examination Susumary Table:

Table SB - Seismic Bolting Table II - Baseline Comparison Summary Table III - Isometric Susunary Appendix E Table I

- Personnel Listing Table II - Ultrasonic Calibration Blocks Table III - Procedure Listing Table IV - Equipment and Materials Appendix F Form NIS-1, Owners' Data Report for Inservice Inspections 9

e a

9 Page 2 of 2

INSERVICE INSPECTION - EXAMINATION

SUMMARY

PRAIRIE ISLAND NUCLEAR GENERATING PLANT - UNIT 2 February 23 to March 23, 1981

1.0 INTRODUCTION

This report is a summary of the examinations performed during the fifth inservice inspection at the Prairie Island Nuclear Generating Plant -

Unit 2.

This was the last inservice inspection conducted for inspec-tion period two.

The examinations were performed during the plant's fif th refueling outage from February 23 to March 23, 1981. Prairie Island - Unit 2 began commercial operation on December 21, 1974.

This report identifies the components examined, the examination met:iods used, the examination number; and, summarizes the examination results of each of the following areas:

1.

Pressure retaining components and supports of the reactor coolant and associated systems cicssified as ASME Class 1 and ASME Class 2.

2.

Reactor pressure vessel examinations; including examination of nozzle bores for underclad cracking.

3.

Bolting of seismic supports classified as ASME Class 1.

2.0

SUMMARY

OF RESULTS The evaluation of all the results from the inservice examinations indicated that the integrity of these systems has been maintained. ine following is a list of all anomalies detected:

System Item ID Exam Method Type & Number of Indications PER Safety A W-1 PT 2 linear W-1A S.E.

PT 2 linear & several rounded PER Safety B W-1 PT 1 linear W-1B S.E.

PT 6 linear PER Spray W-22B PT 3 linear FW Loop A W-177 MT 4 linear A, Hanger MT 1 linear FW coop B W-133 MT 22 linears PT 23 linears l

l MS Loop A G, Hanger VT Loose bolt H. Hanger MT 2 linears MS Loop B 0, Hanger VT Nut not flush with base RCC Loop A RCC-A-6 PT 14 linears 1

RVSI B, Hanger PT 6 linear Page 1 of e

System Item ID

_, Exam Method Tvpe & Number of Indications RTD Loop A B1, Hanger VT Hanger tilted S/G 21&22 Primary MT 1 bolt - 1 linear, 1 bolt-Manway Bolts dented threads S/G 21&22 Secondary VT 6 bolts - dented threadr Manway Bolts 21 bolts gouged S/G 21 Upper Ring VT 2 loose bolts Grinder Connec-ting Bolts S/G 22 Top Column VT 2 loose nuts Connecting Bolts RCP 21 Tie Back Bolts VT 1 loose nut RDV Loop A Outlet Nozzle UT 22 indications Bore Region RPV Loop B Outlet Nozzle UT 83 indicatiorm Bore Region All anomalies, with the exception of the rounded PT indications on Pressurizer Safety Line A and the indications on the Reactor Pressure Vessel Outlet Nozzle Bore Region, were corrected. The loose nuts and bolts were tightened, and the tilted hanger was straightened. The linear MT and PT indications were removed by light hand grinding and blending the surface smooth. The bolts with major steam gouges and linear indication were replaced. All indications were correctad and reexamined with the same method that located them.

The several rounded indications on Pressurizer Safety Line A were accepted as is, based on Westinghouse's evaluation conducted in the January 1980 outage. The indications on the Reactor Pressure Vessel outlet Nozzle Bore Region was also accepted as is, See section 4 for acceptance analysis, i

3.0 ASME CLASS 1 AND 2 COMPONENTS 1

l 3.1 Examination Plan l

The examination plan focused on the pressure-retaining components i

and their suppor s of tha reactor coolant and associated auxiliary systems classified as A5!P Class 1 and Class 2.

t l -

The examination plan was based on the examination requirements of the ASME Boiler and Pressure Vessel Code Section XI, 1974 l

Edition through and including the Summer 1975 Addenda, and com-l plied with Prairie Island's Technical Specification, Section TS 4.2.

l The examination is in accordance with the program submitted to the l

United States Nuclear Regulatory Commission on February 1, 1978 I

entitled, "ASME Code Section XI Inservice inspection and Testing l

Program and Information Required for NRC Review of Requests for l

Relief from ASME Code Section XI Requirements."

l l

l Page 2 of 8

3.2 Examination Methods Ultrasonic examination methods and techniques were used to perform the volumetric examinations. The ultrasonic test systems consisted of an ultrasonic digital analog tester and a two channel strip chart recorder. One channel of the recorder was calibrated to reflect ultrasonic screen height (amplitude) and the second channel was calibrated to indicate metal path (range) to the reflector.

This approach to the examination gives a permanent record to the extent possible.

~

Liquid penetrant or magnetic particle examination methods were used to perform the surface examinations. The liquid penetrant examinations were performed using color contrast-solvent removable materials. Magnetic particle examinations were performed using e: ther a yote with dry powder or an A-C L-10 coil with fluorescent prepared batn.

All v_sual examinations were aided when necessary with artificial light 1ng and verified for adequacy with an 18% neutral grey card with a 1/32 inch black line.

3.3 Examination Procedures The ultrasonic examination procedure for pipe welds complied with the requirements of Appendix III of ASME Section XI that was issued in the Winter 1975 Addenda. All other examination proce-dures complied with the requirements of the 1974 Edition through ard including the Summer 1975 Addenda of ASME Section XI.

A listing of the procedures used for the examinations is shown in Table III of Appendix E.

3.4 Equipment and Materials All equipment and expendable materials used in the examinations are listed by either serial number or type along with their respective calibration date or batch number in Table IV of Appendix E.

l The ultrasonic calibration standards used in the examination are l

listed in Table II of Appendix E.

These standards are owned and l

maintained by NSP at the plant cite.

3.5 Personnel Northern States Power Company contracted Lambert, MacGill, Thomas, Inc. to perform the examinations. Hartford Steam Boiler Inspec-tion and Insurance Company, representing ANI, provided the a

Authorized Inspection.

l All personnel involved in the performance or evaluation of exami-nations are listed along with their title, organization, and ASNT l

Level cf certification in Table I of Appendix E.

Certifications for examination personnel are maintained on file by Northern States Power Company.

Page 3 of 8

3.6 Evaluation Any indications disc 1ceed in the examinations were evaluated by the examiner at the time, in accordance with the rules of the procedure and ASME Section XI.

The ultrasonic examiner was aided in his evaluation by a calibra-tion performed on a standard reference before each day's examina-tion, checked before and after each individual examination, and at intervals net exceeding four (4) hours.

In addition, the ultrasonic data was recorded on strip charts which were made a part of the inspection report, and permitted further evaluation.

3.7 Examination Reports and Docurggiation All examination reports and docamentation are maintained on file by Northern States Power Compeny. Table I of Appendices A, B and D identifies the examinat. ion report number (s) for each item examined. Many of the iteus identify more than one examination report because of the different types of examinations performed on the item.

Table I of Appendix A, B, and D summarizes all the examinations that have been performed to date and identifies the amount that will be examined in the future to complete the ten year examina-tion requirements. For retrieval purposes, the prefix of the inspection report number corresponds with the year that the insp-ection was performed. The examination report numbers for this outage are prefixed with "81 ".

Table II of Appendix A, B, and D compares the baseline examination results with *.he results obtained during this examination. Table III of Appendix A, B, and D identifies the isometric drawings that were used for the examinations. The personnel, ultrasonic cali-bration blocks, procedures, equipment and materials that were used for the inspection are identified in the tables of Appendix E.

Appendix F contains the Form NIS-1, entitled " Owners" Data Report for Inservice Inspections".

4.0 EXAMINATION OF THE REACTOR PRESSURE VESSEL AND OUTLET N0ZZLES Westinghnuse was contracted to perform the remote ultrasonic and visual examinations of the reactor pressure vessel. The visual examina-tion program consisted of two reactor vessel shell clad patches each bein3 36 square inches. The rer.otely operated ultrasonic device was utilized to perform examinations on the shell-to-flange weld, vessel flange ligaments, outlet nozzle-to-weld, and for investigating for the presence of underclad cracking in the reactor vessel outlet nozzle bore region, ihe examinations were performed in accordance with the applicable requirements of Prairie Island's Technical Specification, Section TS 4.2, and the 1974 Edition of ASME Section XI through and including the Summer 1975 Addenda. There was no reportable indications revealed during all the examinations with the exception of the outlet nozzle underclad cracking examinations.

These examinations disclosed 22 discrete reflectors in the cylindrical section of the Loop A nozzle bore and 83 discrete reflectors in the Loop B nozzle bore. There was no Pace 4 of 8

reportable indications detected in the taper regions of either loop A or B nozzles.

The following is a summary of the underciad examination results and bases for evaluation. This information was received by letter from Mr. J.A. Vano, Manager Inspection Services, Westinghouse Electric Corp.

Examinations were conducted from the inside diameter of the nozzle using dual element, transmit-receive, 2.25 MHz, focused immersion search units inclined to generate lonaitudinal waves at a refrac.ed' angle of 55 to 60. Test sensitivit.y was established on the flat bottom of a 2mm diameter hole drilled just below the clad / base metal interface in a representative calibration block. Secnning was conducted on 3/16 inch increments in both circumferential directions. Any indications equal to or exceeding the primary reference response was recorded. Reflector lengths were measured via a 12 dB drop method. This procedure provides a sensitivity 14 - 16 dB greater than current ASME XI requirements and has been demonstrated capable of resolving reflectors as small as 1 to 2mm deep and 3 to 4tr long.

The fact that reflectors are' confined to areas in the nozzles clad with two layers suggests they may indicate the presence of underclad cold cracking. However, the reflector. are located at depths which indicate they may be confined to the cladding, and further, only half of the reflectors are detectable in both scanning directions. Laboratory studies have consistantly shown that sub-clad cracking is detectable from both directions. Since a definite conclusion regarding the nature of the ultrasonic reflectors is not available, all will be conservatively assumed to be planar surface defects just beneath the cladding for analysis purposes.

An ASME XI evaluatibn of these reflectors requires a measurement of their through-wall extent. Current NDE technology does not permit a direct, accurate, measurement of this dimension thus a reliable method of estimating these depths is necessary.

Assuming the worst case, that of underclad cold cracking, exhaustive l

destructive analysis of nozzle strip clad with multiple layers have demonstrated these cracks are always confined to the depth of the heat affected zone of the second layer of cladding, 0.295 inches (7.5mm) maximum. The Prairie Island Unit II nozzles were clad using a process j

with a lower heat input, dual-wire / submerged-arc. Thus an essumption that all reflectors are 0.295 inches deep is conservative for ASME XI l

inservice evaluation purposes.

l -

The criteria of I;'A-3330 for multiple planar flaws have been applied where necessary and all reflectors or groups of multiple reflectors have been characterized as surface flaws, IWA-3310, with depths equal to O.295".

l The thickness of the bore region of the Prairie Island Unit II nozzles i

is 10 inches. This thickness is determined per Table IWB ~n12, note 2, where t=tni + cn2 Dimension ent' and tn2 were btained from nozzle 2

l fabricacion drawings.

i Page 5 of 8

Th3 long3st ultrestnically meccur:d rafisctor obsarv:d in tho outist nozzle bore regions was 1.0".

These reflectors have been evaluated per IWB-3512, ASME XI, 1977 Edition. Assuming a depth of 0.295", the allowable a/t value is 3.5% while the actual a/t value for this case is 2.95%.

Reflectors in the vicinity of the safe end welds have been evaluated per IWB-3514.4 (a), which refers to Table IWB-3514.2. The longest reflector detected in these areas was 0.86".

Assuming a depth of 0.295", the allowable a/t value is 14.2%, while the actual a/t value for this case is 12.3%.

Thus, based on the conservative assumption that reflector depths are 0.295" (7.5mm), it is concluded that all ultrasonic reflectors detected in the Prairie Island loop A and B outlet nozzle bores meet the inservice acceptance criteria of IWB-3500, ASME XI, 1977 Edition.

Structural Materials Engineering (W. Bamford) perfocmed a fractute evaluation on the locations where the indications were detected, even though it was not required by the rules of Section XI of the code because the indications were small. In the nozzle bore region the critical flaw depth was found to be equal to the wall thickness for normal and upset transients, and to be equal to 2.53 inches for the governing accident condition, the larger LOCA. The crack growth of indications beneath the cladding is negligible, so the following results obtain:

ai = 2.55 a

= 12.15 (wall thickness) c ag = 0.295 Therefore the evaluation criteria of IWB 3600 are met:

ag < 0.5 at ag < 0.1 a

~

e In the nozzle safe end region, the critical flaw size for both normal upset and faulted conditions is equal to the wall thickness, because the stresses are very low.

The fatigue crack growth is also negligible in this case, so the fellowing results are obtained:

ag = 0.295 a

= 2.53 c

ai = 2.53 Page 6 of 8

I The criteria used here are based on the calculated stress intensity factors for the observed indication for faulted conditions Kg (a=.295) = 33.0 kai 9in for normal upset conditions Kt (a=.295) = 36.0 kai E K

=Kyc = 200 kai Nin at the governing time for both normal y3 and faulted conditions.

Therefore the criteria for integrity are met:

410 Kr (nomal-upset) = 36 Q 10 114 < 200

=

7K (f..lted) 33 Q 2 46.7 < 200.

=

=

In conclusion, the reflectors meet the acceptance standards of ASME Section XI 1977 Edition. This conclusion was verified by a detailed fracture mechanics analysis perfomed by Westinghouse for Northern States Power Company. Copies of the procedures, inspection programs, inspection data and evaluation, and personnel certificatio a are con-tained under a separate report prepared by Westinghouse. This report will be maintained on file by Northern States Power Company.

5.0 EXAMINATION OF SEISMIC BOLTING The entire seismic bolting program, partially due to the problems that have bear occuring with high strength bolting materials, was scheduled for examination.

This program includes the bolting, anchors, nuts, and pins on tne steam generator, reactor coolant pumps, accumulators, and pressurizer support structures. All items were examined visually, and where feasible, by ultrasonic examination techniques.

la addition, a program for replacing each of the 48 helicoil bolts was scheduled for implementation during this outage. The helicoil bolts (so named because of the helicoil insert utilized in the base metal) form the connection between the steam generator channel head casting and the support structure it rests on.

This replacement was scheduled due to the problems encountered during the detensioning program on Unit I's bolts during the September 1980 cutage.

When the problem on Unit I's helicoil boles was identified (September 1980 outage), Unit 11 was shut down and the helicoil bolts on both steam generators were ultrasonically examined. The examinations revealed 1 bolt without a back reflection, that subsequently sheared off during detensioning, and 2 bolts with a reduced back reflection. These two

~

bolts were removed and a fluorescent magnetic particle examination was perfomed on them revealing a linear indication in the thread relief area adjacent to the bolt head on each bolt. Two of the other 45 bolts were removed and a magnetic particle examination was perfomed on them with no apparent indications. These two bolts were used to replace the two with indications (beca use all three of the bolts with indications were on the same support leg). The remaining bolts were detensioned and reexamined ultrasonically with no further indications.

Page 7 of 8 l

\\

These bolts were all removed during this outage and fluorescent magnetic particle and an ultrasonic examination was performed on each bolt. The ultrasonic examinations revealed one bolt with a reduced back reflection from the head end.

The magnetic particle examinations revealed linear indications in the thread relief area adjacent to the bolt head on 36 of the 45 bolts. The majority of these indications were very small and inter-mittent. All the helicoil bolts were replaced with bolts of an approved design.

All other indications disclosed during the examinations were resolved prior to plant heat up.

The loose nuts and bolts were tightened. All indications were corrected and the areas were reexamined with the same method that located them.

i Page 8 of 8

APPENDIX A ASME CLASS 1 - EXAMLNATION Page 1 of 1

-er-r---,,---w.v,-,-----,,-

-,r_,_,_-,-.,-,,,n----,_.-,,_,,____,-..-~.,________._._-w,-.---_.--_.---+~,,,-ve,,

- -, -... -,..,. ~. -, - - __

i!

S T

T T.

NO.

R R

ON IN O

O F

O I

P TT E

E CR R

R EO V

P P W

W 1

S E N

u IR R

R 1

1 S

tc W_

W_

A

/

1 E

E T

8 LEI BG AA 5

TP 3

64 0

N 1

O I

O I

9 T

2 5

M A

3 E

MC T

EI 245 E

F I

TI I2 IT OOO O2 2

R N

O E

NNN H

1 0

J D

E EEDDD D1 O

A I

O NNLLL U

I' NNEEE I2 M

t

- - % W%

S1 9

.M TMA 3

0 -

X A

3 3

E D.

Q' T.

M E A 0

555 3

06 R

5 3

33 E

E E

PR E

E E

S E R

R E

OR N

IP H

N WH IH I I

- - T C

~

Y RA S

S M

M D ME D

D L

I R

I W O S

E S

A A D

S E

S M

E N

U S

D N

- N A T B

W D

D S

YqI R C D

l T S N

I E

M I

I I

A B I

L M E A O

EDL A

E G

A C N E

L E H D A 0 l

A W I' Y I

I 1

E WI A W

N N

X I

l E

I D

R R P P E S EI E

A O

m E N O R O LD P G

L I

S L

T N L O

I E

E B U N A

N N E A F

T B

A D A

N A A G

1 E R

S I

NLE A G I

1 A

EO I

N E

I O E N D C

I AR I

N T 0

N DT L E I

R L

T 1

T F

I I

N DNE F A N 1.

A W D

E A N 0 A t

M N

U F h E

(

I E

O C A M C A B UCF I

O M

E IL T

M I

R S

H TI M O F R

LN G D m R

GIC D P SD T

C T

Y IDU T

E E

A I

D A I

U D E L F

)

R X

U I G

C U F L O C R I

E A R O RR L

1 M

SI N N N

R I

M E I

T T

D EC f

I I'

EE I

ES D W VW E2 E

I H E B C E G W S S M D N N W

G E

I I

C G

I O

N N R G N R O O O A A I

1 S A R

CIIAMSH(OA I

N N E E E E I

E E

I PTO I

I C

VHC I

F R T.

I I SNT E U C T

E ADP ME.YA TNS C

A B

C N

SAI G

L B

B B

N SE RI C 1

EEI HI V A-T HR BM 1

2 3

. 9 UE l

P RA E ST S

I l

l l

B B

B P

OR N NPI j

a iiJ 1

i

NORTilERN STATES POWER CO.

TABLE SI I PRAIRIE ISLAND UNIT 2

PAGE 2

op 5

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

REACIOR VESSEL

^

YS M p

SUB INSP.

R EQ*D.

AfAT.

ITEM INSPECTtDN TE-D E I IO ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED 1

Bl.3 B-C (00tfr'D)

SIUD HOLE:

HEAD 'IO FIANGE WE 33%

33%

1'IEIU 16 77-W RPV REPORT &

EID NO. 6 77-74,73,75 TO 33%

33%

16 'IHRU 34 B1-141,143,144

'IMREE 33%

I Bl.4 B-D PRIMARY N ZZIE 'IO-VESSEL WEIDS A10 NOZFLE,7NSIDE RADIUSED SECTIONS j

REACIOR CNE COOUNf N0ZZIES CUTIET FOZZIES OE 1

1 BCC-A-1 77-W RPV REEORT

'IWO 1

1 BCC-B-1 81 _W RPV REPORT INIEP N0ZZIES

'IHREE 2

SAFETY IMJECTION

'DIREE 1

FOZZIES TIREE 1

l B1.5 B-E VESSEL PENEffRATINS, INCIDDING OCNIiOL HOD DRIVE Ato INSPIUMENTATIN PFNETTRATIWS GWrROL ROD PErd.'IY@.TIQE GE 3%

  • 3
  • EACH ITEM IIEPECMD

'IWO 3%

  • 3 BY PUNP PERS0tMEL

'IMREE 4%

DURItG EAOi REACIOR VESSEL IEAKAGE

'IEST i

l rosses a7-247e e/7s Fosses poo. ese-sees PP9-A-2

NORTHERN STATES POWER CO.

TABLE S101 PRAIRIE ISLAND UNIT 2

PAGE 3

OF 5

INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

IEACIW VESSEL SUS INSP.

REQ D.

AMT.

BTEM

$NSPECTION N DE TION ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED I.

B1.5 B-E (CONP'D) mSTRUMENPATIN PENE1BATIW S OE 3%

  • 3
  • EACH ITEM INSPECPED

'INO 3%

  • 3 BY PUNP PERSCIAEL

'1HREE 3%

mRING EAG REACIOR VESSEL EAIOGE *1TET REACIOR VESSEL LEAD VENP 1

  • 1 1-21C-36 'IO 2-RC-8-5 Bl.6 B-F N0ZZLE TO SAFE END WEIDS REACIOR CWE COGANT 20ZZES OtrPLET N0ZZES OE 1

1 ICC-A-1 S.E.

77-W R W REPORT &

77420,112

'IWO 1

1 BCC-B-1 S.E.

81-W RW REPORT &

81-21 INLET N0ZZES

'IHREE 2

REACIOR VESSEL SAEETY INJECTIN N0ZZES lOZZ E A S.E.

OE 1

1

10. 1 77-W RW REPORT &

77423,113 IOZZE B S.E.

'IHREE 1

Bl.8 B-G-1 CIDSURE STUDS AND NLfrS QE 16 16 il 'IERU 616 77-W RW REPORP &

77-106 il '1HHU 616

' 78-84,99 (Mr WIX)

'IWO 16 16 617 'INRU #32 81-162,163,165,166 1HREE 16 i

FORD 4 4 7-245 S S/78 FOftta 960. 8S8-4 948 PP9-A-3

NORTHERN STATES POWER CO.

Tall.E S1.1 PRAIRIE ISLAND UNIT.

2 PAGE 4

OF 5

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

REAC'IOR VESSEL M

N YS D,E INSP.

R Eb'D.

AMT.

ITEM INSPECTION SUB E.

N

  • Al TIOq ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED SIUD HOIES:

Bl.9 B-C-1 LIGAMENTS BEDEEN OE 16 16 12-22 & 29-35 77-H RW REPORT HIREADED SIUD fl0LES

'INO 14 14 9-11 & 36-46 81-W RW REPORT DIREE 18 B1.10 B-G-1 CIOSURE WASHERS AN_D_

Bl!SHINGS WPSHERS WE 16 16 PAIRS,1 'HIRU 16 77-W RW RdKRT

'INO 16 16 PAIRS,17 TIRU 32 81-164 MIREE 16 BUSHINGS

-NCtE-B1.11 B-G-2 PRESSURE RETAINING BOLTING NE 3

9 ALL 9 BOLTS 77-W RW REPORT

'IWO 3

9 ALL 9 BOLTS 81-T70 MIREE 3

Bl.12 B-H INTEGRALLY WELDED VESSEL SUPPORTS MIREE 2

31.13 B-I-1 CIDSURE HEAD CLADDING CE 2

2 HCP-1 & HCP-2 77-W RW REPORT

'INO 2

3 liCP-1,HCP-3 & HCP-4 81-T55 TIREE 2

Bl.14 B-I-1 VESSEL CIADDING CNE 2

2 VCP-1 & VCP-2 76-W INTERNALS RPF

'IWO 2

2 VCP-3 (2 PA'ICHES) 81-W RW REPORT MIREE 2

i roa = i1-. eve sire con

. isi-i...

PP9-A-4

2 NOllTHERN STATES POWER CO.

TA!LE S1 1 PRAIRIE ISLAND UNIT 2

PAGE 5

op,,. 5 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

REACIOR VESSEL N

SUS-INSP.

R EO'D.

AMT.

ITEM INSPECTION E.

N DE I TION ITEM PER.

AMT.

EXAM IGENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED i

1 4

Bl.15 B-N-1 VESSEL INTERIOR UPPER IN1ERHAIS AND OiE 76-W INIEINAIS RPr IDWER INTERNAIS

'IWO

~

i 91REE 80-W INIERIAIS RPf

~

, REPPESENTATIVE REGICNS CF '11M INPERIOR SWFACES i

Ato INTERNAIS MADC NYTRSIBW BY THE j

REMOVAL OF CX)MEON-l ENTS DURING NCRMAL l

REEUE11sU OPEilATION 31.16 B-N-2 INTERIOR ATTACHMENTS IDF APPLICABE AND CORE SUPPORT POR PWR'S 2

STRUCIURES B1.17 B-N-3 REMOVABM CORE SUPPORT WIREE

  • 100% OF DIE VISU-APO VISUALLY ACCES-l SIB m SURFACES OF ME CORE SUPPORT

)

S110CIURE 1

{

Bl.18 B-O CONTROL ICD DRIVE HOUSINGS PERIPHERAL CRD HOUSINGS DIREE 2

t i

5 B1.19 B-P EXEMPTED COMPONENFS

  • ALL COMPOtlafrS
  • PERFOPMED BY ILANT EXEMPTED FROM PE3EiOtML IN ACCORD-l NOWBETRIC APO ANCE WIMI IWA-5000 j

SURFACE EXAMINATION DURING EACH SYSTEM i

BY I m-1233 MAKAGE 'IES"' AND EAG SYSTEM HYDID-SfATIC TEST REQUIhED BY IWB-5000 l

FORM I 7-24 76 s/70 FORM MO.458+9998 N ~

4 NORTHERN STATES POWER CO.

TABLE SI 2 PRA'RIE ISLAND UNIT _ 2 __...

PAGE 1

OF 2

INSERVICE 3NSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PRESSURIZER I

SUB INSP.

R EQ'b.

AMT.

ITEM INSPECTION E-DE TION ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMuaED i

B2.1 B-B IONGI'IUDINAL AND i

CIPI1]MFERElff1AL WEIDS IINGI'IUDINAL NEIBS 4

j ELD NO. 1

'IEREE 5'%

'IUREE 5%

)

ELD NO. 2 NE 5%

5%

BorICH 'IO 'IOP 76-45,67

'IND 5%

8%

W-5 DO E 11"78-104,112,118 t

(W)

CIRCUMFERENTIAL WEIDS EBOM NAMEPLATE:

NELD NO. 3 INE 1.7%

33%

+10 ' 'i0 +18 '

76-43,69

'IM) 1.7%

13%

+7'6" 'IO +10'8"78-105,115,122

'IMEE 1.8%

1 EID W). 4 WE 1.7%

33%

+8 ' 'IO +16 '

76-44,66

'IWO l.7%

6%

+8 '4" 'IO +9 ' 10"78-103,114,119

'IHREE 1.8%

g 1

NEID NO. 5 CNE 1.7%

33%

+10 ' 'IO +18 '

76-29,68

)

'IND 1.7%

12%

+6 ' 10" 'IO +9 '9"78-113,116,121

'IHREE 1.8%

B2.2 B-D N0ZZLE 'IO VESSEL WEIDS

-NONE-25/10 j

R2.3 B-E HEA'IER PENETRATIN

  • EACH ITEM INSPEC'IED YRS-BY PLANT PERS0ttiEL B2.4 B-F N0ZZLE 'IO SAFE END WEIDS WE 2

2 W-1A S.E.(8010A) 76-26,53 j

W-1A S.E.(80108) 76-61,52 i

'INO 5

5 W-15 S.E.

78-31,100 W-1A S.E.(RELIEF) 80-58,87,170 W-22A S.E.(SPRAY) 80-57,85,168 W-1A S.E.(8010A)80-188,192,192R,192Ra W-1A S.E.(80108)80-189,131,191R 2

W-1A S.E.(8010A) 81-6,6R,37,63 W-1B S.E.(80108) 81-23,23R,39,62 mm 2

raggg;gg.m i

i NORTHERN STATES POWER CO.

TA"iLE S1.2 PRAIRIE ISLAND UNIT 2

PAGE 2

OF 2

INSERVICE INSPECTION-EXAMINATION SUfAMARY MAJOR ITEM:

PRESSURIZER EXAM COWMENT OR SYSTEM SUS INSP.

R EQ*D.

AMT.

ITEM INSPECTION mfd ITEM y'

I PER.

AMT.

EXAM IDENTIFICATION REPORTNO.

EE M NED B2.5 B-G-1 PRESSURE-RETAINING BOLTS

-NOTE-B2.6 Ato S' IUDS (> 2 IN. DIA.)

{

AND B2.7 (W)

FROM NAMEPLWE:

B2.8 B-H INTEGRALLY WEIDED VESSEL WEID SKIRT WEID WE 3.3%

3.3%

+8"'IO -8" 76-77

'INO 3.3%

23%

+6 ' 'IO +11 ' 9"78-106,107,117

'IHREE 3.4%

4 i

B2.9 B-I-2 VESSEL CLADDIt1G

'HIREE 36 SQ.

IN.

PA'IGi B2.10 B-P EXEMPIED COMPWENIS INSTRUMENT N0ZZE N'). 5A 'DIRD SH

  • EAOi ITEM INSPECTED PENE'IRATIWS BY PLAlff PERSONEL SAMPLE N0ZZE
10. 6
  • EACH ITEM INSPECTED PENETRATIN BY PLAlff PERSQt4EL B2.11 B-G-2 PhESSURE REffAINING EOLTING MANNAY BOLTS 04E 5

5 BOLTS 1 'DIRO 6 76-30

'INO 5

5 BOLTS 6 'DIRU 10 78-82 2

BOLTS 1 'DIRU 16 81-60

'HIREE 6

FORM 37 2476 5/78 FOnan No. ess-teel PP9-A-7

NORTHERN STATES POWER CO.

TATLE s1.3 1 0

PRAIRSE ISL AND UNIT _ ?

PAGE 1

OF 3

4 INSERV(CE !?iSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

STEAM GENERATORS I

^M N

8 SUB INSP.

R EQ'D.

AM1.

STEM INSPECTION TE-DE R Tl N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED I

B3.1 B-B IINGITUDINAL MO CIRCUMFERENPIAL WEIDS (N TIE PRIMARY SICZ IINGITUDINAL WEIDS

-NONE-(CW)

CIRCLMPERENPIAL WELDS ImOM NAMEPLATE:

SIEAM GENERA'IOR NO. 21 OE 1.9%

37%

+8" 10 +13'8"76-111,101,118 IWO 1.9%

8%

+23'8" "IO +26'8"78-108,110,120 THREE 1.8%

SPEAM GENERATOR NO. 22 OE 1.9%

31%

+2' 10 +13'76-112,102,119 4WO 1.9%

17%

+21'10" 10 +28'78-109,111,123 1HREE 1.8%

93.2 B-D NOZZLE TO IIEAD WEIDS

-NONP.-

B3.3 D-F NOZZLE TO SAFE END WEIDS JII:AM GENERATOR NO. 21 TWO 1

1 ROC-A-5 S.E.81-116,125 THREE 1

SPEAM GENERATOR NO. 22 CNE 1

1 BCC-B-5 S.E.

76,136,139 THREE 1

B3.4 B-G-1 PRESSURE RETAINING BOLTS

-tKNE-B3.5 AND STUDS (> 2 IN. DIA.)

AND B3.6

-NONE-B3.7 B-II INTEGRALLY IELDED VESSEL SUPPORTS roam ar-asis sire ronu no.........

PP9-A-8

NORTHERN STATES POWER CO.

TA'lLE S1.3.1 PRAIRIE ISLAND UNIT 2

PAG.E 2

OF 3

INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

SIEAM GENERA'IQlS EXAM COMPONENT OR SYSTEM SUB INSP.

R EQ'D, AMT.

ITEM INSPECTION ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

RY IT M O E EX M NED i

B3.8 B-I-2 VESSEL CLADDING SrEAM GENERA'IOR NO. 21 INIEP SIDE 04E 36 SQ.

36 SQ. CP-1, BEIIM MANEY 76-124 IN.

IN.

PA'IO1 OLTPLET SIDE QE 36 SQ.

36 SQ. CP-2, BEIIM MANEY 76-124 IM.

IN.

PNIOl STEAM GENERNIOR NO. 22 INLET SIDE 04E 36 SQ.

36 SQ. CP-3, BEIIM MANEY 76-123 IN.

IN.

PNIOi QJTLET SIDE QiB 36 SQ.

36 SQ. CP-4, BEIIM MANEY 76-123 IN.

IN.

PA'IOl B3.9 B-P EXEMPPED COMKNENPS

-NONE-B3.10 B-G-2 PRESSURE RETAINING l

BOLTING (< 2 IN. DIA.)

S'IEAM GENERA'IOR NO. 21 MANWAY BOLTING INIEP MANEY OE 5

6 BOLTS 1 'HIRU 6 76-99

'INO 5

5 BOLTS 6 'HIRU 10 78-83 BOLTS 1 'HIRU 16 81-25,31,45

'HIREE 6

ronu s7-aere s/7s ronu no. ess-soes PP9-A-9 m

8 49 9-8 5

8 3

O NO.

N M

S ON p R I

R oO TT 5

O CR F

EO 4,

T 1

A P P 3

R S

1 4

4 E

E N

1 3

N IR 3,

4, 4,

0 0

S E

935 279 279 G

982 1 72 1 72 E

M 681 681 681 LE A 778 778 778

!GET AAS TP N

05 06 06 I

61 1 61 1 61 1 O

T M

A UUU UUU UUU E

MC RRR RRR RRR I

I UH UI HHU T

EI MTT MTD T1T F

I TI IT R

N 1 61 161 1 61 O

E J

I SSS SSS SSS D

TTT TTT TTT A

LLL LLL LLL M

OOO OOO OOO BBB BBB BBB T.MA M

65 65 65 X

A E D.

O' T.

MA 5 5' 6

55 6

55 6

E R

P.

E E

E R

E E

E SNE EO R

Eo R

EO R

IP NW H

iw N

I 1

O

'I 1

OT T

OT 1

1 YRA 22 M

D M

E N

O U

N NI S

M Y

Y lA A

R Y

A N

TX W

O G A

W O

IE N

T N W

N I

E A

A I N

A T

B M

R T A

M A

EO E L M

N P

N O P

N DT E

B T

E E

)

I M

D I

G E

1 O

M NE I

Y L

I T

T C

A I

f J

M A N

Q Q

A W I

f R

X 0

E N e

E2 E

0 T A S M W

(

O N

PTO I I SNT E U C T

E

. Y 2

ADP E

TN S R

O G

6 N

SAI G

7

/

L B

6 N SE 6 0 RI C 71 4 -

EEI 3 A-HI V 0

7 T RR BM 1

9 9

UE I

R A S I

3 MP E

ST B

RP OR N O

NPI F

4 :

,I;

liij'

,4 l;

4 i

NORTHERN STATES POWER CO.

TAILE S1.4 PRAIRIE ISLAND UNIT 2

PAGE 1

OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE BO(.EDARY I

SUB INSP.

H EQ'D.

AMT.

BTEM INSPECTION E.

N DE I I N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B4.1 B-F SAFE Em 'IO PIPING Am SAGE END IN BRANCH PIPING WEIDS

)

REACIOR VESSEL REACIOR CORE COOLANT OE 1

1 W -1 A, 29-2BC-1 A 77 _W RW REPORT &

77-022,112 SYS'IEMS

'INO 1

1 BCC-B-1 S.E.

81-W RW REPORT L 81-21

'IEREE 2

4 SAFETY IMJECTION QE 1

1 W-2, 4-2RC-14A 77 _W RW REPORT &

77-024,113 SYSIEMS

'IHREE 1

I STEAM GENERA'IOR NO. 21 i

REACIOR CORE COOLAMP

'INO 1

1 BCC-A-5 S.E.81-116,125 I

SYS'IEM

'IHREE 1

SIEAM GENERA'IOR No. 22 REACIOR GEE COOLANP QE 1

1 W-5, 31-2HC-2B 76-136,139 i

SYSTEM

'IHREE 1

PRESSURIZER SAFETY LINES OE 2

2 W-1, (8010A) 76-26,53 W-1, (8010B) 76-61,52

'INO 2

2 W-1, (8010A)80-187,192,192R,192Ra W-1, (80108)80-190,191,191R 2

W-1, (8010A) 01-7,7R,38,61 W-1, (8010B) 81-22,22R,40,64 SURGE LINE

'IND 1

1 W-15 SE, 10-2RC-4 78-31,100 RELIEF LINE

'IND 1

1 W-1B 80-58,88,169 1

'DIREE 1

4 FORM s 7-as7e e/7s ronne no.ess-soas PP9-A-13

l NORTHERN STATES POWER CO.

TATLE S1.4 PRAIRIE ISLAND UNIT 2

PAGE 2

OF 19 i

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE BOUNDARY t

" 8 "

EUS INSP.

R EO'D, AMT.

ITEM INSPECTION E-N DE R TI N ITEM PER.

AMT.

EXAM-IDENTIFICATION REPORT NO.

j GORY ITEM TO 8E EXAMINED

~

.i B4.1 B-F (00tff'D) i

^

SPRAY LINE

'IWO 1

1 W-228 80-56,56R,86,167 W-22B 81-5,5R,24

'IHREE 1

B4.2 B-G-1 PRESSURE REMAINING BOLTS

-N WE-B4.3 Ato S' IUDS ( >2 IN. DIA.)

l AND B4.4 B4.5 B-J CIRCUMPERENPIAL AIO I

LONGIWDINAL PIPE WEIDS LONGI'IUDINAL WEIDS

-NONE-CIRCUMFERENPIAL WELDS (1.5 IM. NOM.DIA.' SYS'IEMS)

I SEAL INJECTION A (NE l

'IWO 1

1 W-4 78-12 mREE i

4 SEAL INJECTION B (NB 1

1 W-9 77-57

<1yo

'IHREE 1

(2.0 IN. NOM DIA. SYS.)

SEAL INJECTION A mE 3

3 W-21,22,24 77-18,19,20

'IWO 3

3 W-34,35,36 78-14,16,17

'IHREE 4

SEAL INJECTION B OE 4

4 W-54,55,58,59 77-10,11,13,12

'IWO 5

5 W,29,33,34,36,37 80-91,90,89,92,93

'mREE 4

Fonu s7 a47s e/7e ronu no.ess-sees PP9-A-14

i NORTHERN STATES POWER CO.

TABLE St.4 PRAIRIE ISLAND UNIT

?

PAGE

'l OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

PIPING PDFR91RE BOLNDARY

^

I SUB INSP.

R EQ'D.

AMT.

STEM INSPECTION TE.

N DE I Ti N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B4.5 B-J (00tff'D)

OIARGING LINE WE 6

6 W-81,82A,80,83B, 77-9,8,7,6,5,4 CVCS 83A,83 4WO 6

6 W-32,33,36 78-20,21,22 W-37,38,39 80-96,97,98

'IHREE 6

2 IEIDOM4 LINE AND WE 1

1 W-22 77-27 NAIN LINE TWO 2

2 W-6,7 80-94,95 I

WIREE 2

l AUXILIARY SPRAY WE 1

1 W-1 77-28 10 PRESSURIZER TWO 1

1 W-11 78-71 DIREE 2

RESIDUAL 'IEMPERATURE WE 1

1 W-20 77-42 DE1ECTOR SAKE OFF-4WO 1

1 W-6 80-177 ODID IEG A THREE 1

RESILE TEMPERATURE WE 1

1 W-18 77-60 DE'IEClOR 1AKE OFF-4WD 2

2 W-8,9 80-116,117 00ID IEG B 11REE 1

i RESIDUAL 1EMPERATURE WE 1

1 W-24 77-58 IEIEC10R 1AKE OFF-1ND 1

1 W-29 80-178 IDP LEG A

'IHREE 2

RESIDUAL TEMPERA'IURE WE 1

1 W-19 77-59 DETECTOR 'IRKE OFP-1ND 1

1 W-23 80-104 IDP IEG B

'IHREE 2

SAFETY INJECPION OE HIGi HEAD A TWO 1

1 W-2 78-15 MIREE 1

FORMI 476 4/78 FOR04 NO. ISI-S tel

NORTHERN STATES POWER CO.

TATLE R1_4 PRAIRIE ISLAND UNIT 2

PAGE a

OF to INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PTPTNG PRFRRIIRE InNDARY SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E

N DESCRI Tl N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B4.5 B-J (CONP'D)

SAFETY INJECTIN WE 1

1 W-7 77-43 IIIGi llEAD B TWO 111REE 1

DRAIN LINE W WE 1

1 W-14 77-26 CROSSOVER A TWO 1

1 W-7 78-13 DIREE 1

8 REACIOR VESSEL WE 1

1 W-12 77-17 SA M INJECTIW

'IWO 1

1 W-9 78-19 IDW llEAD A WIREE 1

REACTOR VESSEL WE SAFET1Y INJECTION TWO 1

1 W-2 78-23 ION HEAD B

'DIREE 1

(3.0 IN. NOM. DIA. SYSTEMS) l l

SPRAY 'IO PRESSURIZER WE 3

3 W-5,7,8 77-38,40,39 BRANCII A iWO 3

3 W-20,24,25 80-121,120,119

'HiREE 4

SPRAY 'IO PRESSURIZER NE 2

2 W-18,19 77-48,46 l

BRAN 01 B

'INO 3

3 W-3,4,5 80-118,122,103 TIREE 2

RESIDUAL TEMPERATURE WB 1

1 W-5 77-41 DETECTOR IEIURN A 4WD 1

1 W-2 78-66 11REE 1

l RESIDUAT. TEMPERATURE WE 1

1 W-7 77-56 l

DETECTOR RETURN B 4WD 1

1 W-6 78-85 l

UIREE 1

1 raggs ene vanu na.,s,.....

g

NORTHERN STATES POWER CC.

TA!LE Sl+4 PRAIRIE ISLAND UNIT 2

PAGE 5

op 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURF. 0011DARY M

SUB INSP.

R EO'O.

AMT.

ITEM INSPfC'ItON E.

N DESC I Ti N ITEM PER.

AMT.

EXAM IDENTIFICATION SEPOH1 NO.

GORY ITEM TO BE EXAMINED B4.5 B,J (OWT'D)

PRESSURIZER RELIEF WE LINE A

'INO TIREE 1

PRESSURIZER RELIEF WE 1

1 W-4 77-47 LINE B,

'IND 1

1 W-9 80-99 THREE 1

(4.0 IN. NOM. DIA. SYSTEMS)

SAFETY INJECTIm WE 1

NONE m 'mESE IDW HEAD A TWO WFTIE ARE ACCES-WIREE SIBIE; TIEY ARE IOCA'IED WITHIN ME ONCREfB SHIELD WALL SAFETY INJECTIm QE (SAME AS IOOP A)

ION HEAD B

'IWO DIREE 1

(6.0 IN. NOM. DIA. SYSIEMS) i REACTOR VESSEL OE SAFETY INJECTIm SWO 1

1 W-6 80-100 IDWHEAD A MIREE 1

REACTOR VESSEL WE 1

1 W-9

(+W-8) 76-37 (+76-38)

SAFETY INJECTION

'IWO l

IOW HEAD B UIREE 1

i SAFELY INJECTION OE l

HIGi LEAD A

'lWO i

HIREE 1

l l

roggggene l

l NORTHERN STATES POWER CO.

TAOLE S1 4 PRAIRIE ISLAND UNIT

?

PAGE 6

OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

PIPING PRESSURE BOLNDARY M

8 SUB INSP.

R EQ'O, AMT.

ITEM INSPECTION E-N DE I Tl N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED 3

I B4.5 B-J (00tff'D)

SAFETY INJECTIN OE 1

1 W-1 76-143 HIG1 IEAD B 1WO

'HIREE i

i PRESSURIZER SAFE 71Y OE i

LINE A.

'INO 3

3 W-8,W-3,4 80-102,81-59,58

'I11REE 1

PRESSURIZER SAEETY OE 2

2 W-1,2 76-54,61 i

LINE B 1NO 2

2 W-6,7 81-57,56 1HREE 1

1 PID-CAP A QE L'

gye g

'HIREE 1

1 PID-CAP B QE 4

1NO 1

1 W-1 80-101

'niREE (8.0 IN. NOM. DIL. SYSTEMS)

RESIDUAL HEAT REMOVAL OE 2

2 W-11,12 77-33,32 l

'mKE OFF A 1WO 3

3 W-5,6,8 78-90,94,92

'nmEE 3

IESIDUAL 1 RAT RENNAL OE 3

8 W-25,27,28 76-74,58,56 l

'mKE OPP B

(+W-8,10,11,12,26 )

(+76-70,71,72,73,58)

'INO 2

2 W-12,14 78-95,91

'DIREE 3

FOftM 3 7-2474 e/78 FOftM 000. BSt-leet PP9-A-18

NORTHERN STATES POWER CO.

TABLE SI 4 PRAIRIE ISLAND UNIT 2

PAGE 7

OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE BOWDARY M

SUB INSP.

R EQ'D.

AMT.

ITEM INSPECTION E-N E

IT N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B4.5 B-J (CONF'D)

(10.0 IN. NOM. DIA. SYSTEMS)

RESIDUAL HEAT BEiCVAL WE l'

2 W-1

(+W-9) 76-9 (+76-7)

RETURN B

'INO 1

1 W-7 78-102

'IHREE 1

PRESSURIZER SURGE WE 1

4 W-12 (+W-11,13,14) 76-81 (+76-78,81,79)

LINE B

'IND 1

1 W-14 78-101

'IHREE 2

(12.0 IN. NOM. DIA. SYSTEMS)

ACCWULA'IOR DISCHARGE A WE 1

1 W-11 77-35 TWO 1

1 W-7 80-35,36

'IHREE 1

l ACCUPULATOR DISchARG B OE 2

5 W-1,15 (+W-13,14,76-146,18 (+76-20, 16) 21,19)

THO 1

1 W-13 80-34,37 THREE 2

i (27.5 IN. NOM. DIA. SYSTEMS)

REACIOR CORE COXMr OE CDID EG (INLET) A INO THREE 1

REACIOR CORE COOLANT WE COID EG (INIEf) B 1NO 1

1 BCC-B-12 81-87,94 THREE 4

l ra p9'_rg g */r*

ranu no. isi-issi p

I NORTHERN STATES POWER CO.

TACLE S1.4 PRAIRIE ISLAND UNIT 2

PAGE 8

OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ll EM:

PIPING PRESSURE BOLNDARY SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E

N DE RI TIO IT EM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO E;E EXAMINED B4.5 B-J (CONT'D)

(29.0 IN. NOM. DIA. SYSTEMS)

REACIOR CORE COOLAMP WE 1

1 W-3, 29-2RC-1A 77-044 l

IUP IEG (OUILET) A 1NO

'DIREE REPCIOR CORE COOLAMP WE IDP IEG (OUTIEP) B 1WO

'niREE 1

i (31.0 IN. NOM. DIA. SYSTEMS)

REACIOR CWE COOIMP WE 1

CROSSOVER A

'INO 2

2 BCC-A-6 81-1'15,115R,152 BCC-A-7 81-117,124

'HIREE l

REACIOR CORE COOLAMP WE 1

3 W-6 (+W-7,8 )76-140 (+76-141,142)

CROSSOVER B 1WO

'HIREE 1

B4.6 B-J BRANCil PIPE CONNECTICH WEIDS EXCEEDING SIX INCH DIAFEER ACCLMJIKIOR DISC!!AIGE A ACCtMJLATOR DISCilABGE B WE 1

1 W-R 76-145,137 RESIDUAL HEAT REMOVAL TAKE OFF A RESIDUAL IIEAT REMOVAL IND 1

1 W-Roor 81-113,121,126 TAKE OFF B r o u s7-a47s e/7s ronu wo. sse-soos 79-A-20

NORTHERN STATES POWER CO.

TA!LE S1.4 PRAIRIE ISLAND UNIT 2

PAGE 9

OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

PIPING PRESSURE BOUNDARY 3UB INSP.

R EO'O.

AMT.

ITEM INSPECTION 4

E-DE I TION ITEM PER.

AMT.

EXAM IDENTIFICATION REPCRT NO.

GORY ITEM TO 8E EXAMINED B4.6 B,J (CONF'D)

PRESSURIZER SURGE

'HIREE 1

I ME B l

B4.7 B-J BRANCH PIPE C0tt4ECTION WEIDS SIX INCH DIMF11TR AND SMALLER (6.0 IN. NOM. DIA. SYS'IDE)

PID-CAP A PID-CAP B SMEIY IMJECTION i

HIGi HEAD A SAFETY IMJECTION 03E 1

1 W-R 76-138,144 HIGi HEAD B i

(3.0 IN. NOM. DIA. SYSTEMS)

SPRAY 'IO PRESSURIZER BRANCH A SPRAY 'IO PRESSURIZER

'DIREE 1

BHANCH B RESIDUAL 'IEMPERA'1VRE DETEC'IOR RE'IURN A l

RESIDUAL 'IEMPERA'IURE DE'IEC'IOR RE'IURN B j

i 4

FORM i7-2476 4/78 rwg pg g33.gg3, i

PP9-A-21

NORTHERN STATES POWER CO.

TABLE S1.4 PRAIRIE ISLAND UNIT

~)

PAGE 10 OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE BOUNDARY EXAM COMPONENT OR SYSTEM SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION

[ORY ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

IT M TO E EX M NED B4.7 B-J (OONT'D)

(2.0 IN. NOM. DIA. SYS'IEMS)

IESIDUAL TEMPERATURE DETECTOR 'IAKE OFF OOLD IEG A BESIDUAL 'IEMPERATURE TWO 1

1 W-ROOP 81-89 DETECIOR 'IRKE OFF ODED IEG B NAIN LINS W CROSSOVER A DRAIN LINE W WE 1

1 W-R 76-131 CHOSSOVER B CHAIGING LINE CVCS REACTOR VESSEL SAFETY INJECTION IDW HEAD A REACIOR VESSEL

'IHREE 1

SAFETY INJECTION IDW HEAD B B4.8 B-J SOCKET WEIDS (2.0 IN. NOM. DIA. SYSTEMS)

SEAL INJECTIN A OE

'INO 1

1 SW-9 78-25 THREE 1

ronne s 7-a47s e/ss ronas peo.ess-seos PP9-A-22 1

NORTHERN STATES POWER CO.

TACLE SI 4 PRAIRIE ISLAND UNIT 2

PAGE 11 OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

PIPING PRESSURE BOUNDARY N

SUB INSP.

R EO'O.

AMT.

ITEM INSPECTION E-N DE I I N ITEM PER.

AMT.

EXAM IDENTIFICATICN REPOR T NO.

GORY ITEM TO BE EXAMINED B4.8 D-J (CCNf'D)

SEAL INJECTION B 04E 1

1 SW-64 76-5

'INO DIREE 1

OlARGING LINE B WE 1

1 SW-54 (+SW-57,87) 76-49 (+76-49,6)

'IWO 1

1 SW-27 78-28 MIREE 1

DRAIN LINE AND WE 1

1 SW-1 (+SW-24)76-131 (*76-40)

[EIDOW1 LINE B

'IWO 1

1 SW-10 80-158 TIREE 1

AUXILIARY SPRAY OE 1

1 SW-4 76-42

'IO PRESSURI?ER

'INO MIREE RESIDUAL 'IEMPERA'IURE QE 1

1 SW-13 77-117 Iriullutt 1AKE OFF 4WD 1

1 SW-4 78-27 COLD IEG A TIREE 1

RESIDUAL TEMPERNIURE QE 1

1 SW-15 77-120 DE'IEC' LOR 1AKE OFF TWO 1

1 SW-4 78-26 COED IEG B UIREE 1

RESIDUAL TEMPERATURE OE Dtriu;1un TAKE OFF

'INO 1

1 SW-31 80-154 l

IUr LEG A MIREE 1

RESIDUAL TEMPERATURE OE l

DETECIOR 1AKE OFF

'IWO 1

1 SW-29 80-157 IDP LEG B TIREE 1

SAFErY INJECTION OE llIGI LEAD A

'INO 91REE 1

  • In va,, na,,,,...,

"y9'jy*3

4 NORTHERN STATES POWER CO.

Tall.E. S1.4 PRAIRIE ISLAND UNIT 2

PAGE 12 OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

PIPING PRESSURE BOUNDARY XAM MwONEM OR SYSTEM SUB INSP.

R EQ'D.

AMT.

BTEM INSPECTnON

[ORY f

ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

IT M O E EX M NED B4.8 B-J (CONr'D)

SAFETY IMIECTI N OE 1

1 SW-8 77-110 HIGI IIEAD B

'INO

'IHREE DRAIN LINE W WE 1

1 SW-13 77-114 CROSSOVER A

'lWO mingg 4

REACIOR VESSEL OE 1

1 SW-13 77-111 SAFETY INJECTION

'INO IDW HEAD A

'IIIREE REACIOR VESSEL WE SAFETY IMJECTION

'INO IDW HEAD B

'IIIREE 1

B4.9 B-K-1 INIERALLY WEIDED SUPPORTS SEAL INJECTION A

'IND 1

1 H

78-18,30,39 RESIDUAL 'IEMPERNIURE DE'IECIOR 'IRKE OFF IDPIE A SAFETY IMJECTION HIGI HEAD A SPRAY 'IO PRESSURIZER BRANCil A

'IND 1

1 L

80-76,123,156 BRANCH B

  • 111REE 1

RESIDUAL HEAT

'IND 1

'1 U

78-29,50,93 REMWAL TAKE OFF A

.n=

ragogy4

l l

NORTHERN STATES POWER CO.

TATLE R1.4 PRAIRIE ISLAND UNIT

?

PAGE 13 OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE BOUNDARY j

SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E.

N DE i i N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B4.9 B-K-1 (CONF'D) ifCUl0LA10R DISCHAPGE A SEAL INJECTION 5 TWO 1

1 A

80-49,105,155 I

OIABGING LINE CVCS QE 1

2 Z (+X)76-109,106(+76-110-6) 1

'IWO SHREE 1

RESIDUAL 'IEMPERA1'JRE l

DETIEC'IOR 'IRKE OFF CDID IEG B RESIDUAL TEMPERATURE it'p2.'wR 'IKKE OFF l

IOP IEG B RESIDUAL HEAT QE 1

1 Q

76-60,59 t

REMOVAL TAKE OFF B 4

RESIDUAL HEAT THREE 1

RENNAL RETIURN B I

j ACCUMULATOR DISCHARGE B OE 1

1 B1 76,39-3 SAFETIY IMJECTIQ1 HIGH HEAD B AUXILIAPY SPRAY CWS 1

REACTOR VESSEL

'IHREE 1

SAFE'IT IMJDCT!ON A i

FORM i7-34 74 4/73 FOR M 900. 858-9 Ge t PP9-A-25

NORTHERN STATES POWER CO.

TAILE SI 4 PRAIRIE ISLAND UNIT 2

PAGE 14 OF 19 INSERVICE INSPECTION-EXATA NATION SilMMARY M AJOR ITEM:

PIPING PRESSURE BOUNDARY SUB INSP.

R EQ'D.

AMT.

ITEM INSPECTION E.

N DESCRI T4 N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B4.10 B-K-2 SUPPORT COMPONENTS SEAL INJECTION A WE 4

3 A1, N/G 76-96/77-133 (IER J ADDED,PER.2)

'INO 5

6 F,I,J 78-38,40,65 A,B,C 80-148,147 TIREE 6

4

^

DRAIN LINE W WE CROSSOVER A 7WO TIREE 1

RESIDUAL TFJiPERATURE 04E 1

1 A

76-97 4

IEIECTOR TAKE OFF

'INO 1

1 B1 80-144,144R B1 81-139,139R ODID IEG A TIREE 2

RESIDUAL TEMPERA'IURE 04E

?.

2 C,D 77-144 Dt;m;wK TAKE OFF 7WO 2

2 G,H 80-146 IDP IEG A TIREE 3

SAFE'IY I!UECTION OE 1

1 C

77-131 11101 LEAD A

'INO 1

1 D

80-132 TIREE 1

i RESIDUAL TEMPERATURE Q4E 1

1 C

76-98 DETECTOR RL'IURN A TWO 1

1 B

78-41 illREE 1

SPRAY 70 PRESSURIZER Q4E 4

4 J/h,N,0 76-107/77-151 BRANOI A

'INO 5

5 B,C,D,Il 78-42,43,44,45 V

80-135 l

TIREE 5

SPRAY TO PRESSURIZER WE 3

3 G,H,F 76-107 BRANCil B 7WO 3

3 D,E,F1 80,129,130,131 TIREE 3'

roppffg g */n ron o.isi-ies

NORTHERN STATES POWER CO.

TA'LE SI 4 PRAIRIE ISLAND UNIT 2

PAGE 15 Op 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

PIPING PRESSURE BOUNDARY EXAM COMPONENT OR SYSTEM SUB INSP.

R E Q'D.

AMT.

8 TEM INSPECTION T

^

ITEM PER.

AMT.

EXAM JOENTIFICATION REPORT NO.

RY lT M TO BE EX M NFD B4.10 B-K-2 (00h*P'D)

IESIDUAL lEAT OE 5

5 O,P,Q,S,T 76-41 REMOVAL TAKE OFF A

'IWO 5

5 B,o,D,Il 78-46,47,48,49 C,E 80-54,23 UIREE 6

ACCUMULA'IOR D1 'CilARGE A WE 2

2 H,I 76-33

'IWO 3

3 D,E,G 80-25,50,51 DIREE 3

SEAL INJECTIN B WE 4

4 O,P,N/Q 76-32/77-157

'IWO 4

4 D,E,b,M 80,53,52,47,46 TIREE 5

OIAIGING LINE CVCS WE 5

5 R,S,V,W,Y 76-51,85

'IWO 7

7 K,M,N,0 78-53,53,52,51 O,Q,T,V 80-80,127,126,125 TIREE 8

RESIDUAL 'IEMPERA'IURE WE 2

2 A,A1 77-156 Dtan'10u TAKE OFF

'IND 2

2 B,C/C 78-54,55/80-145 CDID IEG B HIREE 2

RESIDUAL 'IEMPERA'IURE WE 1

1 A2 77-134 DETIECTOR TAKE OFF

'INO 2

2 A1,A 80-73,73R,72 A1 81-140 IDP IEG B TIREE 2

DRAIN LINE AND PE 2

2 F/C 77-135/76-108 IE'ID0ldi LINE B

.0 2

2 A,B 80-73,78 i

MIREE 2

IESIDUAL TEMPERA'IURE OE DETECTOR RETURN B

'IND 1

1 A

78-56 MIREE rogif-ag ein

,o..

o.........

NORTHERN STATES POWER CO.

TAILE SI 4 PRAIRIE ISLAND UNIT 2

PAGE 16 op 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE DOUNMY M

" S M i

SUB INSP.

R E Q'D.

AMT.

ITEM INSPECTION E-N DE i TI N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

t GORY ITEM TO BE EXAMINED B4.10 D-K-2 (CONP'D)

RESIDUAL IIEAT REMOVAL WE 5

5 It/L,M,N,0 76-63/77-145,149 TAKE OFF B

'IWO 5

5 A,B,C 78-57,57,58 C,D,K 80-65,64,133 MIREE 6

RESIDUAL lEAT RDIOVAL WE 1

1 A

77-132

]

RE'IURN,B

'IWO 1

1 B

78-59 TIREE 1

ACCUeULA'IOR DISC 11ARGE B UE 3

3 E,F,C 77-138

'INO 3

3 B,B1/A 78-60/80-48 MIPEE 4

SAFETY INJECTION WE 1

1 C

77-127 IIIW IEAD B

'INO MIREE 1

NJXILIARY SPRAY WE 1

1 A

76-46

'IO PRESSURIZEP.

'IWO 1

1 B

78-61 WIREE 2

REACIOR VESSEL WE 1

1 A

77-128 SAITI"I INJECTION

'Iwo IOW IIEAD A HIREE REACIOR VESSEL WE SAFETY INJECTION

'INO 1

1 A

80-134 IIM llEAD B WIREE PRESSURIZER RELIEF WE LINE B

'INO VIREE 1

PEACIOR VESSEL WE 1

1 D

77-130 SAFF11"I INJECTION

'IWO 1

1 B

l 78-62 IDWIEAD 3 (6 x 4")

91REE 2

l ogg.y.g.n.

NORTHERN STATES POWER CO.

TA2LE S1.4 PR AIRIE ISLAND UNIT _ 2 PAGE 17 _ OF 19 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPItG PRESSURE DOUNDARY ll SUB f

INSP.

R EQ'D.

AMT.

BTEM INSPECTION N DE Ri Tl N ITEM GGAh ITEM TO BE EXAMINED PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

84.10 B-K-2 (OCNP'D)

REAC'IOR VESSEL WE 1

1 D

77-129 SAFETY ITUECTION

'ItD 1,

1 A

80-75 IIM llEAD A (6x4")

HIREE 2

PRESSURIZER SAFETY WE 1

1 A1 77-152 LINES A & B

'INO 1

1 A2 80-128

'DIREE PRESSURIZER SUHGE B WE 3

3 K,J,I 76-48

'INO 4

4 A,B/C,D 78-64,63/80-70,71 TIREE 5

REACIOR (DRE C00RNr WE CROSSOVER A

'IND 1

1 A1 81-138

'HIREE 1

REACIDR CORE COOU NP WE 1

1 B1 76-106 C.NB

'INO

'I11REE 1

B4.11 B-P EXEMPP AND NON-EXEMPP

  • ALL COMPONEN'IS PERFORMED BY COMPWEN_IS EXAMINED IN PLANT PERSOWEL ACCORDANCE WI'I11 HYDROSTATICALLY PRESSURE IWA-5000 AND

'IES'IED 'IO IWA-5000 AT IWB-5000 DURING SYSTEM IEAKAGE END OF 'IEN YEAR INTERVAL PLUS SYS'IEM IEAKEAGE

'IEST 4

EXAM EACH SCHEDUED REFUELING OUTAGE FORM 9 7-2474 S/78 FORM NO. ISt-lGGS PP9-A-29

NORTHERN STATES POWER CO.

TATLE S1.4 PRAIRIE ISLAND UNIT 2

PAGE 18 OF 19 INSERVICE INTECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING PRESSURE BOUNDARY

^

SUS INSP.

R EQ'D.

AMT.

ITEM INSPECTION E-N DES I N

ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

i GORY ITEM TO BE EXAMINED B4.11 B-P (OCNf'D)

EXEMPF:

1 RESISTANCE 'IEMPERA'IURE DETIEC'IOR 'IRKE OFF 1-2RC-7A EXCESS IEIDOW LINE A 1-2RC-8 1-2VC-7 1-2VC-9 RESISTANCC 'IEMPERA'IURE 3

DE1EC10R TAKE OFF

]

1-2BC-7B BEAC'IOR VESSEL CILSURE IEAD VENP 1-2RC-36 REACTOR VESSEL CICSURE IEAD FIANGE i

1-2RC-9A 1-2RC-9B B4.12 B-G-2 PRESSURE RETAINING BOLTING (ONLY SYSTEMS APPLICABIE

'IO 'nlIS I'IEM ARE LIS'IED) l SEAL INJECTION A i QE 4

4 BOLTS 1-4 9 W-2 76-76

'IWO 4

4 BOLTS 1-4 0 W-4 78-81 RESISTANCE 'IEMPERATURE

'DIREE 8

DETECTOR RETURN A ronne a 7-move e/7e conne no. sse-s ee n PP9-A-30 1

J P

A DN U

9 OB 1

NO E

O FR tN OJ TT M

CR E'

EO P P 4

P S E P

N I

9 P

IR 5

2 S_1 3

7 7

G 1

1 1

N E

I 0

0 6

LEP 8

8 7

I EGP AA TP N

2 O

-W I

0 T

M A

E MC 2

2 T

EI 1

4 1

F I

TI A

IT R

N 1

1 1

O E

0 D

s1 s

S J

I t0 t

T A

l8 l

L M

o-o O

B2 B

B

.M 2

2 T A 1

4 -

1 M X A E I

.D.

Q' TM 2

2 E A 1

44 8

1 R

E E

P SR E

E E

D DR R

E N

IP N

WH H

N

'I I I C

I Y

R E

A R

M U

D I

M E

Y i

A N

U r

RB I

NI S

0M r

B E

E 8A r

PN E

N TX A

N MR A

O IE S

O EU S

RE I

I I T

B R

T

' E R

I E

C ER E

A "EO Z

E C

Z N

DT I

J NR I

O I

M R

N mO R

M NE UA I

T Ub S

S' C S

C T

A I

)

D SE L

IE SE R

X EN A

S I'

EN E2 E

'P RI E

EE RI W

N PL S

RD PL O

O N

C PTO

(

I I SNT E U C T

E

.Y 2

ADP E R TNS

^

G N

n.

SAI G

L B

N SE RI C y

EEI y

HI V 2

T RR BM 1

y UE I

RA E ST 4

p S

I 8

p OR N o

NPI r

' i j

l 1

i J

NORTHERN STATES POWER CO.

TASLE St.5 PRAlHIE ISLAND UNIT.

2 PAGE 1

OF 3 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

IEACIOR CORE CODIRTP PUMPS 8

INSP.

R EO*D.

AMT.

ITEM INSPECTION TE.

N DE RI 1 N IT W PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B5.1 IFG-1 PRESSURE RETAINING BOLTS AND AND S' IUDS, IN PIACE B5.3 (2: 2 IN. DIA.)

FLANGE BOLTS PUMP A WE 8

8 BOLTS 1 THRU 8 76-87

'IwO 8

8 BOLTS 9 'HIRU 16 78-67 MIREE 8

PUMP B OiB 8

8 BOLTS 1 THRU 8 76-86

'Iwo 8

8 BO[.TS 9 'HIRD 16 78-68

'I11REE ITEM B5.2 SEAL HOUSE BOLTING PUMP A 04E 4

4 BOLTS 1 'HIRD 4 76-89

'INO 4

4 BOLTS 5 'HIRD 8 78-69

'HIREE I 4 IUMP B 04E 4

4 BOL'IS 1 'HIRU 4 76-88

'IWO 4

4 BDLTS 5 ' HIP.0 8 78-70

'HIREE 4

B5.2 B-G-1 PRESSURE RETAINING BOLTS AND AND SIUDS, NHEN REMNED B5.3 (2 IN. DIA.)

PUMP A

'INO 12 12 BOLT 1 'HIRU 12 81-46,47 SEAL IlOUSE BOLTING PUMP B MIREE 24 FIANGE BOLTING IUMP B Mir;rE 12 SEAL IKXJSE BOLTING roam s t-aste sire com u PP9-B-2

@ $)

s

+

TEST TARGET (MT-3)

' a EM s

l.0 e "a HE==

3

,_ n l,l . f, IN ll!llN l

l

/

l.8 1.25 I l.4 l.6 l

l l

/

6" e

l l

1 4ll*%y

/ S4%

  • hk
  1. 34

/

. $777,

NORTHERN STATES POWER CO.

TACLE St.5 PRAIRIE ISLAND UNIT 2

PAGE 2

op 3 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM: REACIM OCRE COONf PUMP,S__

E N

8 SUB INSP.

R EQ'O AMT.

BTEM INSPFCTION E

DE N

ITEM PER.

AM T.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED B5.4 B-K-1 INIM RALLY WELDED SUPPORTS PUMP A

'IWO 3

3 SUPIORT A,B,C RELIEP No. 47 81-129,131,130 PUMP B

'IWO 3

3 SUPIORT A,B,C 81-132,134,137 UIREE 3

B5.5 B-K-2 SUPPORT COMPONENTS *

  • (DINCIDENT WITil SEISMIC BOLTING PUMP A (DWM AND WE 1

1 00WW 1 77-67,163,158 IATERAL SUPPORTS

'IWO 1

1 00W W 2 80-181,107,174 DIREE 1

WMP B 00W E AND WE I

1 COWM 1 77-64,162,161 IATERAL SUPPOR'IE

'IWO 1

1 OOWm 2 80-181,107,108 TIREE 1

B5.6 B-L-1 PUMP CASING WEW S WMP A

-NONE-WMP B

-NNE-B5.7 B-L-2 PUMP CASINGS TIREE 1

WMP A & B B5.8 B-P EXEMPIED COMRNENIS

-NONE-B5.9 B-G-2 PRESSURE RETAINING

-NONE-BOLTING (< 2 IN. DIA.)

ronM s 7-a47s etre ronu seo.sse-seos PP9-B-3

NORTHERN STATES POWER CO.

TABLE S1.5 PRAIRIE ISLAND UNIT

~1 PAGE 3

OF 3 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

REACIOR CORE 000U@TP PCMPS M

8Y8 "

SUS INSP.

R EO'D.

AMT.

ITEM INSPECT 60N E.

N DE I T10N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO 8E EXAMINED PtNP FLYMEEIS RMP A & B OE 2

2*

PLMP-21, FLMIEEL 76-113,117,116 IUMP-22, FLYWHEEL 76-93,82,92

'INO 2

2 R MP-21, FLYWHEEL 80-141,142,143 RMP-22, FLYWHEEL 80-124,139,140

'AIREE

  • BDI11 FLYWiEEIS WERE BENOVED AS A RESULT OF MODIFICA-TION 'IO 'DE PLEP IAERICATION SYS'I1M

'nE BORE AND KEY-WAY'S WERE Fr EXAM-INED & 'IllE REMAIN-DG SURFICES WERE MT EXR4INED.

U.T.

WAS USED 'IO VOWME-

'I1UCALLY EX.BMINE

'I1E FLYWIIEEIS (!K7IE

'IECH SPT 4.2-1)

FORM 9 7-2476 6/74 FORM sec. ISt-9 001 PP9-B-4

4 NORTHERN STATES POWER CO.

TABLE S1.6 PRAIRIE ISLAND UNIT 2

PAGE 1

OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM:

VALVE PRESSURE BOLNDARY

^M PON 8 M SUS INSP.

R EO*D.

AMT, ITEM INSPECTION TE.

N DES I Tl N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

CORY ITEM TO BE EXAMINED B6.1 B-G-1 PRESSURE RETAINING

-10NE-B6.2 BOLTS Ato SIUDS AND

(< 2 IN. DIA.)

B6.3

-NONE-B6.4 B-K-1 INTEGRALLY WEIDED SUPPORTS B6.5 B-K-2 SUPIORP OCNPCNENTS

  • INCLIOE IN

'mBIE 1.4 UNDER B4.10

-Note-E6.6 B-M-1 VALVE BmY WEIDS B6.7 B-M-2 VALVE BODIES

(> 4 IN. NOM. PIPE SIZE)

REACIOR VESSEL DREE 1

SAFETY INJECTIW IDW HEAD A RESIDUAL HEAT DREE 1

RDOVAL TAKE OFF A PRESSURIZER SAFETY

'IHREE 1

LINE A RESIDUAL HEAT

'IHREE 1

REMNAL REIURN B ACCtMULATOR DISCHARG A

'IHREE 1

B6.8 B-P

-EXEMPPED COMPONENTS 100%

ITEMS INSPECTED INSPECIED BY DURING EACH PIANT PERSCNNEL IEAWE 'IEST roa u sv-34 s sire ro m...........

PP9-B-5

NORTHERN STATES POWER CD.

TABLE SI.6 PRAIRIE ISLAND UNIT 2

PAGE 2,

OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITElWI:

VALVE PRESSURE BOLNDARY M

"E S M Suir INSP.

H EQ'D.

AMT.

BTEM INSPEOTION E-ND DE q

ITEM PfR.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO 8E EXAMINED B6.9 B-G-2 PRESSURE RF? RAINING

  • tDIE SUPPLEMENT BOLTING B6.9 AT 3.4.3 AOCUMUIROR DISQiART OE 16 16
QiECK, 2-8841A 76-12 LOOP A - 12"

'I11REE 16 ACCtNUIATOR DISCHAH2

'INO 16 16

OlECK, 2-8841B 80-82 IOOP B.- 12"

'DIREE 16 RESIDUAL HEAT OE 16 16 M.O. GNIE, 2-8703 76-13 REMOVAL Rfm]RN B-10" RESIDUAL HEAT

'IWO 16 16 M.O. GAIE, 2-8701 A 78-80 RENOVAL TAKE OFF A-8"

'HIREE 16 PCSIDUAL HEAT OE 16 16 M.O. GATE, 2-8701B 76-16 RENOVAL TAKE OFF B-3" OE 16 16 M.O. GA3E, 2-8702B 76-16 SAFETY INJECTIO4

'INO 12 12

OlECK, 2-8842A 80-166 HIGl HEAD A - 6" SAFETY INJECFION

'DIREE 12 HIG1 HEAD B - 6"

?

PRESSURIZER SPRAY IOOP A - 3"

'HIREE 8

IOOP B - 3" OE 8

8 runRR(2-PCV-431B) 76-28

'DIREE 8

RESISTANCE YEMPERA7URE TWO 12 12 GATE, 2-8001 A 78-79 DETECIOR RETURN IOOP A - 3" RESISTANCE 'ITNPERA'IURE

'IND 12 12 GAIE, 2-8001B 78-78 DEmrIOR RET. URN IOOP B - 3" ronne 32-34n ein ronu no. ise-i.es Pn9-B-6

e NORTHERN STATES POWER CO.

TABLE St.6 PRAIRIE ISLAND UNIT 2

PAGE 3

OF 4 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

VALVE PRESSURE BOIN RRY M

SUB INSP.

R EO'D.

AM1.

ITEM INSPECTION E-O DE I N ITEM PER.

AMT.

Ex/ M

DENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED I

B6.9 B-G-2 (ODNr'D)

RESI3TANCE 'IYMPERATURE DE 2

2

2r58, 2RC-1-6 76-95 DETIECTOR 'IME OFF

'INO 2

2

2T58, 2HC-1-7 80-152 ODID IEG A - 2" MIREE 2

RESISTANCE TEMPERATURE

'INO 2

2

2T58, 2RC-1-15 80-137 DETECTOR 'IME OFF qwo 2

2

2r58, 2RC-1-16 80-165 ODID IEG B - 2" DIREE 2

RESISTANCE 'IYMPERA'IURE

'IW 2

2

2r58, 2RC-1-9 80-150 DETECTOR 'IME OFF INO 2

2

2r58, 2ac-1-10 80-151 IDr LEG A - 2" MIREE 2

RESISTANCE TYMPERATURE OE 2

2

2r58, 2RC-1-12 76-103 DETECTOR 'IME OFF TWO 2

2

2r58, 2BC-1-13 80-136 IUP IEG B - 2" DIREE 2

PRESSURIZER RELIEF OE 12 12 M.O. GATE, 2-8000B 76-14 LINES 3"

QE 6

6 GOBE, 2PCV-431C 76-14

'INO 6

6 GDBE, 2PCV-430 80-149 UiREE 12 REACIOR VESSEL SAFETY INJECTION IOW IIEAD A - 6" OE 12 12

OIECK, 2-8843A 76-91 INO 12 12
OIECK, 2-8844A 80-171 IDW HEAD B - 6" OE 12 12
OIECK,

'2-8843R 76-36 MIREE 12 AUXILIARY SPRAY DIREE 6

CVCS - 2" FOR84 5 7-1476 6/78 Popes MO. ISO-8 84 8 PP9-B-7

NORTHERN STATES POWER CO.

TABLE SI.6 PRAIRIE ISLAND UNIT 2

PAGE 4

OF 4 INSERVICE INSPECTION-EXAMINATION StJMMARY M AJOR ITEM:

VALVE PRESSURE BOLNDARY SU8 INSP.

R EQ'O.

AMT.

ITEM INSPECTION E-N DE I Tl N ITW PEN.

AMT.

EXAH IDENTIF8 CATION REPORT NO.

GORY ITEM TO BE EXAMINED B6.9 B-G-2 (ODNP'D)-

DRAIN LINE DE 2

2

2r58, 2RC-1-3 76-11 CN CROSSOVER B

'IHREE 2

' DRAIN LINE GE 2

2

2r58, 2RC-1-2 76-15 ON CROSSOVER A-2"

'IHREE 2

IEI006ti LINE B - 2" OE 8

8 A.O. GOBE, 76-10 2ILV-427

'INO 2

2

2r58, 2RC-1-5 80-81

'IEREE 8

CHAIGING LINE B - 2"

'INO 6

6 A.O. GLBE, 78-24 2-8142 SEAL INJECTION A - 2" OE 2

2 2T-58, 2VC-7-18 76-94 SEM. IMJECTIOJ B - 2" OE 2

2 2P-58, 2VC-7-19 76-84 L

ro'ene a r-aeva sus rones no, ess-s ees PP9-B-8

NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISI.AND UNIT II PAGE 1

0F 7

BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT /SYSTM ISO METHOD IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS REACTOR VESSEL Bl.3 VESSEL-TO-FLANGE AND llEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANCE 42 UT W-1 81-W NONE NONE NONE RPV REPORT llEAD-TO-FLANCE 41 UT W-6 81-141 NONE NONE NONE 81-144 NONE NONE NO S-1 FLANCE

('l-143 NONE NONE NO S-1 FLANCE Bl.4 PRIMARY N0ZZLE-TO-VESSEL WELDS AND N0ZZLE INSIDE RADIUSED SECTION REACTOR CORE COOLANT OUTLET 40 UT RCC-B-1 81-W NONE NONE NONE N0ZZLE i(PV REPORT I

i

  • UNDERCLAD CRACKING 50 UT N0ZZLE A 81-W N/A
  1. INDICATION

' NONE RPV i

REPORT (SEE SECTION 4 0F INTRODUCTIO I

FOR AHALYSIS) 1 i

l FORM NO. ISI-1003

NORTHERN STATES POWER COMPANY TABl.E II PRAIRIE ISLAND UNIT II PAGE 2

0F 7

BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS N0ZZLE B 81-W

  1. INDICATION RPV REPORT N/A (SEE SECTION 4 NONE OF'INTRrDUCTIO 4

~

FOR AN.. LYSIS)

Bl.6 N0ZZLE-TO-SAFE END WELDS REACTOR CORE COOLANT 40 UT RCC-B-1 S. E. 81-W NONE NONE NONE OUTLET N0ZZLE RPV REPORT PT RCC-B-1 S.E. 81-21 NONE NONE NONE Bl.8 CLOSURE STUDS AND NUTS STUDS 39 UT 17,18,20,21 81-162 NONE NONE NONE

& 24 UT 19,22,23,25 81-167 NONE NONE NONE TilRU 32 MT li TilRU 32 81-165 NONE NONE NONE NUTS 39 UT 17 TilRU 32 81-163 NONE NONE NONE MT 17 TilRU 32 81-166 NONE NONE NONE Bl.9 LIGAMENTS BETWEEN TilREADED STUD 110LES LICAMENTS 42 JT 9 TO 11 81-W NONE NONE NONE UT 36 TO 46 RPV" l

REPORT Bl.10 CLOSURE WASilERS AND BUSilINGS WASilERS 39 VT 17 TilRU 32 81-164 NONE NONE NONE Bl.11 PRESSURE RETAINING BOLTING l

MARMON CLAMP 38 VT NO. 2 81-170 NONE NONE NONE FORM NO. ISI-1003

I NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 1

0F 7

BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METil0D IDENT.

NO.

INDICATIONS ATIONS LIMITATIONS MARMON CLAMP 38 VT NO. 1 81-170 NONE NONE NONE MARMON CLAMP 38 VT NO. 3 81-170 NONE COR(ODED TliREADS NONE Bl.13 CLOSURE IIEAD CLADDIN(

47 VT llCP-3 81-155 NONE NONE NONE IICP-4 81-155 NONE NONE N0i10 llCP-1 81-155 NONE NONE NONE Bl.14 VESSEL CLADDING 48 VT VCP-3 81-W-NONE NONE NONE (2 PATCllES)

RPV REPORT PRESSURIZER B2.4 N0ZZLE-TO-SAFE END WELD l

SAFETY LINE A 30 UT W-1A S.E.

81-37 NONE NONE BEST EFFORT S-1 &

l S-2 LIMITED SCAN AREA UT 81-63 NONE NONE B.E. ALL SCANS j

CONFIGURATION PT 81-6 3 LINEAR 2 LINEAP.

NONE

-l SEVERAL SEVERAL ROUNDED ROUNDED PT 81-6R AS ABOVE SEVERAL ROUNDED NONE SAFETY LINE B 30 UT W-1B S.E.

81-39 NONE NONE B.E. S-1 & S-2 LIMITED SCAN AREA UT 81-62 NONE NONE B.E. ALL SCANS CONFIGURATION PT 81-23 NONE 1 LINEAR NONE PT 81-23R NONE NONE NONE FORM NO. ISI-1003

NORTNERN SIATdS POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 4

0F 7

BASELINE COMPARISON SUMMARE NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT /3YSTEM

_ IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS ISO METHOD B2.11 PRESSURE RETAINING BOLTING PRESSURIZER MANWAY BOLTS 36 UT BOLT 1-16 81-60 NONE NONE NONE STEAM CENERATORS B3.3 N0ZZLE-To-SAFE END WELDS STEAM GENERATOR 21 32 UT RCC-A-5 S.E.81-125 NONE S-2 ID GEO. 75%

NO S-1 N0ZZLE CROSSOVER PT 81-116 NONE NONE NONE

]

B3.10 PRESSURE RETAINING l

BOLTING K2 INCil DIA.)

STEAM GENERATOR NO. 21 MAINAY A BOLTS 37 Ur BOLTS 1-16 81-45 N/A NONE NONE i

MT BOLTS 1-16 81-25 N/A NONE NONE MAINAY B BOLTS 37 UT BOLTS 1-15 81-45 N/A NONE NONE MT BOLTS 162 81-31 N/A 1 BOLT LINEAR NONE MT BOLTS 3-15 81-25 N/A NONE

' NONE B4.1 SAFE END-TO-PIPING AND SAFE END IN BRANCll PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT 33 UT RCC-B-1 S. E. 81-W NONE NONE NONE RPV REPORT PT 81-21 NONE NONE NONE FORM NO. ISI-1003

NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 5 OF 7

BASELINE COMPARISON

SUMMARY

NSl' NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM

_ IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS ISO METHOD STEAM GENERATOR NO. 21 REACTOR CORE COOLANT 32 UT RCC-A-5 S.E.81-125 NONE GEO. @l:00, 75%

NO S-1 SAFE END PRESSURIZER SAFETY LINE A 30 UT W-1 81-38 OD.GEO 401 NONE NO S-1 SAFE END UT (8010A) 81-61 (SAME)

NONE NO S-1 SAFE END PT 81-7 NONE 2 LINEAR NONE PT 81-7R NONE-INDICATIONS NONE BUFFED OUT SAFETY LINE B 30 UT W-1 81-40 S-2 OD GEO NONE NO S-1 REDUCER (80108) 40%

UT 81-64 (SAME)

NONE NO S-1 REDUCER PT 81-22 NONE LINEAR NONE PT 81-22R NONE-INDICATION NONE BUFFED OUT I

SPRAY LINE 7C UT W-22B 81-24 S-1,ID GEO.

S-2,OD GEO. 60%

B.E. ALL SCANS 45%

REDUCER S-2,ID GEO.

25%

S-2 OD GEO.

44%

PT 81-5 3/16'i.INEAR 4 LINEARS NONE PT 81-SR 4NONE-INDICATIONS NONE BUFFED OUT B4.5 CIRCUMFERENTIAL AND LONGITUDINAL PIPE WELDS i

REACTOR CORE COOLANT 33 UT RCC-B-12 81-94 NONE NONE ALL SCANS LIMITED COLD LEG (INLET) B 11:45-12:15 & 8:45-9:15 BRANCil CONNECT PT 81-87 NONE NONE NONE 1

FORM NO. ISI-100.'

NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 6

0F 7

BASELINE COMFARISON

SUMMARY

COMPCNENT/ SYSTEM

-I NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION ISO MET 110D IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS REACTOR CORE COOLANT 32 UT RCC-A-6 81-152 NONE NONE B.E. ALL SCANS CROSSOVER A MACllINING TAPER Pi 81-115 NONE NUMEROUS LINEARS NONE PT 81-115h NONE-INDICATIONS NONE BUFFED OUT 32 UT RCC-A-7 81-124 NONE NONE NO S-1 MACllINING TAPER PT 81-117 NONE NONE NONE PRESFURIZER SAFETY A 30 UT W-3 81-59 NONE S-1, ID GEO. 30%

B.E. S-2 ELBOW S-1, OD GEO. 35%

INNER RADIUS S-2, OD GEO. 30%

30 UT W-4 81-58 NONE S-1, ID GEO. 30%

B.E. S-1 & S-2 S-2, ID GEO. 20%

E.I.R.

PRESSURIZER SAFETY B 30 UT W-6 81-57 N/A S-1, OD GEO. 30%

B.E. S-2 S-2, ID GEO. 30%

E.I.R.

30 UT W-7 81-56 N/A NONE B.E. S-1 6 S-2 E.I.R.

S-2 6:00 FITTING j

l B4.6 BRAi4Cll PIPE CONNEC-

~

TION WELDS EXCEEDING SIX INCil DIAMETER RESIDUAL llEAT REMOVAL 20A UT W-ROOT 81-121 NONE S-2, ID CEO. 50%

NO S-1 BRANCH TAKE OFF B 81-126 NONE NONE NO S-2 BRANCH PT 81-113 NONE NONE NONE B4.7 BRANCil PIPE CONNEC-TION WELDS SIX INCll l

DIAMETER AND SMALLER l

RESISTANCE TEMPERAT*JLE 14 PT W-ROOT 81-89 NONE NONE NONE DETECTOR TAKE OFF B FORM NO. ISI-1003

MORTHERN FTATES POWER COMPANY T.GLE II PRAIRIE ISLAND UNIT II PACE 7 0F 7

BASELINE COMPARISON

SUMMARY

I NSP NDE

( W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS B4.10 SUPPORT COMPONENTS RESISTANCE TEMPERATURE 3

VT B1 81-139 NUT NOT liANGER TILTED NONE DETECTOR COLD LEG A FLUSli 81-139R NONE - IIANGER NONE STRAICitTENED RESISTANCE TEMPERATURE 15 VT A1 81-140 LOOSE BOLTS NONE NONE DETECTOR 110T LEG B REACTOR CORE COOLANT 32 VT A1 81-138 N/A NONE NONE CROSSOVER A l

REACTOR CORE COOLANT PUMPS B5.2 P_RESSURE RETAINING BOLTS AND STUDS WilEN REMOVED (&2 IN DIAMETER)

SEAL 110USE BOLTING PUMP A 12 UT 12 BOLTS 81-47 NONE NONE NONE MT 81-46 NONE 2 BOLTS CORRO-NONE SION ON THREADS i

B5.4 INTEGRALLY WELDED j

SUPPORTS PUMP A PT SUPPORT A 81-129 N/A NONE 4" UNACCESSIBLE TT SUPPORT B 81-131 N/A NONE NONE PT SUPPORT C 81-130 N/A NONE 4" UNACCESSIBLE PITclP B PT SUPPORT A 81-132 N/A NONE 4" UNACCESSIBLE PT SUPPORT B 81-134 N/A NONE NONE PT SUPPORT C 81-137 N/A NONE 4" UNACCESSIBLE i

I FORM NO. ISI-1003 i

o s

Table III N0 h 1ERN STATES POWER CO.

PAE 1

0F 4

PRAIRIE IS1AND UNIT 2 ISOMETRIC SLM1ARY CLASS 1

~

REVISIW 00MPONDE OR SYSTD4 IDOP R

2-ISI-1 0

SEAL INJECTION (GENERAL VIEW)

A 1 "62" A

1" 1 -2VC-21A 1

2-ISI-1A 0

A 2"

2-2VC-21A 3

2-ISI-1B 0

A 2"

2-2VC-21A 3

2-ISI-1C 0

A 2"

2-2RC-10A 3

2-ISI-2 0

CROSSOVER DRAIN 2-2RC-11A 3

A 2"

2-2RC-8A 3

2-ISI-3 0

RTD TAKEOFF COLD LEG A

2" 2-2RC-7A 3

2-I3I-4 0

RTD TAKEOFF 110T LEC A

2" 2-2SI-35A 3

2-ISI-5 0

SAFETY INJECTION HIGH HEAD A

3" 3-2RC-6A 4

2-ISI-6 0

RTD RETURN A6B 3"

SPRAY TO PRESSURIZER (GENE.7AL VIEW)

A 3"

3-2RC-5 4

2-1SI-7 0

2-ISI-7A 0

A 3"

3-2RC-5 4

2-ISI-7B 0

A 3"

3-2RC-5 4

2-ISI-7C 0

8 3"

3-2RC-5 4

2-ISI-7D 0

A 6"

6-2RC-13B 6

2-ISI-8 0

SAFETY INJECTION HICll HEAD A

6" 6-2RC-13A 6

2-ISI-9 0

PLO-CAP A

8" RHR TAKE OFF (GENERAL VIEM) 8" 8-2RC-15A 8

2-ISI-10 0

2-ISI-10A 0

8" 8-2Ril-1A 8

2-ISI-10B 0

8" 8-25tH-1 A 8

2-ISI-10C 0

A 12" 12-2RC-16A 11 2-ISI-11 0

ACCUMULATOR DISCHARGE 12-2SI-27A 11

---m-

i e

Table III PORTHEPN STATES PWDt CD.

PAq 2 0F 4 PRAIRIE ISLAND INIT 2 ISOMETRIC SLM4ARY SIh I

REVISICN (XHOENT OR SYSTDI ILOP ER 2-ISI-12 0

SEAL INJECTION (CENERAL VIEW)

B lb"&2" 2-ISI-12A 0

5 2"

2-2VC-21B 3

2-ISI-128 0

B 2"

2-2VC-21B 3

2-ISI-12C 0

B 1\\"

lb-2VC-21B 1

i 2-ISI-13 0

CHARGING LINE (GENERAL VIEW)

B 2"

2-ISI-13A 0

B 2"

2-2RC-17 3

2-ISI-138 0

B 2"

2-2VC-5 3

2-ISI-13C 0

5 2"

2-2VC-6 3

2-ISI-13D 0

B 2"

2-2VC-6 3

2-ISI-14 0

RTD TAKEOFF COLD LEG B

2" 2-2RC-8B 3

2-ISI-15 0

RTD TAFIOFF HOT LEC B

2" 2-2RC-7B 3

2-ISI-16 0

CROSSOVER DRAIN AND LETDOWN B

2" 2-2RC-10B 3

2-2RC-115 3

2-2RC-12 3

2-ISI-17 0

RTD RETURN B

3" 3-2RC-6B 4

2-ISI-18 0

SAFETY INJECTION HIGH HEAD B

6" 6-2RC-13D 6

2-ISI-19 0

PLO-CAP B

6" 6-2RC-13C 6

2-ISI-20 0

RHR TAKEOFF (GENERAL VIEW)

B 8"

2-ISI-20A 0

B 8"

8-2RC-155 8

2-ISI-203 0

B 8"

8-2RH-15 8

2-151-20C 0

8 8"

i 8-2RH-15 8

2-1S1-21 O

RHR RETURN B

10" 10-2SI-26 10 2-ISI-22 0

ACCUMULATOR DISCHARGE B

12" 22-2RC-165 11 12-25I-27B 11 I

Tablo III NORIHERN STATES POWER CO.

PAE 3 0F 4 PRAIRIE ISLAND LNIT 2 ISOMETRIC SlMMRY fife Ab REVISI(N COMPONENT OR SYSTDI 1DOP R

2-ISI-23 0

SAFETY INJECTION HICll HEAD B

2" 2-2SI-35B 2

2-ISI-24 0

AUXILIARY SPRAY 2"

2-2RC-19 3

2 2-2VC-4 3

2-ISI-25 0

F.EACTOR VESSEL SAFETY INJECTION A

2" 2-2SI-24A 3

2-ISI-26 0

REACTOR VESSEL SAFETY INJECTION B

2" 2-2SI-24B 3

2-ISI-27 0

PRESSURIZER RELIEF A6B 3"

3-2RC-21 4

2-ISI-28 0

REACTOR VESSEL SAFETY INJECTION B

4" 4-2RC-14B 5

B 6"

6-2RC-14B 6

B 6"

6-2SI-25B 6

2-1S1-29 0

REACTOR VESSEL SAFETY INJECTION A

4" 4-2RC-14A 5

A 6"

6-2RC-14A 6

A 6"

6-2SI-25A 6

2-ISI-30 0

PRESSURIZER SAFETY A

6" 6-2RC-20A 6

B 6"

6-2RC-20R 6

2-ISI-31 0

PRESSURIZER SURCE B

10" 10-2RC-4 10 2-ISI-32 0

REACTOR COOLANT A

29" 29-2RC-1A 15 A

31'-

31-2RC-2A 15 j

A 27h" 27h-2RC-3A 15 2-ISI-33 0

REACTOR COOLANT B

29" 29-2RC-1B 15 B

31" 31-2RC-2B 15 B

27b" 27 -2RC-3B 15 6

2-ISI-34 0

RECENERATIVE HEAT EXCilANGER 2-ISI-35 0

PRESSURIZER SAFETY AND RELIEF N0ZZLES

l Table III

'NORlHERN STATES POWER 00.

PAG 4

OF 4

PRAIRIE ISIAND INIT 2 l

ISOMETRIC SLM4ARY LINE LINE LTT - CAL' NSP ISO ISI N

I SIZE NtNBER STANDARD MNBER i

25A/16 2-ISI-36 0

PRESSURIZER 25A 2-ISI-37 0

STEAM GENERATORS A&B 2-ISI-38 0

REACTOR VESSEL CONOSEAL BOLTING STUDS-17 2-ISI-39 0

REACTOR VESSEL STUDS, NUTS & WASHERS 2-ISI-40 0

REACTOR VESSEL N0ZZLES 25A 2-ISI-41 0

REACTOR VESSEL HEAD WELD 2-ISI-42 0

REACTOR VESSEL SHELL WELDS 2-ISI-43 0

RC PUMP SEAL !!0USING BOLTIt;G A&B 2-ISI-44 0

RC PUMP FLANCE BOLTING A&B 2-ISI-45 0

RC PUMP FLYWHEEL A&B 6

2-ISI-46 0

EXCESS LETDOWN HEAT CL-1 EXCHANGER 2-ISI-47 0

REACTOR VESSEL CLOSURE CL-1 HEAD CLAD PATCHES 2-ISI-48 0

REACTOR VESSEL CLAD CL-1 PATCH IDENTIFICATION i

O

Table III NORIHERN STATES POWER 00.

PAGE I

OF 1

PRAIRIE ISIAND LEIT 2 ISO!ETRIC SENARY - SEIS;iIC BOLTING AUGMENTED NSP ISO LINE LINE trf - CAL.

REVISI(N 00EONENT OR SYSTBI IDOP NtNBER SIZE NIMBER STANDARD 2-ISI-77 0

STEAM GENERATOR SUPPORT BASE A&B 4/ GENERATOR 2-ISI-78 0

STEAM GENERATOR SUPPORT TOP A&B 4/ GENERATOR 2-ISI-79 C

REACTOR COOLANT PUMP SUPPORT BASE A&B 3/ PUMP 3/ PUMP 2-ISI-80 0

REACTOR COOLANT PUMP SUPPORT TOP A&B 2-ISI-81 0

R.C. PUMP #22 LOWER LATERAL SUPPORT B

2-ISI-84 0

R.C. PUMP #21 LOWER LATERAL SUPPORT A

2-ISI-85 0

STEAM GENERATOR UPPER SUPPORT A&B 2-ISI-86 0

STEAM GENERATOR UPPER SUPPORT SNUBBERS A&B 2-ISI-87 0

STEAM CENERATOR SUPPORT PAD A&B 4/CENERATOR 2-ISI-853 0

PRESSURIZER BASE 2-ISI-89 0

ACCUMULATOR BASE A&B

--.___-y_

l

=

I<.

l l

1 APPENDIX B ASPE CLASS 2 EXAMINATION i

i I

l l

1 i

i i

l I

l l

l Page 1 of 1

NORTHERN STATES POWER CO.

TABLE S2.1 PRALRIE ISLAND i: NIT 2

PAGE I

OF 2 INSERVICE INSPECTION-EXAMINATIOf4

SUMMARY

MAJOR ITEM. PRESSURE VESSELS-S115AlfCElHA101 -

M

" T 8

SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E-ND DE R N

ITEM PER.

AMT.

EXAM IDEr;TIFICATION REPORT NO.

GORY ITEM TO 8E EXAMINED i

l l

C1.1 C-A CIRCUMFERENPIAL RTPP WEMS *

  • (3 AREAS, EQUALLY DIVIDED) l SPEAM GENERA'IOR No. 21 NEW B

'INO 82" 180.5" 0" 10 48",129" 10 81-127,128,133 189",270" 10 330"

& 439 '10 0" NEW F 111" SPEAM GENERATOR NO. 22 NE[D C 82" NEID E 82" iEID 11

'HIREE 111" C1.2 C-B NOzzm 10 VESSEL WEIDS STEAM GENERA'IOR 10. 21 MAIN S2 SAM Nozzm stEDmita NOzzm SPFAM GENERATOR NO. 22 MAIN STEAM NCzzm 111REE 1

stErweta mzzm

-NONE-C1.3 C-C IN1EGRALLY WEIDED SupeoarS I

,o. - o.........

rappp g g n-

R TIA R

E D

G 2

M A

d*O E

I pT ON oS TT CR EO S

PP 6

L S

1 E

E IR 4,

N 2

S S 2 S

08 97 1 5 77 E

77 67 77 44 V

1 1 1 1 1 1 1 1 ELEE 88 88 88 88 R

BGU AAS TPS ER P_

NO I

T M

A E

MC T

EIF I

TI IT R

N

)

)

)

)

P)

P)

F) f)

)

O N.

M M

0 M

J 8

(

A T.

T.

T.

T. ) T.

(

(

(

)

)

)

)

M VU VU VU VUVU

((

((

((

((((

.M TMA 77 00 88 88 - -

X A

1 1 22 1 1 1 1 E

)

)

)

)

)

0*T N

N N

N N

QM I

I I

I I

A 0M 0M 0M 0M0M E

R 2(

2(

2(

2(2(

2 2

2 2

2 E

P R E

S O

R NE O

O W

W W

W IP 1

1 1

I' 1

4 1

Y R

1 2

A 2

2 M

D G

G G

G M

E N

0 N

N O

N N

U 8

I I

N I

I NI 1

S M

T T

T T

A G

E L

L R

L L

O O

O O

O N

X N

T E

I T

D B

I D

B O

I E

N A

A' T

B I

R A

B R

A B

A EO A

E E

E r

N T

N Y

Y N

Y Y

N DT E

E A

A E

A A

M R

G W

H G

W W

O I

MNE N

N N

N M

T C

A I

E M

A A

M A

A R G A

M M

A M

M R

X U N E

E E2 E

S I

I I

W S T S

S E L O

N R O PTO P B I I SNT EU C T

E ADP MEY R

TNS O

D N

SAI G

L C-N SE

  • 0 p,

RI C EEI HI V 7

4 g_

T RR B

J I

g -

RA E EU 1

S C

g.--

OR N o

NPI r

l

NORTHERN STATES POWER CO.

TABLE S2.2.1 PRAIRIE ISLAND UNIT 2

PAGE 1

OF 5 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPItG-CIRCUMEERENPIAL BUIT_WEILS SUS INSP.

R EO'D.

AMT.

ITEM INSPECTION E.

N DE I I N ITEM PER.

AMT.

EXAM IDENTIFIC# TION REPORT NO.

GORY ITEM TO 8E EXAMINED C2.1 C-G CIRCUMFERENPIAL BUIT WEIDS MAIN STEAM A 32-2MS-1 MIN SIEAM B 32-2MS-2 MAIN SIEAM A

'IND 1

1 MS-11 81-123 30-2MS-1

'IHREE 1

MAIN STEAM B

'INO 1

1 MS-83 81-43,55 30-2MS-2 MAIN STEAM A OE 1

1 MS-17 77-101,31 31-2MS-1

'INO 1

6 MS-16,17,18 81-52,83,4,54,85 MAIN SIEAM B M3-19,20,174 81-50,84,51,92,53,86 31-2MS-2

'IWO 1

1 MS-117 81-93 MAIN SIEAM A OE 1

1 MS-188 77-99,15 RELIEF HDR., 30-2MS-1 MAIN STEAM B RELIEF HDR., 30-2MS-2 MAIN STEAM A 6-2MS-1 MAIN SIEAM B 6-2MS-2 OE 1

1 MS-113 77-96,37 EEEDWA'IER A 16-2EW-13 OE 1

1 EW-161 77-45,55 16-2EW-12

'IWO 2

2 EW-161 80-20,27,83,185 16-2EW-11 EW-174 80-18,31,84,160 EW-177 80-19,29,40,162 EW-177 81-10,32,36,42,42R romu o-un ein ro..

o.........

PP9-B-11

NORTl!ERN STATES POWER CO.

TABLE S2.2.1

?RAIRIE ISLAND UNIT 2

PAGE 2

op 5 PIPING-61EUlGE16NfIAL Burr WEILS INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:_

YS SUB INSP.

R EO'D.

AMT.

ITEM INSPECTICN E-N DE I TION O ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED C2.1 C-G (CONT'D)

EEE0m ER B 16-2EW-16 OE 1

1 EW-116 77-97,3 16-2EW-15 TWO 1

1 EW-133 80,21,38,41,161 EW-133 81-11,37,35,41,41 R EEEDE'IER A (8 in) 3-2AF-11 EEEDWA'IER B (8 in) 3-2AF-12 REFUELING WATER SIORAGE

'IENK DISOIA'0E 14-2S1-1

'IND 1

1 W-58 (Pt only) 79-41 12-2SI-3A

'IWO 1

1 W-60 79-83 12-2S1-3B 12-2S-11 12-2SI-4

'RIREE 1

10-2S1-8 1NO 1

1 W-68W 79-84 STREAM 1

'1HREE 1

STREldt 2

'IWO 2

2 W-88,289 79-77, 76 OCNTAINN Nr SUMP B DIS 01AR3E LINES 14-2S1-33A 14-2S1-33B 12-2SI-34A

'INO 1

1 W-17 79-25 12-2SI-34B

'IND 1

1 W-5 79-26 12-2Ril-6A 12-2Ril-6B Fon u s7-aers e/7s ronu no sss-seen PP9-B-12

NORTHERN STATES POWER CO.

T/ ELE S2.2.1 PRAIRIE ISLAND UNIT 2

PAGE 3

OF 5 INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING 4'IRCUMFERENTIAL BUl"r WEIES E M MPON T S M SUB INSP.

R EQ'D.

AMT.

ITEM INSPECTION E-D DE R I N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED C2.1 C-G (00Nr'D)

SAFETY IM ECTION

'UIP NO. 21 SUCTION 6-2Ril-10A BRANCII 1

'IWO 5'

5 W-285,93,161,96,95 79-59,78,79,82,80 BRANCH 2

'I11REE 1

SAFETY IM ECTIN RJMP NO. 22 SUCTIN 6-2Ril-10B BRANCH 1

'IWO 2

2 W-286, 135 79-57, 81 BRANCH 2 DIREE 1

RESIDUAL HEAT REMOVAL DISCHARGE 8-2REl-9A

'IWO 1

1 W-68 79-67 8-2Ril-9B

'I11RSE 1

'IND 1

1 W-53 79-65 8-2Ril-7A 8-2RIl-7B

'INO 1

1 W-201 79-63 BORIC ACID SUPPLY 'IO SAFETY INJECTIN i

6-2SI-13A

'IWO 1

1 W-272R 79-53 mires t

6-2SI-13B

'IWO 1

1 W-271 79-52 8-2S1-17 8-2S1-18

'IND 1

1 W-85 79-94

'111REE 1

RESIDUAL IIEAT RDUIAL SUClIN 10-2S1-9A

'INO 1

1 W-212 79-54 10-2SI-9B

'INO 1

1 W-143 79-55 rogy;gussin ronu o.........

3

NORTHERN STATES POWER CO.

TABLE S2.2.1 PRAIRIE ISLAND UNIT 2

PAGE 4

OF 5 INSERVICE INSPECTION-EXAMINATION

SUMMARY

M AJOR ITEM: PIPING-CIRCUMFERENTIAL BUIT WEILS M

COM E OR YS M ITEM tNSP.

R EO'D.

AMT.

ITEM INSPECTION SUB PER.

AMT.

IXAM IDENTIFICATION REPORT NO.

GORY ITEM TO SE EXAMih*D C2.1 C-G (GNP'D)

N~JMJIA'IOR DISOIAIG LINES 12-2SI-28A 12-2SI-288 12-2SI-29A 12-2SI-29B OE 1

1 SI-316 77-49 C2.1 C-F IESIDUAL llEAT REMOVAL DISOIABGE 10-2Ril-11 OE 1

1 NI-294 77-33

'Iwo 1

1 W-176 79-30

'IliREE 1

6-2MI-12

'Iwo 1

1 W-331 81-66 6-2S1-10B

'IIIREE 1

RESIDUAL llEAT REMOVAL SUCTIOi 12-2MI r>A

'INO 1

1 W-105 79-27 12-2RII-5B TWO 1

1 W-142 79-47,50 8-2RH-4A

'1ho 1

1 W-100 79-68 8-2Ril-4B

'111REE I

1 10-2Ril-3 OE 2

2 Mi-255,Ril-256 77-50,51

'INO 2

2 W-225,226 79-28,29

'IHREE 2

8-2Ril-5A

'IW 1

1 W-104 79-69 8-2RIl-5B

'IND 1

1 W-138 79-64 rOnu 3 7-se7e e/7s FORM PeO tSI 9449 PP9-B-14

l!

]

E J

JFW t,o T

o s

IT M

as s.

o 5

L se A

NO.

s I

O e

p I' IN n

oN TT o

E CR r

1 R

EO P P 2

E S E E

N 2

M IR A

S 5 U

25 6

C 56 4

R I

11 7

E 78 7

LE<

BGG AAN TPI P

IP NO I

T M

A E

MC T

EIF I

TI IT R

N 2

O ED 39 6

J I

34 2

A 3

I I

M SW S

.M T A 1 1 -

1 M X A E D.

O' T.

M E

1 1 1 1

A R

E F.

E SR EOR E

NE IP WH Q '

'I O

I Y

RA M

U D M

E N

U 8 NI S

M N

A O

N IX LI O

IE ETA 8

SC5 5

I E

T B

SD 2 2

I EJ -

A N EO VNI 1

N DT IS S

I

  • M R

2 2

O M

E OY -

T T6 6

C A

I

)

I D

CE R

X EW A

'P E2 E

W N

RS O

O N

C PTO

(

I I SNT E U C T

E ADP MEYR TNS O

F s

N SAI G

7

/

L C

e N SE s

5 RI C 7

1 4

EEI a

HI V

- B T RR BM 1

7 s

UE 9

I RA E ST 2

ne P _

S I

C n P GR N o

NPI r

S G

N I

T T

I t

F t

e N

t I

I S

B.

1 S

O T

)

N NO.

R N

3 M

I O

F%

IN 9

R O.

TT

+

O 2

CR

(

F D

IO P P 0

2 I

S E W

IR 3

N 3,

2 1

S 2

3 L

1 9

A E

N 7

1 I

8 7

LED BGU AAI T P' IG

- N GO N

NI O

2 8

I 1

1 I

T PM A

S S

IPE MC M

M T

EI F

I TI IT O

O R

N I'

I O

E 1

7 J

D A

I 1

1 M

S S

M M

.M T A 1

1 M X A E D.

Q' T.

MA E

1 l

R P

SR NE O

E IP W

4 I

G Y

1 2

R S

S A

S M

M M

M D N

I 2

2 M

E I

0 0

N U

8 O

3 3

NI S

M J

A N

X D

O 4E L

R R

E A

B A

B A

B ADBD I

E 1

2 1

2 1

2 H

H T

B W

M M-M-M -

M M-M M

A EO L

ASAS ASAS ASAS AFAF N

O IN DT A S CMEM EMEM EMEM EEEE

  • M N G T2I 2 T2T2 T2T2 TITI M

NE I

N S

S' -

S-S -

S-S-SLSL C

T D

I 2

2 0

0 1

1 E

E A

I U T N3N3 N3N3 N3N3 NRNP R

X I T I

I I

I I

I I

I E2 E

I' I A

A A

A A

A A

A W

G F M

M M

M M

M M

M N

O N

O N PTO I

I I I SNT E U C T

E ADP ME.Y TN S R

O G

8 N

SAI G

7

/

L C

4 N SE 4

6.

RI C 7

1 4

EEI 2

T RR BM 2

- B.

HI V 7

UE 9.

3 I

RA E ST 2

M P S

I C

R P OR N O

NPI F

NORTHERN STATES POWER CO.

TABLE s2.4 PRAIRIE ISLAND UNIT 2

PAGE 1

OF 2

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

VALVES M

N 8 M SUB INSP.

R EO*D.

AMT.

ITEM INSPECTION E-N DE Tl N ITEM PER.

AMT.

E%AM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED C4.1 C-F VALVE BODY WEWS

-NONE-

  1. U C-G C4.2 C-D PRESSURE RETAINING BOLTING MAIN STEAM A 31-2MS-1

'INO 26 26 (V) 81-9 3(MIN) 26 (Ur) 81-9 MAIN STEAM B 31-2MS-2 MAIN STEAM A (6") (OFF) RELIEF HDR Q1E 12 12 (V)

RS-21-11 77-54 30-2MS-1 2(MIN) 2 (UP)

RS-2-11 77-54

'INO 12 12 (V)

RS-21-14 81-73 2(MIN) 12 (Uf)

RS-21-14 81-73 MAIN STEAM B (6") (OFF) RELIEF IIDR 30-2MS-2

'INO 12 12 (V)

RS-21-20 81-8 2(MIN) 12 (UP)

RS-21-20 81-8

'IHREE 24 (V) 4(MIN)

(UP)

RESICUAL IIEAT REMOVAL WMP A 6-2Ril-12 WMP B 6-2S1-10B OE 12 12 (V) 2-88038 77-63 2(MIN) 2 (Ur) 2-8803B 77-63 FORM 9 7-24 74 6/TS FORM 800. 050-9 99 9 PP9-B-26

NOR1 N STATES POWER CO.

TABLE S2.4 PRAIR ISLAND UNIT 2 PAGE 2

op 2

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

VALVES

^

Sus t hSP.

REO 0.

AMT.

ITEM INSPECTION E

E I 4 N 61E M GORY 8 TEM TO BE EXAMINED PER.

AMT.

EXAM IDENTIFICATION REMT W.

C4.2 C-D (CONT'D)

ACCLMRATOR DISOIAIEE LINES 12-2S1-29A

'HIREE 16 (V) 2(MIN)

(Lfr) 12-2SI-298 C4.3 C-E-1 INTEGRALLY WEIDED SUPPORTS

-NCNE-C4.4 C-E-2 SUPIORT 00HPOtOfrS

-NONE-

?

'T 8

ro -.,.,...

ro =

PP9-B-27

NORTHERN STATES POWER CO.

TABLE S2.2.5 PRAIRIE ISLAND UNIT 2

PAGE 1

OF 3

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INIEGRALLY lEILED SUPPOR'IS SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E-DE I N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO 8E EXAMINED C2.5 C-E-1 INIEGRALLY WEIDED SUPPORTS MAIN S'IEAM A

'IWO 2

1 P,H,A 81-16,48,48R,14,74, 74R,16 30-2MS-1 MIREE 2,

MAIN SIEAM B OE 1

1 I

77-147 30-2MS-2

'INO 2

2 A,H 81-13,30,15,34 MIREE 3

MAIN SIEAM A OE 3

3 J,K,M 77-154,140 31-2MS-1

'IWO 1

1 S

81-2,3 MAIN SIEAM B-31-2MS-2 DIREE 2

MAIN STEAM A 30-2MS-1 (R-HDR)

MIREE 1

MAINS'IEAM B 30-2MS-2 (R-LOR)

MAIN STEAM A 6-2MS-1

?

MAIN STEAM B 6-2MS-2 OE 1

1 P

77-103 EEEDWATER A 16-2EW-13 OE 1

1 K

77-105 16-2EW-12

'INO 10 10 A

80-5,5R,32 16-2EW-11 B,C 80-2,33,6,62 E,P 80-1,28,68,63 H,I 80-67,61,66,59 J,K,L 80-77,60,3,3R,44 80-8,26 A,K 81-19,67,67R,20,68 DIREE 3

roppt31.yfgens ro== no....-i...

NORTHERN STATES POWER CO.

TABLE S2.2.5 PRAIRIE ISLAND UNIT 2

PAGE 2 _op 3

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INIEGRAILY wJr2n SUPPORTS j

EN Spg",

i,"@gs INSP.

R EO'D.

AMT.

ITE M INSPECTION sua i IO O I

PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO 8E EXAMINEO l

C2.5 C-E-1 (CONF'D',

l l

EEEDWA'IER B 16-2EW-16 ONE 2

2 "G,H 77-104,148 16-2EW-15 SWO 8

8 A

80-16,16R B,C,D,E,P 80-9,10,42,74 G,H 80-11,11R,12 A,G 81-18,17

'IUREE 1

REEUELING WA'IER SIORAGE

'IRNK DISCHAICE 12-2SI-4

'IWO 1

1 C

79-42,34 OWTAINPENT SUMP B DISCHARGE LINES 12-2S1-33A 12-2S1-33B SAFETY INJECTION IUMP NO. 21 SUCTIN BRANCH 1 6-2Ril-10A GE 1

1 B

77-119 BRANOI 2 6-2RH-10A WE 1

1 G

77-119 SAFETY IMJECTIm PUMP NO. 22 SUCTION BRANCH 1 6-2RH-1GB

'IWO 1

1 D

79-35,38,38R BRANCH 2 6-2RH-10B

'IHREE 1

RESIDUAL HEAT REMNAL SUCTIm PUMP A 8-2RH-4A

'IWO 1

1 A

79-19,44 i

g._g.g.n.

NORTHERN ?TATES POWER CO.

TABLE S2 2.5 l

PRAIRIE ISLAND UNIT 2

PAGE 3

op 3

l lNSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM: PIPING-INEGRALLY wrIFn SUPPORTS i

EXAM COMPONENT OR SYSTEM

$RY EXAM 1NED

^

PE.'

A EXANI IDEN FICATION EP NO.

IT O

C2.5 C-E-1 (CONT'D)

RESIDUAL llEAT REM 0/AL DISCIPIGE PUMP B 8-L'ui-98 RESIOUAL llEAT RENNE DISCHARGE PUMP A 1 0 - 2161-1 1 NE 1

1 L

77-115

'HIREE 1

RESIDUAL HEAT REMCNAL DISCHARGE PUMP B 6-2SI-10B

-NONE-RESIDUAL HEAT RE2KNAL SUCTIN 14]MP B 10-2Ril-3 (IE 1

1 C

77-118

'19 0 1

1 E

79-37,40,40R 8-2Ril-4B

'INO 1

1 J

79-36,39,39R

'IHREE 1

REACDOR VESSEL SAFETY IMJECTIN A 6-2S1-25A WE 1

1 A

77-109

'IWO 1

1 B

81-27,49,49R

' DIRE 1

REACIOR VESSEL SAFETY INJECTIW B 6-2S1-25B WE 1

1 A

77-108 ronu 37-asts afra ronae no.sse-seet PP9-B-21

NORTHERN STATES POWER CO.

TABLE 92.2.6 PR AIRIE ISLAND UNIT

?

PAGE 1

OF 3

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING-N31 IIEIReD SUPPGtTS M

M "

I "

SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E-N DE I I N ITEM PER.

AMT.

EXAM IDENTIFICA(ION REPORT NO.

GORY ITEM TO 8E EXAMINED C2.6 C-E-2 SUPPORT COMPONCNIS MAIN STEAM A 31-2MS-1

'IHREE 1

MAIN STEAM B 31-2MS-2

'HIREE 1

MAIN S'IEAM A 30-2MS-1

'Iwo 1

G 81-12,128 MAIN S'IEAM B 30-2MS-2

'IHREE 1

MAIN STEAM A RELIEF HDR., 30-2MS-1 QE 1

1 O

77-140 MAIN STEAM B RELIEF HDR., 30-2MS-2

'Iwo 1

1 0

81-1,1R FEED 4NIER A 16-2EW-13

'Iwo 2

2 D,G 80-4,69

'IIIREE 1

REFUELING WNIER S10 RAGE TANK DISCilARGE 12-2S1-4

'Iwo 1

1 B

79-45 ro n u ir-ser eir.

ronu no. isi-i...

PP9-B-22

NORTH 5RN STATES POWER CO.

TABLE S2.2.6 PRAIRIE ISLAND UNIT 2

PAGE 2

op 3

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING-tKN wrre SUPFORTS YI SUS INSP.

R EO*a AMT.

ITEM INSPECTION E.

DE I ON ITEM PER.

MT.

EXM IDENTIFICAT10N REMT NO.

GORY STEM TO BE EXAMINED C2.6 C-E-2 (CONT'D) 10-2S1-8 BRANCH I DIREE 1

BRANCH 2 SAFETI IRTECTION RNP NO. 21 SUCCICN BRANCH I 6-2Mi-10A

-ERE-BRANOi 2 6-2RH-10A

'IWD 1

1 E

79-46

'DiBEE 1

SAFETI IRTECTION RMP NO. 22 SUCTICM BRANCH 1 6-2Mi-108

-TOE-DRANOi 2 6-2RH-10B

'INO 1

1 A

79-33,33R TIREE 1

RESIDUAL EEAT RDD/AL DISOIAICE RNP A 6-2Mi-12 CNE 1

1 M

77-136 RMP B 6-2SI-108 RESIDUAL HEAT REMOVAL SUCTICN RMP B 10-2RH-3 CNE 2

2 A,B 77-155

'IWO 1

1 F

79-9 TGiEE 2

RMP A 8-2Mi-4A

'IWO 1

1 B

79-18 RMP B 8-2Mi-4B DIREE 1

roa u is-u r..ir.

io==

....-i...

PP9-B-23

NORTHERN STATES POWER CO.

TABLE S2.2.6 PRAIRIE ISLAND UNIT 2

P.",G E 3

OF 3

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

PIPING-tKN WEIDED SUPPORIS M

YS M SUB INSP.

R CO*D.

AMT.

STEM INSP2CTION E-N DE I TIOq ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO 8E EXAMINED C2.6 C-E-2 (CONr'D)

RESIDUAL HEAT REM (NAL DISCHARGE PWP A 8-2Ril-9A IUMP B 8-2Ril-9B

'II.REE 1

ACOMJLMOR DISCilAFCE LINES LINE A 12-2SI-28A OE 1

1 B,77-137 12-2S1-29A LINE D 12-2S1-28B

'HIREE 1

12-2SI-29B BORIC ACID SUPPLY

'IO SAFETY INJECTIOi 6-2SI-13A CNE 1

1 B

77-153 6-2SI-13B REAC'IOR VESSEL SAFETY IRJECTION LINE A 6-2SI-25A CNE 1

1 H

77-150 LINE B 6-2SI-25B

'IWO 1

1 B

OCNTAINMENT SUMP DISOIAKE LINES LINE A

-NOE-LINE B

-NOE-FORM 9 7-24 76 6/78 FONM MO. SSI-9 99 9 PP9-B-24

NORTHERN STATES PONER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 3_OF 6

l BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD

_ IDENT, NO.

INDICATIONS INDICATIONS LIMITATIONS PRESSURE VESSELS

' STEAM CENERATORS l

C1.1 CIRCUMFERENTIAL BUTT WELDS STEAM CENERATOR NO. 21 37 UT W-B 81-127 N/A NONE NONE WELD B 81-128 TUBE SilEET GSO NONE 81-133 TUBE SIIEET GEO NONE i

C1.4 PRESSURE RETAINING BOLTING STEAM GENERATOR No. 21 36 UT MANWAY A 81-78 N/A 1 BOLT 65% LOSS NONE 17 BOLTS OF BACK WALL MT 81-70 N/A 16 BOLTS STEAM i40NE C')UGES UT MANWA7 B 81-77 N/A NONE NONE 20 BOLIS MT 81-69 N/A 3 DOLTS DENTED NONE i

THREADS STEAM CENERATOR No. 22 36 UT MANWAY A 81-76 N/A NONE NONE 18 BOLTS MT 81-71 N/A 10 BOLTS STEAM NONE COUGES r

UT MANWAY B 81-75 N/A NONE NONE l

18 BOLTS MT 81-72 N/A 3 BOLTS DENTED NONE THREADS 1

i 9ts' FORM NO. ISI-1003

NDRTPERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 2

OF 6

BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM

_ IDENT.

FO.

INDICATIONS INDIC%TIONS LIMITATIONS ISO MET 110D PIPING - CIRCUMFERENTIAL BUTT WELDS C2.1 CIRCUMFERENTIAL BUTT WEl.DS MAIN STEAM A 46A UT MS-II 81-123 N/A S-2, ID GEO.50%

NONE 46B UT MS-17 81-4 NONE NONE NONE UT MS-16 81-83 MONE NONE NO S-1 PENETRATION S-2 LIMITED SCAN ADJACEh'i WELD MT 81-52 NOWE NONE 46B UT MS-18 81-85 NONE S-1, OD GEO.30%

LIMITED SCAN S-2, OD GEO.35%

5:30 TO 6:30 IIANGER MT 81-54 ARC STRIKE NONE 81-54R NONE-INDICATION NONE BUFFED OUT UT MS-19 81-84 NCNE NONE B.E. S-1 ENCAPSUL-l ATED NO S-2, S-3, S-4 MT 81-50 NONE B.E. LNCAPSULATED UT MS-20 81-92 NONE NONE No S-1, S-3, S-4 ENCAPSULATION B.E.

S-2 LIMITED SCAN AREA 5:30 - 6:30 llANGER MT 81-51 NONE B.E. ENCAPSULATED l

l UT HS-174 81-55 NONE S-1, OD CEO.35%

S-1 LIMITED ADJACENT j

WELD S-2 LIMITED AT 12:00 BRANCil MT 81-53 NONE NONE l

I FORM NO. ISI-1003

NORTHERN STATES POWER COMPANY TABLE PRAIRIE ISLAND UNIT II PACE 3

0F 6

i BASELINE COMPARISON

SUMMARY

' l NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM ISO METHOD:

IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS MAIN STEAM B 47A UT MS-83 81-55 N/A S-1 OD GEO. 30%

NONE S-2 ID CEO.70%

E-2 OD GEO. 30%

MT S1-43 DISSIMILAR METAL NONE 47B UT MS-117 81-93 N/A S-2 OD GEO. 25%

NO S-1 " TEE" S-2 LIMITED VALVE B.E. S-3, S-4 VALVE FEEDWATER A 48A UT W-177 81-32 S-1 ID GEO. S-1 ID GEO. 90%

NONE 50%

S-1 ID CEO. S-2 ID GEO. 60%

60%

S-2 ID CEO.

S-2 OD GEO. 60%

40%

S-2 OD CEO.

50%

UT 81-36 (AS ABOVE)

S-1 ID GEO. 50%

NONE S-2 OD GEO. 60%

PT 81-10 N/A NONE NONE MT 81-42 N/A 4 LINEARS NONE MT 81-42R NONE-INDICATIONS NONE BUFFFD OUT FEEDWATER B 49A UT W-133 81-33 S-1 ID CEO. S-1 ID CEO. 90%

NONE 39%

S-1 OD GEO. S-2 ID CEO. 60%

43%

a S-1 ID CEO.

39%

-l S-2 ID GEO.

l 44%

i S-2 OD GEO.

I 39%

S-2 ID GEO.

48%

j J

FORM NO. ISI-1003

o NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAVD UNIT II PAGE 4 OF 6

BASELINE COMPARISON

SUMMARY

NSP NDE

}{ BASELINE REPORT BASELINE ISI EXAMINATION CGMPONENT/SYSTDI ISO METHOD IDENT.

h0.

INDICATIONS INDICATIONS LIMITATIONS FEEDWATER B (CONT) l UT 81-35 (SAME AS S-1 ID GEO. 70%

UONE ABOVE)

S-1 OD GEO. 70%

S-2 ID CEO. 40%

S-2 OD GEO. 40%

PT 81-11 N/A NUMEROUS LI"(EARS NONE MT 81-41 9 LINEARS 23 LINEAT'S NONE MT 81-41R NONE-INDICATIONS BUFFED OUT 9"91 DUAL IIEAT REMOVAL 56 UT W-331 81-66 N/A S-2 OD CEO. 50%

B.E.

S-2 VALVE Df SCliARGE REACTOR VZSSEL SAFETY 72 UT W-349 81-65 N/A S-1 OD GEO. 40%

NO S-2 VALVE INJECTION A C2.2 LONGITUDINAL WELD JOINTS IN FITTINGS MAIN STEAM A 46A UT MS-11 TO 81-123 N/A NONE NO SCANS CN ELBOW MS-12 OUTER RADIUS AT AREA 0F SUPPORT ATTLCHMENT C2.5 INTEGRALLY LTJLDED SUPPORTS MAIN STEAM A 46A MT F

81-48 N/A ARC STRIKE NOI-S MT 81-48R N/A NhE-INDICATION NONE BUFFED OUT

~

VT 81-16 N/A NONE NONE MT 11 81-74 N/A 1/2" LINEAR 1 PAD INACCESSIBLE ON BOTTOM SIDE

!!T 81-74R NONE-INDICATION NONE BUFFED OUT VT 81-14 N/A NONE NONE l

FORM NO. ISI-1003

o NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLlJiD UNIT II PAGE 5

0F 6 MASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT /SYSTDi

_ IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS ISO MET 110D MAIN STEAM A (CONT)

MT S

81-2 N/A NONE NONE VT 81-3 N/A NONE NONE MAIN STEAM B 47A MT A

81-30 N/A NONE INACCESSIBLE AREA ADJACENT llANGER VT 81-13 N/A NONE NONE MT 11 81-34 N/A NONE GUARD PIPE VT 81-45 N/A NONE GUARD PIPE VT A

81-26 N/A NONE NONE FEEDWATER A 48A MT A

81-67 NONE 1/2" LINEAR NONE MT 81-67R NONE INDICATION NONE BUFEED OllT VT 81-19 LOASE BOLTS NONE NONE MT K

81-68 NONE NONE NONE VT 81-20 MISSING NUT NONE NONE EXTRA NUT FEEDWATER B 49A VT A

81-18 LOOSE NUT NONE

,i3ARD PIPE VT C

81-17 1/4" GAP ON NONE NONE BASE PLATE, NUT NOT FLUSil REACTOR VESSEL SAFETY 73 PT B

81-49 N/A 7 LINEARS NONE INJECTION PT 81-49R NONE-INDICATIONS NONE BUFFE9 OUT p

B2.6 SUPPORT COMPONENTS i

MAIN STEAM A 46A VT G

81-12 N/A LOOSE BOLTS NONE 81-12R NONE-BOLTS l

TIGitTENED I

1 l

FORM NO. ISI-1003

NORTHERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 6

0F 6 BASELINE COMPARISON

SUMMARY

a-NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION Cel W NENT/ SYSTEM ISO HETHOD IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS I

MAIN STEAM B 47B VT 0

81-1 N/A LOOSE BOLTS NONE i

81-1R NONE - BOLTS NONE TIGHTENED REACTOR VESSEL SAFETY 71 VT B

81-28 N/A NONE NONE INJECTION B VALVES C4.2 P_RESSURE RETAINING R

BOLTING i

MAIN STEAM A 46B UT 26 BOLTS G 81-9 N/A NONE ONE END ONLY CV-31116 UT 12 BOLTS @

81-73 N/A NONE ONE END ONLY RS-12-14 MAIN STEAM B 47B UT 12 BOLTS @

81-8 N/A NONE ONE END ONLY RS-21-20

~

1 l

l l

l FORM NO. ISI-1003

TABLE III NOREEIW STATES PGiER CG.

pag 3 op 3

PIMJRIE ISIAND 1 HIT 2 ISLt41HRIC S!!+1ARY - CLASS 2 n

LINE LIFE IIT - CAL.

tes? ISO REVISIQ1 00MPONDir OR SYSTDI 1DOP SIZE tati3ER STNRIARD PAFBER 26 2-1S1-37 0

STEAM GENERATORS A6 '4 2-ISI-46 0

MAIN STEAM (CENERAL VIEW)

A 2-ISI-46A 0

A 32'-

32-2MS-1 NO.

2-ISI-46B 0

A 31" 31-2MS-1 24 30" 30-2MS-1 23 6"

6-2MS-1 7

2-1S1-47 0

MAIN STEAM (CENERAL VIEW)

B 2-ISI-47A 0

B 32" 32-2MS-2 NO.

2-ISI-47B 0

B 31" 31-2MS-2 24 30" 30-2MS-2 23 6"

6-2MS-2 7

2-ISI-48 0

FEEDWATER (CENERAL VIEW)

A 13/16 2-151-48A 0

A 16" 16-2 W-13 2-ISI-48B 0

A 16"

'16-2W-12 13 16" 16-2 W-11 11 8"

3-2AF-11 NO.

2-ISI-49 0

FEEDWATER (GENERAL VIEW) 8 13736 2-ISI-49A 0

E 16" 16-2 W-16 2-ISI-49B 0

L 16" 16-2W-15 13 8"

3-2AF-12 NO.

22-2-ISI-50 0

RilR PUMP B SUCTION (WELDS)

B 10" 10-2Rii -3 29 2-I31-51 0

Ri!R PUMP B SUCTION (IIANCERS)

B 8"

8-2RH-4B 29 B

8" 8-2RH-5B 32 B

12" 12-2RH-5B 22 B

10" 10-2SI-98 2-IS1-52 0

Ri!R PUMP A SUCTION (WELDS)

A 8"

8-2RH *A 29 29 2-ISI-53 0

RHR PUMP A SUCTION (HANGERS)

A 8"

8-2RH-5A 32 A

12" 12-2RJ-5A A

10" 10-2SI-9A 22 I

O

TABLE III NOR11!ERN STATES NWER CO.

PAGE 2 0F 3 PRAIRIE IS!AND INIT 2 ISGEIRIC SlM1ARY - CLASS 2 I

LINE 1.INE IIT - CAL.

REVISI m 00MPONIWT OR SYSUN ILOP SIZE NINllEll STANDARD g

29 2-ISI-54 0

RllR PUMP B DISCllARGE (WELDS)

B 8"

8-2Ril+78 29 2-ISI-55 0

RilR PUMP B DISCllARGE (llANGERS) a 8"

8-2RIl-98 27 B

6" 6-251-10B 2-ISI-56 0

RilR PUMP A DISINARGE (WELDS)

A 8"

8-2RH-7A 29 2-ISI-57 0

RiiR PUMP A DISCIIARGE (llANGERS)

A 8"

8-2Ril-9A 29 22 A

10" 10-2Rii-11 27 A

6" 6-2RH-12 32 2-ISI-58 0

CONTAINHENT SU.T B DISCllARGE (WELDS)

B 12" 12-2 Ril--6 B 2-ISI-59 0

CONTAIhl!ENT S'JMP B DISCliARGE (llANGERS)

B 14" 14-2SI-33B NO.

B 12" 12-2SI-34B NO.

2-ISI-60 0

CONTAINNENT SUMP B DISCHARGE (WELDS)

A 12" 12-2RH-6A 32 2-ISI-61 0

CONTAINMENT SUMP B DISCllARGE (llANGERS)

A 14" 14-2SI-33A NO.

A 12" 12-2SI-34A NO.

2-ISI-62 0

SAFETY IN?ECTION PUMP 22 SUCTION (WELDS)

B 6"

6-2RH-10B 27 2-ISI-63 0

SAFETY IN.IECTION PUMP 22 SUCTION (llANGERS) 2-ISI-64 0

SAFETY INJECTION PUMP 21 Si:CTION (WELDS)

A 6"

6-2R11-10A 27 2-ISI-65 0

SAFETY INJECTION PUMP 21 SUCTION (HANGERS) 2-ISI-66 0

REFUELING WATER STORAGE (WELDS) 14" 14-2SI-1 NO.

TANK DISCHARGE 12" 12-2SI-3A 35 2-ISI-67 0

REFl!LI.ING WATER STORAGE (HANGERS) 12" 12-2SI-3B 33 TANK DISCllARGE 12" 12-251-4 33 10" 10-2SI-8 31 12" 12-2SI-11 33 2-ISI-68 0

BORIC ACID SUPPLY TO (WELDS) 6" 6-2SI-13A 28 l

SAFETY INJECTION 6"

6-2SI-13B 28 2-ISI-69 0

BORIC ACID SUPPLY TO (HANCERS) 8" 8-2SI-17 30 SAFETY INJECTION 8"

8-2SI-18 30 4

TABLE III NOCIllERN STATES POWER 00.

PAE 3 0F 3 PRulRIE ISLAND UNIT 2 ISOf4ETRIC SitMRY - CLASS 2 REVISIO4 00MPdNDIT OR SYSTkN ILOP j

h II R STN

,y, 2-ISI-70 0

REACTOR VESSEL SAFETY INJECTION (WELDS)

B 6"

6-2SI-25fi 6

2-ISI-71 0

REACTOR VESSEL SAFETY INJECTION (llANGERS) 2-1S1-72 0

REACTOR \\ESSEL SAFETY INJECTICN (WELDS)

A 6"

6-2SI-25A 6

2-ISI-73 0

REACTOR VESSEL SAFETY INJECTION (llANGERS) 8" 8-251-18 30 2-ISI-74 0

BORIC ACID SUPPLY (WELDS)'

2-ISI-75 0

ACCIR!ULATOR DISCllARCE (WELDS)

A 12" 12-2SI-28A 11 2-ISI-76 0

ACCUWJLATOR DISCllARGE (llANGERS) 12" 12-2SI-29A 11 B

12" 12-2SI-73B 11 12" 12-2SI-29B 11

~

l

i A?PENDII C FSAR AUGMETTED EXAMINATION NO EXAMINATIONS SCHEDULED THIS OUTAGE -

PAGE 1 of 1

-,_.c.

-_.-.*,.,..,-*y

f l

h i

.i 1

l i

APPENDIX D SEISMIC BOLTING EXAMINATION i

t d

I t

i l

i 9

Page 1 of 1

NORTHERN STATE 3 POWER CO.

TABLE 2 PRAIRIE ISLAND UNIT 2

PAGE I

OF 6

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

SEISMIC BOLTING cNE-"

INSP.

R E Q'D.

AMT.

ITEM INSPECTION sus N DE I Tl N ITEM PER.

AMT, EXAM aO8ENT'J3CATf0N 9EPCMT NO.

GORY ITEM TO BE EXAMINED N/A N/A STEAM GENERA'IORS SIEA14 GFNERA' LOR NO. 21 UPPER RING GIRDER WE 2

2 SNUBBER 1 77-72 (SNUBBER PINS)

'INO 2'

2 WUBBER 2 80-180 8

SNUBBER I 'I11RU 4 81-97 TIREE 4

UPPER RING GIRDER WE 5

5

'IOP ROW 77-143 (SNUBBER WALL BOLTS)

'INO b

5 GWIER ROW 80-110 15 ALL BOLTS81-106 UIRLE 5

UPPER RING GIRDER WE 8

8

'IOP ROW W GIRDER 77-143 (SNUBBER BOLTS)

'INO 8

8

'JOP ROW CN WALL 80-176 32 ALL BOLTS 81-98 TIREE 16 UPPER RING GIRDER WE 10 10 RING 00N. 2 77-159 (RING 00tNECT BOLTS)

'IND 10 10 RING 00N. I 80-110 40 PAD 1 THRU 4 81-119,114,114R TIREE 20 brPER RING GIRDER WE 10 10 10 EXAMINED 77-159 (RING WALL BOLTS)

'IWO 10 10 10 EXAMINED 80-110 30 PAD 1 UlRU 4 81-107,108,109,110

'IIIREE 10 (REPEAT INSP.)

ODIDW PINS WE 2

2 B0r COL 1/10P OLL 4 77-69,70

'INO 2

2 Bor & 'IOP CDL 2 80-182 8

00 WPW 1 DIRU 4 81-135

'IOP & BOPIOK

'IliREE 4

FORM 9 7-34 74 S/70 FOftM NO. SSt-lett PP8-B-22

TABLE SB NORTHERN STATES POWpR CO.

2 op b

PRAWlE ISLAND UNIT PAGE_

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

st;ISMIC BOLTING NE T S M SUB INSP.

R EO'O.

AMT.

BTEM INSPECTION E-D p

q ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO DE EXAMINED N/A N/A (S.G. NO. 21 CONP'D) i BASE ANCHOR BOLTS CNE 8

8 BASE OF 00W m 1 77-143 UNO 8

8 BASE OF GXUm 2 80-106 32 BASE OF OQU M4 1 81-80 WIRL) 4 711REE 16

'IOP 00WW 04E 4

4 TOP OF 00W M 1 77-165 00m ECTING BOUIS

'IWO 4

4

'IOP OF 00w m 2 80-173 16 TOP OF CDwm 1 81-136,149 TH10 4

. 'IHREE 8

UPPER RING GIRDER 2

SGH-2,SGH-4 81-111,112 (SPRING HANGER)

SUPPORT PAD 04E 6

6 (Dwm 1 77-62 HELI-CDIL SCREWS

'INO 6

6 COWW 2 80-183 24 ALL HELIODIL SCREW 81-122 111REE 12 STEAM GENERA'IOR NO. 22 UPPER RING GIRDER Q4E 2

2 SNUBBER 1 77-71 (SNUBBER PINS)

'INO 2

2 94UBBER 2 80-180 8

fNUBBER 1711RU 4 81-96

':IIREE 4

UPPER RING GIRDER Q4E 5

5

'IOP ROW 77-142 (SNUBBER WALL BOLTS)

'INO 5

5 CENIER ROW 80-111 15 ALL BOLTS 81-99 111REE 5

UPPER RING GIhDER Q4E 8

8 TOP B0 lion GIRDER 77-142 (SNUBBER BOLTS)

'INO 8

8

'IOP ROW ON WALL 80-112 32 AIL BOLTS 81-95 111REE 16 ronM 37-a47s e/re rones no. ess-s ees PP8-B-23

\\

NORTHERN STATES POWER CO.

TABLE SB PRAIRIE ISLAND UNIT _2 PAGE 3

OF_6___

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

SEISMIC BOLTING 8

SUB INSP.

R E O'D.

AMT.

BTEM INSPECTION E.

N DE PTl0N ITEM

PER, AMT.

2XAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED N/A N/A (S.G. NO. 22 00NF'D)

UPPER RING GIRDER

@E 10 10 RI!G OQN. 4 77-160 (RING CONECT BOLTS)

'IND 10 10 RING G A. 1 80-111 40 PAD 1 'HIRU 4 81-118,120

'HiREE 20 UPPER RING GIRDER 04E 10 10 10 EXAMINED 77-160 (RING WAIJ. BOLTS)

'IWO 10 10 10 EXAMINED 80-111 30 PAD 1 'DiRU 4 81-102,103,104,105

'IHREE 10 (REPEAT INSP.)

00W M PINS Q4E 2

2 Cows 1 77-65

'IWO 2

2 00wm 2 80-182 8

00mm 1 'IHRU 4 81-135

'IOP & BOI'IOM

'IHREE 4

BASE ANOIOR BOLTS OE 8

8 BASE OR COW m 1 77-160

'IWO 8

8 BASE OF QXUm 2 80-106 32 BASE OF COwm 1 81-79

'DIRU 4

'DIREE 16 UPPER RING GIRDER 2

SCH-2,SGH-4 81-100,101 (SPRING HANGER)

'IOP COLUM WE 4

4

'DOP OF 00w!N 1 77-165 CONNECTING BOLTS

'INO 4

4

'IOP OF Cows 2 80-113 16

'IOP OF COWN 1 81-137,148

'DIRU 4

'IHREE 8

SUPPORT PAD WE 6

6 OOwm 1 77-61 IELI-COIL SCREWS

'INO 6

6 00wm 2 80-184 24 ALL HELIODIL SCREWS81-151

,, m..n.

TABLE 2 NORTHERN STATES POWgR CO.

PRAIRIE ISLAND UNIT PAGE 4

OF 6

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

SEISMIC BOLTING EXAM COMPONENT OR SYSTEM SUB g p.9' ft EO'D.

AMT ITEM INSPECTION E-A D DE ITEM Pert.

AMT.

EXAM IDENTIFICATION REPORT NO.

y yO EE A NED N/A N/A (PUMP NO. 21 GNf'D)

PRESSURIZER BASE ANOIOR BOLTS OE 8

8 1-8 BOLTS77-146 1NO 8

8 9-16 BOLTS80-114 24 AIL BOIIIS 81-91 VIREE 8

ACCUMJIATOR A BASE ANOlOR BOLTS OE 8

8 1-8 BOLTS77-141

'INO 8

8 9-15 BOLTS80-115 24 AIL BOLTS 81-90 THREE 8

ACCUMJIA'IOR B BASE ANO10R BOLTS JE 8

8 1-8 IK>LTS77-141 INO 8

8 9-16 BOLTS80-115 24 AIL BOLS 81-88 TIREE 8

N/A N/A REACIOR COOLANT PUMPS PUMP NO. 21 CDIAM1 PINS OE 2

2 00WW 1 77-67

'INO 2

2 00W W 2 80-?81 6

00WW 1 DIRU 3 81-135

'IOP & B0frIOM THREE 2

BASE ANOIOR BOLTS OE 8

8 BASE OF 00WMN' 1 77-158 TWO 8

8 BASE OF 00WW 2 80-107 24 BASE OF 00W W 1 81-82

'IHRU 3 TIREE 8

roned s 7-sere e/7e roame eso. ese-s ees PP8-B-25

A 2

TABLE NORTHERN STATES POWpR CO.

D PRAIRIE ISLAND UNIT PAGE Of

""C NN INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:_

SUB INSP.

R EO'D.

AMT.

ITEM INSPECTION E.

N DE I Tl N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED N/A N/A (PtXP NO. 21 00NP'D) 00mm CONNECPING OE 6

6

'IOP OF 00WM 1 77-163 BOLTS

'INO 6

6

'IOP OF 00wm 2 80-174 18

'IOP OF CDwm 1 81-154,156 MiW 3

'111REE 6

TIE BACK BOLTS OE 1

1 PAD 1 77-77

'INO 1

1 PAD 2 80-179 3

PAD 1 MiRU 3 81-150,157,160,161

'111REE 1

TIE BACK PINS GE 1

1 PAD 1 71-6 8

'INO 1

1 PAD 2 80-186 3

PAD 1 DIRU 3 81-135

'IliREE 1

'IllD00Gil ANCIKE QE 2

2 PAD 1, SOUrti 2 77-161 BOIES

'INO 2

2 PAD 1, CENIER 2 80-175 6

PAD 1, ALL BOLTS81-157,168 DIREE 2

IA'IERAL SUPPORP AND OE 4

4 PAD 2 7/-158 ELL BC.LTS

'IW) 3 3

PAD 3, 'IOP ROW 80-175 10 PAD 2 & 3,ALL BOLTS81-160,161 DIREE 3

PlTAP NO. 22 00wMN PINS

'OE 2

2 00W M 1 77-64

'IWO 2

2 Comm 2 80-181 6

Cows 1 DIRU 3 81-135

'IOP & LCfl0M DIREE 2

FORM 37 2476 6/78 FORM AO. B51-9 99 9 PP8-B-26

NORTHERN STATES POWER CO.

TABLE SB PRAIRIE ISLAND UNIT _ 2 PAGE 6

op 6

INSERVICE INSPECTION-EXAMINATION

SUMMARY

MAJOR ITEM:

SEISMIC BOLTING SUB INSP.

R EO'D.

AMT.

ITEM tNSPECTION E-N DE RI I N ITEM PER.

AMT.

EXAM IDENTIFICATION REPORT NO.

GORY ITEM TO BE EXAMINED N/A N/A (PUMP NO. 22 00Nr'D)

BASE ANCHOR BOLTS WE 8

8 BASE OF 00w s 1 77-161

'IWD 8

8 BASE OP 00w m 2 80-107 24 BASE OF 00w m 1 81-81 DIRU 3 DIREE 8

00w m 00m ECTING WE 6

6

'IOP OP OXUm 1 77-162 BOLTS

'IWO 6

6

'IOP OP 00w m 2 80-108 18

'IOP OF ODwm 1 81-142,153 DiRU 3 UIREE C

TIE BACK BOLTS WE 1

1 PAD 1 77-76

'IWO 1

1 PAD 2 80-179 3

PAD 1 DIRU 3 81-145,147,158,159 DIREE 1

TIE BACK PINS WE 1

1 PAD 1 77-66

'IWO 1

1 PAD 2 80-186 3

PAD 1 DIRU 3 81-135 "IIIREE 1

'IIIROUGil ANCHOR WE 2

2 PAD 1, SOLTI112 77-158 BOLTS

'IWO 2

2 PAD 1, CENIER 2 80-109,109R 6

PAD 1, ALL BOLTS81-145,168

'I11REE 2

LATERAL SUPPORT AND QE 4

4 PAD 2 77-161 WALL BOLTS

'IWO 3

3 PAD 3,'IOP ROW 80-109 10 PAD 2 & 3,ALL BOLTS81-158,159

'IliREE 3

ronne a 7 247e e/7s rones seo.ese-seos PP8-B-27

NORTNERN STATES POWER COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 1

OF 4

BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPO N / SYSTEM

_ IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS ISO MET 110D SEISMIC BOLTING PRGURAM STEAM GENERATOR NO. 21 UPPER RING GIRDER 85 UT 8 PINS 81-97 NONE NONE NONE SNUBBER PINS UPPER RING GIRDER 86 UT 15 BOLTS81-106 NONE NONE NONE SNUBBER WALL BOLTS UPPER RING GIRDER 85 UT 32 BOLTS 81-98 NONE NONE NONE SNUBBER BOLTS UPPER RING GIRDER 85 UT 40 BOLTS81-119 NONE NONE NONE RING CONNECT BOLTS VT 40 BOLTS81-114 NONE LOOSE NUT NONE 81-114R NONE - NUTS NONE TIGitTENED UPnER RING GIRDER 85 UT 10 BOLTS81-107 NONE NOME NONE WALL BOLTS UT 4 BOLTS81-108 NONE NONE NONE UT 10 BOLTS81-109 NONE NONE NONE UT 6 BOLTS 81-1M NONE NONE NONE COLUMN PINS 78 UT 4 PINS-TOP 81-135 NONE NONE NONE 77 UT 4 PINS-BOT 81-135 NONE NONE NONE BASE ANCllGR BOLTS 77 UT 32 BOLTS 81-80 NONE NONE NONE

~l TOP COLUMN CONNECTING 87 UT 16 BOLTS81-136 NONE NONE NONE BOLTS VT 16 BOLTS81-149 NONE NONE NONE IIELI-COIL SCREWS 87 UT 24 SCREWS81-122 N/A NONE-BASELINE NONE t

UPPER RING GIRDER 85 VT SGil-2 81-100 N/A NONE NOME SPRING llANGER VT SGil-4 81-101 N/A NONE Nc Mf; I

FORM NO. ISI-1003

NORTHERN STATES POWEh COMPANY TABLE II PRAIRIE ISLAND UNIT II PAGE 2

0F 4

BASELINE COMPARISON SUMMART NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM I

ISO MET 110D IDENT.

NO.

INDICATIONS INDICATIONS LIMTTATIONS STEAM GENERATOR NO. 22 TIPPER RING GIRDER 85 UT 8 PINS 81-96 NONE NONE NONE SNUBBER PINS UPPER RING GIRDER 86 UT 15 BOLTS 81-99 NONE NONE NONE l

SNUBBER WALL BOLTS l

l I

UPPER RING GIRDER 85 UT 32 BOLTS 81-95 NONE NONE NONE SNUBBER BOLTS UPPER RING GIRDER 85 UT 40 BOLTS81-120 NONE NONE B.E. " TIT" ilING CONNECT BOLTS VT 40 BOLTS81-118 NONE NONE NONE UPPER RING GIRDER 85 UT 10 BOLTS81-102 NONE NONE NONE WALL BOLTS UT 4 BOLTS81-103 NONE NONE NONE UT 10 EOLTS81-104 NONE NONE NONE UT b BOLTS81-105 NONE NONE NONE COLUMN PINS 78 UT 4 PINS-TOP 81-135 NONE NONE NONE

,NONE TOP COLUMN 87 UT 16 BOLTS81-137 NONE NONE NONE CONNECTING BOLTS VT 16 BOLTS81-148 NONE LOOSE BOLTS NONE 81-148R-NONE-BOLTS NONE TIGllTENED llELI-COIL SCREWS 87 UT 24 SCREWS81-151 N/A NONE-BASELINE NONE UPPER RING GIRDER 85 VT scil-2 81-111 N/A NONE NONE SPRING llANGER VT SGH-4 81-112 N/A NONE NONE I

g

~

FORM NO.1S1-1003 r

I II NORTHERN STATES POWER COMEANY TABLE PRAIRIE ISLAND UNIT II PAGE 3 0F 4

BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONEN'I'/ SYSTEM

. IDENT.

NO.

INDICATION.9 INDICATIONS LIMITATIONS ISO METilOD PRESSURIZER BASE ANCll0R BOLTS 88 UT 24 BOLTS 81-91 NONE NONE NONE ACCUMULATOR A BASE ANC110R BOLTS 88 UT 24 BOLTS 81-90 NONE BOLT #13 & 14 NONE 5% BACK REFLEC-TION ACCUMULATOR B BASE ANC110R BOUfS 89 UT 24 BOLTS 81-88 NONE NONE NONE REACTOR COOLANT PUMP NO. 21 COLUMN PINS 80 uT 3 PINS-TOP 81-135 NONE NONE nolle 79 UT 3 PINS-EUT 81-135 NONE NONE NONE BASE ANC110R BOLTS 79 UT 24 BOLTS 81-82 NONE NONE NONE COLUMN CONNECTING BOLTS 80 UT 18 BOLTS81-156 NONE NONE NONE VT 18 BOLTS81-154 NONE NONE NONE TIE BACK BOLTS 81 UT 1 BOLT 81-160 NONE NONE NONE j

UT 1 BOLI 81-161 NONE NONE NONE UT

'l ILOLT 81-157 NONE NONE NONE VT 3 BOLTS81-150 NONE LOOSE NUT NONE 81-150R NONE - NUT TIGitTENED TIE BACK PINS 84 UT 3 PINS81-135 NONE NONE NONE T11RU ANC110R BOLTS 84 UT 6 BOLTS81-157 NONE NONE NONE VT 5 BOLTS81-168 NONE NONE NOME FORM NO. ISI-1003

l t

l I

NOR111E15 STATES POWER COMPANY TABLE II l

PRAIRIL ISIAND UNIT II

PACE, 4 0F 4 BASELINE COMPARISON

SUMMARY

NSP NDE W BASELINE REPORT BASELINE ISI EXAMINATION COMPONENT / SYSTEM

_ IDENT.

NO.

INDICATIONS INDICATIONS LIMITATIONS ISO METHOD l

LATERIAL SUPPORT 84 UT 4 BOLTS81-161 NONE NONE NONE WALL BOLTS UT 6 BOLTS81-160 NONE NONE NONE REACTOR COOLANT PUK? NO. 22 COLUMN PINS 80 UT 3 PINS-TOP 81-135 NONE NONE NONE 79 UT 3 PINS-BOT 81-135 NONE NONE NONE BASE ANC110R BOLTS 79 UT 24 BOLTS 81-81 tiONE NONE NONE COLUMN CONNECTING BOLTS 80 UT 18 BOLTS81-142 NONE NONE NONE VT 18 BOLTS81-153 NONE NONE NONE TIE BACK BOLTS 81 UT 1 BOLT 81-145 NONE NONE NONE UT 1 BOLT 81-159 NONE NONE NONE UT 1 BOLT 81-158 NONE NONE

!!ONE VT 3 BOLTS81-147 NONE NONE NONE TIE BACK PINS 81 UT 3 PINS81-135 NONE NONE NONE TilRU ANC110R BOLTS 81 UT 6 BOLTS81-145 NUTS NOT NONE NONE FLUSil VT 6 BOLTS81-168 NONE

,NONE LATERIAL SUPPORT 81 UT 4 BOLTS81-159 NONE NONE NONE WALL BOLTS UT 6 BOLTS81-158 NONE NONE NONE FORM NO. ISI-1003

l

~

l

\\

APPENDIX E TABE I

- PERSONNEL LISTING l

TABE II - ULTRASONIC CALIBRATION BLOCKS TABE III - PROCEDURE LISTriG TABE IV - EQUIfMENT AND MATERIALS Page 1 of 1

1 NORTHERN STATES POWER COMPANY APPENDIX E

~

PRAIRIE ISLAND UNIT II TABLE

~

PERSONNEL LISTING PAGE 1 0F 1 ASNT LEVEL EXAMINER TITLE ORGANIZATION UT PT MT VT II II II (lb)

F. Abrigo Technician LMT (2)

L.R. Davis Technician LMT I

II I

R.A. Kellerhall Technician LMT II II II II (la,b)

R.W. Pechacek Techn cian LMT II II I '.

II (lb) d E.L. Thomas Supervisor LMT III III 111 III (la,b)

W.M. Tighe Technician IJIT II I

I G.T. Lenertz Production NSP II II II (lb)

Engineer II (la,b)

L.C. Dahlman M&SP Special-NSP II II list D.B. Hansen Assoc M&SP NSP III III III III (lb)

Engineer C. Lindstrom ANII Hartford Steam Boiler Inspection

& Insurance Co.

FOOTNOTES:

(la) Certified by NSP to perform Visual Determination of Structural Integrity for Hanger Assemblies in accordance with NSP-VT-2.

(lb) Inspection experience and NDE Qualifications were judged to be adequate to perform Visual Examinations in accordance with NSP-VT-1.

(2)

Organization:

Lambert, MacGill, Thomas, Inc. (LMT) 771 Brokaw Road San Jose, CA 95&l2

10RTllERN STATES POWER COMPANY APPENDIX E PRAIRIE ISLAND UNIT II TABLE II ULTRASONIC CALIBRATION BLOCKS F! SE 1 0F 2 PIPE SCllEDULE SERIt.L OR 1

NSP NO.

SIZE & DIA.

& TilICKNESS MATERIAL llEAT NUMBER CALIBRATION REPORTS DATE 4

3" Scil 160

.438" 316 M5900 hK-1 2-26-81 6

6" Scil 160

.718 316 M3715 BMT-4 3-2-81 RK-2 2-28-81 RWP-7 2-28-81 RWP-8 3-2-81 8

8" SCll 120

.719 316 J2338 ELT-1 3-11-81 15 CAST R.C. PIPE A-351 B2877 RK-7 3-5-81 CF8A RK-14 3-10-81 RK-20 3-17-81 23 30" 1.045" A-515 88526 ELT-3 3-11-81 CR. 70 RWP-6 2-28-81 24 31" 1.534" A515 79114 BMT-1 2-24-81 CR. 70 RWP-10 3-3-81 RWP-12 3-4-81 25A 5-5/16" +

SA533 C2220/1 EMT-8 3-14-81 Cl.AD (T) X CR. B CL. 1 RK-15 3-13-81 7-1/16" (W)

RK-16 3-13-81 X 17-3/4" (W) 26 3-1/2"(T)

A-533 52391 BMT-6 3-11-81 X 6" (W) X CR. A CL. 2 BMT-7 3-12-81 12" (L)

DBil-1 3-11-81 27 6"

SCll 40

.280" 304 2P5951 RWP-9 3-2-81 36 16" Scil 100 1.031" &

A-106 45124A RWP-3 2-27-81

.585" CR. C RWP-4 2-27-81

~

i h

2_

M E

1 F

1 O_

X I

2 1 1 D

88 NE E

ELE T

67 PBG A

1 1 PAA D

ATP 33 S

TRO PE R

N 34 O

1 1 I

T PP A

WW R

RR B

ILAC

.R RE OBM 0

LIR 4

At S

I A

RT S

EA SE l

l L

D A

U I

T R

S E

T A

V.

M R

ELS US DE EN 1

K 1CC SI l

ET P

I &

Y S

P N

T.

A C

P O

M L

O B

.)

CI A

AL IN I

1(

R O

D D"

ETI 2

WTT OI A 4

PNR E

/ '5 UB Z

3 S

I I

EDL S

5X TNA

!'. AC TL SSC I I N

N REO O

0 N

EI S 5

lIRA TI R PS RAT H

ORL NPU tl IT1 lI l}ll lll

NORTilERN STATES POWER COMPANY APPENDIX E

PRAIRIE ISLAND UNIT II TABLE III PROCEDURE LISTING PAGE I 0F 1

PROCEDURE NUMBER FIELD PLANT APPROVAL FIELD CilANGE j

AND REVISION CllANGE PROCEDURE TITLE DATE REMARKS CIIANGE DESCRIPTION NSP-MT-1, REV. 2 N/A MAGNETIC PARTICLE l-8-81 NONE EXAMINATION NSP-MT-2, REV. O N/A WET MAGNETIC PARTICLE l-8-81 NONE EXAMINATION NSP-FT-1, REV. 2 N/A LIQUID PENETRANT l-8-81 NONE EXAMINATION NSP-UT-1, REV. 1 N/A ULTRASONIC EXAMINATION 1-8-81 NONE OF PIPE WELDS NSP-UT-2, REV. 1 N/A AU'IDMATIC DATA RECORDING 1-8-81 N')NE NSP-UT-3, REV. 1 N/A ULTRASONIC EXAMINATION 2-20-81 NONE OF FERRITIC VESSELS NSP-UT-4, REV. 1 N/A UL*1RASONIC EXAMINATION 1-8-81 NONE 0F STUDS, BOLTS AND NUTS NSP-UT-4B, REV. 1 N/A AXIAL ULTRASONIC EXAMINA-2-20-81 NONE TION OF S' IUDS AND BOLTS NSP-UT-11, REV. 1 N/A UL'IRASONIC EXAMINATION 2-20-81 NONE OF CAST STAINLESS STEEL PIPING NSP-VT-1, REV. 2 N/A VISUAL EXAMINATION 1-8-81 NONE l

NSP-VT-2, REV. 2 N/A VISUAL EXAMINATION OF 1-8-81 NONE I! ANGER ASSEMBLIES g

I

NORTHERN STATES POWER COMPANY APPENDIX E

PRAIRIE ISLAND - UNIT 2 TABLE IV EQUIPMENT AND MATERIALS PAGE 1 0F 2

MATERIAL OR TYPE OR CALIBRATION DATE REMARKS EQUIPMENT SERIAL NUMBER OR BATCH NUMBER 1

ULTPASONIC:

NORTEC 130 S/N 130-60 CAL:

1-6-81 NORTEC 130D S/N 130-63-D CAL:

1-6-81 NORTEC 131D S/N 128 CAL:

1-2-81 NORTEC 131D S/N 311 CAL:

2-18-81 NORTEC 131D S/N 322 CAL:

12-2-80 0FF SITE 3-7-81 NORTEC 131D S/N 322 CAL:

3-9-81 NORTEC 131D S/N 360 CAL:

9-19-80 RECAL ON SITE 3-13-81 SONIC FTSMK1 S/N 755111 CAL:

12-24-80 RECORDERS:

GOULD 222 S/N 928 CAL:

2-20-81 GOULD 222 S/N 929 CAL:

2-20-81 COULL 222 S/N 1382 CAL:

2-20-81 TEMPERATURE CAUCES:

PTC SURFACE S/N 237 CAL:

5-28-80 CERTIFIED BY THERMOMETER S/N 240 CAL 5-28-80 MANUFACTURER S/N 256 CAL:

5-28-80

~

S/N 271 CAL:

12-3-80 S/N 353 CAL:

1-12-81 S/N 356 CAL:

1-12-81 MAGNETIC PARTICLE:

MAGNAFLUX YOKE S/N LMT-100 CAL:

2-23-81 ON SITE QUALIFICATION MAGNAFLUX YOKE S/N GTL 001 CAL:

3-20-81 ON SITE QUALIFICATION MAGNAFLUX COIL S/N GTL-2 BLACK RAY METER S/N 14935 CAL:

9-29-80 ROMPAS BLOCKS 304 S/S S/N 4 CERT 9-13-76 BY ORLA' S ??AC9INE SHOP 304 S/S S/N 14 CERT 5-17-78 BY ORLA'S MACH 1NE SHOP 4140 C/S S/N 17 CERT 5-17-78 BY ORLA'S MACHINE SHOP IIW BLOCK ASTM-A-36 S/N LMT-2 CERT 5-09-80 BY DIMAC MACHINE CO.

MATERIALS:

MAGNAFLUX PENETRANT SKL-HF/S BATCH NO.

80C094

NORTHERN STATES POWER COMPANY APPENDIX E

PRAIRIE ISLAND - UNIT 2 TABLE IV EQUIPMENT AND MATERIALS PAGE 2

0F 2

MATERIAL OR TYPE OR CALIBRATION DATE REMARKS EQUIPMENT SERIAL NUMBER OR BATCH NUMBER MATERIALS (CONT'D)

SPOTCHECK DEVELOPER SKD-NF BATCH NO 80H091 CLEANER SKC-NF BATCH No.79M015 MAGNAFLUX

  1. 14AM FLUORESCENT BATCH No.79J109 PREPARED BATH MAGNAGLO
  1. 20A FLUORESCENT BATCH NO.80C149 UATER MIX ULTRASON'.C LMT CEL BATCH NO.

COUPLANT LMT 979152 ULTRASONIC TRANSDUCERS:

SIZE FREQUENCY HARISONIC3 013570

.250" 5 MHE HARIS0NICS N1126

.750" 2.25 MHE HARIS0NICS P377

.5" x.5" 2.25 MHE HARIS0NICS P8120

.5" x.5" 2.23 MHE HARIS0NICS Q1032

.5" x.5" DUAL 1.5 MHE HARIS0NICS Q1265

.5" x.5" DUAL 1.5 MHB HARIS0NICS R9167

.25" x.25" 5 MHE HARIS0NICS R10021

.5" x 0 2.".5 MHE HARIS0NICS R12200

.25" x.25" 2.25 MHE HARIS0NICS R9159A & B 1" x 1" DUAL 1 MHB PANAMETRIC A $34 -S

.5" 2.25 MHE AER0 TECH 015450

.5" 2.25 MHE AER0 TECH 015*)63

.5" 2.25 MEE AER0 TECH 016575 1"

2.25 MHZ NORTEC 983

.5" x 1" 2.25 MHE NORTEC 1386 1" x 1" 2.25 MHE NORTEC 6807

.75" 2.25 MHE NORTEC 6948

.5" 2.25 MHE NORTEC CSS-679 1"

1 MHE l

I

APPENDIX F FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTION I

l l

l l

f L

i t

(

PAGE 1 0F 1 i

1 l

FORM NIS-1 OWNERS' DATA RE? ORT FOR INSERVICE INSPECTIONS l

l (As Required by the Provisions of the ASME Code Rules)

I 1.)

Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN 2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) 5.)

Comercial Service Date 12-21-74 6.)

National Board Number for Unit -

7.)

Components Inspected Manu facturer Component or Manu facturer or Installer State or National Appureenance or Installer Serial No.

Province No.

Board No.

Bl.0 REACTOR VESSEL CREUSOT-LOIRE 687 MINN. 200-51 Bl.3 VESSEL-TO-FLANGE AND HEAD-TO-FLANGE CIRCUMFERENTIAL WELDS VESSEL-TO-FLANGE CREUSOT-LOIRE W-1 e

HEAD-TO-FLANGE CREUSOT-LOIRE W-6 Bl.4 PRIMARY N0ZZLE-TO-VESSEL AND N0ZZLE INSIDE RADIUSED REACTOR CORE COOLANT CREUSOT-LOIRE N0ZZLE (OUTLET)

RCC-B-1 UNDERCLAD CRACKING EXAMINATION REACTOR CORE COOLANT CREUSOT-LOIRE I

N0ZZLE (OUTLET)

N0ZZLE A N0ZZLE B 31.6 N0ZZLE-TO-SAFE END WELDS REACTOR CURE COOLANT CREUSOT-LOIRE N0ZZLE (OUTLET)

RCC-B-13.E.

Bl.8 CLOSURE STUDS AND NUTS STUDS 17-32 CREUSOT-LOIRE NUTS 17-32 Bl.9 LIGAMENTS BETWEEN THREADED STUDE HOLES 9 TO 11 & 36 TO 40 CREUSOT-LOIRE ISI-1019, Rev. O Page 1 of 15

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.)

Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.

2.)

Plant PRAIRIE ISLAND NUCLEAR GENERATING PLANT,-UNIT II Addreas WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) --

5.)

Comercial Service Date 12-21-74 6.)

National Board Number for Unit -

7.)

Components Inspected Manu facturer Component or Manufacturer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

Bl.10 CLOSURE WASHERS AND BUSHINGS WASHERS L7-32 CREUSOT-LOIRE l

Bl.ll PRESSURE RETAINING BOLTING CONSEAL BOLTS CREUSOT-LOIRE PER MARMON CLAMP l-3 Bl.13 CLOSURE HEAD CLADDING HCP-3 CREUSOT-LOIRE HCP-4 HCP-1 Bl.14 VESSEL CLADDING VCP-3 CREUSOT-LOIRE 2 PATCHES B2.0 PRESSURIZER WESTINGHOUSE 1191 68-57 B2.4 N0ZZLE-TO-SAFE-END WELDS SAFE'lY LINE A NAVC0 W-1A S.E.

SAFETY LINE B NAVC0 W-1B S.E.

B2.ll PRESSURE RETAINING BOLTING PRESSURIZER MANWAY BOLTS NAVC0 B3.0 STEAM GENERATOR WESTINGHOUSE 1181 68-39 ISI-1019, Rev. O Page 2 f

15

l t

{

I i

I FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)

NORTHERN STATES POWER COMPANY 1.)

Owner Address 414 NICOLLET MALL, HINNEAPOLIS, MINN.

2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA II 4.)

Owner (Certificate of Authorization) --

3.)

Plant Unit 5.)

Comercial Service Date 12-21-74 6.)

Nartonal Board Number for Unit--

7.)

Components Inspected Mantfacturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

B3.3 N0ZZLE-TO-SAFE END WELDS STEAM GENERATOR NO. 21 RCC-A-5 S.E.

NAVC0 B3.10 PRESSURE RETAINING BOLTING (42 INCH DIAMETER)

STEAM GENERATOR NO. 21 WESTINGHOUSE 1181 68-19 MANWAY A BOLTS MANWAY B BOLTS 4

B4.0 PIPING PRESSURE BOUNDARY B4.1 SAFE END TO PIPING AND SAFE END IN BRACH PIPING WELDS REACTOR VESSEL REACTOR CORE COOLANT RCC-B-1 S.E.

NAVC0 STEAM CENERATOR NO. 21 RCC-A-5 S.E.

NAVC0 PZR SAFETY LINE A W-1 NAVC0 PZR SAFETY LINE B W-1 NAVC0 PZR SPRAY LINE W-22B NAVC0 I

ISI-1019, Rev. O Page 3 f 15

FCRM N.5-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As gaquired by the Provisions of the ASME Code Rules) 1.)

Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.

2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) --

5.)

Cournercial Service Date 12-21-74 6.)

National Board Number for Unit --

7.\\

Components Inspected Manu fa cturer Component or Manufacturer or Installer State or National Aopurtenance or Installer Serial No.

Prov! nee No.

Board No.

B4.5 CIRCUMFERENTIAL AND LONGITUDINAL PIPE WELDS REACTOR CORE COOLANT CROSSOVER LINE B RCC-B-12 NAVC0 LINE A RCC-A-6 NAVCO RCC-A-7 NAVC0 PZR SAFETY LINE A W-3 NAVC0 W-4 NAVC0 PZR SAFETY LINE 5 W-6 NAVC0 W-7 NAVC0 B4.6 BRANCH PIPE CONNECTION WELDS EXCEEDING SIX INCH DIAMETER RESIDUAL HEAT REM 07AL TAKE OFF W-ROOT NAVC0 B4.7 BRANCH PIPE CONNECTION WELDS SIX INCH DIAMETER AND SMALLER RESIDUAL TEMPERATURE DETECTOR TAKE OFF W-ROOT NAVC0 B4 10 SUI >

T COMPONENTS RE'iIDUAL ' JERATURE DEW CTOR.and 0FF COLD LEG B1, PRRCH-281 NAVC0 ISI-1019, Rev. O Page 4 of 15

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTICNS (As Required by the Provisions of tne ASME Code Rules) 1.)

Owner NORTHERN STATES POWER COMPANY Address PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II p

Address WELCH, MINNESOTA 3.)

Plant Unt:

II 4.)

Owner (Certificate of Authorization) 5.)

Connercial Service Date 12-21-74 6.)

National Board Number for Unit--

7.)

Components Inspected Manu facturer Component or Maau facturer or Installer S ta te or National Appurtenance or Installer Serial No.

Province No.

Board No.

B4.10 (CONT)

RESIDUAL TEMPERATURE DETECTOR TAKE OFF HOT LEG A1, 137-2RTD-5 NAVC0 REACTOR CORE COOLANT A Al NAVC0 B5.0 REACTOR CORE COOLANT PUMPS B5.2 PRESSURE RETAINING BOLTS AND STUDS, WHEN REMOVI') (22 INCH DIAMETER)

SEAL HOUSE BOLTING PllMF A B5.4 INTEGRALLY WELDED SUPPORTS PUMP A SUPPORT A SUPPORT B s

SUPPORT C I

PUMP B SUPPORT A SUI-PORT B SUPPORT C I

ISI-1U19, Rev. O Page 5 of 15 i

6 i

FORM NIS-L OWNERS' DA".A REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) i NORTHERN STATES F0WER COMPANY l.)

Owner Address 414 NICOLLET MALL HINNEAPOLIS MINN.

2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II Address, '. 4LCH, MINNESOTA 3.)

Plant' snit II 4.)

Owner (Certificate of Authorization) __

S.)

Commercial Service Date 12/21/74 6.)

National Board Number for Unit-o 7.)

Componeries Inspected Manu fa cturer Coisponent or Manufacturer or Installer State or National i

Appurtenance or Installer Serial No.

Province No.

Board No.

ASF3 CLASS 2

("

3 PRESSURE VESSELS, C1.1 CIRCUMFERENTIAL BUTI W'JLDS STEAM GENERATOR No. 21 l

W-B WESTINGHOUSE 1181 68-39 C1.4 PRESSURE RETAINING BOLTING STEAM GENERATOR NO. 21 1181 68-39 MANWAY A WESTINGHOUSE MANWAY B WESTINGHOUSE STEAM GENERATOR NO. 22 1

MANWAY A WESTINGHOUSE 1182 68-40 MANWAY B WESTINGHOUSE j

C2.0 PIPING C2.1 CIRCUMFERENTIAL BUTT WELDS MAIN STEAM A e

MS-ll NAVC0 MS-l7 NAVC0 MS-16 NAVC0 MS-18 NAVC0 MS-19 NAVC0 MS-20 NAVC0 MS-174 NAVC0 MAIN STEAM B MS-83 NAVCO MS-117 NAVC0 f

ISI-1019, Rev. O Page 6 15

FORM MIS-L OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rulcs)

NORTHERN STATES POWER COMPANY 1.)

Owner Address 414 NICOLLET MALL, MINNEAPOLIS, MINNESOTA i

2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II Address WELCH, MINNESOTA l

l 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) --

5.)

Cournercial Service Date 12-21-74 6.)

National Board Number for Unit--

l 7.)

Components Inspected i

Manu fa cturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

C2.1 (CONT)

FEEDWATER A FW-177 NAVC0 FEEDWATER B FW-133 NAVC0 RESIDUAL HEAT REMOVAL DISCHARGE W-331 NAVC0 REACTOR \\ESSEL

. SAFETY INJECTION W-349 NAVC0 C2.2 LONGITUDINAL WELD JOINTS IN FITTINGS MAIN STLAM A MS-ll TO MS-12 NAVC0 C2.5 INTEGRALLY WELDED SUPPORTS MAIN STEAM A F, MSH-39 NAVC0 H, MSH-42 NAVCO S, MSH-17 NAVC0 MAIN STEAM B A, MSH-48 NAVC0 H, MSH-41 NAVCO A, MSH-50 NAVC0 FEEDWATER A A, FWH-66 NAVC0 K, FWH-58 NAVCO of ISI-1019, Rev. O Page 7 15

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)

NORTHERN STATES POWER COMPANY 1.)

Owner 414 NICOLLET MALL, MINNEAPOLIS, MINN.

Address 2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT,. UNIT II Address WELCH, MINNESOTA II 4.)

Owner (Certificate of Authorization) 3.)

Plant Unit 5.)

Commercial Service Date 12-21-74 6.)

National Board Number for Unit--

7.)

Components Inspected Manu facturer Component or Manu fac turer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

C2.5 (CONT)

FEEDWATER B A, FWH-67 NAVC0 G, FWH-59 NAVC0 REACTOR VESSEL SAFETY INJECTION B, RHRRH-25 NAVC0 C2.6 SUPPORT COMPONENTS MAIN STEAM A G, MSH-54 NAVC0 MAIN STEAM B 0, MSH-82 NAVC0 i

EEACTOR VESSEL SAFETY INJECTION B, SIRH-6 NAVC0 C4.0 VALVES C4.2 PRESSURE RETAINING BOLTING

~

HAIN STEAM A CV-31116 NAVC0 MAIN STEAM A RELIEF HEADER RS-21-14 NAVC0 MAIN STEAM B RELIEF HEADER RS-21-20 l

ISI-1019, Rev. O Page 8 f

15

l-FORM NI3-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.)

Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.

2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT. UNIT II Address WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) --

5.)

Connercial Service Date 12-21-74 6.)

National Board Number for Unit -

a 7.)

Components Inspected Manu facturer Component or Manu facturer or Installer State or National or Installer Serial No.

Province No.

Board No.

Appurtenance SEISMIC BOLTING COMPONENTS STEAM GENERATOR 68-39 No. 21 WESTINGHOUSE 1181 SNUBBERS 1-4 8 PINS SNUBBER WALL BOLTS 15 BOLTS SNUBBER BOLTS

.)

32 BOLTS RING CONNECT BOLTS PAD 1-4 40 BOLTS RING WALL BOLTS PAD 1-4 30 BOLTS COLUMN PINS COLUMN 1-4 8 PINS BASE INCHOR BOLTS COLUMN 1-4 32 BOLTS COLUMN CONNECT BOLTS COLUMN 1-4 16 BOLTS HELI-COIL SCREWS COLU)ci 1-4 24 SCREWS l

ISI-1019, Rev. O Page 9 of 15

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)

NORTHERN STATES POWER COMPANY 1.)

Wnn Address 414 NICOLLET MALL, MINNEAPOLIS, MINN 2.)

Piant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) --

5.)

Consnercial Service Date 12-21-74 6.)

National Board Number for Unit-"'

7.)

Components Inspected Manu facturer C.enponent or Manu facturer or Installer State or National l

Appurtenance or Installer Serial No.

Province No.

Board No.

I STEAM GENERATOR l

NO. 21 (CONT)

SPRING HANGER l

SGH-2 NAVCO SCH-4 NAVC0

-i STEAM GENERATOR NO. 22 WESTINCHOUSE 1182 68-40 I

SNUBBERS 1-4

  • l 8 PINS SNUBBER WALL BOLTS 15 BOLTS

{

SNUBBER BOLTS 32 BOLTS l

RING CONNECT BOLTS i

PAD 1-4 40 BOLTS RING WALL BOLTS

[

PAD 1-4 I

30 BOLTS COLUMN PINS COLUMN 1-4 I

8 PINS l

BASE ANCHOR BOLTS COLUMN 1-4 32 BOLTS COLUEN CONNECT BOLTS l

COLUMN 1-4 l

(

16 BOLTS f

ISI-1019, Rev. O Page 10 *f 15 6

I

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules)

~

NORTHERN STATES POWER COMPANY 1.)

Owner l

Address 414 NICOLLET MALL, MINNEAPOLIS, MINN.

2.)

Plant PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNIT II Address WELCH, MINNESOTA 3.)

Plant Unit Il 4.)

Owner (Certificate of Authorization) 5.)

Commercial Service Date 12-21-74 6.)

Na tional beard Number for Unit --

7.)

Components Inspected Manu f acturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

STEAM GENERATOR No. 22 (CONT)

HELI-COIL SCREWS COLUMN 1-4 24 SCREWS SPRING HANGER SCH-2 NAVC0 SGH-4 NAVC0 PRESSURIZER WESTINGHOUSE 1191 68-57 BASE ANCHOK BOLTS 24 BOLTS ACCUMULATOR A DELTA SOUTHERN BASE ANCHOR BOLTS 24 BOLTS ACCUMULATOR B DELTA SOUTHERN BASE ANCHOR BOLTS 24 BOLTS REACTOR COOLANT PUMP 21 WESTINGHOUSE W510 COLUMN PINS COLUMN 1-3 6 PINS BASE ANCHOR BOLTS COLUMN 1-3 24 BOLTS l

l ISI-iO19, Rev. O Page of 7

15

FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECTIONS (As Required by the Provisions of the ASME Code Rules) 1.)

Owner NORTHERN STATES POWER COMPANY Address 414 NICOLLET MALL. MINNEAPOLIS. MINNESOTA 2.)

Piant PRAIRIE ISLAh*D NUCLEAR GENERATING PLANT. UNIT TT Address WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certifieste of Authorization) __

5.)

Consnercial Service Date 12-21-74 6.)

National Board Number for Unit __

7.)

Coeponents Inspected Manu facturer Component or Manu facturer or Installer State or National Appurtenance or Installer Serial No.

Province No.

Board No.

REACTOR COOLANT PUMP 21 (CONT)

COLUMN CONNECT BOLTS COLUMN 1-3 18 BOLTS TIE BACK BOLTS COLUMN 1-3 3 BOLTS TIE BACK PINS COLUMN 1-3 3 PINS THRU ANCHOR BOLTS PAD 1 6 BOLTS LATERAL SUPPORT WALL BOLTS PAD 2 & 3 10 BOLTS REACTOR COOLANT PUMP No. 22 WESTINGHOUSE W-515

~

COLUMN PINS COLUMN 1-3 6 PINS BASE A!!CHOR BOLTS COLUMN 1-3 24 BOLTS COLUMN CONNECT BOLTS 1

COLUMN 1-3 18 BOLTS l

ISI-1019, Rev. O Page 12 o f 15

4 FORM NIS-1 OWNERS' DATA REPORT FOR INSERVICE INSPECIIONS l

(As Required by the Provisions of the ASME Code Rules) 1.)

Owner NORTHERN STATES POWER LCy?ANY Address _ 414 NICOLLET MALL, MINNEAPOLIS, MINNESOTA 2.)

Plant PRAIRIE ISLAND NUCLEAR GENERATING PLANT,-UNIT II Address WELCH, MINNESOTA 3.)

Plant Unit II 4.)

Owner (Certificate of Authorization) --

5.)

Consnercial Service Date 12-21-74 6.)

National Board Number for Unit--

7.)

Components Inspected Manu facturer Compor, ant or Manu facturer or Installer State or National Appurtenance or Installer _

Serial No.

Province No.

Board No.

REACT 0.1 COOLANT PUMP NO. 22 (CONT)

TIE BACK BOLTS COLUMN 1-3 3 BOLTS TIE BACK PINS COLUMN 1-3 3 PINS THRU ANCHOR BOLTS PAD 1 6 BO L'is LATERAL SUPPORT "ALL 3OLTS PAD 2 & 3 10 BOLTS ISI-1019, Rev. O Page 13 of 15

FORM NIS-1 (back) 8.)

Examination Dates 2-23-81 to 3-23-81 9.)

Inspection Interval 12-21-74 to 12-21-84 10.) Abstract of Examinations.

Include a list of examinations and a statement concerning status of work required for current interval.

This was the last inservice inspection in the Second Period of the First Ten Year Interval. The examinations completed the required pressure retaining components and their supports of the reactor coolant and associated auxillary systems classi-fied as ASME Class 1 and Class 2,100% of the Seismic Bolting program, and 100%

of the required volumetric, surface, and visual examinations of the reactor vessel welds, studs and cladding we.s performed.

In addition, both reactor vessel outlet nozzle bore area 3 were examined for the presence of underclad cracking.

11.) Abstract of Conditions Noted.

The results of these examinations indicated that the integrity of these systems was maintained. The following is a list of all anomalies detected:

System Item ID Exam Method Type & Number of Indications PER Safety A W-1 PT 2 linear W-1A S.E.

PT 2 linear & several rounded PER Safety B W-1 PT 1 linear W-1B S.E.

PT 6 linear PER Spray W-22B PT 3 linear FW Loop A W-177 MT 4 linear A, Hanger MT 1 linear FW Loop B W-133 MT 23 linears PT 23 linears MS Loop A G, Hanger VT Loose bolt H, Hanger MT 2 linears MS Loop B 0, Hanger VT Nut not flush with base RCC Loop A RCC-A-6 PT 14 linears RVSI B, Hanger PT 6 lin1ar RTD Loop A B1, Hanger VT Hanger tilted a

S/G 21&22 Primary MT 1 bolt - 1 linear, 1 bolt-Manway Bolts dented threads

^

S/G 21&22 Secondary VT 6 bolts - dented threads Manway Bolts 21 bolts gouged S/C 21 Upper Ring VT 2 loose bolts Grinder Connec-ting Bolts l

Page 14 of 15

System Item ID Exam Method Type & Number of Indications S/G 22 Top Column VT 2 loose nuts Connecting Bolts RCP 21 Tie Back Bolts VT 1 loose nut O

RPV Loop A Outlet Noz;1e UT 22 indications Bore Region RPV Loop B Outlet Nozzle UT 83 indications Bore Region 12.) Abstract of Corrective Measures Recommended and Taken.

All anomalies, with the exception of the rounded PT indications on Pressurizer Safety Line A and the indications on the Reactor Pressure Vessel Outlet Nozzle Bore Region, were corrected. The loose nuts and bolts were tightened, and the tilted hanger was straightened. The lirear MT and PT indications were removed by light hand grinding and blending the surface smooth. The bolts with major steam goug(.s and linear indication were replaced. All indications were corre;'.ted and reexamined with the same method that located them.

The several rounded indicaticns on Pressurizer Safety Line A were accepted as is, based on Westinghouse's evaluation conducted in the January 1980 outage. The indications on the Reactor Pressure Vessei Outlet Nozzle Bore Region was also accepted as is, See section 4 for acceptance analysis.

We certify that the statements made in this report are correct and the examinations and corrective measures taken conform to the rules of he ASME Code,Section XI.

Date Afe2 M

19 F SignedM7uculOmres ff m;m d). By M / A %

Owner V

Cert.ificate of Authorization No. (if applicable)

Expiration Date CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of Mecuesel4 and employed by 64f.,1 Si. Gl..L,a.4 Ls. 0 of U,1 f., d Po e a.

have inspected the com-ponents described in this owner's Data Report during the period A. 23 9 I to 3 23 P/,

and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code,Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data Report. Furthermore, neither the inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connecting with this inspection.

Da M oco l M

19 Y I l

Commissions h t$ bi 3 2.

c.

300. b 9 Ins'pector's Signature National Board, State, Province & No.

Page 15 of 15