ML20004A975: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot change) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 16: | Line 16: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:_ | ||
S | S | ||
: w. m | |||
::. m n .c | )a | ||
FILE: NO-001 (B) | ...2 | ||
::. m n.c | |||
. r: ::-- - | |||
FILE: NO-001 (B) | |||
Washington, D.C. 20555 | SERIAL: NO-81-367 Eit. '' tamas A. Ippolito, Chief | ||
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 1 | .. / | ||
DOCKET NOS. 50-325 AND 50-324 | ' 's Cparating Reactors Branch No. 2 N. />[h' / ',f) g | ||
,,,i Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission t | |||
U b, Washington, D.C. | |||
20555 E-i | |||
: u. A ' O 6 /Sg7 A,,,, | |||
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 1 | |||
'# c$s% | |||
DOCKET NOS. 50-325 AND 50-324 g | |||
LICENSE NOS. DPR-71 AND DPR-62 xI M | |||
SECURITY TRAINING AC QUALIFICATION PLAN | |||
==Dear Mr. Ippolito:== | ==Dear Mr. Ippolito:== | ||
Your letter of March 18, 1981, requested additional informatica concerning the Security Training and Qualification Plan for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2. | |||
Your letter of March 18, 1981, requested additional informatica concerning the Security Training and Qualification Plan for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2. In response to this request, five (5) copies of Revision 1 to the Brunswick Security Training and Qualification Plan are provided as the attached. | In response to this request, five (5) copies of Revision 1 to the Brunswick Security Training and Qualification Plan are provided as the attached. | ||
Revision 1 of the Security Training and Qualification Plan contains detailed sectartty measures for the physical protection of the Brunswick Plant. This document is submitted to NRC under the provisions of Section 2.790(d) of ICCFR Part 2. | Revision 1 of the Security Training and Qualification Plan contains detailed sectartty measures for the physical protection of the Brunswick Plant. | ||
This document is submitted to NRC under the provisions of Section 2.790(d) of ICCFR Part 2. | |||
We therefore request that.his information be withheld from public disclosure in accordance with 10CFR 9.5 (a)(4). | |||
Please contact us should you have any questions regarding this information. | Please contact us should you have any questions regarding this information. | ||
Yours very trul1, | Yours very trul1, | ||
/ | |||
Power Supply and Engineering & Construction JBW:kbb* | .w f | ||
M8<9 E. E. Utley Executive Vice President Power Supply and Engineering & Construction JBW:kbb* | |||
SCO/ | SCO/ | ||
Attachments | Attachments s | ||
/ 5 g | |||
r | r 2 3.:...e 3.m 8I052700(33 | ||
~ | |||
8I052700(33 | .}} | ||
Latest revision as of 11:48, 23 December 2024
| ML20004A975 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 05/26/1981 |
| From: | Utley E CAROLINA POWER & LIGHT CO. |
| To: | Ippolito T Office of Nuclear Reactor Regulation |
| References | |
| NO-81-867, NUDOCS 8105270063 | |
| Download: ML20004A975 (1) | |
Text
_
S
- w. m
)a
...2
- . m n.c
. r: ::-- -
FILE: NO-001 (B)
SERIAL: NO-81-367 Eit. tamas A. Ippolito, Chief
.. /
' 's Cparating Reactors Branch No. 2 N. />[h' / ',f) g
,,,i Office of Nuclear Reactor Regulation United States Nuclear Regulatory Commission t
U b, Washington, D.C.
20555 E-i
- u. A ' O 6 /Sg7 A,,,,
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1 AND 2 1
'# c$s%
DOCKET NOS. 50-325 AND 50-324 g
LICENSE NOS. DPR-71 AND DPR-62 xI M
SECURITY TRAINING AC QUALIFICATION PLAN
Dear Mr. Ippolito:
Your letter of March 18, 1981, requested additional informatica concerning the Security Training and Qualification Plan for the Brunswick Steam Electric Plant, Unit Nos. 1 and 2.
In response to this request, five (5) copies of Revision 1 to the Brunswick Security Training and Qualification Plan are provided as the attached.
Revision 1 of the Security Training and Qualification Plan contains detailed sectartty measures for the physical protection of the Brunswick Plant.
This document is submitted to NRC under the provisions of Section 2.790(d) of ICCFR Part 2.
We therefore request that.his information be withheld from public disclosure in accordance with 10CFR 9.5 (a)(4).
Please contact us should you have any questions regarding this information.
Yours very trul1,
/
.w f
M8<9 E. E. Utley Executive Vice President Power Supply and Engineering & Construction JBW:kbb*
SCO/
Attachments s
/ 5 g
r 2 3.:...e 3.m 8I052700(33
~
.