ML20004E072: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 2: Line 2:
| number = ML20004E072
| number = ML20004E072
| issue date = 03/31/1981
| issue date = 03/31/1981
| title = Unit 1 Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test,Mar 1981.
| title = Unit 1 Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test,Mar 1981
| author name = Cartwright W, Stall J
| author name = Cartwright W, Stall J
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
| author affiliation = VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Line 19: Line 19:
{{#Wiki_filter:...
{{#Wiki_filter:...
O l
O l
I                 REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPE A, B, AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 1 I                           MARCH 1981 PREPARED BY:                         APPROVED BY:
I REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPE A, B, AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 1 I
i
MARCH 1981 PREPARED BY:
      %    L                                            LVl J. A. STALL, ENGINEER                 W. R.CARTWRIGid, CHAIRMAN NUCLEAR OPERATIONS                   STATION NUCLEAR SAFETY l     AND MAINTENANCE                       OPERATING COMMITTEE l
APPROVED BY:
i L
LVl R.CARTWRIGid, CHAIRMAN J. A.
STALL, ENGINEER W.
NUCLEAR OPERATIONS STATION NUCLEAR SAFETY l
AND MAINTENANCE OPERATING COMMITTEE l
l
l
{
{
l     %)o&IID/of
l
%)o&IID/of


I                                                                               ;
I l
l I
I TABLE OF CONTENTS Page_
TABLE OF CONTENTS Page_
Section ii REFERENCES.
Section ii REFERENCES.      . . . . . . . . . . . . . . . . . . . . .
1-1 PURPOSE.
1-1 PURPOSE .      . . . . . . . . . . . . . . . . . . . . . .
2-1
2-1


==SUMMARY==
==SUMMARY==
3-1 TYPE A TEST . . . . . . . . . . . . . . . . . . . . .
3-1 TYPE A TEST 3-2 GENERAL TEST DESCRIPTION.
                                      . . . . . . . . . . . . . .          3-2 GENERAL TEST DESCRIPTION.
3-2 Prerequisites.
3-2 Prerequisites. . . . . . . . . .      .  . .  .  . .  .  .  . 3-2 Equipment and Instrumentation. .        . .  . .  .  . .  .  .
3-2 Equipment and Instrumentation.
I       Data Acquisition System. . . . .
3-3 I
Data Resolution System . . . . .
Data Acquisition System.
3-3 3-3 3-4 TEST ANALYSIS . . . . . . . . . . . . . . . . . . . .
3-3 Data Resolution System.
3-5 TEST RESULTS. . . . . . . . . . . . . . . . . . . . .
3-4 TEST ANALYSIS.
I         OILRT Results. . . . . . . . . . . . . . . . . . .
3-5 TEST RESULTS.
Verification Test Results.      . . . . . . . . . . . .
I 3-5 OILRT Results.
3-5 3-6 Type B and C Penetration Leakage To Be                         3-6 I         Added to Containment Calculated Leakage.          . . . . .
3-6 Verification Test Results.
Appendices 3A  
Type B and C Penetration Leakage To Be 3-6 I
Added to Containment Calculated Leakage.
Appendices 3A


==SUMMARY==
==SUMMARY==
OF PRETEST AND POST-TEST CALIBRATION                 3A-1 CHECKS ON RTT'' S AND DEW CELLS . . . . . . . . . .
OF PRETEST AND POST-TEST CALIBRATION 3A-1 CHECKS ON RTT'' S AND DEW CELLS 3B-1 3B SITE METEOROLOGY DURING CILRT 3C-1 3C INSTRUMENTATION TABLE 3D-1 3D INSTRUMENTATION LOCATIONS 3E-1 3E CONTAINMENT INPUT VARIABLES 3F-1 3F LEAK RATE DATA - ABSOLUTE METHOD.
                                                . . . . . . . . . .        3B-1 3B   SITE METEOROLOGY DURING CILRT 3C-1 3C   INSTRUMENTATION TABLE . . . . . . . . . . . . . .
3G-1 3G CONTAINMENT MASS VS. TIME 3e-1 3N tEAx RATE vS TIME.
3D-1 3D   INSTRUMENTATION LOCATIONS . . . . . . . . . . . .
g 4A-1 4A 1979 AND 1981 TYPE B DATA  
3E-1 3E CONTAINMENT INPUT VARIABLES . . . . . . . . . . .
                                                      . . . . . . . .      3F-1 3F   LEAK RATE DATA - ABSOLUTE METHOD.
                                            , . . . . . . . . . . .        3G-1 3G CONTAINMENT MASS VS. TIME 3e-1 3N   tEAx RATE vS TIME . . . . . . . . . . . . . . . .
g                                                                         4A-1 4A   1979 AND 1981 TYPE B DATA  


==SUMMARY==
==SUMMARY==
                                                          . . . . . . .      4B-1 4B     1979 AND 1981 TYPE C DATA  
4B-1 4B 1979 AND 1981 TYPE C DATA  


==SUMMARY==
==SUMMARY==
i
i
[   -
[


I I
I I
REFERENCES 1   10CFR50 Appendix J, Primary Reactor Containment Leakage Testing For Water Cooled Power Reactors, April 1976 2   ANS N274, Containment System Leakage Testing Requirements, Draft 3, July 1979 3   1-PT-61.1, Reactor Containment Building Integrated Leak Rate Test, February 25, 1981 I
REFERENCES 1
10CFR50 Appendix J, Primary Reactor Containment Leakage Testing For Water Cooled Power Reactors, April 1976 2
ANS N274, Containment System Leakage Testing Requirements, I
Draft 3, July 1979 3
1-PT-61.1, Reactor Containment Building Integrated Leak Rate Test, February 25, 1981 I
I I
I I
I I
I I
Line 71: Line 78:
ii
ii


I I                      SECTION 1 PURPOSE I The purpose of this report is to present a description and analysis of the Surveillance Types A, B, and C Containment Leak Rate Tests (CILRT) results conducted on the Virginia Electric and Power Company's North Anna Power Station, Unit No. 1.
I This report is submitted as required by 10CFR50, Appendix J, paragraph V.B. (Reference 1).
I I
I I
SECTION 1 PURPOSE I
The purpose of this report is to present a description and analysis of the Surveillance Types A, B, and C Containment Leak Rate Tests (CILRT) results conducted on the Virginia Electric and Power Company's North Anna Power Station, Unit I
No. 1.
This report is submitted as required by 10CFR50, Appendix J, paragraph V.B.
(Reference 1).
I I
I I
I I
I I
Line 79: Line 89:
I I
I I
I I
I I
g                           1-1
I I
g 1-1


I I
I I
Line 85: Line 96:


==SUMMARY==
==SUMMARY==
 
2.1 TYPE A TEST The North Anna Unit 1 Containment Integrated Leak Rate Test I
2.1 TYPE A TEST The North Anna Unit 1 Containment Integrated Leak Rate Test (CILRT) was performed from March 9-11, 1981. The following is I a summary of activities prior to and during the performance of the test.
(CILRT) was performed from March 9-11, 1981.
Pressurization for the Type A test was initiated at approximately 0400 hours on March 9, 1981, after satisfactory completion of all test prerequisites, including walkdown of the interior and exterior of the containment building. After several problems I related to removal of H bus for maintenance were encountered and resolved (see Section 3), containment pressurization to 58.3 psia was achieved at approximately 1630 hours March 9, 1981.
The following is a summary of activities prior to and during the performance of the test.
At 0200 hours on March 10, 1981, containment temperature stabili-zation criteria were met and the 24 hour leak rate test was I officially started. After approximately 2.5 hours of data collec-tion, the overall leak rate had dropped to 0.66 La and continued to decrease until the twenty-fourth hour at which time it was less than 0.17 La.
Pressurization for the Type A test was initiated at approximately 0400 hours on March 9, 1981, after satisfactory completion of all test prerequisites, including walkdown of the interior and I
At 0400 hours on March 11, 1981, the mass pumpback verification test commenced. At 0515 hours approximately 394 lbm of air had I been pumped into the containment via the service air line. The computer calculated mass increase was within the acceptable limit and the test was secured. At approximately 0900 containment depressurization was initiated.
exterior of the containment building.
2.2 LOCAL LEAK RATE TESTS (TYPES B AND C)
After several problems related to removal of H bus for maintenance were encountered and resolved (see Section 3), containment pressurization to 58.3 psia was achieved at approximately 1630 hours March 9, 1981.
The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures. The penetrations tested and their associated leak rates are listed in Section 4 of this report.
At 0200 hours on March 10, 1981, containment temperature stabili-zation criteria were met and the 24 hour leak rate test was I
officially started.
After approximately 2.5 hours of data collec-tion, the overall leak rate had dropped to 0.66 La and continued to decrease until the twenty-fourth hour at which time it was less than 0.17 La.
At 0400 hours on March 11, 1981, the mass pumpback verification test commenced.
At 0515 hours approximately 394 lbm of air had I
been pumped into the containment via the service air line.
The computer calculated mass increase was within the acceptable limit and the test was secured.
At approximately 0900 containment depressurization was initiated.
2.2 LOCAL LEAK RATE TESTS (TYPES B AND C)
The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures.
The penetrations tested and their associated leak rates are listed in Section 4 of this report.
I I
I I
I I
I I
Line 98: Line 119:
I I
I I
SECTION 3 TYPE A TEST
SECTION 3 TYPE A TEST
~I 3.1   EDITED LOG OF EVENTS March 9, 1981 After all procedure initial conditions had been satisfied, the North Anna Unit Number 1 Containment Integrated Leak Rate I Test (CILRT) 1-PT-61.1 began at approximately 0400 hours.
~I 3.1 EDITED LOG OF EVENTS March 9, 1981 After all procedure initial conditions had been satisfied, the I
Containment pressurization was accomplished with approximately 10,000 SCFM tf oil free air. Containment atmosphere was centrolled with containment recirculation air fans operating I with chilled water.
North Anna Unit Number 1 Containment Integrated Leak Rate Test (CILRT) 1-PT-61.1 began at approximately 0400 hours.
At 0905 hours pressurization of the containment was halted I when H bus was deenergized for maintenance. When H bus was deenergized, power to rad monitors RMS 159, 160, and 162 was lost. This caused the monitors to alarm, which led to I closure of MOV-HV102 and MOV-HV100A. These valves are located in the purge and exhaust line which was the line that was used for pressurization. Containment pressure at this time was 38 psia.
Containment pressurization was accomplished with approximately 10,000 SCFM tf oil free air.
Containment atmosphere was I
centrolled with containment recirculation air fans operating with chilled water.
I At 0905 hours pressurization of the containment was halted when H bus was deenergized for maintenance.
When H bus was deenergized, power to rad monitors RMS 159, 160, and 162 was lost.
This caused the monitors to alarm, which led to I
closure of MOV-HV102 and MOV-HV100A.
These valves are located in the purge and exhaust line which was the line that was used for pressurization.
Containment pressure at this time was 38 psia.
Containment pressurization was reinitiated at 1224 hours.
Containment pressurization was reinitiated at 1224 hours.
I Pressurization continued until 1630 hours, at which time all compressors were secured. The pressure at this time was 58.3 psia.
Pressurization continued until 1630 hours, at which time all I
At 1724 containment recirculation air fan 1-HV-F-1A tripped 8 due to deenergizing H bus once again. An approved jumper was prepared to power 1-HV-F-1A from the J bus. At 2032 hours all I three (3) containment recirculation air fans were once again operable.
compressors were secured.
At 2215 hours, 1-HV-F-lA once again tripped, this time due to I an overload on the feeder breaker used in the temporary jumper written to power 1-HV-F-1A from the J bus.
The pressure at this time was 58.3 psia.
'E At this time it was decided to perform the type A test with 5 only two (2) operable containment recirculation air fans.
8 At 1724 containment recirculation air fan 1-HV-F-1A tripped due to deenergizing H bus once again.
An approved jumper was prepared to power 1-HV-F-1A from the J bus.
At 2032 hours all I
three (3) containment recirculation air fans were once again operable.
At 2215 hours, 1-HV-F-lA once again tripped, this time due to I
an overload on the feeder breaker used in the temporary jumper written to power 1-HV-F-1A from the J bus.
'E At this time it was decided to perform the type A test with 5
only two (2) operable containment recirculation air fans.
March 10, 1981 Containment temperature stabilization criteria were met at 0200 hours on March 10, 1981.
March 10, 1981 Containment temperature stabilization criteria were met at 0200 hours on March 10, 1981.
After approximately 2.5 hours of data collection, the overall leak rate had dropped to 0.66 La and continued to decrease until the twenty-fourth hour, at which time it was less than I .17 La.
After approximately 2.5 hours of data collection, the overall leak rate had dropped to 0.66 La and continued to decrease until the twenty-fourth hour, at which time it was less than I
.17 La.
3-1
3-1


I I
I I
March 11, 1981 At 0400 hours on March 11 the mass pumpback verification test       .
March 11, 1981 At 0400 hours on March 11 the mass pumpback verification test commenced.
commenced. At 0515 hours, approximately 394 lbm of air had           !
At 0515 hours, approximately 394 lbm of air had I
been pumped into the containment via the service air line. The computer calculated mass increase was within the acceptable limit and the test was secured. At approximately 0900 hours containment depressurization was started.
been pumped into the containment via the service air line.
3.2   GENERAL TEST DESCRIPTION 3.2.1   Prerequisites In accordance with the North Anna Unit No. 1 CILRT l-PT-61.1, t , the following is a partial listing of prerequisites that are completed and documented prior to containment pressurization.
The computer calculated mass increase was within the acceptable limit and the test was secured.
: 1. General inspection of the accessible interior and I             exterior surfaces of the containment structure was performed.
At approximately 0900 hours containment depressurization was started.
I         2. All equipment and instrumentation that could be da.maged or destroyed by test pressure was removed or vented.
3.2 GENERAL TEST DESCRIPTION 3.2.1 Prerequisites In accordance with the North Anna Unit No. 1 CILRT l-PT-61.1, t
: 3. All instrumentation used for this test was calibrated.
the following is a partial listing of prerequisites that are completed and documented prior to containment pressurization.
: 4. Valve line-ups, as required, were completed including closure of the containment isolation valves.
1.
: 5. Componen* cooling and chilled water systems were operable.
General inspection of the accessible interior and I
: 6. Plant computers w3re operational and programmed for the CILRT.
exterior surfaces of the containment structure was performed.
: 7. Instrument location verification tests were completed (see Appendix 3D).
I 2.
: 8. The Official Log of Events book was established and available prior to initiation of the CILRT.
All equipment and instrumentation that could be da.maged or destroyed by test pressure was removed or vented.
3.2.2   Equipment and Instrumentation Pressul-ization of the containment was achieved by utilization I   of approximately 10,000 SCFM of oil free compressed air. Air was piped through two (2) aftercoolers in parallel and a refrig-erated air dryer. The dryer was sized to deliver air at approxi-I   mately 100 psig with a 40* dew point. Instrumentation and valving were installed to maintain proper monitoring and control during pressurization.
3.
All instrumentation used for this test was calibrated.
4.
Valve line-ups, as required, were completed including closure of the containment isolation valves.
5.
Componen* cooling and chilled water systems were operable.
6.
Plant computers w3re operational and programmed for the CILRT.
7.
Instrument location verification tests were completed (see Appendix 3D).
8.
The Official Log of Events book was established and available prior to initiation of the CILRT.
3.2.2 Equipment and Instrumentation Pressul-ization of the containment was achieved by utilization I
of approximately 10,000 SCFM of oil free compressed air.
Air was piped through two (2) aftercoolers in parallel and a refrig-erated air dryer.
The dryer was sized to deliver air at approxi-I mately 100 psig with a 40* dew point.
Instrumentation and valving were installed to maintain proper monitoring and control during pressurization.
I 3-2
I 3-2


I.
I.
During the test, the variables necessary to quantify containment leakage were continually monitored using instrumentation which consisted of multiple resistance temperature detectors (RTD'S),
During the test, the variables necessary to quantify containment leakage were continually monitored using instrumentation which consisted of multiple resistance temperature detectors (RTD'S),
Foxboro dew cells, and two absolute pressure quartz manometers (see Appendix 3C).
5 Foxboro dew cells, and two absolute pressure quartz manometers (see Appendix 3C).
A gas totalizer in the service air system was used during the mass pumpback verification test. All test instrumentation except for the gas totaliser is input into the plant computer for data acquisition and averaging.
A gas totalizer in the service air system was used during the I
3.2.3   Data Acquisition System The North Anna Unit 1 CILRT utilized a Westinghouse Prodac P250 to scan, log, and average, and analyze data received from the I. containment instrumentation.
mass pumpback verification test.
I The p250 analog scan package reads all analog inputs in a pre-established manner, converts these readings into engineering units, and then stores these values for use by the plant engineers.
All test instrumentation except for the gas totaliser is input into the plant computer for data acquisition and averaging.
3.2.3 Data Acquisition System The North Anna Unit 1 CILRT utilized a Westinghouse Prodac P250 I.
to scan, log, and average, and analyze data received from the containment instrumentation.
I The p250 analog scan package reads all analog inputs in a pre-established manner, converts these readings into engineering units, and then stores these values for use by the plant engineers.
For the CILRT, the P250 plant computer monitored the following instrumentation:
For the CILRT, the P250 plant computer monitored the following instrumentation:
Tyge                 Scan Rate (Sec.)
Tyge Scan Rate (Sec.)
18 RTD's                     20 5 Dew Cells                   20 2 Quartz Manometers           2 Instantaneous values of the CILRT instruments were recorded every 5 minutes during the test period using the P250 digital trend function on the operatcr's console.
18 RTD's 20 5 Dew Cells 20 2 Quartz Manometers 2
A 10 minute time average of the 25 readings, calculated by the I p250 Average and Integrate (A&I) package, was used as input in the plant computer CILRT programs.
Instantaneous values of the CILRT instruments were recorded I
I The plant computer CILRT program consists of ILRTDATA, which runs ev_ry 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature, vapor pressure, weighted average contain-I ment temperature, and containment air mass.
every 5 minutes during the test period using the P250 digital trend function on the operatcr's console.
3.2.4   Data Resolution System After the appropriate data has been acquired and averaged utilizing the plant computer system, the results are manually input to a remote computer system for leak rate calculations.
A 10 minute time average of the 25 readings, calculated by the I
i I
p250 Average and Integrate (A&I) package, was used as input in the plant computer CILRT programs.
I I                              3-3
I The plant computer CILRT program consists of ILRTDATA, which runs ev_ry 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature, vapor pressure, weighted average contain-I ment temperature, and containment air mass.
3.2.4 Data Resolution System After the appropriate data has been acquired and averaged utilizing the plant computer system, the results are manually input to a remote computer system for leak rate calculations.
I i I I
3-3


I I
I I
I 3.2.4.1   Absolute Method Mass Point Analysis The absolute method of mass point analysis consists of calculating I air masses within the containment structure over a period of time from pressure, temperature, and dew point observations during the CILRT. The air masses are computed using the ideal gas law as follows:
I 3.2.4.1 Absolute Method Mass Point Analysis The absolute method of mass point analysis consists of calculating I
M=   (P-Pv)   V (144)         (Eq. 1)
air masses within the containment structure over a period of time from pressure, temperature, and dew point observations during the CILRT.
The air masses are computed using the ideal gas law as follows:
M=
(P-Pv)
V (144)
(Eq. 1)
RT where:
RT where:
M = air mass, lb P = total pressure, psia Pv = average vapor pressure, psia I                       R = 53.35 ft lbf/lbm *R   (for air)
M = air mass, lb P = total pressure, psia Pv = average vapor pressure, psia I
T = average containment temperature, 'R V = containment free volume, ft3 The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A (dm/dt) . The leak rate is expressed as a percentage of air mass lost in 24 hours or:
R = 53.35 ft lbf/lbm *R (for air)
Leak Rate = A/B (-2400)         (Eq. 2) where:
T = average containment temperature, 'R V = containment free volume, ft3 The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A (dm/dt).
A = slope of least squares fit curve I                      B = y-intercept I The sign convention is such that an outward leak is positive and the units are in percent / day. The air mass is computed separately and the result is correlated as a function of time by means of a Icest-squares fit of the form:
The leak rate is expressed as a percentage of air mass lost in 24 hours or:
I                         m = At + B                       (Eq. 3) l I The slope A and the y intercept B are then used in Equation 2 to determine the leak rate.
Leak Rate = A/B (-2400)
(Eq. 2) where:
I A = slope of least squares fit curve B = y-intercept The sign convention is such that an outward leak is positive and I
the units are in percent / day.
The air mass is computed separately and the result is correlated as a function of time by means of Icest-squares fit of the form:
a I
m = At + B (Eq. 3) l The slope A and the y intercept B are then used in Equation 2 to I
determine the leak rate.
A 95 percent confidence interval is calculated using a student's T distribution.
A 95 percent confidence interval is calculated using a student's T distribution.
The sum of leakage rate and the 95 percent confidence interval is I the t'CL. Therefore, the leak rate is less than the UCL with a probability of 95 percent.
The sum of leakage rate and the 95 percent confidence interval is I
the t'CL.
Therefore, the leak rate is less than the UCL with a probability of 95 percent.
lI
lI
'I   .,_      _    _
'I 3-4
3-4


I                                                                         !
I I
I 3.3   TEST ANALYSIS The data obtained from the data acquisition system for the period from 0200 hours March 10, 1981 to 0200 hours March 11, 1981, were utilized for the test analysis. The interval between approximately 1630 hours March 9, 1981 to 0200 hours March 10, 1981 represents the containment stabilization period.
3.3 TEST ANALYSIS The data obtained from the data acquisition system for the period I
The leakage rate analysis is performed by Virginia Electric and Power Company's (VEPCO) CILRT program. The input data for the VEPCO CILRT program are shown in Appendix 3E.
from 0200 hours March 10, 1981 to 0200 hours March 11, 1981, were utilized for the test analysis.
The absolute method mass point analysis was used to calculate the containment building leakage rate. The results (Appendix 3F) show I   the UCL to be 0.01656 percent / day, which is within the acceptable limit of 0.07/ day (0.075 less t1:e Type C penalty for valves on systems not vented to the contai. ment) .
The interval between approximately 1630 hours March 9, 1981 to 0200 hours March 10, 1981 represents the containment stabilization period.
The leakage rate analysis is performed by Virginia Electric and Power Company's (VEPCO) CILRT program.
The input data for the VEPCO CILRT program are shown in Appendix 3E.
The absolute method mass point analysis was used to calculate the containment building leakage rate.
The results (Appendix 3F) show I
the UCL to be 0.01656 percent / day, which is within the acceptable limit of 0.07/ day (0.075 less t1:e Type C penalty for valves on systems not vented to the contai. ment).
W' The following appendixes summarize ti.3 plots provided by this report:
W' The following appendixes summarize ti.3 plots provided by this report:
I       Appendix                       Description _
I Appendix Description _
3G         Containment air mass vs. time 3H         Containment leakage rate vs. time The leakage rate test calculations were verified by the mass pump back method. Approximately 4813 ft3 was inserted during approxi-mately 1 hour of elapsed time. The computer calculated-air mass I was within 0.25 La of the metered value (refer to Section 3.4.2).
3G Containment air mass vs. time 3H Containment leakage rate vs. time The leakage rate test calculations were verified by the mass pump back method.
3.4   TEST RESULTS 3.4.1 CILRT Results - Mass Point Method
Approximately 4813 ft3 was inserted during approxi-mately 1 hour of elapsed time.
: 1. Leakage rate calculated, Lam           .0126 percent / day
The computer calculated-air mass I
: 2. 95% upper confidence interval           .00394 percent / day I       3. UCL, Lam leakage rate with 95%
was within 0.25 La of the metered value (refer to Section 3.4.2).
confidence interval (1 + 2)             .0165 percent / day f~)     4. Correction for types B and C h           leakage                                 .005 percent / day
3.4 TEST RESULTS 3.4.1 CILRT Results - Mass Point Method 1.
: 5. Total reportable type A leak I             rate                                   .0215 percent / day
Leakage rate calculated, Lam
-I                               3-5
.0126 percent / day 2.
95% upper confidence interval
.00394 percent / day I
3.
UCL, Lam leakage rate with 95%
confidence interval (1 + 2)
.0165 percent / day f~)
4.
Correction for types B and C h
leakage
.005 percent / day 5.
Total reportable type A leak I
rate
.0215 percent / day
- I 3-5


I I
I I
3.4.2   Verification Test Results
3.4.2 Verification Test Results 1.
: 1. Metered mass of air inserted             393.75 lbm         !
Metered mass of air inserted 393.75 lbm 2.
: 2. Difference between initial computer air mass and final computer air mass                         274.10 lbm
Difference between initial computer air mass and final computer air mass 274.10 lbm 3.
: 3. 0.25 I 2 verification limit               138.69 lbm I             4. Difference between computer air mass difference and metered air (1-2) 119.65 lbm Therefore, the calculated CILRT air mass increase agreed with the mass pump back verification instrumentation within 0.25 La in accordance with 10CFR50, Appendix J.
0.25 I 2 verification limit 138.69 lbm I
3.4.3 Types B and C Penetration Leakage To Be Added to the Containment Calculated Leakage Penetration         Leakage             Penetration           Leakage No.               (SCFH)             No.               (SCFH) 1                           0       56A                   0 2                           0       56B                   0 4                           0       56D                   0 5                           0       57A                   0 I                7                         0.1       60                   0 8                           0       61                   0 62 I                9 10 11 0
4.
0 0
Difference between computer 119.65 lbm air mass difference and metered air (1-2)
63 64 0
Therefore, the calculated CILRT air mass increase agreed with the mass pump back verification instrumentation within 0.25 La in accordance with 10CFR50, Appendix J.
0 0
3.4.3 Types B and C Penetration Leakage To Be Added to the Containment Calculated Leakage Penetration Leakage Penetration Leakage No.
12                         0         70                   1.2 I               13 14 15 0
(SCFH)
0 1.5 71 79 80 1.3 1.19 0
No.
I                16 17 18 0
(SCFH) 1 0
0 0
56A 0
91 82 83 0.04 3.6 0.5 19                         0         84                   0.03 lI                22 24 25 0
2 0
0 0
56B 0
85 86 97A 0
4 0
0.5 0
56D 0
26                         0.6       97C                   0 1I                 27 28 0         105A 105B 0
I 5
0 f                                             4.0 m               39                         0         105C                   0.26 40                         0.25     113                   0 l
0 57A 0
E                41                         0         114                   0.85 l                 46                         0         32                   0 SSB                       0         34                   0.6 l
7 0.1 60 0
lt
8 0
61 0
9 0
62 0
I 10 0
63 0
11 0
64 0
12 0
70 1.2 I
13 0
71 1.3 14 0
79 1.19 15 1.5 80 0
16 0
91 0.04 I
17 0
82 3.6 18 0
83 0.5 lI 19 0
84 0.03 22 0
85 0
24 0
86 0.5 25 0
97A 0
26 0.6 97C 0
1I 27 0
105A 0
f 28 4.0 105B 0
m 39 0
105C 0.26 E
40 0.25 113 0
l 41 0
114 0.85 l
46 0
32 0
SSB 0
34 0.6 l
lt 3-6
(
(
3-6


I I
I I
I                 Penetration       leakage No.             (SCFH) 100               0 lilD               0 108               0 Total Type C leakage to be added     15.52 SCFH Total Type B leakage to be added       0   SCFH Total Types B and C leakage to be     15.52 SCFH added 0.005 percent / day i                 NOTE:   The above penetrations were in a non-vented valve lineup for the CILRT.
I Penetration leakage No.
(SCFH) 100 0
lilD 0
108 0
Total Type C leakage to be added 15.52 SCFH Total Type B leakage to be added 0
SCFH Total Types B and C leakage to be 15.52 SCFH added 0.005 percent / day i
NOTE:
The above penetrations were in a non-vented valve lineup for the CILRT.
I I
I I
I I
I I
Line 202: Line 335:
I 3-7 I
I 3-7 I


I APPENDIX 3A SUMMIRY OF PRETEST AND POST-TEST CALIBRATION CHECKS ON RTD'S AND DEW CELLS
I APPENDIX 3A SUMMIRY OF PRETEST AND POST-TEST CALIBRATION CHECKS ON RTD'S AND DEW CELLS 1.
: 1. Test No. 1 (Pre-Test)
Test No. 1 (Pre-Test) a.
: a. The temperature difference between each RTD computer point and a calibrated digital thermometer inserted I          into a beaker of ice water and a beaker of approxi-mately 100-110* F water was less than 1* F.
The temperature difference between each RTD computer I
NOTE: Acceptance Criteria The temperature difference between each RTD and a cali-I           brated reference thermometer was less than or equal to 1 F.
point and a calibrated digital thermometer inserted into a beaker of ice water and a beaker of approxi-mately 100-110* F water was less than 1* F.
: b. The weighted average dew point temperature as deter-I           mined by a calibrated psychrometer agreed with the weighted average dew point temperature as determined by the dew cells within 5 F.
NOTE:
NOTE: Acceptance Criteria The weighted average dew point temperature by the I           psychrometer is within + 5 F of the weighted dew point average temperature by dew cells.
Acceptance Criteria The temperature difference between each RTD and a cali-I brated reference thermometer was less than or equal to 1
: 2. Test No. 2 (Post-Test)
F.
: a. The temperature difference between each readily acces-iI           sible RTD (computer point) and a calibrated digital thermometer inserted into a beaker of ambient water was less than 1* F.
b.
NOTE: Acceptance Criteria l             The temperature difference between each RTD checked
The weighted average dew point temperature as deter-I mined by a calibrated psychrometer agreed with the weighted average dew point temperature as determined by the dew cells within 5 F.
'g           and a calibrated reference thermometer was less than
NOTE:
!5           cr equal to 1 F.
Acceptance Criteria The weighted average dew point temperature by the I
lg       b. The weighted average dew point temperature as determined E           by a ca11brated psychrometer agreed with the average dew point temperature as determined by the dew cells within 5* F.
psychrometer is within + 5 F of the weighted dew point average temperature by dew cells.
NOTE: Acceptance Crite?:ia The weighted average dew point temperature by the psychro-
2.
'I           meter is within + 5' F of the weighted dew point average temperature by TIE. dew cells.
Test No. 2 (Post-Test) a.
The temperature difference between each readily acces-iI sible RTD (computer point) and a calibrated digital thermometer inserted into a beaker of ambient water was less than 1* F.
NOTE:
Acceptance Criteria l
The temperature difference between each RTD checked
' g and a calibrated reference thermometer was less than
!5 cr equal to 1 F.
lg b.
The weighted average dew point temperature as determined E
by a ca11brated psychrometer agreed with the average dew point temperature as determined by the dew cells within 5* F.
NOTE:
Acceptance Crite?:ia The weighted average dew point temperature by the psychro-
'I meter is within + 5' F of the weighted dew point average temperature by TIE. dew cells.
lI 1
lI 1
3A-1
3A-1


APPENDIX 3B SITE METEOROLOGY DURING THE CILRT I                                         BAROMETRIC WIND SPEED TIME       TEMP *F               PRESSURE     (MPH)             WIND DIRECTION 0000         33                   30.25       3                   270*
APPENDIX 3B SITE METEOROLOGY DURING THE CILRT I
0100         32                   30.24       3                   270 I         0200 0300 3400 30 31 30 30.24 30.23 30.23 3
BAROMETRIC WIND SPEED TIME TEMP *F PRESSURE (MPH)
3 4
WIND DIRECTION 0000 33 30.25 3
270*
0100 32 30.24 3
270 I
0200 30 30.24 3
270*
0300 31 30.23 3
270*
3400 30 30.23 4
270*
270*
0500 32 30.23 4
270 I
0600 32 30.23 6
270*
270*
0700 38 30.24 2
320*
0800 45 30.22 7
270*
270*
0500        32                    30.23                            270 I
I 0900 48 30.22 5
4 0600        32                    30.23        6                    270*
260 1000 48 30.21 5
0700        38                    30.24        2                    320*
260*
0800        45                    30.22        7                    270*
1100 49 30.20 9
I          0900 1000 1100 48 48 49 30.22 30.21 30.20 5
250' 1200 49 30.17 8
5 9
280*
260 260*
I 1300 50 30.16 8
250' 1200         49                   30.17       8                   280*
320*
I         1300         50                   30.16       8                   320*
1400 50 30.16 12 270*
1400         50                   30.16       12                   270*
1500 48 30.17 19 300 I
1500         48                   30.17       19                   300 I         1600 1700 1800 48 44 41 30.18 30.19 30.17 13 5
1600 48 30.18 13 310*.
4 310*.
1700 44 30.19 5
270*
270*
1800 41 30.17 4
260*
260*
l           1900         38                   30.18       13                   270*
l 1900 38 30.18 13 270*
l           2000         37                   30.18       8                   270 2100         37                   30.18       5                   180 l           2200         35                   30.18       2                   120 2300         33                   30.16       6                   120*
l 2000 37 30.18 8
l           2400         32                   30.14       6                   270*
270 2100 37 30.18 5
180 l
2200 35 30.18 2
120 2300 33 30.16 6
120*
l 2400 32 30.14 6
270*
l lI I
l lI I
lI
lI
'I I
'I I
I 3B-1 l   ._ _ , .      _ _ .        _ _ _ _ _ _ _        __ _    _ _  _ ._ _ _ _          _    _
!I 3B-1 l


I I
I I
APPENDIX 3C                       ,
APPENDIX 3C INSTRUMENTATION TABLE The following instrumentation was calibrated, and functionally tested, no greater than 6 months prior to performance of the CILRT in accordance with 10CFR50, Appendix J, and Field Cali-I bration Procedures using instrumentation traceable to the National Bureau of Standards.
INSTRUMENTATION TABLE The following instrumentation was calibrated, and functionally tested, no greater than 6 months prior to performance of the CILRT in accordance with 10CFR50, Appendix J, and Field Cali-I bration Procedures using instrumentation traceable to the National Bureau of Standards.
Instrument Range Accuracy TE-LM-100-3 0-200*F
Instrument         Range       Accuracy TE-LM-100-3       0-200*F       + 0.5*F I           TE-LM-100-4 TE-LM-100-5 TE-U1-100-6 0-200*F 0-200*F 0-20G*F I 0.5*F T 0.5*F T 0.5*F T 0.5*F I           TE-LM-100-7 TE-LM-100-8 TE-LM-100-9 0-200*F 0-200*F 0-200 F T 0.5*F T 0.5*F TE-LM-100-10     0-200*F       T 0.5 F I           TE-LM-100-ll     0-200 F       T 0.5 F TE-LM-100-12     0-200 F       T 0.5 F TE-LM-100-13     0-200*F       I 0.5 F I          TE-LM-100-14 TE-LM-100-15 TL-2-100-16 0-200*F 0-200 F 0-200 F T 0.5*F I 0.5 F T 0.5 F TE-LM-100-17     0-200*F       T 0.5 F I           TE-LM-100-18 TE-LM-10 0-19 0-200 F 0-200 F T 0.5 F T 0.5 F TE-LM-100-20     0-200*F       T 0.5 F I           MT-LM-100-1 MT-LM-100-2 MT-LM-10 0-4 32-110*F 32-110*F 32-110*F I 1 to 2 F I 1 to 2 F T 1 to 2 F MT-LM-100-5       32-110*F       ~ 1 to 2*F I           MT-U1-100-6 PI-LM-102 32-110*F 0-100    psia r  1 to 2*F T 0.01%
+ 0.5*F I
PI-LM-107       0-100   psia   T 0.01%
TE-LM-100-4 0-200*F I 0.5*F TE-LM-100-5 0-200*F T 0.5*F TE-U1-100-6 0-20G*F T 0.5*F TE-LM-100-7 0-200*F T 0.5*F I
I           FIT-LM-100-1 FIT-LM-100-2 0-100 0-100 scfm scfm T 2% of range
TE-LM-100-8 0-200*F T 0.5*F TE-LM-100-9 0-200 F T 0.5*F TE-LM-100-10 0-200*F T 0.5 F I
TE-LM-100-ll 0-200 F T 0.5 F TE-LM-100-12 0-200 F T 0.5 F TE-LM-100-13 0-200*F I 0.5 F TE-LM-100-14 0-200*F T 0.5*F I
TE-LM-100-15 0-200 F I 0.5 F TL-2-100-16 0-200 F T 0.5 F TE-LM-100-17 0-200*F T 0.5 F I
TE-LM-100-18 0-200 F T 0.5 F TE-LM-10 0-19 0-200 F T 0.5 F TE-LM-100-20 0-200*F T 0.5 F I
MT-LM-100-1 32-110*F I 1 to 2 F MT-LM-100-2 32-110*F I 1 to 2 F MT-LM-10 0-4 32-110*F T 1 to 2 F MT-LM-100-5 32-110*F
~ 1 to 2*F I
MT-U1-100-6 32-110*F 1 to 2*F r
PI-LM-102 0-100 psia T 0.01%
PI-LM-107 0-100 psia T 0.01%
I FIT-LM-100-1 0-100 scfm T 2% of range FIT-LM-100-2 0-100 scfm
[ 2% of range I
[ 2% of range I
I I
I I
I 3C-1
I 3C-1


APPEtiDIX 3D INSTRUMENTATION LOCATION       ,
APPEtiDIX 3D INSTRUMENTATION LOCATION I
I M         N l              TE-8 TE-7             MT-1
l M
                                        \
N TE-7 MT-1 TE-8
  !                                                            TE-12 TE-13 TE-11 TE-19 TE-4
\\
          \
TE-12 TE-13 TE-11 TE-19\\
          \]                                                                   _TE-15
TE-4 \\]
  !  TE-3 TE-16 s MT-5            s                                                   TE-6 p
_TE-15 TE-3 TE-16 s s TE-6 MT-5 p
                                    ,-      o          F g
F g
I r   o               &          9     %
o
i! Tg_17      I       /             / /             \
!I r
                                                            \     l I
o 9
6(3/         TE-18                     TE-20 TE-14 I
i!
I lI                         -
I
3oe
/
/ /
\\
\\
l Tg_17 6(3/
I TE-18 TE-20 TE-14 I
I lI 3oe


I I                 ~
I I
~
INSTRUMENTATION LOCATION I
INSTRUMENTATION LOCATION I
                            -TE-4 MT-2   TE-15 TE-3 TE-8 TE-16 I
-TE-4 MT-2 TE-15 TE-3 TE-8 TE-16 I
MT-5 TE-5 TE-18 TE-13     3 ,
MT-5 TE-5 TE-18 TE-13 3
N i \
N i
\\
TE-14 3
TE-14 3
i l
I
I            \
\\
TE-20 TE-ll TT-1 I u-7       m 'o                          \
l i
MT-1 e\   \             TE-6 l                    MTP-3 TE-19 TE-17
TE-20 TE-ll TT-1 I
m 'o
\\
u-7 e\\
l MT-1
\\
TE-6 MTP-3 TE-19 TE-17
:I MT-4 TE-12 l
:I MT-4 TE-12 l
I
, I
!I                                             >-
!I


8 I
8 I
APPENDIX 3E VEPCO NORTH ANNA POWER STATION UNIT 1 INTEGRATED LEAK RATE TEST FROM 0206 HOURS ON 3/10/81 TO 0208 HOURS ON'3/11/81 68 DATA SETS ARE IN ABS PRESSURE     DEWPOINT   VAPOR PRESSURE TEMP TIME       PSIA           'F             PSIA       'F 0.0       57.944           54.25         0.2081     530.06 0.0350   57.939           54.39         0.2092     530.03 0.700     57.934           54.22         0.2079     529.98 I                                                 1.050 1.417 1.767 57.929 57.927 57.923 54.26 54.38 54.33 0.2082 0.2091 0.2088 529.96 529.92 529.89 57.920           54.24 I                                                 2.117 2.483 2.833 57.916 57.913 54.32 54.41 0.2081 0.2087 0.2094 529.84 529.80 529.78 3.200     57.910           54.41         0.2094     529.75 I                                                 3.550 3.900 4.250 57.906 57.904 57.901 54.56 54.43 54.45 0.2105 0.2095 0.2097 529.72 529.72 529.66
APPENDIX 3E VEPCO NORTH ANNA POWER STATION UNIT 1 INTEGRATED LEAK RATE TEST FROM 0206 HOURS ON 3/10/81 TO 0208 HOURS ON'3/11/81 68 DATA SETS ARE IN ABS PRESSURE DEWPOINT VAPOR PRESSURE TEMP TIME PSIA
  'g                                                 4.600     57.899           54.49         0.2100     529.68
'F PSIA
  'E                                                 4.967     57.896           54.38         0.2091     529.',4 5.483     57.892           54.50         0.2101     529.61 5.833     57.890           54.56         0.2105     529.61 I                                                 6.183 6.533 6.883 57.888 57.887 57.886 54.53 54.59 94.69 0.2103 0.2107 0.2115 529.60 529.55 529.56 I                                                 7.233 7.583 7.917 57.885 57.885 57.887 a4.60 54.59 54.72 0.2108 0.2107 0.2117 529.55 529.55 529.59 8.267     37.889           54.71       0.2117     529.57 I                                                 8.617 8.983 9.333 57.890 57.891 57.891 54.59 54.71 54.68 0.2107 0.2117 0.2114 529.60 529.58 529.60 I                                                 9.683 10.017 10.393 57.893 57.894 57.894 54.72 54.85 54.78 0.2117 0.2128 0.2122 529.61 529.61 529.63 10.733 I                                                 11.083 11.417 57.895 57.895 57.895 54.65 54.81 54.72 0.2112 0.2124 0.2117 529.65 529.64 529.67 11.767     57.895           54.87       0.2129     529.65 I                                                 12.117 12.483 12.833 57.895 57.895
'F 0.0 57.944 54.25 0.2081 530.06 0.0350 57.939 54.39 0.2092 530.03 0.700 57.934 54.22 0.2079 529.98 I
                                                                '7.895 54.81 54.83 54.83 0.2124 0.2126 0.2126 529.67 529.66 529.68 I                                                 13.183 13.533 14.050 57.895 57.895 57.895 54.90 55.00 55.00 0.2131 0.2139 0.2139 529.66 529.67 529.66 14.400     57.895           54.99       0.2138     329.69 14.767     57.895           54.98       0.2138     529.66 I                                                                             3E-1
1.050 57.929 54.26 0.2082 529.96 1.417 57.927 54.38 0.2091 529.92 1.767 57.923 54.33 0.2088 529.89 2.117 57.920 54.24 0.2081 529.84 I
                                                                                                                  - n
2.483 57.916 54.32 0.2087 529.80 2.833 57.913 54.41 0.2094 529.78 3.200 57.910 54.41 0.2094 529.75 I
3.550 57.906 54.56 0.2105 529.72 3.900 57.904 54.43 0.2095 529.72 4.250 57.901 54.45 0.2097 529.66
'g 4.600 57.899 54.49 0.2100 529.68
'E 4.967 57.896 54.38 0.2091 529.',4 5.483 57.892 54.50 0.2101 529.61 5.833 57.890 54.56 0.2105 529.61 I
6.183 57.888 54.53 0.2103 529.60 6.533 57.887 54.59 0.2107 529.55 6.883 57.886 94.69 0.2115 529.56 I
7.233 57.885 a4.60 0.2108 529.55 7.583 57.885 54.59 0.2107 529.55 7.917 57.887 54.72 0.2117 529.59 8.267 37.889 54.71 0.2117 529.57 I
8.617 57.890 54.59 0.2107 529.60 8.983 57.891 54.71 0.2117 529.58 9.333 57.891 54.68 0.2114 529.60 I
9.683 57.893 54.72 0.2117 529.61 10.017 57.894 54.85 0.2128 529.61 10.393 57.894 54.78 0.2122 529.63 10.733 57.895 54.65 0.2112 529.65 I
11.083 57.895 54.81 0.2124 529.64 11.417 57.895 54.72 0.2117 529.67 11.767 57.895 54.87 0.2129 529.65 I
12.117 57.895 54.81 0.2124 529.67 12.483 57.895 54.83 0.2126 529.66 12.833
'7.895 54.83 0.2126 529.68 13.183 57.895 54.90 0.2131 529.66 I
13.533 57.895 55.00 0.2139 529.67 14.050 57.895 55.00 0.2139 529.66 14.400 57.895 54.99 0.2138 329.69 14.767 57.895 54.98 0.2138 529.66 I
3E-1 n


i i
i i
I ABS PRESSURE DEWPOINT VAPOR PRESSURE TEMP TIME       PSIA       *F           PSIA       'F 15.117     57.895     54.87     0.2129     529.67 I 15.467 15.817 16.167 57.895 57.894 57.893 54.84 55.04 54.76 v.2127 0.2142 0.2121 529.64 529.62 529.60 16.517     57.891                           529.63 I
I ABS PRESSURE DEWPOINT VAPOR PRESSURE TEMP TIME PSIA
54.84     0.2127 16.867     57.889     54.96     0.2136     529.59 17.217     57.886     54.89     0.2131     529.54 17.567     57.884     54.91     0.2132     529.54 I 17.93's 18.26) 18.633 57.882 57.880 57.878 54.91 55.07 55.04 0.2132 0.2145 0.2142 529.55 529.52 529.49 0.2145 I 19.150 19.517 19.867 57.876 57.875 57.873 55.07 55.26 55.18 0.2159 0.2153 529.45 529.45 529.46 20.217     57.871     55'.15     0.2151     529.44 I 20.567 20.917 11.267 57.868 57.866 57.864 54.90 54.93 54.87 0.2131 0.2134 0.2129 529.38 529.35 529.31 I Pl.617
*F PSIA
    ~1.967 22.317 57.862 57.860 57.859 55.10 54.91 55.04 0.2147 0.2132 0.2142 529.31 529.29 529.31 22.667     57.857     55.03     0.2141     529.28 I 23.033 23.383 23.933 57.855
'F 15.117 57.895 54.87 0.2129 529.67 I
              $7.853 57.850 55.03 55.10 54.95 0.2141 0.2147 0.2135 529.28 529.25 529.19 24.100     57.249     55.07     0.2145     529.20 I
15.467 57.895 54.84 v.2127 529.64 15.817 57.894 55.04 0.2142 529.62 16.167 57.893 54.76 0.2121 529.60 16.517 57.891 54.84 0.2127 529.63 I
16.867 57.889 54.96 0.2136 529.59 17.217 57.886 54.89 0.2131 529.54 17.567 57.884 54.91 0.2132 529.54 I
17.93' 57.882 54.91 0.2132 529.55 s
18.26) 57.880 55.07 0.2145 529.52 18.633 57.878 55.04 0.2142 529.49 19.150 57.876 55.07 0.2145 529.45 I
19.517 57.875 55.26 0.2159 529.45 19.867 57.873 55.18 0.2153 529.46 20.217 57.871 55'.15 0.2151 529.44 I
20.567 57.868 54.90 0.2131 529.38 20.917 57.866 54.93 0.2134 529.35 11.267 57.864 54.87 0.2129 529.31 Pl.617 57.862 55.10 0.2147 529.31 I
~1.967 57.860 54.91 0.2132 529.29 22.317 57.859 55.04 0.2142 529.31 22.667 57.857 55.03 0.2141 529.28 I
23.033 57.855 55.03 0.2141 529.28 23.383
$7.853 55.10 0.2147 529.25 23.933 57.850 54.95 0.2135 529.19 24.100 57.249 55.07 0.2145 529.20 I
I I
I I
I I
I I
I I
I I
I                     28-2
I 28-2


APPENDIX 3F VEPCO NORTH ANNA POWER STATION UNIT 1 I       INTEGRATED LEAK RATE TEST FROM 0206 HOURS ON 3/10/81 TO 0208 HOURS ON 3/11/81 68 DATA SETS ARE CURRENTLY IN I  Time
APPENDIX 3F VEPCO NORTH ANNA POWER STATION UNIT 1 I
        ..... ABSOLUTE TEST METHOD, MASS POINT ANALYSIS......
INTEGRATED LEAK RATE TEST FROM 0206 HOURS ON 3/10/81 TO 0208 HOURS ON 3/11/81 68 DATA SETS ARE CURRENTLY IN
Mass             Leakage         Conf           Ucl Hours   Lbm               Pct / day       Pct / day       Pet / day 0.0     536557.17         0.0             0.0             0.0 0.350   536531.16         0.0             0.0             0.0 I 0.700 1.050 1.417 536547.34 536518.28 536531.69 0.062849 0.128421 0.080343 1.113669 0.305207 0.161978 1.176519 0.433627 0.242322 1.767                     0.061525                       0.160372 I 2.117 2.483 536528.43 536557.53 536555.19 0.008921
..... ABSOLUTE TEST METHOD, MASS POINT ANALYSIS......
                            -0.011408 0.098847 0.101336 0.077354 0.110257 0.065946 2.833   536541.17       -0.008249       0.058153       0.049904 I 3.200 3.550 3.900 536543.66 536526.16 536516.83
I Time Mass Leakage Conf Ucl Hours Lbm Pct / day Pct / day Pet / day 0.0 536557.17 0.0 0.0 0.0 0.350 536531.16 0.0 0.0 0.0 I
                            -0.007888 0.002676 0.013165 0.045199 0.038735 0.034518 0.037311 0.041412 0.047683 4.250 4.600 4.967 536548.28 536506.57 536527.01 0.006055 0.016375 0.016255 0.030236 0.028778 0.024709 0.036290 0.045153 0.040963 5.483   536511.66         0.020051       0.021692       0.041743 5.833   536488.76         0.027893       0.021050       0.048943 6.183   536482.45         0.034162       0.019985.       0.054147 6.533   536519.52         0.030745       0.018218       0.048963 6.883 7.233 7.583 536492.92 536500.20 536500.91 0.032563 0.032327 0.031678 0.016451 0.014823 0.013453 0.049013 0.047150 0.045131 7.917   536469.68         0.035021       0.012907       0.047928 I 8.267 8.617 8.983 536509.26 536496.77 536517.73 0.032429 0.031529 0.028350 0.012219 0.011278 0.011074 0.044648 0.042808 0.039424 9.333 9.683 10.017 536499.62 536505.23 536505.18 0.027368 0.025879 0.024519 0.010309 0.009728 0.009198 0.037677 0.035607 0.033717 10.393   536489.96         0.024448       0.008578       0.033026 I 10.733 11.083 11.417 536488.33 536486.97 536463.05 0.024374 0.024274 0.025643 0.008020 0.007516 0.007246 0.032394 0.031790 0.032889 f 11.767 12.117 12.483 536472.52 536456.58 536415.27 0.026077 0.027258 0.027650 0.006838 0.006538 0.006246 0.032915 0.033855 0.033896 536445.02         0.028937       0.006101       0.035038 I
0.700 536547.34 0.062849 1.113669 1.176519 1.050 536518.28 0.128421 0.305207 0.433627 1.417 536531.69 0.080343 0.161978 0.242322 1.767 536528.43 0.061525 0.098847 0.160372 I
12.833 13.183   536460.22         0.029159       0.005784       0.034943 13.533   536442.87         0.030067       0.005590       0.035658 14.050   536452.99         0.030234       0.005304       0.035538 I 14.400 14.767 15.117 536423.33 536454.44 536452.26 0.031576 0.031321 0.031091 0.005270 0.005020 0.004787 0.036846 0.036341 0.035878 0.029562       0.004896       0.034458 I 15.467 15.817 16.167 536484.81 536481.31 536512.48 0.028275 0.025994 0.004906 0.005384 0.033181 0.031377 0.030903 16.517   536457.74         0.025744       0.005159 I                               3F-1
2.117 536557.53 0.008921 0.101336 0.110257 2.483 536555.19
-0.011408 0.077354 0.065946 2.833 536541.17
-0.008249 0.058153 0.049904 I
3.200 536543.66
-0.007888 0.045199 0.037311 3.550 536526.16 0.002676 0.038735 0.041412 3.900 536516.83 0.013165 0.034518 0.047683 4.250 536548.28 0.006055 0.030236 0.036290 I
4.600 536506.57 0.016375 0.028778 0.045153 4.967 536527.01 0.016255 0.024709 0.040963 5.483 536511.66 0.020051 0.021692 0.041743 I
5.833 536488.76 0.027893 0.021050 0.048943 6.183 536482.45 0.034162 0.019985.
0.054147 6.533 536519.52 0.030745 0.018218 0.048963 6.883 536492.92 0.032563 0.016451 0.049013 I
7.233 536500.20 0.032327 0.014823 0.047150 7.583 536500.91 0.031678 0.013453 0.045131 7.917 536469.68 0.035021 0.012907 0.047928 I
8.267 536509.26 0.032429 0.012219 0.044648 8.617 536496.77 0.031529 0.011278 0.042808 8.983 536517.73 0.028350 0.011074 0.039424 9.333 536499.62 0.027368 0.010309 0.037677 I
9.683 536505.23 0.025879 0.009728 0.035607 10.017 536505.18 0.024519 0.009198 0.033717 10.393 536489.96 0.024448 0.008578 0.033026 I
10.733 536488.33 0.024374 0.008020 0.032394 11.083 536486.97 0.024274 0.007516 0.031790 11.417 536463.05 0.025643 0.007246 0.032889 f
11.767 536472.52 0.026077 0.006838 0.032915 12.117 536456.58 0.027258 0.006538 0.033855 12.483 536415.27 0.027650 0.006246 0.033896 12.833 536445.02 0.028937 0.006101 0.035038 I
13.183 536460.22 0.029159 0.005784 0.034943 13.533 536442.87 0.030067 0.005590 0.035658 14.050 536452.99 0.030234 0.005304 0.035538 I
14.400 536423.33 0.031576 0.005270 0.036846 14.767 536454.44 0.031321 0.005020 0.036341 15.117 536452.26 0.031091 0.004787 0.035878 15.467 536484.81 0.029562 0.004896 0.034458 I
15.817 536481.31 0.028275 0.004906 0.033181 16.167 536512.48 0.025994 0.005384 0.031377 16.517 536457.74 0.025744 0.005159 0.030903 I
3F-1


I I
I I
E I Time Hours Mass Lbm Leakage Pct / day Conf Pct / day Ucl Pct / day 16.067     536470.99       0.025039       0.005008       0.030048 17.217     536498.79       0.023511       0.005119       0.028630 17.567     536478.74       0.022692       0.005004       0.027696 I 17.933 18.267 18.633 536450.01 536450.21 536464.17 0.02.7723 0.022698 0.022264 0.004805 0.004619 0.004471 0.027528 0.027317 0.026736 I 19.150 19.517 19.867 536483.92 536460.78 536437.87 0.021302 0.020968 0.021173 0.004439 0.004289 0.004138 0.025740 0.025257 0.025311 20.217     536441.71       0.021231       0.003990 I
E I
0.025221 20.567     536492.73       0.020127       0.004052       0.024179 20.917     536502.35       0.018896       0.004160       0.023056 21.267     536528.62       0.017220       0.004457       0.021677 I 21.617 21.967 22.317 536493.34 536508.78 536469.78 0.016377 0.015295 0.015013 0.004417 0.004450 0.004320 0.020794 0.019745 0.019332 I 22.667 23.033 23.383 536482.30 536463.69 536470.40 0.014511 0.014357 0.014085 0.004223 0.004096 0.003983 0.018734 0.018453 0.018067 23.933     536514.18       0.013078       0.004026       0.017104 24.100     536486.03       0.012612       0.003943       0.016555 I Initial Estimated Mass - 536526.23     Final Estimated Mass - 536458.29 I
Time Mass Leakage Conf Ucl Hours Lbm Pct / day Pct / day Pct / day 16.067 536470.99 0.025039 0.005008 0.030048 17.217 536498.79 0.023511 0.005119 0.028630 17.567 536478.74 0.022692 0.005004 0.027696 I
17.933 536450.01 0.02.7723 0.004805 0.027528 18.267 536450.21 0.022698 0.004619 0.027317 18.633 536464.17 0.022264 0.004471 0.026736 I
19.150 536483.92 0.021302 0.004439 0.025740 19.517 536460.78 0.020968 0.004289 0.025257 19.867 536437.87 0.021173 0.004138 0.025311 20.217 536441.71 0.021231 0.003990 0.025221 I
20.567 536492.73 0.020127 0.004052 0.024179 20.917 536502.35 0.018896 0.004160 0.023056 21.267 536528.62 0.017220 0.004457 0.021677 I
21.617 536493.34 0.016377 0.004417 0.020794 21.967 536508.78 0.015295 0.004450 0.019745 22.317 536469.78 0.015013 0.004320 0.019332 22.667 536482.30 0.014511 0.004223 0.018734 I
23.033 536463.69 0.014357 0.004096 0.018453 23.383 536470.40 0.014085 0.003983 0.018067 23.933 536514.18 0.013078 0.004026 0.017104 24.100 536486.03 0.012612 0.003943 0.016555 Initial Estimated Mass - 536526.23 Final Estimated Mass - 536458.29 I
I I
I I
I I
I il l
il l
l
l 3F-2
  =
=
3F-2 L
L


I i
I i
700
700
                                                                                                            \
\\
l t
l t
a                                                                                                    [
[
g 600                                                                                                   j E                                                                                                     5 I            \                                                                                     '
a g 600 j
i 500
E 5
                          \ -y               MN                         I              ' "
\\
N u                            \/                                 /                     \     ,  .
I i
o
\\ -y I
  "  .E
MN 500
      -                                                \^            -
\\/
                                                                        /
N
N                \-/
/
v ,.
\\
5                                                                                                       M!   '
u
5
.E
  ~
\\
i I
/
m
\\-/
  <        400                                                                                               ,
o N
1   2   3 4   5   6   7   8 9 10 11 12 13 14 15     16 17 18 19 20 21 22 23 24       ;
v
Time, 1 Hour Intervals 206 3/10/81 To 208 3/11/81 I
^
5 M!
5 i
~
I m
400 0
1 2
3 4
5 6
7 8
9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time, 1 Hour Intervals 206 3/10/81 To 208 3/11/81 I
i'
i'


Line 348: Line 589:
l l
l l
t f
t f
                    .16
.16
                                                                ; - -- l.- -
}
                                                                                            -- j.               ;--
-- j.
                                                                                                                                                                                                                                                                                                                    }
l
a                                              +        .
-)
e 1
e i
i-
I 1
                                                                                                                                                                                                                                                                                                        , -)          I o                                    !
+
i        l                                                                                                                                         l   !
a l
fi.14 e                                                                                            lb _ - j. -.,;-. _ !                         r ____ __4_ _ _ _ .                _ , . . _ , _ _ , ,                  , _ , _ ,        ..        . _ _ _ , , . _ , . _ _ _ , _ _ .
l o
s       !
lb _ - j. -.,;-. _ !
* E                                                       i                                     i
i fi.14 r ____ __4_ _ _ _.
                                                                                                                                                                                                                                ;                                                                              I    i l                                                                                                               .
e s
l                                                                 .
I i
E l
i i
l j
i
* Top Lirie - l UCL i
i E12 i-i j
lBottomlLine-Leak Rate 1
i 1
i l
1 j
j
j
                                                      *' Top Lirie -
.E.10 L ---.
I- --. I_ --
i I
c l
i J'a''
I I
l i
-- r d - 'l --- '--
--------4 i
i
i
                #                                                                                              i                      '
>,. 8 n
l UCL                                                                        i i-E12 i                    '
O
i                                            j                                                                                                                                                1 i
+
lBottomlLine- Leakl                                            Rate 1
N l
                                                                                                                                                            -                      1
I I
                                                                                                                                                                                                                                ;              j                                            j                        ,
1 I
                .E.10 L ---.
w.6 L i
c
m, - - -
                                              -- ! - I- --. I_ --                                                          i                            !                      '      .- - -.---
+
I l                                              ,
l i
                                                                                                                                                          !          i I
e u
J'a''                                                                                                        I              -                                                                                                                                                                l
9 j
                <                                              i                                                                                          i i        .
}
                >, . 8                                                                                                                             -- r d - 'l --- '--
b 4
n                   --,--------.                          - - - -      -              -            --
/N*
                                                                                                                                                                                                                                                                        --------4                          -
I i
O                                             ,'
E x
                                                                                                                                                                                                                              +
.4 L 1, - - - /-
* N I                 l                                                                                                                                                                                                    I                                           .
i J--- :--
1
l i
                                                                                                                                                                                                                                                                                          ;                I e                  i                                                            l w .6 L u                      - ,              m, - - -           ---              +           -            -              -----
i --
i
N l
    ***          b                                                                              9                                                         j                                                                   }                                                           ,
l I
4                       /N*                                                                                         I                                                                                                       i                           '
c.,
    "          E i
a.2 _ -
x              .4 L                                       1, - - -   /-                     :            :                                          J--                                           i --                 l                                                           :          i     :
1' x
N a
7 N
                =                        ,
f f5
l       li x                      7 I               '
=
N            %
i a
f                f5 a .2 _ -                                                                                                                                                                                                                                                                                   i c.,                                  1'         i                                                                                                                                                                                                                                     ,
i i
A w
A F... -.. -
m F. .. - .. -       -    - - - .
w m
    #          8 t
8 t
:                                                                                                        ;                                                  I               N                      N                !
I i
                                          ,#                                                                                                    l
l l
                    .0                            . . . _
I N
I l .. ,
N j
i l
                                                                                                                          ,                  j                                ., .
j I          , . .                                                  ,              ,
P j
P j
0         1     2         3       4         5               6     7             8             9       10         11       12       13 14                 15 16                     17 18                 19               20           21             22           23   24 Time, 1 Hour Intervals                                                                                                                                                               '
.0 l..,
206 3/10/81 To 208 3/11/81
I j
                                                                                                                                                                                                                                                          .                                                            i
0 1
                                                                -                -              -                  -                  -                                -            -                    -            -                              - -                                -j
2 3
4 5
6 7
8 9
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 l
l Time, 1 Hour Intervals 206 3/10/81 To 208 3/11/81 i
-j


                                          . . - - ~ . - . . . - ~ . . - - . - - - = = - -:-----
.. - - ~. -... - ~.. - -. - - - = = -
I                                 .
I SECTION 4 LOCAL LEAK RATE TESTS (TYPES B AND C)
SECTION 4 LOCAL LEAK RATE TESTS (TYPES B AND C)
Local.'eak rate tests were performed by pressurizing with air the
Local .'eak rate tests were performed by pressurizing with air the
'I penetra< ions listed in the following tables and either measuring leakage across containment isolation valves (Type C) or across resilient seals (Type B).
'I penetra< ions listed in the following tables and either measuring leakage across containment isolation valves (Type C) or across resilient seals (Type B).
The total Types B and C leakage documented was verified to be in accordance with station procedures.
The total Types B and C leakage documented was verified to be in accordance with station procedures. The following pages list the penetrations tested and their documented leakage.
The following pages list the penetrations tested and their documented leakage.
I I     -
I I
I I
I I
IC I
IC I
I                                                                                                     .
I I
I                                           .
I I
I I   ~
~
I 4-1
I 4-1


Line 429: Line 691:


==SUMMARY==
==SUMMARY==
Equipment Leakage Penetration Tested (scf/m)
Remarks Fuel Transfer Tube Blind Flange 0
Equipment Hatch and 0-Ring Escape Lock 0
Personnel Air Lock 0
and Escape Door Electrical Penetration No.
l-A Cannister 0
1-A O-Ring 0
1-B Cannister 0
1-B O-Ring 0
1-C Blind Flange 0
1-C O-Ring 0.033 1-D Blind Flange 0.007 1-D O-Ring 0.011 1-E Cannister 0
I l-E O-Ring 0
2-A Blind Flange 0
2-B 0
2-C 0
2-D 0
2-E O
3-A 0
3-B 0
3-C 0
3-D 0
3-E O
I 4-A Blind Flange 0
4-B 0
4-0 0
I 4-D 0
4-E 0
5-A 0
5-B 0
5-C 0
5-D 0
5-E O
I 6-A 0.022 6-B 0
6-C Blind Flange 0
6-D 0
6-E 0
4A-1


Equipment       Leakage Penetration           Tested         (scf/m)               Remarks Fuel Transfer Tube      Blind Flange       0 Equipment Hatch and    0-Ring Escape Lock                                0 Personnel Air Lock                        0 and Escape Door Electrical Penetration                                                '
I Equipment Leakage Penetration Tested (scf/m)
No.
Remarks 1
l-A                    Cannister          0 1-A                    O-Ring            0 1-B                     Cannister          0 1-B                    O-Ring            0 1-C                    Blind Flange       0 1-C                    O-Ring            0.033 1-D                     Blind Flange      0.007 1-D                    O-Ring            0.011 1-E                    Cannister          0 I l-E 2-A 2-B O-Ring Blind Flange 0
7-A o
0 0
i 7-B Blind Flange 0
2-C                                       0 2-D                                       0 2-E                                       O 3-A                                       0 3-B                                       0 3-C                                       0 3-D                                       0 3-E I
7-C 0
O 4-A                     Blind Flange      0 4-B                                       0 4-0                                       0 I 4-D 4-E 5-A 0
I 7-D 0
0 0
7-E O
5-B                                       0 5-C                                       0                           ,
8-A o
5-D                                       0 5-E                                       O I 6-A 6-B 6-C                     Blind Flange 0.022 0
8-B 0
0 6-D                                       0 6-E                                       0 4A-1                                        l
I 8-C 0
8-D 0
8-E Blind Flange 0
9-A 0
9-B 0.036 9-C 0
I 9-D 0
9-E O
10-A 0.043 10-B 0
I 10-C 0.025 10-D 0
10-E O
ll-A Blind Flange 0
ll-B Blind Flange 0
ll-C Blind Flange 0
ll-D Blind Flange 0
ll-E Blind Flange 0
12-A 0
12-B 0
12-C 0
l 12-D 0
12-E O
13-A 0
13-B 0
13-C 0
13-D Elind Flange 0
I 13-E O
14-A 0
14-B 0
14-C Blind Flange 0.018 I
14-D Blind Flange 0
14-E 0.015 15-A 0.029 15-B 0
l 15-C Blind Flange 0
15-D 0
.I 15 -E O
16-A 0
l 16-B 0
16-C 0
16-D 0
16-E Blind Flange 0
l 4A-2


I Equipment                 Leakage                                                                             ;
I Equipment Leakage P,enetration Tested (scf/m)
Penetration                                        Tested                    (scf/m)                                                  Remarks                  1 7-A                                                                                o                                                                                i 7-B                                                  Blind Flange                0 7-C                                                                                0 I            7-D 7-E 8-A 0
Remarks 17-A 0
O o
17-B 0
I            8-B 8-C 8-D 0
17-C 0
0 0
17-D 0
8-E                                                  Blind Flange                0 9-A                                                                                0 9-B                                                                                0.036 9-C                                                                                0 I            9-D 9-E 10-A 0
17-E O
O 0.043 10-B I
18-A 0
0 10-C                                                                              0.025 10-D                                                                              0 10-E                                                                              O ll-A                                                  Blind          Flange        0 ll-B                                                  Blind          Flange        0 ll-C                                                  Blind          Flange        0 ll-D                                                  Blind          Flange        0 ll-E                                                  Blind          Flange        0 12-A                                                                              0 12-B                                                                              0 l
18-B 0.018 18-C Blind Flange 0
12-C                                                                              0 12-D                                                                              0 12-E                                                                              O 13-A                                                                              0 13-B                                                                              0 13-C                                                                              0 13-D                                                  Elind Flange                0 I            13-E 14-A 14-B O
18-D 0
0 0
18-E 0
I            14-C 14-D 14-E Blind Flange Blind Flange 0.018 0
19-A 0
0.015 15-A                                                                              0.029 15-B                                                                              0 l              15-C                                                  Blind Flange                0 15-D                                                                              0
19-B Blind Flange 0
.I l
19-C Blind Flange 0
15 -E 16-A 16-B O
19-D 0
0 0
19-E Blind Flange 0
16-C                                                                              0 16-D                                                                              0 16-E                                                  Blind Flange                0 l
20-A 0
4A-2
20-B 0
 
20-C 0
Equipment          Leakage                I P,enetration   Tested           (scf/m)   Remarks 17-A                               0 17-B                               0 17-C                               0 17-D                               0 17-E                               O 18-A                               0 18-B                               0.018 18-C           Blind Flange         0 18-D                               0 18-E                               0 19-A                               0 19-B           Blind Flange         0 19-C           Blind Flange         0 19-D                               0 19-E           Blind Flange         0 20-A                               0 20-B                               0 20-C                               0 20-D                               0 20-E           Blind Flange         0 21-A                               0.020 21-B                               0 21-C                               0 21-D                               0 21-E                               O 22-A                               0.018 22-B                               0 22-C                               0 22-D                               0.025 22-E                               O 23-A           Blind Flange         0.011 23-B           Blind Flange         0 23-C                               0 23-D                               0 23-E                               O l   24-A           Cannister           0.007 24-A           O-Ring               0
20-D 0
,I 24-B           Cannister           0 l   24-B           O-Ring               0 24-C           Cannister           0 24-C           0-Ring               0 l   24-D           Cannister           0.018 l
20-E Blind Flange 0
24-D           O-Ring               0.014 24-E           Cannister           0.014 24-E           O-Ring               0.007 4A-3
21-A 0.020 21-B 0
21-C 0
21-D 0
21-E O
22-A 0.018 22-B 0
22-C 0
22-D 0.025 22-E O
23-A Blind Flange 0.011 23-B Blind Flange 0
23-C 0
23-D 0
23-E O
l 24-A Cannister 0.007
, I 24-A O-Ring 0
24-B Cannister 0
l 24-B O-Ring 0
24-C Cannister 0
24-C 0-Ring 0
l 24-D Cannister 0.018 l
24-D O-Ring 0.014 24-E Cannister 0.014 24-E O-Ring 0.007 4A-3


I 1981 TYPE B DATA  
I 1981 TYPE B DATA  


==SUMMARY==
==SUMMARY==
Equipment Leakage Penetration Tested (scf/m)
Remarks Fuel Transfer Tube Blind Flange 0
Equipment Hatch and 0-Ring Escape Lock 0
Personnel Air Lock 0
and Escape Door Electrical Penetration No.
1-A Cannister 0.021 1-A O-Ring 0.038 1-B Cannister 0
1-B O-Ring 0.016 1-C Blind Flange N/A l-C 0-Ring 0.027 I
1-D Blind Flange 0.028 1-D O-Ring N/A 1-E Cannister 1-E O-Ring 0
2-A Blind Flange 0
2-B 0
2-C 0
2-D 0
l 2-E O
3-A 0
3-B 0
3-C 0
3-D 0
3-E O
I 4-A 0
4-B 0
4-C 0
4-D 0
4-E O
5-A 0
I 5-B 0
5-C 0
t l
5-D 0
5-E O
6-A 0.036 6-B 0.038 6-C Blind Flange 0
6-D 0
i I
4A-4


Equipment     Leakage Penetration           Tested         (scf/m) Remarks Fuel Transfer Tube      Blind Flange     0 Equipment Hatch and    0-Ring Escape Lock                              0 Personnel Air Lock                        0 and Escape Door Electrical Penetration No.
I Equipment Leakage Penetration Tested (scf/m)
1-A                    Cannister        0.021 1-A                     O-Ring            0.038 1-B                    Cannister        0 1-B                    O-Ring            0.016 1-C                    Blind Flange      N/A I   l-C                    0-Ring            0.027 1-D                     Blind Flange      0.028                                  .
Remarks 6-E o
1-D                    O-Ring            N/A 1-E                    Cannister 1-E                     O-Ring            0 2-A                     Blind Flange     0 2-B                                       0 2-C                                       0 2-D                                       0 l
7-A o
2-E                                       O 3-A                                       0 3-B                                       0 3-C                                       0 3-D                                       0 I    3-E 4-A 4-B O
7-B Blind Flange 0
0 0
7-C o
4-C                                       0 4-D                                       0 4-E                                      O 5-A                                       0 t
7-D o
l I   5-B 5-C 5-D 0
7-E 0.027 8-A o
0 0
8-B 0
5-E                                       O 6-A                                       0.036 6-B                                       0.038 6-C                     Blind Flange      0 6-D                                       0 i
8-C 0
I 4A-4
8-D 0
8-E Blind Flange 0.027 9-A 0
I 9-B 0.041 9-C 0.050 9-D 0.012 9-E O
I 10-A 0.050 10-B 0
10-C 0.021 I
10-D 0
10-E O
ll-A Blind Flange 0
ll-B Blind Flange 0.034 ll-C Blind Flange 0
ll-D Blind Flange 0
ll-E Blind Flange 0.025 I
12-A 0.018 12-B 0
12-C 0
I 12-D 0
12-E 0
13-A 0
13-B 0
13-C 0
13-D Blind Flange 0
14-A 0
I 14-B 0.047 14-C 0.036 14-D 0.027 14-E 0.036 I
15-A 0
15-B 0.047 15-C Blind Flange 0
15-D 0.047 15-E 0.048 16-A 0.054 I
16-B 0.045 16-C 0.038 16-D 0
16-E Bliid Flange 0.021 4A-5


I Equipment   Leakage Penetration Tested     (scf/m)   Remarks 6-E                          o 7-A                           o                i 7-B           Blind Flange  0 7-C                           o 7-D                           o 7-E                         0.027 8-A                           o 8-B                           0 8-C                           0 8-D                           0 8-E           Blind Flange  0.027 9-A                         0 I 9-B 9-C 9-D 0.041 0.050 0.012 I 9-E 10-A 10-B O
I I
0.050 0
Equipment Leakage Penetration Tested (scf/m)
10-C                         0.021 I 10-D 10-E ll-A          Blind Flange 0
Remarks 17-A 0.010 17-B 0
O 0
17-C 0
ll-B           Blind Flange  0.034 ll-C           Blind Flange  0 ll-D           Blind Flange  0 ll-E           Blind Flange  0.025 I 12-A 12-B 12-C 0.018 0
,g 17-D 0.045 g
0 I 12-D 12-E 13-A 0
17-E 0.036 18-A 0.012 18-B 0
0 0
I 18-C Blind Flange 0.027 18-D 0.036 18-E O
13-B                         0 13-C                         0 13-D           Blind Flange  0 14-A                        0 I 14-B 14-C 14-D 0.047 0.036 0.027 14-E I 15-A 15-B 0.036 0
19-A 0.039 I
0.047 15-C           Blind Flange  0 15-D                        0.047 15-E                        0.048 16-A                        0.054 I 16-B 16-C 16-D 0.045 0.038 0
19-B Blind Flange 0
16-E           Bliid Flange  0.021 4A-5
19-C Blind Flange 0
19-D 0.027 I
19-E Blind Flange 0.027 20-A 0
20-B 0
20-C 0
I 20-D 0
20-E Blind Flange 0
21-A 0.023 I
21-B 0.030 21-C 0.050 21-D 0.050 I
21-E 0.009 22-A 0
22-B 0
22-C 0
22-D 0
22-E O
23-A Blind Flange 0.043 I
23-B Blind Flange 0
23-C 0.028 23-D 0.036 I
23-E 0.036 l
24-A Cannister 0
24-A O-Ring 0.011 24-B Cannister 0.022 24-B O-Ring 0.022 24-C Cannister 0.043 24-C 0-Ring 0.036 24-D Cannister 0.052 I
24-D O-Ring 0.041 24-E Cannister 0
24-E O-Ring 0.043 FB#1 0
4A-6 1


I I              Penetration Equipment Tested Leakage (scf/m)  Remarks 17-A                                                    0.010 17-B                                                    0 17-C                                                    0
APPENDIX 4B TYPE C TESTING SUMMABY 1979 Pre Repair Post Repair Leakage Leakage Penetration No.
  ,g            17-D                                                    0.045 g            17-E                                                    0.036 18-A                                                    0.012 18-B                                                    0 I            18-C 18-D 18-E Blind Flange                        0.027 0.036 O
Valves Tested SCFil SCFil Remarks 1 Component Cooling from TV-CC-103B 0
I 19-A                                                    0.039 19-B                Blind Flange                        0 19-C                Blind Flange                        0 19-D                                                    0.027 I            19-E 20-A 20-B Blind Flange                        0.027 0
NA RilR IIeat Exhanger 2 Component Cooling to RIIR l-CC-193 0
0 20-C I            20-D 20-E                Blind Flange 0
NA IIcat Exchanger 4 Component Cooling to 1-CC-198 0.11
0 0
.03 RilR IIeat Exchanger 5 Component Cooling from TV-CC-103A
21-A                                                    0.023 I            21-B 21-C 21-D
.07
                                                ,                      0.030 0.050 0.050 I            21-E 22-A 22-B 0.009 0
.02 RIIR IIeat Exchanger 7 Iligh IIead Safety Injection 1-Sl-79 MOV 1867C 5.0 2.21 1-Sl-77 MOV 1867D ay 8 Component Cooling from TV-CC-101A 0.16 0.04 H
0 22-C                                                    0 22-D                                                    0 22-E                                                    O 23-A                Blind Flange                        0.043 I            23-B 23-C 23-D Blind Flange                        0 0.028 0.036 I              23-E                                                    0.036 l              24-A                Cannister                          0 24-A                O-Ring                              0.011 24-B                Cannister                          0.022 24-B                O-Ring                              0.022 24-C                Cannister                          0.043 24-C                0-Ring                              0.036 I            24-D                Cannister                          0.052 24-D                O-Ring                              0.041 24-E                Cannister                          0 24-E                O-Ring                              0.043 FB#1                                                    0 4A-6 1    .. - - - .          . .. . . .      .        _ _ _ _ - _ - . . _        .
RCP Thermal Barrier TV-CC-101B 9 Air Recirculation 1-CC-572 89 0
Cooling Water 10 Air Recirculation 1-CC-559 89 0
Cooling Water 11 Air Rccirculation 1-CC-546 89 0
Cooling Water 12 Air Recirculation TV-CC-100B 0
NA Cooling Water TV-CC-105B 13 Air Recirculation TV-CC-100C 0
NA Cooling Water TV-CC-105C 14 Air Recirculation Cooling TV-CC-100A 0
NA Water Inside Containment TV-CC-105A 15 Charging 1-CII-3 2 2 0.35 0.136 MOV-1289A


APPENDIX 4B TYPE C TESTING SUMMABY 1979 Pre Repair Post Repair Leakage     Leakage Penetration No.                 Valves Tested             SCFil      SCFil                            Remarks 1 Component Cooling from        TV-CC-103B                  0         NA RilR IIeat Exhanger 2 Component Cooling to RIIR        l-CC-193                  0          NA IIcat Exchanger 4 Component Cooling to           1-CC-198          -
m M
0.11        .03 RilR IIeat Exchanger 5 Component Cooling from          TV-CC-103A                .07        .02 RIIR IIeat Exchanger 7 Iligh IIead Safety Injection    1-Sl-79 MOV 1867C        5.0        2.21 1-Sl-77 MOV 1867D a
M M
y                      8 Component Cooling from         TV-CC-101A              0.16      0.04 H                        RCP Thermal Barrier            TV-CC-101B 9 Air Recirculation              1-CC-572                  89          0 Cooling Water 10 Air Recirculation              1-CC-559                  89          0 Cooling Water 11 Air Rccirculation              1-CC-546                  89          0 Cooling Water 12 Air Recirculation              TV-CC-100B                0         NA Cooling Water                  TV-CC-105B 13 Air Recirculation              TV-CC-100C                0         NA Cooling Water                  TV-CC-105C 14 Air Recirculation Cooling     TV-CC-100A                0         NA Water Inside Containment      TV-CC-105A 15 Charging                        1-CII-3 2 2            0.35      0.136 MOV-1289A
m m
M M
M M
M m
M m
Pre Repair Post Repair Leakage Leakage i
Penetration No.
Valves Tested SCFH SCPH Remarks 16 Component Cooling to 1-CC-154 0.15 0.04 RCP's Shroud Cooling Coils TV-CC-104C 17 Component Cooling to 1-CC-119 0.08 0.01 RCP's Shroud Cooling Coils TV-CC-104B 18 Component Cooling to 1-CC-84 3.4 1.5 RCP's Shroud Cooling Coils TV-CC-104A 4
19 Seal Water from MOV-1380 0
NA RCP's 1-CH-402 MOV-1381 20 SI Accumulater Makeup 1-SI-110 0
NA 1-SI-58 22 High Ilead SI l-SI-185 0
NA
, u y
MOV-1836 w
24 RIIR To RWST l-RH-36 0
NA l-RH-37 25 Component Coolina from TV-CC-102E 0.08 0.02 RCP's & Saroud Cooling Coils TV-CC-102F 26 Component Cooling from TV-CC-102A 0
NA RCP's & Saroud Cooling Coils TV-CC-102B 27 Component Cooling from TV-CC-102C 0
NA RCP's & Saroud Cooling Coils TV-CC-102D i
28 RC Letdown RV 1203, IICV-1200A 9.0 9.0 HCV-1200B, IICV-1200C liCV-ll4 2, TV-120 4 31 Component Atm. Cleanup 1-IIC-14 0.25 0.25 1-ilC-31 1-IIC-12


m              M M              M      m                      m            M      M  M      M  M  m      M  .
Pre Repair Post Repair Leakage Leakage Penetration No.
m Pre Repair   Post Repair
Valves Test'd SCFil SCFH Remarks 33 Primary Drains TV-DG-100A 0
,                                                                                              . Leakage       Leakage i
NA Transfer Pump Discharge TV-DG-100B 38 Sump Pump Discharge TV-DA-100A 0.95 0.37 TV-DA-100B 39 SG Blowdown TV-BD-100A 89 0
Penetration No.                                                   Valves Tested            SCFH         SCPH      Remarks 16 Component Cooling to                                            1-CC-154                0.15          0.04 RCP's Shroud Cooling Coils                                    TV-CC-104C 17 Component Cooling to                                            1-CC-119                0.08          0.01 RCP's Shroud Cooling Coils                                    TV-CC-104B 18 Component Cooling to                                            1-CC-84                  3.4          1.5 RCP's Shroud Cooling Coils                                    TV-CC-104A 4
TV-BD-100B i
19 Seal Water from                                                MOV-1380                0            NA RCP's                                                          1-CH-402 MOV-1381 20 SI Accumulater Makeup                                          1-SI-110                0            NA 1-SI-58
40 SG Blowdown TV-BD-100E O
, u  22 High Ilead SI                                                  l-SI-185                0            NA y                                                                    MOV-1836 w
NA TV-BU-100F 41 SG Blowdown TV-BD-100C 0.36 0.56 TV-BD-100D 42 Service Air 1-SA-58 0
24 RIIR To RWST                                                    l-RH-36                  0            NA l-RH-37 25 Component Coolina from                                          TV-CC-102E              0.08          0.02 RCP's & Saroud Cooling Coils TV-CC-102F 26 Component Cooling from                                          TV-CC-102A              0             NA RCP's & Saroud Cooling Coils TV-CC-102B 27 Component Cooling from                                          TV-CC-102C              0             NA RCP's & Saroud Cooling Coils TV-CC-102D i'
NA i
28 RC Letdown                                                      RV 1203, IICV-1200A      9.0           9.0 HCV-1200B, IICV-1200C liCV-ll4 2, TV-120 4 31 Component Atm. Cleanup                                          1-IIC-14                0.25          0.25 1-ilC-31 1-IIC-12
1-SA-57 a
to E
43 Air Monitor Sample TV-RM-100D 0.04 0.01 TV-RM-100A 4
44 Air Monitor Sample TV-RM-100B 0
NA TV-RM-100C 45 PG Water 1-RC-149 789 0.03 1
j TV-I$19A 46 Loop Fill 1-Cll-3 3 0 200 0.41 FCV-ll60 4
47 Instrument Air TV-IA-102A 4.6 2.03 1-IA-55 48 Priamary Vent Header TV-VG-100A 0.06 0.02 1
TV-VG-100B 50 Nitrogen to Waste Gas HCV-1936 0.85 0.33 i
Charcoal Filters TV-SI-101


Pre Repair Post Repair Leakage     Leakage
m m
.                    Penetration No.                 Valves Test'd  SCFil       SCFH    Remarks 33 Primary Drains              TV-DG-100A      0           NA
M M
,                        Transfer Pump Discharge      TV-DG-100B 38 Sump Pump Discharge          TV-DA-100A      0.95        0.37 TV-DA-100B 39 SG Blowdown                  TV-BD-100A        89        0 TV-BD-100B i
m M
40 SG Blowdown                  TV-BD-100E         O        NA TV-BU-100F 41 SG Blowdown                  TV-BD-100C      0.36        0.56 TV-BD-100D 42 Service Air                  1-SA-58            0         NA i
M M
a                                        1-SA-57 to E        43 Air Monitor Sample           TV-RM-100D      0.04        0.01 4
M M
TV-RM-100A 44 Air Monitor Sample          TV-RM-100B        0         NA TV-RM-100C 1
M M
45 PG Water                    1-RC-149        789        0.03 j                                                    TV-I$19A 46 Loop Fill                    1-Cll-3 3 0     200        0.41 4                                                    FCV-ll60 47 Instrument Air              TV-IA-102A      4.6        2.03 1-IA-55 48 Priamary Vent Header        TV-VG-100A      0.06        0.02 1
M M
TV-VG-100B 50 Nitrogen to Waste Gas        HCV-1936        0.85        0.33 i                        Charcoal Filters            TV-SI-101
M Pro Repair Post Repair Leakage Leakage Penetration No.
Valves Tested SCFil SCFII Remarks 53 Nitrogen to PRT l-SI-106 0.35 0.14 TV-SI-100 54 Primary Vent Pot Vent 1-DA-39 0
NA 1-DA-41 55 PRT Gas Space Sample TV-SS-104A 0
NA Vent TV-SS-104B
.55B Containment Leakage TV-LM-100E 0.10 0.03 Monitoring TV-LM-100F 56 Primary Coolant Cold TV-SS-102A 0
NA Leg Sample TV-SS-102B 4
56B Primary Coolant TV-SS-106A 0
NA l
Ilot Leg Sample TV-SS-106B u
?
56C PZR Liquid Space TV-SS-100A 0
NA A
Sample TV-SS-100B 56D SG Blowdown Sample TV-SS-112A 0.02 0.01 TV-SS-ll2B 57 Containment Leakage TV-LM-100G 0
NA Monitoring TV-LM-100A 57B PZR Vapor Space TV-SS-101B 0
NA Sample TV-SS-101A l
60 Low IIead SI Discharge 1-SI-207 0
NA l
MOV-1890B l
61 Low IIead SI Discharge 1-SI-206 0.7 0.27 MOV-1890A


m                         m    M                                                 M                                 m M M     M     M M M     M   M   M     M Pro Repair   Post Repair Leakage       Leakage Penetration No.                                                                                   Valves Tested     SCFil       SCFII    Remarks 53 Nitrogen to PRT                                                                                l-SI-106          0.35          0.14 TV-SI-100 54 Primary Vent Pot Vent                                                                          1-DA-39          0            NA 1-DA-41 55 PRT Gas Space Sample                                                                          TV-SS-104A        0             NA Vent                                                                                          TV-SS-104B
m M
                            .55B Containment Leakage                                                                          TV-LM-100E        0.10          0.03 Monitoring                                                                                    TV-LM-100F 56 Primary Coolant Cold                                                                          TV-SS-102A        0            NA Leg Sample                                                                                    TV-SS-102B 4
M M
56B Primary Coolant                                                                              TV-SS-106A        0            NA l u                            Ilot Leg Sample                                                                              TV-SS-106B
M M
    ?
M M
A                        56C PZR Liquid Space                                                                              TV-SS-100A       0             NA Sample                                                                                        TV-SS-100B 56D SG Blowdown Sample                                                                            TV-SS-112A        0.02          0.01 TV-SS-ll2B 57 Containment Leakage                                                                            TV-LM-100G        0             NA Monitoring                                                                                    TV-LM-100A 57B PZR Vapor Space                                                                              TV-SS-101B        0             NA Sample                                                                                        TV-SS-101A l
M M
60 Low IIead SI Discharge                                                                          1-SI-207          0            NA l                                                                                                                              MOV-1890B l
M M
61 Low IIead SI Discharge                                                                          1-SI-206          0.7          0.27 MOV-1890A
M M
M m
Pre Repair Post Repair Leakage Leakage Penetration No.
Valves Tested SCFil SCFli Remarks 62 Low IIead SI Discharge MOV-1890C,MOV-1890D 2.6 0.17 1-SI-197,1-SI-199 l-SI-195 l
63 QS Pump Discharge MOV-OS-101B 0
NA l-OS-19 64 QS Pump Discharge MOV-OS-101A 0
NA l-OS-11 66 Casing Cooling to MOV-RS-100A 1.55 0.6 Recirculation Spray MOV-RS-101A 67 Casing Cooling to MOV-RS-100B
.11 4.85 Recirculation Spray 70 Recirculation Spray MOV-RS-156B 0.17 0.05 7
Pump Dicharge 1-RS-27 w
71 Recirculation Spray MOV-RS-156A 0
NA Pump Discharge 1-RS-18 79 Recirculation Spray MOV-SW-103D 89 0
Valve Service Water Reworked i
10.5 2.87 Valve 80 Recirculation Spray MOV-SW-103C Service Water Reworked 81 Recirculation Spray MOV-SW-103B 10 5.9 l
Service Water 82 Recirculation Spray MOV-SW-103A 3.6 89 0
Service Water i
83 Recirculation Spray MOV-SW-104D 89 0.85 Service Water


m     M     M     M     M M           M     M   M       M M   M     M                                                                 M     M m Pre Repair   Post Repair Leakage       Leakage Penetration No.               Valves Tested         SCFil         SCFli                                                              Remarks 62 Low IIead SI Discharge    MOV-1890C,MOV-1890D    2.6          0.17 1-SI-197,1-SI-199 l-SI-195 l    63 QS Pump Discharge          MOV-OS-101B            0           NA l-OS-19 64 QS Pump Discharge          MOV-OS-101A            0            NA
m m
;                                  l-OS-11 66 Casing Cooling to          MOV-RS-100A            1.55        0.6 Recirculation Spray        MOV-RS-101A 67 Casing Cooling to          MOV-RS-100B              .11        4.85 Recirculation Spray
M M
* 70 Recirculation Spray        MOV-RS-156B            0.17        0.05 7    Pump Dicharge              1-RS-27 w
M M
71 Recirculation Spray        MOV-RS-156A            0           NA Pump Discharge            1-RS-18 79 Recirculation Spray        MOV-SW-103D              89        0                                                                   Valve Service Water                                                                                                                        Reworked i
M M
80 Recirculation Spray        MOV-SW-103C        -
M M
10.5        2.87                                                                Valve Service Water                                                                                                                        Reworked 81 Recirculation Spray        MOV-SW-103B             10          5.9 l      Service Water                              .
M M
82 Recirculation Spray        MOV-SW-103A            3.6 89      0
M M
<      Service Water i
M M
83 Recirculation Spray        MOV-SW-104D              89        0.85 Service Water
M M
Pre Repair Post Repair Leakage Leakage Penetration No.
Valves Tested SCFil SCFil Remarks 84 Recirculation Spray MOV-SW-104C 15 0
Valve Service Water Reworked 85 Recirculation Spray MOV-SW-104B 9
0 Valve Service Water Reworked 86 Recirculation Spray MOV-SW-104A 89 4.7 Service Water 89 Air Ejector Vent TV-SV-102-1 4
0.12 TV-SV-102-1 TV-SV-103 Reworked 90 Purge Duct MOV-:lV-100C 6.4 6.4 MOV-IIV-100D MOV-IIV-101 91 Purge Duct MOV-IIV-10 0 A 4.2 4.2
&y MOV-IIV-100B m
MOV-liv-102 92 Containment Vacuum TV-CC-150C 0
NA Pump Suction TV-CC-150D 93 Containment Vacuum TV-CC-150A 0
NA Pump Suction TV-CC-150B 94 Ejection Suction TV-CV-100 11.2 1.25 1-CV-4 97 Liquid Sample TV-SS-103B 0
NA 97B PZR Dead Weight 1-RC-176 0
NA Calibrator 1-RC-178 97C Containment Leakage TV-LM-100B 0
NA Monitor System TV-T.M-100A


m  m                                                        M                                      M M M M    M            M  M    M      M  M  M      M M          M  M Pre Repair   Post Repair Leakage       Leakage Penetration No.                                                                                           Valves Tested               SCFil         SCFil     Remarks
Pre Repair Post Repair Leakage Leakage Penetration No.
,    84 Recirculation Spray                                                                                    MOV-SW-104C                  15            0       Valve Service Water                                                                                                                                      Reworked 85 Recirculation Spray                                                                                    MOV-SW-104B                    9            0        Valve Service Water                                                                                                                                      Reworked 86 Recirculation Spray                                                                                    MOV-SW-104A                    89        4.7 Service Water 89 Air Ejector Vent                                                                                      TV-SV-102-1                   4          0.12      TV-SV-102-1 TV-SV-103                                            Reworked 90 Purge Duct                                                                                            MOV-:lV-100C                  6.4          6.4 MOV-IIV-100D
Valves Tested SCFil SCFil Remarks 100 Wet Layup 1-WT-491 0
* MOV-IIV-101
NA 1-WT-488 103 Refueling Purification 1-RP-28 O
  &  91 Purge Duct                                                                                            MOV-IIV-10 0 A                4.2         4.2 y                                                                                                            MOV-IIV-100B m                                                                                                            MOV-liv-102
NA Inlet 1-RP-26 104 Refueling Purification 1-RP-6 Outlet 1-RP-8 0
* 92 Containment Vacuum                                                                                    TV-CC-150C                    0           NA Pump Suction                                                                                  TV-CC-150D 93 Containment Vacuum                                                                                    TV-CC-150A                    0           NA Pump Suction                                                                                  TV-CC-150B 94 Ejection Suction                                                                                      TV-CV-100                    11.2          1.25 1-CV-4 97 Liquid Sample                                                                                        TV-SS-103B            -
NA 105 Containment Leakage TV-LM-100D 5.6 2.47 Sonitor System TV-LM-100C 105B Containment Leakage TV-LM-101B 19.77 0
0           NA 97B PZR Dead Weight                                                                                      1-RC-176                      0          NA Calibrator                                                                          1-RC-178 97C Containment Leakage                                                                                  TV-LM-100B                    0          NA Monitor System                                                                      TV-T.M-100A
Monitor System TV-LM-101C 105C Centainment Leakace TV-LM-10lD 0.35 0.10 Monitor System TV-LM-101A 106 SI Test Line TV-1842 0
NA TV-1859 109 Containment ATM l-lic-18,1-I:0-16 0.95 0.37 Cleanup 1-IIC-28 113 Iligh IIead SI 1-SI-90 0.26 0.20 MOV-1869B 114 Iligh IIead SI l-SI-201 3
3 MOV-1869A


Pre Repair Post Repair Leakage    Leakage Penetration No.                      Valves Tested            SCFil      SCFil    Remarks 100 Wet Layup                        1-WT-491                  0          NA 1-WT-488 103 Refueling Purification            1-RP-28                    O          NA Inlet                            1-RP-26 104 Refueling Purification            1-RP-6 Outlet                          1-RP-8            -
M M
0          NA 105 Containment Leakage              TV-LM-100D            5.6          2.47 Sonitor System                  TV-LM-100C 105B Containment Leakage              TV-LM-101B            19.77        0 Monitor System                  TV-LM-101C 105C Centainment Leakace              TV-LM-10lD              0.35      0.10 Monitor System                  TV-LM-101A
M M
          "                                                TV-1842 106 SI Test Line                                              0          NA TV-1859 109 Containment ATM                  l-lic-18,1-I:0-16      0.95        0.37 Cleanup                          1-IIC-28 113 Iligh IIead SI                    1-SI-90                0.26        0.20 MOV-1869B 114 Iligh IIead SI                    l-SI-201              3            3 MOV-1869A
M M
 
M M
M     M     M     M     M   M             M     M   M       M M   M   M   M     M M 1981 TYPE C TESTING  
M M
M M
M M
M M
1981 TYPE C TESTING  


==SUMMARY==
==SUMMARY==
Pre Repair Post Repair Leakage Leakage Penetration No.
Valves Tested SCFII SCFII Remarks 1 Component Cooling TV-CC-103B 0
N/A From RIIR lleat Exchanger 2 Component Cooling 1-CC-193 0
N/A to RIIR lleat Exchanger 4 Component Cooling 1-CC-198 0
N/A to RilR IIeat Echanger 5 Component Cooling TV-CC-103A 0
N/A From RiiR IIeat Exchanger 7 Iligh IIcad Safety 1-SI-79 MOV-186?C Injection 1-SI-77 MOV-1867D
.10 fl0 i
8 Component Cooling TV-CC-101A Prom RCP Thermal Barrier TV-CC-101B 0
N/A 9 Air Recirc Cooling Water 1-CC-572 0
N/A 10 Air Recirc Cooling Water 1-CC-559 0
N/A 11 Air Recirc Cooling Water 1-CC-546 0
N/A 12 Air Recirc Cooling Water TV-CC-100B 0
N/A TV-CC-105B 13 Air Recirc Cooling Water TV-CC-100C 0
N/A TV-CC-105C 14 Air Recirc Cooling Water TV-CC-100A 0
N/A Inside cont.
TV-CC-105A 15 Charging 1-CII-3 2 2
.15
.15 MOV-1289A 16 Comp. Cooling to 1-CC-154 0
N/A RCP,s Shroud Cooling TV-CC-104C Coils


Pre Repair  Post Repair Leakage    Leakage Penetration No.              Valves Tested              SCFII      SCFII        Remarks 1 Component Cooling            TV-CC-103B              0            N/A From RIIR lleat Exchanger 2 Component Cooling            1-CC-193                0            N/A to RIIR lleat Exchanger 4 Component Cooling            1-CC-198                0            N/A to RilR IIeat Echanger 5 Component Cooling          TV-CC-103A                0            N/A From RiiR IIeat Exchanger 7 Iligh IIcad Safety          1-SI-79 MOV-186?C Injection                    1-SI-77 MOV-1867D        .10          fl0
M M
    $i 8 Component Cooling          TV-CC-101A Prom RCP Thermal Barrier    TV-CC-101B                0            N/A 9 Air Recirc Cooling Water    1-CC-572                0            N/A 10 Air Recirc Cooling Water    1-CC-559                0            N/A 11 Air Recirc Cooling Water    1-CC-546                0            N/A 12 Air Recirc Cooling Water    TV-CC-100B                0            N/A TV-CC-105B 13 Air Recirc Cooling Water    TV-CC-100C                0            N/A TV-CC-105C 14 Air Recirc Cooling Water    TV-CC-100A                0            N/A Inside cont.                TV-CC-105A 15 Charging                    1-CII-3 2 2              .15          .15 MOV-1289A 16 Comp. Cooling to            1-CC-154                0            N/A RCP,s Shroud Cooling        TV-CC-104C Coils
M M
 
M M
M       M     M   M         M M           M   M         M       M M   M     M   M   M   M Pre Repair   Post Repair Leakage     Leakage Penetration No.               Valves Tested               SCFil       SCFil     Remarks 17 Comp. Cooling to           1-CC-119                 0           N/A RCP's Shroud Cooling         TV-cc-104B Coils 18 Comp. Cooling to           1-CC-119                 0           N/A RCP's Shroud Cooling       TV-CC-104A Colis 19 Seal Water From RCP's       MOV-1380               -
M M
0            N/A 1-Cll-4 02 MOV-1381                                                   .
M M
20 SI Accumulater Makeup       1-SI-110             . O           N/A 1-SI-58 22 liigh IIead SI             1-SI-185                 0           N/A
M M
                          $                                MOV-1836 I                           24 RIIR to RWST               l-RII-3 6                 0           N/A
M M
;                                                          l-Ril-3 7 25 Comp. Cooling From         TV-CC-102E               0           N/A I                             RCP's & Shroud Cooling     TV-CC-102F Coils 26 Comp. Cooling From         TV-CC-102A               .6           .6 I                             RCP's & Shroud Cooling     TV-CC-102B d
M M
Coils 27 Comp. Cooling From         TV-CC-102C               0           N/A RCP's & Shroud Cooling     TV-CC-102D Coils i                         28 RC Letdown                 RV-1203,IICV-1200A,       4           4
Pre Repair Post Repair Leakage Leakage Penetration No.
.,                                                        IICV-120 0B ,IICV-1200C ,
Valves Tested SCFil SCFil Remarks 17 Comp. Cooling to 1-CC-119 0
N/A RCP's Shroud Cooling TV-cc-104B Coils 18 Comp. Cooling to 1-CC-119 0
N/A RCP's Shroud Cooling TV-CC-104A Colis 19 Seal Water From RCP's MOV-1380 0
N/A 1-Cll-4 02 MOV-1381 20 SI Accumulater Makeup 1-SI-110 O
N/A 1-SI-58 22 liigh IIead SI 1-SI-185 0
N/A MOV-1836 I
24 RIIR to RWST l-RII-3 6 0
N/A l-Ril-3 7 25 Comp. Cooling From TV-CC-102E 0
N/A I
RCP's & Shroud Cooling TV-CC-102F Coils 26 Comp. Cooling From TV-CC-102A
.6
.6 I
RCP's & Shroud Cooling TV-CC-102B Coils d
27 Comp. Cooling From TV-CC-102C 0
N/A RCP's & Shroud Cooling TV-CC-102D Coils i
28 RC Letdown RV-1203,IICV-1200A, 4
4 IICV-120 0B,IICV-1200C,
IICV-ll4 2, TV-1204
IICV-ll4 2, TV-1204


M M     M     M     M   M                                         M     M     M M M                 M M                                   M M           M M Pre Repair             Post Repair Leakage               Leakage Penetration No.                                                   Valves Tested       SCFH                   SCFil                           Remarks 29 Cont. Atm. Cleanup                                             1-IIC-14         0                     N/A 1-IIC-31 1-IIC-12 32 Wet Layup                                                       1-WT-468         0                     N/A 1-WT-465 33 Primary Drains Transfer                                         TV-DG-lOOA       0                     N/A Pump Discharge                                                 TV-DG-100B 34 Fire Protection                                                 1-FP-2.52       .6                     .6 1-FP-274 38 Sump Pump Dischg.                                               TV-DA-100A       .55                   .55
M M
            ,                                                                    TV-DA-100B to E 39 SG Blowdown                                                     TV-BD-100A       0                     N/A o                                                                     TV-BD-100B 40 SG Blowdown                                                     TV-BD-100E       .25                   .25 TV-BD-100F
M M
;              41 SG Blowdown                                                     TV-BD-100C       0                     N/A l                                                                                 TV-bd-100D i
M M
42 Service Air                                                     1-SA-58         0                     N/A 1-SA-57 43 Air Monitor Sample                                             TV-RM-100D       0                     N/A TV-RM-100A 44 Air Monitor Sample                                             TV-RM-100B       0                     N/A TV-RM-100C 45 PG Water                                                       1-RC-149         0                     N/A TV-1519A
M M
* 46 Loop Fill                                                       1-Cll-3 3 0     0                     N/A FCV-ll60
M M
M M
M M
M M
M Pre Repair Post Repair Leakage Leakage Penetration No.
Valves Tested SCFH SCFil Remarks 29 Cont. Atm. Cleanup 1-IIC-14 0
N/A 1-IIC-31 1-IIC-12 32 Wet Layup 1-WT-468 0
N/A 1-WT-465 33 Primary Drains Transfer TV-DG-lOOA 0
N/A Pump Discharge TV-DG-100B 34 Fire Protection 1-FP-2.52
.6
.6 1-FP-274 38 Sump Pump Dischg.
TV-DA-100A
.55
.55 TV-DA-100B to E
39 SG Blowdown TV-BD-100A 0
N/A o
TV-BD-100B 40 SG Blowdown TV-BD-100E
.25
.25 TV-BD-100F 41 SG Blowdown TV-BD-100C 0
N/A l
TV-bd-100D i
42 Service Air 1-SA-58 0
N/A 1-SA-57 43 Air Monitor Sample TV-RM-100D 0
N/A TV-RM-100A 44 Air Monitor Sample TV-RM-100B 0
N/A TV-RM-100C 45 PG Water 1-RC-149 0
N/A TV-1519A 46 Loop Fill 1-Cll-3 3 0 0
N/A FCV-ll60


M     M           M     M   M     M     M M M       M M M       M         M     M                                                         M Pre Repair   Post Repair Leakage     Leakage Penetration No.               Valves Tested     SCFil         S C Fil               Remarks 47 Inst. Air                 TV-IA-102B       0           N/A 1-IA-55 48 Primary Vent IIcader       TV-VG-100A       0           N/A TV-VG-100B 50 Nitrogen to Waste Gas     !!CV-1936       0           N/A Charcoal Filters           TV-SI-101 53 Nitrogen to PRT           l-SI-106       ,0           N/A TV-SI-100 54 Primary Vent POT Vent     1-DA-39         0           N/A 1-DA-41 u 55 PRT Gas Space Sample       TV-55-104A       0           N/A 7   Vent                       TV-55-104B w
M M
55B Cont. Leakage Monitoring TV-LM-100E       0           N/A TV-LM-100P 56 Primary Coolant Cold       TV-SS-102A       0           N/A Leg Sample                 TV-SS-102B
M M
;    56B Primary Coolant Ilot     TV-SS-106A       0           N/A Leg Sample               TV-SS-106B 56C PZR Liquid Space         TV-SS-100A       0           N/A Sample                   TV-SS-100B 56D SG Blowdown Sample         TV-SS-ll2A       0           N/A TV-SS-ll2B
M M
;    57 Cont. Leakage Monitoring   TV-LM-100G       0           N/A TV-LM-100A 57B PZR Vapor Space Sample     TV-SS-101B       0           N/A TV-SS-101A
M M
_    __-._m- . _ _        _ _ _ _ _ _ _ _ _ _ _ . . _ _ _ _ _ _ _ _ _ _ _ _
M M
M M
M M
M M
Pre Repair Post Repair Leakage Leakage Penetration No.
Valves Tested SCFil S C Fil Remarks 47 Inst. Air TV-IA-102B 0
N/A 1-IA-55 48 Primary Vent IIcader TV-VG-100A 0
N/A TV-VG-100B 50 Nitrogen to Waste Gas
!!CV-1936 0
N/A Charcoal Filters TV-SI-101 53 Nitrogen to PRT l-SI-106
,0 N/A TV-SI-100 54 Primary Vent POT Vent 1-DA-39 0
N/A 1-DA-41 55 PRT Gas Space Sample TV-55-104A 0
N/A u
7 Vent TV-55-104B w
55B Cont. Leakage Monitoring TV-LM-100E 0
N/A TV-LM-100P 56 Primary Coolant Cold TV-SS-102A 0
N/A Leg Sample TV-SS-102B 56B Primary Coolant Ilot TV-SS-106A 0
N/A Leg Sample TV-SS-106B 56C PZR Liquid Space TV-SS-100A 0
N/A Sample TV-SS-100B 56D SG Blowdown Sample TV-SS-ll2A 0
N/A TV-SS-ll2B 57 Cont. Leakage Monitoring TV-LM-100G 0
N/A TV-LM-100A 57B PZR Vapor Space Sample TV-SS-101B 0
N/A TV-SS-101A
-. m-


Pre Repair   Post Repair
Pre Repair Post Repair
                                                                                                            . Leakage     Leakage Penetration No.                                                 Valves Tested       SCFII       SCFil       Remarks 60 Low IIcad SI Dischg.                                         1-SI-207             0         N ,'A MOV-1890B 61 Low Ilead SI Dischg.                                         1-SI-206             0         N/A Mov-1890A 62 Low Ilead SI Dischg.                                         MOV-1890C,Mov-1890D 0         N/A 1-SI-197,1-SI-199 1-SI-195 63 QS Pump Dischg.                                               MOV-OS-101B         0         N/A 1-QS-19 64 QS Pump Dischg.                                               MOV-QS-101A         0         N/A g                                                                 1-OS-ll i
. Leakage Leakage Penetration No.
[ 66 Casing Cooling To                                             MOV-RS-100A         4           4 Recirc Spray                                             MOV-RS-101A 67 Casing Cooling To                                             MOV-RS-100B         0         N/A Recirc Spray                                             MOV-RS-101B 70 Recirc Spray Pump                                             MOV-RS-156B         1.2       1.2 Dischg.                                                   1-RS-27 71 Recirc Spray Pump                                             MOV-RS-156A         1.3         1.3 Dischg.                                                   l_RS-18 79 Recirc. Spray Service                                         MOV-SW-103D         790       4.6           Valve Rcworked Water 80 Recirc. Spray Service                                         MOV-SW-103C         790       0             Valve Reworked Water 81 Recire. Spray Serv. Water                                     MOV-SW-103B         1.0         1.0 82 Recirc. Spray Serv. Water                                     MOV-SW-103A         3.6       3.6
Valves Tested SCFII SCFil Remarks 60 Low IIcad SI Dischg.
1-SI-207 0
N,'A MOV-1890B 61 Low Ilead SI Dischg.
1-SI-206 0
N/A Mov-1890A 62 Low Ilead SI Dischg.
MOV-1890C,Mov-1890D 0
N/A 1-SI-197,1-SI-199 1-SI-195 63 QS Pump Dischg.
MOV-OS-101B 0
N/A 1-QS-19 64 QS Pump Dischg.
MOV-QS-101A 0
N/A g
1-OS-ll i
[
66 Casing Cooling To MOV-RS-100A 4
4 Recirc Spray MOV-RS-101A 67 Casing Cooling To MOV-RS-100B 0
N/A Recirc Spray MOV-RS-101B 70 Recirc Spray Pump MOV-RS-156B 1.2 1.2 Dischg.
1-RS-27 71 Recirc Spray Pump MOV-RS-156A 1.3 1.3 Dischg.
l_RS-18 79 Recirc. Spray Service MOV-SW-103D 790 4.6 Valve Rcworked Water 80 Recirc. Spray Service MOV-SW-103C 790 0
Valve Reworked Water 81 Recire. Spray Serv. Water MOV-SW-103B 1.0 1.0 82 Recirc. Spray Serv. Water MOV-SW-103A 3.6 3.6


m                       M                                                               M     M     M     M                 -
m M
Pre Repair Post Repair Leakage   Leakage Penetration No.                                                                           Valves Tested     SCFil     SCFH       Remarks 83 Recire. Spray Serv. Water                                                             MOV-SW-104D       .5         .5 84 Recirc. Spray Serv. Water                                                             MOV-SW-104C       90         8           Valve Reworked 85 Recirc. Spray Serv. Water                                                             MOV-SW-104B       90         0           Valve Reworked 86 Recirc. Spray Serv. Water                                                             MOV-SW-104A       .5         .5 I   89 Air Ejector Vent                                                                       TV-SV-102-1       17         .95         TV-SV-102-1 4
M M
Reworked 90 Purge Duct                                                                             MOV-IIV-100C       5         5 MOV-IIV-100D
M M
, $                                                                                          MOV-IIV-101 I
Pre Repair Post Repair Leakage Leakage Penetration No.
U 91 Purge Duct                                                                             MOV-IIV-100A       3         3 MOV-liv-100B MOV-IIV-10 2 92 Cont. Vacuum Pump Suction                                                             TV-CC-150C         0         N/A TV-CC-150D 93 Cont. Vacuum Pump Suction                                                             TV-CC-150A         0         N/A i                                                                                             TV-CC-150B 94 Ejection Suction                                                                       TV-CV-100         0           N/A 1-CV-4 97 Liquid Sample                                                                           /-SS-103B       0           N/A 97B PZR Dead Wt. Caubrator                                                               1-RC-176         0           N/A l-RC-178     -
Valves Tested SCFil SCFH Remarks 83 Recire. Spray Serv. Water MOV-SW-104D
97C Cont. Leakage Monitor                                                                 TV-LM-100B         0         N/A System                                                                       TV-LM-100A 100 Wet Layup                                                                             1-WT-491         0           N/A 1-WT-488
.5
.5 84 Recirc. Spray Serv. Water MOV-SW-104C 90 8
Valve Reworked 85 Recirc. Spray Serv. Water MOV-SW-104B 90 0
Valve Reworked 86 Recirc. Spray Serv. Water MOV-SW-104A
.5
.5 I
89 Air Ejector Vent TV-SV-102-1 17
.95 TV-SV-102-1 4
Reworked 90 Purge Duct MOV-IIV-100C 5
5 MOV-IIV-100D MOV-IIV-101 I
U 91 Purge Duct MOV-IIV-100A 3
3 MOV-liv-100B MOV-IIV-10 2 92 Cont. Vacuum Pump Suction TV-CC-150C 0
N/A TV-CC-150D 93 Cont. Vacuum Pump Suction TV-CC-150A 0
N/A i
TV-CC-150B 94 Ejection Suction TV-CV-100 0
N/A 1-CV-4 97 Liquid Sample
/-SS-103B 0
N/A 97B PZR Dead Wt. Caubrator 1-RC-176 0
N/A l-RC-178 97C Cont. Leakage Monitor TV-LM-100B 0
N/A System TV-LM-100A 100 Wet Layup 1-WT-491 0
N/A 1-WT-488


m     M Pre Repair Post Repair Leakage   Leakage
m M
                      .,n No.                                             Valves Tested       SCFil     SCFII       Remarks 103 Refueling Purification                                               1-RP-28             0         N/A Inlet                                                   1-RP-26 104 Refueling Purification                                               1-RP-6             0         N/A Outlet                                                   1-RP-8 105 Cont. Leakage Monitor                                                 TV-IJ1-10 0 D       1.9       0           TV-LM-100D System                                                   TV-LM-100C                                 Reworked 105B Cont. Leakage Monitor                                               TV-LM-101B         0         N/A System                                                   TV-LM-101C 105C Cont. Leakage Monitor                                               TV-LM-101D         .255       N/A System                                                 TV-LM-101C       .
Pre Repair Post Repair Leakage Leakage
106 SI Test Line                                                         TV-1842             0         N/A
.,n No.
[                                                                           TV-1859 108 Wet Layup                                                             1-WT-514           0         N/A 1-WT-511 109 Cont. ATM Cleanup                                                     1-IIC-18,1-IIC-16   0         N/A 1-IIC- 2 8 113 liigh Ilead SI                                                       l-SI-90             0         N/A MOV-1869B 114 Iligh IIead SI                                                       l-SI-201           .85       N/A MOV-1869A}}
Valves Tested SCFil SCFII Remarks 103 Refueling Purification 1-RP-28 0
N/A Inlet 1-RP-26 104 Refueling Purification 1-RP-6 0
N/A Outlet 1-RP-8 105 Cont. Leakage Monitor TV-IJ1-10 0 D 1.9 0
TV-LM-100D System TV-LM-100C Reworked 105B Cont. Leakage Monitor TV-LM-101B 0
N/A System TV-LM-101C 105C Cont. Leakage Monitor TV-LM-101D
.255 N/A System TV-LM-101C 106 SI Test Line TV-1842 0
N/A
[
TV-1859 108 Wet Layup 1-WT-514 0
N/A 1-WT-511 109 Cont. ATM Cleanup 1-IIC-18,1-IIC-16 0
N/A 1-IIC-2 8 113 liigh Ilead SI l-SI-90 0
N/A MOV-1869B 114 Iligh IIead SI l-SI-201
.85 N/A MOV-1869A}}

Latest revision as of 10:55, 23 December 2024

Unit 1 Reactor Containment Bldg Integrated Leak Rate Test Type A,B & C Surveillance Test,Mar 1981
ML20004E072
Person / Time
Site: North Anna Dominion icon.png
Issue date: 03/31/1981
From: Cartwright W, Stall J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20004E068 List:
References
NUDOCS 8106110104
Download: ML20004E072 (45)


Text

...

O l

I REACTOR CONTAINMENT BUILDING INTEGRATED LEAK RATE TEST TYPE A, B, AND C SURVEILLANCE TEST VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT NO. 1 I

MARCH 1981 PREPARED BY:

APPROVED BY:

i L

LVl R.CARTWRIGid, CHAIRMAN J. A.

STALL, ENGINEER W.

NUCLEAR OPERATIONS STATION NUCLEAR SAFETY l

AND MAINTENANCE OPERATING COMMITTEE l

l

{

l

%)o&IID/of

I l

I TABLE OF CONTENTS Page_

Section ii REFERENCES.

1-1 PURPOSE.

2-1

SUMMARY

3-1 TYPE A TEST 3-2 GENERAL TEST DESCRIPTION.

3-2 Prerequisites.

3-2 Equipment and Instrumentation.

3-3 I

Data Acquisition System.

3-3 Data Resolution System.

3-4 TEST ANALYSIS.

3-5 TEST RESULTS.

I 3-5 OILRT Results.

3-6 Verification Test Results.

Type B and C Penetration Leakage To Be 3-6 I

Added to Containment Calculated Leakage.

Appendices 3A

SUMMARY

OF PRETEST AND POST-TEST CALIBRATION 3A-1 CHECKS ON RTT S AND DEW CELLS 3B-1 3B SITE METEOROLOGY DURING CILRT 3C-1 3C INSTRUMENTATION TABLE 3D-1 3D INSTRUMENTATION LOCATIONS 3E-1 3E CONTAINMENT INPUT VARIABLES 3F-1 3F LEAK RATE DATA - ABSOLUTE METHOD.

3G-1 3G CONTAINMENT MASS VS. TIME 3e-1 3N tEAx RATE vS TIME.

g 4A-1 4A 1979 AND 1981 TYPE B DATA

SUMMARY

4B-1 4B 1979 AND 1981 TYPE C DATA

SUMMARY

i

[

I I

REFERENCES 1

10CFR50 Appendix J, Primary Reactor Containment Leakage Testing For Water Cooled Power Reactors, April 1976 2

ANS N274, Containment System Leakage Testing Requirements, I

Draft 3, July 1979 3

1-PT-61.1, Reactor Containment Building Integrated Leak Rate Test, February 25, 1981 I

I I

I I

I lI I

I l

l I

ii

I I

SECTION 1 PURPOSE I

The purpose of this report is to present a description and analysis of the Surveillance Types A, B, and C Containment Leak Rate Tests (CILRT) results conducted on the Virginia Electric and Power Company's North Anna Power Station, Unit I

No. 1.

This report is submitted as required by 10CFR50, Appendix J, paragraph V.B.

(Reference 1).

I I

I I

I I

I I

I I

I I

g 1-1

I I

SECTION 2

SUMMARY

2.1 TYPE A TEST The North Anna Unit 1 Containment Integrated Leak Rate Test I

(CILRT) was performed from March 9-11, 1981.

The following is a summary of activities prior to and during the performance of the test.

Pressurization for the Type A test was initiated at approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> on March 9, 1981, after satisfactory completion of all test prerequisites, including walkdown of the interior and I

exterior of the containment building.

After several problems related to removal of H bus for maintenance were encountered and resolved (see Section 3), containment pressurization to 58.3 psia was achieved at approximately 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> March 9, 1981.

At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on March 10, 1981, containment temperature stabili-zation criteria were met and the 24 hour2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> leak rate test was I

officially started.

After approximately 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of data collec-tion, the overall leak rate had dropped to 0.66 La and continued to decrease until the twenty-fourth hour at which time it was less than 0.17 La.

At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> on March 11, 1981, the mass pumpback verification test commenced.

At 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br /> approximately 394 lbm of air had I

been pumped into the containment via the service air line.

The computer calculated mass increase was within the acceptable limit and the test was secured.

At approximately 0900 containment depressurization was initiated.

2.2 LOCAL LEAK RATE TESTS (TYPES B AND C)

The local leak rate testing of containment isolation valves and primary containment penetrations was conducted as required by station procedures.

The penetrations tested and their associated leak rates are listed in Section 4 of this report.

I I

I I

2-1

I I

SECTION 3 TYPE A TEST

~I 3.1 EDITED LOG OF EVENTS March 9, 1981 After all procedure initial conditions had been satisfied, the I

North Anna Unit Number 1 Containment Integrated Leak Rate Test (CILRT) 1-PT-61.1 began at approximately 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />.

Containment pressurization was accomplished with approximately 10,000 SCFM tf oil free air.

Containment atmosphere was I

centrolled with containment recirculation air fans operating with chilled water.

I At 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> pressurization of the containment was halted when H bus was deenergized for maintenance.

When H bus was deenergized, power to rad monitors RMS 159, 160, and 162 was lost.

This caused the monitors to alarm, which led to I

closure of MOV-HV102 and MOV-HV100A.

These valves are located in the purge and exhaust line which was the line that was used for pressurization.

Containment pressure at this time was 38 psia.

Containment pressurization was reinitiated at 1224 hours0.0142 days <br />0.34 hours <br />0.00202 weeks <br />4.65732e-4 months <br />.

Pressurization continued until 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br />, at which time all I

compressors were secured.

The pressure at this time was 58.3 psia.

8 At 1724 containment recirculation air fan 1-HV-F-1A tripped due to deenergizing H bus once again.

An approved jumper was prepared to power 1-HV-F-1A from the J bus.

At 2032 hours0.0235 days <br />0.564 hours <br />0.00336 weeks <br />7.73176e-4 months <br /> all I

three (3) containment recirculation air fans were once again operable.

At 2215 hours0.0256 days <br />0.615 hours <br />0.00366 weeks <br />8.428075e-4 months <br />, 1-HV-F-lA once again tripped, this time due to I

an overload on the feeder breaker used in the temporary jumper written to power 1-HV-F-1A from the J bus.

'E At this time it was decided to perform the type A test with 5

only two (2) operable containment recirculation air fans.

March 10, 1981 Containment temperature stabilization criteria were met at 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> on March 10, 1981.

After approximately 2.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> of data collection, the overall leak rate had dropped to 0.66 La and continued to decrease until the twenty-fourth hour, at which time it was less than I

.17 La.

3-1

I I

March 11, 1981 At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> on March 11 the mass pumpback verification test commenced.

At 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />, approximately 394 lbm of air had I

been pumped into the containment via the service air line.

The computer calculated mass increase was within the acceptable limit and the test was secured.

At approximately 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> containment depressurization was started.

3.2 GENERAL TEST DESCRIPTION 3.2.1 Prerequisites In accordance with the North Anna Unit No. 1 CILRT l-PT-61.1, t

the following is a partial listing of prerequisites that are completed and documented prior to containment pressurization.

1.

General inspection of the accessible interior and I

exterior surfaces of the containment structure was performed.

I 2.

All equipment and instrumentation that could be da.maged or destroyed by test pressure was removed or vented.

3.

All instrumentation used for this test was calibrated.

4.

Valve line-ups, as required, were completed including closure of the containment isolation valves.

5.

Componen* cooling and chilled water systems were operable.

6.

Plant computers w3re operational and programmed for the CILRT.

7.

Instrument location verification tests were completed (see Appendix 3D).

8.

The Official Log of Events book was established and available prior to initiation of the CILRT.

3.2.2 Equipment and Instrumentation Pressul-ization of the containment was achieved by utilization I

of approximately 10,000 SCFM of oil free compressed air.

Air was piped through two (2) aftercoolers in parallel and a refrig-erated air dryer.

The dryer was sized to deliver air at approxi-I mately 100 psig with a 40* dew point.

Instrumentation and valving were installed to maintain proper monitoring and control during pressurization.

I 3-2

I.

During the test, the variables necessary to quantify containment leakage were continually monitored using instrumentation which consisted of multiple resistance temperature detectors (RTD'S),

5 Foxboro dew cells, and two absolute pressure quartz manometers (see Appendix 3C).

A gas totalizer in the service air system was used during the I

mass pumpback verification test.

All test instrumentation except for the gas totaliser is input into the plant computer for data acquisition and averaging.

3.2.3 Data Acquisition System The North Anna Unit 1 CILRT utilized a Westinghouse Prodac P250 I.

to scan, log, and average, and analyze data received from the containment instrumentation.

I The p250 analog scan package reads all analog inputs in a pre-established manner, converts these readings into engineering units, and then stores these values for use by the plant engineers.

For the CILRT, the P250 plant computer monitored the following instrumentation:

Tyge Scan Rate (Sec.)

18 RTD's 20 5 Dew Cells 20 2 Quartz Manometers 2

Instantaneous values of the CILRT instruments were recorded I

every 5 minutes during the test period using the P250 digital trend function on the operatcr's console.

A 10 minute time average of the 25 readings, calculated by the I

p250 Average and Integrate (A&I) package, was used as input in the plant computer CILRT programs.

I The plant computer CILRT program consists of ILRTDATA, which runs ev_ry 10 minutes, collects A&I data for all the instrumentation, performs sensor validity checks, and calculates weighted average dew point temperature, vapor pressure, weighted average contain-I ment temperature, and containment air mass.

3.2.4 Data Resolution System After the appropriate data has been acquired and averaged utilizing the plant computer system, the results are manually input to a remote computer system for leak rate calculations.

I i I I

3-3

I I

I 3.2.4.1 Absolute Method Mass Point Analysis The absolute method of mass point analysis consists of calculating I

air masses within the containment structure over a period of time from pressure, temperature, and dew point observations during the CILRT.

The air masses are computed using the ideal gas law as follows:

M=

(P-Pv)

V (144)

(Eq. 1)

RT where:

M = air mass, lb P = total pressure, psia Pv = average vapor pressure, psia I

R = 53.35 ft lbf/lbm *R (for air)

T = average containment temperature, 'R V = containment free volume, ft3 The leakage rate is then determined by plotting the air mass as a function of time, using a least-squares fit to determine the slope, A (dm/dt).

The leak rate is expressed as a percentage of air mass lost in 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or:

Leak Rate = A/B (-2400)

(Eq. 2) where:

I A = slope of least squares fit curve B = y-intercept The sign convention is such that an outward leak is positive and I

the units are in percent / day.

The air mass is computed separately and the result is correlated as a function of time by means of Icest-squares fit of the form:

a I

m = At + B (Eq. 3) l The slope A and the y intercept B are then used in Equation 2 to I

determine the leak rate.

A 95 percent confidence interval is calculated using a student's T distribution.

The sum of leakage rate and the 95 percent confidence interval is I

the t'CL.

Therefore, the leak rate is less than the UCL with a probability of 95 percent.

lI

'I 3-4

I I

3.3 TEST ANALYSIS The data obtained from the data acquisition system for the period I

from 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> March 10, 1981 to 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> March 11, 1981, were utilized for the test analysis.

The interval between approximately 1630 hours0.0189 days <br />0.453 hours <br />0.0027 weeks <br />6.20215e-4 months <br /> March 9, 1981 to 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> March 10, 1981 represents the containment stabilization period.

The leakage rate analysis is performed by Virginia Electric and Power Company's (VEPCO) CILRT program.

The input data for the VEPCO CILRT program are shown in Appendix 3E.

The absolute method mass point analysis was used to calculate the containment building leakage rate.

The results (Appendix 3F) show I

the UCL to be 0.01656 percent / day, which is within the acceptable limit of 0.07/ day (0.075 less t1:e Type C penalty for valves on systems not vented to the contai. ment).

W' The following appendixes summarize ti.3 plots provided by this report:

I Appendix Description _

3G Containment air mass vs. time 3H Containment leakage rate vs. time The leakage rate test calculations were verified by the mass pump back method.

Approximately 4813 ft3 was inserted during approxi-mately 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of elapsed time.

The computer calculated-air mass I

was within 0.25 La of the metered value (refer to Section 3.4.2).

3.4 TEST RESULTS 3.4.1 CILRT Results - Mass Point Method 1.

Leakage rate calculated, Lam

.0126 percent / day 2.

95% upper confidence interval

.00394 percent / day I

3.

UCL, Lam leakage rate with 95%

confidence interval (1 + 2)

.0165 percent / day f~)

4.

Correction for types B and C h

leakage

.005 percent / day 5.

Total reportable type A leak I

rate

.0215 percent / day

- I 3-5

I I

3.4.2 Verification Test Results 1.

Metered mass of air inserted 393.75 lbm 2.

Difference between initial computer air mass and final computer air mass 274.10 lbm 3.

0.25 I 2 verification limit 138.69 lbm I

4.

Difference between computer 119.65 lbm air mass difference and metered air (1-2)

Therefore, the calculated CILRT air mass increase agreed with the mass pump back verification instrumentation within 0.25 La in accordance with 10CFR50, Appendix J.

3.4.3 Types B and C Penetration Leakage To Be Added to the Containment Calculated Leakage Penetration Leakage Penetration Leakage No.

(SCFH)

No.

(SCFH) 1 0

56A 0

2 0

56B 0

4 0

56D 0

I 5

0 57A 0

7 0.1 60 0

8 0

61 0

9 0

62 0

I 10 0

63 0

11 0

64 0

12 0

70 1.2 I

13 0

71 1.3 14 0

79 1.19 15 1.5 80 0

16 0

91 0.04 I

17 0

82 3.6 18 0

83 0.5 lI 19 0

84 0.03 22 0

85 0

24 0

86 0.5 25 0

97A 0

26 0.6 97C 0

1I 27 0

105A 0

f 28 4.0 105B 0

m 39 0

105C 0.26 E

40 0.25 113 0

l 41 0

114 0.85 l

46 0

32 0

SSB 0

34 0.6 l

lt 3-6

(

I I

I Penetration leakage No.

(SCFH) 100 0

lilD 0

108 0

Total Type C leakage to be added 15.52 SCFH Total Type B leakage to be added 0

SCFH Total Types B and C leakage to be 15.52 SCFH added 0.005 percent / day i

NOTE:

The above penetrations were in a non-vented valve lineup for the CILRT.

I I

I I

I I

I I

I 3-7 I

I APPENDIX 3A SUMMIRY OF PRETEST AND POST-TEST CALIBRATION CHECKS ON RTD'S AND DEW CELLS 1.

Test No. 1 (Pre-Test) a.

The temperature difference between each RTD computer I

point and a calibrated digital thermometer inserted into a beaker of ice water and a beaker of approxi-mately 100-110* F water was less than 1* F.

NOTE:

Acceptance Criteria The temperature difference between each RTD and a cali-I brated reference thermometer was less than or equal to 1

F.

b.

The weighted average dew point temperature as deter-I mined by a calibrated psychrometer agreed with the weighted average dew point temperature as determined by the dew cells within 5 F.

NOTE:

Acceptance Criteria The weighted average dew point temperature by the I

psychrometer is within + 5 F of the weighted dew point average temperature by dew cells.

2.

Test No. 2 (Post-Test) a.

The temperature difference between each readily acces-iI sible RTD (computer point) and a calibrated digital thermometer inserted into a beaker of ambient water was less than 1* F.

NOTE:

Acceptance Criteria l

The temperature difference between each RTD checked

' g and a calibrated reference thermometer was less than

!5 cr equal to 1 F.

lg b.

The weighted average dew point temperature as determined E

by a ca11brated psychrometer agreed with the average dew point temperature as determined by the dew cells within 5* F.

NOTE:

Acceptance Crite?:ia The weighted average dew point temperature by the psychro-

'I meter is within + 5' F of the weighted dew point average temperature by TIE. dew cells.

lI 1

3A-1

APPENDIX 3B SITE METEOROLOGY DURING THE CILRT I

BAROMETRIC WIND SPEED TIME TEMP *F PRESSURE (MPH)

WIND DIRECTION 0000 33 30.25 3

270*

0100 32 30.24 3

270 I

0200 30 30.24 3

270*

0300 31 30.23 3

270*

3400 30 30.23 4

270*

0500 32 30.23 4

270 I

0600 32 30.23 6

270*

0700 38 30.24 2

320*

0800 45 30.22 7

270*

I 0900 48 30.22 5

260 1000 48 30.21 5

260*

1100 49 30.20 9

250' 1200 49 30.17 8

280*

I 1300 50 30.16 8

320*

1400 50 30.16 12 270*

1500 48 30.17 19 300 I

1600 48 30.18 13 310*.

1700 44 30.19 5

270*

1800 41 30.17 4

260*

l 1900 38 30.18 13 270*

l 2000 37 30.18 8

270 2100 37 30.18 5

180 l

2200 35 30.18 2

120 2300 33 30.16 6

120*

l 2400 32 30.14 6

270*

l lI I

lI

'I I

!I 3B-1 l

I I

APPENDIX 3C INSTRUMENTATION TABLE The following instrumentation was calibrated, and functionally tested, no greater than 6 months prior to performance of the CILRT in accordance with 10CFR50, Appendix J, and Field Cali-I bration Procedures using instrumentation traceable to the National Bureau of Standards.

Instrument Range Accuracy TE-LM-100-3 0-200*F

+ 0.5*F I

TE-LM-100-4 0-200*F I 0.5*F TE-LM-100-5 0-200*F T 0.5*F TE-U1-100-6 0-20G*F T 0.5*F TE-LM-100-7 0-200*F T 0.5*F I

TE-LM-100-8 0-200*F T 0.5*F TE-LM-100-9 0-200 F T 0.5*F TE-LM-100-10 0-200*F T 0.5 F I

TE-LM-100-ll 0-200 F T 0.5 F TE-LM-100-12 0-200 F T 0.5 F TE-LM-100-13 0-200*F I 0.5 F TE-LM-100-14 0-200*F T 0.5*F I

TE-LM-100-15 0-200 F I 0.5 F TL-2-100-16 0-200 F T 0.5 F TE-LM-100-17 0-200*F T 0.5 F I

TE-LM-100-18 0-200 F T 0.5 F TE-LM-10 0-19 0-200 F T 0.5 F TE-LM-100-20 0-200*F T 0.5 F I

MT-LM-100-1 32-110*F I 1 to 2 F MT-LM-100-2 32-110*F I 1 to 2 F MT-LM-10 0-4 32-110*F T 1 to 2 F MT-LM-100-5 32-110*F

~ 1 to 2*F I

MT-U1-100-6 32-110*F 1 to 2*F r

PI-LM-102 0-100 psia T 0.01%

PI-LM-107 0-100 psia T 0.01%

I FIT-LM-100-1 0-100 scfm T 2% of range FIT-LM-100-2 0-100 scfm

[ 2% of range I

I I

I 3C-1

APPEtiDIX 3D INSTRUMENTATION LOCATION I

l M

N TE-7 MT-1 TE-8

\\

TE-12 TE-13 TE-11 TE-19\\

TE-4 \\]

_TE-15 TE-3 TE-16 s s TE-6 MT-5 p

F g

o

!I r

o 9

i!

I

/

/ /

\\

\\

l Tg_17 6(3/

I TE-18 TE-20 TE-14 I

I lI 3oe

I I

~

INSTRUMENTATION LOCATION I

-TE-4 MT-2 TE-15 TE-3 TE-8 TE-16 I

MT-5 TE-5 TE-18 TE-13 3

N i

\\

TE-14 3

I

\\

l i

TE-20 TE-ll TT-1 I

m 'o

\\

u-7 e\\

l MT-1

\\

TE-6 MTP-3 TE-19 TE-17

I MT-4 TE-12 l

, I

!I

8 I

APPENDIX 3E VEPCO NORTH ANNA POWER STATION UNIT 1 INTEGRATED LEAK RATE TEST FROM 0206 HOURS ON 3/10/81 TO 0208 HOURS ON'3/11/81 68 DATA SETS ARE IN ABS PRESSURE DEWPOINT VAPOR PRESSURE TEMP TIME PSIA

'F PSIA

'F 0.0 57.944 54.25 0.2081 530.06 0.0350 57.939 54.39 0.2092 530.03 0.700 57.934 54.22 0.2079 529.98 I

1.050 57.929 54.26 0.2082 529.96 1.417 57.927 54.38 0.2091 529.92 1.767 57.923 54.33 0.2088 529.89 2.117 57.920 54.24 0.2081 529.84 I

2.483 57.916 54.32 0.2087 529.80 2.833 57.913 54.41 0.2094 529.78 3.200 57.910 54.41 0.2094 529.75 I

3.550 57.906 54.56 0.2105 529.72 3.900 57.904 54.43 0.2095 529.72 4.250 57.901 54.45 0.2097 529.66

'g 4.600 57.899 54.49 0.2100 529.68

'E 4.967 57.896 54.38 0.2091 529.',4 5.483 57.892 54.50 0.2101 529.61 5.833 57.890 54.56 0.2105 529.61 I

6.183 57.888 54.53 0.2103 529.60 6.533 57.887 54.59 0.2107 529.55 6.883 57.886 94.69 0.2115 529.56 I

7.233 57.885 a4.60 0.2108 529.55 7.583 57.885 54.59 0.2107 529.55 7.917 57.887 54.72 0.2117 529.59 8.267 37.889 54.71 0.2117 529.57 I

8.617 57.890 54.59 0.2107 529.60 8.983 57.891 54.71 0.2117 529.58 9.333 57.891 54.68 0.2114 529.60 I

9.683 57.893 54.72 0.2117 529.61 10.017 57.894 54.85 0.2128 529.61 10.393 57.894 54.78 0.2122 529.63 10.733 57.895 54.65 0.2112 529.65 I

11.083 57.895 54.81 0.2124 529.64 11.417 57.895 54.72 0.2117 529.67 11.767 57.895 54.87 0.2129 529.65 I

12.117 57.895 54.81 0.2124 529.67 12.483 57.895 54.83 0.2126 529.66 12.833

'7.895 54.83 0.2126 529.68 13.183 57.895 54.90 0.2131 529.66 I

13.533 57.895 55.00 0.2139 529.67 14.050 57.895 55.00 0.2139 529.66 14.400 57.895 54.99 0.2138 329.69 14.767 57.895 54.98 0.2138 529.66 I

3E-1 n

i i

I ABS PRESSURE DEWPOINT VAPOR PRESSURE TEMP TIME PSIA

  • F PSIA

'F 15.117 57.895 54.87 0.2129 529.67 I

15.467 57.895 54.84 v.2127 529.64 15.817 57.894 55.04 0.2142 529.62 16.167 57.893 54.76 0.2121 529.60 16.517 57.891 54.84 0.2127 529.63 I

16.867 57.889 54.96 0.2136 529.59 17.217 57.886 54.89 0.2131 529.54 17.567 57.884 54.91 0.2132 529.54 I

17.93' 57.882 54.91 0.2132 529.55 s

18.26) 57.880 55.07 0.2145 529.52 18.633 57.878 55.04 0.2142 529.49 19.150 57.876 55.07 0.2145 529.45 I

19.517 57.875 55.26 0.2159 529.45 19.867 57.873 55.18 0.2153 529.46 20.217 57.871 55'.15 0.2151 529.44 I

20.567 57.868 54.90 0.2131 529.38 20.917 57.866 54.93 0.2134 529.35 11.267 57.864 54.87 0.2129 529.31 Pl.617 57.862 55.10 0.2147 529.31 I

~1.967 57.860 54.91 0.2132 529.29 22.317 57.859 55.04 0.2142 529.31 22.667 57.857 55.03 0.2141 529.28 I

23.033 57.855 55.03 0.2141 529.28 23.383

$7.853 55.10 0.2147 529.25 23.933 57.850 54.95 0.2135 529.19 24.100 57.249 55.07 0.2145 529.20 I

I I

I I

I I

I 28-2

APPENDIX 3F VEPCO NORTH ANNA POWER STATION UNIT 1 I

INTEGRATED LEAK RATE TEST FROM 0206 HOURS ON 3/10/81 TO 0208 HOURS ON 3/11/81 68 DATA SETS ARE CURRENTLY IN

..... ABSOLUTE TEST METHOD, MASS POINT ANALYSIS......

I Time Mass Leakage Conf Ucl Hours Lbm Pct / day Pct / day Pet / day 0.0 536557.17 0.0 0.0 0.0 0.350 536531.16 0.0 0.0 0.0 I

0.700 536547.34 0.062849 1.113669 1.176519 1.050 536518.28 0.128421 0.305207 0.433627 1.417 536531.69 0.080343 0.161978 0.242322 1.767 536528.43 0.061525 0.098847 0.160372 I

2.117 536557.53 0.008921 0.101336 0.110257 2.483 536555.19

-0.011408 0.077354 0.065946 2.833 536541.17

-0.008249 0.058153 0.049904 I

3.200 536543.66

-0.007888 0.045199 0.037311 3.550 536526.16 0.002676 0.038735 0.041412 3.900 536516.83 0.013165 0.034518 0.047683 4.250 536548.28 0.006055 0.030236 0.036290 I

4.600 536506.57 0.016375 0.028778 0.045153 4.967 536527.01 0.016255 0.024709 0.040963 5.483 536511.66 0.020051 0.021692 0.041743 I

5.833 536488.76 0.027893 0.021050 0.048943 6.183 536482.45 0.034162 0.019985.

0.054147 6.533 536519.52 0.030745 0.018218 0.048963 6.883 536492.92 0.032563 0.016451 0.049013 I

7.233 536500.20 0.032327 0.014823 0.047150 7.583 536500.91 0.031678 0.013453 0.045131 7.917 536469.68 0.035021 0.012907 0.047928 I

8.267 536509.26 0.032429 0.012219 0.044648 8.617 536496.77 0.031529 0.011278 0.042808 8.983 536517.73 0.028350 0.011074 0.039424 9.333 536499.62 0.027368 0.010309 0.037677 I

9.683 536505.23 0.025879 0.009728 0.035607 10.017 536505.18 0.024519 0.009198 0.033717 10.393 536489.96 0.024448 0.008578 0.033026 I

10.733 536488.33 0.024374 0.008020 0.032394 11.083 536486.97 0.024274 0.007516 0.031790 11.417 536463.05 0.025643 0.007246 0.032889 f

11.767 536472.52 0.026077 0.006838 0.032915 12.117 536456.58 0.027258 0.006538 0.033855 12.483 536415.27 0.027650 0.006246 0.033896 12.833 536445.02 0.028937 0.006101 0.035038 I

13.183 536460.22 0.029159 0.005784 0.034943 13.533 536442.87 0.030067 0.005590 0.035658 14.050 536452.99 0.030234 0.005304 0.035538 I

14.400 536423.33 0.031576 0.005270 0.036846 14.767 536454.44 0.031321 0.005020 0.036341 15.117 536452.26 0.031091 0.004787 0.035878 15.467 536484.81 0.029562 0.004896 0.034458 I

15.817 536481.31 0.028275 0.004906 0.033181 16.167 536512.48 0.025994 0.005384 0.031377 16.517 536457.74 0.025744 0.005159 0.030903 I

3F-1

I I

E I

Time Mass Leakage Conf Ucl Hours Lbm Pct / day Pct / day Pct / day 16.067 536470.99 0.025039 0.005008 0.030048 17.217 536498.79 0.023511 0.005119 0.028630 17.567 536478.74 0.022692 0.005004 0.027696 I

17.933 536450.01 0.02.7723 0.004805 0.027528 18.267 536450.21 0.022698 0.004619 0.027317 18.633 536464.17 0.022264 0.004471 0.026736 I

19.150 536483.92 0.021302 0.004439 0.025740 19.517 536460.78 0.020968 0.004289 0.025257 19.867 536437.87 0.021173 0.004138 0.025311 20.217 536441.71 0.021231 0.003990 0.025221 I

20.567 536492.73 0.020127 0.004052 0.024179 20.917 536502.35 0.018896 0.004160 0.023056 21.267 536528.62 0.017220 0.004457 0.021677 I

21.617 536493.34 0.016377 0.004417 0.020794 21.967 536508.78 0.015295 0.004450 0.019745 22.317 536469.78 0.015013 0.004320 0.019332 22.667 536482.30 0.014511 0.004223 0.018734 I

23.033 536463.69 0.014357 0.004096 0.018453 23.383 536470.40 0.014085 0.003983 0.018067 23.933 536514.18 0.013078 0.004026 0.017104 24.100 536486.03 0.012612 0.003943 0.016555 Initial Estimated Mass - 536526.23 Final Estimated Mass - 536458.29 I

I I

I I

il l

l 3F-2

=

L

I i

700

\\

l t

[

a g 600 j

E 5

\\

I i

\\ -y I

MN 500

\\/

N

/

\\

u

.E

\\

/

\\-/

o N

v

^

5 M!

5 i

~

I m

400 0

1 2

3 4

5 6

7 8

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 Time, 1 Hour Intervals 206 3/10/81 To 208 3/11/81 I

i'

l i

i l

l l

t f

.16

}

-- j.

l

-)

e i

I 1

+

a l

l o

lb _ - j. -.,;-. _ !

i fi.14 r ____ __4_ _ _ _.

e s

I i

E l

i i

l j

i

  • Top Lirie - l UCL i

i E12 i-i j

lBottomlLine-Leak Rate 1

i 1

i l

1 j

j

.E.10 L ---.

I- --. I_ --

i I

c l

i J'a

I I

l i

-- r d - 'l --- '--


4 i

i

>,. 8 n

O

+

N l

I I

1 I

w.6 L i

m, - - -

+

l i

e u

9 j

}

b 4

/N*

I i

E x

.4 L 1, - - - /-

i J--- :--

l i

i --

N l

l I

c.,

a.2 _ -

1' x

7 N

f f5

=

i a

i i

A F... -.. -

w m

8 t

I i

l l

I N

N j

P j

.0 l..,

I j

0 1

2 3

4 5

6 7

8 9

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 l

l Time, 1 Hour Intervals 206 3/10/81 To 208 3/11/81 i

-j

.. - - ~. -... - ~.. - -. - - - = = -

I SECTION 4 LOCAL LEAK RATE TESTS (TYPES B AND C)

Local.'eak rate tests were performed by pressurizing with air the

'I penetra< ions listed in the following tables and either measuring leakage across containment isolation valves (Type C) or across resilient seals (Type B).

The total Types B and C leakage documented was verified to be in accordance with station procedures.

The following pages list the penetrations tested and their documented leakage.

I I

I I

IC I

I I

I I

~

I 4-1

I APPENDIX 4A 1979 TYPE B DATA

SUMMARY

Equipment Leakage Penetration Tested (scf/m)

Remarks Fuel Transfer Tube Blind Flange 0

Equipment Hatch and 0-Ring Escape Lock 0

Personnel Air Lock 0

and Escape Door Electrical Penetration No.

l-A Cannister 0

1-A O-Ring 0

1-B Cannister 0

1-B O-Ring 0

1-C Blind Flange 0

1-C O-Ring 0.033 1-D Blind Flange 0.007 1-D O-Ring 0.011 1-E Cannister 0

I l-E O-Ring 0

2-A Blind Flange 0

2-B 0

2-C 0

2-D 0

2-E O

3-A 0

3-B 0

3-C 0

3-D 0

3-E O

I 4-A Blind Flange 0

4-B 0

4-0 0

I 4-D 0

4-E 0

5-A 0

5-B 0

5-C 0

5-D 0

5-E O

I 6-A 0.022 6-B 0

6-C Blind Flange 0

6-D 0

6-E 0

4A-1

I Equipment Leakage Penetration Tested (scf/m)

Remarks 1

7-A o

i 7-B Blind Flange 0

7-C 0

I 7-D 0

7-E O

8-A o

8-B 0

I 8-C 0

8-D 0

8-E Blind Flange 0

9-A 0

9-B 0.036 9-C 0

I 9-D 0

9-E O

10-A 0.043 10-B 0

I 10-C 0.025 10-D 0

10-E O

ll-A Blind Flange 0

ll-B Blind Flange 0

ll-C Blind Flange 0

ll-D Blind Flange 0

ll-E Blind Flange 0

12-A 0

12-B 0

12-C 0

l 12-D 0

12-E O

13-A 0

13-B 0

13-C 0

13-D Elind Flange 0

I 13-E O

14-A 0

14-B 0

14-C Blind Flange 0.018 I

14-D Blind Flange 0

14-E 0.015 15-A 0.029 15-B 0

l 15-C Blind Flange 0

15-D 0

.I 15 -E O

16-A 0

l 16-B 0

16-C 0

16-D 0

16-E Blind Flange 0

l 4A-2

I Equipment Leakage P,enetration Tested (scf/m)

Remarks 17-A 0

17-B 0

17-C 0

17-D 0

17-E O

18-A 0

18-B 0.018 18-C Blind Flange 0

18-D 0

18-E 0

19-A 0

19-B Blind Flange 0

19-C Blind Flange 0

19-D 0

19-E Blind Flange 0

20-A 0

20-B 0

20-C 0

20-D 0

20-E Blind Flange 0

21-A 0.020 21-B 0

21-C 0

21-D 0

21-E O

22-A 0.018 22-B 0

22-C 0

22-D 0.025 22-E O

23-A Blind Flange 0.011 23-B Blind Flange 0

23-C 0

23-D 0

23-E O

l 24-A Cannister 0.007

, I 24-A O-Ring 0

24-B Cannister 0

l 24-B O-Ring 0

24-C Cannister 0

24-C 0-Ring 0

l 24-D Cannister 0.018 l

24-D O-Ring 0.014 24-E Cannister 0.014 24-E O-Ring 0.007 4A-3

I 1981 TYPE B DATA

SUMMARY

Equipment Leakage Penetration Tested (scf/m)

Remarks Fuel Transfer Tube Blind Flange 0

Equipment Hatch and 0-Ring Escape Lock 0

Personnel Air Lock 0

and Escape Door Electrical Penetration No.

1-A Cannister 0.021 1-A O-Ring 0.038 1-B Cannister 0

1-B O-Ring 0.016 1-C Blind Flange N/A l-C 0-Ring 0.027 I

1-D Blind Flange 0.028 1-D O-Ring N/A 1-E Cannister 1-E O-Ring 0

2-A Blind Flange 0

2-B 0

2-C 0

2-D 0

l 2-E O

3-A 0

3-B 0

3-C 0

3-D 0

3-E O

I 4-A 0

4-B 0

4-C 0

4-D 0

4-E O

5-A 0

I 5-B 0

5-C 0

t l

5-D 0

5-E O

6-A 0.036 6-B 0.038 6-C Blind Flange 0

6-D 0

i I

4A-4

I Equipment Leakage Penetration Tested (scf/m)

Remarks 6-E o

7-A o

7-B Blind Flange 0

7-C o

7-D o

7-E 0.027 8-A o

8-B 0

8-C 0

8-D 0

8-E Blind Flange 0.027 9-A 0

I 9-B 0.041 9-C 0.050 9-D 0.012 9-E O

I 10-A 0.050 10-B 0

10-C 0.021 I

10-D 0

10-E O

ll-A Blind Flange 0

ll-B Blind Flange 0.034 ll-C Blind Flange 0

ll-D Blind Flange 0

ll-E Blind Flange 0.025 I

12-A 0.018 12-B 0

12-C 0

I 12-D 0

12-E 0

13-A 0

13-B 0

13-C 0

13-D Blind Flange 0

14-A 0

I 14-B 0.047 14-C 0.036 14-D 0.027 14-E 0.036 I

15-A 0

15-B 0.047 15-C Blind Flange 0

15-D 0.047 15-E 0.048 16-A 0.054 I

16-B 0.045 16-C 0.038 16-D 0

16-E Bliid Flange 0.021 4A-5

I I

Equipment Leakage Penetration Tested (scf/m)

Remarks 17-A 0.010 17-B 0

17-C 0

,g 17-D 0.045 g

17-E 0.036 18-A 0.012 18-B 0

I 18-C Blind Flange 0.027 18-D 0.036 18-E O

19-A 0.039 I

19-B Blind Flange 0

19-C Blind Flange 0

19-D 0.027 I

19-E Blind Flange 0.027 20-A 0

20-B 0

20-C 0

I 20-D 0

20-E Blind Flange 0

21-A 0.023 I

21-B 0.030 21-C 0.050 21-D 0.050 I

21-E 0.009 22-A 0

22-B 0

22-C 0

22-D 0

22-E O

23-A Blind Flange 0.043 I

23-B Blind Flange 0

23-C 0.028 23-D 0.036 I

23-E 0.036 l

24-A Cannister 0

24-A O-Ring 0.011 24-B Cannister 0.022 24-B O-Ring 0.022 24-C Cannister 0.043 24-C 0-Ring 0.036 24-D Cannister 0.052 I

24-D O-Ring 0.041 24-E Cannister 0

24-E O-Ring 0.043 FB#1 0

4A-6 1

APPENDIX 4B TYPE C TESTING SUMMABY 1979 Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFil Remarks 1 Component Cooling from TV-CC-103B 0

NA RilR IIeat Exhanger 2 Component Cooling to RIIR l-CC-193 0

NA IIcat Exchanger 4 Component Cooling to 1-CC-198 0.11

.03 RilR IIeat Exchanger 5 Component Cooling from TV-CC-103A

.07

.02 RIIR IIeat Exchanger 7 Iligh IIead Safety Injection 1-Sl-79 MOV 1867C 5.0 2.21 1-Sl-77 MOV 1867D ay 8 Component Cooling from TV-CC-101A 0.16 0.04 H

RCP Thermal Barrier TV-CC-101B 9 Air Recirculation 1-CC-572 89 0

Cooling Water 10 Air Recirculation 1-CC-559 89 0

Cooling Water 11 Air Rccirculation 1-CC-546 89 0

Cooling Water 12 Air Recirculation TV-CC-100B 0

NA Cooling Water TV-CC-105B 13 Air Recirculation TV-CC-100C 0

NA Cooling Water TV-CC-105C 14 Air Recirculation Cooling TV-CC-100A 0

NA Water Inside Containment TV-CC-105A 15 Charging 1-CII-3 2 2 0.35 0.136 MOV-1289A

m M

M M

m m

M M

M M

M m

M m

Pre Repair Post Repair Leakage Leakage i

Penetration No.

Valves Tested SCFH SCPH Remarks 16 Component Cooling to 1-CC-154 0.15 0.04 RCP's Shroud Cooling Coils TV-CC-104C 17 Component Cooling to 1-CC-119 0.08 0.01 RCP's Shroud Cooling Coils TV-CC-104B 18 Component Cooling to 1-CC-84 3.4 1.5 RCP's Shroud Cooling Coils TV-CC-104A 4

19 Seal Water from MOV-1380 0

NA RCP's 1-CH-402 MOV-1381 20 SI Accumulater Makeup 1-SI-110 0

NA 1-SI-58 22 High Ilead SI l-SI-185 0

NA

, u y

MOV-1836 w

24 RIIR To RWST l-RH-36 0

NA l-RH-37 25 Component Coolina from TV-CC-102E 0.08 0.02 RCP's & Saroud Cooling Coils TV-CC-102F 26 Component Cooling from TV-CC-102A 0

NA RCP's & Saroud Cooling Coils TV-CC-102B 27 Component Cooling from TV-CC-102C 0

NA RCP's & Saroud Cooling Coils TV-CC-102D i

28 RC Letdown RV 1203, IICV-1200A 9.0 9.0 HCV-1200B, IICV-1200C liCV-ll4 2, TV-120 4 31 Component Atm. Cleanup 1-IIC-14 0.25 0.25 1-ilC-31 1-IIC-12

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Test'd SCFil SCFH Remarks 33 Primary Drains TV-DG-100A 0

NA Transfer Pump Discharge TV-DG-100B 38 Sump Pump Discharge TV-DA-100A 0.95 0.37 TV-DA-100B 39 SG Blowdown TV-BD-100A 89 0

TV-BD-100B i

40 SG Blowdown TV-BD-100E O

NA TV-BU-100F 41 SG Blowdown TV-BD-100C 0.36 0.56 TV-BD-100D 42 Service Air 1-SA-58 0

NA i

1-SA-57 a

to E

43 Air Monitor Sample TV-RM-100D 0.04 0.01 TV-RM-100A 4

44 Air Monitor Sample TV-RM-100B 0

NA TV-RM-100C 45 PG Water 1-RC-149 789 0.03 1

j TV-I$19A 46 Loop Fill 1-Cll-3 3 0 200 0.41 FCV-ll60 4

47 Instrument Air TV-IA-102A 4.6 2.03 1-IA-55 48 Priamary Vent Header TV-VG-100A 0.06 0.02 1

TV-VG-100B 50 Nitrogen to Waste Gas HCV-1936 0.85 0.33 i

Charcoal Filters TV-SI-101

m m

M M

m M

M M

M M

M M

M M

M Pro Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFII Remarks 53 Nitrogen to PRT l-SI-106 0.35 0.14 TV-SI-100 54 Primary Vent Pot Vent 1-DA-39 0

NA 1-DA-41 55 PRT Gas Space Sample TV-SS-104A 0

NA Vent TV-SS-104B

.55B Containment Leakage TV-LM-100E 0.10 0.03 Monitoring TV-LM-100F 56 Primary Coolant Cold TV-SS-102A 0

NA Leg Sample TV-SS-102B 4

56B Primary Coolant TV-SS-106A 0

NA l

Ilot Leg Sample TV-SS-106B u

?

56C PZR Liquid Space TV-SS-100A 0

NA A

Sample TV-SS-100B 56D SG Blowdown Sample TV-SS-112A 0.02 0.01 TV-SS-ll2B 57 Containment Leakage TV-LM-100G 0

NA Monitoring TV-LM-100A 57B PZR Vapor Space TV-SS-101B 0

NA Sample TV-SS-101A l

60 Low IIead SI Discharge 1-SI-207 0

NA l

MOV-1890B l

61 Low IIead SI Discharge 1-SI-206 0.7 0.27 MOV-1890A

m M

M M

M M

M M

M M

M M

M M

M m

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFli Remarks 62 Low IIead SI Discharge MOV-1890C,MOV-1890D 2.6 0.17 1-SI-197,1-SI-199 l-SI-195 l

63 QS Pump Discharge MOV-OS-101B 0

NA l-OS-19 64 QS Pump Discharge MOV-OS-101A 0

NA l-OS-11 66 Casing Cooling to MOV-RS-100A 1.55 0.6 Recirculation Spray MOV-RS-101A 67 Casing Cooling to MOV-RS-100B

.11 4.85 Recirculation Spray 70 Recirculation Spray MOV-RS-156B 0.17 0.05 7

Pump Dicharge 1-RS-27 w

71 Recirculation Spray MOV-RS-156A 0

NA Pump Discharge 1-RS-18 79 Recirculation Spray MOV-SW-103D 89 0

Valve Service Water Reworked i

10.5 2.87 Valve 80 Recirculation Spray MOV-SW-103C Service Water Reworked 81 Recirculation Spray MOV-SW-103B 10 5.9 l

Service Water 82 Recirculation Spray MOV-SW-103A 3.6 89 0

Service Water i

83 Recirculation Spray MOV-SW-104D 89 0.85 Service Water

m m

M M

M M

M M

M M

M M

M M

M M

M M

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFil Remarks 84 Recirculation Spray MOV-SW-104C 15 0

Valve Service Water Reworked 85 Recirculation Spray MOV-SW-104B 9

0 Valve Service Water Reworked 86 Recirculation Spray MOV-SW-104A 89 4.7 Service Water 89 Air Ejector Vent TV-SV-102-1 4

0.12 TV-SV-102-1 TV-SV-103 Reworked 90 Purge Duct MOV-:lV-100C 6.4 6.4 MOV-IIV-100D MOV-IIV-101 91 Purge Duct MOV-IIV-10 0 A 4.2 4.2

&y MOV-IIV-100B m

MOV-liv-102 92 Containment Vacuum TV-CC-150C 0

NA Pump Suction TV-CC-150D 93 Containment Vacuum TV-CC-150A 0

NA Pump Suction TV-CC-150B 94 Ejection Suction TV-CV-100 11.2 1.25 1-CV-4 97 Liquid Sample TV-SS-103B 0

NA 97B PZR Dead Weight 1-RC-176 0

NA Calibrator 1-RC-178 97C Containment Leakage TV-LM-100B 0

NA Monitor System TV-T.M-100A

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFil Remarks 100 Wet Layup 1-WT-491 0

NA 1-WT-488 103 Refueling Purification 1-RP-28 O

NA Inlet 1-RP-26 104 Refueling Purification 1-RP-6 Outlet 1-RP-8 0

NA 105 Containment Leakage TV-LM-100D 5.6 2.47 Sonitor System TV-LM-100C 105B Containment Leakage TV-LM-101B 19.77 0

Monitor System TV-LM-101C 105C Centainment Leakace TV-LM-10lD 0.35 0.10 Monitor System TV-LM-101A 106 SI Test Line TV-1842 0

NA TV-1859 109 Containment ATM l-lic-18,1-I:0-16 0.95 0.37 Cleanup 1-IIC-28 113 Iligh IIead SI 1-SI-90 0.26 0.20 MOV-1869B 114 Iligh IIead SI l-SI-201 3

3 MOV-1869A

M M

M M

M M

M M

M M

M M

M M

M M

1981 TYPE C TESTING

SUMMARY

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFII SCFII Remarks 1 Component Cooling TV-CC-103B 0

N/A From RIIR lleat Exchanger 2 Component Cooling 1-CC-193 0

N/A to RIIR lleat Exchanger 4 Component Cooling 1-CC-198 0

N/A to RilR IIeat Echanger 5 Component Cooling TV-CC-103A 0

N/A From RiiR IIeat Exchanger 7 Iligh IIcad Safety 1-SI-79 MOV-186?C Injection 1-SI-77 MOV-1867D

.10 fl0 i

8 Component Cooling TV-CC-101A Prom RCP Thermal Barrier TV-CC-101B 0

N/A 9 Air Recirc Cooling Water 1-CC-572 0

N/A 10 Air Recirc Cooling Water 1-CC-559 0

N/A 11 Air Recirc Cooling Water 1-CC-546 0

N/A 12 Air Recirc Cooling Water TV-CC-100B 0

N/A TV-CC-105B 13 Air Recirc Cooling Water TV-CC-100C 0

N/A TV-CC-105C 14 Air Recirc Cooling Water TV-CC-100A 0

N/A Inside cont.

TV-CC-105A 15 Charging 1-CII-3 2 2

.15

.15 MOV-1289A 16 Comp. Cooling to 1-CC-154 0

N/A RCP,s Shroud Cooling TV-CC-104C Coils

M M

M M

M M

M M

M M

M M

M M

M M

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFil Remarks 17 Comp. Cooling to 1-CC-119 0

N/A RCP's Shroud Cooling TV-cc-104B Coils 18 Comp. Cooling to 1-CC-119 0

N/A RCP's Shroud Cooling TV-CC-104A Colis 19 Seal Water From RCP's MOV-1380 0

N/A 1-Cll-4 02 MOV-1381 20 SI Accumulater Makeup 1-SI-110 O

N/A 1-SI-58 22 liigh IIead SI 1-SI-185 0

N/A MOV-1836 I

24 RIIR to RWST l-RII-3 6 0

N/A l-Ril-3 7 25 Comp. Cooling From TV-CC-102E 0

N/A I

RCP's & Shroud Cooling TV-CC-102F Coils 26 Comp. Cooling From TV-CC-102A

.6

.6 I

RCP's & Shroud Cooling TV-CC-102B Coils d

27 Comp. Cooling From TV-CC-102C 0

N/A RCP's & Shroud Cooling TV-CC-102D Coils i

28 RC Letdown RV-1203,IICV-1200A, 4

4 IICV-120 0B,IICV-1200C,

IICV-ll4 2, TV-1204

M M

M M

M M

M M

M M

M M

M M

M M

M Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFH SCFil Remarks 29 Cont. Atm. Cleanup 1-IIC-14 0

N/A 1-IIC-31 1-IIC-12 32 Wet Layup 1-WT-468 0

N/A 1-WT-465 33 Primary Drains Transfer TV-DG-lOOA 0

N/A Pump Discharge TV-DG-100B 34 Fire Protection 1-FP-2.52

.6

.6 1-FP-274 38 Sump Pump Dischg.

TV-DA-100A

.55

.55 TV-DA-100B to E

39 SG Blowdown TV-BD-100A 0

N/A o

TV-BD-100B 40 SG Blowdown TV-BD-100E

.25

.25 TV-BD-100F 41 SG Blowdown TV-BD-100C 0

N/A l

TV-bd-100D i

42 Service Air 1-SA-58 0

N/A 1-SA-57 43 Air Monitor Sample TV-RM-100D 0

N/A TV-RM-100A 44 Air Monitor Sample TV-RM-100B 0

N/A TV-RM-100C 45 PG Water 1-RC-149 0

N/A TV-1519A 46 Loop Fill 1-Cll-3 3 0 0

N/A FCV-ll60

M M

M M

M M

M M

M M

M M

M M

M M

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil S C Fil Remarks 47 Inst. Air TV-IA-102B 0

N/A 1-IA-55 48 Primary Vent IIcader TV-VG-100A 0

N/A TV-VG-100B 50 Nitrogen to Waste Gas

!!CV-1936 0

N/A Charcoal Filters TV-SI-101 53 Nitrogen to PRT l-SI-106

,0 N/A TV-SI-100 54 Primary Vent POT Vent 1-DA-39 0

N/A 1-DA-41 55 PRT Gas Space Sample TV-55-104A 0

N/A u

7 Vent TV-55-104B w

55B Cont. Leakage Monitoring TV-LM-100E 0

N/A TV-LM-100P 56 Primary Coolant Cold TV-SS-102A 0

N/A Leg Sample TV-SS-102B 56B Primary Coolant Ilot TV-SS-106A 0

N/A Leg Sample TV-SS-106B 56C PZR Liquid Space TV-SS-100A 0

N/A Sample TV-SS-100B 56D SG Blowdown Sample TV-SS-ll2A 0

N/A TV-SS-ll2B 57 Cont. Leakage Monitoring TV-LM-100G 0

N/A TV-LM-100A 57B PZR Vapor Space Sample TV-SS-101B 0

N/A TV-SS-101A

-. m-

Pre Repair Post Repair

. Leakage Leakage Penetration No.

Valves Tested SCFII SCFil Remarks 60 Low IIcad SI Dischg.

1-SI-207 0

N,'A MOV-1890B 61 Low Ilead SI Dischg.

1-SI-206 0

N/A Mov-1890A 62 Low Ilead SI Dischg.

MOV-1890C,Mov-1890D 0

N/A 1-SI-197,1-SI-199 1-SI-195 63 QS Pump Dischg.

MOV-OS-101B 0

N/A 1-QS-19 64 QS Pump Dischg.

MOV-QS-101A 0

N/A g

1-OS-ll i

[

66 Casing Cooling To MOV-RS-100A 4

4 Recirc Spray MOV-RS-101A 67 Casing Cooling To MOV-RS-100B 0

N/A Recirc Spray MOV-RS-101B 70 Recirc Spray Pump MOV-RS-156B 1.2 1.2 Dischg.

1-RS-27 71 Recirc Spray Pump MOV-RS-156A 1.3 1.3 Dischg.

l_RS-18 79 Recirc. Spray Service MOV-SW-103D 790 4.6 Valve Rcworked Water 80 Recirc. Spray Service MOV-SW-103C 790 0

Valve Reworked Water 81 Recire. Spray Serv. Water MOV-SW-103B 1.0 1.0 82 Recirc. Spray Serv. Water MOV-SW-103A 3.6 3.6

m M

M M

M M

Pre Repair Post Repair Leakage Leakage Penetration No.

Valves Tested SCFil SCFH Remarks 83 Recire. Spray Serv. Water MOV-SW-104D

.5

.5 84 Recirc. Spray Serv. Water MOV-SW-104C 90 8

Valve Reworked 85 Recirc. Spray Serv. Water MOV-SW-104B 90 0

Valve Reworked 86 Recirc. Spray Serv. Water MOV-SW-104A

.5

.5 I

89 Air Ejector Vent TV-SV-102-1 17

.95 TV-SV-102-1 4

Reworked 90 Purge Duct MOV-IIV-100C 5

5 MOV-IIV-100D MOV-IIV-101 I

U 91 Purge Duct MOV-IIV-100A 3

3 MOV-liv-100B MOV-IIV-10 2 92 Cont. Vacuum Pump Suction TV-CC-150C 0

N/A TV-CC-150D 93 Cont. Vacuum Pump Suction TV-CC-150A 0

N/A i

TV-CC-150B 94 Ejection Suction TV-CV-100 0

N/A 1-CV-4 97 Liquid Sample

/-SS-103B 0

N/A 97B PZR Dead Wt. Caubrator 1-RC-176 0

N/A l-RC-178 97C Cont. Leakage Monitor TV-LM-100B 0

N/A System TV-LM-100A 100 Wet Layup 1-WT-491 0

N/A 1-WT-488

m M

Pre Repair Post Repair Leakage Leakage

.,n No.

Valves Tested SCFil SCFII Remarks 103 Refueling Purification 1-RP-28 0

N/A Inlet 1-RP-26 104 Refueling Purification 1-RP-6 0

N/A Outlet 1-RP-8 105 Cont. Leakage Monitor TV-IJ1-10 0 D 1.9 0

TV-LM-100D System TV-LM-100C Reworked 105B Cont. Leakage Monitor TV-LM-101B 0

N/A System TV-LM-101C 105C Cont. Leakage Monitor TV-LM-101D

.255 N/A System TV-LM-101C 106 SI Test Line TV-1842 0

N/A

[

TV-1859 108 Wet Layup 1-WT-514 0

N/A 1-WT-511 109 Cont. ATM Cleanup 1-IIC-18,1-IIC-16 0

N/A 1-IIC-2 8 113 liigh Ilead SI l-SI-90 0

N/A MOV-1869B 114 Iligh IIead SI l-SI-201

.85 N/A MOV-1869A