| number = ML20006F084
| number = ML20006F084
| issue date = 01/31/1990
| issue date = 01/31/1990
| title = Monthly Operating Rept for Jan 1990 for Seabrook Station Unit 1.W/900215 Ltr
| title = Monthly Operating Rept for Jan 1990 for Seabrook Station Unit 1
| author name = Feigenbaum T, Nardone P
| author name = Feigenbaum T, Nardone P
| author affiliation = PUBLIC SERVICE CO. OF NEW HAMPSHIRE
| author affiliation = PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:r wn  ..
{{#Wiki_filter:rwn f$ Mw Hampshire Tod C. F '.
f$ Mw Hampshire                                                                                                   -
            ..'+                                                                                Tod     C.Presi Senior Vice F '.
* 5nt and -
* 5nt and -
Chief Operating Oflicer
..'+
      .p lin                                                                                 NYN- 90039
Senior Vice Presi Chief Operating Oflicer
    $                                                                                February 15, 1990 i
.p lin NYN-90039 February 15, 1990 i
i United States Nuclear Regulatory Comission Washington, DC 20555
i United States Nuclear Regulatory Comission Washington, DC 20555
                                                                                                                                          .;
' Attention:
                  ' Attention:     Document Control Desk
Document Control Desk


==References:==
==References:==
Line 31: Line 29:


==Subject:==
==Subject:==
Monthly Operating Report Gentlemen:                                                                                                               j
Monthly Operating Report Gentlemen:
                                                                                                                                          -l L               '
j
Enclosed please find Monthly Operating Report 90-01. 'This report addresses the operating.and shutdown experience relating to Seabrook Station-
-l L
  ~
Enclosed please find Monthly Operating Report 90-01. 'This report
                    . Unit 1 for the month of January 1990 and is-submitted in.accordance with the-roquirements of Seabrook. Station Technical Specification 6.8~.1.5.
~
: l.                                                                                   =Very truly yours, l
addresses the operating.and shutdown experience relating to Seabrook Station-
!.            s                                                                                         .
. Unit 1 for the month of January 1990 and is-submitted in.accordance with the-roquirements of Seabrook. Station Technical Specification 6.8~.1.5.
t,                                                                                                                                             !
l.
Ted C. Fe genbaum-                                     !
=Very truly yours, l
Enclosure.
s t,
ces- Mr. William T. Russell-Regional' Administrator
Ted C. Fe genbaum-Enclosure.
    ,                      United States Nuclear Regulatory Comission                                                                   .
ces-Mr. William T. Russell-Regional' Administrator United States Nuclear Regulatory Comission Region I 475 Allendale Road
Region I 475 Allendale Road
-King of Prussia, PA 19406 1
                            -King of Prussia, PA 19406                                                                                     1
~Mr.' Noel Dudley-1 NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874
                          ~Mr.' Noel Dudley-                                                                                             1 NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874
/
                                                                                                                                      /
h2270151900131
h2270151900131
                          'R     ADoCK 0500o443:
'R ADoCK 0500o443:
PNu ;;n
PNu ;;n was l
,                                                      was                                                                                   .
l                                                                                                                             .
[
[
                                  .New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300
h U't<
I
.New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300
* Seabrook, NH 03874
* Seabrook, NH 03874
* Telephone (603) 474 9521 h U't  I
* Telephone (603) 474 9521
                                                                                                                                              ]
]
m                                                                                                   -
m 1;
1;


  < e       -    .,
< e
      ~'"                                       OPERATING DATA REPORT t
~'"
              ;g,.
OPERATING DATA REPORT
          +       ,
;g,.
DOCKET NO. 50-443 UNIT Seabrook 1 DATE '02/15/90 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)-
t
OPERATING STATUS                                                                             ,
+
1.- Unit Name ~                       Seabrook Station Unit 1
DOCKET NO.
: 2. Reporting Period:                 JANUARY             1990
50-443 UNIT Seabrook 1 DATE '02/15/90 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)-
: 3. Licensed Thermal Power'(ISit):                       3411
OPERATING STATUS 1.-
: 4. Nameplate Rating (Gross-MWe):                       1197
Unit Name ~
: 5. . Design Electrical Rating (Net MWe):                   1148
Seabrook Station Unit 1 2.
: 6. ' Maximum Dependable Capacity (Gross MWe):             1197 (Initial design value) 7 . -- Maximum Dependable Capacity (Net'MWe):             1148 (Initial design value)
Reporting Period:
: 8. If. Changes Occur in Capacity Ratings (Items Number 3 Through 7)
JANUARY 1990 3.
                    -Since Last Report, Give Reasons:
Licensed Thermal Power'(ISit):
3411 4.
Nameplate Rating (Gross-MWe):
1197
: 5.. Design Electrical Rating (Net MWe):
1148
: 6. ' Maximum Dependable Capacity (Gross MWe):
1197 (Initial design value) 7. -- Maximum Dependable Capacity (Net'MWe):
1148 (Initial design value) 8.
If. Changes Occur in Capacity Ratings (Items Number 3 Through 7)
-Since Last Report, Give Reasons:
Not Applicable
Not Applicable
: 9. Power Level To Which Restricted, If Any:     170 MWt                                 ]
]
: 10. Reasons For Restrictions, If Any:       License   issued on.05/26/89 is a low power       !
9.
license authorizinn operation at reactor core power levels not in excess of 170 megawatts thernel.
Power Level To Which Restricted, If Any:
This Month     Yr.-to-Date     Cumulative 11.-Hours In Reporting Period'                   744.0           744.0         28873.0-   j
170 MWt
: 12. Number Of Hours Reactor Was Critical           0.0             0.0             194.4 i               13. Reactor Reserve Shutdown Hours                 0.0             0.0               0.0 L               14. Hours Generator.On-Line                         0.0             0.0               0.0
: 10. Reasons For Restrictions, If Any:
: 15. Unit Re' serve. Shutdown Hours                   0.0             0.0               0.0
License issued on.05/26/89 is a low power license authorizinn operation at reactor core power levels not in excess of 170 megawatts thernel.
: 16. Gross Thermal Energy Generated (MWH)               0               0             1090
This Month Yr.-to-Date Cumulative 11.-Hours In Reporting Period' 744.0 744.0 28873.0-j
: 17. Gross Elec. Energy Generated (MWH)                 0               0                 0 L               18. Net Electrical Energy Generated (MWH)             0               0                 0   ,
: 12. Number Of Hours Reactor Was Critical 0.0 0.0 194.4 i
l-             19. Unit Service Factor                             0.0             0.0               0.0
: 13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 L
              '20. Unit Availability Factor                       0.0             0.0               0.0 i
: 14. Hours Generator.On-Line 0.0 0.0 0.0
l              21. Unit Capacity Factor (Using MDC Net)             0.0             0.0               0.0 22.JUnit Capacity Factor (Using DER Net)             0.0             0.0               0.0   ,
: 15. Unit Re' serve. Shutdown Hours 0.0 0.0 0.0
i.
: 16. Gross Thermal Energy Generated (MWH) 0 0
: 23. Unit Forced Outage Rate                         0.0             0.0             -0.0
1090
!              J24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
: 17. Gross Elec. Energy Generated (MWH) 0 0
0 L
: 18. Net Electrical Energy Generated (MWH) 0 0
0 l-
: 19. Unit Service Factor 0.0 0.0 0.0 i
'20. Unit Availability Factor 0.0 0.0 0.0 l
: 21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0 22.JUnit Capacity Factor (Using DER Net) 0.0 0.0 0.0
: 23. Unit Forced Outage Rate 0.0 0.0
-0.0 i.
J24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Reactor shutdown as of 06/22/89 for indefinite duration.
Reactor shutdown as of 06/22/89 for indefinite duration.
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:           Indefinite
: 25. If Shut Down At End Of Report Period, Estimated Date Of Startup:
: 26. Prior to Commercial Operation:                               Forecast     Achieved
Indefinite
    )                                           INITIAL CRITICALITY               1989       06/13/89 L                                               INITIAL ELECTRICITY               1990     Not Applicable COMMERCIAL OPERATION               1990     Not Applicable l
: 26. Prior to Commercial Operation:
Forecast Achieved
)
INITIAL CRITICALITY 1989 06/13/89 L
INITIAL ELECTRICITY 1990 Not Applicable COMMERCIAL OPERATION 1990 Not Applicable l
1 of 6 Y-
1 of 6 Y-


Fj >               '
Fj >
i
i w
  ,s w        .y
.y
      ;.
,s i
i
[
[                         AVERAGE DAILY UNIT POWER LEVEL
AVERAGE DAILY UNIT POWER LEVEL
: DOCKET NO. -     50-443 UNIT Seabrook 1 DATE       02/15/90 COMPLETED BY-   P. Nardone
: DOCKET NO. -
,                                                                                TELEPHONE (603) 474-9521:
50-443 UNIT Seabrook 1 DATE 02/15/90 COMPLETED BY-P. Nardone TELEPHONE (603) 474-9521:
(Ext. 4074) l
(Ext. 4074) l l.
: l.         'HONTH         JANUARY. 1990 DAY       AVERAGE DAILY POWER LEVEL                 DAY     AVERAGE DAILY POWER LEVEL (MWe-Net)                                           (MWe-Net)
'HONTH JANUARY. 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
              ,1 -                   0             __
(MWe-Net)
16                    'O g
,1 -
21                   0                               17                     0               j
0 16
  -            !3-                     0                               18                     0 4                   0                               19                     0
'O g
              .5                     0                               20                     0
21 0
,e:           '6~                     0-                              21-                   'O
17 0
                ' 7.                   0                               22                     0               ,
j
i 8                   -0                               23                     0                 ,
!3-0 18 0
9                   0                               24                     0               1 4
4 0
i 10                   0           _
19 0
25                     0               ;
.5 0
20 0
,e:
'6~
21-
'O 0-
' 7.
0 22 0
i 8
-0 23 0
9 0
24 0
1 4
i 10 0
25 0
i
i
              '11                     0           _
'11 0
26                     0'             .j 12                   0                             .27                     0 13                 -0                               28                     0               l 1
26 0'
14                   0                               29                     0             .j 15                   0                               30                     0               ;
.j 12 0
                                                                                                            -(
.27 0
31                     0
13
    .(
-0 28 0
l 1
14 0
29 0
.j 15 0
30 0
-(
31 0
.(
INSTRUCTIONS-
INSTRUCTIONS-
                -On this format, list the average daily unit power level in MWe-Net for each day in the raporting month.- Compute to the nearest whole megawatt.
-On this format, list the average daily unit power level in MWe-Net for each day in the raporting month.- Compute to the nearest whole megawatt.
2 of 6 c               =                                                                                           '
2 of 6 c
=


                                  ~                                                 -
~
.. c:
wxy.
wxy.
                                                                                                                                        . .w. c:
. w
                                                                                                                                    ,                . . . .m
....m
                                                                                                                                              - ,- : w
-,- : w UNIT SHUTDOWNS AND POWER REDUCTIONS
                                                                                                  ^
^
UNIT SHUTDOWNS AND POWER REDUCTIONS                             .. DOCKET NO6 7   50-443                 J- i UNIT Seabrook'l~       .
.. DOCKET NO6 7 50-443 J-i UNIT Seabrook'l~
DATE   02/15/90 REPORT MONTH         JANUARY.'1990 ~                     -COMPLETED BY     P. Nardone TELEPHONE'(603) 474-9521~-
DATE 02/15/90 REPORT MONTH JANUARY.'1990 ~
  ,                                                                                                                              (Ext.-4074)
-COMPLETED BY P. Nardone TELEPHONE'(603) 474-9521~-
No. Date     Type Duration ' Reason 2-         : Method of-         Licensee             Cause & Corrective-(Hours)                       Shutting             Event                     Action to Down Reactor 3          Report i             Prevent' Recurrence i
(Ext.-4074)
No. Date Type Duration ' Reason 2-
: Method of-Licensee Cause & Corrective-l (Hours)
Shutting Event Action to 3
Down Reactor Report i Prevent' Recurrence i
l l
l l
NO ENTRIES FOR THIS 210 NTH 1                       2                                                               3-F: Forced               Reason:-                                                       Method:-
NO ENTRIES FOR THIS 210 NTH 1
S: Scheduled           A-Equipment Failure (Explain)                                   1-Manual B-Maintenance or Test                                           2-Manual Scram C-Refueling           .
2 3-F: Forced Reason:-
3-Automatic Scram D-Regulatory Restriction                                       4-Continued from E-Operator Training & License Examination                         previous month F-Administrative                                               5-Power Reduction G-Operational Error (Explain).                                   (Duration = 0)
Method:-
H-Other (Explain)-                                             9-Other~(Explain) l l
S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 4-Continued from 3-Automatic Scram D-Regulatory Restriction E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain).
(Duration = 0)
H-Other (Explain)-
9-Other~(Explain) l l
3 of.6
3 of.6
_u
_u


                                                                                                                    ' ~
' ~
DOCKET NO. 50-443                 ,
DOCKET NO.
                                                                                                                      ~
50-443
UNIT Seabrook 1 DATE   02115/90 COMPLETED BY P. Nardone CORRECTIVE MAINTENANCE SUt99LRY FOR SAFETY RELATED EQUIPMENT JANUARY. 1990                                TELEPHONE (603) 474-9521 REPORT MONTH (Ext. 4074)
~
Page 1 of 2 COMPONENT                            MAINTENANCE ACTION DATE         SYSTDi Primary             1-CC-V-121                     Air operated valve failed to apen.
UNIT Seabrook 1 DATE 02115/90 COMPLETED BY P. Nardone CORRECTIVE MAINTENANCE SUt99LRY FOR SAFETY RELATED EQUIPMENT TELEPHONE (603) 474-9521 REPORT MONTH JANUARY. 1990 (Ext. 4074)
01/06/90                                                          Repaired broken wire at solenoid coil Component            Train A Cooling Water       Inside Containment             termination.
Page 1 of 2 MAINTENANCE ACTION DATE SYSTDi COMPONENT 01/06/90 Primary 1-CC-V-121 Air operated valve failed to apen.
Isolation Valve Rod Control          1-CP-CP-111                    Both reactor trip breakers failed to 01/06/90                                                         close during surveillance testing.
Component Train A Repaired broken wire at solenoid coil Cooling Water Inside Containment termination.
Train A and B Reactor Trip                   Cleaned dirty contacts on charging Switchgear motor cutoff limit switches. Replaced faulty spring release coil on Breaker B.
Isolation Valve Both reactor trip breakers failed to 01/06/90 Rod Control 1-CP-CP-111 Train A and B close during surveillance testing.
Reactor             1-RC-LCV-459                   Air operated valve failed to close during 01/06/90                                                          letdown isolation test. Replaced defective Coolant              Train A Letdown Isolation             solenoid valve.
Reactor Trip Cleaned dirty contacts on charging Switchgear motor cutoff limit switches. Replaced faulty spring release coil on Breaker B.
01/06/90 Reactor 1-RC-LCV-459 Air operated valve failed to close during Coolant Train A letdown isolation test. Replaced defective Letdown Isolation solenoid valve.
Valve 4 of 6
Valve 4 of 6


                                                                                                                                                                                    . w-DOCKET NO.       Sti-443 UNIT Seabrook 1 DATE   02115190 CORRECTIVE MAINTENANCE SUt9%RY FOR SAFETY REIATED EQUIPMENT                 COMPLETED BT       P. Nardone REPORT MONTH   JANUARY. 1990                                         TELEPHONE (603) 474-9521 (Ext. 4074)
. w-DOCKET NO.
Page 2 of 2 DATE           SYSTEM             COMPONENT                             MAINTENANCE ACTION 01/08/90     Residual Heat         1-RB-P-9B                     Installed redesigned impellar to reduce Removal               Train B                       thrust loads during operation.
Sti-443 UNIT Seabrook 1 DATE 02115190 CORRECTIVE MAINTENANCE SUt9%RY FOR SAFETY REIATED EQUIPMENT COMPLETED BT P. Nardone REPORT MONTH JANUARY. 1990 TELEPHONE (603) 474-9521 (Ext. 4074)
RER Pump 01/17/90     Primary               1-CC-E-17B                   Heat exchanger leaking. Plugged tubes Component             Train B                       identified during eddy current testing.
Page 2 of 2 DATE SYSTEM COMPONENT MAINTENANCE ACTION 01/08/90 Residual Heat 1-RB-P-9B Installed redesigned impellar to reduce Removal Train B thrust loads during operation.
Cooling Water         Primary Component             Resleeved all remaining tubes.
RER Pump 01/17/90 Primary 1-CC-E-17B Heat exchanger leaking. Plugged tubes Component Train B identified during eddy current testing.
Cooling Water Heat Exchanger 01/22/90     Reactor Coolant       1-RC-TB-412D/G               Bistable failed to operate during Protection Set 1             surveillance test. Replaced fuse.
Cooling Water Primary Component Resleeved all remaining tubes.
LO TAVG, LO-LO TAVG Temperature Bistable 5 of 6
Cooling Water Heat Exchanger 01/22/90 Reactor Coolant 1-RC-TB-412D/G Bistable failed to operate during Protection Set 1 surveillance test. Replaced fuse.
_-      m                                                  .      .    . . . . -~       ____.    ._________.-___J
LO TAVG, LO-LO TAVG Temperature Bistable 5 of 6 m
.... -~
J


o     '  -                                                                D00KET NO. 50-443
o D00KET NO.
              +                                                                  UNIT Seabrook 1
50-443 UNIT Seabrook 1
            -                                                                    DATE   02/15/90   __
+
    .                                                                    COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4074)
DATE 02/15/90 COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4074)
REFUELING INFORMATION REOUEST
REFUELING INFORMATION REOUEST
: 1. Name of facility:     Seabrook Unit 1
: 1. Name of facility:
Seabrook Unit 1
: 2. Scheduled date for next refueling shutdown: Not Scheduled
: 2. Scheduled date for next refueling shutdown: Not Scheduled
: 3. Scheduled date for restart following refueling: Not Scheduled
: 3. Scheduled date for restart following refueling: Not Scheduled
Line 177: Line 231:
: 6. Important licensing considerations associated with refueling, e.Bae new or different fuel design or supplier, unreviewed design or parformance analysis methods, significant changes in fuel design, new operating procedures:
: 6. Important licensing considerations associated with refueling, e.Bae new or different fuel design or supplier, unreviewed design or parformance analysis methods, significant changes in fuel design, new operating procedures:
None
None
: 7. The number of fuel assemblies (a) in the core and (b) in the opert fuel storage pools (a) In Core       193                     (b)   0
: 7. The number of fuel assemblies (a) in the core and (b) in the opert fuel storage pools (a) In Core 193 (b) 0
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requestod or is planned in number of fuel assemblies:
: 8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requestod or is planned in number of fuel assemblies:
Present licensed capacity: 1236 No increase in storage capacity requested or planned.
Present licensed capacity:
l I               9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1236 No increase in storage capacity requested or planned.
l                            Licensed capacity of 1236 fuel assemblies based on sixteen refuelings and full core offload capability.
l I
The current licensed capacity is adequate until at least the l                             year 2010.
: 9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
Licensed capacity of 1236 fuel assemblies based on sixteen l
refuelings and full core offload capability.
The current licensed capacity is adequate until at least the l
year 2010.
l 1
l 1
6 of 6 l
6 of 6 l
l i
l i
l}}
l}}

Latest revision as of 03:46, 23 December 2024

Monthly Operating Rept for Jan 1990 for Seabrook Station Unit 1
ML20006F084
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 01/31/1990
From: Feigenbaum T, Nardone P
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-90039, NUDOCS 9002270151
Download: ML20006F084 (7)


Text

rwn f$ Mw Hampshire Tod C. F '.

  • 5nt and -

..'+

Senior Vice Presi Chief Operating Oflicer

.p lin NYN-90039 February 15, 1990 i

i United States Nuclear Regulatory Comission Washington, DC 20555

' Attention:

Document Control Desk

References:

Facility Operating License NPF-67. Docket No. 50-443

Subject:

Monthly Operating Report Gentlemen:

j

-l L

Enclosed please find Monthly Operating Report 90-01. 'This report

~

addresses the operating.and shutdown experience relating to Seabrook Station-

. Unit 1 for the month of January 1990 and is-submitted in.accordance with the-roquirements of Seabrook. Station Technical Specification 6.8~.1.5.

l.

=Very truly yours, l

s t,

Ted C. Fe genbaum-Enclosure.

ces-Mr. William T. Russell-Regional' Administrator United States Nuclear Regulatory Comission Region I 475 Allendale Road

-King of Prussia, PA 19406 1

~Mr.' Noel Dudley-1 NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874

/

h2270151900131

'R ADoCK 0500o443:

PNu ;;n was l

[

h U't<

I

.New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300

  • Seabrook, NH 03874
  • Telephone (603) 474 9521

]

m 1;

< e

~'"

OPERATING DATA REPORT

g,.

t

+

DOCKET NO.

50-443 UNIT Seabrook 1 DATE '02/15/90 COMPLETED BY P. Nardone TELEPHONE (603) 474-9521 (Ext. 4074)-

OPERATING STATUS 1.-

Unit Name ~

Seabrook Station Unit 1 2.

Reporting Period:

JANUARY 1990 3.

Licensed Thermal Power'(ISit):

3411 4.

Nameplate Rating (Gross-MWe):

1197

5.. Design Electrical Rating (Net MWe):

1148

6. ' Maximum Dependable Capacity (Gross MWe):

1197 (Initial design value) 7. -- Maximum Dependable Capacity (Net'MWe):

1148 (Initial design value) 8.

If. Changes Occur in Capacity Ratings (Items Number 3 Through 7)

-Since Last Report, Give Reasons:

Not Applicable

]

9.

Power Level To Which Restricted, If Any:

170 MWt

10. Reasons For Restrictions, If Any:

License issued on.05/26/89 is a low power license authorizinn operation at reactor core power levels not in excess of 170 megawatts thernel.

This Month Yr.-to-Date Cumulative 11.-Hours In Reporting Period' 744.0 744.0 28873.0-j

12. Number Of Hours Reactor Was Critical 0.0 0.0 194.4 i
13. Reactor Reserve Shutdown Hours 0.0 0.0 0.0 L
14. Hours Generator.On-Line 0.0 0.0 0.0
15. Unit Re' serve. Shutdown Hours 0.0 0.0 0.0
16. Gross Thermal Energy Generated (MWH) 0 0

1090

17. Gross Elec. Energy Generated (MWH) 0 0

0 L

18. Net Electrical Energy Generated (MWH) 0 0

0 l-

19. Unit Service Factor 0.0 0.0 0.0 i

'20. Unit Availability Factor 0.0 0.0 0.0 l

21. Unit Capacity Factor (Using MDC Net) 0.0 0.0 0.0 22.JUnit Capacity Factor (Using DER Net) 0.0 0.0 0.0
23. Unit Forced Outage Rate 0.0 0.0

-0.0 i.

J24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Reactor shutdown as of 06/22/89 for indefinite duration.

25. If Shut Down At End Of Report Period, Estimated Date Of Startup:

Indefinite

26. Prior to Commercial Operation:

Forecast Achieved

)

INITIAL CRITICALITY 1989 06/13/89 L

INITIAL ELECTRICITY 1990 Not Applicable COMMERCIAL OPERATION 1990 Not Applicable l

1 of 6 Y-

Fj >

i w

.y

,s i

[

AVERAGE DAILY UNIT POWER LEVEL

DOCKET NO. -

50-443 UNIT Seabrook 1 DATE 02/15/90 COMPLETED BY-P. Nardone TELEPHONE (603) 474-9521:

(Ext. 4074) l l.

'HONTH JANUARY. 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net)

,1 -

0 16

'O g

21 0

17 0

j

!3-0 18 0

4 0

19 0

.5 0

20 0

,e:

'6~

21-

'O 0-

' 7.

0 22 0

i 8

-0 23 0

9 0

24 0

1 4

i 10 0

25 0

i

'11 0

26 0'

.j 12 0

.27 0

13

-0 28 0

l 1

14 0

29 0

.j 15 0

30 0

-(

31 0

.(

INSTRUCTIONS-

-On this format, list the average daily unit power level in MWe-Net for each day in the raporting month.- Compute to the nearest whole megawatt.

2 of 6 c

=

~

.. c:

wxy.

. w

....m

-,- : w UNIT SHUTDOWNS AND POWER REDUCTIONS

^

.. DOCKET NO6 7 50-443 J-i UNIT Seabrook'l~

DATE 02/15/90 REPORT MONTH JANUARY.'1990 ~

-COMPLETED BY P. Nardone TELEPHONE'(603) 474-9521~-

(Ext.-4074)

No. Date Type Duration ' Reason 2-

Method of-Licensee Cause & Corrective-l (Hours)

Shutting Event Action to 3

Down Reactor Report i Prevent' Recurrence i

l l

NO ENTRIES FOR THIS 210 NTH 1

2 3-F: Forced Reason:-

Method:-

S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test 2-Manual Scram C-Refueling 4-Continued from 3-Automatic Scram D-Regulatory Restriction E-Operator Training & License Examination previous month F-Administrative 5-Power Reduction G-Operational Error (Explain).

(Duration = 0)

H-Other (Explain)-

9-Other~(Explain) l l

3 of.6

_u

' ~

DOCKET NO.

50-443

~

UNIT Seabrook 1 DATE 02115/90 COMPLETED BY P. Nardone CORRECTIVE MAINTENANCE SUt99LRY FOR SAFETY RELATED EQUIPMENT TELEPHONE (603) 474-9521 REPORT MONTH JANUARY. 1990 (Ext. 4074)

Page 1 of 2 MAINTENANCE ACTION DATE SYSTDi COMPONENT 01/06/90 Primary 1-CC-V-121 Air operated valve failed to apen.

Component Train A Repaired broken wire at solenoid coil Cooling Water Inside Containment termination.

Isolation Valve Both reactor trip breakers failed to 01/06/90 Rod Control 1-CP-CP-111 Train A and B close during surveillance testing.

Reactor Trip Cleaned dirty contacts on charging Switchgear motor cutoff limit switches. Replaced faulty spring release coil on Breaker B.

01/06/90 Reactor 1-RC-LCV-459 Air operated valve failed to close during Coolant Train A letdown isolation test. Replaced defective Letdown Isolation solenoid valve.

Valve 4 of 6

. w-DOCKET NO.

Sti-443 UNIT Seabrook 1 DATE 02115190 CORRECTIVE MAINTENANCE SUt9%RY FOR SAFETY REIATED EQUIPMENT COMPLETED BT P. Nardone REPORT MONTH JANUARY. 1990 TELEPHONE (603) 474-9521 (Ext. 4074)

Page 2 of 2 DATE SYSTEM COMPONENT MAINTENANCE ACTION 01/08/90 Residual Heat 1-RB-P-9B Installed redesigned impellar to reduce Removal Train B thrust loads during operation.

RER Pump 01/17/90 Primary 1-CC-E-17B Heat exchanger leaking. Plugged tubes Component Train B identified during eddy current testing.

Cooling Water Primary Component Resleeved all remaining tubes.

Cooling Water Heat Exchanger 01/22/90 Reactor Coolant 1-RC-TB-412D/G Bistable failed to operate during Protection Set 1 surveillance test. Replaced fuse.

LO TAVG, LO-LO TAVG Temperature Bistable 5 of 6 m

.... -~

J

o D00KET NO.

50-443 UNIT Seabrook 1

+

DATE 02/15/90 COMPLETED BY P. Hardone TELEPHONE (603) 474-9521 (Ext. 4074)

REFUELING INFORMATION REOUEST

1. Name of facility:

Seabrook Unit 1

2. Scheduled date for next refueling shutdown: Not Scheduled
3. Scheduled date for restart following refueling: Not Scheduled
4. Vill refueling or resumption of operation thereafter require a technical specification change or other license amendmentt Unknown at this time.
5. Scheduled date(s) for submitting licensing action and supporting infonmation l

Not Applicable 1

6. Important licensing considerations associated with refueling, e.Bae new or different fuel design or supplier, unreviewed design or parformance analysis methods, significant changes in fuel design, new operating procedures:

None

7. The number of fuel assemblies (a) in the core and (b) in the opert fuel storage pools (a) In Core 193 (b) 0
8. The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requestod or is planned in number of fuel assemblies:

Present licensed capacity:

1236 No increase in storage capacity requested or planned.

l I

9. The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:

Licensed capacity of 1236 fuel assemblies based on sixteen l

refuelings and full core offload capability.

The current licensed capacity is adequate until at least the l

year 2010.

l 1

6 of 6 l

l i

l