ML20009F318: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (2 intermediate revisions by the same user not shown) | |||
| Line 2: | Line 2: | ||
| number = ML20009F318 | | number = ML20009F318 | ||
| issue date = 01/18/1978 | | issue date = 01/18/1978 | ||
| title = Forwards Completed Questionnaire Re Standby Diesel Generator Units Reliability,In Response to NRC | | title = Forwards Completed Questionnaire Re Standby Diesel Generator Units Reliability,In Response to NRC | ||
| author name = | | author name = | ||
| author affiliation = NEBRASKA PUBLIC POWER DISTRICT | | author affiliation = NEBRASKA PUBLIC POWER DISTRICT | ||
| Line 11: | Line 11: | ||
| contact person = | | contact person = | ||
| document report number = NUDOCS 8107300287 | | document report number = NUDOCS 8107300287 | ||
| title reference date = 12-15-1977 | |||
| package number = ML20009F317 | | package number = ML20009F317 | ||
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | | document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC | ||
| Line 17: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:. | ||
/ | |||
p p | p d | ||
[6,'',. - | losure 3 p | ||
.e | |||
o- | [6,'',. - | ||
6' P' | |||
/ | |||
o- | |||
"i GENERAL OFFICE P. O. box 499, COLUMBUS, NEDR ASKA 68601 Nebraska Publ.ic Power Distric reLe m o~c = >s....s.1 | |||
.n -Q January 18, 1978 l'.b.L?r | |||
Director, Nuclear Rcactor Regulation | ..s N | ||
d 'f Director, Nuclear Rcactor Regulation 77 | |||
Division of Operating Reactors | ,V Attention: Karl R. Coller | ||
U. S. Nuclear Regulatory Cornission | ,w Assistant Director of Operating Reactors | ||
Washington, D. C. | . kygY D | ||
IS/ | |||
Division of Operating Reactors p %.,g % g -- | |||
19 | |||
Q | %f U. S. Nuclear Regulatory Cornission Washington, D. C. | ||
20555 5' Nk | |||
,Q | |||
~. | |||
? | |||
Q G | |||
==Subject:== | ==Subject:== | ||
Standby Diesel Generator Study | Standby Diesel Generator Study | ||
==Reference:== | ==Reference:== | ||
| Line 45: | Line 51: | ||
==Dear Mr. Goller:== | ==Dear Mr. Goller:== | ||
This letter is in response to the referenced letter which transmitted a questionnaire pertaining a reliability study of Standby Diesel Generator Units. | |||
This letter is in response to the referenced letter which transmitted a questionnaire pertaining a reliability study of Standby Diesel Generator Units. It was requested that the questionnaire ba completed and one copy returned to your office by January 20, 1978. We have completed the question-naire and are submitting one copy, for your review and use, as an enclosure to this letter. | It was requested that the questionnaire ba completed and one copy returned to your office by January 20, 1978. We have completed the question-naire and are submitting one copy, for your review and use, as an enclosure to this letter. | ||
Additionally, it was requested that we identify the individual responsible for completing the questionnaire, follow-up communications, or for arranging a reactor site visit. This individual is: | Additionally, it was requested that we identify the individual responsible for completing the questionnaire, follow-up communications, or for arranging a reactor site visit. This individual is: | ||
Mr. L. C. Lessor Station Superintendent Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska | Mr. L. C. Lessor Station Superintendent Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Phone (402) 825-3811 i | ||
i f0t d 8107300287 810720 | i f0t d 8107300287 810720 0260o 3 I | ||
PDR ADOCK 05003298 F | |||
PDR i | |||
,t ' | |||
w | w ' | ||
/. | |||
/ | |||
Are any foreign gases such as propane, freon, halon, carbon S. | |||
dioxide, etc. stored in the: | |||
Diesel Engine room? | |||
pr_. | pr_. | ||
Yes x | |||
or adjacent buildings? Yes | No or adjacent buildings? Yes No X s | ||
,f.i d | |||
If yes, (other than hand portable fire extinguishers), then | }t If yes, (other than hand portable fire extinguishers), then Pp identify gases and give approximate tank size. | ||
y Gases Carbon Dioxide Volume 76 75 lb. bottles ti sw Does control system automatically bypass, in emergency T. | |||
starting, 2ny engine temporarily out of service for maintenance? Yes No X | |||
If yes, then hod many failures to bypass have occured? | |||
Yes X No If yes, then which part or subsystem? copoer tubing How many failures? | Does the control system automatically override the test U. | ||
with stainless steel and no leaks have occurred since. | mode under emergency conditions? Yes x | ||
Would periodic (yearly or other) evaluation and/or testing U. | No Have repetitive mechanical failures occurred in any component part V. | ||
or subsystem of the engine, generator, or switch gear, etc.? | |||
Yes X No If yes, then which part or subsystem? copoer tubing How many failures? | |||
Give brief reasons for the answer. | Three Give nature of failure. | ||
Tubing develooed leaks, was reolaced with stainless steel and no leaks have occurred since. | |||
Would periodic (yearly or other) evaluation and/or testing f33 U. | |||
b | by "outside experts" contribute significantly to the diesel- | ||
<I generator reliability? Yes No x sj p(( | |||
Give brief reasons for the answer. | |||
]d, 94 | |||
+ | |||
b | |||
y | |||
/ | |||
/ | |||
/ | |||
21- | 21- | ||
/ | / | ||
Give the accumulated time-load operating record for each X. | |||
diesel-generator unit from installation to the present | 1. | ||
diesel-generator unit from installation to the present 11 (Running Hours): | |||
Y) | |||
Preoperational test Date 1-11-74 01 Engine Sury. Testing & | |||
: | Emergency Total 7 | ||
:Seria! Ho Maintenanca Hrs. : | |||
and Other Hours | |||
!1 No Load Loaded Service Hrs. : | |||
IL~ - | |||
7103 UN 336 0 | |||
7103 UN | 336 UN | ||
{ | |||
320 | 320 j | ||
: l. 7102 | 0 l | ||
35 | 320 l | ||
: l. 7102 35 Surveillance test load (percent of continuous rating) 2. | |||
Give the projected or planned time-load operation for 3. | |||
each diesel-generator unit during the next 12 months. | |||
: Surveillance & | |||
Emergency Total | |||
:llaintenance Hrs. : | :llaintenance Hrs. : | ||
and other Hours | |||
: Service Hrs. : | |||
40 | 40 0 | ||
40 Provide the follceing sunmary of the periodic surveillance testing 4. | |||
experience: | |||
Starting date of surveillance testing (0L date) Jan. | |||
1974 a. | |||
b. | |||
Periodic test interval monthly I | |||
c. | l j | ||
Total number of surveilTance tests performed | |||
( | |||
210 c. | |||
d. | d. | ||
Total number of test failures 7 | |||
l* | 1i: | ||
l* | |||
3 failure to accept load _ | |||
conditions | o failure to start _ | ||
4 failures due to operator error o | |||
;ft'g failure to carry load 3 | |||
completed questionnaire. | E' failure due to equipment not being operative during emergency N' | ||
conditions 0 | |||
L.. | |||
Supply a copy of the surveillance test procedures with this e. | |||
completed questionnaire. | |||
See attached. | |||
O | |||
7 | |||
.. g t | |||
We have listed UN on several frome- | 2 Additional Comments We have listed UN on several frome-tco k n 1 4 n m, 4"~~~ | ||
t4 the requested information does not warrant additinnni | t4 the requested information does not warrant additinnni | ||
[,l, | |||
2. | 2. | ||
effort to obtain the information. If there is dis- | effort to obtain the information. | ||
agreement on this matter, we will revaluate if contacted. | If there is dis-(, | ||
agreement on this matter, we will revaluate if contacted. | |||
Y. General Suggestions Briefly give conetructive criticism or suggestions as to improvement in reliability of the diesel generators. These remarks may cover tests, naintenance, orattices, orders, policy, adjustmenti, etc. | [ | ||
!I EL.. _ | |||
Y. | |||
General Suggestions Briefly give conetructive criticism or suggestions as to improvement in reliability of the diesel generators. These remarks may cover tests, naintenance, orattices, orders, policy, adjustmenti, etc. | |||
yc - | yc - | ||
i | i j | ||
I a | |||
L. | |||
: t. | |||
D | D | ||
%ebe o | |||
e | |||
**}} | |||
Latest revision as of 08:23, 21 December 2024
| ML20009F318 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 01/18/1978 |
| From: | NEBRASKA PUBLIC POWER DISTRICT |
| To: | Goller K Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20009F317 | List: |
| References | |
| NUDOCS 8107300287 | |
| Download: ML20009F318 (4) | |
Text
.
/
p d
losure 3 p
.e
[6,,. -
6' P'
/
o-
"i GENERAL OFFICE P. O. box 499, COLUMBUS, NEDR ASKA 68601 Nebraska Publ.ic Power Distric reLe m o~c = >s....s.1
.n -Q January 18, 1978 l'.b.L?r
..s N
d 'f Director, Nuclear Rcactor Regulation 77
,V Attention: Karl R. Coller
,w Assistant Director of Operating Reactors
. kygY D
IS/
Division of Operating Reactors p %.,g % g --
19
%f U. S. Nuclear Regulatory Cornission Washington, D. C.
20555 5' Nk
,Q
~.
?
Q G
Subject:
Standby Diesel Generator Study
Reference:
Letter, Karl R. Coller to All Power Reactor Licensees, dated December 15, 1977.
Dear Mr. Goller:
This letter is in response to the referenced letter which transmitted a questionnaire pertaining a reliability study of Standby Diesel Generator Units.
It was requested that the questionnaire ba completed and one copy returned to your office by January 20, 1978. We have completed the question-naire and are submitting one copy, for your review and use, as an enclosure to this letter.
Additionally, it was requested that we identify the individual responsible for completing the questionnaire, follow-up communications, or for arranging a reactor site visit. This individual is:
Mr. L. C. Lessor Station Superintendent Cooper Nuclear Station P. O. Box 98 Brownville, Nebraska 68321 Phone (402) 825-3811 i
i f0t d 8107300287 810720 0260o 3 I
PDR ADOCK 05003298 F
PDR i
,t '
w '
/.
/
Are any foreign gases such as propane, freon, halon, carbon S.
dioxide, etc. stored in the:
Diesel Engine room?
pr_.
Yes x
No or adjacent buildings? Yes No X s
,f.i d
}t If yes, (other than hand portable fire extinguishers), then Pp identify gases and give approximate tank size.
y Gases Carbon Dioxide Volume 76 75 lb. bottles ti sw Does control system automatically bypass, in emergency T.
starting, 2ny engine temporarily out of service for maintenance? Yes No X
If yes, then hod many failures to bypass have occured?
Does the control system automatically override the test U.
mode under emergency conditions? Yes x
No Have repetitive mechanical failures occurred in any component part V.
or subsystem of the engine, generator, or switch gear, etc.?
Yes X No If yes, then which part or subsystem? copoer tubing How many failures?
Three Give nature of failure.
Tubing develooed leaks, was reolaced with stainless steel and no leaks have occurred since.
Would periodic (yearly or other) evaluation and/or testing f33 U.
by "outside experts" contribute significantly to the diesel-
<I generator reliability? Yes No x sj p((
Give brief reasons for the answer.
]d, 94
+
b
y
/
/
/
21-
/
Give the accumulated time-load operating record for each X.
1.
diesel-generator unit from installation to the present 11 (Running Hours):
Y)
Preoperational test Date 1-11-74 01 Engine Sury. Testing &
Emergency Total 7
- Seria! Ho Maintenanca Hrs. :
and Other Hours
!1 No Load Loaded Service Hrs. :
IL~ -
7103 UN 336 0
336 UN
{
320 j
0 l
320 l
- l. 7102 35 Surveillance test load (percent of continuous rating) 2.
Give the projected or planned time-load operation for 3.
each diesel-generator unit during the next 12 months.
- Surveillance &
Emergency Total
- llaintenance Hrs. :
and other Hours
- Service Hrs. :
40 0
40 Provide the follceing sunmary of the periodic surveillance testing 4.
experience:
Starting date of surveillance testing (0L date) Jan.
1974 a.
b.
Periodic test interval monthly I
l j
Total number of surveilTance tests performed
(
210 c.
d.
Total number of test failures 7
1i:
l*
3 failure to accept load _
o failure to start _
4 failures due to operator error o
- ft'g failure to carry load 3
E' failure due to equipment not being operative during emergency N'
conditions 0
L..
Supply a copy of the surveillance test procedures with this e.
completed questionnaire.
See attached.
O
7
.. g t
2 Additional Comments We have listed UN on several frome-tco k n 1 4 n m, 4"~~~
t4 the requested information does not warrant additinnni
[,l,
2.
effort to obtain the information.
If there is dis-(,
agreement on this matter, we will revaluate if contacted.
[
!I EL.. _
Y.
General Suggestions Briefly give conetructive criticism or suggestions as to improvement in reliability of the diesel generators. These remarks may cover tests, naintenance, orattices, orders, policy, adjustmenti, etc.
yc -
i j
I a
L.
- t.
D
%ebe o
e