ML20011A400: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:. -
{{#Wiki_filter:.
                                                                        .j     %
.j b
b fj  ,'            lQ, ff5       G UNITED STATES OF AMERICA           j               bg y 3 NUCLEAR REGULATORY COMMISSION       A             'h           -
lQ, fj ff5 G
c6      jpeeA ae Before the Atomic Safety and Licensinc Boa
UNITED STATES OF AMERICA j
                                          ^
bg y 3 NUCLEAR REGULATORY COMMISSION A
                                                        ~
c 6
g                   6 N
'h eA ae jpe Before the Atomic Safety and Licensinc Boa
In the Matter of                   )
^
                                            )
~
Philadelphia Electric Comp.tny )     Docket Nos. 50-352
g 6
                                            )             50-353 #
N In the Matter of
(Limerick Generating Station, )                                  'yU /S,)N Units 1 and 2)                 )                 S     g             /
)
APPLICANT'S ANSWER TO KEYSTONE ALLIANCE PETITION TO INTERVENE D440 )-
)
0 g    f[-
Philadelphia Electric Comp.tny )
Preliminary Statement 4
Docket Nos. 50-352
                                                                                      't On August 21, 1981, the Nuclear Regulatory Co               hnb
)
(" Commission" or "NRC") published a notice     ' 'he Federal Register entitled " Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2), Receipt of Application for Facility Operating Licenses; Consideration of Issuance of Facility Operating Licenses; Availability of Applicant's 1/
50-353
Environmental Report; and Opportunity for Hearing" (" Notice").             -
'yU /S,)N (Limerick Generating Station, )
In response to the Notice, a petition for intervention was filed by the Keystone Alliance (" Keystone") on September 18, 1981. The petition was signed by Alan J. Nogee, who also filed an affidavit stating that he is the duly authorized representative of Keystone and attesting to the veracity of the petition. The petition was not supported by the
Units 1 and 2)
                                        ~
)
statements of individual Keystone members asserting an                   g interest in the proceeding.                                             J ili 1/ 46 Fed. Reg. 42557 (August 21, 1981).
S g
8110090395 011005 gDRADOCK 05000352 POR
/
 
0 )- f[-
For the reasons discussed more fully below, petitioner Keystone has failed to satisfy the requirements for organiza-tional standing in an NRC proceeding. Nor has petitioner identificd the " specific aspect or aspects of the subject matter of the proceeding" which it wishes to pursue.         Ac-cordingly, the petition should be denied.
0 APPLICANT'S ANSWER TO KEYSTONE D44 g
Argument Under the Commission's Rules of Practice, a petition to intervene in a licensing proceeding may be granted only if the requirements of 10 C.F.R. S S 2. 714 (a) (2 ) and ' (d) have been satisfied. In essence, the regulations require the petitioner to state his specific interest in the proceeding and explain how that interest may be affected by the outcome of the' proceeding.
ALLIANCE PETITION TO INTERVENE Preliminary Statement 4
It is now well settled that " organizations     . . . are   l 1
't On August 21, 1981, the Nuclear Regulatory Co hnb
(" Commission" or "NRC") published a notice
' 'he Federal Register entitled " Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2), Receipt of Application for Facility Operating Licenses; Consideration of Issuance of Facility Operating Licenses; Availability of Applicant's 1/
Environmental Report; and Opportunity for Hearing"
(" Notice").
In response to the Notice, a petition for intervention was filed by the Keystone Alliance
(" Keystone") on September 18, 1981.
The petition was signed by Alan J. Nogee, who also filed an affidavit stating that he is the duly authorized representative of Keystone and attesting to the veracity of the petition.
The petition was not supported by the statements of individual Keystone members asserting an g
~
interest in the proceeding.
Jili 1/
46 Fed. Reg. 42557 (August 21, 1981).
8110090395 011005 gDRADOCK 05000352 POR For the reasons discussed more fully below, petitioner Keystone has failed to satisfy the requirements for organiza-tional standing in an NRC proceeding.
Nor has petitioner identificd the " specific aspect or aspects of the subject matter of the proceeding" which it wishes to pursue.
Ac-cordingly, the petition should be denied.
Argument Under the Commission's Rules of Practice, a petition to intervene in a licensing proceeding may be granted only if the requirements of 10 C.F.R. S S 2. 714 (a) (2 ) and ' (d) have been satisfied.
In essence, the regulations require the petitioner to state his specific interest in the proceeding and explain how that interest may be affected by the outcome of the' proceeding.
It is now well settled that " organizations are l
not clothed with independent standing to intervene in NRC l
not clothed with independent standing to intervene in NRC l
licensing proceedings. Rather, any standing which [an organization) may possess is wholly derivative in character."
licensing proceedings.
l Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1) , ALAB-535, 9 NRC 377, 390 (1979). ~-2/ 1 In other words, an organizational petitioner must establish that at least one of its me:abers has legal standing to intervene in this proceeding undel the rules applicable to individual petitioners.
Rather, any standing which [an organization) may possess is wholly derivative in character."
_2/ See also Texas Utilities Generating Company (Comanche Peak Ste am Electric Station , Units 1 and 2), LBP-79-lS, 9 NRC 728 (1979), Detroit Edison Company (Enrico Fermi Atomic Power Plant, Unit 2), LBP-79-1, 9 NRC 73 (1979).
Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), ALAB-535, 9 NRC 377, 390 (1979). ~-2/
In other words, an organizational petitioner must establish that at least one of its me:abers has legal standing to intervene in this proceeding undel the rules applicable to individual petitioners.
_2/
See also Texas Utilities Generating Company (Comanche Peak Ste am Electric Station, Units 1 and 2), LBP-79-lS, 9 NRC 728 (1979), Detroit Edison Company (Enrico Fermi Atomic Power Plant, Unit 2), LBP-79-1, 9 NRC 73 (1979).


p-f-
p-f- -
In response to'the petition of Marvin I. Lewis to intervene in this proceeding, Applicant has stated its position as to the necessary particularization of an iden-tifiable interest in a licensing proceeding, including an explanation of how that interest would be affected by any given outcome in the proceeding.     This position is equally applicable here.     Rather- than furnish the Licensing Board with repetitive pleadings, Applicant hereby incorporates and respectfully refers the Board to its         w       the Lewis petition for a statement of the authorities upon A
In response to'the petition of Marvin I. Lewis to intervene in this proceeding, Applicant has stated its position as to the necessary particularization of an iden-tifiable interest in a licensing proceeding, including an explanation of how that interest would be affected by any given outcome in the proceeding.
This position is equally applicable here.
Rather-than furnish the Licensing Board with repetitive pleadings, Applicant hereby incorporates and respectfully refers the Board to its w
the Lewis petition for a statement of the authorities upon A
which it relies as to the requisite personal interest for 3/
which it relies as to the requisite personal interest for 3/
standing.-~
standing.-~
The Keystone petition states that its members " reside and/or own property within a 10 mile radius of the Limerick generating station, as well as a larger area out to approxi-4/
The Keystone petition states that its members " reside and/or own property within a 10 mile radius of the Limerick generating station, as well as a larger area out to approxi-4/
mately 50 miles from the Limerick station."--       However, the petition is not supported by the statement of any Keystone member attesting to this fact or otherwise stating facts sufficient to demonstrate his personal interest in the pro-ceedi :. Instead, the petition simply states in general terms that. Keystone members are " interested in the protec-tion of tl.emselves and their neighbors" from alleged nuclear
mately 50 miles from the Limerick station."--
_3/   Petitioner herein has been served a copy of Applicant's     I answer to the Lewis petition.                               i 1
However, the petition is not supported by the statement of any Keystone member attesting to this fact or otherwise stating facts sufficient to demonstrate his personal interest in the pro-ceedi Instead, the petition simply states in general terms that. Keystone members are " interested in the protec-tion of tl.emselves and their neighbors" from alleged nuclear
_4/   Keystone petition at 1.
_3/
Petitioner herein has been served a copy of Applicant's I
answer to the Lewis petition.
i
_4/
Keystone petition at 1.
i r
i r
i l           -                  -            .                            ,
i l


r P-
P-r
      >/         ,
>/
_4-
_4-
    &?
&?
5/.
5/.
                  ' hazards. - However, Keystone's mere = exhibition of a "special.
' hazards. -
                  . interest" in the protection against radiation hazards is not
However, Keystone's mere = exhibition of a "special.
                  -a basis .for intervention because the Supreme' Court "has held that an . organization's mere interest in a problem, 'no matter how long-standing the interest and no matter how
. interest" in the protection against radiation hazards is not
-a basis.for intervention because the Supreme' Court "has held that an. organization's mere interest in a problem, 'no
(
(
qualified the organization is in evaluating the problem,'
matter how long-standing the interest and no matter how qualified the organization is in evaluating the problem,'
6/
6/
is not sufficient for standing to obtain judicial review. "--
is not sufficient for standing to obtain judicial review. "--
The failure of Keystone te-delineate the interests of its members is therefore fatal to the petition.
The failure of Keystone te-delineate the interests of its members is therefore fatal to the petition.
In the Allens Creqk decision in ALAB-585, the Appeal Bon.rd emphasized that the Licensing Board "was not merely entitled but obligated
In the Allens Creqk decision in ALAB-585, the Appeal Bon.rd emphasized that the Licensing Board "was not merely entitled but obligated
                  .to satisfy itself that there was at least one member of the (organization) with a particularized interest which might be affecte,d by the outcore of the proceeding" and, further, 1
.to satisfy itself that there was at least one member of the (organization) with a particularized interest which might be affecte,d by the outcore of the proceeding" and, further, 1
that the Board was not required "to presume that the (peti-l '
that the Board was not required "to presume that the (peti-l tioner] had a member with the requisite affected interest on
tioner] had a member with the requisite affected interest on
_5/
_5/   Keystone petition at 1.                       The petition also states that Keystone has been an active intervenor in rate cases involving PECO before the Pennsylvania Public Utility Commission.                       Of course, rate matters are beyond the jurisdiction of the NRC and are therefore outside the
Keystone petition at 1.
                          " zone of interests" permissible as a basis for inter-vention in a licensing proceeding.                             Portland General Electric Company (Pebble Springs Nuclear Plant, Units 1 and 2 ) , CLI-76-21, 4 NRC 610, 614 (1976); Public Service Company of Oklahoma (Black Fox, Units 1 and 2), LBP-77-17, 5 NRC 657, 659 (1977), aff'd, ALAB-397,                                                             ,
The petition also states that Keystone has been an active intervenor in rate cases involving PECO before the Pennsylvania Public Utility Commission.
5 NRC 1143, 1147 (1977); Metropolitan Edison Company                                                               '
Of course, rate matters are beyond the jurisdiction of the NRC and are therefore outside the
(Three Mile Island Nuclear Station, Unit 1) , Docket No.
" zone of interests" permissible as a basis for inter-vention in a licensing proceeding.
Portland General Electric Company (Pebble Springs Nuclear Plant, Units 1 and 2 ), CLI-76-21, 4 NRC 610, 614 (1976); Public Service Company of Oklahoma (Black Fox, Units 1 and 2), LBP-77-17, 5 NRC 657, 659 (1977), aff'd, ALAB-397, 5 NRC 1143, 1147 (1977); Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1), Docket No.
50-289 (Restart), " Memorandum and Order Ruling on Peti-tions and Setting Special Prehearing Conference" (Septen6er 21, 1979) (slip opinion at 7).
50-289 (Restart), " Memorandum and Order Ruling on Peti-tions and Setting Special Prehearing Conference" (Septen6er 21, 1979) (slip opinion at 7).
_6/   Westinghouse Electrical Corp. (Export to South Korea),
_6/
Westinghouse Electrical Corp. (Export to South Korea),
CLI-80-30, 12 NRC 253, 258 (1980), citing Sierra Club
CLI-80-30, 12 NRC 253, 258 (1980), citing Sierra Club
: v. Morton, 405 U.S. 727, 739 (1972).
: v. Morton, 405 U.S.
l l                           --, , , , _ . - . _ - _ _ - ,
727, 739 (1972).
 
l l
        .the strength of nothing nere than the. naked representation in its petition that a certain number of [petitisner's]
.the strength of nothing nere than the. naked representation in its petition that a certain number of [petitisner's]
members reside within 'close proximity' to the site of the 7/
members reside within 'close proximity' to the site of the 7/
proposed facility."~~ The Appeal Board explained its ra-tionale as follows:                           .
proposed facility."~~ The Appeal Board explained its ra-tionale as follows:
Although it may be reasonable to suppose that most (perhaps all)
Although it may be reasonable to suppose that most (perhaps all)
[ petitioner's] members share that dedication as well as subscribe to the general objectives of the orga-nization as spelled out in the peti-tion, it scarcely follows perforce that each considers that construc-tion of the Allens Creek facility
[ petitioner's] members share that dedication as well as subscribe to the general objectives of the orga-nization as spelled out in the peti-tion, it scarcely follows perforce that each considers that construc-tion of the Allens Creek facility would-invade some personal interest
  ~                          would-invade some personal interest
~
                              " arguably within the zone of interests sought to be protected or. regulated" by either the statutes this commission enforces or the Constitution.             Insoftr t
" arguably within the zone of interests sought to be protected or. regulated" by either the statutes this commission enforces or the Constitution.
as we are aware, joining and retainirg membership in [ petitioner] does not signify adherence to any particular views regarding the desirability of nuclear power facilities, either from a civil liberties standpoint or other-
Insoftr as we are aware, joining and retainirg t
;                            wise. Nor, more importantly, does there appear to be any necessary link between holding [ petitioner] membership and possessing an interest which might be affected by the construction or operation of such a facility.             Indeed, for all that appears on this record, the personal interests of any particular
membership in [ petitioner] does not signify adherence to any particular views regarding the desirability of nuclear power facilities, either from a civil liberties standpoint or other-wise.
[ petitioner] member might be advanced, rather than harmed, by the construction of Allens Creek - i.e., the proposed licensing action would cause the member
Nor, more importantly, does there appear to be any necessary link between holding [ petitioner] membership and possessing an interest which might be affected by the construction or operation of such a facility.
,                            no injury in fact at all.
: Indeed, for all that appears on this record, the personal interests of any particular
                                                                                  \
[ petitioner] member might be advanced, rather than harmed, by the construction of Allens Creek -
Absent disclosure of the name and ad-dress of one such member, it is not possible to verify the assertion that I
i.e.,
7/ ALAB-585, 9 NRC at 391-92.                                         i
the proposed licensing action would cause the member no injury in fact at all.
\\
Absent disclosure of the name and ad-dress of one such member, it is not possible to verify the assertion that 7/
ALAB-585, 9 NRC at 391-92.
i


P
P,
  ,                                              such members exist. In a footnote in their brief, the amici curiae endeavor to brush this consideration aside by noting that the veracity of [ petitioner's]
such members exist.
allegation that it has nearby members that has never been challenged and, were it to be, the Board below could require a [ petitioner) officer to submit an af-fidavit attesting to the truthfulness of the allegation. What this line of reasoning ignores is that both the Board and the other parties were entitled to be provided with sufficient information to enable them to determine for themselves, by independent inquiry if thoughu warranted, whether a basis existed for a formal chal-lenge to the truthfulness of the assertions in [ petitioner's] petition. Beyond that, we are unprepared to accept amici's im-plicit thesis that standing may be es-tablished by means of an affidavit which makes conclusory assertions not susceptible of verification by either other litigants or the adjudicatory tribunal. We know of no authority for such a novel and unat-tractive proposition, which to us runs counter to fundamental concepts of pro-cedural due crocess. _C/
In a footnote in their brief, the amici curiae endeavor to brush this consideration aside by noting that the veracity of [ petitioner's]
allegation that it has nearby members that has never been challenged and, were it to be, the Board below could require a [ petitioner) officer to submit an af-fidavit attesting to the truthfulness of the allegation.
What this line of reasoning ignores is that both the Board and the other parties were entitled to be provided with sufficient information to enable them to determine for themselves, by independent inquiry if thoughu warranted, whether a basis existed for a formal chal-lenge to the truthfulness of the assertions in [ petitioner's] petition.
Beyond that, we are unprepared to accept amici's im-plicit thesis that standing may be es-tablished by means of an affidavit which makes conclusory assertions not susceptible of verification by either other litigants or the adjudicatory tribunal.
We know of no authority for such a novel and unat-tractive proposition, which to us runs counter to fundamental concepts of pro-cedural due crocess.
_C/
Because petitioner in Allens Creek did not satisfy this requirement, its petition to intervene was denied.
Because petitioner in Allens Creek did not satisfy this requirement, its petition to intervene was denied.
The same approach has been taken in a number of other licensing cases. For Oxample, in the Enrico Fermi proceed-ing, the Board stated that an organization which seek: to intervene on the basis of the interest of its members "must identify specifically the name and address of at least one affected member who wishes to be represented by the organi-zation." -
The same approach has been taken in a number of other licensing cases.
              -9/
For Oxample, in the Enrico Fermi proceed-ing, the Board stated that an organization which seek: to intervene on the basis of the interest of its members "must identify specifically the name and address of at least one affected member who wishes to be represented by the organi-
In Waterford, the Board similarly stated that 8/   Id. at 392-93 (footnote and citations omitted) (emphasis in original).
-9/
_9/ Detroit Edison Company (Enrico Fermi Atomic Power Plant, Unit 2), LBP-79-1, 9 NRC 73, 77 (1979).
zation." -
In Waterford, the Board similarly stated that 8/
Id. at 392-93 (footnote and citations omitted) (emphasis in original).
_9/
Detroit Edison Company (Enrico Fermi Atomic Power Plant, Unit 2), LBP-79-1, 9 NRC 73, 77 (1979).


7-institutional standing requires the repr esentative to demon-
7-institutional standing requires the repr esentative to demon-strate that at least one of its members has
              "strate injury that   at least one of its members in fact"                                         has the satisfied and " zone of interest" tests and has at least implicity 10/ authorized the organization to represent his interests.~~ More recently, the Licensing Board in the Perry proceeding also stated the req i u rement that petitions for intervention "be accompanied by one o r more affidavits stating the place of residence of members o n whom standing is based and stating that the organizati represent the member's interests."~~       11/      on is authorized to In the Big Rock Point proceeding     ,
" injury in fact" satisfied the and " zone of interest" tests and has at least implicity authorized the organizati 10/
the Licensing Board held that intervention must be denied               ecause theb organiza-tion had failed to identify specifi c members by name and address, provide a statement by such membe organization to represent it,                           rs authorizing the and provide a statement of the member's interests which would 12                       e affectedb by the proposed action.~~/
interests.~~
And in Comanche Peak,   _
on to represent his More recently, the Licensing Board in the Perry proceeding also stated the req i u rement that petitions for intervention "be accompanied by one o r more affidavits stating the place of residence of members o is based and stating that the organizati n whom standing 11/
the Licensing Board reiterated that while an organi zation can establish 10/
on is authorized to represent the member's interests."~~
Electrical Station, Louisiana Power and Light Company (Waterford Steam randum mid Order" (MarchUnit 3) 7, , Docket No. 50-382, " Memo-11/                                        1979) (slip opinion at 4).
In the Big Rock Point proceeding the Licensing Board held that intervention must be denied b ecause the organiza-tion had failed to identify specifi c members by name and address, provide a statement by such membe organization to represent it, rs authorizing the and provide a statement of the member's interests which would b 12 proposed action.~~/
Power Plant, Units Cleveland Electric Illuminatinc Com 50-441,                                   pany (Perry Nuclear 1 and 2), Docket Nos. 50-440 and Conference (April 9,         Regarding Petitions for Irt"ngMemorandum an 1981) (slip opinicn at 6). n ervention" 12/
e affected by the And in Comanche Peak, Board reiterated that while an organi the Licensing zation can establish 10/
Consumers Power Company Docket   No. 50-155, 1979) (slip opinion at" Memorandum and Order"(Big Rock Point Nuclear 4).                         (September 25,
Electrical Station, Louisiana Power and Light Company (Waterford Steam Unit 3), Docket No. 50-382, " Memo-randum mid Order" (March 7, 1979) (slip opinion at 11/
-                                                                                    R
Power Plant, Cleveland Electric Illuminatinc Com 4).
Units pany (Perry Nuclear 50-441, 1 and 2), Docket Nos. 50-440 and Conference Regarding Petitions for I t" Memorandum a (April 9, r ng 1981) (slip opinicn at n ervention" 6).
12/
Consumers Power Company
" Memorandum and Order"(Big Rock Point Nuclear Docket No. 50-155, 1979) (slip opinion at 4).
(September 25, R


8-standing through its members whose interests may be af-fected, "the specific members must be identified, how their interest may be affected must be shown, and the member's authorization to the organization must be stated .     . . ."--13/
8-standing through its members whose interests may be af-fected, "the specific members must be identified, how their interest may be affected must be shown, and the member's authorization to the organization must be stated.
."--13/
Accordingly, the apparent belief held by Keystone's counsel that its member ship possesses the requisite personal interest necessary for ".ntervention, merely on the basis of Keystone's "special interest" in certain areas, is insufficient as a matter of law for intervention.
Accordingly, the apparent belief held by Keystone's counsel that its member ship possesses the requisite personal interest necessary for ".ntervention, merely on the basis of Keystone's "special interest" in certain areas, is insufficient as a matter of law for intervention.
Finally, Keystone has failed to comply with the re-quirement under the rules for interventici that it designate "the specific aspect or aspects of the subject matter of the proceeding as to which petition wishes to intervene."--14/
Finally, Keystone has failed to comply with the re-quirement under the rules for interventici that it designate "the specific aspect or aspects of the subject matter of the proceeding as to which petition wishes to intervene."--14/
The aspects designated by Keystone merely Outline general areas of subject matters in more or less " table of contents" fashion. These designated " aspects" are entirely too vague to constitute compliance with the standard of specificity contained in 10 C.F.R. 5 2. 714 (a) (2 ) .
The aspects designated by Keystone merely Outline general areas of subject matters in more or less " table of contents" fashion.
These designated " aspects" are entirely too vague to constitute compliance with the standard of specificity contained in 10 C.F.R.
5 2. 714 (a) (2 ).
Ns a final matter, petitioner's request to consider
Ns a final matter, petitioner's request to consider
    " aspects" regarding the availability of water supplies related to Limerick may not be heard because this matter lies within the plenary jurisdiction of the Delaware River 13/ Texas Utilities Generating Company (Comanche Peak Steam Electric Station, Units 1 and 2), LBP-79-18, 9 NRC 728, 729 (1979).
" aspects" regarding the availability of water supplies related to Limerick may not be heard because this matter lies within the plenary jurisdiction of the Delaware River 13/
14/   10 C.F.R. 52. 714 (a) (2) .
Texas Utilities Generating Company (Comanche Peak Steam Electric Station, Units 1 and 2), LBP-79-18, 9 NRC 728, 729 (1979).
14/
10 C.F.R.
: 52. 714 (a) (2).


Basin Commission, see generally Philadelphia Electric Company (Limerick Generating Station, Units 1 and . 2) ,
Basin Commission, see generally Philadelphia Electric Company (Limerick Generating Station, Units 1 and. 2),
ALAB-262, 1 NRC 163.(1975),- which has granted final ap-15/
ALAB-262, 1 NRC 163.(1975),- which has granted final ap-15/
proval to the supplemental cooling water plan for Limerick.
proval to the supplemental cooling water plan for Limerick.
This action of the DRBC was approved by the United States District Court for the Eastern District of Penn.sylvania on August 17, 1981. Moreover, this matter was fully " ventilated and resolved at the construction permit stage" and petitioner has not made "any supported assertion of changed circumstances or the possible existence of some special public interest f actors in the particular case. "   Alabama Power Company (Joseph M. Farley Nuclear Plant, Units 1 and 2), CLI-74-12, i
This action of the DRBC was approved by the United States District Court for the Eastern District of Penn.sylvania on August 17, 1981.
7 AEC 203 (1974). --16/
Moreover, this matter was fully " ventilated and resolved at the construction permit stage" and petitioner has not made "any supported assertion of changed circumstances or the possible existence of some special public interest f actors in the particular case. "
a
Alabama Power Company (Joseph M.
          ~~15/ It may be noted that permits related to the Point 4
Farley Nuclear Plant, Units 1 and 2), CLI-74-12, 7 AEC 203 (1974). --16/
Pleasant project itself, specifically for the Point Pleasant intake structure and for the Chalfont waste treatment plant, are now pending before the United States Corps of Engineers.
i a
          --16/ Without conceding the validity of other aspects pleaded, it is clear that certain other matters are beyond the jurisdiction of this Licensing Board.     Thus, issues pertaining to siting may not be heard because considera-3               tion of alternative site selection at the operating li-cense stage is precluded under the new Section 51.53 (b) and Appendix A to Part 51. Transportation of nuclear
~~15/
,                materials to and f;om the Limerick facility is also not
It may be noted that permits related to the Point Pleasant project itself, specifically for the Point 4
;              a matter within this proceeding since it would have to be authorized by separate licensing under 10 C.F.R. Parts 30, 40 and 70. See Philadelphia Electric Company (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 30 (1974).
Pleasant intake structure and for the Chalfont waste treatment plant, are now pending before the United States Corps of Engineers.
The ultimate disposition of reactor waste is currently the subject of NRC rulemaking. See 44 Fed. Reg. 61372 (October 25, 1979). As a generic issue to be determined by the Commission, it is not for consideration by individual (Footnote 16/ continued on next page)
--16/
Without conceding the validity of other aspects pleaded, it is clear that certain other matters are beyond the jurisdiction of this Licensing Board.
Thus, issues pertaining to siting may not be heard because considera-3 tion of alternative site selection at the operating li-cense stage is precluded under the new Section 51.53 (b) and Appendix A to Part 51.
Transportation of nuclear materials to and f;om the Limerick facility is also not a matter within this proceeding since it would have to be authorized by separate licensing under 10 C.F.R.
Parts 30, 40 and 70.
See Philadelphia Electric Company (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 30 (1974).
The ultimate disposition of reactor waste is currently the subject of NRC rulemaking.
See 44 Fed. Reg. 61372 (October 25, 1979).
As a generic issue to be determined by the Commission, it is not for consideration by individual (Footnote 16/ continued on next page)


10 -
10 -
Conclusion For the reasons discussed more fully below, petitioner has failed to satisfy the requirements for intervention by an organization purporting to represent the personal interests of its members. Further, it has failed to designate those aspects of the subject matter in which petitioner has such 16/   (continued) licensing boards. The Commission's notice of rule-making followed a decision by the Court of. Appeals in the State of Minnesota v. United States Nuclear Regulatory Commission, 602 F.2d 412 (D.C. Cir. 1979),
Conclusion For the reasons discussed more fully below, petitioner has failed to satisfy the requirements for intervention by an organization purporting to represent the personal interests of its members.
which sustained dismissal of a contention regarding ultimate waste disposal in Northern States Power Company (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-455, 7 NRC 41 (1978). In reciting these events, the Licensing Board in the Allens Creek pro-ceeding stated that it was " bound by the Commission 's decision" in dismissing a similar contention. See Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1) , Docket No.
Further, it has failed to designate those aspects of the subject matter in which petitioner has such 16/
50-466, " Order" (March 10, 1980) (slip cpinion at 37-38). See also Virginia Electric and Power Company (North Anna Power Station, Units 1 and 2 ) , Docket Nos.
(continued) licensing boards.
The Commission's notice of rule-making followed a decision by the Court of. Appeals in the State of Minnesota v.
United States Nuclear Regulatory Commission, 602 F.2d 412 (D.C. Cir. 1979),
which sustained dismissal of a contention regarding ultimate waste disposal in Northern States Power Company (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-455, 7 NRC 41 (1978).
In reciting these events, the Licensing Board in the Allens Creek pro-ceeding stated that it was " bound by the Commission 's decision" in dismissing a similar contention.
See Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Docket No.
50-466, " Order" (March 10, 1980) (slip cpinion at 37-38).
See also Virginia Electric and Power Company (North Anna Power Station, Units 1 and 2 ), Docket Nos.
50-338 SP and 50-339 SP, " Order Denying Intervenors' Motion to Amend Petition to Intervene" (August 17, 1979).
50-338 SP and 50-339 SP, " Order Denying Intervenors' Motion to Amend Petition to Intervene" (August 17, 1979).
Also, " economics of available alternatives" may not be considered. Licensing boards "are not authorized . . .
Also, " economics of available alternatives" may not be considered.
to require an applicant to accept or reject an alterna-tive solely cn the basis of i ts economic costs" because this is a business judgment for the applicant. Illinois Power Company (Clinton Power Station, Unit Nos. 1 and 2), ALA   340, 4 NRC 27, 48 (1976); consumers Power Company (Midland Plant, Units 1 and 2), ALAB-458, 7 NRC 155 (1978); Portland General Electric Company (Trojan Nuclear Plant), ALAB-531, 9 NRC 263 (1979);
Licensing boards "are not authorized.
to require an applicant to accept or reject an alterna-tive solely cn the basis of i ts economic costs" because this is a business judgment for the applicant.
Illinois Power Company (Clinton Power Station, Unit Nos. 1 and 2), ALA 340, 4 NRC 27, 48 (1976); consumers Power Company (Midland Plant, Units 1 and 2), ALAB-458, 7 NRC 155 (1978); Portland General Electric Company (Trojan Nuclear Plant), ALAB-531, 9 NRC 263 (1979);
Virginia Electric and Power Company (North Anna Nuclear Power Station, Units 1 and 2), ALAB-384, 11 NRC 451, 456 (1980).
Virginia Electric and Power Company (North Anna Nuclear Power Station, Units 1 and 2), ALAB-384, 11 NRC 451, 456 (1980).


  /;2i '
/;2i 1-
1-
_ 11 _
_ 11 _
an interest.           Accordingly, the petition to intervene should be-denied. Applicant has no objection, however, to a limite'd appearance by petitioner pursuant to 10 C.F.R.
an interest.
Accordingly, the petition to intervene should be-denied.
Applicant has no objection, however, to a limite'd appearance by petitioner pursuant to 10 C.F.R.
S2.715(a).
S2.715(a).
Respectfully submitted, CONNER & WETTERHAHN Troy . Conner, Jr.
Respectfully submitted, CONNER & WETTERHAHN Troy
Mark J. Wetterhahn Robert M. Rader Suite 1050 1747 Pennsylvania Avenue, N.W.
. Conner, Jr.
Washington, D.C. 20006 202/833-3500 l                                                 Counsel for the Applicant l
Mark J. Wetterhahn Robert M.
l         October 5, 1981
Rader Suite 1050 1747 Pennsylvania Avenue, N.W.
\                                                                                                               l
Washington, D.C.
!                                                                                                              l
20006 202/833-3500 l
Counsel for the Applicant l
l October 5, 1981
\\
l


r                                                                                           ]
r
C UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of                 )
]
                                              )
C UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of
PHILADELPHIA ELECTRIC COMPANY )         Docket Nos. 50-352
)
                                              )                       50-353 (Limerick Generating Station, )
)
Units 1 and 2)               )
PHILADELPHIA ELECTRIC COMPANY )
CERTIFICATE OF SERVICE I hereby certify that copies of " Applicant's Answer to Keystone Alliance Petition to Intervene," in the captioned matter have been served upon the following by deposit in the United States mail this 5th day of October, 1981. A                        I Lewis petition copy of Applicant's answer to the Marvin I.
Docket Nos. 50-352
has also been served on petitioner.
)
                                                                ~ ~ ~
50-353 (Limerick Generating Station, )
                                                  ~
Units 1 and 2)
    ~
)
Judge' Lawrence'J. Brenner ~~' Alan S. Rosenthal, Esq.
CERTIFICATE OF SERVICE I hereby certify that copies of " Applicant's Answer to Keystone Alliance Petition to Intervene," in the captioned matter have been served upon the following by deposit in 1981.
Chairman, Atomic Safety and Chairman, Atomic Safety and Licensing Board                   Licensing Appeal Board U.S. Nuclear Regulatory       U.S. Nuclear Regulatory Commission                         Commission Washington, D.C. 20555     Washington, D.C.           20555 Judge Peter A. Morris         Eugene J. Bradley, Esq.
A the United States mail this 5th day of October, I
Atomic Safety and Licensing   2301 Market Street Board                        Philadelphia, Pennsylvania           19101 U.S. Nuclear Regulatory Colleen P. Woodhead, Esq.
copy of Applicant's answer to the Marvin I.
Commission Washington, D.C. 20555       Office of the Executive Legal Director Judge Richard F. Cole         U.S. Nuclear Regulatory Atomic Safety and Licensing         Commission Washington, D.C.             20555 Board U.S. Nuclear Regulatory Commission                   Mr. Chase R. Stephens, Chief Washington, D.C. 20555     Docketing and Service Branch Office of the Secre*sry U.S. Nuclear Regulatory Paul B. Cotter, Jr., Esq.
Lewis petition has also been served on petitioner.
Chairman, Atomic Safety and           Commission Licensing Board             Washington, D.C.             20555 U.S. Nuclear Regulatory Commission Washington, D.C. 20555
~
                                                -    __.                ,,              y -
~ ~ ~
~
Judge' Lawrence'J. Brenner ~~' Alan S.
Rosenthal, Esq.
Chairman, Atomic Safety and Chairman, Atomic Safety and Licensing Board Licensing Appeal Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.
20555 Washington, D.C.
20555 Judge Peter A. Morris Eugene J. Bradley, Esq.
Atomic Safety and Licensing 2301 Market Street Philadelphia, Pennsylvania 19101 Board U.S. Nuclear Regulatory Commission Colleen P. Woodhead, Esq.
Washington, D.C.
20555 Office of the Executive Legal Director Judge Richard F. Cole U.S. Nuclear Regulatory Atomic Safety and Licensing Commission Board Washington, D.C.
20555 U.S.
Nuclear Regulatory Commission Mr. Chase R.
Stephens, Chief Washington, D.C.
20555 Docketing and Service Branch Office of the Secre*sry Paul B.
Cotter, Jr., Esq.
U.S. Nuclear Regulatory Chairman, Atomic Safety and Commission Licensing Board Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Washington, D.C.
20555 y -


Alan J. Nogee Keystone Alliance 3700 Chestnut Street Philadelphia, PA 19104 I
Alan J.
i    W.
Nogee Keystone Alliance 3700 Chestnut Street Philadelphia, PA 19104 I
Robdrt M. Rader Counsel for the Applicant}}
W.
i Robdrt M.
Rader Counsel for the Applicant}}

Latest revision as of 05:05, 21 December 2024

Answer Opposing Keystone Alliance 810918 Petition to Intervene.Petitioner Failed to Satisfy Requirements for Organizational Standing or to Identify Specific Aspects of Interest in Proceeding.Certificate of Svc Encl
ML20011A400
Person / Time
Site: Limerick  Constellation icon.png
Issue date: 10/05/1981
From: Conner T
CONNER & WETTERHAHN, PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Atomic Safety and Licensing Board Panel
References
NUDOCS 8110090395
Download: ML20011A400 (13)


Text

.

.j b

lQ, fj ff5 G

UNITED STATES OF AMERICA j

bg y 3 NUCLEAR REGULATORY COMMISSION A

c 6

'h eA ae jpe Before the Atomic Safety and Licensinc Boa

^

~

g 6

N In the Matter of

)

)

Philadelphia Electric Comp.tny )

Docket Nos. 50-352

)

50-353

'yU /S,)N (Limerick Generating Station, )

Units 1 and 2)

)

S g

/

0 )- f[-

0 APPLICANT'S ANSWER TO KEYSTONE D44 g

ALLIANCE PETITION TO INTERVENE Preliminary Statement 4

't On August 21, 1981, the Nuclear Regulatory Co hnb

(" Commission" or "NRC") published a notice

' 'he Federal Register entitled " Philadelphia Electric Co. (Limerick Generating Station, Units 1 and 2), Receipt of Application for Facility Operating Licenses; Consideration of Issuance of Facility Operating Licenses; Availability of Applicant's 1/

Environmental Report; and Opportunity for Hearing"

(" Notice").

In response to the Notice, a petition for intervention was filed by the Keystone Alliance

(" Keystone") on September 18, 1981.

The petition was signed by Alan J. Nogee, who also filed an affidavit stating that he is the duly authorized representative of Keystone and attesting to the veracity of the petition.

The petition was not supported by the statements of individual Keystone members asserting an g

~

interest in the proceeding.

Jili 1/

46 Fed. Reg. 42557 (August 21, 1981).

8110090395 011005 gDRADOCK 05000352 POR For the reasons discussed more fully below, petitioner Keystone has failed to satisfy the requirements for organiza-tional standing in an NRC proceeding.

Nor has petitioner identificd the " specific aspect or aspects of the subject matter of the proceeding" which it wishes to pursue.

Ac-cordingly, the petition should be denied.

Argument Under the Commission's Rules of Practice, a petition to intervene in a licensing proceeding may be granted only if the requirements of 10 C.F.R. S S 2. 714 (a) (2 ) and ' (d) have been satisfied.

In essence, the regulations require the petitioner to state his specific interest in the proceeding and explain how that interest may be affected by the outcome of the' proceeding.

It is now well settled that " organizations are l

not clothed with independent standing to intervene in NRC l

licensing proceedings.

Rather, any standing which [an organization) may possess is wholly derivative in character."

Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), ALAB-535, 9 NRC 377, 390 (1979). ~-2/

In other words, an organizational petitioner must establish that at least one of its me:abers has legal standing to intervene in this proceeding undel the rules applicable to individual petitioners.

_2/

See also Texas Utilities Generating Company (Comanche Peak Ste am Electric Station, Units 1 and 2), LBP-79-lS, 9 NRC 728 (1979), Detroit Edison Company (Enrico Fermi Atomic Power Plant, Unit 2), LBP-79-1, 9 NRC 73 (1979).

p-f- -

In response to'the petition of Marvin I. Lewis to intervene in this proceeding, Applicant has stated its position as to the necessary particularization of an iden-tifiable interest in a licensing proceeding, including an explanation of how that interest would be affected by any given outcome in the proceeding.

This position is equally applicable here.

Rather-than furnish the Licensing Board with repetitive pleadings, Applicant hereby incorporates and respectfully refers the Board to its w

the Lewis petition for a statement of the authorities upon A

which it relies as to the requisite personal interest for 3/

standing.-~

The Keystone petition states that its members " reside and/or own property within a 10 mile radius of the Limerick generating station, as well as a larger area out to approxi-4/

mately 50 miles from the Limerick station."--

However, the petition is not supported by the statement of any Keystone member attesting to this fact or otherwise stating facts sufficient to demonstrate his personal interest in the pro-ceedi Instead, the petition simply states in general terms that. Keystone members are " interested in the protec-tion of tl.emselves and their neighbors" from alleged nuclear

_3/

Petitioner herein has been served a copy of Applicant's I

answer to the Lewis petition.

i

_4/

Keystone petition at 1.

i r

i l

P-r

>/

_4-

&?

5/.

' hazards. -

However, Keystone's mere = exhibition of a "special.

. interest" in the protection against radiation hazards is not

-a basis.for intervention because the Supreme' Court "has held that an. organization's mere interest in a problem, 'no

(

matter how long-standing the interest and no matter how qualified the organization is in evaluating the problem,'

6/

is not sufficient for standing to obtain judicial review. "--

The failure of Keystone te-delineate the interests of its members is therefore fatal to the petition.

In the Allens Creqk decision in ALAB-585, the Appeal Bon.rd emphasized that the Licensing Board "was not merely entitled but obligated

.to satisfy itself that there was at least one member of the (organization) with a particularized interest which might be affecte,d by the outcore of the proceeding" and, further, 1

that the Board was not required "to presume that the (peti-l tioner] had a member with the requisite affected interest on

_5/

Keystone petition at 1.

The petition also states that Keystone has been an active intervenor in rate cases involving PECO before the Pennsylvania Public Utility Commission.

Of course, rate matters are beyond the jurisdiction of the NRC and are therefore outside the

" zone of interests" permissible as a basis for inter-vention in a licensing proceeding.

Portland General Electric Company (Pebble Springs Nuclear Plant, Units 1 and 2 ), CLI-76-21, 4 NRC 610, 614 (1976); Public Service Company of Oklahoma (Black Fox, Units 1 and 2), LBP-77-17, 5 NRC 657, 659 (1977), aff'd, ALAB-397, 5 NRC 1143, 1147 (1977); Metropolitan Edison Company (Three Mile Island Nuclear Station, Unit 1), Docket No.

50-289 (Restart), " Memorandum and Order Ruling on Peti-tions and Setting Special Prehearing Conference" (Septen6er 21, 1979) (slip opinion at 7).

_6/

Westinghouse Electrical Corp. (Export to South Korea),

CLI-80-30, 12 NRC 253, 258 (1980), citing Sierra Club

v. Morton, 405 U.S.

727, 739 (1972).

l l

.the strength of nothing nere than the. naked representation in its petition that a certain number of [petitisner's]

members reside within 'close proximity' to the site of the 7/

proposed facility."~~ The Appeal Board explained its ra-tionale as follows:

Although it may be reasonable to suppose that most (perhaps all)

[ petitioner's] members share that dedication as well as subscribe to the general objectives of the orga-nization as spelled out in the peti-tion, it scarcely follows perforce that each considers that construc-tion of the Allens Creek facility would-invade some personal interest

~

" arguably within the zone of interests sought to be protected or. regulated" by either the statutes this commission enforces or the Constitution.

Insoftr as we are aware, joining and retainirg t

membership in [ petitioner] does not signify adherence to any particular views regarding the desirability of nuclear power facilities, either from a civil liberties standpoint or other-wise.

Nor, more importantly, does there appear to be any necessary link between holding [ petitioner] membership and possessing an interest which might be affected by the construction or operation of such a facility.

Indeed, for all that appears on this record, the personal interests of any particular

[ petitioner] member might be advanced, rather than harmed, by the construction of Allens Creek -

i.e.,

the proposed licensing action would cause the member no injury in fact at all.

\\

Absent disclosure of the name and ad-dress of one such member, it is not possible to verify the assertion that 7/

ALAB-585, 9 NRC at 391-92.

i

P,

such members exist.

In a footnote in their brief, the amici curiae endeavor to brush this consideration aside by noting that the veracity of [ petitioner's]

allegation that it has nearby members that has never been challenged and, were it to be, the Board below could require a [ petitioner) officer to submit an af-fidavit attesting to the truthfulness of the allegation.

What this line of reasoning ignores is that both the Board and the other parties were entitled to be provided with sufficient information to enable them to determine for themselves, by independent inquiry if thoughu warranted, whether a basis existed for a formal chal-lenge to the truthfulness of the assertions in [ petitioner's] petition.

Beyond that, we are unprepared to accept amici's im-plicit thesis that standing may be es-tablished by means of an affidavit which makes conclusory assertions not susceptible of verification by either other litigants or the adjudicatory tribunal.

We know of no authority for such a novel and unat-tractive proposition, which to us runs counter to fundamental concepts of pro-cedural due crocess.

_C/

Because petitioner in Allens Creek did not satisfy this requirement, its petition to intervene was denied.

The same approach has been taken in a number of other licensing cases.

For Oxample, in the Enrico Fermi proceed-ing, the Board stated that an organization which seek: to intervene on the basis of the interest of its members "must identify specifically the name and address of at least one affected member who wishes to be represented by the organi-

-9/

zation." -

In Waterford, the Board similarly stated that 8/

Id. at 392-93 (footnote and citations omitted) (emphasis in original).

_9/

Detroit Edison Company (Enrico Fermi Atomic Power Plant, Unit 2), LBP-79-1, 9 NRC 73, 77 (1979).

7-institutional standing requires the repr esentative to demon-strate that at least one of its members has

" injury in fact" satisfied the and " zone of interest" tests and has at least implicity authorized the organizati 10/

interests.~~

on to represent his More recently, the Licensing Board in the Perry proceeding also stated the req i u rement that petitions for intervention "be accompanied by one o r more affidavits stating the place of residence of members o is based and stating that the organizati n whom standing 11/

on is authorized to represent the member's interests."~~

In the Big Rock Point proceeding the Licensing Board held that intervention must be denied b ecause the organiza-tion had failed to identify specifi c members by name and address, provide a statement by such membe organization to represent it, rs authorizing the and provide a statement of the member's interests which would b 12 proposed action.~~/

e affected by the And in Comanche Peak, Board reiterated that while an organi the Licensing zation can establish 10/

Electrical Station, Louisiana Power and Light Company (Waterford Steam Unit 3), Docket No. 50-382, " Memo-randum mid Order" (March 7, 1979) (slip opinion at 11/

Power Plant, Cleveland Electric Illuminatinc Com 4).

Units pany (Perry Nuclear 50-441, 1 and 2), Docket Nos. 50-440 and Conference Regarding Petitions for I t" Memorandum a (April 9, r ng 1981) (slip opinicn at n ervention" 6).

12/

Consumers Power Company

" Memorandum and Order"(Big Rock Point Nuclear Docket No. 50-155, 1979) (slip opinion at 4).

(September 25, R

8-standing through its members whose interests may be af-fected, "the specific members must be identified, how their interest may be affected must be shown, and the member's authorization to the organization must be stated.

."--13/

Accordingly, the apparent belief held by Keystone's counsel that its member ship possesses the requisite personal interest necessary for ".ntervention, merely on the basis of Keystone's "special interest" in certain areas, is insufficient as a matter of law for intervention.

Finally, Keystone has failed to comply with the re-quirement under the rules for interventici that it designate "the specific aspect or aspects of the subject matter of the proceeding as to which petition wishes to intervene."--14/

The aspects designated by Keystone merely Outline general areas of subject matters in more or less " table of contents" fashion.

These designated " aspects" are entirely too vague to constitute compliance with the standard of specificity contained in 10 C.F.R. 5 2. 714 (a) (2 ).

Ns a final matter, petitioner's request to consider

" aspects" regarding the availability of water supplies related to Limerick may not be heard because this matter lies within the plenary jurisdiction of the Delaware River 13/

Texas Utilities Generating Company (Comanche Peak Steam Electric Station, Units 1 and 2), LBP-79-18, 9 NRC 728, 729 (1979).

14/

10 C.F.R.

52. 714 (a) (2).

Basin Commission, see generally Philadelphia Electric Company (Limerick Generating Station, Units 1 and. 2),

ALAB-262, 1 NRC 163.(1975),- which has granted final ap-15/

proval to the supplemental cooling water plan for Limerick.

This action of the DRBC was approved by the United States District Court for the Eastern District of Penn.sylvania on August 17, 1981.

Moreover, this matter was fully " ventilated and resolved at the construction permit stage" and petitioner has not made "any supported assertion of changed circumstances or the possible existence of some special public interest f actors in the particular case. "

Alabama Power Company (Joseph M.

Farley Nuclear Plant, Units 1 and 2), CLI-74-12, 7 AEC 203 (1974). --16/

i a

~~15/

It may be noted that permits related to the Point Pleasant project itself, specifically for the Point 4

Pleasant intake structure and for the Chalfont waste treatment plant, are now pending before the United States Corps of Engineers.

--16/

Without conceding the validity of other aspects pleaded, it is clear that certain other matters are beyond the jurisdiction of this Licensing Board.

Thus, issues pertaining to siting may not be heard because considera-3 tion of alternative site selection at the operating li-cense stage is precluded under the new Section 51.53 (b) and Appendix A to Part 51.

Transportation of nuclear materials to and f;om the Limerick facility is also not a matter within this proceeding since it would have to be authorized by separate licensing under 10 C.F.R. Parts 30, 40 and 70.

See Philadelphia Electric Company (Peach Bottom Atomic Power Station, Units 2 and 3), ALAB-216, 8 AEC 13, 30 (1974).

The ultimate disposition of reactor waste is currently the subject of NRC rulemaking.

See 44 Fed. Reg. 61372 (October 25, 1979).

As a generic issue to be determined by the Commission, it is not for consideration by individual (Footnote 16/ continued on next page)

10 -

Conclusion For the reasons discussed more fully below, petitioner has failed to satisfy the requirements for intervention by an organization purporting to represent the personal interests of its members.

Further, it has failed to designate those aspects of the subject matter in which petitioner has such 16/

(continued) licensing boards.

The Commission's notice of rule-making followed a decision by the Court of. Appeals in the State of Minnesota v.

United States Nuclear Regulatory Commission, 602 F.2d 412 (D.C. Cir. 1979),

which sustained dismissal of a contention regarding ultimate waste disposal in Northern States Power Company (Prairie Island Nuclear Generating Plant, Units 1 and 2), ALAB-455, 7 NRC 41 (1978).

In reciting these events, the Licensing Board in the Allens Creek pro-ceeding stated that it was " bound by the Commission 's decision" in dismissing a similar contention.

See Houston Lighting and Power Company (Allens Creek Nuclear Generating Station, Unit 1), Docket No.

50-466, " Order" (March 10, 1980) (slip cpinion at 37-38).

See also Virginia Electric and Power Company (North Anna Power Station, Units 1 and 2 ), Docket Nos.

50-338 SP and 50-339 SP, " Order Denying Intervenors' Motion to Amend Petition to Intervene" (August 17, 1979).

Also, " economics of available alternatives" may not be considered.

Licensing boards "are not authorized.

to require an applicant to accept or reject an alterna-tive solely cn the basis of i ts economic costs" because this is a business judgment for the applicant.

Illinois Power Company (Clinton Power Station, Unit Nos. 1 and 2), ALA 340, 4 NRC 27, 48 (1976); consumers Power Company (Midland Plant, Units 1 and 2), ALAB-458, 7 NRC 155 (1978); Portland General Electric Company (Trojan Nuclear Plant), ALAB-531, 9 NRC 263 (1979);

Virginia Electric and Power Company (North Anna Nuclear Power Station, Units 1 and 2), ALAB-384, 11 NRC 451, 456 (1980).

/;2i 1-

_ 11 _

an interest.

Accordingly, the petition to intervene should be-denied.

Applicant has no objection, however, to a limite'd appearance by petitioner pursuant to 10 C.F.R.

S2.715(a).

Respectfully submitted, CONNER & WETTERHAHN Troy

. Conner, Jr.

Mark J. Wetterhahn Robert M.

Rader Suite 1050 1747 Pennsylvania Avenue, N.W.

Washington, D.C.

20006 202/833-3500 l

Counsel for the Applicant l

l October 5, 1981

\\

l

r

]

C UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of

)

)

PHILADELPHIA ELECTRIC COMPANY )

Docket Nos. 50-352

)

50-353 (Limerick Generating Station, )

Units 1 and 2)

)

CERTIFICATE OF SERVICE I hereby certify that copies of " Applicant's Answer to Keystone Alliance Petition to Intervene," in the captioned matter have been served upon the following by deposit in 1981.

A the United States mail this 5th day of October, I

copy of Applicant's answer to the Marvin I.

Lewis petition has also been served on petitioner.

~

~ ~ ~

~

Judge' Lawrence'J. Brenner ~~' Alan S.

Rosenthal, Esq.

Chairman, Atomic Safety and Chairman, Atomic Safety and Licensing Board Licensing Appeal Board U.S. Nuclear Regulatory U.S. Nuclear Regulatory Commission Commission Washington, D.C.

20555 Washington, D.C.

20555 Judge Peter A. Morris Eugene J. Bradley, Esq.

Atomic Safety and Licensing 2301 Market Street Philadelphia, Pennsylvania 19101 Board U.S. Nuclear Regulatory Commission Colleen P. Woodhead, Esq.

Washington, D.C.

20555 Office of the Executive Legal Director Judge Richard F. Cole U.S. Nuclear Regulatory Atomic Safety and Licensing Commission Board Washington, D.C.

20555 U.S.

Nuclear Regulatory Commission Mr. Chase R.

Stephens, Chief Washington, D.C.

20555 Docketing and Service Branch Office of the Secre*sry Paul B.

Cotter, Jr., Esq.

U.S. Nuclear Regulatory Chairman, Atomic Safety and Commission Licensing Board Washington, D.C.

20555 U.S. Nuclear Regulatory Commission Washington, D.C.

20555 y -

Alan J.

Nogee Keystone Alliance 3700 Chestnut Street Philadelphia, PA 19104 I

W.

i Robdrt M.

Rader Counsel for the Applicant