ML20011D499: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
Line 11: Line 11:
| contact person =  
| contact person =  
| document report number = NYN-89169, NUDOCS 8912270327
| document report number = NYN-89169, NUDOCS 8912270327
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO,LER), TEXT-SAFETY REPORT
| document type = REPORTABLE OCCURRENCE REPORT (SEE ALSO AO LER), TEXT-SAFETY REPORT
| page count = 2
| page count = 2
}}
}}
Line 17: Line 17:
=Text=
=Text=
{{#Wiki_filter:- - _
{{#Wiki_filter:- - _
b       .
b blew Hompshire A
A blew Hompshire                                                             Ted C. Feigenboom Senior Vice President and Chief Operating Officer NYN- 89169 December 21, 1989 l
Ted C. Feigenboom Senior Vice President and Chief Operating Officer NYN-89169 December 21, 1989 l
United States Nuclear Regulatory Commission Washington, DC 20555 Attention     Document Control Desk
United States Nuclear Regulatory Commission Washington, DC 20555 Attention Document Control Desk


==References:==
==References:==
Line 25: Line 25:


==Subject:==
==Subject:==
Inoperability of Containment Post LOCA Area Monitor                                         -
Inoperability of Containment Post LOCA Area Monitor Gentlemen Seabrook Station Technical Specification 3.3.3.1, ' Radiation Monitoring for Plant Operations ' requires-that the radiation monitoring instrumentation channels for plant operations shown in Table 3.3-6 be l
Gentlemen Seabrook Station Technical Specification 3.3.3.1, ' Radiation Monitoring for Plant Operations ' requires-that the radiation monitoring instrumentation channels for plant operations shown in Table 3.3-6 be                                     l OPERABLE with their Alarm / Trip Setpoints within the specified limits. Table 3.3-6   Item 1.A requires'that two channels of the containment Post LOCA Area Monitor be OPERABLE in all modes. Contrary to this-requirement, monitor 1-RM-6576A was inoperable for a period exceeding seven days.
OPERABLE with their Alarm / Trip Setpoints within the specified limits.
This radiation monitor was deenergized on December 1, 1989, to allow the implementation of a design change on its power. source. The plant-has                                   i remained in MODE 5.-Cold Shutdown, for the duration of this equipment outage. The monitor was returned to service on December 12, 1989.
Table 3.3-6 Item 1.A requires'that two channels of the containment Post LOCA Area Monitor be OPERABLE in all modes. Contrary to this-requirement, monitor 1-RM-6576A was inoperable for a period exceeding seven days.
1 This report is being submitted pursuant to the requirements of Seabrook                               j Station Technical Specifications 3.3.3.1,' ACTION 27: and 6.8.2. If you have-                               '
This radiation monitor was deenergized on December 1, 1989, to allow the implementation of a design change on its power. source. The plant-has i
any questions regarding this report, please contact Mr. Richard R. Belanger                                 i at (603)-474-9521, extension 4048.
remained in MODE 5.-Cold Shutdown, for the duration of this equipment outage. The monitor was returned to service on December 12, 1989.
Very truly yours, ffh             4 Ted C. Feigenbaum 8912270327 PDR 891221 S
1 This report is being submitted pursuant to the requirements of Seabrook j
ADOCK 05000443 PDC New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300
Station Technical Specifications 3.3.3.1,' ACTION 27: and 6.8.2.
If you have-any questions regarding this report, please contact Mr. Richard R. Belanger i
at (603)-474-9521, extension 4048.
Very truly yours, ffh 4
Ted C. Feigenbaum 8912270327 891221 PDR ADOCK 05000443 S
PDC New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300
* Seabrook, NH 03874
* Seabrook, NH 03874
* Telephone (603) 474 9521                   E o
* Telephone (603) 474 9521 E
o


l
l 1
  .      .                                                                1 United States Nuclear Regulatory Commission       December 21, 1989 Attention: Document Control Desk                 Page 2               ;
United States Nuclear Regulatory Commission December 21, 1989 Attention: Document Control Desk Page 2 I
I l
l cc Mr. William T. Russell Regional Administrator i
I l
United States Nuclear Regulatory Commission 1
cc   Mr. William T. Russell Regional Administrator                                           i United States Nuclear Regulatory Commission                       1 Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Victor Nerses. Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission Division of Reactor Projects Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 l
Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Victor Nerses. Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission Division of Reactor Projects Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 l
l l
l l
H 1
H 1
1
..]}}
                                                                        . .]}}

Latest revision as of 04:38, 21 December 2024

Ro:On 891201,containment post-LOCA Area Radiation Monitor 1-RM-6576A Inoperable for More than 7 Days to Implement Design Change on Power Source.Plant Remained in Cold Shutdown for Duration of Equipment Outage
ML20011D499
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 12/21/1989
From: Feigenbaum T
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NYN-89169, NUDOCS 8912270327
Download: ML20011D499 (2)


Text

- - _

b blew Hompshire A

Ted C. Feigenboom Senior Vice President and Chief Operating Officer NYN-89169 December 21, 1989 l

United States Nuclear Regulatory Commission Washington, DC 20555 Attention Document Control Desk

References:

Facility Operating License NPF-67. Docket No. 50-443

Subject:

Inoperability of Containment Post LOCA Area Monitor Gentlemen Seabrook Station Technical Specification 3.3.3.1, ' Radiation Monitoring for Plant Operations ' requires-that the radiation monitoring instrumentation channels for plant operations shown in Table 3.3-6 be l

OPERABLE with their Alarm / Trip Setpoints within the specified limits.

Table 3.3-6 Item 1.A requires'that two channels of the containment Post LOCA Area Monitor be OPERABLE in all modes. Contrary to this-requirement, monitor 1-RM-6576A was inoperable for a period exceeding seven days.

This radiation monitor was deenergized on December 1, 1989, to allow the implementation of a design change on its power. source. The plant-has i

remained in MODE 5.-Cold Shutdown, for the duration of this equipment outage. The monitor was returned to service on December 12, 1989.

1 This report is being submitted pursuant to the requirements of Seabrook j

Station Technical Specifications 3.3.3.1,' ACTION 27: and 6.8.2.

If you have-any questions regarding this report, please contact Mr. Richard R. Belanger i

at (603)-474-9521, extension 4048.

Very truly yours, ffh 4

Ted C. Feigenbaum 8912270327 891221 PDR ADOCK 05000443 S

PDC New Hampshire Yonkee Division of Public Service Company of New Hampshire P.O. Box 300

  • Seabrook, NH 03874
  • Telephone (603) 474 9521 E

o

l 1

United States Nuclear Regulatory Commission December 21, 1989 Attention: Document Control Desk Page 2 I

l cc Mr. William T. Russell Regional Administrator i

United States Nuclear Regulatory Commission 1

Region I 475 Allendale Road King of Prussia, PA 19406 Mr. Victor Nerses. Project Manager Project Directorate I-3 United States Nuclear Regulatory Commission Division of Reactor Projects Washington, DC 20555 Mr. Antone C. Cerne NRC Senior Resident Inspector P.O. Box 1149 Seabrook, NH 03874 l

l l

H 1

..]