TEC5ygg t;~w Washington Public Power Supply System P.O. Box 968. 3000GeorgeWashingtonWay Richland,Washingto 3
                                      .                                                                      t;~w Washington Public Power Supply System P.O. Box 968. 3000GeorgeWashingtonWay Richland,Washingto   3     509)372-5000
509)372-5000
                                                                                                              - ou s. y L~aa::;n7 July 18, 1983 Docket Number 50-397 G-02-83-618 Responds to: N/A Response required by: N/A Mr. J. B. Martin, Regional Administrator Nuclear Regulatory Commission Region V 1450 Maria Lane Suite 210 Walnut Creek, California 94596
: s. y
- ou L~aa::;n7 July 18, 1983 Docket Number 50-397 G-02-83-618 Responds to: N/A Response required by: N/A Mr. J. B. Martin, Regional Administrator Nuclear Regulatory Commission Region V 1450 Maria Lane Suite 210 Walnut Creek, California 94596


==Subject:==
==Subject:==
Line 26: Line 27:


==Reference:==
==Reference:==
a)   G02-80-153, N.O. Strand to USNRC, "WPPSS Nuclear Project No. 2 Docket No. 50-397, EA-80-20, Notice of Violation and Additional Information -
a)
G02-80-153, N.O. Strand to USNRC, "WPPSS Nuclear Project No. 2 Docket No. 50-397, EA-80-20, Notice of Violation and Additional Information -
10CFR50.54(f)," dated July 17, 1980 This is the fifteenth Progress Report on the actions we have taken in regard to our commitments in Reference a). This quarterly report covers activities of our Quality Verification Program during the period of April through June 1983.
10CFR50.54(f)," dated July 17, 1980 This is the fifteenth Progress Report on the actions we have taken in regard to our commitments in Reference a). This quarterly report covers activities of our Quality Verification Program during the period of April through June 1983.
During the month of June, two important interface meetings occurred between the Supply System and the Region V.     As a result of these meetings, the Supply System committed to perform additional veri-fication tasks. These are discussed along with our general progress in the attachments.
During the month of June, two important interface meetings occurred between the Supply System and the Region V.
9308030021 830719 PDR ADOCK 05000397 o                   PDR                                                                         ,
As a result of these meetings, the Supply System committed to perform additional veri-fication tasks.
                                          'y
These are discussed along with our general progress in the attachments.
9308030021 830719 PDR ADOCK 05000397 o
PDR
'y
[h'dk
[h'dk


O J.B. Martin Page 2 Please contact me if you have any questions on this matter.
O J.B. Martin Page 2 Please contact me if you have any questions on this matter.
C.S. Carlisle Program Director, WNP-2 CSC:RLK:eek Attachments:' l. WNP-2 Project Review of Completed Safety-Related Work -
C.S. Carlisle Program Director, WNP-2 CSC:RLK:eek Attachments:' l.
WNP-2 Project Review of Completed Safety-Related Work -
Progress Report lA. Prepurchase and Inactive Contracts -
Progress Report lA. Prepurchase and Inactive Contracts -
Status Repor'c 1B. Deficiency Document Review -
Status Repor'c 1B. Deficiency Document Review -
Status Report cc: WS Chin, BPA - Richland, WA JA Forrest, B&R - Richland, WA PE Grady, BPA - WNP-2 JB Knotts, Jr.,.Debevoise & Liberman, Washington, DC to Lewis, EFSEC, . Olympia, WA TA Mangelsdorf, Bechtel - WNP-2 A Toth, NRC, Resident Inspector, WNP-2 JJ Verderber, B&R, Woodbury, NY t
Status Report cc: WS Chin, BPA - Richland, WA JA Forrest, B&R - Richland, WA PE Grady, BPA - WNP-2 JB Knotts, Jr.,.Debevoise & Liberman, Washington, DC to Lewis, EFSEC,. Olympia, WA TA Mangelsdorf, Bechtel - WNP-2 A Toth, NRC, Resident Inspector, WNP-2 JJ Verderber, B&R, Woodbury, NY t


4
4 ATTACHMENT 1 Page 1 of 6 FIFTEENTH PROGRESS REPORT WNP-2 PROJECT REVIEW OF COMPLETED SAFETY-RELATED WORK A.
  -
INTRODUCTION This report covers activities of the Supply System's Quality Verification Program (QVP) during the months of April, May, and June,1983.
* ATTACHMENT 1 Page 1 of 6 FIFTEENTH PROGRESS REPORT WNP-2 PROJECT REVIEW OF COMPLETED SAFETY-RELATED WORK A. INTRODUCTION This report covers activities of the Supply System's Quality Verification Program (QVP) during the months of April, May, and June,1983. Reinspec-tion of welded structural steel installed by an inactive contractor, in-itiated in the previous report period, has been completed. Our special review of prepurchase and inactive (PP&IA) contracts, designed to strengthen confidence in the adequacy of work produced by those con-tractors, was initiated during this report period. However, the depth of this review was questioned by the NRC prior to completion, and additional work was initiated. The analysis of results of previously-completed re-inspections of active contractors' work continues along with preparation of reports. Our review and reporting of Engineering and QC documents for Special Tasks continues.
Reinspec-tion of welded structural steel installed by an inactive contractor, in-itiated in the previous report period, has been completed. Our special review of prepurchase and inactive (PP&IA) contracts, designed to strengthen confidence in the adequacy of work produced by those con-tractors, was initiated during this report period. However, the depth of this review was questioned by the NRC prior to completion, and additional work was initiated. The analysis of results of previously-completed re-inspections of active contractors' work continues along with preparation of reports. Our review and reporting of Engineering and QC documents for Special Tasks continues.
B. GENERAL INFORMATION
B.
: 1. In our last progress report, an additional action of revising our commitment summary to record general information and identify changes was discussed. During this report period Letter No.
GENERAL INFORMATION 1.
In our last progress report, an additional action of revising our commitment summary to record general information and identify changes was discussed. During this report period Letter No.
G02-83-339, dated April 18, 1983, was sent with a revised summary of commitments for your information and use.
G02-83-339, dated April 18, 1983, was sent with a revised summary of commitments for your information and use.
: 2. A presentation of QVP results and status was made to NRC-Region V representatives at Walnut Creek on June 7,1983, as part of a general WNP-2 Project status presentation. During the meeting several questions / issues were discussed and eight specific issues arose which were further addressed by the Supply System at a meeting with Region V representatives at the Project Site on June 21, 1983.
2.
A presentation of QVP results and status was made to NRC-Region V representatives at Walnut Creek on June 7,1983, as part of a general WNP-2 Project status presentation. During the meeting several questions / issues were discussed and eight specific issues arose which were further addressed by the Supply System at a meeting with Region V representatives at the Project Site on June 21, 1983.
These are enumerated below:
These are enumerated below:
(1) Hardware supplied under prepurchase contracts and work per-formed by inactive contractors may not have been sampled for reinspection.
(1) Hardware supplied under prepurchase contracts and work per-formed by inactive contractors may not have been sampled for reinspection.
(2) Define the logic for sample selection and distribution of the sample size for active contracts. Include consideration of the time period when work was accomplished.
(2) Define the logic for sample selection and distribution of the sample size for active contracts.
Include consideration of the time period when work was accomplished.
(3) Provide the basis for judging the acceptability of contractors' past work based on QVP results.
(3) Provide the basis for judging the acceptability of contractors' past work based on QVP results.


Line 56: Line 65:
(7) It would be desirable for the NRC to review the planned content of the final QVP Summary Report.
(7) It would be desirable for the NRC to review the planned content of the final QVP Summary Report.
(8) The impact of the NRC Construction Assessment Team's findings should be considered in the conclusions reached by the QVP.
(8) The impact of the NRC Construction Assessment Team's findings should be considered in the conclusions reached by the QVP.
At the June 21 meeting, information was provided in order to satisfy issues, 2, 3, 4, and 7. Information was also provided to describe three commitments made at the meeting to address issues 1, 5, 6, and
At the June 21 meeting, information was provided in order to satisfy issues, 2, 3, 4, and 7.
: 8.           These commitments are:
Information was also provided to describe three commitments made at the meeting to address issues 1, 5, 6, and 8.
e             The special PP&IA review program, originally designed to assure our document-review-oriented program was satisfactory, is being extended to address issues 1 and 6.
These commitments are:
e             An NDE reverification program is being initiated to address issue 5.
e The special PP&IA review program, originally designed to assure our document-review-oriented program was satisfactory, is being extended to address issues 1 and 6.
e               A comparison of the Construction Assessment Team's findings with QVP results will be made and analyzed to address issue 8.
e An NDE reverification program is being initiated to address issue 5.
e A comparison of the Construction Assessment Team's findings with QVP results will be made and analyzed to address issue 8.
Information pertaining to all eight issues will be included in the QVP Overview Report.
Information pertaining to all eight issues will be included in the QVP Overview Report.
: 3. The schedule for completion of the QVP was also discussed in the June 21 meeting. As a result of the new commitments, our reports will be delayed beyond original plans.
3.
Our original intent was to complete the lower-level detailed reports first, then the intermediate-level task reports, and finally the Overview Report.               Because the task reports will include summary and general information, somewhat similar to the Overview Report, we now intend to prepare the Overview Report as soon as the detailed reports are complete. This will afford the opportunity for NRC Region V review of QVP results while the specific task reports are being completed by the Supply System.
The schedule for completion of the QVP was also discussed in the June 21 meeting. As a result of the new commitments, our reports will be delayed beyond original plans.
Our original intent was to complete the lower-level detailed reports first, then the intermediate-level task reports, and finally the Overview Report.
Because the task reports will include summary and general information, somewhat similar to the Overview Report, we now intend to prepare the Overview Report as soon as the detailed reports are complete. This will afford the opportunity for NRC Region V review of QVP results while the specific task reports are being completed by the Supply System.
i I
i I
i
i
          , ,-e,   ~ - - - - , , ,      ,    ,    , - . ~ - , - , .
,-e,
~ - - - -,,
, -. ~ -, -,.


ATTACHMENT 1 Page 3 of 6 We are developing a new schedule for completing QVP activities in a manner which provides the Overview Report, an outline of which was furnished at the June 21 meeting, to you approximately September 1.
ATTACHMENT 1 Page 3 of 6 We are developing a new schedule for completing QVP activities in a manner which provides the Overview Report, an outline of which was furnished at the June 21 meeting, to you approximately September 1.
Completion of the intermediate-level task reports will follow.
Completion of the intermediate-level task reports will follow.
: 4. Technical Audit Associates (TAA) performed an audit of the QVP on April 29,1983, and listed two " findings" in an audit report dated May 16, 1983. These findings were both related to contract 215 equipment installation reinspection, which was not part of the scope of QVP. A response explaining how equipment reinspection is covered by the Project was sent to TAA on May 26, 1983.
4.
C. SYSTEMS COMPLETION
Technical Audit Associates (TAA) performed an audit of the QVP on April 29,1983, and listed two " findings" in an audit report dated May 16, 1983. These findings were both related to contract 215 equipment installation reinspection, which was not part of the scope of QVP. A response explaining how equipment reinspection is covered by the Project was sent to TAA on May 26, 1983.
: 1. The following is a brief report for each of the active site contract reverification activities:
C.
o   Contract 210A, Peter Kiewit Sons - Complete, reported earlier.
SYSTEMS COMPLETION 1.
o   Contract 213A, Pittsburgh-Des'loines Steel - Complete, reported earlier. The R9 verification Report for this contract was reviewed by an NRC Region V representative during the report period, o   Contract 215/250, WBG/Bechtel - The following is a summary of work during this report period:
The following is a brief report for each of the active site contract reverification activities:
o Contract 210A, Peter Kiewit Sons - Complete, reported earlier.
o Contract 213A, Pittsburgh-Des'loines Steel - Complete, reported earlier. The R9 verification Report for this contract was reviewed by an NRC Region V representative during the report
: period, o
Contract 215/250, WBG/Bechtel - The following is a summary of work during this report period:
Startup Systems - The remaining two (of thirty-seven) sys-tem reports were completed by the Bechtel Reverification Group (BRG) and approved by Bechtel QA. These documents complete the reporting of detailed hardware reinspection results for contract 215.
Startup Systems - The remaining two (of thirty-seven) sys-tem reports were completed by the Bechtel Reverification Group (BRG) and approved by Bechtel QA. These documents complete the reporting of detailed hardware reinspection results for contract 215.
Previously-comtleted system reports are being updated and clarified to accommodate new information. Twenty-nine such revisions are being made and will be issued with the contract 215 Reverification Report.
Previously-comtleted system reports are being updated and clarified to accommodate new information. Twenty-nine such revisions are being made and will be issued with the contract 215 Reverification Report.
Structural Steel - A report, similar to the system re-ports, for the reinspection of contract 215 structural steel construction was completed by the BRG and approved by BQA. The report records that a " low incidence of un-acceptable findings and the minor nature of the individual defects when evaluated with respect to the magnitude of welding and weld patterns specified in the design" provide a high level of confidence in the safety and quality of the contract 215 structural steel.
Structural Steel - A report, similar to the system re-ports, for the reinspection of contract 215 structural steel construction was completed by the BRG and approved by BQA. The report records that a " low incidence of un-acceptable findings and the minor nature of the individual defects when evaluated with respect to the magnitude of welding and weld patterns specified in the design" provide a high level of confidence in the safety and quality of the contract 215 structural steel.


  ~
~
ATTACENENT 1 Page 4 of 6 Results Analysis - Analysis of all of the contract 215 reinspection results by BRG and the A N began during the report period. Based on comments received from the Re-sident Inspector, this work is being extended in detail to determine the possibility of component failure which could result from deficiencies identified in our reinspections.
ATTACENENT 1 Page 4 of 6 Results Analysis - Analysis of all of the contract 215 reinspection results by BRG and the A N began during the report period. Based on comments received from the Re-sident Inspector, this work is being extended in detail to determine the possibility of component failure which could result from deficiencies identified in our reinspections.
Contract 215 Reverification Report - A draft of this re-port is being prepared by BRG to cover the reinspections, the system reports, related program evaluations, the structural steel report, analysis of results, and overall conclusions drawn from these activities. The majority of sections for this report are currently under review by BQA and the QVP office. The remaining sections will be pre-pared upon completion of the results analysis.
Contract 215 Reverification Report - A draft of this re-port is being prepared by BRG to cover the reinspections, the system reports, related program evaluations, the structural steel report, analysis of results, and overall conclusions drawn from these activities. The majority of sections for this report are currently under review by BQA and the QVP office.
o     Contract 216, The Waldinger Corporation - Complete, reported earlier. An addendum to the reverification report has been completed, reviewed, approved, and distributed in late April.
The remaining sections will be pre-pared upon completion of the results analysis.
o     Contract 217, Sentry - Complete, reported earlier.
o Contract 216, The Waldinger Corporation - Complete, reported earlier. An addendum to the reverification report has been completed, reviewed, approved, and distributed in late April.
e     Contract 218, Fischbach/ Lord (F/L) - The draft of the final reverification report has been reviewed by BQA and the QVP office during this report period. In response to Region V's issue (2), discussed in General Item 2., the BRG has compiled information on the time distribution of the reinspection sample. This information is being incorporated into the report.
o Contract 217, Sentry - Complete, reported earlier.
e     Contracts 219/234, O. B. Camon - Complete, reported earlier.
e Contract 218, Fischbach/ Lord (F/L) - The draft of the final reverification report has been reviewed by BQA and the QVP office during this report period.
In response to Region V's issue (2), discussed in General Item 2., the BRG has compiled information on the time distribution of the reinspection sample. This information is being incorporated into the report.
e Contracts 219/234, O. B. Camon - Complete, reported earlier.
In response to the Technical Audit Associates' (TAA) request to clarify coating reinspection which resulted in rework, Revision
In response to the Technical Audit Associates' (TAA) request to clarify coating reinspection which resulted in rework, Revision
                  #1 to these contract reports have been issued.
#1 to these contract reports have been issued.
e   Contract 220, Johnson Controls, Inc. - The final reverification report has been reviewed, approved, and issued in early May.
e Contract 220, Johnson Controls, Inc. - The final reverification report has been reviewed, approved, and issued in early May.
D. PREPURCHASE AND INACTIVE CONTRACTS
D.
: 1. With the completion of the documentation review for contract 7426, Northwest Copper, all originally-planned documentation reviews for the prepurchase and inactive contracts are complete. Contract 7426 is being evaluated by the QVP office. The status report (Attachment IA to this report) has been updated to reflect the current prepur-chase and inactive contract review status. The overall task report is currently in progress and nearing completion.
PREPURCHASE AND INACTIVE CONTRACTS 1.
With the completion of the documentation review for contract 7426, Northwest Copper, all originally-planned documentation reviews for the prepurchase and inactive contracts are complete. Contract 7426 is being evaluated by the QVP office. The status report (Attachment IA to this report) has been updated to reflect the current prepur-chase and inactive contract review status. The overall task report is currently in progress and nearing completion.
7 m -
e m
*-=.--


      .                                                                  ATTACHMENT 1 Page 5 of 6
ATTACHMENT 1 Page 5 of 6 2.
: 2. During this report period, the contract-206 welded-structural-steel reinspection was completed and the final report of those activities is u1derway.
During this report period, the contract-206 welded-structural-steel reinspection was completed and the final report of those activities is u1derway.
The review and evaluation of the follow-up contracts, contracts 206A (Peter Kiewit), 210 (Peter Kiewit) and 6426 (Wright-Schuchart-Harbor, interim contract), completed the contract 206 (Bovee-Crail) work. Reports of those activities have been prepared and are under review at the QVP office.
The review and evaluation of the follow-up contracts, contracts 206A (Peter Kiewit), 210 (Peter Kiewit) and 6426 (Wright-Schuchart-Harbor, interim contract), completed the contract 206 (Bovee-Crail) work. Reports of those activities have been prepared and are under review at the QVP office.
: 3. A special review of the critical components for WNP-2 provided by prepurchase and inactive (PP&IA) contracts was initiated in this report period. A list of these critical components was developed by Project Engineering, from which a sample was selected for review.
3.
A special review of the critical components for WNP-2 provided by prepurchase and inactive (PP&IA) contracts was initiated in this report period. A list of these critical components was developed by Project Engineering, from which a sample was selected for review.
This resulted in a sample of quality records, vendor qualifications and technical adequacy of procedures for components in 20 of the 62 PP&IA contracts being reviewed. A field verification walkdown of this hardware was performed to confirm that components were accur-ately represented by the records. Reinspection of components has not yet been accomplished.
This resulted in a sample of quality records, vendor qualifications and technical adequacy of procedures for components in 20 of the 62 PP&IA contracts being reviewed. A field verification walkdown of this hardware was performed to confirm that components were accur-ately represented by the records. Reinspection of components has not yet been accomplished.
Procedures for this program and the review results were examined by an NRC Region Y representative, and the program was discussed at the June 7 Region V meeting. As a result of our discussions, it was decided to reconsider the list of 62 PP&IA contracts for possible additional review. This additional review is being conducted in four parts, any or all of which may be applied to a particular contract or component. The review strengthens previous assessments of work adequacy and assures attention to our commitment to address the need for reinspection even though the records indicate the hard-ware is adequate, as discussed in item B.2. of this report. The
Procedures for this program and the review results were examined by an NRC Region Y representative, and the program was discussed at the June 7 Region V meeting. As a result of our discussions, it was decided to reconsider the list of 62 PP&IA contracts for possible additional review. This additional review is being conducted in four parts, any or all of which may be applied to a particular contract or component.
,              four parts of our additional verification review are:
The review strengthens previous assessments of work adequacy and assures attention to our commitment to address the need for reinspection even though the records indicate the hard-ware is adequate, as discussed in item B.2. of this report. The four parts of our additional verification review are:
Review of Vendor Qualifications l               -
Review of Vendor Qualifications l
Review of Technical Adequacy of Vendor Procedures Review of Quality Documentation Sample Reinspection of Installed Components (including com-ponents from the 20 contracts discussed above)
Review of Technical Adequacy of Vendor Procedures Review of Quality Documentation Sample Reinspection of Installed Components (including com-ponents from the 20 contracts discussed above)
E. SPECIAL TASKS l
E.
: 1. Deficiency Document Review - All procedure and document reviews for i
SPECIAL TASKS l
site documents identified under this task have been completed. Pro-gress continues on the preparation of reports verifying the tech-l               nical adequacy of those documents which disseminated design change l
1.
Deficiency Document Review - All procedure and document reviews for i
site documents identified under this task have been completed. Pro-gress continues on the preparation of reports verifying the tech-l nical adequacy of those documents which disseminated design change l
i
i
* ATTACHMENT 1 Page 6 of 6 information to contractors. Of eight types of documents examined, the reports on two have been reviewed and approved, one report is in
 
                                    - final draft following review, and drafts of the remaining five are underway. No trends of technically inadequate document dispositions have been demonstrated.
ATTACHMENT 1 Page 6 of 6 information to contractors. Of eight types of documents examined, the reports on two have been reviewed and approved, one report is in
- final draft following review, and drafts of the remaining five are underway. No trends of technically inadequate document dispositions have been demonstrated.
The review of contractors' internal documentation and procedures has been completed on eighteen of twenty-three contracts identified.
The review of contractors' internal documentation and procedures has been completed on eighteen of twenty-three contracts identified.
The review of the remaining five contracts is approximately 75%
The review of the remaining five contracts is approximately 75%
complete and is expected to be completed early in the next report period.
complete and is expected to be completed early in the next report period.
                                  - The status of our reviews is summarized in the charts comprising Attachment-1B to this report.
- The status of our reviews is summarized in the charts comprising B to this report.
: 2.       Personnel Qualifications - The examination of personnel qualifica-                           .
2.
tions reviews conducted under the Restart Program continued during this period. The results of this examination, combined with similar information from reviews performed in the QVP, will be assessed'to determine if further investigation is warranted. An analysis of the Deficiency Document Review results for engineering personnel employed by both the A/E and the construction contractors was.
Personnel Qualifications - The examination of personnel qualifica-tions reviews conducted under the Restart Program continued during this period. The results of this examination, combined with similar information from reviews performed in the QVP, will be assessed'to determine if further investigation is warranted. An analysis of the Deficiency Document Review results for engineering personnel employed by both the A/E and the construction contractors was.
completed during this period, and preparation of the report began.                           ,
completed during this period, and preparation of the report began.
: 3.       Receiving Inspections - No progress during this report period.
3.
: 4.       Grout Evaluation Program - Complete, reported earlier.
Receiving Inspections - No progress during this report period.
: 5.       Evaluation of Concrete Quality Records - Early in the report period, it was decided that, since visual nondestructive inspection of con-crete would generally not provide enough information to determine the quality or adequacy of concrete, a special technical review of concrete quality records was initiated. Such a review was con-sidered to be useful in assessing the adequacy of concrete installed prior to the stop wJrk order of July, 1980. This review will be i                                   reported as a fifth special task.
4.
The task includes: 1) A review of procedures for formwork, rein-forcing steel, and concrete placement; deficiencies identified on
Grout Evaluation Program - Complete, reported earlier.
                                  . nonconformance reports and corrective action documents during the construction; and QC inspection records; 2) analysis of the review results to determine if significant problems exist; and 3) prepara-
5.
!                                    tion of a report.
Evaluation of Concrete Quality Records - Early in the report period, it was decided that, since visual nondestructive inspection of con-crete would generally not provide enough information to determine the quality or adequacy of concrete, a special technical review of concrete quality records was initiated. Such a review was con-sidered to be useful in assessing the adequacy of concrete installed prior to the stop wJrk order of July, 1980. This review will be i
;                                    The technical reviews have been completed and the analysis and re-port preparation are well underway, with completion estimated at 90%.
reported as a fifth special task.
The task includes:
: 1) A review of procedures for formwork, rein-forcing steel, and concrete placement; deficiencies identified on
. nonconformance reports and corrective action documents during the construction; and QC inspection records; 2) analysis of the review results to determine if significant problems exist; and 3) prepara-tion of a report.
The technical reviews have been completed and the analysis and re-port preparation are well underway, with completion estimated at 90%.
I d
I d
4 k+-       + + + w , , s,-E_ .w--,ov,. .,w -.-ev-, .,n - - . - - - ...---.--,ew..,,, -w-,=...c---     .-wm-r-- +-.w,-,--,wr4
4 k+-
+ + +
w,,
s,-E_
.w--,ov,.
.,w
-.-ev-,
.,n
...---.--,ew..,,,
-w-,=...c---
.-wm-r--
+-.w,-,--,wr4


.      . . . ~ .                                    .          .
... ~.
nTTADe sti 1A         .
nTTADe sti 1A FIFTEENTH PROGIESS MPGli SUPPLY SYSTEN REVIEW OF PREPUKHtSE AfD INACTIVE CONTRACTS STATUS REPGtT l-1 I
FIFTEENTH PROGIESS MPGli SUPPLY SYSTEN REVIEW OF PREPUKHtSE AfD INACTIVE CONTRACTS STATUS REPGtT l-                         1                             I                           I                                 I                                 :l l                         l DES 0tIPTION OF               I STATUS OF OWER FINAL I                                         l STATUS OF ONDER EVALUATION   .1 1.CDNTRACTOR               I CONTRACTOR'S WGtK       . l' DOCLMENTATION EVIEW         I RESULTS OF DOCLMENTATION REVIEW 1: ON EED FOR EINSPECTION         -I l                         l                               I (5 CODFLETE)             l                                 ll (5 GNR.ETE)                       l I                                                                                     I                                                                       I I                       .
I I
I                                                                      i 12808-2 General ElectricL NSSS                           I           100             INo Deficiencies                   Il               100-               1 I                                                                                     I                                                                       I I                                                                                   I                                                                         I l         7 Battelle     ll Neteorological Study                   100           l   No Deficiencies                 l                 100               l l                                                                                                                                                             l 1                                                                                                                                                             l l   17 Pathway Bellows I, Refueling Bellows             ll           100           LNo Si p ificant Deficiencies                         100               l I                         I                                                                                           I                                     i i                         1       -
:l l
1                                     I l       18 Farr Company   l Staney Cas Treatment l                                   l                                 l                                     l l                           1 & HEPR Filters           'l           100.           lNo Deficiencies                   1                 100               l l                                                                                                                       l                                     l l                                   .
l DES 0tIPTION OF I STATUS OF OWER FINAL I l STATUS OF ONDER EVALUATION
                                                                                                                          .I                                     I' l   22A Joy Nanufactur- 1 HVAC Fans                                 100             llNo Significant Deficiencies     i                 100               l l
.1 1.CDNTRACTOR I CONTRACTOR'S WGtK
ing         l                                                       -l I
. l' DOCLMENTATION EVIEW I RESULTS OF DOCLMENTATION REVIEW 1: ON EED FOR EINSPECTION
    ;                          I                                                                                                                                 i 1                         1                                                                                                                                 1 l     23 Byron Jackson   l Stan&y Service Water L                 100           INo Deficiencies                   L                 100             .l I                         I Puaps                     l                           I                                   I                                   l l                         I                                                                                           I                                     I l                         1                                                             -
-I l
l                                   l l      24 HJICO Inc       'l Shop Fabricated Tanks                 100 No Deficiencies                                   100               l l                                                                                                                                                           l 1                                                                                                                                                           l l     28 Buffalo Forge   l HVAC Fans                 :I           100            lNo Sipificant Deficiencies         l                 100,             .I I                         l
l I (5 CODFLETE) l ll (5 GNR.ETE) l I
* l                                    l I                         I                                                                                           I                                   1 l   31A Whiting           1 Turbine Generator and l                 100           " Deficiencies resolved, Rein-   'i                   100               l l                         Il Reactor Building Cranes!'                             lspection Completed                 l                                   l l                                                       l                           1                                   I                                   l l                                                       l                           1                                   I                                   l l 32CD Clayton             l JIB Overhead Cranes       l           100           lNo Significant Deficiencies       1                 100               l 1                         I                           I                           I                                                                       l l                         I                           li                         I l   35A Crane Co.         I Puaps & Notors                         100           1No Deficiencies                     1                 100 l                                                                                                                                                             l I                                                                                           -
I I
ll 1     36 Acme Concrete   l Preduction & Delivery l                 100           ]No Significant Deficiencies       l                 100               l I                         I of Concrete               i                           I                                   l                                   l l                         I                           I                           I                                   I                                   I
I I
i 12808-2 General ElectricL NSSS I
100 INo Deficiencies Il 100-1 I
I I
I I
I l
7 Battelle ll Neteorological Study 100 l No Deficiencies l
100 l
l l
1 l
l 17 Pathway Bellows I, Refueling Bellows ll 100 LNo Si p ificant Deficiencies 100 l
I I
I i
i 1
1 I
l 18 Farr Company l Staney Cas Treatment l l
l l
l 1 & HEPR Filters
'l 100.
lNo Deficiencies 1
100 l
l l
l l
.I I'
l 22A Joy Nanufactur-1 HVAC Fans 100 llNo Significant Deficiencies i
100 l
ing l
-l I
l I
i 1
1 1
l 23 Byron Jackson l Stan&y Service Water L 100 INo Deficiencies L
100
.l I
I Puaps l
I I
l l
I I
I l
1 l
l l
24 HJICO Inc
'l Shop Fabricated Tanks 100
' No Deficiencies 100 l
l l
1 l
l 28 Buffalo Forge l HVAC Fans I
l lNo Sipificant Deficiencies l
: 100,
.I
:I 100 l
l I
I I
1 l
31A Whiting 1 Turbine Generator and l 100
" Deficiencies resolved, Rein-
'i 100 l
l Il Reactor Building Cranes!'
lspection Completed l
l l
l 1
I l
l l
1 I
l l 32CD Clayton l JIB Overhead Cranes l
100 lNo Significant Deficiencies 1
100 l
1 I
I I
l l
I li I
l 35A Crane Co.
I Puaps & Notors 100 1No Deficiencies 1
100 l
l I
ll 1
36 Acme Concrete l Preduction & Delivery l 100
]No Significant Deficiencies l
100 l
I I of Concrete i
I l
l l
I I
I I
I


k i
k nTTAONENT 1A i
nTTAONENT 1A Page 2 of 5 FIFTEENTH Rt0 MESS REPORT SUPPLY SYSTEN REVIEW OF PRERRCHASE APO INACTIVE CONTRACTS STATUS REPORT I                               I                               I                               I                                     I l                               l DESG IPTION OF                 l STATUS OF OWNER FINAL ll                                                                               I l CONTRACTOR                     I CONTRACTOR'S WmK               l DO M TATION REVIEW l 5TATUS OF OWER EVALUATION    -l l                                l                                                                  RESULTS OF 00CLMENTATION REVIEW l DN NEED FOR REINSPECTION           I 1 (5 COMPLETE)                   I l (X QNPLETE)
Page 2 of 5 FIFTEENTH Rt0 MESS REPORT SUPPLY SYSTEN REVIEW OF PRERRCHASE APO INACTIVE CONTRACTS STATUS REPORT I
                          !_                                l                               l                             l                                                                         l l                                                                                                                                        I                                 l I                               I                               I 41A velan Valve                                                                                                                     I l                                l IOclear Valves               I           100                 l e Simificant Deficiencies l
I I
i                                 I l             100                l l                              I                                       I l                                 l                               1 l
I I
I                                       I i   418 Anchor / Darling           baclear Valves               l         100                                                                                           l l
I l
lNo Deficiencies                                       100               l l                             I i                                                                 i                               i I
l DESG IPTION OF l STATUS OF OWNER FINAL ll l 5TATUS OF OWER EVALUATION
I    42A Fisher Controls l Control Valves                                   100                                                                                           l i                                                                                                lNo Deficiencies                       ll             100               l I                                       I I                                                                                                                                                                           I I                                       I
-l l CONTRACTOR I CONTRACTOR'S WmK l DO M TATION REVIEW RESULTS OF 00CLMENTATION REVIEW l DN NEED FOR REINSPECTION I
                        !    428 Fisher Controls             Cmtrol valves                           100                 INo Si@lficant Deficiencies I
l l
l                                                                                                                                         I              100              l I
1 (5 COMPLETE)
I                                                                                                                                                                           I I
I l (X QNPLETE) l l
I     47A Westinghouse           i   Switchgear                   l           100                                                                                           I i                                                                                                INo Deficiencies                       l               100               l I                               I                               I I                               I                               I I
l l
i l       48 Westinghouse       1480 Volt Substation               i           100                                                                                           l I
I l
lNo Deficiencies                       ll               100               l i                                 1                               I I                               I                                                                                                                                         I J                               l                                                                         l 1       49 I-T-E Imperial l Notor Control Centers l                           100               lNo Significant Deficiencies l
l I
l               100              l l
I I
1                                                                                                                                                                           l I
I l
i     51A ESB Inc.               I Batteries                                 100                                                                                          I l
l 41A velan Valve l IOclear Valves I
l INO Deficiencies                       ll               100               l I                                 l                               I I                                                                                                                                       I                                 1 i                                 i                               i                                     l l       51B Power Conversion! Battery Chargers                                                                                                                               l l            100               lNo Significant Deficiencies           l               100               l l                               I                                 l                             l                                       l i                               i                                 I                             I 1
100 l e Simificant Deficiencies l
I
100 l
                      !        52 Solid State         i thinterrtptible Power l                     J00               lNo Deficiencies I
i I
l           Controls         l Supply                                                                                                   l               100              l l                              l l_                             l                                   l                             I ll 1
l I
1                             1                                                                                                                                           I I                             I 53 Stewart                                                                                                                                                         I l                              i Diesel Generators               l           100               IDocumentation Deficiencies Being i                       100 1            Stevenson I
I l
4                      I 1                             i   Addressed, Reinspection Completed l                                   l I
l l
I I                                   I I                                                                     I I         55 Westinghouse                                                                                                                                                   I l Containnent Electrical l                     100               lNo Sipificant Deficiencies           l                 100             l l                               l Penetrations                     l                             l                                       l l                               l                                                                                                                                           l 1                                   l l                               1 1
1 I
l         57 Kinemetrics       l Accelerometers                   ll           100                 No Deficiencies I
I l
I                                                                                                                                        l                  100             l l                                 l                             I                                       I                                   l
i 418 Anchor / Darling l
baclear Valves l
100 lNo Deficiencies 100 l
l I
i I
i i
l I
42A Fisher Controls l Control Valves 100 lNo Deficiencies ll 100 l
i I
I I
I I
I I
428 Fisher Controls Cmtrol valves 100 INo Si@lficant Deficiencies I
100 l
l I
I I
I I
I 47A Westinghouse i Switchgear l
100 INo Deficiencies l
100 l
i I
I I
I I
I I
i l
l 48 Westinghouse 1480 Volt Substation i
100 lNo Deficiencies ll 100 l
I i
1 I
I I
I J
l l
1 49 I-T-E Imperial l Notor Control Centers l 100 lNo Significant Deficiencies l
100 l
l l
1 l
I I
i 51A ESB Inc.
I Batteries l
100 INO Deficiencies ll 100 l
l I
l I
I 1
I i
i i
l l
l 51B Power Conversion! Battery Chargers l
100 lNo Significant Deficiencies l
100 l
l I
l l
l 1
i i
I I
I I
52 Solid State i thinterrtptible Power l J00 lNo Deficiencies l
100 l
l Controls l Supply l
l ll 1
l_
l l
I I
1 1
I I
I l
53 Stewart i Diesel Generators 1
Stevenson l
100 IDocumentation Deficiencies Being i 100 I
1 i Addressed, Reinspection Completed l l
4 I
I I
I I
I I
I I
55 Westinghouse l Containnent Electrical l 100 lNo Sipificant Deficiencies l
100 l
l l Penetrations l
l l
l l
l 1
l l
1 1
I l
57 Kinemetrics l Accelerometers ll 100 No Deficiencies l
100 l
I l
l I
I l


nTTAD MENT 1A Page 3 of 5     -
nTTAD MENT 1A Page 3 of 5 FIFTEENTH PROGtESS REPORT SUPR.Y SYSTEN REVIEW OF PREPLRCHASE Am INACTIVE CUNTRACTS STATUS RER]RT i
FIFTEENTH PROGtESS REPORT SUPR.Y SYSTEN REVIEW OF PREPLRCHASE Am INACTIVE CUNTRACTS STATUS RER]RT i                         i                         i                         i                                 l                               i l                         l DESCRIPTION OF         l 5TATUS OF OWNER FINAL I                                   l STATUS OF OWER EVALUATION     I I CONTRACTOR             I CONTRACTOR'S WORK       l DOCLMENTATION REVIEW   I RESULTS OF DOCUMENTATION REVIEW l DN NEED FOR REINSPECTION     l l                         l                         l (5 COMPLETE)           l                                 ll (I CDNFLETE)                 l l                         l                         l                         l                                                                 l i                         i                         I                         i                                                                 l l     58 Jelco           l Instrument Racks       l         100           INo Sipificant Deficiencies       i               100             1 I                         l                         l                         l                                 l                               l l                         l                         l                         l                                 l                               l
i i
  !    59 CE               I Instrument & Control   l         100           INo Deficiencies                 (               100             l i                         I &mds                   I I                               I I                                                   I                                                           I                               I l'                                                 I                                                           i                               1 i     604 Sentry Equip- L Sampling and Analysis l             100             INo Significant Deficiencies     l 100             l 1         ment Corp.         Systems               i                         I                                 L                               l 1                                                   I                         I                                                               I I                                                   I                          i                                                                i l Electrical Cable I    62A Okonite                                    l         100             lNo Deficiencies                 ll             100             l
i l
  !                        l                         I                         I                                 I                               l l                         l                         l                         1                               1                               I i   623 Raychem         ll Electrical Cable       L         100           INo Significant Deficiencies     l               100             l I                                                                             I                                                               I i                                                                             l                                                               l l   G2C Rockbestos       l Electrical Cable       L         100             IDeficiencies Resolved           i               100             l i                         I                                                   I                                                                 l l                         1                                                   I                                                               I I     67 H K Porter       i Air Handling thits     l         100           INo Deficiencies                 ll             100             l I                         I                         I                           I                                                               I
i l
;  I                        I                         i                         i                                                               l l     68 BIF                 Isolation Valves       ll         100             INo Sipificant Deficiencies     ll             100             l l                                                                             l                                                               l l'                                                                             I                                                               I l     69 Velan           l Check Valves           l         100           llNo Sipificant Deficiencies     l               100             l l l                         l                         l                                                           l                               l l                         l                         1                                                           I                              I 71 Air Products & l Hydrogen Reconbiner                                     No Deficiencies i                                                  l         100                                             l              100            l 1       D elcals         l                         l                         ll                               l                               l l                         I                         I                                                           I                               I I                         I                         I                                                         I                               I I   73 Elgar           1 15KVA Inverters         1         100             INo Deficiencies                 ll             100             l i                         I                                                   I                                                               l I                       i                                                   1                                                               l l   90 Leckenby         l Pipe Whip Restraints     l         100             l Deficiencies Identified and   I               100             l l                       l                         l                         l Corrected thru Action Plan   i                               I I                         I                         I                         l                               I                               l I                       I                         i                         i                               i                               l 1 92A Ingersoll Rand i Sampling Probes             i This is an Active Pre- INo Deficiencies                   i               100             l l                       l                         l purchase Contract       l                               l                               l l                       l                         l                         I                               l                               I
l DESCRIPTION OF l 5TATUS OF OWNER FINAL I l STATUS OF OWER EVALUATION I
I CONTRACTOR I CONTRACTOR'S WORK l DOCLMENTATION REVIEW I RESULTS OF DOCUMENTATION REVIEW l DN NEED FOR REINSPECTION l
l l
l (5 COMPLETE) l ll (I CDNFLETE) l l
l l
l l
i i
I i
l l
58 Jelco l Instrument Racks l
100 INo Sipificant Deficiencies i
100 1
I l
l l
l l
l l
l l
l l
59 CE I Instrument & Control l
100 INo Deficiencies
(
100 l
i I &mds I
I I
I I
I I
l' I
i 1
i 604 Sentry Equip-L Sampling and Analysis l 100 INo Significant Deficiencies l
100 l
1 ment Corp.
Systems i
I L
l 1
I I
I I
62A Okonite l Electrical Cable l
100 i
i I
I lNo Deficiencies ll 100 l
l I
I I
l l
l l
1 1
I i
623 Raychem ll Electrical Cable L
100 INo Significant Deficiencies l
100 l
I I
I i
l l
l G2C Rockbestos l Electrical Cable L
100 IDeficiencies Resolved i
100 l
i I
I l
l 1
I I
I 67 H K Porter i Air Handling thits l
100 INo Deficiencies ll 100 l
I I
I I
I I
I i
i l
l 68 BIF Isolation Valves ll 100 INo Sipificant Deficiencies ll 100 l
l l
l l'
I I
l 69 Velan l Check Valves l
100 llNo Sipificant Deficiencies l
100 l
l l
l l
l l
I I
l l
1
' No Deficiencies l
100 l
i 71 Air Products & l Hydrogen Reconbiner l
100 1
D elcals l
l ll l
l l
I I
I I
I I
I I
I I
73 Elgar 1 15KVA Inverters 1
100 INo Deficiencies ll 100 l
i I
I l
I i
1 l
l 90 Leckenby l Pipe Whip Restraints l
100 l Deficiencies Identified and I
100 l
l l
l l Corrected thru Action Plan i
I I
I I
l I
l I
I i
i i
l 1 92A Ingersoll Rand i Sampling Probes i This is an Active Pre-INo Deficiencies i
100 l
4 l
l l purchase Contract l
l l
l l
l I
l I


nTTACmENT 1A     -
l nTTACmENT 1A Page A of 5 FIFTEENTH FRO @ESS REPORT SUPR.Y SYSTEM REVIEW OF FRERRCHASE AM) INACTIVE WNTRACTS STATUS REPORT l
Page A of 5 FIFTEENTH FRO @ESS REPORT SUPR.Y SYSTEM REVIEW OF FRERRCHASE AM) INACTIVE WNTRACTS STATUS REPORT l                         1                         1                           1                                   L                             I l                         l DESGIPTION OF           l STATUS OF OWER FINAL l                                       l 5TATUS OF OWER EVALUATION   l l CON WACTOR             I CONTRACTOR'S WORK       l 00CINENTATION REVIEW     l RESULTS OF 000NENTATION REVIEW l DN NEED FOR REINSPECTION         l
1 1
      !                        l                         l (5 CONPLETE)             l                                 l (5 CINPLETE)                 l I                         I                         I                         I                                   I                               i 1                         I                         I                           I                                   I                             l l   920 Kamari Sciences l Radiation Nonitoring     l This is an Active Pre- lNo Deficiencies                     l               100             l l                         1                         l purchase Contract         1                                   l                             l l                                                   1                                                             I                               I I                                                   I                                                               I                             I l     93 04'E Controls   1 Vacuum Breaker Valves l           100             INo Deficiencies                   I               100             l l                                                                               l                                 l                               l 1                                                                               1 I'                             I l     94 B F S.:w         I NSRV Discharge         l         100             INo Deficiencies                   l               100            l l                         l                                                    l                                                                 t I                         i                                                     I                                                                 i l 12409 Buehler M; clear l BWR High Density Spent I           100             (No Significant Deficiencies       l               100             l l       Products         l Fuel Racks               l                         l                                 l                               1 l                         I                         I                         l                                   l                               i I                         I                         I                           I                                 I                               l l 6426 Wright-           1 Interim Construction   l         100             INo Sigrifficant Deficiencies     i               100             I l       Schuchart-HarborL                         l                         -lSpecial Scoping Review Completed     I                             i I                                                                             I
1 L
'                                                                                                                                                        I l                                                                               I                                                                 l l 6809 Bethlehem         I' Reinforcing Steel                 100             INo Si pfricant Deficiencies       ll               100           l 1
I l
I l                                                                                                                                                 ll l 6904 Welk Brothers     1 Annular Sleeves       i         100               No Significant Deficiencies     '
l DESGIPTION OF l STATUS OF OWER FINAL l l 5TATUS OF OWER EVALUATION l
100 l                                                   I                         I I                                                   I                         I                                                                 l
l CON WACTOR I CONTRACTOR'S WORK l 00CINENTATION REVIEW l RESULTS OF 000NENTATION REVIEW l DN NEED FOR REINSPECTION l
;      I 6905 Welk Brothers         Skimmer Surge Tank               100             INo Sipificant Deficiencies       i               100           i l                                                                             l                                 l                               l l                                                                             l                                 l                               1 i 6912 Pybus             l Structural Steel       l         100             lNo Significant Deficiencies       1               100           I l_                                                 l                         I                                                                 I 4      1                                                                             I
l l (5 CONPLETE) l l (5 CINPLETE) l I
: i.                                                                                           l
I I
      ! 6917 Texas Pipe         l Pipe Spools             1         100             lNo Significant Defielencies       l               100           l 1                         I                         I                         I                                 l                               I l                         i                         I                         I                                 I                               l l 7012 Brand Industriall Form Separation System 11             100             ite Significant Deficiencies         l             100           l l                         e l                                                                 l l                         l                                                   1                                                                 l
I I
-      l 7426 Horthwest Coppert Exhaust Duct               l         100             lNo Significant Deficiencies       l                 10           l
i 1
.      i                         1                         1                         I                                 l                               l I                         l                         l                         i                                 I                               I I                         I                         I                         I                                 I                               l I   205 Stewart Erikson 1 Reactor Building         i         100             INo Significant Deficiencies       l               100             l l                         I Substructure           i                         l                                 l                               l l_                        l                         I                         I                                 I                               I 4
I I
I I
l l
920 Kamari Sciences l Radiation Nonitoring l This is an Active Pre-lNo Deficiencies l
100 l
l 1
l purchase Contract 1
l l
l 1
I I
I I
I I
l 93 04'E Controls 1 Vacuum Breaker Valves l 100 INo Deficiencies I
100 l
l l
l l
1 1
I' 100 l
I l
94 B F S.:w I NSRV Discharge l
100 INo Deficiencies l
l l
l t
I i
I i
l 12409 Buehler M; clear l BWR High Density Spent I 100 (No Significant Deficiencies l
100 l
l Products l Fuel Racks l
l l
1 l
I I
l l
i I
I I
I I
l l 6426 Wright-1 Interim Construction l
100 INo Sigrifficant Deficiencies i
100 I
l Schuchart-HarborL l
-lSpecial Scoping Review Completed I
i I
I I
l I
l l 6809 Bethlehem I' Reinforcing Steel 100 INo Si pfricant Deficiencies ll 100 l
1 I
l ll l 6904 Welk Brothers 1 Annular Sleeves i
100 No Significant Deficiencies 100 l
I I
I I
I l
I 6905 Welk Brothers Skimmer Surge Tank 100 INo Sipificant Deficiencies i
100 i
l l
l l
l l
l 1
i 6912 Pybus l Structural Steel l
100 lNo Significant Deficiencies 1
100 I
l_
l I
I 1
i.
I l
4
! 6917 Texas Pipe l Pipe Spools 1
100 lNo Significant Defielencies l
100 l
1 I
I I
l I
l i
I I
I l
l 7012 Brand Industriall Form Separation System 11 100 ite Significant Deficiencies l
100 l
l e
l l
l l
1 l
l 7426 Horthwest Coppert Exhaust Duct l
100 lNo Significant Deficiencies l
10 l
i 1
1 I
l l
I l
l i
I I
I I
I I
I l
I 205 Stewart Erikson 1 Reactor Building i
100 INo Significant Deficiencies l
100 l
l I Substructure i
l l
l l _
l I
I I
I 4


ATTACH 4ENT 1A Page 5 of 5
ATTACH 4ENT 1A Page 5 of 5
                                                                          . FIFTEENTH FROGtESS REPORT SUPPLY SYSTEM REVIEW OF PREPURCHASE APO INACTIVE CONTRACTS STATUS REPORT l                             l                           l                           l                                   1                                 l l                             l DESCRIPTION OF             l STATUS OF OWNER FINAL l l CON 1RACTOR                 I UINTRACTOR'S WORK l STATUS OF OWNER EVALUATION      l l 00CLMENTATION REVIEW       l RESULTS OF 0001NENTATION REVIEW l DN NEED FOR REINSPECTION           l
. FIFTEENTH FROGtESS REPORT SUPPLY SYSTEM REVIEW OF PREPURCHASE APO INACTIVE CONTRACTS STATUS REPORT l
  !                              l                           l (X CD>FLfTE)               l                                   l (X CD4PLETE)                     l l -'                           I                           I                           I                                                                       I l                             I             -
l l
1                           I                                                                       I I     206 Bovee Cra11         1 &neral Construction         l         100               IReinspections of Strue. Stl.       I               100               l l                             l                             l                             ' Completed                           I t                                                                                         '                                                                      l 1                           I l
l 1
1                             I                             i I 2064 Peter Kiewit l
l l
l Architectural Const.       I         100               INo Si@ lficant Deficiencies         ll             100               l l                             l                           l                             lSpecial Scoping Review Completed l                                   l l_                             l                           I                           l                                   I                                 l 1                             1                           I                             I                                   I                                 I i     207 PCM                   Structural Steel         1         100               INo Si @ lficant Deficiencles                         100 i
l DESCRIPTION OF l STATUS OF OWNER FINAL l l STATUS OF OWNER EVALUATION l
l                                  l l                                  l I
l CON 1RACTOR I UINTRACTOR'S WORK l 00CLMENTATION REVIEW l RESULTS OF 0001NENTATION REVIEW l DN NEED FOR REINSPECTION l
I                                 I I     209 Rigging Int.       I Rigging of Reactor         l         100               "No Deficiencies                     l               100 l                                                                                                                                                               l l Pressure Vessel           l                           l                                   l                                 l l                             l                           l                           l                                   l                                 l 1                             1                           I                           I                                   I                                 l l     210 fDier Kiewit       l Architectural Const.       I         100               10 pen Documentation Deficiencies                     100               l l                             l                           l                             l Resolved, Special Scoping Review I
l l (X CD>FLfTE) l l (X CD4PLETE) l l -'
l I                           I                            ICompleted                                                             l I                             I                           I                             I                                                                       I
I I
$                              I                           I                             I                                                                      l l     213 PUN               l Primary Containment       i           100               INo Significant Derfielencies       l               100               l l                             l Vessel                     l                             l                                   l                                 l i-                             1                           I                             I                                   I                                 i 1                             1                             I                           I                                   I                                 I l     221 PTL               l Testing Laboratory         1           100               (0 pen Deficiencies Being Resolved i                 100               l l                                                             [                           IThru Corrective Action Process     l                                 l l                                                                                       l                                   l                                 l l                                                                                         i l                                 l l     .?25 McMillin Bros. 1 Nake tp Water Fumphousell                 100             INo Sip ificant Deficiencies         1               100               l I                           I                                                           I                                   I                                 I I                             I                                                         I                                   I                                 I I     226 Slme             l Reactor Building             i           100             lNo Deficiencles                     l               ]OO               l l                           l     Excavation               l                           l                                   l                                 l l                                                           l                           I                                                                       I I                           ,
I I
I                           I                                                                       I I     233 B F Shaw         l Spray Pond Alteration i                 100             lNo Deficiencies                     ll               100               l l                           I                                                           l                                   l                                 l I                           I                                                           i                                   i                                 i l                           i Reactor Internals             l                           l                                   l                                 l l     235 EI & SE           IInstrument Nodifications!                 100             [No Significant Deficiencies         1               100               l l                           1                             1                           I                                   I                                 I
l I
1 I
I I
206 Bovee Cra11 1 &neral Construction l
100 IReinspections of Strue. Stl.
I 100 l
l l
l
' Completed t
1 I
I l
l 1
I i
l I 2064 Peter Kiewit l Architectural Const.
I 100 INo Si@ lficant Deficiencies ll 100 l
l l
l lSpecial Scoping Review Completed l l
l_
l I
l I
l 1
1 I
I I
I i
207 PCM Structural Steel 1
100 INo Si @ lficant Deficiencles l
100 l
i l
l I
I I
I 209 Rigging Int.
I Rigging of Reactor l
100 "No Deficiencies l
100 l
l l Pressure Vessel l
l l
l l
l l
l l
l 1
1 I
I I
l l
210 fDier Kiewit l Architectural Const.
I 100 10 pen Documentation Deficiencies 100 l
l l
l l Resolved, Special Scoping Review l
I I
I ICompleted l
I I
I I
I I
I I
l l
213 PUN l Primary Containment i
100 INo Significant Derfielencies l
100 l
l l Vessel l
l l
l i -
1 I
I I
i 1
1 I
I I
I l
221 PTL l Testing Laboratory 1
100 (0 pen Deficiencies Being Resolved i 100 l
l
[
IThru Corrective Action Process l
l l
l l
l l
i l
l l
.?25 McMillin Bros. 1 Nake tp Water Fumphousell 100 INo Sip ificant Deficiencies 1
100 l
I I
I I
I I
I I
I I
I 226 Slme l Reactor Building i
100 lNo Deficiencles l
]OO l
l l Excavation l
l l
l l
l I
I I
I I
I I
233 B F Shaw l Spray Pond Alteration i 100 lNo Deficiencies ll 100 l
l I
l l
l I
I i
i i
l i Reactor Internals l
l l
l l
235 EI & SE IInstrument Nodifications!
100
[No Significant Deficiencies 1
100 l
l 1
1 I
I I


['
['
t FIFTEENTH PROGtESS REPORT                                               Attachment IB Page 1 of 4 DEFICIENCY 00CtA4ENT REVIEW StAe4ARY QC - I C(NTRACTS f, GML7i) CLASS-1 SEISMAC-1                                                           SITE DOCLMENTATION SUBICT                                             l-i       %ITE %7 K PE 70RWD                                                                   TO QVP REVIEW                                                   l F'         l         .
t FIFTEENTH PROGtESS REPORT Attachment IB Page 1 of 4 DEFICIENCY 00CtA4ENT REVIEW StAe4ARY QC - I C(NTRACTS f, GML7i) CLASS-1 SEISMAC-1 SITE DOCLMENTATION SUBICT l-i
                                        }     PCN             PED               cwt             E04     l     RCC         C)             6               RFI     l ICont ract       Centractor       1ReviewlStatus+ Review 15tatus+ Reviewl5tatus+ RevleulStatus+1RevievlStatus+ Review 15tatus+ ReviewlStatus+ Reviewf5tatus+1 170p - ,teunt-Erickson           -i Yes j   7     E I     7     E     l   7     Yes l   7   l E   l 7   Yes I   7     Yes   I 11     Yes   I   7 l
%ITE %7 K PE 70RWD TO QVP REVIEW l
  -i 206* 18evee-Cra11                 I Yes ! -7 l E l 7 l Yes l 7- l Yes . l 7 l Yes I 7 l Yes I 7 I Yes I 11 l E l 7 l l 206A* IPeter Kienit Sons'       l Yes I 7 l Yes l 7 l E l 7 l Yes l 7 l Yes l 7 l Yes l 7 l Yes l 11 I Yes l 7 l l 207* iPittsburgh-Des Moines ! Yes l 7 I Yes l 7 I Yes I 7 l Yes l 7 l Yes ] 7 l Yes l 7 l Yes l 11 l Yes l 7 l 8 209' lLampson Inc               l Yes l 7 1 D l 7 l E l 7 l Yes.l -7 l Yes l 7 l Yes l 7 l 0 l                                         7 I D l 7 I I 210* lPcter Kiewit Sons'         l Yes' l 7 l Yes l 7 l E l 7 l Yes l 7 l Yes j 7 l Yes I 7 l Yes i 11 l Yes l 7 l l 210A l Peter Kiewit Sons'       l Yes ! 7 i B l 7 l B l 7 l Yes l 7 l E l 7 l Yes j 7 l B l                                             7 l B l 7 l l 6426* !Wr17t Schuchart Harbor l Yes ] 7 l E l 7                       l Yes l 7 l Yes l 7 l Yes I 7 l Yes l 7 l Yes l 11 l Ves I 7 l l 213* lPJ*.tsburgh-Des t*aines ! Yes l 7         1'Yes l 7- 1 E         l '7 l Yes I 7 l Yes l 7 l Yes l 7 l Yes l 11 l Yes ] 7 l
F' l
  .I 2DA* !?lttstntrgh-Des Moines I Yes [ 7 l Yes l                         7 I E l 7 l Yes I 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 l 1 215 lK:i/Roccon/CERI             l Yes I 7 l Yes ] 7. l F             l 7 l Yes l 7 l F l 7 l Yes - l 7 l Ves .l 11 l Yes I 11 l l 216 lWalcinger                   l Yes l 7 l Yes l 7 l F l 7 I Yes . l 7 l F l 7 l Yes ! 7 I Yes l 11. l Yes j 7 l 4 217 l Sentry                     l Yes ! 7 l Yes l 7 ] F l 7 l Yes l 7 l F l 7 l Yes-l 7 l Yes I 11 l Yes l 7 l l 218 lFischbech/ Lord             1 Yes ! 7 l Yes l 7 l F l 7 l Yes l 7 l F. l 7 l Yes l 7 l Yes l 11 l Yes l 7 l
}
    ! 219 l0.B. Cannon                 1 Yes l 7 j Yes l 7 l F l 7 l Yes l 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 i
PCN PED cwt E04 l
    ! 720 l Johnson Controls           ! Yes ! 7 l Yes l 7 l F l 7 l Yes l 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 l l 221* l Pacific Testing Labs j Yes l 7 l E l 7 l Yes j 7 l Yes ] 7 l Yes ] 7 l Yes l 7 l Yes j 11 l Yes l 7 l l 22iA l Pacific Testing Labs l Yes l 7 l D l 7 l E l 7 l Yes l 7 l E l 7 l Yes ! 7 l D l                                                   7 l D l 7 l l 225* IMcMillan Brothers           l Yes l 7 l D l 7 l E l 7 l Yes ] 7 l Yes l 7 i Yes l 7 l Yes l 11 l Ves l' 7 l l 126 l$1ae f'ontruction Co. I Yes l 7 l E l 7 l E l 7 l Yes l 7 i E l 7 I Yes I 7; I Yes I                                                 7 l E l 7 l 1 233* lDF 31aw                     I Yes l 7 l Yes l 7 l Yes l 7 I Yes l 7 l Yes l 7 l Yes l 7, l Yes l 11 l Yes l 7 l l 234       10.B. Cennon           i Yes I 7 l Yes i 7 l E l 7 l Yes I 7 l E l 7 l Yes l 7 l Yes _ l 11 l Yes l 7 l 4 235 (CE IS4E                     l Yes I 7 1 0 1 7 l E I                     7 I Yes l 7 I E l 7 I Ves I 7 l D l                         7 1 D I 7 l I
RCC C) 6 RFI l
NOTES:                                                                     LETM):
ICont ract Centractor 1ReviewlStatus+ Review 15tatus+ Reviewl5tatus+ RevleulStatus+1RevievlStatus+ Review 15tatus+ ReviewlStatus+ Reviewf5tatus+1 170p -,teunt-Erickson
A 7 Review nat commenced                                                   PO4 - Project Change Notice                       i B - No QC-I Work performed prior to 7/f6                                   PED - Project Engineering Directive C - Special Review                                                         NCR - Nanconformance Report 0 - tb QC-1 or UC-II/SC-1 Docunentation closed prior to 7/80               RFI - Request For In'ormation E - Document not used for this contr. set                                   ECN - Engineering Change Notice F - Document reviewed under CAR 1475                                       CNR - Contractor Walver Request                   ,
-i Yes j 7
    * - Denotes Inactive Contract                                               RCC - Request for Contract Change
E I 7
    +    - Pkmbers indicate action in Flow Cheat, Page 4                       C.O. - Change Order s
E l
7 Yes l 7
l E l
7 Yes I 7
Yes I 11 Yes I 7 l
-i 206* 18evee-Cra11 I Yes !
-7 l E l 7 l Yes l 7-l Yes. l 7 l Yes I 7 l Yes I 7 I Yes I 11 l E l 7 l l 206A* IPeter Kienit Sons' l Yes I 7 l Yes l 7 l E l 7 l Yes l 7 l Yes l 7 l Yes l 7 l Yes l 11 I Yes l 7 l l 207* iPittsburgh-Des Moines ! Yes l 7 I Yes l 7 I Yes I 7 l Yes l 7 l Yes ] 7 l Yes l 7 l Yes l 11 l Yes l 7 l 8 209' lLampson Inc l Yes l 7 1 D l 7 l E l 7 l Yes.l
-7 l Yes l 7 l Yes l 7 l 0 l 7 I D l 7 I I 210* lPcter Kiewit Sons' l Yes' l 7 l Yes l 7 l E l 7 l Yes l 7 l Yes j 7 l Yes I 7 l Yes i 11 l Yes l 7 l l 210A l Peter Kiewit Sons' l Yes ! 7 i B l 7 l B l 7 l Yes l 7 l E l 7 l Yes j 7 l B l 7 l B l 7 l l 6426* !Wr17t Schuchart Harbor l Yes ] 7 l E l 7 l Yes l 7 l Yes l 7 l Yes I 7 l Yes l 7 l Yes l 11 l Ves I 7 l l 213* lPJ*.tsburgh-Des t*aines ! Yes l 7 1'Yes l 7-1 E l
'7 l Yes I 7 l Yes l 7 l Yes l 7 l Yes l 11 l Yes ] 7 l
.I 2DA* !?lttstntrgh-Des Moines I Yes [ 7 l Yes l 7 I E l 7 l Yes I 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 l 1 215 lK:i/Roccon/CERI l Yes I 7 l Yes ]
7.
l F l 7 l Yes l 7 l F l 7 l Yes - l 7 l Ves.l 11 l Yes I 11 l l 216 lWalcinger l Yes l 7 l Yes l 7 l F l 7 I Yes. l 7 l F l 7 l Yes ! 7 I Yes l
: 11. l Yes j 7 l 4 217 l Sentry l Yes ! 7 l Yes l 7 ] F l 7 l Yes l 7 l F l 7 l Yes-l 7 l Yes I 11 l Yes l 7 l l 218 lFischbech/ Lord 1 Yes ! 7 l Yes l 7 l F l 7 l Yes l 7 l F.
l 7 l Yes l 7 l Yes l 11 l Yes l 7 l
! 219 l0.B. Cannon 1 Yes l 7 j Yes l 7 l F l 7 l Yes l 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 i
! 720 l Johnson Controls
! Yes ! 7 l Yes l 7 l F l 7 l Yes l 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 l l 221* l Pacific Testing Labs j Yes l 7 l E l 7 l Yes j 7 l Yes ] 7 l Yes ] 7 l Yes l 7 l Yes j 11 l Yes l 7 l l 22iA l Pacific Testing Labs l Yes l 7 l D l 7 l E l 7 l Yes l 7 l E l 7 l Yes ! 7 l D l 7 l D l 7 l l 225* IMcMillan Brothers l Yes l 7 l D l 7 l E l 7 l Yes ] 7 l Yes l 7 i Yes l 7 l Yes l 11 l Ves l'
7 l l 126 l$1ae f'ontruction Co.
I Yes l 7 l E l 7 l E l 7 l Yes l 7 i E l 7 I Yes I 7; I Yes I 7 l E l 7 l 1 233* lDF 31aw I Yes l 7 l Yes l 7 l Yes l 7 I Yes l 7 l Yes l 7 l Yes l 7,
l Yes l 11 l Yes l 7 l l 234 10.B. Cennon i Yes I 7 l Yes i 7 l E l 7 l Yes I 7 l E l 7 l Yes l 7 l Yes _ l 11 l Yes l 7 l 4 235 (CE IS4E l Yes I 7 1 0 1 7 l E I 7 I Yes l 7
I E l 7 I Ves I 7 l D l 7 1 D I 7 l I
NOTES:
LETM):
A 7 Review nat commenced PO4 - Project Change Notice i
B - No QC-I Work performed prior to 7/f6 PED - Project Engineering Directive C - Special Review NCR - Nanconformance Report 0 - tb QC-1 or UC-II/SC-1 Docunentation closed prior to 7/80 RFI - Request For In'ormation E - Document not used for this contr. set ECN - Engineering Change Notice F - Document reviewed under CAR 1475 CNR - Contractor Walver Request
* - Denotes Inactive Contract RCC - Request for Contract Change
- Pkmbers indicate action in Flow Cheat, Page 4 C.O. - Change Order
+
s


rIFTEENTH PR0 MESS REPORT                                         Attachmen.t IB Page 2 of 4 DEFICIENCY DOCLMENT REVIEW TASK NONCONFGWANCE REPORT (NCR)
rIFTEENTH PR0 MESS REPORT Attachmen.t IB Page 2 of 4 DEFICIENCY DOCLMENT REVIEW TASK NONCONFGWANCE REPORT (NCR)
REVIEW SIM44tY 7                       l                               l                 l           l 00CLMENTS   l               l l                     l                               l 10. OF Nm'S l               l IDENTIFIED   l CLARIFICATION l l                     l           (DNTRACT           l CLOSED PRIM l               l REQUIRING   l PROVIDED -     l (DN E ACT l       CONTRACTOR     I           ACTIVITY           l   TO 7/80       l S44R.E l CLARIFICATION l Nm CLEARED       l REMARMS 205*     l Stew-Erikson         i Rx Bldg. Substructure         i         31       1   4     1       0     l         -
REVIEW SIM44tY 7
                                                                                                                                                          ~
l l
206*     I Bovee-Crall         l General Construction         1       417       l   42     1       0     l         -
l l 00CLMENTS l
l 206A* l Peter Kiewit Sons' l Arch. Construction                 1       387       l   39     I       4     1       4       l l                     l                               1                 1           I             I               l 207'     l Pittsburgh-Des       l                               l                 l           l             l               l l Molnes Steel Co. I Structural Steel             l         32       l   3     1       1     l       1       1 209'     I Lampson Inc.         l Rigging of Reactor Pressure l                   l         l               l               l l                     1 Vessel                       1         2       1   0     1         -
l l
I       -
l l 10. OF Nm'S l l IDENTIFIED l CLARIFICATION l l
l 21 0*   l Peter Kiewit Sons' l Arch. Construction             !        Al       l   5     l       0     l         -
l (DNTRACT l CLOSED PRIM l l REQUIRING l PROVIDED -
l 210A     I Peter Kiewit Sons' l Arch. Construction'             l         A       I   A     l         -
l (DN E ACT l CONTRACTOR I
l       -
ACTIVITY l
l 6426*     I wright Schuchart     i                               l                 l         l             l               l l Harbor               i Interim General Construction l         113       l   11     1       0     l         -
TO 7/80 l S44R.E l CLARIFICATION l Nm CLEARED l
l 213'   l Pittsburgh-Des       l                               l                   l         l             l               l l Moines Steel Co. 1 Primary Cont Vessel           l       104       I   10     1         1   l         1     l J       213A' l Pittsburgh-Des         l                               l                   l         l             l               l l Moines Steel Co. I Primary Cont Vessel Retrofit l           75       l   10     l         1   1         1     1 215     l WSH/Boecon/GERI     l Mechanical Construction       l       1016     l 126       l       11     l       11       I g      216     l Waldinger           l HVAC, Plunbing               l         422     1   49     l       15     l       15       1 217     l Sentry               l Fire Protection               1           3     l     1   1         0     l       -
REMARMS 205*
l 218     i Fischbach/ Lord     l Electrical Construction       l         375     l   37   l         6     l       6     l 219     1 0.B. Camon           l Special Coatings             l         13     1     2   1         0     1       -
l Stew-Erikson i Rx Bldg. Substructure i
l 270     l M oson Controls l Instrumentation                   l         27     1     3   1         0     l       -
31 1
l 221'   l Pacific Testing Labl Testing                         l           6     l     1   1         0   l         -
4 1
l 221A   l Pacific Testing Labi Testing                         l           A     l     A   l         -
0 l
l         -
~
l 225*   I McMillan Brothers l Makeup Water Pump House         1         24     l     2   l         1   l         1     l 233*   l BF Shaw             l Spray Pond Alterations       l           4     1     1   1         0   l         -
206*
1 J       234     1 0.B. Camon           I Wetwell Coating               l           4     l     1   1         0   l         -
I Bovee-Crall l General Construction 1
l 235     l CE IS&E             l I&C Board Modification       I           B     l     B   l         -
417 l
1         -      1 I                     I                               l                 l         l             1     _        l l                     l                               l       3096     1 347     I       40   l       40     l
42 1
0 l
l 206A* l Peter Kiewit Sons' l Arch. Construction 1
387 l
39 I
4 1
4 l
l l
1 1
I I
l 207' l Pittsburgh-Des l
l l
l l
l l Molnes Steel Co.
I Structural Steel l
32 l
3 1
1 l
1 1
209' I Lampson Inc.
l Rigging of Reactor Pressure l l
l l
l l
1 Vessel 1
2 1
0 1
I l
21 0*
l Peter Kiewit Sons' l Arch. Construction Al l
5 l
0 l
l 210A I Peter Kiewit Sons' l Arch. Construction' l
A I
A l
l l
6426*
I wright Schuchart i
l l
l l
l l Harbor i Interim General Construction l 113 l
11 1
0 l
l 213' l Pittsburgh-Des l
l l
l l
l l Moines Steel Co.
1 Primary Cont Vessel l
104 I
10 1
1 l
1 l
J 213A' l Pittsburgh-Des l
l l
l l
l l Moines Steel Co.
I Primary Cont Vessel Retrofit l 75 l
10 l
1 1
1 1
215 l WSH/Boecon/GERI l Mechanical Construction l
1016 l 126 l
11 l
11 I
216 l Waldinger l HVAC, Plunbing l
422 1
49 l
15 l
15 1
g 217 l Sentry l Fire Protection 1
3 l
1 1
0 l
l 218 i Fischbach/ Lord l Electrical Construction l
375 l
37 l
6 l
6 l
219 1 0.B. Camon l Special Coatings l
13 1
2 1
0 1
l 270 l M oson Controls l Instrumentation l
27 1
3 1
0 l
l 221' l Pacific Testing Labl Testing l
6 l
1 1
0 l
l 221A l Pacific Testing Labi Testing l
A l
A l
l l
225*
I McMillan Brothers l Makeup Water Pump House 1
24 l
2 l
1 l
1 l
233*
l BF Shaw l Spray Pond Alterations l
4 1
1 1
0 l
1 J
234 1 0.B. Camon I Wetwell Coating l
4 l
1 1
0 l
l 235 l CE IS&E l I&C Board Modification I
B l
B l
1 1
I I
l l
l 1
l l
l l
3096 1 347 I
40 l
40 l
* Inactive Site Contract A: No QC-1 NCR's closed prior to 7/80
* Inactive Site Contract A: No QC-1 NCR's closed prior to 7/80


                                                                                                                                                                .r O
.r O
                                                                                                                                                        ^
^
r1FTEENTH FR0 MESS RER)RT Attachment IB             '
r1FTEENTH FR0 MESS RER)RT Attachment IB Page 3 of 4 DEFICIENCY 00CtMENT REV!cW SlM4ARY QC - 1 CDNTRACTS
Page 3 of 4 DEFICIENCY 00CtMENT REV!cW SlM4ARY QC - 1 CDNTRACTS
'l GJALITY CLASS-1 SE1941C-I l
  'l                       GJALITY CLASS-1 SE1941C-I                           l l                         SITE WORK ERFORIED                                                     CONTRACTm 00CtDENTAIION                        l l                      StBJECT TO QVP REVIEW
CONTRACTm 00CtDENTAIION l
    !            l                                                                                                                                   l l                        INTERNAL DOCl#ENTS l Contract l                           Contractor                           1 DD e Review l
l SITE WORK ERFORIED l
205*                                                                                          Status +     D(D     Review         Status +1 1             l Stewart-Erickson                                           l Nm l Yes             Complete None         -        'Completel l   206*     I Bovee-Crall                                               l IR l Yes           ICompletel     Nm l Yes             lCongletel 1     206e l Peter V!ewit Sons'                                             l IR l Yes               6 1            i None 1       -
StBJECT TO QVP REVIEW l
I   -
l l
l l   207*   l Pittsburgh-Des Nolnes                                       l         l Yes   ICompletel             I Yes           (Congletel i     209*   l Lampson Inc l         l D     lCompletel             I     D       ICompletel l     210'   I Peter Kiewit Sons'                                         l IR l Yes         lCompletel None 1           -        lCompletel l 21DA l Peter Klewit Sons'                                                 l N/A l B           lCompletel N/A l B                   lCompletel
INTERNAL DOCl#ENTS l
  ! 6426' l Wright Schuchart Harbor                                           l IR l Yes         lCompletel         IR l Yes           lCongletel i   213*     I Pittsburgh-Des Nolnes                                     l CMt I Yes         lCompletel ECAR l Yes                 l'ongletel l   213A* 1 Pittsburgh-Des Nolnes l CAR l Yes         ICompletel ECAR l Yes                 IOompletel l   215     i WSH/Boecon/GERI l IR l Yes         lCompletel Fm l           .C         ICompletel i     216     l Waldinger l DR I Yes         ICongletel         DR I Yes           lCompletel -
l Contract l Contractor 1 DD e Review Status +
l     217     1 Sently l IR l D           lCompletel         IR l D           10ampletel l     218     l Fischbach/ Lord                                             l IR l Yes         lCompletel         IR l Yes         lCompletai l     219     i O.0. Camon                                                 l IR l Yes           ICompletel None l           -        lCompletel l     2'20   l Johnson Controls                                     _    l ISR l Yes         (Congletel JRN l. Yes                 ICompletel 1      221*  l Pacific Testing Labs                                                  l Yes   ICompletel l                                          l Yes         ICompletel 1     221A 1 Pacific Testing Labs                                         l               D   lCompletel l                                l D           lCongletel l     225*   ) NcNillan Brothers                                           l ICL l Yes         l     6     l   C#t I Yes         1     5     l
D(D Review Status +1 1
!      226   l Slee Construction Company                                   l         l Yes   1     6     l         l Yes         l     3     l l     233*   l BF Shaw                                                     l         l Yes   l     5     l None 1       -
205*
l Complete l l     234   1 0.B. Cannon                                                 l IR l Yes         ICongletel None l           -        lCompletel i     235     l T IS&E                                                     I ml Yes           1       6     l None !       -      ICompletel NOTES:
l Stewart-Erickson l Nm l Yes
, Complete None
'Completel l
206*
I Bovee-Crall l IR l Yes ICompletel Nm l Yes lCongletel 1
206e l Peter V!ewit Sons' l IR l Yes 1
6 i None 1 I
l l
207*
l Pittsburgh-Des Nolnes l
l Yes ICompletel I Yes (Congletel i
209*
l Lampson Inc l
l D lCompletel I
D ICompletel l
210' I Peter Kiewit Sons' l IR l Yes lCompletel None 1 lCompletel l 21DA l Peter Klewit Sons' l N/A l B lCompletel N/A l B lCompletel
! 6426' l Wright Schuchart Harbor l IR l Yes lCompletel IR l Yes lCongletel i
213*
I Pittsburgh-Des Nolnes l CMt I Yes lCompletel ECAR l Yes l'ongletel l
213A* 1 Pittsburgh-Des Nolnes l CAR l Yes ICompletel ECAR l Yes IOompletel l
215 i WSH/Boecon/GERI l IR l Yes lCompletel Fm l
.C ICompletel i
216 l Waldinger l DR I Yes ICongletel DR I Yes lCompletel -
l 217 1 Sently l IR l D lCompletel IR l D 10ampletel l
218 l Fischbach/ Lord l IR l Yes lCompletel IR l Yes lCompletai l
219 i O.0. Camon l IR l Yes ICompletel None l lCompletel l
2'20 l Johnson Controls 1
221*
l Pacific Testing Labs l ISR l Yes (Congletel JRN l. Yes ICompletel l
l Yes ICompletel l Yes ICompletel 1
221A 1 Pacific Testing Labs l
l D
lCompletel l D lCongletel l
225*
) NcNillan Brothers l ICL l Yes l
6 l
C#t I Yes 1
5 l
226 l Slee Construction Company l
l Yes 1
6 l
l Yes l
3 l
l 233*
l BF Shaw l
l Yes l
5 l None 1 l Complete l l
234 1 0.B. Cannon l IR l Yes ICongletel None l lCompletel i
235 l T IS&E I ml Yes 1
6 l None !
ICompletel NOTES:
LEEPO:
LEEPO:
A - Review not courenced                                                         IR - Inspection Report 6 - No QC-1 Work performed prior to 7/80                                         CAR - Corrective Action Report C - Special Review DR - Deficiency Report 0 - No QC-I or QC-II/SC-1 Documentation closed prior to 7/80                     ISR - Inspection Surveillance Report DD - Deficiency Document                                                         m - Quality Report O(D - DPsigi Change Document
A - Review not courenced IR - Inspection Report 6 - No QC-1 Work performed prior to 7/80 CAR - Corrective Action Report C - Special Review DR - Deficiency Report 0 - No QC-I or QC-II/SC-1 Documentation closed prior to 7/80 ISR - Inspection Surveillance Report DD - Deficiency Document m - Quality Report O(D - DPsigi Change Document
      - Denotes insetive Contract                                               ECAR - Engineering Corrective Action Report-
- Denotes insetive Contract ECAR - Engineering Corrective Action Report-F m - Field Change Request
- Nunbers indicate action in Flow Chart, Page 4 JFRN - Johnson Controls Field Request Notice
+
+
F m - Field Change Request
      - Nunbers indicate action in Flow Chart, Page 4                            JFRN - Johnson Controls Field Request Notice


ATTACHMENT Paga 4 of 4      1B ' .'
ATTACHMENT 1B '.'
FIFTEENTH PROGRESS REPORT                                                                     ,
Paga 4 of 4 FIFTEENTH PROGRESS REPORT FLOW CHART FOR REVIEW 0F CONTRACTOR INTERNAL DOCUMENTATION 7
FLOW CHART FOR REVIEW 0F
Write Report s-d b
  !                                                      CONTRACTOR INTERNAL DOCUMENTATION 7
1 2
Write
3 4
:                                                                                                                      Report s-d           b 1                 2                     3                                 4                 5                 6                               11 1
5 6
Coordinator Interface A       Checklist Interview
11 1
                                    --)     '
Coordinator A Checklist --) Procedural A Logbook A Sample Decision Wri te Interface Interview Review Review Review To Report Sample r
Procedural Review A     Logbook Review A       Sample Review Decision To Wri te Report Sample         .
g V
r g
l f
V                          l f                                                                                               ,
Yes.
s
No s
                                                <<                                                                              Yes. ,
A
No A
\\
    \                           '
i 10 i
10 i
8 9
i                                                                                                                              8               9 Decision Y
Decision l
l
Docurent Y
Review To
[
[
                                                                              .                                          Docurent            Review          To
Selection Increase
;                                              _ s                                                                       Selection                        Increase Sample jg
_ s Sample jg
                                                            ~
~
_                                                                                                                                            Iw         .;
Iw Yes
Yes
=;-
                                                                                    -                        =;-
\\
                                                                                                                            \
l i
l i
l                                                                                     .,-
l
                                                                                                                                  .                -,        .        _ .-}}
.-}}

Latest revision as of 23:49, 20 December 2024

Forwards Fifteenth Progress Rept Re Actions Taken to Correct Violations Noted in 800717 Notice of Violation & Addl Info.Rept Covers Activities of Quarterly Verification Program During Apr-June 1983
ML20024D036
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 07/18/1983
From: Carlisle C
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Martin J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
G-O2-83-618, NUDOCS 8308030021
Download: ML20024D036 (17)


Text

_____-____ -__ _ _ _ _ _ _ _

y. -

TEC5ygg t;~w Washington Public Power Supply System P.O. Box 968. 3000GeorgeWashingtonWay Richland,Washingto 3

509)372-5000

s. y

- ou L~aa::;n7 July 18, 1983 Docket Number 50-397 G-02-83-618 Responds to: N/A Response required by: N/A Mr. J. B. Martin, Regional Administrator Nuclear Regulatory Commission Region V 1450 Maria Lane Suite 210 Walnut Creek, California 94596

Subject:

SUPPLY SYSTEM NUCLEAR PROJECT NO. 2 FIFTEENTH PROGRESS REPORT - 10CFR50.54(f)

Reference:

a)

G02-80-153, N.O. Strand to USNRC, "WPPSS Nuclear Project No. 2 Docket No. 50-397, EA-80-20, Notice of Violation and Additional Information -

10CFR50.54(f)," dated July 17, 1980 This is the fifteenth Progress Report on the actions we have taken in regard to our commitments in Reference a). This quarterly report covers activities of our Quality Verification Program during the period of April through June 1983.

During the month of June, two important interface meetings occurred between the Supply System and the Region V.

As a result of these meetings, the Supply System committed to perform additional veri-fication tasks.

These are discussed along with our general progress in the attachments.

9308030021 830719 PDR ADOCK 05000397 o

PDR

'y

[h'dk

O J.B. Martin Page 2 Please contact me if you have any questions on this matter.

C.S. Carlisle Program Director, WNP-2 CSC:RLK:eek Attachments:' l.

WNP-2 Project Review of Completed Safety-Related Work -

Progress Report lA. Prepurchase and Inactive Contracts -

Status Repor'c 1B. Deficiency Document Review -

Status Report cc: WS Chin, BPA - Richland, WA JA Forrest, B&R - Richland, WA PE Grady, BPA - WNP-2 JB Knotts, Jr.,.Debevoise & Liberman, Washington, DC to Lewis, EFSEC,. Olympia, WA TA Mangelsdorf, Bechtel - WNP-2 A Toth, NRC, Resident Inspector, WNP-2 JJ Verderber, B&R, Woodbury, NY t

4 ATTACHMENT 1 Page 1 of 6 FIFTEENTH PROGRESS REPORT WNP-2 PROJECT REVIEW OF COMPLETED SAFETY-RELATED WORK A.

INTRODUCTION This report covers activities of the Supply System's Quality Verification Program (QVP) during the months of April, May, and June,1983.

Reinspec-tion of welded structural steel installed by an inactive contractor, in-itiated in the previous report period, has been completed. Our special review of prepurchase and inactive (PP&IA) contracts, designed to strengthen confidence in the adequacy of work produced by those con-tractors, was initiated during this report period. However, the depth of this review was questioned by the NRC prior to completion, and additional work was initiated. The analysis of results of previously-completed re-inspections of active contractors' work continues along with preparation of reports. Our review and reporting of Engineering and QC documents for Special Tasks continues.

B.

GENERAL INFORMATION 1.

In our last progress report, an additional action of revising our commitment summary to record general information and identify changes was discussed. During this report period Letter No.

G02-83-339, dated April 18, 1983, was sent with a revised summary of commitments for your information and use.

2.

A presentation of QVP results and status was made to NRC-Region V representatives at Walnut Creek on June 7,1983, as part of a general WNP-2 Project status presentation. During the meeting several questions / issues were discussed and eight specific issues arose which were further addressed by the Supply System at a meeting with Region V representatives at the Project Site on June 21, 1983.

These are enumerated below:

(1) Hardware supplied under prepurchase contracts and work per-formed by inactive contractors may not have been sampled for reinspection.

(2) Define the logic for sample selection and distribution of the sample size for active contracts.

Include consideration of the time period when work was accomplished.

(3) Provide the basis for judging the acceptability of contractors' past work based on QVP results.

ATTACHMENT 1 Page 2 of 6 (4) Define the methodology for evaluating the results of review and reinspection in determining the need, if any, for expansion of sanple size.

(5) Describe the program for evaluation of NDE contractors' work, including the consideration of sampling vendor radiographs.

(6) Prepurchase and inactive contractors' procedures may not have been examined for technical adequacy.

(7) It would be desirable for the NRC to review the planned content of the final QVP Summary Report.

(8) The impact of the NRC Construction Assessment Team's findings should be considered in the conclusions reached by the QVP.

At the June 21 meeting, information was provided in order to satisfy issues, 2, 3, 4, and 7.

Information was also provided to describe three commitments made at the meeting to address issues 1, 5, 6, and 8.

These commitments are:

e The special PP&IA review program, originally designed to assure our document-review-oriented program was satisfactory, is being extended to address issues 1 and 6.

e An NDE reverification program is being initiated to address issue 5.

e A comparison of the Construction Assessment Team's findings with QVP results will be made and analyzed to address issue 8.

Information pertaining to all eight issues will be included in the QVP Overview Report.

3.

The schedule for completion of the QVP was also discussed in the June 21 meeting. As a result of the new commitments, our reports will be delayed beyond original plans.

Our original intent was to complete the lower-level detailed reports first, then the intermediate-level task reports, and finally the Overview Report.

Because the task reports will include summary and general information, somewhat similar to the Overview Report, we now intend to prepare the Overview Report as soon as the detailed reports are complete. This will afford the opportunity for NRC Region V review of QVP results while the specific task reports are being completed by the Supply System.

i I

i

,-e,

~ - - - -,,

, -. ~ -, -,.

ATTACHMENT 1 Page 3 of 6 We are developing a new schedule for completing QVP activities in a manner which provides the Overview Report, an outline of which was furnished at the June 21 meeting, to you approximately September 1.

Completion of the intermediate-level task reports will follow.

4.

Technical Audit Associates (TAA) performed an audit of the QVP on April 29,1983, and listed two " findings" in an audit report dated May 16, 1983. These findings were both related to contract 215 equipment installation reinspection, which was not part of the scope of QVP. A response explaining how equipment reinspection is covered by the Project was sent to TAA on May 26, 1983.

C.

SYSTEMS COMPLETION 1.

The following is a brief report for each of the active site contract reverification activities:

o Contract 210A, Peter Kiewit Sons - Complete, reported earlier.

o Contract 213A, Pittsburgh-Des'loines Steel - Complete, reported earlier. The R9 verification Report for this contract was reviewed by an NRC Region V representative during the report

period, o

Contract 215/250, WBG/Bechtel - The following is a summary of work during this report period:

Startup Systems - The remaining two (of thirty-seven) sys-tem reports were completed by the Bechtel Reverification Group (BRG) and approved by Bechtel QA. These documents complete the reporting of detailed hardware reinspection results for contract 215.

Previously-comtleted system reports are being updated and clarified to accommodate new information. Twenty-nine such revisions are being made and will be issued with the contract 215 Reverification Report.

Structural Steel - A report, similar to the system re-ports, for the reinspection of contract 215 structural steel construction was completed by the BRG and approved by BQA. The report records that a " low incidence of un-acceptable findings and the minor nature of the individual defects when evaluated with respect to the magnitude of welding and weld patterns specified in the design" provide a high level of confidence in the safety and quality of the contract 215 structural steel.

~

ATTACENENT 1 Page 4 of 6 Results Analysis - Analysis of all of the contract 215 reinspection results by BRG and the A N began during the report period. Based on comments received from the Re-sident Inspector, this work is being extended in detail to determine the possibility of component failure which could result from deficiencies identified in our reinspections.

Contract 215 Reverification Report - A draft of this re-port is being prepared by BRG to cover the reinspections, the system reports, related program evaluations, the structural steel report, analysis of results, and overall conclusions drawn from these activities. The majority of sections for this report are currently under review by BQA and the QVP office.

The remaining sections will be pre-pared upon completion of the results analysis.

o Contract 216, The Waldinger Corporation - Complete, reported earlier. An addendum to the reverification report has been completed, reviewed, approved, and distributed in late April.

o Contract 217, Sentry - Complete, reported earlier.

e Contract 218, Fischbach/ Lord (F/L) - The draft of the final reverification report has been reviewed by BQA and the QVP office during this report period.

In response to Region V's issue (2), discussed in General Item 2., the BRG has compiled information on the time distribution of the reinspection sample. This information is being incorporated into the report.

e Contracts 219/234, O. B. Camon - Complete, reported earlier.

In response to the Technical Audit Associates' (TAA) request to clarify coating reinspection which resulted in rework, Revision

  1. 1 to these contract reports have been issued.

e Contract 220, Johnson Controls, Inc. - The final reverification report has been reviewed, approved, and issued in early May.

D.

PREPURCHASE AND INACTIVE CONTRACTS 1.

With the completion of the documentation review for contract 7426, Northwest Copper, all originally-planned documentation reviews for the prepurchase and inactive contracts are complete. Contract 7426 is being evaluated by the QVP office. The status report (Attachment IA to this report) has been updated to reflect the current prepur-chase and inactive contract review status. The overall task report is currently in progress and nearing completion.

7 m -

e m

  • -=.--

ATTACHMENT 1 Page 5 of 6 2.

During this report period, the contract-206 welded-structural-steel reinspection was completed and the final report of those activities is u1derway.

The review and evaluation of the follow-up contracts, contracts 206A (Peter Kiewit), 210 (Peter Kiewit) and 6426 (Wright-Schuchart-Harbor, interim contract), completed the contract 206 (Bovee-Crail) work. Reports of those activities have been prepared and are under review at the QVP office.

3.

A special review of the critical components for WNP-2 provided by prepurchase and inactive (PP&IA) contracts was initiated in this report period. A list of these critical components was developed by Project Engineering, from which a sample was selected for review.

This resulted in a sample of quality records, vendor qualifications and technical adequacy of procedures for components in 20 of the 62 PP&IA contracts being reviewed. A field verification walkdown of this hardware was performed to confirm that components were accur-ately represented by the records. Reinspection of components has not yet been accomplished.

Procedures for this program and the review results were examined by an NRC Region Y representative, and the program was discussed at the June 7 Region V meeting. As a result of our discussions, it was decided to reconsider the list of 62 PP&IA contracts for possible additional review. This additional review is being conducted in four parts, any or all of which may be applied to a particular contract or component.

The review strengthens previous assessments of work adequacy and assures attention to our commitment to address the need for reinspection even though the records indicate the hard-ware is adequate, as discussed in item B.2. of this report. The four parts of our additional verification review are:

Review of Vendor Qualifications l

Review of Technical Adequacy of Vendor Procedures Review of Quality Documentation Sample Reinspection of Installed Components (including com-ponents from the 20 contracts discussed above)

E.

SPECIAL TASKS l

1.

Deficiency Document Review - All procedure and document reviews for i

site documents identified under this task have been completed. Pro-gress continues on the preparation of reports verifying the tech-l nical adequacy of those documents which disseminated design change l

i

ATTACHMENT 1 Page 6 of 6 information to contractors. Of eight types of documents examined, the reports on two have been reviewed and approved, one report is in

- final draft following review, and drafts of the remaining five are underway. No trends of technically inadequate document dispositions have been demonstrated.

The review of contractors' internal documentation and procedures has been completed on eighteen of twenty-three contracts identified.

The review of the remaining five contracts is approximately 75%

complete and is expected to be completed early in the next report period.

- The status of our reviews is summarized in the charts comprising B to this report.

2.

Personnel Qualifications - The examination of personnel qualifica-tions reviews conducted under the Restart Program continued during this period. The results of this examination, combined with similar information from reviews performed in the QVP, will be assessed'to determine if further investigation is warranted. An analysis of the Deficiency Document Review results for engineering personnel employed by both the A/E and the construction contractors was.

completed during this period, and preparation of the report began.

3.

Receiving Inspections - No progress during this report period.

4.

Grout Evaluation Program - Complete, reported earlier.

5.

Evaluation of Concrete Quality Records - Early in the report period, it was decided that, since visual nondestructive inspection of con-crete would generally not provide enough information to determine the quality or adequacy of concrete, a special technical review of concrete quality records was initiated. Such a review was con-sidered to be useful in assessing the adequacy of concrete installed prior to the stop wJrk order of July, 1980. This review will be i

reported as a fifth special task.

The task includes:

1) A review of procedures for formwork, rein-forcing steel, and concrete placement; deficiencies identified on

. nonconformance reports and corrective action documents during the construction; and QC inspection records; 2) analysis of the review results to determine if significant problems exist; and 3) prepara-tion of a report.

The technical reviews have been completed and the analysis and re-port preparation are well underway, with completion estimated at 90%.

I d

4 k+-

+ + +

w,,

s,-E_

.w--,ov,.

.,w

-.-ev-,

.,n

...---.--,ew..,,,

-w-,=...c---

.-wm-r--

+-.w,-,--,wr4

... ~.

nTTADe sti 1A FIFTEENTH PROGIESS MPGli SUPPLY SYSTEN REVIEW OF PREPUKHtSE AfD INACTIVE CONTRACTS STATUS REPGtT l-1 I

I I

l l

l DES 0tIPTION OF I STATUS OF OWER FINAL I l STATUS OF ONDER EVALUATION

.1 1.CDNTRACTOR I CONTRACTOR'S WGtK

. l' DOCLMENTATION EVIEW I RESULTS OF DOCLMENTATION REVIEW 1: ON EED FOR EINSPECTION

-I l

l I (5 CODFLETE) l ll (5 GNR.ETE) l I

I I

I I

i 12808-2 General ElectricL NSSS I

100 INo Deficiencies Il 100-1 I

I I

I I

I l

7 Battelle ll Neteorological Study 100 l No Deficiencies l

100 l

l l

1 l

l 17 Pathway Bellows I, Refueling Bellows ll 100 LNo Si p ificant Deficiencies 100 l

I I

I i

i 1

1 I

l 18 Farr Company l Staney Cas Treatment l l

l l

l 1 & HEPR Filters

'l 100.

lNo Deficiencies 1

100 l

l l

l l

.I I'

l 22A Joy Nanufactur-1 HVAC Fans 100 llNo Significant Deficiencies i

100 l

ing l

-l I

l I

i 1

1 1

l 23 Byron Jackson l Stan&y Service Water L 100 INo Deficiencies L

100

.l I

I Puaps l

I I

l l

I I

I l

1 l

l l

24 HJICO Inc

'l Shop Fabricated Tanks 100

' No Deficiencies 100 l

l l

1 l

l 28 Buffalo Forge l HVAC Fans I

l lNo Sipificant Deficiencies l

100,

.I

I 100 l

l I

I I

1 l

31A Whiting 1 Turbine Generator and l 100

" Deficiencies resolved, Rein-

'i 100 l

l Il Reactor Building Cranes!'

lspection Completed l

l l

l 1

I l

l l

1 I

l l 32CD Clayton l JIB Overhead Cranes l

100 lNo Significant Deficiencies 1

100 l

1 I

I I

l l

I li I

l 35A Crane Co.

I Puaps & Notors 100 1No Deficiencies 1

100 l

l I

ll 1

36 Acme Concrete l Preduction & Delivery l 100

]No Significant Deficiencies l

100 l

I I of Concrete i

I l

l l

I I

I I

I

k nTTAONENT 1A i

Page 2 of 5 FIFTEENTH Rt0 MESS REPORT SUPPLY SYSTEN REVIEW OF PRERRCHASE APO INACTIVE CONTRACTS STATUS REPORT I

I I

I I

I l

l DESG IPTION OF l STATUS OF OWNER FINAL ll l 5TATUS OF OWER EVALUATION

-l l CONTRACTOR I CONTRACTOR'S WmK l DO M TATION REVIEW RESULTS OF 00CLMENTATION REVIEW l DN NEED FOR REINSPECTION I

l l

1 (5 COMPLETE)

I l (X QNPLETE) l l

l l

I l

l I

I I

I l

l 41A velan Valve l IOclear Valves I

100 l e Simificant Deficiencies l

100 l

i I

l I

I l

l l

1 I

I l

i 418 Anchor / Darling l

baclear Valves l

100 lNo Deficiencies 100 l

l I

i I

i i

l I

42A Fisher Controls l Control Valves 100 lNo Deficiencies ll 100 l

i I

I I

I I

I I

428 Fisher Controls Cmtrol valves 100 INo Si@lficant Deficiencies I

100 l

l I

I I

I I

I 47A Westinghouse i Switchgear l

100 INo Deficiencies l

100 l

i I

I I

I I

I I

i l

l 48 Westinghouse 1480 Volt Substation i

100 lNo Deficiencies ll 100 l

I i

1 I

I I

I J

l l

1 49 I-T-E Imperial l Notor Control Centers l 100 lNo Significant Deficiencies l

100 l

l l

1 l

I I

i 51A ESB Inc.

I Batteries l

100 INO Deficiencies ll 100 l

l I

l I

I 1

I i

i i

l l

l 51B Power Conversion! Battery Chargers l

100 lNo Significant Deficiencies l

100 l

l I

l l

l 1

i i

I I

I I

52 Solid State i thinterrtptible Power l J00 lNo Deficiencies l

100 l

l Controls l Supply l

l ll 1

l_

l l

I I

1 1

I I

I l

53 Stewart i Diesel Generators 1

Stevenson l

100 IDocumentation Deficiencies Being i 100 I

1 i Addressed, Reinspection Completed l l

4 I

I I

I I

I I

I I

55 Westinghouse l Containnent Electrical l 100 lNo Sipificant Deficiencies l

100 l

l l Penetrations l

l l

l l

l 1

l l

1 1

I l

57 Kinemetrics l Accelerometers ll 100 No Deficiencies l

100 l

I l

l I

I l

nTTAD MENT 1A Page 3 of 5 FIFTEENTH PROGtESS REPORT SUPR.Y SYSTEN REVIEW OF PREPLRCHASE Am INACTIVE CUNTRACTS STATUS RER]RT i

i i

i l

i l

l DESCRIPTION OF l 5TATUS OF OWNER FINAL I l STATUS OF OWER EVALUATION I

I CONTRACTOR I CONTRACTOR'S WORK l DOCLMENTATION REVIEW I RESULTS OF DOCUMENTATION REVIEW l DN NEED FOR REINSPECTION l

l l

l (5 COMPLETE) l ll (I CDNFLETE) l l

l l

l l

i i

I i

l l

58 Jelco l Instrument Racks l

100 INo Sipificant Deficiencies i

100 1

I l

l l

l l

l l

l l

l l

59 CE I Instrument & Control l

100 INo Deficiencies

(

100 l

i I &mds I

I I

I I

I I

l' I

i 1

i 604 Sentry Equip-L Sampling and Analysis l 100 INo Significant Deficiencies l

100 l

1 ment Corp.

Systems i

I L

l 1

I I

I I

62A Okonite l Electrical Cable l

100 i

i I

I lNo Deficiencies ll 100 l

l I

I I

l l

l l

1 1

I i

623 Raychem ll Electrical Cable L

100 INo Significant Deficiencies l

100 l

I I

I i

l l

l G2C Rockbestos l Electrical Cable L

100 IDeficiencies Resolved i

100 l

i I

I l

l 1

I I

I 67 H K Porter i Air Handling thits l

100 INo Deficiencies ll 100 l

I I

I I

I I

I i

i l

l 68 BIF Isolation Valves ll 100 INo Sipificant Deficiencies ll 100 l

l l

l l'

I I

l 69 Velan l Check Valves l

100 llNo Sipificant Deficiencies l

100 l

l l

l l

l l

I I

l l

1

' No Deficiencies l

100 l

i 71 Air Products & l Hydrogen Reconbiner l

100 1

D elcals l

l ll l

l l

I I

I I

I I

I I

I I

73 Elgar 1 15KVA Inverters 1

100 INo Deficiencies ll 100 l

i I

I l

I i

1 l

l 90 Leckenby l Pipe Whip Restraints l

100 l Deficiencies Identified and I

100 l

l l

l l Corrected thru Action Plan i

I I

I I

l I

l I

I i

i i

l 1 92A Ingersoll Rand i Sampling Probes i This is an Active Pre-INo Deficiencies i

100 l

4 l

l l purchase Contract l

l l

l l

l I

l I

l nTTACmENT 1A Page A of 5 FIFTEENTH FRO @ESS REPORT SUPR.Y SYSTEM REVIEW OF FRERRCHASE AM) INACTIVE WNTRACTS STATUS REPORT l

1 1

1 L

I l

l DESGIPTION OF l STATUS OF OWER FINAL l l 5TATUS OF OWER EVALUATION l

l CON WACTOR I CONTRACTOR'S WORK l 00CINENTATION REVIEW l RESULTS OF 000NENTATION REVIEW l DN NEED FOR REINSPECTION l

l l (5 CONPLETE) l l (5 CINPLETE) l I

I I

I I

i 1

I I

I I

l l

920 Kamari Sciences l Radiation Nonitoring l This is an Active Pre-lNo Deficiencies l

100 l

l 1

l purchase Contract 1

l l

l 1

I I

I I

I I

l 93 04'E Controls 1 Vacuum Breaker Valves l 100 INo Deficiencies I

100 l

l l

l l

1 1

I' 100 l

I l

94 B F S.:w I NSRV Discharge l

100 INo Deficiencies l

l l

l t

I i

I i

l 12409 Buehler M; clear l BWR High Density Spent I 100 (No Significant Deficiencies l

100 l

l Products l Fuel Racks l

l l

1 l

I I

l l

i I

I I

I I

l l 6426 Wright-1 Interim Construction l

100 INo Sigrifficant Deficiencies i

100 I

l Schuchart-HarborL l

-lSpecial Scoping Review Completed I

i I

I I

l I

l l 6809 Bethlehem I' Reinforcing Steel 100 INo Si pfricant Deficiencies ll 100 l

1 I

l ll l 6904 Welk Brothers 1 Annular Sleeves i

100 No Significant Deficiencies 100 l

I I

I I

I l

I 6905 Welk Brothers Skimmer Surge Tank 100 INo Sipificant Deficiencies i

100 i

l l

l l

l l

l 1

i 6912 Pybus l Structural Steel l

100 lNo Significant Deficiencies 1

100 I

l_

l I

I 1

i.

I l

4

! 6917 Texas Pipe l Pipe Spools 1

100 lNo Significant Defielencies l

100 l

1 I

I I

l I

l i

I I

I l

l 7012 Brand Industriall Form Separation System 11 100 ite Significant Deficiencies l

100 l

l e

l l

l l

1 l

l 7426 Horthwest Coppert Exhaust Duct l

100 lNo Significant Deficiencies l

10 l

i 1

1 I

l l

I l

l i

I I

I I

I I

I l

I 205 Stewart Erikson 1 Reactor Building i

100 INo Significant Deficiencies l

100 l

l I Substructure i

l l

l l _

l I

I I

I 4

ATTACH 4ENT 1A Page 5 of 5

. FIFTEENTH FROGtESS REPORT SUPPLY SYSTEM REVIEW OF PREPURCHASE APO INACTIVE CONTRACTS STATUS REPORT l

l l

l 1

l l

l DESCRIPTION OF l STATUS OF OWNER FINAL l l STATUS OF OWNER EVALUATION l

l CON 1RACTOR I UINTRACTOR'S WORK l 00CLMENTATION REVIEW l RESULTS OF 0001NENTATION REVIEW l DN NEED FOR REINSPECTION l

l l (X CD>FLfTE) l l (X CD4PLETE) l l -'

I I

I I

l I

1 I

I I

206 Bovee Cra11 1 &neral Construction l

100 IReinspections of Strue. Stl.

I 100 l

l l

l

' Completed t

1 I

I l

l 1

I i

l I 2064 Peter Kiewit l Architectural Const.

I 100 INo Si@ lficant Deficiencies ll 100 l

l l

l lSpecial Scoping Review Completed l l

l_

l I

l I

l 1

1 I

I I

I i

207 PCM Structural Steel 1

100 INo Si @ lficant Deficiencles l

100 l

i l

l I

I I

I 209 Rigging Int.

I Rigging of Reactor l

100 "No Deficiencies l

100 l

l l Pressure Vessel l

l l

l l

l l

l l

l 1

1 I

I I

l l

210 fDier Kiewit l Architectural Const.

I 100 10 pen Documentation Deficiencies 100 l

l l

l l Resolved, Special Scoping Review l

I I

I ICompleted l

I I

I I

I I

I I

l l

213 PUN l Primary Containment i

100 INo Significant Derfielencies l

100 l

l l Vessel l

l l

l i -

1 I

I I

i 1

1 I

I I

I l

221 PTL l Testing Laboratory 1

100 (0 pen Deficiencies Being Resolved i 100 l

l

[

IThru Corrective Action Process l

l l

l l

l l

i l

l l

.?25 McMillin Bros. 1 Nake tp Water Fumphousell 100 INo Sip ificant Deficiencies 1

100 l

I I

I I

I I

I I

I I

I 226 Slme l Reactor Building i

100 lNo Deficiencles l

]OO l

l l Excavation l

l l

l l

l I

I I

I I

I I

233 B F Shaw l Spray Pond Alteration i 100 lNo Deficiencies ll 100 l

l I

l l

l I

I i

i i

l i Reactor Internals l

l l

l l

235 EI & SE IInstrument Nodifications!

100

[No Significant Deficiencies 1

100 l

l 1

1 I

I I

['

t FIFTEENTH PROGtESS REPORT Attachment IB Page 1 of 4 DEFICIENCY 00CtA4ENT REVIEW StAe4ARY QC - I C(NTRACTS f, GML7i) CLASS-1 SEISMAC-1 SITE DOCLMENTATION SUBICT l-i

%ITE %7 K PE 70RWD TO QVP REVIEW l

F' l

}

PCN PED cwt E04 l

RCC C) 6 RFI l

ICont ract Centractor 1ReviewlStatus+ Review 15tatus+ Reviewl5tatus+ RevleulStatus+1RevievlStatus+ Review 15tatus+ ReviewlStatus+ Reviewf5tatus+1 170p -,teunt-Erickson

-i Yes j 7

E I 7

E l

7 Yes l 7

l E l

7 Yes I 7

Yes I 11 Yes I 7 l

-i 206* 18evee-Cra11 I Yes !

-7 l E l 7 l Yes l 7-l Yes. l 7 l Yes I 7 l Yes I 7 I Yes I 11 l E l 7 l l 206A* IPeter Kienit Sons' l Yes I 7 l Yes l 7 l E l 7 l Yes l 7 l Yes l 7 l Yes l 7 l Yes l 11 I Yes l 7 l l 207* iPittsburgh-Des Moines ! Yes l 7 I Yes l 7 I Yes I 7 l Yes l 7 l Yes ] 7 l Yes l 7 l Yes l 11 l Yes l 7 l 8 209' lLampson Inc l Yes l 7 1 D l 7 l E l 7 l Yes.l

-7 l Yes l 7 l Yes l 7 l 0 l 7 I D l 7 I I 210* lPcter Kiewit Sons' l Yes' l 7 l Yes l 7 l E l 7 l Yes l 7 l Yes j 7 l Yes I 7 l Yes i 11 l Yes l 7 l l 210A l Peter Kiewit Sons' l Yes ! 7 i B l 7 l B l 7 l Yes l 7 l E l 7 l Yes j 7 l B l 7 l B l 7 l l 6426* !Wr17t Schuchart Harbor l Yes ] 7 l E l 7 l Yes l 7 l Yes l 7 l Yes I 7 l Yes l 7 l Yes l 11 l Ves I 7 l l 213* lPJ*.tsburgh-Des t*aines ! Yes l 7 1'Yes l 7-1 E l

'7 l Yes I 7 l Yes l 7 l Yes l 7 l Yes l 11 l Yes ] 7 l

.I 2DA* !?lttstntrgh-Des Moines I Yes [ 7 l Yes l 7 I E l 7 l Yes I 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 l 1 215 lK:i/Roccon/CERI l Yes I 7 l Yes ]

7.

l F l 7 l Yes l 7 l F l 7 l Yes - l 7 l Ves.l 11 l Yes I 11 l l 216 lWalcinger l Yes l 7 l Yes l 7 l F l 7 I Yes. l 7 l F l 7 l Yes ! 7 I Yes l

11. l Yes j 7 l 4 217 l Sentry l Yes ! 7 l Yes l 7 ] F l 7 l Yes l 7 l F l 7 l Yes-l 7 l Yes I 11 l Yes l 7 l l 218 lFischbech/ Lord 1 Yes ! 7 l Yes l 7 l F l 7 l Yes l 7 l F.

l 7 l Yes l 7 l Yes l 11 l Yes l 7 l

! 219 l0.B. Cannon 1 Yes l 7 j Yes l 7 l F l 7 l Yes l 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 i

! 720 l Johnson Controls

! Yes ! 7 l Yes l 7 l F l 7 l Yes l 7 l F l 7 l Yes l 7 l Yes l 11 l Yes l 7 l l 221* l Pacific Testing Labs j Yes l 7 l E l 7 l Yes j 7 l Yes ] 7 l Yes ] 7 l Yes l 7 l Yes j 11 l Yes l 7 l l 22iA l Pacific Testing Labs l Yes l 7 l D l 7 l E l 7 l Yes l 7 l E l 7 l Yes ! 7 l D l 7 l D l 7 l l 225* IMcMillan Brothers l Yes l 7 l D l 7 l E l 7 l Yes ] 7 l Yes l 7 i Yes l 7 l Yes l 11 l Ves l'

7 l l 126 l$1ae f'ontruction Co.

I Yes l 7 l E l 7 l E l 7 l Yes l 7 i E l 7 I Yes I 7; I Yes I 7 l E l 7 l 1 233* lDF 31aw I Yes l 7 l Yes l 7 l Yes l 7 I Yes l 7 l Yes l 7 l Yes l 7,

l Yes l 11 l Yes l 7 l l 234 10.B. Cennon i Yes I 7 l Yes i 7 l E l 7 l Yes I 7 l E l 7 l Yes l 7 l Yes _ l 11 l Yes l 7 l 4 235 (CE IS4E l Yes I 7 1 0 1 7 l E I 7 I Yes l 7

I E l 7 I Ves I 7 l D l 7 1 D I 7 l I

NOTES:

LETM):

A 7 Review nat commenced PO4 - Project Change Notice i

B - No QC-I Work performed prior to 7/f6 PED - Project Engineering Directive C - Special Review NCR - Nanconformance Report 0 - tb QC-1 or UC-II/SC-1 Docunentation closed prior to 7/80 RFI - Request For In'ormation E - Document not used for this contr. set ECN - Engineering Change Notice F - Document reviewed under CAR 1475 CNR - Contractor Walver Request

  • - Denotes Inactive Contract RCC - Request for Contract Change

- Pkmbers indicate action in Flow Cheat, Page 4 C.O. - Change Order

+

s

rIFTEENTH PR0 MESS REPORT Attachmen.t IB Page 2 of 4 DEFICIENCY DOCLMENT REVIEW TASK NONCONFGWANCE REPORT (NCR)

REVIEW SIM44tY 7

l l

l l 00CLMENTS l

l l

l l 10. OF Nm'S l l IDENTIFIED l CLARIFICATION l l

l (DNTRACT l CLOSED PRIM l l REQUIRING l PROVIDED -

l (DN E ACT l CONTRACTOR I

ACTIVITY l

TO 7/80 l S44R.E l CLARIFICATION l Nm CLEARED l

REMARMS 205*

l Stew-Erikson i Rx Bldg. Substructure i

31 1

4 1

0 l

~

206*

I Bovee-Crall l General Construction 1

417 l

42 1

0 l

l 206A* l Peter Kiewit Sons' l Arch. Construction 1

387 l

39 I

4 1

4 l

l l

1 1

I I

l 207' l Pittsburgh-Des l

l l

l l

l l Molnes Steel Co.

I Structural Steel l

32 l

3 1

1 l

1 1

209' I Lampson Inc.

l Rigging of Reactor Pressure l l

l l

l l

1 Vessel 1

2 1

0 1

I l

21 0*

l Peter Kiewit Sons' l Arch. Construction Al l

5 l

0 l

l 210A I Peter Kiewit Sons' l Arch. Construction' l

A I

A l

l l

6426*

I wright Schuchart i

l l

l l

l l Harbor i Interim General Construction l 113 l

11 1

0 l

l 213' l Pittsburgh-Des l

l l

l l

l l Moines Steel Co.

1 Primary Cont Vessel l

104 I

10 1

1 l

1 l

J 213A' l Pittsburgh-Des l

l l

l l

l l Moines Steel Co.

I Primary Cont Vessel Retrofit l 75 l

10 l

1 1

1 1

215 l WSH/Boecon/GERI l Mechanical Construction l

1016 l 126 l

11 l

11 I

216 l Waldinger l HVAC, Plunbing l

422 1

49 l

15 l

15 1

g 217 l Sentry l Fire Protection 1

3 l

1 1

0 l

l 218 i Fischbach/ Lord l Electrical Construction l

375 l

37 l

6 l

6 l

219 1 0.B. Camon l Special Coatings l

13 1

2 1

0 1

l 270 l M oson Controls l Instrumentation l

27 1

3 1

0 l

l 221' l Pacific Testing Labl Testing l

6 l

1 1

0 l

l 221A l Pacific Testing Labi Testing l

A l

A l

l l

225*

I McMillan Brothers l Makeup Water Pump House 1

24 l

2 l

1 l

1 l

233*

l BF Shaw l Spray Pond Alterations l

4 1

1 1

0 l

1 J

234 1 0.B. Camon I Wetwell Coating l

4 l

1 1

0 l

l 235 l CE IS&E l I&C Board Modification I

B l

B l

1 1

I I

l l

l 1

l l

l l

3096 1 347 I

40 l

40 l

  • Inactive Site Contract A: No QC-1 NCR's closed prior to 7/80

.r O

^

r1FTEENTH FR0 MESS RER)RT Attachment IB Page 3 of 4 DEFICIENCY 00CtMENT REV!cW SlM4ARY QC - 1 CDNTRACTS

'l GJALITY CLASS-1 SE1941C-I l

CONTRACTm 00CtDENTAIION l

l SITE WORK ERFORIED l

StBJECT TO QVP REVIEW l

l l

INTERNAL DOCl#ENTS l

l Contract l Contractor 1 DD e Review Status +

D(D Review Status +1 1

205*

l Stewart-Erickson l Nm l Yes

, Complete None

'Completel l

206*

I Bovee-Crall l IR l Yes ICompletel Nm l Yes lCongletel 1

206e l Peter V!ewit Sons' l IR l Yes 1

6 i None 1 I

l l

207*

l Pittsburgh-Des Nolnes l

l Yes ICompletel I Yes (Congletel i

209*

l Lampson Inc l

l D lCompletel I

D ICompletel l

210' I Peter Kiewit Sons' l IR l Yes lCompletel None 1 lCompletel l 21DA l Peter Klewit Sons' l N/A l B lCompletel N/A l B lCompletel

! 6426' l Wright Schuchart Harbor l IR l Yes lCompletel IR l Yes lCongletel i

213*

I Pittsburgh-Des Nolnes l CMt I Yes lCompletel ECAR l Yes l'ongletel l

213A* 1 Pittsburgh-Des Nolnes l CAR l Yes ICompletel ECAR l Yes IOompletel l

215 i WSH/Boecon/GERI l IR l Yes lCompletel Fm l

.C ICompletel i

216 l Waldinger l DR I Yes ICongletel DR I Yes lCompletel -

l 217 1 Sently l IR l D lCompletel IR l D 10ampletel l

218 l Fischbach/ Lord l IR l Yes lCompletel IR l Yes lCompletai l

219 i O.0. Camon l IR l Yes ICompletel None l lCompletel l

2'20 l Johnson Controls 1

221*

l Pacific Testing Labs l ISR l Yes (Congletel JRN l. Yes ICompletel l

l Yes ICompletel l Yes ICompletel 1

221A 1 Pacific Testing Labs l

l D

lCompletel l D lCongletel l

225*

) NcNillan Brothers l ICL l Yes l

6 l

C#t I Yes 1

5 l

226 l Slee Construction Company l

l Yes 1

6 l

l Yes l

3 l

l 233*

l BF Shaw l

l Yes l

5 l None 1 l Complete l l

234 1 0.B. Cannon l IR l Yes ICongletel None l lCompletel i

235 l T IS&E I ml Yes 1

6 l None !

ICompletel NOTES:

LEEPO:

A - Review not courenced IR - Inspection Report 6 - No QC-1 Work performed prior to 7/80 CAR - Corrective Action Report C - Special Review DR - Deficiency Report 0 - No QC-I or QC-II/SC-1 Documentation closed prior to 7/80 ISR - Inspection Surveillance Report DD - Deficiency Document m - Quality Report O(D - DPsigi Change Document

- Denotes insetive Contract ECAR - Engineering Corrective Action Report-F m - Field Change Request

- Nunbers indicate action in Flow Chart, Page 4 JFRN - Johnson Controls Field Request Notice

+

ATTACHMENT 1B '.'

Paga 4 of 4 FIFTEENTH PROGRESS REPORT FLOW CHART FOR REVIEW 0F CONTRACTOR INTERNAL DOCUMENTATION 7

Write Report s-d b

1 2

3 4

5 6

11 1

Coordinator A Checklist --) Procedural A Logbook A Sample Decision Wri te Interface Interview Review Review Review To Report Sample r

g V

l f

Yes.

No s

A

\\

i 10 i

8 9

Decision l

Docurent Y

Review To

[

Selection Increase

_ s Sample jg

~

Iw Yes

=;-

\\

l i

l

.-