ML20054M068: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot insert)
 
(StriderTol Bot change)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML20054M068
| number = ML20054M068
| issue date = 07/06/1982
| issue date = 07/06/1982
| title = Advises That Unrevised 821130 Date for Having Second Senior Reactor Operator on Shift Per NUREG-0737,Items I.A.1.3.2 & III.A.1.2 Was Inadvertently Placed in Util 820609 Ltr,In Response to Generic Ltr 82-10.Correct Date Is 830601
| title = Advises That Unrevised 821130 Date for Having Second Senior Reactor Operator on Shift Per NUREG-0737,Items I.A.1.3.2 & III.A.1.2 Was Inadvertently Placed in Util ,In Response to Generic Ltr 82-10.Correct Date Is 830601
| author name = Bayne J
| author name = Bayne J
| author affiliation = POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
| author affiliation = POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:_ _ - _ _
{{#Wiki_filter:...
                                                            .4
.4 POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMeus CIRCLE NEW YORK. N. Y.10019 (212) 397.6200 GEORGE T. BERRY ortnavina orrecen TRUSTEES a cuY VE v cE g a u g
* POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMeus CIRCLE     NEW YORK. N. Y.10019 (212) 397.6200               GEORGE T. BERRY TRUSTEES                                                                        ortnavina orrecen a cuY VE v cE g a u g G EORGE L. ING ALLS
:w = = t*"" "
:w = = t*"" "
vic t cwainMAN                                                             JOSEPH R. SCHMiEDER suscuYevs vics
G EORGE L. ING ALLS vic t cwainMAN JOSEPH R. SCHMiEDER suscuYevs vics July 6, 1982
      "'C"^"" " '' " "                                                July 6, 1982       ."E '"?***'"
."E '"?***'"
RoRERTi uiLLONz'                                                 JPN-82-60     LEROY W. SWCLAIR rREDERicic R. cLARic                                                                  ,
"'C"^""
                                                                                                , 'r'i' .I='c7a'E"*'
RoRERTi uiLLONz' JPN-82-60 LEROY W. SWCLAIR "c"[.,", r'i.I='c7a'E"*'
                                                                                          "c"[.,",
rREDERicic R. cLARic
                                                                                      "  " a t'v"E n..,-       ,
" a t'v"E n..,-
Director of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C.                 20555 Attention:                 Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing
Director of Nuclear Reactor Regulation U.S.
Nuclear Regulatory Commission Washington, D.C.
20555 Attention:
Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing


==Subject:==
==Subject:==
James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 Post-TMI Requirements Additional Information in Response to Generic Letter No. 82-10
James A.
FitzPatrick Nuclear Power Plant Docket No. 50-333 Post-TMI Requirements Additional Information in Response to Generic Letter No. 82-10


==References:==
==References:==
: 1.               NRC letter,   D.G. Eisenhut tv All Licensees of Operating Power Reactors, dated May 5, 1982
1.
: 2. PASNY letter,   J.P. Bayne to D.B. Vassallo, dated June 9,     1982 (JPN-82-50)
NRC letter, D.G.
Eisenhut tv All Licensees of Operating Power Reactors, dated May 5, 1982 2.
PASNY letter, J.P.
Bayne to D.B.
: Vassallo, dated June 9, 1982 (JPN-82-50)


==Dear Sir:==
==Dear Sir:==
 
Reference 1 requested the status or schedule of certain NUREG-0737 post-TMI requirements.
Reference 1 requested the status or schedule of certain NUREG-0737 post-TMI requirements. The Power Authority responded to this request in Reference 2. Reference 2 consists of a letter summarizing the Authority's response and an enclosure which provides detailed information.
The Power Authority responded to this request in Reference 2.
Reference 2 consists of a letter summarizing the Authority's response and an enclosure which provides detailed information.
The Authority's response addressed the requirements for Minimum Shift Crew and Staffing Levels for Emergency Situations -
The Authority's response addressed the requirements for Minimum Shift Crew and Staffing Levels for Emergency Situations -
NUREG-0737 Items I.A.l.3.2 and III.A.l.2. The enclosure of Reference 2 stated that a second SRO would be placed on shift by June 1, 1983 and provided detailed justification for this revised date. However, the unrevised November 30, 1982 date, for having a second SRO on shift, was inadvertently placed in the summarizing letter of Reference 2.
NUREG-0737 Items I.A.l.3.2 and III.A.l.2.
The enclosure of Reference 2 stated that a second SRO would be placed on shift by June 1, 1983 and provided detailed justification for this revised date. However, the unrevised November 30, 1982 date, for having a second SRO on shift, was inadvertently placed in the summarizing letter of Reference 2.
OY nrmn*aa8%
OY nrmn*aa8%
P
P


                                                                                                                                      .s i             .                                                                                                              ,
.s i
e j
e j
9 i
9 i
This is to inform you that the revised date of June 1, 1983, as stated in the enclosure of Reference 2, is the correct date.
This is to inform you that the revised date of June 1,
i If you have any further questions, please contact !!r. J.A.
: 1983, as stated in the enclosure of Reference 2, is the correct date.
i If you have any further questions, please contact !!r.
J.A.
Gray, Jr. of my staff.
Gray, Jr. of my staff.
  .                                                                                                                                      Very truly yours, J
Very truly yours, J
J P. Bayne enior Vice President I
J P.
Bayne enior Vice President I
Nuclear Generation 1
Nuclear Generation 1
                            . State of New York F
. State of New York F
Coun,,;ty:u 0CJ.N.ew York           -
Coun,,;ty:u 0CJ.N.ew York
                                  . Notary Puba:. S2 c .. ..u , s..
. Notary Puba:. S2 c..
..u, s..
No. 30 474n329 Qualifie<lin Nassau County Commission Expires March 30,19U
No. 30 474n329 Qualifie<lin Nassau County Commission Expires March 30,19U
                            -Subscribed and sworn to before me this day y9 of June 1982
-Subscribed and sworn to before me this day y9 of June 1982
                                                                      /
/
tytarg Public l                             cc:               Mr. J. Linville.
tytarg Public l
;                                                Resident Inspector i
cc:
U.S. Nuclear Regulatory Commission
Mr.
;                                                P.O. Box 136
J.
;                                                Lycoming, New York 13093 fir . Ron Barton l                                               United Engineers & Constructors, Inc.
Linville.
!                                                30 S. 17th Street Philadelphia, PA 19101 i
Resident Inspector i
U.S.
Nuclear Regulatory Commission P.O.
Box 136 Lycoming, New York 13093 fir. Ron Barton l
United Engineers & Constructors, Inc.
30 S.
17th Street Philadelphia, PA 19101 i
i l
i l
4 1
4 1
4 1
4 1
i
i
      ._._ ._ _ , . . , _ . . - . _ . _ _ _ . _ _ . - . _ . . . _ . _ . . . - , . _ . _ , . , _ . , _ . _ . _ . - . - , . _ , _ . -                              . _._ _. _ , .}}
. _._ _. _,.}}

Latest revision as of 16:39, 17 December 2024

Advises That Unrevised 821130 Date for Having Second Senior Reactor Operator on Shift Per NUREG-0737,Items I.A.1.3.2 & III.A.1.2 Was Inadvertently Placed in Util ,In Response to Generic Ltr 82-10.Correct Date Is 830601
ML20054M068
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 07/06/1982
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Vassallo D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-3.A.1.2, TASK-TM GL-82-10, JPN-82-60, NUDOCS 8207090212
Download: ML20054M068 (2)


Text

...

.4 POWER AUTHORITY OF THE STATE OF NEW YORK 10 COLUMeus CIRCLE NEW YORK. N. Y.10019 (212) 397.6200 GEORGE T. BERRY ortnavina orrecen TRUSTEES a cuY VE v cE g a u g

w = = t*"" "

G EORGE L. ING ALLS vic t cwainMAN JOSEPH R. SCHMiEDER suscuYevs vics July 6, 1982

."E '"?***'"

"'C"^""

RoRERTi uiLLONz' JPN-82-60 LEROY W. SWCLAIR "c"[.,", r'i.I='c7a'E"*'

rREDERicic R. cLARic

" a t'v"E n..,-

Director of Nuclear Reactor Regulation U.S.

Nuclear Regulatory Commission Washington, D.C.

20555 Attention:

Mr. Domenic B. Vassallo, Chief Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A.

FitzPatrick Nuclear Power Plant Docket No. 50-333 Post-TMI Requirements Additional Information in Response to Generic Letter No. 82-10

References:

1.

NRC letter, D.G.

Eisenhut tv All Licensees of Operating Power Reactors, dated May 5, 1982 2.

PASNY letter, J.P.

Bayne to D.B.

Vassallo, dated June 9, 1982 (JPN-82-50)

Dear Sir:

Reference 1 requested the status or schedule of certain NUREG-0737 post-TMI requirements.

The Power Authority responded to this request in Reference 2.

Reference 2 consists of a letter summarizing the Authority's response and an enclosure which provides detailed information.

The Authority's response addressed the requirements for Minimum Shift Crew and Staffing Levels for Emergency Situations -

NUREG-0737 Items I.A.l.3.2 and III.A.l.2.

The enclosure of Reference 2 stated that a second SRO would be placed on shift by June 1, 1983 and provided detailed justification for this revised date. However, the unrevised November 30, 1982 date, for having a second SRO on shift, was inadvertently placed in the summarizing letter of Reference 2.

OY nrmn*aa8%

P

.s i

e j

9 i

This is to inform you that the revised date of June 1,

1983, as stated in the enclosure of Reference 2, is the correct date.

i If you have any further questions, please contact !!r.

J.A.

Gray, Jr. of my staff.

Very truly yours, J

J P.

Bayne enior Vice President I

Nuclear Generation 1

. State of New York F

Coun,,;ty:u 0CJ.N.ew York

. Notary Puba:. S2 c..

..u, s..

No. 30 474n329 Qualifie<lin Nassau County Commission Expires March 30,19U

-Subscribed and sworn to before me this day y9 of June 1982

/

tytarg Public l

cc:

Mr.

J.

Linville.

Resident Inspector i

U.S.

Nuclear Regulatory Commission P.O.

Box 136 Lycoming, New York 13093 fir. Ron Barton l

United Engineers & Constructors, Inc.

30 S.

17th Street Philadelphia, PA 19101 i

i l

4 1

4 1

i

. _._ _. _,.