{{#Wiki_filter:
{{#Wiki_filter:V
'
# '
U. S. NUCLEAR REGULATORY COMMISSION
 
==REGION V==
Report No. 50-133/82-02 (IE-V-506)
Docket No. 50-133 License No. DRR-7 Safeguards Group Licensee:
Pacific Gas & Electric Company 77 Beale Street San Francisco, California 94106 Facility Name:
Humboldt Bay Power Plant Inspection at:
Eureka, California Inspection Conducted: June 21-24, 1982 Date of Last Physical Security Inspection Visit: April 6-9,'1981 Type of Inspection:
Routine Physical Protection 87!8/[d Inspectors:
M C. A. Schwan, Physical
)rotection Inspector Date Signed Approved by: @ 7 b I
/ao
 
J7 M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:
Areas Ins 3ected: Follow-up on Noncompliance; Follow-up on IE Information
' Notices; Follow-up on Previous Inspection Findings; Site Orientation; Security Plan and Procedures; Security Organization Security Program Audit; Records and Reports; Testing and Maintenance; Locks and Keys; Physical Barriers; Security System Power Supply; Lighting; Assessment Aids; Access Controls; Detection Aids; Alarm Stations; Conmunications;.and Independent Effort. The inspection involved 22 inspector hours onsite by one NRC inspector.
 
Of the total' inspection hours, 2 were
'
conducted during non-regular hours.
 
Results: The licensee was found to be in compliance within the 19 areas inspected.
 
ENCLOSEE CONTAINS SAFEGUARDS INPORMATION.
 
UPON SEPARATION THIS PAGE IS DECONTROIJED.
 
8207270038 820702 PDR ADOCK 05000133 G
PDR
}}
}}

Latest revision as of 10:12, 17 December 2024

IE Safeguards Insp Rept 50-133/82-02 on 820621-24.No Noncompliance Noted.Major Areas Inspected:Security Plan & Procedures,Security Organization & Program Audit Records, & Locks & Keys.Details Withheld (Ref 10CFR73.21)
ML20058D173
Person / Time
Site: Humboldt Bay
Issue date: 07/01/1982
From: Schuster M, Schwan C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20058D153 List:
References
50-133-82-02, 50-133-82-2, NUDOCS 8207270038
Download: ML20058D173 (1)


Text

V

'

  1. '

U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-133/82-02 (IE-V-506)

Docket No. 50-133 License No. DRR-7 Safeguards Group Licensee:

Pacific Gas & Electric Company 77 Beale Street San Francisco, California 94106 Facility Name:

Humboldt Bay Power Plant Inspection at:

Eureka, California Inspection Conducted: June 21-24, 1982 Date of Last Physical Security Inspection Visit: April 6-9,'1981 Type of Inspection:

Routine Physical Protection 87!8/[d Inspectors:

M C. A. Schwan, Physical

)rotection Inspector Date Signed Approved by: @ 7 b I

/ao

J7 M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:

Areas Ins 3ected: Follow-up on Noncompliance; Follow-up on IE Information

' Notices; Follow-up on Previous Inspection Findings; Site Orientation; Security Plan and Procedures; Security Organization Security Program Audit; Records and Reports; Testing and Maintenance; Locks and Keys; Physical Barriers; Security System Power Supply; Lighting; Assessment Aids; Access Controls; Detection Aids; Alarm Stations; Conmunications;.and Independent Effort. The inspection involved 22 inspector hours onsite by one NRC inspector.

Of the total' inspection hours, 2 were

'

conducted during non-regular hours.

Results: The licensee was found to be in compliance within the 19 areas inspected.

ENCLOSEE CONTAINS SAFEGUARDS INPORMATION.

UPON SEPARATION THIS PAGE IS DECONTROIJED.

8207270038 820702 PDR ADOCK 05000133 G

PDR