                                                                            - .-        :: -                :                  '.  :- ::    Y-1 APPENDIX A
Y-1 APPENDIX A
,                ,                                                , NOTICE OF VIOLATION J
, NOTICE OF VIOLATION J
Long Island Lighting Company                               Docket No. 50-322 i*-
Long Island Lighting Company Docket No. 50-322 This refers to the inspection conducted by representatives of the Region i*-
This refers to the inspection conducted by representatives of the Region I (Philadelphia) office at the Shoreham Nuclear Power Station, Shoreham,
I (Philadelphia) office at the Shoreham Nuclear Power Station, Shoreham, New York, of activities authorized by NRC Construction Permit CPPR-95.
            .                    New York, of activities authorized by NRC Construction Permit CPPR-95.
1 During this inspection conducted on August 8-11, 1978 the following
1                       During this inspection conducted on August 8-11, 1978 the following
- 4 l
-4               l               apparent items of noncompliance were identified.
apparent items of noncompliance were identified.
I I.
I.
10 CFR 50, Appendix B, Criterion IX requires that welding be accom-plished using qualified procedures in accordance with' applicable
I 10 CFR 50, Appendix B, Criterion IX requires that welding be accom-plished using qualified procedures in accordance with' applicable
{                                           codes and gecifications.
{
              .j                            The Shoreham Nuclear Power Station FSAR, Chapter 17, Paragraph
codes and gecifications.
                  '    fsI                  17.1.9 B, states, in part: "The S&W Quality Assurance Program...                                       {
The Shoreham Nuclear Power Station FSAR, Chapter 17, Paragraph
provides assurance that approved special process procedures are                                       '
.j 17.1.9 B, states, in part: "The S&W Quality Assurance Program...
used ... in accordance with specified codes...(and) requires that special process controls... be imposed by specification..."
{
fsI provides assurance that approved special process procedures are used... in accordance with specified codes...(and) requires that special process controls... be imposed by specification..."
The S&W specification SH1-327, Radial Beam and Pipe Break Restraint Installation, states, in part: " all welding shall conform to the Structural Welding Code AWS Dl.1."
The S&W specification SH1-327, Radial Beam and Pipe Break Restraint Installation, states, in part: " all welding shall conform to the Structural Welding Code AWS Dl.1."
The Structural Welding Data Sheet for the pipe break restraints FWR 1, 2, and 15 directs that the welding is to be performed in accordance with Welding Procedure Technique Sheet W70H(0), which, in turn, i                         states that, "This procedure is prequalified in accordance with AWS D1.1-72."
The Structural Welding Data Sheet for the pipe break restraints FWR 1, 2, and 15 directs that the welding is to be performed in accordance with Welding Procedure Technique Sheet W70H(0), which, in turn, i
The AWS Structural Welding Code D1.1, paragraph 2.9 limits the weld
states that, "This procedure is prequalified in accordance with AWS D1.1-72."
                        -                  joint angle for single-bevel-groove welds to 45' minimum.
The AWS Structural Welding Code D1.1, paragraph 2.9 limits the weld joint angle for single-bevel-groove welds to 45' minimum.
C
-C
            ,'j                           Contrary to the above, on August 9,1978, the single-bevel-groove weld joint angles for pipe break restraints FWR 1, 2, and 15 were
,'j Contrary to the above, on August 9,1978, the single-bevel-groove weld joint angles for pipe break restraints FWR 1, 2, and 15 were
:4                                   30*.
:4 30*.
This is an infraction.
This is an infraction.
II.       10 CFR 50, Appendix B, Criterion V, states, in part: " Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings... and shall be accomplished in accordance with these instructions, procedures, or drawings."
II.
10 CFR 50, Appendix B, Criterion V, states, in part:
" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings... and shall be accomplished in accordance with these instructions, procedures, or drawings."
d
d


                                                                                                      ~
~
                    }=        .:                                                                ; _ -b- b rz- ;--
_ -b-b rz- ;--
j Appendix A                           2 1
}=
The Shoreham Nuclear Power Station FSAR, Chapter 17, paragraph 17.1.5B., states, in part: "The S&W Quality Assurance Program...
Appendix A 2
j 1
The Shoreham Nuclear Power Station FSAR, Chapter 17, paragraph 17.1.5B., states, in part:
"The S&W Quality Assurance Program...
requires that quality activities are based on engineering specif-ications... (and) these documents indicate... the applicable codes..."
requires that quality activities are based on engineering specif-ications... (and) these documents indicate... the applicable codes..."
      ~
~
The S&W engineering specification SH1-24, Specification for Shop Fabricated Piping, requires that code class 3 piping systems be
The S&W engineering specification SH1-24, Specification for Shop Fabricated Piping, requires that code class 3 piping systems be designed, fabricated, and inspected in accordance with the ASME III
        ~                                designed, fabricated, and inspected in accordance with the ASME III i                       Code, edition 1971 with Winter 1972 addenda, f
~
Pipe spools 1821-SLP-203-1 and 1821-SLB-211-3-1 are 10-inches
i Code, edition 1971 with Winter 1972 addenda, f
                ;                        diameter standard weight pipe, Class 3. For these, paragraph i                         ND3661.1 of the ASME III Code requires slip-on flange front
Pipe spools 1821-SLP-203-1 and 1821-SLB-211-3-1 are 10-inches diameter standard weight pipe, Class 3.
                ;                        weld size (inside diameter) to be 1/4 inch and back weld 1
For these, paragraph i
size (outside diameter) to be 0.511 inch.
ND3661.1 of the ASME III Code requires slip-on flange front weld size (inside diameter) to be 1/4 inch and back weld size (outside diameter) to be 0.511 inch.
(")             Contrary to the above, on August 9,1978, the front weld (inside diameter) size on pipe spool slip-on flange 1821-SLP-211-3-1 was less than 1/4 inch. The back weld (outside diameter) size on pipe spool slip-on flanges 1821-SLP-211-3-1 and 1821-SLP-203-3-1 was less than 3/8 inch.
1
(")
Contrary to the above, on August 9,1978, the front weld (inside diameter) size on pipe spool slip-on flange 1821-SLP-211-3-1 was less than 1/4 inch. The back weld (outside diameter) size on pipe spool slip-on flanges 1821-SLP-211-3-1 and 1821-SLP-203-3-1 was less than 3/8 inch.
This item is an infraction.
This item is an infraction.
i l
i l
:          s-l         (-)
s-l
          ~!
(-)
~!
t 1
t 1
t
t
                    **            "~
"~
                                                                              ~T           ~ - ' "
~T
                                                                                                                  ~m m.y--..!w   .}}
~ - ' "
~m m.y--..!w
.}}

Latest revision as of 00:01, 17 December 2024

Notice of Violation from Inspec on 780808-11
ML20062C831
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 08/30/1978
From: Robert Carlson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20062C822 List:
References
50-322-78-12, NUDOCS 7811140243
Download: ML20062C831 (2)


Text

.

Y-1 APPENDIX A

, NOTICE OF VIOLATION J

Long Island Lighting Company Docket No. 50-322 This refers to the inspection conducted by representatives of the Region i*-

I (Philadelphia) office at the Shoreham Nuclear Power Station, Shoreham, New York, of activities authorized by NRC Construction Permit CPPR-95.

1 During this inspection conducted on August 8-11, 1978 the following

- 4 l

apparent items of noncompliance were identified.

I.

I 10 CFR 50, Appendix B, Criterion IX requires that welding be accom-plished using qualified procedures in accordance with' applicable

{

codes and gecifications.

The Shoreham Nuclear Power Station FSAR, Chapter 17, Paragraph

.j 17.1.9 B, states, in part: "The S&W Quality Assurance Program...

{

fsI provides assurance that approved special process procedures are used... in accordance with specified codes...(and) requires that special process controls... be imposed by specification..."

The S&W specification SH1-327, Radial Beam and Pipe Break Restraint Installation, states, in part: " all welding shall conform to the Structural Welding Code AWS Dl.1."

The Structural Welding Data Sheet for the pipe break restraints FWR 1, 2, and 15 directs that the welding is to be performed in accordance with Welding Procedure Technique Sheet W70H(0), which, in turn, i

states that, "This procedure is prequalified in accordance with AWS D1.1-72."

The AWS Structural Welding Code D1.1, paragraph 2.9 limits the weld joint angle for single-bevel-groove welds to 45' minimum.

-C

,'j Contrary to the above, on August 9,1978, the single-bevel-groove weld joint angles for pipe break restraints FWR 1, 2, and 15 were

4 30*.

This is an infraction.

II.

10 CFR 50, Appendix B, Criterion V, states, in part:

" Activities affecting quality shall be prescribed by documented instructions, procedures, or drawings... and shall be accomplished in accordance with these instructions, procedures, or drawings."

d

~

_ -b-b rz- ;--

}=

Appendix A 2

j 1

The Shoreham Nuclear Power Station FSAR, Chapter 17, paragraph 17.1.5B., states, in part:

"The S&W Quality Assurance Program...

requires that quality activities are based on engineering specif-ications... (and) these documents indicate... the applicable codes..."

~

The S&W engineering specification SH1-24, Specification for Shop Fabricated Piping, requires that code class 3 piping systems be designed, fabricated, and inspected in accordance with the ASME III

~

i Code, edition 1971 with Winter 1972 addenda, f

Pipe spools 1821-SLP-203-1 and 1821-SLB-211-3-1 are 10-inches diameter standard weight pipe, Class 3.

For these, paragraph i

ND3661.1 of the ASME III Code requires slip-on flange front weld size (inside diameter) to be 1/4 inch and back weld size (outside diameter) to be 0.511 inch.

1

(")

Contrary to the above, on August 9,1978, the front weld (inside diameter) size on pipe spool slip-on flange 1821-SLP-211-3-1 was less than 1/4 inch. The back weld (outside diameter) size on pipe spool slip-on flanges 1821-SLP-211-3-1 and 1821-SLP-203-3-1 was less than 3/8 inch.

This item is an infraction.

i l

s-l

(-)

~!

t 1

t

"~

~T

~ - ' "

~m m.y--..!w

.