ML20065D894: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 19: Line 19:
p Aus p405 O NRR -
p Aus p405 O NRR -
y' l
y' l
i                                             -
i 14, 1990 1
1
September
:                                            September 14, 1990
.l l'
  <                        .l l'                             l L
l L
j                                                                         .
j U. S. Nuclea'r Regulatory Commission Document Control. Desk
                              !  U. S. Nuclea'r Regulatory Commission
{ Washington, D. C. 20555 I
* Document Control. Desk
1l  
{ Washington, D. C. 20555
,                            I l-                          1l  


==Reference:==
==Reference:==
Oregon State University TRIGA Reactor (OSTR),
Oregon State University TRIGA Reactor (OSTR),
l
l-l Docket No. 50-243, License No. R-106
:                Docket No. 50-243, License No. R-106
]
            ]       {l     ;
{ l


==Subject:==
==Subject:==
 
Operator Licensing Examination Schedule (Generic. Letter L
Operator Licensing Examination Schedule (Generic. Letter L                         90-70)
90-70)
Gentleme'i:
Gentleme'i:
OlWN                       As requested in Generic Letter 90-70,. we have enclosed the . form L
l giving our estimated operator ~ licensing examination requireme OlWN As requested in Generic Letter 90-70,. we have enclosed the. form L
,            STrn           l giving our estimated operator ~ licensing examination requireme UNivr asrn         ,
STrn UNivr asrn for the next several years. We anticipate the need for one instant SR0 exam in August 1992,'and one instant'SR0 exam in August'1994.-
for the next several years. We anticipate the need for one instant SR0 exam in August 1992,'and one instant'SR0 exam in August'1994.-
As we are a non-power facil.ity it is our understanding that-the.
4 As we are a non-power facil.ity it is our understanding that-the.
4 naimo. cea'" ^'*
naimo. cea'" ^'*
other information requested with respect 'to the requalification l
                              ,  other information requested with respect 'to the requalification l       con.m .orera         '
con.m.orera examination schedule and the Generic Fundamental Examination l
examination schedule and the Generic Fundamental Examination
Schedule (GFES) is not applicable to us.
            * " "
* Schedule (GFES) is not applicable to us.
l                            ,
1
1
(
(
l l-                           ,
l l-Yours. sincerely,
Yours. sincerely,
{
{
3T#
3T#
l                                                                           A. Dohnson-Direc or
l A.
                            ; AGJ/bd p                             <  cc: Standardization and Non-Power Reactor Project Directorate, i
Dohnson-Direc or
l'                                     Division of Reactor Projects III, IV, V and Special Projects,-
; AGJ/bd p
Office of Nuclear Reactor Projects,; Washington, D. C. 20555-
cc: Standardization and Non-Power Reactor Project Directorate, i
                            ,          ATTN: Mr. Al Adams 1elqhone l
l' Division of Reactor Projects III, IV, V and Special Projects,-
: j.       5"'"""
Office of Nuclear Reactor Projects,; Washington, D. C. 20555-ATTN: Mr. Al Adams 1elqhone l
j.
5"'"""
l Regional Administrator, USNRC, Region V.
l Regional Administrator, USNRC, Region V.
l               rn suom ono                      Oregon Department of Energy, Salem, Oregon l-                           l         ATTN: Mr. D. Stewart-Smith Prof. B. Dodd, Reactor Administrator T. V. Anderson, Reactor Supervisor-0 0 Q' "
l rn Oregon Department of Energy, Salem, Oregon suom ono l-l ATTN: Mr. D. Stewart-Smith Prof. B. Dodd, Reactor Administrator T. V. Anderson, Reactor Supervisor-0 0 Q' "
9010010107 900914                                                                     -
9010010107 900914
'.c       PDR       ADOCK 05000243'                                                               (( [-
'.c PDR ADOCK 05000243'
V                       PNV                                                             /   j
(( [-
V PNV
/
j


              <r .       -7s                                         -
<r.
a 'p w a t
-7s t
Enclosure 1 PROPOSED GPERATOR LICENSlHG EXAHit!ATION SCPltt0LE f0RMAT Oregon State University.
a 'p w a PROPOSED GPERATOR LICENSlHG EXAHit!ATION SCPltt0LE f0RMAT Oregon State University.
FACILITY ,_           Triga Reactor                   NRC' REGION. _y FY 1991.       FY'1992         FY.1993         fY 1994         1
FACILITY,_
('10/1/90-       (10/1/91-         (10/1/92;       (10/1/93 ,
Triga Reactor NRC' REGION.
9/30/91)-       9/30/92)         9/30/93)-       9/30/94) t
_y FY 1991.
: 1.         Assigned           ,
FY'1992 FY.1993 fY 1994 1
Date (GL89-03)     ___
('10/1/90-(10/1/91-(10/1/92; (10/1/93,
                  #RC l.
9/30/91)-
                  #Sh0 Instant                         ,gge-Aua 92                           one-Aug_S4
9/30/92) 9/30/93)-
                  #510 Upgrade 1
9/30/94) t 1.
                  #SR0 Limited                                                                                 1 q
Assigned Date (GL89-03)
: 2.         Assigned Date
#RC l.
                        ;GL89-03)                                                                                 !  .
#Sh0 Instant
                  #RO i
,gge-Aua 92 one-Aug_S4
iSR0 instant                                                                                   ,
#510 Upgrade
tSR0 Upgrade d
#SR0 Limited 1
fSR0 Limited                                                                                 i
1 q
                                                                                                            -:1 Please indicate initial cold license . examinations by placing an asterisk (*) by               4 the date. Please indicate' examinations intended to extend an operator's license-to a second or subsequent unit with-two asterisks (**). _(for example,.if Unit 1:
2.
i; in operation and Unit 2 is approaching fuel load, and:three'R0' candidates                   1 with no previous license are to be examined on both Units 1 and 2, and five RO                       l candidates licensed on Unit I are to be examined to extend their licenses to init 2, then indicate "R0 3,5**.")                                                                   !
Assigned Date
                                                                                                              ]
;GL89-03)
#RO i
iSR0 instant tSR0 Upgrade d
fSR0 Limited i
-:1 Please indicate initial cold license. examinations by placing an asterisk (*) by 4
the date. Please indicate' examinations intended to extend an operator's license-to a second or subsequent unit with-two asterisks (**). _(for example,.if Unit 1:
i; in operation and Unit 2 is approaching fuel load, and:three'R0' candidates 1
with no previous license are to be examined on both Units 1 and 2, and five RO l
candidates licensed on Unit I are to be examined to extend their licenses to init 2, then indicate "R0 3,5**.")
]
i i
i i
                                                                                                              '~.
'~.
l ca}}
l ca}}

Latest revision as of 19:55, 16 December 2024

Responds to Generic Ltr 90-07, Operator Licensing Exam Schedule. Encl Schedule Indicates Need for One Instant Senior Reactor Operator Exam in Aug 1992 & Another in 1994
ML20065D894
Person / Time
Site: Oregon State University
Issue date: 09/14/1990
From: Andrea Johnson
Oregon State University, CORVALLIS, OR
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
GL-89-03, GL-89-3, GL-90-07, GL-90-7, NUDOCS 9010010107
Download: ML20065D894 (2)


Text

~

p Aus p405 O NRR -

y' l

i 14, 1990 1

September

.l l'

l L

j U. S. Nuclea'r Regulatory Commission Document Control. Desk

{ Washington, D. C. 20555 I

1l

Reference:

Oregon State University TRIGA Reactor (OSTR),

l-l Docket No. 50-243, License No. R-106

]

{ l

Subject:

Operator Licensing Examination Schedule (Generic. Letter L

90-70)

Gentleme'i:

l giving our estimated operator ~ licensing examination requireme OlWN As requested in Generic Letter 90-70,. we have enclosed the. form L

STrn UNivr asrn for the next several years. We anticipate the need for one instant SR0 exam in August 1992,'and one instant'SR0 exam in August'1994.-

As we are a non-power facil.ity it is our understanding that-the.

4 naimo. cea'" ^'*

other information requested with respect 'to the requalification l

con.m.orera examination schedule and the Generic Fundamental Examination l

Schedule (GFES) is not applicable to us.

1

(

l l-Yours. sincerely,

{

3T#

l A.

Dohnson-Direc or

AGJ/bd p

cc: Standardization and Non-Power Reactor Project Directorate, i

l' Division of Reactor Projects III, IV, V and Special Projects,-

Office of Nuclear Reactor Projects,; Washington, D. C. 20555-ATTN: Mr. Al Adams 1elqhone l

j.

5"'"""

l Regional Administrator, USNRC, Region V.

l rn Oregon Department of Energy, Salem, Oregon suom ono l-l ATTN: Mr. D. Stewart-Smith Prof. B. Dodd, Reactor Administrator T. V. Anderson, Reactor Supervisor-0 0 Q' "

9010010107 900914

'.c PDR ADOCK 05000243'

(( [-

V PNV

/

j

<r.

-7s t

a 'p w a PROPOSED GPERATOR LICENSlHG EXAHit!ATION SCPltt0LE f0RMAT Oregon State University.

FACILITY,_

Triga Reactor NRC' REGION.

_y FY 1991.

FY'1992 FY.1993 fY 1994 1

('10/1/90-(10/1/91-(10/1/92; (10/1/93,

9/30/91)-

9/30/92) 9/30/93)-

9/30/94) t 1.

Assigned Date (GL89-03)

  1. RC l.
  1. Sh0 Instant

,gge-Aua 92 one-Aug_S4

  1. 510 Upgrade
  1. SR0 Limited 1

1 q

2.

Assigned Date

GL89-03)
  1. RO i

iSR0 instant tSR0 Upgrade d

fSR0 Limited i

-:1 Please indicate initial cold license. examinations by placing an asterisk (*) by 4

the date. Please indicate' examinations intended to extend an operator's license-to a second or subsequent unit with-two asterisks (**). _(for example,.if Unit 1:

i; in operation and Unit 2 is approaching fuel load, and:three'R0' candidates 1

with no previous license are to be examined on both Units 1 and 2, and five RO l

candidates licensed on Unit I are to be examined to extend their licenses to init 2, then indicate "R0 3,5**.")

]

i i

'~.

l ca