ML20065H913: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:. ..
{{#Wiki_filter:...
VIHoINTA ELECTRIC AND POWEH COMPANY RicuMoNu,VinuiNIA 232 61 April 13, 1994 United States Nuclear Regulatory Commission                 Serial No.     93-770 Attention: Document Control Desk                             NL&P/EJW Washington, D.C. 20555                                       Docket No.     50-338 License No. NPF-4 Gentlemen:
VIHoINTA ELECTRIC AND POWEH COMPANY RicuMoNu,VinuiNIA 232 61 April 13, 1994 United States Nuclear Regulatory Commission Serial No.
93-770 Attention: Document Control Desk NL&P/EJW Washington, D.C. 20555 Docket No.
50-338 License No.
NPF-4 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 SECOND TEN-YEAR INTERVt.L INSERVICE INSPECTION PROGRAM REVISION 4 North Anna Unit 1 is presently in the second period of the second ten-year interval.
VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 SECOND TEN-YEAR INTERVt.L INSERVICE INSPECTION PROGRAM REVISION 4 North Anna Unit 1 is presently in the second period of the second ten-year interval.
North Anna Unit 1 examinations have been conducted to the requirements of the 1983 Edition and Summer 1983 Addenda of ASME Section XI.
North Anna Unit 1 examinations have been conducted to the requirements of the 1983 Edition and Summer 1983 Addenda of ASME Section XI.
Line 24: Line 27:
The associated revision (Revision 4) to t' e ISI Program Plan for Components and Component Supports is also provided for your information (Attachment 3). The ISI Program Plan reports the examinations performed and scheduled for the Second inteival.
The associated revision (Revision 4) to t' e ISI Program Plan for Components and Component Supports is also provided for your information (Attachment 3). The ISI Program Plan reports the examinations performed and scheduled for the Second inteival.
If you have any questions concerning this request, please contact us.
If you have any questions concerning this request, please contact us.
Very truly yours, 1   x W. L Stewart Senior Vice President - Nuclear Attachments
Very truly yours, 1
: 1. Summary of Changes to inservice inspection Program
x W. L Stewart Senior Vice President - Nuclear Attachments 1.
: 2. Unit 1 Inservice inspection Program
Summary of Changes to inservice inspection Program 2.
: 3. Unit 1 Inservice Inspection Program Plan 94o4150209 940413                                           i PDR     ADOCK 0500o338
Unit 1 Inservice inspection Program 3.
* O                    PDR                                 \\
Unit 1 Inservice Inspection Program Plan 94o4150209 940413 i
PDR ADOCK 0500o338 O
PDR
{
{
\\\\


V .s
V
                                                      ?
.s
?
I i
I i
cc: (w/ Attachment 1 only)                 ;
cc:
U. S. Nuclear Regulatory Commission     :
(w/ Attachment 1 only)
Region ll -.
U. S. Nuclear Regulatory Commission Region ll -
101 Marietta Street, N. W.
101 Marietta Street, N. W.
Suite 2900                             :
Suite 2900 Atlanta, Georgia 30323 l'l Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station j
Atlanta, Georgia 30323                 l
s i
                                                    'l Mr. R. D. McWhorter                   ;
e i
NRC Senior Resident inspector North Anna Power Station             j s
1 i
i e
~!
i 1
i
                                                  ~!
t
t
                                                    =
=
j.
j.
i l
i l
Line 53: Line 57:
[-
[-
i i
i i
Jl h
Jl h:[-
:[-


l 1
l 1
l h
h North Anna Power Station Unit 1 Summary of Changes to inservice inspection Program y
Attachment 1                      ,
North Anna Power Station Unit 1 Summary of Changes to inservice inspection Program y
I
I
                                                      )
)
h I
h
                                                    .I
.I


g i
g i


==SUMMARY==
==SUMMARY==
OF CHANGES NORTH ANNA UNIT 1 INSERVICE INSPECTION PROGRAM REVISION             4
OF CHANGES NORTH ANNA UNIT 1 INSERVICE INSPECTION PROGRAM REVISION 4
: 1) Changed relief request NDE-5 " Basis for Relief" section from         .i "Two of the North     Anna Power Station Unit 1 reactor coolant'       ;
1)
pumps are ...
Changed relief request NDE-5 " Basis for Relief" section from
to "The North Anna Power Station Unit 1 reactor coolant pumps are   ....
.i "Two of the North Anna Power Station Unit 1 reactor coolant' pumps are to "The North Anna Power Station Unit 1 reactor coolant pumps are All of the Unit i reactor' coolant pumps have casing welds.
                                "  All of the Unit i reactor' coolant pumps have casing welds.                                                       !
2)
: 2) The " Alternative Examination" section of relief request NDE-6           l has been revised to perform a visual examination on one valve           I out of a group of similar valves.           The examination will be     l performed once       an   interval   when one     of the valves is     !
The " Alternative Examination" section of relief request NDE-6 has been revised to perform a visual examination on one valve I
disassembled for maintenance purposes.               This reflects the examination requirements of the 1989 Edition of ASME Section XI.
out of a group of similar valves.
i
The examination will be performed once an interval when one of the valves is disassembled for maintenance purposes.
: 3) Changed the Augmented Inspection Table by removing the requirement for Rockwell Edwards valve examinations.             This inspection program is no longer required.
This reflects the examination requirements of the 1989 Edition of ASME Section XI.
: 4) Changed the Augmented Inspection Table for reactor coolant loop           ,
i 3)
bypass lines, pressurizer spray piping, main steam postulated           l break locations,       and feedwater postulated break locations.
Changed the Augmented Inspection Table by removing the requirement for Rockwell Edwards valve examinations.
Changed "every weld" to " selected welds."       Not every weld within these system descriptions are required to be in the augmented inspection program.
This inspection program is no longer required.
: 5) Added Code Case N-489 to list of ASME Section XI Code Cases incorporated into program.         This Code Case increases the time between Level III recertification from 3 years to 5 years.
4)
                                                                              )
Changed the Augmented Inspection Table for reactor coolant loop bypass lines, pressurizer spray piping, main steam postulated break locations, and feedwater postulated break locations.
: 6) Added relief request NDE-20 which was submitted to the NRC on           l August 5,     1993.     This relief request documents partial examinations from the 1993 refueling outage.                             ;
Changed "every weld" to " selected welds."
: 7) Added relief request SPT-12 which was submitted to the NRC on August 5, 1993.       This relief request allows alternatives to hydrostatic testing following repairs and replacements involving welding.}}
Not every weld within these system descriptions are required to be in the augmented inspection program.
5)
Added Code Case N-489 to list of ASME Section XI Code Cases incorporated into program.
This Code Case increases the time between Level III recertification from 3 years to 5 years.
)
6)
Added relief request NDE-20 which was submitted to the NRC on August 5,
1993.
This relief request documents partial examinations from the 1993 refueling outage.
7)
Added relief request SPT-12 which was submitted to the NRC on August 5,
1993.
This relief request allows alternatives to hydrostatic testing following repairs and replacements involving welding.}}

Latest revision as of 19:41, 16 December 2024

Forwards Rev 4 to North Anna Power Station Unit 1 ISI Program General Second Insp Interval
ML20065H913
Person / Time
Site: North Anna Dominion icon.png
Issue date: 04/13/1994
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20065H916 List:
References
93-770, NUDOCS 9404150209
Download: ML20065H913 (4)


Text

...

VIHoINTA ELECTRIC AND POWEH COMPANY RicuMoNu,VinuiNIA 232 61 April 13, 1994 United States Nuclear Regulatory Commission Serial No.93-770 Attention: Document Control Desk NL&P/EJW Washington, D.C. 20555 Docket No.

50-338 License No.

NPF-4 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 SECOND TEN-YEAR INTERVt.L INSERVICE INSPECTION PROGRAM REVISION 4 North Anna Unit 1 is presently in the second period of the second ten-year interval.

North Anna Unit 1 examinations have been conducted to the requirements of the 1983 Edition and Summer 1983 Addenda of ASME Section XI.

The first period of the second interval ended on December 24,1991. The Virginia Power Inservice inspection (ISI) Manual has been revised requiring changes to be submitted for the ISI Program following completion of the first period. Revision 4 to the ISI Program is hereby submitted (Attachment 2) as required by 10 CFR 50.55a(g}. A summary of the changes is attached (Attachment 1).

The associated revision (Revision 4) to t' e ISI Program Plan for Components and Component Supports is also provided for your information (Attachment 3). The ISI Program Plan reports the examinations performed and scheduled for the Second inteival.

If you have any questions concerning this request, please contact us.

Very truly yours, 1

x W. L Stewart Senior Vice President - Nuclear Attachments 1.

Summary of Changes to inservice inspection Program 2.

Unit 1 Inservice inspection Program 3.

Unit 1 Inservice Inspection Program Plan 94o4150209 940413 i

PDR ADOCK 0500o338 O

PDR

{

\\\\

V

.s

?

I i

cc:

(w/ Attachment 1 only)

U. S. Nuclear Regulatory Commission Region ll -

101 Marietta Street, N. W.

Suite 2900 Atlanta, Georgia 30323 l'l Mr. R. D. McWhorter NRC Senior Resident inspector North Anna Power Station j

s i

e i

1 i

~!

t

=

j.

i l

i j

[-

i i

Jl h:[-

l 1

h North Anna Power Station Unit 1 Summary of Changes to inservice inspection Program y

I

)

h

.I

g i

SUMMARY

OF CHANGES NORTH ANNA UNIT 1 INSERVICE INSPECTION PROGRAM REVISION 4

1)

Changed relief request NDE-5 " Basis for Relief" section from

.i "Two of the North Anna Power Station Unit 1 reactor coolant' pumps are to "The North Anna Power Station Unit 1 reactor coolant pumps are All of the Unit i reactor' coolant pumps have casing welds.

2)

The " Alternative Examination" section of relief request NDE-6 has been revised to perform a visual examination on one valve I

out of a group of similar valves.

The examination will be performed once an interval when one of the valves is disassembled for maintenance purposes.

This reflects the examination requirements of the 1989 Edition of ASME Section XI.

i 3)

Changed the Augmented Inspection Table by removing the requirement for Rockwell Edwards valve examinations.

This inspection program is no longer required.

4)

Changed the Augmented Inspection Table for reactor coolant loop bypass lines, pressurizer spray piping, main steam postulated break locations, and feedwater postulated break locations.

Changed "every weld" to " selected welds."

Not every weld within these system descriptions are required to be in the augmented inspection program.

5)

Added Code Case N-489 to list of ASME Section XI Code Cases incorporated into program.

This Code Case increases the time between Level III recertification from 3 years to 5 years.

)

6)

Added relief request NDE-20 which was submitted to the NRC on August 5,

1993.

This relief request documents partial examinations from the 1993 refueling outage.

7)

Added relief request SPT-12 which was submitted to the NRC on August 5,

1993.

This relief request allows alternatives to hydrostatic testing following repairs and replacements involving welding.