ML20066C081: Difference between revisions
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| (One intermediate revision by the same user not shown) | |||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:}} | {{#Wiki_filter:* | ||
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 (2151841 4000 October 29, 1982 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention: | |||
Document Control Desk | |||
==SUBJECT:== | |||
Peach Bottom Atomic Power Station, September, 1982, Monthly Operating Report Data Correction Gentlemen: | |||
Attached are twelve corrected copies of the page " Unit Shutdowns and Power Reductions" of the monthly operating report-for Peach Bottom Unit 2 for the month of September, 1982 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4. | |||
The reason (2) column for No. 9 shutdown has been connected from D | |||
" Regulatory Restriction" to G | |||
" Operational Error". | |||
We regret any inconvenience this error may have caused. | |||
yery trul | |||
: yours, M. | |||
ooney S, | |||
rintendent G | |||
eration Division - Nuclear Attachment cc: | |||
Mr. R. C. Haynes A. R. Blough l | |||
Administrator Site Inspector Region I P.O. Box 399 US Nuclear Regulatory Commission Delta, PA 17314-0399 631 Park Avenue King of Prussia, PA 19406 | |||
}b' | |||
( 8211090338 8121029' | |||
~ ' ", | |||
PDR ADOCK 05 l 9 __.._._,.-_ 000277 _.,,' | |||
PDR l | |||
.}} | |||
Latest revision as of 18:39, 16 December 2024
| ML20066C081 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 10/29/1982 |
| From: | Cooney M PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| Shared Package | |
| ML20066C083 | List: |
| References | |
| NUDOCS 8211090338 | |
| Download: ML20066C081 (1) | |
Text
PHILADELPHIA ELECTRIC COMPANY 2301 MARKET STREET P.O. BOX 8699 PHILADELPHIA PA.19101 (2151841 4000 October 29, 1982 Docket Nos. 50-277 50-278 Director Office of Inspection & Enforcement US Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk
SUBJECT:
Peach Bottom Atomic Power Station, September, 1982, Monthly Operating Report Data Correction Gentlemen:
Attached are twelve corrected copies of the page " Unit Shutdowns and Power Reductions" of the monthly operating report-for Peach Bottom Unit 2 for the month of September, 1982 forwarded pursuant to Technical Specification 6.9.1.C under the guidance of Regulatory Guide 10.1, Revision 4.
The reason (2) column for No. 9 shutdown has been connected from D
" Regulatory Restriction" to G
" Operational Error".
We regret any inconvenience this error may have caused.
yery trul
- yours, M.
ooney S,
rintendent G
eration Division - Nuclear Attachment cc:
Mr. R. C. Haynes A. R. Blough l
Administrator Site Inspector Region I P.O. Box 399 US Nuclear Regulatory Commission Delta, PA 17314-0399 631 Park Avenue King of Prussia, PA 19406
}b'
( 8211090338 8121029'
~ ' ",
PDR ADOCK 05 l 9 __.._._,.-_ 000277 _.,,'
PDR l
.