ML20070F282: Difference between revisions

From kanterella
Jump to navigation Jump to search
(StriderTol Bot change)
(StriderTol Bot change)
 
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:I
{{#Wiki_filter:[
[    m Ccmmtnwnith Ediscn Braidwood Nuclear Power Station                                                          I
Ccmmtnwnith Ediscn
( f .i~~_, -
( f.i~~_,
Route #1, Box 84
Route #1, Box 84 Braidwood Nuclear Power Station m
            %/       Braceville, Illinois 60407 Telephone 815/458-2801 July 11,1994 Director Office of Resource Management                                                                     ,
%/
U.S. Nuclear Regulatory Commission                                                                 !
Braceville, Illinois 60407 Telephone 815/458-2801 July 11,1994 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk
Washington, D.C. 20555                                                                             :
Attention: Document Control Desk


==Dear Sir:==
==Dear Sir:==
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclezr Generating Station for the period June 1 through June 30, 1994.
Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclezr Generating Station for the period June 1 through June 30, 1994.
                                                            ,      . ) gyj L'. ofron Station Manager Braidwood Station KLK/JL/dla BW/94-0130.wpf Attachments                                                                                       ,
. ) gyj L'.
cc:     J. B. Martin, U.S.N.R.C., Region 111 R. R. Assa, U.S.N.R.C.                                                                     1 1.D.N.S.
ofron Station Manager Braidwood Station KLK/JL/dla BW/94-0130.wpf Attachments cc:
U.S.N.R.C. Resident inspector, Braidwood INPO Records Center                                                                         j D. L. Farrar, Nuclear Regional Service Mgr.                                                 I D. M. Saccomando, Nuclear Licensing Admin.
J. B. Martin, U.S.N.R.C., Region 111 R. R. Assa, U.S.N.R.C.
1.D.N.S.
U.S.N.R.C. Resident inspector, Braidwood INPO Records Center j
D. L. Farrar, Nuclear Regional Service Mgr.
I D. M. Saccomando, Nuclear Licensing Admin.
D. R. Eggett, Nuclear Engineering Dept.
D. R. Eggett, Nuclear Engineering Dept.
K. Kaup, Site Vice President, Braidwood NFS, PWR Plant Support Results Engineering Grp., Systems Eng., Bwd.
K. Kaup, Site Vice President, Braidwood NFS, PWR Plant Support Results Engineering Grp., Systems Eng., Bwd.
Nuclear Group, Systems Engineering, Bwd.
Nuclear Group, Systems Engineering, Bwd.
l.D.N.S. Resident inspector, Braidwood J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.
l.D.N.S. Resident inspector, Braidwood J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.
9407180267 940630 ADOCK 0500o456
iff)Ll' 9407180267 940630
[Jiff)Ll'
[J
    ]'       PDR R                          PDR k'; i
]'
PDR ADOCK 0500o456 k'; i R
PDR


l BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 l
l BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT 1
MONTHLY PERFORMANCE REPORT             1 Commonwealth Edison Company NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 f
Commonwealth Edison Company NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 f
i
\\
                                                          \


i A.    
i A.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 Braidwood Unit 1 entered the month of June 1994 at 100% capable. The Unit operated routinely through the end of the month.                                                       ,
OF OPERATING EXPERIENCE Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 Braidwood Unit 1 entered the month of June 1994 at 100% capable. The Unit operated routinely through the end of the month.
i e
i e
i i
i i
B.
OPERATING DATA REPORT Docket No: 50 - 456 1
Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS
: 1) Reporting Period: June 1994 Gross Hours: 12.0
: 2) Currently Authorized Power Level (MWt):
3411 Design Electrical Rating (MWe-gross):
1175 Design Electrical Rating (MWe-net):
1120 Max Dependable Capacity (MWe-gross):
1175 Max Dependable Capacity (MWe-net):
1120
: 3) Power level to which restricted (If Any):
None
: 4) Reasons for restrictions (If Any):
None
]
I This Mo.
Yr to Date Cumulative I
: 5) Report Period Hours:
720.0 4,343.0 51,896.0
: 6) Hou s Reactor Critical:
720.0 2,696.3 40,294.5 I
I
I
 
: 7) RX Reserve Shutdown Hours:
B. OPERATING DATA REPORT Docket No: 50 - 456            1 Unit: Braidwood 1        !
0.0 0.0 0.0
Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS                                                                              ;
: 8) Hours Generator on Une:
: 1) Reporting Period: June 1994              Gross Hours: 12.0
720.0 2,649.2 39,674.2
: 2) Currently Authorized Power Level (MWt):            3411                                    !
: 9) Unit Reserve Shutdown Hours:
Design Electrical Rating (MWe-gross):              1175 Design Electrical Rating (MWe-net):                1120 Max Dependable Capacity (MWe-gross):              1175 Max Dependable Capacity (MWe-net):                1120
0.0 0.0 0.0
: 3) Power level to which restricted (If Any):          None
: 10) Gross Thermal Energy (MWHt):
: 4) Reasons for restrictions (If Any):                None                                    ]
2,420,491.6 8,327,132.7 123,688,151.3
I This Mo. Yr to Date      Cumulative    I
: 11) Gross Elect. Energy (MWH):
: 5) Report Period Hours:                              720.0        4,343.0        51,896.0    ,
827,569.0 2,877,280.0 41,691,867.0
: 6) Hou s Reactor Critical:                            720.0        2,696.3        40,294.5    I I
: 12) Net Elect. Energy (MWH):
: 7) RX Reserve Shutdown Hours:                           0.0           0.0               0.0
799,230.0 2,752,791.0 39,895,608.0
: 8) Hours Generator on Une:                           720.0       2,649.2         39,674.2
: 13) Reactor Service Factor:
: 9) Unit Reserve Shutdown Hours:                         0.0           0.0               0.0
100.0 62.1 77.6
: 10) Gross Thermal Energy (MWHt):               2,420,491.6   8,327,132.7 123,688,151.3
: 14) Reactor Availability Factor:
: 11) Gross Elect. Energy (MWH):                   827,569.0   2,877,280.0     41,691,867.0
100.0 62.1 77.6
: 12) Net Elect. Energy (MWH):                     799,230.0   2,752,791.0     39,895,608.0
: 15) Unit Service Factor:
: 13) Reactor Service Factor:                           100.0           62.1             77.6
100.0 61.0 76.4
: 14) Reactor Availability Factor:                     100.0           62.1             77.6
: 16) Unit Availability Factor:
: 15) Unit Service Factor:                             100.0           61.0             76.4   ;
100.0 61.0 76.4
: 16) Unit Availability Factor:                         100.0           61.0             76.4
: 17) Unit Capacity Factor (MDC NET):
: 17) Unit Capacity Factor (MDC NET):                     99.1         56.6             68.6   l
99.1 56.6 68.6
: 18) Unit Capacity Factor (DER NET):                     99.1         56.6             68.6   l
: 18) Unit Capacity Factor (DER NET):
: 19) Unit Forced Outage Rate:                             0.0           0.0                 9.0
99.1 56.6 68.6
: 20) Unit Forced Outage Hours:                           0.0           0.0           3905.1
: 19) Unit Forced Outage Rate:
0.0 0.0 9.0
: 20) Unit Forced Outage Hours:
0.0 0.0 3905.1
: 21) Shutdown Schedule Over Next 6 Months:
: 21) Shutdown Schedule Over Next 6 Months:
(
(
Line 81: Line 108:
3
3


4   g C. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: June 1994 Ray         MWe-net         Qay     MWe-net
4 g
: 1)           1105         16)         1117
C.
: 2)           1121
AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: June 1994 Ray MWe-net Qay MWe-net 1) 1105 16) 1117 2) 1121
* 17)         1112
* 17) 1112 3) 1119 18) 1104 4) 1116 19) 1096 5) 1092 20) 1111 6) 1096 21) 1106 7) 1096 22) 1107 8) 1120 23) 1113 9) 1117 24) 1127
: 3)           1119         18)         1104
* 10) 1102 25) 1132
: 4)           1116         19)         1096
* 11) 1099 26) 1126
: 5)           1092       20)         1111
* 12) 1024*
: 6)           1096         21)         1106
27) 1121
: 7)           1096       22)         1107
* 13) 1119 28) 1127
: 8)           1120         23)         1113
* 14) 1117 29) 1125
: 9)           1117         24)         1127 *
* 15) 1117 30) 1107
: 10)           1102         25)         1132 *
* Due to condenser efficiency
: 11)           1099       26)         1126 *
: 12)           1024*       27)         1121 *
: 13)           1119         28)         1127 *
: 14)           1117       29)         1125 *
: 15)           1117         30)         1107
* Due to condenser efficiency 1


D. UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: June 1994 LER                               Cause & Corrective Action No.           Date         Type     Hours   Reason   Method     Number     System Component         to Fmver.t Recurrence None TYPE                   REASON                                       METHOD                     SYSTEM & COMPONENT F - Forced             A - Equipment Failure Maint or Test         1 - Manual S - Scheduled         B - Maint or Test                           2 - Manual Scram           Exhibit F & Instructions for C - Refueling                               3 - Auto Scram             Preparation of Data Entry Sheet D - Regulatory Restriction                   4 - Continued               Licensee Event Report (LER)
D.
E - Operator Training & Licensee Examination 5 - Reduced Load           File (NUREG-0161).
UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: June 1994 LER Cause & Corrective Action No.
Date Type Hours Reason Method Number System Component to Fmver.t Recurrence None TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER)
E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).
F - Administration G - Operator Error H - Other
F - Administration G - Operator Error H - Other


                                                                                                                                                    ~.
~.
E. SAFETYlREUEF VALVE OPERATIONS                                                                 -
E.
Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994               -
SAFETYlREUEF VALVE OPERATIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Mike Smith Telephone: 815-458-2801 1
Completed by: Mike Smith Telephone: 815-458-2801 Valves             No. & Type Plant Date         Actuated             Actuation Condition   Description of Event None
Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None i
                                                                      --    :w -                                               .
1
:w -


l l
F.
F. UCENSEE EVENT REPORTS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
UCENSEE EVENT REPORTS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.
Licensee Event Report Number           Date           Title of Occurrence 94-010               06/10/94         1A Diesel Generator Rupture Disk     ;
Licensee Event Report Number Date Title of Occurrence 94-010 06/10/94 1A Diesel Generator Rupture Disk problems.
problems.
i l
i l
l 1
1


4 A.              
4 A.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 Braidwood Unit 2 entered the month of June 1994 continuing with power ascension to 100%. The unit operated routinely through the end of the month.
OF OPERATING EXPERIENCE Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 Braidwood Unit 2 entered the month of June 1994 continuing with power ascension to 100%. The unit operated routinely through the end of the month.
l l
l l
                                                                                                                )
)


D. OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i
D.
: 1) Reporting Period: June 1994               Gross Hours: ZZQ
OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i
: 2) Currently Authorized Power Level (MWt):               111].
: 1) Reporting Period: June 1994 Gross Hours: ZZQ
Design Electrical Rating (MWe-gross):               jlI5 Design Electrical Rating (MWe-net):                 jl2Q Max Dependable Capacity (MWe-gross):                 jll5 Max Dependable Capacity (MWe-net):                   j_12Q
: 2) Currently Authorized Power Level (MWt):
: 3) Power level to which restricted (if Any):             None
111].
: 4) Reasons for restrictions (if Any):                   tjorig                                   l This Mo.         Yr to Date       9_umulative
Design Electrical Rating (MWe-gross):
: 5) Report Period Hours:                                 720.0         4,343.0         49,978.0 ,
jlI5 Design Electrical Rating (MWe-net):
: 6) Hours Reactor Critical:                               720.0         3,064.6         41,378.7
jl2Q Max Dependable Capacity (MWe-gross):
: 7) RX Reserve Shutdown Hours:                               0.0             0.0             0.0
jll5 Max Dependable Capacity (MWe-net):
: 8) Hours Generator on Line:                             720.0         3.053.9         41,040.2
j_12Q
: 9) Unit Reserve Shutdown Hours:                             0.0             0.0             0.0 ,
: 3) Power level to which restricted (if Any):
: 10) Gross Thermal Energy (MWHt):               2,255,220.2         9,066,339.1   125,809,756.3 ;
None
: 11) Gross Elect. Energy (MWH):                   767,937.0         3,118,713.0     42,232,536.0
: 4) Reasons for restrictions (if Any):
: 12) Net Elect. Energy (MWH):                     740,436.0         3,002,503.0     40,469,086.0 ,
tjorig l
: 13) Reactor Service Factor:                             100.0             70.6             82.8
This Mo.
: 14) Reactor Availability Factor:                         100.0             70.6             82.8 l
Yr to Date 9_umulative
: 15) Unit Service Factor:                                 100.0             70.3             82.1 l
: 5) Report Period Hours:
: 16) Unit Availability Factor:                           100.0             70.3             82.1 l
720.0 4,343.0 49,978.0
: 17) Unit Capacity Factor (MDC NET):                       91.8           61.7             72.3 '
: 6) Hours Reactor Critical:
: 18) Unit Capacity Factor (DER NET):                       91.8           61.7             72.3 !
720.0 3,064.6 41,378.7
: 19) Unit Forced Outage Rate:                               0.0           29.7             6.2 !
: 7) RX Reserve Shutdown Hours:
: 20) Unit Forced Outage Hours:                               00           1289.1           2735.1
0.0 0.0 0.0
: 21) Shutdown Schedule Over Next 6 Months:             10/08/94 l
: 8) Hours Generator on Line:
720.0 3.053.9 41,040.2
: 9) Unit Reserve Shutdown Hours:
0.0 0.0 0.0
: 10) Gross Thermal Energy (MWHt):
2,255,220.2 9,066,339.1 125,809,756.3
: 11) Gross Elect. Energy (MWH):
767,937.0 3,118,713.0 42,232,536.0
: 12) Net Elect. Energy (MWH):
740,436.0 3,002,503.0 40,469,086.0
: 13) Reactor Service Factor:
100.0 70.6 82.8
: 14) Reactor Availability Factor:
100.0 70.6 82.8 l
: 15) Unit Service Factor:
100.0 70.3 82.1 l
: 16) Unit Availability Factor:
100.0 70.3 82.1 l
: 17) Unit Capacity Factor (MDC NET):
91.8 61.7 72.3
: 18) Unit Capacity Factor (DER NET):
91.8 61.7 72.3
: 19) Unit Forced Outage Rate:
0.0 29.7 6.2
: 20) Unit Forced Outage Hours:
00 1289.1 2735.1
: 21) Shutdown Schedule Over Next 6 Months:
10/08/94
: 22) If Shutdown at end of Reporting Period, Estimated Date of Stariup:
: 22) If Shutdown at end of Reporting Period, Estimated Date of Stariup:


I C. AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994     ,
I C.
Completed by: Chris Pershey l Telephone: 815-458-2801 MONTH: June 1994                                                       .
AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey l
Rey       MWe-net           Qay     MWe-net                 ,
Telephone: 815-458-2801 MONTH: June 1994 Rey MWe-net Qay MWe-net 1) 484 16) 1115 2) 504 17) 1113 3) 569 18) 1107 4) 753 19) 1103 l
: 1)           484         16)         1115
5) 782 20) 1110 6) 1096 21) 1105 7) 1118 22) 1105 p
: 2)           504         17)         1113
8) 1131
: 3)           569         18)         1107
* 23) 1108 9) 1128
: 4)           753         19)         1103               l
* 24) 1121
: 5)           782         20)         1110
* 10) 1124
: 6)           1096         21)         1105
* 25) 1105 1
: 7)           1118         22)         1105               p
11) 1121*
: 8)           1131
26) 1004 i
* 23)         1108
12) 1119 27) 1120 13) 1120 28) 1119 14) 1117 29) 1117 15) 1114 30) 1104
: 9)           1128
* Due to condenser efficiency l
* 24)         1121 *
I i
: 10)           1124
* 25)         1105               1
: 11)           1121*       26)         1004               i
: 12)           1119         27)         1120
: 13)           1120         28)         1119
: 14)           1117         29)         1117
: 15)           1114         30)         1104
* Due to condenser efficiency                                           ;
l I
i


D. UNIT SHUTDOWNS / REDUCTIONS                                                                                                                               -
D.
j                                                                                                                            Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey                       -
UNIT SHUTDOWNS / REDUCTIONS j
Telephone: 815-458-2801 REPORT PERIOD: June 1994 LER                                   Cause & Corrective Action h       Date       Type     Hours                   Reason Method Number       System   Component         to Prevent Recurrence None TYPE                     REASON                                               METHOD                       SYSTEM & COMPONENT F - Forced               A - Equipment Failure Maint or Test                 1 - Manual S - Scheduled             B - Maint or Test                                   2 - Manual Scram             Exhibit F & Instructions for C - Refueling                                       3 - Auto Scram               Preparation of Data Entry Sheet D - Regulatory Restriction                           4 - Continued               Ucensee Event Report (LER)
Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: June 1994 LER Cause & Corrective Action h
E - Operator Training & Licensee Examination 5 - Reduced Load                     File (NUREG-0161).
Date Type Hours Reason Method Number System Component to Prevent Recurrence None TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Ucensee Event Report (LER)
E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).
F - Administration G - Operator Error H - Other
F - Administration G - Operator Error H - Other


                                                                                                                                                        . 1 E. SAFETY REUEF VALVE OPERATIONS Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Mike Smith Telephone: 815-458-2801             ,
1 E.
i Valves No. & Type               Plant Date                                         Actuated   Actuation           Condition             Description of Event None i
SAFETY REUEF VALVE OPERATIONS Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Mike Smith Telephone: 815-458-2801 i
Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None i
l '
l '
I i
I i
1
1


I
i F.
  .  .                                                                                        i l
LICENSEE EVENT REPORTS Docket No.: 50 - 457 i
F. LICENSEE EVENT REPORTS Docket No.: 50 - 457       i Unit: Braidwood 2   l Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10   l CFR 50.73.                                                                       '
Unit: Braidwood 2 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 l
l           Licensee Event Report Number             Date                     Title of Occurrence None                                                                       ,
CFR 50.73.
i l
l Licensee Event Report Number Date Title of Occurrence None i
                                                                                            !}}
l
.}}

Latest revision as of 09:45, 16 December 2024

Monthly Operating Repts for June 1994 for Braidwood Nuclear Generating Station Units 1 & 2
ML20070F282
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 06/30/1994
From: Lewand J, Pershey C
COMMONWEALTH EDISON CO.
To:
NRC, NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9407180267
Download: ML20070F282 (14)


Text

[

Ccmmtnwnith Ediscn

( f.i~~_,

Route #1, Box 84 Braidwood Nuclear Power Station m

%/

Braceville, Illinois 60407 Telephone 815/458-2801 July 11,1994 Director Office of Resource Management U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Attention: Document Control Desk

Dear Sir:

Enclosed for your information is the Monthly Performance Report covering Braidwood Nuclezr Generating Station for the period June 1 through June 30, 1994.

. ) gyj L'.

ofron Station Manager Braidwood Station KLK/JL/dla BW/94-0130.wpf Attachments cc:

J. B. Martin, U.S.N.R.C., Region 111 R. R. Assa, U.S.N.R.C.

1.D.N.S.

U.S.N.R.C. Resident inspector, Braidwood INPO Records Center j

D. L. Farrar, Nuclear Regional Service Mgr.

I D. M. Saccomando, Nuclear Licensing Admin.

D. R. Eggett, Nuclear Engineering Dept.

K. Kaup, Site Vice President, Braidwood NFS, PWR Plant Support Results Engineering Grp., Systems Eng., Bwd.

Nuclear Group, Systems Engineering, Bwd.

l.D.N.S. Resident inspector, Braidwood J. M. Bunecicky, Westinghouse D. R. Seavers, A.N.I.

iff)Ll' 9407180267 940630

[J

]'

PDR ADOCK 0500o456 k'; i R

PDR

l BRAIDWOOD NUCLEAR POWER STATION UNIT 1 AND UNIT 2 MONTHLY PERFORMANCE REPORT 1

Commonwealth Edison Company NRC DOCKET NO. 050-456, LICENSE NO. NPF-72 NRC DOCKET NO. 050-457, LICENSE NO. NPF-77 f

\\

i A.

SUMMARY

OF OPERATING EXPERIENCE Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 Braidwood Unit 1 entered the month of June 1994 at 100% capable. The Unit operated routinely through the end of the month.

i e

i i

B.

OPERATING DATA REPORT Docket No: 50 - 456 1

Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS

1) Reporting Period: June 1994 Gross Hours: 12.0
2) Currently Authorized Power Level (MWt):

3411 Design Electrical Rating (MWe-gross):

1175 Design Electrical Rating (MWe-net):

1120 Max Dependable Capacity (MWe-gross):

1175 Max Dependable Capacity (MWe-net):

1120

3) Power level to which restricted (If Any):

None

4) Reasons for restrictions (If Any):

None

]

I This Mo.

Yr to Date Cumulative I

5) Report Period Hours:

720.0 4,343.0 51,896.0

6) Hou s Reactor Critical:

720.0 2,696.3 40,294.5 I

I

7) RX Reserve Shutdown Hours:

0.0 0.0 0.0

8) Hours Generator on Une:

720.0 2,649.2 39,674.2

9) Unit Reserve Shutdown Hours:

0.0 0.0 0.0

10) Gross Thermal Energy (MWHt):

2,420,491.6 8,327,132.7 123,688,151.3

11) Gross Elect. Energy (MWH):

827,569.0 2,877,280.0 41,691,867.0

12) Net Elect. Energy (MWH):

799,230.0 2,752,791.0 39,895,608.0

13) Reactor Service Factor:

100.0 62.1 77.6

14) Reactor Availability Factor:

100.0 62.1 77.6

15) Unit Service Factor:

100.0 61.0 76.4

16) Unit Availability Factor:

100.0 61.0 76.4

17) Unit Capacity Factor (MDC NET):

99.1 56.6 68.6

18) Unit Capacity Factor (DER NET):

99.1 56.6 68.6

19) Unit Forced Outage Rate:

0.0 0.0 9.0

20) Unit Forced Outage Hours:

0.0 0.0 3905.1

21) Shutdown Schedule Over Next 6 Months:

(

22)If Shutdown at End of Reporting Period, Estimated Date of Startup:

3

4 g

C.

AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 MONTH: June 1994 Ray MWe-net Qay MWe-net 1) 1105 16) 1117 2) 1121

  • 17) 1112 3) 1119 18) 1104 4) 1116 19) 1096 5) 1092 20) 1111 6) 1096 21) 1106 7) 1096 22) 1107 8) 1120 23) 1113 9) 1117 24) 1127
  • 10) 1102 25) 1132
  • 11) 1099 26) 1126
  • 12) 1024*

27) 1121

  • 13) 1119 28) 1127
  • 14) 1117 29) 1125
  • 15) 1117 30) 1107
  • Due to condenser efficiency

D.

UNIT SHUTDOWNS / REDUCTIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: June 1994 LER Cause & Corrective Action No.

Date Type Hours Reason Method Number System Component to Fmver.t Recurrence None TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Licensee Event Report (LER)

E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).

F - Administration G - Operator Error H - Other

~.

E.

SAFETYlREUEF VALVE OPERATIONS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: Mike Smith Telephone: 815-458-2801 1

Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None i

1

w -

F.

UCENSEE EVENT REPORTS Docket No.: 50 - 456 Unit: Braidwood 1 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 CFR 50.73.

Licensee Event Report Number Date Title of Occurrence 94-010 06/10/94 1A Diesel Generator Rupture Disk problems.

i l

1

4 A.

SUMMARY

OF OPERATING EXPERIENCE Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 Braidwood Unit 2 entered the month of June 1994 continuing with power ascension to 100%. The unit operated routinely through the end of the month.

l l

)

D.

OPERATING DATA REPORT Docket No: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 OPERATING STATUS i

1) Reporting Period: June 1994 Gross Hours: ZZQ
2) Currently Authorized Power Level (MWt):

111].

Design Electrical Rating (MWe-gross):

jlI5 Design Electrical Rating (MWe-net):

jl2Q Max Dependable Capacity (MWe-gross):

jll5 Max Dependable Capacity (MWe-net):

j_12Q

3) Power level to which restricted (if Any):

None

4) Reasons for restrictions (if Any):

tjorig l

This Mo.

Yr to Date 9_umulative

5) Report Period Hours:

720.0 4,343.0 49,978.0

6) Hours Reactor Critical:

720.0 3,064.6 41,378.7

7) RX Reserve Shutdown Hours:

0.0 0.0 0.0

8) Hours Generator on Line:

720.0 3.053.9 41,040.2

9) Unit Reserve Shutdown Hours:

0.0 0.0 0.0

10) Gross Thermal Energy (MWHt):

2,255,220.2 9,066,339.1 125,809,756.3

11) Gross Elect. Energy (MWH):

767,937.0 3,118,713.0 42,232,536.0

12) Net Elect. Energy (MWH):

740,436.0 3,002,503.0 40,469,086.0

13) Reactor Service Factor:

100.0 70.6 82.8

14) Reactor Availability Factor:

100.0 70.6 82.8 l

15) Unit Service Factor:

100.0 70.3 82.1 l

16) Unit Availability Factor:

100.0 70.3 82.1 l

17) Unit Capacity Factor (MDC NET):

91.8 61.7 72.3

18) Unit Capacity Factor (DER NET):

91.8 61.7 72.3

19) Unit Forced Outage Rate:

0.0 29.7 6.2

20) Unit Forced Outage Hours:

00 1289.1 2735.1

21) Shutdown Schedule Over Next 6 Months:

10/08/94

22) If Shutdown at end of Reporting Period, Estimated Date of Stariup:

I C.

AVERAGE DAILY UNIT NET POWER LEVEL LOG Docket No: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey l

Telephone: 815-458-2801 MONTH: June 1994 Rey MWe-net Qay MWe-net 1) 484 16) 1115 2) 504 17) 1113 3) 569 18) 1107 4) 753 19) 1103 l

5) 782 20) 1110 6) 1096 21) 1105 7) 1118 22) 1105 p

8) 1131

  • 23) 1108 9) 1128
  • 24) 1121
  • 10) 1124
  • 25) 1105 1

11) 1121*

26) 1004 i

12) 1119 27) 1120 13) 1120 28) 1119 14) 1117 29) 1117 15) 1114 30) 1104

  • Due to condenser efficiency l

I i

D.

UNIT SHUTDOWNS / REDUCTIONS j

Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Chris Pershey Telephone: 815-458-2801 REPORT PERIOD: June 1994 LER Cause & Corrective Action h

Date Type Hours Reason Method Number System Component to Prevent Recurrence None TYPE REASON METHOD SYSTEM & COMPONENT F - Forced A - Equipment Failure Maint or Test 1 - Manual S - Scheduled B - Maint or Test 2 - Manual Scram Exhibit F & Instructions for C - Refueling 3 - Auto Scram Preparation of Data Entry Sheet D - Regulatory Restriction 4 - Continued Ucensee Event Report (LER)

E - Operator Training & Licensee Examination 5 - Reduced Load File (NUREG-0161).

F - Administration G - Operator Error H - Other

1 E.

SAFETY REUEF VALVE OPERATIONS Docket No.: 50 - 457 Unit: Braidwood 2 Date: 7/10/1994 Completed by: Mike Smith Telephone: 815-458-2801 i

Valves No. & Type Plant Date Actuated Actuation Condition Description of Event None i

l '

I i

1

i F.

LICENSEE EVENT REPORTS Docket No.: 50 - 457 i

Unit: Braidwood 2 Date: 7/10/1994 Completed by: John Lewand Telephone: 815-458-2801 The following is a tabular summary of all Licensee Event Reports submitted during the reporting period, June 1 through June 30,1994. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10 l

CFR 50.73.

l Licensee Event Report Number Date Title of Occurrence None i

l

.