| issue date = 02/28/1991 | | issue date = 02/28/1991 | ||
| title = Monthly Operating Repts for Feb 1991 for Beaver Valley Units 1 & 2 | | title = Monthly Operating Repts for Feb 1991 for Beaver Valley Units 1 & 2 | ||
| author name = Sieber J, Winger M | | author name = Sieber J, Winger M | ||
| author affiliation = DUQUESNE LIGHT CO. | | author affiliation = DUQUESNE LIGHT CO. | ||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:R | {{#Wiki_filter:R | ||
-l | |||
., =, | |||
l | |||
snimnowi PA tson om March 8, 1991 Beaver Valley _ Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthlv Operatina Report U. S. Nuclear Regulatory Commission Document Control Desk Washirgton, D.C. 20555 Gentlemen: | "%s M | ||
In accordance with Appendix A, Technical Specifications, | teennone sm 393 5000 | ||
=~ | |||
snimnowi PA tson om March 8, 1991 Beaver Valley _ Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthlv Operatina Report U. S. Nuclear Regulatory Commission Document Control Desk Washirgton, D.C. | |||
20555 Gentlemen: | |||
In accordance with Appendix A, | |||
Technical Specifications, the Monthly Operatirs Report is submitted for Unit 1-and Unit _2 _for_- the month'of February, 1991. | |||
Very truly yours, | Very truly yours, | ||
. D.--Sieber ice President Nuclear Group MAW /Img Enclosures cc: NRC Regional Office King of Prussia, PA i | |||
9103140259 910228 PDR | 9103140259 910228 Ih PDR ADOCK 05000334 R | ||
f | |||
\\ | |||
PDR | PDR | ||
f | f NARRATIVE SLM%RY OF KND{LY OPEATING EXPERIENCE j | ||
UNI'I I FEBRUARY 1991 February 1 The unit remained shutdown to repair the main turbine's D.C. | |||
Bearing Oil Pump. At 2009 hours the unit was synchronized and the unit's output was escalated to a ncaninal value of 100%. | Bearing Oil Pump. | ||
February 2 | At 2009 hours the unit was synchronized and the unit's output was escalated to a ncaninal value of 100%. | ||
Fabruary 3 | February 2 The unit operated at a ncaninal value of 100% output. | ||
FeW' 4 | Fabruary 3 At 0150 hours the unit's output was reduced-to approximately 80% to load follow. | ||
February 5 | At 0847 hours the unit's output was escalated to 100%. | ||
At 2315 hours the Unit's output was reduced to 80% to load follow. | |||
FeW' 4 At 0500 hours the unit's output was escalated to 100%. | |||
February 5 The unit operated at a ncxninal value of 100% output. | |||
through February 28 | through February 28 | ||
(!He-Net) | i AVmAGE IRILY LNIT METR LEVEL Docket 14o. | ||
0 | 50-334 Unit BVPS LMit 1 Date March 7. 1991 Capleted by M. A. Wirner Telephone (1121393-7621 P.Dtml FEBRUARY 1991 IAY AVERAGE !*ILY TWIR ILVfL DAY AVmAGE (WILY K MER LEVIL | ||
(!He-Net) | |||
(!We-Het) 4 1 | |||
0 17 821 2 | |||
690 18 | |||
12 | ,,,- 813 l | ||
14 | 3 775 19 808 | ||
-i 4 | |||
INS'IRUCI' IONS - | 771 20 81" 5 | ||
825 21 f21 6 | |||
821 22 r14 7 | |||
813 23 814 8 | |||
817 24 821-( | |||
9 821 2,r 813 i | |||
10 825 26 817 11 817 27 817 12 821 28 813 13 813 14 817 15 023 | |||
-16 810 INS'IRUCI' IONS - | |||
On this format, list the average daily unit power level-in IWe-Net for each day in the reporting month, cmpute to the nearest whole megawatt.: | On this format, list the average daily unit power level-in IWe-Net for each day in the reporting month, cmpute to the nearest whole megawatt.: | ||
l u | l u | ||
'1 | |||
Unti SmuTDoves AmD PovER REDUCTIONS | Unti SmuTDoves AmD PovER REDUCTIONS Docket he. | ||
Unit mere | 50-334 Unit mere RVPS Unit #1 Date perch T. | ||
Date | 1991 Completed 3y R.A. Winner REPORT N0sTE FE9#UARY 199* | ||
4 | Telephone (6123 393-7621 Methed of ticeauce Cause & Cone t ive Duration Shutting Ew nt System Component Action to Co. | ||
T 910203 | Date Typel (Nours) | ||
Reason 2 Dawn Reactor 3 Report 8 Code 4 Code 5 Prevent Recurrence 3 | |||
910201 F | |||
20.1 A | |||
4 m/A NA PUMPXE Unit remained shutdou* to repair main Turbine's 9. 5. Lube ett Pump. | |||
4 | |||
'910203 S | |||
0 N | |||
5 m/m ZZ ZZZZZZ Out pt:t reduced free 100% to 801 to toed foltou. | |||
T | |||
:5 910203 5 | |||
0 N | |||
5 m/A ZZ ZZZZZZ output reduced from 1001 to 801 to lead foltou. | |||
t 1 | t 1 | ||
2 | 7 2 | ||
3 4 | |||
Method: | 'F-Forced Reason: | ||
3-Automatic seres | Method: | ||
B-Regulatory Restriction | Enhibit G-instructions for S-Scheduled. | ||
A-Equipment Felture (Exptein) 1-menuel Preparatier of Date Entry Sheets 8-Meintenance or' Test 2-Manost Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic seres (suREG0161). | |||
B-Regulatory Restriction 4-Cont *d. | |||
free Prewfous Month E-Operator Training & License Exam 5-Reduction 5 | |||
F-Administrattwe 9-Other Exhibit 3-Seme source. | |||
s-operationet Error (Emptain) | s-operationet Error (Emptain) | ||
N-Other (Emplain).- | N-Other (Emplain).- | ||
} | |||
i OPERATING DATA REPORT DOCKET NO. | |||
OPERATING DATA REPORT DOCKET NO. | 50-334 REPORT DATE: | ||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 | 03/07/91 COMPLETED BY: M.A.WINGER TELEPHONE: | ||
(412) 393 7621 OPERATING STAIMS | |||
: 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes | |||
: 2. REPORTINC PERIOD: FEBRUARY 1991 | : 2. REPORTINC PERIOD: FEBRUARY 1991 | ||
: 3. LICENSED THEP. MAL POWER (MWt): | : 3. LICENSED THEP. MAL POWER (MWt): | ||
: 4. NAMEPLATE RATING (Cross MWe): | 2652 | ||
: 5. DESIGN ELECTRICAL RATING (Net MWe): | : 4. NAMEPLATE RATING (Cross MWe): | ||
: 6. MAX DEPENDABLE CAPACITY (Gross MWe): | 923 | ||
: 7. MAX. DEPENDABLE CAPACITY (Not MWe): | : 5. DESIGN ELECTRICAL RATING (Net MWe): | ||
835 | |||
: 6. MAX DEPENDABLE CAPACITY (Gross MWe): | |||
860 g | |||
: 7. MAX. DEPENDABLE CAPACITY (Not MWe): | |||
81n B. IP CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS: | |||
w | w | ||
: 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | : 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe): | ||
: 11. HOURS IN REPORTING PERIOD: | None i | ||
: 12. NO. OF HRS. REACTOR WAS CRITICAL: | : 10. REASONS FOR RESTRICTIONS, IF ANY: _ _ _ | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | N/A THIS MONTH YEAR TO DATE CUMULATIVE | ||
: 14. HOURS GENERATOR WAS ON LINE: | : 11. HOURS IN REPORTING PERIOD: | ||
: 15. UNIT RESERVE SHUTDOWN HOURS: | 672.0 1416.0 130008.0 | ||
: 16. GROSS THERMAL ENERGY GEN. (MWH): | : 12. NO. OF HRS. REACTOR WAS CRITICAL: | ||
: 17. GROSS ELECT. ENERGY GEN. (MWH): | 672.0 1075.5 81369.9 | ||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | 0.0 0.0 4462.8 | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | : 14. HOURS GENERATOR WAS ON LINE: | ||
: 21. UNIT CAPACITY FACTOR (MDC): PCT | 651.9 1041.8 79586.8 | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | : 15. UNIT RESERVE SHUTDOWN HOURS: | ||
: 23. UNIT FORCED OUTAGE RATE: ' PERCENT) | 0.0 0.0 0.0 | ||
: 16. GROSS THERMAL ENERGY GEN. (MWH): | |||
1698024.0 2660994.0 188949441.5 | |||
: 17. GROSS ELECT. ENERGY GEN. (MWH): | |||
553420.0 861390.0 60694119.0 | |||
: 18. NET ELECTRICAL ENERGY GEN. (MWH): | |||
524150.0 813910.0 56678110.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 97.0 73.6 63.4 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.0 73 6 63.4 | |||
: 21. UNIT CAPACITY FACTOR (MDC): PCT 96.3 71.0 56,'i | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 93,4 68.8 55.0 | |||
: 23. UNIT FORCED OUTAGE RATE: ' PERCENT) 3,0 26.4 16.5 | |||
: 24. SHUTDOWNS SCHEDULED CVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED CVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH): | ||
THE UNIT IS SCHEDULED TO SHUTDOWN F0]LIllE UNIT' S 8TH REFUELING OMI6GE ON APRIL 12.1991. THE UNIT IS SCHEDULED TO BE SHUTDOWN FOR 10 WEEKS. | THE UNIT IS SCHEDULED TO SHUTDOWN F0]LIllE UNIT' S 8TH REFUELING OMI6GE ON APRIL 12.1991. | ||
THE UNIT IS SCHEDULED TO BE SHUTDOWN FOR 10 WEEKS. | |||
: 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | : 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l | ||
!#RPATIVE SLIMJtY OT lotfIHLY OPIRi&I!)3 D3'IRIDJCE UGT II ITERUARY 1991 rebruary 1 The Unit operated at a rmtnni value of 100% eutput. | |||
threnxjh February 28 i | |||
threnxjh February 28 | |||
l | l | ||
OPERATING DATA REPORT DOCKET NO.. | OPERATING DATA REPORT DOCKET NO.. | ||
: 1. UNIT NAME: BEAVER VALLEY POW *R STATION, UNIT 2 | 50 412 REPORT DATE: | ||
03/07/91 COMPLETED BY: M.A.WINGER TELEPHONE: | |||
(412) 393 7621 OPERATING STATUS | |||
: 1. UNIT NAME: BEAVER VALLEY POW *R STATION, UNIT 2 Notes | |||
: 2. REPORTING PERIOD: FEBRUAhY +i91 | : 2. REPORTING PERIOD: FEBRUAhY +i91 | ||
: 3. LICENSED THERMAL POWER (MWt): | : 3. LICENSED THERMAL POWER (MWt): | ||
: 4. NAMEPLATE RATING (Crost MWe): | 2652 | ||
: 5. DESIGN ELECTRICAL RATING (Net MWe): | : 4. NAMEPLATE RATING (Crost MWe): | ||
: 6. MAX DEPENDABLE CAPACITY (Cross MWe): | 923 | ||
: 7. MAX. DEPENDABLE CAPACITY ' Net MWe): | : 5. DESIGN ELECTRICAL RATING (Net MWe): | ||
836 | |||
: 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (het MWe): | : 6. MAX DEPENDABLE CAPACITY (Cross MWe): | ||
: 10. REASONS FOR RESTRICTIONS, IF ANY: | 870 | ||
N/A THIS MONTH | : 7. MAX. DEPENDABLE CAPACITY ' Net MWe): | ||
: 11. HOURS IN REPORTING PERIOD: | 820 8. | ||
: 12. No OF HRS. REACTOR WAS CRITICAL: | IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, CIVE REASONS: | ||
: 13. REACTOR RESERVE SHUTDOWN HOURS: | : 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (het MWe): | ||
: 14. HOURS CENER/iTOR WAS ON LINE: | None | ||
: 15. UNIT RESERVL 3HUTDOWN HOURS: | : 10. REASONS FOR RESTRICTIONS, IF ANY: | ||
: 16. CROSS THERMAL ENERGY GEN. (MVH): | N/A THIS MONTH Yi.AR TO DATE CUMUIATIVE | ||
: 17. GROSS ELECT. ENERGY GEN. (MVH): | : 11. HOURS IN REPORTING PERIOD: | ||
: 18. NET ELECTRICAL ENERCY GEN. (MWH): | 672.0 1416.0 28791.0 | ||
: 19. UNIT SERVICE FACTOR: (PERCENT) | : 12. No OF HRS. REACTOR WAS CRITICAL: | ||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) | 672.0 1416.0 23763.3 | ||
: 21. UNIT CAPACITY FACTOR (MDC): PCT | : 13. REACTOR RESERVE SHUTDOWN HOURS: | ||
: 22. UNIT CAPACITY FACTOR (DER): PCT | 0.0 0.0 0.0 | ||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) | : 14. HOURS CENER/iTOR WAS ON LINE: | ||
672.0 1416.0 23577.8 | |||
: 15. UNIT RESERVL 3HUTDOWN HOURS: | |||
0.0 0.0 0.0 | |||
: 16. CROSS THERMAL ENERGY GEN. (MVH): | |||
1772383.0 3738488.0 56866104.4 | |||
: 17. GROSS ELECT. ENERGY GEN. (MVH): | |||
573700.0 1209000.0 182458u0.0 | |||
: 18. NET ELECTRICAL ENERCY GEN. (MWH): | |||
544633.0 1148384.0 17191708.0 | |||
: 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 81.9 | |||
: 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 81.9 | |||
: 21. UNIT CAPACITY FACTOR (MDC): PCT 98.8 98.9 71.8 | |||
: 22. UNIT CAPACITY FACTOR (DER): PCT 96.9 97.0 71.4 | |||
: 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.9 | |||
: 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH): | : 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH): | ||
: 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 00 STARTUP: | : 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 00 STARTUP: | ||
: 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | : 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION): | ||
FORECAST | FORECAST ACHIEVED INITIAL CRITICALITY | ||
__ N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l | |||
l l | l l | ||
l 1 | l 1 | ||
...___m | |||
_.m.. | |||
4 | 4 l | ||
i 1 | |||
UNIT SMUYDOWNS AND POWER REDUCTIces Docket me. | |||
50-412 Unit Name SWP5 Unit #2 i | |||
Date March T. | |||
Duration | 1991 I | ||
Completed By M.A. | |||
l Cone | Winger f | ||
REPORT MouTM FEsaumat 1991 Telephone | |||
4 | .(412) 393-7621 i | ||
i | h. | ||
t' 4 | Method of Licensee Cause & Corrective | ||
[ | |||
3 l | Duration Shutting Event System Component Action to f | ||
{ | |||
.co. | |||
Date-Typet (nours) | |||
Reeson2 Down acactor3 seport # | |||
code' code 5 Prevent accurrence 1 | |||
l Cone f | |||
I f | |||
5 4 | |||
i t | |||
i ~ | |||
[ | |||
t' I | |||
4 | |||
+ | |||
1 3 | |||
l 4 | |||
i h | |||
ir I | |||
4 i | 4 i | ||
1 2 | |||
3 4 | |||
? | |||
F-Forced | F-Forced Reesoe: | ||
S-Scheduled | Method: | ||
Exhibit G-instructions for S-Scheduled A-Equipment Failure (Emplain) 1-menvat | |||
' Preparation of Bate Entry Sheets | |||
' i S-Meintenance or Test 2-menvat scree-for Licensee Event Report (LER) File' i | |||
5-Redvetion | C-Refueling | ||
_3-Automatic scram (uueEG0161). | |||
[ | |||
N-Other (Emplain) | 0-megulatory' Restriction 4-Cont'd. from Previous Month t | ||
E-Operator Training & License Ex== | |||
5-Redvetion 5 | |||
i 9-Other Exhibit 1-Same Source. | |||
l | |||
'F-Administrative.: | |||
G-operational Error (Emptain) | |||
[ | |||
N-Other (Emplain) | |||
{ | |||
i i | i i | ||
i | i 3 | ||
3 | |||
} | } | ||
4 | 1 4 | ||
2 t | |||
i I | |||
~ - | |||
~, _.. _ _. _ _. _._ _. _ _....,.. | |||
e i | e i | ||
AVERAGE CAILY TWIT POWFR LEVEL l | l AVERAGE CAILY TWIT POWFR LEVEL l | ||
1 DrAet No. 50-412 1 | |||
DrAet No. 50-412 | Unit BVPS Unit 2 j | ||
Date j$ar d 7. 1991 j | |||
Ccmpleted W M. A. Winaer Telephone (412) 393-7621 1 | |||
1 | 1 | ||
!Dml FI21RUARY_199.1 DAY AVERAGE DAILY POWER LEVEL DAY. | |||
DAY | AVERAGE DAILY POWER LEVEL | ||
(!We-Net) | (!We-Net) | ||
i | (l@e-Net) 1 807 17 811 i | ||
2 807 18 811 i | |||
4 | i 3 | ||
5 | 811 19 807 1 | ||
4 811 20 811 t | |||
t, 1 | 5 811 21 811 l | ||
6 811' 22 807 7 | |||
10 | 815 23 811 t, | ||
12 | 1 8 | ||
i 13- | 811 24 802 9 | ||
815 25 811 10 815 26 811 11 811 27 811 I | |||
in the reporting month. - Ctmpute to the nearest whole megawatt. | 12 811 28 807 | ||
? | |||
i 13-807 1 | |||
14 811 i | |||
15 815 t | |||
16 815 INSIRUCTICNS l | |||
t On this format, list the average daily unit power level in PWe-Net for each day in the reporting month. - Ctmpute to the nearest whole megawatt. | |||
i i | i i | ||
l l | l l | ||
I | I y.+mm,,-.-.r.z- | ||
--,,v e,--.,,.., | |||
.,,-y__..,y,,..,_..m..,,_,m.,_,.,.. | |||
r...r.yr.,_m.g | |||
__-c, | |||
..,-..#-..,.m.4,....c.,.-r-ww----* | |||
*w.---- | |||
-.---E+-=-w?-+.--/}} | |||
Latest revision as of 09:37, 16 December 2024
| ML20070H602 | |
| Person / Time | |
|---|---|
| Site: | Beaver Valley |
| Issue date: | 02/28/1991 |
| From: | Sieber J, Winger M DUQUESNE LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 9103140259 | |
| Download: ML20070H602 (9) | |
Text
R
-l
., =,
l
"%s M
teennone sm 393 5000
=~
snimnowi PA tson om March 8, 1991 Beaver Valley _ Power Station Unit 1 - Docket No. 50-334, License No. DPR-66 Unit 2 - Docket No. 50-412, License No. NPF-73 Monthlv Operatina Report U. S. Nuclear Regulatory Commission Document Control Desk Washirgton, D.C.
20555 Gentlemen:
In accordance with Appendix A,
Technical Specifications, the Monthly Operatirs Report is submitted for Unit 1-and Unit _2 _for_- the month'of February, 1991.
Very truly yours,
. D.--Sieber ice President Nuclear Group MAW /Img Enclosures cc: NRC Regional Office King of Prussia, PA i
9103140259 910228 Ih PDR ADOCK 05000334 R
f
\\
f NARRATIVE SLM%RY OF KND{LY OPEATING EXPERIENCE j
UNI'I I FEBRUARY 1991 February 1 The unit remained shutdown to repair the main turbine's D.C.
Bearing Oil Pump.
At 2009 hours0.0233 days <br />0.558 hours <br />0.00332 weeks <br />7.644245e-4 months <br /> the unit was synchronized and the unit's output was escalated to a ncaninal value of 100%.
February 2 The unit operated at a ncaninal value of 100% output.
Fabruary 3 At 0150 hours0.00174 days <br />0.0417 hours <br />2.480159e-4 weeks <br />5.7075e-5 months <br /> the unit's output was reduced-to approximately 80% to load follow.
At 0847 hours0.0098 days <br />0.235 hours <br />0.0014 weeks <br />3.222835e-4 months <br /> the unit's output was escalated to 100%.
At 2315 hours0.0268 days <br />0.643 hours <br />0.00383 weeks <br />8.808575e-4 months <br /> the Unit's output was reduced to 80% to load follow.
FeW' 4 At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the unit's output was escalated to 100%.
February 5 The unit operated at a ncxninal value of 100% output.
through February 28
i AVmAGE IRILY LNIT METR LEVEL Docket 14o.
50-334 Unit BVPS LMit 1 Date March 7. 1991 Capleted by M. A. Wirner Telephone (1121393-7621 P.Dtml FEBRUARY 1991 IAY AVERAGE !*ILY TWIR ILVfL DAY AVmAGE (WILY K MER LEVIL
(!He-Net)
(!We-Het) 4 1
0 17 821 2
690 18
,,,- 813 l
3 775 19 808
-i 4
771 20 81" 5
825 21 f21 6
821 22 r14 7
813 23 814 8
817 24 821-(
9 821 2,r 813 i
10 825 26 817 11 817 27 817 12 821 28 813 13 813 14 817 15 023
-16 810 INS'IRUCI' IONS -
On this format, list the average daily unit power level-in IWe-Net for each day in the reporting month, cmpute to the nearest whole megawatt.:
l u
'1
Unti SmuTDoves AmD PovER REDUCTIONS Docket he.
50-334 Unit mere RVPS Unit #1 Date perch T.
1991 Completed 3y R.A. Winner REPORT N0sTE FE9#UARY 199*
Telephone (6123 393-7621 Methed of ticeauce Cause & Cone t ive Duration Shutting Ew nt System Component Action to Co.
Date Typel (Nours)
Reason 2 Dawn Reactor 3 Report 8 Code 4 Code 5 Prevent Recurrence 3
910201 F
20.1 A
4 m/A NA PUMPXE Unit remained shutdou* to repair main Turbine's 9. 5. Lube ett Pump.
4
'910203 S
0 N
5 m/m ZZ ZZZZZZ Out pt:t reduced free 100% to 801 to toed foltou.
T
- 5 910203 5
0 N
5 m/A ZZ ZZZZZZ output reduced from 1001 to 801 to lead foltou.
t 1
7 2
3 4
'F-Forced Reason:
Method:
Enhibit G-instructions for S-Scheduled.
A-Equipment Felture (Exptein) 1-menuel Preparatier of Date Entry Sheets 8-Meintenance or' Test 2-Manost Scree for Licensee Event Report (LER) File C-Refueling 3-Automatic seres (suREG0161).
B-Regulatory Restriction 4-Cont *d.
free Prewfous Month E-Operator Training & License Exam 5-Reduction 5
F-Administrattwe 9-Other Exhibit 3-Seme source.
s-operationet Error (Emptain)
N-Other (Emplain).-
}
i OPERATING DATA REPORT DOCKET NO.
50-334 REPORT DATE:
03/07/91 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STAIMS
- 1. UNIT NAME: BEAVER VALLEY POWER STATION, UNIT 1 Notes
- 2. REPORTINC PERIOD: FEBRUARY 1991
- 3. LICENSED THEP. MAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Cross MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
835
- 6. MAX DEPENDABLE CAPACITY (Gross MWe):
860 g
- 7. MAX. DEPENDABLE CAPACITY (Not MWe):
81n B. IP CHANCES OCCUR IN CAPACITY RATINGS SINCE LAST REPORT, GIVE REASONS:
w
- 9. POWER LEVEL TO WHICH RESTRICTED, IF ANY (Net MWe):
None i
- 10. REASONS FOR RESTRICTIONS, IF ANY: _ _ _
N/A THIS MONTH YEAR TO DATE CUMULATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 130008.0
- 12. NO. OF HRS. REACTOR WAS CRITICAL:
672.0 1075.5 81369.9
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 4462.8
- 14. HOURS GENERATOR WAS ON LINE:
651.9 1041.8 79586.8
- 15. UNIT RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GEN. (MWH):
1698024.0 2660994.0 188949441.5
- 17. GROSS ELECT. ENERGY GEN. (MWH):
553420.0 861390.0 60694119.0
- 18. NET ELECTRICAL ENERGY GEN. (MWH):
524150.0 813910.0 56678110.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 97.0 73.6 63.4
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 97.0 73 6 63.4
- 22. UNIT CAPACITY FACTOR (DER): PCT 93,4 68.8 55.0
- 23. UNIT FORCED OUTAGE RATE: ' PERCENT) 3,0 26.4 16.5
- 24. SHUTDOWNS SCHEDULED CVER NEXT SIX MONTHS (TYPE,DATE AND DURATION OF EACH):
THE UNIT IS SCHEDULED TO SHUTDOWN F0]LIllE UNIT' S 8TH REFUELING OMI6GE ON APRIL 12.1991.
THE UNIT IS SCHEDULED TO BE SHUTDOWN FOR 10 WEEKS.
- 25. IF SHUT DOVN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
!#RPATIVE SLIMJtY OT lotfIHLY OPIRi&I!)3 D3'IRIDJCE UGT II ITERUARY 1991 rebruary 1 The Unit operated at a rmtnni value of 100% eutput.
threnxjh February 28 i
l
OPERATING DATA REPORT DOCKET NO..
50 412 REPORT DATE:
03/07/91 COMPLETED BY: M.A.WINGER TELEPHONE:
(412) 393 7621 OPERATING STATUS
- 1. UNIT NAME: BEAVER VALLEY POW *R STATION, UNIT 2 Notes
- 2. REPORTING PERIOD: FEBRUAhY +i91
- 3. LICENSED THERMAL POWER (MWt):
2652
- 4. NAMEPLATE RATING (Crost MWe):
923
- 5. DESIGN ELECTRICAL RATING (Net MWe):
836
- 6. MAX DEPENDABLE CAPACITY (Cross MWe):
870
- 7. MAX. DEPENDABLE CAPACITY ' Net MWe):
820 8.
IF CHANCES OCCUR IN CAPACITY RATINGS SINCE IAST REPORT, CIVE REASONS:
- 9. POWER LEVEL TO VHICH RESTRICTED, IF ANY (het MWe):
None
- 10. REASONS FOR RESTRICTIONS, IF ANY:
N/A THIS MONTH Yi.AR TO DATE CUMUIATIVE
- 11. HOURS IN REPORTING PERIOD:
672.0 1416.0 28791.0
- 12. No OF HRS. REACTOR WAS CRITICAL:
672.0 1416.0 23763.3
- 13. REACTOR RESERVE SHUTDOWN HOURS:
0.0 0.0 0.0
- 14. HOURS CENER/iTOR WAS ON LINE:
672.0 1416.0 23577.8
- 15. UNIT RESERVL 3HUTDOWN HOURS:
0.0 0.0 0.0
- 16. CROSS THERMAL ENERGY GEN. (MVH):
1772383.0 3738488.0 56866104.4
- 17. GROSS ELECT. ENERGY GEN. (MVH):
573700.0 1209000.0 182458u0.0
- 18. NET ELECTRICAL ENERCY GEN. (MWH):
544633.0 1148384.0 17191708.0
- 19. UNIT SERVICE FACTOR: (PERCENT) 100.0 100.0 81.9
- 20. UNIT AVAILABILITY FACTOR:(PERCENT) 100.0 100.0 81.9
- 22. UNIT CAPACITY FACTOR (DER): PCT 96.9 97.0 71.4
- 23. UNIT FORCED OUTAGE RATE: (PERCENT) 0.0 0.0 4.9
- 24. SHUTDOWNS SCHEDULED OVER NEXT SIX MONTHS (TYPE,DATE, AND DURATION OF EACH):
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 00 STARTUP:
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY
__ N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A l
l l
l 1
...___m
_.m..
4 l
i 1
UNIT SMUYDOWNS AND POWER REDUCTIces Docket me.
50-412 Unit Name SWP5 Unit #2 i
Date March T.
1991 I
Completed By M.A.
Winger f
REPORT MouTM FEsaumat 1991 Telephone
.(412) 393-7621 i
h.
Method of Licensee Cause & Corrective
[
Duration Shutting Event System Component Action to f
{
.co.
Date-Typet (nours)
Reeson2 Down acactor3 seport #
code' code 5 Prevent accurrence 1
l Cone f
I f
5 4
i t
i ~
[
t' I
4
+
1 3
l 4
i h
ir I
4 i
1 2
3 4
?
F-Forced Reesoe:
Method:
Exhibit G-instructions for S-Scheduled A-Equipment Failure (Emplain) 1-menvat
' Preparation of Bate Entry Sheets
' i S-Meintenance or Test 2-menvat scree-for Licensee Event Report (LER) File' i
C-Refueling
_3-Automatic scram (uueEG0161).
[
0-megulatory' Restriction 4-Cont'd. from Previous Month t
E-Operator Training & License Ex==
5-Redvetion 5
i 9-Other Exhibit 1-Same Source.
l
'F-Administrative.:
G-operational Error (Emptain)
[
N-Other (Emplain)
{
i i
i 3
}
1 4
2 t
i I
~ -
~, _.. _ _. _ _. _._ _. _ _....,..
e i
l AVERAGE CAILY TWIT POWFR LEVEL l
1 DrAet No. 50-412 1
Unit BVPS Unit 2 j
Date j$ar d 7. 1991 j
Ccmpleted W M. A. Winaer Telephone (412) 393-7621 1
1
!Dml FI21RUARY_199.1 DAY AVERAGE DAILY POWER LEVEL DAY.
AVERAGE DAILY POWER LEVEL
(!We-Net)
(l@e-Net) 1 807 17 811 i
2 807 18 811 i
i 3
811 19 807 1
4 811 20 811 t
5 811 21 811 l
6 811' 22 807 7
815 23 811 t,
1 8
811 24 802 9
815 25 811 10 815 26 811 11 811 27 811 I
12 811 28 807
?
i 13-807 1
14 811 i
15 815 t
16 815 INSIRUCTICNS l
t On this format, list the average daily unit power level in PWe-Net for each day in the reporting month. - Ctmpute to the nearest whole megawatt.
i i
l l
I y.+mm,,-.-.r.z-
--,,v e,--.,,..,
.,,-y__..,y,,..,_..m..,,_,m.,_,.,..
r...r.yr.,_m.g
__-c,
..,-..#-..,.m.4,....c.,.-r-ww----*
- w.----
-.---E+-=-w?-+.--/