ML20071M036: Difference between revisions
Jump to navigation
Jump to search
StriderTol (talk | contribs) (StriderTol Bot insert) |
StriderTol (talk | contribs) (StriderTol Bot change) |
||
| Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:5 f | {{#Wiki_filter:5 f | ||
.n | |||
.y | |||
I "" | % T! f' is I "" | ||
ej.yb | ej.yb ej | ||
...,. x | |||
-.s ROCHESTER GAS AND ELECTRIC CORPORATION | |||
* 89 EAST AVENUE, ROCHESTER, N.Y.14649 GINNA STATION | * 89 EAST AVENUE, ROCHESTER, N.Y.14649 GINNA STATION August 6, 1982 | ||
August 6, 1982 | ....cm,... | ||
sao2700 Director, Office of Minacement Information and Procram Analysis U.S. NUCLFAR REGJIKIORY CONISSION Washington, DC 20555 | |||
==Subject:== | ==Subject:== | ||
| Line 31: | Line 32: | ||
==Dear Sir:== | ==Dear Sir:== | ||
Pursuant to our Technical Ebecification 6.9.1, attached herewith is the monthly operating status report for Ginna Statim for the mcnth of July, 1982. | Pursuant to our Technical Ebecification 6.9.1, attached herewith is the monthly operating status report for Ginna Statim for the mcnth of July, 1982. | ||
Very truly yours, h1 | Very truly yours, h | ||
h1 uce A. Srow P3 ant Superintendent BAS /lm3 1 | |||
Attachments | Attachments cc: | ||
Mr. Bonald C. Haynes NRC (1) | |||
[h i | [h i | ||
l l | l l | ||
B209240231 B20806 j | |||
PDR ADOCK 05000244 i | |||
R PDR L}} | |||
Latest revision as of 06:14, 15 December 2024
| ML20071M036 | |
| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 08/06/1982 |
| From: | Snow B ROCHESTER GAS & ELECTRIC CORP. |
| To: | NRC OFFICE OF RESOURCE MANAGEMENT (ORM) |
| Shared Package | |
| ML20071M040 | List: |
| References | |
| NUDOCS 8209240231 | |
| Download: ML20071M036 (1) | |
Text
5 f
.n
.y
% T! f' is I ""
ej.yb ej
...,. x
-.s ROCHESTER GAS AND ELECTRIC CORPORATION
- 89 EAST AVENUE, ROCHESTER, N.Y.14649 GINNA STATION August 6, 1982
....cm,...
sao2700 Director, Office of Minacement Information and Procram Analysis U.S. NUCLFAR REGJIKIORY CONISSION Washington, DC 20555
Subject:
mnthly Deport for July,1982 Operating Status Informaticri R. E. Ginna Nuclear Power Plant Unit No.1 Docket No. 50-244
Dear Sir:
Pursuant to our Technical Ebecification 6.9.1, attached herewith is the monthly operating status report for Ginna Statim for the mcnth of July, 1982.
Very truly yours, h
h1 uce A. Srow P3 ant Superintendent BAS /lm3 1
Attachments cc:
Mr. Bonald C. Haynes NRC (1)
[h i
l l
B209240231 B20806 j
PDR ADOCK 05000244 i
R PDR L